HomeMy WebLinkAboutDistrict Wood Heating in Fort Yukon R3 DOE-EA-1922-FONSI-2013 REF Grant 7030021Department of Energy
s�
g Golden Field Office
1617 Cole Boulevard
Golden, Colorado 80401-3393
FINDING OF NO SIGNIFICANT IMPACT
COMBINED POWER AND BIOMASS HEATING SYSTEM AT FORT YUKON, ALASKA
DOEIEA-1922
AGENCY: U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable
Energy (EERE)
ACTION: Finding of No Significant Impact (FONSI)
SUMMARY: DOE is proposing to provide federal funding to the Council of Athabascan Tribal
Governments (CATG) to implement a community Combined Power and Biomass Heating
System' (Proposed Project) to be constructed by the Gwitchyaa Zhee Utility Company (GZU),
an entity that is owned and operated by the Gwitchyaa Zhee Corporation (GZC). GZU also has
been selected to receive financial assistance via grants from the Denali Commission and the U.S.
Department of Agriculture Rural Utility Service (RUS) High Energy Cost Grant Program.
DOE, in cooperation with the Denali Commission and RUS, has completed an Environmental
Assessment DOEIEA-1922 (EA) to evaluate the potential environmental impacts of providing
federal funding to implement a community Combined Power and Biomass Heating System and
wood harvesting program in Fort Yukon, Alaska. The analysis provided in the EA supports
DOE's determination that providing federal funding for the Proposed Project will not
significantly affect the quality of the human and natural environment. The EA is hereby
incorporated into this FONSI by reference.
The Proposed Project involves the construction of a new combined heat and power (CHP) plant
containing a diesel -fueled electrical generation plant with a heat recovery system and a high
efficiency boiler fired by wood chips, a wood chip storage area, a shop to protect and work on
equipment, biomass harvesting equipment, and a district heating loop to distribute heat to local
buildings. The proposed CHP plant would replace the existing diesel -fueled power plant in Fort
Yukon, and offset 80 to 100 percent of the diesel fuel oil currently used to heat buildings to be
Prior to the issuance of this FONSI, DOE authorized CATG to use a percentage of the federal funding for
preliminary activities, which include system design, boiler permitting, negotiation of landowner agreements and
donations, and preparation of this EA. These activities are associated with the Proposed Project and do not
significantly impact the environment nor represent an irreversible or irretrievable commitment by the DOE in
advance of this funding for CATG's Proposed Project.
Finding of No Significant Impact
DOEIEA-1922
1
served by the heat distribution system. To provide fuel for the new boiler, approximately 1,600
to 2,000 green tons of woody biomass would be harvested each year from surrounding private
lands owned by GZC. Operation of the proposed Combined Power and Biomass Heating System
would help stabilize volatile fuel prices and provide economic development in Fort Yukon
through the development of a local wood products industry.
DOE places a strong emphasis on avoiding, minimizing, and mitigating potentially adverse
environmental impacts. As set forth in section 2.2.5 of the EA, CATG has committed to
incorporating mandatory project design. criteria (e.g. applicant committed measures) which are
intended to ensure that the potential for adverse impacts to natural and cultural resources are
minimized if not eliminated. CATG's commitment to obtain and comply with all appropriate
federal, state, and local permits required for the project and to minimize or avoid potential'
environmental effects to biological resources, soils, wetlands, air quality, noise and cultural
resources through the implementation of applicant committed measures detailed in section 2.2.5
of the EA, shall be incorporated and enforceable through DOE's financial assistance agreement.
Context of Potential Impacts
CATG's Proposed Project seeks to implement a community Combined Power and Biomass
Heating System in Fort Yukon, Alaska. The proposed Combined Power and Biomass Heating
System involves the construction of a new CHP plant, a wood chip storage area, a shop to protect
and work on equipment, biomass harvesting equipment, and a district heating loop to distribute
heat to local buildings. The new CHP plant would be constructed on a partially developed site
owned by the GZC within Fort Yukon near the airport. Construction and acquisition of all
project components would disturb approximately 10 acres within Fort Yukon and would take 12
to 18 months.
To provide fuel for the new CHP boiler, approximately 80 to 100 acres of forest would be
harvested per year during the first 40 to 50 years of the Proposed Project to provide the
approximately 1,600-2,000 tons of wood chips needed to operate the biomass boiler. The
woody biomass would be harvested each year from surrounding private lands owned by GZC.
For the first five years, all harvesting would take place within five miles of Fort Yukon. The
harvested trees would represent approximately 33 percent of the annual sustainable harvest area
on GZC owned lands within the five mile radius. For the remainder of the Proposed Project,
biomass harvesting would occur within 10 miles of the community.
Because the effects of the project are limited to the local geographic area; intermittent in
duration; small-scale in nature; and the applicant committed measures listed in Chapter 2.2.5 of
the final EA are designed specifically to minimize or eliminate potential environmental effects to
biological resources, soils, wetlands, air quality, noise and cultural resources, DOE has
Finding of No Significant Impact
DOE/EA-1922
2
determined that there would be no direct, indirect, or cumulative effects of sufficient size or
duration to be significant at the local, regional, or national level.
Intensity of Potential Impacts
The following discussion is organized around the ten (10) intensity factors described in 40 CFR
1508.27, which refers to severity of impact. The intensity of effects considered is in terns of the
following:
l) Impacts that may be both beneficial and adverse
In the EA, DOE analyzed and considered the beneficial and adverse impacts for the
implementation of the Proposed Project. The Proposed Project would result in negligible to
minor direct and indirect adverse impacts on the environment, and would have beneficial impacts
on air quality and socioeconomics in the region. Applicant committed measures have been
established to minimize or eliminate potential adverse impacts to biological resources, soils,
wetlands, air quality, noise and cultural resources
The EA evaluated adverse effects of this project separately from beneficial effects, to determine
whether such potential adverse effects would have been significant in their own right, and no
such effects were found to be significant. In no cases did the analysis in the EA use beneficial
effects to offset the potential significance of any adverse effect. In addition, the analysis in the
EA did not use any long term beneficial effects to offset the potential significance of any short
term adverse effects.
1) The degree to which the proposed action affects public health or safety:
In the EA, DOE found that there would be no disproportionately high or adverse human health or
environmental effects related to the proposed project. Worker exposure to health and safety risks
would be minor during construction and operation activities. Biomass harvesting would occur
when rivers are either frozen or at a low enough level so as to not endanger workers or
equipment. No environmental health risks or safety risks associated with the Proposed Project
would disproportionately affect children. Overall impacts to human health and safety from the
Proposed Project would be minor. The Proposed Project would not be a likely target for
intentional destructive acts that could further affect public safety. Based on the analysis in the
EA and supporting record, the Proposed Project will not cause any significant effects on public
health and safety.
3) Unique characteristics of the geographic area such as proximity to historic or cultural
resources, park lands, primefarmlands, wetlands, wild and scenic rivers, or ecologically critical
areas:
The proposed CHP site has no known unique or significant geographic resources or
Finding of No Significant Impact
DOE/EA-1922
3
characteristics. However, wetlands are common in the area surrounding Fort Yukon, and are
present within and adjacent to some of the timber stands proposed for harvesting. Timber within
those wetlands would not be harvested, and the project would avoid disturbing soils within and
adjacent to wetlands. As supported by the EA, this project would not cause any adverse effects
on unique characteristics of the geographic area.
4) The degree to which the effects on the quality of the human environment are likely to be highly
controversial:
The Proposed Project is backed by broad -based community support. Energy cost stabilization
and savings realized by the project would stay in Fort Yukon and would pay for creating jobs,
infrastructure, and maintenance and replacement of the new district heating system, as needed.
No public comments were received on the Draft EA when it was available for public review.
Accordingly, the effects of the Proposed Project are not highly controversial.
5) The degree to which the possible effects on the human environment are highly uncertain or
involve unique or unknown risks:
Applicant committed measures, an adaptive management program implementation, standard
practices, and monitoring will ensure effects are within the expected parameters (EA, Chapter 2).
Accordingly, the effects of the Proposed Project are not highly uncertain, nor do they involve
unique or unknown risks.
6) The degree to which the action may establish a precedent for future actions with significant
effects or represents a decision in principle about a future consideration:
Neither scoping nor public comment for the Proposed Project raised any disputes pertaining to
the appropriate scope of the Proposed Project, connectedness of other actions, or reasonably
foreseeable future actions. The Proposed Project would increase the energy independence of
Fort Yukon, as well as result in energy cost stabilization and savings which could motivate other
rural communities in Alaska to seek similar energy independence, as well as long-term access to
reasonably priced electric power. However, the impacts associated with the Proposed Project me
intermittent and of small scale, and it is unlikely that the project would establish a precedent for
future actions with significant effectsin other communities.
7) Whether the action is related to other actions with individually insignificant but cumulatively
significant impacts:
The Proposed Project would result in negligible to minor direct and indirect adverse impacts on
the environment, and would have beneficial impacts on air quality and socioeconomics in the
region. Because the direct and indirect impacts of the project would be small, the contribution of
the Proposed Project to the cumulative effects from all reasonably foreseeable future projects
Finding of No Significant Impact
DOE/EA-1922
4
generally also would be small. DOE evaluated the Proposed Project in the context of other past,
present and reasonably foreseeable actions (EA, Chapter 4). When considering other activities
within the area affected, the cumulative impacts of the Proposed Project could contribute minor
impacts to the cumulative adverse effects on biological resources, concentration of re -suspended
particles in the air, and noise levels, but otherwise would have no more than a negligible
cumulative effect. As supported by the discussion in the EA, DOE concludes the cumulative
impacts of the Proposed Project would not be significant, and the proposed activities are not
related to other actions, that when combined, would have significant impacts at the local or
regional scale.
8) The degree to which the action may adversely affect districts, sites, highways, structures, or
objects listed in or eligible for listing in the National Register of Historic Places (NRHP) or may
cause loss or destruction ofsignificant scientific, cultural, or historical resources:
An adaptive management program is being established by the CATG Natural Resources
Department to continually improve the inventory model and to manage all aspects of the
proposed biomass harvest and forest regeneration. Prior to harvesting a site, the GZC and CATG
Natural Resources Department would determine if the area contains sensitive tribal resources. If
such resources are determined to occur, harvesting would be excluded from the affected areas.
The Alaska State Historic Preservation Office under the Alaska Department of Natural
Resources Office of History and Archaeology confirmed that no historic properties would be
affected by the proposed CHP plant or the heat distribution system and issued concurrence in a
finding of no adverse effect to historic properties from the proposed harvesting activities and use
of the initial storage area.
Accordingly, DOE concludes the Proposed Project would have no adverse effects on NRHP-
listed or eligible districts, sites, highways, structures, or objects and would not cause the loss or
destruction of significant scientific, cultural, or historical resources.
9) The degree to which the action may adversely affect an endangered or threatened species or
its habitat that hay been determined to be critical under the Endangered Species Act (ESA) of
1973:
There would be no significant adverse impacts to threatened, endangered, or State of Alaska
sensitive species or associated habitat within the assessment areas. The U.S. Fish and Wildlife
Service (USFWS) was consulted in the development of the EA, as per the requirements set forth
in Section 7 of the Endangered Species Act. The USFWS Fairbanks Fish and Wildlife Office
indicated that no listed or candidate species, nor any critical habitat, occur within Fort Yukon or
its vicinity. In addition, no state -listed species occur in or near the project area. DOE therefore
concludes that construction and operation of the CHP plant and associated facilities, as well as
biomass harvesting activities, would not affect any species listed or proposed for listing as
Finding of No Significant Impact
DOE/EA-1922
5
threatened or endangered
Additionally, to comply with the Migratory Bird Treaty Act and the Bald and Golden Eagle
Protection Act, biomass harvesting activities would incorporate USFWS survey and buffer
recommendations. DOE therefore concludes that there would be no significant impacts to either
migratory birds or bald and golden eagles as a result of the Proposed Project.
10) Whether the action threatens a. violation offederal, state, or local law or requirements
imposed for the protection of the environment. -
The project proponent has committed to obtaining and complying with all appropriate federal,
state, and local permits required for the project and to minimize potential impacts through the
implementation of applicant committed measures (EA, Chapter 2). The Proposed Project does
not violate any federal, state, or local law or requirement imposed for the protection of the
environment.
FLOODPLAIN STATEMENT OF FINDINGS: A portion of the proposed activities that
make up the Proposed Project are located in the 100-year floodplain of the Porcupine and Yukon
Rivers; therefore, DOE conducted a floodplain assessment pursuant to Executive Order 11988,
"Floodplam Management', and DOE implementing regulations at 10 CFR Part 1022,
"Compliance with Floodplain and Wetland Environmental Review Requirements." This
assessment is presented in the EA, Chapter 3.
The proposed location of the CHP plant, much of the heat distribution system, and the wood
storage areas are within the 100-year floodplain. Because most developed areas in Fort Yukon,
including the facilities to be serviced by the heat distribution system, are within the 100-year
floodplain, it would not be practicable to locate the CHP plant and other aspects of this project
outside of the floodplain. Therefore, alternative locations outside of the floodplain are not a
viable option. Construction of the earthen pads to elevate the CHP plant and wood storage area
would result in a small loss of floodwater storage area within the floodplain, which could cause
an increase in the elevation of floodwater in the area. Any increase in the elevation of
floodwater resulting from the presence of those facilities would be small, and associated impacts
of flooding would be negligible, because the pads would be small relative to the size of the
floodplain in the area and because the floodplain within and near Fort Yukon is unconfined.
The Proposed Project would be designed to minimize potential harm to or within the floodplain,
would negligibly increase the risk or severity of flooding of other properties, and would only
minimally affect the natural and beneficial floodplain values in the area. Therefore, DOE
expects no long-term adverse direct or indirect impacts to the beneficial values of the 100-year
floodplain of the Porcupine and Yukon Rivers.
Finding of No Significant Impact
DOE/EA-1922
6
CONCLUSION: Based on the EA and the above considerations, DOE finds that providing
federal funding for the Proposed Project is not a major action that constitutes a significant effect
on the human environment. This finding and decision is based on the consideration of DOE's
NEPA implementing regulations (10 CFR Part 1021) and the Council on Environmental
Quality's (CEQ) criteria for significance (40 CFR 1508.27), both with regard to the context and
the intensity of impacts analyzed in the EA. Accordingly, the Proposed Project does not require
the preparation of an environmental impact statement.
For questions about this FONSI or the Final EA, please contact:
Casey Strickland
NEPA Document Manager
U.S. Department of Energy
Golden Field Office
1617 Cole Boulevard
Golden, Colorado 80401
gonepa@go.doe.gov
For information about the DOE NEPA process, please contact:
Office of NEPA Policy and Compliance
U.S. Department of Energy
1000 Independence Avenue, SW
Washington, DC 20585
http://energy.gov/nepa/office-nepa-policy-and-compliance
Issued in Golden, Colorado this & day of May, 2013.
Carol J. Battershell
Manager
Finding of No Significant Impact
DOE/EA-1922
7