Loading...
HomeMy WebLinkAboutManley Hot Springs Geothermal Plant Progress Report 2010 REF Grant 2195421Wky fbt SpAgs Geahems! Phm GmMAWwmeW*n2A21 ttac me et 2 Flogress Report Fern, Grantee: TDX Power, inc, Project Name: tv.Ilanley Hot Springs Geothermial Plant Period of Report: Aug 20, 2008 to Feb 01, 2010 V / March 05, 2010 Project Activities Completed: Task V is complete. The aeromagnetic survey was performed in 2009. The results are included in the report provided to AEA in February 2010. Task #2 is complete. Local well information was included in the report provided to AEA in February 2010. This task will be invoiced at a later date. Task #3 is complete. The results from the RaMPS - ground -based resistance survey are included in the same report. Task #4 is currently being performed. Existing or Potential Problems: _DX Power is looking for additional funding to fulfill the malach requirements in order to continue with the project. Activities Targeted for Next Reporting Period: Task #2 "acquire local well information" will be finalized and invoiced. By the end of March 2010, we are expected to finalize the cost and risk analysis of proceeding with the next phase of the project. The next step would be ic, drill a test well at the near surface magnetic anomaly identified in the report. Submitted by: Martin Miller TDX Power 907 762 0479 907 382 5630 Page 29 of 311