Project activities completed
• Acquired topographic mapping (by Sentec)
• Developed preliminary arrangement of project features
• Prepared request for FERC jurisdictional determination
• Prepared responses to FERC requests for additional information
• Coordinated with SSRAA regarding preliminary project arrangement and potential impact
mitigation measures
Project existing or potential problems:
• FERC determination resulted in increased licensing, permitting, and design requirements
rendering this project economically unfeasible.
Activities targeted for the Next Reporting Period, First Quarter 2011:
• Project terminated .