HomeMy WebLinkAboutRuby Hydrokinetic Construction Progress Report 2011 REF Grant 2195402Ruby Hydrokinetic Construction
Grant Agreement #2195402
Attachment 2 Progress Report Form
Grantee: Yukon River Inter-Tribal Watershed Council
Project Name: Ruby Hydrokinetic Construction
Grant # 2195402
Period of Report: April 16 2011 to June 30 2011
Project Activities Completed:
-Secured river anchoring system in Yukon river at Ruby to reuse as
necessary in future deployments
-Removed underground electrical wiring from Ruby shore landing
site to point of electrical grid connection
- Removed interconnection equipment from site marine cable
landing to the electrical grid tie
-Removed turbine from Ruby and sent to Nenana for use in UAF
fisheries studies
-Assisted with retrofitting of turbine barge for fisheries studies
-Facilitated installation of turbine at the UAF museum of the north
for energy display
-Removed all hydrokinetic equipment from Ruby and completed
final report to Ruby Tribal Council/City of Ruby
Existing or Potential Problems:
N/A
Activities Targeted for Next Reporting Period:
Continue to use the YRITWC’s experience and equipment to assist
with hydrokinetic work throughout the state.