Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Tazlina Biomas docs 2017
DISTRICT HEAT SYSTEM BIOMASS BOILER TAZLINA,ALASKA °GARN WHS-2000 CORDWOOD-FIRED BOILER IN 40'MODULE *COVERED STORAGE FOR 50 CORDS OF FIREWOOD e 350+LF DISTRIBUTION PIPING TO (5 EA)COMMUNITY BUILDINGS e INSTALLATION OF (4 EA)COMMUNITY BUILDING HEATING SYSTEMS e (2 EA)FUTURE HEATING SYSTEM CONNECTION POINTS In Cooperation with: Renewable Energy Grant (AEA-#18004) Native Village of Tazlina (NVT) and Alaska Energy Authority NOVEMBER 2017 95%ISSUED FOR REVIEW SHEET INDEX No.Tille PRG.ECT LOCATION PO BOX C548 AHONORAGE.AK S923 PHL O07-345-NEAE Fak:BEP-349-1015 Location Map Consultant RECORD DRAWING CERTIFICATE THESE DRAWINGS REFLECT RECORDED INFORMATION OBTAINED DURING CONSTRUCTION. INFORMATION PROVIDED HEREIN IS ACCURATE TO THE BEST OF MY KNOWLEDGE. bate Construction Foreman FINAL GESIGA ANF APPROVAL Censtruction Period An Ruits (wate)2n17 (Date) Ct rern)__{is)_. (Dote} COVER SHEET AND SHEET INDEX GtO0 GFNERAI NOTFS G11 SCOPCITGCNN,DESHSN CRITERIA ANU CODE DAIA G20 COMMUNITY MAP AND PROJECT AREA G21 SURVEY CONTROL DOCUMENT CIVIL DRAWINGS: C114 OVERALL SITE PLAN 1.2 SITE PLAN C21 ARCTIC BOX,PIPC TRONCH DETAILS C22 ARCIIC 8OX CONSTRUCTION ARCHITECTURAL DRAWINGS: A141 ELEVATIONS -BIOMASS MEAT MODULE A12 FLOORPLAN BIOMASS HEAT MODE Al3 (NOTUSED) Al4 SiCTIONS AND DCTAILS -BIOMASS HEAT MODULE STRUCTURAL DRAWINGS: $01 STRUCTURAL NOTES $1.1 ENDWALL SECTION $24 FOUNDATION Pi AN $31)GARN WOOO HFATER SECTION &DETAIL MECHANICAL DRAWINGS: M11 LCGCNDS,ABBREVIATIONS,SCHEDULES M12 MECHANICAL SCHEDULES M31 BIOMASS HEAT MODULE -MECHANICAL PLAN M320 TVG OFTICE -MOCHLANICAL PLAN M330 TVC COMPURETY BUILDING -MECHANICAL PLAN M34 TVE CLINIC -MECHANICAL PLAN M35 TVC SHOP MECHANICAL PLAN MB10 MFCHANICAL POTAIS -RIGMASS HEAL MOUULE ELECTRICAL DRAWINGS: E17)FLOCTRCAl 1 OGPND&REQUIREMENTS£21 ELECTRICAL SITE PLAN E31 ELECTRICAL POWER &SICNAL PLANS E41 ELFCTRICAL DIAGRAM &NETAN S GENERAL NOTES PERFORM ALL WORK IN ACCORDANCE WHIH IHL LAILSF SIAL OF ALASKA AUOFILO LUITION OF THE INTERNATIONAL FIRE CODE,THE INTERNATIONAL MECHANICAL CODE.THE INTERNATIONAL 8UILDING CODE,AND THE NATIONAL ELECTRICAL CODE INCLUDING STATE OF ALASKA AMENUMLNIS.COMPLY WIHEH ALL APPLICAULL STATE ANDOF CULRAL REGULATIONS. THL URAWINGS ARE DIAGRAMMATIC AND DO NOT NECESSARILY SHOW ALL FEATURES OF THE REQUIRED WORK.PROVIDE ALL LABOR.EQUIPMENT AND MATERIALS REQUIRED FOR A COMPLETE SYSTEM VERIFY EXISTING FIELD CONDITIONS PRIOR TO STARTING CONSTRUG HON,IMMLUOUATLLY CONTAGT THE ENGINEER FOR CLARIFICATION OF QUESTIONABLE ITEMS OR APPARENT CONFLICTS. ALLITEMS SHOWN ARE NEW UNLESS SPECIFICALLY INDICATED AS EXISTING.INSTALL ALL MATERIAL AND EQUIPMENT IN ACCORDANCE WATH MANUFACTURER'S RFCOMMFNNATIONS,INSTRUCTIONS,AND INSTALLATION DRAWINGS UNLESS INDICATED OTHERWISE. PERFORM WORK VATH SKIi 1 FD GRAFTSMEN SPECIALIZING IN THE REQUIRED WORK.INSTALL ALL MATERIALS IN A NEAT,ORDERLY,AND SEGURE FASHION,AS REQUIRED BY THESE SPECIFICALIONS ANU COMMONLY RECOGNIZED SIANUARDS OF GOOD WORKMANSHIP, MARK UP DESIGN DRAVANGS TO REFLECT FIELD CHANGES THROUGHOUT CONSTRUCTION.TURN OVER 'RED LINE CONSTRUCTION DRAWINGS TO ENGINEER AT COMPLETION OF THE PROJECT. NOT ALL UTILITIES MAY BE SHOWN ON THE PLANS FIFEQ LOCATE ALD FXISTING UTIITIFS BEFORE BEGINNING CONSIRUCHON PROILCEUIINESATALLFIMESDURINGCONSTRUCTION,REPAIR ANY DAMAGE IN ACCORDANCE VATH THE RESPECTIVE UTILITY COMPANIES REQUIREMENTS PROVIDE ANT MAINTAIN ALE SIGNS,BALUCADI $ANT]WARNING LIGHTS AND OTL PROMLCTIVE DEVICES NECESSARY FOR SAFETY Alf WURK SHALL BE PERFORMED IN ACCORDANCE WITH US.ENVIRONMENTAL PROTECTION AGENCY,ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION,AND STATE &FEDERAL OCCUPATIONAL HEALTH AND SAFETY REGULATIONS. COORDINATE WORK REQUIRED BY THIS PROJECT \WMITH OTHER CONTRACTORS IN THE ARFA,HIS SHIRCONTRACTORS,THE OWNER,STATE AND TCOCRAL AUTIIORITIES. THE SPECIFICATION OF A NAME BRAND PRODUCT FOLLOWED BY THE "OR EQUAL'PHRASE IS DONE MERELY 10 ESFASLISH THE MINIMUM LEVEL OF QUALITY OF MATERIALS AND EQUIPMENT REQUIRED AND IS NOT A PRODUCT ENDORSEMENT SUBMIT SUBSTITUTIONS FOR REVITW AND APPROVAL,UNLESS "NO SUBSTITUTIONS [S SPECIFIED.SUBMIT VENDORS LIST WITH A LIST OF EQUIPMENT TO BE PROVIDED BYEACHVENDOR.PUT OPERATION AND MAINTENANCE:LITERATURE PACKED WITH MATERIALS AND EQUIPMENT IN A BOX ON SITE FOR ENGINFFR AT SURSTANTIAL COMPLETION INSPECTION. INSTALL FIRE EXTINGUISHERS WHERE INTICATED FIRE EXTINCUISHERS SHALL HAVE A MINIMUM RATING OF 3-A,40-B:C TESTING,START-UP,ANO COMMASSIONING 1 PERFORM SYSTEM TESTING.STARTUP,AND COMMISSIONING IN ACCORDANCE WITH THE FOLLOWING PROCEDURES.LEAVE ALL WORK SITES IN AN ORDERLY CONDITION CONSISTENTVATH THAT FOUND UPON ARRIVAL 2.PRESSURE IESI ALL PIPING WIIH AIK 10 60 PSI.ISOLATE PIPING SECTIONS AS APPROPRIATE.CHECK FOR LEAKS VATH SOAP SUDS.PRESSURIZE FOR AT LEAST ONE HOUR.FILL OUT AEA PIPELINE PRESSURE TEST REPORT.DO NOT PRESSURIZE CARN HYORONIC HEATER VATH AIR. 3.FILL HEATING SYSTEM SECONDARY SIDE PIPING VATH A 50/90 MIX OF INHIBITED PROPYLENE GLYCOL MWATFR PROPYLENE GLYCOL,DOW ROST OR APPROVED EQUAL.WATER.TREATEDAS REQUIRED TO BE SERVICEABLE IN HYDRONIC HEATINGSYSTEMSWITHNOADVERSEEFFECTSONSYSTEMCOMPONENTS. 4.CHECK ALL PUMPS FOR PROPER OPERATION.ENSURE THAT EACH PUMP IS FLCODED WATH HEAT TRANSFER FLUID BEFORETESTINGOONOTRUNDRYONCETHESYSTISINOPFRATION,CHECK THF OPFRATING CURRCNT ON CACH PUMP MOTOR AND VERIFY THAT IT FS VATHIN THE NAMEPLATE RATING OF THE PUMP. §ONCE THO HCATING SYSTIM IS IN GPCRATION AND WARM FOR AT LCAST 2 HOURS,SCT HYORONIG FLOW RATES WITH BALANCING VALVES AT THE HEATING LOADS,PER FLOWS SPECIFIED IN SCHEMATICS ON SHEETS M1 1 THROUGH M14. G.THE ENGINEER SHALL PERFORM STARTUP AND COMMISSIONING ON THE GARN HEATING SYSTEM. 7.INSTRUCT LOCAL SYSTEM OPERATORS ON PROPER OPERATION AND MAINTENANCE PROCEDURES FOR THE EQUIPMENT,AND STORE LEFT OVER MATERIALS AND SPARES IN SECURE LOCATION OF OWNER'S CHOOSING WOOD {.PRESSURE TREATED TIMBERS SHALL BE BE HEM FIR NO.2 OR BETTER VATH PRESSURE TREATMENT IN ACCORDANCE VATH AWPA STANDARN LP-22,0 60 MINIMUM RETENTION,RATED FOR GROUND CONTACT FIELO TREAT CUT ENDS IN ACCORDANCE WITH AWPA STANDARD M4. 2.ARCTIC BOXES SHEATHING SHALL BE 11-11,S/u'THICK,VATH GROOVES SPACED ON &CENTERS 244 LUMBER NOf IN CONIAC I WITH GROUND SHALL BE 42 HEM-FIR OR BETTER. PIPING AND FITTING MATERIAL REQUIREMENTS 4.UNDERGROUND INSULATED DISTRIBUTION PIPING SHALL BE UPONOR ECOFLEX (#5027925)THERMAL TWIN 2.$O.D.ASTM NOMINAL OR APPROVED EQUAL.OUTER JACKET SHALL BE CORRUGATED HOPE,INSULATION SHALL BE CLOSED CELL POLYETHYLENE,AND INNER PIPE SHALL BE PEX MEETING OR EXCEEDING UPONOR SPECIFICATIONS. ©CONNECIHING FIETINGS SHALL BE BRASS UPONDR 'VAPEX'OR APPROVED EQUAL.END Fil TINGS SHALL BE APPROVED BY THE INSULATED PIPE MANUFACTURER NO 'MIX AND MATCH FITTINGS SHALL BE ACCEPTED. 3.INSULATED PIPE ENDS SHALL BE COVERED WITH MANUFACTURER'S APPROVED END BOOTS AND BANOS,ANG)INSTALLED PER MANUCACTURCR'S INSTRUCTIONS. 4.ALL UNDERGROUND INSULATED PIPE SHALL BE JN ONE CONTINUOUS |FNGIM WHEW NO UNDERGROUND JOINTS.ALL CU1S IN ROLLS OF UNDERGROUND FIFE SHALL Ht CAREFULLY PLANNED TO MINIMIZE WASTE AND MISTAKES.PURCHASING OF PIPING ROLL LENGTHS SHALL BE GOVERNED BY THESE UNDERGROUND RUNS WITH NG INTTRMEDIATT JOINTS EARTHWORK 1.LOCATE ALL EXISTING UTILITIES IN IHL VICINITY PRIOR TO BEGINNING EXCAVATION.CAREFULLY LAY OUT WORK TO MINIMIZE OISRUPTION AND DAMAGE TO EXISTING STRUCTURES PCRIOORAA ALL WORK IN ACCORDANCE VATH OSHA REQUIREMENTS. BARRICADE OPEN EXCAVATIONS TO PROHIBIT PUBLIC ENTRY. 2? AACKFIE CXCAVATIONS VATH CLCOAN EXCAVATED MATERIAL,LOCAL PIT RUN GRAVEL OR IMPORTED GRAVEL AS INDICATED. MATERIAL SHALL BE NON FROST SUSCEPTIBLE OE€TAILS ARE SHOVWN IN THE PLANS. CORDWOCD-FIREO HEAT MODULE 1 PEL (ARN WHS-2100 FLAT MODULE SHALL BE FABRICATED UNIT,CONSTRUCTED IN ACCORDANCE VATH THE DRAWINGS THE UNIT SHALL BE HOUSED IN AN OCEAN SHIPPING CONTAINER.40 FT LONG X @ FT WIDE BY 95 FT HIGH RESORCDASVANGCERTIFICGTETHESED2AUAKGSJEF.ECTRECORDEDCOUARSCONSTRUCT.Ch,INF3evaNONPROVICEDPERSINSBACCUMATETC"4BESTOFW¥IRFCAMATCeCBRTAINKNOWLECGEGateKRAZESCALB-ASSPC.eenteeOaeA.ATEVSTEMotSTRICTGENERALNOTESTAZLINA,ALASKAENGINEERS,INC.C_--=REVISiCN|Be|OATEpy27aMPowAawroewd SCOPE OF PROJECT THIS PROJECT WILL CONSTRUCT A CORUWOULH+IRED DISTRICT HEATING SYSTEM JN THE VILLAGE OF TA7LINA THAT WILE HEAT FOUR CAC)COMMUNITY BUILDINGS. THOSE BUILDINGS ARE: 1.COMMUNITY HALL BURLOING 2?IRIBAL OFFiCe 3.VILLAGE CUNEC 4.SHOP BUILDING (TENT FRAME) CONNECTION POINTS ARE ALLUWED fF Ure «FUTURE GREENHOUSE SOUTH OF HEATING SYSTEM AND WOOD STORAGE COMPLEX «FUTURE GENERATOR ADOM IN EXISTING STORAGE BUILDING ADJACENT TO THE COMMUNITY HALL BUILDING A SINGLE GARN WHS.2000 CORGYWVWOOD-FIRED HYDROMIC HATING UNIT INSJAI7 EU IN AN INSULATLD40 FT LONG SHIPPING CONTAINER WILL BE COMBINED WITHA SEPARATE 40 FT LONG CONTAINTR "THE 1 WU PARALLEL CONTAINERS WILL GE SEPARATED BY A 20 FT SPACE AND COVERT BY AMODULAR ROOF SYSTEM TO FORM A 50 CORD WOOD STORAGE AREA. HEAT Wa)RE LIS TRIBUILD TO TL DUILDINGS THROUGH UNDERGROUND INSULATED HEAT PEX UNES USING THE UPONOR FCASEI EX 2-127 [HERMAL 7¥MN PIPING SYSTEM TO ARCTIC BOXES ON EACH BUILDING SFRVEN. LEGEND EXISTING PROPOSED DESCRIPTION -=a-a)WOU PLAS -SUPFLY FROTURN @Iirsr tits >.CARVERT ee ae ----a 4 FURTED ELECTRICAL UNE --Poo ee CVE READELECING a UNUTY FOF [||ROADS AND FAD---=_- wo -mMe ane CONTOUR LINE CL,Cr BRU AL _-ee vee eae DvTert Lint - --ee te DIRECTIONOF NRAINAGE --PROPERTY Une e FOUND2°DIA AL LEANN CAD ON Sit Ms RCRA ©OUND F°DA YELLOW PLAETIC CAD Cr 58"rhea PORAR ¢SET SURVET MARK NAL +ROUw Sere DESIGN CRITERIA BUILDING CES'GN HUQ SNOW LOAD {Py}2WINDSPEED SCP ATRUCIUHAD NOES SEISMIC DATA 5 SOM BEARING CPACITY 2500 PSF MIN ANNUAL DDCGREF QaArS 43.797 FOR HEATING DESHIN TEMP 40°F, INTERIOR LIVE LOAD 125 PSP 2012 (UT OCCUPANCY CeaASSIFICATION Ft TYPE OF GINS IRUCTION V-6 NON RATED SUILDING AREA VarOD HEAT MCR SAS.Fe 8S0Q0SO.FT.TABLE £03 FIRE SPRINKI FRE NUE)REQUPRLE POR 2006 10C SCC 93323 DISTANGE TH PROFERIT LINE X40,FOR V-0 CONSIRUCTION PIR}RESISTANT LALOR WALL NOT REQLURED,PER TABLE 602 FIRE EXTINGUISHERS (2)3 A-40-000 gf OS PER IFC SEL 9064 gEa eeBL«x a.Al2@PeetFESSBobazePepe282opRrFXaoe¢&a Z°R aREV wgea8Boose23FEBELE wlzo==E24:2 = .enteea§BE$&eeSsowoa¢FrePsae Qa |2we2aaiqney"£K w ©ce)SzYiogaante) oO CODEDATA"AZLINA,ALASKAPOLOCZRANTHIRICE,AXO05PEED*XROSESLISENGINEERS,INC.REVISION|DATE:=]al zlrlBPwoé Fd viizBiggieaeon&# Breet tic ae-VOISWI WN TZ0L SUNV CNSOdUNL8HadCONEWe SENHeeTNDe a 1 pry PPA, sor ONI 'SHSSNIONG =a men AP301650 95OUALYE*DO7 sIMEH| z Wau Lo3arDud ONY Gaa20"IloCAUCHGRCUWNECANI NOUNS fren an GVW ALINAIWWOD + Faas he > BMIECG TENIVEAS NOLL ath 4 TEENToc c CIDNCSTy123"99YSONNINEC 37EHL Naoke ae Sr Or eee #1C2 AON a 3 Tivsisndi> ONWANTS GUS STe awas WALSAS IH LOaLSIC 2 za|4a Noles wali : Ye33\ si as LF ed &i.- ” Las 3 . ek33 q<= as 44733 ygte F| Bet}fFsgteEs ma EY. 73Pa zPe38 oS oaifae a siZ2 Sti erE Send z seize] iit, ehe Hla | D>a ese se zi" o Jat 2 a2iss Alia bow | BedoAPelG zgxa SN *2$28] »BF Ext g*7e : EAs 38 Bes =f345 i ae o nagE3vi3 =fg 8 ee Be a 3go agaiicil 343 445i9PES Fi ase a3i 2 asi3as if = 3ana!|ayiu| ae ira == EAPROJECTAR ewe ET ---«L.< - v Be5 ha?aeTEs wee oe NN LOT Wid PROPOSEDOAPROVEMENTS f7a?Ss -Gis” PIE EF ree 32 «LE7CF 27°OSSFog"_AL GS?£357 B77 F._ LEGEND D Found Stole BAW Mon's Oat E04 Sorke CERTIFICATE OF OFWNERS HIF We tareby cartity that we ore the fego!owners,of the property shawa ondderebeebereonasbeingpartiallysubdrusded,ond rhet we adopt this plow ofFt,LVS PGA. +:f t.Coit Te Vehie Wolya'OC.Kabsen £-o "8 aeeeeeee Frank Habsen Aylin gs .7 betrsey!Welyo HobsonGuardionforFuton Billom NOTARY S ACKNOWLIOGEMENT thtfed Sfofes of America Shorts of Alaska This ss Yo eertity that oa this doy of Moy.1478 dbefare ma,the undersigned,odelycommissionedNotaryPublicixandforheStateofAlasks,oppeared FrankFobsoaondWotyeQHabron,Lnawa by me to be the owners ond sadierduals wheenceatedtieForegoungcertifrcoreofownership. Cg es a4 CERTIFICATE OF SURVEYOR I a vezistered Lond Surveyor,hereby certify thet this plot represents the surveyperformed54méorendermydirection,ond thet aff drvvances,Bearings,ond monumentsarecorres?!Yo my taawledge ond beter.7-4 ae Mag 21,1975 Ck,Budkha Dare 309 Mieoteloa DED "FLED DENALI ENGINEERING COChibistdesearCOPPERSFNTFR,ALASKAe-ld Plsk te, Wa oyVoySs PARTIAL SUBDIVISION HOBSON PROPERTY .LOCATED IN va WO=2%.276|and PayRegsestes,or¥runks.¥enAsRlenratanrSlyancesdesires "4 SW 1/4,SECS,T.3.8,RI W.CRM. CHITINA RECORDING DISTRICT GLENNALLEN,ALASKA Scolei*200".May 1975 anavs faoszAeoeh6 E2226fy,Ee oybe5s heeBEZELRtes$828gigebewgsoge24"seeee |.F28y2 |s rt anhy§8 233 ge [i ok: ey iis =a E a)gat Fr §a=)G2rayCS)iw ¢U7 bed OQ:<wis)D>aftO>zWs}wo 3a5eo}go 8a) o wy feast B yoO:2: gi%cLYZé=Oka E Q i E =]s{sl 2ea,ny o"oa .Fs =z :BIEtigEEE820ag& Sent Mt. TAZLINA VILLAGE COMMUNITY HALL PROPOSED BURIED GLYCOL HEAT PIPING,UPONOR ECOFLEX j 2.5"ASTM THERMAL TWIN AL OF £350 LF TOTOAL) Ive STORAGE 6 --_ IPROPOSED BIOMASS HEAT MODULE AND CORDWOOD STORAGE ¥oN ' PROPOSED ADDITIONAL HEAT CONNECTIONS FOR FUTURE TVC GREENHOUSE rn os 'PROPOSED :'ARCTIC BOXES, _,TYPICAL OF 6awoe FUTURE TVG GREENHOUSE TVC STORAGE BUILDING AND ""\_EXISTING MOUNDED'\_"SN .SEPTIC DRAIN FIELD (1.\OVERALL SITE PLAN\C1.17 SCALE:AS SHOWN NORTH PROPERTY LINE HOBSON PROPERTY PLAT #76-19 \PROPOSED POWER SERVICE POLE OATERECORDDRAWINGCERTIFICATE.THESEDRAWINGSREFLECTRECORDEDCONSTRUCTION.INFORMATIONPROVIDEDHEREIN(SACCURATETOTHEGESTOFMYKNOWLEDGE.INFORMATIONOBTAINEDDURINGNAME.SCALE:ASSHOWNConk1OMEINGtSCRIARaALCEAMMESBIOMASSBOILERTAZLINA,ALASKADISTRICTHEATSYSTEMOVERALLSITEPLANPOBOX232548ANCHORAGE,AK90523PH:SO7-MO-1010FAX:907.48-1015ENGINEERS,INC.BY|DATEREVISIONPCWPCWOrawn nyqws 2 ml!Kvshagtt fFNOTE.fea ie ?ARCTIC BOX,THIS ARCTIC OX FANG IS TYPICAL SEB ARCTIC BOX RheeaSCCMECHANICALSHEE[5 FOH ALON HORSE Ut SEE #2agsihMORITIEDLOCATIONSFECIFICARCTICBOX4a=28 wyNezPIPINGREQUREMENTSE2.S|2 22 5&!¥o25a£86 oy(2)UPONGR 2°FER XZ"MIPT WAPEX PITTING a)2 389af23#5450020 geu Ze s(9)ureonon 2-192 BEX XZ MIPT WAPEX FITTING i ages |-..rr t#8550U2S (2)7 BALL VALVE FETT este 5 (2)7 BALL VALVE.IPTAFIPT 7 (3)2x 1-14 COPPER BUSHING,MIPT XC azwa@(3)7 COPPER FEMALE ADAPTER Fe Ex G a &(4)1-114"COPPER Wr.CxC bo ()PUOPPER SPeHit Cl oFee (S)1-17 COrreR THENG (5)2 eznt-t4"COPPER TEE,CxCxC .6 )-](G)unistRUT#pasat POST Base 444°TYPE L ARO COPPER TUBING (7)UNIS RUT #P 1000-7 FRAMING CHANHEL 12 GA ©)UNIS (RED &P2041 POS)BASE @)UNIS TRUT #046N0S2 2-7.1 CUSILA.CLAMPCa)UNIS TRUT #P1000-T FRAMING CHANNEL 12 GA (2)UPONOR CCOFLEX END CAP £3557975 (3)UHISTRUT #CASNCS2 2 TIBTIO CUSH A CLAMP uroNon EcorLexf-THERMAL TWH 10)UPONOR ECOFIEX FSO CAP am saoy INSULATED PING UPONOR ECOFLEX THERMAL TWIN RISULATED PIPING Sp =|of Zacfle=ereyaSrs)Ogie:4HySSinfos(+\ARCTIC BOX (TWO INSULATED PIPE CONNECTIONS)(2.\ARCTIC BOX (SINGLE INSULATED PIPE CONNECTION)4 a2 8 C2.1/scale nts G21)ecae nite ofl OreyFr #2 *ws 9 QoQ2< by = $ @ MINUS.Well GRADE GRANULAR GCOMPACTARI F RACKS L .2MATERIAL,WTH LESS THAN 20%PASSING THE #260 :UPONOR ECOPLEX THERMAL TWIN INSULATED PIPING. MOTE All TRENCHES AND OTHER FACAVA TIONS SleWet SELECIEU FHUR TRENCH EXUAVA TION OR INPORTED i a INS TALL INA WAVY LINDT CONTACTING THF VHALLS OF = SHALL BF SLOPED OR SHOPED IN ACCORDANCE COMPACT TO 80%OF MAXIMUM DENSITY i ”THE TRENCH TO ALLOWTOR THITRMAL FAPANSIOR LF ao:WITH (GHA STABTARCS an Pal THE INTERNAL HEPEX PIFING =>Ps / i wi a i :us § .om WIDE ALUMINUM BACKED DETECTAGLE WARNING TAPE.'=<%ACAUT KOS BURIED PIPELINE BEI CPAM,YET Ove WITH BLACK OoLETTERS,BURIED 12°TQ 16 BELOW GRADE CENTERED q.-éABUYEPIFESERONREY!F 885512 OR FOUAD 1 A ui 5 (arp e UPONOR ECOFLEX oH a THERMAL TVAad ||g INSULATED FING ' = |;3 WIDE TRENCH,TYP "=.PyPE BED MATERIAL SABU ;2 2 [4 3 x j | -. z(AYTYPICAL PIPE TRENCH SECTION (3\TYPICAL TRENCH PLAN VIEW il igi\C2.1]ws \CZ1/ws is §48 $ Howat Hes. /\Tvc SHOP 4 Mh IN \eeoA a a \we- v \ee w a \i ee " 0 10"oo aa eebo34\oe \ _ te ee ire eee eee _-_--e TTPROPOSEDBURIED---meGLYCOLHEATPIPING,moaTIREINORFCOFLEX2.5" NASTMTHERMAlTWN,\PROPOSED BIOMASS HEAT MOUURE.SEE TRENCH DETAK., 40 "HIGH CUBE"CONTAINER a TYPICAL \(BW Hace)C2.\ PROPOSED STORAGE CONNEX.\40 18GH CUBE™CONTAINER PROPOSED 441.50 GRAVEL PAD, et {OVATE AOL}FCMOWE O8HGANH:S AND LEVEL &2 OF NFS MATERIAL (7°MINUS)ABOVE EXISTINGyo7=e PARKING ARFA FDHIVEWAY,PROVIDE -2%SLOPL FROM DUILOING PERIMETER TYPICAL ---oe \"\aT A \ae yond " ",7 -a .Pa a ane 2 a a \we a in | »a »+\cor eenae BS p>\lb =- = : :--er -%a]| =5 7 --"TyC in __}-OeSTORAGE'aostVrast .o 'a PROPOSED /-_ we CORUVAKHD we 4}, TAZI INA VEL AGE .STORAGE _ COUNCH (Tv0)AREA -COMMUNITY HALL ' 4"ay 5) ,» TC HEALTH CLINIC a ore -- ne a '"LR ”a ne oo ia : 'ONL on welScomme 'bom4oay|'\i i *_-\{|-_-;i\1 Pruner tv j NS | .f-GHEENHOUEE '-_- y a Potts Oe eee PROPOSED)1 ADMAN ANCHORS,a ins - AL TYPICAL OF 6 EACH AT CONTAINER CORNERS,aan SEE "7 -_-a ,-- , *3h}aSatte..._PROPOSED ARCTIC DOXES (TYPICAL),1 a /noe e -an aStkMECHANICALBHEETSFOR//mm mA,aLOCATIONGPECIFICREQUIREMENTSfaaia7awi'oe --oftme.-_A ,me '_wre -_--'in Tore oes wee eee ee 1 --Lee '.i 1 \Py 1 I a '| .1 1 PROPOSED POWER FOLE-s 4 |= - .*'AND SERVICE 4 INE,SEE ee ;se MOUNDED SEPTN:i (am_-,DRAIN FIELD E21 -_-ae s .*..;2 -_- .os o : IL OPE ICE a tee ;te :AWE DEE IE ., wae me ._-7wea-_-ett---_-_-TTS mem ee eee ee m __ ee_itoorn 7 =-."-{1 \SITE PLAN .mA we XCL2f cone ap cece+N.Te nal -s EXSITING POWER SFAVKE POLE FOR CLINIC THESEOPAWINGSREF_ESTRECORDEDRESCAOOFAWINGCERTITISSTEIN®CRAATICNOBTAINEDDRINS.COHETRUCTION.BFORMATONPRIVICEDHESPNISACCURATETCTHEBESTOFLyKVOALEZDGEASENAd.teSCOLE83§SCUNrerHHA)BeDawaWeshb.attomedat=oF.88484,aehattebas,¢,RIO=C2NaaUragas®re Y el 4<a zwrdLtu|<ad Zz Q 7)5gElahes 2] Fy ;AN A 3?=: =F;gt tas: uw ziQO;ayLus x > 5 Fd 4 x r .elerl.&¢&és 2 2 5 E Sheoct Me. C1? .OvNOTES:a #z A w $.THIS 1S A GDNERAL CONSTRUCTION DRAWING FOR AN 5 8 F i"& ARCTIC BOX DIMCNSIONS CAN OT CHANGEIFIQ FI ag EESPECIFICPIPINGARRANGEMENTSARGTACHOXESMAYElabsBESHEATHEDWITHMETALSIDINGTOMATCHBUIDING4ageeSIDING: 2 3 All A MATERIAL SHAIL BE GHALIE #2 OR BETTER.a oreMOLE Oe VOTER SERVE A 3 BS '$o|zz Fi3.FLAWED CONSTRUCTION MATERIAL SHALL NOE He UEED eg)28549--2 ZINC PLATED PIANO HINGE @o«-22 i .;SECURE AIH B10 ¥/F ZINC HAGE %TH AMINATIONS,AND SPLITS CAUSED DURING BATED Pane ee 8SESASSEMBLY.SCREW. 4.ALL"2X"MATERIAL SHALL BE FASTENEO 70 PLYWOOO .|AND Tt1-11 WITH #8 X.2"ZINC PLATED DECK SCREWS we opuapis3.AFTER INSTALLING PING INSULATCD Witt!(21 AYERS)Ber PLY WOUND mae feZRIGIDFOAMSGARDANDFILLINTERIORVOIDSWITH --COVER WeTH SHEET METAL SEE ae BATT INSULATION.NN BELOW FOR DETALS b-Sa"11-11 SIDING,TYP BEVEL TOP OF 2x4 10 4B ANGLE Peawe BLOCKING SET TO HEH! FOR UNISTRUT PIPE SUPPORT a . a 7 RIG RDAM HOAHID(2 LAVERS) "CUT TO FIT AROUND PIPING INSIDE s ae ARCTIC BOX rer-ib:ar BoatProoe"yy .|AR ae 4Cna, PO ™Sa a Pe)eee"lrg al H C4-tt =Ter z"Me fl xO FFaOr81au4 ce .<oF =ae a al Fr $Se TD 5 Ow *Sa.|"a ae =as 8RIESDEPENDINGONa"SS F "3VARIESNSw PPE PENETRATION PLL wreRIOR voIs -/a ne 3 7 ARO SME PIFINGS VT"Sag,eae PASTON DOTTOM WATH SER BATT SNSULATION Saf DEUX SUNciweONEACH ARCTIC BOX INSULATION BIDE AS SHAN ; s Z 3DOEumes26GAGALWANIZED=eSHEPTMETAL= NOTE @w aINSTALLMETALBLIPCOVEROVERTOP(SLm0C ms owe Si COVER FROM FRONT TO REAR)SECURE : -.-Ha :VATH 10%8 x 117°LONG ZINC PLATED HEX TEK I &)i osSCLFTAPPINGSI{LET METAL SCREWS,&OC |.|a i @ r Trad |a a|.lSSTywIhocll Iz a ;one ray SHEET MCTAL LID We oo!Es)i E z Te :atl We a FROMT (NTS)|]-War Mat tL!=O)rf AvoiOF .fe)--»--_---.currence I |é ALK @cak}t i a p @ |: a Hod>Wet: -_és Sls]xb e-VARILS DEPENDING Ot a,9 Mm)iVLPLNLIAOSS2*e -=a ¥BE,£=a(1\ARCTIC BOX DETAIL fs gg 2 8 \c2.2/NTS .Seane C2.2 SFRVICE MAST AND eee DISCONNECT AREARER GARN VCHDD (110 F RCOMES BONAIRINTAKEHOODSEE aGi™ _-T- CONEX BOORS - 6 LONG IGE CLEAIB UN HOO 10 PREVENT $1 nenG ICE ANO SNOW ATDOORS,TYPICAL OF 2 LOCATIONS ARCTIC BOX, INTAKE FE XHALSET fi iO AIRVENTS.SEEZUN T -<=4 -: ELEGIRIC METER Wh L wi ROWE HACE KEL INSTALL PER MANUFAC TURE INS IROL HONS,SEE GARN RAIN CAP VERT FLUE #F-tud GARN WOOO SOILER EXHAUST STACK a Sart m1 . HOUF GABLE ENDS,WOOD FRAMIN ANA SREATHED WATH Tt-0)SIDING.TYPICAL FRONT ANT AAA Sale9,SEE ROOF SYSTEM,FOOROCE &OR EQUAL,FASTEN TO CONEX PER MANUFACTURE INSTRUCTIONS .Hii aaaREESE CORDWOOD STORAGE AREA 2HGH© (£0 CORDS) qtUUtrressoH>40 "HIGH CURE”GON TAINI(EWxTSHRATL),TYPICAL OF 2A = _--CONEX DOORSL ac =S|| ae esael =] wi ROOF BRACE KIT,INSTALL PER MANIIFACTURE INSTRUCTIONS SEE GARN WOOO 80!FR EXHAUST STACK CAHN RAIN CAL -VERT [LUC #0102 a -T 20 (8 GA)CHAIN FINK Fe RACING:wi PRIVACY SLATS [BACK SIE} -(4 OA)CHAIN LINK CONCING «/PRIVACY SLATS ANO 29 DBL GATE (FRONT Sac {1 \FRONT ELEVATION BIOMASS HEAT MODULEVATSCALE:AF=10 INTAKE Allt VENT, See @)ROOF RAYS TEM PLIDRODE ©OR EQUAL,FASTEN 10 CONE PER MANUFACTURE INSTRUCTIONS f (@). f . _ TW Wt il f}ae .5ANDOISCONHECHEREAKEIC |u PRIVACY SLATSAND 20DBLGHdHJPRIVACYSLATSANO20DBLGATE a6 ae |INSULATED INSULATED METAL METAL DOU OOOR BIOMASS ,MICHA SEE °° ee ? 2 LW ot |. IG:\_Oe a __J ar)-m :»,L \GARN WOOD BOWER COMAUS TION41KINTAKEHOO,SEE '2 ;BEGIN AVANE ¥/O0U FRAMED DECK TO TND OF MOOULE NEAR MECHANICAL ROOM DOOR (2.\|FFT ELEVATION BIOMASS HEAT MODULE AL MALE sere te DaneSECORDDRANGCERTIFICA”HEAE-NISACCURATE"OTHEJDSTOFfeyKNOWLEDGETHESEORGUMN2SREFLECTO2CORILDCONSTRACTION.INFORMATION>ROMDECINFORMATIONDEINECUINGSCABaSMOfeteaayaay.tarememeroa9Su,"'SJ+Of.A: | ea.3Ovaes: w - =2wi(a) ha EO 4"«|ge badWigWeZzQni&r Om z">3a6g ao POG0620AnHerat,axGRYFAATUSPEBeetENGINEERS,INC=}sf xae]2)8. z *H z%*FE @FgtohlUf=&2:s 652 Ghee No. Ai MICIIAXACAL PIFING AND EQUIPMENT,SCE AS, 2X6 WOOD FRAMED DECK (AWE)ON a EXTENDED 6:8 FOUNDATION SLEEPERS - 246 WOOD FRAMED OCCK [AVAAF)ON aEXTENDEDB68FOUNDATIONSLEEPERS \Al2 SCALE Ws=140 CG)FIRE EXTINGUSHER 3-A40 8 C 4¥"HIGH CUBE” (2.\PERSPECTIVE VIEW BIOMASS HEAT MODULEWieSCALENTS i ao - :Oo?10-8".=|-22 ---e BLOCK OUT 1414"AREA AROUND FLUE PUNTTRATION FOR REQUIRED SEPARATION v4ToCOMBUSTIONTSsrr: 14 SB 8 "M Yi=[|ian fli uy fl [][|UI [|[|[la | i i s r ==-oo --S 7t Ee 7 *yn CYA 7 fa eee {:re -x aK X XIX MK KX K X Jd™4 iY)er 7 15 1 }. iN TA VI I 25 x x x x{x xX KX M x "-_-_---T 5}At Kate SS0aSeeexxHXKRKLMKOKOMOK -1-11". :(7 FAS Sey Ur STEEL l 4 '.GARN 2000 x xX RX M XIX HX KX RX DIAMOND RRH IFAD %t V.O0D FIRED HEATER x xe M KEM MOM OM OR OX PLATE SCREWHI IO A -b ee.'FIRE PLYWOOD FLOOR DAY USE MITIIANICA!f &UNSULATED)xxx xR KIX KK OR MOR CORD WODD ROCM i STORAGE AREA"4 Z KM MX KR REM KX KM KR y g x MX XM MH XIK ROM KOM {4 a §I7f*x x x x x x{u xe KK xX 4 .y x x %x IK RK xX x x ; q ©an =aig:x x MR M RIK X ©)x xIx7.ARAR -r A”<7 "-<-T -7 _7 a4 rn”OKs = -r -=CF orn -J cr -y =| L \CL.:;>\Co AMIGA GALV MEIALSTUUS,\;j "seeod he crue ae Cagmeanr |ta'-{178)2 SEE -:s ic\Sae {COORDINATE ¥/OOD EXT.WALL (+>B WALLS SEE RAMEO INSULATED-STUCS 10 PROVIDE FASTENING)SEE ">May'Aid a.a '|iT Uy - }ar \7 -19°-3"-16.7" WUQD HOILER COMBUSTION AIR INTAKE 73" Hoop,see ty} .(1 \FLOOR PLAN BIOMASS HEAT MODULE EXHAUST AIR VENT,eS om TAT STU FRAMED INSUE ATEDaWALLSATTACHCDTOINSEE02+ CONEX DOORS,SIMILAR TO ViALL FRAMING,SEE a ;' a CONEX DOORS lp #3fal=:iaeeefFshyZzenie:g Efefaere.o EREOu 4 y isigh?£ g |ia3(4oanEE BFWfeKSeb3 ae Lee 8a,ordiWess}a8raie a<=rn =|"ay Oo2z/=2ea]=baroeo4<Ph tal uj OCrymZObalao "=a ra) m TAZLINA,ALASKA: z ¢2! oeLily¢tH=sOgae2 z g -217fl,2:iazaaosa Stet Ho A1.2 | EW avten baywenones TASTY WRITZYL BIDERSTWNJAE ACOESEPSOHOSYPRRETE230Ce wom TF Wd percjun poorwepe|cc ON 'SUSANIONS on Am JO1890B-4 On ALYY NERA| d3sn LON"9, o CRONGHG ROLLY AACAML NOLLONEL SOS eeie Wod uA-AEC JaNPTLAG WOLWiWOdM Tay < mT CSOHODSH LOTTTsSONeACHOBESHE iors BY om g ZvaWvUubad DNwao CLOTaN nes Weis dea sclalsig pregJ FAvaluy 3 FRAMING,SEE ">#FRAMING.SEE ("1@,)--GD wr T TECK SPRAYED URETHANE a f 5 esee!8 rey ofEl©oe oFRAMEGARNHEATERA!EAGH END wl 361-5/0%18GA gq BoF 3-4 GALV.METAL STUDS,24°:O.C.AS REQUIREDTO PROVIDE ze}&gS beSUPPORTANDSHEETwi316ALUMINUM(6061-T6}PROANIDE B8a5 zBLOCKOUT16x16AREAAROUNDFLUEPENETRATION10OPERINGSASREQUIREDFORGARNPENETRATIONSANDaerorePROVIDEREQUIREOSEPARATIONTOCOMAUSTIBLESAGCESSPANELFASTENwi12-1-14SFFPRA LING TEKS z bz BE(NO FAPOSED SPRAY FOAM INSULATION)SCREWS.TYPICAL BEE42X3TOPPLATEAND2X3TOPPLATEANDsz59eeewteag&2 ze ry KNOIVETOQENAME7 aor -_|al F OAM INSULATION ON WALLS,; ae AND CEILING,TYPICAL oea-7 : i _"yy ch 'oo SHEPING ;:'a CONTAHER Ba 3 |a 5 i: I ALUMINUM SHEET!/FASTENED TO PROVIDE 4] L REMOVABLE ACCESS i.PANT FOR GARN =we UNFACED 2XEF FIBERGI ASS HEATCR MAINTE NANCE 7 Daa re Bo THERMAL BATT INSULATION AK ALL AROUNO GARN HEATER << dS Cs F<:rs a WALL OPENING FOR A ae t ”CONNEC ay,. EXHAUST FAN ANDar ;ve : ;>8'-10"CHEANOUI onae .WALL OPENINGS FOR Fe hyACCESSDOORiELECTRICHEATERPORTzeK2 f TO GARN Ss AND CLEANOUTS sb:if GARN 200 |tIREBOX Le 4BE_WOUU FIRED HCATC 7 on5HUGNSULATED!| ' :'. ---GARN CAITR ee eee Win ANCHOR TO CONTAINER "Th =52 DECK PER MANUFACTURE pp a<SPECIFICATIONS a oF s=a SPRAY URCTHANT §GAM BYSUR ATION TO FILL ia -5 4ALLVOIDSONBOTTOMOFCORIAINEHAND4Gz"SPRAY UHr !HAND FCIAM INSULATION TO FILL -COAT WITH OURATHANE WATERPROOF COATAG T x «$ALL VOIDS ON BOTTOMOfCONTAINER AND .6 nz zCOATWITHDURATHANEWATERPROOFCOATING=wo oO F]_ oF Fed <{4.\SECTION -GARN WOOD HFATER AREA B \TYPICAL SECTION -BIOMASS HEAT MODULE Bl EO a :Ald)seme sa e3a .a Ou\At4 SCALE 3a"=bar !=o FdSTE 5 n TAME AND MUD ALL GYPSUM BOARD apaia3BLOCKIN2K4BLOCKIN:SHIPYING CONTAINER |'°SEAMS SHIPPING CONTAINER .* FIRE CAL K ALL GAFS SEAMS AND WALL PONCTRATIONS THAT EXPOSE SPRAY (OAM WSR ATION ALTERNATE SEAMSOFMULTIPLE .-ot,LAYER Wal 2)CESUNG COVER .ot rcMATCRIALSWIENPOSSIBLEThLelee2x3ke--ee al rote, 2eaC See :2 er 1K]|*a)eaereni roopana-ae '1"GYPSUM BOARD (FASTENED wtxt 4'8"BUGLE HEAD,an WT COR Pa VAYOOLHPAINI ED)12 GYPSUM BOARD TUARSE JHREAD DRYVALL SCREWS)OVER 6 MIL VAPOR pt 'OVER €Mit VAPOR BARRIER OM CEILING AND BASRIFR ON Cr INT ANLDPEXTCRIOW WALLS.TYPICAL oot f EXTERIOR WALLS (TASTCON w/6x 1-5 BUGLE HEADnet,:CUMAHSE THREAD DRYWALL SCREWS)TYPRALhs ENGINEERS,SB2X3 §TUDS,--"] 20g 2x3 PLATE | wxisus -an ] 7 "Lot [ . . s ve Tusk sastuos -"][Po oo240C¢yt --337 THIGK SPHAYED URLIHANT OAM vP OC a Ol !™3%THICK SERAVED URETHANE FOAM Coon,INSULATION ON WALLS.AND CEWING TYPICAL "7 nen ©!AHSUIL ATION OR WALES ABA CEALING,TYPICAL a an £]Ss]xf 2 ao a FL 8]&gote|'..= 'vy ,z 3 : gl,PEGWALL/FRAMING DETAIL GARN HEATER AREA (o\WALL /FRAMING DETAIL TYPICAL ee SCALE NTS Vata)WANTS Tneot hr MECHANICAL SYMBOL LEGEND MECHANICAL SPECIFICATIONS PIPING SYMBOLS HVAC SYMBOLS SYMBOL |ABBR.DESCRIPTION SYMBOL |ABBR.DESCRIPTION WASTE AND SOIL PIPE 4 NEW DUCTWORK ------VENT Pro |ost.ACOUSTICALLY LINED DUCT ---COLD WATER pt THERMALLY INSULATED DUCT ----HOT WATER {I Tat DUCTWORK UP ----_|HE |HOT WATER RECIRCULATION DUCTWORK DOWN --GHR--|GHR |GLYCOL HEATING RETURN oF TURNING VANES -GHS-|GHS |GLYCOL HEATING SUPPLY OE AIR EXTRACTOR --SMR--SMR |SNOW MELT SUPPLY 'O--S/A SUPPLY AIR REG,GRILLE OR DIFFUSER -SMS-|SMS |SNOW MELT RETURN ++]RA RETURN/EXHAUST AIR REG.OR GRILLE -s-LOW PRESSURE GAS -SUPPLY @ AIR CONNECTION OUTLET Se RETURN OR EXHAUST ®WATER CONNECTION OUTLET al)SUPPLY AIR SLOT WITH FLEX DUCT ©LUBE CONNECTION OUTLET oa RETURN AIR SLOT -»DEEP SEAL TRAP tl,FLEXIBLE DUCT -_-»PIPE ELBOW DOWN |a)FLEXIBLE CONNECTION -0o PIPE ELBOW UP FEFPS||vp.BD |vou pampert+UNION fs FD FIRE DAMPER -><t-|6V/S0OV!GATE VALVE/SHIT-OFF VALVE fea FSD FIRE/SMOKE DAMPER sé GAS COCK @LJ efi]|Mop MOTOR OPERATED DAMPER -pe-GLOBE VALVE 2072 +DUCT SIZE -8,|Mov |MOTOR OPERATED VALVE 2-WAY rap HC HEATING COIL hi MOY |MOTOR OPERATED VALVE 3-HAY =a]SIA SUPPLY AIR ee PRY |PRESSURE REDUCING VALVE a RA RETURN /RELIEF AIR ay RV RELIEF VALVE Cz E/A EXHAUST AIR a CV |CHECK VALVE O/A OUTSIDE AIR Ot BALL VALVE (FULL PORT)[pd Dp DUCT DETECTOR Tv STRAINER Ma ACCESS PANEL a THERMOMETER @ TSTAT |THERMOSTAT,THERMOSTAT WINS.BASE ?PRESSURE GAGE W/ISOLATION VALVE GP)STATIC.PRESSURE SENSOR 2,SOLENOID VALVE ©SWITCH -_-rA-BALANCING VALVE ABBREVIATIONS --SGUARE HEAD COCK SyMBoL -s|ABBR.DESCRIPTION -F-BUTTERFLY VALVE EAT ENTERING AIR TEMPERATURE -=-FLEX CONNECTION LAT LEAVING AIR TEMPERATURE --Or |WHA |WATER HAMMER ARRESTER (SIZE)ENT ENTERING WATER (GLYCOL)TEMPERATURE =AUTOMATIC FLOW CONTROL LWT LEAVING WATER (GLYCOL)TEMPERATURE -co CLEAN-OUT APF ABOVE FINISHED FLOOR -Woo |WALL CLEAN-OUT AFG ABOVE FINISHED GRADE ®FCO FLOOR CLEAN-OUT BDD BACK DRAFT DAMPER (FD FLOOR DRAIN FO FUEL OIL 3 PIPE ANCHOR 5S STAINLESS STEEL -=-_PIPE GUIDE VIR VENT THRU ROOF -MP6e-MEDIUM PRESSURE GAS OADB OUTSIDE AIR DRY BULB DIFFUSER KEY AAV AUTOMATIC AIR VENT DIFFUSERS,GRILLS AND REGISTERS SYMBOL:SYMBOLS DO NOT NECESSARILY APPEAR ON PLANS IN SAME SIZE AND PROPORTION AS SHOWN HERE, PLANS DO NOT NECESSARILY USE ALL OF THE SYMBOLS SHOWNHERE. GENERAL: I.THESE DRAWINGS ARE DIAGRAMMATICAL IN NATURE AND DO NOT SHOW ALL FITTINGS AND/OR ACCESSORIES NECESSARY FOR A FUNCTIONAL AND COORDINATED INSTALLATION.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THEIR WORK WITH OTHER TRADES AND WITH FIELD CONDITIONS. 2.ALL PLUMBING PIPING SHALL BE PER THE UNIFORM PLUMBING CODE,2012 EDITION AND ALL LOCAL AMENDMENTS, ALL MECHANICAL WORK SHALL BE PER THE INTERNATIONAL MECHANICAL CODE,2012 EDITION AND ALL LOCAL AMENDMENTS. 4,ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION (FIRE BARRIERS,SHAFTS AND HORIZONTAL ASSEMBLIES) MUST COMPLY WITH IBC CHAPTER 7. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND FEES. 6.THE CONTRACTOR SHALL PROVIDE SUBMITTAL DATA ON ALL MECHANICAL SYSTEMS.THIS INFORMATION SHALL BE BOUND IN ATHREERINGBINDER,PROPERLY MARKED AND TAGGED.DATA SUBMITTED SHALL BE COMPLETE AND SUBMITTED AT ONE TIME ASPARTIALSUBMITTALSWILLBERETURNEDWITHOUTREVIEW.SUBMITTALS SHALL BE CLEARLY MARKED TO INDICATE EXACT ITEM TO BE SUPPLIED,SHOP DRAWINGS FOR THE "VAY"DUCT SYSTEM SHALL BE SUBMITTED SHOWING THE PROPOSED ROUTING. ADDITIONALLY A COMPUTER DUCT RUN SHALL BE SUBMITTED SHOWING REVISED DUCT LAYOUT. 1.NO SUBSTITUTION OF MATERIALS WILL BE ALLOWED WITHOUT OWNERS APPROVAL. &.AT THE END OF THE PROJECT PROVIDE THE OWNER WITH THREE COPIES OF AN OPERATION AND MAINTENANCE MANUALASSEMBLEDSPECIFICALLYFORTHISPROJECTFORALLMECHANICALEQUIPMENTFURNISHEDUNDERTHISCONTRACT. INFORMATION SHALL BE COMPLETE AND SHALL PROVIDE SPECIFICATION,OPERATION AND MAINTENANCE INFORMATION, WARRANTY INFORMATION,AS WELL AS SOURCES OF REPLACEMENT PARTS. 94.PROVIDE A COMPLETE SET OF AS-BUILT DRAWINGS AT THE END OF THE PROJECT,DRAWINGSSHALLSHOWALLCHANGESMADETOTHEPROJECTDURINGCONSTRUCTION.AS-BUILT OF CONTROL DRAWINGS SHALL ALSO BE INCLUDED. 10.ALL WORK PERFORMED UNDER THIS CONTRACT SHALL BE FREE FROM DEFECTS FOR A PERIOD OF ONE YEAR AFTERACCEPTANCEOFTHEPROJECTBYTHEOWNER.THIS SHALL INCLUDE MATERIALS,EQUIPMENT AND WORKMANSHIP.ALL DEFECTS SHALL BE REPLACED OR REPAIRED TO THE OWNERS SATISFACTION. Il.PROVIDE IDENTIFICATION OF ALL MECHANICAL PIPING,DUCTWORK AND EQUIPMENT.PIPING SHALL BE IDENTIFIED WITH STENCILS,OR WRAP AROUND PLASTIC IDENTIFICATION.EQUIPMENTS SHALL HAVE ENGRAVED PLASTIC LABLES OR PRE-MANUFACTURED EGUIPMENT ID LABELS. (12.PROVIDE MANUFACTURERS RECOMMENDED CLEARANCE AND ACCESS TO ALL EGUIPMENT. 18,ALL PIPING,DUCT WORK,AND EQUIPMENT SHALL BE SEISMICALLY RESTRAINED IN ACCORDANCE WITH THE SMACNA SEISMIC RESTRAINT MANUAL FOR MECHANICAL SYSTEMS. PIPING: |.HEATING PIPING SHALL BE A COMBINATION OF TYPE 'L"HARD DRAWN COPPER TUBING,WROUGHT SOLDER TYPE FITTINGS, 95/5 TIN-ANTIMONY SOLDER,OR PROPRESS AND UPONOR HEATPEX TUBING. 2.DISTRICT HEATING PIPING SHALL BE UPONOR ECOFLEX PIPING. HEATING: I.HEATING EGUIPMENT SHALL BE COMMERCIAL GRADE COMPLETE WITH ALL SAFETIES AND TRIM,FOR INFORMATION ON MODEL ETC.,SEE EQUIPMENT SCHEDULES.hdwvANGULATION: 1.INSULATE ALL HOT PIPES,UP TO 2",WITH I”FIBERGLASS INSULATION,PIPES 2-1/2"OR LARGER,INSULATE WITH I-1/2" FIBERGLASS INSULATION,(FIBERGLASS 25 ASJ/SSL.-II) 2.-INSULATE EXHAUSTDUCTWORKFROMFAN TO THE EXTERIOR. SHEET METAL: I.DUCTWORK SHALL BE FABRICATED SHEET METAL AND INSTALLED IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS. 2.DIMENSIONS SHOWN FOR DUCTWORK ARE THE INSIDE CLEAR DIMENSIONS.CONTRACTOR SHALL ADD TO THE DUCT ALLOWANCES FOR SOUND LINING. BALANCING: |.BALANCE HVAC SYSTEMS USING NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)RECOMMENDED PROCEDURES. CONTROLS: I.THE CONTRACTOR SHALL PROVIDE A COMPLETE AND OPERATIONAL CONTROL SYSTEM AS REGUIRED TO PROVIDE EGUIPMENT CONTROL. PERMIT SET RECORDDRAWINGCERTIFICATETHESEDRAWINGSREFLECTRECORDEDCONSTRUCTION.INFORMATIONPROVIDEDHEREINtSACCURATETOTHEBESTOFMYKNOWLEDGE.INFORMATIONOBTAINEDDURINGDATENAMESCALE:AS-SHOWNBARISONEINCHONORIGINALDRAWINGrJFNOTONEINCHONTHISSHEET,ADJUSTLEGENDS,ABBREVIATIONSDISTRICTHEATSYSTEMBIOMASSBOILERSCHEDULESTAZLINA,ALASKAENGINEERS,INC.@iBY|DATEREVISIONTws17777NOV.03,2017ProjectNo..DateBKSDrawnTwsPPIag3= BYDRONIC HEATING SCHEDULE EQUIPMENT SCHEDULE Tas |TYPE |FID |EMT |unr |erm |Mew |cr |Rem ||NOOR |REMARKSui|poor,|e"|140 |120 |o5 |35 |230 |-|veon2on Tee AWOL WITH ALT REGUIREDWooD|50/50 MODINE HG ISL WITH ALL REQUIREDU2|oone |er |40 |20 |05 |35 |230 |-|veon20n |MOU50/50 MODINE AC I65L WITH ALL REGUIUs|sHop |62°]140 |120 |56 |466 |3480,-|vanzon |MOD REX) NOTES: (©FUTURE UNIT HEATER INSTALLATION. PUMP SCHEDULE B-| BOILER:GARN WOOD FIRED BOILER,MODEL "WH 2000".FURNISH COMPLETE WITH ALL REGUIRED CONTROLS AND SAFETIES.I20 VOLT. EMT-I GLYCOL TANK:AXIOM MF200 "PRESSURE PAL"MINI SYSTEM FEEDER,6.0 GALLONS,WALL MOUNTED,120 VOLT SINGLE PHASE.40 WATTS. HX-| HEAT EXCHANGER:TACO MODEL "TBIOTx40"PLATE HEAT EXCHANGER.50/50%PROPYLENE GLYCOL,I14 MBH.[710 ENT,ISO LWT20GPMBOILERSIDE,140 EWT,120 LWT,20 GPM BUILDING SIDE.MAXIMUM 3.2 PS]PRESSURE DROP. FLUID HEAD |_MOTORTAG|LOCATION |SERVICE |FLUID |Tye |opm |EAP |MONO ew |REMARKScP|(OCP.|BOILER|WATER)160 |200 |20'|\aradon |SOD STICKIESCP-2 |MORE LIRCILATION Pe |40 |200 |35 |a/4rz4on |PRINDFOSUPS32-160OFFICE|BUILDING |50-50 ;GRUNDFOSUP26-64FoP3|Siiiiis bee Peo!Ho |34 |20 Vi2n2on |crt BAANTY BUEN 5222 |wo |57 |20°|wanion |SRNOFOS2E-FCLIN|BUILDING |50-50 GRUNDFOS UP 26-64FCPS|BUILDING CIRCMATION "pe |40 |32 |20 A2N20N |--SHOP |BUILDING ;GRUNDF:-6AFCP-6 |BUILDING LIRCMATION "BE?!40 |56 |20 W2A20n__|-@ NOTES: ()PROVIDE WITHALLTRIM.@ FOR FUTIRE. ON.NOM,MOTORTAG{LOCATION |SCFM |RPM |Foi |op |type |Soe |use |vise.|MOORO |REMARKSE+]toon!50 |-|-|025"cen]-|BA |HoRZ |MIWI20n PANSONC YONG?) C)PURNISH WITH SPEED CONTROLLER,BACK DRAFT DAMPER,AND WALL OR ROOF CAP. ET-| EXPANSION TANK:AMTROL MODEL *SX-45V"EXPANSION TANK. RH-| RADIANT HEATER:MYSON MODEL "T655-5-I4"RADIATOR,5,464 BUT/HR,0.1 GPM. RH-2 RADIANT HEATER:MYSON MODEL "T655-4-08"RADIATOR,2,150 BUTHR,O5 GPM. RH-3 RADIANT HEATER:MYSON MODEL "T6SS-6-l6"RADIATOR,6440 BUT/HR,0.4 GPM.. SEQUENCE OF OPERATION CP-| CP-I SHALL BE ENERGIZED WHENEVER THE BOILER IS IN THE HEATING CYCLE AND AT ALL TIMES WHEN OUTDOOR TEMPERATURE ISBELOW40DEGREESF.(ADJUSTABLE)AND OFF ALL OTHER TIMES. CP-2 CP-2 SHALL BE ENERGIZED WHEN EVER THE BOILER WATER TEMPERATURE IS ABOVE 140 DEGREES F.(AD.USTABLE)AND OFF ALL OTHER TIMES. CP-3,4 &5 . CP-3,4 #5 SHALL BE ENERGIZED WHEN EVER THE DISTRICT HEATING MAIN WATER TEMPERATURE IS ABOVE IIO DEGREES F.(ADJUSTABLE)AND OFF ALL OTHER TIMES.RECORDDRAWINGCERTIFICATECONSTRUCTION.INFORMATIONPROVIDEDHEREINISACCURATETOTHEBESTOFMYTHESEDRAWINGSREFLECTRECORDEDKNOWLEDGE.INFORMATIONOBTAINEDDURINGDATENAME+SCALE:AS-SHOWNORIGINALDRAWINGGARISONEINCHONIFNOTONEINCHONTHISSHEET.ADJUSTSCALE:MECHANICALSCHEDULESDISTRICTHEATSYSTEMBIOMASSBOILERTAZLINA,ALASKAENGINEERS,INC.BY|DATEREVISIONwW7TTTwsBKSNOV.03,2017ro;DateDesiOrawnTwsSheet No. M1.2 GMT-1 a ARCTIC BOX,Era)Lt EXHAUST AIR VENT, SEE &)INTAKE AIR VENT, M8. - im ET-1 F-1 :GARN - CP-2 UH O CONTROL YH-2 -=-_=MODULE i cP-1 40'"HIGH CUBE” CONEX FIRE EXTINGUSHER 3-A:40-B:C Cl(1.\MECHANICAL PLAN -WOOD HEAT MODULE\w3.1)SCALE:1/2"=1-0" GARN CORDWOOD FIRE HEATING MODULE il STEEL PIPE.PROVIDE OI-ELECTRIC FITTINGS IN TRANSITION TO COPPER PIPE.ALL OTHER PIPING IN MODULE SHALL BE 2"COPPER UNLESS NOTED OTHERWISE. ET-1 PG-1 PG-1 tH {)@9)6AC)U |a |NT KH P-2 GMT-1 NOTE:FIRST SIX FEET OF PIPING FROM BOILER SHALL BE SCHEDULE 40 BURIED HEAT LINE (2.\PIPING SCHEMATIC -WOOD HEAT MODULEW3SCALE:N.TS.D)KY(05Cee¢CCTATaNamtSSwA®:ea=9)fs84yyFO=ats,Arayfy4\SaAVWLPBYQeSSAN(¢ARCTIC BOX TRANSITION TO BURIED DISTRIBUTION PIPING \DISTRICTHEATSYSTEMBIOMASSBOILERC(3.\PERSPECTIVE VIEW -WOOD HEAT MODULE INTAKE AIR HOOD \w3.1/SCALE:NTS. PERMIT SET RECORDDRAWINGCERTIFICATECONSTRUCTION.INFORMATIONPROVIDEDHEREINISACCURATETOTHEBESTOFMYTHESEDRAWINGSREFLECTRECORDEDKNOWLEDGE.INFORMATIONOBTAINEDDURINGDATENAMESCALE:AS-SHOWNBARISONEINCHON'ORIGINALDRAWINGe\FNOTONEINCHONTHISSHEET,ADJUSTSCALETVCWOODHEATMODULEMECHANICALPLANTAZLINA,ALASKAENGINEERS,3POBOX232046ANCHORAGE,AK99523PH:907-349-1010FAX:907-349-1015#<a > [) z 9 a >iyx er,&]g|al o8)8]e]a e& >2Bl.2 &Lo &B ¢€azaoaoa Sheet No. M3.1 titwlLE - Soy6--I Tre ||ms ||||aVade--4 6-__i_4 Tannen nnitlexeewa[0 |eeKad oT mina |wa [||||LE - Kast O14 lnenennnellws[|||]|aeCas}fo}| \ oa O-__ COPPER TO PEX TRANSITION CONNECT TO ARCTIC BOX,A +SEE fom €])-to-© (2.\TVC OFFICE PIPING SCHEMATIC =Gpm_-s £3\M3.2/SCALE:NTS 3,S<Os.G @)"thy (ae:«eAYCe((3.\TVC OFFICE ARCTIC BOX\M3.2/SCALE:NTS ARCTIC BOX, SEE (4)UPONOR 2"PEX X 2"MIPT WIPEX FITTING#5550020 @)2"BALL VALVE ,FIPTxFIPT @)2"x 1-1/4"COPPER BUSHING,MIPT x G @)1-1/4"COPPER 90°,CxC 6)1-1/4"COPPER TUBING @)4-1/4"MALE ADAPTER TO HEPEX HEAT TUBING @®UPONOR 1-1/4"HEPEX HEAT TUBING UNISTRUT #P2941 POST BASE UNISTRUT #034N040 2 1/8"OD CUSH-A-CLAMP G1)UPONOR ECOFLEX END CAP #5957925(2"THERMAL TWIN) (3)UNISTRUT #P1000-T FRAMING CHANNEL 12 GA. NOTE:RADIANT PANEL LOCATION WILL BE ADJUSTED AS REGUIRED TO FIT FIELD CONDITIONS eesree TO RHI I RH-24ee a a at i”a TB/4"GHOER.{ TO RH-2 { yeSa1 |RH--2! |B/A°GHOER | TO RH-2 | is|! RH-2 1 1 I | | \ \ B/4"GHOERTORN | | | | _4! | \/4*GHSER+a { | { 3/4°GHSER TO RH2 FINAL ROUTING AND CONCEALMENT OF HEATING PIPING WILL BE COORDINATED WITH FIELD CONDITIONS aeiBPROPOSED ARCTIC / Ge (4.\TVC OFFICE FLOOR PLAN\M3.2/SCALE:1/4"=1-0"PERMIT SET CONSTRUCTION.INFORMATIONPROVIDEDHEREINISACCURATETOTHEBESTOFMYRECORDDRAWINGCERTIFICATETHESEDRAWINGSREFLECTRECORDEDKNOWLEDGE.INFORMATIONOBTAINEDDURINGDATENAMErvSCALE:AS-SHOWNBAR(SONEINCHONORIGINALDRAWINGIFNOTONEINCHONTHISSHEET.ADJUSTSCALES= yw owPlu z £ale 9Fewi<¢Ela Ou da<tae <ui]«|"Oo ¢+2)oZ 2Bloft5rw|2 eG R ja woe2)= a $bad2 ysOo:5Zi wim=ij&ius§=zO;%<==Lis = w<[e) > ao z 6 a >wing Nf]gl «al 2nosS|8)=)a]E8 >9 bh: 3 e &&So &s $az oa o (=)< SheetNo 31va JWYN ASMA"L33HSSIKL VASVTV 'VNITZVL SUOL-GHE-206 XW O101-G9C-206'Hel£2956My"2OVHOHONY996262 X08Od NO HON! 3NO.LON at ¥ 6 SML'3003MOND ONT SYANIONA Pe ona umeig AWJO 1539 3H1O1 ALVENDOVW SI NISZHSH + ° NV1d IWOINVHOAN O3CIAOUd NOLLVWHOSNI'NOLLONYLSNOOONWMYHG TWNIOHO ONICTING ALINNWWOD SAL SML Biseq ONIN GANIVLEO NOILVWHYOSNI d3q0¥003Y LO314d3y SONIMVHC 3S3HL NO HONI 3NOSIuveNMOHS-S¥ BLVOISILYS9 SNIMVEG GYO0Re's1VOSy3a11I0€ SSVWOId WALSAS LVAH LOPLSIG salva Aa NOISIAZa 2102'0'AONFO"ONZLiLb pola Sheet No. M3.3 (4.\TVC COMMUNITY BUILDING FLOOR PLAN\M3.3/SCALE:1/4"=1-0"PERMIT SET x @| $4 : | Xo G i aeuTl 4-64P--- -_ ee Qa e o O+3) ; <#4yj \ :|3 Wig | [4 gS |8 | LI & ;x iu ( | |6 5 _-hoe---------dtt-ul J ieitfx 2 |-TVar 7mw é5 ¢2 . ga re " $38 so 225ZoFacs > (aS 3gee --] Bo2ZiregzeeSa | 2aga ( 9S2e aeeBe ro) 25 2 8< <=iu=B Td © 19 Z 3 FS\ Oo. x E( o (o] or OG I bil z [o) w wo ez 81Ga © E : © Z g [ea oO ira i be| rs * o&38 &isi2 Oo a we§F wg g¢ oa |ena = = e5£¢$ €28 1OwHO 2 bEbPa. i a a22 ° | rea) 2zq9iyo5e= 9 a > »£gS$¢8Be3g&, ry z aeeeeeee Zz Swu 256£&F Sece | > o3bsa 9 4PsPs#<Sz ! = 2£&&#f EF ER BR | S S85 8 &£&zgzgBeSF toF oO 28256&$K&5§&&bE Zz a epee 99S&FFS2223 Be ! {-=h oO 58NNNNae5 5 50 Sf OQ_ ae oI, POOOOOHHGO© || -=H- + ----+4 jd . "xg = 1 [oS| Ap g aa!in t 4 z| | | _) }ee en ne 4! . |! =n24 ! ° =F ee ! = |= best ! |--|_»- t | ik- ] ||=H56+4 | x ; TN | z|| pase | y ol J | . f Lo | fp "ee ! 1I 4 pe-> ??qe7%? 3] 3|ee =" |_-- |= |=] (| (J) c= (3\TVC COMMUNITY BUILDING ARCTIC BOX\M2.2/SCALE:NTS salva SWYN ohigygooyanos WSVTy"VNITZVLSIO\-6¥6106 Xvmover'Hdwai "JOVUOHONY 96262X08Od NO HON!3NOLONI ONI SYSSNIDNS SML"BOCTIMONY| NV1d IWOINVHOSAN >a nei AW3O 1S39 3HLOL BLVENODOV SINISYSH f+ ° SINIID SAL " . . G3dIAOYd NOILVWYOANI'NOLLONYLSNOOERIMYECTYNIONES SML ised ONIN OANIVLEO NOILWAYOSIN! 3040938 1031434 SONIMVEC SSSHL=| NMOHS-S¥ Zv0z'80'AONFO yaTIO€ SSYWOIE Zediv"ONSheet No. WALSAS LV3H LOLSId ALVOIILYAD ONIMVad GYOosY'a1vosaivalada NOISIASY efor \-3/4*GHSER TO Rit2 FINAL ROUTING AND CONCEALMENT COORDINATED WITH FIELD CONDITIONS OF HEATING PIPING WILL BE (4.\TVC CLINIC FLOOR PLAN\M3.4/SCALE:1/4"=1-0" LOCATION WILL BE ADJUSTED NOTE:RADIANT PANEL AS REGUIRED TO FIT FIELD CONDITIONS B/4*GHoERH|SEE Gatedjo}aQ3)x¢aWwaOo5inaa oO < E g = z is) Pd rel Lu E x © z By aay =5 pay © 5 . g8 o g --- ” o ind 3F-woO[a] * = -_=+- |= : f 8¢#28¢ -----9 r&& az85 J).|Fe.|yee. Z Pb Sg#eeEE 8 = é w : x ryzt = c=8}b=8c=8a. x&2gd£@gs§8 ¥2 oy oO0 oOo< o oO ie 73myad< 3 s Fo Ze -- ee z}OI O Pe £pe§5&&BE85 -_- . =a e * * * - Zz so 3&£&#€§ § 59 wB == ponnnnb TTT b-4-------- a 5 S85&¢=-2@z¢5% |=]. ! | Ol 463 8§&©&&BRBe 1¢ © id z aes : : x=zF4 25 hy KL4 \ OlF S52 N N WN A + 5 5S 503 58 aO els 71 Ua 3 OMOODDHODOO®O© in I 1 wt > . x NIOCH) =(-f§)5 \\ aain O 77) {7 ! | | --- ----------b- iF | LE ad +Ot ol Cn@ 4 < oe ! : {----.4 =>3°° x oO a" - AN = aiom (=r oN 2 Co = < z1O°O kK--] O BF egy z| 2 ee Uk,BB = he aBEC) oO ae| Voge O On es a aa < M3.4PERMITSET\M3.4/SCALE:NTS alvd SAVN SHOI-G¥E-206 XV Ob01-GP6"206'Hd£2556My"JOVHOHONY9P6262 XOGOd x DOOW SaTvOS VXSVTV'WNITZVLASNPOy''L345HSSIHL dd NO HONI SNO LOWaI ¥'SML "SOC WMONy|es NV1d IVOINVHOAW ONI SYFANIONS >a ria AW40LS SHLOL 3LveNoOv SINIBNSH ff+ 9 w 6 : CAOIAOYd NOLLWAYOANI NOLLONYLSNOD =f SkwMuaTwNonio SM1L seq ™ ONINNG GANIVLEO NOLLVAYOJNI Zoz€0AON 980 .= G30Y0034 1037434 SONIMVEG aSaHL =| NMOHS-sv Wao0g SsvNold on 4 Ziiib BLVOISILUaO ONIMVEG GuOosds'a1vosWALSAS LV3H LOIWLSIC pefolg3 & < g 5 o nN 2 = 2 F iz E (3) Ps Zz a = * wioO Zz 2 Lo nd xrz < 1p rm o x o Fs] 8 Ww = a > w 3 a _ aFE 9a = g uik 2Zz a = <ES3° <£ bZz x=<oo= . ) =br= °Ww & o a =(2) =-2= a = i" wn x fu) a n Zz =745re D4 ral raN = e a Zzx ft) wi N a - aWua awre$ x> xiae f=)owi=83 Zz Pod a8-<=Paf=]Zz =) fiwio wia 5 N 5 aS§ aSfo} i iz=aao = 90, P aOoa ouwv*Bo&sOg N<. a a a =kbFE ko Ws "eg x°9°<[vd 2 2 2, "Yr eos 4 = (3)s)=[e]&[ea et Ou 2°2d= 5 . p é B B 25 6E O88 a xxzxzis)2n 26 OF ag .Fs57=aZzZz Z> aes S# N N < = v =)=)5 30 SN xoOao53)=raratin -- 9 SEE RH-1 (2.\TVC SHOP PIPING SCHEMATIC\M3.5/SCALE:NTS PEX TRANSITION CONNECT TO ARCTIC BOX, t COPPER TO 6Aym) (3.\TVC SHOP ARCTIC BOX\M3.5/SCALE:NTS ASWe FOR INTAKE -1/4"MESH BIRD SCREEN ON 1/2"FLANGE,BOTH LEGS FOR EXHAUST -1/4"MESH BIRD SCREEN ON OUTSIDE LEG,CAP INSIDE LEG 20 GA GALV,TYP. BLOWER MOTOR AT EXHAUSTaHOODONLY (4+.\_INTAKE/EXHAUST AIR VENT M8.1/NTs NOTE: NEED 2 -ONE EXAUST -ONE INTAKE DIGITAL THERMOMETER TH-1 AND TH-2: WEISS #4DVU35 WEISS #€35-75BS IMMERSION WELL 4"FTGx3/4"FPT FEMALE SWEAT ADAPTOR (3°PIPE RUNS AND LARGER) 1°Cx3/4°FPT SWEAT ADAPTOR(2"PIPE RUNS AND SMALLER) 1"TYPE L COPPER TUBING CUT TO LENGTH FOR ADEQUATE IMMERSION WELL TIP CLEARANCE INSIDE TEE (TUBING SIZES 1 1/4"AND SMALLER) COPPER SWEAT TEE CxCx1"C (3 THERMOMETER MOUNTING DETAILM8.1/NTS \42 \(1 zB 20 GA GALV,TYP. 40 1/4"MESH BIRD SCREEN a"ON 1/2"FLANGE es ' (2.\AIR INTAKE HOOD\wa.1/NTS NOTE: MOUNT GAUGE VERTICALLY UP FOR EASY READING.ON VERTICAL PIPE RUNS,USE 90°SWEAT ELBOW AND 1/2"CU TUBING TO POSITION GAGE VERT.UP. PRESSURE GAUGE 1/4"OR 1/2"MPT AS SPEC'D. $f 1/2"FTGx1/2"FPT FEMALE SWEAT ADAPTOR FOR 1/2"GUAGES{}---1/2"Cx1/4"FPT FLUSH BUSHING FOR 1/4"GAGES 1/2"SWEAT BALL VALVE CxC (HANDLE SWINGS UP) 1/2"TYPE L COPPER TUBING COPPER SWEAT TEE CxCx1/2"C (4.\PRESSURE GAUGE MOUNTING DETAIL\w8.1/NTS PERMIT SET CONSTRUCTION.INFORMATIONPROVIDEDHEREINISACCURATETOTHEBESTOFMYRECORDDRAWINGCERTIFICATETHESEDRAWINGSREFLECTRECORDEDKNOWLEDGE.INFORMATIONOBTAINEDDURINGDATENAMEvSCALE.AS-SHOWNORIGINALDRAWINGARISONEINCHON(FNOTONEINCHONTHISSHEET.ADJUSTSCALESDISTRICTHEATSYSTEMBIOMASSBOILERWOODHEATBUILDINGMECHANICALDETAILSTAZLINA,ALASKAENGINEERS,a4POBOX232046ANCHORAGE,AK99523PH:907-349-1010FAX:907-340-1015,us<a > Oo z 9 a >WwWa hr Sl gl wf oroeRR]Ef a]éfr]o >2Ble 2s 8a2446¢ Sheet No. M8.1 11/3/20171:40:21PMP:\E17\E17-2744TazlinaDistrictHeatSystem\050OWG\E17-2744_EShts18_Tazlina_Heat.svtqc:10/23/201711:20:26:fc-0:0.0;0.0:0.0/0[IELECTRICAL LEGEND ELECTRICAL SPECIFICATIONS ELECTRICAL SPECIFICATIONS [==JE=I0 LUMINAIRE.TYPE AS NOTED ON PLAN,ABBREVIATIONS 26 00 00 -GENERAL REQUIREMENTS:ALL ELECTRICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH 26 06 33 -RIGID METAL CONDUIT (RMC):ANSIC80.1,UL 6.WITH BUSHINGS AT ALL TERMINATIONS.FITTINGS: (0)DEMOLISH ALL REQUIREMENTS OF THE LATEST EDITION OF THE NATIONAL ELECTRIC CODE (NEC},STATE,MUNICIPAL,GALVANIZED MALLEABLE IRON WITH THREADED HUBS FOR ALL CONDUIT ENTRIES AND COUPLINGS.SET Zi33===>©LUMINAIRE -WALL MOUNTED:TYPE AS NOTED ON PLAN (E)EXISTING FEDERAL LAWS,AND AMENDMENTS GOVERNING THE PROJECT.ALL WORK SHALL BE PERFORMED UNDER SCREW OR RUNNING THREAD FITTINGS ARE NOT PERMITTED.USES:BELOW GRADE,IN CONCRETE,STUB 2:15 =THE SUPERVISION OF A CERTIFIED ADMINISTRATOR JOURNEYMAN ELECTRICIAN.ALL ELECTRICAL UPS,CONCEALED,EXPOSED,WHERE EXPOSED TO PHYSICAL DAMAGE,ROUTED ON BUILDING ROOF,"(S38 =2$SWITCH-SINGLE POLE,SINGLE THROW,UON (R)__|RELOCATED EQUIPMENT SHALL BE NEW COMMERCIAL GRADE AND INCLUDE THE SEAL OF A NATIONALLY RECOGNIZED SERVICE RISERS,OR WITHIN 10FT OF RACEWAY ROUTED INTO FIXED FOUNDATIONS SUCH AS LIGHT POLE aj"s &gA__[AMPERES TESTING LABORATORY FOR THE PURPOSE FOR WHICH IT IS INSTALLED.CONTRACTOR SHALL SUBMIT BASE OR STRUCTURE.mise 2 &$x.SWITCH-SEE SWITCH LEGEND FOR TYPE AC [ABOVE COUNTER/BACKSPLASH REQUEST FOR SUBSTITUTION IN WRITING TO THE ENGINEER.THE CONTRACTOR SHALL OBTAIN ALL Z-|85 $tse28 &METERING DEVICE AFC![ARC FAULT CIRCUIT INTERRUPTER REQUIRED CONSTRUCTION PERMITS AND PAY ALL ASSOCIATED FEES.26 05 34-ELECTRICAL METALLIC TUBING (EMT):ANSI C80.3,UL 797;GALVANIZED STEEL TUBING.FITTINGS:Qu"8 beesAFF[ABOVE FINISHED FLOOR NEMA FB 1;GALVANIZED STEEL OR MALLEABLE IRON SET SCREW OR COMPRESSION,DIE CAST OR wt oRkGaascSPOWERPANELBOARDAFG[ABOVE FINISHED GRADE 26 00 00.1 -WORKING CLEARANCES:THE CONTRACTOR IS REQUIRED TO COORDINATE THE MINIMUM PRESSURE CAST FITTINGS OR LOCKNUTS ARE NOT PERMITTED.USES:CONCEALED OR EXPOSED WHERE vw te |ReSSSEAHSTAUTHORITYHAVINGJURISDICTIONWORKINGCLEARANCESANDDEDICATEDEQUIPMENTREQUIREDBYTHENEC110.26.THE CONTRACTOR IS NOT SUBJECT TO PHYSICAL DAMAGE.Pre S2ee83tesCONTROLPANEL-TYPE AS NOTED (SURFACE;RECESSED)AIC”[AMPS INTERRUPTING CAPACITY REQUIRED TO COORDINATE WITH ALL SUBCONTRACTORS SO THAT ENCROACHMENTS INTO THE @ Q [GH]JUNCTION BOX OR EQUIPMENT CONNECTION (CEILING;WALL;FLOOR)AL |ALUMINUM RESTRICTED SPACE ARE PREVENTED.26 05 35 -FLEXIBLE METAL CONDUIT (FMC):GALVANIZED OR ZINC COATED FLEXIBLE STEEL CONSTRUCTION, Bi 1BONDING JUNPER FMC FITTINGS:GALVANIZED MALLEABLE IRON OR STEEL WITH INSULATED THROATS.USES:CONNECTIONS GQ DUPLEX RECEPTACLE -GFCI PROTECTED 26 00 00.2-PLENUM RATING:ALL CABLING,RACEWAYS,CABLE TIES AND COMPONENTS LOCATED IN CEILING TO MOTORS,TRANSFORMERS,AND OTHER MOVABLE OR VIBRATING EQUIPMENT. SWITCH LEGEND ae nee CELCIUS SPACES THAT ARE PLENUMS SHALL BE PLENUM RATED,rzee -26 05 36 -WET RATED:LIQUIDTIGHT FLEXIBLE CONDUIT (LTMC),RMC OR IMC,FITTINGS:GASKETED AND .gé 8g3(THREE WAY);4 (FOUR WAY);L (LOW VOLTAGE);D (DIMMER);K (KEYED);CB __|CIRCUIT BREAKER 26 00 00.3-FIRE RATING:ALL ELECTRICAL PENETRATIONS THROUGH FIRE RATED BARRIERS SHALL BE WET RATED BOXES,EMT WET RATED GLAND COMPRESSION CONNECTORS AND COUPLINGS.USES:aj ;a eeP{PILOT LIGHT);V (VARIABLE SPEED CONTROL);VS (VACANCY SENSOR);CO,€.0,[CONDUIT ONLY SEALED IN ACCORDANCE WITH NEC ARTICLE 300.21.PROVIDE FIRE PUTTY AT ALL BOXES IN FIRE RATED EXTERIOR,WET,EQUIPMENT IN ELEVATOR PITS,<333 useDV(DIMING VACANCY SENSOR);OS (OCCUPANCY SENSOR);TM (TIMER);CT __|CURRENT TRANSFORMER WALLS.CONTRACTOR TO PROVIDE SUBMITTAL OF ALL FIRE RATING SYSTEMS TO BE USED.VAPOR ®g 5 528 T (INTEGRAL MOTOR OVERLOAD)cu___|COPPER BARRIERS:SEAL ALL VAPOR BARRIER PENETRATIONS TO MAINTAIN SYSTEM INTEGRITY.26 05 40 -BOXES:PROVIDE PULL AND JUNCTION BOXES AS REQUIRED PER NEC REQUIREMENTS RATED FOR a DISC [DISCONNECT THE ENVIRONMENT INSTALLED.BRANCH CIRCUIT JUNCTION BOXES TO BE ELECTRO-GALVANIZED,4° DENOTES AVAILABLE FAULT CURRENT EGC EQUIPMENT GROUNDING CONDUCTOR 26 00 00.4-ACCESS PANELS:PROVIDE ACCESS PANELS FOR ALL LOCATIONS NECESSARY TO ACCESS SQUARE BY 1 1/2"DEEP MINIMUM FOR USE IN INTERIOR AREAS,PROVIDE 4 11/16"SQUARE BY 2 1/8"DEEP a ERCSP ELEVATOR RECALL CONTROL AND SUPERVISORY PANEL ELECTRICAL EQUIPMENT AND JUNCTION BOXES.ACCESS PANELS SHALL BE FIRE RATED EQUAL TO OR OUTLET BOXES FOR ALL VOICE AND DATA OUTLETS.DO NOT INSTALL BOXES BACK-TO-BACK IN WALLS.9LINETYPE/LINEWEIGHT DENOTING FUTURE WORK EXCEEDING THE ADJACENT WALL OR CEILING CONSTRUCTION AND PAINTED TO MATCH,PROVIDE SEPARATION TO MINIMIZE SOUND TRANSFER.PROVIDE FIRE RATED PADS TO COVER EACH BOX IN a ve RK TO REMAIN F ___[FAHRENHEIT FIRE RATED WALLS WHERE NECESSARY TO MAINTAIN FIRE WALL RATING.=LINETYPE/LINEWEIGHT DENOTING EXISTING WORK TO REMAI FAA__IFIRE ALARM ANNUCIATOR 26 00 00.5 -REMODEL:EXISTING/REMODEL WORK THAT CANNOT BE CONCEALED DUE TO EXISTING SOLID ie} LINETYPE/LINEWEIGHT DENOTING NEW WORK FACP _|FIRE ALARM CONTROL PANEL CORE OR CONCRETE CONSTRUCTION SHALL BE INSTALLED USING WIREMOLD SURFACE MOUNTED 26 05 §3 -IDENTIFICATION FOR ELECTRICAL SYSTEMS:PROVIDE PRINTED LABELS TO IDENTIFY ALL 8 FHP ___|FRACTIONAL HORSEPOWER RACEWAY AND BOXES IN FINISHED AREAS AND EXPOSED CONDUIT IN NON-FINISHED AREAS,PROVIDE ELECTRICAL PANELBOARDS,DISCONNECTS,CONTROL EQUIPMENT,POWER OUTLETS AND WALL SWITCHES.zlx &woaeeccccn LINETYPE/LINEWEIGHT DENOTING DEMO WORK FLA __|FULL LOAD AMPS TEMPORARY POWER AND LIGHTING FOR ALL AREAS OF THE BUILDING DURING THE RENOVATION.DEMOLISH LETTER HEIGHTS SHALL BE 1/4 INCH FOR EQUIPMENT AND 1/8 INCH ON RECEPTACLES AND WALL SWITCHES.5l8|le /zsieFSDFIRESMOKEDAMPERALLABANDONEDSPECIALSYSTEMCABLESANDPOWERWIRINGBACKTOSOURCE.UPDATE ALL PANEL RECEPTACLE AND SWITCH NAME PLATES SHALL INCLUDE PANELBOARD NAME AND CIRCUIT NUMBER.LABEL Zia]|2/8|/2 12 EQUIPMENT TAG LEGEND FT IFEET SCHEDULES TO REFLECT CURRENT CIRCUIT DESCRIPTIONS,EACH CONDUCTOR AT EACH TERMINATION OR INTERCONNECTION OF WIRING IN PANEL BOARDS,GUTTERS,Siz]|£/8/3 |e Fu FUSE PULL BOXES,OUTLETS AND LOAD CONNECTIONS.LABEL SHALL DENOTE PANEL NAME AND CIRCUIT LUMINAIRE TYPE (UNDERLINED)G,GFCI_[GROUND FAULT CIRCUIT INTERRUPTER 26 06 15 -POWER CONDUCTORS:ALL POWER CONDUCTORS SHALL BE THHN 90 DEGREE ©INSULATED WARNING LABELS ON ALLELECTRICALEQUIPMENT REQUIREDBYNEC SUCH AS PANELBOARDS,CONTROLS;COPPER UNLESS NOTED OTHERWISE.CONDUCTORS INSTALLED WHILE AMBIENT TEMPERATURE IS LESS ;LUMINAIRES Aa GEC _[GROUNDING ELECTRODE CONDUCTOR THAN 7c PANELS ETC,COLOR CODE FIRE ALARM RACEWAY,BOXES,AND CABLING WITH RED.2H-15a--CIRCUIT AND SWITCHLEG -TC (20F}OR LOCATED IN UN-HEATED SPACES SHALL BE XHHW 90 DEGREE C INSULATED COPPER ]GES __|GROUNDING ELECTRODE SYSTEM UNLESS NOTED OTHERWISE,INSTALL ALL CONDUCTORS AND CABLES IN ACCORDANCE WITH NEG aayPANELGFEP_|GROUND FAULT EQUIPMENT PROTECTION REQUIREMENTS FOR AMBIENT TEMPERATURE DERATING,CONDUIT FILL DERATING,AND BOX FILL.PROVIDE 26 24 16 -PANELBOARDS:PROVIDE AND INSTALL NEMA PB1;BOLT-ON CIRCUIT BREAKER TYPE.FS W-P-115;Sea) TYPICAL LUMINAIRE HP [HORSEPOWER UNSHARED DEDICATED NEUTRAL FOR EACH CIRCUIT.TYPE |,CLASS 1 PANELBOARD OF THE RATING AND CONFIGURATION AS SHOWN ON THE SINGLE LINE 3 aS won ern ne eee e ee ee enn one enna -------1D TIDENTIFICATION DIAGRAM,PANEL SCHEDULES AND SCCR TABLE.PROVIDE TYPED CIRCUIT DIRECTORY SHOWING CIRCUITING Si87 a Sa A ee aR SPONDING IN__[INCHES 240V/120V CONDUCTORS:COLOR CODE CONDUCTORS BLACK,RED,WHITE,AND GREEN.MINIMUM SIZE ea NM ORAM Ie OE AKER HANDLE TIES ON ALL EXISTING AND NEW MULTIWIRE BRANCH CIRCUITS LOOPCONTROL$LUMINAIRE CONTROL KVA IKILOVOLT-AMPERE CONDUCTORS FOR 15 AND 20 AMP BRANCH CIRCUITS MEASURED FROM THE PANELBOARO TO THE .SZSWITCHESRwTKILOWATTFURTHESTDEVICEONTHECIRCUITUNLESSOTHERWISENOTEDONTHEDRAWINGS:12 AWG UP TO 75 FT,= UPPERCASE LETTER OR NUMBER 10 AWG 75 FT TO 120 FT,8 AWG GREATER THAN 120 FT.26 27 13-ELECTRICAL SERVICES:THE ELECTRICAL CONTRACTOR SHALL CONTACT THE SERVING UTILITY__oo eeeeeeeeDENOTES SWITCH CONFIGURATION _a AMPS CO.AND VERIFY EXACT SERVICE REQUIREMENTS FOR POWER.SUBMIT SHOP DRAWINGS TO SERVING .POWER UTILITY FOR APPROVAL PRIOR TO EQUIPMENT PROCUREMENT.THE CONTRACTOR SHALLAHU-1 =:QUIPMENT ID (UNDERLINED)MCA __[MINIMUM CIRCUIT AMPACITY CONCEALEDANDROTECTED)ne MO CABLE WITH STEEL OUTER SHEATH (WHERE ROUTED COORDINATE AND PROVIDE ALL REQUIREMENTS OF THE SERVING UTILITY AND ALL EQUIPMENT SHALL EQUIPMENT MOP __[MAIN DISTRIBUTION PANEL "CONFORM TO THE SERVING UTILITY STANDARDS AND REQUIREMENTS,2) CONNECTIONS 901.35 (MOTOR STARTER SHOWN MOS _|MAIN DISTRIBUTION SWITCHBOARD 26 05 26 -GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS:PROVIDE EQUEPOTENTIAL GROUNDING Zz 5 $.t )MES [MAXIMUM FUSE SIZE SYSTEM,IN ACCORDANCE WITH NEC ARTICLE 250,AT SERVICE ENTRANCE EQUIPMENT AND EACH 26 27 27 -RECEPTACLES:SIMPLEX OR DUPLEX (AS DENOTED ON THE PLANS)COMMERCIAL GRADE,2 POLE,Ps bad Ww aCIRCUITNUMBER(S)NC ___[NORMALLY CLOSED SEPARATELY DERIVED SYSTEM.PROVIDE GROUNDING CONDUCTOR IN ALL RACEWAYS BONDED TO 3 WIRE,120V,20 AMP STRAIGHT BLADE,UON,UL LISTED,SMOOTH NYLON FACE,BACK AND SIDE WIRED.esos 4PANELNIGNOTINCONTRACT(NOTINSCOPE)EQUIPMENT AND TO RACEWAY SYSTEM.PROVIDE COMMUNICATION GROUND SYSTEM USING INSULATED INSTALL RECEPTACLES VERTICALLY WITH GROUNDING POLE ON BOTTOM UNLESS NOTED OTHERWISE.woe S = Dr r rcsrcssessceeenceenaan -NO NORMALLY OPEN GROUND BUS AT EACH TELECOM ROOM OR TTB BONDED TO THE MAIN SERVICE GROUND VIA #2 COPPER.at Wey <7 MOUNTING HEIGHT AFF >IPOLES PROVIDE #2 BOND FROM INSULATED GROUND BUS TO EACH RACK.26 27 28 -GFCI RECEPTACLES:DUPLEX WITH CLASS 3 INTEGRAL GROUND FAULT CURRENT INTERRUPTER al 5 ESRECEPTACLESoe3eTNUMBER(S Sa -IBHOTD GEIL {GFC).THE GFC!SHALL BE INSTALLED IN A READILY ACCESSIBLE LOCATION OR PROVIDE GFCI BREAKER IN WwW WW ra 5]L5-208 hema CONE NSURATON FOR SPECIAL PHB PHASE 26 05 29 -HANGARS AND SUPPORTS FOR ELECTRICAL SYSTEMS:SUPPORT ALL ELECTRICAL EQUIPMENT PANEL.EXTERIOR OR WET LOCATIONS SHALL BE WEATHER RESISTANT MARKED "WR"ON THE FACE.we i F a INCLUDING,BUT NOT LIMITED TO,LIGHT FIXTURES,PANELBOARDS,BOXES,CONDUIT,ETC.PER NEC AND IBG weRECEPTACLES(UNDERLINED)PNL_«[PANEL SEISMIC REQUIREMENTS.PROVIDE SEISMIC SUPPORT AND DESIGN AS A DEFERRED SUBMITTAL TO THE AHJ 26 27 35 -SWITCHES:20 AMP,120/277V AC,BACK AND SIDE WIRED CONFIGURED AS INDICATED ON THE PRI [PRIMARY FOR ALL EQUIPMENT OVER 400 LBS SEALED BY A LICENSED STRUCTURAL ENGINEER.DRAWINGS,PROVIDE NEUTRAL (GROUNDED CONDUCTOR)IN ALL SWITCH BOXES FOR EACH SWITCHEDREC_[RECEPTACLE CIRCUIT TO ALLOW FUTURE TECHNOLOGIES TO BE INSTALLED WHICH REQUIRE NEUTRAL CONDUCTOR. RIB___|RELAY IN A BOX (MOTOR RATED)26 05 31 -POLYVINYL CHLORIDE CONDUIT (PVC):UL 651,SCHEDULE 40 AND SCHEDULE 80.FITTINGS:UL ra SCCR _|SHORT CIRCUIT CURRENT RATING 514C AND UL 514D.USES:SCHEDULE 40 -BELOW GRADE OR SLAB ON GRADE.SCHEDULE 80-BELOW 26 27 42-MOTOR RATED SWITCH:MANUAL FRACTIONAL HORSEPOWER RATED SWITCH RATED FOR 3SETSERVICEENTRANCERATEDGRADE,SLAB ON GRADE,OR CORROSIVE ENVIRONMENT.DO NOT INSTALL WHEN AMBIENT TEMPERATURES VOLTAGE,PHASE AND HORSEPOWER AS DENOTED ON THE PLANS,SWITCH TO INCLUDE OVERLOADS = MOUNTING HEIGHT SCHEDULE SEO SECONDARY ARE LESS THAN -7C (20F).WHERE NOT INCLUDED INTEGRAL TO THE MOTOR.3 EQUIPMENT HEIGHT SSB)_[SUPPLY SIDE BONDING JUMPER 26 51 00-LUMINAIRES:PROVIDE AND INSTALL ALL LIGHTING EQUIPMENT AS SHOWN ON THE DRAWINGS AND z PANELBOARDS (TOP)ics SSEB {SUPPLY SIDE EQUIPMENT BONDING JUMPER DESCRIBED IN THE LUMINAIRE SCHEDULE.DRIVERS SHALL BE SOUND RATED A.EXTERIOR FIXTURES SHALL .=SPECIAL SYSTEM PANELS (TOP)ica SVC_|SERVICE BE RATED FOR -40 DEG F OPERATION,PROVIDE LED FIXTURES WITH LONG-LIFE LED'S,COUPLED WITH HIGH OsPOWERMETERBASE(CENTER LINE OF SOCKET)PER UTILITY TELECOM|TELECOMMUNICATION EFFICIENCY DRIVERS,L80 PERFORMANCE FOR 50,000 HOURS.aiCONTACTORS,MOTOR STARTERS,DISCONNECT SWITCHES (TOP)66"TGB _|TELECOMMUNICATION GROUNDING BUSBAR =e RECEPTACLES IN OFFICE AREAS 18"TMGB _|TELECOMMUNICATION MAIN GROUNDING BUSBAR ws RECEPTACLES LOCATED IN HAZARDOUS OR S-2 OCCUPANCIES 24°MINIMUM TYP _|TYPICAL a = RECEPTACLES IN NON-FINISHED AND MECHANICAL SPACES ae UON _[UNLESS OTHERWISE NOTED i Z[ABOVE COUNTER/BACKSPLASH DEVICES (DENOTED "AC')4 ABOVE ; v_|VoLTs wWALLMOUNTEDSWITCHES6VA_|VOLTS-AMPERES =z TELECOMMUNICATION OUTLETS 18"VED _[VARIABLE FREQUENCY DRIVE Oa TELECOMMUNICATION WALL MOUNTED OUTLETS (DENOTED "W)©5a"W_|WATTS OR WIRE = CLOCK OUTLETS (BOTTOM)80"WG __[WIRE GUARD Lis = HORNS/STROBES/HORN STROBES/DOORBELL RINGER (BOTTOM)80 WP _|WEATHERPROOF (NEMA 4 RATED)EQUIPMENT CONNECTION SCHEDULE PULL STATIONS,PUSH BUTTONS,DOORBELL PUSHBUTTON 46"XFMR _|TRANSFORMER NOTES (KEY)|x DENOTES A GENERAL,NON-REFERENCED,NOTE.NUMBERED NOTES ARE REFERENCED IN THE SCHEDULE. (A)_[QUANTITIES/COUNTS SHOWN IN SCHEDULES ARE FOR CONVENIENCE ONLY.CONTRACTOR TO VERIFY ALL QUANTITIES/COUNTS FROM PLANS. (8)_[REFER TO FLOOR PLAN DRAWINGS FOR EQUIPMENT TYPE REQUIREMENTS,LOCATIONS AND QUANTITIES.2 (C)__|COORDINATE ALL CONNECTION REQUIREMENTS WITH ACTUAL EQUIPMENT SUPPLIED PRIOR TO ROUGHIN,z\e(D)_|COORDINATE AND PROVIDE SPECIFIC SIZING OF OVERLOADS AND FUSES WITH EQUIPMENT NAMEPLATES.a 1 _|PROVIDE HP RATED RELAY IN A BOX'(RIB)WHERE NECESSARY FOR AUTOMATIC CONTROL.COORDINATE ALL CONTROL REQUIREMENTS WITH MECHANICAL.FA 2SCHEDULEao ary]_EQuIPID LOCATION OR FUNCTION KVA_|_HP |FLA |MCA |MFS TYPE CONFIG |V [PH FEEDER (MINIMUM)CU UON |NOTES LUMINAIRE SCHEDULE 1_|cPA BOILER CIRCULATION PUMP 1.656 |3/4 MOTOR SWITCH 240 [1 |[0.5°C,(2)12 AWG,(1)12 AWG EGC 1 NOTES 1_[cP-2 BOILER CIRCULATION PUMP 1.656 |3/4 MOTOR SWITCH 240 |1 |[0.5°G,(2)12 AWG,(1)12 AWG EGC 1 |_| (KEY)[(x)OENOTES A GENERAL,NON-REFERENCED,NOTE.NUMBERED NOTES ARE REFERENCED IN THE SCHEDULE,1_|cp-3 OFFICE BUILDING CIRCULATION PUMP 0.264 |42 MOTOR SWITCH 120 [1 |[0.5°C,(2)12 AWG,(1)12 AWG EGG 1 3 (A)_[QUANTITIES/GOUNTS SHOWN IN SCHEDULES ARE FOR CONVENIENCE ONLY.CONTRACTOR TO VERIFY ALL QUANTITIES/COUNTS FROM PLANS.1 |cP4 COMMUNITY BUILDING CIRCULATION PUMP |0.264 |1/12 MOTOR SWITCH 120 [1 |[0.5°C,(2)12 AWG,(1)12 AWG EGC 1 = (B)_[CATALOG NUMBERS ARE FOR GENERAL REFERENCE AND ARE NOT INCLUSIVE OF ALL OPTIONS OR REQUIREMENTS DENOTED ON PLANS AND SPECIFICATIONS.1_(CP-5 CLINIC BUILDING CIRCULATION PUMP 0.264 |12 MOTOR SWITCH 120 |1 |[0.5°C,(2)12 AWG,(1)12 AWG EGC 1 3]=|a]alo(C)_[REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION AND PROVIDE MOUNTING HAROWARE/FLANGES ETC FOR ALL LUMINAIRES FOR CEILING TYPES SHOWN,1_|cP-6 SHOP BUILDING CIRCULATION PUMP 0.264 |12 MOTOR SWITCH 120 |1 |[0.5°C,(2)12 AWG,(1)12 AWG EGC i S|8]a)gl a2 1 [NOT USED,1 [EFA EXHAUST FAN 0.012 |FHP |0.1 MOTOR SWITCH 120 |1 |[0.5°C,(2)12 AWG,(1)12 AWG EGC =|8]2]2SCHEDULE1[GMT GLYCOL MAKE-UP TANK 0.048 |FHP |0.4 DUPLEX GFCI G__|120 |1 |[0.5°C,(2)12 AWG,(112 AWG EGC a)Ss)ele)ary |TYPE DESCRIPTION WATTS]__LAMPS MOUNTING __|MANUFACTURER MODEL NOTES 1_[UHM UNIT HEATER 0.096 |FHP |08 MOTOR SWITCH 120 |1 |J0.5°6,(2)12 AWG,(1)12 AWG EGC 5 3!8 1_|_VG0_|WALL MOUNT LED CAST ALUMINUM GLOBE &GUARD 18W |600LMLED WALL LITHONIA __[OLVIWM 1_[uH2 UNIT HEATER 0.096 |FHP |0.8 MOTOR SWITCH 120 |1 |105°C,(2)12 AWG,(1)12 AWG EGC 8l28 2 84_|_vP24 [2FT LED GASKETED WET LOCATION NON-METALLIC WRAP 40W |4353LMLED |SURFACE LITHONIA _|DMW2-1.24-4000LM-PCL-MO-MVOLT-GZ1-40K-80CRI 1 [UH3 UNIT HEATER 0.864 |18 MOTOR SWITCH 120 |1 ||0.5°G,(2)12 AWG,(1)12 AWG EGC é2 444 2 1_|_ZW1_|OUTDOOR LED WALLPACK W/INTEGRAL PHOTOCELL tw |1490 LMLED WALL LITHONIA _[OLW14 1 [WHA WOOD HEATER 1.600 15 DIRECT WIRED 120 [1 |[0.5°C,(2)12 AWG,(1)12 AWG EGC ane E1.1 Wor Bue2}e AaaELLEOPE'LO6 J Z1L6°6P E206L 81566 AY JOVYOHDNY002 aLIns AMH Ga¥MaS G10 2269 $011 D03V#"d'ODvb22-LT3'ONBOF313KE) $uaINIONA TyIIML ATT ON!'SYa3aNIONIATONIGHCOOVSa1vosASANO "L33HS SHL NOHONI 3NO LON-H ab ° ONIMVAO TWNIDIONO HON 2NO SIave YOLOSdSNILune-svNYWauOdONDIVLS'aTvOS¥oo8 01314 OYO93Y NOLLONYLSNOD 32 GINHOS"TNVIN@NeyTy reibt-34 Aye Naan? ALIS WOIMLOATA SSWNOId WaiSAS LVSH LOrsIsia VASVT¥"VNITZVLNW1dEMTS: SVOL-GPE-206 XW4 OLOL-GPE°L06 HdE7566HY "JOVUOHONY SP6C0% X08Od YONI'SUFSNIONA=osawn=UAB E2.1"SrsvanosPeusseaLuozeon, Fd NOHLdIdIS30NOISIAaY WAN wriz-213 Sheet No. pelo CONTRACTOR TO COORDINATE POWER LINE EXTENSION AND NEW BIOMASS WOOD HEAT MODULE POWER SERVICE CONNECTION WITH UTILITY. GENERAL NOTES 1. (E)Tvc sHoP (N)BIOMASS WOOD HEAT MODULE METER/MAIN - {N)POWER SERVICE {N}CORDWOOD STORAGE AREA: (NJSTORAGE CONNEX {E)POWER POLE CLINIC -+(F)TVC GREENHOUSE tr aa) yt ij Wow| |. oF. He Lei2 2gaz ed2ee 5 ; |7 =fA uw Or |i 2 & i\74OL13/ J)ef i ne /meas ay HLYON40°20° SCALE IN FEET {N)POWER LINE: {E)POWER LINE (N)POWER SERVICE DROP (N)POWER POLE (N)POWER SERVICE TRANSFORMER (E)MOUNDED SEPTIC DRAIN FIELD - - . 1CDi 0/0'0:0'0'0'0 :0-94: 9Z:07-TT LTO7/EZ/OT:2b WISH CUNZeL BTSIYST HHLZ-LTI\OMG OSO\WAISAS 9H J1sISIQ EuN|Ze) PHZZ-ZTA\LTIVd Wd 7Z:0b:T LTOZ/E/TE EShts18_Tazlina_Heat.rvt11/3/20171:40:24PM__P:\E17\E17-2744TazlinaDistrictHeatSystem\050DWG\E17-2744qc:10/23/201711:20:26:fc-0:0.0;0.0:0.0/0ICO!@)REFERENCED SHEET NOTES (WOOD HEATER BLOWER cP-2_-GMT-1 __UH-1 __UH-2 EF-1_A911 A-3 1 WOOD HEATER CONTROL me iw --PANEL 'A'rar3 im 3 24 VAC CONTROL WIRING (INCLUDED WITH meen] WH-1 10 uw-1 p24 A2 WOOD HEAT SENSOR STEM (1)BIOMASS WOOD HEAT MODULE POWER &SIGNAL PLAN "SERVICE METER/MAIN' E3.1/SCALE:1/2"=1-0" (2 TVC HEALTH CLINIC POWER &SIGNAL PLAN E3.1/SCALE:4/8"=1'-0° (CBN 1VC OFFICE POWER &SIGNAL PLAN E3.1/SCALE:1/8"=1'-0* IN] (4 TVC COMMUNITY HALL POWER &SIGNAL PLAN 3.1 SCALE:1/8"=1'-0" REF 1 2 3 NOTE WOOD HEATER BLOWER FAN CONNECTS TO WOOD HEATER CONTROL PANEL INTEGRAL RECEPTACLE VIA CORD AND PLUG.SEE 3/64.1 FOR DETAIL. PROVIDE DRIVEN GROUND ROD FOR WOOD HEATER BONDING.SEE 2/€4.1 FOR DETAIL. PROVIDE BRANCH CIRCUIT FROM EXISTING PANEL FOR NEW LOAD,SEE EQUIPMENT SCHEDULE FOR WIRING REQUIREMENTS,ELECTRICIAN TO FIELD VERIFY EXISTING PANEL CONDITIONS AND PROVIDE CIRCUIT BREAKER AS NECESSARY.NEW CIRCUIT BREAKERS SHALL MEET EXISTING PANEL AIC CIRCUIT BREAKER RATINGS, ADDITIONAL LOAD TO THE EXISTING ELECTRICAL PANEL IS 0.253 kVA.THIS LOAD IS NEGLIGIBLE.THE EXISTING BUILDING POWER SYSTEM IS ADEQUATE TO SUPPORT THIS LOAD. ADDITIONAL LOAD TO THE EXISTING ELECTRICAL PANEL IS 1.128 kVA.THIS LOAD IS NEGLIGIBLE.THE EXISTING BUILDING POWER SYSTEM IS ADEQUATE TO SUPPORT THIS LOAD, CONTRACTOR TO FIELD COORDINATE EXACT EQUIPMENT LOCATION ON SITE. TVC SHOP (5\1VC SHOP POWER &SIGNAL PLAN SISyo 2 2a|22 2w|Ze &:Z./26 =<aee=<120 £wan8Sle2o8ese2ia=|BRGaag Ee¥[79 xeo22}we S82ee0 3 a cee =33 yore3]23 Bisoes55Saae a a [e] oOw ing z Q i= 3 xa 2/33 /8aJail2wSle]jel si di3ClzSl|2|/2]z2 SNAySNe \Zo Bieox?2 &.hGat25206)gotKK Mysaaia4fostVARgseaHo4%a tzu 87LerDiseesVX"3*8S xWETe38 OFWEARSWA 9) 2S|Jfo)zt ao oz ss|20 x bla 0 4Aide2z=<>|0Oi 4 <ial Of a Zza}U0 Wo Axj=qBy)Ww FE=Oo=ofaa<2) al Cle:2POBOX732946ANCHORAGE,AK99523PH:907-343-1010FAX:907-343-1015ENGINEERS,INCREVISIONDESCRIPTIONNUM]E34 SCALE:1/8"=1'-0"17-274411/03/2017DesignedKMM/BLSKMM/BLSDrawnBLSApproved EShts18_Taztina_Heat.rvt11/3/20171:40:26PMP:\E17\E17-2744TazlinaDistrictHeatSystemm\050DWG\E17-2744,qc:10/23/201711:20:26:fe-0:0.0;0.0:0.0/0Ico!(®)REFERENCED DETAIL NOTES EQUIPMENT SCCR SCHEDULE 1.CONTRACTOR TO COORDINATE POWER SERVICE CONNECTION AND REQUIREMENTS WITH UTILITY. @® OVERHEAD POWER SERVICE: 240/120V,1PH,3W WEATHERHEAD "SERVICE METERMAIN'\"RATED,100A,NEMA 3RPANEL 'A' SEE 264.1 FOR DETAIL = ALL EQUIPMENT TO HAVE SCCR EXCEEDING THE AVAILABLE SCA AT THE CALCULATED X/R RATIO.WHERE X/R RATIO IS GREATER THAN THE INDUSTRY STANDARD TEST X/R RATIOS THE APPROPRIATE MULTIPLICATION FACTOR SHALL BE APPLIED TO PROPERLY RATE THE EQUIPMENT.DOWNSTREAM EQUIPMENT AND ASSOCIATED CIRCUIT BREAKER RATINGS MAY BE SATISFIED BY USING FULLY RATED EQUIPMENT OR MANUFACTURER TESTED COMBINATIONS FOR BRANCH CIRCUITS RATED 100 AMPS OR LESS PER NEC 240,86(B)TO SERIES RATE FOR THE AVAILABLE SCA AT EQUIPMENT.ALL SERIES RATED EQUIPMENT TO BE CLEARLY LABELED &IDENTIFIED PER NEC 110.22(C),SERIES RATED EQUIPMENT MOTOR LOADS CANNOT EXCEED 1%OF AIC RATING PER NEC 240.86(C). CONTRACTOR TO VERIFY ACTUAL EQUIPMENT TO BE PROVIDED WITH SERVING UTILITY PRIOR TO EQUIPMENT PROCUREMENT.ANY DECREASE OF TRANSFORMER %Z, CONDUCTOR LENGTHS,OR INCREASE IN TRANSFORMER KVA OR CABLE SIZES TO BE REPORTED TO CONTRACT OFFICER FOR RECALCULATION OF AVAILBLE FAULT CURRENT PRIOR TO PROCUREMENT OF EQUIPMENT. PROVIDE WARNING PLACARD INSTALLED ON SERVICE DISCONNECT PER NEC 110.24 DENOTING ALL PROJECT PARAMETERS REQUIRED BY NEC. ASSUMED UTILITY SYSTEM CONFIGURATION {BASIS FOR CALCULATION) SERVICE TRANSFORMER KVA [|%Z |XR|SCA(PRL)|SCA(SEC.)25 {1.00[1.20 |1,000,000 |10,415 SERVICE| -FOR FAULT CURRENT CALCULATION ONLY - AMPS SERVICE LATERAL FT FEEDER SCHEDULE 100 4.25"C,(3}2 AWG,(1)6 AWG BJ 59 Li)AMPERAGE |.FEEDER (MINIMUM)CU UON EQUIPMENT ID SCAmps XR SERVICE METER/MAIN 100 1,25°C,(3)2 AWG,(1}6 AWG BJ SERVICE METER/MAIN 6,108 0,64 A 100 1.25°C,(3)2 AWG,(1)6 AWG EGC A 5,663 0.60 (1\POWER ONE-LINE DIAGRAM E44 SCALE:NONE BUILDING STEEL CONCRETE ENCASED ELECTRODE (UFER}25FT 2 AWG BARE COPPER IN CONCRETE FOOTING 2"COVER SERVICE EQUIPMENT. |GROUND BUS NO'TES: 1. a comes $4 BOND ALL PIPING AND BUILDING DISCONTINUITIES TO PROVIDE ELECTRICALLY CONTINUOUS SYSTEM.PROVIDE BOND JUMPER EQUAL TO GROUNDING ELECTRODE CONDUCTOR FOR THAT SYSTEM, .PROVIDE RACEWAY FOR ALL CONDUCTORS,RACEWAY TO BE METALLIC iN PLENUM AIR SPACES.WHERE METALLIC RACEWAY IS USED,BOND EACH END TO CONDUCTOR. 3.CONDUCTOR SIZES SHOWN ARE COPPER. MAIN BONDING JUMPER,8 AWG (NOTE:DO NOT BOND NEUTRAL TO GROUND AT ANY OTHER POINT IN THE SYSTEM) EQUIPMENT BONDING JUMPER,8 AWG aha AWG8AWG 4 AWG (MIN)MIN (2\GROUNDING SYSTEM ONE-LINE DIAGRAM CT3METALLIC PIPING L-6 AWG (MIN) DEDICATED EXTERIOR DRIVEN GROUND ROD §/8"X 8-0" Le HEATER STEEL EXTERIOR DRIVEN GROUND ROD 5/8"X 8-0"(TYP OF 2) E41 SCALE:NONE LOAD CLASSIFICATIONS SCHEDULE NOTES g:|38(KEY)|'xy DENOTESA GENERAL,NON-REFERENCED,NOTE.NUMBERED NOTES ARE REFERENCED IN THE SCHEDULE."125 5 oe 4)[NOTALL LOAD CLASSIFICATIONS ARE NECESSARILY USED.ONLY CLASSIFICATIONS FROM LOADS THAT ARE CONNECTED TO EACH "ce 3 &(A)|PANEL ARE SHOWN IN THE SUMMARY SECTION OF THE PANEL SCHEDULES.wilo®o &uw za "4B)_|PANELBOARD BUS RATINGS TO EQUAL OR EXCEED OPD RATINGS SHOWN IN PANEL SCHEDULES UNLESS OTHERWISE NOTED.z.les ¢Yare(8)2:189 3 Gees4_|THE NEC DEMAND PERCENTAGE IS SHOWN AS A WEIGHTED AVERAGE.FOR EXAMPLE 125%OF 100VA PLUS 100%OF 100VA WILL O.lG &8 ge 5SHOWTHEWEIGHTEDAVERAGEPERCENTAGEOF112.5%RESULTING IN 225VA.Zeya esas e ZK oSCHEDULEv-te |RELSS 3CLASS.|_NEC REFERENCE DESCRIPTION we CB tre CONT [NEG 2014:210.20(A)[125%OF THE CONTINUOUS LOAD ETR [NEC 2014:220.87 RECORDED DEMAND LOAD *125% LTG [NEC 2014:210.20(A)_[LIGHTING LOADS CONSIDERED TO BE CONTINUOUS.125%OF THE CONTINOUS LOAD.LTGE |NEC 2014:210,.20(A)_[CALCULATED SAME AS 'LTG'BUT EXCLUDED FROM ENERGY LIGHTING POWER DENSITY CALCULATIONS. MTR |NEC 2014:430.24 125%OF THE FULL-LOAD CURRENT RATING OF THE HIGHTEST RATED MOTOR PLUS THE SUM OF THE Pee etFULL-LOAD CURRENT RATINGS OF ALL OTHER MOTORS.(SEE NOTE 1)i 28 3343 NCDN |NEC 2014:220.60 NONCOINCIDENT LOADS:WHERE IT IS UNLIKELY THAT TWO OR MORE NONCOINCIDENT LOADS WILL BE IN z 558 wa 35USESIMULTANEOUSLY,THE LARGEST LOAD WILL BE USED,LOADS CLASSIFIED AS NCDN WILL HAVE ZERO 8 g 3 5o”§LOAD.ag 2¢* NCNT [NEC 2014:210.20(A)[100%OF THE NON-CONTINUOUS LOAD 2 REC [NEC 2014:220.44 NON-DWELLING RECEPTACLE LOADS =FIRST 10KVA OR LESS AT 100%PLUS REMAINDER OVER 10KVA AT I] 50%,(SEE NOTE 1)& MCA (SEE MTR)THE LOAD IS BASED ON THE GIVEN MCA (MINIMUM CIRCUIT AMPACITY)WHICH INCLUDES 125%OF THE 9 LARGEST MOTOR OF THE UNIT.100%OF THE MCA LOAD.« z ° - o PANEL SCHEDULE NOTES z §&Ee ZienREFNOTEgfe}/2)s\378'KEY'|'(x)'DENOTES A GENERAL,NON-REFERENCED,NOTE.NUMBERED NOTES ARE REFERENCED FROM THE PANEL SCHEDULES DENOTED o\2 raLbaesBY'f#f.(NOT ALL NUMBERED NOTES ARE REFERENCED.)Ojz ole}<l2 (A)[REFER TO POWER ONE-LINE DIAGRAMS FOR ADDITIONAL PANEL CONFIGURATION AND REQUIREMENTS. (B)[REFER TO EQUIPMENT SCCR SCHEDULE FOR PANEL SHORT CIRCUIT RATINGS.= [1].[PROVIDE RED BREAKER IDENTIFICATION WITH OEM DEVICE THAT CAN BE LOCKED IN THE "ON”POSITION FOR FIRE ALARM CIRCUITS.Za \\ [2)_PROVIDE 30mA GFPE CIRCUIT BREAKER.FS eM)[3)_[PROVIDE 6mA GFCI PROTECTED CIRCUIT BREAKER.Z x;3 oe) [4)_[PROVIDE OEM DEVICE THAT CAN BE LOCKED IN THE "OFF”POSITION FOR USE AS DISCONNECT PER NEC.rant sae 4teHye?t Son ee)2We,edNCISSAcedWie wn a <|3PANEL"A"SCHEDULE a -!0 S$VOLTAGE:240/120V,1PH,3W LOCATION:BIOMASS WOOD HEAT MODULE 2 3 awn aOPDRATING:100A ENCLOSURE:NEMA1 Flees =3MOUNTING:SURFACE Sule <aCKTLOADDESCRIPTIONAMP|P A B P|AMP LOAD DESCRIPTION CKT Ma ake ae <1_[MTRALTG.UH-1,HEAT EX RM 20 |1 |014 |015 +_|20 [LTG WOOD HEAT RM.EXTERIOR 2 ElalO o>Ww z 3_|MTRREC,GMT-1,HEAT EX RM 20 |1 0.23 |036 |1 |20 [REC WOOD HEAT RM,EXTERIOR 4 ud WwW xa gy5[MTR GP-1 75 |2 |083 [on 1 |20 [MTR EF-1,UH.2 6 +r Oo ss 7 [-|=0.83 [|1.80 [1 |20 [MCA WH-1 8 Qo 9 [MTR CP2 15 |2 |083 |0.00 1 [20 [SPARE 70 pc nt [-=|=083 |000 |1 |20 |SPARE 12 a 13_[SPARE 20 |1 |000 |000 1 [20 [SPARE 14 al 15_|-SPACE --|-0.00 |0.00 |-|-|-SPACE-16 =17_|-SPACE--|-|000 [000 =_|_-_|-SPACE-8 S 19_[-SPACE -=|[-0.00 |6.00 |-|--|-SPACE-20 3 21_[-SPACE-=|-[000 [000 _|_-__|-SPACE-22 $ 23_|-SPACE --[-0.00 |0.00 |-|-|-SPACE-24 3 25_|-SPACE --|-[000 |000 -|_-_|-SPACE-26 e 27_[-SPACE--[-0.00 [0.00 [-|-|-SPACE-28 5 29_|-SPACE --|-|000 [0.00 -|_-_|-SPACE-30 Oo 3TOTALKVAIPHASE:2.1 40 =*TOTAL AMPS/PHASE:Tal 337 =f PHASE BALANCE %:A-B 6s & SUMMARY BY LOAD TYPE <p)é _ o ee LOAD CLASSIFICATION CONNECTED |NEC FACTORS |TOTALNEC a:< r 7 LTG 0.193 KVA 125.00%0.241 kVA uj 2WOODHEATERSTEMSENSOR----»>!Orn I MCA 1.800 kVA 100.00%7.800 kVA PANEL TOTALS Lu & (PROVIDED WITH WOOD HEATER}||MTR 3.564 kVA 114.62%3.978 KVA CONNECTED KVA:|6.097 kVA =e: REC 0.540 kVA 00.00%0.540 kVA NEC CALCULATED KVA.|6.559 kVA o Ps|Im CONNECTED AMPS:[25 A # L 4 NEC CALCULATED AMPS:[27 A iG sGARN2000WOODHEATER2 CONTROL PANEL (PROVIDED =WITH WOOD HEATER)x|_|5a]a5S|a]oSom]oe]>]moAUXILIARYDRYCONTACT=>-T4 FOR ROOM FAN CONTROL _||:2\8oetaCTTOROOMFANg&F UTIL ahNEUTRALWHITETip(IF UTILIZED)a gGROUND+}-SREEN, |IwooDHeaTeR-+(.)-_-+-_+4)=+-atower FAN RECEPTACLE || BLOWER FAN cet LLL 4 z WH-4 = WOOD HEATER +]S]3)4]88]8 8]2]2re]sl S|=(3 TYPICAL WOOD HEATER CONTROL PANEL ONE-LINE DIAGRAM my;§}Z)€ 4.17 SCALE:NONE "|'g 33ee3&2!o@ FP =F €@s 68 oo &@azaaa< Sheet No. E4.1