Loading...
HomeMy WebLinkAboutchistochina wood docs 20146/09/2013=2:14pm=Soin : ee PO%wii f SEC.Aaped ETERIA *=oor\Sf [see1383ee'>> }/BSa a ase*Bole, \,(1=Ke/ BB,pl baaR 9g08Bao3a5awoesQuah lag a *aa8 iapPd#39 6mosBag agagN aa4ALISTIVEALINMICD:WINYNIHIOLSINDABBREVIATIONS A AMPERE AFF ABOVE FINISH FLOORBCUBARECOPPERcCONDUIT ce CONTROL PANEL G GROUND CONDUCTOR GA GROUND FAULT INTERRUPTINGGRCGALVANIZEDRIGID(STEEL)CONDUIT H HOT CONDUCTOR HDPE =HIGH DENSITY POLYETHYLENEHOAHANDOFFAUTO HP HORSEPOWER HPS HIGH PRESSURE SODIUM KVA KILO-VOLT AMPERESLIFUQUIDTIGHTFLEXIBLE CONDUIT (METALLIC) MCB MAIN CIRCUIT BREAKER MLO MAIN LUGS ONLY N NEUTRAL CONDUCTOR SIG SIGNAL CONDUCTOR TWSH =TWISTED WIRE SHIELDED CONDUCTORTYPTYPICAL raoaMOmOReeppeee28098¥)-heoe®)tSTAT |RouTE |secnon |romesue |nance |weroiAN |YEAR) LEGEND CONDUIT RUN UNDERGROUND OR IN CONCRETE HOMERUN TO PANEL °X",CIRCUITS NO.Y AND Z CONDUIT RUNS NOT OTHERWISE DEFINED ARE 1/2°C WITH 3912 GROUND 120V,SELF-LIMITING HEAT TRACE,3W/FT. APPROVED FOR USE IN POTABLE WATER,NELSON #LT3-2 OR EQUAL. CONDUIT RUN -CHANGE IN ELEVATION UQUID-TIGHT FLEXIBLE CONDUIT MOTOR,3 PHASE MOTOR,SINGLE PHASE JUNCTION BOX OR FITTING THERMOSTAT,120V,UNE VOLTAGE W/'OFF'POSITION UNIT HEATER,HORIZONTAL, MOLDED CASE CIRCUIT BREAKER,X =AMPERE RATING,Y =NO.OF POLES,*=GFI PROTECTED MOTOR OVERLOAD DISCONNECT SWITCH PANELBOARD COMBINATION MOTOR STARTER MANUAL MOTOR STARTER,SQUARE D CLASS 2510 TYPE FGSP SINGLE POLE SWITCH,BRYANT #49011 120V,20A,THREE WAY SWITCH,BRYANT $4903-! SINGLE POLE SWITCH W/PILOT UGHT.LEWTON #55361 120V,20A,THREE POSITION,HAND OFF--AUTO SWITCH, SQUARE D CAT#KS43BH13 120V,20A,EMERGENCY PUSHBUTTON,RED MUSHROOM HEAD,PUSH-PULL TYPE W/CONTACTS AS REQUIRED,SQUARE D CAT#KRORH13 120V DUPLEX RECEPTACLE,NEMA CONFIGURATION 5 20R, BRYANT #52621 120V DUPLEX GROUND FAULT INTERRUPT RECEPTACLE,NEMACONFIGURATION5=20R,BRYANT JGF53IA MOTORIZED DAMPER HEAT TRACE END KIT.NELSON §GTCK-N HEAT TRACE POWER POINT.NELSON §GTCK-N 120V HEAT DETECTOR,GENTEX MODEL 7100T OR EQUAL 120V SMOKE DETECTOR W/STROBE,GENTEX MODEL 7109CS-C OR EQUAL 120V STROBE,WEATHERPROOF,EDWARDS CAT §51R-N5 OR EQUAL FILEPATH:P:\Projects\KAE\ChistochinaWaterDistributionBullding\Dwg\Elec\E1ElectricalSitePlon.dwgage 120V SMOKE DETECTOR,GENTEX MODEL 7100 OR EQUALvin 535 SOLENOID VALVEgP8a”TELEPHONE JACK fi,"¢£1.07 SCALE:1°=50'-0""Net ene SEFORCONSTRUCTION=«es3 "ane”\._/ {(mv.Descrep TION oan |nev,DESCRIPTION Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING omeon SHEET NO.)pk P0.Box 241 ELECTRICAL SITE PLAN AND [m=n ow gene eter ete pc AK,99588 POWER ONE-LINE wow me -}EI a elephone #-3503 _os sans C eZ Focsimile #(307}.822-8197 OISTOCMINA AtuoeR aa ag wom J 4/09/2013-2:14pmFILEPATH:P:\Projects\KAE\ChistochinaWoterDistributionBullding\Dwg\Elec\E2.dwgSTATE |ROUTE |SECTION |TOWNSHIP |RANGE |MERIDIAN |YEAR 2003mfanebncoon|cose |SORE NOTESTOTALCONNECTEDLOAD#25.8kVA/71.7A @ 208V @ 2”GRC WEATHERHEAD AND SERVICE RISER W/443/0(3H,N). @ 208V,200A,34,4 WIRE,7-JAW METER/MAIN,NEMASR,CIRCLE AW CAT $227MTB OR EQUAL.COORDINATEPANEL°A'ELECTRICAL SERVICE REQUIREMENTS WITH ALASKA POWER &TELEPHONE 907-883-5101,©)®@ 208V,225A,39,NEMA 12,PANELBOARD,SQUARE 0,@ CAT #NQ442L2C OR EQUAL. 6 )()#4 BCU GROUNDING ELECTRODE BONDING CONDUCTORROUTEDTOCONCRETE-ENCASED ELECTRODE (UFERGROUND)IN BUILDING FOUNDATION,I (5)#4 BCU ELECTRODE GROUNDING CONDUCTOR.BOND 6 =a]TO METER/MAIN &GROUNDING SYSTEM. ©GROUND SYSTEM CONSISTING OF (1)EACH 3/4°X 10°7 vd COPPER CLAD STEEL GROUND ROD EMBEDDED 12”MIN. 5 BELOW GRADE AT EACH CORNER OF THE BUILDING & ®®INTERCONNECTED W/§2/0 BCU BURIED A MIN.OF 39"®2 ¢,43/0 (3H,N)&196 (6). @)#6 BCU BONDED TO FUEL STORAGE TANK.C2 POWER ONE-LINE ()200A,208V,4 POLE RECEPTACLE.\e/:i 200A,208V,3-POLE,4 WIRE,NEMA 3R,MANUALTRANSFERSWITCH.SQUARE D CAT#DTU324NRB OREQUAL. Gi)1°HOPE,410 (34,6). @ 2087120,3s,SERVICE DROP BY ALASKA POWER &TELEPHONE. 3 EXISTING OVERHEAD POWER LINE. €EXISTING UTILITY POLE. 43)ELECTRICAL HEAT TRACE ROUTED ALONG WELL LINEANDDOWNINTOWELL. Gi)2°HOPE W/POWER/CONTROL CABLE SUPPLIED W/UFT STATION.PROVIDE GRC RISERS WHERE CONDUIT EMERGES ABOVE GRADE."DO NOT CUT POWER/CONTROL CABLE !!"COIL ANY EXCESS CASLE IN TOP OF LIFT STATION. ay /. /AIR ; /-/ WELL PUMP #2" / { A x >,i /Cy Gy }/ /We pump #1 E)'/ /a x ot :/j :ae /A /bed i %x a /i a j /j </(A)WASHETERIA ELECTRICAL SITE_PLAN \wf=&|j H !f}£2 /SCALE:1"=10'-0"----*a! ¢ ;4 i ; ;f '20 4jj|j i !//\FOR CONSTRUCTION 4p3'ei fi A i £'/ ev.DESCREPTION gare |tev.DESCRIPTION Dare ty Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING -[tomes +SHEET NO.)COC NG ecoune |Ee P.0.BOX 241 ELECTRICAL SITE PLAN AND [eeANCHORAGE,AK 68503 Bee J Telephone 7 (907 7332-3503 POWER ONE-LINE =cant E2 L (07)276-7838 -Focsimile #(Sox;822-5197 CHISTOGINA AtaSIeR wash nore D Building\Owg\Elec\E3.dwg4/09/2013-2:14pmWaterDistributirw"ATO UFT STATION” ay(OSSs =oa t imag emer onesies state |route |secnion |tomse |Rance |weroun |year)Mm |we BB ovee |006@ |SPENT dons SHEET NOTES (1)METERBASE (@)MANUAL TRANSFER SWITCH (B)GENERATOR RECEPTACLE (®PANELBOARD 'A' )WELL PUMP CONTROL PANEL SEE SHEET 5 ®©pea PLACARD TO IDENTIFY RECEPTACLE AS DEDICATED FOR HEADBOLTTER @ 208V:240V BUCK/BOOST TRANSFORMER,SOLA/HEW-DUTY CAT #HS20F 500A.(8)LIFT STATION CONTROL PANEL BOILER EMERGENCY SHUTDOWN PUSHBUTTON.SEE DETAIL 4,SHEET E68 STROBE TO ACTIVATE W/SMOKE DETECTORS.PROVIDE W/0.5A FUSE Cit)24VAC,COIN TIMER MONARCH PART #20-HRV24AC IN HOUSING HMG (72)24VAC SHOWER SOLENOID VALVE,SEE MECHANICAL (3)3/4°C,4910 (3H,C) 4)1/2°C,5$12 (2H,2N,6) 5)ALL ELECTRICAL WIRING SHALL BE SURFACE MOUNTED IN THE MECHANICALANDBOILERROOMS 1/2°C,4912 (2SMTCHLEG,N,C) @ 1/2°C,3412 (SMTCHLEG.N,G) PRESSURE SWTCH,SEE COMPONENT SCHEDULE ITEM 8 SHEET E5 4/2°C,3#12 (2S16,6) 0)SUPPLY FAN HAND-OFF-AUTO SWITCH,SEE DETAK.5,SHEET £6. @})MOUNT TIMER IN NEMA 4X HINGED JUNCTION BOX @2 CONTROLLER FOR WATERING POINT HEATED SLAB,SEE MECHANICAL GENERAL NOTES: 1.ALL SMOKE AND HEAT DETECTORS SHALL BE WRED IN TANDEM SO THAT ACTIVATION OF ANY ONE DEVICE SHALL ACTIVATE ALL DEVICES AND THE EXTERIOR STROBE.FILEPATH:P:\Projects\KAE\ChietSOOTAeWa(1\POWER PLAN Z*f4o\E3.0/SCALE:1/2"=1' 0"el 5.Aeryzsox"Yep.=ueor,WgFORCONSTRUCTION 4f3"*WE©/ =DESCRIPTION a DESORPTION DATE CDC.INC.Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING =='SHEET NO.)pa P.O.BOX 241aNOORAGEAK90508{ace Gokono,AK 99586 POWER PLAN wwe E3(907)276-7933 vite ge Telephone #(307 822-3503 CHEESH-NA WASHETERIA bate 4Ars C -s"Facsimile #(907)822-5197 CHISTOCHINA,ALASKA cA AS NOTED y, state |Route |Secon |towisser |eanon |meron)year\rs ae =COPPERiese{|00"|core |eRE2008 OCCUPANCY SENSOR CEILING MOUNT LEVITON CAT O0C20-MOW W/LEVITON,120¥V POWER PACK CAT#ODP13-010 OR EQUAL. ne ae SHEET NOTES OUTSIDE LIGHT CONTROLLED BY TIMER AND H-O-A SWITCH. SEE SCHEMATIC ON SHEET E6. 7-DAY TIMER.SEE SCHEMATIC ON DRAWING E6. ® @ ® (@ 120V,208,HAND-OFF-AUTO SMITCH FOR CONTROL OF OUTSIDE LIGHTS. ) ® ®4/09/2013=2:14pmSEE SCHEMATIC ON SHEET E6. 120V,2,000W PHOTOCELL,TORK MODEL 2101 OR EQUAL,MOUNT UNDER7EAVEFACINGNORTH.;- CEILING MOUNTED JUNCTION 80X FOR FUTURE EXHAUST FAN.HeeS A2 /FAN TO SWITCH ON W/LIGHT.WO ®@ /EXHAUST FAN TO OPERATE WITH THE LIGHT.4}, a”uy 1 -FIXTURE SCHEDULEfSYMBOLLAMPSIZEMOUNTING TYPE__08 \{=@®a 120V,1'x4",FLUORESCENT,a |2-320 SURFACE 2-LAMP,LITHONIArvFLUORCEILING#VRI-232 MVOLT-GEB101S an iY conan--OR EQUAL. rc rh 120V,2°x4°,4-LAMP,-l fi J_-_---}]}*>"CHAIN HANG INDUSTRIAL FLUORESCENT"|a |FLUOR GIO'AFF =IFIXTURE.LITHONIA AF10 432a|Sant MVOLT GEB1OIS. NY:j jlo 3 s-30w surrace |120V.2x4 FLUORESCENT,FLOR CELING 3 LAMP,LITHONIA #VRI 332eyia+6)GS)MVOLT GEB1OIS OR EQUAL. |ifiHu 120V,HIGH PRESSURE SODIUMo|Hy 1-70W |SURFACE WALL ,'3 !:||l a HPS MOUNT WALL PAK.LITHONIA #TWL 70S qo SELF CONTAINED EMERGENCY _LIGHTING UNIT WITH 2 ,{"4 LED WALL MOUNT [OIRECTIONAL LAMPS.ABOVE DOOR iMAINTENANCE-FREE LEADMS|ane CALCIUM BATTERY.LITHONIA +"41 @ LHOM SW 4 R 120/277 H - 120V,3 LAMP,INDUSTRIAL L 3-320 SURFACE [FLUORESCENT FIXTURE.AM FLUOR CEILING LITHONIA AF10-332 MVOLT GEBIOIS OR EQUAL. (1.\LIGHTING PLAN eel,E5 /SCALE:1"=2'-0"_onborne Ag hy0z¢Pee"ey FILEPATH:P:\Projects\KAE\ChistochingWaterDistributionBuilding\Dwg\Flec\E4.dwgWes,"SFtereFORCONSTRUCTION«ps WES y, DATE Rev.DESCRIP ROM .DATE DC,INC.Ch eesh'Na Tribal Council WATER DISTRIBU TION BUILDING cee me SHEET no.) oRA OR OM*pS4 P.O.BOX 241213W.FIREWEED LANE fsssily,:86 UGHTING PLAN APROED OFweed==6 Telephone §130)*922 3503 CHEESH-NA WASHETERIA ih EA.-Facsimile #(907)822-5197 CHISTOCHINA,ALASKA san AS NORD D, 4/09/2013-2:14pmFILEPATH:P:\Projects\KAE\ChiatochinaWeterDistributionBuilding\Dwq\Elec\E5.dug(-;STATE |ROUTE |SECTION |TOWNSHIP |RANGE |MERIDIAN |YEAR /f ou }or wm [--|sia |coon |coon |CAPER T2003 -oO o'208,3 oh Ba AY fe)FRONT PANEL VIEW \fe)l'G LS oie COMPONENT SCHEDULES -ry a-o%e .-i 25/3 WELL PUMP ITEMS PROVIDE MATERIALS SPECIFIED (SUBSTITUTIONS NOT ALLOWED) MM 3O)CONTROL PANEL "WP"(A)[PROT UGHT,120V,LED,NEMA 4X,ALLEN BRADLEY CAT #800HC-ORHIO",WHERE ®=LENS TINT AS SHOWN,Np o1°(2)|120¥RELAY,SPDT,11-PIN OCTAL SOCKET MOUNT WITH MECHANICAL ON/OFF'INDICATOR,ALLEN BRADLEY CAT $700-HA33A1 AND #700-HN126 SOCKETOjBASE. |(3)[PLOT UGHT,PUSH TO TEST,120V,LED,NEWA 4X ALLEN BRADLEY CAT-3.2 #800HC-ORTHIO*,WHERE *=LENS TINT AS SHOWN, (4)]120v,10A,DPOT,ALTERNATING RELAY TIMEMARK MODEL 2610120 OR EQUAL WELL PUMP (5)[S{POSITION SELECTOR SWITCH,120V,NEMA 4X,ALLEN BRADLEY CAT*"SELECT °F800HC-JR2A,PROVIDE CAM AND CONTACT BLOCKS AS REQUIRED.Q (6)|3-POLE,600V,234,IEC,OPEN TYPE CONTACTOR WITH 120¥COL ALLENBRADLEYCAT#100-C12010 AND SOLID STATE,SINGLE PHASE,OVERLOAD RELAY ALLEN BRADLEY CAT #193-ESIBB.PROVIDE WITH ADDITIONAL AUXILIARY AND OVERLOAD CONTACTS,ANO REMOTE OVERLOAD RESET ALLEN BRADLEY CAT #i93-ER1D AS REQUIRED. Q)MOTOR CIRCUIT MONITOR,3-PHASE FRANKLIN ELECTRIC MODEL #586 000 5000. 120V,PRESSSURE SWTCH WTH ADJUSTABLE DIFFERENTIAL,SQUARE D,CLASS9013TYPEFYG2. wt (@)[2008 MOUNTED DISCONNECT SWITCH,240¥,GOA,POLE W/PADLOCK["|PROVISION,ALLEN BRADLEY CAT#194RF NNO6OR24E+---{}----O NEMA 4,NON-METALLIC ENCLOSURE WTH REMOVABLE STEEL BACK PANEL,|INNER DEAD-FRONT HINGED DOOR AND OUTER DOOR.SIZE AS REQUIRED. we HOFFMAN.PRESSURE SWITCH MINIATURE CIRCUIT BREAKER,240V,AMPERE RATING AND NUMBER OF POLESesnee®AS SHOWN,DIN RAIL MOUNTED W/BOX LUGS,SQUARE D MULTI 9 C60N CLASS ABOVE 60 PSI 560 SERIES (iaLoz!i __-1_j t H RI |oO (@) jp+5 }if HAND oF aiatea {R2 po +o-»%---}if RUN L L a)FOR FUTURE CHLORINE ®Mi T M2 T INJECTION CONTROLS SALA,a ie oF hseerso"arZxisgmINtsH"-"%Pevegh for efaraperace redi)ton #&#''"Pp,,Fs(1 WELL PUMP CONTROL PANEL,'WP'SCHEMATIC Wn eS'2 a ee adXK)SCALE:NTS FOR CONSTRUCTION spss JS (vv.DESCRIP Te caw |ev DESCRIPTION OAaTE Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING =[seam +SHEET NO.)EDC.INC ecoune |Ae P.0,BOX 241 WELL PUMP CONTROL PANEL =[e=_™onaas acess |cnnB AK 99586 SCHEMATIC --n ES(907)276-7033 GA Telephone #(907)822-3503 CHEESH-NA WASHETERIA cae sreCZZFacsimile#(907)822-5197 CHISTOCHINA,ALASKA man Ag NORD J 4/09/2013-2:14pmFILEPATH:P:\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Elec\E6.dwqstate |Roure |SECTION |townsite]mance |memoian |year)wm tT]gs |coe |cove [SRPER TL a003 SHEET NOTES BOILER _@ stein ©Bi heeUE AREERMON BRIM cae nsooo.PANEL 'a'(-=--ou ?{2 120V,20A,SINGLE POLE SWITCH,BRYANT $4901. H CP-1A __aN afte TO BOILER 1 &CP-2A 24-HOUR,SEVEN-DAY,PROGRAMMABLE TIMER,120V,SINGLE CHANN120v,Me ----¢}-}*Z oo ie)cKT #21 O oT NEMA 1,PARAGON MODEL #€L7100/120 OR EQUAL.in - N cP--18 wy f-----4-H BOILER EMERGENCY SHUTDOWN PUSHBUTTON.e-27 |.___f if PANEL i (7773 af o }ro BOLER 2 &CP-28 ©PROVE WI "BOILER EMERGENCY SHUTDOWN"PLACARD.e418 (5)120V,LINE VOLTAGE THERMOSTAT,SEE MECHANICAL.@ ® (1.\PRIMARY HEAT CIRCULATION PUMP SCHEMATIC (4)BOILER SHUTDOWN SCHEMATIC £6_/SCALE:NTS £6 /SCALE:NTS po pe+Hann OF auto $*Hann OFF auto 3ootootae |tpt 2 i ftel 9{_oA }ra |OOTSIDE L La an [_SUPPLY FAN,SF-1hate:LIGHTS coms aLn|- : nC}4 (2.\OUTSIDE LIGHTING SCHEMATIC (5.\SUPPLY FAN,SF-1 SCHEMATICEs/SCALE:NTS £6_/SCALE:NTS BUCK/BOOST XFMR ae 4 >)PANEL.'A'''|)!| 7 H |H x H 240V °7 Ts |TO LIFT STATION 9 '208V i:'*'CONTROL PANEL Pzoye |f Co Ji, |v (3 LIFT STATION BUCK/BOOST XMFR WIRING SCHEMATIC£8 _/SCALE:NTS SeySep,gxiagm 34 FOR CONSTRUCTION =1p3 ShGRee”_/ (_nx -e --{--a"EDC.INC.%Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING osoee SHEET NO.)2isW.FREWEEDLANE |qin P.O.BOX 241 ELECTRICAL SCHEMATICS iancworace.coms |=a.B reap ana"e"(ob Soe 3503 "sorSg-na paaevean =m]&S=-Facsimile #(907)822-5197 CHISTOCHINA,ALASICA wan ag wo J 4/09/2013-2:14pmBuilding\Dwg\Elec\E7.degWaterOiFILEPATH:P:\Projects\KAE\Chstate |route |secnon|tows]pance |wemoan |vear\ua |an eon |coe rl 2003 PANEL SCHEDULE PANEL 'A'208Y 120V 32,4 Wire 225A MAINS PANEL LOCATION -PROCESS ROOM MLO SURF/NEMA 12 10,000 AIC AMP POLE]A i:C |POLE AMPPOLEReLOADDESCRIPTIONwalaa@|kva LOAD DESCRIPTION TRIP POLE 1 WELL P CONTROL 26/34 0.8 [OUTSIDE LIGHTS 20/4 2 3 20/3 PANEL,WP"26 37 ¢.4 JINTERIOR LIGHTS 201 4 5 28 4.4 |4.8 |HEADBOLTHEATER RECEPTACLE §2071°6 HEADBOLT HEATER RECEPTACLE 201°7 22 LET STATION 1.4 |29 1.5 8 8 4 18 0.4 {BATHROOM RECEPTS 201 10 "1 18/4 |UNIT HEATER,UH-1 o4 0.8 |0.4 [COUNTER RECEPTACLES 20/1 12 13 qsite [WELL LINE #1 HEAT TRACE]96 |1.4 0.5 OUTSIDE RECEPTACLES a1 4 18 454°[WELL LINE #2 HEAT TRACE]6 9 1.3 |PROCESS /MECH RM RECEPTS |201 18 7 201 |CP-1A/B 058 0.6 {|0.4 [SHOWER TMERS 20/1 18 19 20/1 |CP-3A/B,CP-4A/B o4f 1.2 0.9 [SMOKE DETECTORS /STROBE 18/3 20 21 20/1 |BOILER #1/CP-2A 09 1.4 0.2 [SUPPLY FAN,SF-1 20/1 22 23 20/4 |BORER #2 /CP-2B 09 0.9 |0.0 [SPARE 20/1 24 23_|2071 |DAY TANK 08 |16 0.8 26 27 2011 |WATER HEATER /GMT-1 02 1.0 08 28 29 20/1 |BOILER CONTROLLER o4 O41 30 EY 20/1 |CP-S,LC700 021 02 22 33_|20/1 [SPARE 0.0 0.0 a4 35 0.0 0.0 36 37 0.0 |0.0 38 39 0.0 0.0 40 41 0.0 0.0 42 *-INDICATES GFCI CIRCUIT BREAKER 10.1}9.5 |62 TOTAL kVA ®25.8 kVA AMPS #71.7A oro Ra a=AE onteennihg oteoreSsahr)rd ede *% Veep corse nsett SStyarrest”L FOR CONSTRUCTION saps nes y, (mv.DESCRP TOW SATE nev.DESCRPTION pare Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING one SHEET NO.)219 W INC.D LANE Fast P.O.BOX 241 PANEL SCHEDULES AND oom oe ANCHORAGE,AK 88503 {a8 Gakona,AK 99586 ELECTRICAL SCHEMATICS ==E7276-7933 a Telephone ¢(907)822-3503 ou 4s(907)ath Focairnil 9075 822-5197 CHEESH-NA WASHETERIA_nil acsimile #CHISTOCHINA,ALASKA wan AS NOTED J) 4/09/2013--2:15pmFILEPATH:P:\Projects\KAE\ChistochineWaterDistributionGudding\Dwg\Elec\ES.dwgiene i Er ahdCoe Beyenefaafhanternerdeterensetied .¢Vi\|v1 Be'i ||_WORK SHOF \|apa]"amfava a"2 Y PaoweiTtimeiti _ i \too i {\snagaettetetag,egcomment'<_aCepemereeencerrr\ 1 4COMMUNITY BUILDI a inincnaner<3 ed \amscreel!sersemnetsareerememmisefeetGene\TT 'f!;i'temastave |route {secnon |rowsar |navce |wemoian |year)xmMfom]oie |com {|cove |"Riey |2003 NOTES. @ ELECTRIC HEAT TRACE ROUTED IN BUILDING SEWER SERWCEARCTICPIPE.SEE DETAIL 1,SHEET C7,TYPE &&C PIPES. ELECTRIC HEAT TRACE ROUTED IN BUILDING WATER SERVICE ARCTIC PIPE.SEE DETAIL 1,SHEET C7,TYPE G PIPE. @)172°C.3412(H,N,G).ROUTE HOMERUN TO NEW SERVICEMETER/MAIN/(NEW LOAD CENTER). (@ UFT STATION CONTROL PANEL. (®POWER/CONTROL CABLE FURNISED W/LIFT STATION.ROUTEIN2°HDPE CONDUIT W/RIGID STEEL RISERS WHERE IT EMERGES ABOVE GRADE."OO NOT CUT CABLE!”ANY EXCESS LENGTH SHALL BE COILED AND SECURED IN TOP OF UFT STATION, ©3/4°C. 4#10(2H,N,G).ROUTE HOMERUN TO NEW SERVICEMETER/MAIN/(LOAD CENTER). @)REMOVE EXISTING METER/MAIN AND REPLACE W/NEW 200A,120/240V,NEMA 3R,METER/MAIN W/BREAKERS AS SHOWN, MILBANK CAT#UAP3282 0 OR EQUAL.INSTALL W/CENTEROFMETER5-1/2 TO 6 FEET ABOVE GRADE, (@)PROVIDE SECTION OF LIF IN RISER TO METER/MAIN (LOAD CENTER)TO ALLOW FOR MOVEMENT. #5 BCU BONDED TO LOAD CENTER AND TO (2)3/4°x 10° \ COPPER CLAD STEEL GROUND RODS IMBEDDED A MINIMUM OF 12”BELOW GRADE,SEPARATED A MINIMUM OF 10 FEET AND INTERCONNECTED WITH 2/0 BCU, REMOVE EXISTING METER/MAIN AND REPLACE WITH NEW H ___ i i ®{ H { :H j ;} ;'i i {H H waned i RAED Hare |iOe i | gs en | TRIBAL |.|.OFFICE py7onfy A 13!'i 'wo.i ot i 'XE }io ||S iyae, |OY ---fS y eee .ee |eee mee ed Ob.aotee wae phe-pd i EW -=©). i nee:.ae wae?AeA re Be tee Bee ieee Benete ei ge an nn Ae an peeve er PS aoeweawnPoN 120/240V,100A 18 NEMA 3R,6-SPACE LOAD CENTER, SQUARE 0 CAT#QO612LI00TRB OR EQUAL.REMOVE EXISTING FEEDER ROUTED ON THE GROUND TO THE PLAY GROUND.(1.\WORKSHOP ELECTRICAL SITE PLAN (2 COMMUNITY BUILDING ELECTRICAL SITE_PLAN (3 TRIBAL OFFICES ELECTRICAL SITE PLAN (7)BOND NEW METER/MAIN TO EXISTING GROUNDING ELECTRODE £8.0/SCALE:1"=20'-0"F8.0/SCALE:1"=20'-0'el £8.0/SCALE:1"=20'-0"--------CONDUCTOR. oO 20°0 20 40°0 20°40°43 EXISTING METER/MAIN AND SERVICE RISER. @ INSTALL NEW 50/2 CIRCUIT BREAKER IN EXISTINGMETER/MAIN. 44 3/4°C,348 (2H,N)&1910 (GC). (B)NEW 120/240V,100A,18,NEMA 3R 6-SPACE LOAD CENTER, ESTIMATED MAXIMUM DEMANO LOAD:7.2KVA =30A ©240¥ESTIMATED MAXIMUM DEMAND LOAD:24.9KVA =104A ©240V ESTIMATED MAXIMUM DEMAND LOAD:13.8KVA =57.3A ©240V SQUARE D CAT#QO612L100TRB OR EQUAL. ® o™EXISTING COMMUNITYS0/2 BUILDING PANELBOARD Oot PANELBOARDoNo™ . }-O 0-+EXISTING WORKSHOP PANELBOARD QD pO O--+- LIFT STATION CONTROL PANEL : 60/2 30/2 .GFSetLIFTSTATIONCONTROLPANELan HEAT TRACE,SEWER SERVICE [-UFT STATION CONTROL PANEL ees,GL 5/7 HEAT TRACE,SEWER SERVICE B/D HEAT TRACE,WATER SERVICE - HEAT TRACE,SEWER SERVICE CAL - O-+HEAT TRACE,WATER SERVICE L569 oO r HEAT TRACE,WATER SERVICE 15/l 100/2 ;1 LE ®p--O-__}sara,A,TouTUTY:£S.+TO.WORKSHOP Fei Ay) FROM COMMUNITY,=veel BLDG METER/MAIN'=be (4 WORKSHOP POWER ONE-LINE (5.\COMMUNITY BUILDING POWER ONE-LINE (6.\TRIBAL OFFICE POWER ONE-LINE ee wes£8 /SCALE:NTS €8/SCALE:NTS £8_/SCALE:NTS FOR CONSTRUCTION «ss Qe i, (te.pescrrnon om |rev vescunon bare Cheesh'Na Tribal Council WATER DISTRIBUTION BUILDING =[meen +SHEET NO.CDC.INC.eo Lane ex P.0.BOX 241 ELECTRICAL SITE PLANS AND [=="_@ancHonacs,aceosos |Quen Tele none (AK 99586 POWER ONE-LINES -s-E8(907)276-7933 ave pucphone #(307)822-5197 CHEESH-NA WASHETERIA ini nd acsimile #CHISTOCHINA,ALASKA scan AS NOTED D, ABBREVIATIONS SYMBOL LEGEND SCHEDULES ABS ACRYLONITRILE BUTADIENE HW HOT WATER BOILERS __=STYRENE HWR HOT WATER RETURN aAFFABOVEFINISHEDFLOORHWSHOTWATERSUPPLY>PIPE TEE DOWN ff]AIR SEPARATOR TAG NO.TYPE FUEL Input oureuT HEAT rey ra (cou)alae EECTRCAL,MANUFACTURER /MODELAWTAVERAGEWATERTEMPERATURE=HR HOUR BB BASEBOARD HX HEAT EXCHANGER O-PIPE RISER @ PRESSURE GAUGEBoPBOTTOMOFPIPEAWINACCORDANCEWITH B-1 (STEEL,DIRECT VENT.|go oi |1.25 |143 |50%|460 |180 |15.9 |1-1/4]1-1/4]120 /5.8 /1 [BURNHAM MODEL LEDV-3 WITHBTUBRITISHTHERMALUNITIDINSIDEDIAMETER &PIPE DROP 0 THERMOMETER B-2 {SEALED COMBUSTION PG BECKETT AFil BURNER CRM =«CUBC FEET PER MINUTE,IN H20.INCHESOF STATIC.WATER CNGATEVALVEOR GENERICCOMCOMMONCOLUMNDtSCHEMATICVALVE §FLEXIBLE CONNECTORcpCIRCULATIONPUMPIPSIRONPIPESiZEOtBALLVALVE PUMPSLWCOLOWWATERCUTOFFAIRRELEASEVALVE TEMP Flow |HEAD ELECTRICALCUHCABINETUNITHEATERMBHTHOUSANDBTUPERHOURt.MANUFACTURER/ cw COLD WATER MIN MINIMUM 44%CHECK VALVE pRESCURE RELEF VALVE TAG NO SERWCE FLUID |(Fy |BODY |(Gem)|(=)|(HP/VAC/PH)MODEL NOTES D DRAIN UTRAL DELTA P PRESSURE DIFFERENTIAL NJs Nor APPLICABLE 4 SPRING CHECK VALVE cp-ta/e [ERMARY HYORONIC i sox pc}180 |caSTIRON|14.6 20 |1/6 /120/1 |GRUNDFOS UP 26-99F |WET-ROTOR CIRCULATOREAEXHAUSTAIRN.C,NORMALLY CLOSED CIRCULATION PUMP =EF EXHAUST FAN Nic NOT IN CONTRACT 1X}BALANCING VALVE ®CP-2A/B |BOILER CIRCULATORS |50%PG}180 |CASTIRON|16 5 fiz /120 /1 UP 26-64 |weT_ROTOR CIRCULATOREGTENTERINGGLYCOLTEMPERATUREjo,NUMBER @ THERMOSTAT WATER UNE HEATeTEXPANSIONTANKN.O.NORMALLY OPEN "Il UNION cp-3a/e WATER 50%PG|180 |CASTIRON|1.6 14 |1/25 /120 /1 [GRUNDFOS UP WET-ROTOR CIRCULATOReeeeNPTNATIONALPIPETHREAD++REDUCER THERMOSTATxTBEYAHRENHETTNTSNOTTOSCALEH ce-4a/e |SERER UNE HEAT =50x pg]180 [CAST IRON|1.6 14 |1/25 /120 /1 [GRUNDFOS UP WET-ROTOR CIRCULATOR RS FLOOR CLEAN OUT PD PRESSURE DROP &3-WAY CONTROL VALVE TEMPERATURE SENSOR cp-5 _|WATERING POINT sox PG|180 |CAST IRON|20 10 1/25 /120 /1 |GRUNDFOS UP WET-ROTOR CIRCULATORHEATEDSLAB15-58FCFIGFIGUREPSIPOUNDSPERSQUAREINCHDOMESTICWATERGRUNDFOS UPENTFEMALENATIONALPIPETHREAD=RPM REVOLUTIONS PER MINUTE DK+SOLENOID VALVE TEMPERATURE CONTROLLER CP=6 lee aTER 50%PG}180 |CASTIRON|6.5 9 1/25 /120 /1 |er esecc WET-ROTOR CIRCULATORRWRAWWATER FOS FUEL OIL SUPPLY sp STATIC PRESSURE - HOSE BIBB (F)Wad 'S FES BD oR)aw fig f &[oiFPMFEETPERMINUTESTLSTEELPRESSURETRANSMITTER="”™ee ee FT HD FEET HEAD T TEMPERATURE KK)STRAINER&oa er ™TEMPERED WATER :Cty GALVANIZED w UAT HEATER RETURN AIR GRILLE VARIABLE.FREQUENCY DRIVE UNIT HEATERS 'GPH GALLONS PER HOUR Vv VENT OR VOLTS HEAT FAN FLUIDEGPMGALLONSPERMINUTEoNVEDVARIABLE.FREQUENCY,DRIVE [surety AIR GRILLE [M]MOTOR OPERATOR TAG NO.LOCATION CAPACITY Nou)SPEED rey re row i Rey obra MANUF ACTURER/NOTESSs(BTU/HR RPM GPM2GTSGLYCOLTRACINGSUPPLYWWASTE-H HOT w/wim -*GROUND TRANE MODEL [coi wo_HuNG >HC HANDICAP ACCESSIBLE weo WALL CLEAN OUT -|WALL SUPPLY AIR GRILLE UH-1 |TREATMENT ROOM 34,400 |750 |1000 |180 |160 35 |012 |1/20 /120 /1]s-48 AT STD HORIZONTAL CISCHARGEZzHGRHEATINGGLYCOLRETURNWHWATERHEATERRATINGS 3 HGS HEATING GLYCOL SUPPLY YCO YARD CLEAN OUT 8 HP HORSEPOWER id DIAMETER -{-MANUAL BALANCING DAMPER8 RADIANT PANEL :(F)FUTURE ITEM (NOT IN CONTRACT)TO BE PERMETER |NTEROR nino now!PRESSURE Tar ]TBE [MATERATSINSTALLEDBYOTHERSTAGNO.|LOCATION -_|INSTALLATION |INSTALLATION |"ca.5 DROP |(ry |SZE |(PLATE [MANUFACTURER/MODEL [NOTES(BTUH/PNL)|(BTUH/PNL)(FT H20)(iN)|TUBE) :RP-1 |BATHROOMS 1320 1025 1.0 0.9 |170 |1/2.|ALUMINUM |AIRTEX HPH 2448 TOON ee SURFACE 7. 5 s RP=1 |CHEMICAL ROOM 1320 1025 1.0 09 |170 |1/2 |ALEMNUM /AiRTEX HPH 2448 MOOT Rae SURFACE ;PIPING LEGEND RP-2 |CHEMICAL ROOM 660 512 1.0 05 |170 |1/2 |ALOMOIOM |AIRTEX HPH 2424 NOUMT FRA SURFACE5CW:COLD WATER _- z HW:HOT WATER -_-- 3 TW:TEMPERED WATER GLYCOL FILL_TANK %TANK VOL ELECTRICALgD:SANITARY DRAIN TAG NO,SERVICE (GAL)|PUMP CAPACITY |(wvac/pH)MANUFACTURER/MODEL NOTES a e 7 §FOS:FUEL OIL SUPPLY cut_1 |HYDRONIC HEAT 17 [07 MO OY 59 7120/1 Anau MODEL MF300 "PRESSURE |_<V:SANITARY VENT -_--_ 3 HGS:HEATING GLYCOL =SUPPLY .HGR:HEATING GLYCOL - s RETURN= gs& 3 ay=we yanteeeeAi'4snZzA* 2 i ° aa"Z iesesecseeet.<eAqFORCONSTRUCTIONYaron |=mma(-™DESCRIPTION DATE REV.DESCRIPTION DATE Cheesh'Na Tribal Council WATER PROCESS BUILDING DESONEDot EWH SHEET NO.) "EDC,INC.P.O.BOX 241 MECHANICAL LEGEND owen ew ss 213 W.FIREWEED LANE og,Gak AK 99586 APPROVEDBt EWHzANCHORAGE,AK 00503 L226 Telephone #(907)622.3803 ABBREVIATIONS AND SCHEDULES MOO1 a (907)278-7633 og Faceinile #507)829-5197 CHEESH NA COMMUNITY CENTER WATER é&SEWER PROJECT |"=2/ef2013 re acsimile #(907)CHISTOCHINA,ALASKA wens __AS NOTED J 4/10/20136:12amFILEPATH:F:\Dato\Wasilla\\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M-001MechanicalLegendAbbreviationsandSchedules.dwgFacsimile #(907)822-5197 SCALE:AS NOTEDCHISTOCHINA,ALASKA SCHEDULES WATER HEATERS -INDIRECT-FIRED PLUMBING FIXTURES TANK |HEAT |FIRST HOUR |EGT |LGT |FLUID FLOW)ELECTRICAL |MANUFACTURERTAGNO.SERVICE (cat)|INPUT |'Recovery'|CF)|CF)|(GPM)(vAG/PH)rac /NOTES TAG NO.DESCRIPTION cw |wi uw]w v MANUFACTURER/MODEL DOMESTIC HOT 87 |140 GH O TRIANGLE TUBE |INDIRECT-FIRED STORAGE HEATER WITH :WH-1 WATER 28 |wen |sor rise |'80|150]65 |%/208/11 |suart 30 INTEGRAL THERMOSTAT (F);i (F)3 3 FANS (F)i |-feslee G9 43SEPH,Had *.FLOW |EXT S.P.|SPEED |ADJACENT ELECTRICAL |MANUFACTURER .__-:- TAG NO.|LOCATION SERVICE TYPE |(cem)|(IN H20)|(RPM)|DAMPER |(HP/VAC/PH)MODEL /NOTES FD-1_FLOOR DRAIN __.2 |1-1/2 [YR_SMITH FIG 2005Y,CAST-IRON BODY WITH 6”ROUND NICKEL-BRONZE 2-POS PANASONIC CONTROL WITH LIGHT SWTICH.STRAINER EF-1 [BATHROOM |TOILET EXHAUST |CEILING |50 0.25 -MoToRIZzeD |25¥/120 /1 WHISPEREIT MODEL DAMPERS OPEN WHEN FAN hatte Ora aneOR FLANGE,REVERS ENN OS COLA PA FLOORPANASONICCONTROLWITHLIGHTSWIIGH.Fo-2 OR ORRIN -CHEMICAL -|-|-|2 |1-1/2 |pRIMARY AND SECONDARY WEEP HOLES,6-1/2 IN ROUND ADJUSTABLEEF 2 |BATHROOM |TOILET EXHAUST |CEIING|50 |0.25 -|yc [25/120 /1 WHISPERFIT MODEL [DAMPERS OPEN WHEN FAN FCSTRAINER SECURED WITH STAINLESS STEEL SCREWS,AND SOCKETFV-08'. 7 up-1 (HOSE Biba j _|.t-_ |NIBCO FIG QTS4X,3/4",NSF/ANSI 69-9 COMPLIANT W/WATTS MODEL F ...8A _NON-REMOVABLE HOSE CONNECTION VACUUM BREAKER(F)3 °oi KOHLER KINGSTON WALL-MOUNT MODEL K=2005 WITHCHICAGOFAUCETSNSF-61 RATED,MODEL 2200-4,3-HOLE,, "OOK MODEL [DIRECT-DRIVE FAN WITH LAV 1/LAVATORY (ADA-COMPLIANT)4 4 |-|2 |1-172 |pEcK MOUNTED,SINGLE LEVER FAUCET.PROVIDE CONCEALEDsr-1 [BOER =|coounG SUPPLY |INUNE |150 |0.25 |1135 |MODULATING |iew 7 129 /1/COO ELECTRONIC SPEED WALL=MOUNT CARRIERROOMMOTORIZEDGN-164 CONTROLLER MUSTEE MODEL 63M 24x24x10 ONE-PIECE MOLDED FIBERGLASS WITH INTEGRAL DRAIN CONNECTION.MODEL 63.600A DUAL- MS-1 {MOP SINK 3 -z 2 |1-1/2 |HANOLE WALL FAUCET WITH SUPPORT BAR AND PAIL HOOK.MODEL 65.700 HOSE AND HOLDER.MODEL 65.600 WALL MOUNT EXPANSION TANK MOP HOLDER.DURAGUARD WALL GUARD. TANK VOL |MAX ACCEPT|DIAMETER SHOWER (ADA COMPLIANT)j j 1-1/2 HEAD,MOUNTING SLIDE BAR,ANDCHROME PRESSURE-BALANCINGSH-1 --|2 |1-1/2 |HEAD,MOUNTING SLIDE BAR,AND CHROME PRESSURE-BALANTAGNO.SERVICE rio |"aly |vou (eal)|CN)MANUFACTURER /MODEL NOTES MIXING VALVE WITH ADA LEVER HANDLE __|SYMMONS 6-102-W ASSE1017 MIXING VALVE WITH WALL MOUNT ET-1 [MAIN HYDRONIC LOOP 50%PG 8 24 12 |AMTROL EXTROL MODEL ASME-RATED,BLADDER-TYPE STEEL TW=t [THERMOSTATIC MIXING VALVE ;73 BRACKET °AX-15(V)TANK ;(F)yg |SRERMOSTATIO MONG GAL YE i j 4 |QRALEY SAADATOR S1g-a0,72°F GUT ET-2 |WATER UNE HEAT TRACE soxPG |14 11.3 15-3/8 |AMTROL EXTROL 90 HME RATED,BLADDER-TYPE STEEL wo-1_|WATER CLOSET (ADA-COMPLIANT)y |-|-|3 |2 [KOHLER CMWARON COMFORT HEIGHT MODEL K 3496 TOLET WTH ET-3 |WATER LINE HEAT TRACE 50%PG 14 11.3 15-3/8 |AMTROL EXTROL 90 AONE RATED,BLADDER-TYPE STEEL DAMPER SCHEDULE FLOW |SIZE WANUFA uHEATEXCHANGERSTAGNO.|LOCATION SERVICE (crm)|UN)TYPE |ACTUATOR ANUFACTURER/MODEL TAG HEAT HOT SIDE COLD SIDE MD-100 [BOILER ROOM [SF-1,OA 150 |8x8 |OPPOSED |MODULATING [RUSKIN CDTI-S0BF (INSULATED) NO,SERVICE (Gnu)Fuuio |tin |t ourl FLow |weo |eww!tin It ourl Flow |wep MANUFACTURER /MODEL MD-101 [BOILER ROOM |SF-1,RA 150 |8x8 |PARALLEL |MODULATING [RUSKIN CD36 GEA FLATPLATE SINGIECWALL BRAZED MD-102 [BOILER ROOM |SF-1,EA 150 |8x8 |OPPOSED |2-POSITION [RUSKIN CDTI-50BF (INSULATED)Hx-1 [WATER UNE HEAT |7165 |Sj sear |160F j0.8 Gem|1.0 FT|SX |sor |Gor |1.6 GPM]1.4 FT [PLATE:FPSXI2L 4.3/4”MPT MD-110 [RESTROOM TOILET EXHAUST |50 6x6 |OPPOSED |2-POSITION [RUSKIN CDTI-SOBF (INSULATED)CONNECTIONS MD-120 [RESTROOM TOILET EXHAUST |50 6x6 |OPPOSED |2-POSITION [RUSKIN CDTI-5OBF (INSULATED) SEWER UNE HEAT 50x GEA FLATPLATE SINGLE-WALL BRAZED =--Hx-2 |SENER 7.165 |3 |1e0F |te0F |0.8 GPM|1.0 FT|WATER|357 |SOF |5.2 GPM]1.4 FT |PLATE:FPSXI2L 4,3/4”MPT (F);30 54 or ROH LATED) CONNECTIONS (F)-3,s BO &xS } FUEL STORAGE TANK14sDESORPTION Tank NOL MANUFACTURER/NOTES GRILLES,REGISTERS,AND DIFFUSERS ==.MAX MAX MANUFACTURER AST-1 [FUEL STORAGE TANK 3,000 |ANCHORAGE TANK -|UL-142 DOUBLE-WALL,TIGHT-WRAP,EPOXY-PAINTED STEEL TANK ON SKIDS.PROVIDE TAG NO.|LOCATION |SERVICE (oT neck |CFM |=(FT)NC PATTERN MODEL /NOTES ;MODEL ATSMULAG _|FITTINGS AND ACCESSORIES AS REQUIRED BY DETAILS AND SPECIFICATIONS.SCUMBING RAN 35 DERLEGTION ACUMINUN TOUVERED RETURNRG-1 watt R 8x6 |NA |50 NA NA |"Lonc BLADES |TUS MODEL 350 Jcrite,3/4”BLADE SPACING AIR SEPARATOR TAG NO.SERVICE (ou)<n)his MANUFACTURER/MODEL NOTES DAYTANK SCHEDULE AS-1 [MAIN HYDRONIC LOOP 14.6 |1-1/2]0.9 |SPIROTHERM/SPIROVENT VJRISOTM INLINE TAG |i ocation|service |TANK [SUPPLY RETURN]ELECTRICAL |WANUFACTURER/NOTES .GAL)|(GPM)|(GPM)|(HP/VOLTS/PHAS-2 [WATER LINE HEAT TRACE LOOP 1.6 1 |0.9 [BELL &GosseTT EASB-uR 3/4”-_|INUNE COALESCING SEPARATOR WITH AUTOMATIC No (GAL)|(GPM)|(GPM)|(HP/VOLTS/PH)|MODEL 7 BOILERS WITH SUPPLY PUMP AND INTEGRAL AS-3 |SEWER LINE HEAT TRACE LOOP 1.6 1 0.9 |BELL &GOSSETT EASB--WR 3/¢IIR CENT ANID EXPANSION TANK CONNECTION pT-Poor fk Ol |25 |2 7 |173.7120 /|guptex sst-25 |CONTAINMENT BASIN.FIELD PIPE FUEL OILHEATER-METER ON SUPPLY PUMP DISCHARGE.oth,oe aaa aes£4 4 Ber xt Serer4.oer ts)4%.Emest W Hetrick'SaVia.ME 10284 weeytretineeFORCONSTRUCTIONNRans | (rev.DESCRIPTION OATE REV.DESCRIPTION DATE Cheesh'Na Tribal Council WATER PROCESS BUILDING vescenor EWH SHEET NO.) EDC,ING cous |Oe P.O.BOX 241 MECHANICAL EQUIPMENT comANCHORAGE,AK 90608 L2A¢Gakona,AK 99586 SCHEDULES 2 apenases EWA Moo2(907)276-7683 cre Telephone #(907)822 3503 CHEESH-NA COMMUNITY CENTER WATER &SEWER PROJECT [X@____5/8/2015 _/ 4/10/2013-6:12amandSchedules.dwgLegendAbbreviati.FILEPATH:F:\Data\Wasilla\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M-001MSCHEDULES MECHANICAL PANELS AND CONTROLS SCHEDULE CONTROL VALVE SCHEDULE FLOW |aP SIZETAGNO.LOCATION SERVICE POSITION |OPERATION cv MANUFACTURER/MODEL TAG NO.LOCATION SERVICE ELECTRICAL PARAMETERS REMARKS (GPM)|(PSI)(IN)/ (WATTS/VOLTS/PH)PRV-200A PRESSURE RELIEF 143 BOILER AND BOLER Ryo coum (BOILER ROOM [PRESS 2-way |ON-OFF |Jf |30 |NA |3/4 |PRESSURE RELIEF VALVE.WATTS MODEL 174ABC-200 BOILER ROOM BONE CONROE 600 /120 /1 -TEKMAR MODEL 268 BOILER CONTROLLER SMO TONES VALE wit HS-200A/8 BOILER ROOM B-1/2 ON OFF SWITCH __-FCV--310 |RESTROOM RADIANT PANEL RP-1 2-WAY ON-OFF 1.0 2 &1/2 coe ACTUATE TURN OPEN, PRIMARY HYDRONIC BELIMO ZONE215S-10 VALVE WITH TE-200A |BOILER ROOM SUPPLY TEMPERATURE -140F -180F |PROVIDED WITH BC 200 FCV-320 |RESTROOM RADIANT PANEL RP-1!2-way |ON-OFF |1.0 |2 |.8 |1/2 |ZONE24NO,SPRING-RETURN OPEN,24VAC ACTUATOR PRIMARY HYDRONIC BELIMO ZONE215S-10 VALVE WTH TE-2008 |BOILER ROOM RETURN TEMPERATURE -140F -180F |PROVIDED WITH BC-200 FCV-330 |CHEMICAL ROOM |RADIANT PANEL RP-1|2-way |on-orF |1.0 |2 |.8 |1/2 ZONE2ANO,SPRING-RETURN OPEN,SENSOR EMERGENCY BOILER WALL-MOUNTED,RED,MUSHROOM-STYLE EMERGENCY STOP _ BELIMO ZONE215S-10 VALVE WITHPB-200 {TREATMENT ROOM |auRWER SHUT-DOWN ==PUSHBUTTON.SEE ELECTRICAL Fov-400 |JREATMENT Ht WATER UNE 2-WAY |ON-OFF |0.8 |2 |1.0 |1/2 /ZONE24NO,SPRING-RETURN OPEN,PRIMARY PUMP PRESSURE .PI-200A/8 |BOILER ROOM ie -0-15 PS |US GAUGE P-500 2”LM TREATMENT HX<2 SEWER LINE BELIMO ZONE215S-10 VALVE WITH GLYCOL SYSTEM PRESSURE Fev-4io [;Real pee SEN 2-way |on-oFF |08 |2 |1.0 |1/2 |ZONE24NO,SPRING-RETURN OPEN, PI-201_-|BOILER ROOM INDICATOR ESSU -0-30 PS!US GAUGE P-500 2”LM 24VAC_ACTUATOR ee YE Sa Fev_600 [RESTROOM SHOWER TIMER CW way |on-orr |20 |-|-|172 |ALCON DELRION-BODY ELECTRICALLY11-200A/8/C/DIBOLER ROOM CHCOL SUFPLY &RET _30 -240 F |TEL-TRU MODEL 71203 9”ADJ W/WELL ACCESS PANEL _|SHUTOFF ACTUATED SOLENOID VALVE.NSF-61, Fcv-6o1 [RESTROOM SHOWER TIMER TW away |on-orr |20 |-|-|1/2 [ALCON DELRION-BODY ELECTRICALLYTS-200A/B |BOILER ROOM B-1/2 SECONDARY _200 F SECONDARY AQUASTAT.BOILER HIGH TEMPERATURE SHUTDOWN ACCESS PANEL |SHUTOFF .ACTUATED SOLENOID VALVE.NSF-61, HIGH-LIMIT AQUASTAT WITH MANUAL RESET.HONEYWELL L4006B WITH THERMOWELL rcvo6i0 [RESTROOM SHOWER TIMER GW away |oncorr |20 |2 |=11,2 [ALSON DELRION-BODY ELECTRICALLYTSH-300 [TREATMENT ROOM [ROOM THERMOSTAT TO Z 63 F HONEYWELL TRADELINE 1822K1000 ACCESS PANEL |SHUTOFF ACTUATED SOLENOID VALVE.NSF-61. ROOM THERMOSTAT FOR Fever [Access PANEL |sHUTOrF |2-WAY |ON-OFF |20 |-|-|1/2 [ACTUATED SOLENOID VALVE.NSF--6I,TSH-310 |RESTROOM ROOM -68 F HONEYWELL TRADELINE 7822K1000 ACTUATED SOUR OID VALWENS 81. TSH-320 IRESTROOM ROOM THERMOSTAT FOR _68 F HONEYWELL TRADELINE 7822K1000 Fov-700 |arey)MENT HEATNG POINT SLAB]2-way |ON-OFF |2.0 |0.64]25 |3/4 ZONE24NO,SPRING-RETURN OPEN, TSH-330 [CHEMICAL ROOM |RCOM THERMOSTAT FOR -68 F HONEYWELL TRADELINE 7822K1000 HX-1 HEAT TRACE HONEYWELL 1675A1516 REMOTE BULB TEMPERATURE CONTROLLER -CLOSETC-400 |TREATMENT ROOM ITeypeRATURE CONTROL -50 F ON FALLING TEMP HX-1 HOT SIDE .TI-400A/8 |BOILER ROOM HOU RER ATURE INDICATOR -30 -240 F |TEL-TRU MODEL 71203 9°ADJ W/WELL HX-1 COLD SIDE .T-401A/8 {BOILER ROOM TOUPESA TURE INDIGATOR -30 130 F |TEL-TRU MODEL 71203 9”ADJ W/WELL HX-1 HEAT TRACE LOW NO FLOW @ |ARMOR-FLO 3521 0370 1-10 GPM,HORIZONTAL LR FLOW,1”NPT ENDS,FSL-400 /TREATMENT ROOM |e ow swiTcH -2 GPM BRASS BODY,SINGLE LIMIT SWTCH SPDT,CONTACTS HX=1 HEAT TRACE LOW HONEYWELL T675A1516 REMOTE BULB TEMPERATURE CONTROLLER -CLOSETSL-400 |TREATMENT ROOM |TeWPERATURE SWITCH =45 F ON FALLING TEMP HX=2 HEAT TRACE HONEYWELL T675A1516 REMOTE BULB TEMPERATURE CONTROLLER -CLOSETC-410 [TREATMENT ROOM |TeWPERATURE CONTROL =OF ON FALLING TEMP HX-2 HEAT TRACE LOW _NO FLOW @ |ARMOR-FLO 3521 03TO 1-10 GPM,HORIZONTAL L>R FLOW,1”NPT ENDS,FSL-410 TREATMENT ROOM [Ff ow SwiTCH 2 GPM BRASS BODY,SINGLE LIMIT SMTCH SPDT,CONTACTS HX-2 HOT SIDE .TI-410A/8 BOILER ROOM ERE Re INDICATOR -30 -240 F |TEL-TRU MODEL 71203 9"ADJ W/WELL HX-2 COLD SIDE :Tl-411A/8 [BOILER ROOM EE NCATOR -0-100 F |TEL-TRU MODEL 71203 9”ADJ W/WELL HX-2 HEAT TRACE LOW HONEYWELL T675A1516 REMOTE BULB TEMPERATURE CONTROLLER -CLOSETSL=410_[TREATMENT ROOM |TeMPERATURE SWITCH =45 FON FALUNG TEMP TSH-500 |BOILER ROOM we THERMOSTAT FOR 24 VAC -TEKMAR DOMESTIC WATER HEATER AQUASTAT FOR BC-200 MONARCH COIN HM6 COIN BOX WITH QUARTER SLOT ANDKC-600 |RESTROOM SHOWER COIN TIMER 120 V TIMER -MOARASe oR MONARCH COIN HM6 COIN BOX WITH QUARTER SLOT ANDKC 601 _|RESTROOM SHOWER COIN TIMER 120 V TIMER -OCT SON Me. Lc-200 |TREATMENT ROOM |SAOW WELT 80 /120 /1 -TEKMAR MODEL 665 SNOW MELT CONTROLLER "ME 10284 ,”neteeeeset®es [FOR CONSTRUCTION "RRR 21 | (rev.DESCRIPTION DATE REV.DESCRIPTION DATE Cheesh'Na Tribal Council WATER PROCESS BUILDING DESIGNED BY:ew SHEET NO.\ ORAWN BY:p&P.0.BOX 244PhddiestigrendotiesL=. @,Gakona,oo)eon CONTROLS SCHEDULES APPROVEDOv”:EWH MOO3(907)278-7a83 caw,Telephone #(907)822-3505 CHEESH-NA COMMUNITY CENTER WATER &SEWER PROJECT [°S 5/8/2013 C -Z Facsimile #(907)822-5197 CHISTOCHINA,ALASKA man as NOTED J 4/10/2013-6:12amSEQUENCESOFOPERATION. 1)All necessary controls including but not limited to sensors,Instruments,controllers,relays,wiring,actuators,and programming shall be provided to accomplish the followingoperationsforeachsystemdescribedbelow. 2)All setpoints shall be adjustable. 3)The contractor shall thoroughly test each and every sensor,instrument,controller,relay,actuator individually to ensureproperinstallationandoperation.Failures shall be correctedandre-tested at contractor's expense. 4)After proving the operation of each control element per theprecedingparagraph,all systems shall be fully tested to ensure proper operation per the sequences below. BOILER ROOM COOLING FAN (SF-1) Boiler room ventilation fan SF -1 provides cooling for the boiler room.The boilers have sealed combustion air ducting,so this fan Is not interlocked with,and does not affect,the boilers. 1)Included equipmenta)©SE-1,Supply fanb)HS=-100,Hand-off-auto switch c)MD-100,ZC-100,Outside air damper and motor d)MD=-101,ZC-101,Return air damper and motor e)MD=-102,ZC-102,Exhaust air damper and motor f)TSH-100,Boller room space temperature thermostat g)IC-100,Mixed supply air temperature controller h) JSL=100,Mixed supply air low temperature cut-out 2)Initial state (Shut-down) a)S-100 is in the OFF position b)SE-1 Is off c)MD=-100 (OSA)is closed (Fail position) d)MD=101 (RA)is open e)MD-102 (EA)is closed 3)Cooling mode (Initiated by line voltage t-stat ISH-100) a)4HS=100 is in the AUTO position b)On temperature rise above 85°F,SF-1 starts.MD-102 opensfully.MOQ-100 and MD-101 modulate inversely to maintain a fan discharge temperature of 55°F. c)On temperature drop below 83°F tha system retums to the initial state. 4)General ventilation mode (Manually initiated) a)HS 100 is in the HAND position b)SF-1 runs c)MD=100 (OSA)opens fully d)MD=-101 (RA)closes fully e)MD 102 (EA)opens fully Exhaust fan EF=1 provides exhaust In restroom when occupied. 1)Included equipment a)E£=1,Exhaust fan b)Light switch c)MD=-110,ZC-110,exhaust air damper and motor 2)Initial state (Shut-down)a)Light switch is in the OFF position b)EFL is off c)MD=-110 (EA)Is closed 3)Exhaust mode (Manually initiated) a)Ught switch Is in the ON position b)€E-1 runs c)MD-110 (EA)opens fully d)€E=1 continues to run for 15 miinutes after light switch istumedOFF. EXHAUSTFAN(EF-2) Exhaust fan EF-2 provides exhaust in restroom when occupied.The sequence of operation is identical to EF-1 above. 1)Included equipment a)£2,Exhaust fan b)Light switch c)MD-120,ZC-120,exhaust air damper and motor CHEMICAL ROOM EXHAUST FAN (EF-3) Exhaust fan EE-3 provides continuous exhaust in the chemical room at 10airchangesperhourtocontrolcorrosionandpreventbuildupoftoxic fumes. 1)Included equipment a)EE=3,Exhaust fan b)HS-130,On-off wall switch c)MD=130,ZC-130,Outside air damper and motor dé)MD=-131,ZC-131,Makeup air damper and motor 2)Initial state (Shut-down) a)HS-130 is in the OFF position b)€E=3 is OFF (for maintenance only)c)MQ=130 (EA)is closed d)MQ-131 (MA)is closed 3)Exhaust mode (Manually initiated) a)S130 is in the ON position b)EF-3 runs c)MD-130 (EA)opens fully c)MO=131 (MA)opens fully HYDRONIC BOILER SYSTEM (8-1 and B-2) The boiler system Is managed by boiler controller BC-200 which stagesboilersandpurnpstomeetheatingdemand.The boiler system runs all year to provide building heat in the winter and hot showers in the summer. 1)Included equipment a)B=1 and B=2,Oil-fired hydronic boilers b)HS-200 and HS-201,On-off switch for each boiler c)BC-200,Boiler controller d)JE=200,Primary loop temperature sensing element e)PB=200,Emergency shutdown pushbutton f)CP-1A and CP-1B,Primary hydronic loop circulation pumps g)CP=-2A and CP-28,Boiler loop circulation pumps h)ISH-200 and JSH-201,Secondary aquastat high temperature switch 2)Initial state (Shut-down) a)S200 and HS-201 are in the OFF position or BC-200 is in the OFF positionb)CP=1A,CP=1B,CP=2A and CP-28 are OFF 3)Boiler operation a)Lead and lag boilers B-1 and 8-2 are staged on and off by BC=-200 as required to meet heating demand. b)Associated boiler circulators CP-2A,and CP-2B start 1 minute before boiler is enabled and continue to run for 2 minutes after boiler shut-down. c)Internal boller controls control single-stage boiler firing asrequiredtomaintainthesupplytemperatureat180°F.d)Lead boiler and circulator are automatically rotated once permonthbyBC-200, 4)Primary circulaton pump operationa)The primary circulation pump CP-1A or CP-1B is manuallystartedbytheWIPoperator. b)'The primary circulation pump is manually rotated monthly. 6)Boiler system safeties and alarms a)An Internal,manual reset aquastat on the supply side of each boiler to disable bummer operation at temperaturesabove210°F. b)An Internal probe type low water cut-off disables boileroperationonlowglycollevel.c)and are secondary pipe-mounted automaticresethigh"mit caquastat to disable burner operation if thesupplytemperaturerisesabove200°F.d)PB=200 Is a boiler kill switch outside the boiler room door toshut-down power to the boilers. e)=is monitored by the building alarm panel.on alarm IsinitiatedifBC-200 goes into fault. UNIT HEATER (UH=1) The unit hecter provide space heating by circulating hot glycol through thecoilwiththefanrunning. 1)Included equipment a)UH=1,Hydronic unit heater b)ISH=300,Treatment room space temperature thermostat 2)Initial state (Shut-down)a)='The fan in UH-1 is off.b)Heating glycol flows through unit heaterwhenevertheprimaryboilersystempumps run. 3)Heating mode (Initiated by line voltage t-stat TSH-300)a)On temperature drop below 65°F,the fan in VH--1 starts. b)On temperature rise above 68°F,the fan in UH-1 stops. HYDRONIC RADIANT CEILING PANEL (RP-1) The radiant ceiling ponels provide space heating by circulating hot glycolthroughthepanels.This sequence applies to heating equipment in bothRestroomsandtheChemicalRoom. 1)Included equipmenta)BP=1,Hydronic radiant panel heater b)ISH=310,Space temperature thermostat c)ECY-310,Glycol flow control solenoid valve 2)Initial state (Shut-down) a)£ECV-310 Is closed b)ECV¥=310 fail position is fully open 3)Heating mode (Initiated by tine voltage t-stat JSH--310) a)On temperature drop below 65°F,ECV-310 opens fully. b)On temperature rise above 68°F,ECV-310 closes fully. WATER LINE HEAT TRACE (HX-1) The heat exchanger HX-1 provides freeze protection for the waterdistributionlinebycirculatinghotglycolthroughtheheattracepiping. 1) 2) 3) 4) 5) Included equipment a)HX=1,Glycol-to-glyco!heat exchanger b)CP-3A and CP-38,Heat trace circulation pumps c)JC 400,Heat trace return temperature thermostat d)ECY-400,Glycol flow control solenoid valve e)ESL 400,Heat trace loop low flow switch TSt-400,Heat trace retum low temperature alarm switch g) PSL=400,Heat trace loop low pressure alarm switch Initial state (Shut-down) a)OP-3A and CP-38 are off b)ECV-400 fs open (Fall position) c)ESL=400,ISL-400 and PSL-400 are disabled Heating mode (Manually initiated)When the outside air temperature falls below 35°F,CP-3A or CP-38is manually started by the WIP operator.b)IC 400 modulates ECY-400 to maintain 55°F return glycol from the heat trace loop. c)The system returns to the initial state when both pumps are tumed off by the operator. Thawing mode (Manually initiated)a)If the heat trace pipe freezes,CP-3A and CP-3B are valved to be in series. b)Both pumps CP 3A and CP-3B are manually started by the WIP operator to increase the pumping head. c)JC-400 modulates ECV-400 open to maintain 55°F retum glycol from the hect trace loop. d)When the heat trace pipe is thawed,the operator manuallystopsthepumps,resets the valves to a parallel arrangement, and restarts the primary pump. Safeties and alarms a)Alarms FSL-400,ISL-400 and PSL-400 are enabled wheneithercirculationpumpruns. b)Alarms are disabled when both pumps are off. d)ESL+400 is monitored by the building alarm panel.An alarm isinitiatedifnofiowisdetected. d)ISL=400 is monitored by the building alarm panel.An alarm isinitiatediftheheattraceloopreturntemperaturefallsbelow 50°F. d)PSL=400 is monitored by the building alarm panel.An alarm is initiated if no flow is detected. e)by the building alarm panel.An alarm is initiated if the pressurefallsbelow10PSIG. WATER LINE HEAT TRACE (HX-2). The heat exchanger HX-2 provides freeze protection for the sewer line bycirculatinghotglycolthroughtheheattracepiping.The sequence ofoperationisidenticaltoHX-1 above. 1)Included equipment a)UX=2,Glycol-to-glycol heat exchanger b)CP-4A and CP-48,Heat trace circulation pumps c)IC -410,Heat trace return temperature thermostat d) ECVY=410,Glycol flow control solenoid valve e)ESL=410,Heat trace loop low flow switchf)TSL=410,Heat trace return low temperature alarm switchg)PSL=410,Heat trace loop low pressure alarm switch 1)Included equipment a)GMT-1,Glycol mix tank 2)Automatic pressure maintenance a)The glycol charging system automatically maintains theprimaryhydronicsystemfilllevelandpressure.b)When the pressure in the hydronic system drops belowtheminimumsetpoint,the integral pump in GMT-1 starts and pressurizes the system to 15 psi.c)When the pressure setpoint has been reached,the pumpstops. 3)Manual pressure maintenance a)When either heat trace loop has low pressure,the WIP operator isolates the primary hydronic loop and opens the valve to the heat trace piping. b)The glycol charging system automatically fills the heat trace loop to the correct fill level and pressure. c)When the pressure in the heat trace loop drops below theminimumsetpoint,the integral pump in GMT-1 starts and pressurizes the system to 15 psi. d)When the pressure setpoint has been reached,the pump stops. 4)Manual pressure maintenance a}The glycol mix tank also serves as the receiving tank forglycolrelievedfromtheboilersorheatexchangersduetoeitheranover-temperature or over-pressure condition. INDIRECT-FIREDHYDRONICWATERHEATER(WH--1), The water heater provides hot water to the plumbing fixtures and a tempered water supply to the emergency eye wash EW-1in the Chemical Room. 1)Included equipment a)WH-1,Water heater b)JSL-500,Water tank thermostat c) ¢P=6,Water heater glycol pump 2)Initial state (Shut-down) a)6CP-6 is off 3)Water heating mode (Initiated by boiler controller BC-200) a)On tank temperature drop below 140°F,CP 6 runs. b)On temperature rise above 145°F,CP-6 stops. SHOWERCOINTIMER(SH=-1) The shower coin timer accepts quarters to open the water supplies to the shower. 1)tncluded equipment a) SH=-1,Shower and related valves b)KC-600,Shower coin timer c)ECV-600,Shower CW flow control solenoid valve d)ECY-601,Shower TW flow control solenoid vaive 2)Initial state (Shut-down) a)KC=600 Is off Roatanb)ECY-500 fail position is fully closed as enetteeen sosABy 3)Shower on a)Coins are inserted in KC-600, b)ECY-600 and FCV-601 open. FOR CONSTRUCTION iProresssOOa”Teey42015 | DESCRIPTION DATE REV.DESCRIPTION DATE FILEPATH:F:\Data\Wasilla\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M-001MechanicalLegendAbbreviationsondSchedules.dwgCheesh'Na Tribal Council SHEET NO.)WATER PROCESS BUILDING MECHANICAL SEQUENCES OF DRAWN BY EWHFIREWEEDLANEEE<P.O,BOX 241ANCHORAGE,AK 60508 Gakone.|ony eae OPERATIONS --r M0047033ohTelephone#(907)822-3503 -pate 3/8/2013 .(907)276-ee Faccimile #(907)822-5197 CHEESH-NA COMMUNITY CENTER WATER&SENER PROVECT [°°_"/S/2*J 4/10/2013-6:13amgoon cass FUTURE WORK, NOT IN CONTRACT 2”DOMESTIC CW SUPPLY FROM PROCESS PIPING.SEE 1,VALVES BEHIND LOCKINGACCESSPANEL,TYPICAL OF 2 NOT IN CONTRACT (1 PLUMBING FLOOR PLAN LOCKING ACCESS PANEL TO 2-FT HOSE Ke)SCALE:1/4"=1'-0" (2 WASTE_AND VENT FLOOR PLAN FoR dCONTINUATION2h @ mu "HOUSE ECV-610,ECV= ECY=700 es|0 ¢gs Lay POINT DRAIN.SEE CIVIL SHEET C16 EXTERIOR WATERING COIN BOX TIMER FOR EXTERIOR WATERING POINT. WIRE TO SHUTOFF SOLENOID VALVE BEHIND LOCKING ACCESS PANEL EXTERIOR WATERING POINT. 3/4”COPPER ELBOW WITH WATTS 8FR FREEZE-PROOF VACUUM BREAKER AND qstttttayOF aftoeOF...Al4BY FILEPATH:F:\Data\Wasilia\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\0wg\Mech\M-101PlumbingFloorPlan.dwgKo SCALE I/F =V0"--FOR CONSTRUCTION OESCIP RON oaTe DATE one tt tey Cheesh'Na Tribal Council WATER PROCESS BUILDING -_SHEET No. K AE"Inc.C0,NGenue os P.0.BOX 241 PLUMBING FLOOR PLAN enfo,FED LANE Ve J Gakona,AK 99586 vee Ew M101SngGonze-res8 -S reerene foo)baaeiay CHEESH-WA COMMUNITY CENTER WATER,&SEWER PROECT eee J 4/10/2013-6:13amFILEPATH:F:\Data\Wesilia\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M-102HeatingandVentilationFloorPlan.dwg(15 \/e\NGS, 2fe\WATS N\A (1 \HEATING FLOOR PLAN 1 M504 A M504 Ki)SCALE:1/4"=1'-0" FUTURE WORK, NOT IN CONTRACT CIML SHEET C16 | |up WATERING POINT[HEATED SLAB.SEE SHEET NOTES MOUNT TRANSFER GRILLES IN TREATMENT AREA 12”AFF.MOUNT TRANSFER GRILLES IN RESTROOMS 12”BELOW CEILING,TRANSFER AIR PATH IS THROUGH STUD SPACE IN WALL @)1-1/4"PEX TUBING TO AND FROM HX-2 FOR SEWER LINE GLYCOL HEATTRACING G)1-1/4"PEX TUBING TO AND FROM HX--1 FOR WATER LINE GLYCOL HEATTRACING ®GLYCOL HEAT TRACE DOWN TO WATER LINE ARCTIC PIPE PENETRATION INFLOOR ©GLYCOL HEAT TRACE DOWN TO SEWER LINE ARCTIC PIPE PENETRATION INFLOOR woe1/ FUTURE WORK, NOT IN CONTRACT (2 VENTILATION FLOOR PLAN ap WE ORDA eS: L SoA SAE UES 9 es FOR CONSTRUCTION -iia,| (_sv =e -e a Cheesh'Na Tribal Council WATER PROCESS BUILDING some ewH |SHEET NO.EOC NGecon |on P.0.BOX 241 HEATING AND VENTILATION cme b ANCHORAGE.AK 99503 (=e Telephone (007)622,3803 FLOOR PLAN ==EE M102 C (907)276-7833 20 sat Facsimile #(907)822-5197 CHEESH-NA COE TOCINAT WATER &SEWER PROJECT -Snow J 4/10/2013-6:13amFILEPATH:F:\Data\Wasilia\Active\Projects\KAE\ChistochinaWoterDistributionBuilding\Dwg\Mech\M -501MechanicalDetails1.dwg01 A.WALL INSERT-MALE 10° DEEP CUT TO MATCH WALL THICKNESS IN FIELD. B.WALL INSERT-FEMALE 4” DEEP.(A X B) mepesLeboleasorlexd2---UNOBSTRUCTED MAX -UNOBSTRUCTED STRAIGHT PIPE STRAIGHT PIPE MINIMUM MINIMUM CLOSELY SPACED TEE (1\SECONDARY PIPING TAKE-OFF\YSo NOT TO SCALE MOUNTED TO WALL WTH LAG SCREW OR CONCRETE ANCHORS UNISTRUT PIPE SUPPORT J 1240 WALL -])pasteTNCOATEDUNISTRUTPIO00T"T° BOLT NUT INCLUDED INSTALL WALL CEILING OR FLOOR PIPE SUPPORT ON 5°CENTERS OR AS REQUIRED. (F) 3X3X1/4 GALVANIZED STEEL PLATE WITH (3)HOLES FOR 3/4"ZINC WASHER HEAD TAPPING SCREWS 1/2"GALVANIZED a TAPE BEHIND FLANGE sMETAL 3/4”WASHER HEAD TAPPING SCREWS AT 3°0.C.APPLY 1” WDE BLACK RUBBER MASTIC BIRD SCREEN OF HOOD,INSTALL BIRD SCREEN AT BOTTOM OF 18”EXTENSION € SYMBOL LOCATION SERVICE A B c D E F HD-1 BOILER ROOM SF-1 INTAKE 3"”8”””18” HD-2 BOILER ROOM SF-1 EXHAUST 3 ”3°'.18° Pp +g CHEWICAL SIGESLE |Es -3 bxenusi 8 AS go a Oo s HD--4 RESTROOM EF=1 EXHAUST 6"”NA 6"NA 18" HO-5 RESTROOM EF--2 EXHAUST 6”6°NA 6°NA 18° MOUNTING FLANGES 1-1/2"(TYP.)AROUND PERIMETER.SEAL FLANGE PERIMETER WITH CONTINUOUS BEAD OF WEATHER CLEAR SILICON CAULK 20 GAUGE GALVANIZED SHEET 1-1/2 X 1-1/2 X 1/4GALV,ANGLE STL \-For HOODS HD-4 &HD-5,ELIMINATE BOTTOM 'TEE'PORTION INSTALLATION NOTE:AFTER SECURING THE FEMALE WALL INSERT FLANGE TO THE EXTERIOR, SPRAY URETHANE FOAM INSULATION BETWEEN INSERT AND WALL PENETRATION.APPLY TWO UFTS OF INSULATION,NOT EXCEEDING A 1/4°-BEAD DURING EACH LIFT,TO PREVENTEXPANDINGFOAMFROMDEFORMINGTHEINSERT. (2\WEATHER HOODS\YSor/NOT TO SCALE WOOD SAMMY SCREW. SIZE AS REQUIRED VARIES4"-%”GALVANIZED ALL THREAD AS REQUIRED NOTES; 1.PIPE HANGERS AND SUPPORTS SHALL BE LOCATED AS SHOWN OR AS REQUIRED IN THE SPECIFICATIONS, MANUF ACTURER-SUPPLIED DIRECT VENT KIT FOR SUPPLIED BOILER ™,. PROVIDE 1/4-INCH MESH GALVANIZED STEEL BIRD SCREEN - .] FINISHED GRADE MAINTAIN CLEARANCE TO COMBUSTIBLES PER MANUFACTURER'S WRITTEN INSTRUCTIONS SECURE PIPE TO CEILINGj™UNISTRUT P1000 EXHAUST VENT AIR INTAKE ANAAAFROM CEILING(4\SUPPORTW507)(SIMILAR TO DETAIL) ---SLEEVE,FLASH,AND CAULKPENETRATIONWATERTIGHT 4”FLEXIBLE DOUBLE WALL ae RIGID STEEL COMBUSTION VACUUM RELIEF DAMPER.i INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS 18-GAGE GALVANIZED SHEETMETAL DRIP PAN BELOW BURNER AND a,TIGERLOOP DEAERATER CONCRETE\M502 /HOUSEKEEPING PAD NOTE:SEE SHEET M3.1 AND DETAILS 2/M2.1 AND 4/M5.0 FOR ADDITIONAL BOILER INSTALLATION REQUIREMENTS BOILER COMBUSTION AIR (3.\AND EXHAUST VENTING\ysoy/NOT TO SCALE 2.INSTALL 3°OR 4°COPPER PIPE AND .APPURTENANCES AS SHOWN ON THESE PLANS.2.ones ne TO PIPE 2”NOMINAL DIAMETER (3 \PIPE HANGER (4)\PIPE HANGER \yso1/NOT TO SCALE \y5o1/NOT TO SCALE Oo,"Ve Qteg crvsseneaeFORCONSTRUCTIONCRa (Rev.DESCRIPTION DATE REV,DESCRIPTION OATE NC.pk Cheesh'Na Tribal Council WATER PROCESS BUILDING cesaepon EWH SHEET NO.) ORAWH BT:EWHadcereus|Ye cone',va 24 MECHANICAL DETAILS 1 mone |450}Bh Teleph 907)822-3503 = bate(907)276-7038 Facsimile H G07 592-5197 CHEESH-NA COMMUNITY CENTER WATER&SEWER PROJECT |"__ 4/10/2013-6:13amFILEPATH:F:\Dota\Wasilla\Active\Projects\KAE\ChistochinaWaterDistributionBuliding\Dwg\Mech\N-50tMechanicalDetails1.dwgPIPINGMAIN \-[ u 3/4"BRONZE BALL VALVE (1.\LOW POINT DRAIN 3/4”PLUG OR CAP \4508/NOT TO SCALE ¥"BRONZE AAVBALLAeaosPITCHUP4FULL SIZE¢;WELDOLET BRAN OR PIPING MAIN (2\HIGH POINT AIR RELEASE\Y508/NOT TO SCALE POP-OFF DUST COVERS SECURED WITH CHAINS WASH UNIT WALL-MOUNT BRACKET TUBING SUPPLIED WITH EYE WASH 3/8 TO 1/2 \ INCH ADAPTER HAND-HELD EYE EXTEND EDGE OF PAD 4” MINIMUM BEYOND EQUIPMENT FRAME ON ALL .SIDES #4 REBAR ©12”0C1”CHAMFER ALL ALONG PERIMETER OFOUTSIDEPAD CORNERS FINISHED {XYFLOORS|. #5 REBAR ©12°0C BOTH DIRECTIONS.WRE TIE DOWELS TO GRID EPOXY DOWEL SLAB SURFACE SHALL FLOOR SLAB INTO CONCETE BE ROUGHED IN SEE STRUCTURAL PAD PREPARATION FOR CONCETE PAD NOTES: 1,FLOOR AND PAD ARE 3000-PSI MINIMUM CONCRETE,STANDARD WEIGHT. 2.ALL HOUSEKEEPING PAD REINFORCEMENT SHALL BE TO ACI STANDARDS FOR MINIMUM AREA AND COVERAGE, 3.PAD DIMENSIONS AND ANCHOR BOLT SIZES TO SUIT EQUIPMENT AND SEISMIC RESTRAINT REQUIREMENTS. 4.CONSULT WITH STRUCTURAL ENGINEER TO DETERMINE IF A THICKENED FLOOR SLAB UNDER BASE IS REQUIRED. (3 \HOUSEKEEPING PAD\gS0g/NOT TO SCALE FUTURE WORK, NOT IN CONTRACT (4 \UNIT HEATER PIPING (3s \FUTURE EYE WASH INSTALLATION aun\y508/NOT TO SCALE \w503/NOT TO SCALE Fat FOR CONSTRUCTION "REYag REV.DESCRIPTION DATE REV.DESCRIPTION DATE 'WATER PROCESS BUILDING TesneD om EW SHEET No.) EDC,INC.p&Cheesh Na Tribal Council -"_ ae ORAGe AK G00 L220 Gakona,AK 99586 MECHANICAL DETAILS 2 APPROVEDBY:EWH M502(907)276-7933 So,Telephone i (07>Seemed CHEESH-NA COMMUNITY CENTER WATER &SEWER PROVECT [SE 3/8/2018 \_gesimi'e CHISTOCHINA,ALASKA Sea:AS NOTED D 4/10/2013-6:13amFUTURE WORK, NOT IN CONTRACT 183K GAL TANK FILL LINE PE DISCHARGE TUBING ROUTED OVERHEAD INSIDE PVC CONDUIT ans MINIMUM VTR WATERTIGHT ROOF FLASHING COLLAR; OR EQUAL SEAL ALL EDGES OF FLASHING COLLAR WITH ROOF CAULK INJECTOR/CHECK SEE mowers Lb ae CaP ct ARMAFLEX INSULATION J).SURFACE NOT IN CONTRACT 60 GAL MIX & SETTLE TANKCONCENTRICaSeaHYPOCHLORITEFLOWINDICATOR REDUCER.SIZE : AS REQUIRED EXTEND PIPE Ce SueABSVENT.SIZE INSULATION DOWN me AS PER DRAWING | INTO BATT INSULATION -* fi ON CEILING =1/2”SETTLED a Pp (h SLUDGE DRAIN MANUFACTURER'S YO Se AINCCoS oe35GALLESSSTEELWAORT4°AFF MAX SOLUTION TANK BULKHEAD FITTING EXHAUST 500m!CALIBRATION ON TANK BOTTOM. HOOD PENETRATION COLUMN MOUNT TO H (1\SANITARY VENT THROUGH ROOF THROUGH CHEMICAL WALL AT MID RIGID SUCTION\yS0g/ROT Tosca |eve |)ROOM WALL HEIGHT OF TANK.ANE SUPPORT TANK STANDNEPTUNECC500OR-EPOXYEQUAL]COATED FOOT STEEL CONST EF-1 PE BALL VALVE VALVE FLEXIBLE J oma DUCT TO WALL SUPPORT WITH WOODW?VAPOR.BLOCK,SEE BOTTOM (3\FUTURE CHEMICAL INJECTION SYSTEM DETAIL FUTURE WORK,BARRIER SUPPORT FOR SIDE VEW \y50g/NorTo SCALENOTINCONTRACT ---ALL ALUMINUMDUCTWORK BRASS BALL VALVE EXTEND 1/2"VENT INSERTION EQUAL CORPORATION STOP _ PIPE ABOVE TO PIPE RADIUS /NO,CPVC QUILL 1/2"FPT TO RECEIVE MAXIMUM LIQUID MAXIMUM LIQUID 'CHEMICAL PUMPLEVEL-|LEVEL DISCHARGE CHECK VALVETERMINATE DUCT 6”AFF ASSEMBLY\ i 3/4°MPT CONNECTION TO WATER STORAGE TANK FILL/CIRCULATION COIL 2-3 FEET OF 1/2”ID CLEAR SLACK TUBING BETWEEN VINYL TUBING TANKS FOR EASE OF MOVEMENT NOTE;ALL PIPING AND FITTINGS ARE SCH.80 PVC WALL SUPPORT ROTATED 90° FOR CLARITY.TOENAIL WOOD BLOCK TO WALL.STRAP DUCT TO BLOCKV,--20-GALLON LEVEL FILEPATH:F:\Data\Wasillo\Active\Projacts\KAE\ChistochinaWaterDistributionBuilding\Owg\Mech\M-S0tMechanicalDetails1.dwg(4\FUTURE CHEMICAL TANK TRANSEER PIPING SeTILNG AANK (en EXHAU ST FAN a eo PIPELINE CHLORINE IOR \yso3/NOT TO SCALESOLUTIONstantessSYEEL ;BULKHEAD "HOT TAP”AND REMOVALINTERIORSTAINLESSSTEELFITTINGFUTUREWORK,PRESSURE RESTRAINTBULKHEADSETTLEDSOLUTIONNOTINCONTRACTCHAINFITTINGDECANTVALVE (eag Por scx (S\FUTURE CHEMICAL INJECTION QUILL DETAIL 2008 4t1,\W503/NOT TO SCALE ES% WeenceseSFFORCONSTRUCTIONSSas (rev.DESCRIPTION DATE REV.DESCRIPTION DATE NC.Ax Cheesh'Na Tribal Council WATER PROCESS BUILDING Desoeon EWH SHEET NO.)COC cwep une |pare P.0.BOX 241 MECHANICAL DETAILS 3 espeng.)Gakona,AK 99586 EwH M50onenesswaTelephoneHSov)Lremrenes CHEESH-NA COMMUNITY CENTER WATER &SEWER PROJECT |"3/8/2013 S acsimile CHISTOCHINA,ALASKA SOME:AS NOTED J 4/10/2013-6:13amFILEPATH:F:\Data\Wasillo\Active\Projects\KAE\ChistochinaWaterDistributionBuillding\Dwg\Mech\M-501MechanicalDetoils1.dwg8"xX 8 PANEL ASSEMBLY CLIP MOUNTING BRACKET ©ARCTIC HOOD FIBERGLASS INSULATION LY 3”FIBERGLASS SEE DETAIL CEILING ASSEMBLY .BOARD INSULATION Weer) BALANCE /SHUTOFF WITH FOIL VAPORWAVALVEBARRIER =E/A Te RADIANT PANEL EXTERIOR SURFACE MOUNT TO CEILING WALL /1/2”TYPE L SOFTRADIANTPANELASSEMBLYSURFACEMOUNTFRAMECOPPERTUBING FINISHED T FLOORCEILINGATTACHMENTNUMBEROFPANELSPERSAREAVARIESSEEHEATINGFCY-310 NgPLANANDSCHEMATIC (1.\RADIANT PANEL INSTALLATION (2\RADIANT PANEL PIPING (3 \BOILER ROOM EXHAUST DETAIL\u504/NOT TO SCALE \u504 J NOT TO SCALE \uS04/NOT TO SCALE 4”FLEXIBLE DUCTCONNECTON FOR CONNECTIONS ATTACH TO CEILING JOISTS Gn) 5/e"ALL om FCO:FINISHED FLOORGTSYCO:18°x18"CONCRETE ANTHREAD(TYP)EOPRENE ey GRADE BLOCK CLEANOUT PLUG ISOLATOR Loi SEISMIC SWAY”(TYP)MD=101-p10.i arene HOOD "\(/-CEANOLT BOXBRACE(TYP)i SEE Dera "a Te 1/2"GALVANIZED COPPER TO PEX BIRD SCREEN POLY-CAMoNTRANSITION FITTING,COPPER TYPICAL FACTORY COATED CAST PEX WATER OR IRON BODY,INDEPENDENT |WATER OR OF CLEANOUT BOX /S Bt as SEE CIVIL DISCHARGE DUCT -WYE--FITTING AND a FIBERGLASS BOARD cly 5 45°ELBOW OR _NSULATION WITH FOIL COMBINATION WYETSL=100:,sf O/A i) CRISS-CROSS ELEMENT VAPOR BARRIER +AND 1/8 BEND IN TOP 2/38 OF DUCT Ic=100 ARCTIC PIPE FLOOR\No ASSEMBLY,SEE CIML p } EXTERIOR WALL Goer HEAT TRACE CONNECTION (6\WASTE CLEAN OUTS an,504)NOTTO SCALE EeeLate/@\BOILER ROOM SUPPLY FAN DETAIL eos"Sey\g504/NOT TO SCALE :iy VS ern SSFORCONSTRUCTION"NERY os | DESCRIPTION DATE REV.DESCRIPTION DATE NC.Ax Cheesh'Na Tribal Council WATER PROCESS BUILDING Senoim EWH SHEET NO. ORAW BY:EwSaimreiecUeVereGakone,"a S3998 MECHANICAL DETAILS 4 moon en]M504 ae Telephone #(907)822-3503 ou pate:3/8/(907)276-7833 eS Facsimile #(907)822-5197 CHEESH-NA COMMUNITY CENTER WATER &SEWER PROJECT |"=-J 4/10/2013-6:13amFILEPATH:F:\Data\Wasillo\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Owg\Mech\M-501MechanicalDetails1.dwgDOUBLE 4”NOMINAL IDOUBLE-WALL FLEXIBLE . EXHAUST DUCT HEATING LOADS MANUFACTURER'SWALLPENETRATION (1 Vs \/ce \ASSEMBLY \M101AM501/(\24 / ((-ra HGR FROMHEATINGLOADS MANUFACTURER'S WALL HGS TO BOILER PENETRATION ASSEMBLY HEATING LOOP aw XN 4"RIGID SEALED COMBUSTION AIR INLET 3/4-IN COPPER TUBE PRESSURE RELIEF DRAIN. TERMINATE 2”ABOVE GMT-1 FUNNEL CONCRETE HOUSEKEEPING PAD, LAD)EXTEND PAD 6"BEYOND FOOTPRINT OF BOILER AND BURNER ON ALL l SIDES 1/2-IN DRAIN WITH BALLVALVE,HOSE THREADS,4ANDBRASSCAP SPECIALTY VALVES,FUELFILTER,ETC.NOT SHOWN \M506/NOTE:NOT ALL VALVES,FITTINGS, AND EQUIPMENT SHOWN.SEE SHEET M601 AND DETAILS 5/M501 AND 4/M506 FOR ADDITIONAL BOILER INSTALLATION REQUIREMENTS (1 \BOILER ISOMETRIC SCHEMATIC\yS05/NOT TO SCALE a oriSee."hast %ro!"ehFti4gax' 475 uereat w notre GF475%.ME 10284 "oFNegeeecneertetodFORCONSTRUCTIONRRaos | f ¢REV.DESORPTION pare |_Rev.DESCRIPTION ATE &Cheesh'Na Tribal Council WATER PROCESS BUILDING orsmenom EH SHEET NO.)CDC,INC.P.O.BOX 241 ee ew Pde perpen L=®Gakons,AK 99886 MECHANICAL DETAILS 5 approveda:EWH M505(907)270-7038 oy Telephone #(907)822-3503 CHEESH-NA COMMUNITY CENTER WATER &SEWER PROJECT [™S____2/8/2013 C Facsimile #(907)822-5197 CHISTOCHINA,ALASKA waa as won J 4/10/2013-6:130mFILEPATH:F:\Data\Wosilla\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M-506FuelSystemPlanondDetails.dwgDETAIL NOTES 2°FNPT:MONITORING PORT, SECONDARY TANK 2”FNPT:SPARE,PLUGGED, SECONDARY TANK 4”FLNG:TOP TANK FILL,PIPE TO FILL BOX 4”FLNG:BLIND SPARE, PRIMARY TANK 2”FNPT:1/2”SUPPLY, PRIMARY TANK 2”FNPT:3/4”RETURN, PRIMARY TANK 2”FNPT:CLOCK GAGE, PRIMARY TANK 2”FNPT:WATER DRAW PORT, PRIMARY TANK @)2”FNPT:MANUAL STICKINGPORT,PRIMARY TANK 2”FNPT:NORMAL VENT, PRIMARY TANK 8”FLNG:EMERGENCY VENT, PRIMARY TANK 42)8"FLNG:EMERGENCY VENT,SECONDARY TANK 3)2”FNPT:NORMAL VENT,SECONDARY TANK GRADE-LEVEL FILL BOX LADDER 7|vimaNORMAL VENTS FOR PRIMARY AND SECONDARY TANKS 2”PRIMING PORT WITH 12'-0" SLEEVE, INSULATE,CAULK, AND SEAL WALL PENETRATIONS ANTI-SIPHON VALVE TANK BOTTOM NOTE: FOOT VALVE 2”'sings! ALL EXTERIOR FUEL OIL PIPING TO BE SCHEDULE 80 WELDED,PAINTED STEEL.THREADED FITTINGS MAY BE USED FOR VALVES AND FLEX HOSE me 1-1/2"7 GALVANIZED RIGID CONDUIT GALVANIZED HEX HEAD LAG SCREW AND WASHER, 5/16”X 3°,TYP \ GALVANIZED,TWO-HOLE, HOLD-DOWN CLAMP,MIN. 3-0"ON CENTER &AT EVERY CHANGE OF DIRECTION 18"LONG 6”X 6° TREATED LUMBER pers|"bury SLEEPER=IN DEEP \FUEL-RATED -FLEX HOSE,TYP -- 3/4”FUEL OIL SUPPLY (2\FUEL PIPING SECTION (AST-1)\u506/NOT TO SCALE eee enn vn (3 \GROUND PIPING SUPPORT :ce \u506/NOT TO SCALE P.O.BOX 241 Gakona,AK 99586 Telephone #BO)822-3503Facsimile#(907)822-5197 FUEL SYSTEM PLAN AND DETAILS CHEESH-NA COMMUNITY CENTER WATER &SEWER PROJECT |" CHISTOCHINA,ALASKA 6 YD &in i |Ch sorrison(6)Li,PACKAGED BROTHERS MODEL -DAYTANK 1-1/2"VENTS|155 SCREENEDASSEMBLYGOLDENROD#496 ww VENT CAP 12s-<7):FILTER W/496-5 S ABOVE GRADE.OSHA-COMPLIANT ELEMENT PHANDRAIL-(3){8+s-9)enews ty ttn nna BRAIDED STAN Eee EONS TIGERLOOP ULTRA MODEL TJN HOSES TO BURNER COMBINATION FUEL DEAERATOR GALVANIZED AND SPIN-ON FILTER petGRIPSTRUT"||--5'-0"MINIUMUM--CATWALK °.\Yy 3/4 SCH80 WELDED, (2 \/ast\|Soy |FOS [PAINTED STEELEK7O-®ire 05 -<|P G7 ay pT S\23/4"FOS FROM TANK 3 ;L |§-1”FOR TO TANKC)4 aN -L ;<1 \a \,SEAL PENETRATIONSK\GATE VALVE (TYP)\-aNcHoR To FLOOR CONTAINMENT BASIN WATER TIGHT COPPER R OIL SAFETY INTERIOR PIPING -SCHEDULE 40,VALVE (TYP)s THREADED,BLACK STEEL,UNLESS NOTED(1 \MECHANICAL FUEL SYSTEM PLAN OTHERWISE. 50 22x34:1/2”=1°-0",14x17;1/4”2 1'-0"L')2 4ee *,(4 \FUEL OIL PIPING ea.geNOTTOSCALE040pre'”\x808/FOR CONSTRUCTION IEReonsy, (rev.DESCRIPTION OATE REV.DESCRIPTION OATE Cheesh'Na Tribal Council WATER PROCESS BUILDING cescepmm EW SHEET NO. appaveDonEWH M506 3/8/2013 AS NOTED y, 4/10/2013-6:13am"(1 "CLOSELY-SPACED FILEPATH:F:\Dota\Wosilla\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M-601HeatingSystemSchemotic.dwg(M501 TEES” A4S-1;AIRSEPARATOR . os .1-1/4"HGS LZ yore i b =f iu t f i tfax3/4”HGS ey 1 |ey"HGR |=f &&OT Sin)ver we ,@ ©]Ca)©]=YCOL HEAT AAV \ \1B /SPOON J L \S TS TS S OOS S TS S OTSa)Ls)q |5)G i tH P Ley P m a)Le)p Le)De)Ls) LL J wu \cl /rp \/rp \/re \/un \ A \t/1 1 1 1 wax 1 1 (1)(4%\M502/M504 M504 \M504/\502/ SECONDARY Fs "8 2 2 @ (2AQUASTATUM504M504nf(M504)foie 2 ROUTE RELIEF VALVE -_-__I /ce wood wood)/PIPING TO GLYCOL TANK. /TUG)_SECONDARY Fg MAINTAIN FULL SIZE OF . A AQUASTAT :VALVE DISCHARGE.SLOPE 3/4"HGS RETURN TEMPERAy|e CONTINUOUSLY DOWN |3/4"HoR SERN TEMPERATURE FrY/fl r TOWARD TANK.TYPICAL 'UMzfF,1@®'4 /@)[ERHEH27(?%&De % !HII 5am[e\|\XG)_warer une\1 /NN =="2"AIR GAP BETWEEN ®=GLYCOL HEAT \DISCHARGE,AND Wl Lf TRACE ™s \TANK FUNNEL J \FOR aa (5-rnt++4 &"HD Cel tot |CONTINUATIONi||&/ONS 3/4"|Ny,-@)pot Ls- it =) WATERING POINT RADIANT SLAB SEQUENCE HB Rl @ The injecti 'ly heat ¢Initial state (Shut-down)e injection pump ¢cp-5 runs to supply hea (e]a Eev-700 ts closedtheslabbasedonthesnowandicesensorcall3CP-5 is off /cp \ for heat.\34 / 1)Included equipment 3)Soom Met OO)(Initiated by snow and ice FROM GMT=1 /cp \ 0)€P-5,Injection Pump .a)HS=700 is in the ENABLE position.3/4”\3/b)ECY-700,Glycol flow control solenoid b)CY=700 opens.valve c)¢P=5 runs. °(2)3)ECV--701,weot betencing valve d)€CV--702 modulates to maintain a2ECV-702,Glycol di ng valve supply temperature of 85 F and ae)ECY=703,Glycol balancing valve return temperature at JS-702 above "f)HS-700,Snow melt enable switch 140 F.1-1/4 g)LC=700,Slab heat controller wuh)IS -700,Snow and Ice sensor cor aayi)IS 70L Supply temperature sensor SS aDIS=702,Return temperature sensor CONTINUATTON (i (5 \: a "esSessenneet."SeFORCONSTRUCTION"RY as | (rev.DESCRIPTION DATE FEV.DESCRIPTION DATE NC.Cheesh'Na Tribal Council WATER PROCESS BUILDING cescenim EWH SHEET NO.) EDC >4 DRAWN BY:EWH218W,FIREWEED LANE Eo one BOX zat HEATING SYSTEM SCHEMATIC Mereon EW M601(907)276-7833 Te Telephone #(507)822-3505 CHEESH-NA COMMUNITY CENTER WATER &SEWER PROVECT |S __3/8/2013C-Z Facsimile #(907)822-5197 CHISTOCHINA'ALASKA sun as nore , 4/10/2013-6:13amFILEPATH:F:\Data\Wasillo\Active\Projects\KAE\ChistochinaWaterDistributionBuilding\Dwg\Mech\M 901PlumbingIsometrics.dwgoN EXTERIOR WATERING POINT.EXTENM.3/4”CW ELBOW AND WATTS 8FR PORIT DRAIN See1/2"cw.|}NN VACUUM BREAKER CIVIL SHEET C16 SEE PROCESS '\Px a"™|w=2a™LE”A]1/2"Tw a - 1/2”CW 1/2”CW |we a1-1/2"TW Za 1/2”TW \ «' 3/4"CW 3/4"Tw SH-1 ”gt \AoeSp1-1/2"HW W-2 @ 1/2”CW 4 2 °GMT-1Lae=.pee1-1/2"HW me 1/2 CW DRAIN eS/ FUTURE WORK,HE-1NOTINCONTRACT / HB-1 (/1.\DOMESTIC WATER SUPPLY PIPING ISOMETRIC ((2.\WASTE AND VENT PIPING ISOMETRICYiSCALE:NONE Ney)SCALE:NONE gsbttttaOFAugte 43.Ernest W Hetrick:'Se4"55%,ME 10284 Seoe,ete netteS L FOR CONSTRUCTION Seo"Yarz0| fre.DESCRIPTION DATE REV,DESCRIPTION DATE NC.Cheesh'Na Tribal Council WATER PROCESS BUILDING CemexBn EWH SHEET NO.)Fav msec Le Er coin mi 38088 PLUMBING ISOMETRICS moore |14904 Bw.Telephone _DATE:3/8/2013 : (907)276-7983 Bo Telephone H (307)822-5187 CHEESH-NA COMMUNITY CENTER WATER &SEWER PROECT [°”=J CAS (ACHINA Ce TP CLYSTOCK INE le07?