Loading...
HomeMy WebLinkAboutSHP Geotechnical Data Report Vol I AEA11-022 Feb 2015SNe et ae . Sie& tia i vats me SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. Report 14-34-REP v0.0 Susitna-Watana Hydroelectric Project Geotechnical Data Report Volume| 022AEA11 1835 South Bragaw St.,Suite 350 Anchorage,AK 99508 Prepared by: MWH Americas,Inc. 813 West Northern Lights Blvd. Alaska Energy Authority Anchorage,AK 99503 Prepared for February 2015 16-1434-REP-022215[ALAS SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. Report 14-34-REP v0.0 Susitna-Watana Hydroelectric Project Geotechnical Data Report AEA11-022 i]hdaePrd 1835 South Bragaw St.,Suite 350 Anchorage,AK 99508 Prepared by: MWH Americas,Inc. 813 West Northern Lights Blvd. Alaska Energy Authority Anchorage,AK 99503 Prepared for. February 2015 16-1434-REP-022215=ALASKA (@ME”ENERGY AUTHORITYlz The following individuals have been directly responsible for the preparation,review and approval of this Report. Paul Richards,Jeremiah Holland,Eric CannonPreparedby: Reviewers:James Gill,Robert Dugan,and Carolyn Randolph Loar UP Bee Approved by: Michael Bruen,Geology,Geotechnical,Seismic Lead EEKM.Approved by: Brian Sadden,Project Manager Disclaimer This document was preparedfor the exclusive use ofAEA and MWH as part of the engineering studies for the Susitna-Watana Hydroelectric Project,FERC Project No.14241,and contains information from MWH which may be confidential or proprietary.Any unauthorized use of the information contained herein is strictly prohibited and MWH shall not be liable for any use outside the intended and approved purpose. THIS PAGE INTENTIONALLY LEFT BLANK zy ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years,1 6-1 434-REP-02221 5 TABLE OF CONTENTS EXECUTIVE SUMMARY 0...cccceccescsssssccsseeeseccseecesseesessessessessesseseecasesscssessesscseeaseseeseeseenesaees ES-1 L.INTRODUCTION oc cccessssecsseeeesesssesteeecesessessecsecseesecseesecseeeecasseeenseaeeeeseseasereseseeesaeeaees 1-1 L.L.Project DeScription.......eeeceseessseceeessesseecseseseceseeseeacseeseeeseessaeseeseeeesceaesneneeaseneseaes I-1 1.2.Scope Of Work oo...ceccssescscesceseesesseesecseesecseesessscseesscssesessessessssssesessseseeaesaeeasenecenees 1-1 1.3.Project Datum 00...eeessesecscesceseceseseeeceseesseesecsessscasesecscessssecseesecseeaseseeeesseseeesenauenesaees 1-3 2.PREVIOUS SITE WORK20...ccccsseecetecsecsseseesceenseseeaeseceaesaseseearenecseeanenesseeseesesanseneeaeeneeees 2-1 SITE INVESTIGATION METHODS 0.0...cceesesseecseseesceeesseesceseeseesesseeseeneeensseeneseneneeeneeaeees 3-1 B.2.Dr ng ee eee cseesesseeneeececeneseseesesseeasesessecasesesseesessaesaseessaseseaesaseseeaeeasensoarenees 3-1 3.1.1.2011 GMC Rock Core Sample Review...........c:csscssessesssessessectseseccsseceeessettaceeesees 3-1 3.1.2.2OL1 Field Season...ceecseseeceeesesessecssesecssesecsceseseeeaeeseseeeseseasenseeseateaseaseates 3-1 3.1.3.2012 Field Season...eee eseeccsseesseceeseeeseceseceseeseeeseseaecaeesaseseesseesssenesenesseeeasenas 3-2 3.1.4.2014 Field Season...ecsssescesecsceseceseseeseceseeassessasesecasesecesesesseseeesseseenseeessees 3-2 3.1.5.Water SOUrCeS occ ecceeesesssesseseeesesesecesecescenesecesseeeaseeseseseseesasessceascaeseaaeanseaeeseeegs 3-3 3.1.6.Core Logging and Classification 0.0...cc csesessesecesesesseceeceeeeeesecseessseecnessasesecasesses 3-3 3.1.7.Core Sample Storage...cccscecceseceseseseeeeeeseceeseaceeacesecesaseseseseaeesaseasesnsesesenesanses 3-4 3.2.In-Situ Testing .......ceeeesscesnsesneceseeeeceesceeeseecesceeacecscecsneeesacersasossesessesssecssasseasesesessrevaes 3-4 3.2.1.Water Pressure Testing ..........cccccccccsccsseceteceeeecessetceeeeeeeeeecereseseeessavsseseseeseesesesees 3-4 3.2.2.Down-Hole Televiewer Surveys ........scescscssescscsessscssssssssssssesseesessecssesesseseneoees 3-5 3.3.Instrumentation oo...ceeececeeeeesceescesaceseceaeesessaaseessaeeeeseascsssesesenscusssseasseeseusesssesesesaes 3-5 3.3.1.PieZOMEteTS .......ee eeecseeccecssecesnnecessnesessnecenacesesseccsseesosssscassessesssessstsevsseseceseeseneeeees 3-6 3.3.2.Ground Temperature MOMItoring........ce eeeesesesseessesceseceseesesosensessssesereeseeseseneeaees 3-6 3.3.3.Historical Instrumentation Retrofitting...eee eeeeeeeseeeseesesecessecseessseseseeeeeees 3-6 3.4.Bulk Samples oo...eee ccescsseseccesseeseceressssasessecseseesesasesesscsaesssseseeseeseeessaseoesseeasneseneas 3-7 4,LABORATORY TESTING .......cccccccsccscceccesesecessesececeacesesscesessesnssssscscssasssssesseenecereseeseensenaenes 4-1 4.1.Summary of Laboratory Testing ........cccsccsescessestessesrenseeseseesseseseesssneceeseeeneseesenanes 4-1 4.2.Petrographic Examination...cccessesscsesssssescsesseseesessssseseeseesssseseeeseeeeeneeaseessenseneees 4-3 5.INSTRUMENTATION MONITORING 0...eeceeeeeecesecsseeesesssscnsessceasceseseeseeeseseseaseaasseeeesars 5-1 6.GEOLOGIC SETTING uu...ccccessessesecsceseeescneseneeceeseseesscesusssssasaceseceeessecsseneeneenessseeesesensnnengs 6-1 Geotechnical Data Report Page i 02/22/15 yw.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.16-1434-REP-022215 6.1.Topography and Physiography «00.0...sescssesseecesececeecsecsseseseesssesssesssseeseusesesaseseneeees 6-1 6.2.Regional Geology 0...ce ceeeescesscesreeeecseeseceeeceseseseseeeesecssesneesesesasesdcenseseeeeesesaseasensoeges 6-1 6.3.GeOlO VIC UNIts oe ee eeeccscseccseeseeeseeseeseecseeeseessecseeseessaeceeeceeeeaceseceaseesessaseseveeaeeeeeses 6-2 6.3.1.Bedrock Geology ......cs ceecessessessesecsereeeesceseseessesseseesersscesecseoressesssessesssesessoseseee 6-2 6.3.2.Overburden Materials 0.0.0...ceseeccesecssscseceeeceseesccescescecesesaeessecseeeaeesasesaseeseseeenees 6-3 7.USE OF THIS REPORT .........cccccccssssssessescscesscsseseseceecsesneecensenescesseneeeseesecaceasesesassceaceesseaesees 7-1 8.REFERENCESou...ccescsscssessesessesscscescesesseseeseeasacsceacesessessesecesseseesessssaeseeeeeaseneseseseaeeeeseneaeees 8-1 Geotechnical Data Report Page ii 02/22/15 --ZT.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.16-1434-REP-022215 LIST OF TABLES Table |Borehole Summary,2011 -2014 Table 2 Water Pressure Test Data Summary Table 3 Geotechnical Instrumentation Summary Table 4 Summary of Historical Geotechnical Instrumentation Assessment Table 5 Laboratory Test Results -Watana Dam Site Table 6 Laboratory Test Results Summary -Quarries A and M Table 7 Laboratory Test Results Summary -Concrete and RCC Mixes LIST OF FIGURES Figure |Watana Dam Site Location Plan Figure 2 Exploration Plan -Dam Site Figure 3 Rock Quarry Sites Figure 4 Exploration Plan -Quarry A Figure 5 Geotechnical Instrumentation Plan Figure 6a Regional Geologic Map Figure 6b Regional Geologic Map Key LIST OF APPENDICES Appendix A Geologic Logs Appendix B-Rock Core Photographs Appendix C Water Pressure Testing Appendix D Down-Hole Televiewer Logs Appendix E Geotechnical Instrumentation As-Builts Appendix F Laboratory Test Data Appendix G_Petrographic Analysis Appendix H_Geotechnical Instrumentation Monitoring Data Geotechnical Data Report Page iii 02/22/15 Ze SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHORITY AEA11-022 16-1434-REP-022215 LIST OF ABBREVIATIONS Acres Acres International,Inc. AEA Alaska Energy Authority AK-DNR Alaska Department of Natural Resources ANCSA Alaska Native Claims Settlement Act of 1971 AKSP Alaska State Plane ASTM ASTM International Crux Crux Subsurface,Inc. FERC Federal Energy Regulatory Commission GDR Geotechnical Data Report GMC Geologic Materials Center GPS Global Positioning System Golder Golder Associates,Inc. Harza-Ebasco -__Harza-Ebasco Joint Venture ISRM International Society of Rock Mechanics LiDAR Light Detection and Ranging Ma Mega-annum MWH MWHAmr ricas,Inc. NAD83 North American Datum of 1983 NAVD88 North American Vertical Datum of 1988 PN Petrographic Number Project Susitna-Watana Hydroelectric Project RQD Rock Quality Designation SPZ Standpipe Piezometer TAC Temperature Acquisition Cable UCS Unconfined Compressive Strength USACE United States Army Corps of Engineers USCS Unified Soil Classification System USGS United States Geologic Survey VWP Vibrating Wire Piezometer Geotechnical Data Report Page iv 02/22/15 a ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 EXECUTIVE SUMMARY This Geotechnical Data Report (GDR)summarizes the geologic data collected from geotechnical investigations and monitoring data conducted by MWH Americas,Inc.(MWH)with the assistance of Golder Associates,Inc.(Golder)for the Alaska Energy Authority's (AEA)Susitna- Watana Hydroelectric Project (Project)during the 2011 through 2014 field seasons.The investigations were comprised of rock core borings,in-situ testing,laboratory testing,and instrumentation installation and monitoring programs.In addition,geologic mapping and surveys were also performed which in the dam site area and are documented Field investigations were developed in a phased approach,with the scope of each field season being developed based on both project needs at the time and the data obtained from prior field seasons in accordance with the project Exploration and Testing Program Work Plans.Key objectives for the field investigations included the following: = {mplementation of the exploration and work plans for each field season; *Obtain the required water use and land access permits to conduct the planned field work; «Explore subsurface rock and soil conditions by advancing boreholes at selected locations within the dam foundation area,Quarry A,and Quarry M; «Evaluate in-situ rock conditions by conducting water pressure testing and down-hole televiewer surveys; «Conduct laboratory testing to determine the engineering properties (e.g.,physical and mechanical)of rock samples collected from the dam foundation,Quarry A ,and Quarry M;and «Identify groundwater levels and ground temperature by installing and monitoring geotechnical instrumentation in new boreholes and selected historical boreholes. Geotechnical Data Report Page ES-1 02/22/15 -yz.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 1.INTRODUCTION 1.1.Project Description The Alaska Energy Authority (AEA)proposes to develop and construct a major hydroelectric facility,the Susitna-Watana Hydroelectric Project (Project),on the Susitna River near river mile 184.4 in the Talkeetna Mountains of south-central Alaska (Figure 1).AEA selected MWH Americas Inc.(MWH)to assist in the completion of engineering feasibility studies,including deriving the size and capacity of the major structures,developing the design to sufficient detail for verification of project development cost estimates,and defining the Project components and operation.MWH has subcontracted Golder Associates Inc.(Golder)to assist with geotechnical services related to the feasibility studies in support of the selection of a preferred dam type and optimization of the Project layout. The Project is currently in the pre-application phase of the Federal Energy Regulatory Commission (FERC)licensing process.This phase includes engineering feasibility studies,as well as environmental studies and planning,in support of a FERC license application. As currently envisioned,the Project would include an approximate 735-foot tall dam with a nameplate generating capacity of 600-megawatts.The proposed dam would likely consist of a curved gravity structure comprised of roller compacted concrete.The dam would impound a reservoir that is 42-miles long.Other key components of the Project include gated spillway, diversion structure,transmission lines to the existing grid,an access corridor to the site,and supporting facilities at the site such as switchyards,housing,roadways,and an airstrip. This Geotechnical Data Report (GDR)summarizes the data collected from field investigation efforts for the 2011 through 2014 field seasons related to geotechnical drilling,sampling,in-situ testing,instrumentation rehabilitation and monitoring,and laboratory testing. 1.2.Scope of Work The scope of work for the Susitna-Watana geotechnical investigations was developed in a phased approach beginning in 2011 and continuing through 2014.The field investigations were tailored each year to meet the project information needs,site access constraints,and project budgets. The overall objectives of the 2011 through 2014 field investigations were to define geologic conditions,determine rock mass properties,identify zones of alteration,weathering or shearing, investigate geologic structural features such as discontinuities,shears,lineaments and faults,and evaluate groundwater and ground temperature conditions at the dam site.These objectives were Geotechnical Data Report Page 1-1 02/22/15 -z ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-RE P-02221 5 achieved by conducting subsurface drilling,in-situ testing,and laboratory testing,as well as installing and monitoring geotechnical instrumentation. Exploration and testing program work plans were developed for each of the field investigation programs conducted in the 2011,2012,and 2014 field seasons (MWH,2011,2012;2013).The focus of the investigations was the proposed Quarry A identified by the U.S.Army Corps of Engineers (1979),the dam site foundation area and newly delineated Quarry M in 2012,and the dam site foundation area in 2014.|While the 2014 investigations are now complete,only a limited portion of the proposed exploration and testing program as outlined in the 2014-2015 Work Plan has been implemented (MWH,2013).Future field investigations and testing programs are planned to complete the work required to support feasibility. Permitting efforts were completed for the 2011,2012,and 2014 field season.Golder obtained water use and land access permits for the 2011 and 2012 field investigation efforts.The water use permits for the 2014 field efforts were obtained by MWH.For each of the field seasons, AEA obtained the necessary land access permits with support from MWH. Subsurface conditions were explored by advancing a total of 15 boreholes during the 2011,2012, and 2014 field investigations.The 2011 field investigations consisted of three boreholes in the proposed Quarry A location.The 2012 field investigations were comprised of five boreholes in or near the dam foundation,and three boreholes in proposed Quarry M location.The 2014 field investigations consisted of four boreholes conducted in the dam foundation area.In addition to the boreholes,bulk samples were collected from selected site locations for laboratory testing. Some rock cores from the 1970s and 1980s field programs currently stored at the Alaska Department of Natural Resources Geologic Materials Center (GMC)were reviewed in 2011 to determine which cores had been saved and to become familiar with the rock conditions at the dam site before beginning the field geotechnical investigation programs. Water pressure testing and down-hole televiewer surveys were conducted to evaluate in-situ conditions in the borings at the dam site.Water pressure testing was conducted at regular intervals in each of the 2011 through 2014 boreholes.Test data were used to determine the tightness of discontinuities,determine rock mass permeability,and too provide a qualitative evaluation of foundation grouting requirements.Down-hole televiewer surveys were conducted in selected 2012 boreholes and all 2014 boreholes.Data from the surveys were used to evaluate the rock discontinuities at depth,the geologic structure,in particular joint orientations,and zones of core loss. Laboratory testing programs were developed for each of the 2011,2012,and 2014 field investigations.In general,laboratory tests were used to evaluate the engineering properties of Geotechnical Data Report Page 1-2 02/22/15 -zZ.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 the rock in the dam foundation and the suitability of rock materials from Quarries A and B as aggregate sources. Groundwater and ground temperature conditions were evaluated by reviewing existing geotechnical instrumentation in historical boreholes and installing additional geotechnical instrumentation in new boreholes.Historical geotechnical instruments were identified and evaluated as part of the 2011 field season.Selected instruments were retrofitted with new sensing equipment and/or fitted with data loggers to record data continuously.New geotechnical instrumentation consisting of stand pipe piezometers,vibrating wire piezometers,and temperature acquisition cables were installed in the 2011 through 2014 boreholes.Data loggers were installed to collect vibrating wire piezometer and temperature acquisition cables generated data over time.Instrumentation data and water levels from standpipe piezometers were collected at selected intervals during the 2012 and 2014 field seasons. 1.3.Project Datum Horizontal control for work conducted during the 2011 through 2014 field investigations was based on the North American Datum of 1983 (NAD83),Alaska State Plane (AKSP),Zone 4. Vertical control for the project was the North American Vertical Datum of 1988 (NAVD88).All horizontal and vertical coordinates have been expressed in feet unless otherwise specified. Coordinates and elevations provided for the 2011 through 2014 boreholes and structural data were not located by professional surveying methods.In most instances,locations were determined using recreational grade Global Positioning System (GPS)devices,which are strongly influenced by adjacent slopes and vegetation cover.Accordingly,coordinates and elevations provided should be considered approximate. Geotechnical Data Report Page 1-3 02/22/15 zw ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-RE P-02221 5 2.PREVIOUS SITE WORK A larger scale "Susitna Hydroelectric Project”was proposed by the United States Army Corps of Engineers (USACE)and later by the Alaska Power Authority (AEA's prior name)in the late 1970s and early 1980s (FERC Project No.7114).That historical Project was to be composed of two major dams (the Watana Dam and Devils Canyon Dam)constructed in three stages over a period of two decades.The state conducted extensive engineering and environmental studies and filed an application for license with FERC in 1983;and FERC prepared a draft Environmental Impact Statement.Despite the extensive work that was conducted at the time,development efforts were halted in 1986. Geotechnical investigations and studies were conducted as part of this historical work at the Watana dam site.These studies included work that dated back to 1975 by the USACE,work by Acres American (Acres)in the early 1980s,and work by joint venture Harza-Ebasco in mid- 1980s.The bulk of the geotechnical work conducted during these historical studies is summarized in six geologic and geotechnical reports.These reports and a brief summary of the key geotechnical work that they contained are listed below: 1.USACE 1975.South-central Railbelt Area,Alaska,Upper Susitna River Basin, Interim Feasibility Report,Hydroelectric Power and Related Purposes.Alaska District,Anchorage,Alaska. A broad scoped feasibility report that includes a preliminary geologic and seismic evaluation of both the Watana and Devil Canyon Sites.This report presents an initial overview of the available geologic data available at the time,much of which was based on United States Geologic Survey (USGS)mapping efforts at the Devil Canyon Site (Csejtey 1974).The report also conducts a preliminary assessment of the regional seismicity. 2.USACE 1979.South-central Railbelt Area,Alaska,Upper Susitna River Basin, Supplemental Feasibility Report,Hydroelectric Power and Related Purposes.Alaska District,Anchorage,Alaska. The 1979 USACE report includes investigations and testing data conducted on both the Watana and Devil Canyon sites.Work conducted at the Watana site primarily focused on: =Geologic mapping of the dam and reservoir area; «Seismic refraction surveys at the dam site,borrow areas,and relict channel «Rock drilling and water pressure testing in the dam area; Geotechnical Data Report Page 2-1 02/22/15 -yz.-ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 #Soil boreholes in the Watana relict channel area; »Shallow auger holes in borrow areas; »Test pits of the borrow areas;and «Laboratory soil and rock testing. 3.Acres 1981.Susitna Hydroelectric Project:1980-81 Geotechnical Report. Similar to the 1979 USACE study,the Acres 1980-81 geotechnical report focused on both the Devil Canyon and Watana project sites.With respect to the Watana site,the 1980-81 investigation included the following key efforts: Geologic mapping at the dam site; Air photograph interpretation of the dam and reservoir areas; Rock drilling and water pressure testing in the dam area; Downhole geophysical surveys in selected borings; Installation of piezometers and thermistors in selected borings; Seismic refraction surveys of the dam site,Watana relict channel,and borrow areas; «Auger boreholes and test pits of borrow areas;and *Laboratory soil and rock testing. 4.Acres 1982.Susitna Hydroelectric Project:1982 Supplement to the 1980-81 Geotechnical Report. Acres'1982 report served as a continuation of the 1980-81 report,providing additional detail to the previous work.The primary tasks summarized in the 1982 report include: Geologic mapping of the dam site; Soil boreholes in the Borrow Area D and Watana relict channel area; Seismic refraction surveys of the dam site and relict channel areas; Installation of piezometers,thermal probes,and Laboratory soil testing. 5.Harza-Ebasco 1983.Susitna Hydroelectric Project:Watana Development Winter 1983 Geotechnical Exploration Program.September. This report investigated aspects of the Watana site primarily focusing on defining river alluvium depths and subsurface conditions at the dam and cofferdam locations.It also defined the subsurface conditions of the Watana relict channel in greater detail.Key portions of the 1983 investigation include: Geotechnical Data Report Page 2-2 02/22/15 -z-ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years,1 6-1 434-REP-02221 5 «*Becker hammer borings within the Susitna River channel and Watana relict channel; "Geophysical surveys in the river channel,dam and cofferdam footprints, and Watana relict channel; «Water pressure and permeability testing; =Piezometer and thermistor installation; ="Downhole geophysical surveys,including gamma logging;and *Laboratory soil testing. 6.Harza-Ebasco 1984.Susitna Hydroelectric Project,FERC Project No.7114:1984 Geotechnical Exploration Program,Watana site.Document No.1735.July. The primary focus of this report was to identify the subsurface conditions in the major shear zones of the GF1 (Fins)and GF7 (Fingerbuster).In addition, boreholes were conducted in the area of the proposed underground powerhouse. Work associated with this investigation included the following key tasks: "Geologic mapping at the dam site and specifically the geologic features; =Rock drilling and water pressure testing in borings located in the GF1, GF7,and underground powerhouse areas; Hydraulic conductivity testing; Groundwater chemical analyses; Piezometer installations;and Laboratory soil and rock testing. Geotechnical Data Report Page 2-3 02/22/15 -yz.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 3.SITE INVESTIGATION METHODS 3.1.Drilling Rock core drilling was conducted during the 2011,2012,and 2014 field seasons (Figure 2)to sample and evaluate the subsurface rock conditions underlying the dam and the near-by proposed Quarries,A and M (Figure 3).In addition,available rock core samples collected during historical site investigations were reviewed.The following paragraphs present details of the review of historical rock core samples and rock core boreholes.Figure 2 presents the locations of the 2012 and 2014 boreholes completed at the Watana Dam site and the adjacent Quarry M. The 2011 boreholes were drilled in the proposed Quarry A (Figure 4).Table 1 presents a data summary and the location of each of the boreholes undertaken in the 2011,2012,and 2014 field seasons. 3.1.1.GMC Rock Core Storage Sample Review Selected core samples from the historical subsurface boreholes at the Watana site have been stored at the Alaska Department of Natural Resources GMC located in Eagle River,Alaska.A two person team consisting of staff from MWH and Golder conducted a brief review of the rock core samples between June 27,2011 and July 1,2011.The review included taking an inventory of the rock core samples present,conducting a qualitative evaluation of the core condition of the samples observed,and photographing selected core samples.The results of this study are presented under a separate technical memorandum (Golder 201 La). 3.1.2.2011 Field Season The 2011 field investigation efforts were focused on determining the suitability of bedrock in the Quarry A location for use as construction aggregate.This quarry consists of a dome-shaped outcrop of rock located south of the Watana Dam site that is comprised primarily of andesite porphyry,with minor amounts of diorite.In these preliminary investigations,boreholes were advanced using a mixture of fresh water and EZ-Mud”polymer as a drilling fluid. Drilling,water pressure testing,and installation of geotechnical instrumentation during the 2011 field season was conducted by Discovery Drilling Inc.of Anchorage,Alaska.Three boreholes (G11-DHO1 through G1 1-DH03),totaling approximately 606 lineal feet,were advanced using a Hydrocore 28 Longyear drill rig.Boreholes G11-DHO1 and G11-DH02 were advanced vertically using NQ double-tube wireline drilling methods.Borehole G1 1-DH03 was advanced at an angle of 11 degrees (from vertical)at an azimuth of 185 degrees using NQ3 triple-tube wireline drilling methods. Geotechnical Data Report Page 3-1 02/22/15 yz.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,relrable energy for the next 100 years.1 6-1 434-RE P-02221 5 3.1.3.2012 Field Season The primary objectives of the 2012 field investigation were to characterize the rock mass present in the proposed RCC Dam site foundation,the left abutment and previously mapped geologic features identified on the right abutment,and the recently identified Quarry M areas.To accomplish this,a total of eight boreholes (DH12-1 through DH12-8)comprising approximately 2,355 lineal feet of rock core were drilled. DH12-1,DH12-2,and DH12-8 were drilled on the left abutment to evaluate general rock foundation conditions.DH12-3 and DH12-4 were drilled on the dam site right abutment to evaluate historically mapped geologic features as well as general rock foundation conditions. DH12-5,DH12-6,and DH12-7 were drilled to evaluate Quarry M.These later three boreholes were conducted to explore both general rock conditions and a historically mapped geologic feature.All boreholes were drilled at angles ranging from 20 to 30 degrees from vertical and were typically oriented to penetrate the potential geologic features obliquely. Crux Subsurface Inc.(Crux)of Spokane Valley,Washington completed core drilling,water pressure testing,and installation of ground temperature and water level monitoring equipment for the 2012 investigation program.Rock coring was accomplished using a Burley 5500-3 drill rig and a Burly 6000 drill rig.Core was advanced using HQ3-triple tube wireline methods using a mixture of fresh water and EZ-Mud*polymer as a drilling fluid. 3.1.4.2014 Field Season Four rock core boreholes (DH14-9b through DH14-12),with a combined total footage of 1,850 lineal feet,were conducted during the 2014 field exploration effort.The 2014 field explorations were advanced to target specific postulated shears zones and mapped geologic features at the dam site. Boreholes DH14-9b and DH14-10 were advanced in a crossing pattern extending across the Susitna River from the north and south banks,respectively,to investigate the rock foundation conditions beneath the dam site area and to identify potential shear or fracture zones should they be present along the alignment of the river.Both boreholes were inclined at angles of 30 degrees from vertical.Borehole DH14-9b was drilled at an azimuth of 170 degrees from the lower right abutment.DH14-10 was drilled from approximately 300 feet downstream of the lower left abutment at an azimuth of 010 degrees. DH14-11 and DH14-12 targeted gullies on the right abutment that had been previously mapped as geologic features (Acres 1982a,1982b).DH14-11 was advanced at an inclination of 30 Geotechnical Data Report Page 3-2 02/22/15 -Z ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 degrees from vertical and at an azimuth of 035 degrees.DH14-12 was advanced at an angle of 30 degrees from vertical and an azimuth of 041 degrees. A fifth borehole,DH14-9a,was abandoned by the drilling contractor after excessive caving was encountered while attempting to advance casing through the overburden and into rock.A borehole,DH14-9b was completed at this location as described above. Crux also performed the drilling services in 2014,advanced the boreholes,conducted water pressure testing and installed geotechnical instrumentation for the 2014 field investigation effort. Drilling was conducted with a Burley 5500-3 drill rig and a Burley 6500 drill rig using HQ3 triple-tube wireline methods.Only fresh water was used for rock coring activities.Drilling fluids containing additives such as bentonite and polymers were allowed while advancing through overburden only. 3.1.5.Water Sources Fresh water for use in drilling and water pressure testing was obtained from area lakes in accordance with temporary water use permits.Water used for boreholes located south of the Susitna River (G11-DH01 through G1 1-DH03,DH12-1,DH12-2,DH12-5 through DH12-8,and DH14-10)was obtained from an unnamed lake located approximately 1.5 miles south of the dam site.Water used for boreholes located on the north side of the Susitna River (DH12-3,DH12-4, DH14-9b,DH14-11,and DH14-12)was pumped from "Panhandle”Lake,located approximately 1.5 miles north of the dam site.When water conditions were clean enough for drilling purposes during the 2014 field season,supplementary water was pumped from the Susitna River as needed for drilling circulation.Water pressure testing was not conducted with Susitna River water. 3.1.6.Core Logging and Classification Drilling operations and the recovered core samples were observed and logged by a geologist or geotechnical engineer.Rock samples were visually classified in the field according to International Society of Rock Mechanics (ISRM)standards for weathering,rock strength,core recovery,Rock Quality Designation (RQD),fracture index,and description of discontinuities (Brown 1981).Soil samples were visually classified in the field according to the Unified Soil Classification System (USCS).A field exploration manual was developed prior to the 2014 field season to provide guidance and to aid in uniform rock classifications.Rock core was photographed and boxed in the field for shipment back to Anchorage to be stored for further examination,classification,and testing.Geologic logs are presented in Appendix A,and core photographs are presented in Appendix B. Geotechnical Data Report Page 3-3 02/22/15 -zZ ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 3.1.7.Core Sample Storage Core samples from the 2011,2012,and 2014 boreholes were collected,boxed,and transported in general accordance with ASTM International's (ASTM)recommended standard practice (ASTM D5078 -Standard Practice for Preserving and Transporting Rock Core Samples).Rock core samples collected from the 2011 boreholes were stored in wax-coated corrugated cardboard core boxes.Core samples from the 2012 and 2014 boreholes were stored in 5-foot long wooden core boxes.All core boxes were stored in Conex shipping containers located at AEA's storage yard at 2601 Commercial Drive,Anchorage,Alaska. 3.2.In-Situ Testing 3.2.1.Water Pressure Testing Water pressure testing was performed in each of the 2011 through 2014 boreholes.Table 2 summarizes the results of each of the water pressure tests conducted.Detailed calculation sheets for each water pressure test have been included in Appendix C. Water pressure tests were conducted using a five-stage test procedure in accordance with the recommendations presented by Houlsby (1976).During each pressure stage,water pressure and water take were recorded each minute for five minutes on an instrument console.For each water pressure test,water pressure was increased at regular intervals in three consecutive stages,and then reduced in the following two stages.Maximum allowable pressures were calculated based on in-situ stresses estimated for the midpoint of the test interval using assumed rock unit weights and groundwater elevations measured prior to the test.Actual test stage pressures were selected based on a maximum allowable pressure,rock condition,pump performance,and pressure range of the pressure gauge.Data including time,pressure,water take,and test interval length were used to calculate lugeon values for each test,which can be used to estimate permeability and the groutability of the rock formation. Water pressure tests were conducted using wireline-type packer assemblies that were lowered down through the drill string.With the exception of boreholes DH12-1 and D12-2,water pressure tests were conducted in a downstage (single packer)manner,with the bottom of hole acting as the lower point of test confinement.Upstage testing,using a double-packer assembly, was employed in DH12-1 and DH12-2. In general,boreholes were flushed with fresh water for approximately 10 minutes prior to water pressure testing.Polymers (used in the 2011 and 2012 field seasons)were not chemically broken down prior to testing.No polymers were used for rock core drilling during the 2014 field investigations. Geotechnical Data Report Page 3-4 02/22/15 -y-ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years,1 6-1 434-REP-02221 5 3.2.2._Down-Hole Televiewer Surveys Down-hole televiewer surveys were conducted in selected 2012 boreholes and each of the 2014 boreholes.Crux conducted all televiewer surveys and produced the associated survey logs. Down-hole televiewer survey logs are presented in Appendix D. In the 2012 field season,down-hole televiewer surveys were conducted in boreholes DH12-3, DH12-4,DH12-6,and DH12-8.Optical televiewers were used to survey DH12-3 and DH12-4 since groundwater levels were relatively deep and water conditions were clear when encountered.Acoustic televiewer survey methods were selected for DH12-6 and DH12-8 since cloudy water conditions were present.Portions of the 2012 televiewer surveys were limited due to unstable borehole conditions.This was most notable in DH12-6 where caving conditions were encountered,limiting the down-hole televiewer survey to between the depths of 289.5 feet and 347 feet.Unstable borehole conditions also precluded televiewer surveys above a depth of 62 feet in DH12-3. Each of the four boreholes conducted during the 2014 field season were surveyed using down- hole televiewers.Since groundwater was encountered above the elevation of the bedrock in boreholes DH14-9b and DH14-10,these boreholes were surveyed over the entire length of the hole using both optical and acoustic televiewers.Optical televiewer surveys were conducted over the entire length of DH14-11 and DH14-12;however,acoustic televiewer surveys,which require water in the borehole to propagate the acoustic waves into the rock mass,were limited by the deeper groundwater levels encountered in each of these boreholes.Accordingly,acoustic surveys were conducted below a depth of approximately 34.5 feet in DH14-11 and 95.5 feet in DH14-12. 3.3.Instrumentation Geologic instrumentation consisting of vibrating wire (VWPs)and standpipe piezometers (SPZs),and the temperature acquisition cables (TACs)were installed in selected boreholes.A total of 11 VWPs,4 SPZs,and 10 TACs were installed in the 2011 through 2014 boreholes. Each of the VWPs and TACs were equipped with data loggers to collect data at regular intervals. In addition,selected historical boreholes were retrofitted with VWPs,TACs,pneumatic piezometer transducers,SPZ monitoring transducers and data loggers. A list of the geotechnical instrumentation installed during the 2011 through 2014 field seasons is presented in Table 3.A list of historical geotechnical instrumentation in the area of the dam and the proposed borrow and quarry areas near the dam site are presented in Table 4.The locations of boreholes containing geotechnical instrumentation are presented on Figure 5.Appendix E Geotechnical Data Report Page 3-5 02/22/15 -zZ ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 presents as-built depictions for geotechnical instrumentation installed in the 2011 through 2014 boreholes and historical boreholes retrofitted with new instrumentation equipment. 3.3.1.Piezometers Piezometers were installed in each of the boreholes advanced during the 2011 through 2014 field seasons.VWPs were installed in boreholes DH12-1 through DH12-6,DH12-8,and DH14-9b through DH14-12.Each VWP was fitted with a single channel data logger.SPZs were installed in G11-DHO1 through G11-DH03,and DH12-7.These SPZs were monitored using hand held water level indicators during instrumentation monitoring field efforts. 3.3.2.Ground Temperature Monitoring TACs were installed in boreholes DH12-1 through DH12-4,DH12-6,DH12-8,and DH14-9b through DH14-12.Each of the TACs were fitted with a data logger to collect temperature data over time.Additional TACs with data loggers were installed in existing boreholes DH-24, DH-28,BH-03,and DH84-06 during the 2012 field season.TACs installed during the 2012 field season (DH12-1 through DH12-4,DH12-6,and DH12-8)had a general node spacing of 3,6,10, 20,35,50,75,100,125,150,200,and 250 feet.TACs installed during the 2014 field season (DH14-9b through DH14-12)generally had nodes located at 3,6,9,12,15,20,25,50,75,100, 125,150,200,and 250 feet. 3.3.3.Historical Instrumentation Retrofitting In 2011,Golder performed a review of historical geotechnical reports to identify existing instrumentation at the site including open standpipes,pneumatic piezometers,and thermistor probes (Golder,2011b).Geodetic coordinates of each instrumented site were obtained from the historical boring logs when possible.When coordinates could not be identified on boring logs, historic maps were digitized and coordinates were created. Based on the information obtained during the 2011 assessment,some existing boreholes were selected to be retrofitted with new sensors and data loggers.This work was completed during the 2012 field season. Two historical boreholes were retrofitted to collect groundwater data,DH84-1 and DH84-2.The retrofits included adding pressure transducers to existing pneumatic sensors,adding a VWP to one existing SPZ,and adding self-contained water level data loggers to a SPZ.Pneumatic sensors and VWPs were connected to data logging units installed at the ground surface. Four historical boreholes were retrofitted to collect ground temperature data.TACs were installed in existing tremie pipes,SPZs,or casings of boreholes BH-3,DH-24,DH-28,and Geotechnical Data Report Page 3-6 02/22/15 - -ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 DH84-6.TAC range in depth from 35 to 100 feet and generally had nodes at depths of 3,6,10, 20,35,50,75,and 100 feet.Each TAC was connected to a data logger that was installed at the ground surface. 3.4.Bulk Samples Bulk samples were collected during the 2011 through 2014 investigations.During the 2011 investigations,approximately 300 pounds of bulk samples were collected from Quarry A for laboratory testing of potential aggregate.Similarly,approximately 200 pounds of bulk samples for laboratory testing were also collected from talus slopes in the area of the left abutment and Quarry M during the 2012 field investigation.Results of the laboratory testing of bulk samples are presented in Appendix F.An estimated 200 pounds of bulk samples were collected from selected locations near the dam site for potential age dating during future laboratory testing programs. Geotechnical Data Report Page 3-7 02/22/15 -yzw ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-RE P-02221 5 4.LABORATORY TESTING 4.1.Summary of Laboratory Testing Laboratory testing programs were conducted as part of the 2011,2012,and 2014 field investigation efforts.Laboratory testing performed during the 2011 field investigations focused on the suitability of the rock material from Quarry A as a concrete aggregate source.The 2012 laboratory testing program evaluated rock index properties of the dam foundation and the suitability of rock material from the proposed Quarry M as a concrete aggregate.The 2014 laboratory testing program focused on the rock properties within the dam foundation.Table 5 summarizes the laboratory testing conducted of rock samples collected in the dam foundation area.Table 6 presents laboratory testing conducted on rock core and bulk samples from Quarry A and Quarry M.Table 7 summarizes concrete and roller compacted concrete tests conducted on samples comprised of aggregates manufactured in the lab from rock core and bulk samples obtained from Quarry A and Quarry M. The laboratory testing programs were designed to provide data on the quality of the rock,the engineering properties of the rock material,in order to evaluate the rock foundation and its suitability as a construction material,e.g.,concrete aggregate.These tests are also useful indicators of the suitability of the rock for other uses such as riprap and road surfacing.Testing was conducted in general accordance with either ASTM or ISRM test methods.The laboratory test results are presented in Appendix F.Testing methods used include: *Uniaxial Compressive Strength (UCS)of Intact Rock Core Specimens -ASTM D7012.This test method is used to determine the strength of intact rock core specimens. The rock core samples are placed between two platens and loaded until failure.The peak stress is reported as the unconfined compressive strength.In some instances,strain gauges are attached to the sample to determine Young's modulus and Poisson's Ratio. UCS testing conducted during the 2011 field season was conducted in accordance with ASTM test method D7012-07 Method C.Tests conducted during the 2012 field season were performed in accordance with ASTM test method D7012-07 Method D.Tests conducted as part of the 2014 field season were conducted in accordance with ASTM test methods D7012-14 Method C or D7012-14 Method D. *Point Load Strength Index Text -ASTM D5731.The point load index test is used to provide estimates of the compressive strength of rock for classification purposes.Rock core samples were tested in a diametral test,placed between two platens,and loaded until failure.A constant,K,which is specific to a particular rock unit,is used to relate the point load index to an approximate UCS value.After analysis and comparison with UCS Geotechnical Data Report Page 4-1 02/22/15 a ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years 1 6-1 434-REP-02221 5 test results,a K value of 19 was determined to convert point load test results into approximate UCS values.All samples were tested in accordance with ASTM test method D573 1-08. *Brazilian Strength Test -ISRM 1981.The Brazilian Strength test,or Indirect Tensile test,is used to determine the tensile strength indirectly.The sample is compressed diametrically,inducing a tensile force and causing the sample to split.The peak rupture load is then used to calculate the Brazilian tensile strength. «Direct Shear -ASTM D5607.The direct shear test is used to provide estimates of shear strength along an existing joint surface,a saw-cut surface,or two dissimilar surfaces (such as rock and concrete).Test results provide a friction angle and apparent cohesion for the joint or surface being tested.Shearing tests were conducted on rock core samples to evaluate saw-cut surfaces;natural calcite coated surfaces inferred to be an in-situ healed joint;and various degrees of weathered joints having various amount of clay, calcite and/or iron-oxide.All samples were tested in accordance with ASTM test method D5608-08. =Pulse Velocities and Ultrasonic Elastic Constraints of Rocks -ASTM D2845.Pulse velocity is used to determine intact elastic constants of isotropic or slightly anisotropic rock by measuring the speed at which a propagated wave travels through a test specimen. Test results are used to approximate seismic velocities (P-and S-waves),Young's Modulus,Shear Modulus,and Poisson's ratio. «Petrographic Examination including Petrographic Number -ASTM C295 /CSA A23.2-15A.Petrographic examinations are made to:(1)determine the physical and chemical characteristics of the material that may be observed by petrographic methods and that have a bearing on the performance of the material in its intended use;(2) describe and classify the constituents of the sample;and (3)determine the relative amounts of the constituents.Petrographic examinations are described in detail in Section 4.2 of this report. "Modified Mortar Bar Test -ASTM C1260/C1567.The mortar bar test (ASTM test method C1260)provides a way of detecting an aggregate's potential to undergo expansion as a result of alkali-silica reaction when incorporated into a cement mortar. The accelerated mortar bar test (ASTM test method C1567)evaluates the effect of pozzolans and blast furnace slag to control expansion due to alkali-silica reaction. Samples tested as part of the 2011 field investigation were conducted in general accordance with ASTM test method C1260.Samples tested as part of the 2012 investigation program were conducted in general accordance with ASTM test method Geotechnical Data Report Page 4-2 02/22/15 -w-.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-RE P-02221 5 4.2. C1567.These 2012 test specimens were evaluated using varying amounts of both Class C and Class F fly ash.Fly ash replacement values (the portion of the cementitious content comprised of fly ash)consisted of either 35 percent or 45 percent for various samples. Los Angeles Abrasion (Large Size,500 revolutions)-ASTM C131.The Los Angeles Abrasion test is widely used for testing of coarse aggregate for resistance to abrasion using a standardized machine.It is used as an indicator of the relative quality or competence of various sources of aggregate having similar mineral compositions. Soundness,Magnesium Sulfate (5 cycles)-ASTM C88.The magnesium sulfate test evaluates aggregate soundness when subjected to weathering action in concrete or other applications.This is accomplished by repeated immersion in saturated solutions of magnesium sulfate followed by oven drying to partially or completely dehydrate the salt precipitated in permeable pore spaces.The internal expansive force,derived from the rehydration of the salt upon re-immersion,simulates the expansion of water on freezing. Freeze-Thaw Durability (55 cycles)-Modified ASTM D5312.The freeze-thaw durability test is designed to determine the effects of freezing and thawing action on individual pieces of rock and the resistance of the rock to deterioration.The rock is subjected to multiple cycles of freezing and thawing based on the location of the project site.While the ASTM D5312 test standard does not provide a recommended number of freeze-thaw cycles for the Project site,a total of 55 freeze-thaw cycles was selected based on interpolation of the test standard.This method was modified to accommodate samples that were smaller than those recommended by the ASTM standard. Relative Density (Specific Gravity)and Absorption of Coarse Aggregate --ASTM C 127.This test method is used to determine the density and absorption of coarse aggregate particles.Test results provide an average value representing the sample.The sample is oven dried and then soaked for a prescribed duration.The absorption is the increase in the weight of aggregate due to water in the pores of the material,but not adhering to the outside surface of the particles,expressed as a percentage of the dry weight. Petrographic Examination Petrographic examinations were performed to determine the composition of selected rock samples collected during the 2011 and 2012 field investigations.Selected samples were obtained from rock cores,outcrops and talus deposits.Petrographic examinations conducted as part of the 2011 investigations focused on potential construction materials from Quarry A.These samples included four andesite porphyry samples (petrographically classified as altered dacite)and one Geotechnical Data Report Page 4-3 02/22/15 -y.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 diorite sample (petrographically classified as altered tonalite).Samples examined from the 2012 field investigation focused on material from Quarry M consisted of diorite (petrographically classified as quartz diorite).Results of the petrographic examinations are presented in Appendix G. Rock type classification in the petrographic examination was based on visual estimates of mineral proportions in hand samples and a cursory review of thin sections.In addition,rock type categories and sub-categories were defined on the basis of mineral composition,grain size,and presence or absence of alteration. The Petrographic Number,or PN,is calculated as part of the petrographic examination.The PN is a numeric index of physical-mechanical quality of a coarse aggregate material.The use of the PN as a measure of coarse aggregate quality was first established in the Province of Ontario (Canada)in the 1950s,and eventually developed into a rapid quality control tool for the assessment of processed gravel aggregates.Correlation of the PN with other physical quality indices indicated that it could serve as a reliable indicator of quality for field samples, production-run materials,and eventually,exploration samples.The PN is based on the relative proportions of various physical-mechanical quality classes,"Good”,"Fair”,"Poor”and "Deleterious”,into which all the particles of a sample are sorted,based upon their physical properties (strength,hardness,toughness,absorption/porosity,weathering).Each quality class is assigned a numeric multiplier (1,3,6,and 10);a PN is calculated for the sample using the relative proportions of each quality class. A theoretically "perfect”sample would thus be classified as containing 100%"Good”quality material,and would have a PN of '100',i.e.,100 x 1 =100,while the theoretically worst sample would have a PN of 1000 (100%x 10 =1000).In normal use,PNs for good-quality commercially produced aggregates tend to have PNs that range from near 100 to around 150. Concrete aggregates,railroad ballast,and Superpave asphalt aggregates would likely have PNs that fall below 130 to 140,while road base aggregates,for example,might have PNs that are somewhat higher,since the demands required would tend to be somewhat less stringent. Materials proposed for use as aggregates would have PNs that generally would not exceed 200. Geotechnical Data Report Page 4-4 02/22/15 -z ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-RE P-022721 5 5.INSTRUMENTATION MONITORING In general,monitoring and data acquisition was conducted by two person teams that measured water levels in selected SPZs,downloaded data from the data loggers,observed instrumentation condition and performed minor maintenance such as replacement of data logger batteries. Instrumentation monitoring site visits occurred during the 2012 and 2014 field seasons.Two monitoring site visits were conducted during the summer and fall of 2012.Monitoring was not conducted during the 2013 field season due to land access restrictions.Monitoring resumed in 2014 with one summer site visit and one fall site visit. The first 2012 site visit occurred between August 2 and August 8.Groundwater level and ground temperature measurements were obtained at 24 selected historical boreholes.The historical borehole sites visited are presented in Tables 4 and 5.The team also collected groundwater level measurements from the three 2011 drill holes in Quarry A.In addition, groundwater and temperature data were downloaded from the 2012 instrumentation data loggers that had been established at the time of the field visit (DH12-1 and DH12-2). The second 2012 field visit took place between October |and October 3.Data from selected historical instruments,the 2011 boreholes,and the 2012 boreholes were collected during the second instrumentation field visit.Additional details of the 2012 instrumentation monitoring site visits are presented under a separate technical memorandum (Golder 2013a). Instrument monitoring site visits were foregone during the 2013 field season due landowner land access restrictions.Field teams collected and removed monitoring devices from lands on November 6"and 7"at the request of the land owners.Batteries in some of the instrumentation monitoring devices had run out prior to this site visit.Accordingly,significant data gaps occurred prior to and following the November 2013 site visit.A summary of the data collected from the geotechnical instrumentation devices once removed from the site were presented under a separate technical memorandum (Golder 2013b). The key objectives of the 2014 instrument monitoring program were to re-install the instrument monitoring devices that were removed during the 2013 field season and to collect groundwater and ground temperature data over the summer.Instrumentation was re-established during a field visit conducted in June 2014.A second field visit was conducted between October 8 through October 12,2014 to download data,replace data logger batteries,and observe water levels in SPZs. Geotechnical Data Report Page 5-1 02/22/15 zw.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,retiable energy for the next 100 years.1 6-1 434-REP-02221 5 Data collected from the geotechnical instrumentation monitoring through the October 2014 field monitoring site visit has been compiled and is presented in Appendix G.Figure 4 presents the location of boreholes containing instrumentation. Geotechnical Data Report Page 5-2 02/22/15 -z ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years,1 6-1 434-RE P-02221 5 6.GEOLOGIC SETTING 6.1.Topography and Physiography The Project is located in the Talkeetna Mountains physiographic province of central Alaska (Figure 1;Wahrhaftig,1965).These mountains are located between the Alaska Range to the north and the Chugach Mountains to the south.The physiographic province was formed through the accretion of volcanic island terrain onto the North American continent.It is bound by the Denali Fault to the north,the Castle Mountain Fault to the south,the Copper River lowlands to the east,and the upper Matanuska valley to the west. The Talkeetna Mountain province is comprised of four sub-provinces,consisting of the Fog Lake Upland,the Chulitna Mountains to the northwest,the central Talkeetna mountains to the southeast,and the Clearance Lake Uplands to the east.The Watana site is located within the Fog Lake Upland sub-province.This sub-province is characterized by a northeast-southwest trending terrace with rolling hills and thin layers of sediment overlying shallow rock.The overlying soil mantle is believed to have formed from repeated glaciations (Acres,1982a).The terrace is bisected by a deep U-shaped valley formed by the Susitna River,which is in excess of 800 feet deep at the location of the Watana site.Thicker soil layers are present locally within the Fog Lake Upland where relict channels and other erosional features have been filled in by Quaternary sediments. 6.2.Regional Geology The Project is located in the geologically and tectonically complex Talkeetna Mountains.The mountains consist of glaciated,mountainous terrain,with peaks on the order of 6,000 to 9,000 feet high.The mountain range is also characterized by broad rolling uplands with steeply incised river valleys (Csejtey,1974).The orogeny of the Talkeetna Mountains has resulted from the subduction of the Pacific tectonic plate below the over-riding North American plate.This subduction fault is commonly referred to as the Alaska-Aleutian Subduction Zone.Over geologic time,movement along this subduction zone has accreted a number of structural blocks, or terranes,onto the North American continent.The Talkeetna Mountains are comprised of three such terranes consisting of the North Talkeetna Flysch Terrane,the Peninsular Terrane,and the Wrangellia Terrane.The Project is located within the North Talkeetna Flysch Terrane near the southwest boundary with the Wrangellia Terrane (Fugro,2011). The region is underlain by bedrock which is comprised of a sequence of Cretaceous shale (regionally metamorphosed to argillite)and lithic greywacke sandstone of the Kahiltna assemblage (Csejtey et al.,1978).The Kahiltna assemblage is regionally intruded by small Geotechnical Data Report Page 6-1 02/22/15 -y.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 bodies of Paleocene granites,and granodiorites with minor diorite (Csejtey et al.,1978),between 53.2 Ma (1 Ma =1 million years)to 64 Ma during the late stages of accretionary tectonics from terrains that drifted northwestward and sutured onto the North American plate (Csejtey 1978). Diorite and quartz diorite bedrock underlies the dam site and lower reservoir area and upstream for a short distance (Acres 1982b).Further upstream,the reservoir is underlain by Paleozoic and Cretaceous meta-sedimentary bedrock.Other bedrock units include Paleocene to Miocene subaerial volcanic rocks and related shallow intrusives (Woodward-Clyde Consultants,1980), including andesite porphyry,mafic to felsic dikes,and basalt flows (Acres 1982b).Figures 6a and 6b present the geology of the region surrounding the Project. 6.3.Geologic Units 6.3.1.Bedrock Geology 6.3.1.1.Diorite The dam site is primarily underlain by Tertiary volcanic intrusions that range in composition from diorite to granodiorite to quartz diorite.The bedrock is medium to dark green gray,fine to medium grained,generally strong to very strong,competent,and fresh to slightly weathered. The more intense weathering was observed in the upper portions of the rock and along discrete fractures within the rock formation.Discontinuities within the diorite are typically moderately to widely spaced,but are intermittently closely to very closely spaced in localized areas.In outcrop,joints are typically tight to open,although they are mostly tight at greater depths,rough to smooth and sometimes are slickensided,planar,and some contain iron stains or carbonate coatings or deposits.At depth,weathering locally can occur in areas of highly fractured rock, and the fractured rock may also contain shear zones and/or have been hydrothermally altered. Discontinuities at depth are commonly healed with carbonate. 6.3.1.2.Andesite Bedrock directly downstream of the dam site and in Quarry A consists of extrusive volcanics, mostly andesite porphyry.The andesite is similar in chemical composition to the diorite and is generally dark gray to black,slightly weathered to fresh,strong to very strong,competent and in places contains diorite xenoliths.This rock contains unfilled joints and veins with quartz, calcite,clay/silt,and iron oxides.Some discontinuities are very tight to partially open. Xenoliths consisting of volcanic and granodiorite inclusions that is up to 0.2 feet in maximum dimension. Geotechnical Data Report Page 6-2 02/22/15 yw.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 6.3.1.3.Dikes The diorite pluton has been intruded by mafic and felsic dikes that are generally between a few inches to a few feet wide,and exhibit contacts that are healed and competent.Felsic dikes are observed in outcrop as well as boreholes.Felsic dikes are generally light gray,fine to medium grained,fresh,and strong to very strong.Mafic dikes are less common than felsic dikes but were encountered in outcrop and in several boreholes.The mafic dikes typically consist of andesite and are less than 5 feet wide.They are dark gray to green-gray,fine-grained,fresh,hard,and strong.Mafic dikes may be porphyritic and include xenoliths of the parent rock and generally have tight contacts and with the parent rock. 6.3.1.4.Altered Bedrock Alteration zones were penetrated in a number of boreholes.Hydrothermal solutions have caused the chemical breakdown of the feldspars and mafic minerals in the host rock leaving a lighter greenish-gray to tan to white appearance.These zones are rarely seen in outcrop,likely due to preferential weathering of the moderately to severely weathered and altered zones.Where encountered in rock cores,the thickness of the altered zones in boreholes range up to 20 feet but are typically less than 5 feet.These zones are typically associated with close fracturing,fracture zones,or shear zones.The transition between fresh and altered rock is gradational over a few inches to few feet.The degree of alteration encountered is highly variable,but in the areas of most severe alteration the rock can be weak to extremely weak and contain zones of rock completely altered to clay minerals over several inches in width. 6.3.2.Overburden Materials Overburden was encountered in all but three boreholes conducted during the 2011,2012,and 2014 field seasons.Overburden ranged in thickness from 0 feet in boreholes G11-DH01,D11- DH03 and DH14-12 to 73 feet thick in borehole DH14-9b.The deepest overburden was encountered in boreholes conducted at or near river Jevel,while the shallowest overburden depths were encountered in Quarry A and along ridgelines in the right abutment area. Intermediate thickness of overburden on the order of 6 to 17 feet was encountered in boreholes targeting geologic features and on the upper left abutment. Overburden observed in the 2011 through 2014 boreholes were generally consistent with descriptions of those encountered in historical boreholes at the dam site.Overburden depths encountered in boreholes near the dam site and Quarries A and M are presented in Tables 1 and 3. Geotechnical Data Report Page 6-3 02/22/15 Zw ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reboble energy for the next 100 years 1 6-1 434-REP-02221 5 Overburden within the river channel consists of alluvium comprised primarily of well-graded coarse-grained gravels,sandy gravels,and gravelly sands with cobbles and boulders.Near the south abutment the alluvium transitions to a thick talus deposit of diorite.Above the river level on the northern abutment,the encountered overburden is comprised primarily of coarse-grained, angular to sub-angular colluvium.Boreholes in the upper areas of the left abutment encountered overburden consisting of till,alluvium,and talus comprised of sand,gravel,cobbles,boulders, and silt. Geotechnical Data Report Page 6-4 02/22/15 -yw ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,relable energy for the next 100 years.1 6-1 434-REP-02221 5 7.USE OF THIS REPORT This report was prepared for the exclusive use of AEA for investigation of the Watana dam site as part of the engineering feasibility studies for the Susitna-Watana Hydroelectric Project.If there are significant changes in the nature,design,or location of the proposed facilities,and/or additional site investigations are performed,MWH should be notified so that we may review our conclusions and recommendations in light of the proposed changes and provide a written modification or verification of the changes. There are possible variations in subsurface conditions between boreholes and also with time. Therefore,inspection and testing by a qualified engineering geologist and/or geotechnical engineer should be included during future site investigations,final design and construction to provide corrective recommendations adapted to the conditions revealed during future project activities. Unanticipated subsurface conditions are commonly encountered that cannot fully be determined by a limited number of boreholes or samples.Such unexpected conditions frequently result in additional project costs in order to build the project as designed.Therefore,a contingency for unanticipated conditions should be included in the construction budget and schedule. The work program followed the standard of care expected of professionals undertaking similar work in the State of Alaska under similar conditions.No warranty expressed or implied is made. Geotechnical Data Report Page 7-1 02/22/15 -z ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 8.REFERENCES Acres American,Inc.(Acres),1982a.Susitna Hydroelectric Project:1980-81 Geotechnical Report.Prepared for the Alaska Power Authority.Volumes 1 -3. Acres American,Inc.(Acres),1982b,Susitna Hydroelectric Project,1982 Supplement to the 1980-81 Geotechnical Report.Prepared for Alaska Power Authority,December 1982, Volumes |-2. Brown,E.T.(ed.),1981,Rock Characterization,Testing and Monitoring:ISRM Suggested Methods,Commission on Testing Methods,International Society for Rock Mechanics, Pergamon Press,211 p. Fugro Consultants (Fugro),2011.Susitna Watana Hydro:Seismic Hazard Characterization and Ground Motion Analyses for Watana Damsite.Technical Memorandum No.|DRAFT (12-02-TM)October 14,2011. Csejtey,Bela,1974.Reconnaissance Geologic Investigation in the Talkeetna Mountains.USGS Open File Report 74-147. Csejtey,B.,Jr.,Nelson,Wh.H.,Jones,D.L.,Silberling,N.J.,Dan,R.M.,Morris,M.S., Lanphere,M.A.,Smith,J.G.,Silberman,M.L.,1978.Reconnaissance Geologic Map and Geochonology,Talkeetna Mountains Quadrangle,Northern Part of Anchorage Quadrangle,and Southwest Corner of Healy Quadrangle,Alaska.USGS Open File Report 78-558-A,60 p.,|sheet 1:250,000 scale. Golder Associates,Inc.(Golder),201la.Technical Memorandum RE:Watana Rock Core Review -Railbelt Large Hydro Engineering Program,Alaska.July 11,2011. Golder Associates,Inc.(Golder).2011b.Watana Dam,Geotechnical Instrumentation Condition Assessment Program.Memorandum.October 31,2011. Golder Associates,Inc.(Golder).2012.Geotechnical Data Report,Watana Quarry A.Prepared for Alaska Energy Authority by Golder Associates Inc.for MWH.February 2012. Golder Associates,Inc.(Golder).2013a.Interim Geotechnical Data Report,Final Draft Report. Prepared for Alaska Energy Authority.Prepared by Golder Associates Inc.for MWH. March 13,2013. Golder Associates Inc.(Golder),2013b.2013 Watana Instrumentation Data Report. Memorandum.December 12,2013. Geotechnical Data Report Page 8-1 02/22/15 J.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 Harza-Ebasco,1983.Susitna Hydroelectric Project:Watana Development Winter 1983 Geotechnical Exploration Program.Prepared for the Alaska Power Authority.September 1983. Harza-Ebasco,1984,Susitna Hydroelectric Project,Federal Energy Regulatory Commission Project No.7114,1984 Geotechnical Exploration Program Watana Dam Site,Final Report,prepared by Harza-Ebasco Susitna Joint Venture for Alaska Power Authority, Document No.1734,1735,1736,July 1984. Houlsby,A.C.,1976.Routine Interpretation of the Lugeon Water-Test.Q.J.Engineering Geology,Vol.9,pp.303-313. MWH,2011.Susitna Watana Hydro:Exploration and Testing Program Work Plan,Quarry A. Technical Memorandum No.|(11-10-TM).Prepared for the Alaska Energy Authority. July 28,2011. MWH,2012.Susitna Watana Hydro:Exploration and Testing Program Work Plan -2012. Technical Memorandum No.7 (12-13-TM).Prepared for the Alaska Energy Authority. July 5,2012. MWH,2014.Susitna Watana Hydro:Exploration and Testing Program Work Plan 2014-2015. Technical Memorandum No.11 (13-38-TM).Prepared for Alaska Energy Authority. December 20,2013. USACE,1975.South-central Railbelt Area,Alaska,Upper Susitna River Basin,Interim Feasibility Report,Hydroelectric Power and Related Purposes.Alaska District, Anchorage,Alaska. USACE,1979.South-central Railbelt Area,Alaska,Upper Susitna River Basin,Supplemental Feasibility Report,Hydroelectric Power and Related Purposes.Alaska District, Anchorage,Alaska. Wahrhaftig,C.1965.Physiographic Divisions of Alaska.USGS Professional Paper No.482,52 p.,6 plates. Woodward-Clyde Consultants,1980.Interim Report on Seismic Studies for Susitna Hydroelectric Project.December. Geotechnical Data Report Page 8-2 02/22/15 a ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 TABLES -z- SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years, ALASKA ENERGY AUTHuRk1Y AEA11-022 16-1434-REP-022215 Table 1.Borehole Summary 2011-2014 Exploration Location vie fon cmace Tiss "Berton .op mo nom ae a.9°Instrumentation' Watana Dam Site DH12-1 Left Abutment 2012 1877.6 5.9 1871.7 300.4 60 21 3225828 |1885044 VP,TAC DH12-2 Left Abutment 2012 1961.3 10.8 1950.5 200 65 20 3225533 |1884943 VPW,TAC DH12-3 Right Abutment 2012 1712.3 11.2 1701.1 400.5 235 30 3227091 |1885107 VWP,TAC DH12-4 Right Abutment 2012 1630.4 16 1614.4 350 255 20 3226857 |1884848 VP,TAC DH12-8 Left Abutment 2012 1461.8 46.2 1415.6 354.2 172 20 3226359 |1884985 VWP,TAC DH14-9b |}Right Abutment 2014 1500 73 1427 683.3 170 30 3226738 |1884902 VWP,TAC DH14-10 Left Abutment 2014 1478 58.2 1419.8 692 10 30 3226171 |1884559 VP,TAC DH14-11 |Right Abutment 2014 1672 5.4 1666.6 196.8 35 30 3226766 |1884641 WP,TAC DH14-12 |Right Abutment 2014 1639 0 1639 175 41 30 3226646 |1884513 VWP,TAC Quarry A G11DH-04 Quarry A 2011 2565 0 2565 202 0 0 3222597 |1884686 -- G11DH-02 Quarry A 2011 2487.2 1.5 2485.7 202.2 0 0 3223063 |1884284 - G11DH-03 Quarry A 2011 2480 0 2480 202 185 11 3223402 |1885723 --- Quarry M DH12-5 Quarry M 2012 2000.8 10.7 1990.1 247.8 66 20 3226024 |1886861 VWP DH12-6 Quarry M 2012 1935.5 5 1930.6 352.2 55 10 3225803 |1885929 VP,TAC DH12-7 Quarry M 2012 2025.1 6 2019.2 150 65 10 3226407 |1887554 SPZ Geotechnical Data Report 02/22/15 a ALASKA ENERGY AUTHORITY ; AEA11-022neni16-1434-REP-022215 Notes: (1)Ground surface elevation estimated from 2011 Matanuska-Susitna Borough LiDAR data,NAVD88 vertical datum.Elevation not surveyed. (2)Inclination ranges from 0°(vertical drill hole,down)to 90°(horizontal drill hole). (3)Alaska State Plane Coordinates,Zone 4,NAD83,USFT.Based on coordinates from recreational grade GPS receiver.Coordinates not surveyed. (4)Instrumentation:(VWP)vibrating wire piezometer,(SPZ)standpipe piezometer,(TAC)temperature acquisition cable,(VWPT)vibrating wire pressure transducer. Geotechnical Data Report 02/22/15 -se ALASKA ENERGY AUTHuni1 ¥ AEA11-022SITNA-WATANA HYDROSU 16-1434-REP-022215Clean,reliable energy for the next 100 years. Table 2.Water Pressure Test Data Summary Depth Exploration (ft)Perms)lity Lugeons Flow Pattern Notes Top Bottom 2011 Explorations 23.5 52.0 1.2E-04 12 Void Filling 53.5 102.0 ---Packer bypass G11-DH01 53.5 102.0 2.0E-05 2 laminar 98.3 187.0 2.0E-05 2 Laminar 158.4 202.0 1.0E-05 1 Laminar 23.7 52.2 1.0E-06 0 laminar Tight formation 53.5 102.2 1.0E-06 0 laminar Tight formationG11-DHO02 -103.3 152.2 1.0E-06 0 laminar Tight formation 153.5 202.2 1.0E-06 0 laminar Tight formation 23.2 52.0 1.0E-05 1 Laminar 48.4 102.0 6.0E-05 6 Laminar G11-DH03 A42 103.3 152.0 5.0E-05 5 Washout 153.3 202.0 ---Packer bypass 2012 Explorations 24.9 44.9 1.0E-04 10 Laminar 44.9 64.9 2.0E-05 2 Laminar 64.9 84.9 1.0E-04 10 Laminar 84.9 104.9 3.0E-05 3 Laminar DH12-1 -104.9 124.9 1.0E-05 1 Laminar 124.9 144.9 3.0E-05 3 Laminar 144.9 164.9 3.0E-05 3 Laminar 164.9 184.9 3.0E-05 3 Laminar Geotechnical Data Report 02/22/15 --yw SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHunit Y AEA11-022 16-1434-REP-022215 Depth - Exploration (ft)Perl lity Lugeons Flow Pattern Notes Top Bottom 184.9 204.9 3.0E-05 3 Laminar 204.9 224.9 1.0E-05 1 Laminar DH12-1 224.9 244.9 4.0E-05 4 Laminar (cont.)244.9 264.9 3.0E-05 3 Laminar 264.9 300.4 ---Rods did not charge 279.9 300.4 ---Rods did not charge 17.5 38.0 ---Packer bypass,ended test after attempting to reseat packer 39.5 60.0 1.0E-05 1 Laminar 57.5 78.0 ---Packer bypass,ended test after attempting to reseat packer 79.5 100.0 1.0E-05 1 Laminar DH12-2 99.5 120.0 ---Packer bypass,ended test after attempting to reseat packer 119.5 140.0 ---Packer bypass,ended test after attempting to reseat packer 139.5 160.0 1.0E-06 Laminar 159.5 180.0 1.0E-06 Laminar 179.5 200.0 ---Ran out of water,drillhole would not charge 22.8 42.8 ---Ran out of water,drillhole would not charge 42.9 62.9 ---Ran out of water,drillhole would not charge 62.9 82.4 ---Could not reach target pressure for Stages 2 &3,ran DH12-3 out of water during stage 3 82.9 102.9 4,2E-04 42 Washout Could not reach target pressure for Stages 2,3,4, pressures reduced 102.9 122.9 1.9E-04 19 Laminar Geotechnical Data Report 02/22/15 -z- SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHurt Y AEA11-022 16-1434-REP-022215 Depth Exploration i)Peremis)Lugeons Flow Pattern Notes Top Bottom 122.9 142.9 1.1E-04 11 Washout 142.5 162.5 1.0E-05 1 Laminar 162.5 182.5 1.0E-05 1 Laminar 182.5 202.5 1.2E-04 12 Laminar Target Injection pressure reduced to 80 psi 202.5 222.5 5.0E-05 5 Laminar Target Injection pressure reduced to 90 psi 222.5 242.5 1.0E-05 1 Laminar DH12-3 242.5 262.5 1.0E-05 1 Laminar(cont.) 262.5 282.5 1.0E-06 0 Laminar 282.5 302.5 1.0E-05 1 Laminar 302.5 322.5 1.0E-06 0 Laminar 341.0 361.0 1.0E-06 0 Laminar 361.0 381.0 2.0E-05 2 Laminar 380.5 400.5 1.0E-05 j Laminar 23.6 40.8 4.1E-04 44 Dilation 40.8 60.8 2.9E-04 29 Laminar 60.8 80.8 2.2E-04 22 Laminar 80.8 100.8 3.0E-05 3 Dilation 100.8 120.8 2.0E-05 2 Laminar DH12-4 120.8 140.8 1.0E-06 0 Laminar 140.8 160.8 3.0E-05 3 Laminar 160.8 180.8 4.0E-05 4 Dilation 180.8 200.8 1.4E-04 14 Laminar Unable to reach target pressure 200.8 220.8 1.0E-04 10 Laminar Unable to reach target pressure 220.8 240.8 3.0E-05 3 Laminar Geotechnical Data Report 02/22/15 -zZ SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHun Y AEA11-022 16-1434-REP-022215 Depth Exploration if)Pers)Lugeons Fiow Pattern Notes Top Bottom 240.8 260.8 9.0E-05 g Turbulent Unable to reach target pressure Yont)260.8 280.8 1.3E-04 13 Laminar 280.8 300.8 3.0E-05 3 Laminar 24.4 428 <1.3.0E-05 0 Laminar Less than 1 gallon take over 5 stages 44.4 62.8 <1.3.0E-05 0 Laminar Less than 2 gallons take over 5 stages 64.4 82.8 <1.3.0E-05 0 Laminar Less than 1 gallon take over 5 stages 84.4 102.8 <1.3.0E-05 0 Laminar Less than 1 gallon take over 5 stages 103.9 112.8 <1.3.0E-05 0 Laminar Less than 1 gallon take over 5 stagesDies114.4 142.8 1.0E-05 1 Laminar 144.4 172.8 1.0E-06 0 Laminar 174.4 202.8 1.5E-04 15 Turbulent 204.4 222.8 <1,3.0E-05 0 Laminar Approx.2 gallons take over 5 stages 224.4 247.8 <1.3.0E-05 0 Laminar Less than 2 gallons take over 5 stages 64.3 102.2 1.0E-00.5 Void Filling 104.3 122.2 1.0E-06 Laminar 124.3 142.2 1.9E-04 19 Washout 144.3 162.2 5.0E-05 5 Turbulent 162.1 192.2 ---Ran out of water in Stage 4DHI26193.2 222.2 ---Ran out of water in Stage 3 224.1 242.2 ---Ran out of water in Stage 2 243.3 262.2 ---Ran out of water for Stages 4&5 264.1 282.2 ---Ran out of water in Stage 4 283.3 302.2 <1.3.0E-05 0 Laminar Less than 1 gallon take over 5 stages Geotechnical Data Report 02/22/15 J SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHuri Y AEA11-022 16-1434-REP-022215 Depth Exploration (ft Perms)Lugeons Flow Pattern Notes Top Bottom DH12-6 303.3 322.2 <1.3.0E-05 Laminar Less than 1 gallon take over 5 stages (cont.)323.3 352.2 <1.3.0E-05 Laminar Less than 1 gallon take over 5 stages 15.9 38.3 3.3E-04 33 Dilation 38.3 68.3 ---Not able to meet targeted maximum pressures due to high flow volume DH12-7 68.2 93.2 1.0E-06 0 Laminar 92.8 122.8 1.0E-06 0 Dilation 116.0 150.0 6.0E-05 6 Washout 55.8 75.8 4.8E-04 48 Washout 76.3 94.2 2.4E-04 24 Void Filling 95.8 114.2 ---Ran out of water stages 4 &5 115.8 134.2 2.0E-05 2 Laminar 135.8 153.8 1.0E-06 0 Laminar 155.8 184.2 1.0E-05 1 Laminar DH12-8 185.8 204.2 1.0E-05 1 Laminar 205.8 234.2 1.0E-05 1 Laminar 235.8 254.2 1.0E-06 0 Laminar 299.8 284.2 1.0E-06 0 Laminar 285.8 304.2 ---Ran out of water in stage 3 305.8 324.2 <1.3.0E-05 0 Laminar Less than approximately 1 gallon take over 5 stages 325.8 354.2 3.0E-05 3 Void Filling Geotechnical Data Report 02/22/15 -zT SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHuniY AEA11-022 16-1434-REP-022215 Depth Exploration )reromis)Lugeons Flow Pattern Notes Top Bottom 2014 Explorations 87.5 110 6.0E-05 6 Laminar 110 130 1.0E-05 1 Laminar 130 149 1.0E-04 10 Washout 151 170 1.1E-04 11 Turbulent 170 190 -Exhausted water supply during test. 190 209.5 -Exhausted water supply during test. 210 230 1.0E-04 10 Turbulent 230 250 -Exhausted water supply during test.Could not reach target pressure due to high water flow rates. 250 270 1.0E-06 0 Tight Formation 270 290 1.0E-06 0 Tight Formation DH14-9b 290 310 1.0E-06 0 Tight Formation 310 330 1.0E-06 0 Dilation 330 350 1.0E-05 1 Laminar 350 370 1.0E-06 0 Dilation/Void Filling 370 390 3.0E-05 3 Turbulent 390 410 1.0E-06 0 Tight Formation 410 440 1.0E-06 0 Laminar 440 470 2.0E-05 2 Turbulent 470 510 1.0E-05 1 Turbulent 508.9 559.4 1.0E-06 0 Laminar 560 610 1.0E-06 0 Tight Formation 610 659.5 1.0E-06 0 Laminar/Tight Formation Geotechnical Data Report 02/22/15 zw ALASKA ENERGY AUTHORITY AEA11-022SUSITNAWATANABYDRO16-1434-REP-022215 Depth i Exploration (ft)renie)Lugeons Flow Pattern Notes Top Bottom 77.8 97.8 3.0E-05 3 Dilation 97.8 117.8 3.0E-04 30 Turbulent 117.8 137.8 2.5E-04 25 Turbulent 137.8 157.8 1.0E-05 1 Washout/Void Filling 157.8 177.8 1.0E-06 0 Tight Formation 177.8 197.8 1.0E-06 0 Tight Formation 197.8 217.8 1.0E-06 0 Tight Formation 217.8 237.8 1.0E-06 0 Tight Formation 237.8 257.8 3.0E-05 3 Void Filling 262.3 277.8 4.3E-04 43 -Could not reach target pressure due to high water flow rates.Fracture zone encountered. 277.8 297.8 5.5E-04 55 -Could not reach target pressure due to high water flow DH14-10 rates. 297.8 317.8 1.5E-04 15 Void Filling 317.8 337.8 3.0E-05 3 Turbulent 337.8 357.8 1.0E-06 0 Void Filling 357.8 377.8 9.0E-05 9 Turbulent 377.8 397.8 1.0E-05 1 Laminar 397.8 417.8 1.0E-05 1 Laminar 412.1 437.8 1.0E-06 0 Laminar 432.1 452.8 9.0E-05 9 Laminar 462.1 482.8 1.5E-04 15 -Could not reach target pressure due to high water flow rates.Fracture zone encountered. 482.1 502.8 0.0E+00 1.0E-06 Void Filling 502.1 522.8 0.0E+00 1.0E-06 Tight Formation Geotechnical Data Report 02/22/15 Zz SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHORITY AEA11-022 16-1434-REP-022215 Depth Exploration ft vermis)Lugeons Flow Pattern Notes Top Bottom 522.1 542.8 1.0E-06 0 Void Filling 542.1 562.8 3.0E-05 3 Turbulent 562.1 582.8 2.0E-05 2 Laminar 582.1 602.8 1.0E-06 0 Void FillingDH14-10 :(cont.)602.1 622.8 4.0E-05 4 Laminar 622.1 642.8 2.0E-05 2 Void Filling 642.1 672.8 1.9E-04 19 -Could not reach target pressure due to high water flow rates.Fracture zone encountered. 672.1 692 1.0E-05 1 Dilation 15.3 31.8 6.9E-04 69 Laminar Exhausted water supply during test. 31.8 51.8 2.0E-05 2 Dilation 51.8 718 2.0E-05 2 Void Filling 718 91.8 1.0E-06 0 Tight Formation DH14-114 91.8 111.8 1.0E-06 0 Tight Formation 111.8 131.8 8.0E-05 8 Dilation 131.8 151.8 4.0E-05 4 Void Filling 151.8 171.8 1.0E-06 0 Tight Formation/Dilation 171.8 176.8 1.0E-06 0 Dilation 5 25 5.6E-04 56 Laminar 25.2 45.5 1.9E-04 19 Laminar 45.2 65.2 5.0E-05 5 Washout DIe 12 65.2 85.2 5.0E-05 Washout 85 105 3.3E-04 33 -Exhausted water supply during test. 105.2 125.2 1.0E-06 0 Tight Formation Geotechnical Data Report 02/22/15 ee ALASKA ENERGY AUTHunil¥ AEA11-022ITNA-HYDROSUSWATANA 16-1434-REP-022215Clean,reliable energy for the next 100 years. Depth - Exploration (ft)erie)Lugeons Flow Pattern Notes Top Bottom DH14-12 125 145.2 1.0E-06 0 Dilation (cont.)145.2 175 1.0E-06 0 Laminar Geotechnical Data Report 02/22/15 -f- SUSITNA-WATANA HYDRO Clean,retiable energy for the next 100 years. ALASKA ENERGY AUTHORITY AEA11-022 16-1434-REP-022215 Table 3.Geotechnical Instrumentation Summary .Total ee Alaska State Plane Coordinates,Coordinates Exploration vocation instrumentation Elevation (ft)Depth Overburden Inclination Vea Zone 4,NAD 83,US ft (NAD 83,°) p Installed GS TOR TD cw ft ft Inclination Azimuth Northing Eastin Latitud Longitud(°,From Vert)(°)g atitude ongitude 2011 through 2014 Instrumentation Watana Dam Site DH12-1 Dam -Left Abutment VWP,TAC 1877.61 |1871.71 1597.2!-300.4 5.9 21 60 2012 3225828 1885044 62.82072 -148.53727 DH12-8 Dam -Left Abutment VWP,TAC 1461.8!1415.61 11291 -354.2 46.2 30 172 2012 3226359 1884985 62.82204 -148.53737 DH12-2 Dam -Left Abutment VWP,TAC 1961.31 1950.5 1 1773.41 -200 10.8 20 65 2012 3225533 1884943 62.81992 -148.53791 DH14-10 Dam -Left Abutment VWP,TAC 1478!1419.81 878.7 '-692 58.2 30 10 2014 3226171 1884559 62.82172 -148.54017 DH12-3 Dam -Right Abutment VWP,TAC 1714.31 1365.5 !1365.5 '_400.5 11.2 30 235 2012 3227091 1885107 62.82423 -148.53648 DH12-4 Dam -Right Abutment VWP,TAC 1630.4 !1614.4!1301.51 350 16 20 255 2012 3226857 1884848 62.82355 -148.5383 DH14-9b Dam -Right Abutment VWP,TAC 1500 '1427 |908.2 '-683.3 73 30 170 2014 3226738 1884902 62.8232 -148.53805 DH14-11 Dam -Right Abutment VWP,TAC 1672 '1666.6 4 1501.5!-196.8 5.4 30 35 2014 3226766 1884641 62.82333 -148,.53955 DH14-12 Dam -Right Abutment VWP,TAC 1639 1 1639 |1487.4 |-175 0 30 41 2014 3226646 1884513 62.823 -148.54038 Quarry A G11-DH01 Quarry A SPZ 2021 |2521 1 2319!2501 1 202 0 0 2011 3222597 1884686 62.81191 -148.53985 G11-DH02 Quarry A SPZ 2441 |2439.5 |2438 1 2436 1 202.2 1.5 0 2011 3223063 1884284 62.81321 -148.54219 G11-DH03 Quarry A SPZ 2448 1 2448 1 2246 |2434 1 202 0 11 185 2011 3223402 1885723 62.81404 -148.53354 Quarry M DH12-5 Quarry M VwP 2000.8 1 1990.11 1767.9!247.8 10.7 20 66 2012 3226024 1886861 62.82114 -148.52639 DH12-6 Quarry M TAC 1935.5 '1924.6 1 1588.7 '-352.2 5 10 55 2012 3225803 1885929 62.8206 -148.53199 DH12-7 Quarry M SPZ 2025.11 |2019.21 1877.41 -150 6 10 65 2012 3226407 1887554 62.82215 -148.52219 Retrofitted Historical Instrumentation DH-24 Dam -Left Abutment TP 2061 2054.1 1921.1 NR 139.9 6.9 0 0 1978 3225125 1884762 62.81882 -148.53905 DH-28 Dam -Downstream Left Abutment P 1971 1961.8 1845.8 125.2 9.2 __1978 3225486 1883616 62.81987 -148.54585 BH-03 Dam -Right Abutment PPZ (x2),MPT,TP |2150.7 2124.7 1367.8 NR 782.9 26 55 335 1981 3227960 1884138 62.82661 -148.5424 BH-06 Dam -Right Abutment PPZ,MPT 1608.8 1601.9 967.6 1461.8 641.2 6.9 60 225 1980 3226685 1884291 62.82311 -148.54166 DH84-02 Powerhouse PPZ (x2),SPZ,TP |2024.2 2011.5 1259.2 2021.6 765 12.7 60 25 1984 3227572 1883978 62.82555 148.54341 DH84-06 Portal -Downstream PPZ,SPZ 1521.4 1512.4 1353.6 1377.7(ice)167.8 9 60 25 1984 3226947 1883209 62.82389 -148.54809 DH84-01 GF1 PPZ,SPZ 2143.1 2124.6 1294.6 2070.9 848.5 18.5 56 230 1978 3229319 1886629 62.83017 -148.52732 Notes: 1 Boring not surveyed:location and elevation values are approximate 7 TAC -Temperature Acquisition Cable 2 TP -Thermal probe casing 8 GS -Ground Surface 3 SPZ -Standpipe piezometer 9 TOR -Top of rock 4 PPZ -Pneumatic Piezometer 10 TD -Termination depth 5 MPT -Permanent multipoint thermistor string 11 GW -Groundwater 6 VWP -Vibrating Wire Piezometer Geotechnical Data Report 02/22/15 -w- SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHORITY AEA11-022 16-1434-REP-022215 Table 4.Summary of Historical Geotechnical Instrument Assessment SPZ TP/Ground Temperature PPZ Instrumentation Installed Jul-Oct 2012 Exploration |Elevation Inclination |2011 |2012 |Original |2012 2011 |2012 |Original 2012 a 2012 GW _|Install GwNumber|(NAVD88,ft)Location (*,from vert.)|Sound |Sound Sound GW Depth |Sound |Sound Haan reniva casing ruven).Depth instr entation Depth ce ben)hn Observationepuies/No ype gs(ftbgs)|(ftbgs)|(ft bgs)(ftbgs)|(ftbgs)|(ft bgs)(ft bgs)(°F)(ft bgs)(ft bgs)Date Notes Dam Site BH-8 1984 Left Abutment 30 10 8.8 Unk.---------Blockage at 8.8 ft DH-12 1952.6 Left Abutment 0 ----(1 20 127.2 Diesel - ----Ice with diesel observed at 19.5 ft on tip of probe DH-23 1953.8 Left Abutment 45 ___05 05 75.5 _7 _..___Casing plugged 0.5 ft above ground surface with angular gravel DH-24 2061.6 Left Abutment 0 ----20.9 83.8 84.8 31 E.Glycol --TAC 75 -- DH-28 1975.7 |Left Abutment 0 ----444 |1184 |122 31.6 |E.Glycol --TAC 100 --a 2012 temperature measurements to 84 ft BH-3 2156.5 Right Abutment 35 ---23.8 81.7 TREMIE 33.8 Grout Yes 74 TAC 81.7 _-Temps read in tremie pipe BH-6 1616.9 Right Abutment 30 (1)-----Yes 141.2 ----MPT broken DH84-2 2029.1 |Right Abutment 30 _@ |2035!|203.5)|Artesian'|_--34.1 -Yesx2 |Artesian'?|vwerwwet |88.326 |TOCI5.2psi|1-Oct-12 |DeeP PPZ exceeds readout range500+590 Artesian DH84-6 1530.3 Right Abutment 30 (1)37.9 128.2 Frozen ---30.1 ---TAC 30.3 __Temps in SPZ,frozen DH84-8 1685.4 Right Abutment 30 -(t)6.7 84 0.9 ---Yes 5.2 -__-Hard bottom/blockage in SPZ Relict Channel /Borrow Site D AH-D11 2362.6 Borrow Site D 0 -54.8 -45 47.8 54.8 34.4 Glycol -----Historical records indicate SPZ lost AH-D30 2229.2 Borrow Site D 0 ------_--Yes 67 --- AH-D5 2225.3 Borrow Site D 0 31 30.6 30 27.1 31 46.6 50 34.5 Glycol ------ AH-D7 2215.4 Borrow Site D 0 19.1 19.1 27 0.8 46.7 46.7 48 34.9 Glycol -- ---- DH84-1 2149.9 Relict Channel 34 -2)387.3 396.3 20.1 ---Yes 15.2 LL,BL 25 (+2)-- DH84-10 2167.9 Relict Channel 35 1.3 108.5 109.8 13.8 ----Yes 17.8 -- DH84-4 2167.8 Relict Channel 35 --(2)100.3 108.9 40.9 -------Z --- DH84-4a ™1746 Relict Channel 35 _Q 96.3/107.3/36.9/ __.__Yes x2 35.5/ __..Deep SPZ not observed,possibly below TOC ?283.4 ?53.5 .Unk'2)/41.9/188.4/1.5/1]Shallow PPZ exceeds readout rangeDH84-9 2167.6 Relict Channel 35 28.6 35.6 296 41 13 -----Yes x2 10.3 --- DR-22 2233.1 |Relict Channel 0 224.6 |2241 |2235 |2176 ----Diesel -----MPT destroyed,diesel in both SPZ and TPstandpipes HD83-2 2152.3 Relict Channel 0 ----Yes 17.3 ---- HD83-6 2215.5 Relict Channel 0 ----124.2 125.5 125 34.4 E.Glycol ------ HD83-8 2224.3 Relict Channel 0 ---42.5 74.2 80 33.5 P.Glycol ------ HD83-49 2210 Relict Channel 0 ----35.8 36.9 39 34.5 Water ----- Notes:Abbreviations: (1)Exploration site not visited in 2011. (2)Exploration not sounded. Ground Surface elevations from Mat-Su LIDAR and Imagery Project (2011),NAVD 88 vertical datum.Elevations not surveyed. Inclination represents angle of exploration from vertical. Glycol type indicated (TP Casing Fluid)in previous explorations where specified in associated report. E:Ethylene,ft:feet,ft bgs:vertical feet below ground surface,GW:Groundwater,P:Propylene,PPZ:Pneumatic Piezometer, SPZ:Standpipe Piezometer,TP:Temperature Probe,TAC:Temperature Acquisition Cable,TOC:Top of Casing,VWP: Vibrating Wire Piezometer,VWPT:Vibrating Wire Pressure Transducer,LL:Solinst Water Level Logger,BL:Solinst Barologger Geotechnical Data Report 02/22/15 ey oe ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.16-1434-REP-022215 Table 5.Laboratory Test Results Summary -Watana Dam Site ASTM D7012 ASTM D5607 ASTM C127 (Method C,D)ASTM D5731 ISRM 1981 Direct Shear Pulse Velocities and utraconie Elastic Constraints of Rocks Relative Density (specific Gravity)and ASTM C295SamplesamesampleDescriotion- Absorption of Coarse Aggregate Location(s)(i)P P compressive Gay Point load Bra Strength Friction Angle Apparent Density P-Wave S-Wave Young's |Shear Poisson's Relative Relative Apparent Absorption PetrographiStrength,Peak Strength Index See Tensile (degrees,base Cohesion (ibs/ft?)Velocity |Velocity Modulus Modulus Ratio Density |Density Relative 9%'1 c Number Stress (psi)|Test,K value =19 ress (psi)or peak)(psi)(fsec)|(ft/sec)|(108 psi)|(108 psi)(Dry)(SSD)|Density (PN) 2012 Laboratory Testing Program DH12-1 11.3-12.8 SW,R4-R35,Diorite 24352.6 _---------------- DH12-1 69.0-69.8 MW,R3,Diorite 7611.1 ---------------- DH12-1 162.8-163.9 FR,R5,Diorite,red stained 24505.5 ------------ DH12-2 72.1-73.7 FR,R85,Diorite 19654.3 --------_--- DH12-2 131.1-132.2 SW,R4,Diorite 26638.6 ------------_--- DH12-3 324.3-325.0 SW-FR,R4-R5,Diorite 29345.9 ----------- DH12-3 373.2-374.5 SW-FR,R4-R5,Diorite 25811.2 --------------"--- DH12-4 35.9-36.6 FR,R85,Diorite 26884.3 -------- ----- DH12-4 212.7-214.4 FR,R65,Diorite 27406.1 ---------_--- DH12-8 60.5-61.5 FR,R5,Diorite 29648.1 --------_-----_ DH12-8 210.7-212.8 FR,R65,Diorite 31134.1 ---------_-- DH12-1 69.8-70.7 MW,R3,Diorite -1560 (1 --------7 -_-- DH12-2 53.4-54.1 SW,R4,Diorite -26912 ---------_--- DH12-3 253.4-253.8 FR,R85,Diorite -24882 -_------------ DH12-3 372.4-373.2 SW-FR,R4-R5,Diorite 23442 ----------_---- DH12-4 340.0-340.7 SW-FR,R4-R5,Diorite -23770 ----------a _ DH12-5 96.3-96.9 FR-SW,R4-R5,Diorite - 20440 ---------------- DH12-5 162.2-162.8 |SW-FR,R5-R5,Diorite,red stained 18693 2 DH12-8 210.7-212.8 FR,R85,Diorite -31326 ---------------- DH12-8 311.9-312.9 SW-FR,R4-R5,Altered Diorite -27056 ---"----------- DH12-1 115.3-116.3 SW-FR,R4-R5,Diorite --2283.6 ----------- DH12-2 49.6-51.6 SW-FR,R4-R5,Diorite -2134.8 ----_----z= DH12-3 380.0-380.5 FR,R65,Diorite --2296.6 ---------_--- DH12-4 168.0-168.9 SW-FR,R4-R5,Diorite --2146.6 --------_-_ DH12-8 149.9-150.7 FR,R65,Diorite _-2359.1 ---------_--__ pH12-4 |41.2421 |FRIRD,Dioris Nalita fon Oxide ---31 (residual)|0 .....i DH12-4 199.1-200.4 FR,R8,Diorite Sawcut --31 (base)0 ---------------_- DH12-8 88.0-89.1 FR,R65,Diorite,Sawcut ---23 (base)0 ----------- pH128 |1349-1357 |TR ea wered)---26 (base)0 ....i i i FR,R65,Diorite Natural Calcite DH12-8 330.2-331.5 |Coated Joint Surface (inferred in----48 (peak)0 -------- situ healed joint) Geotechnical Data Report 02/22/15 zw ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,rehable energy for the next 100 years.16-1434-REP-022215 ASTM D7012 7 ASTM C127 (Method C,D)ASTM D573]ISRM 1981 Direct Shear Pulse Velocities and ultrasonic Elastic Constraints of Rocks Relative Density (specific Gravity)and ASTM C295SampleSampsampleDescription=: Absorption of Coarse Aggregate Location(s)(ty P compressive (os),Point load Brail Strength Friction Angle Apparent Density P-Wave S-Wave Young's |Shear Poisson's Relative Relative Apparent Absorption PetrographiStrength,Peak Strength Index oe Tensile (degrees,base Cohesion (Ibsift3)Velocity |Velocity Modulus Modulus Ratio Density |Density Relative 9%*|c Number Stress (psi)|Test,K value =19 tress (psi)or peak)(psi)(fUsec)|(fUsec)|(108 psi)|(108 psi)(Dry)|(SSD)|Density (PN) DH12-1 204.2-205.1 FR,R65,Diorite,red stained ----168.24 |17651.89 |9871.67 |9.00568 |3.53868 0.27 ----- DH12-2 48.6-49.7 SW-FR,R4-R5,Diorite -----168.61 |16092.14 |9320.33 |7.88819 |3.16133 0.25 ----- DH12-3 396.6-397.5 SW-FR,R4-R5,Diorite -----167.93 |16800.19 |9533.13 |8.31795 |3.29411 0.26 ------ DH12-4 335.7-336.4 FR,R4-R8,Diorite -----168.35 |16607.27 |9489.87 |8.23072 |3.27245 0.26 ------ DH12-8 143.1-144.2 FR,RS,Diorite,red stained -----166.82 |18111.53 |10121.15]9.39014 |3.68832 0.27 ------- DH12-8 76.3-80.1 FR,RS,Diorite -----------2.666 2.683 2711 0.62 - MW-SW,R3-R4,Quartz DioriteDH12-2 141.1-144.6 and Altered Quartz Diorite 145.8 DH12-4 270.8-273.7 SW,R4,Quartz Diorite ----------------111 DH12-8 239.2-241.8 FR,RS,Quartz Diorite --------------_111 2014 Laboratory Testing Program DH14-9b 103.9-104.9 MW,R3,Altered Diorite 6758.2 ----_--------_-- DH14-9b 110.8-111.9 |MW-HW,R3-R2,Altered Diorite 1581.5 ------------------a - DH14-9b |295.6-296.4 SLW,R4,Andesite Porphyry 13521.8 -------------_- pHt4-10 |1586-t59.9 |MM RS Altres Doris,calcite 15513.1 --a -- DH14-10 |256.8-257.8 Fr,R5,Diorite 24990.2 --------------------- DHI4-10 |4190-4198 |a er ectares oreccnt 9444.8 -a a .-,..i Z MW,R4,Diorite/Altered DioriteDH14-10 |503.5-504.6 contact 5130.9 --------------------_ DH14-10 |535.4-536.5 MW,R4,Altered Diorite 10514 ----------------__ DH14.9 |152.3-183,7 Ne eo 7 -a 36 (peak)43 -a . DH14-9 433.5-434.8 Fr,R5,Diorite,calcite-infilling ---23 (residual)0 ---------_- DH14-9 613.3-615.0 Fr,RS,Diorite,calcite-infilling ---21 (residual)0 ---------- DH14-10 141.0-141.9 SLW,R4,Diorite,slickensided ---26 (residual)0 ------------_ DHi4-10 |20332049 |SSW ee mee --a 31 (peak)93 -Z -Z - DH14-11 73.2-74.1 Fr,R5,Diorite -29 (residual)0 --------- DH14-11 103.1-103.9 MW,R3,Altered Diorite ---34 (peak)58 ---------_---- DH14-12 47.3-48.0 SLW,R4,Diorite --35 (residual)0 ----------"---- DH14-9 103.2-103.9 MW,R3,Altered Diorite --472.43 ----------------_ DH14-10 166.2-167.4 MW,R3-R4,Altered Diorite --811.98 ------------___ Notes: l Invalid test,rock strength below minimum for test 2 Invalid test,fracture surface only passed through one loading point (--)Not tested Geotechnical Data Report 02/22/15 zw ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.16-1434-REP-022215 Table 6.Laboratory Test Results Summary -Quarries A and M TasTwD7012ASTMD5731chert)ASTMC131 |ASTMC88 |ASTMDS5312 |Relative Density tspect Gravity and Absorption |ASTM C295 |ASTM C289 Sample Sample sample Descriot -: of Coarse Aggregate Location(s)it)ample mescripuion Compressive Gai)Doint toot Friction Angle |Apparent Pate Soundness,Freeze-Thaw Relative Relative |Apparent ..Potential Strenath,Peak oeren thInd (degrees,base Cohesion rasion Magnesium (55 cycles),%Density Density |Relative Absorption,Petrographic Alkali-Silicagth,gth Index (500 revs),%|Sulfate (5 cycles),:%Number (PN)- Stress (psi)Test,K value =19 or peak)(psi)loss Weighted Loss %loss (Dry)(SD)Density Reactivity 2011 Laboratory Testing Program G11-DH02 102.5-103.5 Andesite Porphyry (Dacite)16539 ---=-_---__ G11-DH02 137.2-137.6 Andesite Porphyry (Dacite)23597 -------__ G11-DH02 168.2-169.0 Andesite Porphyry (Dacite)33755 -_----------- G11-DH02 184.7-185.2 Andesite Porphyry (Dacite)11655 ---------- 17.0-26.0,79.2- G11-DH03 88.2,159.9-Andesite Porphyry (Dacite)---_14.2 0.6 -2.601 2.641 2.71 1.55 104.8 - 168.5 G11-DH03 50.9-51.6 Andesite Porphyry (Dacite)20720 -_------- - G11-DH03 87.6-88.2 Andesite Porphyry (Dacite)16415 -------- G11-DH03 140.3-144.1 Andesite Porphyry (Dacite)29888 ------__- G11-DH03 160.8-161.2 Andesite Porphyry (Dacite)34563 --------- Aggregates G11-DH03 165-166.9 Andesite Porphyry (Dacite)-__----Considered Innocuous 2012 Laboratory Testing Program DH12-5 95.2-96.3 SW-FR,R4-R5,Diorite 17738.3 -----------a DH12-6 168.0-168.8 FR,R4-R5,Diorite 25775.8 ----------------- DH12-7 25,8-26.5 SW-FR,R4-R5,Diorite 26955.8 -------------- DH12-7 84.2-86.0 HW-MW,R2-R3,Diorite 5486.3 --------------i DH12-7 89.0-89.9 MW,R2,Altered Diorite 5259.6 ---=-----Z - DH12-5 96.3-96.9 FR-SW,R4-R5,Diorite 20440 --------- DH12-6 162,2-1628 |SWER:RERS,Dorie,Red a 18693 ©)---a a z DH12-7 62.6-63.0 SW,R4,Diorite --26212 ------=------_ DH12-5 1268-1276 |ee ee etre iene --33 (base)0 --.. DH12-5 272.5-277.8 FR,R&S,Diorite ----18.7 -----_------ DH12-6 224.4-230.2 SW-FR,R4-R5,Diorite -----19.5 -------- Talus Surface Left Bank at 0 FR,R5,Quartz Diorite -----20.5 -0.01;0.02 -------- Dam Site DH12-5 39.8-44.5 SW-FR,R4-R5,Diorite ------0.5 ---------- Geotechnical Data Report 02/22/15 ALASKA ENERGY AUTHORITY AEA11-022 16-1434-REP-022215 ---z- SUSITNA-WATANA HYDRO Clean,rehable energy for the next 100 years. ASTM D7012 ASTM D5607 ,ASTM C127 (Method C,D)ASTM D5731 Direct Shear ASTM C131 ASTM C88 ASTM D5312 |Relative Density (specific Gravity)and Absorption |ASTMC295 |ASTM C289 Lonation(s)Depth Sample Description Uniaxial Estimated UCS a LA.Soundness ee (ft)Compressive (psi),Point load Friction Angle Apparent Abrasion Magnesium Freeze-Thaw Relative Relative Ap parent Absorption,|Petrographic PotentialStrength,Peak Strength Index (degrees,base Cohesion (500 revs),%|Sulfate (5 cycles),(55 cycles),%Density Density Relative %Number (PN)Alkali-SilicaStress(psi)Test,K value =19 or peak)(psi)loss Weighted Loss %loss (Dry)(SD)Density Reactivity DH12-6 114.8-119.7 FR,RS,Diorite ----0.5 ----__._ DH12-6 346.0-352.2 SW-FR,R4-R5,Diorite ----0.7 ---------- DH12-7 28.3-33.3 SW-FR,R4-R5,Diorite -----0.5 -_--- DH12-5 27.8-32.8 FR,R65,Diorite =__2.687 2.706 2.74 0.71 - DH12-5 47,8-50.0 SW-FR,R5,Quartz Diorite ------_112.8 - SW-FR,R4-R5,QuartzDH12-6 184.6-186.9 Diorite _---------111.2 - Notes: 1 Refer to Appendix F for interpretation of direct shear tests. --Not tested. Geotechnical Data Report 02/22/15 --zw SUSITNA-WATANA HYDRO Clean,reliable energy for the next 100 years. ALASKA ENERGY AUTHORITY AEA11-022 16-1434-REP-022215 Table 7.Laboratory Test Results Summary -Concrete and RCC Mixes Sample Fly Ash |Fly Ash Potential Alkali Reactivity (Motto Bar Method)Lonation(s)a Sample Description Clase!My 5 Mix Type Expansion (%) 14 days 28 days 60 days 90 Days 2011 Laboratory Testing Program G11-DH02 137.6-140.6 Andesite Porphyry (Dacite)--Mass Concrete 0.327 0.503 -- G11-DHO3 38.0-41.9 Andesite Porphyry (Dacite)--Mass Concrete 0.446 0.681 -- G11-DH03 132.9-137.6 Andesite Porphyry (Dacite)--Mass Concrete 0.319 0.525 - - 2012 Laboratory Testing Program 508-528,SW-FR,R4-R5,Diorite Cc 35 Mass Concrete 0.041 0.078 0.148 0.197 DH12-5 113.8-116.2,FR,R65,Diorite Cc 45 RCC 0.024 0.028 0.052 0.065 (Composite)|142.8-145.9,SW,R4-R5,Diorite F 35 |Mass Concrete 0.039 0.077 0.144 0.195239.6-241.8 FR,R85,Diorite F 45 RCC 0.02 0.03 0.05 0.057 30.1-82.2,SW,R4,Diorite C 35 Mass Concrete 0.039 0.083 0.162 0.22 DH12-6 122.2-125.0,SW,R4-R5,Diorite C 45 RCC 0.019 0.028 0.046 0.057 (Composite)|238.4-241.2,SW-FR,R4-R5,Diorite F 35 |Mass Concrete 0.035 0.08 0.167 0.229921.5-325.4 SW-FR,R4,Diorite F 45 RCC 0.019 0.034 0.048 0.06 SW,R4,Diorite C 35 Mass Concrete 0.038 0.07 0.147 0.206 DH12-7 om SW-FR,R4-R5,Diorite C 45 RCC 0.018 0.026 0.047 0.062 (Composite)|4379 4398 MW-SW,R3-Ré4,Diorite F 35 |Mass Concrete |0.034 0.069 0.139 0.192 MW,R4-R5,Diorite F 45 RCC 0.022 0.031 0.066 0.077 Notes: 1 Fly ash obtained from Transalta's Centralia Power Plant,Centralia,Washington. Geotechnical Data Report 02/22/15 -Zz-ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-02221 5 FIGURES LEESAOLAGiS»ttn USysisre .Shee'aNtiq,vaF 3f « J Neeete "Ae a LEGEND:=. A Proposed Watana Dam Site 5>Proposed Watana Reservoir am ENERGY AUTHORITY O DNR_akplacenames 174 Denali State Park Date:February,2015 L__}(Special Land Use District)-+-Railroad Denali National Watana Dam Site Roads tJ Park and Preserve 0 10 20 Location Plan Figure 1 cM AERO ey a -ia 'HD83-142 an've Oe ; 'aa ;Of SEP AS EP HD83-15 . . _p-MAXIMUM OPERATING..- "°2 " : _ WATER SURFACE ELEVATION 2050 \ ne aaa y WATER SURFACE ELEVATION1 Lf an a 850 [2 / Og oe Sarrelbss JNHD 83-43a LEGEND eee @ 0H14-1 CORE HOLE,2014=HD83-28 @ DH12-1 CORE HOLE,2012a-7 c TN eo HD83-24y-aa aLv 4@ DH28 =COREHOLE,VERTICAL WS BH-G CORE HOLE,INCLINED 4@ 4083-11 HAMMER BORING -My TP-R8 TEST PIT .ce et a _a a B22 Sa Do "ae /_ < , a 2 £20"c " cpoe3enSek_ad ae f <A SEISMIC REFRACTION SURVEY LINE "tN apes.sa6 a 'ae "oO f |_Ns225a00 va 7:1228460 -_-a _ae 08,os ?ee jg SEISMIC REFRACTION SURVEY LINE a oo 2 '"==HARZA-EBASCO/HARDING LAWSON ASSOC. ae a"7 209 2/!vt -os me =é a a «jg GROUND RADAR SURVEY LINE"""oO Ls wee gig -Kf -a 4.t| HARZA-EBASCO/HARDING LAWSON ASSOC. po oa . '/we gr 4 ae a /"cn a ao _2080 "Lom Y co RESERVOIR eee ce Y a a se af a NOTES"a wee .we 7 a :oe oe --No "as ca ;Mo ee _-aa Tene |4,EXPLORATIONS FROM CORPS OF ENGINEERS, a _ra woe ms .es aa " "1975 AND 1978,ACRES AMERICAN 1980-1983; Ne "LY .oe -_.us a HARZA EBASCO 1983-1984;MWH/GOLDER 2012. _Le,aan ed ea a 2.HORIZONTAL DATUM IS ALASKA STATE PLAN /a S a . :a wea COORDINATES,ZONE 4 USFT. 4 ,a .-wr ABE Tener .-a -Ma 3.VERTICAL DATUM IS NORTH AMERICAN L a /7 -aa VERTICAL DATUM OF 1988,GEOID12a USFT. ae -Y SS a oe areas ..<a a - :, Q °.Daa 7 i se ae - "_-_Oo NAD83ASPZ4FT 'i S _ '___:; SCALE WARNING Project No._10500200_|STATE OF ALASKA SUSITNA-WATANA HYDR FIGURE 2 2014 BORINGS PR [visi 0%4 -aeEreererreo ALASKA ENERGY AUTHORITY oe 1 2014 EXPLORATION PROGRAM mB (6/12/14 4"=200 |NOT FOR CONSTRUCTION Ni W H DAM SITE 0_[_ROCKCONTOURS DIGITIZED FROM 1980INFORMATION/iF THIS BAR DOES Designed _MBRUEN _|This document is designated "interim”and not suitable for ®«=ALASKA EXPLORATION PLAN 2 TOPO BASED ON MATSU-NORTH BARE EARTH OATA NOT MEASURE construction.As an interim document,it may contain data =_ REV DESCRIPTION By |DATE NOT TO SCALE that is incomplete or defineandlocate structures that remain =ENERGY AUTHORITY 148°34'W 148°33'W 148°32'W 148°31'W 148°30'W 148°29'W 148°28'W 148°27'W a>a)megmENERGY AUTHORITY LEGEND tt Proposed Dam Site (<3 Quarry s>Proposed Watana ReservoirAei,se oyrsWatanaDamand[%2-1 \- Stream/RiverPowerHouseX Location Map THIS DOCUMENT IS CONSIDERED CEil CRITICAL ENERGY INFRASTRUCTURE INFORMATION -DO NOT RELEASE-z0 4,000 2,000 Feet 0 200 400 ee Meters Projection:Alaska Albers NAD 1983 Date Created:2/18/2015 Map Author:MWH-Eric ZimmermanFile:SuWa_Rock_Quarry_Sites_11xt7Landsc_2_18_2015.mxd Rock Quarry Sites Figure 3 SyDig Co)QUARRY A LIMITS POINT NAME!NORTHING |EASTING SCALE FEET G11-DH01 |3222596.76 |1884685.63 G11-DHO2 |3223063.15 |1884283.96LEGENDG11-DHO3 |3223401.60 |1886723.15@G11-DHO1 ROCK CORE APPROXIMATE LOCATION G11-S01 |3223521.55 |1884578.81 G11-S02_|3223117.89 |1885246.32 G11-S02 BULK SAMPLE APPROXIMATE LOCATION G11-S03_|3223026.68 |1885464.60 @ "80804 BULK SAMPLE APPROXIMATE LOCATION(ACRES,1981) MAPPED LIMIT OF QUARRY A FROM ACRES (1981) N OTE STATE OF ALASKA ALASKA ENERGY AUTHORITY 1.)COORDINATES PROVIDED IN ALASKA STATE PLANE,ZONE 4,a=ALASKA NAD83,US SURVEY FEET.ear ENERGY AUTHORITY 2.)W80-XXX SAMPLES WERE BULK SAMPLES TESTED BY ACRES,SUSITNA-WATANA HYDROELECTRIC PROJECT 1981.EXPLORATION PLAN REFERENCE QUARRYA 1.)ACRES,1981,ACRES AMERICAN INCORPORATED,SUSITNA HYDROELECTRIC PROJECT,1980-81 GEOTECHNICAL REPORT VOLUME 1,FIGURE 6.37 1/6/15 FIGURE 4 GEOTECHNICAL EXPLORATION SUMMARY DH NO.NORTHING (FT)|EASTING (FT)|ELEVATION (FT) AH-D5 3231048 1888216 2225.3 AH-D7 3231795 1889914 2215.4 AH-D11 3236010 1893868 2362.3 AH-D30 3230825 1886751 2229.2 BH-3 3227960 1884138 2186.5 BH-6 3226685 1884291 1616.9 BH-8 3225349 1884517 1984.0 DH-12 3225601 1884655 1952.6 DH-23 3225497 1884653 1983.8 DH-24 3225125 1884762 2061.6 DH-28 3225486 1883616 1975.7 DH12-1 3225828 1885044 1877.6 DH12-2 3225533 1884943 1961.3 DH12-3 3227091 1885107 1712.3 DH12-4 3226857 1884848 1630.4 DH12-5 3226024 1886861 2000.8 ue x east Oe aA Soe! DH12-6 3225803 1885929 1935.5 m4 ee oe Q --wor : DH12-7 3226407 1887554 2025.1 a Lo ane .-By : DH12-8 3226359 1884985 1481.8 ; ; -Te .a -Oot DH14-9b 3226738 1884902 1500.0 ; .os oe os 7 DH14-10 3226171 1884559 1480.3 /; : :">Gupesse » DH14-11 3226766 1884641 1671.8 , DH14-12 3226646 1884513 1638.1 DH84-1 3229319 1886629 2149.9 . DH84-2 3227572 1883978 2029.1 DH84-9 'a DH84-4 3228998 1885849 2167.8 _el p2H083-2 DH84-4a 3228956 1885809 2174.6 {fo 2 UNS "CO -- leo pos DH84-4a @ove410 DH84-6 3226947 1883209 1530.3 : :! DHB4-8 3227197 1983148 1685.4 DH84-9 3229324 1885896 2167.6 DH84-10 3228996 1885848 2167.9 DR-22 3231965 1886840 2233.1 G11-DHO1 3222597 1884686 2565.0 G11-DH02 3223063 1884284 2487.2 G11-DHO3 3223402 1885723 2480.0 ho" HO83-2 3229270 1886140 2152.3 H oA Pi oH14-9b HD83-6 3230029 1884824 2218.8 et OHTA HD83-8 3228617 1885464 2224.3 H083-49 3230472 1885307 2210.0 ORILL HOLE LEGEND Fon 14-9b F p26 ®611-pH03 @ HD83-6 NOTES: 4.BASE TOPOGRAPHIC CONTOURS FROM 2011 MSB LIDAR 7 IMAGERY.CONTOUR INTERVAL IS 10 FEET.a a w .; .NS2.COORDINATES IN ALASKA STATE PLANE,ZONE 4,FEET,NAD 83.. .7 7 ys aa ea 3.ELEVATIONS ON NAVD88 VERTICAL DATUM ae ,'Duo2 4.GEOTECHNICAL INSTRUMENTATION INSTALLED IN DRILL HOLES - INCLUDES PIEZOMETERS (VIBRATING WIRE,PNEUMATIC AND OPEN STANDPIPE),AND MULTI-POINT THERMISTOR STRINGS OR THERMAL PROBES.SEE USACE (1979);ACRES (1982A,1982B); HARZA-EBASCO (1983,1984);GOLDER (2012,2013). SCALE °wane ,Project No.CONCEPTUAL DESIGN PHASE ALASKA ENE OF ALASKA SUSITNA-WATANA HYDROELECTRIC PROJECT 103-05560 01 ee NOT FOR CONSTRUCTION ENERGY AUTHORITY 42/40/2014 IF THIS BAR DOES Designed This document is designated "interim”and not suitable for Ni W H ®@ =_,WATANA DAM S ITE 5 Y=7s0__|-_ansio THENDRAWINGIS [>%¥"that eincomplete ordeters arenes ste ee otra «= _ és incomplete or define an:ct tREVDESCRIPTIONBY|DATE}FULLSIZE NOT TO SCALE Approved ___ "to be optimized amucresmenreman >ENERGY AUTHORITY GEOTECHNICAL INSTRUMENTATION54 oF M.BRUEN My 1 tdshlTAYBSVg)pe Y = am ENERGY AUTHORITY 4 ey” See Figure 6-15b for geology tegend + rP; -” ee,,.a see.axa le Watana- 2Dam Site Yahsi a ee ? 4 2 A:at : Toegr og sys £3 Data Sources:See Map References Geology from:Wilson et al.,1998 (USGS Open-File Report 98-133) and Wilson et al.,2009 (USGS Open-file Report 2009-1108) Location Map @)mw 6 3 O 6 12 =a km Projection:NAD 1983 StatePlane Alaska 4 FIPS 5004 Feet Date Created:2/25/2015 Map Author:MWH-Eric ZimmermanFile:SuWa_Site_Region_Geology_11x17_Landsc_2_25_15.mxd Regional Geologic Map Figure 6a Tgd Tpgr Ice fields or glaciers Water QUATERNARY DEPOSITS Surficial deposits,undifferentiated Alluvium along major rivers and terraces (Holocene) Landslide and colluvial deposits (Holocene and Upper Pleistocene) Glacial deposits,undivided (Quaternary) Younger outwash deposits (Holocene) Major moraine and kame deposits (Upper Pleistocene) TERTIARY ROCKS Sedimentary Rocks Sedimentary rocks,undivided Nenana Gravel Coal-bearing rocks Fluviatile sedimentary rocks and subordinate volcanic rocks Igneous Rocks Volcanic and Hypabyssal Rocks Tertiary volcanic rocks,undivided Hypabyssal felsic and intermediate intrusions Intrusive Rocks Granitic and volcanic rocks,undivided Intrusive rocks,undivided OLIGOCENE Granitic rocks EOCENE Mafic volcanic rocks Granite and granodiorite PALEOCENE Biotite-hornblende-granodiorite Granitic rocks of Paleocene age TERTIARY AND/OR CRETACEOUS Sedimentary Rocks TKd Dikes and sills Igneous Rocks 7 Intrusive Rocks _TKg,Granitic rocks 'Granodiorite,tonalite and monzonite dikes,TKgd.and stocks TKgb.Gabbroic rocks Metamorphic Rocks TKgg Gneissose granitic rocks UNDIVIDED MESOZOIC ROCKS METAMORPHIC ROCKS Schist and amphibolite Phyllite,pelitic schist,calc-schist,and amphibolite of the Maclaren metamorphic belt CRETACEOUS Melange Kmar Melanges of the Alaska Range TrSI Limestone blocks Igneous Rocks Voicanic and hypabyssal rocks 'KVal Andesitic subvolcanic rocks "Kg ;Granitic Rocks Plutonic Kqms Quartz monzonite,monzonite,and syenite CRETACEOUS AND/OR JURASSIC Sedimentary Rocks KJs |Argillite,chert,sandstone,and limestone KJf Kahiltna flysch sequence Kit Flysch sequence n%Conglomerate,sandstone,siltstone,shale, Ss and volcanic rocks JURASSIC Sedimentary Rocks JTrim;Limestone and marble "tk |Talkeetna Formation .3Tres; TrPavs Trgb] _Trnm, JTrsu 'JT ret' IN, [TrDv) JURASSIC (continued) Igneous Rocks Mafic and ultramafic rocks Plutonic Rocks Alaska-Aleutian Range batholith,Trondhjemite Granodiorite and quartz monzonite Metamorphic Rocks Uranatina metaplutonic complex Plutonic and metamorphic rocks,undifferentiated Amphibolite Marble TRIASSIC Sedimentary Rocks Calcareous sedimentary rocks Basaltic to andesitic metavolcanic and sedimentary rocks Plutonic Rocks Gabbro,diabase,and metagabbro Volcanic Rocks Nikolai Greenstone and related similar rocks Metamorphic Rocks Metavolcanic and associated metasedimentary rocks MESOZOIC AND PALEOZOIC Assemblages and Sequences Red and brown sedimentary rocks and basalt Crystal tuff,argillite,chert,graywacke, and limestone Kamishak Formation [includes some volcanic rocks] Red beds Volcanic and sedimentary rocks Serpentinite,basalt,chert and gabbro,Late Devonian PALEOZOIC Assemblages and Sequences (Skolai Group) Eagle Creek Formation,marine argillite and limestone, lower greenschist facies (equivalent to Hasen Creek Formation) Station Creek and Slana Spur Formation,and equivalent rocks Station Creek Formation,andesitic volcanic rocks (correlated with Tetelna volcanics) --=--«lee contact (glacier limit) ---Shoreline or riverbank chain Lineament ---Stratigraphic contact nreeeteeees Concealed shear zone Fault -Certain Fault -Approximate ----Fault -Inferred -- -Fault -Inferred (queried) sennemee Egult -Concealed -Thrust fault -Certain - -Thrust fault -Approximate - 4---Thrust fault -Inferred 4-4.Thrust fault -Concealed 2013 Strike/Dip Field Data for Bedrock Outcrops on Note:Strike/Dip symbol may not be in the exact location on this map due to overlapping and symbol representation. = =. Game ENERGY AUTHORITY Geology from:Wilson et al.,1998 (USGS Open-File Report 98-133) and Wilson et al.,2009 (USGS Open-file Report 2009-1108) @)mw Projection:NAD 1983 StatePlane Alaska 4 FIPS 5004 Feet Date Created:2/25/2015 Map Author:MWH-Eric ZimmermanFile:SuWa_Site_Region_Geology_LEG_11x17_Landsc_2_25 15.mxd Regional Geologic Map Key Figure 6b zy ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-01 1 21 5 APPENDIX A Geologic Logs yz ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-01 1 21 5 Geologic Logs Geologic logs for each of the boreholes conducted during the 2011 through 2014 field seasons are presented in the following pages.The logs have been organized by location of the Watana Dam site,Quarry A,and Quarry B.Geologic logs from the 2011 and 2012 have been published previously by Golder (2012 and 2013a)and are reproduced in this document without modification.While the classification systems used in the 2011 and later investigation effort are very similar,some variations do exist.Accordingly,two legends are provided,one for boreholes conducted during the 2011 field season (G11-DHO1!through Gl1-DHO03),and one for the remaining boreholes.It is also important to note that updated topographic data was established following the publication of the 2011 geologic logs.The elevations presented on the 2011 geologic logs are based on recreational grade,hand-held GPS units.As such,these elevations are generally accurate within 30 to 50 feet.Since the time the 2011 geologic logs were originally published,a LIDAR derived ground surface model with sub-meter accuracy has been developed. Borehole elevations based on this more accurate surface model are presented in Table 2 of this report. -yz ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-R EP-01 1 21 5 2011 GEOLOGIC LOG LEGEND sLB[ANC_SOIL_LEGEND]2/16/12UNIFIED SOIL CLASSIFICATION (ASTM D 2487-00) MATERIAL CRITERIA FOR ASSIGNING SOIL GROUP NAMES GROUP TYPES AND GROUP SYMBOLS USING LABORATORY TESTS SYMBOL SOIL GROUP NAMES &LEGEND 5 GRAVELS CLEAN GRAVELS Cy24AND1sC,53 GW WELL-GRADED GRAVEL Q oO o29lbJ££@O: 0 350%OF COARSE |T'NES Cy <4 ANDIOR 1 >C,>3 GP |POORLYGRADED GRAVEL |,ay Sa2=z FRACTION RETAINED BN T 8 529fa)Ww ON NO 4.SIEVE GRAVELS WITH FINES CLASSIFY AS ML OR CL GM SILTY GRAVEL ©(MP ox =aasS FINES =y 2 a >12%FINES FINES CLASSIFY AS CL OR CH GC CLAYEY GRAVEL PK<<4ers°w .SANDS CLEAN SANDS Cy26AND15C,53 SW WELL-GRADED SAND 5 i=]neQSz<5%FINES Bee re Cy <6 AND/OR 1>C,>3 SP POORLY GRADED SAND 223o*250%OF COARSE 8 &>1S)FRACTION PASSES =e 2sONNO4.SIEVE |SANDSAND FINES |"NES CLASSIFY AS ML OR MH SM |SILTY SAND BES 0,212%FINES FINES CLASSIFY AS CL OR CH sc CLAYEY SAND " SILTS AND CLAYS ORGANIC CLAY OR SILT |4 CL LEAN CLAY 5 =5 =7)be gp.(OH,OL)if cH a S528PJ=|Lt (oven dried)A oo oD9mwLIQUIDLIMIT<50 +40 |"LL (not dried)<0.75,alg 4s ML SILT 3 .as|x”*[4s 5D8oanedot|ORGANICCLAYORSILT [152 22Wla>aac teen ee KE --|g 35 8Sagres!se"a ge22%|sitsanpciays |Q Zab oC "CH |FAT CLAY Wp ikkO893TaMHgeesweaonj&8H ?2 z LIQUIDLIMIT 250 |4 ML 7 MH ELASTIC SILT 5258Le42.a .=x os°o %4%8 70 0 9%|OH |ORGANICCLAYORSILT |[Z7)J2®85LIQUIDLIMIT(LL)=> HIGHLY ORGANIC SOILS PRIMARILY ORGANIC MATTER,DARK IN COLOR,AND ORGANIC ODOR =PT.PEAT Ro Gravels or sands with 5%to 12%fines require dual symbols (GW-GM,GW-GC,GP-GM,GP-GC,SW-SM,SW-SC,SP-SM,SP-SC)De (Dy ?and add "with clay"or "with silt'to group name.If fines classify as CL-ML for GM or SM,use dual symbol GC-GM or SC-SM.Cys Dio C,=D.xDOptionalAbbeviations:Lower case "s”after USCS group symbol 19 ®60Genoteseither"sandy”or with sand and .RELATIVE DENSITY/CONSISTENCY ESTIMATEg"denotes either "gravelly"or "with gra USING STANDARD PENETRATION TEST (SPT)VALUES CRITERIA FOR DESCRIBING COHESIONLESS SOILS ®COHESIVE SOILS”UNCONFINEDMOISTURECONDITION(ASTM D 2488-00)N,(BLOWS/N,(BLOWS/COMPRESSIVERELATIVEDENSITY'4 (c)CONSISTENCY (c)(a)DRY |ABSENCE OF MOISTURE,DUSTY,DRY TO THE TOUCH FOOT)FOOT)"_STRENGTH (TSF) MOIST |DAMP BUT NO VISIBLE WATER VERY LOOSE 0-4 VERY SOFT 0-2 0-0.25 WET VISIBLE FREE WATER,USUALLY SOIL IS BELOW LOOSE 4-10 SOFT 2-4 0.25 -0.50 WATER TABLE COMPACT 10-30 FIRM 4-8 0.50 -1.0 DENSE 30 -50 STIFF 8-15 1.0-2.0 COMPONENT DEFINITIONS BY GRADATION VERY DENSE OVER 50 VERY STIFF 15 -30 2.0-4.0 COMPONENT SIZE RANGE :---_,en 30 oven 4.0{a)Soils consisting of gravel,sand,and silt,either separately or in combination possessing no characteristicsBOULDERSABOVE12IN.of plasticity,and exhibiting drained behavior.y 9 COBBLES 3 IN.TO 12 IN.(b)Soils possessing the characteristics of plasticity,and exhibiting undrained behavior. GRAVEL 3 IN.TO NO.4 (4.76 mm)(c)Refer to ASTM D 1586-99 for a definition of N.Values shown are based on N values corrected foroverburdenpressure(N,).N values may be affected by a number of factors including material size,depth,COARSE GRAVEL 3 IN.TO 3/4 IN.drilling method,and borehole disturbance.N values are only an approximate guide for frozen soil orFINEGRAVEL3/4 IN.TO NO.4 (4.76 mm)cohesive soil. SAND NO.4 (4.76 mm)TO NO.200 (0.074 mm)(d)Undrained shear strength,s,=1/2 unconfined compression strength,U,.Note that Torvane measures s, and Pocket Penetrometer measures U,COARSE SAND NO.4 (4.76 mm)TO NO.10 (2.0 mm)c MEDIUM SAND NO.10 (2.0 mm)TO NO.40 (0.42 mm)SAMPLER ABBREVIATIONS FINE SAND NO.40 (0.42 mm)TO NO.200 (0.074 mm)SS SPT Sampler (2 in.OD,140 Ib hammer)C Core (Rock) SILT AND CLAY SMALLER THAN NO.200 (0.074 mm)SSO _Oversize Split Spoon (2.5 in.OD,140 Ib typ.)TW Thin Wall (Shelby Tube) SILT 0.074 mm TO 0.005 mm HD Heavy Duty Split Spoon (3 in.OD,300/340 Ib typ.)MS Modified Shelby CLAY LESS THAN 0.005 mm BD Buik Drive (4 in.OD,300/340 Ib hammer typ.)GP Geoprobe CA Continous Core (Soil in Hollow-Stem Auger)RC Air Rotary Cuttings GS Grab Sample from Surface /Testpit AG Auger Cuttings DESCRIPTIVE TERMINOLOGY FOR PERCENTAGES (ASTM D 2488-00)LABORATORY TEST ABBREVIATIONS DESCRIPAVE eee CON Con Consolidation _P200 Percent Fines (Silt &Clay)SpG Specific Gravity _Comp Proctor Compaction (D698/D1557)pH =Soil pH TC Thaw Consoiidation/Strain TRACE 0-5%Dd _Dry Density PID Photoionization Detector TV Torvane FEW 5 -10%K Thermal Conductivity PM Modified Proctor TX Unconfined Compression LITTLE 10 -25%MA_Sieve and Hydrometer Analysis PP Pocket Penetrometer W.Liquid Limit (LL) SOME 30 -45%NP Non-plastic PTLD Point Load Ww,Plastic Limit (PL) MOSTLY 50 -100%OLI Organic Loss SA Sieve Analysis Q.Soil Resistivity WATANA_MV&,Ty GolderAssociates SOIL CLASSIFICATION /LEGEND Figure A-1 2/16/12[ANC_ROCKLEGEND]WEATHERING CLASSIFICATION*TYPICAL ROUGHNESS PROFILES FOR JRC* TERM DESCRIPTION GROUP |SYMBOL RANGE |ROUGHTIESS Fresh No visible sign of rock material weathering:Polished (P) FR perhaps slight discoloration on major I wi {0-2 Slickensided(FR)discontinuity surfaces (K) Discoloration indicates weathering of rock Slightly material and discontinuity surfaces.All the rock Ke -|2-4Weathered|material may be discolored by weathering and u Ww2 (SW)may be somewhat weaker externally than in its fresh condition.[nt B Moderate!Less than half of the rock material is Smooth (SM) Weathered decomposed and/or disintegrated to a soil.Mm W3(MW)Fresh or discolored rock is present either asdiscontinuousframeworkorascorestones.as: Highly More than half of the rock material isdecomposedand/or disintegrated to a soil.weaW)€d |Fresh or discolored rock is present either as Vv wa remem mines 1:0)discontinuous framework or as corestones. Completely |All rock material is decomposed and/orWeathered|disintegrated to a soil.The original mass Vv W5 PO 10-12 |Rough (R)(CW)structure is largely intact. Residual All rock material is convertged to soil.The mass Soil structure and material fabric are destroyed.Vl Pp 12-14 (RS)There is a large change in volume,but the soil has not been significantly transported. Te 14-16 FRACTURE ORIENTATION with respect to (wrt)core axis tt |Very Rough a oe oS=ow (VR) -_-\\60 0 py 18-20 SHAPE 0 5 10eeSCALEcM FRACTURES /FOOT (as illustrated on Drilihole logs) FRACTURESFOOT Planar (PL)Curved (C)Undulating (U)Stepped (ST)Irregular (I)auwooe INTACT ROCK STRENGTH CLASSIFICATION*O/FT APPROX.RANGE OF UNIAXIAL GRADE /DESCRIPTION FIELD IDENTIFICATION COMPRESSIVE STRENGTH GREATER MPa (psi)THAN Ro |Extremely |indented by thumbnail 0.25 -1.0 (35 -150) Very weak Crumbles under firm blows with point ofR1Tockgeologicalhammer,can be peeled by a pocket 1.0-5.0 (150 -725)MODIFIED CORE RECOVERY AS AN knife INDEX OF ROCK QUALITY Can be peeled by a pocket knife with difficulty, R2 Weak rock |shallow indentations made by firm blows with 5.0 -25 (725 -3500)DESCRIPTION OF point of geological hammer RQD ROCK QUALITY Medium Cannot be scraped or peeled with a pocketR3strongknife,specimen can be fractured with a single 25 -50 (3500 -7000)0-25 Very poor rock firm blow from geological hammer 25 -50 Poor Specimen requires more than one blowRaStrongrockgeologicalhammertofractureit 50 -100 (7000 -15000)50 -75 Fair Very ::75 -90 GoodSpecimenrequiresmanyblowsfromaR5stronggeologicalhammertofractureit100-250 (15000 -36000)90 -100 Excellent Extremely Speci :: :pecimen can only be chipped with a NOTE:Rock Quality DesignationR6sonsgeologicalhammer>250 (>36000)(RQD)is measured as the summationroc!of all the core pieces that are greater *From Brown,1981,"Suggested Methods for Rock Characterization Testing and Monitoring,” International Society for Rock Mechanics (SRM) than 4 inches in length,divided by the total core run length.WATANA_MWH_LIB.GLB&,Ty GolderAssociates ROCK CORE LOGGING LEGEND Figure A-2 -ww ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-01 1 21 5 2012 AND 2014 GEOLOGIC LOG LEGEND 12/10/144).GLB[WAT_ROCK_LEGEND]WEATHERING CLASSIFICATION*TYPICAL ROUGHNESS PROFILES FOR JRC* SDPlanar(PL)Curved (C)Undulating (U Stepped (ST)Irregular (t) INTACT ROCK STRENGTH CLASSIFICATION* APPROX.RANGE OF UNIAXIAL GRADE |DESCRIPTION FIELD IDENTIFICATION COMPRESSIVE STRENGTH MPa (psi) RO Extremely |indented by thumbnail 0.25 -1.0 (35 -150weakrock Crumbles under firm blows with point ofR1Veryweakgeologicalhammer,can be peeled by a pocket 1.0-5.0 (150 -725) knife Can be peeled by a pocket knife with difficulty,R2 Weak rock |shallow indentations made by firm blows with 5.0 -25 (725 -3500) point of geological hammer Medium Cannot be scraped or peeled with a pocketR3strongknife,specimen can be fractured with a single 25 -50 (3500 -7000) rock firm blow from geological hammer Specimen requires more than one blow ..R4 Strong rock geological hammer to fracture it 50 -100 (7000 -15000) R5 wey Specimen requires many blows from a 100 -250 (15000 -36000)rock geological hammer to fracture it Ext |;:.. RG strong”Specimen can only be chipped with a geological >250 (>36000) rock jammer "From Brown,1981,"Suggested Methods for Rock Characterization Testing and Monitoring,” International Society for Rock Mechanics (ISRM) TERM DESCRIPTION GROUP |SYMBOL RANGE ROWS Fresh No visible sign of rock material weathering:Polished (P) FR perhaps slight discoloration on major discontinuity |w1 {0-2 |Slickensided(FR)surfaces (K) Discoloration indicates weathering of rock material Slightly and discontinuity surfaces.All the rock material Ke --{24 Weathered |may be discolored by weathering and may be ll w2 (SW)somewhat weaker externally than in its fresh condition.-[|46 |Smooth (SM)Moderate!Less than half of the rock material is decomposedWeeathoredand/or disintegrated to a soil.Fresh or discolored tH W3(MW)rock is present either as discontinuous frameworkorascorestones.mt BB Hight More than half of the rock material is decomposedWeatnenedand/or disintegrated to a soil.Fresh or discolored Vv w4 (HW)rock is present either as discontinuous framework er 1S. or as corestones. Completely |All rock material is decomposed and/orWeathered|disintegrated to a soil.The original mass structure Vv W5 PO ta |Rough (R) (CW)is largely intact. Residual All rock material is convertged to soil.The massSoilstructureandmaterialfabricaredestroyed.There Vl pa 12-14 (RS)is a large change in volume,but the soil has not been significantly transported. PN tt FRACTURE ORIENTATION with respect to (wrt)core axis Pe tts Very Ro ugh=oe [S=lt (VR) _\\60°0°JeOY 18-20 SHAPE 5 10 CM FRACTURES /FOOT (as illustrated on Drillhole logs) FRACTURES PER FOOT Nwrooae? OFT GREATER MODIFIED CORE RECOVERY AS AN INDEX OF ROCK QUALITY roo |*RSSRURSY 0-25 Very poor 25 -50 Poor 50 -75 Fair 75 -90 Good 90 -100 Excellent NOTE:Rock Quality Designation (RQD) is measured as the summation of all the core pieces that are greater than 4 inches in jength,divided by the total core run length.LIBRARY-ANC-z-. SUSITNA-WATANA HYDRO ROCK CORE LOGGING LEGEND Figure A-1 12/12/14UNIFIED SOIL CLASSIFICATION (adapted from ASTM D2487) DESCRIPTIVE TERMINOLOGY FOR MATERIAL CRITERIA FOR ASSIGNING SOIL GROUP NAMES GROUP TYPES AND GROUP SYMBOLS USING LABORATORY TESTS SYMBOL SOIL GROUP NAMES &LEGEND 20 GRAVELS CLEAN GRAVELS Cy24AND1sSC,53 GW WELL-GRADED GRAVEL 1a)O]- bw gu; o 550%OF COARSE.|FINES Cy <4 ANDIOR [C,<1 OR Cc >3]GP POORLY GRADED GRAVEL |},aed Sy 8=.FRACTION RETAINED BML]8 Se25wONNO4.SIEVE GRAVELS WITH FINES CLASSIFY AS ML OR MH GM SILTY GRAVEL Ah]8%=qos FINES Y =<zww224>12%FINES FINES CLASSIFY AS CL OR CH GC |CLAYEY GRAVEL oA<eESWwW&-4 ed O SANDS CLEAN SANDS Cy26AND1SC,53 Sw WELL-GRADED SAND 3252<5%FINES ee.cane 250%OF COARSE Cy <6 AND/OR [C,<1 OR C,>3]SP POORLY GRADED SAND 8 3le)'0 8&5oFRACTIONPASSESzPse ON NO 4.SIEVE SANDS AND FINES FINES CLASSIFY AS ML OR MH SM SILTY SAND 8 8 3 A712%FINES FINES CLASSIFY AS CLOR CH Sc CLAYEY SAND 'e stSILTSANDCLAYS-*°ORGANIC CLAY OR SILT |CL LEAN CLAY £3 25”f¢50}.(OH,OL)if:ob BRE 8Sow|LIQUIDLIMIT<50 |SS &|Milovenste<0.75/%ML SILT geee”w>ww 40F "vy Saree asoO2[76 3agOgOL|ORGANICCLAYORSILT [S222233FTOfWyiiie2x|)siLTsanDCcLays |2 Fat -CL.sve ene CH FAT CLAY -Y 8 B58weeBe|MH pgs z LIQUID LIMIT 250 s ter aan mu |.....!!!!Ctw MH ELASTIC SILT 5 8 s 5docjoree:010 20 0e789 100 |OH ORGANIC CLAYORSILT [47,22 85 HIGHLY ORGANIC SOILS PRIMARILY ORGANIC MATTER,DARK IN COLOR,AND ORGANIC ODOR PT PEAT a D Dy)? WOTES Ce po RELATIVE DENSITY /CONSISTENCY ESTIMATE 10 10 '60 Gravels or sands with 5%to 12%fines require dual symbols (GW-GM,USING STANDARD PENETRATION TEST (SPT)VALUESGW-GC,GP-GM,GP-GC,SW-SM,SW-SC,SP-SM,SP-SC)and add "with i clay"or "with silt"to group name.If fines classify as CL-ML for GM or SM,use (adapted from Terzaghi and Peck 1967,and NAVFAC DM 7.1)dual symbol GC-GM or SC-SM.D,,,is soil particle diameter where X%is %(a)(b)finer."Optional Abbeviations:Lower case "s"after USCS group symbol denotes COHESIONLESS SOILS COHESIVE SOILS UNCONFINED either "sandy”or "with sand"while "g"denotes either "gravelly”or "with gravel"(N,)(N,)COMPRESSIVERELATIVEDENSITY(blows/ft)®CONSISTENCY (blows/tt)®STRENGTH (TSF) VERY LOOSE 0-4 VERY SOFT 0-2 0-0.25CRITERIAFORDESCRIBINGMOISTURECONDITION];oose 4-10 SOFT 2 4 0.25 0.40(adapted from ASTM D2488)MEDIUM DENSE 10-30 MEDIUM STIFF 4-8 0.50-1.0 ORY |ABSENCE OF MOISTURE,DUSTY,DRY TO THE TOUCH DENSE 30 -50 STIFF 8-15 1.0-2.0 MOIST]DAMP BUT NO VISIBLE WATER VERY DENSE OVER 50 VERY STIFF 15 -30 2.0-4.0 weT |VISIBLE FREE WATER,USUALLY SOIL IS BELOW :____|_HARD OVER 30 OVER 4.0.(a)Soils consisting of gravel,sand,and silt,either separately or in combination possessing no characteristics ofWATERTABLEplasticity,and exhibiting drained behavior. (b)Soils possessing the characteristics of plasticity,and exhibiting undrained behavior. (c)Refer to ASTM D1586 for a definition of N value.(N,)g9 is the N value corrected for hammer energy andCOMPONENTDEFINITIONSBYGRADATIONoverburdenpressure,and is detailed in ASTM 6066.-N values may be affected by a number of factorsincluding:material size,sampier size,hammer weight and type,depth,drilling method,and boreholeCOMPONENTSIZERANGEdisturbance.N values are only an approximate guide for cohesive soil and do not apply to frozen soil.BOULDERS GREATER THAN 12 in.(d)Undrained shear strength,s,=1/2 unconfined compression strength,U,.Note that Torvane (TV)measures COBBLES 42 in.to 3 in.$,and pocket penetrometer (PP)measures U, GRAVEL 3 in.to #4 Sieve (4.76 mm) COARSE GRAVEL 3 in.to 3/4 in.SAMPLER ABBREVIATIONS FINE GRAVEL 3/4 in.to #4 (4.76 mm)SS SPT Sampler (2 in.OD,140 Ib hammer)C Core (Diamond Bit)SAND #4 (4.76 mm)to #200 (0.074 mm)HD Heavy Duty Split Spoon (3 in.OD,340 Ib hammer)TW Thin Wall (Shelby Tube)COARSE SAND #4 (4.76 mm)to #10 (2.0 mm)-BL Brass Liners used in Split Spoon TP Thin Wall Piston SamplerMEDIUMSAND#10 (2.0 mm)to #40 (0.42 mm)CA _Continous Core (Soil in Hollow-Stem Auger)MS Modified ShelbyFINESAND#40 (0.42 mm)to #200 (0.074 mm)GS Grab Sample from Surface /Testpit MC_Geoprobe Macro-CoreSILT&CLAY (FINES)SMALLER THAN #200 (0.074 mm)AG Auger Charge RC Air Rotary Cuttings AW Auger Wash AG Auger Cuttings LABORATORY TEST AND NOTES ABBREVIATIONS /SYMBOLS LIBRARY-ANC(12-11-14).GLB[WAT_SOIL_LEGEND]PERCENTAGES (ASTM D2488)Con Consolidation PID Photsionization Detector TXCD Triaxial,Consolidated Drained DESCRIPTIVE |RANGE OF Dd_Dry Density PM Modified Proctor (D1557)TXCU Triaxial,Consolidated Undrained TERMS PROPORTION K_Thermal Conductivity PP Pocket Penetrometer (Field)TXUU =Triaxial,Unconsolidated UndrainedTRACE0-5%MA Sieve and Hydrometer PTLD Point Load W,Liquid Limit (LL) FEW 5 -10%NP Non-plastic SA_Sieve Analysis W,Plastic Limit (PL) LITTLE 10 -25%OLI Organic Loss SpG Specific Gravity Q._Soil Resistivity (Res.) SOME 30 -45%P200 Passing #200 Sieve (D1140)TC Thaw Consolidation/Strain Y Water Level "pH Soil pH TV Torvane (Field)Y Water Level While DrillingMOSTLY50-100%PI_Plasticity Index (D4318) 2 SOIL CLASSIFICATION /LEGEND FigureSUSITNA-WATANA HYDRO - 12/10/144).GLB[WAT_ICE_LEGEND]FROZEN SOIL CLASSIFICATION (ASTM D 4083-89) 1.DESCRIBE SOIL INDEPENDENT CLASSIFY SOIL BY THE UNIFIED SOIL CLASSIFICATION SYSTEM OF FROZEN STATE MAJOR GROUP SUBGROUP DESCRIPTION |DESIGNATION DESCRIPTION DESIGNATION Poorly bonded Nfoffriable Segregated ice not N No excess NbnvisiblebyeyeWellice 2.MODIFY SOIL bonded EDESCRIPTIONBY Xcess Nbe DESCRIPTION OF ice FROZEN SOIL Individual ice crystals Vxorinclusions Ice coatings VeSegregatedonparticles ice visibleye(ice eby Vv Random or irregularly Vr than 25 mm oriented ice formations thick)Stratified or distinctly Vsorientediceformations Uniformly distributed ice Vu 3.MODIFY SOIL Ice with soil : DESCRIPTION BY Ice greater inclusions ICE+soil type DESCRIPTION OF than 25 mm ICESUBSTANTIALthick Ice without ICEICESTRATAsoilinclusions FROST DESIGN SOIL CLASSIFICATION " %FINER FROST THAN 0.02GROUP?GENERAL SOIL TYPE mm BY TYPICAL USCS SOIL CLASS WEIGHT 8)(a)GravelsNFSCrushedstone 0 to 1.5 GW,GP[MOA NFS]|__Crushed rock (b)Sands 0to3 SW,SP PFs”(a)GravelsCrushedstone 1.5to3 GW,GP[MOA NFS]Crushed rock [MOA F2]|(b)Sands 3 to 10 SW,SP $1 .GW,GP GW-GM,GP-GM,[MOA F1]Gravelly soils 3 to6 GW:GC,GP-GC $2 .SW,SP SW-SM,SP-SM,[MOA F2]|Sandy soils 3to6 |swisc,sP-Sc F1 .GM,GC,GM-GC,GW-GM,[MOA F1]|Gravelly soils 6to10 |GP-GM,GW-GC,GP-GC :GW,GP GW-GM,GP-GM, Fo (a)Gravelly soils 10 to 20 GW-GC,GP-GC [MOA F2]SM,SW-SM,SP-SM,SC,(b)Sands Sto15 |Sw-Sc,SP-SC,SM-SC _(a)Gravelly soils Over 20 |GM,GC,GM-GCMOAF3](b)Sands,except very fine silty sands Over 15 SM,SC,SM-SC |(c)Clays,Pl>12 CL,CH __{a)Silts --ML,MH,ML-CL cst 4 (b)Very fine silty sands Over 15 SM,SC,SM-SC[MOA F4]|_(C)Clays,Pl<12 CL,ML-CL (d)Varved clays or other fine--CL or CH layered with ML,MH, grained banded sediments ML-CL,SM,SC,or SM-SC (1)From U.S.Army Corps of Engineers (USACE),EM 1110-3-138,"Pavement Criteria for Seasonal Frost Conditions,”April 1984 (2)USACE frost groups directly correspond to frost groups listed in Municipality of Anchorage (MOA)design criteria manual (DCM),2007; except as noted. (3)Non-frost susceptible (4)Possibly frost susceptible,requires lab test for void ratio to determine frost design soil classification.Gravel with void ratio >0.25 would be NFS;Gravel with void ratio <0.25 would be $1;Sands with void ratio >0.30 would be NFS;Sands with void ratio <0.30 would be S2 or F2 oOE BONDING SYMBOLS No ice-bonded soil observed Poorly bonded or friable LILLdWell bonded DEFINITIONS Candled[ce is ice which has rotted orotherwiseformedintolongcolumnarcrystals, very loosely bonded together. Clear Ice is transparent and contains only a moderate number of air bubbles. Cloudy Ice is translucent,but essentially sound and non-pervious Friable denotes a condition in which material is easily broken up under light to moderate pressure. Granular Ice is composed of coarse,more or less equidimensional,ice crystals weakly bonded together. Ice Coatings on particles are discernible layers of ice found on or below the larger soil particies in a frozen soil mass.They are sometimes associated with hoarfrost crystals, which have grown into voids produced by the freezing action. Ice Crystal is a very small individual ice particle visible in the face of a soil mass. Crystals may be present alone or ina combination with other ice formations. Ice Inclusions are individual ice masses visible in the face of a soil mass.Inclusions may be present alone or in a combination with other ice formations. Ice Lenses are lenticular ice formations in soil occurring essentially parallel to each other,generally normal to the direction of heat loss and commonly in repeated layers. Ice Segregation is the growth of ice as distinct lenses,layers,veins and masses in soils,commonly but not always oriented normal to direction of heat loss. Massive Ice is a large mass of ice,typically nearly pure and relatively homogeneous. Poorly-bonded signifies that the soil particles are weakly held together by the ice and that the frozen soil consequently has poor resistance to chipping or breaking. Porous Ice contains numerous voids,usually interconnected and usually resulting from melting at air bubbles or along crystal interfaces from presence of salt or other materials in the water,or from the freezing of saturated snow.Though porous,the mass retains its structural unity. Thaw-Stable frozen soils do not,on thawing, show loss of strength below normal,long-time thawed values nor produce detrimental settlement. Thaw-Unstable frozen soils show on thawing, significant loss of strength below normal, long-time thawed vaiues and/or significant settlement,as a direct result of the melting of the excess ice in the soil. Well-Bonded signifies that the soil particles are strongly held together by the ice and that the frozen soil possesses relatively high resistance to chipping or breaking.LIBRARY-ANC|z FROZEN SOIL CLASSIFICATION /LEGEND Figure SUSITNA-WATANA HYDRO A-3 -Z-.SUSITNA-WATANA HYDROELECTRIC PROJECT Figure A-4 -Discontinuity Classification/Legend CLASSIFICATION OF DISCONTINUITY APERATURE* DESCRIPTION WALL SEPARATION Very Tight <0.004 inches <0.1 mm Tight 0.004 -0.01 inches 0.1 -0.25 mm Partially Open 0.01 -0.02 inches 0.25 -0.5 mm Open 0.02 -0.1 inches 0.5 -2.5 mm Moderately Wide 0.1 -0.4 inches 2.5 -10 mm Wide >0.4 inches >10mm Very Wide 0.4 -4 inches 1-10cm Extremely Wide 4 -40 inches 10 -100 cm Cavernous >40 inches >1m DISCONTINUITY SPACING CLASSIFICATION* DESCRIPTION SPACING Extremely Close <0.75 inches <2cm Very Close 0.75 -2.5 inches 2-6cm Close 2.5 -8 inches 6 -20 cm Moderate 8 inches -2 feet 20 -60 cm Wide 2-7.5 feet 0.6 -2m Very Wide 7.5 -20 feet 2-6m Extremely Wide >20 feet >6m Note:*From Brown,1981,"Suggested Methods for Rock Characterization Testing and Monitoring”,International Society for Rock Mechanics (SRM) Figure A-4 -z ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-01 1 21 5 2012 AND 2014 DAM SITE GEOLOGIC LOGS (2012 Logs Originally Presented by Golder 2013a) RECORD OF DRILLHOLE DH12-1 SHEET 1 of 16 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 _E:1,885,044OoTyShapeRoughnesslafilling-Pyrte @ Axalro)J-Joint B-Bedding PL-l janar PO-Potished Bt Biotite Ep-Epidote ak artz,Op 1=F-Fautt FO-Fotation C-Curved K-Slickensided Bx-Breccia FeOx-Iron Oxide 3a-Sand iametra z {6 glale|.[SIT SSmies wemen sMsmen”coy,Geom,Soe |poe.te =CO)BLY)&|PR Fracture Pereguer -URWey Rough Gaacte MISH su Suiphide zs a8 NOTES wu 1o DESCRIPTION gms ye DISCONTINUITY DATA z aa WwATER LEYo|Z z (£5/2|88)]rao |rractures |F¥e Ox bx l|tox|x xxx LEVELS x &ijae/2z/°R Ps Fue TYPE and Fo |SzH|EZB/NORS 2& |R=|3)8)%PERFOOT |29%|SURFACE $9 [ERZ|8h2 (Seno FSLo4%S ageg|avoee Pe DESCRIPTION S71 eer 0.0-1.0 Ly<>|Very loose,moist,green and%|brown,ORGANICS,fibrous i EL PD 876.7 | O|10-25 1.0 ©|Soft,moist to wet,brown,8|sit L s (ML)4 6 NP 875. g|25-63 pb]2.5 NiA<Dense to very dense,moist,fo CN.@|_tight brown,poorly graded »7 |GRAVEL (e)an4(GP)Oo Drilling RateoOO(7/18/12):0 i =a CN to 5.4 feet |=r D>(soil),1 hour, D 2.5.4 feet/hour g LO (a)rs From drilling action,cobbles .Q 7 |_|inferred.At approximately 2.5 ft fodepth,drilling fluid changes from |C)' dark brown to light brown.0 NIA L o(\7 Top of Rock=6.3 ft 871. 6.3-15.5 .|63 Slightly weathered to fresh t | a (SW-FR),iron-oxide-stained \@ |J,PL,SM-R,FeOx 65°4joints,rehealed calcite joints,|34 swveryclosetomoderate| 40 9, ;/1 60%tospacedfractures,xenoliths vq 85%FR(fine grained),dark greenish t 'o ° -gray,medium grained,very \@)|,PL,SM-R,FeOx,CL 44 4 strong (R5),DIORITE pr 7d \d J,Pt-l,SM-R,FeOx 32°.!@ |J,PL,ML,FeOx,ML/Sa 60°-++ L Infill |/.4 \ \ NN in /-10 {Loss of 4 \o J,PL,SM-R,FeOx 20°circulation at "4 R5 approximately |3.4 9.9 feet, a o \3.4 \ circulation 4 a t 7 2 100%@ |J,PL,SM,FeOx 55°retums. 3 VO 100% & a |.N2=g \",= 3 3g¢N FR 3 rsd SE a)\e J,PL-C,SM,FeOx 26° J E 3 . 3 So Lie)x 4inn]=,@/J,PL,SM,FeOx 72° ot &N e J,PL-C,SM-R,FeOx 25°7 a [o)rsQ\zt (! 2 \ gL r =ap 15 'or 48 T @|J,PL,SM,FeOx 75°\g 14g63.43|7"|[57% x 15.5-16.5 4 118.5 98%I:e J,PL,SM,FeO 40°mn Slightly weathered to fresh [="hb VE OM FeO SW |R4ay(SW-FR),iron-oxide-stained f to |to 7 a joints,close to moderate "862.FR |RS2spacedfractures,dark to "465©light greenish gray,medium {|>. e J,PL,SM,FeOx 21 a grained,strong to very vq 4 Sg strong (R4-R5),ALTERED | <DIORITE \ >165-288 re a Slightly weathered to fresh |°Changed drill 4&(SW-FR),iron-oxide-stained |\P |:PL SM,FeOx 83 cr |RS bit at 17.8 a joints,rehealed calcite joints,7.feet. close to moderate spaced V 5.0 Run 4:Drillrsfractures,xenoliths (fine N 4|29 |!)goo,tod bindingorgrained),dark greenish gray,|/4 QN medium grained,very strong |\°7 100% -(R5),DIORITE I N -20 ["4 4 ---continued on next page=DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8GIdDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure Bi Older DRILLER:T.Fisher CHECK DATE:1/9/13 AS8PPSolder...7 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 2 of 16 INCLINATION:-69°ECannon3/8/13PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/2412 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.828 _E:1.885.044 8 J-Joint B-Bedding BLPlanar Hey olisned iaete Ep-Epidote ote art @ Anal=I F-Fault FO-Foliation K-Stckensided Bx-Breccia FeOx-lron Oxide Sa-Sand QC Diametral x |b g |2 le Wen OROnhogenal Ura Rkough «GR chibrte Hierietnatte Segue ||OPEe=ic}Z yi 2%|FR-Fracture Hrreguiar VR-Very Rough CaCalcte ML-Sit 5u-Sulphide z8 B g essBEloDESCRIPTION243)ee DISCONTINUITY DATA z aotp 7 WATER ELSZz=|Ee|/Z|88)rao |rractures |$¥a TYPE and 2 SSH i226 |A aKS4€|Be/Z/Ri %PERFOOT |25%SURFACE 8 |ehe B52 Sine|og 12 o &ggea|are?bs DESCRIPTION a7 coro 9 x 16.5-28.8 \ Slightly weathered to fresh tv.|° (SW-FR),iron-oxide-stained |o”|?Pk SM ae 53°|joints,rehealed caicite joints,| i J,PL-C,SM,FeOx 34 -close to moderate spaced '50 " 7 fractures,xenoliths (fine oo 4|50 'gay ::@ jJ,PL,SM,FeOx 62° grained),dark greenish gray,°i !|medium grained,very strong \100%| a (R5),DIORITE (Continued)'a 'J,PL,SM,FeOx,Ca 62°d .i @ |J,PL-C,SM,FeOx 64° ie | =e J,PL,SM-R,FeOx 27°q 'N In s @ J,PL,SM-R,FeOx 76° a »e J,PL-C,SM-R,FeOx 14°4 rn 7.FR |R5 24.6 feet:In-situ joint,25°dip \ |95 w.r.t.core axis,open,iron-oxide fF +_|5.0 _I stained,calcite infilled \5.0 @ |J,PL,SM,FeOx 68° N 5 :72%| 7.100%@/J,PL-I,SM,FeOx 72° i \©||J,PLA,SM,Feox 17°a N !@ |J,PL,SM,FeOx 70° Ly ||\|Drilling Rate r Joints at 29.3 and 29.5 feet depth >+nao 7 grangered-nust-colored,RO infil |\'||@ |J,PLU,SM,FeOx 51°feet (rock),6ig \hours,7.1 ty |feet/hour |\ 4 5 @ |J,PL,SM,FeOx 63° @ [7 4850.7 -£28.8 -30.6 [i 28.8 J °Moderately weathered to aN »J.PL.SM-R,Sa Infill 32°5 |Slightly weathered e or :o_|Mw |ROS|(MW-SW),iron-oxide-stained |"\J,PL,SM,FeOx,CL Infill 26 to |to|joints,very close to .[ 30 |14|moderate spaced fractures,|/50 SW |RA Run6: 7 "|dark to light greenish gray,=6 .66%50-60%|medium grained,extremely 849.400%water retum.2 ||weak to strong (RO-R4),\[30.6 °30.0 feet. .=|ALTERED DIORITE L |Lost 4 £/306-537 \circulation, §|Slightly weathered to fresh then (SW-FR),iron-oxide-stained |,|intermittent a joints,rehealed calcite joints,\@ |J.PL.SM,Feox 60°circulation at 4 very close to moderate coe greater spaced fractures,xenoliths L depths.(fine grained),dark greenish vq i gray,medium grained,very :\ -strong (R5),DIORITE 7 Ly | \@:|J,PL,SM,FeOx 44° n in /e J,PL-U,SM,FeOx 17°4 'N rv. -35 5.0 - \7|5°||90%FR |RS'on 100% L 1 @J,PL-ST,SM,FeOx 85° q L ,| \ a hs +f 4 37.2 feet:Approximately :\@|J,PL-l,SM,CL 73° 1-inch-wide calcite vein,40°dip ||p-- w.rt.core axis rv]1 i 7 ° \:|J,PL,SM-R,FeOx,Ca 44 37.8 feet:4 @ |J,PL-C,SM-R,FeOx 56°Lost : r 'circulation on 50 after Run 7 :8 |©|},88%-@ ||4,PLC,smR 24°4 4 100% \|@ |J,PL,SM,FeOx 67°|ao | |: -a continued on next page=e DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi =DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igureolderA-5 1403-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]FP),Golder DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 3 of 16 INCLINATION:-69°312.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Cannon3/8/13103-95560WsDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 _E:1,885,044 T r8v7jointB-Bedding PL Peanar Bo Borered grote Ep-Epidote ot wart @ AxalzrF-Fault FO-Foliaton -C-Curved K-Stickensdied Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametral x ifm o)2 le Uven OROrhogonal STSenec'RR”RRs Geeatte |Seeencte banve3°zZ W)2%|FR Fracture tireguar --VR-Vey Rough GaCalle ML-Sit Su-Suiphide |2 7 Fs NOTES w lo DESCRIPTION 24 s|/ee DISCONTINUITY DATA =],aspo TESTS a z z=i/z_|2|98 Eu oO |xipx|tox |»xxx WATER LEVELSFa&jFel S|Oo}Rap |FRACTURES |Fu TYPE and Zo Soi ean W HSSe)eju-i5|#1 %PERFOOT |39%SURFACE a8 |282|8k2|82r540a6/9 |&8898 |avons Pe oh DESCRIPTION e-|5 "loose z 30.6 -53.7 a Slightly weathered to fresh r 7.@ |J,PL,SM,FeOx 62° (SW-FR),iron-oxide-stained \° joints,rehealed calcite joints,l @|J,PL,SM-R,FeOx 73 [--- _ very close to moderate '5.0 4 spaced fractures,xenoliths \"4 50 4(fine grained),dark greenish |8 88% gray,medium grained,very \400% strong (R5),DIORITE 7 e J,PL-Il,SM,FeOx 42° q(Continued)\ \@ |J,PL,SM,FeOx,Ca 67° in 7 \b+++|| NX 1/4 @ ||J,PL-C,SM,FeOx 29° \@)jJ,PL,SM,FeOx 42° » 4 44.2-445 feet:Zone of os >J,PL,SM-R,FeOx,Ca 32° moderately to slightly weathered I e J 30° (MW-SW),white to orange,N '@|J,PL-I,SM-R 74°44 |45 extremely weak to very weak ir ¢.]5.0 |(RO-R1),DIORITE EQ o 7 !g|50 92%r J,PL,SM,Ca 68' r/4 100%@ |J,PL-,SM-R,Ca 67° |4 N Ly | ' 3 ve ®|J,PL,SMR,Ca 31 eR |RS » 4 r,/. |@/J,PL,SM,Ca 71° N lJ aa Hole 4'oe J,PL,SM-R,Ca 41°advanced to<>|48.2 feet:Tan/reddish felsic |PL,-R, ©|intrusion approximately 0.75 inch |\®|J,PL,SM,Ca 68°47.8 feet on 2 wide,33°dip w.r.t.core axis I /r J,PL,SM 64°TH8/12. &\°4a@@|J,PL,SM,CL 75 @ by |[2:PLSM.Ca,Feox 45°Noo 5 | 2 '|®@ |J,PL,SM,Ca 66° =7 \5.0 _50 re L >|23N\10 78%Gel 1g|*100%®||J,PL,SM-R 36° o \os 4 €t e »J,PL-C,SM 40° 8 \J,PL-C,SM,CL 63°»Ly | \ i @ |J,PL,SM,Ca 69°Ph]4 XN Ne @ |J,PLC,SM 57° | \Changed drill 4 on @ |J,PL-C,SM-R 54°bit at 52.8 \4a07 feet. 537-580 j ,53.7 °J,PL,SM,CT 36° Highly to moderately = ; q weathered (HW-MW),S @ Vv,Qtz §2 jointed and fractured,very a \close spaced fractures,zone \»J.PL,SM,FeOx 36° L 55 oriented approximately 36°Ht 48 fe coe 4 w.rt.core axis,pale green,="1 50 0%55 to 58 feet: dark gray,rust yellow,tight 'fs NIA H Fracturetannishgray,fine to medium =¥96%iw index per footgrained,interlayered . not estimat extremely weak rock with v7]MW |R3 as recovered 7 medium strong rock (RO-R3),=core was RO ALTERED DIORITE »NIA strength"Ly altered diorite \interlayered 4 A with R3 a)strengthSNIAmaterial. 4 4823. 7]58.0 58.0 feet:7 =)50 Contact is an .tered zone,7]'MW |R2 a > =12 5.0 18%to to extremely Es sw |]R3 weak rock 4 A 100%59.0 feet:=@J,PL,SMR,FeOx 82°|__|Rocka.e J,PL+l,SM-R,FeOx 10°transitions y 60 --continued on next page 7 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiYGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine reedePDSolder. RECORD OF DRILLHOLE DH12-1 SHEET 4 of 16 ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12to 7/24/12 ELEVATION:1877.6ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 _E:1.885.044 a Ty;Re Infilling .Py-Pyrite @ Anal 8 rio,geting,ty atti bia ESM wie SE |cloimet x IG @|ele Uven” GROnhogonal STStepeed ReRowh -Chchoste |Mavrictatte Sestes ||FOP = on Oo |8}wi]&[Fracture hivegue =VR-VeyRough GaCacte MUSH SuSuipnde |2S oR NOTES BX Jo DESCRIPTION 27 3|ee DISCONTINUITY DATA =aie TESTS w=|2 72-3 |zs Elo |x vex WATER LEVELS =&|ee|Z]9]Rap |FRactuREs |$¥e TYPE and 2,(S2S/EZS/ABRS oo 9 eje-|5])#2]%PERFOOT |25%SURFACE 28 |S63|5¢2lsen0 &|60 a o S828|arool pe gh DESCRIPTION x B eese o x 580-719 i :from Moderately to slightly =es weathered weathered (MW-SW),a in-situ iron-oxide-stained joints,a y OS le J,PL4,SM,FeOx 40°appearance veined,very close to wide \5.0 to extensive 7 spaced fractures,light a 5.0 7 °iron-oxide green,medium grained,an 12 18%°J,PLC,SM-R,FeOx 39 staining onweanmediumStrong,'100%VES discontinuities wancal .=\ms 4 DIORITE (Continued)ys °J,PLA,SM-R,FeOx 40° SS A 4 =| " tL . | 63.5 and 64.3 feet depth:0.5to |\°J,PL,SM-R 13 0.75 inch wide smoky white to vaclear,quartz veins at =\ 1 65 approximately 13°dip w.rt.core S 50 = axis 4)|13)©|170%e||[4 PL.sMR 13° y 100% .-@|J,PL-C,SM,FeOx 73°ww we 4 'e .2-4 )) 66.3 feet:Transition from dark =|//_4,PL,SM-R,FeOx 55 SW |}R3greendioritewithredtintzones,atoalteredlightgreendioriteat. approximately 67.8 feet He \@®|J,PL,SM,FeOx 57°4 "=\ We J >aN e J,PL,SM-R,FeOx 38° ®iE= g NS 4 Q a 8 nN <Ly-70 13 N 5.0 4 ""|[14]O°|tearSs= g A 100%@ |J,PLC,SM-R,FeOx 51° 2 =1 £. 5 i .iS)a 810 .e J,PL,SM-R,FeOx 15° 71.9 -130.4 (71.9 @ |J,PL,SM-R,FeOx §2 5 Fresh (FR),t 7.:° iron-oxide-stained joints,\@ J,PL-C,SM,FeOx 83 rehealed calcite joints,very 7 ° close to wide spaced |*@)J PLA SM,Ca 45 4 fractures,xenoliths (fine ion @ |J,PL,SM 66° grained,dark gray),dark 1 green with zones of red tint,N |8 J,PL,SM,FeOx 35° medium grained,very strong in / J,PL,SM,FeOx 36° ITI 4(R5),DIORITE |®|J,PL,SM,FeOx 63° 'on \7 71.9 feet:Transition from light \38 :° 7T green altered diorite to dark greenr /_|15|>98%'@|J,PL-l,SM-R,FeOx 71 P- ]diorite \|]100% |*FR |R5 4 \ | N he |@>=|J,PL,SM,FeOx 48° 'on \ . 4 aa 1 \Er |\16|52 |||g79,@ |J,PL-C,SM,FeOx 70° t 7] ° |Je]|J,PL.SMR,FeO axe |7 \100%rh »FOOX |1 : || hed || y 80 =-continued on next page 7 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiYGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine reo(A Golder DRILLER:T.Fisher CHECK DATE:1/9/13 - RECORD OF DRILLHOLE DH12-1 SHEET 5 of 16 ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}103-95560W.PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 __E:1,885,044 8 YP B-Bedding BUPanar =PO Boiened -Srbctte Ep-Epidote Cbdua |0X3F-Faut FO-Foliation -C-Curved K-Slickensided Bx-Breccia.©FeOx-Iron Oxide Sa-Sand 0 Diametral z |e gid lal »(Yue Skeittnn geguem eke Ce Seer,ae”|SoeVein:||=Feo =Cla le)2 FR-Fracture ogre RireguarVAvery Rough GaGakte MUSK Suuiphide 5608 wouesw=lo DESCRIPTION 2 +43]28 DISCONTINUITY DATA z |,ae PikaZzrit3/905 E a xbx|/lox |=xxx WATER LEVELSZzaleeO@|RQD |FRACTURES |Eve TYPE and Eg |Ozu 2a oaks&e ju /3)8 %PERFOOT |29%SURFACE a8 |GueSlmeoisxns &oe:&a lz 2898 |a+002 Pees DESCRIPTION e"|8 |*eso 9 = 71.9 -130.4 Fresh (FR),r YYiron-oxide-stained joints,\ rehealed calcite joints,very | -close to wide spaced |5.0 o | fractures,xenoliths (fine "o 5.0 @ ||J,PL-U,SM,FeOx 31 grained,dark gray),dark I 16 87% green with zones of red tint,N 100%@ |J,PL-C,SM,FeOx 53° L medium grained,very strong |/ a (R5),DIORITE (Continued)\ | NN ie @ |J,PL,SM,FeOx,Ca 67° -«i"J,PL,SM-R,FeOx 26°4 '|J,PL,SM,FeOx 64° | |(@ |,PL,SM,FeOx 7 a in 'a 'J,PL,SM,Ca 54° | |>@ |J,PL,SM-R,FeOx 51° 1 85 \"50 -+ {9,t \ 7 80%Drilling Ratersil100%@|J,PL,SM,FeOx 77°(7/20/12): i vo [4 47.8 to 122.8 N feet (rock), [74 @)|J,PL-C,SM-R,FeOx 44°11 hours,6.8 \feet/hour \ ag N 4 ir /.]@ |J,PL,SM,FeOx 59° | N g ly 4 4 _|3 \@ |J,PL,SM-R,FeOx 71° 2 4 @||J,PL-C,SM,FeOx ae | a a 1 t e J,PL,SM,FeOx 38°q _§I? 3 \ ; L Loo |£.50 @ |J.PLISMR FeOx 61°FR |R6 a3Si;5.0nNfaa]9 |lex8[|100% a =v4 @ |14,Pil,SMR,FeOx 22° Jfo] Cc £\ s r y @ (J,PL,SM,FeOx 52° "4 i 92.0 feet:Approximately | 0 7 0.1-foot-wide discontinuity of |\@)J,PL,SM,FeOx 72 iron-oxide-stained,extremely '| weak (RO),clay and medium sand 1infill\a r @ |J,PL,SM-R,FeOx,CL 69°| 4 |'.a 1 ':®|J,PL,SM,FeOx es Lo \ie i 7 @ /J,PL,SM,FeOx 54°7 { ['@ |4,PL,SM,FeOx 57° a r 95 Run 19:Numerous,|38 .J,PL,SM,FeOx,Ca 35°7 iron-oxide-stained joints (very tight_>19 .76% to partially open)vo 100%@|J,PL,SM,FeOx 73° i N L @ ||J,PL.SM,FeOx 34°4 t 7 _| \ I e J,PL-l,SM-R,FeOx 18° '\ rar = -\ .!@||J,PL,SM,Ca 42° ie @||J,PL-U,SM,FeOx 38° a 1 J N rn a 205.°20 82%@|J,PL,SM,FeOx 74 -|*°@ |J,PL,SM-R,FeOx 6°Lo 7 oq 100% | |®J,PL,SM,FeOx 36° =[7 }=100 Log continued on next page : =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fiqure=DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine g=Goider A-5AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc. DRILLING DATES:7/18/12 to 7/24/12 DATUM:Ground Surface ELEVATION:1877.6ft SHEET 6 of 16 INCLINATION:-69° AZIMUTH:60°ECannon3/8/13LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 _E:1.885.044 a »joint B-Beddin:BLP einar i lished aon Ep-Epidote oe arte @ Axali-Beddit -2 ¥-'g FFaut FO-Folaten -C-Cunved KSickensided Bx-Breccla -FeOrlron Oxide SaSand CO Diameral x |g|z2 le Vien”GROrhogonal StStepeed'RRovwn --Ehehbrte «Heetietvatte -Srsuea ||SOP =Fo =CO}a |B)&LRFrcture Fimeguar _VRVeryRough CaCacte MLSit Su-Sulphide 589 a NOTES uw lo DESCRIPTION o KH 2 vad DISCONTINUITY DATA z aap 7 WA ST.Eo|Z z /=5|2]88)rao |eractures |Sy Ox S|fon]xxx TER LEVELS x ae\z/°°txr2 TYPE and =Szu\ezu neds 8©ju -|5|2)%PERFOOT |29%SURFACE 28 Quo /geS|eenn &&6 |o jz)*one DESCRIPTION go |e Eee ee eo ox|400 a ;BFa|aw owl PR se I ic)®eeeee© 71.9 -130.4 \ | Fresh (FR),by |iron-oxide-stained joints,\ rehealed calcite joints,very | -close to wide spaced L '5.0 7 fractures,xenoliths (fine 4 5.0 6grained,dark gray),dark \20 82% green with zones of red tint,»100%@|J,PL,SM,FeOx,Ca 7°-LL medium grained,very strong [/| (R5),DIORITE (Continued)an XN in / .J,PL-C,SM,FeOx 19° a |J,PL,SM,FeOx 28°J N Ly | \ \ L N 4 ++ \ 1 N -105 an 5.0 4 I 21|©||7a%@ |J,PL,SM,FeOx 63°MJN r 7 100% \@ |J,PL,SM,FeOx 65° a Approximately 106-107 feet depth:l 4 near-core-parallel rehealed calcite}.'joint,very tight to partially open 4 e ° joint.vO J,PL,SM,FeOx 69°| a \@ |J,PL,SM-R,FeOx 50°2 ty _| \ 1 «J,PL,SM-R,FeOx 23° NN a r" Changed drill = an bit at 107.8 =.feet. g be @ |J,PL,SM,FeOx 65° L &an @||J,PL,SM,FeOx 38°Z a NX2L &an e J,PL,SM,FeOx 28° c |50 FR |R5t-110 re ty |50 4 N \22 58% 3 | g >100%@ |J,PL,SM,FeOx 60° aE 2 \ ;@ |J,PL,SM,FeOx,CL 65°_7 é \ an e J,PL,SM,FeOx,CL 26° =1 4 \ ly /. \ a » 4 eo @ |J,PL,SM,Ca 68°\'a 1 \lS 'XN L-Neo @ |J,PL,SM,FeOx 69°4 \PL,SM, !> r > |«J,PL,SM,FeOx,Ca 27° \ 115 l 5.0 +4 |>23)°°|100% an 100% t »= Ly | an @ |J,PL,SM,FeOx mh| N =ly 4 4 ( NX ly /. L \| '\ Ly |: vy 38 @ |J,PL-+,SM,FeOx 64° L->24)||,86%|Lo @ |[J PL,SM,FeOx 29°a "oq 100%[ 1 @ |J,PL-C,SM,FeOx 51° N rosa 4t20Logcontinuedonnextpage __DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiADRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure Ci older A-5 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Associates DRILLER:T.Fisher CHECK DATE:1/9/13 ECannon3/8/13342.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WéRECORD OF DRILLHOLE DH12-1 SHEET 7 of 16 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12to 7/24/12 ELEVATION:1877.6ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 __E:1,885,044Tyi -8 Md jomt B-Bedding Be nae Loa kere Sacte Ep-Epidote oe ar @ Axal4F-Fauk -FO-Fohaton --C-Curved K-Shckensded Bx-Breccia FeOxiron Oxde Sa-Sand 0 Diametral x If 9)2 le Viven OROrmogenal StSepeed?ReRcugh CHER brte |eects SPAR [EePe2CO)SB]&[Frere Fimegular _VR-VeryRough CaCakie MLSit Su-Sulphide 280 A NOTES w -1o DESCRIPTION 97s)e$8 DISCONTINUITY DATA =ase TESTS a >rT f/x 2160 =o wipx|tox |«xxx WATER LEVELS z a2 |FelZ]oo]Rap |FRACTURES |#0 TYPE and Fd Sou EEO ABERS€je i351 2)%PERFOOT |29%SURFACE 88 |2e2/Ge2 (Sins fF420aOo{Oo |/&SBE8iawool®Pa gh DESCRIPTION go 5 "Wweso 9 x 719°1304 N |@ ||J,PL-U,SM,CL 28° res ,ros iron-oxide-stained joints,v4 rehealed calcite joints,very | r close to wide spaced |5.0 4 fractures,xenoliths (fine in 5.0 |! grained,dark gray),dark 24 86%)||green with zones of red tint,400% \medium grained,very strong [7 4 (R5),DIORITE (Continued)an N ty | L ' |Hole 4 \advanced to ir /.@ |J,PL,SM-R,FeOx 62°122.8 feet on i} |'J,PL-l,SM,FeOx 51°THON. L N 4 74 @ |J,PL,SM,FeOx 56° \:|N i] -125 Run 25:In-situ joints very tight to |\”7)28 @ [J,PL,SM,FeOx ar FR |R5 . 7 Partially open,iron-oxide stained,|25|91%: calcite infill » 7 FI'99%@ |J,PL-ST,SM,FeOx 44° a \! 4 N | he ; i L |\ ; @ |J,PL,SM,Ca 59°4 vq @ |J,PL,SM,FeOx 51° I N a oa Changed drilf 4\ |bit at 127.8>N e J,PL,SM-R,FeOx 20°feet.g be '@|J,PL-I,SM,FeOx 77° a i \ \J,PL-l,SM,FeOx 25° aa. 8 voi130=L 'I.4 "i /1755.926|©|ja%9 130.4 -134.8 Ht 1130.4Moderatelytoslightly=)99% 5 '&|weathered (MW-SW),r * e V,Qtz,CL 20°4 €|_iron-oxide-stained joints,a y8closetowidespaced\ fractures,0.5 inch quartz A a vein,0.75 inch RO clay infill,=f | 4dlighttannishgray,medium » grained,extremely weak to a y MW |ROstrong(RO-R4),ALTERED NG to toDIORITEUe1SW|R4 133.2-134.5 feet:Broken core in a bd J,PLA,SM-R,FeOx ar zone of low dip w.r.t core axis ==\@ J,PL-l,SM-R,FeOx 69° discontinuities,inferred as \i F ”*°J,PL-l,SM-R,FeOx 36° a mechanical breaks.a \rs UPL SM-R'FeOx 36°J \ " =751. 435 134.8 -189.3 "34.9 |5.0 = Fresh (FR),t 7 5.0 iron-oxide-stained joints,\27 99% rehealed calcite joints,very \100% close to wide spaced [| * -fractures,xenoliths (fine vq 4 grained,dark gray),dark 1 green with zones of red tint,N medium grained,very strong in 7. L (R5),DIORITE j 4 e -Fi °['|J,PL-I,SM,FeOx 31 FR RS \ \ 5 \-| be | N u 5.0 :e J,PL-C,SM,FeOx,Ca 9° i L >|f2a}9 |)94%.7ve100%@ ||J,PL,SM,FeOx 34 |»||@f 1d,PLA,SM,FeOx 39° a Vy pio || _140 Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Figure er DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine i 5. DRILLER:T.Fisher CHECK DATE:1/9/13 - lates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 8 of 16 INCLINATION:-69°ECannon3/8/134103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCORILLHOLE]Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° ATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 _E:1.885.044 8 J-Joint bo Borched itpette Ep-Epidote.ae arte @ Axal 4 Fault _K-Slickensled =Bx-B FeOx-Iron Oxide Sa-Sand O Diametral VT}QO oc Nien tepoed?Roshth Chentrte Hneteeatite sesica®bof.3 i}Wl &|FR-Fractu VR-Very Rough CaCakte ML-Si suSuipnise |S50R NOTES o DESCRIPTION e 2/eu DISCONTINUITY DATA =or WATER LEVELSza2/398)rap TYPE and o,[SZR/ELRISAEA y 5 e 3|=|%SURFACE £8 |ge2 dg2(8ere Fao33e8DESCRIPTIONsPAouso F 134.8 -189.3 Fresh (FR), iron-oxide-stained joints,o rehealed calcite joints,very J,PL-l,SM,Ca,FeOx 12 close to wide spaced 5.0 fractures,xenoliths (fine 5.0 6grained,dark gray),dark 94%J.PL SM.Ca 44°green with zones of red tint,100%coe medium grained,very strong {R5),DIORITE (Continued) J,PL,SM,FeOx 65° J,PL-t,K,SM 69° J,PL,SM,Ca 36°44 J,PL-C,SM,Ca 9° J,PL,SM,FeOx 76°F 5.05.0 |100% 100% J,PL,SM,FeOx a 5 J,PL,K,SM,Ca 73°| 5fa]J,PL,SM,Ca 71°P|o rs)J,PL,SM-R,Ca 22° =FR |R5 o a8 J,PL,SM,Ca 73° N "}100%3 400% = 2 J,PL,SM-R,FeOx 64° 3 oO J,PL-l,SM,Ca 47°a'CAA FE °Drilling RateJ,PL,SM,FeOx 34 (7/21/2012):122.8 to 182.8 feet {rock),11 hours,5.5 feet/h e®J.PL,SM,FeOx 58° aie @,(J,PL,SM,FeOx 44° 5.0 J,PL,SM,FeOx 42° 5.0 87% 100% J,PL-C,SM,FeOx 54° 156.2-156.8 feet:Light tan,fine to medium grained intrusion withdiffusecontactsapproximately0.25 inches wide J,PL,SM,FeOx,Ca 67° j 159.25-159.4 feet:Approximately 0.75-to 2-inch-wide,dark green,| in-situ fine grained,intrusion,° approximately 30°dip w.r.t.core J,PL,SM,FeOx 71 rmaxis,sharp contacts 49 J,PL-ST,SM,FeOx 13° 5.9 |I71%159.5-160.2 feet:Zone of broken 98%core with at least seven °° iron-oxide-stained and rehealed J,PLH,SM-R,FeOx,Ca_12 calcite joint discontinuities, possible mechanical breaks.L |@J,PL,SM,Ca 81° Log continued on next page ae DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureA\4 DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine IgurFGolderaA-5 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 9 of 16 INCLINATION:-69°ECannon3/8/13}12.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 __E:1.885.044T;roughness i 7aJonB-Beddin Sener Bo 'olished iBone Ep-Epidote Ot Quartz @ Axal =F-Faut FO-Foliation -C-Curved K-Slickensided ©Bx-Breccia FeOx-lron Ode Sa-Sand O Diameval =>SH-Shear (CQ-Contact U-Undulating =SM-Smooth CL-Clay G-Gouge Se-Sencite EAMxWwQa|@ >Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte _Hm-Hematite Si-Siica 59F=NOTES7e\=9 z u Ze |FR-Fracture irregular VR-VeryRough CaCalite ML-Silt Su-Sulphide 3 $id g TESTS w=lo DESCRIPTION ok 3/ee DISCONTINUITY DATA =aap Ss o |Z Zz IE_!2/99 =oT vex|tox|«xxx WATER LEVELS =a jEs 83 |Rao |FRACTURES |Wo TYPE and 2,|SSS/ESS ASSESOo&lw |5)8 %PERFOOT |29%SURFACE ag |oue ge2 Sins freeke6|9o |z gseeg|avons pa ef DESCRIPTION g-("5 |="ese g z 134.8 -189.3 \J,PL-° Fresh (FR),7 ,PL-U,SM,FeOx 88' iron-oxide-stained joints, rehealed calcite joints,very | -close to wide spaced '49 4 fractures,xenoliths (fine an 5.0 |grained,dark gray),dark 1 32 71% green with zones of red tint,98% a medium grained,very strong / | {R5),DIORITE (Continued)| N '| \ =I 4 4 N Ly | \ | 5 \4 / \ | N e : ° 465 v4 5.0 J,PL,SM-R,FeOx,Ca ia t-|| !33/59 |"sqa%e J,PL-ST,SM-R,FeOx 43) 7 100% \ e !1 4 'j oe J,PL,SM-R,Ca 38° 4 | tL »@ @|4,PL,SM-R,FeOx 70°7 in J,PL,SM,FeOx 38° | '@||jd,PL,SM-R,FeOx 17° 5 oq 4 |@|J,PL,SM,Ca 78° 3s N @ z 4 j a \e@)[JPL SMR,Ca ar 4 » 8 4 : =fl J,PL,SM,FeOx 53 AA ER R5 --170 o Run 34:Broken core zones ;58 ° 7 "|(represented by "*"symbology to |,7 34)°°85%@|J,PL,SM,FeOx,Ca 74 [ ] 3 |right):169.7 feet,approximately 1 6¢g 0.25 to 0.5 inches wide zone;\100%AK G =170.6 feet,up to 1 inch wide zoner 7 _|2 an @/J,PL-ST,SM,FeOx 77°|1 8 \@/J,PL,SM,FeOx 74°| '| \ E fl 4 N "4 a 172.8-173.0 feet:Broken core,|@ |J,PL-ST,SM,FeOx,Ca 68°J iron-oxide-stained and rehealed /[ calcite joints,possible mechanical), ]breaks.| '\ =\'4 | \@ J,PL-l,SM,Ca 80°-+-__] vq t-175 (5.0 ° _ .J,PL-ST,SM,FeOx 56'175.1-175.6 feet:Broken core,N 5.0 ';* ' iron-oxide-stained and calcite val 35 82%@J,PL-U,SM,FeOx 88° rehealed joints,possible 100% mechanical breaks..t L Oo 4 |@ |J,PL,SM,FeOx 68°N '1 1 v4 > 4 |@||J,PL-U,SM,Ca 47° NX ion =|4 \ /- \ , 2.0 i .36|©°|400%7 vq 100% |J,PL-U,SM,Ca,Possible .ol:,SM,Ca,67° i 180 ya K tS | Log continued _on next page 103-95560Wi=IM GoldPrcotder DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-5 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 10 of 16 INCLINATION:-69° DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.828 __E:1,885,044 a yy 7 Re Infitling Py-Pyrte @ Axal 8 fie,eget,oe ee in SE,SY |Opametalximo|>le Wen GRonncoonal eee Ror =GREKorte Finerismatte -Sesiea®5aenEe2is)iz iw %|FR-Fracture nye VR:"very Rough Ca-Calcite ML-Sitt 3u-Sulphide z8 2 g eats a |DESCRIPTION Qt.8|es DISCONTINUITY DATA =aoe STS a z Ei/z |2/566 =ovis |tox|= xxx WATER LEVELS <a|Fe|2}60]ROO |FRACTURES |Eva TYPE and Q sh Eos ASES&éjw=|3]/2 %PERFOOT |29%SURFACE 23 i9u9 gee g INP 1804 o |?|g8¢e|v+v0o@2 pa sh DESCRIPTION 5 |%eese 2 x134.8 -189.3 Fresh (FR),ry Jiron-oxide-stained joints,° tehealed calcite joints,very |@|4,PL-ST,SM,FeOx,Ca 72 p>- -close to wide spaced L '5.0 7 fractures,xenoliths (fine 4 50 grained,dark gray),dark {36 100% green with zones of red tint,»100% a medium grained,very strong |/ 4d (R5),DIORITE (Continued)( NX ty _| a Hole 4|e J,PL,SM-R,FeOx 13°advanced to r 7.|182.8 feet on \\7/20/12. L \4 "4 @ |J,PL-C,SMR,FeOx 55° ,FR |R5 N 1 185 eon 47 4 |37|59 |]/e8% r/o 94%\@ |J,PL-ST,SM,FeOx 70°\/fo Pp -\°J,PL-C,SM-R,Ca 35°7 {'@ (J,PL,SM,FeOx 58° 187.2 feet:Light reddish tan,very \| fine grained,quartz vein up to \i -0.25 to 0.4 inch wide,with white,|4 ALTERED DIORITE from r 7 approximately 186.9 to 188.0 feet |' NX a /.Drilling Rate 4 189.3-189.8 feet:Broken core,\(7/22/2012).=|possible mechanical breaks in .|1828to2additiontonaturalbreaks.>192.8 feet E VI (rock),2.5 j 5 \_1700.9 hour,4.0 FJ :feet/hour$|189.3-192.1 189.4 ; u y©]Moderately to slightly @ |J,PL,SM 60 189.6 ft ¥. |490 €(MW-SW),jointed 5.0 10/1/12;VWP i” |(approximately 60°dip w.r.t.50"|core axis),very close to 38)52%mw!Rt3closespacedfractures,100%|altered,light green,medium sw Bi-'m|grained,very weak to 4 |medium strong (R1-R3), 8 ALTEREDDIORITE/FRACTURE ZONE r 698.490.3-193.2 4d <192.1 -242.8 "92.1 feet:Broken 2 L e J,PL,SM,Ca 19°core, 3 Fresh (FR),7.possibleiron-oxide-stained joints,\mechanical Se tehealed caicite joints,very |e J,PL,SM,Ca 14°breaks in JFSclosetowidespaced'@ |J,PL,SM,Ca 66°addition to o fractures,dark greenish gray vq natural8withzonesofredtint,|breaks.medium grained,very strong \@|J,PL,SM,CL 74°Hole or (R5),DIORITE 4 %J,PL,SM,Ca 6"advanced to 7 2)\J,PL,SM,Ca 63 192.8 feet on NXyg>|45 721/12. el \45 4of1953976%@ J,PL,SMR,FeOx 51° 8 .100% x on |a +»FR |R5 7 e ao 2 . at /4 Ss vn @ |J,PL-ST,SM,FeOx 50° |<>N <\7. a ; 4 ,39 5 >Jao}9 |00%a ] ra]N 100%4 5 'on *J,PL,SM,FeOx 51° A ( <\|@ |J,PL,SM,FeOx,Ca 47°ZL 200 :| Ps --continued on next page=DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8@GIdDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine gureEsolderA-58PFGeldiates ECannon3/8/132.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WéPROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 11 of 16 INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 __E:1,885,044 a id joint B-Bedding Ep-Epidote oe uartz @ Axal |site,Semel §cones Om"sae,|SOaretsxilo}a a V-Vein OR-Orthogonal Hm-Hemnatite sr Sica °5 [=]NOTESFolsoO);a /¥2%|FR-Fracture Eler ML-Sitt Su-Sulphide 55oF|wos}wu es TESTSWwOoDESCRIPTIONQS|)a>DISCONTINUITY DATA zl WATER LEVELSoa12zlE=|2|88)rao |rractures oS SOx ESS |ASKSir@(22|2z/°9 9 Ze |8§a|z2a|oen8O2|eo)5 iv %26 |SHS/UE2 |B Sna6«geea|n+cee g-|5 IF ees200192.1-242.8 40 "100% Fresh (FR), iron-oxide-stained joints,35° rehealed calcite joints,very -close to wide spaced 7 fractures,dark greenish gray 2.5 with zones of red tint,2.5 9 4 "41 94%medium grained,very strong 5 : .(R5),DIORITE (Continued)100%73°bh]d J,PL-C,SM-R,Ca 33° 61° -205 50 _ 42|59 |'100% 100% 42° |65° 4 44-4 L 4 _J,PL,SM,FeOx,Ca 59° §56°&J,PL,SM,FeOx,Ca 70°- L é J,PL-C,SM,FeOx,Ca =63°4 2 8 30° <FR 210 13 5.0 R5 4ov43|©|)g5%se)i]100% = a >4 &36° 5) L "-4 214.4-214.8 feet:Light reddish °tan,approximately 10°dip w.r.t.23 core axis,fine to medium grained,215 felsic intrusion,approximately 14 20inchwide441 400% 100% 5.0 ;45|59 ||98%4 100% y_220 Log continued on next page 7 Gard DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureAV\z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentineé.E Golder me.:G.A-5AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-1 SHEET 12 of 16 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 _E:1,885,044 T Shay Rougmness InfillaaMjointB-Bedding PL-Pianar Po-Polished Br Bitte Ep-Epidote Oeduore Ohne! =F-Fautt FO-Foliation C-Curved --K-Slickensded =Bx-Breccia.©FeOx-lron Oxide Sa-Sand ODiametral xz |b o}eie Gen GROrhogonal SiStepoee”Rowe.GhGherte Hortowate Sena |GOPFe39zwy2|FR-Fracture kirregular VR-VeryRough Ca-Calcite -ML-Sift Su-Sulphide 289 g woues w-|o DESCRIPTION ok 2/28 DISCONTINUITY DATA xz,ase a jz =/E_|2|98 am 3 xbxltox|x xxx WATER LEVELS z &jbe/Z|O9|Rov |FRACTURES |$x TYPE and Fo |S2Z45/<2dlaano 8Fs3oe}3 a %PER FOOT 29%SURFACE Fas)Navas ebz Sina FoO°e BSeesgl|la+owe Pg gh DESCRIPTION Fs A eso oF &220 7921-2426 T S|1S.PLU,SIER,possible , Fresh (FR),L ,|mechanical break along iron-oxide-stained joints,\Ca vein rehealed caicite joints,very | -close to wide spaced ['5.0 t @)J,PL-U,SM,Ca 1°4 fractures,dark greenish gray |,"45|©||agx '@ |J,PL,SM,Ca 69° with zones of red tint,|°| medium grained,very strong N 100%| L {R5),DIORITE (Continued)I / - 220.9-221.4 feet:Slightly altered [||zone,lighter green color,possible |° fine to medium grained intrusion |," |@;|,PL,SM-R,Ca "4 riling R -223.0-225.75 feet:Zone of at |(71232012),| least four reddish tan,felsic L.192.8 feet tointrusions,diffuse contacts,driller |,7 }252B featindicatesharddrillinginthese| .8 feel a zones.intrusions range from N : (rock),10.75 4 approximately 0.75 to 1.25 inches;,_|hours,5.6 wide,with dips ranging from 13°|\feet/hour to 51°w.r.t.core axis.l N pf ¢at 4|225 \58 @ ju,PL,SM,Ca 57° |46)°°|})94% ir /|100% -|e J,PL-C,SM-R,Ca 12° 7 Ty '|@ |J,PL-C,SM,Ca 70° \®,|J,PL,SM,Ca 65° - \J,PL,SM,Ca 77°7 7. \ I S a 4 \= | 5 \ o r /¢i] a 5 an @ |J,PL,SM,Ca 54°| a \@/J,PL-ST,SM,Ca 74°§hy @ |4,PLST,SM,Ca a2 |S °FR i 230 |5 >5.0 . R5 4 "i ee 47 5.0 400%e J,PL,K,SM,Ca 19 |g N 100% -2 eon °J,PLST,SM,Ca 14°J £(5 N °r 7 |@||u,PL,SMR,Ca 36° |231.8 feet:Reddish tan,anofelsic/quartz intrusion,N 7 5 approximately 0.75 inches wide,oO diffuse contacts,35°dip w.r.t.\7s core axis | cL 232.1 feet:Reddish tan,\°Changed drill 4 2 felsic/quartz intrusion,t yi] °J,PL,SM,Ga 37 bit ato 8§approximately 0.75 inches wide,|\. e J,PL,SM,Ca 44°feet. g 35°dip w.r.t.core axis |: N L >|®||J,PL-ST,SM,Ca 32° ar \ 7 a \2 \ 3 r/4 @ ||J,PL,SM,FeOx 31° Sh 235 I 5.0 J,PLI,SM-R,Ca 11°4 °|*4a)5°|lra%Z 235.4-235.7 feet:Broken core,\"5eefracturesmaybemechanical;100% ot .4 io)in / e J,PL-C,SM,Ca 29° a ©N we ./4 4 oO \ 2 ] <\ a \7zet238.0-239.1 feet:Alteration zone |7 2 of slightly weathered to fresh L ,(SW-FR)DIORITE mm 5.0 @ ||J,PL-ST,SM,Ca 20° al .49|©|79%| q 7 100%|@ ||,PL-C,SM,FeOx 32° 2 $2 | S P7240 Log continued on next page "|[a =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8€.LMF Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine rer€a i -_ :+DRILLER:T.Fisher CHECK DATE:1/9/13|W&A Associates ECannon3/8/13312.GPJLIBRARY-ANC(2-8-13).GLB(ANCDRILLHOLE]103-95560WsRECORD OF DRILLHOLE DH12-1 SHEET 13 of 16 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,828 __E:1,885,044 Q Ty -Shay Roughness.Infilling Py-Pyrite @ Axalfo)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotte Ep-Epidote Qtz-Quartz =F-Faut FO-Foliation -C-Curved K-Slickensided ©Bx-Breccia FeOx-Iron Oxide Sa-Sand 0 Diametral -SH-Shear CQ-Contact U-Undulating SM-Smooth CL-Clay |G-Gouge 3e-Sencite x w Q@/2 |e >|vven OR-Orthogonal ST-Stepped R-Rough Ch-Chiorite Hm-Hematite i-Silica 50g.NOTESEe=°d u @&|FR-Fracture Hrregular VR-Very Rough Ca-Calcite ML-Sitt 5u-Sulphide 55 2 g TESTSw-}o DESCRIPTION o }-2/#e DISCONTINUITY DATA x ase EST; a |Z Zz jiz_|2/98 =o-ykx|tox|»ves WATER LEVELS ir a |be/ZS]oo |Rao |FRACTURES |3ye TYPE and 2,|oeil eat ABSA ypOo@[a |35|@&%PERFOOT |29%SURFACE 26 |eez weZ Bins|240 a )cs SBeg|ax owe PE gs DESCRIPTION %5 eeso 9 & 192.1 -242.8 a Fresh (FR),t 7 |iron-oxide-stained joints,\e J,PL-U,SM,Ca 16° rehealed calcite joints,very | F close to wide spaced >5.0 FR 4 fractures,dark greenish gray |\°>5.0 @ |J,PL,SM,Ca 57° with zones of red tint,I 49 78%RS medium grained,very strong '100% a (R5),DIORITE (Continued)in 7.e J,PL,SM,Ca 27°4 .!@ /J,PL,SM-R,Ca 51° [7 1650.9 a 242.8 -246.3 AH p42.9 @ |J,PL-ST,SM,QtzV 47° 4 Slightly weathered with =i @ 50° zones of highly weathered *243.2 feet:(HW-SW),iron-oxide-stained a \Approximately joints,close to moderate NN e J,PL,SM-R,FeOx 31°1.5-inch-wide [spaced fractures,light HW \zoey q whitish gray,medium = 0 HW OV, grained,medium strong s @ |J,PL,SM,FeOx 68 to R3 medium-to (R3),ALTERED DiORITE we Q Sw coarse-sand |245 N 5.0 sized,RO-R3,_I it 5.0 >AlteredAan5072%e J,PL,SM,Ca 38'Diorite;50° 100%dip w.r.t.coreaQaxis i \4647.7 7 246.3 -258.2 \"B46.3 Fresh (FR),rehealed calcite |},_| a joints,very close to \° moderate spaced fractures,N |@)|J.PL,SM-R,Ca 46 T dark greenish gray,medium ° grained,very strong (R5),\/>q J,PL-ST,SM,Ca a7 DIORITE { a 245.0 feet:Approximately 1-to L s 7 |2-inch-wide zone of highly \"4 e J,PL-ST,SM,Ca 31° 2]weathered (HW),medium to |gE coarse-sand sized,extremely Ny a o weak (RO),Altered Diorite,zone |,|dahas42°dip w.r.t.core axis \ ©I 38 L y @/J,PL,SM-R,Ca 79°|__| L250 |5 '5.0 = "|s 51|59 iI)a4%3 vo 100%@ |4,PL,SM,Ca 20° =l @ J,PL.SM,Ca 84° n Dm N 4 &fvwfs}\ o |@ |J,PL,SM,Ca 55° a 4 FR |R5 _ \ \@ (J,PL,SM,Ca 57° roa |an oo Hole 4 N advanced to ry _|252.8 feet on Mi @ |J,PL SM,Ca 56°22/12. i N 4 +| \ ;®|J,PL-U,SM,Ca 62° XN |255 4 5.0 4 52|5°||98% Ly |100%||,PL.SM,Ca at \ L ;4 256.15 feet:In-situ calcite N rehealed joint,11°dip w.r.t.core F /_|axis,very tight to tight,series of |\ i three joints .!@ |J,PL,SM,Ca 50° r/4 @)J,PL-C,SM-R,Ca 73°IN | 'HW |ROiby Installed 4\/1636.NO_CORE to |to dritbitat258.2 -259.2 A 258.2 sW |R3 257.8 feet.Slightly weathered to fresh =N 5.0 Sw |R3(SW-FR),reheaied calcite y '53|5-0 |||goog to |to -joints,dark greenish gray to =635 °FR |R5 4 teddish tan,medium grained,"p59.100%medium strong to very [ : strong (R3-R5),ALTERED ao FR |RS t-260 DIORITE.l _ Log continued on next page at DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj(2)Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine asLI> CON : \&,Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 14 of 16 INCLINATION:-69° &,Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12 to 7/24/12 ELEVATION:1877.6 ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.828 E:1.885.044 i Fl y8MaanB-Bedding Beane «Bo Borthed ot Botte Ep-Epidote Ot Quartz @ Ava 2 F-Fautt FO-Folation C-Curved K-Slickensxied Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametral im eo]Ble ven SR-Onhogonal Srstepoed?Brow Chehoite Hnerlevatite eoee 5a==|=is}a wi)2%|FR-Fracture Fineguar VR-Very Rough CaCacte MLSit Su-Suhide |2 veerswiSloDESCRIPTIONgrosasDISCONTINUITYDATAzeoeWATERLEVELSz@|e-|Z]/831 rao |rractures |Exe TYPE and 2.|S2R/E28 |S SzS&@ |g=/3)8 %PERFOOT |29%SURFACE a3 |Que wee Brnoi)6 |o |&83e2|a<002 3 g DESCRIPTION go 5 eesoo xg--260 259.2 -264.8 L Fresh (FR),reheated calcite +,_}joints,wide spaced \ fractures,dark greenish .' -gray,medium grained,very Ly 5.0 7 strong (R5),DIORITE on 5.0(Continued);53 92% '100% a r 7.4 'FR |RS N L ;| \|.\4 f 4 J \ 1 Run 4:RQD estimate of 50%|>4 based on R2 or greater core.4 e@ |J.PL-ST,SM,Ca 50°;.,SM, \__1630.4 |265 264.8 -267.3 7 ped |50 a Moderately to slightly =i 5.0 ||sqaweathered(MW-SW),quartz >54 . and fine-grained pyrite in a 100% veins,very close to mw ;RO a moderate spaced fractures,Hf to to T light whitish tan,medium =)sw |R4grained,extremely weak to » strong (RO-R4),ALTERED "y a DIORITE NS 628 266.9-267.8 7] 1,- - °feet:Brok2673-3004 ber.J PLC,SM,Ca 28 core,mary.Fresh (FR),rehealed calcite +;_|°fracturesjoints,very close to wide \J,PL,SM,Ca 61°inferred asrspacedfractures,dark .|J,PL,SM,Ca 27°mechanical 7 =|greenish gray,medium L > J,PL-C,SM,Ca 28 breaks.2 grained,very strong (R5),vq &)DIORITE |@ |J,PL,SM,Ca 65° 5 C|268.8-269.5 feet:Brokencore,|, 4 @ possible mechanical breaks.orn 6 ((3) g LY R4 270 [6]270.0-271.2 feet:Broken core,|\"Be to 7 "|possible mechanical breaks..|55|*84%RS 3 7 100% =\ -2 |@ ||J,PLISM-R,Ca 27° 7 6 t 7 J «J,PL,SM,Ca,Qtz 23°is)\ | .\4edtv]Run 55:Lost S vy @ ||J,PLU,SM,Ca 31°circulation oO N a sl.r/-©)|J.PL SMR,Ca 40 Drilling Rate 4 E 273.2-274.4 feet:Reddish tan,vee)oO very fine grained,quartz intrusion,|FR 2928 feetwuapproximately2.5 inches wide,r7 10 75 hours ot 14°dip w.r.t.core axis \37 feet/hour 4 rel nN =[74-! ={ &}275 >88 °J,PL-ST,SM,Ca 19°4 9 on 56)400% !=\100%@ ||u,PL,SM,Ca 23° a r 7.=of \°! a \R5 %eowe|4 gS [NPg/| >\ a I ef L »@ |J,PL,SM,Ca 51°4 o \/]7 5.0 >|*5.0 5o/ ]57 90%JOr\ N '100% 4 »e J,PL-C,SM,Ca 39° [74<vq215901 4SLogcontinuedonnextpage ==DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Figure8AGIdDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine g 8 ©Golder A-5 se] Oo PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-1 CLIENT:MWH Americas Inc. DRILLING DATES:7/18/12 to 7/24/12 DATUM:Ground Surface ELEVATION:1877.6 ft SHEET 15 of 16 INCLINATION:-69° AZIMUTH:60°ECannon3/8/13_012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560VW....Associates DRILLER:T.Fisher CHECK DATE:1/9/13 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.828 _E:1,885,044 Q Jfont --B-Bedding PlPana fORoishes --Braicite Ep-Epidote Ob dure @ Aaal z F-Fautt FO-Foliaton -C-Curved K-Slickensided 8x-Breccia FeOx-tron Oxide Sa-Sand O Diametral x EF oO >ven OROtngnal Sr sipoce!aRowa Cher brte Bae ratite ese?59Fo=io}z i %|FR-Fracture ineguear VR-VeryRough CaCalte ML-Silt SuSuiphide |3S NOTES w=|e DESCRIPTION 2K 2)¢e DISCONTINUITY DATA z |, a”WATER LEVELSFo&|FelZ|388]Rao |Fractures |$¥e TYPE and o /xoslign|aang x 2 |B=|/5;2]%PERFOOT |29%SURFACE 28 |2B2 |GEe |B enn[oa]oO "S888 |ue owe PEs DESCRIPTION aa 5 eese z;_260 267.3 -300.4 .|Fresh (FR),rehealed calcite 7.°joints,very close to wide ba J,PL-C,SM,Ca 22°spaced fractures,dark |J,PL,SM,Ca 23° t greenish gray,medium »5.0 4 ./=R5grained,very strong (R5),4 7 5.0 9)DIORITE (Continued)5 90% »100% ad /- 4 I °e J,PL,SM,Ca 6° \J,PL,SM,Ca 39° / a |4 NX 7 J a NX 4 7 | \ N 7-285 a8 R4 .!$8)100%.°J,PL-U,SM,Ca 7°to ;100%RS a 285.9-287.0 feet:Broken core,|@ |J,PL,SM-R,Ca 48°4 possible mechanical breaks in \ addition to natural breaks.7. \ a 'e J,PL,SM-R,CL 15°7 \ NX a / om c \ 2 NN ®/ | |5 °\ 3 | 2 ;@||J,PL,SM,Ca 45° -290 |3 '5.9 FR 4 "i -|s9]&°|foa%Ce)|ie}\100% ||e | 4 P=)!@ |J,PL-C,SM,Ca 67° fo]N°;_|®||J,PL-C,SM,Ca 37° a \4 N 7. 292.8 feet:Dark gray to black,\ e J,PL,SM-R,Ca 11°Holeifinegrained,mafic intrusion,up to 7 approximately 0.25 inches wide,'4 oecod'011°dip w.r.t.core axis .|7/23/12. a 7.R5 4 |@J,PL,SM,Ca 85° \@ |J,PL,SM,Ca 57° os 46 |295 |60!46 |o1%@ |J,PL,SM,Ca 55°4 / 100% I a N 4 |,;@ (J,PL,SM,Ca 58° N Drilling Rate i rm (7/24/2012):4 ;292.8 to N 300.4 feet, 7 3.5 hours,2.2L.|@ |J,PL-C,SM,Ca 60°feet/hour 4 N rm 2.5 ||i!®|J,PL-U,SM,Ca 65° |61)9 |170%L Ny 4 7d 83% I '\ a 7.Li 4300Logcontinuedonnextpage° __a DEPTH SCALE:1i :.:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.A E Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine ree€ 103-95560WATANA2012.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannon3/8/13RECORD OF DRILLHOLE DH12-1 SHEET 16 of 16 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-69° PROJECT NUMBER:103-95560 DRILLING DATES:7/18/12to 7/24/12 ELEVATION:1877.6ft AZIMUTH:60° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.828 __E:1.885.044Ty;Roughness lefillii Py-Pyrite @ AxialJ-Joint B-Bedding PL-Planar PO-Polished Bt-Biotte Ep-Epidote Qtz-QuartzF-Faut FO-Foliation ---C-Curved KSlickensided Bx-Breccia FeOxlron Oxide Sa-Sand 2 Diametrat SH-Shear CO-Contact U-Undulating =SM-Smooth CL-Clay G-Gouge 5e-SenciteR-Rough Ch-Chiorite =Hm-Hematite SilicaifVR-Very Rough Ca-Cakite ML-Sitt 3u-Suiphide DISCONTINUITY DATA TYPE and NOTES POINTLOADTESTS(psi)TESTSDESCRIPTIONWATERLEVELSRQDFRACTURES %PER FOOT e200 2°SOFTA|NODS ROCKINDEX14.5k7.25k3.62k725DEPTH(ft)BORINGMETHODSTRENGTHRUNNUMBERGRAPHICLOGCORERECOVERYDESCRIPTION ifrx)6SJ,PU SM,Ca 67"7¥e gbd QS23SURFACEzo1iv}IR6IRS|IR4||R3R2R1a=fro]TTT nmaaa> a YI x=Poeoere a 597 300.4Boringcompletedat300.4 ft. -Notes:4 1.Drilihole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT,based on -location recorded with a 4 recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 a Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. 3.Vibrating wire piezometer-305 (VWP)(Slope indicator,P/N: 52611040,S/N 12-6863)was taped to a sacrificial tremie pipe, placed alongside the temperature acquisition cable (TAC)conduit, and grouted in place with cement bentonite slurry at 280.4 feet depth. 4.1-inch Schedule 40 PVC TAC aconduitinstalledtoapproximately 250 feet depth and filled with propylene glyco!antifreeze.Top of HQ3 drill rod has 2.9 feet of S stickup above ground surface.i” 5.TAC (BeadedStream,S/N 2119)placed in TAC conduit and is removable.TAC sensors are t located at 0,3,6,10,20,35,50,4 75,100,125,150,200,and 250 feet depth,0 feet depth = elevation 1877.6 feet. rH 310 6.Discontinuity graphic log is a ao depiction of discontinuity angle measured from the left hand margin of the log column. -7.Loss of circulation at 30.0 feet, then intermittent circulation at greater depths. 8.Abbreviation "w.r.t"indicates "with respect to”. 9.Water level estimate from VWwe. 10.Point load test rock strengths presented as equivalent UCS based on a K value of 19 for conversion between 1Is(50)and L equivalent UCS.4 -315 a [--320 4 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine rerea”CQ . - . --Associates DRILLER:T.Fisher CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-2 SHEET 1 of 11 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12 to 7/30/12 ELEVATION:1961.3 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,225,533 __E:1,884,943QOShayRoughnessInfillingPy-Pyrite @ Axialfo)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotite Ep-Epidote Qtz-Quartz F-Faut FO-Foliation -C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand OD Diametral =|e @|2 |e Uiven”GRonhogonal StSlopped'Rough GhGnbrte Himtlenae §=Sone |SO?Vein :n |..=Feo =iS}a wl »%ER-Fracture ogenal Pogue”«UR Wey Rough CeCacte MUSH Bu Suiphide 25a Aa NOTESu -1o DESCRIPTION ore re DISCONTINUITY DATA x aap 7 EST. ao |Z Zz j/E_|2/99 =3 yisx|tox| xxx WATER LEVELS ©a jFe/5}oo |ROD |FRACTURES |S24 TYPE and 2 Som EQS|ABESa)ej/e-|3|2]%PERFOOT |29%SURFACE &8 |222/8h2/Ssro 8 Lo [va]7)«Begg|nero Pe g DESCRIPTION x 5 oor YF 0.0-1.0 yyVeryloose,moist,dark brown,PEAT i PPM)A 960.4 | 10-24 1.0 Compact,moist,dark brown, SILTY SAND with gravel, cobbles and boulders a present 4 |(SM)959. 2.4-11.5 024 Dense,moist,brown,Q L well-graded GRAVEL with KD q 4 silt,cobbles and boulders Q<=/present3|(GW Od£Qa 4[ & °Qd 8 Q Od5=4 3 Q x O qSQ le 4 '1 3 s(3)q fe =Rd 2 a |68 Rg J Q4q +Rg q J Od 40 Q 4 4 No core1qdrecovered Z Q 11.5-12.0 "] Top of Rock=11.5 ft 950.feet. 41.5-27.0 \(11.5 Fresh to moderately t 7.ol weathered (FR-MW),\Switched to 1 35 extremely close to wide !FR |RS core drill at 3 spaced fractures,FeOx and)|.'12 feet Ca filled discontinuities,inStgreenishgray,medium to \4 e coarse grained,medium \335weaktoverystrong(R3-R5), [,/33 ; w DIORITE O 1|>R,CL 3 -J,PL,R,FeOxoy|11.5-13.0 feet:Fresh (FR),very L .100%26°Highly 7 rel 2 |_strong (R5)on ML weathered z E|13.0-21.6 feet:Moderately .!next to =O |weathered (MW),medium weak )incipient345@|(R3)"oq J,PL,SM,CL 29°discontinuity 4 oO &13.1 -13.6 feet:Broken core |Driller notes Z 4 difficulteS&r 71 drilling aL ow |conditions._ °os \ a)i]l\/ MW |R3©o ae &s 4 9 6 weazs)\5.0<\5.0zN2. a r 7 100%Drill Rate:|&VO °Run 2 =16.7 a \feet/hour. 2 I / or 1 | N \ P=I /. | +20 'a 4 Log continued on next page L. =-DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fiqure8=Golder DRILLING CONTRACTOR:Crux Subsurface,inc.CHECKED:E.Cannon p 6a==:-4 DRILLER:N.Arneson CHECK DATE:1/9/138Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 2 of 11 INCLINATION:-70°103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Cannon3/8/13DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12to 7/30/12 ELEVATION:1961.3ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,225.533__E:1,884,943 fs B-Bedding BUPona FOPoened Brace -_Ep-Epidote Oke Suarez @ hal=FO-Fokation -C-Curved K-Skckensided Bx-Breccia.©FeOxlron Oxde Sa-Sand O Dametal xz 6 gl ale]»[Mert Seon Gitmo SMS Se Ete Sa”|BoPPe29)a \a)& Le 'Omnogonal Frreguar -VRvey Rough Cecacte MCS Sy eS ende ze o z wearsw 10 DESCRIPTION 97 s/2 DISCONTINUITY DATA x aoe a |2iz 53 =oy |tex |«xxx WATER LEVELS =&jFe1Z|38 FRACTURES |Uo TYPE and 2,|SSR/EZH/ASSN y&€j/g=i3)8 PERFOOT |29%SURFACE a8 |oes ge2 SINS 820a6|o°fe nvoo®Pa gh DESCRIPTION e715 "eso gs 11.5 -27.0 .2 : Fresh to moderately a y |a | weathered (FR-MW),\14 ar extremely close to wide |Ta MW |R3-spaced fractures,FeOx and '3]Dri . 4 :aan 7 ritl Rate:Ca filled discontinuities,on 9,= .'400%Run 3 =8.4greenishgray,medium to (feet/hourcoarsegrained,medium X ; L weak to very strong (R3-R5),' e J.PL,Healed 13°4 DIORITE (Continued)rhea' 21.6 -27.0 feet:Fresh (FR),close.>discontinuities to massive,strong ;\4 a (R5)|| >@ (J,PL,R,FeOx 68° ' |e J,PL,R,FeOx 13° }\48 4 ara |-9, \4 62%FR 7 RS Drill Rate: |96%Run 4 =10 L .feet/hour. 25 "4 4 { NX in 7. -I @ |J,PLR,FeOx 58°4 XN rh |9359 J,PL,R,FeOx 27°Hole i 27.0-31.0 7 \27.0 advanced to 7 Moderately weathered (MW),|=")26.7 feet on extremely close spaced r 7ASIN2. fractures,FeOx and Ca filled |7 \J,CL,Sa,FeOx -discontinuities,light greenish N 4 <|grey,medium to course aggrained,very weak to weak =(R1-R2),ALTERED re i §|plorITE A 5.0 MW |Ri 4 |28.7 -30.7 feet:Sand filled 5 |50 Many healeddiscontinuitieswithCafillinga6discontinuities©|27.0-28.7 feet:Broken core =\100%J.CL,Ca Healed Drill Rate: ¢S oa Run 5 =10.3 1 30 a a \feet/hour.7 N ys g "y - =ES 4932.2 JPl31.0-143.5 .'[31.0 J,PL,R,FeOx 47° '5 Fresh to moderately read J,PL,R,Ca 78° -O|weathered (FR-MW),\J,PL,R,FeOx 17° extremely close to wide | -spaced fractures,FeOx and . q Ca filled discontinuities,os greenish gray,medium to I coarse grained,medium N a weak to very strong (R3-R5),[7 PI ° 4 DIORITE v 38 BER coon Me Drill Rate: 31.0 -59.6 feet:Fresh (FR),close}.38 oo Run 6 =17.5 discontinuities to massive,strong +,6/ 87%feet/hour. RS)va 100%[34 -47 feet:Grades to greenish !°7 gray with occasional red feldspars)_'\|@ J,PL,R,FeOx 82°---_ l-35 '4 in /.]|| Ly jI: N ||FR |RS Replaced drill |ty |ri bit at 35.5 7\ ,H @ =|J,PL,SM,CL 45°feet. N P|| a vO |@e|(J,PLR Fedx 42° 4 \|e {4,1 R,FeOx 23° by |43 i |J,1,R,Ca 51° \.ey i'oe °J,PLR,CL 14°Drill Rate:\Or Gyr L ) 100%Run 7 =9.9 7 |feet/hour. I >@/J,1.R,Ca 65° L "4 4 \ \ba J,PL,R,FeOx 23° Ug oom ||i fe fd.PLR Feox 20° ;_40 Log continued on next page 4 -DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiAYéGolderDRILLINGCONTRACTOR:Crux Subsurface,inc.CHECKED:E.Cannon igure gy A.A-6Associates RECORD OF DRILLHOLE DH12-2 SHEET 3 of 11 ECannon3/8/132.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WEPROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12 to 7/30/12 ELEVATION:1961.3 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.225.533 _E:1,884,943 8 4 joint B-Bedding ePanar PO Botsned trantte Ep-Epidote oe arte @ Anal =F-Fault FO-Foliation C-Curved K-Slickensided x-FeOx-lron Oxide Sa-Sand O Diametral x It g |ele Vien OROrhogonal STStepped FiRough Ghonbite Hmrimatte Sake |SOP =Fe 2 9 i fe &|FR-Fractu {regular vR-Very Rough CaCakite -ML-Silt Su-Sulphide z¢2 a eeeu lo DESCRIPTION gk 2!2s DISCONTINUITY DATA x ase ao |Z ZT izE_|2/99 Eu 3 xbxltox|x xxx WATER LEVELS z a fe 5/08 RQD FRACTURES aa)TYPE and Fo [Ozu p2u NOON wo o é wt)Ss)8 %PERFOOT |29%SURFACE 59 gus wh Bika &40 ef (o]«g3eg|av col hae gh DESCRIPTION x PA wooso oO £ 31.0 -143.5 \12 ||]|Fresh to moderately /12 9 i ; weathered (FR-MW),7 8 100%||Orill Rate: extremely close to wide |100%{e J,PL,R,FeOx 20°Run &=2.5 -spaced fractures,FeOx and ' 1 feet/hour. Ca filled discontinuities,os +3greenishgray,medium to {9 .90%Drill Rate:coarse grained,medium °ue a weak to very strong (R3-R5),74 100%¢J,PL,R,FeOx 28 Run 9 =2.7 DIORITE (Continued)feevhour._Replaced drill'18 bit at 42.0 ;10 4.8 400%feet. 42.0 -47.2 feet:Reddish gray .100% 7 | \ a N Replaced drill 7.bit at 43.8 |feet. N e J,PL,R,Ca 16° +45 om ifi}: N i 7.@|J,PLR,Ca 45° ,44; .11}47 |72% /6 Drill Rate: 4 94%Run 11 =6.3 \ 5 \@e)|J,PL,R,Clean 19°feet/hour. ;tv "||g!|J,PL,R,Ca 42° 47.2 feet;Becomes greenish gray @ JJ,PL,R,Clean 46° !J,PL,SM 61°N a | a | 2Oo 7.||a \ 5 '| re) <|3.1 50 143 »3.2 FR |R5Peyf|"9%Drill Rate: a \97%Run 12 =6.4 ¢g N feet/hour. =='sl 2 fo}XNeo/.] tL | »17 "s 143}1?|r00%ol Rat{6 ate: i .100%J,PLR,Ca 8%Run 13=6 s @ |,PL.R.Ca et feethour. 1 'a 7.'24 @J,PL,R,Ca 82°--_] \14)2-1 ||r00%Dil Ratos@J,PLR,Ca 83°|rill Rate: 54.8 -55.2 feet:Reddish 100%Run 14=45 p 85 green-gray N feet/hour. /Hole4advanced to \ |\®|J,PL,SM,Stained 68°eal io Caving |material 56.6 -57.9 feet:Red staining \observed in -56.9 -58.9 feet:Broken core a e J,PL,R,Ca 26 Run 15 | >44 &J,PL,R,CL 34° 7 15;95%@J PLR,Ca 22°F . a Orill Rate:|.|100%e PL,R,Clean 86°Run 15=4 \ | J,PL,R,Clean 84 feet/hour. is |@|J,PL,R,Clean 74° \|. :58.9 -63.8 feet:Felsic dike \@ |SH,PL,K,FeOx 69 /.] \ 59.6 -59.8 feet:Slightly \ |60 weathered (SW),strong (R4)7.Pt --continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiqureeGIdiDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon g older A-6PDSoler.DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 4 of 11 INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12to 7/30/12 ELEVATION:1961.3ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,225,533 _E:1,884,943 8 yjoint B-Bedding PL-Pianar BO Boned orBote Ep-Epidote ae arte @ Axal =F-Fault FQ-Foliation C-Curved_K-Slickensided Bx-Breccia. FeOx-Iron Oxide Sa-Sand O Diametral x |i Q}zie Vven” OROnhogonal ST-Slepead RoW.hehe Gaerichate «=Segiea |SOPEe2ic}Z wi 2 |FR-Fracture Pineguar VR-Very Rough Ca-Cakite -ML-Sift Su-Suiphide Z0 EA ease wu 1o DESCRIPTION 9 4 s|/eb DISCONTINUITY DATA x I, aapo WAT!a Zz Zz iz_|z2/98 =vipx|tox|x xex ER LEVELS z a lFelZ|oo]RaD |FRACTURES |Eye TYPE and 5g 5 Eg ig ABE wyrel2jw-i 35)2 %PERFOOT |20%SURFACE fez |UEZ|Ssn060a(c)c4 2898|n+0w2 Pe ee DESCRIPTION b loeso gy 5 31.0-143.5 LC 6 56%)é Hole Fresh to moderately 7.;advanced to weathered (FR-MW),18 p 59.9 feet on extremely close to wide .|16 1.8 56%{P22. a spaced fractures,FeOx and °ee!|)PLR FeO Drill Rate: Ca filled discontinuities,os 100%| »J PLR FeOx Run 16 =1.4 greenish gray,medium to (||JU.R FeOx feet/hour. coarse grained,medium ' |oe J.PL,R,FeOxt.weak to very strong (R3-R5),7 :J.PLR.FeOxDIORITE(Continued)\:, |59.8 -91.9 feet:Fresh (FR),close|.>md J,U,R,FeOx discontinuities to massive,strong || 5 (R5)]°J,PL,R,FeOx N / \4.7 r '17|+7 ||ea%@ |J,U,R,FeOx J ( Drill Rate: 64.4 -64.8 feet:Red feidspars |100%Run 17 =4.4 \feet/hour. -65 os @ |J,PL,R,Ca 4 1 NX 7. -66.1 -67.4 feet:Very closelyto [||®(J,PL,R,FeOx Faint 7 closely spaced discontinuities 74 e J,PL,R,FeOx striations at , 66.0 feet i .©J,PL,SM,FeOx 7 a $[J.ST.R,Fedx|J,PL,R,FeOx >24 ;18|35 |Jeo%=. Drill Rate: 2 . 69%Run 18 =4.4 '3 4 feet/hour. S &)4 oa \o6 4 is) c \ -70 Jig \FR |R5 4 ©)70.1-71,7 feet:Very closeto fF 7 -]@|J,ST,R,Clean Ss closely spaced discontinuities \ ;18 2 .19}18 |100% a =7.°@ |J,PL,R,Clean q 2 an 100%@ |J,PL,R,FeOx 6 \(3)7.@SH,PL,K,Clean L \4 N 7 ] =4 7.\ \ \!@ J,PL,R,Clean /.5.0 L \50 | 4 Sf [Pe t00%Drill Rate: )100%Run 20 =6.7 7 feet/hour. -75 I + \ hs \ 3 '= 7. | \e J,PL,R,Clean 23° =7 4 \ N 7 \L.j 48 | \ y |Jat}59 T gee\ 787 -78.8 feet Redfeldspars [|96% 4 Drill Rate: !Run 21=7 'feet/hour. =80 . 7 4 Log continued on next page --DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiqureAGIdiDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:€.Cannon g =Golder A-6&,4103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Cannon3/8/13Associates DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/1312.GP3LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WéRECORD OF DRILLHOLE DH12-2 SHEET 5 of 11 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70°PROJECT NUMBER:103-95560 ;DRILLING DATES:7/19/12to 7/30/12 ELEVATION:1961.3ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.225.533 ___E:1,884,943Ty'Sha i 7aJointB-Bedding Bi Pinar bonehead aeBoke Ep-Epidote Ob due @ Anal=F-Faut FO-Foliation -C-Curved K-Sickensded Bx-Breccia. FeOxlron Oxide Sa-Sand O Diametral ->$H-Shear CQ-Contact U-Undulating =SM-Smooth CL-Clay G-Gouge 3e-SericitextaoOiux>V-Vein OR-Orthogonal §/Stepped R-Rough Ch-Chiorite =Hm-Hematite i-Silica 5 ore NOTESEreS°z %f&|FR-Frecture L-lrregular VR-Very Rough Ca-Calcite ML-Sit Su-Sulphide 5 $o EaWw1oDESCRIPTION972/e5 DISCONTINUITY DATA x ase TESTS o 12 Zz /E.|2/99 =o-eipxltox|«vex WATER LEVELS z @ |Fe|/2|8S}Rao |eractures |Sve TYPE and 2,(SZO E25/RSRSfe}&|wo 2|«|*PERFOOT |29%SURFACE a8 2¥2/GE2 (Sino &|a0 a 6 ssea|a+vool pags DESCRIPTION x 5 leese Y F 31.0 -143.5 \ Fresh to moderately ry.weathered (FR-MW),\48 extremely close to wide !21|5:9 ||a¢e,-spaced fractures,FeOx and |" 4 Ca filled discontinuities,"oq 96% greenish gray,medium to 1 coarse grained,medium N _weak to very strong (R3-R5),in /i”DIORITE (Continued)\48 . >1.881.7 -83.5 feet:Broken Core L 22 100%oq Drill Rate: a '100%Run 22 =2.2 4 N feetv/hour. Ly | \ |Hole advanced to -84.0-91.2 feet:Porphyritic Ly 83.5 feet on 4 texture \RS 7122/12. N Ly |85 85.0 -88.2 feet:Red feldspars |\4 N r "4 5.0 L '|23]59 ||gaa @ ||J,PLR Clean 23°FR 4 N _Drill Rate: L ,_|100%Run 23 =5.7 \ \feet/hour. gS N 87.1 -89.2 feet:Very closelyto [7 @)J,PLR,Ca 46° closely spaced discontinuities \@/J,U,R,Ca 69° N [75 4 @ J,PL,SM,C:° . 4_ \ | a 80 Faint o \°striations at s L >| @ |J,PL,R,Clean 55 88.0 feetEe\ |Many healed -B di tinuiti 4a\@/J,PL,R,Ca 75°A|from 88.5_2 Ly |. 8]89.5-91.9 feet:Strong (R4)vo 90.8 feet =\ +90 =\ |a r/3.9 R4 3 90.4 -97,4 feet:Red feldspars )24 3.9 90% Drill R\rill Rate: i x=Ly |100%Run 24 =8.4 2 \feet/hour.7 5 Ns)te -91.9 -93.1 feet:Becomes i 4 moderately to highly weathered \ae MW (MW-HW),medium weak (R3)Fs _|J,PL,R,Clean 23° $2.4 -93.2 feet:Extremely close |'|J,PL,SM,CL 25°HW R3 Highly i to closely spaced discontinuities N MW weatheredL-joint at 92.5 7 93.2 -143.5 feet:Fresh (FR),veryl ">eet astrong(R5){ N L r."4 J 94.2 -94.6 feet:Red feldspars l L »49 |os \,25 49 100%@)J,PL,R,Clean 73)Pp] N 100% fr 4 at \ | L N 4 96.2-97.3 feet:Redfeldspars |,'e J,PL,R,Ca 25° .I FR |R5 L ros.\4 .!@ |J,PL,R,Ca 67° f 4 at L an J,PL,SM,Ca 58° d LS 45 v 26}+5 |i 89% r 99.0 -101.6 feet:Redfeldspars |>100%°°\PL'Ay Ce ar"7 4 4 996-1013 feet Large3-to |}none IN4-inch diameter,fine grained NxenolithsL I 100 ; is -4Logcontinuedonnextpage =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fie=Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon ne&,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 7 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 6 of 11 INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12 to 7/30/12 ELEVATION:1961.3 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.225.533 __E:1,884,943 a Pint B-Beddin Plbana POBomhed -BrBcte --Ep-Epidote Geduste |oeSdF-Faut FO-Foliation -C-Curved K-Slickensided Bx-Breccia FeOx-lIron Oxide Sa-Sand OD Diametral x 15 a)ele Wien”OROrhogonal STSepped”own”EhGhirte «Amefletnatte -SrSica Oe.Fo 2 i}Fi wl 2 LER Himeguar -VR-VelyRough CaCalcte ML-Sift suSuiphide |5S 7 g wearseloDESCRIPTION92)ee DISCONTINUITY DATA zr aiap™STS a >zr [=z 2165 vipxltox|x eex WATER LEVELS z @ [FetZ)]oo]RAD |FRACTURES |$Wo TYPE and 2,|S25 eZ aeao 8ra&j}a=/3|2 %PER FOOT aoe |SURFACE ag |eee ag Sins &100-1 oP ie g8ge|avooe PRs DESCRIPTION g |S2s2 2 31.0 -143.5 . Fresh to moderately t »| weathered (FR-MW),; 45 extremely close to wide 45 9 F spaced fractures,FeOx and |26 89%4 Ca filled discontinuities,a 100%: greenish gray,medium to | coarse grained,medium N é.2 t weak to very strong (R3-R5),/ |4,PL,R.Ca 89 4 DIORITE (Continued): NX 102.7 -104.1 feet:Extremely [7 >@)|J,PLR,Clean 44° a close to closely spaced 1 4 discontinuities N 103.2 feet:Fine gained xenolith fF 7 _|Ca \ L \5.0 4 ">27]59 |i aa%{ \100% i 105 en 4 i N L | 106.0 -113.9 feet:Red fetdspars [_!7 LD |e J,ST,R,Ca 31° a > 4 \ N gs fd 4 =\ 3 \ro)7. |os |49 J a N 49 °28 00%.S|109.4-109.8 feet:Closely spaced),'400% e J,PLR,Ca 10 Drill Rate: ©|discontinuities ' ° JPLRC 16°Run 28 =8.2 Ec N JPLR,Ga feethour.110 |e FR |R5 4 4 7.N rel !fa]N= r 9 os J,U,R,Ca 3s J £|.J,ST,R,Clean 33°fo}N(s),. or \4 ed NeS7 oO | sl..: S)|@ J,PL,SM,Ca 80°Ww N -|7.44 op \5.0 4 q 3 |29 78%Drill Rate:BS .88%Run 29 =8.3 =v4 feet/hour. ©4415 "| [a] Oo '@ |J,U,R,Ca 59° z /.] <\al \ a '4 @ iooO 2ia116.5 -116.7 feet:Closely spaced|_'@)J,U,R,Ca 76° a discontinuities »@ jJ,PL,R,Ca 53° oP Drill Rate: 7 g \Run 30 =4.2 >/feet/hour. a a 28et30}28 Hoax ill Rate: 1 a \°Drill Rate: a 7 100%Run 31=13 118.5 -119.9 feet:Red feldspars |\;;feet/hour. >i a \ -Je]jsPLRca 27°4 C /.]'\J,PL,R,Ca 29°Replaced drill 5 bit at 119.7 a [att O2 (0%:we JJPLR °feet. $0 ys)fae]08 Hac [fer IN JS12LogcontinuedonnextpageI =z DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi8€.EY Golder DRILLING CONTRACTOR:Crux Subsurface,inc.CHECKED:E.Cannon Nefe]=- f *DRILLER:N.Arneson CHECK DATE:1/9/133|Wf Associates PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc. DRILLING DATES:7/19/12 to 7/30/12 DATUM:Ground Surface ELEVATION:1961.3ft SHEET 7 of 11 INCLINATION:-70° AZIMUTH:65°ECannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560W/DRILLER:N.Arneson CHECK DATE:1/9/13 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,225,533__E:1,884,943 8 J-Joint B-Bedding Be Penar Hea aol ate Ep-Epidote Oe aie @ Axal =Faut FO-Foliation -C-Curved K-Slickensided Bx-Breccia FeOx-iron Oxide Sa-Sand DO Diametral ->SH-Shear CQ-Contact U-Undulating SM-Smooth CL-Clay G-Gouge Se-Sericite woxriTQnm|%Vein OR-Orthogonat ST-Stepped R-Rough Ch-Chiorite =Hm-Hermatite Si-Silica 5 ope NOTESP=S 9 d id z=FR-Fractu cirreguir VR-Very Rough Ca-Cakite ML-Sitt Su-Sulphide fo)g @ aw=|DESCRIPTION 8738/28 DISCONTINUITY DATA z ls ae WATER LEVELSzairoz88|Rao |FRACTURES |§¥o TYPE and 2,(SSS lESSIASES ypfe)&w-|S/@|%PERFOOT |&93 SURFACE a8 ewe GEZ|SereaaBS298|n+008 Ps ts DESCRIPTION fa 5 loose 2 &120 31.0 -143.5 jw 9 J,PL,R 51 Fresh to moderately va 100% weathered (FR-MW), extremely close to wide .!1.0 -spaced fractures,FeOx and 27 i 4 Ca filled discontinuities,is 32 33%Drill Rate: greenish gray,medium to |37%.Run 32 =9 coarse grained,medium N feet/hour. a weak to very strong (R3-R5),/ J DIORITE (Continued); NX';L {4 N 123.4 -124.5 feet:Fine grained,/o i @)J,PL,SM,Clean 73°Pp]2-to 3-inch diameter xenoliths | L \3.7 ] "4 133}37 |Hoo rll@)/J,PL.RCa 43°rill Rate: N 100%Run 33 =9.2 L425 /oJ feet/hour._| | N ¢. -|°4 126.1 -127.6 feet:Closely spaced)\>|J,PL,R,Ca 62 HolediscontinuitiesaaeJ,PL,R,Ca 18°advanced to \126.1 feet on -.©)4,PL,R,Clean 76°723i. 4 .!@ [J,PL,R,Clean 50° i | J a |49[7 »5.0By34 94%e '4 °Orili Rate: L é |98%Run 34 =5.8 4 ®N feet/hour. 5 7.8is | -130 |3 'FR R5 JPe | 3 1 \1 =/ I2oaN°¢.] =I | »io132.3 -132.7 feet:Closely spaced;/_|e J,U,R,Ca 22 fractures \° 132.3 -133.4 feet:Many healed |@;(J,PLR,Clean 39 L joints \a a A 4 7a 49 |5.0133.6 -133.7 feet:Red feldspars |\35 98%Drill Rate:L.'|98%Run 35 =-| |11.1 \feet/hour. al F135 |4 NN 135.3 -135.7 feet:Many healed 7. joints | _\ °|136.1 -136.8 feet:Many healed [/-|@ (J,PLR,Clean $1 joints,Ca cemented \136.5 -137.3 feet:Many healed nNjoints,Ca cemented /e J,PL,R,Clean 12° | N co 3.0 -|36}©|'00%4 |100% |Dnill Rate: = »Run 36 =6.1 4 7.feet/hour. 139.0 -139.5 Feet:6-inch |diameter xenolith };_140 Log continued on next page Y <a DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi€.A\4 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon he.Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 8 of 11 INCLINATION:-70°103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12 to 7/30/12 ELEVATION:1961.3 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.225.533 _E:1,884 943 8 Mu jon B-Bedding PL-Panar BoBornes teocte Ep-Epidote oer art @Axal g F-Faut FQ-Foliation --C-Curved K-Sickensided @x-Breccia.©FeOxlron Oxide Sa-Sand O Diametral x IG go}2 le Ven OROrhogonal St-Stepred'Retoun -Chicherte mohatte ssn |bOPPe2ie}i Ww %|FR-Fractu irregular VRVey Rough CaCakte MLSit Su-Sulphide Z6 3 a vcsrsw |o DESCRIPTION o =|#e DISCONTINUITY DATA x |, ao-p o Zz lz_/2 Bxltox|x «ex WATER LEVELSZziZ/oO Ew [3]xOn |EONZz&|Fel S|OG]Rad |FRACTURES |Sye TYPE and Tq |SZWiEZuINeAsS 84&|B=|/Z/ B|%PERFOOT |39%SURFACE SG |ee2 (eke (Senn &L440 a 7)(v4 8898|a ooe PS gh DESCRIPTION x |&moose oz 31.0-143.5 a Fresh to moderately r 30weathered(FR-MW),\36)100% extremely close to wide |100% -spaced fractures,FeOx and '°J,PL,R,Clean 35°q Ca filled discontinuities,4 greenish gray,medium to I coarse grained,medium N FR |R5 a weak to very strong (R3-R5),/ 4 DIORITE (Continued)| 140.0 -144.6 feet:Many healed}'joints,Ca cemented 4 @ |J,PL,R,Ca 47° -141.7 -142.8 feet:Red feldspars (4 L »4826.38143.5 -148.4 1 43g 37|©"|(60%Drill Rate:Completely to moderately =9,!=r weathered (CW-MW),very >S 9%mw |R3 Run 37 =77 J close to wide spaced a \. fractures,Ca healed \ discontinuities,light gray,A 145 medium to course grained,=):4 extremely weak to medium s cw |Roweak(RO toR3),ALTERED |",DIORITE NN -143.5 -144.6 feet:Moderately =4 weathered (MW),medium weak \ (R3)a \ 144.6 -146.1 feet:Completely \ -weathered (CW),extremely weak|//q (RO)=MW |R3146.1 -148.4 feet:Moderately 1 //weathered (MW),medium weak |=\'é 7 (R3)s 4 c #feat.43 :2|148.4-176.2 \148.4 3g|5.0 ||gog:f€|Fresh to moderately t vi] 5 &|weathered (FR-MW),very \86%2 R3 4 »|Close to wide spaced |SW}to5|fractures,Ca filled ' R4©]discontinuities,greenish gray |\" |450 |to light greenish gray,|Drill Rate:4"|medium to course grained,\Run 38 ="|medium weak to very strong '4 12.5|(R3 to R6),DIORITE ,feet/hour. =\ a @|148.4 -150.2 feet:Slightly / 7 €weathered (SW),greenish gray,|&|and medium weak to strong N 416(R3-R4)L ,39 16 100%J,Healed Ca "eqEr150.2 -160.0 feet:Fresh (FR),|* |: i 4 very strong to strong (R5)N 100% 74 = I 4 \ r,/4 e J,PL,R,Ca 18° .@ |J,PL,R,Clean 60° L ty _|4 @ |\u PLR Ca 22° L >46 L155 Vv fan]48 |"100%4 t FR RS \100%@ |J,PL,R,Clean §3° \/.]Caving at ,155.5 feet qL.N after tripping /@ [J,PL,R,Clean 53°rods I N a Ly |4 e J,PL,R,Ca 27° N bha 4 \43 ! /5.0441 90%Va °@ |J.PL,SM,Ca 62° : .98%4 \'4 \i N oO -160 . \@ |J,PL,SM,Ca 55 i” Log continued on next page sont =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi(2);Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon Ne.=, -L#Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 9 of 11 INCLINATION:-70° &,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12 to 7/30/12 ELEVATION:1961.3 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N;3,225,533 _E:1,884,943 a Shape Roughness Infilling By Fyre @ Axalfo)J-Joint B-Bedding PL-Planar PO-Polished Bt Biotite Ep-Epidote Qiz-Quartz no tral =F-Fautt FO-Folation C-Curved «-Slickensided 8x-Breccia FeOx-tron Oxide Sa-Sand ametral -:SH-Shear CO-Contact U-Undutating SM-Smooth Cl Clay G-Gouge Se-Sencite EAMxWwQrfridV-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte =Hm-Hematite Si-Silica Zz offs NOTESonOo;4 yw 2 |FR-Fracture Liregular VR-Very Rough CaCakite ML-Sitt Su-Suiphide EIHBTels3|/g/a (4 ogous TESTS be lo DESCRIPTION Q }-42|ee DISCONTINUITY DATA z |, ar WATER LEVELSo712z=|E>/2/88]rap |eractures |$20 2 NSH Eos |AnyzelbelZ]oo eV TYPE and To |SZA/<E4 eno 8 &eb 5]oR!%PERFOOT |&5%SURFACE $9 |ee2/Uh2|Beno &|+60 a o a 23892 axrwoo?Pe gf DESCRIPTION fa 5 wese gs z 148.4 -176.2 \°Fresh to moderately ty |e J,PL,R,Ca 20 weathered (FR-MWV),very \|close to wide spaced |49 -fractures,Ca filled L 41|29 Hoos +J discontinuities,greenish gray |,'° to light greenish gray,|98%a medium to course grained,\@ /J,PLR Ca 68 L medium weak to very strong /4 (R3 to R5),DIORITE |(Continued)\ by\ r 163.0 -163.7 feet:Broken core ['7 ty | \ \@ |J,PL,SM,Ca,CL 69° a |'|[ 4 \ {5.0 FR R5\5.042 70% =164.9-165.4 feet:Brok re |Lf 4165eet:Broken col \ .100%2NN Ly | \ .\4 NX L | \@J,U,SM,Ca 83°+-_] a 166.8 -167.7 feet:Red feldspars |.'ao 4 ("4 | |i \| _h/4 @J,ST,R,Ca 86°}---d _ | 9 \ 3 L €\¢.] x &|4 a@ |169.2 to 171.0 feet:Moderately |» 8 weathered (MW),strong (R4)vq 5.0 €it [43]&°||96%170 1 bd 100%MW |R4 7 N \@ |J,PL,R,Ca 53° oO ) g \ =r 7.@ (J,PL,SM,Ca 49° D @!171.0 to 176.2 feet:Fresh (FR),|a "5 |_strong to very strong (R4-R5).|3 he of I @ |J,PL,SM,Ca 61°+ =N g re @ |J,PL,SM,Ca 58° j ®/J,PL,R,Ca 65° c Sr 173.0-176.2 feet:Porphyritic |>>4 $texture with many healed joints |®|J,PL,R,Ca 63° a .!FR |R5 or ie 7 PI |5 ,3ar/ .6 ©1475 \ |"4 S6%Drill Rate:| =)N 86%Run 44 =8.3 S r 7a feet/hour. \x ] ar |47057 @ |J,PL,SM,Ca et 4 eS 176.2 -179.8 "76.2 =Moderately weathered (MW),=ba moderate spaced fractures,Se Ca cementation,light gray,£y J S medium to course grained,\° <moderately weak to strong it @)J,PL,R,Ca THe | z (R3-R4),ALTERED =st DIORITE a MW |R3 J 2 nN 43 =a 45|44 |TeamEL98%@ |J,PLR,Ca 59 7 =ay &"4792. 180 , .a)FR |R4 J Log continued on next page =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fiqure8€.A\z Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon p 6foxea- o Oo PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-2 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 10 of 11 INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:7/19/12 to 7/30/12 ELEVATION:1961.3 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS;_N;3,225,533 _E:1,884,943 o Type -Shape Infilling Py-Pynite @ Axalre)J-Joint 8-Bedding PL-Planar PO-Polished Bt-Biotte_Ep-Epidote ==Qtz-Quartz Oop 1 4 F-Fault FO-Foliation C-Curved _K-Siickensided Bx-Breccia FeOx-iron Oxide Sa-Sand iametral z {é Pe en a eeFo2CO)SB]&|FRtrecture Firegular __VR-VeryRough CaCakte -ML-Sit su-Suiphide |33a 8 veers wu lo DESCRIPTION orm 2 hae DISCONTINUITY DATA x ase STS a z xr |Z 06 =o vipx|tox|x xxx WATER LEVELS =aq /Es|=/]/6G |RAO |FRACTURES |Eu TYPE and 2 |SSHiELSIAGSAx&|t=|3/2]%PERFOOT |29%SURFACE 29 |G8218E2/8eN5 8|00 42 &||z geeg|a o0e Po gf DESCRIPTION e-|°5 |=ese a x179.8-183.4 "179.4 ! Fresh (FR),moderate Ly |of | spaced fractures,Ca filled \43 ||@ J,PL,R,Ck 26° discontinuities,greenish !45|44 tilegael tlt || -gray,strong (R4),DIORITE |> + 4 (Continued)oq 98% 180.6 to 184.0 feet:Occasional Ra red staining L 'FR a \/4 e SH,PL,K,Ca 28°| \ N ir / @ |J,PL,R,Ca 60° a !4 S 4789. 183.4 -189.9 A (183.4 Highly weathered (HW),=47 .moderate to wide spaced 4e|+7 |[32%4 Afractures,Ca and clay filled '=\discontinuities,light gray,N 100% medium to coarse grained,4 °Healed Ca 35° |485 weak to extremely weak =| (R1-R0),ALTERED s DIORITE £y S A L Zy 4 N a RO=Hole \HW e advanced to a A \186.4 feet on 4 aN 7I24/12. A=\iN 7 Ui J,PL,SM,CL 9°4 = = 5 : :ZN fay)80i& =47|5-9 |i3g0%a re A 98% fe]X8' ¢"4 »782.919018]189.9-200.0 \(189.9 ° 4 "|Fresh (FR),close to wide L ,|@/J,U,R,Ca 74 |spaced fractures,Ca filled \ ¥}discontinuities,greenish .|@/5,U,R.Ca 76° ==|gray,medium to coarse L 4©|grained,strong to very os 6 |strong (R4-R5),DIORITE |Oo \ ty _| a \e J,PL,R,Ca 15°7 .!®@ /J,PL.RCa 58° rosa id J,ST,R,Ca 36° a 192.8 -194.9 feet:Red feldspars {a NN r 7 | \Az i |s 48|59 ||7g%q 4 Lost' 1 94%circulation \and all drilling fr 7 fluid down L-195 a FR |RS hole at 195.6 7 .feet. I 16 © |e|lustre 39°7ARSI12;10:15 am 7 \_ST,R,Ca 4 17 (Severe drill XN chatter a LD | 4 \ I N I /34 4 r ;3.6 4 \ 49 61%Drill Rate: rv]94%Run 49 =5.5 ' |feet/hour. a \t J,U,R,Ca 10°4 Ly | \ \ 2 J,U,R,Ca & _ 500 773.4 | DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon rere 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WsLOC. PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 ATION:Susitna River,Talkeetna Mountain s,A RECORD OF DRILLHOLE DH12-2 K. CLIENT:MWH Americas Inc. DRILLING DATES:7/19/12 to 7/30/12 EQUIPMENT:Burley 6000 DATUM:Ground Surface ELEVATION:1961.3ftCOORDS:_N:3,225,533 __E:1,884,943 SHEET 11 of 11 INCLINATION:-70° AZIMUTH:65°BORINGMETHODDESCRIPTION GRAPHICLOGDEPTH(ft)levev.RUNNUMBERCORERECOVERYShaBL-PlanarC-Curved U-UndulatingST-Stepped R-R|-leregular Roughness:bO-BolshedK-Slickensided SM-Smooth oughVR-Very Rough InfillingBt-Biotite x: CL-Clay Ca-Calcite ¢C Ch-Chiorite Ep-Epidote. @ Axal O DiametralpiFeOx-Iron Oxide SiSilicaSu-Sulphide DISCONTINUITY DATA FRACTURES PER FOOT NeTOooS Va TYPE and SURFACE DESCRIPTION ROCKSTRENGTHINDEXWEATH:ERINGINDEX36.2kIGRAPHIC|LOGNOTES TESTS WATER LEVELS + 210 --220 Notes: 1.Drillhole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. 3.Vibrating Wire Piezometer (Slope Indicator,P/N:52611040, S/N:12-6864)was taped to a sacrificial tremie pipe,placed alongside the temperature acquisition cable (TAC)conduit, and grouted in place with cement bentonite slurry at 180 feet depth. 4.1-inch Schedule 40 PVC TAC conduit installed to approximately 194 feet depth and filled with propylene glycol antifreeze.Top of HWT surface casing has 3.2 feet of stickup above ground surface. 5.TAC (BeadedStream,S/N 2122)placed in TAC conduit and is removable.TAC sensors are located at 2,5,9,19,34,49,74, 99,149 and 189 feet depth,0 feet depth =elevation 1961.3 feet. 6.Discontinuity graphic log is a depiction of discontinuity angie measured from the left hand margin of the log column. 7.Cuttings between 194 to 200 feet depth. 8.Point load test rock strengths presented as equivalent uniaxial compressive strength (UCS)based on a K value of 19 forconversionbetweenIs(50)and equivalent UCS. 200.0 EF GoldAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:N.Arneson LOGGED:P.Richards CHECKED:E.Cannon CHECK DATE:1/9/13 Figure A-6 RECORD OF DRILLHOLE DH12-3 SHEET 1 of 21 312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Cannon3/8/13103-95560WsPROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 a Pat B-Bedding PrPanar =PORoRRSG atthe Ep-Epidote Oe ote @ Axal=F-Faut FO-Foliaton ©C-Curved -K-Slickensided =Bx-Breccia FeOx-Iron Oxide Sa-Sand Ci Diametral x im oo]?ie wen OROahogenal Sr Stepaad?Rionoon Chehbrte Gove latte ogee bof.rE e 2 ic}z W &[FRFracture hinreguar VR-Very Rough CaCalcite ML-Silt 5u-Sulphide 289 g NOTES a |g DESCRIPTION 2 73 /as DISCONTINUITY DATA =ase TESTS a |Z Zz /=Z_|2}99 Eu 5-1xbx|tox!x xex WATER LEVELSir&@ |Fel/Z|C9]ROO |FRACTURES |Sya TYPE and g,(SSS)E25/AARF oo5e|u|s Fd %PERFOOT |29%SURFACE Ege)ene YHZ|eena &9 ire)6 B8ea|anwooe Pe gh DESCRIPTION Fe 5 wos NY x 0.0-12.9 bY : Dense,moist,brown,0 \' GRAVEL with silt,sand, cobbles and boulders oO (TALUS)(6 to 8 inch thick bO 4 vegetative layer)oCb, E pO | 5 oOap, o fo) 5 LO 7 3 Ps of\3 D, a [e) 3 pS | =o(\o D,c=fo)a58 bb 1S)4 §ae <=fo) £LO NIA i 8 o(\ Oo LO 7 oYb> LO | =felD>CG Drill Rate:S.Run 1 =11.6io1S)feet/hour.2 o(\p,°1 NA27 410bOo Qi.10.0 feet: Lost drilleyie)circulation 7 ae)b, LO 7 =oC) &|_Top of Rock=12.9ft Ps 4701.-£12.9 -36.0 \112.9 34 : 4 |Fresh to slightly weathered =|,_|44 9@(FR-SW),very close to close [\2 0%.Drill Rate:S|spaced fractures,FeOx |77%z Run2=98©1 stained discontinuities,|feet/hour.4|greenish-gray,medium to vq"|coarse grained,strong to | "|very strong (R4-R5),\ G|DIORITE ré 445ag\=4 =|12.9 -16.9 feet:Broken core | 2 N 8 oy L >R4 vq 23 ag FR |to|3 2.3 26%R5 4 [i Drill Rate:4v4100%:J,ST,R,FeOx 20°Run 3 =11.5 |feet/hour. [>@|J,PL,R,FeOx 70 176 feet: on J,ST,R,FeOx 28°Re-gained 4 |circulation |\s after settingvq45Escasing |4]45 ||139%J ry.100% a \ | '\ r-20 .oaLogcontinuedonnextpage qe DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Figur€.A\4 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon remv7,A DRILLER:N.Arneson CHECK DATE:1/9/13 -LA Associates RECORD OF DRILLHOLE DH12-3 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 2 of 21 INCLINATION:-60°ECannon3/8/13PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107OoTy:Roughness Infilling ;Py-Pyrite @ Axalra)J-Joint B-Bedding PL-Pianar PO-Polished Bt-Biotite Ep-Epidote Otz-Quanz oo i =F-Fautt FO-Foliation C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand iametral x oo o |ze le Vien”SROrhogonal StStepeed'Rihowgh GCM |Mowricmatte «=Sess |OP =Fe 2 is}z Wl 2 [|FRFracture tregular VR-VeryRough CaCakite ML-Silt 1u-Sulphide z=B g veers w lo DESCRIPTION 8}3|¢$DISCONTINUITY DATA xz |, aap a Zz z/Z_|2/990 tu a |¥5x|tox|xxx WATER LEVELS Fed a|'e Z|°9 RQD FRACTURES Fe2 TYPE and Fo |\oz24 pean NOBN wo 5 2 w=!3 w %PERFOOT |29%SURFACE 26 |eve2 ae?Biko RF|90 a °332eg|a+ ooe Ps gh DESCRIPTION %5 eese 9 £ 12.9 -36.0 N | Fresh to slightly weathered by |Drill Rate: (FR-SW),very close to close |\Run 4 =8.2 spaced fractures,FeOx i 45 feet/hour. -stained discontinuities,|45 4 greenish-gray,medium to \"4 4 coarse grained,strong te |400% very strong (R4-R5),\J,PL,R,FeOx 41° a DIORITE (Continued)r7 ”J,PL,R,FeOx 30°4d an J,PL,R,FeOx 3 XN J,PL,R,FeOx 33° eon @ |J,PLR,FeOx 60° r ||J,PL,R,FeOx 55°4 N ty | . \@ @ |J,PL,R,FeOx 22°23.6 -23.9 feet:Broken core .|a,yPL.R Feox 65° by ||u,ST,R,FeOx 33°4 4 J,PL,R,FeOx 30° 24.4 -36.0 feet:Broken core 1 0 J,1,R,FeOx 45° ro7 5 5.0- 25 vy FR |R4 Drill Rate:4 !100%to Run 5 =12 \RS feet/hour. eon 25.0 feet: i I Lost drill _ \circulation L | \ | L \4 Ly | \ |Hole | advanced to iz oq 27.4 feet on 4 o \8/2/12. a >30 Ee vy g|39 a Pas |Drill Rate:4 @ | 100%Run 6 =5.3 8 |feet/fhour. 1390 ||29.9-36.0 feet:Moderately \_ q weathered (MW),extremely / |closely spaced discontinuities,\ ,gS orangish gray to greenish gray,N=|strong (R4)L ,LL 2 4 4 £1 So]\°f "4 t \ s I 4 \ \cs 50 |7|50 5 N MW |R4 4 r/4 100% | NX =|" = \ { \ by \ -35 1 4 \ Ly | \ i '1681,7 36.0 -39.0 4H {36.0 Completely weathered (CW),|=2.5 very closely spaced g |25fractures,brown,extremely a \ a weak (RO),ALTERED . 100%J DIORITE aaN cw |RO H}.=\4 \ a==\5.0 a *4678.5 g |5.0 :\"]39.0 ©),|u,U,R,FeOx 40° L 100%e UR iafivesSlew]|,PL,R,FeOx ° +40 .|IN 4 Log continued on next page _-_DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi=G Id.DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure =oider A-7£&,103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Associates DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560W.RECORD OF DRILLHOLE DH12-3 SHEET 3 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1.885.107 8 VBnt -_-B-Bedding PPoner BOBoished «Baie Ep-Epidote abeduste |Oana =F-Faut FO-Folation C-Curved K-Slickensied Bx-Breccia. FeOx-lron Onde =Sa-Sand O Diametral =(8 g zig Yen OR-Srtogenal StStepped”Rhowgh”-Ehenente fiwtemote Soir |OPFeP=9 a Pd 2%|FR-Fracture Hirregular VR-VeryRough CaCalite -ML-Sit 3u-Suiphide 58 %a veersui}o DESCRIPTION o }-{2]¢8 DISCONTINUITY DATA =aa STS a z xr {jz 2/96 =o xix |tox|«xxx WATER LEVELSZzalEe/2/66]Rao FRACTURES |3 TYPE and zr S25 Eau SLAs 85&je=/3)2]%|PeRFooT |a9%SURFACE 29 |2e2/gE2 (Bins|40 ive)9 «SBeg|avo we Ps 4 or ren 55 a 1 eexze go & 39.0 -74.5 \PL,R,FeOx ”40.0-45.0 Slightly weathered (SW),t +.:J,PL,R,FeOx 30°feet:Hole extremely close to close \ , e J,ST,R,FeOx 32°caving after:stained,ight gray,meaum |>50 yy ee Rce os ow 7 to coarse grained,strong 4 50 : (R4),DIORITE (Continued)'9}?16%=e NX40.0 feet:Becomes light gray to F /_|100% a greenish gray \ 7 41.2 -42.3 feet:Broken core | \ 74 a 42.9 -55.8 feet:Broken core |J,PL,R,FeOx 24° 4 N L | \ { S N - ty |\ | > 6rvl46p48'10]45 |47%"| .!Drill Rate: L ,100%Run 10 =7.1 va feet/hour. a \4 » by |\ 1 gg N _| ros if \ N 3 [7 4 \ a | S N 9 7 49.0 -51.0 5 \:feet: i a |aoe”moderate drill 7 2 . ae chatter S 4 :-Eee5018|*14}>|10%Ré | N vo 100% o | g \ =t |J 2 an Drill Rate: =.Run 11 =13 o ty |feet/hour. \ |j 4 \ on \ L N a ly ca I N a '4 J \ N ty |5.0 L 55 12]59 |[42%| ..Drill Rate: ty |100%Run 12 =4.8 \feet/hour. |J,PL,R,FeOx 50° f 4 WJ o 56.3 -59.4 feet:Broken core \ , J,PL,R,FeOx 53' NX S ly / 4 I 57.7 -$8.0 feet:Soft clay(S2)[\'>J,PL,SM,CL 50° -layer .|18 E 4 ry |8 18 FY ox I 100% t N 4d L ;| \ ,J,U,R,FeOx 43° \14 W%Et:J,PL,R,FeOx 56° =ona as i60Logcontinuedonnextpage i i DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiFGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon renlzi;, ;P.Associates DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCORILLHOLE]RECORD OF DRILLHOLE DH12-3 SHEET 4 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 8 Mi point B-Bedding Bonar ioe dee Botte Ep-Epidote _Ob duane @ Axa! F-Fautt FO-Foliation -C-Curved K-Slickensided 8x-Breccia FeOx-Iron Oxide Sa-Sand O Diametral x |i gala).[even SRsmtoa SPetieeP Rowe See view Sees”|bopWein:x nt =Pe 2 °a Wil 2%|FR-Fracture Coens!fireguar”=VRVeyRough CaCakie MUSH Su-Suphide zs 2 q NOTES u lo DESCRIPTION 87 3\|es DISCONTINUITY DATA z ask ESTS a Zz F /E_|2]92 Ep T-1xbx|tox|x xxx WATER LEVELS <ales Oo |RQD |FRACTURES |E¥o TYPE and 2,\SSR/ELE ASSESx&(b=)3)a %PERFOOT |49%SURFACE 28 |eee we2 8sis 860a6|Oo Jz 83eg|a+002 Pe gh DESCRIPTION a |5 eese eg s 39.0 -74.5 a : Slightly weathered (SW),t 7. extremely close to close \ spaced fractures,FeOx | -stained,light gray,medium |36 4 to coarse grained,strong "4 36(R4),DIORITE (Continued)i 14) XN60.1 -64.8 feet:Broken core +;_|100%sw |R4L\ 4 ] \ ty | \ a |4 NN ie 63.7 -64.8 feet:Fresh (FR),close | Z discontinuities,greenish gray,»4 very strong (R5)ly / J,PL,R,Ca,FeOx 61°FR !R5 I N er d,PL,R,FeOx 35°64.8 -74.5 feet:Slightly t vif PLR, J-65 weathered (SW),extremely close|\50 J,PL,R,FeOx 60 4 to close discontinuities,light gray |15 5.0togreenishgray,strong (R4)L »Drill Rate: 65.5 -68.8 feet:Broken core \/-100%Run 15 =12 -|feet/hour.4 '\ Ly | \ i =N 4d r,om | \ a [7 4 ' ]$, a 6 |69.0-72.4 feet:Broken core N |J,PL,R,FeOx 56 7 8 a °y SW |R4 £&70 13 L .Z 5.0 4 x \16|203|Drill Rate: =|'100%Run 16 = ->"rq 125 4 £1 feet/hour. fo]NoOr,74 =I 4 N\ r/-J,PL,R,FeOx 28° | =72.9 -77.6 feet:Broken core '4 ri | N .ry 4 '4647 74.5 -78.7 "He \74.5 Moderately weathered (MW),=)45 75 extremely close spaced .17|#5 7 fractures,FeOx stained a \discontinuities,light gray,N 100%Mw |R4 medium to coarse grained,wt L very weak (R1),ALTERED =4 DIORITE W * 76.1 -76.3 feet:Quartz vein =\ 76.6 -78.0 feet:Becomes iy .completely weathered (CW)=HW |R1 77.0 feet: 4 a Heavy drill =\30°chatter Xs J,PL,SM,CL cw |RO a HW 4 ="5.0 HW |R1H__644.5.0 78.7 -79.6 feet:Broken core \[78.7 18 -78.7 -85.4 feet:Slightly L ,100%_ weathered (SW),extremely close to close FeOx stained \ |SW |R4 discontinuities,strong (R4)\ by |J,PL,R,FeOx 63° y_80 Log continued _on next page qq ne DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fir-\DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure =Golder A-7&.Associates DRILLER:N.Arneson CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-3 SHEET 5 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK.EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107Tji 78WontB-Bedding PiBina BO Bonened orate Ep-Epidote Oh dusre Ona =F-Faut FO-Foliation --C-Curved K-Slickensided Bx-Breccia FeQx-Iron Oxide Sa-Sand ODiametral ->SH-Shear CO-Contact U-Undulating §==SM-Smooth CL-Ciay G-Gouge Se-SericitebaaiuQoa[ed V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte =Hm-Hematite Silica 5a e =rels oO)SIE]&[FRFradure Viregular --VR-Very Rough CaCakite -ML-Sift uSuphide |Zim RB NOTES ue |o DESCRIPTION o L#ya]ey DISCONTINUITY DATA x ous TESTS Oo 12 ziz 1/2/58 =3 yvisx|tox |x xxx WATER LEVELS z &&2|/5/99]Rao |Fractures |$ya TYPE and Zo S25 ELH/ASES 5 @ |e-|5)yl %PERFOOT |29%SURFACE 29 /2e2/GEZ|8sn0 F0°©3 DESCRIPTION B15 osm ay =80 787-1279 7 SH,PL,K,FeOx 5 Slightly weathered to Fresh rv d(SW-FR),extremely close to \ moderate spaced fractures,|5.0 -FeOx stained and Ca filled |50 4 discontinuities,light gray to in 18 SW |R4 greenish gray,medium to |400% coarse grained,strong to -J,PL,R,Clean 67° a very strong (R4-R5),pr 7 0 DIORITE (Continued)an 4,PL,R,Ca,FeOx 58 4 [.Hole 4 RS advanced to r 83.0 -84.3 feet:Broken core 82.4 feet on 4 »8/3/12. by _| \ |\.\J 7 44 J,PL,R,Clean 68°Ra |19 4484,7 -85.6 feet:Broken core _J,PL,R,FeOx 30°Drill Rate: y 85 'on 100%Run 19=6.3 - !feet/hour. 85.4 -86.7 feet:Fresh (FR),\J,PL,R,Ca 67° closely to moderately close r 74 J,PL,R,FeOx 10°44 a discontinuities,greenish gray,;strong to very strong (R4 to R5)\R5 7 7 4 86.7 -99.0 Slightly weathered | -(SW),extremely close to close \4 discontinuities,light gray to [4 greenish gray,strong (R4)\ \86.8 -92.2 feet:Broken core N a ro 7 \4 1 5 \ 3 L J L a |5.0 7 8 [>20 5.0 °an 100% Loo |>_ pe "4 a ( a \ L =p74 ?\ 1 £! o XN[s)ty | \ a I 4 =\J,PL,R,FeOx 3Ea4J,PL,R,Ca 76°-}- _| I J,PL,R,FeOx 25) SL \J,PL,R,FeOx 68°SW |R4 | £ae o \ C (J,PL,R,FeOx 87° NX -7 5.0 4 x an 5.0 °21 =N 3 r vil 100% x 94.8 -96.0 feet:Broken core \ x}95 |4 re)L z 95.4 feet:1-inch thick felsic dike [,” =I ar |*J,PL,R,FeOx 60°4 o |J,PLR,Ca 15° ny \ a 96.8 -98.7 feet:Broken core r vidol\7 2 \ 4 \ &\'J |\A ;: o N a hr j22 5.0 2 100% mi Or 99.0 -101.3 feet Fresh(FR).|>": 4 =greenish gray,very strong (R5)j\7] i FR |R5N 100 . ;"4 Hs 4 Log continued on next page Sa DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi€.A\4 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon re €&,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 -103-95560Wi 4103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Cannon3/8/13RECORD OF DRILLHOLE DH12-3 SHEET 6 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 __E:1,885,107 8 yjoint 8-Bedding PL-Planar 60 Borched Gracie Ep-Epidote.ot art @ Axal ¥F-Faut -£O-Foliation Curved K-Slickensided Bx-Breccia FeOx-iron Oxide Sa-Sand O Diametal z |i glzle When OROvhogonal STStepeed RRovh -GhChibte |aeticatte ©Seana |OP =Fo 2 SO}ow)&[FR Fracture Firegular-VR-Very Rough Ca-Galcite| ML-Sift Su-Subhide |23 2 g woees wi Jo DESCRIPTION 9k e|as DISCONTINUITY DATA x ath TS a z riz iz/|50 =3)vinx |tox|«xxx WATER LEVELSZzalbe68|rao |Fractures |$20 TYPE and 2,|SSHl/ESH ABSA yFs=|b=|/35|eB]«%PERFOOT |25%SURFACE ag /gug wee 8sn3 8Ls00426|o |&geee|a+oae pe DESCRIPTION eG "peso gy = 78.7 -127.9 : Slightly weathered to Fresh |,_|FR |RS(SW-FR),extremely close to |.\; 5.0 moderate spaced fractures,5.0 9 -FeOx stained and Ca filed |.»22 42%sw |Ra 4 discontinuities,light gray to v7 100% greenish gray,medium to | coarse grained,strong to \2 a very strong (R4-R5),ir 7.14 @/J,PL,R,FeOx 78°--__|} J DIORITE (Continued)44 @1J,PL,R,FeOx 75° 100.5 -101.2 feet:Broken core \23]11 |100%)--- ; 101.3 -101.8 feet:Slightly Ly 100% Drill Rate: weathered (SW),light greenish |\°7]°Run 23 =2.4 Zz gray,strong (R4)|feet/hour.4 101.8 -106.6 feet:Fresh (FR),Changed moderately close to close r 7.drilling bit at discontinuities,greenish gray,\102.9 feet. very strong (R5).'Hole -102.9 -103.7 feet:Brokencore |advanced to 4 104.1 feet:1/2-inch thick felsic |,"FR |RS 102.9 fdike37a .9 feet on 1 37 @ |J,PL,R,Ca 57 8/4/12. L 24|7"||59%; pe vf foo ET Smits 105.3 -106.6 feet:2-to 3-inch .':8 |ot PLR,Feox 30°feet/hour. diameter,fine grained xenoliths +,|*J,PL,R,FeOx 28° \4 J,PL,SM,FeOx 78° j 'J,PL,K,CL 42°J fr 7 J,ST,R,FeOx 42° 106.6 -108.5 feet:Slightly an ss a weathered (SW),strong (R4)\St a eon 4 !4 SW |R4\ a rs.4 4 \ \"J,ST,R,FeOx 20° 2)1085-1164 feet:Fresh (FR),|>:d,PL,R,FeOx 30° £|moderately close to close vq 47 5 a discontinuities,greenish gray,\25 5.0 4 o very strong (R5)N 8 lr,/ 94% :\L440 é 109.9 -112.8 feet:Brokencore |= a \/. oO I g > 2 @ |4,PLR,FeOx 59° 8 \@ |J,PL,R,Ca 64° in "a s |4 N in / |FR |RS | =N 4 i?4 113.4 -113.8 feet:Broken core !ey>5.0 -\"26)5-9 4 \100% hi L115 4 115.2 -115.2 feet:Broken core |.'vy \ a \4 ly / 116.4 -118.3 feet:Slightly I weathered (SW),strong (R4)\ | 116.6 -118.5 feet:Brokencore =f 7 _|4d \ .!Sw |R4 re =(43 _ N 4.118.3 to 120.7 feet:Fresh (FR),+7 27 close to moderately close \100% discontinuities,greenish gray,\ 5 very strong (R5)L .%|4,PL.R,FeOx 63°4 on . :J,PL,R,FeOx 66°FR |RS |:@ ||4,ST,R,Feox 21° f 7.ptt i 4p120Logcontinuedonnextpage -_S DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi(aLMF Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon ren75DRILLER:N.Arneson CHECK DATE:1/9/13sociates €Cannon3/8/132.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WiRECORD OF DRILLHOLE DH12-3 SHEET 7 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107OoTyShayRoughnessInfillingPy-Pyrite @ Axal|.B-B 4 a *7 -9 Eat FOFoaten =G-Cuned.ronoaned,siscie,Epsoion,Ge dure |CpmetalfoSH-Shear CO-Contact U-Undulating SM-Smooth CL-Clay G-Gouge 3e-SenciterWwLo]ir ae V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chionte =-Hm-Hematite Silica 5a 2 =Fels QO)eye)&[eR Frocure Firregu VRVery Rough Caaicte ML-Sifl SuSubpnide |2308 NOTES ui=Jo DESCRIPTION 2 t-43|ey DISCONTINUITY DATA z |,ar WATER LEVELSFS@l&>o/2|/88|rap |Fractures |$¥o TYPE and 2,|SSR/ELH/ASES 5 2 (e=/3)2]%|PeRFooT |a9 SURFACE $3 /2b2/eE2|Sen0 Fp=120-4159 O|°|#|leges|vvoee pee {DESCRIPTION g-|"5 ees2 2 & .7-127.9 a Slightly weathered to Fresh mm 27 y)@ 1 Us R Feox 70 JJ FR |R5(SW-FR),extremely close to |\° 'e|lu PLR Feo . moderate spaced fractures,|ves x 40 -FeOx stained and Ca filled =|: 4 discontinuities,light gray to "4 S greenish gray,medium to I 20 me coarse grained,strong to \20 ass a very strong (R4-R5),r7 28)0%&SW |R4 Drill Rate:4d DIORITE (Continued)tow!|TRE ri Rate:120.7 -123.2 feet:Slightly .CE Run 28 =12 weathered (SW),extremely close |,a feet/hour. to close discontinuities,gray,oe % -strong (R4)'4 120.7 -123.2 feet:Broken core @ |J,PL,R,FeOx 59° 122 feet:Becomes greenish gray [/| 123.2 -126.3 feet:Fresh (FR),\ close to moderately close N | -discontinuities,greenish gray,°4 very strong (R5)4 @ |4,PLR,FeOx 58 124.1 -125.2 feet:Broken core | |.FR R5 +125 \]5.0 "| .29|5 ||aa% 125.6 -126.1 feet:Broken core I 7 100%XYr|J,PL,R,FeOx 13°7 126.3-127.9 feet:Slightly t ,_|weathered (SW),extremely close |'J,PL,R,FeOx 5 to close FeOx stained \ Z discontinuities,greenish gray to 4 orangish gray,strong (R4)ry a SW |R4 126.6 -129.6 feet:Broken core I \4601. a 127.9 -132.3 Ht 27.9 4 - |Moderately weathered (MW)=|extremely close to close » 2|spaced fractures,FeOx A |'S|stained discontinuities,N MW |R3 q 2)orangish gray to greenish H .$|gray,medium to coarse =\. ©|grained,moderately weak . z¢|(R3),ALTERED DIORITE "y130|'.'RS |S4 4 Sy)129.8-130.3 feet:G-inch thick |30}&9 |lagealayerofplasticsilt,stiff NN a =100%: a D =\4 (=131.1-133.4 feet:Brok =feet:Broken core a mw |R3 o =y a HW 4 =597.7 132.3 -178.2 \"1132.9 Slightly weathered to Fresh t yo |(SW -FR),extremely close \SW |R4 to wide spaced fractures,|7 FeOx stained and Ca filled ' discontinuities,gray to a 4 greenish gray,medium to | -coarse grained,strong to N J,PL,R,FeOx 4°+ very strong (R4-R5),I /o]J,PL,R,FeOx 44° DIORITE ; N |435 132.3-133.5 feet:Slightly r 7 5.0 i weathered (SW),extremely close |,'|50tocloseFeOxstained31)38%°F discontinuities,gray,strong (R4)|" 7 °J,PL,R,FeOx 74 Pp Drill Rate: 133 feet:1/2-inch thick altered vq 100%°Run 31=9.4 a zone @ |J,PL,R,FeOx 66 feevh|CE RY ©||[2 PLR Feox a]our.4 136.4 -137.0 feet:Broken core in /.§>> |':FR |R&S +|@8\/.ST,R,FeOx 78° | ar J,PL,R,Ca 61° XN }ae = \ | '49 @/J,PL,R,FeOx 73°# Ly |. L ve [a2]2 |6%4 »98% \/4 ,J,PL,R,FeOx 67° L440 !|@ |J,PL,R,Ca 59°| Log continued on next page =aa . . :DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi(aAY\z Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon renFP,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 - ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]RECORD OF DRILLHOLE DH12-3 SHEET 8 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 __E:1,885,107 8 Rint B-Bedding BLP anar BO Bocned orale Ep-Epidote__Oe dust @ Anal r F-Fauk FO-Folation -C-Curved K-Slickensied -Bx-Breccia.FeOx-lron Oxide Sa-Sand C)Diametral 2 |i @ |e Vion GRonhogonal St-Stepped'Rehowhe.-GhCherte |Himeetatte «Seon |SOPFe38zWi2|FR-Fracture Fimegular VR-Very Rough Ca-Calte ML-Sit su Sulphide z <3 q NOTES a lg DESCRIPTION g 3|x3 DISCONTINUITY DATA =z.ecus TESTS i)z z|/z_|2|96 =o <x |tox |=xxx WATER LEVELSFeda2|FelZ|OG]RaD |FRACTURES |F¥o TYPE and 2.|SSS\ESEINSSA3@|w@|35)2 PERFOOT |29%SURFACE 28 |2¥2|ge2 Beem FL440a9(4 $332 3 ao oL ee RPTON _a |e eero 9 = 132.3 -178.2 '@ [J,PLR,Clean < Slightly weathered to Fresh t >|(SW -FR),extremely close \ ,to wide spaced fractures,e +FeOx stained and Ca filed |*49 @)[4 PLR,FeOx 42 discontinuities,gray to "4 50greenishgray,medium to |32|76% coarse grained,strong to N 98% a very strong (R4-R5),in aDIORITE(Continued).j |@ |J,PLR Ca,FeOx 60° 140.9 -141.7 feet:Broken core om ' \ L .j143.2 -143.4 feet:Broken core |)[MAN \: \ Ly |@/J,PLR,Ca 72°|\: |i |e J,PL,SM,CL 31° N 1 L :| 445 MF 5.0 @ |J,PLR,FeOx 54°| 145.1 -145.5 feet:Broken core fl 50 PLR, \33)"68% en 100% -I @|J,PL,R,Ca 70°|4 NX h'4 |@ J,PL,RCa 78°| _|i \ =NX 4d 4 I N sg y 7 4\ 1 10 'Hole 3 1 Mla OF 1,PL.8 00 ,saree@F@/J,PL,R,FeOx 7°.9 feet on E in 100%e'|[J PL.R Fedx 40”8/5/12. -a |J,PL,R,FeOx 20°4 g a °\ \@ J,PL,R,FeOx 81° 150 |5 | 4,PLR Ca 8”FR |R5 4 "\|39 $4 PL.R.Ca 82° 9 . :e@.J,PL,R,FeOx 78°g >361 39 ||loo%Py jJ,PL,R,Ca 78°) F D @ J,PL,R,FeOx 79°42100%'a [-}N°L |or i -\4 N i |ly | 152.8 -153.1 feet:Quartz rich |36/02 0%|@ |J,PL,R,Ca 51° ; g dike Ly r 102 |Drill Rate:7 an |Run 36 =1.3 |9 :feet/hour. »100%@ |J,PL,R,FeOx 59°Changed i r'drilling bit at 4 ||e J,PL,R,Ca 32°153.0 feet. L }165 |45 ©||J,PLR.Feox 35° | |»37|45 |}go%°J,PL,R,FeOx 42° ori Rat4'rilt Rate:100%@ |J,PL,R,FeOx 55°Run 37 =7.1 L \feet/hour.d +7 |\ '| |v4 |4 I .| ros4 @ J,PL,SM,Stained 75° =i :[J 4d N he 5.0 '|38}5°||oa%||7 LY 100%4 \ \:\@ §J,PL,R,FeOx 62° | roy L : 1 4160Logcontinuedonnextpage ..=DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi(aA\3 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon ren7;DRILLER:N.Arneson CHECK DATE:1/9/13LAAssociates ECannon3/8/13212.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WiRECORD OF DRILLHOLE DH12-3 SHEET 9 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 __E:1,885,107 oO Ty;.Shape Roughness Infilling Py-Pyrite @ Axalfo)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotite Ep-Epidote Qtz-Quartz 2 F-Faut FO-Folation C-Curved -K-Slickensided Bx-Breccia. FeOx-Iron Oxide Sa-Sand O Diametral -SH-Shear CO-Contact U-Undulating SM-Smooth CL-Clay G-Gouge Se-Sericite EAM=x iT QO rf oe >V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chlorte =Hm-Hematite Si Silica 39OF=NOTESrr=)S 9 z w &|FR-Frecture Elrregular VR-Very Rough CaCatkite ML-Sit Su-Sulphide 3 3 id &TESTSwu10DESCRIPTION972/¢$DISCONTINUITY DATA z |, ase a |¢=iz /2/86 <a 31x 8x|tox|x xxx WATER LEVELS z &@ |Fe|/$|o9]RAD |FRACTURES |$¥o TYPE and Ty (Sze Eze)Veas xe o 2 ||5 ted %PER FOOT LOR SURFACE 26 |fez we Sena RL1604=aa a B8gh|ww eooe Fae DESCRIPTION B |Bese &z 132.3 -178.2 N ° Drill Rate: Slightly weathered to Fresh =|,_|e J,PL,R,FeOx 12 Run 38 =7.9 (SW -FR),extremely close \feet/hour. to wide spaced fractures,|50 '@|jJ,PL,SM,FeOx 42° a FeOx stained and Ca filled |*50 @)/J,PL,SM,FeOx 41°4 discontinuities,gray to on 38;>94% greenish gray,medium to |100%coarse grained,strong to N @ (J,PL,R,FeOx 51° i very strong (R4-R5),"4 {|4 DIORITE (Continued);°J,PL,R,Stained 66° 157 -164 feet:Discontinuities =>J,PL,R,FeOx 64° may be rehealed fractures.v7 rr.*J,PL,R,Ca ay 7 7 le|u,PL,R,FeOx 73°\»PL,R, J,PL,Ri FeOx 56° i t 7 |J,PLR,Ca 57° 4 \ \ N 5.0 =r vil 5.0 y \@ J,PL,R,Ca 67°|165 0 39 94%Drill Rate: N 100%Run 39 =9.4 L ,|feetv/hour. \ L \| N in 7. \ L N 4 ly /.] \ NX a .7 4 \ \ s \@||SH,R,FeOx 39° e 168.7 -169.5 feet:Broken core I os fd 1 5 .FR |R5 7 »L3 on°5.0 470 §|.40|2 |Hag,e J,PL,R,FeOx 31 _| Nn on 100%ro)| 4 N r D or 7 £\ oS Noly7. L |4 "X l,/@ J,PL,R,FeOx 80°}---_]| i L \4 roy]@/J,PL,R,Stained 72°P|\ 1 N |5 e@||J,PL,SM,FeOx 42°q | "X rm 50 L475 at}5°|'sc0%4 N r 7.100%e J,PL,SM,FeOx 56° \ \J,PL,SM,FeOx 13° i LY @ |,U,SM,Feox 59°4 \ | NX =ly / = { N ros.:J,PL,R,Stained 68° \4 J,PL,R,Stained 66° -4558.1.8 :J,PL,R,FeOx 59°7 tL 178.2 go]1.8 ; XS 100%:178.8 -179.4 feet:Plastic clay 7].|I seam =I +@ |J,PL,SM,CL 60 mw |R3 179.3 -180.0 feet:Broken core [),| af 43 47% N ; +80 . .LLB 7 Log continued on next page .DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards .\?Figure(62)Golder DRILLING CONTRACTOR:Cru Subautce,ne CHECKED:€Caron iguAssociates-N.Ammeson : PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-3 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 10 of 21 INCLINATION:-60°ECannon3/8/13103-95560WATANA2012.GPd_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 8 Pat 8-Bedding Bonar Bo Boeke Oriole Ep-Epidote Ob dust °Anal =F-Fautt FO-Foliation _C-Curved K-Slickensided Bx-Breccia FeOx-iron Ode Sa-Sand O Diametrat r i Oo]?\e oven OR Orthogonal Sisepaee Roo Cherie Aeeietate Sore bo?Fo 2 6 4 Ww)&|PR-Fracture Tinegur -VR-Very Rough Ga-Cakte ML-Sit Su-Suiphide |23 2 zg Nearsw>1o DESCRIPTION Ot ee a DISCONTINUITY DATA =aoe a z Fix |2156 =G-|vinwltox|«exe WATER LEVELS z a |EFo|/2/63 |Rao |FRACTURES |E¥o TYPE and Fo (See Eee |SSES wo52/w-|5|Bl %PERFOOT |29%SURFACE &8 jeez /eb2(Sinn f480aoOEasgeg|anew 02 Pe get DESCRIPTION eo]&looro ay x 178.2-180.7 Ht | Moderately weathered (MW),|==MW |R3extremelyclosetomoderate4555.8 spaced fractures,clay filled .[180.7 32aandFeOxstainedL32 * 7 '@ =|J,PL,R,FeOx 44°4 discontinuities,gray to ,43)"47%i greenish gray,medium to |100%| coarse grained,moderately ||:° a weak (R3),ALTERED a J,PL,R,Stained 48 | DIORITE (Continued)1 i 180.7 -351.1 » Fresh to moderately l / a weathered,(FR-MW),\4extremelyclosetowideN spaced fractures,FeOx and f ,_|J,PL,R,FeOx 66°MS ]Ca filled discontinuities,gray \FeO.> to greenish gray,medium to N !:J,PL,SM,x 18 -coarse grained,very strong L ,=4 to moderately weak (R5 to eo = R3),DIORITE j = \5.0 ||ip :182.3-183.3 feet:Brokencore [/ J 5.0 Ae @ J,ST,R,FeOx 79 SW;R4 185 183.7 -184.2 feet:Broken core [| \44 22'|7 \100% 185.5 -186.7 feet:Broken core 7 ,_| \ 5 {d N r,/. |J,PL,R,FeOx 51° NX r 180.7-188.9 feet:Slightly t |° 4 weathered (SW),extremely close |\J,PL,SM,CL 14 to close FeOx stained and Ca | filled discontinuities,greenish »Hole a gray,strong (R4)7 ¢advanced to J 187.2 -192.3 feet:Broken core \ :187.5 feet on =\8/6/12. oi rosai=\ =a 188.9 -191.5 feat:Moderately |4 @ |Weathered (MW),close to \ 3 extremely close discontinuities,[7[s)greenish gray to tan,moderately \\5.0 iEc|weak (R3)N 5.0 a190|L >45|7 0%.4 x \ ;400%BE MW |R3 g N x L .="rq 4 £|[]\ ©]191.5 -203.0 feet:Slightly L ,|weathered (SW),greenish gray,|\strong (R4).|| a \J,ST,R,FeOx 70°bh]5 | 4 \ | 193.7 -194.8 feet:Broken core £' a \4 | N ir /.5.0 B L195 !46|©°|136%= =94 o195.4 -197.7 feet:Broken core \/>100%@J,U,R,FeOx 87 .!sw |R4 L LY s \i I : \ a ly |: | N ra L I 4 198.1 -199.1 feet:Broken core |'oo 5.0 A |47|5°|f2a% 5 r 7.100%i ; 7 \1 I °199.5-200.3 feet:Broken core |.'i |e SH,PL,K,FeOx 12 KX[." ett200Logcontinuedonnextpage 4 -_<DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Figur(6);Gold er DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon re eLJAssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/13312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WiRECORD OF DRILLHOLE DH12-3 SHEET 11 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 T Sha it Py-P)a Joint B-Bedding BLPonar =BGBolshed -«Bteaioite _Ep-Epidote abut |oe z F-Faut FO-Folation -C-Curved K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand O Diametral =|b O |Ble]-|Yvene OROwwgona StSepped Rikon Gnenbte Himtemate Seciea ||BOPEe29awi&|FR-Fracture Firregular VR-Very Rough CaCaicite ML-Sill Su-Sulphide es %ry neueswu}oO DESCRIPTION otk 42/¢s DISCONTINUITY DATA x a-r ESTS Qo z Zz jz_12/98 =o-iyibx|tox|<xxx WATER LEVELS z a |E=|/2|881 rao |eractures |F¥o TYPE and 2,|SZS/EZa/ABES yp3eWSgsFed%PER FOOT 29%SURFACE ag |gue Gee Bena_je}o x gag2|avons Po gt DESCRIPTION e 5 ese2 & 180.7 -351.1 N ' Fresh to moderately tv.° weathered,(FR-MW),\@ (J,ST,S,SM,FeOx 49 extremely close to wide | 5.0-spaced fractures,FeOx and |*50 ;4 Ca filled discontinuities,gray \co 47|24%Kwtogreenishgray,medium to |400%SW |R4 coarse grained,very strong \ =to moderately weak (R5 to 7 4d R3),DIORITE (Continued)an 201.0-201.6 feet:Broken core |>202.0 -203.0 feet:Broken core on n 203.0 -207.8 feet:Fresh (FR),l 4 close to moderately close N discontinuities,greenish gray,ros] very strong (R5)\ \ 5 N | Ven @ ||J,PLR,FeOx 34° | \5.0 ad J,PL,R,FeOx 34° 205 >faa}&9 |tree = | \100%FR |R5 ty |®J,ST,R,CL,FeOx 35° \ a j 4 N f /. \ \ sg NX | L 7 _| \ \ NX 207.8 -212.5 feet:Slightly r vi]EB weathered (SW),extremely close |\7 >|to close discontinuities,gray to | 2 |greenish gray,strong (R4)» £|2078-2126 feet:Broken core [,/ s&&{4 4 NX 5 tv. 8 'y 5.0 =a g N 5.0 |bho |210 bs r 7 "9 %SW |R4N\100% 3 | XN=L q Ss 2 \/|3 4 5 .a a(s)b>' \ L '4 NN Ly |212.5 -218.7 feet:Fresh (FR),\oe J,PL,R,FeOx 41° close to moderately close |@ J,PL,R,FeOx 35° a discontinuities,greenish gray, L J,PL,R,FeOx 80°= very strong (R5)\"e J.PL.R.FeOx 51°[3 PL Ri FeOx 80° '@ (J,PL,R,FeOx 53° I'®/5,PLR,FeOx 72°SI 4 {@)(J,PL,R,FeOx 48° N 7 4 5.0 L 215 50|59 ||2e%= LY 100% \ ;FR |R5 sg »4 in /.] | 216.6 -217.2 feet:Felsic dike \ Ly |L \ 4d 217.2 -219.0 feet:Felsic !@ @ |J,PL,R,FeOx 18° intrusions »>>J,PL,R,FeOx 54° r /.J \ -!@ |[J,U,R,FeOx 31° 7] r\/ |5.0 of @ |J,PL,R,FeOx 61° 218.7 -2247 feet:Slightly 51|59 ||49a] i weathered (SW),extremely close |100%ES 4 to close discontinuities,grayto f-% °a a a greenish gray,strong (R4)\ \..a SW |R4 219.5 -222.5 feet:Broken core = -["4 'a |220 Log continued on next page <DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiAGId.DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igureeAolderAssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 A-7 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-3 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 12 of 21 INCLINATION:-60°ECannon3/8/13.103-95560WATANA2012.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 a Ty :Shape Re Infilling .Py-Pyrite @ Axal fo)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotrte Ep-Epidote Qtz-Quartz =F-Fautt £O-Foliation C-Curved -K-Slickensided =Bx-Brecoia.©FeOx-lron Oude Sa-Sand C Diametrat z_|é gla le|.[Me Roeteas Fa auerer”ee,State Sa"|soe.Fe =SG}a |B)&(FR Frecture Fimeguar_VR-VeryRough CaCakite MLSitt Su-Sulphide 280 a NOTES "lo DESCRIPTION oe ee a DISCONTINUITY DATA =ase ESTS a |Z z|E_|/2)98 =o-|v=|tox|x xxx WATER LEVELS s aq jes OO |RQD |FRACTURES |Xo TYPE and QS |SSHESH/ABEA&6 |G£|/2)°-2]oe PERFOOT |29%SURFACE 28 |9a9 Mies Sine XNLo00426|°|&889R|\a+002 bY oF DESCRIPTION ge?(5 |=pesoe zs 180.7 -351.1 \"; Fresh to moderately 74weathered,(FR-MW), extremely close to wide | 5.0'spaced fractures,FeOx and '50 :4 Ca filled discontinuities,gray os 51|>18% to greenish gray,medium to j 100%a coarse grained,very strong \° 5 to moderately weak (R5 to / J R3),DIORITE (Continued)\ N >Sw |R4 . @ (J,PL,SM,FeOx 61 -222.9 -228.9 feet:Broken core I 4 NX 7 \ gs N 4d a | 224.7 -225.2 feet:Moderately '48i225weathered(MW),gray,|52 7 50%MW |R3 7 moderately weak (R3)i "225.2 -227.5 feet:Slightly N 98% weathered (SW),extremely close |,_|to close discontinuities,gray to r greenish gray,strong (R4)|Ld J,PL,R,FeOx 28°4 N 7.SW |R4 \ }'4 227.1 -227.5 feet:Felsic dike \7 227.5 -229.2 feet:Moderately .!weathered (MW),extremely close FE to close discontinuities,greenish ' 4 gray,moderately weak (R3)I=.MW |R3 e 7 | |1s Jfal7.e J,PL,R,Ca 28°@ |229.2 -237.4 feet:Slightlyso)weathered (SW),extremely close |,fm©]to close discontinuities,gray to |5.0 : |230 E|greenish gray,strong (R4)\53 5.0 0%:| |930.1 -231.1 feet:Brokencore [7 |BS @ |J,PL,R,FeOx 68° N 100%(2)i g N a =7 |4 2 ' °oS|2315-2325 feet:Broken core |>:@ |J,PL,R,FeOx 68 L |» XN "4 |@ (J,PL,R,FeOx 60° 233.1 -233.7 feet:Broken core 7 sw |R4 233.5 -233.7 feet:Felsic dike N l t / 4 234.1 -236.5 feet:Broken core |bg J,PL,R,FeOx 23° '\ / 5.0 |235 54|5 ||so%4 YI 100% \ 1 1 \= an \ t N 1 \"4 @ J,PL,R,FeOx 82°----__7 \237.4 to 315.7 feet:Fresh (FR),|@ |J,PL,R,FeOx 47 extremely close to close Y 7 Hole a discontinuities,greenish gray,an advanced to | very strong (R5)N 237.5 feet on 237.8 -238.9 feet:Broken core }5.0 8/7/12. v4 50 J,PL,SM,FeOx 6°R4 1 55 .58%FR BijJ400%°J,ST,R,FeOx 46°| \ 'Oe J,PL,SM,FeOx 44° \ry J,PL,R.FeOx 70° 240 7 Lig ®e J,PL,SM,FeOx 70° Log continued_on next page |4 DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi(aA FE:Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon re eAssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 €Cannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WRECORD OF DRILLHOLE DH12-3 SHEET 13 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 __E:1,885,107 T |8 Md joint B-Bedding Bana Hie:ioral Hace Ep-Epidote.ahr arte @ Axal =F-Faut FO-Foliation K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand 0 Diametral z |é A oe ee ee een-:=Fe 3 ie}a wi z PR-Fracture ogena ST-Stepp VR.eyRough Ca-eee Hirsi Su Sulphide 2 ESFa a NOTES wu |o DESCRIPTION gh 2|¢s DISCONTINUITY DATA x |, ase TESTS a |Z z|E_|2]99 ep a xbxliox|x xxx WATER LEVELSid2jhe|F|O9 |RQO |FRACTURES |324 TYPE and fo (S2R(EZR/SORS woOo2j|w-|/5|@ %PERFOOT |20%SURFACE $0 [222 /8h2 (Seno &|349-42 o %283gg|veo?Pe ei,st CeSCRETION 15 eG peso a x180.7 -351.1 , :oe”JST.R,Fedx " Fresh to moderately L '|Ps { J,PL,R,FeOx 27°weathered,(FR-MW),\RE >>J,PL,R,FeOx 68°extremely close to wide !50 ; J,PL,R,FeOx 50 -spaced fractures,FeOx and |50 ' 4 Ca filled discontinuities,gray [,”>55|>58% to greenish gray,medium to \100%A>> coarse grained,very strong °c a to moderately weak (R5 to ." & 4 R3),DIORITE (Continued) 'N240.6-241.4 feet:Broken core r 7-8 J,U,R,Stained 66° .;{J PL,R,Ca 67°4 »@ |J,PL,R,Ca,FeOx 66° vq > \ L NX 4d 244.1 -244.2 feet:Broken core I /.]AAR |\e J,PL,R,Ca 40° N 5.0 ° |*50 @ |J,PL,R,FeOx 48 r-245 va 56 68%4 \100%e J,PL,R,FeOx 42° >@|J,PL,SM,FeOx 79°NXv75 a |@)J,PL,SM,FeOx 74 rh]4 N t \: .!@ J,PL,SM,Ca 78°}--__||.:4 247.1-249.6 feet:Brokencore [/ :hed J,PL,R,Ca 40 247.1 -248.6 feet:Broken core \1 N -[7 \4 $, E \/ 7 G|249.0-249.8 feet Broken core [||4 :v4rs) =oo)@)|J,PL,SM,Feox 42°250 |3 L '57|>42%FR |R4 4 N vo 100%2|250.5-251.4 feet:Broken core N !=L a Dp \os 7 £1 oS N°f 4a] \ 5 \4 N 17 },a | L_\|@.J,PL,SM,Ca,CH 76° L i e {|7 7 i J,PL,R,Ca,CH 52°\,PL,R,Ca, 253.4 feet:1-inch thick felsic dike t \a L.in '@||J,PL,R,Stained 46°7 I 254.5 -261.5 feet:Broken core I?_|50 L255 58|59 ||44%a L >|100% \ ! a \ : 4 ty |: \} !f Y | L 1/4 i J \ XN ly /J ' 5 \2 L/4 5.0)|th |59]59 ||7% 7 L 100%4 \ ! a r 7 i i”260 --continued on next page | DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FigurDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon gureolderA-7PPGolderDRILLER:N.Arneson CHECK DATE:1/9/13 £Cannon3/8/13RECORD OF DRILLHOLE DH12-3 SHEET 14 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12to 8/18/12 ELEVATION:1712.3ft AZIMUTH:235° LOCATION:_Susitna River,Talkeetna Mountains,AK.EQUIPMENT:Burley 6000 COORDS:_N:3,227,001 _E:1,885,107 Oo Ty Shape Roughness.Andibti ;Py-Pyrte @ Axalfs)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotite Ep-Epiote__Qtz-Quartz Obi fzrF-Fautt FO-Foliation C-Cu K-Slickensided x-Breccia FeOx-Iron Oxide Sa-Sand iametral x |i a |2 le Vere”OROrhogonal StStepeee'RRouh --ChCAerte |Mmerietnatte |Sesea ohmFo2is}ad wi 2 |FR-Fracture tirreguiar VR-Very Rough CaCalcite ML-Sitt Su-Sulphide F3 Fs @ g NOTES wu 1o DESCRIPTION ok 2|#28 DISCONTINUITY DATA x=a,TESTS a z XZ |Z 12/96 Felton)xxx WATER LEVELS irq alte s OO |RQD |FRACTURES |E#e TYPE and 2,525 2%NGEN wo 3 &je-|3|@ %PERFOOT |29%SURFACE ag |2¥2 oR2 Sino NL-260-4 aan a 8898)nvooe Pe ge DESCRIPTION S|Rese 2 & 180.7 -351.1 C F ae Fresh to moderately ry _|weathered,(FR-MW),\ extremely close to wide ! 5.0spacedfractures,FeOx and |.*50 ipCafilleddiscontinuities,gray [,'>59}>7% to greenish gray,medium to ]100%og! coarse grained,very strong \0 a to moderately weak (R5 to rf 7 J,PL,SM,Ca 57 R3),DIORITE (Continued)an 262.5-263.2 feet:Broken core |> \ i |J,PL,SM,FeOx 61° Ly SH,PL,K,FeOx 53° on J,U,R,Stained 71° SPL,R,FeOx 55°SQ o |*J.PLR,FeOx 70%} ra 4 J,PL,R,FeOx 70° ||id J,PL,R,FeOx 35°5.0 {@®|J,PL,SM,FeOx 76° }265 r./>feo)5°|156%|J,PL,R,FeOx 53°| (100%|*°@ |J,PL.R,FeOx 66° V4 @ [5 PLR FeOx 52 N S 1 4 \;@ ||u,PLR,FeOx 21° on | L N 4d L | ' i .Hole 267.8 -268.2 feet:Brokencore +/_|advanced to a \XX 267.5 feet on 1 =|8/14/12. 3 268.4 -269.4 feet:Broken core » .r 7 &§\ I 4 o N 2 ty _|3 \ |50 @|J,PL,SM,FeOx 72°p- _| -270 $269.6 -271.6 feet:Moderately »61 5.0 36%FR R4 _ qj |close discontinuities l,7 :to . \100%:RCe)t ; 5 g \ -oO ion 4 £I 8 '>> 271.6 -272.7 feet:Broken core in / i |4 NX M4 >> | :e SH,PL,K,Ca 25° a \L_4 hs ' N or "4 t 7 a |g N @ |¢[J PLR FeOx r 5 bard 5.0 SH,PL,K,Stained 56° =\Zt 275 62|©||/¢e%4 Q Ly 400% <\ =1 a \or 4 o ly 7 @ |J,PL,R,FeOx 54° Sea \ aL ne 1 36 S |@||J,PL,SM,Ca 40° <N &oo et '|||J,PLR,FeOx 36°| a N -ne a8 @||J,PL,SM,FeOx 40° 2 63]5&9 |172%| OF |»400%@||SH,PL,K,FeOx ate 4 a "4 @)[J.PL.SM,Fedx 39° S I |J,PL,SM,Ca 42° <='®J,PL,SM 37° Z|280 [4 LH le -|E Log continued on next page =_DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi8GolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon renon=- :DRILLER:N.Arneson CHECK DATE:1/9/13|Wf Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-3 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 15 of 21 INCLINATION:-60°ECannon3/8/13)12.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}103-95560WéPROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 8 J-Joint -_B-Bedding SUBaoar =BORoIened -Bratte Ep-Epidote edust |©A*2=F-Fault FO-Foliation C-Curved K-Siickensided Bx-Breccia FeOx-iron Oxide Sa-Sand O Diametral -SH-Shear CO-Contact U-Undulating ==SM-Smooth CL-Clay -G-Gouge e-Sericite=x HT]Q a oe V-Ven OR-Orthogonai ST-Stepped Rough Ch-Chwrite Hm-Hematite i Silica Fo 2 =NOTESrgl=9 Z uw z=FR-Fractui Lirregular VR-Very Rough Ca-Calite ML-Sitt 3u-Sulphide 55 %gwu10DESCRIPTIONoi43|ee DISCONTINUITY DATA =eae TESTS ao 12 z/zE_|2/98 tu ov x|tox|x xxx WATER LEVELSz@|Fe]S|oo |Rao |FRACTURES |F¥a TYPE and Fy (Oz2u e2i oso &x em /3)2 %PERFOOT |46%SURFACE 33 2e2/GR2|Ssn0 8 o80 a o)e seeel|nw0oee Pg E|DESCRIPTION &5 wore oy x 180.7 -351.1 wa J,PLR,Ca 58 Fresh to moderately 7.weathered,(FR-MW),\ extremely close to wide .'5.0-spaced fractures,FeOx and - e PL.K °4 Ca filled discontinuities,gray \"63 5.0 72%SH,PL,K,Ca 45 to greenish gray,medium to \100%coarse grained,very strong N ° |to moderately weak (RS to 7. JR3),DIORITE (Continued)\ |@J,PL,SM,Ca g2°L__| NX 282.7-286.5 feet:Broken core |,' ={4 NX \/ ] | a \ 4 - | N 5.0 | /.5.0 ; t 285 285.0 -291.0 feet:Becomes gray |\64 27%| |100% \/.] =1 4 N 'on | 1 N 4 \/.] | N =\/_j o |3 N @ ||J,PL,R,FeOx 27° o faL.5 ,@ |J,PL,R,FeOx 62° |a °L >®|/J,PL.R,Ca 33° 5 + °4 5.9L290|$|65|5°|56%FR |R4 4 pl v4 100%toos!@ |J,PL,R,FeOx 61°RS g \ |2 ra .4 3 \°\/.] =I 4 NX \/. | L \ 4 \a | XN =\/= i 'N 'or 50|295 66|5°4 YI 100% \ 295.7 feet:1-inch thick feisic \ -intrusion \ 4 on { N a ra 4 | NX vy 5 |4 XN sw 5.0' |67 5.0 a 298.9 -299.1 feet:Broken core |om 100%J,PL,R,Stained 4 \ | N a 7. 4300Logcontinuedonnextpage =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiAY4GolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:€.Cannon igure Bai A-7AssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/13103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]RECORD OF DRILLHOLE DH12-3 SHEET 16 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,001 _E:1,885,107OoTyRoughnessinfillingPy-Pyrite @ AxialfoJ-Joint B-Bedding PL-Planar PO-Polished Bt-Biottte Ep-Epiote Otz-Quantz .=z F-Fautt FO-Foliation --C-Curved K-Shckensided Bx-Breccia. FeOx-lron Oxide Sa-Sand O Diametat x -o|>lo wenn SRomagonal Si-Stepaed aoe GRehonte Hovrcteatte -Secies baer,re 2 oO)aw]&LFRrrecture Fireguiar __-VR-VeryRough CaCalcte ML-Sit su-Supnide |SSB NOTES b=|o DESCRIPTION 9 ls]25 DISCONTINUITY DATA z an WATER LEVELSao2z|E>)2!883]rap |rractures |$¥a J /¥Om (29H ASS x oe\|2 ¢2 TYPE and Te |Szuleee ON worel@|w |3|2 %PERFOOT |29%SURFACE $9 j2e2/e52/Ssn5 F oo {2 o x 889R|avowe Pooh DESCRIPTION a7 lenso oT3001807-3814 . Fresh to moderately r 7.weathered,(FR-MW),\ extremely close to wide |5.0 |@||J,PL,SM,FeOx 43° -spaced fractures,FeOx and = *e J,PL,SM,Fi 42°4 Ca filled discontinuities,gray [\/ |67)°°|1aa%»PL,SM,FeOx sian (OYtogreenishgray,medium to I 9,.ne coarse grained,very strong \100%10/3/12;VwP a to moderately weak (R5 to rosa q R3),DIORITE (Continued)\ 301.7-302.3 feet:Broken core |: a 'ks @||J,PLR,Ca 43°J N L 7;| \ |FR R4 i L to 4 "4 R5 | >28 -f@ ||SHPL.K,Ca 23° rH 305 vq 68)84%4 |100% /. \ s I 4 \®@ |SH,PL,K,Ca 66° Ly | V @ |J,PL,SM,Ca 61° }\4 L 7 _| \ 307.5 -307.8 feet:Broken core ['Hole 307.6 -308.2 feet:Slightly :[advanced to L weathered (SW),light greenish [,":J.PLR Clean oy SW |R4 #07 8 fost on a _ |gray,strong (R4)|isa:oo 8/15/12o308.2 to 310.2 feet:Fresh (FR),N a Be . @j|extremely close to close ty ||discontinuities,greenish gray,\Pee -GB |very strong (R5)(_ ©|308.6-308.9 feet:Broken core \.J.PL,SM,Ca 33°FR |RSgLy|PL,SM, °|5.0 L310 |=»69|5°|170%- i}310.2 -310.6 feet:Slightly '4 100%sw Rs>|weathered,light gray,strong (R4)I|310.6 to 311.1 feet:Fresh (FR).|\ a =|Ca filled discontinuities,greenish F /_|FR |R5 | 2)gray,very strong (R5)\ \'S|311.1 -311.5 feet:Slightly SW |R4&|weathered (SW),light greenish |'e|luPLRCa 36°gray,strong (R4)'4 vo i 311.5 to 315.7 feet:Fresh (FR),;q Ca filled discontinuities,greenish |.e J.PL,SM,Ca 40° gray,very strong (R5)t 7. coe \ iLE\» 'on ee |)PLRCa 14° :PLR,47° .|J,PL,R,Ca FR |RS -74 :@!|J,PL,R,FeOx 37°4 ,: NX 7 5.05.0 0--315 315.0 -318.0 feet:Broken core [!70 46%J,PL,SM,Ca 22 | L 100% \ 315.7 -322.2 feet:Moderately ! f-weathered (MW),Ca and CL filled|'4 discontinuities,light greenish agray,moderately weak (R3)\ | N 1 p 7 4 \ I 317.5 feet:1/2-inch thick clay |>filled joint en mw R3L.|4 rs.50 ! \ |)|r FO)ae ml upR ce,PL,SM,Clean 4 7 L >100% 4 \ N I 320 pe [1 @ ||J,PL,SM,CL 30° = Log continued on next page -DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi(2)Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon 7.Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-3 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 17 of 21 INCLINATION:-60° DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 8 7joint B-Bedding BU Blana Bo Boned Hate Ep-Epidote oer arte @ Axalz=F-Fault FO-Foliation K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametrat =|G @|le Ven OR-Orhogenal tee Rough Ghehbrte |Himilematte «=Sse |SOR =re =9°i w 2%|FR-Fracture Irregular vR-Very Rough CaCalcite -ML-Sitt Su-Sulphide z $%B NOTES Ww 19 DESCRIPTION e432]ee DISCONTINUITY DATA =,ase TESTS a |Z Z\/zZ_|2|99 =o-yisx|tox|=xxx WATER LEVELS S a lee OO |RAD |FRACTURES |$¥oa TYPE and 2,(SSS ELH AsES y,5 e|w-/5|#2]%PERFOOT |29%SURFACE aO |2e2|Ur2/8en5 FR L 3204-O|P [Fl [sess|a+coe bag DESCRIPTION Bo |°pase yz 180.7 -351.1 \ Fresh to moderately 7.4weathered,(FR-MW), extremely close to wide | 5.0-spaced fractures,FeOx and ':4 'ane /5.0 MW |R3Cafilleddiscontinuities,gray 4 71 56% to greenish gray,medium to I 9 e coarse grained,very strong '100%@)(J,PLR,Clean 45 a to moderately weak (R5 to 7 J R3),DIORITE (Continued)| N322.2 -341.8 feet:Fresh (FR),Ca ° filled discontinuities,greenish om @ |J,PL,SM,Ca 66°| 5 gray,very strong (R5)\ppt t+°J,PL,SM,Ca 56 4 ,@ |J,PL,R,Ca 50°"|@ |J,PL,R,Ca 57° | S NX J 7.@ |J,PL,SM,Ca 55° ] \5.0 -325 "4 |72]5°1)sa%4 |400% 7. i '326.0 -327.5 7 / ]feet:Heavy ;e J,PL,R,Su 42°drill chatter a \4d | |Changed vd drilling bit at y ;My yy Ty |327.5 feet.7 a \ 0 /@ J,PL,R,Ca 27° 2 | L &I 4 a \ 5 /.| °5.0 °J,PL,R,Ca 15° L330 |=S 73|59 ||6%4 N a 400% 3 | \L =/.4 2 @|J,PL,SM,Clean 78°FR |R65°o \o 7 ot |4 =NX 3 a |@ J,PL,SM,Clean 18° S-.4 5 4 ag(a)\uw N -L 7 = a 2 \@ |,PL.R,Ca 58° a "4 47 1 335 74|5-9 ||4%= Q om 94% aS \ at .: (o)7. a)]pry \ aL Zz 3 e ||J,PLSMCa 20° 4 N z 4 L |4é. a vl 50 5.0=|75 92%2OL338.9 -339.1 feet:Porphyritic \400%@ |4,U,SM,Ca 56 4 s texture o @ ||u,PLR Ca 3° 5 || ' 340 is E 4 =continued _on next page=DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fiqure8DRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon g w 8 older A-78PiGolder. RECORD OF DRILLHOLE DH12-3 SHEET 18 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 a Pome B-Bedd Bt Pen PO-Pokshed brett Ep-Epidote Oe dus oa i -Beddin "|":.9 FFauth FOFotsten =C-Cuned «KK Sickensted ©Bxreceia.©FeOxiron Oxide SaSand 0 DiametralEAeee=ols Syn le]&PReFractu caonal Pireguar” Vivery Rough Cacacte MUSH SuSuiphide z4 2 fa veatew=to DESCRIPTION ee 2/es DISCONTINUITY DATA =ase T a x |x 2/3660 Bx<|tox|=<exw WATER LEVELS.z &|EelZ/60]Rap |FRACTURES |Eee TYPE and 2 SSS ESS |AaRR=2 |R=/35)/2)%&PERFOOT |25%SURFACE a8 jeus BE2|Ssn0340-4 e|?|*2898|w+oe2 Pa 34 DESCRIPTION &-|22s2 2 180.7 -351.1 \7. Fresh to moderately roy |,|weathered,(FR-MW),\,;: extremely close to wide -spaced fractures,FeOx and =£'50 7 FR |RS | Ca filled discontinuities,gray an 7§.92% to greenish gray,medium to '100% j e J,PL,R,Ca 32° coarse grained,very strong \||| a to moderately weak (R5 to '|4 R3),DIORITE (Continued)|j SW |R4 341.8 -342.6 feet:Slightly L 'Changed drillweathered(SW),light gray,and |, 7]bit at 342.5.tL strong (R4)I Hole 7 342.6 -346.1 feet:Fresh (FR),Ca)\advanced tofilleddiscontinuities,greenish /.]342.5 feet ongray,very strong (R5)|8/16/12. ag N \ 4 ty | uo |FR |R5 N 5.0 i || L345 1/4 re}&°|100%4 { .100%Ladd os | i vO ||e J,PL,SM,Ca 20°| 346.1 -347.8 feet:Sightly \j weathered (SW),light gray,strong,_|:|(RA)aa i | L »SW |R4 4 he l I |®|J,PLR,Ca 64° N 347.8 -351.1 feet:Fresh (FR),Car,_|: | a filled discontinuities,greenish \ A gray,very strong (R5)N @J,PLR,CL gee |__] o fr 4EV7 J,PLR,Ca 74° 5 8 FUR Ca mis 4 N o2 rv.8 I 50 |@J,PLR,Ca age |FR |RS L350 15 |S 77|59 |jaa%a a v4 100%a)| g N =ae [7 4408.2 @/J,PLR,Ca 71°4 23511-3714 7 B51.i _ 8|Slightly weathered (SW),=|extremely close to close \! a spaced fractures,clean and a Y : = bald clay filled discontinuities,N S light gray to light greenish a S |e J,PL,SM,CL oe gray,medium to course = c grained,strong (R4). Sr ALTERED DIORITE Ly 4 €N 8 352.5 -361.4 feet:Broken core 4a \ -L..35 .4 a Zl la]35 1 |om°fa =: 5 bs 3 a \100% iv _Xi 355 r,s[Ss]=\z \R4 "A col =\J 5 \ B 4 @o ia we a 4Pay\ 4 : <1 >=i 5.0=.5.0etvi79 50%]b- 4 g ZN 100%J,PL,R,CL A 'J,PL,SM,CL 2 =oO a r *4 e Sy 8 >> Z|360 =)ani @|/SH,U.K,Clean |é Log continued on next page | =a =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi8=Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon renrot)=- :5 DRILLER:N.Arneson CHECK DATE:1/9/133|WEF Associates ECannon3/8/134103-95560WiRECORD OF DRILLHOLE DH12-3 SHEET 19 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 a Pat B-Bedding BiPinar BovBonned -BeBclte Ep-Epidote ate Gusrtz @ Axal g F-Fault FO-Foliaton C-Curved K-Siickensided Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametral i gla lel »SENT Semen Hein BAS”Se,ae Ser |cop.Fo 2 oO)ala)&[FR recture FimeguarVR-VeryRough GaCalite MLS suSuiphide |SSB rerew=19 DESCRIPTION ew 2 gS DISCONTINUITY DATA E Jeoxl ane WATER LEVELSza|EslZ/56]Rao |Fractures |$20 TYPE and So /SERIEZO AGESx3geZz)8 %PERFOOT |29%SURFACE a9 |2b2 ag2 Bing £360 Oo o «33e2|ne wo2 Pe gh DESCRIPTION fa b oer Ys 351.1-3714 Mt 5.0Slightlyweathered(SW),=5.0 iextremelyclosetoclose"ce)50% spaced fractures,clean and A \100%| -clay filled discontinuities,N 7 light gray to light greenish a gray,medium to course =@ |J,PL,R,Cagrained,strong (R4). a ALTERED DIORITE Zy 4 (Continued)NN H361.5 -371.3 feet:Broken core |=\ \S a a 4 a 50Ago!59 |b40% i"100%SH,P,K,CL 4 364.2 -364.3 feet:Felsic intrusion;=\& A 365 364.85 -364.9 feet:Felsic ae a intrusion it 7=\ ds A 'R4 |NY 4 A= A 4|Ly A=\ PF ay 5.0 ||by 5 ys a1)©||40% E =100% -3s '4 2 Zy[7]IN°/ <=\1 370 |4 N A 3 * =A a ®=4 = s *4390.7 O|371.4-381.2 \|B71.4 Fresh (FR),close to wide t yl Z spaced fractures,clean and \4 clay filled discontinuities,| greenish gray,medium to |*Course grained,very strong o | a (R5),DIORITE t a >5.082)2°|oar _ N 100% J 4 \osOoIaN =rev]Xt 375 vO 4 Oo \z b 7] =\R5 a 375.8 -378.0 feet:Broken core | ay : ; a a *|a \ 4olr/oq.z on 8.9etvO83]>|152%4 s \100% >\osao.IOrN . 4 N Ly |°SH,PL,K,CL 32 o \ { \ y_380 Log continued on next page _4 -=DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FigureAgGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon i 7&,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 3/8/13ECannon4103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]RECORD OF DRILLHOLE DH12-3 SHEET 20 of 21 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:103-95560 DRILLING DATES:8/2/12 to 8/18/12 ELEVATION:1712.3 ft AZIMUTH:235° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,227,091 _E:1,885,107 a y Joint B-Bedding ae Ponar Sion dere rahe Ep-Epidote oe arte °Axal =F-Fault FO-Foliaton -C-Curved K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand O Diametral x |G 9 |Ble ven"GROrhogonal St-Stepeed'Rehowh -ChGhote |Aevtistatte «Stairs |FOPFr=2 °a uw 2%|FR-Fracture Pineguer VR-Very Rough Ca-Cakite -ML-Silt 3u-Sulphide za 8 B NousaeoODESCRIPTIONge2yeDISCONTINUITYDATAz=:aap WATER EVELSo12=/Es|/2/88]rao |eractures |Fv TYPE and OQ |SSszQn|SeEN©SiRE/Z/-o]%PERFOOT |29%SURFACE 29 22 |GR2 Btnm &a 6 jo |x esee 2 boos DESCRIPTION ee E/E"*owga gy x |380 &sN nN vODe BE oO o jeromeerattr 7.5.0 4 ve 83 52%eR |RS .100%|if a L 382.2 381.2 -390.2 4 881.4 Slightly to moderately =weathered (SW -MW),'* -extremely closely to a \moderate spaced fractures,NN Ca filled discontinuities,light 7]sw |R4gray,medium to course ne | a grained,stong to moderately *0 Jweak(R4 to R3),ALTERED |"y 5.0 Poe a J,PL,SM,CL 27 DIORITE Ns 84 5.0 38%382.9 -386.2 feet:Brokencore [4 : ne 100%ao _\" a : = ::N : "Ht=\-385 \ 4 y .Ly mw |R3NN A ' : |=\= 7 NS ': ZY a J,PL,SM,Ca 25° Fr :wt Ss 4 N BS :J,PL,R,CL 3t° A \"EB J,PL,SM,Clean 5° i \ae mens J,PLR,Ca 20°J A \49 as & s <1 [a5]5°||16%a.ia It fe be sw |R4E=Y 98%2 : : -5 S TT 'J,PL,SM,Ca 7° 7 8 =Ag°yn ae :'J,PL,SM,Ca 47° }-390 |5 =Ne744 im | "|390.2 -400.5 \890.2 SEP q §|Fresh (FR),close to r |=' =moderate spaced fractures,\oe L”BS : -'=|Ca filled and Ca healed 'a Hol 4 |discontinuities,light greenish |''advanced to8&|grayto greenish gray,on 391.0 feet onmediumtocoursegrained,1 1 B72 @ very strong (R5),DIORITE \1 ° J \/. 391.0 feet:Becomes massive N with Ca healed discontinuities L -392.8 feet:Contact between two |\7]t+}+= granitic flows l 46L>86|©°|i se% \ \92% L . 4 Ly _| \ \ . N :395 re |FR |RS5 7 ] N Ly | |\4 \ NX on | L \| 4 Le |\ |45 :|>a7|*5 |j100%4 \ \400%: ,|Ly | L \4 \ >Lh]|v4 :| | 1 ! -400 Log continued on next page _DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi€.A \4 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon re e7+DRILLER:N.Arneson CHECK DATE:1/9/13 -L#Associates PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 LOCATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH12-3 CLIENT:MWH Americas Inc. DRILLING DATES:8/2/12 to 8/18/12 Burley 6000EQUIPMENT: DATUM:Ground Surface ELEVATION:1712.3 ft COORDS:_N:3,227,091 SHEET 21 of 21 INCLINATION:-60° AZIMUTH:235° E:1,885,107 BORINGMETHODDESCRIPTION GRAPHICLOGDEPTH(ft)'Tevev.RUNNUMBERTy;J-Jornt F-Faut SH-Shear Vein FR-Fracture B-BeddingFO-Foliation CO-Contact OR-Orthogonal BU Bana6:CrdustingstSteppedL-lrregular Roughness AnfiilinPO-Polished Bt ButteK-Slickensided z SM-Smooth CL-Clay-Roug!VR-Very Rough Ca-Calite Ep-EpxtoteFeOx-lron Oxide @ Axal OU Diametral G-GougeHm-Hematite ji ML-Sitt Su-!Suphide RQD FRACTURES %PER FOOT S89R|an+eeeCORERECOVERY DISCONTINUITY DATA x POINTTYPE and SURFACE DESCRIPTION GRAPHIC,LOG36.2kLOADNOTES TESTS WATER LEVELS N7365.fo)TIT].OT|[nia]|100% Lili 3/8/13ECannon415 312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]r-420 Boring completed at 400.5 ft. Notes: 1.Drilihole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. 3.Vibrating Wire Piezometer (Slope Indicator,P/N:52611040, S/N:12-6865)was taped to sacrificial tremie pipe,placed alongside the temperature acquisition cable (TAC)conduit, and grouted in place with cement bentonite slurry at 380 feet depth. 4.1-inch Schedule 40 PVC TAC conduit installed to approximately 250 feet depth and filled with Propylene glycol antifreeze.Top of HWT surface casing has 4.1 feet of stickup above ground surface. 5.TAC (BeadedStream,S/N 2123)placed in TAC conduit and is removable.TAC sensors are located at 3,6,10,20,30,50,75, 100,125,150,200,and 250 feet depth,0 feet depth =elevation 1712.3 feet. 6.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand margin of the log column. 7.Water level estimate from VWP. 8.Point load test rock strengths presented as equivalent uniaxial compressive strength (UCS) based on a K value of 19 for conversion between |s(50)and equivalent UCS. 400.5 403-95560Wi(63)GolderLJAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:N.Arneson LOGGED:P.Richards CHECKED:E.Cannon CHECK DATE:1/9/13 Figure A-7 RECORD OF DRILLHOLE DH12-4 SHEET 1 of 19 ECannon3/8/13012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560W;DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 _E:1,884,848 Q Mi owt B-Bedding BP nar Hos Boished Bote Ep Enidote oe arte @ Anal z F-Fautt FO-Fokaton -C-Curved K:Sickerteded Bx-Breccia eOx-Iron Oude Sa-Sand ODiametral x Hf o|]2 le iver OR Onhtagonal St Stepped aRounon Gh-choete CSeuge eSee Foe.E e 2 9 z w %|FR-Fracture Fireguiar UR Vey Rough Ca-Cakite Sit $u-Sulphide =3 7 a NeueswrloDESCRIPTION273)2s DISCONTINUITY DATA =ly ae ER EVELSao|2 z=(=5/2;/88]rao |rractures |$2 oD |¥oulzon |xase WATER LEV rd &jaeizs|°9 pa TYPE and Zo |SZa 1484 eens 9&2 |B 5 oe)%PERFOOT |25%SURFACE BQ |eezZiezZ|Sano RLo12°BB9a|a+ooe PR Bh DESCRIPTION 5 |®Rese 2k 0.0-1.0 =Loose,moist,dark brown, PEAT (PT) -a 629.| 1.0-17.0 b J]1.0Verydense,moist,light °(Nbrown,BOULDERS with »sand,silt,and gravel,moist OQ f (TALUS),occasional open LO Lost 4 boulders and cobbles (GP)5 NN circulation at D 2.0 feet O -LO 4 oC OQ -LO 4 of\' b> 5 L re)|4 of | D5 5 L,fe)|» iS Q | g 2.5 2 L e)4 a}o(\ §Ro L °L fe)| é qaND,oO fo) +g LO NIA 4 8 oO) £b%O+40 :L Oo 4 =ae z Ro 5 5 L e)4 °aeb> -LO 4 aeb> 'LO 4 °(\D> 7 bO J aeD5 45 b S)4 qeb, r bO J ae a Top of Rock=17ft wan 614.4 | 17.0 -68.0 \117.0 No core Slightly weathered to fresh ty |recovered (SW-FR),extremely close to \17.0 to 17.9 moderate spaced fractures,'feet r [-]FeOx stained and Ca filled =|Drill Rate: 7 discontinuities,light greenish v7 SW |R4 Run 1=12.4graytogreenishgray,|>>. medium to coarse grained,N 28 feet/hour. a strong to very strong ly 4 4 ”17% = = (R4-R5),DIORITE \90%a:[s :">8a>>@ J,PL,R,FeOx 30° \7d i FR |R5 --20 . '4 =continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FigureizeIdDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon g older A-8PYGolder. RECORD OF DRILLHOLE DH12-4 SHEET 2 of 19 -30 ECannon3/8/13PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 __E:1,884,848 Oo ty Sha Roughness Infilling Py-Pyrite @ Axialfo)J-Joint B-Bedding Pl-Planar PO-Polished Bt-Biotte Ep-Epidote Qtz-Quartz F-Faut FO-Foliation -C-Curved K-Sickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand O Diametral x |G Ae ee en aers:rf as |"=F e 3 9 Fl uy x ER-Fracture ogona irregular V-vey Rough CaCalcte MCSit °5 Sulphide 2 aa g rere w=lo DESCRIPTION gik-43 ey DISCONTINUITY DATA =jl oop WATER LEVE!o 4 =|Fs!Z|/88]roo |Fractures |#2 TYPE and go |x9x ELZE|AGSS y s 3 2 |u=|5)2)%PERFOOT |29%SURFACE 28 /2b2/8E2/Sin0 f[cay )4 Sgeglavrowoe Pag DESCRIPTION aa 5 loese ye £;20 77.0-68.0 T my |Slightly weathered to fresh t 7.1 17%°(SW-FR),extremely close to |4 :J,PLR,FeOx 50 moderate spaced fractures,|J,PL,R,FeOx 56° FeOx stained and Ca filled |»J,PL,SM,FeOx 57°4 discontinuities,light greenish [\'> gray to greenish gray,| medium to coarse grained,\ strong to very strong oa (R4-R5),DIORITE |(Continued)17.0 -19.5 feet:Slightly weathered: (SW),extremely close to close \ FeOx stained discontinuities,I A strong (R4)2 5.0 329 J,PL,R,FeOx 32° 17.9 -19.1 feet:Broken core ros]at o 19.5 -47.9 feet:Fresh (FR),\400%!|e:@ |J,PL,SM,FeOx 67 closely to moderately close discontinuities,greenish gray,|«JPL.R Ca 23°medium to coarse grained,very |,|.a > strong (R4-R5),DIORITE '@)|J,PL,SM,FeOx 45) N H @||J,PL,R,FeOx 45° J,PL,R,FeOx 67° 25 25.0 -26.4 feet:Broken core \ZaSETAES\@ ||J,PLR,FeOx 33° 27.5 to 27.7 feet:Broken core N ! 74 46 4 >!3|©|eax @ |J,PL,R,FeOx 59° oD L 9,2 \i 92% 8 !1 2 L >@ |J,PLR FeOx 48° fs)vo£°J,PL,R,FeOx 31° 6 Ly |FR |RS 4 N \ 3 ;e@||J,PLR,Ca 38° x=L >@ |J,PL,R,Ca 55° Dn 4 T &1 8 > \_SM,FeOx 50°4PL, PL,R,Ca 32°44 PL,R,Ca 37°] 46 46 9 J,PL,SM,FeOx §3°65%Drill Rate: Run 4=9.2 feet/hour.|100% 34.3 -35.8 feet:Broken core --35 | NX i7,-4Ldeo°"eooan\5 |Be ||0%4|Blocked off at 103-95560WATANA2012.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]\35.6 feet 4 in / 50% | 36.8 -36.9 feet:Broken core r >|®|J,PL,R,Stained 65°LAA J \ \ L >|28 @ |J,PL,SM,Ca 50° |6)|[80%@ |J,PL.RCa 54°4 \400%@ |J,PL,R,Ca 51° L | \e J,U,R,Ca 21° |a |[@/J,PLR,Ca 76°-7 by |e*SH,PL,K,Ca 46°7 \ , J,PL,R,Ca 26°| -40 [4 tr e 4 Log continued on next page -DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiADRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure =Golder A-8(?Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc. DRILLING DATES:8/22/12 to 8/30/12 DATUM:Ground Surface ELEVATION:1630.4 ft SHEET 3 of 19 INCLINATION:-70° AZIMUTH:255°3/8/13ECannon12.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WéAssociates DRILLER:N.Arneson CHECK DATE:1/9/13 LOCATION:Susitna River,Talkeetna Mou EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 __E:1,884,848 8 BPeinar Bo Bmnenes Botte Ep-Epidote oe art °Axial="Unsung SiSmoan”lew.Gowge S88eheae [Sng->"Gouge _ 5e-Sericite=x 9 [oa ST-S -:s baehe=CS ale]&Firaguee” VatveyyRough Cecacle MUSK SuSopnide Z8 be NOTES i=lo DESCRIPTION 243 |es DISCONTINUITY DATA Z|.aske WATER LEVELSZz&|FelZ|383 FRACTURES |Bo TYPE and 2,[SSR/ESH AaaoOeum|S|)293 SURFACE as j/eus wee Sinsa°*nt oo Pes DESCRIPTION at 5 peso a x-40 17.0 -68.0 7 ;*7)TJ.PL,R,FeOx ar Slightly weathered to fresh 6(SW-FR),extremely close to moderate spaced fractures,Hole-FeOx stained and Ca filled 2 0!ediscontinuities,light greenish le J,PL,SM,FeOx 76°>advanced to gray to greenish gra J,PL,R,FeOx 39 40.8 feet onmediumtocoarsegrained,@ (J,PL,R,FeOx 56°8/22/12. |strong to very strong (R4-R5),DIORITE @ |J,PL.R,Ca 58° (Continued) @|J,PL,R,FeOx 72°| 43.2 -44 feet:Broken core @J,PL,R,FeOx 83° >>Drill Rate: i Run 7 =10.3 a ;FR R5 feet/hour. :@|J,PL,R,FeOx 79°}-__| 45 4 a @ |J,PL,R,FeOx 55° 3 >> 46.7 -47.1 feet:Broken core ee L 47.9 -48.5 feet:Slightly @e |.PLR,Ca 40°=weathered (SW),strong (R4)@ J,PL,R,Ca 59°SW |R4 ;|48.5 -54.2 feet:Fresh (FR),close %\Be R.¢a ae peil a 03€|to moderately close FeOx stained oe °SS un 6 =1. ='S|and Ca filled discontinuities,very bad J,PL,R,FeOx 61 feet/hour.ind strong (R5)|J,PL,R,FeOx 17° g J,PL,R,FeOx 27° &Pe PP)PLR,FeOx 36° c J,PL,R,FeOx 5°t 50 3 49.9 -51.7 feet:Broken core - 4 N oO >>=[-f=.) £ &ee FR |R5 5 @ |J,ST,R,FeOx 54° @||J,PL,R,FeOx 45° e J,PL,R,FeOx 40° i 54.1 -55.0 feet:Broken core | 54.2 -57.2 feet:Slightly 4weathered(SW),extremely close PF to close discontinuities,light r-55 greenish gray,strong (R4)_ ®|J,PL,R,FeOx 66°SW |R4 @ |J,PL,SM,Ca 61° 57.2 -68.0 feet:Fresh (FR),close e ®|J,PL,R,FeOx 66°to moderately close le J,PL,R,FeOx 18 discontinuities,greenish gray,J,PL,R,Sa 39° |very strong (R5) 4d ©J,PL,SM,FeOx ar FR |RS L g9 |©J,PL,R,FeOx 8 |Log continued on next page i 5 DEPTH SCALE:1 i : iN:!inch to 2.5 feet LOGGED:P.Richards Fj€.\3 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon NB PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 4 of 19 INCLINATION:-70°ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12to 8/30/12 ELEVATION:1630.4ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.226.857 __E:1,884 848 8 TPnt B-Bedding Bonar Bo-Potshed Bette Ep-Epidote.ae art @AxalzrF-Fau FO-Foliation C-Curved |K-Sickensided Bx-Breccia =FeOx-Iron Oxide Sa-Sand 0 Diametral x (5 |B lag|_[I S2Stinw Yea Skene,Se Sart |bon.E e 2 °z w 2%|FR-Fracture F-Irregul VRVery Rough Ca-Calite L-Silt 3u-Sulphide FS $a a NOTES a 106 DESCRIPTION eo -He|ge DISCONTINUITY DATA x ase TESTS a |S =/z |3|53 +5yexltox|«vex WATER LEVELSied&{Fe/2Z/65)rap |Fractures |Fue TYPE and OQ /SSS/ESH INSEEfe)2 |e-|S|%PERFOOT |203 SURFACE a8 859 gee geie 860+"2 f=eeb crest ys g&___DESCRIPTION S|eeee && 17.0 -68.0 \V @ |SH,PL,K,F ° Slightly weathered to fresh t »|10 84%:+PL,K,FeOx 5 {SW-FR),extremely close to \{ moderate spaced fractures,!| -FeOx stained and Ca filled |@ |J,U,R,FeOx 57°4 discontinuities,light greenish |,'> gray to greenish gray,I medium to coarse grained,N a strong to very strong in /-_ (R4-R5),DIORITE |(Continued)\ Te a |4.9 =@ J,U,R,FeOx 80°}---_|4 »4 5.0 40%d J,U,R,Ca 32°44 a . 63.5 -64.4 feet:Broken core \ ,98% E 'FR |R5 4 +7 | \ | L >J,U,R,FeOx 38° -65 vo J,U,R,FeOx 40°"| \ vo @ SH,PL,K,FeOx at a 65.9 -66.8 feet:Broken core .|J,PL,R,FeOx 78°4 +7 _| \ | r . @/J,PL,SM,FeO 73 7 r PL,1 F@OX ° \an |- 67.5 -67.9 feet:Broken core .!OXi”566. 680-788 7,|680|_.|20 é | |Slightly weathered to highly =I 12 34%@|weathered (SW-HW),100%E |extremely close to wide a a 6 |spaced fractures,light gray 4 @ |to light greenish gray,7] S|medium to coarse grained,=\©|very weak to strong (R1-R4),\ ||ALTERED DIORITE a _|70 ti L \A \ «|68.0-74.2 feet:Slightly a ,g weathered (SW),extremely close |a a =}to moderately close spaced Ht2discontinuities,light greenish ==\SW |R4 | 5 |gray,strong (R4)y eo)69.0 -74.2 feet:Broken core va '=N a A 7 =\ NY a r 4.4 y "a '"3 "°ae Drill R 1 oH rill Rate:=98%Run 13 =18 feet/hour. z =4 74.2 -75.3 feet:Soft,moist,light |'gray,silty CLAY (ML)=\XS RS }$1-75 a iN 7 am 75.3 -76.6 feet:Highly weathered a(HW),massive,light greenish = ray,very weak (Ri \ i gray,very (Ri)_:HW |R1 4 =\i N { 76.6 -78.8 feet:Moderately a a weathered (MVV),massive,light greenish gray,medium weak (R3)/: 7 =\5.0 5.0 at 14 MW |R3 a =100%Drill Rate:4 va Run 14 = =Y 15.8 S 4556.4 feet/hour. L 78.8 -83.7 feet:Slightly \|{78.8 5 4 weathered (SW),light greenish fF /_|4 gray,strong (R4)},SW |R4 t-l ¢e +80 Log continued on next page ma DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi\¥:DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure€2)F Golder aurssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 LOC. RECORD OF DRILLHOLE DH12-4 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 ATION:Susitna River,Talkeetna Mountains,AK CLIENT:MWH Americas Inc. DRILLING DATES:8/22/12 to 8/30/12 EQUIPMENT:Burley 6000 DATUM:Ground Surface ELEVATION:1630.4ftCOORDS:_N:3,226,857__E:1.884.848 SHEET 5 of 19 INCLINATION:-70° AZIMUTH:255°BORINGMETHODDESCRIPTION feinMi FR-Fracture -l Pl-PlanarC-Curved U-UndutatingOR-Orthogonal §1-Steppedirregular B-BeddingFO-Foliation CO-Contact D2Bo BorshedK-Slickensided SM-Smooth -RoughVR-Very Rough infiliingBt-Biotite egive]L-ClayCh-Chlorite Ca-Cakite Py-PyriteQtz-Quartz a-SandEp-EpidoteFeOx-lron Oxde @ Axal O Diametrai 3e-SericiteG-GougeHm-Hematite SilicaML-Silt su-Sulphide GRAPHICLOGRUNNUMBERCORERECOVERYDISCONTINUITY DATA POINTFRACTURES PER FOOT nvtooo Eyeadxoe 32io TYPE and SURFACE DESCRIPTION WEATH-36.2k145k7.25k3.62k9g Zz fra w GRAPHIC]LOGROCKSTRENGTHINDEXINDEXR6R5R4R3LOADNOTES TESTS WATER LEVELS -85 --90 ECannon3/8/1395 312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]r-100 Coring(HQ3,2.5-in.CoreDiameter)78.8 -88.0 Slightly weathered to fresh (SW-FR),extremely close to moderate spaced fractures, clay and Ca filled discontinuities,light greenish gray to greenish gray, medium to coarse grained, strong to very strong (R4-R5)DIORITE (Continued) 80.8 -81.9 feet:Broken core 83.7 -88 feet:Fresh (FR),close to moderately close discontinuities,greenish gray, very strong (R5) 86.8 -87.0 feet:Feisic intrusion 4=&=aS|TLclo100% |5.0 5.0 \100% 2&.o& b| |,4547.7 88.0 -89.7 Moderately weathered (MW), moderately spaced fractures, Ca filled discontinuities,light gray,medium to course grained,moderately weak (R3),ALTERED DIORITE 88.0 17 26% S546 89.7 -92.7 Fresh (FR),very close to moderate spaced fractures, clay and Ca filled discontinuities,greenish gray,medium to course grained,very strong (R95), DIORITE 90.1 -90.8 feet:Broken core 91.0 -95.5 feet:Broken core 89.7 \4543. 92.7 -95.8 Moderately weathered (MVWV), extremely close to close spaced fractures,light gray to light greenish gray, medium to coarse grained, strong (R4),ALTERED DIORITE 92.7 5.05.0 100% 540. 95.8 -137.3 Fresh to moderately weathered (FR-MW), extremely close to moderate spaced fractures,Ca filled discontinuities,light greenish gray to greenish gray, medium to coarse grained, very strong to moderately weak (R5-R3),DIORITE 95.8 -98.6 feet:Fresh (FR),close to moderately close discontinuities,greenish gray, very strong (R5) 98.6 -99.9 feet:Slightly weathered,extremely close to close discontinuities,light greenish gray,strong (R4) Log continued on next page "195.8 48 5.0\19 54% 96% J,PL.R SH,PL,K.CL J,PL,R,CL J,ST,R,Clean SH,PL,K,Clean J,PL,SM,Clean J,PL,R,Ca J,PL,SM,Ca J,PL,SM,Ca J,PL,SM,Ca J,PL,R,Ca J,PL,R,Ca J,U,SM,Clean J,PL,R,Ca J,PL,R,Ca J,PL,R,Ca 2 86° SW |R431° 36° 72° 9° FR |RS f&Bere\27° MW |R3 33° 49°FR |RS MW |R4 36° 38° 64°FR |R5 18° SW |R463° Hole advanced to 80.8 feet on 8/23/12. Drill Rate: Run 16 =13 feet/hour. Onill Rate: Run 17 = 12.5 feet/hour. Drill Rate: Drill Rate: Run 19 = 11.5 feet/hour. 99.5 -99.9 feet:Broken 103-95560Witg'4 GolderAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:N.Arneson LOGGED.P.Richards CHECKED:E.Cannon CHECK DATE:1/9/13 Figure A-8 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 6 of 19 INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12to 8/30/12 ELEVATION:1630.4ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 __E:1,884,848 T8Jfont 8 Bedding BU Pana PGBoiened =Bt-Bctte ---Ep-Epxdote Oke Gusttz @ Ava =F-Fauk FO-Fohation C-Curved K-Shckensided Bx-Breccia FeOx-Iron Oude Sa-Sand OD Diametral =|o e lz le Yvon OROnhogonal Si-Stepped'Rkowh -GnChbite |Hivtenate Sour |SORFe3OC}HY]&FR Frecture Fireguar _VRVeryRough CaCakte ML-Sit Su-Suiphide |3S 7 q Weare w=10 DESCRIPTION oh 2]ee DISCONTINUITY DATA z |, ase STS a 12 z/E_|2)99 =a «x |tox|x xxx WATER LEVELS z &lFe|2)S|Rao |Fractures |Evo TYPE and Zo SOSESHIASEN ylo]@ |¥=|5|2 %PERFOOT |29%SURFACE €3 |2e2/eRzZ/S tne 8100a9°&SB8eR|a70 oe PB sg cE DESCRIPTION &b euros x 95.8 -137.3 \TI :FR |RS core Fresh to moderately 7 19 54%|weathered (FR-MW),\iri | extremely close to moderate \i -spaced fractures,Ca filled -_iio discontinuities,light greenish |,">:FR |R5 gray to greenish gray,\° medium to coarse grained,N ||||@)|J.PL,SM,Ca "4 q very strong to moderately a weak (R5-R3),DIORITE '|(Continued)N 99.9 -102.4 feet:Fresh (FR),L ,close to moderately close V7 SW |R4 5 discontinuities,greenish gray,\3.0 very strong (R5)\20 5.0 30%102.3 -103.6 feet:Brokencore f /_|;Drill Rate: 102.4 -103.2 feet:Slightly \100%FR |RS Run 20 = weathered (SW),strong (R4),!15 o 103.2 -104.0 feet:Fresh (FR),[o . close to moderately close " SH,PL,K,CL 20 feet/hour. discontinuities,greenish gray,I very strong (R5)\104.0-115.8 feet:Slightly L ,-105 weathered (SW),extremely close |,7]a to close discontinuities,greenish I gray,strong (R4)» 104.3-105.1 feet:Broken core 74 a 105.4 feet:1/2-inch thick quartz 1 J,PL,SM,Ca 42°J 'N en J,PLR,Ca 45° |J,PL,SM,Clean 62° =XN J ty | \ | 107.6 -107.9 feet:Broken core \J,PL,R,Ca 36° a I>$0 4 F|108.3 -109.3 feet:Broken core N 21)42% 2 ry 100% L & ' 1 4 a Ny .o }J,PL,R,Ca 27 é o 40 €109.7 -115.8 feet:Broken core .|Sw |R4 | wo L 0 "4 oo 1 g \ r o on 7 f=1 6 \°van : \: F |om 4 /it \ | i a [.5.0 ; b 4d +.of|22 a Drill Rate: N 400%Run 22 =10 L rn 7.feet/hour.d |: . ir 7.' 115 (4 nN ion i 115.8-119.2 feet:Fresh (FR),| close to moderately close L , q discontinuities,greenish gray,or J,PL,SM,Ca 27° very strong (R5)| N ' a r vid |q \ 1 b 5.0 |Je ||PLRCa 21°FR |RS .vo 23|59 |56%|q |*100%Tt TT]el lpirca ate ]noneI a 118.9 -137.4 feet:Broken core \@ |J,PL,SM,Clean 47 4 119.2 -130.8 feet:Slightly vq :e J,ST,R,Ca 14° weathered (SW),extremely close I i >>sw|Rtoclosediscontinuities,greenish { 4 420 gray,strong (R4)t 7 |Lif ! 4 Log continued on next page mee DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fié.AY Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon rene 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13Associates DRILLER:N.Arneson CHECK DATE:1/9/13 3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannon103-95560W.,RECORD OF DRILLHOLE DH12-4 SHEET 7 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 ; DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 ___E:1,884,848Ty78aJomtB-Bedding BU Blane FO -Bonnea brace Ep-Epidote ae art @ Axal =F-F aut FO-Fokaton K-Slickensided Bx-Breccia FeOx-iron Oxide Sa-Sand O Diametral x=iT Q 2 xe Sven onSaeconat Shares Bown Chet erte Fite atte Seen?cae.rele CS}Sle]&|FR Fmcure ireguar _VR-VeryRough CaCalte MLS Su-Supnite |ZX in B NOTES a |DESCRIPTION 9-418)es DISCONTINUITY DATA z aoe TESTS Oo 12 z/E_|2/99 =ovis |tox|xxx WATER LEVELS vd alte oo RaD FRACTURES |372 TYPE and =SSH/EQSIASES &ee 3)2!)%PERFOOT |25%SURFACE ag /eee gz2 Brine 8|02 |fF]seea|«se se page __orscnrien a foe Belem gx 95.8 -137.3 , Fresh to moderately +>_23 56% weathered (FR-MW),\ extremely close to moderate ! -spaced fractures,Ca filled ['discontinuities,light greenish vq ° gray to greenish gray,1 SH,PL,R,Ch 67 medium to coarse grained,s .very strong to moderately I 7.weak (R5-R3),DIORITE °(Continued)|SH,PL,K,Ch 28 L 7 | \ a |48 op':9 SH,PL,K,Ca 14° 7 4 24 10% °Drill Rate: 92%J,PLR,Ch a7 Run 24 = a \J,PL,R,Ca 58°10.7 r vil SH,PL,K,Ca 21°feet/hour. \,;J,PL,R,Ca 27° \ |rv125vO SH,PL,R,Ch 22°7] \SW |R4 b ,| a \SH,PL,K,Ch 3° XN he 'J,PL,R,Ca 39° = * in |J,PL,R,Ch 20° J N a ly is 5.0 ; t =!25|59 ||28% > L 9,E \7.4 100% a &(J °\ S [74oO\| ¢.!SH,PL,K,Ch 23° 130 15 >SH,PL,K,Ca 50°4peaJ,PL,R,Ca 25° oo I[e]N=|130.8-133.5 feet:Moderately +/_|a @|weathered (MW),extremely close||7 <<discontinuities,light greenish | &|gray,medium weak (R3)' Ly | \ a |4 N MW |R3 4 J i \49 4 hy')Jae!59 ||0% 133.5 -137.3 feet:Slightly .!98%J.PL,SM,CL 60° weathered (SW),extremely close |° 5 to close discontinuities,light vq J,PL,SM,CL 58 4 greenish gray,strong (R4)I [>J,PL,R,Ca 27° "4 r-135 (4 N ir /.SW |R4 | a \a rm i i I”5014 5 :7 Ll :. 137.3-138.9 7 he7d 13%Diill Rate: Highly weathered (HW),very =100%Run 27 = |close to moderate spaced *13.8fractures,light gray,medium a i HW |R2 feet/hour.7 to course grained,N : moderately weak (R2),4 \' ALTERED DIORITE =W499.i ! :! |J ° r 138.9 -149.3 feet:Slightly \(138.9 2.0 ToPT ES »PL,SM,Ca 53 4 weathered (SW),extremely close -2.0 i ie to close discontinuities,light \7 28 35%i >>SW}R4 greenish gray,strong (R4)100%f ms ° 140 439.0 -139.6 feet:Broken core |af tp ©{|fd PLRCL 22 | a continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi"Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon ren;DRILLER:N.Arneson : -FD'Golder CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc. DRILLING DATES:8/22/12 to 8/30/12 DATUM:Ground Surface ELEVATION:1630.4 ft SHEET 8 of 19 INCLINATION:-70° AZIMUTH:255°ECannon3/8/13LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 ___E:1.884 848 8 Went B-Bedding PL-Panar -PO-Rolshed BeBette Ep-Epidote Qtr Guanz @ Ava=z F-Fautt FO-Folation C-Curved K-Slickensided Bx-Breccia. FeOxlron Oxide Sa-Sand O Diametral 2 IG g |zie Vien GRonhogonal Si-Sepeed Rough Chehde ©mtetatte sence?|SOP -Co 2 QO)oY)&|FRFracture tireguar VR-Vey Rough CaCaite'MLS Su-Suiphide 289 Ea NeuesuoloDESCRIPTION9742/2 DISCONTINUITY DATA z |, aaR TS ao I$=lz |2|53 =o]x5x |tox|xxxx WATER LEVELS z a |/fe/5)O09 |RQD |FRACTURES |Syo TYPE and To |QeWPZY/NORS wo S @ |w |3)¢%PERFOOT |29%SURFACE £6 |222|WEZ|Seno &140-42 °*S828 |avon?Pa gt DESCRIPTION &|&eee 2 &138.9 -321.9 N rq Drill Rate: Fresh to slightly weathered r vf 28 35%'Run 28 =4.3 (FR-SW),extremely close to \f |feet/hour. very wide spaced fractures,.'I @||J,PLR,Ca 37°Hole-Ca filled discontinuities,light | :e JPLRC 23°4 greenish gray to greenish vq |una bales togray,medium to course,1 gaia onstrongtoverystrongNdiSH,PL,K,Ca 4". L (R4-R5)DIORITE rv \ |(Continued)'| NX | 7 | a I a8 4 »5 0, ty |29 62% :Drill Rate:'100%;|@ |{J PLR,Ca 30 Run 29 =15 i N i :feet/fhour.J r 7 : \|: 'i N i R4 14 144.8 -145.4 feet:Quartz rich 7-145 zone vO @ /5,PL.R,CL 49°7 '>> b>_| a 145.8 -146.2 feet:Broken core |, |q N L | \ \J,U,R,Ca 7° =\-- r "od 3. 147.3 -149.3 feet:Broken core |'#2 :oy N 30 31%a @ (SH,U,K,Ch 65°Drill Rate: i i'100%Run 30 =4 _|@ |SH,U,K,Ch 63°19.4 o \feet/hour. o by |-E \ L &I Y a N§|149.3-183.3 feet:Fresh (FR),|7 _|[e)moderately close to close \12|discontinuities,greenish gray,|1. -150 Ps very strong (R5)[y 31|15 ||go%ee 4 N CT «j 80%||g \1 i i =i"7.:Replaced drill J2\bit at 150.8 5 N |feet. °t ,|'e||Ju PLRCa ww \1 5 I 4 N I /.] |Sd J,U,R,Ca 10° a \49 a rv 5.0 "an 32 66%Drill Rate: .98%@ |J,PL.SM,Ca 52°Run 32 =13 5 [74 |feet/hour.4d\e @ [4.PL.R,Ca 56°||J,PLR,CL 14° if /R5 r-155 |4 155.1 -155.3 feet:Mafic intrusion)\\ j ir /.|e J,PL,R,Ca 35° I L \.4 hesee4feet:1/2-inch thick quartz .|e J,PL,R,Ca 26° L |!Ld J,PL,R,Ca 37° +vo e ||SH,PL,K,Ca 24°1 '|i || 174 30 HH}}|[ee (J,PLR Clean 48° i ;33) "72%||J,PL,R,Ca 20°4 '100%'@ (J,PL,R,Ca 55° eo @ (eJ,PL.RCa 81°Ran wate 188-7 feet:1/2-inch thick quartz .||||J,PL.R.Clean 16°fun 33=13vel!7 +,_| |(||f@ yf PLR,Clean 20° '\ ->ALLEL EGY |7 Log continued on next page mn DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi=Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure E A-8 103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 9 of 19 INCLINATION:-70°ECannon3/8/13312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]1403-95560WrPROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:__N:3.226857 __E:1,884,848 o Ty;Shape Re infilling yeFymte @ Axal J-Joint B-Beddin PL-Planar PO-Polished Bt-Biotte Ep-Epidote Qtz-Quartzfs)F-Faul FO-Foliation C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide -Sand 0 Diametral E ge le |»(Mert,SSmien Eesmeme Suen Eee Oe Ta [soee229awi&[FRE 'irregular vRwey Rough CaCatcite ML-Sit Su-Sulphide 28a Ea noats=fo DESCRIPTION 2743 |28 DISCONTINUITY DATA =|. ea WATER LEVELSoa12&Eo!Z|88 |rap |eractures |$40 TYPE and 2,[SPSIELE AGEN yS@jw-|2)2)*%PERFOOT |29%SURFACE a8 222 852 /82nm FRiv6«23898|la+vonoe Pa gh DESCRIPTION a"1 &eeso 2 &160 138.9 -321.9 L Tilt.Fresh to slightly weathered t 7 |33 72% (FR-SW),extremely close to |very wide spaced fractures,| -Ca filled discontinuities,light ' greenish gray to greenish co gray,medium to course,| strong to very strong N °}-{R4-R5)DIORITE Pv e J,PL,R,Clean 45)(Continued)| N om @ ||J,PLR,Clean 26°ga |38N if34)84%i . 163.4 feet:1/2-inch thick quartz ( !:Drill Rate: vein ;100%::Run 34 = \'16.7 . Ly |feet/fhour. | N I 165 ee rosa |OY|®|J,PL,R,Ca 63°10/3/12;VWP N L ,| a { \ L ,|: \ gs \t L || |: 1 L 50 |i |i |e@ |}J,PLR,ca 33° r |er | =35|©9 |'100%D nNDvresid 100% |5 a \°o |@ |J,PL,SM,Ca 54 8 c | 170 |5 |.SW |R5 N | ey 1fej.: i x=Ly | t Hole 2 ;advanced to S N 170.8 feet onco)+|8/25/12. \ .{* 172.1 feet:1/4-inch quartz vein N L | \ L \5.0L|: | 36 100%Drill Rate: \100%Run 36 = ros id 10.3 [ , feet/hour. N / 175 j NN /.@ |J,PL,R,Clean 59° 175.6 -175.7 feet:Quartz vein | y L 7 |e |jJ,PL.R,cL 23° \ NX t fr 4 ad 177.1 -177.8 feet:Felsic intrusion}\! :5.0L|. L '||37}9 F |96% '100% ;rv Drill Rate: \Run 37 = 11.5 5 ky |}i feet/hour. 1 N +-[7 4180Logcontinuedonnextpage vad DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FigureAj\4 DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon@®E Golder henAssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 10 of 19 INCLINATION:-70° Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:__N:3.226.857 __E:1,884 848 8 Md joint B-Bedding BL Planar Po-Poished grote Ep-Epidote ohn uart2 °Axal =F-Fautt E0-Foliation C-Curved_K-Slickensided _Bx-Breccia eOx-Iron Oxide Sa-Sand O Diametral x IG o|2 |e Vien GROnhogonal StSlepped”RRowh -Chchbrte |mvicthatte -Srsea"®oP-ce 2 is}i Wi z |eRe Hrreguiar VRVery Rough CaCakte MLSit Su-Sulphide Fs 3 a woaesw-1o DESCRIPTION 978 ee DISCONTINUITY DATA x ase ao |Z =z /E_/Zz]98 =o-yix|toxlx x WATER LEVELSFedajFe/2)6S)Rad |FRACTURES |Eve TYPE and Fe Sos E25)SS .fe 2 iw=|2)2]%PERFOOT |29%SURFACE 28 |282/8E2/82x5 &Lao"ae ba Se¢h)cw sees Pa gy __vEtenvion §-|Bese 2 z 138.9 -321.9 \ Fresh to slightly weathered t 7!37 96%|(FR-SW),extremely close to \' very wide spaced fractures,|Shi -Ca filled discontinuities,light ' ; 4 greenish gray to greenish \'418 ;gray,medium to course,{18 ': strong to very strong S 38}"<4 100%|i ||||Sw |RS Drill Rate: i eontinued)en 100%aa Run 38 =4 4 i feetv/hour. 181.0 feet:Becomes massive \ (widely spaced fractures)I / ; b J,PL,R,Clean 4 4 »1183.3 -187.2 feet:Slightly ty |! weathered (SW),strong (R4)\,; \4 he ! L >49 |-185 a 5.0 4 =,;39 98%SW |R4 Drill Rate: \98%j !Run 39 =20 ,/4 :|feet/hour. L i | | \|| L ,|ae \:i '' a NN 4d 187.2 -190.2 feet:Fresh (FR),|\"7greenishgray,very strong (R5)|j _ L ne '; |Ss \ z 4 FR |R5 |||32 J°\40|34 |100% 8 v :400% L-190 |5 |s A no = N 190.2 -190.4 feet:Slightly 7 SW!sR4os|weathered,strong (R4)|Healed Ca g 190.4 -215.9 feet:Fresh (FR),\ a =|greenish gray,very strong (R5)fF 7 _} D \t 4 £||fo] 8 _| .|1 @ /J,U,SM,Ca 57° J°1 rT \ 2 Ls |6 \ 1 gf 59 1 £4 .9 8 .y "100%Drill Rate: *.100%Run 41 =5 1 rv..feet/hour.J:"| =\|=ie | =iBf198;a oO \FR |R5 g J TT\: ;e J,PL,R,Clean 31°or » ;i 4 oO in 7s |J,PL,R,Ca 38° =|Py diC-)»Pp dt S -ian 31 : 4 <.42)**||/90%|Drill Rat,ri ate:>a 100%|Run 42 = et !15.5 4 a 198.2 feet:Slightly weathered |*@||SH,U,K,Ca 40 feet/hour._4 (SW),1/2-inch either side of vq Replaced drill >discontinuity I :bit at 198.9 8 a \\feet.Jwir7.19 i !Drill Rate: =\19 dG Run 43 =4.4a|43 100%feet/hour.gs >400%Z|-200 4 4 E Log continued on next page$===DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fiqur®A\g Id DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure 8 =Goider A-82&, RECORD OF DRILLHOLE DH12-4 SHEET 11 of 19 ECannon3/8/13312.GPJLIBRARY-ANC(2-8-13).GLB[ANCORILLHOLE]PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.226.857 _E:1,884,848 a y.joint B-Bedding PUPlanar Hic econ faethe Ep-Epidote oe art @ AxalzrF-Faut -FO-Folation K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand O Diametral x ir oa]>tle sere ORO wee nal Ueding a omen Sheterite Gree atte se Sercte bat.Fo 3 i}Fl Wil &|FR-Fracure tireguar VR-Very Rough GaCakte MLSit Su-Sulphide z6 @ Fa NOTES 4 |g DESCRIPTION 9-74 38/es DISCONTINUITY DATA xz],aoe TESTS ao |Z z Iz=_|2|99 ax 8x|tox|<xe WATER LEVELSFd&|Fe|/2|8S]Roo |Fractures |$¥o TYPE and 2 |[SZE/E20 ASSLie]ea )3|Z|%PERFOOT |29%SURFACE a8 22/852 /Stn5 8L200aoBBER|n+owe be gh DESCRIPTION oe A geese gd = 138.9 -321.9 PT]Fresh to slightly weathered _43 100%(FR-SW),extremely close to very wide spaced fractures, a Ca filled discontinuities,light 4 greenish gray to greenish 4 gray,medium to course,| strong to very strong a (R4-R5)DIORITE 4 4 (Continued) ¢ \ L i 30 1 44)©|100%Drill Rate: 100%Run 44 = 12.5 Jfeet/hour. @ |J,PL,R.Ca 52° -205 | @|@/J,PL,R.Ca 8° a J,PLR.Cl 66°7 i oo 50 FR |R5 4 =5.0 4 S "6 o% .Drill Rate: 2 7.100%@ |J,PL,R,Clean 47 Run 45 = L &10.3 4[a]feet/hour. o(o]7 3° L210 |$4 "|e J,PL,R.Ca 25° i]NX t i x=7 @ =6J,PL,R,FeOx 43 Hole J2advancedto 5 40.8 feet onoO748/26/12. 7. a Y 58 4 +.!9 e46100%®|J,PLR.Ca 62 Drill Rate: 100%Run 46 =12 -/-feet/hour.| on -215 |J .: -215.9 -217.5 feet:Slightly , :Slight 4 weathered (SW),light greenish /|]hydrothermalgray,strong (R4)!|alteration i Sw |R4 from a /.||215.9-217.5 J feet 217.5 -225.4 feet:Fresh (FR),47 |2greenishgray,very strong (R5)}om 47 5.0 88%'@ |J,PL,SM,Clean 50° 94%° ? o @!(J,PL,R,Clean 43 Drill Rate: Run 47 =10 i |FR |RS feet/hour.a /i @3,PLR,Clean a7°| |@ |J,U,R,Ca 52° -220 4 iS)i f |--continued on next page <DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiqureWcIdiDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon guoiderA-8 103-95560W/FF Golder DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 12 of 19 INCLINATION:-70° Associates DRILLER:N.Arneson CHECK DATE:1/9/43 PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 __E:1,884,848 8 Pint B-Bedding BUPana ©PoBeensd -«BBeike -_Ep-Epidote Oeedustz |OA" 2 F-Faut -FO-Foliation --C-Curved K-Sickensided Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametral x |&g|zie WNen” OROrhogenal St-Sepped'RRovwh --Chchbnte imicante «=Seswe |bOP aF=2 9 a w 2%|FR-Fracture Hrregular VE-Very Rough Ca-Cakite ML-Silt $u-Sulphide es %a veerswu|o DESCRIPTION ek 2/#s DISCONTINUITY DATA x |, oak oe 2 yz 131538 =I-x5x|tox |xxxx WATER LEVELS z a2ihe Z|9°93 RQD FRACTURES |3y TYPE and Fo [See |EZE/NSRA wo 4 &|KE Zz;BR)%PERFOOT |283 SURFACE SQ jer2|Whe|Sene F|20 oO o B8ea\|n+0e2 PR oh DESCRIPTION &5 wesee z 138.9 -321.9 x i]Fresh to slightly weathered 7.47 88%° (FR-SW),extremely close to °@|J,PLR,Ca 43 very wide spaced fractures,| -Ca filled discontinuities,light '4 greenish gray to greenish os gray,medium to course,i strong to very strong » q (R4-R5)DIORITE 7 | (Continued)|@||J,PL.R,Ca 37° /.FR R5 ||28 4 NX .oI4894%@J,U,R,Ch 84°Drill Rate: \100%Run 48 =9.7 i \feet/hour.4 4 | >@ |J,PL,SM,Ca 51° -225 >a ! 225.4 -225.9 feet:Slightly »@ |SH,PL,K,Clean 54°sw |R4weathered(SW),strong (R4)/-@ |J,PL,SM,CL 47° a 225.9 -229.1 feet:Fresh (FR),I 4 close discontinuities to massive,N very strong (R5)7 | \ a \= '| 1 FR R5 \ i 7 5.0 4 -|5.0 4 3 . 49 100%Drill Rate: 2 /.100%Run 49 =8.1 -&|feet/hour.4 S|229.1 -230.0 feet:Slight \g weathered (SW),close to widely 7a]©|spaced discontinuities,strong \e J,PL,R,Ca 44°SW |R4|(R4)zone |@ jJ,U,R,Ca 47° F230 |18]230.0-243.9 feet:Fresh (FR),|>;|@|I4U,RCa 35° 7] N close discontinuities to massive,| 3 |very strong (R5)! o \ _ ='-4 26 N°°|@ |J,PL,SM,Clean 47° of i 4 -\ S 7. oO | St .48 @|1J,PL.R,Ch 43°4 B "4 Igo]59 |eax&; °Drift Rate: w \96%Run 50 =7.5 -./.]feet/hour.4wy\i @ |J,PL,SM,Ca 50°2 N 3 '4 Sh 235 \FR |R5 4 oO \ z an =! ao.\4 3 4 a ! Pee]N aL /4 is) z \ <\e J,U,R,Ca 13° x "4 30 SL ,51]>°|100%| a 2+feet:Brok '100% 5 238.2 -238.6 feet:Broken core ,_'0 Drill Rate: Run 51 =5.8 fo}i N feet/hour.a x 'on 8 ]|©J,PL,R,Ca 8° $;anne /=S 240 Log continued on next page =-DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi8AGId.DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon gure 8 =Golder A-83|WEA RECORD OF DRILLHOLE DH12-4 SHEET 13 of 19 ECannon3/8/132.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70°PROJECT NUMBER:103-95560 : DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,.857__E:1,884,848 a Infilling Py je @ AxalJBB|f8eo,fgeeme,lny See,Set,Seine,Gee”|Gomme->SH-Shear CO-Contact U-Dnauisting Rao CL-Clay G-Gouge Se-SencitexrifS|Big!|ven OR-Odhogonal ST-Stepped Ch-Chiorte Hm-Hematite S+Silica bop.NOTESElz9Zuwfe|FR-Fracture -lregular vR-veyRough Ca-Caicite ML-Sitt Su-Sulphide 3 6 OgWw1oDESCRIPTION972]es DISCONTINUITY DATA x aak TESTS [s)Zz x |=2/90 =3)vinx |tox|x xux WATER LEVELSirajhez|°9 ROD FRACTURES |3y2 TYPE and =SSH\ELSHIAZEAfe)e ija-i3!/¥%PERFOOT |29%SURFACE 22 (889 /seg/exN8 8a6|°|&egeg|avooe Pog DESCRIPTION go ES oor yt240136.9-321.9 THT TT Te :Pity ft. 9 -:\i e ° Fresh to slightly weathered 74 54 100%4 PLR,Su 53 (FR-SW),extremely close to very wide spaced fractures,| r Ca filled discontinuities,light ' 4 greenish gray to greenish om gray,medium to course,| strong to very strong \ a (R4-R5)DIORITE / FR R5 4(Continued)| 240.3 -240.9 feet:Light gray >@ |J,PL,SM,Ca 51° felsic dike ' -I 48 4 \5.052 96%vod °Drill Rate: \96%Run 52 =10 5 243.9 -245.4 feet:Slightly .feet/hour.q weathered (SW),light gray,strong”./” |Hydrothermal{R4),zone surrounding healed \ |alteration joint N sw |R4 from °243.9-245.4|245 '4 e J,PL,SM,Ca 13 feet _| | 245.4 -250.9 feet:Fresh (FR),» close discontinuities to massive,[/ G very strong (R5)|| 7. 1 2.5 +.53]75 ||/92%Dall Ran 4 |rill Rate: ;100%Run 53 =10 »feet/hour. L 7 _ e J,PL,R,Ca 29°FR |R5 g 'HoleEe" @ |J,PL,R,Ca 49°advanced toag&;248.3 feet on 24N258/27/12. &'7)|s4 25 |400% s 100%250 13 ' 4éZz a lgN L S|250.9 -260.6 feet:Slightly 4 @ =|J,PL,SM,Ca 48° ;4 |weathered (SW),close |Drill Rate: S|discontinuities to massive,light N Run 54=48©|greenish gray to greenish gray,/feet/hour. strong (R4)4 -251.4 -252.4 feet:Porphyritic I 4 texture \ "4 ||.\49 4 a 5.055 92% . fo Dritt Rate: N 98%Run 55 =10 a /.feet/hour.q j @ (J,U,R,Ca 53° N 7. fF 255 ;= N /.]J J,PL,R,Ca 33°sw |R4 1 L XN J /. ,®|/J,PL,R,Ca 32° N |nl 4 | mm 5.0 L 56|°°|!6a%| »100% /.Drill Rate: 258.7 -259.3 feet:Broken core |Run 56 =9.7 a \feet/hour.J /. \°J,U,SM,CL 6° }--/pd260--continued on next page 7 =e DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiEGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure A-8 103-95560WéDRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 14 of 19 INCLINATION:-70°ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT NUMBER:10603-95560 DRILLING DATES:8/22/12to 8/30/12 ELEVATION:1630.4ft AZIMUTH:255° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 _E:1,884 848 8 v1 joint B-Bedding PL Pinae BovBolened atBole Ep-Epidote oe uartZ @ hal =F-Fauk FO-Folaton -C-Curved KSlickensided Bx-Breccia. FeOx-lron Oxide Sa-Sand O Diamerral 2 iG g |Zz le Ven”OROrhogonal StStepeed Rough Ghchbme Hattematte -SeSuea |EOP =Fo 2 oO}5 )u &|FR-Fracture Fimegular VR-Very Rough Ca-Cakte |MLSit Su-Sulphide Z6 oe NOTES Ce mys |ww eous TESTSMwoODESCRIPTIONiS]Z|a>DISCONTINUITY DATA =F WATE ELS°FS =|=.|/2|88]rao |rractures |$¥Qo |xox|tox|x xxx R LEVI z aelz|°9 ss Fr 2 TYPE and To |SZA\<zZGloqno 3 @\w-|3)2]%PERFOOT |39%SURFACE 23 |2e2|ge2/8ene faoaSBS8\unvonol®Pe gs DESCRIPTION a"|&leeze 9 fF260738.9-321.9 T WT),sw!paFreshtoslightlyweathered7.56 68%'. (FR-SW),extremely close to ° ; @)4 PLR,Ca 44 very wide spaced fractures,{ Ca filled discontinuities,light '4 greenish gray to greenish cs gray,medium to course,| strong to very strong \ (R4-R5)DIORITE ' = (Continued)| 260.6 -269.1 feet:Fresh (FR),>moderately close discontinuities ta 4 massive,greenish gray,very |5.0 + 4 istrong(R5).57 5.0 ||rgo,|i . ;100%|i e J,PL,R,Clean 46 NN !| | : 4 e J,PL,R,Ca 31° 'I '\' -265 om FR |R5 | | NX 7 |4 NN 7 | »4 | | N 7.20 = - |-9 5 \ 58 94%Drill Rate: @ |100%Run 58 =9.4 &|feet/hour.J °269.1 -272.2 feet:Slightly N 5 weathered (SW),close 7.©|discontinuities to massive,light e J,PL,R,Ca 29° c|greenish gray,strong (R4)| r-270 |3 >@ |J,PL,SM,Ca 56°4 a ony 3 .'te |[JPL SM,cL 30°sw |R4z=7.4 |4 2 | =| 6 \j3);_| J . 4 272.2 -278.8 feet:Fresh (FR),||moderately close discontinuities ta,": massive,greenish gray,very I strong (R5).£0 ac 4 4 -9,oe J,PL,R,Ca 42° | 59 96%Drill Rate: \100%Run 59 =13 '|@ J,PLR,Ca 37°feet/hour.J \ N fn 274.8 feet:1/4-inch thick calcite \y 275 healed fracture N 4 os FR |RS i '@||J,PL.R,Ca 42°4 fd 1 276.5 -277.2 feet:Porphyritic |||@ ||J,PL,SM,Ca 30° texture ' |' 276.5 feet:2-inch feisic dike cs : :4 S | 7 5.0 ;60|°°|i p6%i |@|jyurca 39°: '100%| s Drill Rate: ||Run 60 =20 278.8 -282.2 feet:Slightly N feet/hour. weathered (SW),moderately 7 i | 7 close discontinuities,light 4 greenish gray,strong (R4)I ||SW |R4 \|t | = rae | | |280 Log continued on next page _DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi€.EF Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon reeLSAssociates ECannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560W/RECORD OF DRILLHOLE DH12-4 SHEET 15 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 _E:1,884,848OoTyShaReInfillingPy-Pyrite @ Axaifo)J-Joint 8-Bedding PL-Planar PO-Poiished Bt-Biotite Ep-Epidote Qtz-Quanz DialF-Fault FO-Foliation C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand OC Diametral -$H-Shear CO-Contact U-Undulating ==SM-Smooth CL-Clay |G-Gouge Se-Sericite EAwMxWwQOirexr>V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte Hm-Hematite Silica ZORs NOTESes9aduw&|FR-Fracture Hrregular VR-Very Rough Ca-Caicite ML-Sitt 3u-Sulphide fal g 8 a TESTSu 19 DESCRIPTION Q 72]Zs DISCONTINUITY DATA xz i, a-r a |Z z=/z_|2|828 ram 3]xbx\ton| xxx WATER LEVELS z 2 lhels 69 RQD FRACTURES |372 TYPE and Eq |Qa8 ezu N ORs Fefe)2 |u |S|%PERFOOT |292 SURFACE £O |2e2|UhZ|Sen0 8380a)x 8 3 4 ne0@ 2 ek DESCRIPTION :=5 weese od & 438.9-321.9 iw :|@ J,PLR,Ca 5° Fresh to slightly weathered by |60 at | (FR-SW),extremely close to \j very wide spaced fractures,|@||J,U,R,Ca 42° 'Ca filled discontinuities,fight |>e ||s.U,R CaHealed 23°sw |R4 4 greenish gray to greenish vq core gray,medium to course,{ strong to very strong »18 a (R4-R5)DIORITE [." 25 4(Continued)v 81 72% 72%282.2 -283.8 feet:Fresh (FR),4 >° very strong (R5)vo -!FR |RS 4 ' in 7.Holevanced to|a 283.8 -285.3 feet:Slightly °283.3 feet on §weathered (SW),moderately t '4 J,PLR,Ca 33 8/28/12.7] close discontinuities,light | greenish gray,strong (R4)l °J,PL,R,Ca 33°sw |R4284.6 -285.3 feet:Broken core » I 285 on 44285.3 -290.8 feet:Fresh (FR),||62 44 50%close discontinuities to massive,|,|°e SH,PL,K,Ch 19°Drill Rate: greenish gray,very strong (R5)\100%Run 62 =88LL.'feet/hour.7 ir 7. | a \a ir /. ( NN .'a 4 FR |RS ] a |So N 9 a @||J,PL,R,Clean 37° L 5 y 34 e ||J.PL,SM.Ca 25°J ao 2 \63|37 |I|90% 5 ros.5 Drill Rate: °|100%Run 63 = 290 |5 .@ |J,PLR,Ca 59°10.3 | ed ro 7a]feet/hour. "\Slight S \!weathering =|290.8 -292.8 feet:Slightly t |next to joint :a |weathered (SW),light greenish |\at 289.9 feet 'S|gray,strong (R4).|[o)L OO sw |R4 =I 4 'N r,om 292.8 -295.3 feet:Fresh (FR),\5aclosediscontinuitiestomassive,},_|50 4 greenish gray,very strong (R5)\64 94%Drill Rate: N 100%Run 64 = | r vid 10.3 avOFR|RS feet/hour. [L '@'(J,PL,R,Ca 46° on e SH,PL,K,Stained 30° i 295 | N 295.3 -296.2 feet:Slight roy | weathered (SWV),light greenish \ gray,strong (R4).|SW)R4 296.2 -297.1 feet:Fresh (FR),|\77closediscontinuitiestomassive,I greenish gray,very strong (R5)\FR R5 s --af 297.1 -297.5 feet:Slightly sw Rsweathered(SW),light greenish \43 4 J,PL,Ca Healed 33° gray,strong (R4)a .2975-2991 feet:Fresh (FR),|\"es)©9 |||aaa-close discontinuities to massive,|J greenish gray,very strong (R5)'"86% Pv FR |RS Drill Rate: ar Run 65=9.4 it 299.1 -313.8 feet:Slightly N j feet/hour.4 weathered (SW),massive,light [7 greenish gray,strong (R4)\ |299.1 -305.0 feet:Porphyritic .SW |R4textureL,300 Log continued on next page ea DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards .FigureGolderoetieeCONTRACTORCruxSubsurface,Inc.CHECKED:&Cannen 'guiAssociates:N.Ameson : RECORD OF DRILLHOLE DH12-4 SHEET 16 of 19 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannon3/8/13PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.226.857 _E:1.884 848TyaveRoughness8itdjointB-Bedding lana PO-Polshed dole Ep-Epidote Bede art @ Axai=z F-Fautt FO-Folaton -C-Curved K-Sickensded Bx-Breccia FeOx'lon Oxide Sa-Sand O Diametral x |G g|zfe Wer OR-Onhogonal Si-Steppea”Rough RSH |Hmietatie =Sauer |SOPVeinonite}7"=Fe 2 °Z wi >|FR-Fracture o@ irregular VR-Vey Rough CaCakte MUSif Su-Suiphide Fs s a A NOTES w<Jo DESCRIPTION esl ey DISCONTINUITY DATA =|,aap WATER LEVELS e ijwr)s %PERFOOT |a9 SURFACE a6 rz|\eSz|as2B|9 |Z)"|oscelaeon?Po3 DESCRIPTION eo Ee SF os YEF -300 : g 138.9 -321.9 N TIFreshtoslightlyweatheredt+.65 86% (FR-SW),extremely close to \ ;very wide spaced fractures,|i 7 Ca filled discontinuities,light |*4 greenish gray to greenish \fs gray,medium to course,1 strong to very strong \ g (R4-R5)DIORITE a =(Continued) >42 vl les}42 |100%r |Drill Rate:q _100%Run 66 =14 in feet/hour. | -N 1 4 ros \ | N +305 eo 4 ||| .rf dt 'on | .|1 t 4 N ' a || \:\ l 1 ' a N i .SW |R4 4d 7.5.0|67|59 |'100%\Drill Rate: ry |100%Run67=10a\feet/hour.T 5 \ 9 by-4a3&(4 a \ 5 vy £|310 ||310.0-310.2 feet:Maficdike |>4 N vq a l g N -2 on 7 £&|8 \ r 7 i 311.8 -312.5 feet:Porphyritic \ ,texture nN 48 7 roy]5.0 6,' ar 88 96%Drill Rate: a 96%Run 68 =12 a 312.9 -313.9 feet:Porphyritic \4textureL74feet/hour. |i N | a 313.8 -316.0 feet:Fresh (FR),oF +_|' massive to moderately close \7 discontinuities with occasional | slight weathering next to joints,» greenish gray,very strong (R5)ly 7- 315 316.0 to 316.8 feet:Slightly !FR R5 4 weathered (SW),light greenish N gray,strong (R4)ae 316.8 -318.0 feet:Fresh (FR),\ massive to moderately close I 25rdiscontinuitieswithoccasional=|_+4 slight weathering next to joints,|,”69|25 |100%|!greenish gray,very strong (R5)\4 'SW |R4 Drill Rate: 318.0 -319.0 feet:Slightly N 100%e 25°Run 69 =7.5 a weathered,light greenish gray,>,|:J,Ca and Qtz Healed feet/hour.4dstrong(R4)\ 319.0 -321.9 feet:Fresh (FR),'; massive to moderately close N FR R5 discontinuities with occasional a Hole slight weathering next to joints,\ ;advanced to a greenish gray,very strong (R5).317.5 feet on 7 i |32 |@|/J.PLRCLCa 36°sw |R4 8/29/12. 3.3|70 97% a 321.8 -321.9 feet:Broken core '97% | + 321.9 -3225 feet:Moderately [|/° i weathered (MW),moderately i weak (R3).!FR |RS L |}_/o 1 44320-_--continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi|Gold ler DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon renAssocatesDRILLER:N.Arneson CHECK DATE:1/9/13 - PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc. DRILLING DATES:8/22/12 to 8/30/12 DATUM:Ground Surface ELEVATION:1630.4ft SHEET 17 of 19 INCLINATION:-70° AZIMUTH:255°2.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannon3/8/13LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 _E:1,884,848 =Shape Roug lefilting Py-Pyrite @ Analro}J-Jomt 8-Bedding PL-Planar PO-Potshed Bt-Botte Ep-Epxiote Qtz-Quar oD qzrF-Faul FO-Folation C-Curved -Sickensded _8x-Breccia FeOx-lron Oude Sa-Sand Diametral E o|2 le Giver ORGrhogenal Stepped”Roush Ghehbete |Hiwbemsatte SrShea oe.=e 3 9 a W 2 |FR-Fractu eae tiregular vR-ery Rough CaCakcte -ML-Set Su-Sulphide Zz S94 Ea veersn=Jo DESCRIPTION 2h 3/#8 DISCONTINUITY DATA x oar WATER LEVELSz@|E>|2/86 |rao |Fractures |$20 TYPE and o,|SSHESHIASSS&@i/u=|5|2]%PERFOOT |29%SURFACE ag |oug BE2/8ine f|500-42 6 |o |&seeg|a<one Pood DESCRIPTION e 6 beso a 5 138.9 -321.9 C [||Fresh to slightly weathered rod 70 97% (FR-SW),extremely close to \|very wide spaced fractures,!bya eR |RS-Ca filled discontinuities,light >4 greenish gray to greenish vo :; gray,medium to course,|:strong to very strong \4327.9 ;!AN .(R4-R5)DIORITE 7821.9 +: Sw Ra J (Continued)=t MW |R3 321.9 -334.2 ry | Slightly weathered to wy i || i moderately weathered (SW-|:59 ! 4d MW),close to very wide HW 5.0 :1 i spaced fractures,Ca filled ==\71 .100%\sw |Radiscontinuities,light greenish S 100%gray,medium to coarse AL r grained,moderately weak to N 4 strong (R3-R4),ALTERED ADIORITE=I mw |R3 a{325 322.5 -324.4 feet:Slightly =4 weathered (SW),strong (R4)» 324.4 -324.8 feet:Moderately a ,weathered (MW),moderately i weak (R3)7 d 324.8 -329.2 feet:Slightly =\weathered (SW),strong (R4)'325.1 feet:1/2-inch thick diorite |//' porphyry = i A sw |R4 4 =\ ao a - -47 4 = A 5.0 9 s =i n one Drill Rate: @ \94%Run 72 =8.3 -5 ©\feet/hour.q a \@ |329.2-320.4 feet:Moderately [f°MW T-R3yo)weathered (MVV),moderately =©)weak (R3) L330 &|329.4 -334.2 feet:Slightly dt | |weathered (SW),strong (R4)=\ N Soa"Ale]=\ =N a D>a 7 £=\|fo}\'s)a \ i :@ /J,PL,R,Ca 64°SW |R4 4 4=\e J,Qtz Healed 20°S 42 A 4.2 " r Sy?100%Drill Rate:4 100%Run 73 =7.4.°©||4,Qtz Healed 15°puniaer4XQ ut a =316.4 7 334.2 -350.0 ,"834.4 Fresh to slightly weathered t +.(FR-SW),moderate to wide \ ,-335 spaced fractures,fight . 4 greenish gray to greenish L 'repraces drillgray,medium to coarse 4 feetgrained,very strong to I {. a strong (R5-R4),DIORITE \ J 7 : 334.2 -341.5 feet:Fresh (FR),\; greenish gray,very strong (R5).| Ly |; r 337.0 feet:Slightly weathered =[\49 ®||J,PL.R,Ca 34 FR |RS 4 next to joint N 5.0 r.”7A)||98%0 Drilt Rate:337.7 feet:Slightly weathered =[\98%°J,PL,R,Ca 15 Run74=58 -next to joint ,|feet/hour.7 Ly | \ \ ' 4I.a \ ' N Ly |-340 - 4 Log continued on next page -.-DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiaureAsGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:£.Cannon p 8 103-95560WéAssociates DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/134103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]RECORD OF DRILLHOLE DH12-4 SHEET 18 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/22/12to 8/30/12 ELEVATION:1630.4ft AZIMUTH:255° LOCATION.Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 ___E:1,884 848OoTyJShayughnessinfilling”Py-Pyrite @ Axal 8 Phy psec,eg SEE,BS,faite EE®|Ooanerax45o|zie Vien SROrhogonal StStepped'Rehouh -Ghehbite =Mimflematte -Seguce |OP aFe3fe}Z mI &[ER Piregular VR-Very Rough CaCakte ML-Sif 3u-Sulphide 239 a NOTES wu 16 DESCRIPTION o L"42|ee DISCONTINUITY DATA =aap TESTS ao |Z Zz _|2|99 =5 wisxltox |<xxx WATER LEVELSFed&|Fe|/5|og}Rao |FRACTURES Evo TYPE and g,SSHIESEINAEA oyoO@ju-/5!|2 %PERFOOT |292 SURFACE a8 j2ee wz Bena f&a0 a o «ggegiaxonoe Pes DESCRIPTION 2 A ooso gy & 334.2 -350.0 \ Fresh to slightly weathered r 7]O (FR-SW),moderate to wide \ spaced fractures,light \FR |R5 -greenish gray to greenish |*4 gray,medium to coarse vq : grained,very strong to |H strong (R5-R4),DIORITE \ a (Continued)r 7 il | \5.0 , 341.5 -344.4 feet:Slightly I 50weathered(SW),light greenish »75 .100%' gray,strong (R4)P74 Drill Rate: \100%Run 75 = a \SW |R4 2 \ 10.3 s L >feet/hour. 3 VT €| r a |e |[uy PL Rca 19°J @ \|GO|344.4-345.6 feet:Fresh (FR),|o greenish gray,very strong (R5)N |345 =eo FR |RS 4 ry]I ao N S|345.6 -346.9 feet:Slightly roel i =|weathered,strong (R4),light \ |Lo;)i 4 gz greenish gray N sw |R4fo)roseoO\ | t 346.9 -348.5 feet:Fresh (FR),\| greenish gray,very strong (R5)in 'i 5.0 |76|©°|100%\FR |RS Drill Rate: i ty 100%Run 76 = \11.6 7 .!feet/hour. 348.5 feet:Becomes slightly Lyweathered(SW),light greenish oq i gray,strong (R4){4 |»FR |R4an 350 "4301.8 Boring completed at 350.0 350.0 "| bid Notes: 1.Drillhole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation =estimated from 2011 4 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. -3.Vibrating Wire Piezometer 4 (Slope Indicator,P/N:52611040, S/N:12-6869)was taped to sacrificial ttemie pipe,placed alongside the temperature i 355 acquisition cable (TAC)conduit,4 and grouted in place with cement bentonite slurry at 330 feet depth. 4.1-inch Schedule 40 PVC TAC a conduit installed to approximately 250 feet depth and filled with propylene glycol antifreeze.Top of HWT surface casing has 3.65 feet of stickup above ground surface. 5.TAC (BeadedStream,S/N 2118)placed in TAC conduit and is removable.TAC sensors are located at 3.25,6.25,10.25, 20.25,35.25,50.25,75.25, 100.25,125.25,150.25,200.25, and 250.25 feet depth,0 feet depth =elevation 1630.4 feet.4 6.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand F360 Log continued on next page 7 a DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FjA\4 G Id.DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon igure i olderAssociates DRILLER:N.Ameson CHECK DATE:1/9/13 A-8 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-4 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 19 of 19 INCLINATION:-70°ECannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WéPROJECT NUMBER:103-95560 DRILLING DATES:8/22/12 to 8/30/12 ELEVATION:1630.4 ft AZIMUTH:255° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,857 _E:1,884,848OoTyJSha;Roughness Infilling Py Pyrite @ AxalroJ-Joint B-Bedding Pl-Planar PO Bolshed Bt-Biotite Ep-Epidote Qtz-Quartz 4 F-Faut FO-Foliaton --C-Curved K-Slickensded Bx-Breccia. FeOx-Iron Oxide Sa-Sand ODiametrat ={6 gla le|,ive Seman Sse SMSO SER Gels Sac”|SoeVein-nal x -|=FE 2 2 is}Z rd z FR Fracture oa Piney VR-Vey Rough Cacaete wea su Sulphide s8 7 EI NOTESw=|o DESCRIPTION 27 2|es DISCONTINUITY DATA z |,ase w ATER LEVELSa12Zzj=-|2/88 1 rao |eractures [Fva TYPE and S |xoy tox |X xxx52/BE Zz)an]%PERFOOT |29%SURFACE £g 1853 S52|82c5 8o6|9 |&gseglaeooe pag DESCRIPTION g 5 "loeso go x-360 margin of the Tog column. 7.Water level estimate from i 8.Point load test rock strengths i” Presented as equivalent uniaxial compressive strength (UCS) based on a K value of 19 for a conversion between 1Is(50)and J equivalent UCS. [-365 4 -370 a --375 - r-380 4 ms DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Figuref-DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon€E Golder Ine renAssociatesDRILLER:N.Arneson CHECK DATE:1/9/13 M2.GPJ LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13103-95560WeRECORD OF DRILLHOLE DH12-8 SHEET 1 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172°LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.226.359 __E:1,884,985 T Shay i iaJoint--B-Bedaing PL-Pianar Boe ished «Brake -«Ep-Epidote.«Qe uate |ca F-Faut FO-Foliation C-Curved K-Slickensided Bx-Breccia FeOx-tron Oxide Sa-Sand C Diametral->SH-Shear CO-Contact U-Undulating SM-Smooth CL-Clay G-Gouge Se-Sencite LAW=tw Q i |&>V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorite =Hm-Hematite S+Silica _ZOR=NOTESeeS9iuw@&|FR-Fracture L-Irreguiar VR-Very Rough Ca-Calcite ML-Sitt Su-Sulphide 5 $2 g TESTSwu1oDESCRIPTION9-7 2!es DISCONTINUITY DATA Fa ak ao |Z Zz /E_|2)98 =o-yisx|tox|x xxx WATER LEVELS ir &lee GO |RQO |FRACTURES |Fy@ TYPE and 2 [SSH ELH AwES yOo=|e |S)Bl]%PERFOOT |29%SURFACE 28 |oue gaz Seno fLo4°o|F |ggea|v+owe bag DESCRIPTION Bo |°bese eg0.0-49.2 bp J Very dense,moist to wet,°iedarkgreenishgrayanddarkDbrown,poorly graded fo) -GRAVEL and SILTY SAND,{©4 trace to few organics (roots, wood),multi-lithic angular °{N 1 NADioriteandvolcanicrockb.,3.2 a cobbies and subrounded Oo J coarse gravel is) (GP)[ALLUVIUM and of \TALUS]D(oe) i bO 4 ofD[<Drilling Rate r bO (8/17/2012):4 0 to 7.4 feetbyQ(soil),0.5 O hours,14.8 5 L,Oo feet/hour 4 °ia 2 42 N/A D, L L,e)| oC)b, L L fe)| b QO HoleFjL,advanced to g oD 7.4 feet on 4 &pS BII7/2. a b Q ast © s 1 10/3/12;VWP L °L O 4 i 0()N oO D5 3 48 NIAf-10 Z 10,0-14.2 feet:Frozen,poorly fp re)NIA 7 oa bonded,dark brown,ORGANICi=SILT,trace to few organics (roots,Q (\@)wood),approximately 20-30%by D, a oO volume (OL,Nbe+Vs)oO J 5 ) =10.0-12.2 feet:2-to 5-inch-long bh Q>Clear ice parallel to core axis,oO a 5 approximately 1 inch diameter b iS)4 LS)ae2,; p 4 NA | °N 2.0 b, L L Q 4 14.2-19.1 feet:Possible thawed/unfrozen zone b (\O I 15 LO 4 )b, 'bO 5)a6 |NM 7 oOb> =L QO 4 feD '.Drilling Rate i Run 6:Driller comments bouldery/2 (8/18/2012): and gravelly drilling 0 ie)Had °30.9 1 feet (soil),by Q 6)43 ||NA 10.25 hours, >2.3 feet/nour i 19.1-29.2 feet:Possible frozen i.)7 soil,cold core samples 0 ieD 7 51 N/A2TT20o a Log continued on next page 7 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine MinL?Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 LOCATION:Susitna River,Talkeetna Mou! PROJECT:2012 Susitna-Watana Geotech ntain: RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc. DRILLING DATES:8/17/12 to 8/27/12 s,AK EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1461.8ftCOORDS:_N:3,226,359 E:1,884,985 SHEET 2 of 19 INCLINATION:-70° AZIMUTH:172°ECannon3/8/13ODBORINGMETHDESCRIPTION {ft)DEPTH|ELEVRUNNUMBERRe PO-Polished K-Slickensded SM-Smooth R-RoughVR-Very Rough Ca-Calcite B-BeddingFO-Foliation U-UndulatingST-SteppedLlrregular Ep-EpidoteFeQx-iron Onde G-GougeHm-Hematite ML-Sitt T$ Si-Silica Su-Sulphide DISCONTINUITY DATA POINFRACTURES PER FOOT anton?CORERECOVERYTYPE and SURFACE DESCRIPTION IGRAPHICLOGROCKSTRENGTHINDEX145k7.25kLOAD3.62kRER5R4R3NOTES TESTS WATER LEVELS 25 r-30 Coring(HWTCasing,HQ3,2.5-in.CoreDiameter)r-35 -40 0.0-49.2 Very dense,moist to wet, dark greenish gray and dark brown,poorly graded GRAVEL and SILTY SAND, trace to few organics (roots, wood),multi-lithic angular Diorite and volcanic rock cobbles and subrounded coarse gravel (GP)[ALLUVIUM and TALUS](Continued) Run 11:Core barrel of sediment encountered tripping into run, approximately 5 feet of heave encountered. Log continued on next page WoSeFooO5ene)QODOQOo4GRAPHICLOG0$.1 WesQO"0°OO"SO"SO S0°SO SO°"So S0oSOSOSOoOTesSeoSoWee3.0 2.0 10}47 1)33 3.1 14)39 VT New casing bit installed at 30.0 feet. Hole advanced to 30.9 feet on 8/18/12.4103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}SscSLJAssociatesGolder DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-12 ECannon3/8/13)12.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560W/RECORD OF DRILLHOLE DH12-8 SHEET 3 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884,985 a y loint B-Bedding PLPlanar Bo rehed trace Ep-Epidote ae arte @ Axal=F-Faut FO-Foliation -C-Curved K-Slickensded Bx-Breccia FeOx-lron Oxide =Sa-Sand O Diametral x im Qo]2 le wen ORoanegenal Si Sead?RRoon Chenorte Coreiatte Seamer 5ae.F e =9 Z ey &|FR-Fracture hireguer VR-VeryRough CaCalcite ML-Silt Su-Sulphide Zs 8 g NOTES u-10 DESCRIPTION eH 2|#e DISCONTINUITY DATA x asp TESTS =)2 riz |2/96 =GO wbx |tox|x xxx WATER LEVELSSs@/Fs|/Z]06]RaD |FRACTURES |S¥u TYPE and 2 |SSh/EsslAssxx@|g=|35)/2]%PERFOOT |29%SURFACE 23 |9uS Geo\erns fL4g=5 |°eege|avo?pee DESCRIPTION g-[ob |eesoe0.0 -49.2 b i Very dense,moist to wet,°A ' dark greenish gray and dark brown,poorly graded (a) a GRAVEL and SILTY SAND,b oOtracetofeworganics(roots, wood),multi-lithic angular °CY 14 NADioriteandvolcanicrockD,3.9 L.cobbles and subrounded e)coarse gravel 2) (GP)[ALLUVIUM and a N_.|TALUS](Continued)D.Drilling Rate i s %(8/19/2012):£p 30.9 to 54.2 &°ie feet (soil andaD15]44 |[NA rock),10.5 5 [o):hours,2.2 a o i)1)feet/hour Swo »Q NIA is) =sr)45 g b OQ = =a2D C - 8 ir 16 NYAtCbO36 =°C 2 OQ |=L e)(2)5 aD, r bO J SG17 r Top of Rock=49.2 ft pb O4415.6 |63%3 4 49.2 -92.2 \'149.2 od J,PL,SM-R,Ca 34 Fresh (FR),roy Jiron-oxide-stained joints,\ -50 rehealed calcite joints,very |44 r-close to wideSpaced h L ,ractures,dark greenish gray |,"7 ° with zones of red tint and \28 bed i PL eu Foon ane R4 orange discoloration,\38 vee to Jmediumgrained,strong to ir 7.18)93%R5 very strong (R4-R5),9) DIORITE |100% Ly | a 52.0-52.5 feet:Orangish brown |,'\ 4 felsic/quartz intrusion N r J.PL.SM.Ca 63° re J.PL.SM,FeOx 61° 7 .!AZ @ |J,PL,SM,FeOx,Ca 68°4 c te}ita]1?|leaeoS\oD \100% ||g . 4 A f 4 ow]°'|OZ Hole 6 .20]0.7 |179%FR advanced to° :r 7.||54.2 feet on 55 |S \100%8/19/12.4re)j Changed drill»|*bit at 54.2 Sg 'on feet. a x=| 4 2 >R5 | - L 48 4 TP fat!48 |100% X 100% by | -\- XN Povo ' 1i \@ ||J,PL,SM,FeOx,Ca 18° | \/ \ |50 \22 83%| Log continued on next page T in DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Figur.€.A Fe Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine Ne 1D.7 'DRILLER:T.Fisher CHECK DATE:#13 -LS Associates DATE:19/1 3/8/134103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannonRECORD OF DRILLHOLE DH12-8 SHEET 4 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 __E:1,884,985. a Mi loint B-Bedding BLPanar BO Boisned Beaute Ep-Epidote Gun dusre °Axel =F-Fault FQ-Foliation C-Curved K-Slickensided 8x-Breccia FeOx-Iron Oxide Sa-Sand O Diametral E g]ala]y (RE SRStittna Gate ghar ee,St,eee”|oe.e =9 id wi 2 |FR-Fracture Ltregular VR-Veyy Rough CaCabte ML-Sit Su-Sulphide FS é9 a vcoreWwloDESCRIPTION943/25 DISCONTINUITY DATA =|+on WATER LEVELSao{2 &|=-/2188]rap |rractures |$20 TYPE and Q |¥SHlEQnlSasA ,x SIREl ZB]%PERFOOT |25%AC £8 |9G9/gr9|egx99 &9 a lz eq ts)SURFACE So |exe2 WE2/Sana KR|6 12 °agea|avooe Pa eh DESCRIPTION g |&ease2 e49.2-92.2 a f Fresh (FR),t 7]iron-oxide-stained joints,\ rehealed calcite joints,very ! F close to wide spaced L .4 fractures,dark greenish gray |,°"| with zones of red tint and | orange discoloration,»45 5 medium grained,strong to |" 45 J very strong (R4-R5),22 83% DIORITE (Continued)N 400%@ |J,PL-ST,SM,FeOx 63° Ly | \ t 62.9-64.2 feet:Broken core,| ' 4 possible mechanical breaks in N : addition to natural breaks.rv , \1 \'] ee i J,PL,SM,Ca 74°oy PL SM,Ca 66P I 65 on @ |J,PL,SM,FeOx,Ca 65° | 65.4 feet: \7 Circulation on a {and off below 4 »this point by _|5.0 po |23|5 |Ja5% ->100%®||J,PL,SM,Ca 32°7 44 \ 67.7-68.0 feet:Broken core,| \@ |J,PL,SM,Ca 60° 5 possible mechanical breaks in "5 = _ |addition to natural breaks.| =N @ r 7. |5 v J °'06 Drilling Rate §tJ 24)oe 100%(8/20/2012):o 54.2 to 84 ©i 400 FR |RS feet (rock)=Tv ''770ndFos] 00%10.5 hours, N \2.8 feet/hour S ,|.Changed drill g |> @ |J,PL,SM,Ca 47 bit at 69.8 a D |feet.4 £i o XNSs)L |44L.'|25|44 |]93%4 \@ |J,PL,SM,FeOx,Ca 59° by |100% ' | L N :@ |J,PL,CL,Ca,FeOx 58°» on \ N a na a \ ; XN by | \»J,PL,SM,Ca 36° 75 |4 N ir 7.®|J,PL,SM,FeOx,Ca 63° | S 'XN 4 er 42 @||,PL SM,Ca 33° .|26)™100%. i t 7]100%| \ }| NX Ly | \ -\4 '\ ky | \ | L \J r 7.5.1 .y 27|51 ||g0% >100%|r_80 Log continued on next page qT _DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon .FigureAEGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine A-1272DRILLER:T.Fisher CHECK DATE:1/9/13LJAssociates RECORD OF DRILLHOLE DH12-8 SHEET 5 of 19 ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884,985 a J Shape Roughness Infilling Py-Pyrite @ Axialta)sont B-Bedding put lanar We 'olished Bt-Biotite Ep-Epidote OQtz-Quariz 2 'aut --FO-Foliation 'Curved K-Slickensided Bx:Breccia FeQxlron Oxide Sa-Sand C Diametral E EsShear §2:Contact C.undusting SM-;'Smooth cL.G-Gouge SencitexiOlzim),Orthogonal ST-Stepped Rough GhEhbrte HreHenatte -SeShea 5oP-NOTESaros9dWwxrR.Cr ture °-lrreguiar VR-Very Rough Ca-Calite ML-Sitt 5u-Sulphide 3 $2 g TESTS w |o DESCRIPTION gi 8|e5 DISCONTINUITY DATA x ooofa)=={z 13/336 <u oJ wisxltox |<xxx WATER LEVELS z aire fore)RQD FRACTURES |379 TYPE and =SSwlEZ BIAKSA m =hE/Z/°G)"%PERFOOT |25%SURFACE £8 |2e2|SE2/S205 F|50 o 6 {9°|&889R|a70@2 PS DESCRIPTION e7 |5 s "woos 2 49.2 -92.2 Fresh (FR),ry |iron-oxide-stained joints,\ rehealed calcite joints,very ! -close to wide spaced | 4 fractures,dark greenish gray |," with zones of red tint and \ orange discoloration,\Bt L medium grained,strong to / .99 = very strong (R4-R8S),\ i 27 99% DIORITE (Continued)\100% r zit e J,PL,SM,Ca 44° 80.4 feet:In-situ,calcite vein,10°]\| a dip w.r.t.core axis,approximately |+J 0.25 inches wide,white to light »:@ |J,PLC,SM,FeOx,Ca =61° yellow \fs i L XN 4 f 7 Hole \ | advanced to N 84.0 feet on Ly 8/20/12. -85 on @}|J,PL,SM,Ca 39°4 |@ |J,PL-C,SM,FeOx,Ca =63°F by | .\FR |R5 | L '3.17fae}51 TP g6%! a N 100%4 ri | N =- \ 4 |ij \ @ rv] S §\ I 4 a . 8 _ '| i= -90 13 |* N \oaoO1 ¢\ =ae 5 D|92.2 feet:Contact is gradational |\7 =over approximately 1 inch width,|5.18|contact is approximately 30°dip |*54w.r.t.core axis,felsic/calcite veins)',"no 29 88% a up to 0.5 inch thick 4975,400%J TIS mz +[aleereamfere.ce aSlightlyweatheredtofresh=e |)PL SMR FeO 55°-4(SW-FR),very close to 1 PEL SNER,FEOX -moderate spaced fractures,a X sw |R4 4 light greenish gray,felsic and .tt trehealedcalciteveinswithiFRRSsomeredmineralinfilling,=\ a diffuse contacts with . 4 adjacent diorite,medium a \@J,PL-,SM-R,FeOx 90° grained,strong to very &1373.,,, > strong (R4-R5),ALTERED |[94.5 j@ |J,PL-l,SM-R,FeOx 70° DIORITE L.any9504.5 -136.5 \ 4 Fresh,iron-oxide-stained .!joints,rehealed calcite joints,=|.close to wide spaced 4 At O65 Feet, =fractures,xenoliths (fine |out for PP 4 grained),dark greenish gray \F with zones of red tint,r 74 3.0 sharpening. medium grained,very strong |' ,30}59 Ht 92%RS),DIORITE -(RS)|>100%4 in FR |R5 96.4 feet:In-situ felsic intrusion,N !Drilling Rate approximately 25°dip w.r.t.core |(8/21/2012).L-axis,approximately 0.5 inch wide,|,|84 to 114 2 4 diffuse contacts,light orange .I feet (rock),5 Ly hours,6 vq feet/hourL.|4 N Ly |5.0 VI 31|5.0 (0%00%z .||Z100Logcontinuedonnextpage DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiqureGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine gu A-12 103-95560WiFP,Golder DRILLER:T.Fisher CHECK DATE:1/9/13 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}]ECannon3/8/13RECORD OF DRILLHOLE DH12-8 SHEET 6 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 __E:1,884,985 Q Pat B-Bedding er lanar PO-Bolisned irate Ep-Epidote.oe art @ Axal =F-Fautt -FO-Foliation --C-Curved K-Slickensided B8x-Breccia.©FeOx-iron Oxide Sa-Sand O Diametral x |gz le Vien OROmhogonal StStepped Roun Chenowe «Mericnatte Siswa |bOP =on oO)41a)&|FR-Fracture Finegular VR-Vey Rough CaCakite ML-Sit Su-Suipnide |2 Sin B NOTES w=lo DESCRIPTION o LY 4s]ye DISCONTINUITY DATA x aap TESTS a {$s =fz 13/538 =5-1visxltox|xe exx WATER LEVELSFda|FelS)65 |RQD |FRACTURES |Bye TYPE and 2)|SSE/ESN ASKSfo)e w |S)2 %PERFOOT |29%SURFACE aS |e#2 we SinsFA6xageeg|avon?PS ef DESCRIPTION &E wore 9 =- 100 945-1365 7 TOO%TTT!Fresh,iron-oxide-stained r vd | joints,rehealed calcite joints,|\| close to wide spaced \I |'@||J,PL-ST,SM,Ca 40° -fractures,xenoiiths (fine L t 4 grained),dark greenish gray \a with zones of red tint,| medium grained,very strong 5.0 L R5),DIORITE (Continued)[." =(Re)(Comnved [i a1}9 |100% N 100% \'al ={4 NN on | , 1 \4 ee 4 @ J,PL,SM,Ca 31° \ NX -105 ie 4 { N @ |J,PL,SM-R,Ca 60° orL-|4 NN ./ 5.0 I 32|59 |so0% r L >100%: 4 mi 107.65-107.75 feet:Broken core,|\ =interpreted as mechanical breaks.in 7 J =i 5 \oy r 7. -&' I 4 a \ 5 [," 5 \ rae |FR |RS Z w bPY \caoo1 a N -=/@ ||J,PL,SM,FeOx,Ca 36°| Cc £I in a 33)100%oe J,PL-C,SM,Ca 41° a |100%7 ma \ 1 \4 17 113.55-114.2 feet:tn-situ .| rehealed calcite veins up to 0.25 |,J J,PL-ST,SM,Ca 33° io inch thick,00°to 25°dip w.r.t.or \ ° 4 core axis,white to light red t @)|J,PL,SM,FeOx 40 Hole N L ,advanced to vn 114.2 feet on p 115 |8/21/12.4 'XN 7 | '®||J,PL,SM,Ca 36° a N a a >J,PL,SM,Ca 36°\PL,SM, !30N4 100% -ian 100%4 ! N I /. -|@ (J,PL,SM,Ca 49°4 N hi? I || a N 4 4 ty |i \5.0 I New drill bit |35|5-9 |100%|||installed at |> 119.2 feet. 120 Log continued on next page 7 a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.EY Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine Ne 1Dra$DRILLER:T.Fisher CHECK DATE:1/9/13 - sociates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 7 of 19 INCLINATION:-70° Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 __E:1,884,985 a Ty Srape R Infilling Py-Pyrite ®@ Axialre)J-doint 8-Bedding PL-Pianar PO-Polished Bt-Biotite Ep-Epidote _Qtz-Quartz . x F-Fauk FO-Folation -C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand ODiametratfaa>SH-Shear CO-Contact U-Undulatng =SM-Smooth CL-Clay G-Gouge 3e-Sericite EADxwQi|V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chionte -Hm-Hematite Silica 5of-NOTESC==°a uw z FR-Fracture -lregular VR-Very Rough Ca-Catite ML-Silt Su-Sulphide 556 2 aWw19DESCRIPTION2143/es DISCONTINUITY DATA z aaey TESTS ioe Zz x Jz=_|z2/99 =oO 1xfx|tox|x xxx WATER LEVELS z a |Fs|/|oo |Rad |FRACTURES |$¥e TYPE and go feecan Egu AHSS5éuX|3 Fe %PERFOOT |29%SURFACE Es)Quo gE2 Bins|400 o °;S298 /ar0 ae 3 i DESCRIPTION fa B ease go & 94.5 -136.5 \TO0%' Fresh,iron-oxide-stained tv]joints,rehealed calcite joints,|\close to wide spaced | -fractures,xenoliths (fine | grained),dark greenish gray \co with zones of red tint,| medium grained,very strong '5.0 L (R5),DIORITE (Continued)|50' ,35}100% 9 e J,PL,SM,Ca 21°Approximately 122 feet:L ,100% Drilling RateSlickensidedwhiteandlightred|\°7] : ':(8/22/2012):-calcite,lineation approximately i 114.2 to66°angle w.r.t.core axis [.134.2 feet on (rock),4.25ihours,4.7 b [\feet/hour Run 36:Broken core,interpreted |,om 1.0asmechanicalbreaks.I 1.0\36)°100% L-125 "+100% I XN Ly _| \ L | \ rsd \ | aad a 7 \ ;5.0 \37|©9 |a7% L on 100%FR |R5|3s \ 3 L £\os |Ss \a \ g r 7doO\@ |J,PL-ST,SM,Ca 61° €?|,PL,SM,Ca 61°-130 [3 | *pe \/ |eS J,PL-ST,SM,Ca 36° 3 | =bo 5 o vq @ |J,PL,SM,Ca 58° Cc £| 9°XNoOty | L 7 4.0 2 X 381 *°|00%@ a3\100% | 5 a [NB"4 oO |Ww XN -L r 7iy\ a |°N HoleayL15advanced to=!oy 15 "134.2 feet onEL135!39 100%8/22/12. 9 '100% z fs=<\ -! a \N (a)r 7.Poy \4333. re 136.5 -141.3 y 136.5 a Maderately to slightly =of.weathered (MW-SW),jointed *137 feet:3 with clay infil,close to very \4.0 e J,PL,CL 30°Loss ofstwidespacedfractures,light N 6 40 5 circulation[4 tannish gray,medium y 4 100% St grained,weak to medium =100%@/|J,PL,SM-R,FeOx 39°MW |R2astrong(R2-R3),ALTERED "to toaDIORITELeSW|R3 5 NN a OF LyNNN a A \L 140 'a1 96%Log continued on next page =--DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Figur.© .8 Ayg G Id DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine gure 8 Golder A-123]WEA PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 8 of 19 INCLINATION:-70°ECannon3/8/134103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION._Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884,985 Qa YRint -B.Beda Pe poveotered Beach Ep-Epidot Ged |Ofna-Joint |int -Planar z -fe 45S)FFaut FO-Foiaten -C-Cury KSlckensded Bx-Breccia FeOxiron Oxide Sa-Sand 0 Diametral x |p gl ela|_(Set Botte Wistar ether”See,ECR.Sees”|bogFo2oO;ale]&ER Practure Pv OMnogON PT cer Vitvey Rough Gacaeie MLSi su-Suphie |2 28 eens w]e DESCRIPTION ge 2/28 DISCONTINUITY DATA z |,aap WATER LEVELSo12&|E>|2)/88]rao |rractures |$¥e QO SOMES |ARESzaFels69RiRAIRiz72TYPEandZo|8Z0 aon eNo §fo)2 |e-j;S|«%PERFOOT |29%SURFACE &O |/2¥Z/WEZ/8n0 KR140aeago/O |&9398|n+ce8 pa oh DESCRIPTION e-|ob ese ga fs EH 140.0 feet:In-situ calcite vein,approximately 0.06 inches wide,La \r21°dip w.r.t.core axis a mw |R2 =\to to S 4329.SW |R3 7 141.3 -180.0 \|144.3 Fresh (FR),rehealed calcite [|,_||joints,close to very wide \45 | -spaced fractures,xenoliths !41}45 |toa%(fine grained),dark greenish '5gray,medium grained,very an 100% strong (R5),DIORITE | 441.25 feet:In-situ calcite vein,|'7 27°dip w.r.t.core axis,, approximate contact between ! altered diorite and diorite ' =I / 4 | 144,5-147.0 feet:Near core axis |'parallel (00°to 17°dip w.r.t.core |\°7-145 axis),rehealed calcite joints,very I 4 tight to partially open \ hy {L.N = L | \ |5.0 \42]©9 |100% +7 100%4 | N ly / L |4 aN 3 or £\ =&N q[a]L @ \/.fo){o \ L150 |=r4 _ N i 7 Nrs]t 7 |FR |R5=\ - =|a J °4 2 .46 ®|J,PL,SM-R,Ca 64 NM] 8 "4 443]45 |100%|100% : hs \ -in /= | N I / =(= NN ly /J | t-155 | 4 a ®|J,PL,SM 64° I N -on 3.0 4 |44|59 |'400% rool 100% \Drilling RateLYl(8/23/2012):7 r >134.2 to 4 179.2 feet\ ;@ |J,PL,SM,Ca 71°[ (rock),8.25 a \{hours,5.5 4 in fal feet/hour ! NN f /WJ = a \50 .45|©9 |100% r/74 100%||160 Log continued on next page 7 =DEPTH SCALE:1 inch to 2.5 feet LOGGED:€.Cannon Fiaur"Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine gure =(70.A-12 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 LOCATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc. DRILLING DATES:8/17/12 to 8/27/12 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1461.8ftCOORDS:_N:3,226,359 _E:1,884,985 SHEET 9 of 19 INCLINATION:-70° AZIMUTH:172°ECannon3/8/13112.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]a »aint B-Beddin:PPonar BO Botshed ache Ep-Epidote ah wart @ Aval =F-Faul FO-Foliation C-Curved K-Slickensided @x-Breccia FeOx-lron Oxide Sa Sand O Diametral ad >SH-Shear CO-Contact U-Undulating =SM-Smooth CL-Clay G-Gouge _e-Sencite enwxwuQOa|&>Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorite =Hm-Hematite Silica Zor NOTESes9auw&|FR-Fracture Liregular VR-Very Rough Ca-Caicite ML-Sitt 5u-Sulphide 3 $9 a TESTSw=lo DESCRIPTION 2}2)es DISCONTINUITY DATA =|. aor WATER LEVELSaZzlFs|2|88 |rao |Fractures |$8 TYPE and 2.|S2R ELE ASES ya}2je-i 5,Z|%|PeRFOoT |29%SURFACE 89 |22Z/8E2/Skn0 8480a°o SBE2|nto ee PB DESCRIPTION =5 orn ss 141.3 -180.0 |T Fresh (FR),rehealed calcite +/_|| joints,close to very wide \l spaced fractures,xenoliths .|; Z (fine grained),dark greenish =)@ |J,PL,SM,Ca 58 4 gray,medium grained,very | strong (R5),DIORITE |° (Continued).59 @ |J,PL,SM,Ca 60 a v4 45 100%J |100% NX 74 =I 4 \ ma | i N i e J,PL-C,SM,Ca 33°4 rm i \24 -165 1'|48|2&4 100%4 |100% rm a {4 NX ' \ \@ |J,PL,SM,Ca 50° L \4 P74 i \1 i]1 » i ros P|: qT-\ | 3 .$9 3 hr"47)5°|100%iy 4ira|100%@ |J,PL,SM,Ca 48° o L3 "4 ¢!FR RS 170 |3 [ 4 A \/.oO I e N =r/4 @ |J,PL,SM,Ca 51°5 .=| 9 N[s)he 5 !4 XN ora 3.0 y 48|°°|100% 'L *100%4 \/] |@'|J,PL-C,SM,Ca 44° =ly /4 { N a r-175 |4 N ly /.] | a N 4 L ,_| \ ;50 \49]>|'100% +'on 100%4 { '\ he L \4 N ®|J,PL,SM,Ca 64° 7 | |N r 7.Hole 7 \5.0 advanced to |50|5-0 |'100%179.2 feet on 480 t 4202.7 ||||8/23/12. Z Log continued on next page :=DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fiqureé.A Fe Golder DRILLING CONTRACTOR:Crux Subsurface,inc.CHECKED:C.Valentine Ne 12 103-95560WsAssociates DRILLER:T.Fisher CHECK DATE:1/9/13 LOC. PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 ATION:Susitna River,Talkeetna Mou ntains,AK RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc. DRILLING DATES:8/17/12 to 8/27/12 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1461.8ftCOORDS:_N:3,226,359 SHEET 10 of 19 INCLINATION:-70° AZIMUTH:172° E:1,884,985 ECannon3/8/13103-95560WATANA2012.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]DEPTH(ft)BORINGMETHODDESCRIPTION GRAPHICLOGtindilliBUBictteBx-Breccia CL-ClayCh-Chiorite Ca-Caicite PO-PolshedK-Slickensided SM-Smooth R-RoughVR-Very Rough TyJthentF-Faukt SH-Shear V-Vein FR-Fracture 8-BeddingFO-Foiiation CO-Contact red U-UndulatingOR-Orthogonal ST-SteppedHirreguer Ep-Epidote.FeOx-iron Oxide 5u-Sulphide DISCONTINUITY DATA POINTCORERECOVERYRQO % 3amad FRACTURES PER FOOT nawvton? TYPE and SURFACE DESCRIPTIONRUNNUMBER80 GRAPHICLOGROCKSTRENGTHINDEX36.2k145k7.25kLOAD3.62kR6RSR4R3NOTES TESTS WATER LEVELS r 185 --190 -195 --200 (\_ALTERED DIORITE 180.0 -181.8 Slightly weathered to fresh (SW-FR),jointed,moderate spaced fractures,diffuse contacts with adjacent diorite,light greenish gray, medium grained,strong to very strong (R4-R5),291.=coaG]3e!|J,PL,SM,CL ' | j } | \ i | 181.8 -186.7 Fresh (FR),rehealed calcite joints,moderate to wide spaced fractures,dark greenish gray with red tint, medium grained,very strong (R5),DIORITE 187.25 feet:Approximate contact [ 36°dip w.r.t.core axis 181.8 J,PL,SM,Ca50100% 100%| J,PL,SM,Ca 5.0 5.0 186.7 -187.6 Moderately to slightly weathered (MW-SW),felsic and calcite veins to 100%: 100% approximately 0.4 inches wide,diffuse contacts with adjacent diorite,light gray to light reddish brown,fine to medium grained,strong to very strong (R4-R5),ALTERED DIORITE/FELSIC INTRUSION 187.6 -191.1 Fresh (FR),calcite rehealed joints,wide to very wide spaced fractures,dark greenish gray with red tint, medium grained,very strong (R5),DIORITE t_¢J282. J,PL,SM,Ca Coring(HQ3,2.5-in.CoreDiameter)191.1-192.5 Slightly weathered (SW), calcite and felsic veins,zone oriented approximately 17° dip w.r.t.core axis,diffuse upper contact with adjacent (191.1 280. 52 100% 100% ' diorite,light reddish tan,fine to medium grained,strong to very strong (R4-R5), ALTERED DIORITE 192.5 -195.8 Fresh (FR),rehealed calcite joints,dark greenish gray, medium grained,very strong {R5),DIORITE 277. 192.8 195.8 -198.3 Moderately to slightly weathered (MW-SW),white calcite,felsic,dark gray veining with trace fine-grained pyrite,light green to light reddish brown, medium grained,strong to very strong (R4-R5), ALTERED DIORITE 195.8 53 400% 100% 198.3 -200.0 Fresh (FR),rehealed calcite joints,dark greenish gray, medium grained,very strong (R5),DIORITE 100% Log continued on next page 42° 59° 33° FR |RS MW to sw R4 to RS 61° FR |RS R4 sw RS FR |R5 Mw to sw R4 to R5 FR SW 192.1 feet: In-situ vein, felsic with calcite core, planar-undulating, 47°dip w.r.t. core axis,up to 0.1 inches wide,light reddish brown 196.5 feet: In-situ vein (felsic, calcite,dark gray with fine grain pyrite), 17°dip w.rt. core axis, planar, smooth, approximately 0.25 inches wide GolderAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-12 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 11 of 19 INCLINATION:-70°ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}103-95560WiDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.226.359 _E:1,884,985 a J joint B-Bedding Be enar Bey olished Brawite Ep-Epidote ote uartz @ Axal:F-Fauit FO-Foliation -C-Curved K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand 1 Diametral -SH-Shear CO-Contact U-Undulating SM-Smooth CL-Clay G-Gouge 5e-SencitexrimQimls]5 |¥ven -OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte Hm-Hematite -SiSilica bof.NOTES£e =°iz B &|FR-Fracture -lrregular VR-Very Rough Ca-Calcite ML-Sikt 3u-Sutphide 5s ogw=Jo DESCRIPTION 2 43 ee DISCONTINUITY DATA z 6 WATER LEVELSFs&|Fsl2/88|rap |rractures |Sa TYPE and g |SSS|ESN ASRR Y g €G=|Z)B]%PERFOOT |29%SURFACE $8 |SE2bE2 Bene RaOo|o |x e3ea|aecae 2 DESCRIPTION oo}pesogo 5200200.0-201.7 7 poo.g |100%Slightly weathered (SW),= felsic and dark gray veining,R4diffusecontactswithaSW|toaadjacentdiorite,light green Xd R5 7 to white,medium grained,Hf strong to very strong =272.iN (Ras).ALTERED | bo1.7 $9 @ |J,PL-ST,SM,Ca 70°aj 201.7 -2227 >84,OF 100%| Fresh (FR),rehealed calcite 1 100% joints,moderate to extremely '@ |J,PL,SM,Ca 52°R4 a wide fracture spacing,dark / togreenishgray,medium RS q grained,very strong (R5),\ DIORITE ty | \ L \ 4 Run 55:Dark gray intrusions with ,fine-grained pyrite,up to 1to 1.5 |\°7incheswide,multiple dip | L205 orientations w.r.t.core axis (10°,\ 25°,70°)dip w.r.t.core axis,7.planar-undulating,approximately |'0.1 inch wide,light reddish brown N i / L \4 i f 7.).0,an 55 100%Drilling Ratea \100%(8/24/2012):7 /179.2 to|\234.2 feet.|(rock),8 a hours,6.9 4 _ion feet/hour 5Do XN |6g t ?. a \ ; 1 g \ oO a 210 |§tpe\ 7] N hoyayooC||210.75 feet:in-situ joint,24°dip |.FR a |w.t.core axis,dark gray,trace |,F -E |fine grain pyrite mineralization,|9 approximately 0.1 inch wide {5.0co)5.0>56 100%ia] = ri?4 04\ \ 100%R5 7 "N rv \ L | 4 NX t 7.\ | [ N roy |7 4 | NN L245 en 4 I NN L | \ a i 4 N he 5057|©|100% L LY |100%| \ I N by L \4 { NX Ly _| \ a { 4 NN Ly |5058)59 |400% 1 290 »||| _|Log continued on next page -DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.A E Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine NereAssociates 103-95560WATANA2012.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]}ECannon3/8/13RECORD OF DRILLHOLE DH12-8 SHEET 12 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Ine.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884,985 O Ty ;Shape Roughness \nfilling Py-Pyrite @ Axalfo)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotite.Ep-Epidote.Qtz-Quartz . 4 F-Fautt FO-Foliation C-Curved --K-Sickensided =Bx-Breccia.©FeOx-lron Oxide Sa-Sand ©Diametral x |G a |2 le Ven OROuhogonal StStepped'Roun -Ghchome «Hmrctnatte «Sowa |FOP aFo3CO)BIB) &[FR Fracture blregular -VR-Very Rough CaCalcte -ML-Sift $u-Sulphide 3808 Noes w-19 DESCRIPTION 2 13/eB DISCONTINUITY DATA Z|.a WATER LEVELSFe&lee!2)83]rao |Fractures |$22 TYPE and 2)[SSH/ESE ASRS yral@|e-|S5/gi]%PERFOOT |293%SURFACE a8 G22 /GE2/Sen5 8220iv)°«SB8ee|nwrowoe Pe gh DESCRIPTION Fe 5 eso ge 5 a 201.7 -222.7 \100% Fresh (FR),rehealed calcite +/|joints,moderate to extremely |\wide fracture spacing,dark | -greenish gray,medium |»FR |RS 2 grained,very strong (R5),\co DIORITE (Continued)| |*5.0 r v "||58]°°|100%. 222.7-224.2 feet:Broken core,interpreted as mechanical breaks.|'252.100% 222.7 -224.9 222.7 -Moderately to slightly =7 1 weathered (MW-SW),felsicintrusiveandrehealedcalcite a \Mw |R3veinsto0.1 inch width,light IN i to to S gray,medium grained,vi sw |R4 4 medium strong to strong a(R3-R4),ALTERED '" DIORITE ©Nose -225 224.9 -236.4 \224.9 4 Fresh (FR),rehealed calcite +,|joints,extremely wide \ spaced fractures,dark i a greenish gray,medium |*4 grained,very strong (R5),vq DIORITE 1 5.0 |59]5°|100% a \ \100%7 XN He = |4 N 3 in ft o 'Ee \ a \/ 5 | oO \ ce |44i230|5 VI". Csr)L g vq FR |R5 =| L 2 . » 5 vy [las !60!©9 |100% L L |100%| \ ] i 232 8-234.2 feet:74Core-axis-parallel calcite rehealed;| 7 joints,very tight to tight \e J,PL-C,SM,Ca 36° he | |4 NX i /.]Hole \advanced to N 234.2 feet on L-235 Ly |8/24/12.4 \ | 'N in /J ; 4 239.7 236.4 -238.2 4 236.4 58 5Slightlyweatheredtofresh|=61 100% L (SW-FR),rehealed calcite ay >100%sw |R4 4 veins,diffuse contacts with Zs to toadjacentdiorite,dark to light NG FR |RSgrayishgreen,medium Hf a grained,strong to very a J strong (R4-R5),ALTERED S 4238.{[\DIORITE __f|\238.2 238.2 -248.5 rd Fresh (FR),rehealed calcite [' |! a joints,dark greenish gray N ;FR |R5 7 with zones of red tint,by 50 | medium grained,very strong j|\ |5.0 |-4n09(R5),DIORITE ©62 nia | 240 Log continued _on next page + DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiFEGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine Ne 1D74DRILLER:T.Fisher CHECK DATE:1/9/13L.A Associates ECannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WrRECORD OF DRILLHOLE DH12-8 SHEET 13 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884,985 8 Pent B-Bedding BUPenar FO Boined =BttBulte --Ep-Epidote Gedusne |©Ane 2 F-Faut FO-Foliation --C-Curved K-Slickensided Bx-Breccia.FeOx-Iron Oxide Sa-Sand O Diametral x |e|2 le Viton”ORGnhogenal St-siepped”Rough CRChBrte |Mmefnatte |SrSiee”|SOP.Fo 2 QO)SiR]&|kre rcure kimeguar =VR-VeryRough CaCakte MUSit SuSuphide |Zhan Bo NOTES a tg DESCRIPTION 2 t=3|zs DISCONTINUITY DATA =aak TESTS a {¢=fz 13/53 =oT yExltox|<xxx WATER LEVELS <a |Ee/Z|Gd]RD |FRACTURES |S¥o TYPE and 2,jaei pean)Seas 8x&we 5 w %PERFOOT |20%SURFACE a8 jeue wee Bike340ire)o &00%BBESli nw woe PS gh DESCRIPTION x 5 perreg ¢ 238.2 -248.5 9°Fresh (FR),rehealed calcite +'|joints,dark greenish gray \| with zones of red tint,\| r medium grained,very strong)|.'4 (R5),DIORITE (Continued)"rq \ .5.0 r Vv Jez]$9 |t00%7 N 100% ry!} \ -i +4 NN +,|: \ t i] .\4 Ne RS | NX -245 io 4 \ NN ty _| \Drilling Rate '|(8/25/2012):q L 50 234.2 to in 50 257.2 feet ;63|>"|100%(rock),5 5 \9)hours,4.6 4 ly / 100% ;'feet/hour |: N ! 1 ly / 4 c 4228>. @|2485-2516 ly 248.9EeFresh(FR),altered angular a)5 |to subrounded diorite yd 7 |xenoliths,light green,fine to a)8|medium grained,strong |=|(Ra),PORPHYRITIC Ny FR -250 o ANDESITEANTRUSION ins R4 a N a)g 7 =N 2 Nv 8 SN j2254 |$2251.6 -253.5 7]\251.464)100%| 5 Fresh (FR),rehealed calcite =9,4 joints,felsic xenoliths,light to X 100% dark greenish gray,medium a \R4 grained,strong to very aN to strong (R4-R5),ALTERED -[RS D DIORITE =\7 S 223.6I. 253.5 -269.9 \"253.5 Fresh (FR),rehealed caicite |},_|i joints,wide to extremely wide |\" 7] spaced fractures,dark |\New drill bitgreenishgraywithzonesof=|,installed at ted tint,medium grained,v7 7 °254.2 feet. L955 very strong (R5),DIORITE |[4 PLC,SM.Ca 24 = N aa 3.0 |65)>°|100% a L>100%4 v4 | |>R5 a 4 4 .|Hole L ,advanced to V7 257.2 feet on }(t t 8/25/12.q >5.0vy|es}©|100% a \100%.4 r+i | \:| N 1 '| a ["+.4260Logcontinuedonnextpage 5 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiqureA\z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine g Fa olecr DRILLER:T.Fish CHECK DATE:1/9/13 A-12 :T.Fisher :Associates PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc. DRILLING DATES:8/17/12 to 8/27/12 DATUM:Ground Surface ELEVATION:1461.8ft SHEET 14 of 19 INCLINATION:-70° AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884.985 8 My ont B-Bedding Bee nar BO Borered tebe Ep-Epidote Be arte @ Axa =F-Fauk FO-Foiiation C-Curved K-Slickensided -Bx-Breccia FeOx-Iron Oxide Sa-Sand ODiametal z |e gale)>|San SRoeine Gita MSO SC,Ste Soe”|bok.Fe 2 9 a w 2%|FR-Fracture Hrregul VR-Very Rough CaCakte MLSit 3u-Sulphide 249 a NOTES Ww 1o DESCRIPTION gone]a¢e8 DISCONTINUITY DATA x aste TESTS a Zz =/zr |3/66 =oy &xltox|«xxx WATER LEVELSFd&@ |Fei Z|So |Rap |Fractures |S20 TYPE and 26 SOS ELH|ASES S ea /3)2)%PERFOOT |29%SURFACE g8 |2v2|852/82r0 8L-2604"a ao ggen|vee Pes DESCRIPTION 6.|&Bese Bz 253.5 -2699 LC Fresh (FR),rehealed calcite {|,_|joints,wide to extremely wide |\spaced fractures,dark |. -greenish gray with zones of '66!©-9 |400%red tint,medium grained,7 very strong (R5),DIORITE |100% (Continued)N Ly |i 260.9 feet:In-situ joint,27°dip |\w.r.t.core axis,planar,smooth,| open,calcite infill » by _| \ i 4 ,e|[J PL.SM,Ca,possible 45.|*67 100%FeOx ie 100% \ }N L | \ | >R5 }-265 on 4 ! N L 7 _| \ 5 {4 NX roy |5.0 y 68)©°|100% r on 100%4 \ ] '\ Ss [/4 \Pa | 2 |269.6-2708feet:Broken core,at.>£least 36 fractures interpreted as |\7 5 a mechanical breaks,majority with i 4 o approximately 90°dip w.r.t.core \5 axis in 7.oO :4208.2 FR -270 |8 |269.9 -283.2 ly 269.9 a «|Fresh (FR),rehealed calcite \ |joints,green with white Wy|medium-grained porphyritic Ni a =|crystals,fine to medium 4 4d D NM©grained groundmass,strong a]6 |to very strong (R4-R5),58.0 O}PORPHYRITIC Ni 69 5.0 100%ANDESITE/INTRUSION of Ny y 100%4 $Naa c Nt 2,NY 4 é 4uNy mp Naa 4 g odN=NI R4 oO}to 4275i)a N 9 a]R5 <a or ;0 4 9°Nia 3.9 oe IN 5.0 9, «a)70 100% Nol Naa 400%4 Z NI .My aq&N t ny 4 &Ny 2 N | OF NY 4 N NI 5.0 1 8 NY j7t}80 "c0%|2 4 oo 2S280Logcontinuedonnextpage =7 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8€.MY Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine iN 1Da=- :7 DRILLER:T.Fisher CHECK DATE:1/9/138|4 Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 15 of 19 INCLINATION:-70° Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.226.359 __E:1,884,985TyShai r8v7JointB-Bedding PL-Pianar PO-Polisned Brite Ep-Epidote ar carte @ Axal=F-Fauk FO-Foliation C-Curved K-Slckensded Bx-Breccia =FeOx-Iron Oxide Sa-Sand O DiametratFo>SH-Shear €O-Contact U-Undulating SM-Smooth Cl-Clay |G-Gouge 3e-S oxiQOaae>ein OR-Orthogonal ST-Stepped R-Rough Ch-Chlorite |Hm-Hematite t-Silica 5 offs NOTESre|=9 Z br fe |FR-Fracture Lirregular VR-Very Rough Ca-Cakite ML-Sitt 5u-Suiphide fo)3 id a TWw1oDESCRIPTIONee4e)ey DISCONTINUITY DATA x cat ESTS [a z Fix |3/o06 Bx lt ue xxy WATER LEVELS =2 |Fs|/2/63|Rao |Fractures |F¥o TYPE and g,,|SSS/ELE/ASES Qre]eia-|3|2)%PERFOOT |29%SURFACE a8 |gue S52 Brne 8+280-4+ Ol?[Fl [sazaineoee Pa eG DESCRIPTION S|5 |?Bese ee269.9 -283.2 VAS 100%Ty Fresh (FR),rehealed calcite a)i joints,green with white Nawmedium-grained porphyritic a) -crystals,fine to medium i 4grainedgroundmass,strong Nytoverystrong(R4-R5),4PORPHYRITICN 5.0 Ra L ANDESITE/INTRUSION N 5.0 to J(Continued)Naa 71 100%RS , N 100%283.2 feet:Contact approximately,»ive62°dip wrt.core axis,following NI -calcite vein P o4 195.7 4 283.2 -285.9 \283.4 Fresh (FR),rehealed calcite +/_|joints,close to extremely \ +wide fracture spacing,dark | 4 greenish gray with red tint,' medium grained,strong to iq RSverystrong(R4-R5),I |285 DIORITE [._| +J,PL,SM,Ca,possible ° !«FeOx 2a 24193 Drilling Rat-°rilling Rate +285.9 -289.8 (a P854 @ ||v PL SM,Ca a1 (8/26/2012)4 Fresh (FR),rehealed calcite =5.0 257.2 to joints,close to very wide i 5.0 «J,PL,SM,Ca 22°314.2 feet spaced fractures,xenoliths =\72) "100%(rock),8 -(fine grained),light greenish .100%hours,7.1 4d gray,medium grained,Ht feet/hour strong to very strong = (R4-R5),DIORITE (Slightly R4Altered)ay to a \R5 7 <=Run72:Numerous fractures AL2interpretedasmechanicalbreaks.| E "t -a =\FR 4 o S 8 a.o =\189. _o99 |G |289.8-298.4 \"289.8 |2 Fresh (FR),rehealed calcite |,_|os joints,very close to veryG|wide spaced fractures,dark | =|greenish gray with red tint,L -@|medium grained,very strong |,">|4 5 (R5),DIORITE .|49 r7-|[73]°°|j98% oT |98%4 S \ 3s ca c | or N 4 €rv I \°|w ' -b a 4wW\R5ro)I x=N 4 -=/ ind 294.8 feet:Possible core loss \of 295 from Run 74 -4.6-5.0 feet |4 [o}N 2 rv dRS\ao I re \a, oO 296.1-297.4 feet:Brokencore,|+_| a possible mechanical breaks in \ , 49 }addition to natural breaks. N 74 5.0 66% Sr ie 98%a 4 FeD N =Ly ||299.2-300.0 S |\feet:Broken a x!181.4 voncibl | Ss 4 7 °possible7298.4 -299.8 7 p94 JPL,SMR,Ca 36 mechanicalPySlightlyweatheredtofresh=)sw breaks in Of (SW-FR),rehealed calcite y t R4 addition to 4 a joints,very close to close ZY 60 ER natural a spaced fractures,light \50 |J,PL-U,SM,Ca 9 breaks. grayish green,medium A 4180.475)>95% 1 grained,strong (R4),ft ||FR |RSr-300 a Log continued on next page =-DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiOoreAGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure 4 ea A-122 o PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 16 of 19 INCLINATION:-70°ECannon3/8/13PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1.884.985 g Ret Bedding BlPena POeened -«BLBee --Ep-Epidote Gadus |oh =F-Fautt FO-Fotation C-Curved K-Sickensded Bx-Breccia.=FeOx-lron Onde Sa-Sand O Diametral x oI a |2 le Ven”GROnhogenal StStepped'RRough -GRChbrte Hewrieatte Seouce |bOP =Fe 2 °i re &|FR-Fracture riregular VR-Very Rough CaCakteML-Sit Su-Sulphide 280 a NOTES wu |o DESCRIPTION ge 2/e2s DISCONTINUITY DATA x asp TESTS a |g zz /2/83 ez o-|x5x |tox |x xxx WATER LEVELS z &@ (be)2]69 |Rap |FRacTURES |Fo TYPE and Fo |SZH/SZe\scans § 5 2|e-|5|2]%PERFOOT |29%SURFACE £8 |2e2/e52/Se.5300a°«88e28|n +w ow?Pe gh DESCRIPTION 3 A weso go £ {ALTERED DIORITE [)<7 k99.€=[100%ito d:299.8 -304.2 Ly Fresh (FR),rehealed calcite \ joints,very close to wide !i F spaced fractures,dark |*+ greenish gray,medium ' ' grained,very strong (R5),| DIORITE (Continued)N 5.0 '|| a rv id 5.0 R5 \ \75 .95%' \100%| b>|| \i a |tt N ! : /J ! \1 7 i}|)||e Ja etsm,ca 55° 5 b 175.9 : 304.2 -305.3 H 804.2 ! Fresh (FR),light greenish =i |R4 gray,diffuse iower contact to +305 with adjacent diorite,medium |"R5 = grained,strong to very 1174.9 | strong (R4-R5),ALTERED .805.3 : FRDIORITErs. z 305.3 -311.6 anFresh(FR),reheated calcite N joints,dark greenish gray b ,_|3.0 ; with red tint,medium 76|5-9 |'100%grained,very strong (R5),| r DIORITE | »100% * 4 fv4 || |!: N \| L ir /.]t -| c |; 5 \|RS a L :"7 Md z é \4 o a 8 eon | ¢I 310 |e .4 Nn ie | $3)312.1 feet:in-situ joint,10°dip I =i wet.core axis,planar-undulating,|\| +'|smooth,calcite infill ,/4 £ 8 '}1696 |39 |311.6-313.9 A 811.477 ,100%. a Slightly weathered to fresh =100%4 (SW-FR),rehealed calcite » :ijoints,diffuse contacts with "y ':sw |ra |adjacent diorite,light to dark NY ' t tgreenishgray,medium "t ER RSigrained,strong to very =f 7 strong (R4-R5),ALTERED r DIORITE wy |r \1166.8 : a 313.9-322.4 ,613.9 4 Fresh (FR),rehealed calcite F ,_||||Holejomis.very wide spaced \ ,advanced tofractures.ark greenish gray |.|[@ ||u,PLU,SM,Ca 21 314.2 feet on 315 grained,very strong (R5),on |8/26/12."] DIORITE |' N ; ne | i ;: 4 '5.07}78}59 |s00%( a N 100%FR R5 4 4 Ty | \| a Lp | 4 \ \| XN ': Ly || =\4 \i \5.0 i i i 4 79}5-9 |400%|: 320 Ih.| Log continued on next page int DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiADRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure Pa oider A-12Associates103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]DRILLER:T.Fisher CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-8 SHEET 17 of 19 ECannon3/8/13112.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/17/12 to 8/27/12 ELEVATION:1461.8 ft AZIMUTH:172° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,359 _E:1,884,985 8 dan B-Bedding PePan «=BOE bracts Ep-Epidote ote Quartz @ Axal<=F-Fautt FO-Foliation C-Curved K-Slickensided _Bx-Breccia FeOx-Iron Oxide Sa-Sand O Diametrai -SH-Shear CO-Contact U-Undutating ==SM-Smooth CL-Clay G-Gouge 5e-Sericitez=HT}8 a if >Vein OR-Orthagonal S$"Stepped R-Rough Ch-Chiorite =Hm-Hematite Silica bop.NOTESreSsoibyfe|FR-Fracture -iregular VR-VeryRough Ca-Caicite ML-Sitt Su-Sulphide 56 2 au lo DESCRIPTION gk 2|e DISCONTINUITY DATA x aoe TESTS a Zz z jz_|2|96 am OT vipx|tox!«xxx WATER LEVELSirate3/199 RQD FRACTURES |3}TYPE and Io Soa EZW/NOEN wo5e|e-|3 8 %PER FOOT 582.SURFACE gs ae age Brno |390 :5 S888 |nar antl Pg DESCRIPTION &5 ese 9 = 313.9 -322.4 \100% Fresh (FR),rehealed calcite |},_|joints,very wide spaced \ fractures,dark greenish gray | with red tint,medium _FR |R5 4 grained,very strong (R35),inDIORITE(Continued)| '5.0Vt79]9 |00%7 'O144158.5322.4 -325.5 7822.4 |100%Moderately to slightly =\e J 15°weathered (MW-SW),4rehealedcalcitejoints,wide a \to very wide spaced ara fractures,diffuse contacts Awithadjacentdiorite,light =\ww 2greenishgray,medium - sw |R5 7 grained,weak to strong a \(R2-R4),ALTERED aN DIORITE a 325 =4 A 4185.9 325.5 -327.4 \|p25.5Fresh(FR),rehealed calcite +,_|joints,close to wide spaced \a fractures,dark greenish |5.0gray,medium grained,very ['5.0 FR 1 RSstrong(R5),DIORITE in 80 100% |100%7 S 1154. 327.4 -329.3 HW B27.4 Moderately to slightly =\ weathered (MW-SW),. 4|fehealed calcite joints,close a \e J,PL,SM,C 16°ww 8©|to wide spaced fractures,NN hem va sw Ra2diffusecontactswith[1gj}adjacent diorite,light to dark = Q_|greenish gray,medium "4452,7 2)grained,weak to strong TB29.438(R2-R4),ALTERED i"'. c ||DIORITE ion330[14 |329.3-332.3 i 7 "|Fresh (FR),rehealed caicite \ 3 joints,dark greenish gray ly 7 |with red tint,medium |FR |RSS|grained,very strong (R5),\= |DIORITE r 7 .a1|59 ||r00% r 7 9,4hag.100% 332.3 -333.2 A 832.3 Slightly weathered to fresh =\ >SW |RA(SW-FR),rehealed calcite \9 [+PL SM.Ca 80 FR |Rejoints,close to wide spaced 9 |"1148.7 5 7 fractures,diffuse contacts \"833.4 ®|J,PL-C,SM,Ca 63° with adjacent diorite,light to 7.dark greenish gray,medium \ grained,strong to very ! 4 strong (R4-R5),ALTERED aDOREaPatinga333.2 -344.5 !314.2to 335 Fresh (FR),rehealed calcite {|*354.2 feet 4 joints,close to very wide "4 (rock),7.5spacedfractures,dark \hours.5.3greenishgraywithredtint,\feet/hourmediumgrained,very strong [7 ] (R5),DIORITE \@ (J,PL,SM-R,Ca 55°| 5.0 ot fa2]&9 |100%FR |R5Run82:At least 17 fractures |interpreted as rehealed calcite N 100%4 joints with mechanical breaks,b 7 |with approximately 60°dip wert.14 core axis | N hs 4 | NRa | N 2.0I83)5-9 |100%340 !ii}| |Log continued on next page 103-95560Wi"DEPTH SCALE:1inch to 2.5 feet LOGGED:E.Cannon Fi(PF Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine M2LIoa ?-Associates DRILLER:T.Fisher CHECK DATE:1/9/13 3/8/13ECannon103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT LOC. NUMBER:103-95560 PROJECT:2012 Susitna-Watana Geotech ATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH12-8 CLIENT:MWH Americas Inc. DRILLING DATES:8/17/12 to 8/27/12 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1461.8ftCOORDS:_N:3,226,359 SHEET 18 of 19 INCLINATION:-70° AZIMUTH:172° E:1,884,985 DEPTH(ft)BORINGMETHODDESCRIPTION (ft)GRAPHICLOGDEPTH|FLEV.RUNNUMBERB-BeddingFO-Foliation CO-Contact OR-Orthagonal BU Blanar-Curved U-UndulatingST-Steppedbreguar Py-Pyrite @ Axal Qtz-Quartz a-SandBovBonenedEp-EpidoteK-Slickensided FeOx-lron Oxide SM-Smooth R-Rough Hm-HematiteVR-Very Rough =Ca-Caicite ML-Sét >e-Sericite -Siica 5u-Sulphide: G-Gouge CORERECOVERYFRACTURES PER FOOT ntToeoe DISCONTINUITY DATA AXISttEig aoav 8 TYPE and SURFACE DESCRIPTION 145kPOINT7.25k3.62k36.2kQO < & wROCK STRENGTHINDEXWEATHINDEXRERSR4R3NOTES TESTS WATER LEVELS 333.2 -344.5 Fresh (FR),rehealed caicite joints,close to very wide spaced fractures,dark greenish gray with red tint, medium grained,very strong (R5),DIORITE (Continued) 341.9 feet:In-situ calcite rehealed joint,32°dip w.r.t.core axis,planar-undulating,smooth Run 84:At least 13 mechanical breaks ranging in dip from 53°to 79°w.r.t.core axis.T"Nf\4138. -345 344.5 -346.9 Slightly weathered to fresh (SW-FR),rehealed calcite joints,wide to very wide spaced fractures,diffuse contacts with adjacent diorite,light to dark greenish gray,medium grained, strong (R5),ALTERED DIORITE 344.5 135.Coring(HQ3,2.5-in.CoreDiameter)--350 346.9 -354.2 Fresh (FR),reheaied calcite joints,wide spaced fractures,dark greenish gray,medium grained,very strong (R5),DIORITE Run 85:Broken core 351.9-353.2 feet.Approximately 12 mechanical breaks,for example at 353.3 feet:joint,53°dip w.r.t. core axis,planar,smooth 346.9 _fomaa383 100% 5.05.0 |loom 100% 5.0 gs}50 100% FR R5 J,PL,SM,Ca 25° Sw R4 FR FR |R5 J,PL-U,SM,Ca,possible mechanical break w” -355 f-360 Boring completed at 354.2 ft. Notes: 1.Drillhole focation provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. 3.Vibrating Wire Piezometer (Slope Indicator,P/N:52611040, S/N:12-6867)was taped to sacrificial tremie pipe,placed alongside the temperature acquisition cable (TAC)conduit, and grouted in place with cement Log continued on next page Pi coe DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-12 RECORD OF DRILLHOLE DH12-8 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 LOCATION:Susitna River,Talkeetna Mountains,AK. CLIENT:MWH Americas Inc. DRILLING DATES:8/17/12 to 8/27/12 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1461.8 ft INCLINATION:-70° AZIMUTH:172° COORDS:__N:3,226,359 E:1,884,985 SHEET 19 of 19 ECannon3/8/13312.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE)ODDESCRIPTION (f)BORINGMETHGRAPHICLOGDEPTH[evevRUNNUMBERCORERECOVERYFR-Fracture Lrregul shape RoughnessB-Bedding PL-Planar PO-PoiishedFO-Fohation C-CurvedSH-Shear CO-Contact U-Undulating SM-SmoothOR-Orthogonal fi Stepped -Roug!iv VR-Very Rough Py-Pyrite @ AxaiEp-Epidote Qtz-Quartz FeOx-lron Oxide Sa-Sand O Diametrat Q-Gouge 5e-SericiteHm-Hematite SilicaML-Sitt 5u-Sulphide S898 |ae 0e8 DISCONTINUITY DATA FRACTURES |SWPERFOOT|25%28 ROCKSTRENGTHINDEXWEATH-ERINGINDEX7.25k3.62kIGRAPHIC|LOGLOADTESTS(psi)725RGRSR4R3R2R1NOTES TESTS WATER LEVELS 360 bentonite slurry at 333.1 feet depth. 4.1-inch Schedule 40 PVC TAC conduit installed to approximately 255 feet depth and filled with propylene glycol antifreeze.Top of HWT surface casing has 3.5 feet of stickup above ground surface, 5.TAC (BeadedStream,S/N 2121)placed in TAC conduit and is removabie.TAC sensors are located at 3,6,10,20,35,50,75, 100,125,150,200,and 250 feet depth,0 feet depth =elevation 1461.8 feet. 6.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand margin of the log column. 365 7.Circulation on and off from 65.4 feet to bottom of hole. 8.Abbreviation "w.r.t"indicates "with respect to”. 9.Water level estimate from VWP. 10.Point load test rock strengths presented as equivalent uniaxial compressive strength (UCS) based on a K value of 19 for conversion between is(50)and equivalent UCS. 370 103-95560WrDEPTH SCALE:1 inch to 2.5 feet ler DRILLING CONTRACTOR:Crux Subsurface,Inc. iates DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-12 1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB{[WATANADRILLHOLE]WATANA201.PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetn a Mountains,AK RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface APPROX.ELEVATION:1500 ft APPROX.COORDS:_N:3,226,738 __E:1,884,902 SHEET 1 of 35 INCLINATION:-60° AZIMUTH:170° r-20 BORINGMETHODDESCRIPTION (ft)DEPTHjetevRUNNUMBERTydein F-Fault SH Shay Roughness InfiltingB-Bedding PL-Planar PO-Polished Bt-BiotiteFO.-Foliation C-Curved K-Slickensided -CO-Contact U-Undulating =SM-Smooth CL-ClayV-Vein OR-Orthogonal ST.R-RoughFR-Fracture VR-Very Rough"SteppedHrregular Ep-EpidoteFeOxkonOxide Hm-Hematite ML-Silt TESTS(psi)DISCONTINUITY DATA ROD FRACTURES%PER FOOT nvtoo? TYPE and SURFACEbEDESCRIPTIONCORERECOVERYB38 IRS3'62kLOADGRAPHIC]LOGNOTES TESTS WATER LEVELS 4.5-in.ODCoring-TripleTube(HWTCasing4.5-inch,HQ3,2.4-in.CoreDiameter)withdrillingmud0.0 -84.3 OVERBURDEN:Medium dense to dense,moist, brown to light gray,sandy GRAVEL to gravelly SAND with boulders,cobbles,and silt,subrounded to angular. [TALUS AND ALLUVIUM] Log continued on next page oO(2qGRAPHICLOG4SEWSEore)oOoOoOooOoOaO°RIGOooOSOAOSOSOEOS0wsoOmane)aero)ae)oOAISoeISoeSOSOSOSOOOOoOooOoPOSoCeeoerooai.||NA 3 ft:Lost circulation -zZ DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO pnritter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetna Mo CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 untains,AK EQUIPMENT:Burley 5500-3 RECORD OF DRILLHOLE DH14-9b DATUM:Ground Surface APPROX.ELEVATION:1500 ft APPROX.COORDS:_N:3,226,738 __E:1,884,902 SHEET 2 of 35 INCLINATION:-60° AZIMUTH:170° infilliBt-BiotaQx-BrecciaShapeRoughnessPL-Planar PO-PolishedC-Curved K-SlickensidedU-Undulating =SM-SmoothST-St Lregular Ty,J-Joint B-BeddingF-Fault FQ-Foliation SH-Shear CO-ContactFt-Orthogonal Ca-Calcite V-Vein R-RoughFR-Fracture VR.Very Rough Ep-EpidoteFoon[ron Cade: @ Axal Hin HematiteML-Sitt DESCRIPTION DISCONTINUITY DATA CORERECOVERYFRACTURES PER FOOT nwroo? TYPE ard SURFACE DESCRIPTION ROO %e BORINGMETHOD{ityRUNNUMBERDEPTH[evevBBS ROCKSTRENGTHINDEX|&GRAPHIC}LOGNOTES TESTS WATER LEVELS 0.0 -84.3 OVERBURDEN:Medium dense to dense,moist, brown to light gray,sandyGRAVELtogravellySAND with boulders,cobbles,and silt,subrounded to angular. [TALUS AND ALLUVIUM] (Continued)c5 SoDOG0?4GRAPHICLOGWTie)-25 erme)SOUSOoWISOoAISOoDOPODROOlOOoe)-30 TABSwooOQoEoticharpdoueionetes4.5-in.ODCoring-TripleTube(HWTCasing4.5-inch,HQ3,2.4-in.CoreDiameter)withdrillingmudwT10)-35 TsOISOTSOoae)"COCOBo»°oO(DO-40 'i33.2 ft 9/8/14;07:50 33.9 ft 8/27/14;07:45 34 ft 9/7/14;07:00 34.5 ft 9/11/14;08:00 35.1 ft 8/24/14;07:28 35.4 ft SR9/6/14;12:15 35.5 tt 8/22/14;15:20 Log continued on next page DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paitter:B.Edmonds WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB_[WATANADRILLHOLE}LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 1/13/16richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201RECORD OF DRILLHOLE DH14-9b SHEET 3 of 35 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60°PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.738 _E:1,884,902fayTypeRoughnessInfillingPy-Pyrite @ Axial 8 PEs parting,PRara Ae,Bare,peso,Gece |Sanwax|2 le Ven ORontognal SiSepred Bh”henge fmtetae sae?|Oere|=8 aw &[FR-Fracture }irreguiar VR-Very Rough Ca-Calcite --ML-Silt 3u-Sulphide zs o zg NOTES uw l6 DESCRIPTION Qo Ya]we DISCONTINUITY DATA =z Ts espe TESTS ao |Z z=|=_|2]99 Ew ao yx|tox)exe WATER LEVELS=a@|Fe oO |RAD FRACTURES |Soa TYPE and Zo /Sew|een |Sess52iei35|@|%PERFOOT |29%SURFACE a8 |Que|Saoisek5 8|4g 12 6 =asgen|avo be 3A DESCRIPTION §"|o |*"geese2 z0.0 -84.3 bb OVERBURDEN:Medium of Ndensetodense,moist,DJbrowntolightgray,sandy OQ -GRAVEL to gravelly SAND |,©4 with boulders,cobbles,and NNsilt,subrounded to angular.oly[TALUS AND ALLUVIUM}D. a (Continued)L Q 4 fy (jo) r LO a °Cb .LO | ofbs l-45 L,e)= Z Bo2OQ a =L,S)4 z ofFED, a s pe - ®D £oYgPs a 8 L,9g 4 g b Q+jo) L s b (Se)4 g q Q3°81350|LO NA 4 ts] :0 5 D, a 8 L,fe)4 bE z ie g OQ a 3 L O 4 2 ie&oO = o b ie)4 ;a Qa P> .)L,fe)4 "4 2 qeryD. -55 55 ft:becomes subrourndedto e)7 subangular °N b> T LO J "Cyb i LO J aeb> P LO 4 ae (o) -LO J aeb> -60 - ™ aLogcontinuedonnextpage zy DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO pritter:B.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 RECORD OF DRILLHOLE DH14-9b DATUM:Ground Surface APPROX.ELEVATION:1500 ft APPROX.COORDS:_N:3,226,738 __E:1,884,902 SHEET 4 of 35 INCLINATION:-60° AZIMUTH:170°1/13/15ficharpdType Shape Roughness nflJ-Joint B-Bedding PL-Planar PO-Polshed fBoneF-Fauit FO-Folation C-Curved K-Sickensided 8x-BrecciaSH-Shear CO-Contact U-Undulating SM-Smooth CL-ClayV-Vein OR.ST Stepped R-Ch-ChionteFR-Fracture Hrregui VR-Very Rough =Ca-Calcite Hm.HematteML-Silt te @ AnalPy.Ep-Epidote te.FeOntonOxde Sa-Sand C)Diametral DESCRIPTION DISCONTINUITY DATA ROD FRACTURES |Ela TYPE and %PERFOOT |202 SURFACE B89R|ve ome Pe sf DESCRIPTIONDEPTH(ft)BORINGMETHODDEPTHtft)jeLeV,RUNNUMBERCORERECOVERYROCKSTRENGTHINDEXWEATH-ERINGINDEX14.5k7.253.62kGRAPHIC;LOG@2$s$POINTLOAITESTS(psi)NOTES TESTS WATER LEVELS 0.0 -84.3 OVERBURDEN:Medium dense to dense,moist, brown to light gray,sandy -GRAVEL to gravelly SAND with boulders,cobbles,and silt,subrounded to angular. [TALUS AND ALLUVIUM)ag (Continued)ao(2qGRAPHICLOGCFSESSSOSS0--65 Jo8oOWIGOAIGOoAISOoCLOPCOblDoie)81.3 -70 N/A XaNOMTONE4.5-in.ODCoring-TripleTube(HWTCasing4.5-inch,HQ3,2.4-in.CoreDiameter)withdrillingmudoOwT0)-75 SNENNENCNENG°DOr-80 Log continued on next page WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]a DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO paitter:B.Edmonds CHECK DATE:11/14/14 VW13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201RECORD OF DRILLHOLE DH14-9b SHEET 5 of 35 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60°PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.738 _E:1,884,902 Q Dn Beds PrBena -OBaaned Sits Ep Epcot Secure |oa2EFaut-FO-Foliatoa C-Cuved 'K-Slickensided BxBreccia FoOrianOxide Sa-Sard CO Diaretral z |i ee eeFe28afH]a |FRFracture Fereguiar VR-Very Rough CaCalete-MUSit suSuipnde |3 &%g NoTESwloDESCRIPTION2fy3|ge DISCONTINUITY DATA z=],oh =STS Oo 2 x |x 2/66 Eu o xOx|tox!x wax WATER LEVELSzraf=3|°°RaO FRACTURES reo TYPE and Fo |Qzw/EZu AGENfo)a jer|S)@&%PEAFOOT |20%SURFACE &9 |282 wee 8Eno NR|80 ao 9 ta BBIZ|i nwowe Pe ed DESCRIPTION s 5 eso x 0.0 -84.3 b j OVERBURDEN:Medium °CN |dense to dense,moist,D 81.3]|wabrowntolightgray,sandy (a) -GRAVEL to gravelly SAND)|,©)4 with boulders,cobbles,andsilt,subrounded to angular.°'a.Recovery{TALUS AND ALLUVIUM]D,and RQD |(Continued,count only aOo2)rock portion. Bit No.9o(UMX (a) L L Da a of 201]4 (a)1 5.0 40% Top of Rock=84.3 tt ie 9 1427)40%s 84.3 -100.3 ,|843 @||v.PL.Heated,ca 35°DIORITE:Greenish gray,ty.%,PL,Healed,|as phaneritic,medium to Vv ae J,PL,R,FeOX/CH 40 |coarse grained,fresh to 'Efe slightly weathered (FR-' SW),and strong to very on ma i-;strong (R4-R5).Joints are ' 5 ®MB,Ca,Healed 35° -rough,planar or unduiating,\4 Bottom of _ FeOx stained,Ca/clay r 74 R le,|MB,Ca,Healed 40°surface infilled,and close to widely |' ,©|B!Ca.Healed so-T\.\!Rs |FR casing at,Ca,Ne ;spaced. |SS Run 2:Drill a 84.3 -88.8 ft:Fresh,very strong |,"e J,PL,R,Ca/FeOx 15°Rate=4 4 (R5),moderate to closely spaced |mirnftdiscontinuitiesN I 47|4 NN "4 5.0\5.0 9 °88.8 to 92.3 ft:Slightly weathered,[_|2 100%e J,PL,SM,Ca 10 a strong (R4),brecciated,healed |100% 7 S|withCa iqg| x NN 8 r 490|"Drilling mudP=]!flushed from=|s R4 |SW hole prior to o "4 run 3.Fresh r 2]91.3 -91.6 ft:Broken core (water -4 2 'beginning&1.4 run 3.fan)Run 3:Drill i 2 .I o C,Ca,Healed Rate=t0 |lo].oO r vil min/ft c|92.3 -94.1 ft ALTERED \ J |DIORITE,moderately weathered,! «|medium strong (R3) |e U,Ca,Heated a oo fl sj 93.2 -93.8 ft:Broken core 5 MW D>»2y3rfa}50 |100%JPL.CL L \d @|94.1 -94.5 ft:Slightly weathered,100%\=|Sirona (Ra)7 @||PL,Ca,Healed aoek \|94.5-96.3 ft:Fresh,very strong |\°,Ga,heal ao)(R5)|\95 |\.= {=}aa » o \R5 |FRoO|PL,Ca,Healed 30°},96 ft:Trip out°L >e PL,Ca,Healed 15%)change bitL<|4d +\ ©-|@®|J,PL,R,CL 60°\.S 96.3 -98.7 ft:ALTERED yeL,A, '.©3|DIORITE,moderately weathered,|.0.9 |_pun 4 Dell i medium strong (R3)\,4 1.3 69%mint _1L>89%||Lostcore vy R3 |MW !@ |J,PL,Ca/CL,Healed 60°.Run 5:Drilt L \NS Rate=7 4 t ,|™min/ft 98.4 -100.9 ft:Broken core aa 24 97.8 -98.4 ft: :3.0 Lost core98.7 -100.3 ft:Fresh,very strong |5 80% i (RS)My 80%WPT:1 1 R5 |FR DH14-9b-1|*(90.0-110.0ft)in|@!|J,PL,Ca,Heaied 45° t-100 . :on =Log continued on next page a DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO opnitter:B.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 6 of 35 INCLINATION:-60° AZIMUTH:170° -Z SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _€:1,884,902 a Type Shape Roughness infill .Py te @ Anal g Fraut FOroltan Cured KStewemded BvBroota -FSGeter Oxide Scand”|Ci Diametral z |G Bel _Rien,Romine Gua Remo”Ce,Soe Bae cogMein::|-Chlori :=Fs 2 8 BL)&Lepr ractuce tieregular VAVey Rough CaGalete,MCS Se Suiahide z a9 Z NOTESw=lo DESCRIPTION of 2)BY DISCONTINUITY DATA =f.aseo ESTS a z Z/Z=|21 906 =rs)xix |tox WATER LEVELS «&|ae/2)O9|ROD |FRachwEs |Fee TYPE and o,(SSk ESS ames 9 @eje-|5)&]*PERFOOT |29%SURFACE £8 |2e2/gs2/s2x5 8a9xBB8R8lnw0oe2%DESCRIPTION &5 ko 2o zr-100 +TT\_1413 80%R5 FR 100.3-112.4 "|100.3 ° ALTERED DIORITE:Light =Run 6:Drill a gray.medium to coarse pS 15 Rate=6 4grained,moderately "©\TS mint weathered (MW),and y 6 .67% medium strong (R3).Joints "4 100%are slickensided to rough,=\° -planar,Ca healed,and yl *4 close to widely spaced.=\Run 7:Drill NS Rate=4 i \min/ft EB 101.1 -101.6 ft:Fractured zone S 103.2 ft: 4 102.1 10 102.6 ft:Brokencore |\Brazit Test = S 472 psi a r =103.9 ft:4 49 UCS =6758 =7)49 I \ga%psi YS 4105 Wy 100% | of "iy °S,K,Clean 15° »@S,K,CL 8077 L na | 3 aN R3 |MWFyye\= S °43;Ny @ |J,PL,R,Clean 60 .\Run 8:Drill s e ||u,Ca,Healed 15°Rate=z=a a o =I 4 2 s 2.6QoHWcv 5 =8 |39 Fila7%>»a v7]87% 8 =°J,Ca,Healed 5°7 (3)& s a 3 = a N _]10)5 Ly Run 9:Drill 2 g y Rate=5 2 3 w @!|J,Ca,Healed 40°Moe tt-L 2 ,\UCS =1582 4 ZB 2 =\\psi a 2 S 5 F _f 2 S 5 WPT:1 iy)8 A (4027 |5G DH14-9b-2 5 Ol 7112.4-146.0 \[Mal 9 |>|100%ra |sw (110.0-130.0ft)zt 8 DIORITE:Greenish gray,by |100%ar .|phaneritic,medium to \| FS |coarse grained,fresh to ! z 2 |slightly weathered (FR-| 2 «|SW),and medium strong to |,>|ZL very strong (R3-R5).Joints i |<are smooth to rough,planar NEStostepped,Caor Chinfilled [7[ra with FeOx or Clay,and anFa}close to widely spaced., >11s Shears are slickensided,Cl +,_|@/||J,PL,R,Ca 35°4 «intilled or clean.\ i oOa]a Er 112.4-112.9 tt:Slightly '4 ra}weathered,strong (R4)N e S,K,CL 25° +112.9 -132.6 ft:Fresh,very by \R5 |FR =strong (R5),close to moderately |,'>\ &|Spaced discontinuities 1 4 $'5.0 Run 10:Drill t 7 |26 Rate=!=vO 10]©°|yo00%mint =S 100% i re Run 19:Drill 7 2 \ \Rate=4 o N min/ft +L=-/ se \4 iS)| =" OF 120 + =Log continued on next page o N < z <E <x E4 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 7 of 35 INCLINATION:-60° AZIMUTH:170°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 8 Pot abode PlBanar PO foithed «Be EpEpidore tte «|AMJoin-Badd -::7 ;2 Frat FO-Foliation C-Curved KSickeriided BrSrectia -FeOron Oxide SarSand ©Diametral x |zie Viven GROnnogenal Stepped Ahough --Chenbite retetawe =Sa?[QeFs28Ha)&[ea Fracue Pkraguiar _-VF-Very Rough GaCalete'-ML"Silt suSuptioo |SSB NOTES w=16 DESCRIPTION QL"3|#Y DISCONTINUITY DATA =z |eae TESTS a |S z (xz |3|356 =a xiixi tox!¢vex WATER LEVELSivaa|eei 5/09]Fao FRACTURES |39/0 TYPE and To /Qzulezw ABERfe)ew |5|&%PERFOOT |29%SURFACE a9 (22 BE2|8in5 BRL-120 oO o a BBeR awooe 3 a DESCRIPTION x 5 ote Nz 112.4 -146.0 \I DIORITE:Greenish gray,t 7 _|phaneritic,medium to \Run 11:Drillcoarsegrained,fresh to \Rate=6rslightlyweathered(FR-|*min/ft 7 SW),and medium strongto |,"> very strong (R3-R5).Joints 1 @||J,PL,Ca,Healed 45° are smooth to rough,planar \ a to stepped,Ca or Ch infilled ir / qwithFeOxorClay,and |5.0 @ |[JPL Ca,Partially 30°close to widely spaced.\11)59 |boos,HealedShearsareslickensided,Ci +,_|fier \intilled or clean.(Continued)A , 100% \ ty _| \ \ j Ly @ ||),PL,Ca,Healed 30°4 \ .!@|J,PL,Ca,Healed 75°| -425 rv «J,U,Ca,Healed 20° 4anRun12:Drill N Rate=8 ros min/ft \ F |4 5 |R5 |FR3"@ |J,PL,A,Clean 50° =|J,PL,R,CH 85° -G '@ |J,PL,Healed 55°' 4£ea 5.0 3 12)°°|00%|J,PL,Ca,Healed 0' |,PL,Ca,Heal 50° a <I'100%*J,PL,Ca,Healed 60”NN J3' S €N &r/4 @ |J,U,Ca,Healed 50° -g |-|fod \2)L e J,PL,Ca 40° £OO+]\ J N NN _l>130 3 t |WPT:\ -Ob-:2 g ;;DH14-9b-3bay131.3 -132.6 ft:Closely spaced N (130.0-150.0ft) FL gy;eins bo @ ||4,U,Ca,Healed 20° iF\2B g .|@||J,ST,R,CL 45° 5 iS ra -|2 .0 ||lu PLR,CUica 10°4 WwW fo)L 50 |8 5 132.6 -133.6 ft:ALTERED vy 13)°°|leo @ 2 PLR CLiCa 50°ft a 6-6 ft:{conf ©} DIORITE,moderately weathered,100% °=z <¢|medium strong (R3),closely L '@ jJ,PL,SM,CL 50 a3 |MW - oO @ fractured on <S 1 Zz se]NELrf 4<x 133.0 -150.2 ft:Closely fractured|\2)zone ' o 133.6 -137.5 ft:Fresh,very » oJ strong (R5)7oO\ >135 4 fa N @||J,PL,Ca,Healed 45°ES ros o ;2.0 FRE FR Run 13:Drill = .2.0 |F Soe @ |u,PL,Ca,Healed 70°RS Rate=7 4Eb140%:min/ttzbyLeoO\100%s Run 14:Dritt >|Rate=15iS['minétt SE \137.5 ft:Tri | 2 .|@ |J,PL,R,Ca/FeOXx 60°LA out to P E 137.5 -146.0 ft:Slightly by change bit 2 weathered,strong to moderately |\°(No.14) I strong (R4 to AS)|9 Run 16:Drill 7 a ty 3.0 R3 Rate=68vyit80%mint=.|97%|f4 sw ar ) 1 iam 7 R4-I XN a f 7 i”140 Log continued on next page WATANA201-zw SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 RECORD OF DRILLHOLE DH14-9b PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 8 of 35 INCLINATION:-60° AZIMUTH:170° 2 DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO priter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.738 __E:1,884,902 a Type ;Shape Roughness Infilting .Py-Pyrite @ Anal g ERun EoPoithan =CCuned KRSlnereded =BrBeata ESO nde Sees OD Diametrat x |&ee en eeFe¥§z Wy]2 |FRFracture Hrregular VR-Very Rough Ca-Calcite_-ML-Sill Su-Sulphide F3 83 Fy NOTESwu15DESCRIPTIONgto=|es DISCONTINUITY DATA zT,De STS o |<=|==!2|83]rao |rractumes |¥¥QSOs |ESh|Aas WATER LEVELS z &|re|3S]o9 eo TYPE and Fo |Sem|zen|SFEE ooOoa|wr)sS ir %PER FOOT 29%SURFACE a8 arid gG2 Bina £449 a °«8828 vvooe Fe)2 4 DESCRIPTION 5 Ps were S = 112.4 -146.0 N 2 Run 15:Drill DIORITE:Greenish gray,t 7 Rate=6 phaneritic,medium to \min/ft coarse grained,fresh to .!a slightly weathered (FR-e PL,SM.CL/45°4 SW),and medium strongto |," >J,PL.SM,CL/Ga 5 very strong (A3-R5).Joints | are smooth to rough,planar \ a to stepped,Ca or Ch infilled I,'|4 with FeOx or Clay,and 48 °close to widely spaced.|16!5-9 ||96a @ /J,PL,SM,Ca 70 Shears are slickensided,Cl +,_|° infilled or clean.(Continued)\96%Lo t R4 |SW 4 XN Ly | \ ] L N @ |,PL.SM,Ca 50° 4 ts J,PL,SM,Ca 45° a t Ny \ + [7 -145 vo Run :17 Drill \@ |S,U,P/Healed,ChYCa 50°Rate=6 ty |mint, i \_13734 146.0 -156.2 A |146.0 @ |J,PL,SM,Chy/CL 50°7 3|ALTERED DIORITE:Light =\ |greenish gray,phaneritic,y y 3 medium to coarse grained,| y 38agmoderatelyweatheredXN45 4 =;(MW),and medium strong 17) =|(R3).Joints are smooth to g4%,|rough,planar to undulating,° }<=}Ca,Ch,or clay infilled,and J 2|very close to moderately2|spaced.& a a @ 4 2eo a =SELEE +18]95 0%:150 |S tr i Mw R one 4bs9'@ |U,SM,Clean 70°un 18:DrillPyg100%Rate=105=o PL,Ca,Healed 20°min/tt =8 °U,R,Ca,Healed 10% cam 3 = z 5 WW R3 a = 5 C A '=2 =}Ja=\5.0 WPT:8 Ua 5.0 DH14-9b-435=19 74%@|U,R,Ca 75°(150.0-170.0ft) S fo)ut 100%152.3 ft:=|c =Direct Shear 4 fa s @ |S,K,Ca 60° <te a a z 8 =\ <Ser154.0 -186.2 ft:Slightly A on 4 =)weathered,moderately strong =@|(J,ST,R,Ca 40°)(R3): a 154.4 -155.0 ft:Broken core Ln \OMyy&4 _>155 i sw Run 20:Drill <=\Rate=6ormint a "Ly @||J,PL.SM,CL'Ca 40° Br 11364.4 Oo 156.2 -291.1 \|156.2]° \. +DIORITE:Greenish gray,Ly J,ST,SM,CL/ChiCa 30 3S phaneritic,medium to \ x -coarse grained,fresh to \\= 2 slightly weathered (FR-|5.0 \ <SW).and strong to very a 20|5-9 ||goo,' <x strong (R4-R5).Joints are | 3eLsmoothtorough,planar to 100% q +stepped,Ca healed or a e J,ST,R,CUCh/Ca 30°R5 |}FR a Ca/clay infilled,andcloseto |',|Go widely spaced.\=be @|(4,PL,.R.Ca 35° ar 156.2 -166.0 ft:Fresh,very \ \ 7 -strong (R5),moderate to widely Nspaceddiscontinuities|@ fo @!JJ,PLR,Ca 40° OL 160 ; 1 1 I \ _| 3 Log continued on next page S N < z P-@E <x = 1/13/15ticharpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201RECORD OF DRILLHOLE DH14-9b SHEET 9 of 35 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 __E:1,884,902 i ian B-Beddi PL Par PO.leet ne it Ep te &van @ Anal Q EFaut FOFoaton C-Cuved KSiickonaded BxBrectia EeOLron Oxide Sa'Sand |Ci DiametralEoeaeeee38Gye]|FR rracture Frogs Va vey Rough Cacaete Mee $u-Sulphide FS 8%Z veersw=|G DESCRIPTION ei 3|#8 DISCONTINUITY DATA =z.aapFas)>Fix 2/356 =o yvisx|tox WATER LEVELSFs&|==!2/88 |roo |Fractures |Evo TYPE and 2 (ose eza|SSS5 yoaI2|h=\Z)2)%PERFOoT |25%SURFACE ag |Oug|gco|azn5 8 |160-42 G|O |&BBIR|vw owe PS gh DESCRIPTION a-|"5 |="wezeg = 156.2 -291.1 ' DIORITE:Greenish gray,'aphaneritic,medium to \°J,PL,R,Ca 10°Run 21:Drill coarse grained,fresh to 'Rate=12 -slightly weathered (FR-|*minitt 4 SW),and strong to very "4 strong (R4-R5).Joints are I @|J,PL,Ca,Healed 70° smooth to rough,planar to s 4.0 L stepped,Ca healed or oa 21|49 |400%= Hae \Ca/clay infilled,and close to ,widely spaced.(Continued)N 100% fl q R5 |FR5\4 161.8 -163.2 ft:Broken core .a i] a XN .= boy Trip out to \ ,change bit Run 22:Drill by Rate=5165\|min/ft q N 165.7 -167.41:Brokencore |,49 °J,U,SM,Ca 10° r 165.0 166.5:Sight Sf [22]|98%o|[u.Pl.sm.cuica ase =tow | ra weathered,strong L 100%3 166.5 -186.4 ft:Fresh,very on 21 strong (R5)\ .£S 4 2 oa £'|@ |J,PL.R.Ca soe |de na : 1sanRun23:Drill 2 Ny Rate=7 t ,20 min/ft[a]"oo 20 L g I 23 90%7 °LY 100% =169.6 -169.8 ft:Very closely vO MAAN|470 w|spaced discontinuities N - RB}fl wo=x \: \Run 24:DrillaLpe||u,PL.R.Ca 15°Rate=8afas\minft 7 ®' a \ =r./ f ?.5.0 WPT:as 7 5 bp BO 14-9b-°"24 100%(170.0-190.0h)s)|100% | 5 / +R5 |FRidt fie]N a r vil e J,PL,R,Clean 40° J \\, \ \ in /-e J,U,R,Stained 40° y-175 .!\.Run 28:Drill 175.4-176.2 ft:Very cosely =[,/ |Rate 9spaceddiscontinuities{ S '\"4 +f \f |@ |J,PL.R.Ca 50° L [% a NY 4 |5.0 |s 25|59 |I a4%' |\100% r |e@||u,PI,R,Clean 40°)7 b \en \ \@ |J,PL,SM,Clean 60°h.* = \-4d 7 | N r /J 4180Logcontinuedonnextpage zy DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO priter:8.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 10 of 35 INCLINATION:-60°1/13/15richarpdPROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:N:3,226,738 _E:1,884,902QaTy-38 infilling ;Py-Pynte @ Acal 8 PEs Biesing,Samy Os,Bene,peso Seca |S canaralx|Zlg]a [Wome SRSRRnw GPSai RATE Ene Se SSE |poe-_2 8 A)) &|Fa recue Pkregular VR-Very Rough Ca-Galcite.-ML-Silt Su Sulphide s éo FA Carsb=lo DESCRIPTION @ 1-42)#Y DISCONTINATY DATA zl,or WATER LEVELSaz=x z=Z|Oo ROD FRACTURES Eu o "xOx|TOx|xxxr=a |FelS|oo sa@ TYPE and Zo |8Za\<25|gexd 2&#(85/2)°R|%PEAFOOT |25%SURFACE SO jeez |ehe|Sena &-1g04--=BB9R|woo?Pa gs DESCRIPTION 6 |&Sete 2 & 156.2 -291.1 . DIORITE:Greenish gray,ty @||J,U,R,Ca 45° phaneritic,medium to \Nocoarsegrained,fresh to N |circulation -slightly weathered (FR-L |beginning 1 SW),and strong to very or AM of 8/26.strong (R4-R5).Joints are |Hadsmoothtorough,planar to »40 circulation at a stepped,Ca healed or -26|49 |100%end of day 4 Ca/clay infilled,and close to |' |on 8/25widelyspaced.(Continued)N 100%Run 26:Drill ty _|Rate=13if\ :min/ft 4d .Rs |-R Bit binding at 183.3 -183.6 ft:Brokencore =f 183.9 ftvyee 1 =»4 ty _|Run 27:Drili \Rate=7 Ny min/ft L e J,PL,SM,Ca 35° IL 185 on a | N on 4.9 |27|#9 ||roa%4 NX -Ly2186.4 -186.8 ft:Slightly on 100%Ra |sw=|weathered,strong (R4)I e J,PL,Ca,Heaied 30°). a Pad 186.8 -191.8 ft:Fresh,Very N |@|Strong (R5)ty _| £' '\ =N _-=:[7 ™4 3 \ ;Run 28:Drili e N Rate=16 s r ram 2.0 min/ft L @ 28|2°|100%7 2 N°be 100% &\ 3 |R5 |FR 190 ;% | TF S vo J,PL,R,C 40=i @ (J,PL,R,Ca ° @ J,PL,R,Ca 50°E |» -|191.8-192.5 ft:Felsic dike,fresh,\Run 29:Drill 7 @}very strong (R5)u e J,PL,SM,Ca 30°Rate=12S.\inst=Ly 40 mind '191.8 -193.9 ft:Broken core \4.0 a 2 ,!29 100%WPT:-| 8 ry _|400%DH14-90-6 192.5 -197.0 ft:Slighty \(190.0-210.0ft)8 weathered,strong (R4)| |_NX 4 £roy. ©\in t Loe) N L [7 4: j Run 30:Drilt Rate=|*@ |J,PL,Sm,Ca/CL 50°mintaN|Ra |sw 194 ft: -195 'Tripped out > |*to change bitvo38(No.14) i]° i .30 3.8 95%e J,PL,R,Ca/CL 16 | ie 100% 196.5 -197.5 ft:Broken core !@)|J,PL,SM,Ca/CL 40° 7 197.0 -199.3 ft:Fresh,very re T] strong (R5).| Ly | a Run 31:Dri 4 N R5 ;FR Rate=9 198.3 -198.6 ft:Broken core r minétv422xX) | i \31|22 |hoo @|/J,PL.A,Ca 35° 7 Pov it 10, 199.3 -200.4 ft:Slightly ar 100% weathered,strong (R4)\R4 |SW by =200 Log continued on next page WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]=z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,inc. SUSITNA-WATANA HYDRO pater:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 11 of 35 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500ft =AZIMUTH:170°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:N:3,226,738 _E:1,884,902 a Ty .hness infilling Py-Pyrite @ Axa 8 Py foe,ty ES,Eee.Bi,SEE Soames -SH-Shear CQ-Contact U-Undulating =SM-Smooth CL-Clay G-3e-SericitebaWw8axV-Vein OFR-Orthogonal ST-St -Rough Ch-Chlorite Hm-Hematite i-Silica 5a 2 =>Fo |s Oo}4g)&|FrFractue Miregular_VA-Very Rough Ga-Caleite._ML-Silt suSuphive |ZnB NOTES wu 19 DESCRIPTION 9 i 2|72 DISCONTINUITY DATA z I,aap Ww ATER EVELSé&|F2/Z/88]pao FRACTURES Eva TYPE ard Zo See EQS ASRSaojwuTSs%20%SURFACE a a ro\6 vu FS 200 8 Go}a «BBEZ|nar 0ewe O°8 DESCRIPTION go "Ee $0 Soe -| 956.2 -291.1 ,Run 32:Drill DIORITE:Greenish gray,+y Ra |SW Rate=10 phaneritic,medium to \minétt coarse grained,fresh to .\-slightly weathered (FR-°4 SW),and strong to very \"°J,PLR,Ca 30 \ strong (R4-R5).Joints are t \ smooth to rough,planar to \\ L stepped,Ca healed or a 45 \rs |-R - Ca/clay infilled,and close to ;32 45 87%' widely spaced.(Continued). ° ty |100% 200.4 -203.6 ft:Fresh,very \ -strong (R5),!7 203.5 -204.5 ft:Broken core on \l.203.6 -204.0 ft:Slightly \1 |J,PL,Ca,Healed 40°Ra |SW 4 weathered,strong (R4)f 7. 204.0 -204.5 ft:ALTERED \ |Ra |MwDIORITE,moderately weathered,+ Dri medium strong (R3)|*Aun oS Dn- 205 204.5 -207.1 ft:Slightly 7 min/ft 4 weathered,strong (R4)|be J,PL,R,Ca 50°hh 2052-2126 1t:Joints cosey |>|@ |J,PL.SM,Ca/Staining 50°,opened 4 N R4 |SW i 1 .4 NX 3 7.Bw \5 Ld J,U,SM,Ca/CL 10° 2 |33 26 ae °J,PL,R,Ca 40° L di ly 4 @|207.1 -209.0 ft:ALTERED rf 7 e P M.° =|DIORITE,moderately weathered,|'100%J,PL,SM,St 40 \, |medium strong (R3).! -S|207.5-208.41t:Brokencore |">R3 |Mw 4 D>|e \@)|J,PL,SM,Ca 40° A hy @ ||u,PL,Ca,Healed 20° r 8]209.0 -213.0 ft:Slightly 'J ©|weathered,strong (R4);£vo °J,U,R,Ch 15° +| a "i N210|os]210.0-211.6 ft Brokencore |>|Run 34:Drilt 4 w S \@)JJ,PL.R,U 40°Rate=12 a =|@ ||J,PL,R/U/Ca 30+:min/tt =g . a 2 a R4 |SW 4 ES g o 2 '@ |J,PL,R,Ca/CL 60° S C \om 5.0 fF 3 |34|59 |'100%wet: 4 "8 ae 100%@ ||J,PL,R,Cac 30°DH14-9b-7 g |212.6-215.2 ft:Joints widely =|*, \(210.0-230.0ft) a O|spaced \\z a ¢|213.0 -220.9 ft:Fresh,very L ,\1 ral |strong (RS)7 $tj |213.2 ft:3 inch thick felsic dike [_!SL rs.<x \ 4 3|\ \ q s Run 35:Drill [o}\Rate=10>215 ! °mint 4 a 215.2 -220.9 ft:Joints closely .ba J,PL,SM,Ca 20 ia spaced "ao 3 .!@ |S,K,Ca 55° ha 4 z rv. ©216.4 -217.1 ft:Broken core .|50 R5 |FR S Fart °J,PL,R,Stainin 30° SL >}f35}82 |a0%4 9 4 z .!100% ={4 5 NPXL 9 wo }@/J,PL,R,Stainin 70°: Dri +1 !rPLOR,9 mh]Run 36:Drill SL N i Rate=12 a boy |min/ft "] =\i e J,PL,R,Clean 30° |+'ended 8/28 [>36 N 00%\started 8/27 p 220 Log continued on next page :7 WATANA201-yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO patter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 12 of 35 INCLINATION:-60° -zZ-DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO priter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.738 _E:1,884,902Tyi 78JointB-Bedding Bt Boner PO-Sed sraionte Ep Epidote eA artz @ Asal 4 Fault FO-Foliation C-Curved -K-Slickensided =@xBreccia ©FeQx-ron Oxide Sa-Sand 1 Diametral z {é zie ,[Her Sotiiie Gitar Bir”Fee oe See”|coe.-.|2 8 |&W)>|FAFracture iiraguiar--VLVery Rough Ga Caleta ML-Silt ssupride |ZS ¥NOTES w=16 DESCRIPTION g 42)ee DISCONTINUITY DATA =eae TESTS fa)>=iz [3/53 =ot vx |tox WATER LEVELSFaa|Fsl2Z|Go|Roo |FRACTURES |$e TYPE and 2,(See ELa/N SRS ypPa<22s uy %PER FOOT 2ox SURFACE a@ |6u9/$29 Bars Agg6|o |2 ©Gos 29 /fa2Z/Ph2|eon f|990 a 8888|n+eee 3g DESCRIPTION g 5 wero ge & 156.2 -291.1 \ DIORITE:Greenish gray,_phaneritic,medium to , ; J,PL,SM,Ca/Cl/Clean 15°RS |FR coarse grained,fresh toIEslightlyweathered(FR-'4 SW),and strong to very ' strong (R4-R5).Joints are {R4 |SW smooth to rough,planar to \ ag stepped,Ca healed or 7.5.0 4 Ca/clay infilled,and close to 5.0 9, widely spaced.(Continued)nN 36 100% ;|100% -220.9 -221.9 ft:Slightly !4 weathered,strong (R4)\ 221.9 -225.8 ft:Fresh,very '- strong (RS; i na (Fs)|RS |FR | ?.. N Run 37:Drill Rate=14 -225 225.0 -231.3 ft Broken core '|minétt a N 225.8 -227.7 ft:Slightly 9 |boosrweathered,strong (R4).!37 ;00%®|J,PL,R,Clean 65° 7 3 , 100%e J,U,8M,CL 0° a2 I R4 |SWLos\4 2 /.|227.4 ft: =Rods =binding.3)207.7 -230.5 ft:Moderately 'Bun 38:Drill L |strong (R3)7 @ |J,PL,SM,CL 55°Rate=5 J 2 .i 26 min/ft &/38}25 ||gte r 8 |100%R3 |SW 7 <'| +I +230 |S '4 oO fo ©CoSS=230.5 -238.6 tt:Strong (R4)| =2an3 a @ |J,PL,SM,Ca 50°7 ae Run 39:Drill z 2 .I @ |J,PL,SM,Ca 60°Rate=10 2 fo /SS minitt °.=>;4 ay 5 ,5 H14-0b-8 |5.0 @ |J,PL,R,45° 3D- 3 ©)932.5.234.5 tt:Very closely '39 70%3 8 (230.0-250.0f) 5 i 8 spaced discontinuities |100% == -4 5 3 a <id I z os \ =i so a” =| ©234.5 -238.0 ft:Broken core 5 Ra |Sw Oo .=\|=235 N Run 40:Drill <sl Rate=8 5 ;minftt c+.Z Zz a ¢||885.40}25 ||o7%aL 74 4 <, 100% =N <x / Ea \q 2 \e J,PL,SM,Ca 35° /g 238.6 -246.7 ft:Fresh,very | Run 41:Drill ue strong (R5)N 5.0 Rate=11 ql 5.0 minft 7 =|41 100%RS FR a |100%|o Ot 240 . a S =tog continued on next page S N < zZ < E< = VWAI3/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201RECORD OF DRILLHOLE DH14-9b SHEET 13 of 35 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60°PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX,COORDS:N:3.226.738 _E:1,884,902 8 en a ce ee |OhQEFautFO-Folalon C-Cured -«K-Sicnonsided Bxrecta EsGrbenOxide Sagan”|CI Diametral zs |G 2 le Gon GRonhogna Steeped Roe Ekembte Sei SSO |eae-o|S 8 YP)&|FAFrectue Firegular_VR-Very Rough Ca-Calete -ML-Sill Susuphide |25H H NOTES =lo DESCRIPTION 243)#8 DISCONTINUITY DATA z ls gare WATER LEVELSao|&|Fe|/2)89 |pop |eRactunes |Evo TYPE and gL SSS ESE]waxy&2 |e=|35|2]%PERFOOT |aox SURFACE 28 222 /de2 azxs &|540-42 6 |o |&8B9R|veo oe Pog DESCRIPTION g7 |"5 |e""lense a =156.2 -291.1 \| DIORITE:Greenish gray,t |phaneritic,medium to \ coarse grained,fresh to | -slightly weathered (FR-| q SW),and strong to very onstrong(R4-R5).Joints are (5.9 smooth to rough,planar to \at]29 |ya0% g stepped,Ca healed or pr " >4 Ca/clay infilled,and close to |' , 100% widely spaced.(Continued)N L 7 a ;4 'N r 7d R5 |FRan Run 42:Drill \Rate=14 L LY min/ft 7 "4 ! NX 245 245 ft:Moderately spacedjoints |\">40 @ |u,PL,R,Stained 50°4 I Sv »42|49 |'100% VT 100% e ' 246.7 -249.9 ft:Slightly 1 ° L 3 weathered,strong (R4)\bd J,SM,Ca 30 4 2 r 7 £'yFs\Run 43:Drill -7 Rate=6r3]\mint 7 ca)|@)|J,PL,R,CL 46°R4 |SW:5 2sfs}a 43}25 |100% =w q&.100%wet: :rose].DH14-9b-9&\{250.0-270.0ft)bs !e J,PL,SM,CL/Ca 15°t-250 |"|249.9 -257.3 ft:Fresh,very \ | @|strong (R5)r vilg\ =\ p-]L >@||J,PL,R,CaCl 35°Ej / Jri"an Run 44:Drill r=\ 'Rate=12 r ne ;@ ||u,¢,R,Stained 30°mint t D | :@)|J,PL,R,Clean 45%Ji= =N 5.0 3 [7 [44]29 |400% i 3 |100% | z ie e||u,PL,SM,Ca 45°os |R5 |FR _I 7 J i ' 7 | °J,U,R,Ca 10° Z255 x Run 45:Drill fr 7 Rate=8 \ \minét gq \ a I 'J ( | @ |J,PL,SM,Clean 60° NN S 4 ' i 4 5.0 257.3 -265.2 ft:Slightly .!50 ,@ ||J,ST.SM,Ca 30° weathered,strong (R4}ty _| 45 100% \ \100% oa \ ;R4 |SW a >| J \ j NX a f 7 |260 Log continued on next page .Zz DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.HollandSUSITNA-WATANA HYDRO pritter:8.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 14 of 35 INCLINATION:-60° --Z- SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:N:3,226,738 _E:1,884,902 a .<3 Infilling .Py-Pynite @ Axial 8 PEs sie,ity BE,Se ae Se"|omnesx(5 aFo2§Gu)&|ertracure Frregular_VRVery Rough Ca-Calate-_ML-Sil Supe |30 8 woesw=16 DESCRIPTION Qr42)|#8 DISCONTINUITY DATA z |, oor WATER LEVELSe22l&s/2|/88]Rap |Fractures |Evo TYPE and 2,(Soe e2h ASRS S <w=Zz;2 %PERFOOT |20%SURFACE aQ |2#2 wae Sino960aoaBBIR|av one >DESCRIPTION x 5 yoro gy x 156.2 -291.1 .Run 46:Drill DIORITE:Greenish gray,|)_|Rate=5 phaneritic,medium to \ ; min/ft coarse grained,fresh to ° -slightly weathered (FR-|*e |jd.PL SM.Ca 35 4 SW),and strong to very aon strong (R4-R5).Joints are | smooth to rough,planar to .stepped,Ca healed or In '4 7 Ca/clay infilled,and close to 5.0 ° widely spaced.(Continued)|as|©°|so0%@||J,PL.SM,Ca 40 \wutsL4 Ww7.° \100%®||J,PL,SM,Ca 35 a \4 N r7 'J,PL,SM,Ca,Partially ° VI °healed 10 Ss \4] 7 | >@ ||J,PL,SM,Ca 30° -265 an _4 265.2 -285.1 ft:Fresh,very i aunt Drilltrong(R5)\annslL>min/ft \ a |4 NN &Foy ®|J,PL,SM,Ca 60°we \™2 |e J,PL,R,Ca 30° ar on 50 \ g i 47]59 |s00%' 2 LY |100% =\ 4 3Ee N fay 4'=@ I 4 8 |»@||u,PL.A,Ca 40° £, +1 a a \4270gt,_|WPT: wo \DH14-9b-10 3 =As above with zones of reddish .!(270.0-290.0ft) =8 brown feldspar };_|7 2 9 @ |J,PL.R,Ca 55°Run 48:Orig=271.5 -271.8 ft:Broken core L 'a Nye min/tt =2 \4mal5.5.9 a is)i?faa]59 |100%as |FR=a {6S|rs).100% ||_|5 ©ion $3 |273.5-275.5 ft:Broken core | EL be 4 <\ 3)( N a f 7 J 2)4xf275,Run 49:Drill <=tv Rate=15 o \min/ft ZL .| z ros |Trip out tooO\ ;33 change bit z \49]3-3 |-+00% SE oo lr,|100%@ |J,PL,SM,Ca 55°4 $277.1 tt:Felsic dike \ <\ s " 7 ' = a ry.[Sof 62 Crow:Run 50:Drill g v [51]0.2 [row Rate=93 N min/ftt An L 100%7 =V 52|92 |100% 2 .02 ||Run 52:Drill OL 290 ; 7 Rate=3 | =Log continued on next page 5 NN < z < e< = PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 15 of 35 INCLINATION:-60°1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 a Type jhness:Infiting Py-Pyrite @ Axal 8 Peo fete,Seay SE,Bets Ee SES |OanaxtoZz\|a Vien OROrhogenal ST-Stepped?Acar Gheneite eeetante -Sesnea”Bor.Fe 2 8 z y 2 [FR Fracture birregu VR-Very Rough Ca-Caleite -ML-Silt Su-Sulphide 285 q 'carswu1oDESCRIPTION8i-2]gs DISCONTINUITY DATA ae oor WATER LEVELSazx|=z|99 Ew o <Ox|ZOx|xe xxx=aire OO |RAD FRACTURES |34°92 TYPE and To |O2wWlEZU/UVOEN o5-ija-|3)ge)%PERFOOT |20%SURFACE 28 /2e2/Se2\sins R|380 o (o)«8898|avooe PS sh DESCRIPTION F 5 eere ge = 156.2 -291.1 o TOO%}minéft DIORITE:Greenish gray,by phaneritic,medium to \ coarse grained,fresh to .lrslightlyweathered(FR-L @ |J,PL,R,Ca 55°7 SW),and strong to very wostrong(R4-R5).Joints are |5.0smoothtorough,planar to N 50 a stepped,Ca healed or 7.52 100% 4Ca/clay infilled,and close to \ |100% widely spaced.(Continued)|.as |FR ca a |°J,PL,R,Ca 30°4 \ fo4ay \ |Run 53:Drill - )Rate=5 7 7 minft \ N =." omnd285285.1 -291.5 ft:Slightly ' weathered,strong (R4)N 40 L 4.0 °J,U,R,Ca 10° 285.7 -287.7 ft:Very closely on 53 50% a spaced discontinuities |100%!|HI q N . &roy oO \ =1 i 5 \4 ®ros=\@;|J,PL,R,Ca 40° £1 *..Run $4:Drill r Ss vy 'Rate=5 7 ro |R4 |Sw mint &N 3&roy 33fayon.9 L @ |54 83%@ |¥.PL.SM,Stained 50°}wer 4 8 N 100%J,PL,R,Clean 504%.DH14-9b-14 .ros °NN."sD- <an e J,PL,Ca,Healed 25 .(290.0-310.0ft)+I 290 |S 'e J,PL,R,Ca 15°4 oO f 7aOo\15=!Ts @J,U,SM,Clean 85° g |»55|'5 |100%ues L E} }1247:5 °_ 4'a |291.1 -300.0 Ry wy3si-s]|100%©|4,U,SM,Ca 50°Run 85:Dil|ANDESITE PORPHYRY:BS]ag min/ft|Greenish gray,moderately Nae 201.5 tt: a o&|weathered (MW),and ey Blocked off 4 |strong (R4).Joints are i8|rough,planar,Ca infilled,Nyoaandclosetomoderately 4 Run 56:Drill i |spaced.Ni 35 Rate=6 | s 35 @ |J,PL,R,Stained 65°min/ft @ Ny vy)56 94%' ain «|291 5 -291.7 ft Clay seam Vv 4 100%@/|J,PL,R,Ca 70°P- ] F 291.7 -300.0 ft:Slightly 7 weathered,strong (R4)Ni\is Ni i |295 XY @J,PL,R.Ca 80°--_]- t Run 57:DrillNyRate=7 ¢min/ftNiRa|SW 295.6 tt: -st UCS =5 Wy 13522 psiwt Na ; i ay @ |J,U,R,Stained 65°4 a 5.0vv50\57|100%@ (J,PL,R,Ca/CL 60° NM 7 100% Ni vy<4 Na vr a 299 -299.7 ft:Broken core 4 4 NY vvay r ', -300 NM fr24o || Log continued on next page WATANA201Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO.pritter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 VW13/15richarpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetna Mountains,AK CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 EQUIPMENT:Burley 5500-3 RECORD OF DRILLHOLE DH14-9b DATUM:Ground Surface APPROX.ELEVATION:1500 ft APPROX.COORDS:_N:3,226,738 _E:1,884,902 SHEET 16 of 35 INCLINATION:-60° AZIMUTH:170° r-305 7-310 -315 -320 Log continued on next page a Mien Bo Berete Ep-Epidot Sedusnaf--Q F-Fault K-Sickensided FeGehen Oxide SaSand"©DiametralEiale|.(wer sige Shor Sortie Sot”|poe.w 8 Oe]&LR Fracture VALVery Rough MUSilt Susupnice |Son %NouESgDESCRIPTION29ti2)es DISCONTINUITY DATA z= |. capo ESTS 2 =z |=|2/66 ao xisx|tox x WATER LEVELS ax &|ee/o)C9)Rap TYPE and F,|Seu|Tzu SASS pfe}e/w-|5)&%SURFACE $6 |2e2/ag2(Senc &a 9 «BB2a OESCRIPTION FS 5 owen wv 300.0 -683.3 300.0}J,PL,R,Ca 55°Run 58:Drill DIORITE:Greenish gray to °Rate=10 pinkish gray,phaneritic,S,K,SM,Ca 20 minstt medium to coarse grained,, fresh to slightly weathered J,PL,R,Stained 40°\\4 (FR-SW),and strong to very ° strong (R4-R5).Joints are J,PL,Healed 25 . rough to smooth,planar to Sy stepped,Ca healed or \ J Ca/clay infilled,and close towidelyspaced.98% 300.0 to 330.2 ft:Fresh,very PL,R,Ca 20°_ strong (R5) PL,R,Ca 25°4 PL,R,Ca 70°4 Run 59:Drill Rate=8 min/ft 306.2 ft:Joints become widely 27 4 iM 0°5 |Spaced 27 |100%PL,SM,Ca 60°kL i2 = a a4 2 £ 2 Run 60:Drill 5 Rate=10 7 o min/ft 5 end 9/6/14, a)749%start 9/7/14 g °®/PL,R,Ch 65°: 4 S 3 WPT:©]309.3-309.9 ft:Broken core @ |J,PL,R,Ca 70 DH14-9b-12 £er (310.0-330.0ft) +R5 |FR = oO oO = a2 =4 e Run 61:Drill 2 Rate=12 =minft 2 4 &5o 100% a ©4 £J,PL,R,Ca 50° © to) J,PL,R,Ca/CL 20° e J,PLR,Ca 15° Run 62:Dritl "Y Rate=17 mint 5.0 1 5.0 |400% -z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pritter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 17 of 35 INCLINATION:-60° AZIMUTH:170°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902faly,.Shape Roughness intilling Py-Pyrite @ Axialro)J-Joint B-Bedding PL-Pianar PO-Polished Bt-Biotite Ep-Epidote.Qtz-Quarz . ¥F-Faut FO-Foliation -C-Curved K-Slickensided Bx-Breccia. FeOx-Iron Oxide Sa-Sand C Diametral zt 15 a |Ble Viven' GR-Onhogenal St-Soppeg)Rough Chenente rePeate =Saat |bePe3S|He]&|errractue Tiveguar VALVery Rough Ga-Caleta)-MI"Silt SuSupnide |F353 NOTES wu 16 DESCRIPTION oh 2)2s DISCONTINUITY DATA =sak TESTS a =z i|zx 2 5 t WATER LEVELSz&|es!/2!88]roo |rractures |En TVPE and Q lSSS/ESS A aExx@|g=/3;/2)«%PERFOOT |20%SURFACE 22 |O09|S291 g ¥N8fo)s Oo z c oot <9 |xacZ Zs,oO Nee|309 a S898 |nro we Pag &DESCRIPTION 7 5 were z 300.0 -683.3 , Run 63:DriltDIORITE:Greenish gray to +._!Rate=7 pinkish gray,phaneritic,\min/ft medium to coarse grained,| a fresh to slightly weathered ' J (FR-SW),and strong to very |,"74 °J,PL,R,Ca 30°strong (R4-RS5).Joints are { rough to smooth,planar to N \L stepped,Ca healed or /. 4Ca/clay intilled,and close to ||5.0 @ |J,PL.R.Ca 60°widely spaced.(Continued)|.63 5.0 100% \|100% N Ly | \ | L-\ 4 I / | \e J,PL,Ca,Healed 30° |oa °--325 vo *4 PLA,Ca 50°KN |ns |FA Run 64:Drill \N Rate=8 re e||Ju PL.R,ca 15°mint .|4 . N @ f 7.o \z | a $XN 4 g L/ 5.0 =64|59 |i100%NX _Ly 100% a o \4 3 &N a ie L @ '-| &\@)|J,PL,R,Ca 45°but 9b-13:f /J _ g \(330.0-350.0ft)|329.7 -330 ft:Broken core | a nN \ 4330Oorv.1 G|330.2 -337.2 ft:Slightly \=|weathered,strong (R4)|2]|3 . =2 ir /.|R D 7 un 65:Dnillgi2.|Rate=6£=L ,minéftae].an=a D>i}0 o 7 rm 'S|332.2-333.9ft:Brokencore {|»35 ®|J,PL,Ca,Healed 65 3 9 on 65/>98%y 3 8 .100% |ig £ro? a 2 iv 4 S ! z o \R4 |SWEL333.9 -334 ft 1 inch thick matic [,/ +@ |J,PL,SM,CL 50° 4 =dike | -N ao] yt \_|xf 335 ,Run 66:Drill <brn @||J,PLA,Ca 40°Rate=8ooyy\ minft x =' -z a ©336.4 ft:Becomes closely jointed fl @;||J,PL,R,Ca 40° x N @ |J,PL,R,Ca 50°aL rv | a <\5.0 @ |4,PL,R,Ca 50°Zz 337.2 -343.1 ft:Fresh,very |50 ;S strong (RS)>66 100%|J,U,A,Ca 30°. =\|100%; l . 7 Pa 338.2 -344 ft:Broken core .\. |'°5 uo @)|J,PL,R,Ca 40 ps |FA ics a \N 4 a r 7.rr \ -\ '" =[7 -340 Log continued on next page WATANA201Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO_pritten:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 18 of 35 INCLINATION:-60° AZIMUTH:170°1/13/15richarpd-345 -350 [-355 r-360 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:N:3,226,738 __E:1,884,902 a Joint --B-Bedi ace poRersd Bement Ep-Epidot Oe Cuan @ Aval 2 PFaot --FOFolatan «=OCuved =KSiworteded Bx Breckia--Eeoreront Sasa |__C]Diametral im >lo wen OR Ortagonal sresno Bae Gh cherite HereHecratite 3 eect oe.3 8 Bl)&[pe Fractue Frreguar_V-Very Rough Ga-Calcie__ML-Silt suSuipride |ZH RB wraseoODESCRIPTIONgk2]ge DISCONTINUITY DATA x |, aap Zz z iz |2/966 =a7 visx|tox WATER LEVELS =ajte =|50 RaD FRACTURES ae TYPE and =SSulezu &SSH5aja|/5;2]%PERFOOT |29%SURFACE a8 |OG9)S29)8 2N5 a 6 |°|&889R|veo oe PS Ba DESCRIPTION s-|b |*"gezege =300.0 -683.3 L Run 67:Drill DIORITE:Greenish grayto -,_|Rate=9pinkishgray,phaneritic,\min/tt medium to coarse grained,N !fresh to slightly weathered ; 4 (FR-SW),and strong to very |,°7] strong (R4-R5).Joints are |R5 |FRroughtosmooth,planar to \4.9 :stepped,Ca healed or ae 67,49 |100%e J,PL,R,Ca 30 J Ca/clay infilled,and close to |° ,widely spaced.(Continued).100% i?4 \4 343.1 -344.3 ft:Slightly N weathered,strong (R4)rev. v @ |JJ,PLA,Ca 30°na |sw '+344 ft:Joints become widely Lspaced vo @||y,PL.Ca,Healed 40°\344.3 -345.9 ft:Fresh,very (J,PL,Ca,Healed 40 aN Run 68:Drillstrong(R5)|y |N Rate=7 \ i R5 FR min/ft % |3.7v437 |100%345.9 -346.4 ft:Slightly | 68 2 a _|weathered,strong (R4)N 100%R4 |SW2346.4 -375.9 ft:Fresh,very can=|strong (R5)|e J,PL,R,Ca 20° =NX _3 a F '| . |Run 69:Drill =io Rate=10 7 Fs |min/ft&|348.4 -348.8 ft:Coarse grained |*2.6)xenoliths fr 7 23 °vO 69 100% q S \100%WPT: 2 by ||U,PL.SM,cL 40°DH14-9b-14 =v (350.0-370.0ft) AN \\4 g fi osxi| QO N 3 1/4 1 i Run 70:Drill 3 N Rate=8fsL,minft :|end 9/7/17, 2 !art 9/8/14 4 =N 5.0 start 9/8, 3 r/ -} |70}59 ||96%8 |100% | g r 7 R5 |FRwo\id \"a "N f /.4 \ | ' OO @||J,U,R,Ca 40° \| NN [7 J \ \ \Run 71:Drill \Rate=10 J by min/ft \ i by _|| an 5.0 |71|>|100%387-7-358.2 ft:5 Inch thick felsic 4 ;100% | N t | \ \ '= Ly | \ \ 'N t ||Log continued on next page WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}-Z SUSITNA-WATANA HYDRO_paiter:8.Edmonds DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 19 of 35 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.738 _E:1,884,902 a Be B-Baddi PL-Pi BovBouared or oon Epidote Sedan ©Axal;i "|oll :2 FFat FOP «=CCumed -sKBlcRensaed Bxbltia EE ide Seay C Diametral x |alg]_|S Rote Gea pase”Ce aoe.Set coeFols8Sw)&|Fa-rrecure Fereguar_VR-Very Rough CaGalets MICS srSuphice |259%NOTES wu 1o DESCRIPTION oR 2|#Y DISCONTINUITY DATA xz |.oe TESTS ao \2 Zz /E_|2)99 Eu a-y5xitox WATER LEVELS c a =5|/°°ROD FRACTURES |§ww TYPE and oo Sen Eze A KR .fe}eju-i5)ge)%PERFOOT |20%SURFACE &O |/@r2|Wh2|Aexe R60ao«BSIB|vw ewe Pe eW DESCRIPTION g 5 leeso 9 & 300.0 -683.3 .Run 72:Drill DIORITE:Greenish grayto |,_|Rate=7 pinkish gray,phaneritic,min/t medium to coarse grained,| r fresh to slightly weathered '4 (FR-SW),and strong to very os strong (R4-R5).Joints are I rough to smooth,planar to \o J,PL,Ca,Healed 35° |stepped,Ca healed or a @;|J,PL,Ca,Healed 40 -| Ca/clay infilled,and close to \5.0 \ '4 \widely spaced.(Continued)|.72 5.0 100%\ fo i 100% 7 'N Ly | | a \4 Ly ' 'N a Pos 4365Aun73:Drill \e J,PL,Ca,Healed 10°Rate=8 7.minstt LL |4 L \®||J,PL,Ca,Healed 45° 2 fr 74 ao3 |366.7 -367.7 ft:Broken core \ L s \4 g _5.0 £73)©9 |100%=N 7 i roy 100%rs |FR J oD 3 | &\ 3 Vr a @ }4 8 \WPT: °am DH14-9b-15, £(370.0-390.0ft) +! +-370 |%'4fo)|w oO 5 =! x 2 ' FL g 7 4]r \Run 74:Drillz2NRate=8 £fy t ,|mint =D>fl 4 rn 5 .5.0 a (3)72 fe Joints become closely 4 74|5-9 |198%,bs J,PL,R,Ca 20° [a]Fe31©!372.8 ft Joints become widely |.100%@;jJ,PL,SM,Ca/Ch 40° |ra |spaced | a ©\, <s 1 Zz o N EL ,.4 4< =| -|N a /e J,PL,R,Ca 20° x 975 .|Run 75:Drill 4 <?Rate=11 a minéft =375.9 -378.6 ft:Slightly N end 9/8/14, &Ro a .;HH /4gweathered,strong (R4)ros start 9/9/14 go it S 376.7 -378.0 ft:Broken core .aL 4 s 5.0 :R4 |SW=.75|59 1!gee<; 6 »|[J,PL,SM,CL 35° 2 , 100% >\ 5 rs Aa 378.6 -391.7 ft:Fresh,very strong, SL (RS)\_| N /=7 R5 |FR-\ N }fm380Logcontinuedonnextpage _WATANA201Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO priter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 20 of 35 INCLINATION:-60°1/13/15PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 a Type .hness lnfiting J Py-Pyrite @ Axal 3 Pee poem,ley OB,BSE,Se Soe"|CoanexdG2laVian”GRonhogenal StSeped”though Ehennte Aineatte Seis 502Fe=g Yu)&|FRFractwe Firegular VR-Very Rough Ca-Caloite.-ML-Silt 3 Sulphide Zhu!NOTESwe16DESCRIPTIONo4a]ee DISCONTINUITY DATA =x aay TESTS o \2 z=Z_|2|89 =a vigx|tox WATER LEVELS 2 a lbs ratat RQD FRACTURES |3H TYPE and r Szu Ezy &BSS5#iu-/5;#2]%PERFOOT |20%SURFACE &8 |OBS GeSi gens|38042 6/9 |e 882g|arene PS eh DESCRIPTION e |"E°|*""pose a = 300.0 -683.3 i °Run 76:Drill DIORITE:Greenish gray to b 5 |Rate=6 pinkish gray,phaneritic,\min/t medium to coarse grained,! -fresh to slightly weathered 7 (FR-SW),and strong to very |,47> strong (R4-R5).Joints are \ rough to smooth,planar to \ a stepped,Ca healed or l " bh J,PL,R,Ca 20°4Ca/clay infilled,and close to |5.0 bd J,U,R,Ca 15 widely spaced.(Continued)|.76 5.0 90% VO 100% -380.0 -380.5 ft:Very closely |4 spaced discontinuities L ;a ' ='N 4 r \/ ! >@ |J,PLR,Ca 65° 1 385 vo Run 77:Drilt "| N Rate=8 t »|min/tt a v RS |FR 7 N 5 bei]\ ='|.5 \ J £4 5.0 £77|9 Il |94% ' 3 |*100%@ |J,PL,R,Stained 60° was NS 4 2 i &\ fa]ir os J 8 |®|J,PL,Ca,Healed 55°WPT:1 :oa @||J,PL,Ca,Healed 45°DH14-9b-16 s uo (390.0-410.0f) 390 |©. 4 a aie}\ =! \ i 3 i Run 78:Drilt 7 Ld J,PL,R,Ca 0°un 78:Drig|3 \Rate=6 2 .minft|991.7-394.3 ft:ALTERED ao @ |S,K,SM,Stained 70° =>DIORITE,moderately weathered,1 47 q '=|medium strong (R3)\478t7}|78)**|100% a 100% L °.R3_|Mw 4 &f 7.z | oO \ F 394.2 ft:Becomes closely jointed 1 6 lspLoma 30° 4 394.3 -396.1 ft:Slightly \ weathered,strong (R4)7. |395 \@ |J,U,R,Clean 60°A _| |@ ||u,PL.SM,ch gor,RA |SW\|27 e J,PL,SM,CL 20°\F 396.0 ft:Joints become wey |>|[79 #7 |100%®|J,1,R,Ca 65°\Run 79:Drill 4 see 409.6 ft:100%Rate=10 1+.6 ft:Fresh,very 1 minfftstrong(R5)N =\/ 4 | N L \ a !R5 |FR Trip out to 7 r ;|5.0 change bit '|80]°°|hoo r >100%Run 80:Drill 4 an Rate=9 |min/ft N }-[7 | 4400Logcontinuedonnextpage WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}_richarpd---zw DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux SUSITNA-WATANA HYDRO priter:B.Edmonds Subsurface,Inc. LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 21 of 35 INCLINATION:-60° AZIMUTH:170°1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902OoType;Shape Roughness infilting Py-Pyrite @ Axial ,B-Beddi :.-; :Q FFaur FO Folaion =C-Cused -KSlickenaned ©ExBracia EoGitnOxide Sargamy”|_C]Diametrat x |i zie Gen”GROrhegonal St-Slopoed thou ---GhEHrte |Hortctante -Sesnea soe.re 3 8 a Wy] &|FR Fracture kirregular VA-Veny Rough GaCaicle, MLSil $u-Sulphide FS ao ral weenewu16DESCRIPTION9t-42|2s DISCONTINUITY DATA z=|opa|¢={xz |}2|33 Sy 3]x$x|tox!«<<<WATER LEVELS =2 |ce OO |RAD |FRACTURES |Ean TYPE and Fo |SZe|czy NORA wo5=|u=)5]/B)%|PeRFOOT |aGZ SURFACE £8 |989\Geoisens &..400-2 6 )o |&23292|we owe Po DESCRIPTION e |"5 |?"eese gz 300.0 -683.3 \ DIORITE:Greenish gray to t +|pinkish gray,phaneritic,\ medium to coarse grained,.!50 a fresh to slightly weathered =|50 , 4 (FR-SW),and strong to very |,">80 100% strong (R4-R§5).Joints are \100%° rough to smooth,planar to N °@||J,PL,Ca,Healed 40 .stepped,Ca healed or a @ |J,PL,R,Ca 55°KA ; I Ca/clay intilled,and close to \ |N Run 81:Orill widely spaced,(Continued)N Rate=5 ty |min/tt \ L ;4 N ty | \ ; e J,PL,R,CL 30° a \4 ie ®|J,U,R,Ca 65° \!5.0 |408 a1!59 |400%R5 |FR | {400% \ +,_| \ L ;4 ' 5 t 7. o \ =1 _r=S 4raL>@ |,1LA,Ca 60° =vo ™ = =|Run 82:Dritl a rez Rate=7 a s \ ,min/tt q 2 .26 &t7-4 [sz]2 |100% r g !100%.48|409.2 tt 2inchthickhealed |®)|/SH,U,CL,Healed 15°DHT 90-17&|breccia zone -(410.0-440.0tt)s+|409.6 -411.6 ft:Slightly ! :, +410 |"|weathered,strong (R4)4 3 in 7.®J,PL,Ca,Healed 35° =|Ra |sw |8 ty i:'0 ' |Run 83:Drill 2 N ®J,PL,Ca,Healed 30°Rate=7ariT|Soya ener io \end 9/9/14, -2 !end 9/10/14 4 N 5.0 °74 |a3}9 |hoo ; 8 |100%aaeeen |ec LPs voin'"3 N a r 4 | NN ty | \ L415 .!Run 84:Drill 7 rv.Rate=7 \®|J,1,R,CaCl 65°mirvtt 1 °R5 |FR L 415.9 ft:Joints become very \@ |J,PL,SM,Ca 55 4 widely spaced \/ | '\ = r 7 J '|5.0 .84}59 |'yo0%I >| \ \ 100% | N 7 | =»4 LP \ | N /wl - 420 Log continued on next page WATANA201-y SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 22 of 35 INCLINATION:-60° AZIMUTH:170°1/13/15richarpdLOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 a ty .Shape Roughness Infitling Py-Pyrite @ Axa 8 PE poems,Eis REE,GE.Stet SEE |Sommers z |&ze],[vert Rotem Seep Be”ee,See Bae”|coeFe38a]e1 &|Freee Fereguiar Vi-Very ough Ga-Calete-ML-Sitt Su-Sulphide 58%q NOTESw=|6 DESCRIPTION gk 3]ge DISCONTINUITY DATA =aap TESTS ao |2 =1z_|2)'831 gon |pracrunes [Eu a]xBx|tox!x xx WATER LEVELS a &|2e/2/°3 Fa TYPE and Tq |S2u|a24 &ARSfo)a |wr|S w %PERFOOT |2O%SURFACE 26 [raz 252)8 ero a 9 =S8gRi nwo oe PS eh DESCRIPTION e-1o5 aU"ooze z--420 300.0 -683.3 7 Run 85:Drill DIORITE:Greenish gray to ty |Rate=7 pinkish gray,phaneritic,min/tt medium to coarse grained,| fresh to slightly weathered >+ {FR-SW),and strong to very |,°7 ° strong (R4-R5).Joints are ;@ ||J,PL,Ca,Healed 30 rough to smooth,planar to N stepped,Ca healed or a 46 . | Ca/clay intilled,and close to |' |46 5 \ widely spaced.(Continued)N 85 100% r 7.100% |e||u,PL,Ca,Healed 45°| 'N L >| \ ' »= ty _| \ \ 424.7 ft:2-inch thick matic dike |*°J,PL,Ca,Healed 15°Run 86:Drill i 425 4 Rate=9 - |minft N Ly | \3.1i 4 .86|24 100% s crip ap.[OO 100% 3]426.6 ft:3-inch thick matic dike \ 5 s J @ pr 7 =an3.. _ror ol Run 87:Drill $\ ; Rate=8 4 2 min/ft 5 | a on 2 \-| 8 N s re +\ -430 |©|*34 R5 |FRSg\/ 87|100% PL p ,'° z=!100%J J,PL,Ca/Py,Healed 30 QD2 } e an \7 2 \\ 2 \ F in /.e J,PL,SM,Clean 30° 2 i = 'S|432.2 ft:1/4 inch thick feldspar ' O|vein !+ a I \ . [o)N Run 88:Drill ¢by Rate=7 7 §a minftisd\ oO \433.5 ft: aa Direct Shear \ 4 \@ |J,PL,SM,Ca 60°434.4 ft:Becomes closely jointed |L | |495 434.8 ft:Joints become 5.0 @ |J,ST,SM,Ca 60° | moderatety spaced .88 5.0 100% ro 100% | »4 t | |.@ |J,PLR,Ca 60°KL \ 4 i N ty | \Run 89:Drill N 'Rate=7 4 L min/ft '2.3\ \33 8 J,PL,CL,Healed 60° .89)<<"|100%e 4 U,R,Ca 60°] r,/100%|J,Pi,SM,Ch/Ca 60 _- ' L *J,PL,Ca,Healed 60° y_440 Log continued on next page °WATANA2014LOGS11-24-14.GPU_WATANA2014GINTLIBRARY.GLB_[WATANADRILLHOLE]yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO _pritter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 23 of 35 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 oa Type . .Sha ughness infilling ; Py-Pyrite @ Anal 8 ies pore,ly Ree,Bees,een Sae |Coanez(6 zle|_HS,Rose.Gear Beer”ee aoe See |soe.cso x 8 SH)Q) &|FRFracue Pkregular VA-Very Rough Ga-Calcte-ML-Silt su Sulphide 388 Ea veersREISDESCRIPTIONg#43]vy DISCONTINUITY DATA zl.ae WATER LEVELSfa)Zz x {=Zz}99 Eu [es]xox |EOx|x tayiraafe3|os ROD FRACTURES Ero TYPE and Iq |ozs gow 1 BBAi@/w=|3|2 %PERFOOT |25%SURFACE 6 |eH2 WEZ |B ExesoooaSBER|ve 0s Pegs a DESCRIPTION £5 pore z440300.0 -663.3 L "J,PL,Ca,Healed 507 WET: DIORITE:Greenish grayto +,|°DH14-9b-18 pinkish gray,phaneritic, ,J,PL,Ca,Healed 45 (440.0-470.0ft) medium to coarse grained,° r fresh to slightly weathered r J,PL,Ca,Healed 40 Run 90:Dritt 7 (FR-SW),and strong to very > °2.strong (A4-R5).Joints are J,PL,Ca,Healed 25 Ratesroughtosmooth,planar to end 9/10/14. -stepped,Ca healed or [.7 start 9/11/14 4 Ca/clay infilled,and close to j 5.0widelyspaced.(Continued)»90 5.0 98%R5 |FR |100% 4 r,/ - : Joi 1 J,PL,R,Ca/Ch 30° i 4437 4 443.8 ft:Joints are closely %y PCR Ga aeo4 | 443.8 ft:Joints become widely =f / | spaced | 444.8 -446.1 ft:Slightly @ ||J,PL.Ca,Healed 30°\ 445 weathered,strong (R4)}br vid 7 j \Run 91:Dritl \Rate=7 L >|Ra |SW mirvft &|@ |J,PL,R,Ca 55°4 446.1 -464.1 ft:Fresh,very&|strong (R5)7 .| Co=l x== =\91 .100% =100%°J,PL,Ca,Healed 30° |.=r./4 \ 4 3 I =@ |J,Pt,R,Ca 55° g L ,5 | .©i 4 ko](o)L £ x ! 3 Run 92:Drill[450 |_-|450 ft:Joints become very widely |'@)|J,U,A,Ca/Ch 45 Rate=7 FJ wo Gj}spaced 4 min/ft ==z \5 = x o cad 3 rv 4 - \°g 3 |44 @||J,PL,Ca,Healed 40 S '4 92}*'|100%S -|_2 100%\4 |8 7 2 a aL °R5 |FR 7 iva £p 7 @ |J,PL,SM,Ca 50°=)©<x S t z oO ZL r 7.Run 93:Drill 4 =|Rate=6=.min/ft a r 7. Lo>fr 455 |I i é ny [|a8at93}4°|100%ar brn 100% 1 S \= aL r 7 4 <Zz ' <E L< Ee ;Run 94:Drill 4@|J,PL,SM,Ca 55°Rate=7at7|min/ft[or]5.0 J,PL,R,Ca 55°=!5.0 a 94 98%4 o r./4 100% -\ N = r 7 4460Logcontinuedonnextpage WATANA201.-z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO onitter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 24 of 35 INCLINATION:-60° AZIMUTH:170°V/AIB/A5ticharpdLOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burtey 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 Q |j Shape Roughness tnfiling By Pynte @ Anal g EYgut_POrotatbn =E-Cuved «KCBickoreded ©ExBrocla ESO Ren Oxide Serene”|CI Diametral x {i z\e vive Sanogoral ST-Siopped hough GhEHte reeemaite «=Sse |bap?Fo|3 8 Ww)&|pRFracture Frregular VR-Very Rough Ga-Calcite ML-Silt Su-Sulphide Z8 ae NOTES w=|o DESCRIPTION o Yds]ye DISCONTINUITY DATA Fa aoe TESTS 5 |3 2 fz 13/3538 =oT vbx|tox WATER LEVELS =a@jFelZ/oo]Rad FRACTURES |Eto TYPE and 2,|SSaleSa|A SHA©2 iG=|2| e]%PERFOOT |26%SURFACE 28 |us)Gz3/8en5seo426|°|/&889Rg|n 0ne bogs DESCRIPTION em [TET |E 8 pesoa = 300.0 -683.3 a DIORITE:Greenish grayto +,_|pinkish gray,phanenitic,\° medium to coarse grained,|°J,PL,SM,Clean 9 -fresh to slightly weathered |5.0 7 (FR-SW),and strong to very |,'>|94|59 |loge,strong (R4-R5).Joints are \4 °@ |J,PL,Ca,Healed 55° rough to smooth,planar to »100% &stepped,Ca healed or ros i]as |ER | Ca/clay infilled,and close to |' ,widely spaced.(Continued)N fs i \ ;Run 95:Drill -f \Rate=7 L |J,U,R,Ca 45°minét 'y J,PL,R,Clean 45° a NN - 464.1 -465.9 tt:Slightly r 7d °R4 \U,R,Ca 45weathered,strong (R4)|a J,U,R.Ca 50°|»©J,PL,Ca,Healed 50°). 465 vq $.0 |}R4 |SWfl955.0 66%e SH,PO,Ca/CL 30° N rv il 100% L.465.9 -472.4 ft:Fresh,very |4 strong (R5)\\ 3 bs $\ \ 7 5 .4 a f 4£,ee J,U,R,Ca 30°$7 J,PL,R,Ca 65> a co roy ol Run 96:Drill 4 g vy Rate=82Nymint a b 6 \/.t +2 \4 3 'R5 |FR <I,7 @ |J,PL,SM,Ca 50° <| 470 |'5.0 ®|jJ,U,A,Ca 45°\ . 4 3 pov.5.0 WPT: g \96 100%DH14-9b-19\ 2 \100%@ |J,PL,R,Ga/GL 45°(470.0-510.08t) a e on 4 ®| 2 » e ros a D>\ || Cc §N OG]472.4-473.5 tt:Slightly r.7 @ |J,PL,R,Ca 55° Q|weathered,strong (R4)| a °472.8 -474.8 ft:Broken core Ny R4 |sw Run 97:Drill 4 £rv Rate=7 2 \ ;mirvft |473.5 -476.8 ft:Fresh,very Nstrong(R5)Ly a an 4 I NX I./ -475 !5.0 on R Fl|>97]°9 |100%5 |FR \100%| 5 475.9 -477.8 ft:Broken core \ 4 r 7 i] \ I N 476.8 -477.6 tt:Slightly t ,_|[weathered,strong (R4)},many \7 healed joints .|R4 |SW 477.6 -480.5 ft:Fresh,very P 7. i strong (R5)'Run 98:Drill 4 \Rate=10 r 7.min/ft vO 22 i \98]2 |100%RS |FR | an 100% | N r ¢ws -480 og continued on next page WATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}-z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO _pnaitern:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetnea Mountains,AK RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 25 of 35 INCLINATION:-60° AZIMUTH:170°1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE](tt)DEPTHi 485 r-490 T 495 + 500 APPROX.COORDS:_N:3,226.738__E:1,884,902 T i 7QJfrt-_B-Bedding Biter POoiee Ebon Ep-Epdote Seda oon= |Git Seite Sing Sage geese Geto Bare,|ioenetsi8rif[aad V-Vein OR-ST-St -R-Rough ChGhibrite Hoe Hematite Si-Silica 5 =]2 =NOTESSie}Z yu &|FR-Fracture irregular VR-Very Rough Ca-Calcite =ML-Silt Su-Suiphide fa $g EA TEST9gDESCRIPTIONSh2]eS DISCONTINUITY DATA x aae STS >Fiz |23155 =Oo xisx|tox we WATER LEVELS =a lFs/2!6o]Rap |FRACTURES |Sita TYPE and S.,[osu een |AaSR yg&|h=/3)B]%|Penroor |a5%SURFACE a |Qeo/gee/Ssn5 8[val G |9 a BBeR|nr owe o°o F DESCRIPTION c*5.=_gere 2 = 300.0 -683.3 io rs |-R Run 99:Orill DIORITE:Greenish gray to t 7.Rate=7 pinkish gray,phanenitic,min/ft medium to coarse grained,|end 9/11/14, fresh to slightly weathered ' ° start 9/12/14 7 (FR-SW),and strong to very |,">|@ |iJ,U,R,CaCl 30 strong (R4-R5).Joints are | rough to smooth,planar to \° stepped,Ca healed or ["7 q J,UR,Ca/Cl 25 4 Ca/clay infilled,and close to \5.0widelyspaced.(Continued)=)g9|59 |.He%@/J,PL,RCL 75°R4 |swfo4 480.5 -484.5 ft:Slightty ' 100% |weathered,strong (R4)°481.2 ft:Joints become closely |'bai J,PL,R,CL 20 spaced os @ J,PL,R,Ca/Cl 50° 482.7 -483.9 ft:Broken core |" 482.5 -482.8 ft:Series of mafic |>4 veinlets at 30 degrees with - respect to core axis | 484.5 -501.4 ft:Fresh,very \ strong (R5)/.4 |Run 100: .Orill Rate=9 ty _|min/ft 486 -486.5 ft:Broken core .|a 5 be @ |u,PL,R,Ca 60° og .3S | £N @ |J,ST,R,Ch 60°KL 4 £a 5.0 £1}frog,5 |e6%eo sore\,PL,R, *Ly |100% | z 5 .@ u,PL.R.Ca =a|489.0-490.6 ft:Healedbreccia |@ |u,PL,R,Ca J 8 |489.2 tt:Joints become widely s ®J,PL,SM,CUCa |spaced ¢ |489.4 -490 ft:Matic matrix with [|os |diorite clasts L yf Run 101: 7] g Drill Rate=7x=|min/ft D ' 2 | & F roy @ |J,ST,Ca,Healed 50° 2 7 ;.1 [-}L 50 R5 |FR1.)os 101}>88% 8 |100%:c|493 ft:Joints become closely L , bd J,PLR,CL 30 _ @|spaced 4 NS \hed J,PL,Ca,Healed 40° oO |s @ ||s,PLR,ca 30°\\494 ft:Joints become widely 4 Ld J,PL,R,Ca 30%4 spaced | NN Prova Nn Run 102: ] r 7.Orill Rate=9 ;min/ft XN 4 t | 1 _ ae 45 @|J,PL,Ca,Healed 70°4 i}foal 45 |is00%.- \ boy 100% fl 4 | \@ |J,U,R,MnOx 60°| Ly |N {Run 103:[om 103,82%Drill Rate=7 _ Log continued on next page WATANA201-yzw DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO_priter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holiand CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 26 of 35 INCLINATION:-60°1/13/15ticharpdPROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 __E:1,884,902 a Jin,B Bea BLe Boeuetes BrBotte Ep Epidot Oedusn @ Aaa Join ¥z Poh:|;g Fesuk -FOfolatyn «=Lured KcSckenaded ©Be Grecea-FeGetont sa sand |_C)Diametral x |b zl],[fer RSttinw Sethe Bee”oe,See Soe |ceeFe38awi&|FA-Fracture brreguiar VA-Very Rough Ca-Calcte -MUSilt Su Sulphide 3 ES 8 g 'cersw=lo DESCRIPTION @ |=2)we DISCONTINUITY DATA Zl,oor WATER LEVE!Oo |Z =/=.)2/88]rao |rractures |Sy QS lS9s/ESa|a maK LEVELS a &lazZ|z2 og 2a 2 TYPE and roa 82a <Zalaqne 8ral@ju-|3|¢%PERFOOT |20%SURFACE So |@az/"G2 |S ane is|s00 a o =B882R|n+ewe Pe eh DESCRIPTION x 5 loere wr 300.0 -683.3 .min/ft DIORITE:Greenish gray to 7.pinkish gray,phaneritic,rs |FRmediumtocoarsegrained,! -fresh to slightly weathered '4 (FR-SW),and strong to very ' strong (R4-R5).Joints are | rough to smooth,planar to s 6 a stepped,Ca healed or /.5.0 : | Ca/clay infilled,and close to \103 5 |{gpe,®|J,PLR,CL 65 widely spaced.(Continued)N ro)R4 |SW ,|100% 501.4 -503.2 ft:Slightly i weathered,strong (R4)N |7 502.1 -502.5 ft:Very closely spaced discontinuities /@/J,U,SM,CL 75° 502.5 ft:Joints moderately I a spaced N = 503.2 -505.2 ft:ALTERED 7.R3 |MwDIORITE,moderately weathered, medium strong (R3)1 . 503.5 -504.5 ft:Very closely .Run hoes =spaced discontinuities /|{ = |505 503.5 -504.5 ft:Joints become ;@ |J,PLR,Ca 65°min/tt very closely spaced N504.5 ft:Joints become ymoderatelyspaced > i 505.2 -516.2 ft:Slightly ;4 weathered,strong (R4)N 5 /.8 J,PL,SM,CL 60° g |5.0 J,U,R,Clean 60°] :%.104 59 |loa ca 4 i 4. =100%£; °@ ||J,PL,Ca,Healed 30° 3 N \ a = /.|| s o |@ |J,U,R,Ca 55° €' 8 /5 a a @ i 4 8 'WPT: |809.4 ft 1/4 inch thick |(B09.4-669 att=|quartsfeldspar vein @ |J,PL,SM,CaCl 60° - 510}s 4 g =\ \R4 Run 105: 3 /@ jJ,PL,SM,Ca/CL 55°Drill Rate=9 +2 min/ft a ©I a N F '5.0 5 2 105,59 |Jaze 4 3 am 100% a}512.6 -513.5 ft:Broken core 'Sw g °N 4 £/. id |@ |J,PL,R,Ca/CL 65° ro)\@®/J,U,R,CL 65° 5 7 4 \ .@ |J,PL,R,CL 60°Run 106:"|Drill Rate=4 H 515 7 mint 7 ¢end 9/12/14, "start 9/13/14 I }-'4 /@ |J,PLR,Ca 55° 516.2 -519.5 ft:Fresh,very > strong (R5)1 s 5.0 :"4 Hoe 59 |100%4 |100% 7 F ;@ |J,PL,R,Ca 60°RS |FR z ' , /. \ l 519.5 -519.8 ft:Slightly .| weathered,strong (R4)” 519.9 -528.8 ft:Fresh,very |Ra |Sw Run 107: 500 strong (R5)a”107]100%P|aS)FR Drill Rate=11 | Log continued on next page WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]--zZ DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pritter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 RECORD OF DRILLHOLE DH14-9b SHEET 27 of 35 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 ; DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 a Sort Bedding Piien POSueed --BeBome «Ep Epidote eo |©anal 2 FFaut FO-Foliation C-Curved --"K-Slickensided Bx-Breccia. FeOx-lron Oxide Sa-Sand 0 Diametral x |i Pa Gen”GAortogonal St-Siepeec”Reon heNbite |Hmtetaite Sse |FOP =Fe =8 z w 2 [FR-Fracture krregular VB-Very Rough _CaCalcite_MUSitt Su-Sulphide FS g 3 g Neueuw16DESCRIPTION2-4 2|es DISCONTINUITY DATA =].cako STS (a)z =1z_/21958)|pop |ecracrum eu Z-xbx|tox|x xx<WATER LEVELSxajael>/eo RACTURES |sq2 TYPE and Eq [Sze Eza/NBENfe)e/e-|5)@&%PERFOOT |293 SURFACE a8 |QUS Gao exis & 300.0 -683.3 ' PL,SM,minft DIORITE:Greenish gray to t '_pinkish gray,phaneritic,\ medium to coarse grained,| -fresh to slightly weathered '4 (FR-SW),and strong to very |,' strong (R4-R5).Joints are | rough to smooth,planar to s a stepped,Ca healed or /.5.0 @)||J,PL,Healed,Mafic 40°\4 Ca/clay infilled,and close to 5.0 widely spaced.(Continued)[|107 100%\ ,_100% 520.5 -521.2 ft:Broken core \@ |J,PL,SM,MnOX 65° 7 N 4s .,PS 520.6 -521.4 ft:Healed oo brecciated zone,matic matrix with | Z diorite clasts '4 521.9 ft:1.5 inch thick mafic dike |7 |R5 |FR| 524.5 -525.5 ft:Broken core N Run 108: |525 vol ®||J,PL,SM,Clean 45°Drill Rate=18 |525.0 -525.5 ft:Occasional pink |minift feldspar N @®(J,PL,R,CaCl 55° vo a |4 &|526.3 -526.7 ft:Reddish pink >|45|feldspar 453|108 *%e i £\ a J,ST,8,Ca/CL 30°J 3 ?|100%\ £, 3 \ EB 528 ft:1/2 inch thick fekispar vein ,a e J,PL,SM,Ca/CH 30° 7 QD&]528.8 -532.2 tt;Slightly ,OG |weathered,strong (R4)7 t+@|528.8 -529 ft:Very closely (4 8 |spaced discontinuities N Run 109: :7..°Drill Rate=10 s oa :ee J,U,K,Stained 0 min/tt+529.6 ft:Joints become closely |23 ae e J,PL,R,Ca/CL 254 |gg9 ||spaced \SS eh J,PL,SM,CL 20°7 + ©3 7.109)"30% S =1 100%|.ff @ |v.PL,SM,CUCh/Ca 35°R4 |SW =2 \J,PL,SM,Ca 35° ad 3 74 ©||J,U,R,Ca 30°4 El ®i ®J,PL,R,Ca/Cl 30° a \Trip out to5g=?|@||J,PL,R,Ca/Cl 45°change bit =p >;(No.14)| Ldrn-- .N ° =O|532.5 ft:Joints become |Orill Rate=5 st ©|moderately spaced \32 min/ft a £yo 410)81% <£100% Zz ie]\ ES |@ ||J,PL,R,CaCl 30° a \=oo(o}\\|RS |FR>535 |\Run 144: ] <7 Drill Rate=6 Fa minstt a \ ch .4 2 536.1 -536.7 ft:Occasional pink [7 oO fekispar 'st _XN &-is 47 4 z 537.2 ft:Joints become closely |111 47 79%@)ju PLR,Ca 40° spaced »>J,PL,R,Ca 35°S 537.5 -538.6 ft:Slightly / 100%\. a weathered,strong (R4)\|ft}|)|@ jd,PL,SM,Ca/CL 50°a >\@ ||J,U,R,CaCl 25°XY Ra |SW y.|3 §38.6 -544.1 ft:Fresh,very j SL strong (R5)\4 vv 7.Run 112: =RS |FR Drill Rate=7 |. \min/ft a om 112 98%540 Log continued on next page ° ] &SS aa DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards < z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland g SUSITNA-WATANA HYDRO|pritter:B.Edmonds CHECK DATE:11/14/14 1/13/15ticharodWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-9b SHEET 28 of 35 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 fa)ty Bead Sha ness Infilting |Py-Pyrite @ Axal 8 PEs porte,Elie EE,SER,poston,Sa |Soaresz|B a eeFe38zrd%|FRFracture Mrreguiar Vavey Rough Ca-Calcite -ML-Silt Su-Sulphide 3 a9 Ea Nearswu16DESCRIPTIONoh2/e8 DISCONTINUITY DATA zs ase a |g =lz |2|33 =oO xBx|tox|«xxx WATER LEVELS x Ea felis oo ROD FRACTURES zee TYPE and To |oz peu ON wnorah)w %PERFOOT |29%SURFACE 26 gee wEz Sina &540 a S £BSes|n+cowe rie et eee 50 x 5 gesoy = 300.0 -683.3 , PLA, DIORITE:Greenish gray to t '|pinkish gray,phaneritic,\@ (J,PL,SM,Ch 50° medium to coarse grained,| -fresh to slightly weathered | *ss ° 4 (FR-SW),and strong to very |,">}:Ld J,PL,R,CVCH 30 strong (R4-R8§).Joints are i en rough to smooth,planar to \" i stepped,Ca healed or ae 47 as |cR a Ca/clay intilled,andciose to.|'1121 *7 |loge,widely spaced.(Continued)|.100% a a 541.6 -541.7 ft:Broken core .!4 541.7 ft:Joints become I im moderately spaced -544.1 -546.1 ft:Slightly »4d weathered,strong (R4)f 7 @|jJ,PL,R,CL/Ca 45° 544.2 ft:Joints become closely |,' ;ok .spaced ,@|[J PLA,Stainea 30°Run 113: by J,PL,R,Stained 35°]Drill Rate=7-545 on Ra |sw minft 4 | ['e J,PL,R,Ca/CL 35° a L '°4 546.1 -548.9 ft:Fresh,very N @ |J,PLR,CL 45 &|strong (R5)r 7.3 laa £8 :5 .113,59 |i igae,| £r.'4 100% g |°J,U,R,Ca/Cl 10°R5 |FRN -3 ke @ |u,PL,SM,Ca/cL 50°7 $\.z . G|548.9 -550.8 ft:Slightly [4 : i @|weathered,strong (R4)' I @ |J,PL,SM,Ca/CL 50° 4 8&|549.0 -550.1 ft:Broken core N : €"4 op Run 114: i Drill Rate=6jR4|SW A550|V |*minift 4 G 550.2 ft:Becomes pinkish gray \os x 1 : °8 550.6 ft:Joints become widely N @ |[J,PL.SM,Ca/CL 30 spaced r vl-|550.8 -592.9 ft:Fresh,very \4 2]strong (R5)| 2 '5.0 |:re f /50 a o \W4 >76% 4 Cc 5 |*100%oO Jfa)! L °XN + s r 7.Py \iss |fo)N gs [7 \ ' |s Run 115:Jv -Drill Rate=8 t-555 \min/ft - N tL ,_|R FR Many heated fractures \' , 5 b '\ad ty | \ N 5.0 |he)fits 5.0 |'so0%1 557.2 -558.3 ft:Healed 1 100% brecciated zone,diorite clasts in » mafic matrix in 7.L.'4 N f /oJ \ 1 =»f ae ' N 116)i 00%f /.]-;_560 Log continued on next page a DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO pritter:8.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 29 of 35 INCLINATION:-60° AZIMUTH:170°1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 _E:1,884,902 a Type Beddi Sha Roughness Wnfilting ;Py Pyne @ Axial 2 EFat FOFouaten «--Cumed KKaichersded BeBrocda FeOrkcn Oxide SacSend Ci Diametral x i 8 2 |e ven OR Oahagenal sresped?how"Ghetterte Fre senate 31-Silica bare NOTESFolsOo;4 Ww &|FR-Fracture Elrregular VR-Very Rough Ca-Calcite -ML-Silt Su-Sullphide 5 $8 EA TESTSw=|o DESCRIPTION Q 42)ee DISCONTINUITY DATA F:ase a Zz zix |2/96 =aon visxltox|«vex WATER LEVELS =a /Fe|S|]OS)RAD |FRACTURES |Eyu TYPE and 2,(Soe Esa ABS&2 a=Z|ou %PERFOOT |2%SURFACE ag |eue wee Stns &9 z z|560 a 9 a B8gR|a+0oee Pe gh DESCRIPTION &5 owen 300.0 -683.3 \ DIORITE:Greenish grayto f+,_|@||J,PL,R,Ca 45°;pinkish gray,phaneritic,\Run 116: medium to coarse grained,!Drill Rate=8 fresh to slightly weathered 'minét 4 ({FR-SW),and strong to very |,"> strong (R4-R5).Joints are | rough to smooth,planar to N stepped,Ca healed or yo 5.0 d Ca/clay infilled,and close to fl 116 >?|100%WPT: widely spaced.(Continued)Nn DH14-9b-21 L ,100%(560.0-610.0f) \ \4 ' Ly | \ | »4 Ly | \ 1 Run 117: .Drill Rate=7 -565 on minét 4 \ N L | \ {4 N 3 boy |8 \§.0|FS \117}©9 |100%7 =rs 100% g 1 'e J,U,R,Ca/CL 10° N a ae no ee oe |aOo\ 3 \ i=NXwcbfa]oo g i = 8 \ <eon °J,PL,R,Ca/CL 5°Run 118: t \Drill Rate=8 570 |S 'R5 |FR minft S [> =! 23BiF\2 3 ttt 3?|100%4 a |100% -aa o ,@ ||J,PLR,Ca/Ce 30°q 5 n [o)r+ 8 Run 119: N °Drill Rate=7 4 ¢v4 e U,R,ChiCa 15 min/ft oOin \oO N f 7 oJ 4 \ \ N 574,7 tt:Joints become very [,'>5.0 ®PL,R,Ca/CL 25° -§75 widely spaced |119 5.0 |499%_ I /-|100% ' '= f ¢ \ \ \ I /ad \ N I.Run 120: i Drill Rate=8 4 \min/tt ee 2.4 |129 244 "100% rv.100% \ | N roy ol -580 Log continued on next page WATANA201yz SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux DRILLER:B.Edmonds Subsurface,Inc. LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b DATUM:Ground Surface APPROX.ELEVATION:1500 ft CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 SHEET 30 of 35 INCLINATION:-60° AZIMUTH:170° Jy DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paiter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 __E:1,884,902 a Ty;Shape "hne:tnfilling .Py-Pynite @ Axa 8 res teem,Cy SER,BBs,eet BEE |arenax|G ele)(fiery,Bottinw Giiier Bee”Boe Gee Soe”|sopFo28ale)&FReFracture Three _VVey Rough _CaGaleta MES SuSuiphide FA Soa 'cersa=lo DESCRIPTION 9 t-S|#s DISCONTINUITY DATA ae ae WATER LEVELSaz==/=./2|/828]roo |Fractures |F2o TYPE S|SOS/ESK|4 Kasira2ja2|z|°R Be ard Ze |S%alazalguNsro}ao |w s c %PER FOOT 2O%SURFACE 26 |#ezZziWEzZ/Sann RK a 6/9 |=889g|av eee PS oF DESCRIPTION eb BU"osoaw =-580 +300.0 -683.3 N Run 121: DIORITE:Greenish gray to t 7 _|Drill Rate=8 pinkish gray,phaneritic,\min/ft medium to coarse grained,| -fresh to slightly weathered |4 (FR-SW),and strong to very |,> strong (R4-R5).Joints are I tough to smooth,planar to X a stepped,Ca healed or r 7.4 Ca/clay infilled,andctose to |' ,5.0widelyspaced.(Continued)|.124 5.0 400% \|100% N I / | S »| f 7. \ \ N f 7 J 4585\ ,Run 122: \Drill Rate=11 t ,_|minsft \ _|4 NN 8 4 @)|PL,R,Ch 40°5 |FR =1 4.9 L rf |s 122,49 |y00%\4 =vo 100% =' a =\/.4 3 \ &\ a in / _o I 4 &X Tube stuck, :a trip out,&\ ;replace bit=(No.14) |nN \4.590 s L >| x =x \ IBg@ N"L g ie 4 ie !30a'N ai]=123 94% £fad ry.Run 123:2 >\100%Drill Rate=6L.I .4-|&N mint gs L.cos=z [o)14fo)"aL >|592.9 -595.9 ft:Slightly \ .= AS |weathered,strong (R4)r'ad J,PL,R,Ca/CL 35 aon |$Lied N EL r 7.-=: |Run 124: =N R4 |Sw Dril Rate=9a7@||u,PL.SM,ca/cL 30°mint >595 _ i N <L c 598.9-597.7 ft:Fresh,very |v">JPL 15°5 strong (R5)|e ,PL,R,Ca S »4z75.0 ©i}frzal ©|100%aL LY |100%R5 |FR | $s=\ ES 597.7 -598.4 ft:Slightty 74 i weathered,strong (R4)1 R4 |Sw 4 2 N o 598.4 -602.8 ft:Fresh,very strong,"+(R5)\ 3 a \ 4 %ir va 3.9 R5 |FR Run 125: n 1]|125)39 Hf 90%Dail Rate=6nNi [)LSk.600 ,_|100% |>Log continued on nextpage 5 nN < Zz <i<x = PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 31 of 35 INCLINATION:-60° AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burtey 5500-3 APPROX.COORDS:_N:3.226.738 _E:1,884,902 T Shape Roughne:left i i 5 J oant B-Beddil PL-Pianar PO.Dlisted Br-Brotre Ep-Epidote.Bede °Aval'-Faul Hation oA -en Ix-Brecca |S=Sea EBiciaten CE Cuned.,Gectenaed Brirema Fegrron Onde SeSeng |Camexitg|zile V-ver OR-Orthagonal ST-St R-Rough Ch-Chiorte HmHematite -§-Silica 5oY.NOTESEeleSigy%|FR-Fracture irregular VR-Very Rough Ca-Calcite -ML-Siit Su-Sulphide 5 $9 Ea TESTSwu1oDESCRIPTION2f-3|€s DISCONTINUITY DATA =I, aa- TERa|z =/=_1/2|98]|pop |cractures DEw S-]xbx|tox)x xxx WATER LEVELS ia a /O2/2|°9 eat TYPE and zg |\SzZH/<28|NOR 2ro)quo!S =%PERFOOT |20%SURFACE 26 |ezz whe Brno00a)=S88R|avrewe ak DESCRIPTION 5 ero ge x 300.0 -683.3 a DIORITE:Greenish gray to 7.1pinkishgray,phaneritic,\ medium to coarse grained,| -fresh to slightly weathered ,39 4 {FR-SW),and strong to very |\°7 wt strong (R4-RS).Joints are 125,39 Hlg0%R5 |FR rough to smooth,planar to \100% -stepped,Ca healed or /.4d Ca/clay infilled,and close to.|' widely spaced,(Continued)N 'ol \ 5 601.4 -601.7 ft:Broken core 1 Ra |SW Run 126:4 602.8 -603.3 ft:Slightly >Drilt Rate=7 weathered,strong (R4)\'|min/ft 603.3 -604.9 ft:Fresh,very jl a strong (R5)N 4 7.R5 /FR \ \ N I 605 604.9 -608.4 ft:Slightly vy 36 4 weathered,strong (R4).j 126 48 75% 7s 75% \ f 606.5 -607.7 ft:Lost core .!4 a]7.g 606.5 -607.9 It:Closely spaced |\;R4 |SW 606.5 - |pints .607.7ft:Lost i $/core 7 =er Core loss ||607.5 -608.8 ft:Moderately .!locationspacedjoints,many healed joints |°approximate. I =|607.7 -609.9 ft:Broken core 74 @ jJ,U,SM,Ca 55 Drill unsure 4oO\ 3 |of depths S|608.4-626.1 ft:Fresh,very '23 GO|strong (R5)|1271 23 fF E70%@||J,PL,SM,Ca/CL 40° +@|608.8 -609.4 ft:Very closely 1 $; = 8 |spaced discontinuities N 100%Run 127: =|609.4-611.5 ft Closely spaced |,'ral ial 0J]joints ' mn 610 |%.- a so] =Z @ |J,PL,SM,CaCh 65° a x= Saal NNSL3v4 @|J,U,SM,Ca/CL 70°|: . Run 128:Zl g 611.2 -611.5 ft:Broken core x |Drill Rate-8 g |611.5 -622.6 ft:Widely spaced /min/ft 2 fi joints yomhfod\a a =N 5.0 WPT: Q Bh -aa /.5.0 DH14-9b-22 3 S v 128 94%(610.0-659.5ft) or]o .100% | x €+a Po ..Vv . <™|613.4 ft:1/2 inch thick \613.3 ft: z ©) feldspar/quartz vein N Direct Shear EL 7 4<x \3];R5 |FR 'N >|618 |Run 129:7]<=7.Drill Rate=8 ©\,;minétt eb .J Fa vo p |J,PL,SM,Ca 65° =1 =N aL /.4Ea\0z617.3 -617.5 ft:Broken core 50S"ae .429 >"|l1o0% =\|100% =>N a1]vo +1 zt ;:wu so ca \ -' ' _/-_620 Log continued on next page WATANA201---Z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paiter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 1/13/15richarpdPROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy Authority DRILLING DATES:8/20/2014 -9/17/2014 DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 32 of 35 INCLINATION:-60° AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 __E:1,884,902 a Ty : i shape Roughness \nfilling .Py-Pyrite @ Axial 8 Fey fgese,fity RE,fom,pesaes,Ce |Coanexzlta|Wen”GROdhogonal St Stopped Rhowh --GREMBrite Hertctatte -SeStea”pachieeFe28awi&|FR-Fracture Hrragular VR-Very Rough Ca-Calcite -ML-Silt Su-Sulphide S $a g Wearew=lo DESCRIPTION Qt 42]#S DISCONTINUITY DATA z aah STS ao |z z=iE.)2}88 =on visx|tox WATER LEVELS z a |Fe OO ROD FRACTURES |Eo TYPE ard z=Saul|ezw ASSES©=|g=)3)2)%PeRFOOT |26%SURFACE £8 |2E2/SE2|82n5 89Zzz|g20 ao S a B8BeR|avon?8 2 &DESCRIPTION g i eeroe = 300.0 -683.3 \Run 130: DIORITE:Greenish gray to 7.Drill Rate=7 pinkish gray,phaneritic,min/ft medium to coarse grained,n-fresh to slightly weathered > 7 (FR-SW),and strong to very strong (R4-R5).Joints are @J,PL,R,Ca/Cl 85°}---_| tough to smooth,planar to ' .stepped,Ca healed or / J Ca/clay infilled,and close to 5.0widelyspaced.(Continued)N 130,9-9 78% cH 100%J,PL,R,Ca/CL 25°fhly 622.6 -624.2 tt:Broken core N R5 |FR 7 / S »4 fo NN =' "4625Run131: .Drill Rate=6 7.min/ft 626.1 -626.8 ft:Slightly i weathered,strong (R4)N 7 »|626.1 -627.2ft:Broken cores 7.R4 |SW a 3 626.8 -631.3 ft:Fresh,very \8 strong (R5)7 _|5.0 7 s 131!©|so0% i =YI 100% =4 a€N &7. Ss a 43NRS|FR c / §630 |©)630 -631.6 ft:Broken core >|Run 132: 4 g Drill Rate=7 =,min/ft 8 '.J Oo Many healed 7 G|631.3 -632.4 ft:Slightly .joints broken |weathered,strong (R4)7 by drilling L a R4 |SW |€N 5. 8 .5.0O]|632.4 -633.4 ft:ALTERED "|132|>80%oa DIORITE,moderately weathered,Rt |ic)medium strong to very strong (R3 |\100%@ ||S,PL,SM,CLG 35°aa MW : i=7 b@|632.9 ft:1 inch thick layer of clay osS|gouge ;©)633.4 -634.9 ft:Slightly N \weathered,strong (R4)7. 4634-634.4 ft:Broken core \R4 |SW Many healed N joints broken 7d by drilling \ -635 634.9 -641.1 ft:Fresh,very _| strong (R5)\Run 133: /.Drill Rate=9 \min/ft L N 4 "7 " =' +f 5.0 e J,PL,R,Ca 45°637.2 -637.3 ft:Broken core 50 @ |J,PL,A,Ca 4544 "A 637.6 -637.8ft:Brok ,133 36%'@l J,PL,R.Ep 75°Re FR 6-.8 ft:Broken core sf FUR, NN\100%@J,PL,R,Ep 85% N ian L | 4 \ NN / 4840Logcontinuedonnextpage WATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]---z SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy AuthorityPROJECTNUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 RECORD OF DRILLHOLE DH14-9b DATUM:Ground Surface APPROX.ELEVATION:1500 ft SHEET 33 of 35 INCLINATION:-60° AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 __E:1,884,902 a Joint ---B-Bedi ace eae Ep-Epi Cedar @ Anal }-Joint |MI a nal |Ir |rat2Fault FO-Folaton -C-Curved KGhckonsided |BeErectia -«FeOetonOxide SaSand Diametral =|i Z|Vven” ORGehogenal StSepeed Bho”GERrte Eeecista raiea 502Vein*-Rou =|te i-Sali =Pe g 8 B )|&[pe Frectue Fieger”Vey Rough Gacuen Moe oh te Zz &%a NoueSwu16DESCRIPTION9F--42|ge DISCONTINUITY DATA zs aseaZzIjzj;2/90 =Gxi tox WATER LEVELS <a jEs|=z RQD |FRACTURES Won 2 189 Sh]ASKSx</2=/z|°9 rae TYPE and Zo |SZa/<Z8/GeNs 2ral&|e-\3)#%PERFOOT |2.9%SURFACE a6 |eeo\ae2lsens &Lao a o ES 3a9e|avceae Po oh DESCRIPTION ge 1 5 Ea loern @ =300.0 -683.3 \Run 134: DIORITE:Greenish gray to roy |Drill Rate=9 pinkish gray,phaneritic,\RS |FR min/tt medium to coarse grained,| -fresh to slightly weathered |>»4 (FR-SW),and strong to very |\">R4 [SW strong (R4-R5).Joints are ' rough to smooth,planar toL.stepped,Ca healed or f 7a | Ca/clay infilled,and close to |. ,5.0widelyspaced.(Continued)\134,5-9 HI goo,@ jJ,1,R,Ep 50°NSe%"YR -641.1 -641.3 ft:Slightly i 100%5 |FR 4 weathered,strong (R4)N 641.3 -644.4 ft:Fresh,very rv strong (R5)\ °643.3 -643.7 ft Many Ca and *(J,PL,R,Ca/Ep 50° -epidote healed joints L > _4 an644.4 -644.6 ft:Slightly |R4 |SWweathered,strong (R4)N 645 644.6 -647.2 ft:Fresh,very rev ol _|strong (R5)\ ,Run 135: N Drill Rate=11 by min/tt .@ |J,PL,R,Ep 50°}.RS |FR 4 NX N\5 |i]\ =1 |5 .45 7 o .a 4.5=]647.2 -648.1 ft:Slightly "4 135|100% =°g weathered,strong (R4).!100%®|J,PL,SM,CL/Ca 65 Ra |sw o r 7 4d 2 648.1 -654.6 ft:Fresh,very \ \2 |strong (R5). a Lyaco 5 g 1 4 8 \ c fo 7 oJ +'Run 136: x .Drill Rate=8-650 3s L S|min/ft T wo =x=\ i|e . aL 2 t ,|dfa\ BH lg | 2 \FS =ir 7 _|5.0 R5 |FR =|2 136,5 |'100%4 --NX487 100% =a \aL °N aiva£f 7[a]a \ <x S ! Zz sed N EL r./4 4<x \ =654.6 -658.3 ft:Slightly .![aa]weathered,strong (R4)L ,Run 137:Fa}654.6 -655.4 ft:Many joints ro Drill Rate=10=L-655 healed with epidote or Ca .i min/ft T <L ©\/ a 'zc =» 4 z ea ©' =\5.0 R4 |SW Ss 2-137)©9 |00%4 =.!100% me by = =>N a 658.3 -659.9 ft:Fresh,very aaostrong(R5)\ +{ sr 659.6-664.5 ft:Broken core | RS)FR 4 han \ 659.9 -660.0 ft:Slightly l 1 weathered,strong (R4)[,138)[/2%KX R4 |SW860Logcontinuedonnextpage [7” 7a DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO DRILLER:B.Edmonds WATANA201LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 RECORD OF DRILLHOLE DH14-9b SHEET 34 of 35 VI3/N15ficharpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GL8[WATANADRILLHOLE]PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/20/2014 -9/17/2014 APPROX.ELEVATION:1500 ft AZIMUTH:170° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,738 __E:1,884,902 8 Mem B Bede abe Boats «Grete Ep Oeduan @ Anal g FFaut FOPoiaien -C-Curved.-«KSlickensided ©Bx-Brocela FeOcron Oxide SeSend,|]Diametral =|E Ae ee es ee geFs384wi)2 |FR-Fracture Pkragular VR-Very Rough Ca-Calcite -ML-Sill 8u-Sulphide za 3 gz NOTES wg DESCRIPTION 9 42/5 DISCONTINUITY DATA =aah TESTS a >Fiz {3166 =o winx |tox WATER LEVELS =a |FelZ/65 ROD FRACTURES |Ew TYPE and 2 SSGELRARSA |5 @|u=|/3)Fl]%PERFOOT |29%SURFACE a@ |9a9/Seo|esn5 8 L 60-42 O\P |@|"|eseeivweee peg DESCRIPTION a |"5-|F""poseg =300.0 -683.3 '; e °R2 to Run 138:DIORITE:Greenish grayto |>J,PL,SM,GCL 48 r3_|MW Drill Rate=7 pinkish gray,phaneritic,\min/ft medium to coarse grained,' fresh to slightly weathered [|4 (FR-SW),and strong to very |,"7 strong (R4-R5)}.Joints are | rough to smooth,planar to » stepped,Ca healed or I,ae 5.0 J Ca/clay infilled,and close to 5.0 0, widely spaced.(Continued)N '138 72%R4 |SW L >100% ,@®(J,PL,SM,CL 45° 660.0 -660.5 ft:ALTERED ]4 DIORITE,moderately weathered,|<medium strong to strong (R3-R2)r +_|660.2 ft:Shear with approximately|\1/4 inch of clay/gouge |@|/J,PL,SM,CL'Ca 40° 660.5 -664.1 ft:Slightly |>4 weathered,strong (R4)ra664.1 -668.5 ft:Fresh,very \strong (R5)\Run 139: b Drill Rate=10 665 .|mirvtt 7 \ -_-ae \ i]4 N 5 L ,|R5 |FR \g |495S139,*%|100%4 8 L =on 100% =| =XS f 7 wt 4oO\ 3 \ 5 |668.5 -671.1 ft:Slightly L >O|weathered,strong (R4)wan ©\4 8&N c=or Run 140: a R4 |SW Drill Rate=9 670 |%'min/tt 4 8 "> xX 670.4 -671.9 ft:Broken core 1 8 N 3 [7 4 tS |671.1 -671.7 ft:ALTERED '|€|DIORITE,moderately weathered,]R3 |MW{=|medium strong (R3)L >5.0 @ ||J,PL,SM,Ca/CL 30° 1 671.7 -681.5 ft:Slightly altered,|,7 140,5.0 96%\2]strong (R4)I id . 4 5 '100%\re)|\ a \ {[e)N = £r 7. ©\ia 'oO N in /+f | NN he 675 I _| ' i?+ .I R4 |SW J f 7.4 Run 141: \ ;44 Drill Rate=11 N 141)100%mini ° bY 100%@J,PL,R,CaCl 80°+--__| 7 \ N he i 4 . re ' 681 ft:1 cmthick feldspar vein |>|44 4 vy faa 45 Hl g9% |98%||/J 4680Logcontinuedonnextpage -z DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO pnriter:8.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetn:a Mountai RECORD OF DRILLHOLE DH14-9b CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/20/2014 -9/17/2014 EQUIPMENT:Burley 5500-3ns,AK DATUM:Ground Surface APPROX.ELEVATION:1500 ft APPROX.COORDS:_N:3,226,738 SHEET 35 of 35 INCLINATION:-60° AZIMUTH:170° E:1,884,902 1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]DEPTH(ft)BORINGMETHODr-685 -690 -695 700 DESCRIPTION (ft)GRAPHICLOGDEPTH|ELEVRUNNUMBERCORERECOVERYTySint F-Fault 'SH-Shear V-Vein FR-Fracture B-BeddingFO-Foliation CO-Contact OR-Orthogonal BLBranarC-Curved U-UndutatingST-Steteregular Roughness InfillPO-Polished annK-Slickensided SM-Smooth R-RloughVA-Very Rough CL-Clay Bt-Brotite BxBreccia Ch-Chiorite Ca-Calcite te @ Axal Ep-&teFOOLvonOxide C Diametral 'GougeHm-Hernatite ML-Silt Road % BBS FRACTURES PER FOOT NnroaS DISCONTINUITY DATA TYPE ard SURFACE DESCRIPTION ROCKSTRENGTH|yINDEX7gGRAPHIC]LOGf=) <oa 3eta]NO No oOacnoe NOTES TESTS WATER LEVELS 300.0 -683.3 DIORITE:Greenish gray to pinkish gray,phaneritic, medium to coarse grained, fresh to slightly weathered (FR-SW),and strong to very strong (R4-R5).Joints are rough to smooth,planar to stepped,Ca healed or Ca/clay infilled,and close to widely spaced.(Continued) 681.5 -683.3 ft:ALTERED DIORITE,MW,med.strong (R3)\_|908.2|aeole142) 98% 89% V,Healed,Fids/qtz J,P,SM,Ca/OL Sw 70° R3 |MW 35° Borehole completed at Nates: 1.Exploration was located in the field base spatial relation with identifiable surface features in the 2011 Matanuska-Susitna BoroughLIDARdata.Coordinates are provided in Alaska State Plane Coordinates,Zone 4,NAD83,US ft. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna BoroughLiDARdata,NAVD88 vertical datum. 3.Vibrating Wire Piezometer was taped to a sacrificial tremie pipe and grouted in place with bentonite) cement slurry at 253.3 ft depth. 4,t-inch Schedule 40 PVC TAG conduit installed to approximately 252.8 ft depth and filled with propylene glycol antifreeze.Top of} HWT surface casing has 6.4 ft of stickup above the ground surface. 5.TAC placed in TAC conduit. Conduit was damaged during installation,grouting the TAC in place.TAC sensors are located at 5.8,8.8,11.8,14.8,17.8,22.8, 27.8,52.8,77.8,102.8,127.8, 152.8,202.8,and 252.8 ft depth. 0 ft =elevation +/-1500 ft. 6.Discontinuity graphic log is a depiction of discontinuity angie measured from the left hand margin of the log column. 683.3} Run 142: Driti Rate=8 minft WATANA201-zZ-DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paiter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 RECORD OF DRILLHOLE DH14-10 SHEET 1 of 36 1/13/15richarpd11-24-14.GPUWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 8 ye,B-Bedding Bibiana POMeicted -«EtBee-Ep-Epidote Gece |®oonSdF-Fautt FO Foliation C-Curved K-Slickensided 8x-Breccia FeQx-Iron Oxide Sa-Sand C Diametral x |eeFs28Spa}|RFracture Feregular_VR-Very Rough Ca-Calcite_ML-Sill SuSuphide |§ae q NOTESn=lo DESCRIPTION Qo 44s]we DISCONTINUITY DATA xz |. i--7 STS a x |x >Fel tox WATER LEVELSFSa|-s!2/88!rap |rractures |$¥0 TYPE and O 1 S95|ESE Aasg#(&=|/Z/ f|%|perroor |adx SURFACE 28 |989|GrQ/sen5 8lga6/9 }&B8E9R|wv owe Pa ef DESCRIPTION e |5 3°loose gw =0.0 -67.2 bY OVERBURDEN:medium ° dense to very dense,wet,-0.4 multi-lithic volcanic and OQ 1 1.8 NAigneous,green,white,and 1,CO)4 gray,rounded to angular,22%poorly graded GRAVEL with |°Q boulders and cobbies Loy(GP)[TALUS AND 0.0 | ALLUVIUM]p 2106 ||N/A oY 4 om (a) LO 1 o aan |¥CG 8/16/14;08:00Oo 4.0-4.5 ft:with gravel remnants |,©7 from talus }iN 15 44ft ¥DS |3|46 ||wa 8/29/14;07:30 5 LO 33%4 5 o(\ $b | =re)sor FY |$b -\8/28/14;07:45 x=fe) =dD -7.0 ft:End c 8/14/14;S b )Begin - 3 aa 8/15/14 z D5 |77k 6 81 80-931t:zoneottrozensoll [©8/27/14;07:30 7 O|observed }'a<b+QN 4 a bOie]6 48=x S 4|>N/A§fe)"gat ¥10 1S LO 92%8/26/14;08:30 4 +fe)£D 02oOpe | z °(\ F Pe 2 pO 1 3 : Ee i) 2 bO 1 =ofN iat ©°D 23 8/24/14:08:003)<5|357)|wa 4O}140-226 tt:mixed graveland [©=|talus of 64%vaso |¥+D.8/23/14;07:30 ¥(s)14.4 ft15LO8/22/14;07:40 4 5 14.7 ftLN8/25/14;07:30b, bO | of\18 reso 86 20 8/21/14;07:30Q6NA164ftLO90%8/20/14;07:40 =7 17 ft°Q 8/18/14;08:30B bO 1 ae 25 2 7/481 |wa J P 52% 9 -be Log continued on next page a DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO paitter:T.Fisher CHECK DATE:12/9/14 RECORD OF DRILLHOLE DH14-10 SHEET 2 of 36 1/13/15richarpdWATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB(WATANADRILLHOLE]PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft =AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 a y|.nness Infilling ;Py-Pyrite @ Axal 3 Fey poem Fly ee,Seat.Fee See |Somaxrin>[tag Wore Spores Steer Bhon Ch eheoite Freneeatte 4 See °of. Fels 8 S|&|peFracture Frreguiar-__-VA-Very Rough Ca-Caloite-_ML-Silt Supniee |2858 eesw=16 DESCRIPTION 9k 2/es DISCONTINUITY DATA =f,aap™Qa rT i|=x =}Felt WATER LEVELSz&|=s/2/88 |rao |rractures |F¥a TYPE and oO |xox EOx|4 ERSrs)=|G=/Z/"o]%PERFOOT |25%SURFACE £9 1359)528 gene 8 |oo {2 G ||&BBER8|vv owe Pgh DESCRIPTION a |B [Fo pese ge = 0.0 -67.2 bp OVERBURDEN:medium fo dense to very dense,wet,D -multi-lithic volcanic and 2 igneous,green,white,and 6 2.5 4 gray,rounded to angular,7 48 NWA poorly graded GRAVEL with [°!4 .boulders and cobbles hy 52% (GP)[TALUS AND Q z ALLUVIUM](Continued)ig ae io) 20.0 ft:rounded,boukers,0 <)7 cobbles and gravel 6 'a 16 D.,8}22]1 WA bO 73%4 24,5 ft:occasional wood ,Q fragments OQ -25 b 9D 4 5 oC$OQ8po 35 : =°CN 9 N/A =tyFyD,93% g pO 1 3 of 5 - a io) £"12 =|10]29 ||waPabO60% | 2 o(\ 3 Fe -30 |29.8-34.9 ft gravelandtalus e)7 z of\2 Do2oO 2 pS ; 2 of\ =OO fo)3 LO a7 ; 0 of [at]TT ba=|73% 2 pO 1 3 0 [a]OQ °Ke 1 ®ae o) f-35 34.9 -37.2 ft:Alluvium and gravel |,C)7 ae 18fo)-_ L 12]23 ||wa 4 o[78% b> bO | of Ke)ae Bs b 13}59 ||waoO70%=LO of oO.r 40 Log continued on next page 7 a,DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.RichardsSUSITNA-WATANA HYDRO_priter:T.Fisher CHECK DATE:12/9/14 RECORD OF DRILLHOLE DH14-10 SHEET 3 of 36 1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft |AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226.171__E:1,884,559OoTypeB-Bedd $n Ri ness Infilling J Py-Pyrite @ Axial Q FFaut FOFolaien -C-Curved.KiSickorsded Bxbiocia EGrkerOnide Sesaa™|_C]Diametral z {6 gel »(We,Rothe Gear ae”ee,See"|poeFe33aW&[|FRFracture Prreguee VE-Very Rough Ca-Calcite -_ML-Silt Su-Sulphide 2 &9 g NOTES w-15 DESCRIPTION 9 2/es DISCONTINUITY DATA xz |, aap TESTS a |g =fz |3/$38 =a ysx|tox!eeee WATER LEVELS c e16e o9°Roo FRACTURES |sy'2 TYPE and =osu lEzu AGEN wo o &rh 3 Bl %PERFOOT |25%SURFACE £9 jeez/252 8in5 B40aB898|n+eo?Pe &DESCRIPTION g A ere og 0.0 -67.2 bb OVERBURDEN:medium °CNdensetoverydense,wet,Dmulti-lithic volcanic and (a)3.5 igneous,green,white,and |,©)13]29 ||wa 4 gray,rounded to angular,rNpoorlygradedGRAVELwith[°|4 70% boulders and cobbles fy(GP)[TALUS AND eo)a ALLUVIUM](Continued)Oo of (a) 40.0 -49.0 ft:Alluvial gravel and 5,©7 talus \°- (a) bO 45 a of\tra]45 |la Q 100% -45 O -+ p :i: =OQ wo = 2 bp E CY 2 © 3 bO o E oN)fas 5 eS)15]23 ||wa |&p 57% s yy +5<j |490-565 ft:Aluvialgravel =O)4 4 of) <D 2.0so|=re 16|29 ||wa 46iOnaof100% c= a Q5LO 4 Ee =of \51.0 tt:End=),8/15/14; @ Begin2bO8/16/14 7 2 fo CN[=5 =b>37 2 LO 17|47)|iwa 4 ¢3 o(\90% a OQ :ae i ae <D., H-55 b e)4 oN 14boia}'4 |[NAbO100% 7] fe]G a9209L,(e)19 N/A 4 100%5S Mo),replaced bO 4 oY 29 2.8ty20 N/A LO 71%4 oC O +60 .[h 4 Log continued on next page a DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO pritter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DRILLING DATES:8/14/14 -8/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1478 ft SHEET 4 of 36 INCLINATION:-60° AZIMUTH:10° -yz SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 Q J-Joint 8-Beddi ae Pogneres Brett Ep-Epi Oda @ Axal -Join -Beddi x .72FEctPoreaen«-ECuted --«KGickended ©ExBracca -EsGen'Oxde SeSard'=|_Cl Diametral z {5 I ee eeFe38zuw2(FR-Fracture Threguiar VELVery Rough Ca-Calcita -ML-Silt Su-Sulphide FS $7 gz Neateuw|e DESCRIPTION 9 7 2/es DISCONTINUITY DATA xz],aa-7 WATE VELSo12=|Z./2/88]nao |rracrumes |$y D1 ¥9N/295]a xaa R LEVEL ira <=|o2|z\°R ia?TPE and Zo |SHa(Z25/gene 8fo)ew"i S|«%PERFOOT |20%SURFACE 26 |2HZ(YEZ|Bina KR a Gg |o |&B89e2|nro oe Po gh DESCRIPTION a”|"ET|""pesoa =60 00-672 bw OVERBURDEN:medium of Ndensetoverydense,wet,DJmulti-lithic voicanic and (2)13 f igneous,green,white,and b fe)2.0 4 gray,rounded to angular,a1 N/ApoorlygradedGRAVELwith[°ie 65% boulders and cobbles 'a a (GP){TALUS AND -| ALLUVIUM](Continued)Ib oO Oo i 60.2 -67.2 ft:Gravel with bO 4 subrounded to rounded cobbies aandboukersbyLy(o) r LO a of \3.4 D,22|59 ||wa 65 bO 68%7 ae fo) a Lb Q I ofFe,.Top of Rock=67.2 ft 1419 7 67.2-77.0 \|67.2 e J,PL,PO,Clean 40° DIORITE:Greenish gray,by]NIA medium to coarse grained,\ -fresh to moderately '4 weathered (FR-MW),and |R5 |FRmediumstrongtoveryoq 1-{strong (R3-R5).Joints are !. ag smooth to rough,planar to N HWT casing 4 stepped,FeOx stained,Ca [7 |3 set at 68.7 ft infilled,and close to \ j 5.0 rl BE ou Cay ape NN Ra (SW tojodiied.z ,PL,OM,Fe!moderately spac:|.23|2-9 Higa,PLL SM.Ca 64°SQ MW 79 100%@ |/J,PL,SM,Ca 29° 7 bald N \ a |69.4-69.6 ft:ALTERED by |\S |DIORITE,moderately to slightly |\ 5 $|weathered,Ca filled I 4 zg «|discontinuitiesno a ££|69.5 -75.0:Numerous Ca healed |' gs |discontinuities Nn ' j 2 ;@||u,PL,SM,Ca 40°| m |e oy |3 e .\ 3 E [." 4 t1=|5 \it ®/J,PL.R.Ca 62°7 5 2 |aay"!|152%Rs |FR <[=]LZz°vo 52%@ |J,U,A,Ca 56° cEL=I 4 $be '74.3 ft:End =-r 8/16/14; [on]Begin 3 g |8/17/14 >75 g Ly | 4 &2 \ \e J,U,R,Ca 38° o @ N 27 @||J,PL,SM,Ca 40°Run 25: Eb =eo 25 35 ||46s \wieamy | z os a @ |J,PL,SM,Ca 55°kN we ation©£.77%|hb @ |J,PL,SM,Ca/FeOXx 4824. 2 3 io > gL °sy fats,\ <Q|770-836 4"{770 @ |J,PL,SM,Ca 62° | Z 2 ALTERED DIORITE:Light =! J,PL,SM, 3 z grayish green,medium to Wl @.|J,PL,SM,Ca 46°} =|coarse grained,moderately |y @ =|J,PL,SM,Ca/FeOx 48-7 Iw WPT: -©]to highly weathered (MW-y NX DHt14 10-1 4 x HW),and medium strong to |/x -10- 6 strong (R3-R4).Joints are =\4 RB fo Ma (77.8-97.8ft) +smooth,planar or stepped,*47 J,PL,SM,Ca/FeOx 60° Sb FeOxX stained,Ca intilied,"y 26|*87%_: yl and close to moderately &100%z spaced." o =\ lu)S Or ”e |>80 Log continued on next page 3° N < z <bE<x = VABNSricharpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]WATANA201RECORD OF DRILLHOLE DH14-10 SHEET 5 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft ©AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX,COORDS:_N:3,226,171 _E:1,884,559 Q Jibint 8.Boddi ace EoBoiced -«GrBlonle Ep Ge duar 0 weal g Frat FOFolaton Curved -«KSickeneided «BxBrocda --FeOkron Oxide Sasand |_(C]Diametral z |E A ee ee eeFo=8 4 wi}|FR Fracture Pkregular VR-Very Rough Ca-Calate -ML-Silt Su-Sulphide 285 g eaewu|o DESCRIPTION 2 s|ge DISCONTINUITY DATA zol+aan WATER LEVELSOo/2 =/=5/2|/881 rao |Fractures |$Ha Q |)XOX EON)sa2&|Fs/2/33 Eye TYPE and To See eZe/NSSS oofo)ew)Ss)&%PERFOOT |20%SURFACE £9 |raz|eEzZ|Sex5 FR|80 fea)So BBeS|nw ows PQ of DESCRIPTION &5 eeso ge = 77.0 -836 7}o”(CPL SM Ca Ba)ALTERED DIORITE:Light =\..J,PL,SM,Ca 29 grayish green,medium to .is coarse grained,moderately |"7 \ a to highly weathered (MW-N rk \| HW),and medium strong to |26)7"87%' strong (R3-R4).Joints are =\100%be J,ST,SM,Ca 20° smooth,planar or stepped,'°R3 to MW to .FeOxX stained,Cainfilled,|Z y R4 |HW 7 and close to moderately NN spaced.(Continued)ALa @ ||J,PL,SM,Ca 25° Lo "=¥7 '1405.6H:° ae catF 1536 @ ||J,PL,SM,Ca 31° | a DIORITE:Reddish or |\J pinkish greenish gray to \ greenish gray,medium to \ coarse grained,fresh to |50moderatelyweathered(FR-{7 50 o @J,PL,SM-A,Ca 87°}--_-85 MW),and strong to very 27 100% . 7 strong (R4-RS).Joints are .100%@)|J,PL,SM,Ca 46 smooth to rough,planar to 7 \stepped,Ca infilled,and y S close to moderately N 4 ;|Spaced.ro"-]°J,PL,SM,Ca 17°SW to\Ss |FR 3 N z 5 LP 4 2 \ =! =LO @)|J,PL,SM,Ca 41° a ca \Ré4 to 4 |3 N \RS £ros.a \ | 5 g N 1 fo]oO a c \MW =| t \5.1 90 ||¢9.0 -91.0 tt:slightly to r/o 2a}51 |loa,4 |moderately weathered zone |100%=N °:e J,PL,SM,Ca 19°Ps L a 3 ron @ |u,PL,R,Ca 50°FR 7 2 N 2 rv.EF \ =2 \'4 5 rosa s J,PL,SM,Ca 20°)SW ro)\Re J,PL,SM,Ca 20 Qa |: |fe)L >@ |J,PL,SM,Clean 52° 4 £7 ©|Ss NoOL/ S \= ! \ LP \ |5.2P95\52 4,@||J,U,SM,Ca 39°4 r"4 =|?8 90%@ |J,U,R,Clean 60°\ |100% NX i L ,4 FR\ ;R5 ' LP b-\4 ' NN Pov ad \ i |97.8 ft:End _ L ,8/17/14; aan @ |J,PL,SM,Ciean 61°Kh Begin j 28 @ |J,PL,SM,Ca 64°8/18/14 ',9 WPT: F r7-|(|%oe DH14-10-2 4 '100%(97.8-17.8ft) | @ |J,PL,SM,Ca 54°Run 30:Drill 100 vq Rate=10 _| Log continued on next page zy DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO priter:T.Fisher CHECK DATE:12/9/14 VI13/15PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetna Mo!untains,AK EQUIPMENT:Burley 6500 RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/14/14-8/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1478 ft APPROX.COORDS:_N:3,226, SHEET 6 of 36 INCLINATION:-60° AZIMUTH:10° 71 _E:1,884,559 -105 - 110 richarpdr-120 r-115 8 bin B-Bedding Bipanar -Bo-Aaiehed Ep-Epicote Gecuaw =F-Fault FO-Fotiation C-Curved K-Slickensided FeOx-ron Oxide Sa-SandEiAeeGeneSS |poe.3 8 4 wi)>|FRFracture Hrregular VaVery Rough MUSilt Sulphide Za 5 q 'cers3DESCRIPTION2t-]8|es DISCONTINUTY DATA ae oor WATER LEVELSzx|=2/90 Ew [5]"xOx|ZO™|=ex=a |Fe OG |ROD FRACTURES |Ew Fo Osu |GzZu/NSES5=|a=|3|@]%|PERFOOT |a9%28 222 |EE52/8tno 8ao/°|=B8e8|a+owe ps sh S|5 ere 2: 83.6 -141.7 .minitt DIORITE:Reddish or t pinkish greenish gray to greenish gray,medium to coarse grained,fresh to J,PL,50°7 moderately weathered (FR-30 96%®JPL 50%)MW),and strong to very °Ny strong (R4-R5).Joints are smooth to rough,planar to @ |J,PL,SM,Clean 55°4 stepped,Ca infilled,and close to moderately spaced.(Continued)b 100.6 ft:3-inch wide light pink to | pinkish white,felsic and quartz) intrusion R5 [ @ |J,PL,SM,Ca 54°Run 31: 4 @ |J,PL,R,Clean 57°Creamy graycirculation 31 100% |@ ||J,PL,SM,Ca 25° FR Run 31:Drilt 7 3 b Rate=6 $min/ft s 4 s [ °J,PL,SM,Ca 11° x= = s | co)€ &r a 2 - 8 @)|J,PL,SM,Clean 41° £ | +es |110.0 ft:3-inch wide pinkish white,«v 25° Rd to 4 |felsic and quartz vein 32 100%AS= g L 3 ad E 2 i 111.4-112.5 ft:ALTERED|DIORITE,moderately to slightly fF&|weathered,strong (R4),Ca filled @ =|J,PL,SM,Clean 54°J£discontinuitiesGj111.5-112.8 ft:Numerous healed @ |J,PL.SM.Ca 58°swt9)discontinuities )'pra ¢o o O J,PL,R,Ca 48°71N.MW z J,PL,R,Clean 52°\Run 93:Drill 4 g #|J.PL.SM,Clean 57°mint °J,C,SM,Clean 481 '\Run 35:7 Cream colored circulation5.0 @ |J,PL,SM,Ca 67°4 33|59 |!)age,R5 FR WPT:4118.0 -122.8 ft:Numerous healed 410-discontinuities 50 °J,PL,SM,Ca 14°(117.8 197 Bt) 34]29 ||goo,@ |J,PL,SM,Ca 59°.R4 q°J,PL,R,Clean 40°NS\ \.Run 34:Drill {|Rate=10 | Log continued on next page WATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]-zZ DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pzaiter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 7 of 36 INCLINATION:-60°1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANAORILLHOLE}PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft |AZIMUTH:10°LOCATION:Susitna River,Talkeetn untains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 Q Perm B-Bec ae Po foched -BtBlotle -«EpEpkdote =Gaur |«©Me.ji .-- ;2 FFaut FO-Folaibn -C-Curved.KSickensded BeBrecia --FeOxran Oxide Sa'Sand 0 Diametral x im >c Wen OR Sahagenal sre ey Rhoh Gheclabrte Finer eatite eSiea bat.Fo|s 8}4 Ww) &|FRFracture Fkregular_VR-Very Rough Ga-Calcite-_ML-Silt suSuphice |Sin ZB wearst=o DESCRIPTION o KY 2/a$DISCONTINUITY DATA z |. asp STS a |$=fz |3|33 <a 3]xbx|tox «xxx WATER LEVELS=z a re 2109 ROD FRACTURES |=”TYPE and Te |QZW RZWI NOON wofe)e/e|5)@ %PERFOOT |29%SURFACE SG |2eZ/UE2/Senn KR|400 oO So a BBkR|wv ome PB 3 DESCRIPTION a 5 wero YF 83.6 -141.7 J,G,SM,Ca 27 min/ft DIORITE:Reddish or Jpinkishgreenishgrayto greenish gray,medium to -coarse grained,fresh to '0 4 moderately weathered (FR-os 34)56 |MW),and strong to very 80% strong (R4-R5).Joints are 100%@||J,PL,SM,Ca 43°ag smooth to rough,planar to io J,PL.SM.Ca 39e4 = stepped,Ca intilled,and e mn ST.SM.Cc 70°aNclosetomoderately,971,OM,Ca spaced.(Continued)N |.@ |J,PL,SM,Clean 59° 4 Run 35:No recovery, core R4 recovered -during Run 4 J,PL,R,Ca 72°36.8 J,PL,SM,Ca 70° F125 35;29 4 &|>9 ||og%36)100% a ®|J,ST,SM,Ca 55°7 5 @|u,PL,SM,70°g Ss Ca P-- ] |s 4 2 '|@ |J,PL,SM,Clean 62° E=] FS a ro a ft oj fod 127.0 feet:| 3 Slower 2 coring & a ®J,PL,SM,Clean 35° rc 8 J,PL-U,SM,Clean 43>FJ (ay £ <+130 |.20 Réto|*| A (9)g 37 96%RSPs100% 3 ro]4r--'i ,@ J,PL,SM,Ca 27°1.3 ft:1-to 2-inch ,PL,SM,@|ekg|1°Pinch dameter @ |J,PL,SM,Clean 52° 2 =D>4 Cc - o [o) Q a i.)132.8 ft:End 4 £7.8/18/14; ©Begin a 8/19/14 ,133.0 ft: r 132.8 -137.8 ft:Ca filled "|tripped to q discontinuities sharpen bit@|J,PL,SM,Clean 62°Run 44:Drill «J,PL,SM,Ca 24°Rate=6 -135 $.0 :min/ft 4 5.0 oe J,PL,SM,Clean 45°Run 38:Drill3888%|f:,PL,SM,wy be vs PL,SM,Clean 507%Rate=7100%min/ft -e J,PL,SM,Ca 25°132.8 -172.8 7 @||J,ST,SM,Clean 38°R5 ft:No circulation L @)|J,PL,SM,Ca 46°\4 a L WPT:= 6 J,PL,SM,Ca 23°OH14-10-4 6 (137.8-157.8ft)55 @|J,ST,R,Ca 70° a 39)>92%J Run 39:Drill100%Rate=6 min/ft p 140 Log continued on next page ] yz DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO priter:T.Fisher CHECK DATE:12/9/14 WATANA201 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 8 of 36 INCLINATION:-60°TAB/TSricharpdPROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft ©AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:N:3,226,171 _E:1,884,559fa)Ty 39 Infilling .Py-Pynte @ Axa 8 Fey perio,iis Ee,Beet,sen,See |Canaxrm>x gis CO-Cont gPRduiating SM Smooth Gi Clay a Sencite kanFes=8 S }|&|PR Fracture Firegul VEERough SaGaete MSI Su Sulphide 2858 NOTES uo DESCRIPTION Q AH 2|ee DISCONTINUITY DATA =].aage TESTS a 2 Tix 13);566 rae WATER LEVELS z a les|/2]88]roo |rracrures |Eva TYPE and o (Sealess Aaea©€/g=/5)2]«PERFOOT |a Ox SURFACE aQ |OG9|Srol/gxNe &a S/o fa)*Bo*s DESCRIPTION 2Q |ers)Sue re140-45 S898 |wvom?Ps Be §|&erre2= N Ly | ' R5 i |J,PL,SM,Ca a7e FR q ty |5.0 141.0 ft: hises 42°5.0 |lgo%Direct Shear 1355. 141.7 -146.0 a |141.7, |100%PosK CL eee.MW a ALTERED DIORITE:Paie =tee. ° ,7 greenish white,medium yl *@SH,I,K,CL 84°--_ grained,moderately to =° highly weathered (MW-\.'Br OL ee HWi.HW),and medium strong "_-. | 4 (R3).Shears are =\Run 40:Drill slickensided,curved to "Rate=11 irregular,and clay and a \min/ft gouge infilled.Joints are &e-smooth to rough,planar or 4 °J,1.SM,Ca 18 R3 to q irregular,and Ca infilled.a Ra Discontinuities are closely y '@ |J,1,SM,Ca 50°mwRBG3/4-inch wide Ca coated |=\-145 N 5.0 +gouge - . 50140.8-147.8 ft:Ca filled a '40|>80%discontinuities aN 5 @ |J,PL,SM,Clean 50°hate 100%@ |J,PL.SM,Ca BTR . Td60T1EES =N80 @||J,PL,SM,Ca 46°,4 ;:N , 6 |DIORITE:Greenish grayto +,_|\Sw 8 greenish gray with pink ;tints,medium to coarse r a grained,fresh to slightly °J,PL,SM,Ca 7° 4=|weathered (FR-SW),and an e J,PL,SM,Ca 17° £|strong to very strong (R4-i 2)RS).Joints are smooth to a |rough,planar or curved,p 7 | = {|and Ca infilled.Fractures an2|are smooth,stepped,and \of 4.PL.SM,Ca 612K |Ca infilled.Discontinuities ty _|\J,PL,SM,Ca 50° i ¢are very close to moderately |\©|J,PL,SM,Ca 67°FR |8|Paces:.°FR,ST,SM,Ca 0°R5 Run 41:Ori€Vv :@J,PL,SM,Ca 82°}-__|nah bl r-150 |X)449.2 -157.8 ft:Muttiple Ca .ao tt 4 Gj healed discontinuities,weak 7 41 .68% x}cementation 1 : 3 \100% g 3 p " 4E\ Cy | a N=E a .\ s a 1 -f=N o .(3)74 a \ j R4 a N 4d£r 7 |Run 42:DrillFe0@||J,PL.SM,Ca 43°sw Rate4 o N \mint L .," >@ J,PL,SM,Ca 77°q\.1 1 ,4 [y.PUR Ca seek \@ |J.C,SM,Ca 65%)|RSwaeJ,PL,SM,Ca 62°) -155 |36 :®J,PL,SM,Ca 38°a '.|42 66%@:J,PL,SM,Ca 79°|11343.100%}fF ° a 1558-1705 7 (185.8 ©J,PL.SM,Ca 48°.J ALTERED DIORITE:White =NwithflecksofgreenandyyzonesofgraytopalegreenayeJ,PL,SM,Ca 41° with dark gray fractures,N 3 \R3rmediumtocoarsegrained,|@ |jt Rca 30 N 7 moderately to highly =weathered (MW-HW),and medium strong to strong Ly \MW ta }(R3-R4).Joints are smooth NS e@ |J,C,SM,Ca 47°\HW WPT:4torough,planar to irregular,=|\DH14-10-5 Ca infilled,and close to =\\(157.8-177.8ft) moderately spaced.S 5.0Ua43|©9 |'s00%%@ |J,PL,R,Ca 64°.|RB to ;L.-tpinch w.,|=)o ay 158.8 ft:7156.7 ft:1/2-inch wide Ca vein NN 100%UCS = wy °15,513 psiRNRun43:Drill |160 Yi @|jJ,PL,SM,Ca 42°Rate=4 ] Log continued on next page WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GL8[WATANADRILLHOLE]-z DEPTH SCALE:1 inch to 2.5 feet ORILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO _priter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 9 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 8 Mian B-Badding Boerne =pORNees -BOMe Ep Epidote Oorduarz @ Axal2F-Faut FO-Foliation ©C-Curved _-K-Slickensided =Bx-Breccia. FeOx-(ron Oxide Sa-Sand C1]Diametral z |G oe en ee-3 8 a)&LpFracture Fhreguar __VR-Very Rough _Ga-Caleta -MLSifl suSuiphide |SSB NOTES w-16 DESCRIPTION o }248]es DISCONTINUITY DATA =Sous TESTS a Zz z {|Z _/|2|96 =G-|x6x|tox]x xxe WATER LEVELSzz=|F-/2]/88]roo |Fractures |Exe TYPE and 2 |See|czu/S4E5 y 5 2 |w=|5)2)%PERFOOT |20%SURFACE ag |Qe2/geo Sinn 860a6xBB8R|nv owe a 3 4 DESCRIPTION Fa 5 |uso = 155.8 -170.5 iW °min/ftALTEREDDIORITE:White |=\Py [ds PL.SM,Ca 38 with flecks of green and * zones of gray topale green |"y @ |J,PL,SM,Ca 49° F with dark gray fractures,IN 0 dl J,PL,SM,Ca 34°\| medium to coarse grained,"w 5.0 9 coe moderately to highly =43 100% weathered (MW-HW),and "100% -medium strong to strong a \| (R3-R4).Joints are smooth &to rough,planar to irregular,|/g (4.PL,SM,Ca 60°|Ca infilied,and close to =\\J,ST,SM,Ca 60°)Sa moderately spaced. a (Continued)a \7 "@)||J,PL,SM,Ca 43° aN \ 163.4 -163.7 ft:Xenoiith,slighty |"yweathered,spheroidal shape,fine}.grained DIORITE HW=\ 165 s 38 @||J,PL,SM,Ca ate R3 to 4 Ly 44}>"|1190%R4 Myya100%\Z ee fy @ |eu,PL,SM,Ca 30° |166.2 ft:Discontinuity,1/2-inch NG J,PL,SM,Ca 905wide,clay,with Ca filling,pyrite HW J,PL,SM,Ca/CL/Py 166.2 ft: 2 =\\Brazil Test =2 4 "812 psi L 3 LL 4 &A == if S 4s :Run 45:Drill 7 3 S @ |J,PL,R,Ca 52 Rate=4&"y @ |J,PL,SM,Ca 67 NN rminvt a 2 S = 8 a$a 64,PL,SM,Ca a7e |__| 170 |=5.0 4 6 3 1 .|u330448|2°|79%@ |,PL,SM,Ca 59° fa)=|170.5 -208.6 "1170.5,|400%!°@J.1 of =2 DIORITE:Dark greenish t y dR,Ca 80°>-a |gray to dark greenish gray \ ° "] g 2|with pink tints,medium to !be \pr a ee oe sw 8 =|coarse grained,fresh to |*A:PL'SM.oe goefed R4 tox):slightly weathered (FR-SW)a >y PL SM.oe aoe R5"hE =|with a 0.4 ft section being |3 PL SM!oa 824)one 4my=|highly weathered (HW),and |+TP OM,Ga Run 46:Drill =G |strong to very strong (R4-r 7 |Rate=7ga|A5).Joints are smooth to @||J,C,SM,Ca 38°mint dL ©}rough,planar to stepped,\ z |Cainfilled,and close to Ly |172.8 ft: T a 2 widely spaced.\ ,Regain$a .circulation in =L ,talus i \7 qTS|N a [./ E175 ]5.0 4tr|S 46|9 |100%@/J,PL,R,Ca 73°|o v 100% -__NN =bE FRZz>S @J,PL,SM,Ca g2et__|RS =IN aL r 7 4g\ '177.8 ft:End é ,8/19/14;e a Begin =\8/20/14 -\WPT:4 2 'DH14-10-6 6 \ons 5.0 (177.8-197.8ft)<t 1 50 177.8 -1843aN47|100%ft:No =nu r 7.9,circulation =\ \ 100%Run 47:Drill N Rate=10 min/ft-180 ; p 7 4Logcontinuedonnextpage WATANA201yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO patter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 10 of 36 INCLINATION:-60° -yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO priter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559[a]j Roughness bnfilt By Pyne @ Axial 9 FFaut FOFoimt>n -ECuved -«KSkekoreded ©Bx-Bracta ESOP Onde StGe?|C1 Diametral z (5 dle]»[Hort Somme Sey Bee”See,Se,Som |eaeels8yu}|FrFracture FrregularVB-Very Rough CaCalete -MUSit su Suphide |250 Hh NOTES =DESCRIPTION 3 44 2)pe DISCONTINUITY DATA =roy TESTS4|g =fz 13/53 5 5 xc |tox WATER LEVELS =@ |Fel=|88]Rap |FRACTURES |Eva TYPE and 2,\oswieea|SSER5€iB=|Z/2)%PERFOOT |a O%SURFACE 28 )owo|gao/sen5 8 180 a o)/9 |&B8ER8|necae a &DESCRIPTION aa 5 ="oso gy 5 170.5 -208.6 a DIORITE:Dark greenish t 5graytodarkgreenishgrayVv®|(J,ST,SM,Ca 35 with pink tints,medium to ' -coarse grained,fresh to L ,5.0 7 slightly weathered (FR-SW}vq 50 with a 0.4 ft section being \47 100%@||J,PL,SM,Ca 37° highly weathered (HW),and »100%\L.strong to very strong (R4-f "74 °®|J,PL,SM,Ca 64°}q R5).Joints are smooth to rough,planar to stepped,N Ca intilled,and close to by |widely spaced.(Continued)\ r |Run 48:Drill 7 ty |Rate=9 \,;minfft ' 4 he .|184.0 ft: van Regain185\38 e@ ||J,PL.Sm,ca 27°circulation in 4 .|48;°°95%talus ir 7.1 100% 5 \| 'N 5 rv.oC \ 2 186.7-187.3 ft:slightly to |@ |J,PL,SM,Ca 59°b. =moderately weathered zone,pale |*ol =i greenish gray r,'°J,PL,R,Ca 36 . £| =N a co rv °| s VI P )jy PL.SM,Ca 30 Run 49:Drill Rate=65Fom\min/ft 5 2 '|FR / 8 \ s re+( |N \5.4190os|25 R5 Pa ¢\49 100% x |=2 \100% 7h e oo q gO 5 iS Lssr7 4 @ |J,PL,SM,Ca 49°\ae 2 I 'NY 4 a 8 > °°on =a \=a °N 4 x £rv.Run 50:Drill a 2 an Rate=7 $o .minéttaLrv.Z$|192.8ft:Lost a |||u,PL,SM.Ca 38°circulation a \oo P J,PL,SM,Ca 36% >fF 195 !$.0 @||J,PL,SM,Ca 40°x 4 &|50]>|i/aa%a vo 100%' aL N @)|J,PL.SM,Ca 3o°\4 Z r,/ \oO +| -\ aL b 7 4<<\ Z \ <N<br S|an WPT:4 5 \DH14-10-7 6 r 7 J,PL,SM,Ca 54°(197.8-217.8ft)be an 3+J,PL,SM,Ca 59°77 Sy SL .51)5!||ga%' FR | ay ion 100% i 2 .@ |j¥:PL.SM,Ca 17° OL.fp? 4=200 Log continued on next page ° pay N < 2 <E< = PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DRILLING DATES:8/14/14 -8/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1478 ft SHEET 11 of 36 INCLINATION:-60° AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 a Bm BBedding «shenay «=POPoIehes =EtBode Ep Epidotle,©Ge Guatz one4F-Faut FO-Foliation -C-Curved KSlickensided Bx-Breccia FeOx-iron Oxide Sa-Sand CO)Diametral x |o 2 |Ven StSiepoed Bho CR CMBrte «Hmteeaiie «=Sia |OQ!Fels 8 Oi)&|Farrecure Pregl VR-Very Rough CaCaicte_ML-Sift SuSupride |259%veers"=)o DESCRIPTION 242 2 DISCONTINUITY DATA ae a WATER LEVELSa|2 &|E&=s|2|/8|rao |Fractures |F¥a TYPE and 2 [SSS coh aes5@ig=|Z|2]%PERFOOT |aO%SURFACE a6 Quo ace|Sen5 foO6|°|&88gR|1+002 Pood DESCRIPTION a7 5 SY"lowsa z200170.5 2086 .JPL,SMa 51 DIORITE:Dark greenish t |gray to dark greenish gray \ with pink tints,medium to .|a coarse grained,fresh to @ |J.ST.SM.Ca 60°4 slightly weathered (FR-SW)[7 >a4 u--FRwitha0.4 ft section being \51 .98%RS highly weathered (HW),and \100%IL strong to very strong (R4-a ° J R35).Joints are smooth to |®|J,ST,SM,Ca 59°KL 202.0 tt:rough,planar to stepped,N ™ RegainCainfilled,and close to by,|°J,PL,SM,Ca 33°Sw circulation in widely spaced.(Continued)\talus,cream |.!ag |HW colored 203.0 ft:1/2-inch felsic/quartz vein \'|203.3 Shear -202.9 -203.3 ft:highly weathered |>@ ||J,PL,SM,Ca 38°4 ALTERED DIORITE aroundthe {\°7] vein 1 N L 205 199.5 -203.0 ft:Ca filed healed [v"7}49 4 discontinuities .\52|49 |400% in /-100% i !@|(J,PL,SM,Ca 44°RA to FR J NN - L ®J,PL,SM,Ca 62°s ion N =! a s \4 2 a @ |J,PL,SM,Ca 66° =\®J,PL,SM,Ca 46°r, =| =\\ a oo rv.4oO\ 3 I -\_1297.°&|2086-2155 7)(208.6 PP ju.PL,SM,Ca 65 .@|ALTERED DIORITE:Pale = ° = &|green,medium to coarse °J,PL,SM,Ca 36 =|grained,moderatelyto high "@||J,PL,SM,Ca 38° z weathered (MW-HW),and \ ai}Medium strong to strong i 5 \4y 210 ||(R3-R4).Joints are smooth =|=50 ct J,|,SM-R,Ca 27° ©G|to rough,planar and "53]94% 5 =|irregular,Ca infilled,and "Ly 100%R3 to =8)close to moderately NS R4 5 =|spaced.qe \@ J,PL,SM,Ca 28°7 Sees s r fy g '\an 2]241.6 ft:1/2-inch Ca vein ,'we 4 a 8 ="2 a Ht |°=4 =€S Run 54:Drillis@ayRate=6 $a SN min/t <a <f x Ra 1 z.A[oa]=\ 3 S 7 a i>215 Zy 38 @)jJ,PL,SM,Ca 45°4 <\41291454 5 215.5 -224.2 .[2155]|100%a DIORITE:Greenish gray,t 7.Br medium to coarse grained,\7 ©fresh to slightly weathered |sw ¢(FR-SW),and very strong L >R4 to S (R5).Joints are smooth,a R5 Sie planar or stepped,Ca !ba J,PL,SM,Ca are 217.0 ft: 4 $infilled,and close to »Recain<x moderately spaced.F 7.fegain3\circulation at ='caseing - |217.8 ft:Lost 4 2 on circulation g 5 FR WPT: zt »50 DH14-10-8 =L bv (85)>|]88%RS (217.8-237 8tt)a =100%||J,PL,SM,Ca 32°Run 85:Dri=\ate=9 219.9 ft:3/8-inch felsic/quartz vein.,a minéft \ -220 . '4 Log continued on next page WATANA201-z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pritter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 12 of 36 INCLINATION:-60°1/13/15richarpdPROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:N:3,226,171 _E:1,884,559fyTy;Shape Roughness infilling Py-Pyrite @ Axal 2 EFast FOroiutbn =Cowed -«'KSckereded ©ExBroctia«EeotenOude Seaerd™|__C1 Diametral z {6 fle][Merny Romine Ym SHEE”See,Soa Soe'[SoeFe38ZW&[FR-Fracture Fregul VA-Very Rough Ca-Calote -_ML-Sill Su-Sulphide F3 g a gq NOTES wie DESCRIPTION g ys]ee DISCONTINUITY DATA FS cae TESTS o Zz zr {x |2/66 =xisx|tox WATER LEVELS <a /Fe/Z|/6G |Rap |FRACTURES |Eo TYPE and SYSiESS A KES ,,5 @ja=)3|)2]%PERFOOT |20%SURFACE 2e2/SE2/82n5 FR|290 o 9S oc BB8R|anvrwa?Es 34 DESCRIPTION S erna zs 215.5 -224.2 ' DIORITE:Greenish gray,t 'nd J,PL,SM,Ca medium to coarse grained,\|@ |J,PL,SM,Cafreshtoslightlyweathered! a (FR-SW),and very strong |5.0 e J,PL,SM,Ca (R5).Joints are smooth,"4 50 %planar or stepped,Ca |55 88% infilled,and close to .100% s moderately spaced.[4 e TSMConeruschuo,[STS Ca as |Fa\@ |J,PL,SM,Ca L |224.8 ft:Shear wath DIORITE \,a DIORITE/ALTERE!IORt "Dri contact,surroundedby |»®J,PL,SM,Ca 30°\Aun 86 DailhydrothermalalterationVvj|\mirvft j |>1263.4 @||J,PLU,Ca 407 \ 224.2 -226.4 224.2 \ ALTERED DIORITE:Pale =ih 38 \\greenish white,medium to :56)56%®)|SH,PL-U,K,CL,Ca 35° -225 coarse grained,andfreshto |'9,J ° highly weathered (FR-HW),|"100%©)|F.C.ACa 40"225.1 tt:Joints are smooth to rough,=|\®@ |J,C,SM,Ca 67 SA)RS to bw 4 Blocked off; planar to undulating,and =AS lo flushed hole i Ca infilled.Fractures are S |_|HW for 4 min. rough,curved,and Ca a \Cream 3},infilled.Discontinuities are er @J,PL,SM,Clean 84°}--__coloredS|\_very closely to closely \|226:circulation3spaced.aa 11 duringIéDIOAITE.Gouenish 57|1 |1730 2265 End=:Greenish gray N fe 3 At =|with pale green tograyish =+,_|100%|:rf BC ow cea 74°8/20/14;#1 green,medium to coarse \ae >Begin -<}grained,fresh to highly ||8/21/14 2|weathered (FR-HW),and >o@@/.PL.SM 82°|_|226.7 tt:&|strong to very strong (R4-vq J,PL,SM 62°.RegainaR5).Joints are smooth to l |circulation at a @|rough,planar to stepped,»®|J,PL,SM,Clean 65°casing, 6 |Ca infilled,and very close to |™cream C1}widely spaced.;e J,PL,SM,Ca 16°colored =.@ |J,PL,SM,Ca 58°Run 57:Drill bi ty |Rate=9 +230 7%226.4 ft:1/2-inch quartz vein.3.0 mint §|ALTERED DIORITE at quartz vein |sal 5 |laec,227.8 -237.0|junction.L ft:No os 100%circulation\3 i Run 58:Drill a -\@ |J,PL,SM,Ca 54°Rate=6 2 r 7.min/t cofa ; 'N -2 r €\ 8 1 a |»@ |(J,PL.SM,Ca 29° a °vn \ &t ES XN \RS FRavq I \ f 7] \ 1 N >L §.0235v455 I Run 59:Drill \59 100%@ |J,PL,SM,Ca 64°h Rate=6 .100%min/ft Ly | =\ |@/J,C,SM,Ca 72°| f 7 4 \ | ( '237.0 ft: 74 °Regain 20 %ar @ /J,PL,SM,Ca 68 Ph]circulation x for 5 min, o r 7a cream to \ ;brownish N 0 cream color L >50 WPT: L v7 60 100%DH14-10-9 |9 (237 .8-257.8ft)'100%Run 60:Drill an Rate=6 i min/t ;_240 Logcontinued on next page WATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pritter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/1 4 PROJECT:2014 Susitna-W atana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 13 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 __E:1,884,559 ran)ype _Sha;Roughness j Py-Pynite @ Axal 8 Ut ee gperisow,.SeCiate |1 cretex{5 gale)-(Mork,Rote Gee sis Soete Eamte'|coere=9 Zz wi z [FR Fracture Hrregular VR-Very Rough MCS 3 Sulphide FS g oe NOTESw=16 DESCRIPTION 243)gs DISCONTINUITY DATA z |. aoe TESTS °=&|E>|2/88 |pop |rractunes |Fea TYPE and Qo SS ESSlAasA ,,WATER LEVELS ro]&|=5 w %PERFOOT |20%SURFACE ag |Qeo ge2 ike 8L240aooB8ER|nv0eae g z DESCRIPTION S 5 puro Ys zDIORITE:Greenish gray >@ [2 Pt SM,Ca 56°ttNo:t +_|: with pale green to grayish \circulation green,medium to coarse i -grained,fresh to highly '5.0 4 weathered (FR-HW),and >|5.0 strong to very strong (R4- ' 1 60 100% R5).Joints are smooth to N 100% L rough,planar to stepped,fos J,PL,SM,Ca JCainfilled,and very close to'|widely spaced,(Continued)N ra L '4 'N in /J t a N J r,'Run 61:Drill oa .Rate=8244.4 ft:1-inch diameter dark gray (' to black xenolith \minét 245 ie 5.0 + !61|59 |100% r 7 100% a |4 5 |*@ |J,PL,SM,Ca 50° i \iS ,N\ a s \ 4 2 a 247.0 tt: =ar Flush,cream z .color a ©I 247.8 tt:Lost 42\circulation 5 >a vq -2 I 4 8 Run 62:Drill c roy]Rate=9 =\ ,min/t°Los |[.50 @ |ju,PL,R,Ca 20 as |eR | YS 8 62]5 |00%5 \6 = N 100%=E 5 I.os 4 o \gy ole ; 3 r \/_f 2 252.0 tt: 7 a 5 L >|@||u,PL,SM,Ca 34°Flush,light2a \ ;brown cream =]°N ir £r 7.7 [a]@ \ s 3 .!@ |J,PL,SM,Ca 58° iE r ">7 =;@ |J,PL,R,Ca 63°Run 63:DrillFadnNRate=5 a if 7.min/ft 5}255 5.0 i” ©|*63;©9 |i100%a yy 100% _ EF .@/J,ST,R,Ca 70°4 5 L 5 v i >t S x «J,PL,SM,Ca 23° x =l '|256.8 ft:= °UCS =Zz '° z . J,PL,SM,Ca 60 .24.990 psi<x 7.257.0 ft: =an Packeri. .flushed,fight 7 a ty |:brown g 258.5-259 ft:Very closely I 5.0 sb fractured zone ,64 5.0 54%rx |ba vo 100%Rute s Drill|bal J,PL,SM,Clean 54°min/ft 260 Ly be J,PL,SM,Clean 52° Log continued on next page C =WATANA201--z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO pruter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 1/13/15richarpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-10 SHEET 14 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14-8/19/2014 APPROX.ELEVATION:1478 ft |AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 Q Pei BB ae POSieres Beatle EpEpidote Gk dustz |augF¥aut FOPoiaten C-Cuned --KSlckercided BrcBroca«FeGeton Ode Sa'Sand DO Diametral Pan iit 2 |e Vven”GAGrragenal STSepeee Rtowe - GneAbete Hetetate same'|faeon28wyw&|FR-Fracture (irregular VR-Very Rough Ca-Calcite ML-Silt Su-Sulphide FS 88 g NOTES w=|o DESCRIPTION Q}42)ee DISCONTINUITY DATA =eae TESTS a |g 2y/z 13/153 =s-lvixl tox .WATER LEVELS z &|E2|/Z|88 rap |rractues |$¥a TVPE and Fo [Sze Feu |SESS oyx2BE2,0 |"e |'renroor |252 SURFACE £9 |222 Se2/asx0 8 60 g G z 8888 |vv oes Po sf DESCRIPTION g-|5 SUS oso ow 226.4 -413.5 "260.0 -262.8 DIORITE:Greenish gray t ;ft:No with pale green to grayish \circulation green,medium to coarse | L grained,fresh to highly |5.0 7] weathered (FR-HW),and 4 5.0 strong to very strong (R4-j 64 54%@ |J,PL,SM,Clean 60°-R5).Joints are smooth to N 100% 5 rough,planar to stepped,|.7 ° @ |J,PL,R,Clean 66°4 Ca infilled,and very close to ;e@\uPLS.CL ewidelyspaced.(Continued)|.: /PL,S,68°WPT: '.]0H14-10-10 \(262.3-277.8ft)|-.!"@ j@/J,PL,SM,Ca 24° aa J,PL,SM,Ca 70 '@ |U,C,R,Clean 66° a N ®|J,PL,SM,Clean 66°= fr 7 Run 65:Drill \Rate=6.!mint i [,' 5.0 4265\50 267.8 ft:End.!65)|{/90%8/21/14; r 100%Beginvo00%9/22/14L.\4 N 3 t 7 i]\ =®|J,PL,R 65° a s mo |3 by=a e J,PL,SM,Ca 30°=\ 5 |>@ |J,PL,SM,Ca 64°KN 2678tt:Lost|268.1 tt 1/2-inch Quartz/Felsic \{.mY circulation£vein,reddish tinted \ 8 fr "74 |1%M FR 78.®J.C,R,Clean 70°Aug L LG,R,Rate=8<v4 ©|9)CR Clean 70°min/it+{270 |©|5.0 RS 4 g v i 86 °°ere @ |J,PL,R,Ci 52°|2 ,100%he nh Olean a e io 4 3 |@ |u,ST.SM,Ca 63° Ee I / -2 7 272.0 tt: 7 3 p 7-4 Flush hole, o \ , no returns i a).@ ||J,PL,SM,Ca 30° J £aa\&@J,PL.R,Ca aie NIoy\\ a a \ 4\ ;Run 67:Drill N Rate=8 L ,min/ft VO @ |J,ST,SM,Ca 45° -275 !5.0 4 °L .67 5.0 94%@|J,7 on Ca 43° vu 100%@ ||J,PL,SM,Ca 35° L N 4 I 7]278 -278.5 ft:Closely fractured [' zone t a \ ,®J,PL,SM,Ca 35°T N I.'a -278.5 ft:3/8-inch quartz/felsic .!a ay rabhatyaero 7 vein,moderate to highly L oe 4 MW t added aweathered2inchesoneitherside],"5 as e J,PL,SM,Ca 34°Co ded 'dipping 34 degrees with respect to,,mas @J PL,SM.Ca 8574 HW collar to coothecoreaxis.Discontinuous on |\68];38%®/)PL.SM.Ca 72-4 casing JJcontactwithcalciticandargilic+,>'i oe WPT:cement,weakly cemented uo 100%DH14-10-11 'FR (277.8-297.8ft) N Run 68:Drill fo 4 oJ pty 4280Logcontinuedonnextpageiz py DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO paiter:T.Fisher CHECK DATE:12/9/14 1/13/15richarpdRECORD OF DRILLHOLE DH14-10 SHEET 15 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft =AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 3 Te,cansing Ena ©SEIS BET,cpemwn See |g Frat FOFolaten ==Curved --«K-Slekensided |Br-Broceia FoOnwon Oxide Sa.Serd O Diametral 5 gle),MET Rote Yee en Ee Ge Soa |soe.z_|¥8 |&Ww}%|FR Frecure Hiregular_VR-Very Rough Ca-Calote_M-Sat suSuphice |SSB vcoreGEISDESCRIPTIONoLY48)eu DISCONTINUITY DATA z |. ap 7 WATER LEVEaz=ix |2|96 Su a]x6x|Zox|x xxx LS =alFe OO |RAD FRACTURES |3X TYPE and To |S2H Zu AS 95jw)5|wi)%PERFOOT |26%SURFACE 26 [RRS eEZ|Sans RK |oa0-|2 g|°jz 8898|avane PS DESCRIPTION a ("5 *oy eee =226.4 -413.5 '::Rate=6 DIORITE:Greenish gray r .|min/ft with pale green to grayish \MW green,medium to coarse \ -grained,fresh to highly |5.0 }bE °J,PL,SM,Ca 20°4 weathered (FR-HW),and on 50 38%strong to very strong (R4-|68 "4R5)}.Joints are smooth to \100%4 L rough,planar to stepped,.7 4 Ca infilled,and very close to |* ,®J,PL,SM,Ca 63°KLwidelyspaced.(Continued)N e @ 3 PLR,Ca g2° r 7d J,PL,R,Clean aa. 5 |\ 4 NN Ly | \ I a 281.0 ft:Ca/Clay filled |*Run 69:Drill q discontinuity dipping 20 with vq Rate=7respecttocoreaxis,moderately I minvftweathered1-inch on either side \ 285 re 5.0 ;@|J,PL,R,Ca 75°|4 !aa)°°|100% ir /.100% a |J NX 2 oe J,PL,R,Clean 55° 2 =N 4igby:J,PL,SM,Clean 59° E '| =N ;w |)|J,PL,SM,Ca 37° L 7 /4 2 4,ST,R,Ca 59°£N ,&rl Q J,PL,R,Ca 60° -g |Run 70:Drill 7 o t ,_|Rate=8c=)°in= \ \@|J,ST,SM,Ca 73°P|min/ft +290 |©.5.0 @ |J,PL,SM,Clean 60 -RS | fs)a 5.0 3gz|70 82%®|J,PL,A,Clean 63°FR=N 100%®J,PL,R,Ca 65 a 2 oe 4 co)I =.®|J,PL,SM,Clean 65° f o¢ . 4 @ J,PL,SM,Cl 74° |[oy a lean bh)| -£NXwy8rv |ie)\pa a 1 SL fo)N @ |J,PL,SM,Ca 50° q=)Z [a Pa on 4 S i é °'@ |J,PL,SM,Clean 60° £rv NN . 4<P a :Run 71:DrillESN Pop Rate=6 ao by min/ft a v7 :J,PL,SM,Ca 63° ob 295 7 50 J,PL,SM,Ca 66°4 ©;74)>92% &u,100%©||4,C,SM,Ca 17° g »4Zzl,”4 .od J,PL,SM,Ca 34°oO ; : =N @ (J,PL,SM,Ca 55° aL ae °4 s \ \ @)|J,PL,SM,Ca 47 \ =\ <a ca J,PL,SM weT:4 5 \DH14-10-12 6 ir '.4 °J,PL,SM,Ca 8°(297.8-317.8ft) Tt |= aL \72|+8 |ila7,. 1olry.100%@ |J,PL,R,Ca 66°Run 72:Drill =vy @|SPL,R.Ca 79%Rate?iN °J,PL,SM,Clean 41°' S f 7+e 4300Logcontinuedonnextpage zw DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO_pritter:T.Fisher CHECK DATE:12/9/14 WATANA201. 1/13/15ticharpdPROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 16 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft =AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 fa)Type .nness infilling Py-Pynte @ Axal 8 Hy ponte,ies REDE,Beek,fest,Soe |Coanex|o Z lg!»Wert,Stine Gee Skee”oe Som Goa |eaeFow8aiBzFRFractureHeregularRenRoughCacaetsMCSxSulphideF3S%q Noesw=16 DESCRIPTION 9p 2]ee DISCONTINUITY DATA z T. aoaeé ESTS Q z z=|E_/2/88 eu o-|v5x |tox WATER LEVELSivaa@jreoORQDFRACTURES|Ea TYPE and 2 S95 eSa A &ES 9 @(/e-|3)2]%PERFOOT |a5%SURFACE ag |2e2/ge2|Sen5 8ahd*B89R|vv oe?PE 2h DESCRIPTION 5 &mere 2 &- 300 2364-4135 Tr $-3-PL SM,Clean he DIORITE:Greenish gray /@ |J,PL,SM,Clean 594 with pale green to grayish - green,medium to coarse ' -grained,fresh to highly '48 - weathered (FR-HW),and os 72|48 |i]g7o,strong to very strong (R4-1 >R5).Joints are smooth to 100% a rough,planar to stepped,J Ca infilled,and very close to 'widely spaced.(Continued)\ '@ |J,PLR,Ca 64°tf |-4 .| / @ |J,PL,SM,Clean 55° ||b N - '@ J,PL,SM,Ca 54°Bun 73:Drill|'J,PL,SM,Clean 63°SS minitt 54 : Z os 54 ®|J,PL,SM,Cl °430573|51 96%J,PL,SM,Clean 65 "100% can a |4 NX 5 , a 2 1 a s \ |iy / =; R5 =N a o ol FR | 23 1 -&N s )@||J,PL,SM,Ca 40°Pt | i 8 \Run 74:Drill 1 8 in 74:3 .32 ®|J,PL,SM,Clean Took Rate-9eCo)|ral F?|)|92%> >°@|J,PLR,Ca 74°mint v |[-- ]L319 |8 \100% | o ?.][ej \ =!e J,PL,R,Ca 20° Qo N .3 7 a=\ 2 | =.311.4 ft:End :CF 8/22/14: -2 !Begin 4 5 .@||J,PL,SM,Ca 35°8/23/14rs)4 Run 75:Drill [a]fl 5 Rate=9 a °\35 mind d€74 1751 35 |100%&'|100%@||J,PL,R,Clean 44° o \ |-vo @ |J,PL,SM,Clean 49°7 ".NY / \ r-315 !4 \ \ta 315.7 It:Quartz/Felsic vein,highly |°J,PL,SM,Ca/CL 32°HW -weathered 1-inch on either side '2 ; _| an 29 R4to Run 76:Drill an 76|*79%RS Rate=10 N 100%@J,PL,SM,Ca 82°minétt -Vv @,|J,PL.SM.Ca 32°4 1 J,ST,SM,Ca "\N \ ' \ L 'FR WPT:4 N DH14-10-13 'J,PL,SM,Ca 55°(317.8-337.8tt)v 3.9 *J,PL,SM,Ca Bert\. .77|59 |Ilea%J,PL,SM,Ca 68°)5 7.Run 77:Drill | oo 100%Rates? N min/ft /y-320 Log continued on next page °|WATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]zy DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO praiten:T.Fisher CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 17 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft =AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 Q Peg Eat POenctes Bolle Ep Gece |°As2EFaut FO-Poiaion C-Cuved -«K-Slickensded Bxtiweda Eerie Onde Sa-Sand O Diametral i >le Wer BR Gnhogonal Steep Aeon Chettyte freee Sreeecte 5ae.=o 3 §aw]Lepr Frregular__VR-Nery Rough Ca-Calete MCS SuSulphide |3S 3 Ea veersw=16 DESCRIPTION 9K 2|e@s DISCONTINUITY DATA =aor WATER LEVELSo{2 z=j=.|2|881}roo |rractunes |Fu S|SOS |EOS|w aKS&<=|a2/z|°¢rae TYPE and Zo |38Go/<2a/ge8S 8fe)eye)S|&%PERFOOT |20%SURFACE GO |E#Z/¥EZ/8ina KRPra]6 ra 839 atoaue 3 gh DESCRIPTION c 5 oor NY x3203264-4135 7 1 J-PLOSM,Ca 6 DIORITE:Greenish gray boy with pale green to grayish \ green,medium to coarse \ -grained,fresh to highly |5.a weathered (FR-HW),and 4 5.0 °strong to very strong (R4-|7 88% R5).Joints are smooth to '100%e J,PL,R,Ca 38° a rough,planar to stepped,fo @ |J,PL,SM,Ca 48°0\=Ca infilled,and very close to \widely spaced.(Continued)N J,©,SM,Ca 45°IN 4 L \4 'N 7 \ _-' 4 ty _|Run 78:Drill \Rate=12.!min/ft L ,e J,PL,R,Ca 28° -325 wo 3.9 e*|'J,PL,SM,Ca 4374 4 |78}9 tl)90%J,ST,SM,Ca 24° r yl 100% \ a j 4 . '@ |J.PL,SM,Clean 50° 2 r 7 J,PL,SM,Ca 50”g '©||J,PL,SM,Ca 2574S .£\ 4 ®fp /.=\P=]'g . _pf "7 4 i $\ oD | 5 N a]in on g @ fl 48'Run 79:Drill L =1€ca |,|eu,PL,VR,Clean 80°| __|Rate-18+1 J,PL,SM,Ca 37 -330 |©'5.0 RS)FR 4 9 [vs 5.02gVI79 98%©)|J,PL,R,Ca 44° a 7 N 100% =L 2 r/-e||ju,PL,SM,Ca 13°4 z 3 E a \ ks r [\">=L 2 ;a q «|S > 2 Q a|o \ 4ia<rv.fa 2 \ <i 'Zz se]N=ty |<P \@ ||J,PL,SM,Ca 34°Run 80:Driil | 2).|@ |J,PL,SM,Ca 48%Rate=6 q 7 J,PL,SM,Ca 57°minétt SL 335 48 4 a \80 5.0 72%°J,PL,SM,Ca 32°=r+° @ |J,ST,SM,Ca 53°Fa v 96%,ST,SM, =|.. 1 z aOo\ +'J,PL,SM,Ca 21° =N aL a 4<y ®||J,PL.SM,Ca 33° <NEerv S|.WeT:4 5 N DH14-10-14 a rv (337.8-357.8tt)1)\5.0+\wal .81)°°|)r00%|x ry |100%@ |J,PL,R,Clean 54°Run 81:Drill x \°Rate=10,!min/ft L ,®J,PL,SM,Ca 28° 340 Log continued on next page -yz WATANA201DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO pritter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 18 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14-8/19/2014 APPROX.ELEVATION:1478 ft ©AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 a Ty ss Infilling .Py-Pynite @ Axa 8 HPs egee,Riy Re,Soe,fein Saat |Soarz{6 Ze ||W,Rome FEM RAE ete EO SS |Os-2 8 4 rd 2%|FRFracture lrreguiar VR-Very Rough Ca-Calcite --ML-Silt Su-Sulphide z g a Ea NOTES Th {WwW )S]ww eous TESTSulOoDESCRIPTIONoa>DISCONTINUITY DATA xz].F ao |Z z=/E_|2|98 =o--yix|tox WATER LEVELS z a |Fo 88 |Rad |Fractures [Evo TYPE and S|See |Geum!NSS5&|w=|3)/%PERFOOT |20%SURFACE 2g |209|Sc3/8=N6L402G|O |=B89R|ww oo?PS 2 DESCRIPTION e7 "5°|*eese a = 226.4 -413.5 '; ° DIORITE:Greenish gray t a”@ |J,ST.SM,Clean 56 with pale green to grayish \ green,medium to coarse ' -grained,fresh to highly |5.®|J,ST,SM,Clean 65°4 weathered (FR-HW),and V4 5.0 ,strong to very strong (R4-|81 100% R85).Joints are smooth to \100%341.5 ft:Lost a rough,planar to stepped,7.2 ft of core, J Ca infilled,and very close to |'used second widely spaced.(Continued)N barrel to L ,retrieve \ .\4 N Ly | \ | S » r 7]Run 82:Drill '@|(J,PL,SM,Ca 42°Rate=5 N \min/ft L \ }-345 or 5.0 \+ 7 82]9 |400% r 100%wo 00%@ |u,PLA,Ca 60°|.|4 \ 3 by co]\ 2 I a ir \ 4 oO 'aa a=\ ; @ |J,PL,Clean 56 3 \ L g \" |_ od | =N i L |P@ |J,PL,SM,Ca 32°]®an J,PL,SM,Ca 568 &\Run 83:Drill 7 :rv id Rate=5 =vO ®||J,PL,SM,Ca 35°mint L350 |o \5.0 R5 |FR | ©8 >fea}%9 |fo0%=|2 Ps N 100% HL 2 ir 7 |4 Bg ! 5 -. S$&[/.eT 2 ar ®|J,PL,R,Clean 59° q ny '=\™. 4 8 aoO\ =Q \=a °'352.8 ft:End a x £ty 8/23/14; R ' I BeginZzosN8/24/14 5 [ir os 4 Run 84:Drill2.|@ |J,PL,R.Ca 60°KL Rate-6 " a hi'_|min/t ob ass 5.0 _ ©|g4|5-9 |190%Fa 100% cr . 4 Zz royoO\ ='eal \Oo }NL 7 | 4 <4 z<|<x at a WPT.4 XN °DH14-10-152|>@ |J,PL,SM,Clean 53 (357.8-377Bit)g vy ||ggica\a5}59 |'y00%;; | %[7 un 85:Dritlx=\ , 100%Rate=8 2 .©/J,PL.A,Clean 63°mint lo]," 43360Logcontinuedonnextpage S ON < z <=Ee<x = Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paiten:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DHi4-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 19 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 a y|.Shay Roughness tnfilling .Py-Pynte @ Axalfo)J-Joint B-Bedding PL-Pianar POQ-Polished Bt-Biotite Ep-Epidote__Qtz-Quartz Ob alrF-Fault FO-Foliation C-Curve K-Slickensided Gx-Breccia FeOx-lron Oxide Sa-Sand jarmetr: x fed >©SHY Shear SO-Gontact yetedulating SM Smooth CL Clay 'G-Gouge '3e-Sencite ae)Fels 8 4 1G)>[earache rrrequar”VRVeyRough Catala MCSit-SurSuphide |Sah NOTESn=15 DESCRIPTION e+2|#e DISCONTINUITY DATA z |. cak TESTS a 2 =F l=_|2|/98]|pap |eracturnes (Eu 2 1x8x|tox]«xxx WATER LEVELS =fe oo ria]TYPE and rz S2w/Zw Nosy woa=[w=|3|2)%|PERFOoT |26x SURFACE ag |2e2/seesenn360a6x88gavoo?pa gh DESCRIPTION F 5 owe ay = 226.4 -413.5 ,360.0 -425.8 DIORITE:Greenish gray t 'a ft:Water with pale green to grayish \added at green,medium to coarse |collar to cool a grained,fresh to highly |5:casing 4 weathered (FR-HW),and vo 50 I e|/J,PL,R,Clean 43° strong to very strong (R4-I 85 100% R85).Joints are smooth to \100%\ |tough,planar to stepped,f 7 e J,C,SM,Ca 16° J Ca infilled,and very close to |' ,widely spaced.(Continued)N h\/>@ ||u,PL,SM,Ca 23° a {= L >°J,PL,SM,Ca 17° \ { -'J,PL,SM,Ca 70°ng 4 rv.%J,PL,SM,Ca 75%Run 86:Drill \Rate=9 .!min/ft -365 re 5.0 ||7 !86|59 ||70% ry 100%vo @,J,PL,SM,Clean 75° +95)PLL SM!Ca sav)4 --_@ ||J,PL,SM,Clean 32%ro 5 @ ||.ST,SM,Clean 30°FR 3 I L 5 .4 a ,4=oe J,PL,SM,Ca 20° |367.5-368.5 ft:Very closely l fractured zone |* r B on @J,PL,VR,Ca 90°J D t£N lo |J,PL,SM,Ca 70° &rv.a \ a o I 4 8 s Run 87:Drill s on @ ||J,PL,SM,Ca ate mint |370 |.5.0 J.C,SM,Ca 19°RS | 8 >)[a7]59 |76%@ ||J,PL,SM,Ca 32° 5 {a =.100% =a 3 ir /.|qzg9e||ju,st.R,Ca 17° a 2 |»@ |J,C,R,Ca 52° s re ra | -Da !4 -|€\ 3 S re =Q I S|rs)N @ |J,PL,SM,Clean 53° Siva£rv. °@|373.3,374.7,and 377.2 ft:an ;|Oiscontinuities have moderate °z °weathering within approximately |.@/J,PL,R,Ca 78° <>(inch vo Run 88:Drill 7 |@ j|J,ST,R,Ca 56°un 88:Dri3.Rate=5 a tL / @ ||SH,PL,SM,Ca/CL 28°mint >375 '5.0 _ z \5.0 '@||u,PL,SM,Ca are FR to L 88 78%<7.MW o an 100%\=}.4 z a G \ t .!@/J,PLR,Ca 77°| Zz \«J,PL,SM,Ca 27 <N<t 7 S|vO @ ||J,PL,SM,Ca 32°WPT:a N 3 DH14-10-16rsLy|50 @ |4.0,S,.Ca 56 (377.8-397.8ft) +an 50 @ |J,PL,R,Ca 60°FR oe N 89|>80%q o i'100%°J,PL,SM,Ca 18°pues Drill=°an.= x J,U,SM,Ca Bae Rates |7.|_-380 Log continued on next page WATANA201---z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO priter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 20 of 36 INCLINATION:-60°1/13/15PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft ©AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559oOTy,Roughne:Infilling Py-Pyrite @ Aval 8 PB pean,tn FOR,eae,Epis Seay |oneal x |G z le Viven=ORGrinogonal ST-Stepoed?Aiton”GhCnite imeeraite Sia”|OPSon8Wey]2 |FR-Fracture tereguiar VR-Very Rough Ca-Calcte -ML-Silt 3u-Sulphide 2253 NOTES ae o/2]ys oous TESTStialRo)DESCRIPTION St 2]as DISCONTINUITY DATA zl +or WATER LEVELao|Z ===|2|/88]ron |rractunes |$e So |)xox|ion sae SFa&ibe S|o9 ee TYPE and Fy |Seu|e2e |Sahsro)a wr)5 w %PERFOOT |20%SURFACE So |gzz|¥2 BrKe5380aGxg89R|vv 002 Pe ef DESCRIPTION &r ese z 226.4 -413.5 e ||DIORITE:Greenish gray by |with pale green to grayish \®(J,PL,SM,Ca 47° green,medium to coarse '|:grained,fresh to highly |*5.0 \1 weathered (FR-HW),and "4 50 J @ |J,ST,SM,Ca 69° strong to very strong (R4-{89 80% R5).Joints are smooth to 100% |rough,planar to stepped,foo 44 Ca infilled,and very close to \widely spaced.(Continued).J,PL,SM Ly | a \ \e J,PL,SM,Ca 23° J N \ Fof ol |e ||JPLACa 17° a N 4|/.\Run 90:Drill ' |Rate=7 N min/ft L ,|I 385 \34 @ |J,PL,A,Clean 53°7] N |90) "90% in so 100% L.ol.4.I ®J,PL,R,Clean 66 as 386 ft:Barrel &roy won't catch, s a @ |J,PL,SM,Ca 63°é:,@ /4!PL,SM;Clean 5744 tnp out rods <7 NX|£4 2 '4 -\ =\ F \ .=t 7.387.8 ft:End 4 3 ' |8/24/14; i=\°FR Begin s LP |di J,PL,R,Ca 34 8/25/14 \ o |4'3 s Run 91:Drill9Ly_|Rate=3 §\mint +1 -390 |Wt |»5.0 ae S|ot far}5%|100%=100%8 | °@ |J,PL,SM,Ca 55°}3 7.|Ee \ x]1 2 ' Fe r 7 @ |J,PL,SM,Clean 53° 1 \ 5 2 1 4 =\®J,PL,R,Clean 63°b.8 [7 m, a 'y |fs)\ J€LO @||J,PL,SM,Ca 38° no \ °&x @ |J,PL,SM,Clean 56 \ _-r / '|Run 92:Drill 7 N Rate=6 +,|min/ft \ I 395 l §.0 a 5.0 Ré4 toon9286%RS '100%.J,PL,SM,Ca 22° L .@ |J,PL,SM,Ca 50°A 7 a |@ |jJ,PL,SM,Ca 36° -397.0 ft:Moderate weathering on @ /J,PL,SM,Ca/Py 71°AY MW 7 approximately 2 inches on either ! side of discontinuity ' arn a an FA WPT:4 \DH14-10-17 rv.(397.8-417.8it) 398.6 ft:Moderate weathering \ '36 e J,U,SM,Ca 33°MW i approximately 3 inches near N 93)100%R5 Jdiscontinuitya100%pun 93°DrilllFRminstt y_400 Log continued on next page 7 WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}_richarpd--Zz-DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pritter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 DATUM:Ground SurfaceCLIENT:Alaska Energy Authority SHEET 21 of 36 INCLINATION:-60°1/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559OoType.Shape ughness lov Py-Pyrite @ Axal2Eran FOromtin C-Cured --KSickorsded BxBacta ESOS vide SEES |Ci Diametral x |B Ze)=HET,RSM BP Me ee Sette Soe |coeFo28Fwyz|RF Hrregular VR-Very Rough Ca-Calcite -ML-Silt 3u-Sulphide 389 EA veersiiaRo}DESCRIPTION 2 3]ey DISCONTINUITY DATA z |. oor s a >=(zx 3/65 Ew 3]xipx|tox!«WATER LEVELS x @ |F2|2|88]ron |Fractures |$20 TYPE and Tog osu |FZO/S5ESa)elu |3)2)%PERFOOT |aG%SURFACE a8 oee|seeisens R400aoaBSBIS|nwrowoe PS 3 DESCRIPTION x 5 pura && 226.4 -413.5 LS DIORITE:Greenish gray boy |with pale green to grayish \ green,medium to coarse |@ jJ,PL.SM,Ca 60° -grained,fresh to highly |»50 4 weathered (FR-HW),and "5.0 ,strong to very strong (R4-|93 100% R5).Joints are smooth to .100% L rough,planar to stepped,'|e U.SM ° 4Cainfilled,and very close to \ 4,U,SM,Ca 38 widely spaced.(Continued)\ he 5 i 4 'N 74 @)|J,PL,SM,Ca 48°.1 \ a \\-| rv Run 94:Drill \Rate=4.!minft +405 io 45 4 !94}58 Ili gox L gM.car LS |90%J,PL,SM,Ca/Py 462k a an J,PL,R,Ca 48°N\J N \FRsaa\}RS oO \=1 a s N +2 .,' -\='=NX -S|408.0 and 409.0 ft:1/4-inch ion 7 2 Feisic/Quartz veins,welded | B >fa)vo 5 @ { . 4fo}N Run 95:Drill(o) <bos Rate=7 =' 1 @ |J,PL,SM,Ca 55°min/ft 410 |S |*5.0 4 S fas]8 |trae<=\ 2 N 100% \8 r 7 4e\ ®\ a N @ /J,PL,R,Ca 66°F ../4 a >1 ®|J,PL,R,Ca 64°7 =N °WPT:O|412.4 ft:Moderately weathered2 |,"@)|J,PL,SM,Ca 45 DH14-10-18©|inches on either side of j MW {412.1-437.8ft)O|discontinuity \ 4 - c L ,R3 to 2 Vins.o PL,R,Ca/P ° re | o3|41395-4198 Ly 14935 CO,PL,R,Ca/Py 30 ANDESITE PORPHYRY:Xt @||J,PL,SM,Ca 45°-Greenish grey to grayish vas Run 96:Drill 1 green,very fine grained with |.)Rate=7MediumtocoarsegrainedcqeJ,PL,SM,Ca 22°min/ftporphyriticcrystals,Ny415moderatelyweathered ry 5.0 ;4 (MW),and weak to medium My 96|29 |fF eqaqstrong(R2-R3).Joints are @ |J,PL,SM,Ca 62°smooth,planar or curved,Na 100%ue |Ca infilled with pyrite BI |crystals,and moderately Veespaced.SI Wy Oy e J,PL,SM,Ca 16°R2 to)saw"I @ |J,C,SM,Ca 66°4 R3 |a J \ NawSI L yt 4 SI Wy ral 419.0 ft:|."Sf 197)|||86%@J,PL,SM,Ca a5?|__|BGS =9445 | Ny 100%Aun 97:DrillcrRate=6tage||CO,U,SM,Cay 48°}Re minstt p 420 Log continued on next page 7]WATANA201-z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO paiten:T.Fisher LOGGED:J.Holiand CHECKED:P.Richards CHECK DATE:12/9/14 1/13/15richarpdWATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-10 SHEET 22 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:N:3.226.171 _E:1,884,559oOTy;hness Infilling Py-Pynte @ Axial 8 Fey poesia,Boia ERE Bees,fest,Saat |Somnetax|i 2 a Vien”GROrhogenal St-Slopoee”Ringe Chenérte «oHmieaite «Sem |50e-Fe 2 8 Wyo)&|eRFracure Hreguar -VRLVery Rough |GaCalote MUS su-Suipnide |SS B NOTES=pW S|]wu aun TESTSWwoODESCRIPTIONQ<>DISCONTINUITY DATA x & Oo {2 Zz jz_|2]88 €a vigx|tox WATER LEVELSZzqleeOO|ROD FRACTURES |Ew TYPE and Tq |\Sea|FZE/ASES ypPa=|R=/2)go)%PERFOOT |3.5%SURFACE ag |2es/ee8iszis & 420 a 6|o /é@ BB88R|aeons 3 34 DESCRIPTION zo 5 Ed "(ee299 = 419.8 -430.2 "1419.8 | DIORITE:Greenish gray,|>_|©|J,PL.SM,Ca/Py 60° medium to coarse grained,\@ |J,PL,SM,Ca 63°™ fresh to moderately '( a weathered (FR-MW)},and ['1 @ |J,PL,SM,Ca/Py 61°4 strong to very strong (R4-on 97 51 sexR5).Joints are smooth to ( ;fo ° rough,planar to irregular,\100%®/J,PL,SM,Ca/Py 63 a Ca infilled with some pyrite [7 |>acrystals,and very close to -|'®/J,PL,SM,Ca-Py 66° moderately spaced.N(Continued)by _| \ a l 422.9 ft:End q |*8/25/14; an Begin |;rs |ER 8/26/14 . |>Run 98:Drill 1 \Rate=8|@ ||J,PL,SM,Ca 30°minftt L-425 44 47 4 |4.9 9,.Yo>%el @ 4,PL.SM,Ca-Py 59° wy 96%| | @ |J,PL,SM,Ca 59° a |@ |{J,PL,SM,Ca 32°,7 3 beC7]\ 3 1 a s \_] g ./@ |J,PL,SM,Ca 62° ='@ |J,PL,RCa 45% cs N a =ra +4 3 | 5 L 4,U,SM,Clean ase} °i a 5|429.5ft:1/4-inch Quartz/Fetsic ' 5 Ré4 to|FR to 4 8|vein,21 degrees with respectto |*ae @)|J,PL,SM,Ca 45 R5 |SW|core axis,wekded "o es =a *N JO ft bof -430 |os po,[105.4 |Bo Pe Run 99:Drill g 430.2 -436.5 H |430.2)99)46%td »J,PL,SM,Ca/CL 30°Rate=7 .=:ay < -=|coarse grained,moderately |an a \4 @|to highly weathered (MW-y eB |feb e J,PL,SM,Ca 20°|HW),and medium strong to |ae |strong (R3-R4).Joints are =\ 7 o@|smooth to rough,planar or ,-q|irregular,and Ca infilled.1a e °.8 Shears are slickensided,.; JWR,Ca 85 7 Bt4-10-19oOplanarorirregular,and Ca Hf "9 - (432.1-452.8ft)|infilled with pyrite.=)s : :: -«|Discontinuities are very yO 7 =|close to moderately =\Kd °R3 to MW tolxspaced.@®|J,PL,R,Ca 60 7 Ra |HW 7 Ss Run 100: 7 -_;:Drill Rate=7 436.5 ft:Contact between =)| :min/ft ALTERED DIORITE and Hf 7 @ |SH,PL,K,Ca 60° +435 DIORITE dipping 30 degrees with |'=-\5.0 4 respect to core axis.Gradual IN 100 59 |fege,* transition,however trends around |//° @ |J PLR CaP 65°discontinuity =100%es L "Wt 4 =\S 1100.° 436.5 5040 14365 @)|[4 PL,K,Cacia 1S DIORITE:Greenish grayto +;.greenish gray with pink \ 4 tints,medium to coarse \ grained,fresh to slightly .@|JR,Ca 38° weathered (FR-SW),and an -strong to very strong (R4-\: a J,PL,SM,Ca 45° 4 R5).Joints are slickensided \ Py R4 to|FR to to rough,planar to stepped,ae 3 R5 |SW and Ca infilled.Fractures ar 38 .@ |J,PL,SM,CL 55° a are very rough,irregular,104)62% _and Ca infilied.Ly rool |||©|,PL.SM,Ca 55°Run 101: Discontinuities are very \°Drill Rate=5closetoverywidelyspaced..!:min/ft 1 a tt:_I440Logcontinuedonnextpage .Zz DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO.pritter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 23 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 Q yy B-Beddi ie Booiened Br Bion Ei Oe duan @ hal g FFaut FOFolaton COuned KK Slickensided BxBrectia FeOrtenOxde Sesem |Ci Diametral:_|é eeFo384Wi%|FR Frecure beregular VR-Very Rough Ga-Galcite ML-Sill "Sulphide sa 3 q NOTES wu 15 DESCRIPTION gh s)es DISCONTINUITY DATA xz].aak TESTS a Zz z|z_|2!1 66 =a xi5x|tox]«xe WATER LEVELSxars<oo RAD FRACTURES |32a TYPE ard Fo |\S2uleza &SSS wofe]ze /w |5)&%PERFOOT |20%SURFACE ag |oee ge?gzns 8440aOoivaB888R|a+0w?g 2 DESCRIPTION =5 wero eg «= a 436.5 -504.0 e?|S PLR Ca 57°DIORITE:Greenish grayto |>|JL PL,SM,Ca 35° greenish gray with pink \ tints,medium to coarse .|r grained,fresh to slightly |0 .° 4 weathered (FR-SW),and vo 50 @)j|J,PL,R,Ca 45 strong to very strong (R4-!101 62%FR to R85).Joints are slickensided |\100%sw L_to rough,planar to stepped,in an 4 and Ca infilled.Fractures °are very rough,irregular,.!@||J,PL,R,Ca 40 and Ca infilled.boy \Discontinuities are very \ a close to very widely spaced.|4 (Continued)['v4 i a \°_ L .J,PL,SM,Ca 34 Run 102: @ |J,PL,SM,Ca 59°Drill Rate=7 N mint >0 ®/J,PL,R,Ca 65° 445 \30 ®@ 1J,PL,R,Ca 65°7 N |102 "68% IPLAC ° FR hes 100%°PPL,A,Ga 4 tL i 4 'N = L @ |J,PL,SM,Ca 60°}.ro 'on ®|S PLR,Ca B9ep tN FB 0={ £ =FA L '|4d =\@|J,PL,R,Ca 72° =i =\ a r 7.=&\ 3 i =\i]_ a os |448.8 -452.0 ft:Very closely \ \|a 5 |fractured zone .Run 103: 7 e a Drili Rate=4 od \min/tt +\ +450 ss |>39 a cnt | :)2 g \ \103,FR MW 6 = \100% "Eh 3 eo |4 3 8 4 N£Fe t 7 Js;\ =a I 4 £a &|*ra]°on x f=)IaL°\452.8 ft:End 4 ©£he 8/26/14; Kd Begin3os|B/27/14 ea bos 4<\ ,Run 104: =.Drill Rate=6 ©L min/ft 3 "4 >;455 '3.0 FR,|,VR,Ca o°4 a |*toa 59 |100%FR Ff on 100% pa Er 456.0 ft:Discontinuity is rough |@'J,PL,R,Ca 77°|5 FS with polished faces os G a RS x \ RL a |Pd \ z \ ¢N F neS[\J >NN a L ¢Ly 88 aL N 105,5°f |96%eye i ow a 100%Run 105: x \°Drilt Rate=9N!min/ft =ros >|4460Logcontinuedonnextpage WATANA201Zz SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 24 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft =AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 8 Aid int B+fi BL Banar scr aero orBiote Ep-Epidote _oe art °Axal 2 FFault FO-Foliation ©C-Curved -K-Slickensided -Bx-Breccia.©FeQx-lron Oxide Sa-Sand ©Diametral x to 2 |Ven GROen Steamed tow Gnehbite Herbefanie Sica”bof.Fe be 8 |g)&|eFracuue Hrreguiar__VR-Very Rough Ga-Calate-_ML-Silt SuSupnice |FSR 'CarsRE]SG DESCRIPTION oi 43|ve DISCONTINUITY DATA z |,core WATERazriz|3|/466 En Oo «bx |tox "LEVELS «2 Ge 9°ROD FRACTURES |=a'0 TYPE ard Zo |Oz4|Ez2u SSSA 0 9 eju-)3|2]*PERFOOT |29%SURFACE 28 |2e2/Sz2|sens 8|ago a °c BBSR|anvroosr Pe gh DESCRIPTION x 5 jeero oe = 436.5 -504.0 Nn DIORITE:Greenish gray to 7 greenish gray with pink tints,medium to coarse l -grained,fresh to slightly '50 @ |J,PL,SM,Ca 45°-| weathered (FR-SW),and om 5.0 i @ |J,PL,SM,Ca 46%R5 strong to very strong (R4-;105)96%YX R5).Joints are slickensided '100% ° a to rough,planar to stepped,so 4 and Ca infilled.Fractures j e J,PL,R,Ca 19°WPT: are very rough,irregular,N DH14-10-20 and Ca infilled.rm (462.1-482.8ft)Discontinuities are very -close to very widely spaced..y 7 (Continued)) @||J,ST,SM,Ca 42° >|\ ||\ _ \@||J.ST.SM,Ca geek q ,.J,PL,R,Ca 38 Run 106: Drill Rate=4 .I mint +465 oo 5.0 @||J,C,R,Ca 40°4 .!106)5.0 86%»J,PL,SM,Ca 37° ae 100% ={f 5 '@)|J,PL,SM,Ca 40° 2 +@||J,PL,SM,Ca 4424 2 ;; 'sg J,PL,SM,Ca 53°\, .§|466.9 ft:3/4-inch wide \Vv,PL 60°T SN 4 &| Felsic/Quartz vein,dipping 60 /.| rj degrees with respect to core axis,\=welded contact N R4 to _'1 R5 a 5 4 3 1 E \ =7Fa}| a ®|FR to 4 f]N Sw Run 107: °/|Drill Rate=9 £min/ft +\ -470 |'3.0 @ |J,PL,SM,Ca 45°4 o 8 7.1071 5.0 @ |J,PL,SM,Ca 50° bo Ifa]=\100% =L 2 '4 @ |u,PL,SM,Ca 58°4 g 4 a N a = s}[FE a =-D 1 4 -=\oT)S a S)' @ ||J,PL.A.Ca 20° =Qa t SL °\4 x £/ o eed<x s | Zz 0 N =a sl 4 Run 108: 2 .(Drill Rate=7 o a min/ft a g -475 !§.0 i &|frog &°|)90%®||4,PL.SM,Ca 30° :wasters voreney ||toe fa a \e J,PL,SM,Ca 32°\\a z "4 |oO |®J,PL,SM,Ca 27°R5 st _iN SL oJ 4 < z | <\ =an Z|;||J,PL.SM,Ca gae 4 >NN a g oy}88 al .og >|iiza%FR : a 7.Run 109: >100%Drill Rate=7 o |minétt oO OL '=4=480 Log continued on next page 8 a DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards =|SUSITNA-WATANA HYDRO prnten:T.Fisher CHECK DATE:12/9/14 = PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 25 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226.171 _£:1,884,559 Q Jen B-Bedi Fs Be iehed -GrBietle -Ep-Epidot Orcas &aval|Join i a Poli:|.2 Prat FOfotaton -CGuved --K-Shexeneided ©GxBreccia --FeOrkon Oxide |Sa'Sand OD Dametral e =|Wen”GaGrhagenal St-Slepped'Afowgh --GhGhifite Hertdtatte «Sona |Oe=2 8 Gly &|FRFracture Tereguar VA-Wety Rough Ga.Caleta)-ML"Silt su-Suiptide |89 A Nearswi=|o DESCRIPTION Qo "43 |ee DISCONTINUITY DATA x |, aae a Zz x {iz 2/96 =3)vi5x!tox WATER LEVELS =a@ |FslZ|/86 |Rao |FRACTURES |E¥o TYPE and Fo (Osu EZuINGSA&¢w=Z|Z|%PERFOOT |26%SURFACE ag (Que gE2|Sine480aocBBk8|are we Pe 2 4 DESCRIPTION &5 puso yf 436.5 -504.0 ' DIORITE:Greenish gray to 'Jgreenishgraywithpink tints,medium to coarse ! -grained,fresh to slightly .4 weathered (FR-SW),and |5. strong to very strong (R4-\103 55 (74%R5).Joints are slickensided N e ly PLsMc 48 a to rough,planar to stepped,/.100%7 Pu,»Ca ° = and Ca infilled.Fractures \ °@ |J,PL,SM,Ca 46°»WPT: are very rough,irreguiar,N DHt4-10-21andCainfilled.7.;(482.1-502.8ft)Discontinuities are very @ |u,PL,SM,Ca 54° a close to very widely spaced.I 4 (Continued). 482.1 -482.8 ft:Very closely >®|J,PL,SM,Ca 61e fractured zone .| . /.Run 110: _ Drill Rate=12 .!min/ft 485 os a N |110)5.0 98% vod |.1 a 5 >FR 2 7. $| a 5 \4 o /- \®|J,PL,SM,Ca 61° 3 . F S|488.0 -492.2 tt:1.25 to 2.5-inch |1°>|4 '|Wide Felsic/Quartz vein,dipping ! &10 degrees with respect to coreFasaxis / | =o 1 4 &.Run 1ft: : Drill Rate=10 |488.8 -489.8 ft:Very closely ' mintxt|fractured zone | 490 |'5.0 R5 4 8 " aa]5-9 |[709%5 I2°> \100% =,18 /: z 'e ,»||uPLRCa 32° o £'®J,PL,R,Ca 34° $s ad /.] 2]5 ;7 Ccaa]3 ' Fel S)os @ ||u,PL,SM,Ca 34e 3 B|492.8 and 495.0-496.0 tt:1/2-to || |xz a <5-inch wide felsic/quartz veins 7.=)©<=s 1 z to)N L 7.| = |Run 112:2 .Drill Rate=6 o ,mint a o oO"}-495 {5.0 @||J,PL,SM,Ca 42°4 &.112 5-9 ||eax FR to </°°\SWfra400%e J,ST,SM,Ca 30 x j °e J,PL,R,Ca 0° EE »@ J,PL,SM,Ca 42°4 z |\Fs]. +|\496.5 ft:Lost &/0.4 ft of core | x I @||u,PL,SM,Ca 39° <x \=/ 2]'497.8 ft:End 4 >N 8/27/14; a 7.Begini]3.9 e J,PL,K,Ca 39°8/28/14 =')Hag)39 ||gae FRap5° Run 113: 7 a 7 : a 100%Drill Rate=9 ,!min/tt =(4 =e 4500Logcontinuedonnextpage WATANA201--yzw DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paiter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 1/13/15ticharpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-10 SHEET 26 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559[ay Type Shape Roughness Infilting Py-Pynie @ Axal Q EFgut FQroimibn Cured «KCSceersted ExBracaa FeO rkenOude Sears”|)Diametral x irr >la V-Vein SR Onragenal sreemd Bhooee Chcheete Freese sia”boe.Fe 2 8 z wi >|FR-Fracture Fregu VR-Very Rough Ca-Calcite L-Silt 5u-Sulphide F Fs B g NOTESw=lo DESCRIPTION o +2/ee DISCONTINUITY DATA =].aae TESTS ao 12 zIZ_|2|99 €os eizgx|tox WATER LEVELSFea\jbe OO |RQD |FRACTURES |Sy TYPE ard 2,(osul|ezn |SS5S y,5 2 jw -|3;Bi %PERFOOT |2O%SURFACE 29 |2e2 z3i82n5L500-4 =PPE,lesee|wsece paged|DeSCnPION po |Bee Bg436.5 -504.0 :io + DIORITE:Greenish gray to +,||.J,PL,SM,Ca 56° greenish gray with pink \3.9 ; tints,medium to coarse .!113)3-9 |I goo,@®|J,PL,SM,Ca 45° a grained,fresh to slightly L 4 weathered (FR-SW),and "100% strong to very strong (R4-!@ |J,PL,SM,Ca 50° RS).Joints are slickensided =||NYF||Beanipimare serra 1)|elet.sm clan ae.ns |FR.I 414)°°73%®J,PL,SM,Clean 30°WPT:are very rough,irregular,. ,\DH14-10-22andCaintilled.r 7 100%\(502.1-522.8ft)Discontinuities are very \'Run 114:a .'\un 144:2closetoverywidelyspaced..Drill Rate=9(Continued)>mint500.0 -502.0 tt:felsic/quartz vein |x ">@ J,ST,SM,Ca 48°.503.5 ft: i 'ho41.§\UCS =5131 | 504.0 -509.5 "+04.psi ALTERED DIORITE:=\Run 115: Grayish green to greenish 'Drill Rate=4 white,medium to coarse £y minit i 505 grained,moderately to NN 5.0 e SH,PL,SM,Ca/CVG 1W°4 highly weathered (MW-Wi 115 ©9 |100%HW),and strong (R4).=\\>Joints are smooth to rough,S 100% a planar to stepped,and Ca "Ly @ J,U,R,Ca 75° | infilled.Shears are smooth,& &|_planar,and Ca,clay,and " $|gouge infilled.=\@/J,PLR,Ca 69°MW ta =|Discontinuities are S ! ;R4 Paw -@|moderately to widely @ |J,STR,Ca 66 4 =|spaced.N £aF3=YNr r S|508.5-509.1 ft:1/4-0 1/2-inch |//'J @/Cavein,dipping 20 degrees with |=©|respect to core axis \,J,i VR,Ca 55° a oy @ |J,PL,SM,Ca 65°} i 8 yn ™Run 116: 7 °=11036 Drill Rate=4&. °ind=DIORITE:Greenish gray,a ;.m8 5 [oe PL SM.Ga 6 sw m j-510 «|medium to coarse grained,\ ,50 - 7Z tesniostgmtyweanered /')fig °°|aoe FT|etsuce sek=-SW),|°. &|(RS).Joints are smooth to vq 100%Ay J,PL,SM,Ca 20 I (2 |rough,planar or curved,Ca | : 4 «|_infilled,and close to \ |moderately spaced.ioer' Le i=.)» 4CcL 3 "41s)\ (a)\ fe)t | Z Jv J Tr !iS ' °ian @ |J,C,R,Ca 44° L .Run 117: 7 +|Drill Rate=9 ' \RS min/ft 515 [.5.0 FR + 7 fat7t 59 |Lape,;i L. .100%@ |J,PL,SM,Ca 66°KL fos 'I @|J,PL,SM,Clean 76°_||] '\ he r .!@ |J,PL,SM,Ca 54°7 by |\ | S "_ [7 \'59 i he ig 5.0 ||g0%7 9 Run 118:.|100%@/|J,PL,SM,Ca 68°Pp]Drill Rate=4 ;min/ft \ a '\ |520 Log continued on next page ya DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO priter:T.Fisher CHECK DATE:12/9/14 a Mo PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetns untains,AK RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DRILLING DATES:8/14/14 -8/19/2014 EQUIPMENT:Burley 6500 DATUM:Ground Surface APPROX.ELEVATION:1478 APPROX.COORDS:_N:3,226,171 SHEET 27 of 36 INCLINATION:-60° AZIMUTH:10° E:1,884,559 ft 1/13/15richarpd11-24-14.GPJ.WATANA2014GINTLIBRARY.GLB[WATANAORILLHOLE]DEPTH(ft)BORINGMETHODDESCRIPTION GRAPHICLOG(ft)DEPTH|ELEVRUNNUMBERTy;Joint BBeddingF-Fault FO-Foliation SH-Shear V-Vein FR-Fracture 'ShaPUBanarC-Curved U-UndulatisST-Ste STS InfillirBtBiote Ca-Calcite Py-PyriteEp-Epidote Otz-Quartz FeOx-ron Oxide Hr-Hematite ML-Silt ROD %CORERECOVERYBSR DISCONTINUITY DATA POINTTESTSTYPE and SURFACE DESCRIPTION GRAPHICLOGROCKSTRENGTHINDEX{56°3.62kRéRSR4R3R2NOTES TESTS WATER LEVELS -525 -535 -540 3.78-in.ODCoring-TripleTube(HQ3,2.4-in.CoreDiameter)withfreshwater509.5 -522.3 DIORITE:Greenish gray, medium to coarse grained, fresh to slightly weathered82SW27and:eAcRNO BENE(tb palauris rasaiaroannto 40rough,planar or curved,Ca infilled,and close to moderately spaced. (Continued)1025. 118 §22.3 -527.5 ALTERED DIORITE: Grayish green,medium to coarse grained,moderately to highly weathered (MW- HW),and medium strong to strong (R3-R4).Joints are smooth,planar,Ca infilled, and very close to moderately spaced. 522.3 -526 fi:Closely fractured zone 526.5 ft:Healed discontinuities §22.3 1021.onSkolo90% 100% 119} 527.5 -535.6 DIORITE:Greenish gray, medium to coarse grained, fresh to moderately weathered (FR-MW),and strong to very strong (R4- R5).Joints are smooth to rough,planar or curved,and Ca infilled.Fractures are rough,irregular,and Ca healed.Discontinuities are close to moderately spaced. 532.8 -533.8 ft:Very closely fractured zone 527.5]cyBaPOl4d% 96%[FE 120 onjo°100% « 1014.2 535.6 -542.5 ALTERED DIORITE: Grayish green to greenish white,medium to coarse grained,moderately to completely weathered (MW-CW),and very weak to strong (R1-R4).Joints are smooth,curved,and Ca infilled,and close to widely spaced. Log continued on next page 535.6 121 wnjook°82% 100% 122 hen)ee0%: 100%bee J,PL,R,Ca J,PL,R,Ca J,PL,SM,Ca J,PL,SM,Ca BFR,1,R,Ca J,C,R,Ca J,PL,R,Ca J,PL,R,Ca J,PL,R,Ca R5 |FR 69° 43° R3 to R4 MW to HW 65° 37° 90° 50°R4 to RS FR to MW 20° 20° 8° R3 to MW to R4 |HW WPT: DH14-10-23 (522.1-542.8ft) Run 119: Drill Rate=5 min/ft Run 120: Drill Rate=5 min/ft Run 121: Drill Rate=7 min/ft 535.4 ft: UCS = 10,514 psi Run 122: Drill Rate=6 min/ft WATANA201-yz SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 1/13/15richarpdWATANA2014LOGS11-24-14.GPJ-WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-10 SHEET 28 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 __E:1,884,559OoTy,hness tnfitting Py-Pynte @ Axal 8 ifs foes,Ete RATE,Beer,fest.Saat |Soanmax|i z |Vien SaGrhogonal StSepeed?Afowgh |Gncnete Hnttate =Sem”|5OPFr=3 8 Z w 2 |FR-Fracture I-kregular VR-Very Rough Ca-Caicite -ML-Silt Su-Suiphide Zao Ea 'carsbE|e DESCRIPTION 2-423]28 DISCONTINUITY DATA ae oO WATER LEVELSo12@|F=|2/88]rao |raactunes |Ewa TYPE and 2,(See esalanaste)2 |u=|5|#|%PERFOOT |20%SURFACE 29 (2e2/G52/Stn5 f|540-1 °*B898|vvoo?peg DESCRIPTION S|&ere Sz it 34 R3 to MW to\5a R4 |HW7122) LL =100%4 ©R1 to MW to \16 R3 |CWa166-=I 123 81%Fun 123: 4 1008.2 |100%:@ |J,C,SM,Ca 48°Drill Rate=9 542.5 -625.2 \[5425 \sw minitt DIORITE:Greenish grayto +,@)|J,PL,SM,Ca 46°\WPT: .dark greenish grey,medium |\\DH14-10-24 4 to coarse grained,fresh to .|(542.1-562.8ft) slightly weathered (FR-|. SW),and strong to very "oq 542.8 tt Endttstrong(R4-R5).Joints are |Begin ,| smooth to very rough,\planar to stepved,anica (of @ |J,PL.SM,Ca 46°8/29/14 infilled with some pyrite VI \ a crystals to Ca and Ch _545 infilled.Fractures are ..a Ré to Run 124: smooth to rough,planar or \124 -82%RS |ep Drill Rate=5 curved,and Ca infilled.'98%min/t Discontinuities are very |*»J,PL,SM,Ca 37° -close to widely spaced.oq 4 i3Ny @||J,PL,R,Ca 35° g t +_|546.5 feet: \ °Lost 0.6 ft of a F 547.0 ft:5/8-inch Ca filled |J,PL,SM,Ca 9 core 4 =|discontinuity,dipping 9 degrees s : |with respect to core axis.a2|Moderate weathering 2 inches on 1 i |either side.XN 547.8 ft:End 4 2 ir /8/29/14; °Begin 9/6/145]548-552.8 (t Broken core S ®||J,PLA,Ca 35 9 |8 KJ |8 ' 'Run 125: :N @ |F,C,R,Ca 56°KS Drill Rate=6c=L >mint =or-550 -5.0 4 3 |128)5-9 ||/es% \100%8 °@ |F.PL,R,Ca 53° =Ej '4E ¢2 \rq [SW to =.e ||i,PLR,Ca 17°Mw .2 7 4i<j \ s I °J,PL,SM,Ca 8° Oo \ fas]Pov. ©O|552.8-555 ft:Very closely \ 5 '|fractured zone .|7 2 ae o ' a N |4 ros Run 126: \Drill Rate=5N!4 min'ft Ly |46 r-555 \ ;126 46 67%= .100%@)J,PL,SM,Ca/Py 36 , \ a 1 4 ts Ré4 to+FRy@|J,PL.R,N/A 49°RS -\ 4 Ly | \ !Run 127: | Recovered a a =extra 0.5 ft,4 i =]@ |J,PL,R,Ca 53°footage \34 ok adusted ,/127)"82%7 . ER -.100%Ra |W Run 127: 1 r 7.Drili Rate=4 \ ;mins ='es +4560Logcontinuedonnextpage Zz DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland ORILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.RichardsSUSITNA-WATANA HYDRO_pritter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 29 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 Q Ma Boddi PLP Po eered Brion Ep-Epidor Cheha ©Asal 2 Fraut FOroliaton -C-Curved -««KSlickensided ©-BxBreoa «©FeOtron Oxide SaSard 2 Diametral i >oc wen GR Sonesenal giessone Rae"hetthcte Fr rceatte sr Sica 5oe.-=8 Sa)=|Fe Frecture Fkregular VAVey Rough GaCalete M-Sat su-Suiphide |2 ao g NOTES w=|DESCRIPTION 94 3]ee DISCONTINUITY DATA x ase TESTSQariz>3 reels WATER LEVELSz=&/=s/2)88]|roo |eractunes |Fo TYPE O”)$ON)HSN|a KER«<|2E/2 w ox and z 825)<281 go etox2/e=|3)#2]*%PERFOOT |29%SURFACE a8 |2ee BE2/8 Enos|seo oO oO ina 8898 |av00e 8 3 4 OESCRIPTION x Ps peroes542.5 -625.2 \bly °DIORITE:Greenish grayto |;a 1271 82%@;J,PLR,Ca 38°1, dark greenish grey,medium |\,|\to coarse grained,fresh to t . -slightly weathered (FR-||oat aoe,4 SW),and strong to very vo !ora'9strong(R4-R5).Joints are |20 smooth to very rough,\2.0 0 L planar to stepped,and Ca [7 128 100%Run 128:ninfilledwithsomepyrite'100%Drill Rate=10 crystals to Ca and Ch N min/tt infilled.Fractures are t |WPT: smooth to rough,planar or \DH14-10-25 a curved,and Ca infilied.|(562.t-582.8ft)7 Discontinuities are very | close to widely spaced."rq(Continued)|R4 |FRto a 562.8 -602.8 It:Healed LS |®|J,PL,VR,Ca 50°MW Run 129: 4 discontinuities \NN Drill Rate=3.!minvft I 565 en 5.0 : 4 x 129 5 |ya0%e@ |J,PL.R,Ca 507K t 7]100%' \ a '4 NX 5 b> g \ ; e J,PL,VR,Ca 14° L 5 \ 4aof4WJ=\ =1 Fe N a =\'] 3 I i=NN&boyaOT °J,PL,R,Ca/Py 32°gs ov +f5|Run 130:°L ,_|Drill Rate=5£\min/ttt+!570 |©>5.0 + rs 8 A [30 ©?|100%8 s .100%©|||J,PL.sM,ca 6°=L 2 t 7 -|.FR,PL,R,Ca 7° 7i\ \@®|J,PL,SM,Ca 507%Bole , s r |a >jl = -|€NN48,.2 Qa ' {R4 to|FR toaL°N R5 |SW a=z [5 @ in <S | z oO _ =L rs Run 131 1 @ (J,PL,SM,51°un 134:2 |4,PL,SM.Ca Drill Rate=4 a by J mini \ob 575 5.0 _| ie \5.0 a<ty |131 100% 3 |100%a3 Ny 4aat7|oO \ 2 ' &L 7 4 <\ >\ 4 N&t 7 ='J 2 N §a: aL \132 9 |100%RS |FR 4 |iy /.un 132: =\100%Drill Rate=5 N min/ft.be 4580Logcontinuedonnextpage WATANA2012 DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO_pzaitter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 VW/13/15richarpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-10 SHEET 30 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.171 _E:1,884,559 a ty Shape hne ss lnfiting Py-F mite @ Axal 8 PE eBesing, BiBow POM,Beate,fete,|GaGa |G OenetalzrHt2|a wen OR Oehegonal St Siepeed Brow:"Chehbrte -erhetatto ore boe.Fe 5 8 a wi &|Fa-Fracture Lirregular VR-Very Rough Ca-Calcite--ML-Silt Sulphide FS ao gq NOTES=16 DESCRIPTION g }=42/ey DISCONTINUITY DATA xz].ase ESTS 4 |g ziz [3153 =ol vinx |tox WATER LEVELS=are OG |ROD |FRACTURES |Fue TYPE and (Ose |EZa/SSSR oy52/SE/3/72]x PERFOOT |OX SURFACE 29 |923/S29/e=83 8 80 8 6 |o |@ 8828|avon?Po oh DESCRIPTION e-5 eM lowso wz 542.5 -625.2 ' DIORITE:Greenish gray to t ;Zdarkgreenishgrey,medium |\to coarse grained,fresh to ! -slightly weathered (FR-'50 4 SW),and strong to very vo 5.0 strong (R4-R5).Joints are I 132 100%smooth to very rough,'100%° g planar to stepped,and Ca 7 °°J,PL,SM,Ca 42 \4 infilled with some pyrite \\WPT:crystals to Ca and Ch N \ -10- vo.DH14-10-26infilled.Fractures are ry |(582.1-602.8ft)smooth to rough,planar or \ a curved,and Ca infilled..|4 Discontinuities are very L close to widely spaced."oo(Continued){@||J,PL,SM,Ca 44° ='N = ros.Run 133: \Drill Rate=5 ;.!mint 584.7 -585.8 ft:Medium to | 585 coarse grained felsic vein,weded/|fx 5.0 + !133 ©|100% ros 100% i \ ;@ FR,PL,R,Ca 7 4 N 3 by |FR \g .&\4 2 4 =an @||J,PL,SM,Ca 36° 3 a 587.8 -592.8 ft:Broken core z |@ |FR,PL,SM,Ca 47° 4 a :,. Pas I 7 5 @ '4fo\Run 134:e Ly |Drill Rate=6 £'mirvft +\L590 |©|5.0 RS 4 8 Mot fraal 59 |poeIgN100% a 2 t 7 |@ |J,PL.SM,Ca 45°di\ 2 ' a N Jim ir csSsfo.)I a Cc =N ro)ir /a | _fe)N 4¢meaoOT e J,PL,SM,Ca 32° |593.5 -595.5 ft:Felsic/quartz ! vein,medium grained,43 degree |@ |J,PL,A,Clean 60° L dip with respect to core axis,rq 4 welded contact.jl Run 135: .Drill Rate=5 ty |min/ft L595 '|59 e ||u,PL.ACa 17° om | \.ce) Ly |135 100%e J,PL,R,Ca g°sw Vy 100% a \@ |U,PL,R,Ca Sie H | I 'a | '" = [7 4|®|J,C,A,Ca 36° N L | 597.8 -602.8 ft:Healed \ \idiscontinuities. +4 by @ j|J,PL,SM,Ca 56° \|5.0 i .136 59 |iszoq}||FR : r 7.Run 136: \100%Drill Rate=5 .min/ft Posed pit -f600Logcontinued_on next page py DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO_paiter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 31 of 36 INCLINATION:-60°PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 2 Pet B-Bed are Pomucred -BrBioNle Epp Qeduwe |oAQFFaut FO-Folation C-Cuwed KSicxensided Bx Brecda «FoOrkon Oxide Sarserat D Diametral x ir >[omg en”a ORO onal erespe Bass in "Gh etabte HirHematite oe"e bor.Fels 8]4 wl |Fracture Eiregular_VA-Very Rough Ga Cale MLS uSupnde |SS5 HR Weaesw=165 DESCRIPTION Qg bys]we DISCONTINUITY DATA xz].aap TESTS a {§=fz 13/53 ™5 visx!tox WATER LEVELSZz&|/E=/2]/88}roo |eractunes |Evo TYPE and |Oow|seu |A KsSoa</S=lz w %PER FOOT aox SURFACE a8 |Om9)Se9/9 x88fe)g 4 z iv aot <9 [faz Suz |oO -ns|600 a BB9R|wv ome bg si DESCRIPTION c 5 pero z§42.5 -625.2 wy idl »PCR,Ca/Ch 7™ DIORITE:Greenish gray to roydarkgreenishgrey,medium to coarse grained,fresh to ' -slightly weathered (FR-'5.0 J,PL,R,Ca 25°4 SW),and strong to very os 136 5:2 |bse,@ |J,PL,R,Ca/Ch 48°R5strong(R4-R5).Joints are I ° smooth to very rough,\100% .planar to stepped,and Ca a °®|J,PL,SM,Ca/Ch 63° 4infilledwithsomepyrite|WPT:crystals to Ca and Ch nN DH14-10-27infilled.Fractures are ror (602.1-622 8ft)smooth to rough,planar or :6028 ft:Endacurved,and Ca infilled.l 9/7/14:Begin 7 Discontinuities are very |4 o8/14"close to widely spaced.os E |(Continued)'Q i 600.01 -601.5 ft:Brokencore |,a ;|Run 137: 7 a!Drill Rate=4.!|min/ft -605 en 49 a °J,PL,R,Ca/Ch 17°| l 137)34%605.4 ft:Felsic/quartz vein,40 \'; degree dip with respect to core /98% axis,contact welded \4602.8 -606.5 ft:Very closely \3 fractured zone with some healed ||discontinuities os @ |J,PL,SM,Ch 60° = a £\ 48boy £ 3 _ |@ (J,PL,SM,Ch/iCa §0°:cms vo \4DN,D | E Ne @ |u,PL,SM,Chica/P 50° o g \oe y FR a[=]\NN Run 138:e Ly |Drill Rate=5smin/ftt+| j 5 @ |J,PL,SM,ChiCa 50°610 ||610.0 ft:Felsic/quartz vein,48 .38 aie .4 w @|degree dip with respect to core >138 34%5 =|axis |100%J=g »fo -=|610.0-611.5 ft:Very closely os 7 RI 2!fractured zone.with some healed 'e J,PL,SM,Ch/Ca 26°R4 to52]discontinuities 'R55E/. -|2 |@ |J,PL,SM,Chica 64°4 a 8 so =Q i36\@ |J,PL,SM,Ca 49°7 x &rf 7||B :$3 ,<LrE 7 4$s 614.1 ft 1/2-inch felsic/quartz ,Run 139: =vein,weathered contact with Ca N Onill Rate=4 a and Ch,55 degree dip with ty _|min/ft 5 respect to core axis ;0 @/J,PL,SM,Ca/Py 74° 4>615 613.0 -617.5 tt:very closely 35EafracturedzoneL.139 S e °5 100%J,PL,SM,Ca 50 i ='N fz4 © <=NN3 @ |J,PL,SM,Ca 50°NL / 4< z ||='@ |J,PL,SM,Ca 57° <a (=a '5 J,PL,SM,Ca/Ch 55°4d >N 5 is 5.0 @)|J,PL,SM,Ch 41°Sy '50 @||J,PL,SM,Ca/Ch 377K3aN140 °48%\SW J i a 9,Run 140:¥100%Drill Rate=6-'|J,PUST,SM,ChiCa 16°minsttNN a ia ans -_|620 Log continued on next page °WATANA201zw SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 1/13/15richarpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB{[WATANADRILLHOLE]PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 E:1,884,559 a Type . Roughness intilling .Py-Pyrite 8 res,forme,fie SRS,geet,fase,See |Coaxim>[oa oven Oa Seratenal sreese Racori Gren rete atte i-Silica teFools8Bla&|eRFrecture Flreguiar __VR-Very Rough Ca.Calate-ML-Silt iphide vetsu lo DESCRIPTION or 2 ee DISCONTINUITY DATA zsi)2 Z lz |2/55 =ot xbx|tox WATER LEVELSFra&|Fe||Oo |ROO |FRACTURES |S#a TYPE and Fo |Seu|zea 5 Z w=!3 w %PERFOOT |39%SURFACE ag |Quo|Gro a °x B8E8|n+0e08 a DESCRIPTION oo 5 =zy6205405-6252 =:T-PLSM,Cah 50 DIORITE:Greenish gray to y dark greenish grey,medium to coarse grained,fresh to[-slightly weathered (FR-5.4 SW),and strong to very 5.0 SW strong (R4-R5).Joints are smooth to very rough,100% a planar to stepped,and Ca 4 infilled with some pyrite WPT:crystals to Ca and Ch R4 to DH14-10-28infilled.Fractures are 4R5(622.1-642.8ft)smooth to rough,planar or a curved,and Ca infilled.7 Discontinuities are very close to widely spaced. Continued)a )FR to -620.8 -621.8 ft:2 to 3-inch MW Run 141: 7 fracture zones Drill Rate=4 min/ft i 625 38 :4 625.2 -627.3 .54%Run 141: ALTERED DIORITE:Pale 100%Core grayish green,medium to dropped, -coarse grained,moderately core out of 4 |to highly weathered (MW-Ag f vw order 2 HW),and medium strong to2)strong (R3-Ré4).Joints are a =|Caand clay infilled,and awo@|very close to moderately7\Spaced.=|627.3 -692.0 _.|DIORITE:Dark greenisha&|gray to pale greenish gray,q ®|medium to coarse grained,°5 fresh to moderately °J,PL,SM,Ca 38 |weathered (FR-MW),and \-|strong to very strong (R4-°: = &|R65).Joints are smooth to @ 4,PL.A,Ca 53 Run 142: =|very rough,planar to Drill Rate=5 |stepped,and Ca and Ca/Ch min/ft |.630 a mee wn Pyne crystals,5.0 FR to = 5|and very close to widely Eo °8 spaced 5.0 [ll gga,@||J,PLR,Ca 40 SW 8 100%\ a e 4 C)»J,PL,SM,Ca 32° @ .- EE =Da 4 &@ (J,PL,SM,Clean 60° 8 R4 to Oo R5 [e)632.8 -637.8 ft:Healeda|discontinuities ®|J,PL,R,Clean 63°7 2 4 re) i Run 143: 7 Dritl Rate=5 min/t r-635 iv a f {68%e J,PL,SM,Ca 14° 94% FR »J,PL,R,Ca 32° 36 @ |J,C,R,C 55° i 5.0 |1 90%aa R5 | Run 144:100%Drill Rate=4 min/ft 640 Log continued on next page "T RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/14/14 -8/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1478ft |=AZIMUTH:10° SHEET 32 of 36 INCLINATION:-60° 2 SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 DATUM:Ground SurfaceCLIENT:Alaska Energy Authority SHEET 33 of 36 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,171 _E:1,884,559 fan)Type Shape SS Infilli Py-Pyrite @ Axalfo)J-Joint B-Bedding PL-Planar PO-Pohshed Bt-Biotite Ep-Epidote Qtz-Quartz Op algF-Fault FO-Foliation ©C-Curved -K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand amet x HT =le Non GROntecenal STeeeatigg BMESmaoth Chehibite Ereneeatte Sesuee bar.Fr =3 8 ba]Wy 2 |FR-Fracture brregul VR-Very Rough Ca-Calcite -ML-Silt Su-Sulphide F3 4 &Ea NOTESweleDESCRIPTIONeiseeDISCONTINUITYDATA=aa TESTS a |$=iz |2/63 <a 3 vx |tox WATER LEVELS =a |Fe OO ROD FRACTURES |Eun TYPE and 2 SSUlESH SKEA5&@ jw |3)pe)%PERFOOT |29%SURFACE 28 /2e2|Se2 sexs 8ic}zZ 2 ea0 0 o a BSIS|nwt oewe Pa gh DESCRIPTION Fe 5 eeso og = 627.3 -692.0 ' ° DIORITE:Dark greenish b>|@ [PL SM,ChiGa 50 Ngraytopalegreenishgray,\ medium to coarse grained,| LE fresh to moderately 1 >5.0 7 weathered (FR-MW),and on 50 strong to very strong (R4-i 144 90% R5).Joints are smooth to N 100% a very rough,planar to lr 7 4stepped,and Ca and Ca/Ch |'|WPT: infilled with pyrite crystals,\DH14-10-29 and very close to widely ty (642.1-672.8ft) spaced.(Continued)\ ,| |*@ ||J,PL,R,Chica aie}v4 ol|@ |,PL,R,ChvCa 52 \RS |FRa >S Run 145: | \Drill Rate=6.!mindt rev.-4-645 ,38 @)||J,PL,SM,Ca 41° .!145 100% ir /.]100% L '4 N 5 r 7 J a \ 3 \ a s \-| @ r/o = =\ i o 644.7 -652.8 ft:Broken core by 647.8 ft:End 4d 2 ' I 9/8/14;Begin2N9/9/14 &r a ion @)J,PL,SM,Ca 72° i 8 .Run 146: 7 >LP Drill Rate=7 £\minft +650 ||$.0 |f as ra 3 frag)&°|te2efo\2 .N 100% an 2 on 7 gz 2 \ oO 2 ' 5 -r 7. =)2 y @ |u,PL,SM,Ca 50° | cim3 |*< =[ey]/.]2 a FR to aL e)\SW Jirc=Fy @ |J,PL,R,Ca 57°[a]:\ <e \ z °>Ré4 to BS Z \ ,°J,PL,R,Ca 68 Pm]R5 Run 147:4 - @/J,PL,R,Ca 70°Drill Rate=6 a L YY |- min/ft \¢-655 !$.0 |4 x .147)59 |eae,&rv.°e J,PL/ST,SM,Ca 41° a an 100% 4 a N \.45ty|®|J,U,A,Ca ereoO\ z . S&L r/o eo @ |v,PL,SM,Ca 55°|6570 tt 4 Zz .(J,PL,R,Ca 17 Wireline E ty _|release e4 657.8 -662.3 ft:Broken core an failed,trip 7 Na658.3 -659.3 ft:Broken core /.]g 1 le 23ah5148,4 ||78%sw | a va Run 148: =\100%Drill Rate=7.!minsft _-[7 _=-{660 Log continued on next page WATANA201-z SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-10 DATUM:Ground SurfaceCLIENT:Alaska Energy Authority SHEET 34 of 36 INCLINATION:-60° ---yZ DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO priter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:N:3,226.171 _E:1,884,559 a Ty ,Roughness infill Py-Pyrite @ Axal 8 reo igri,Seis SE,Be,6A SOE |Oanaxto2leaV-Vein On One Sree,seed"Broo"Ch Crite Bor neat Sone bor.e e 2 8 z Ww &|FRFracture Hrregui VRVery Rough Ca-Caicite -ML-Silt Su-Sulphide Fs $a g 'carsw-15 DESCRIPTION gk 3]e¢s DISCONTINUITY DATA =z],asp WATER LEVELSo12=|/=>|2|88]ran |Fractures [Fe 2 Sos zSs]wanax&jhe/2/°9 c pad TYPE and Fo (S28)228 /SSK3 «Oo ge we)S id %PER FOOT asks SURFACE 26 |ee¢z woz Sina660a6z88eR|avons be of DESCRIPTION co 5 eeseos z 627.3 -692.0 \ DIORITE:Dark greenish L , gray to pale greenish gray,\ medium to coarse grained,.!45 ®|)jJ,PL,R,Ca 32° -fresh to moderately L 45 -weathered (FR-MW),and =[,/ y '(#48 78% strong to very strong (R4-(100%SW R5).Joints are smooth to s a very rough,planar to p 7 Jstepped,and Ca and Ca/Ch |',infilled with pyrite crystals,N and very close to widely 4ed.(Continued)\ L spaced.()@ |u,PL,VR,Ca 57°4 N 663.4 ft:Ca filled void on \R4 to L \R5 2 ty |@ |J,PL,R,Ca 62° N Run 149: \5 Drill Rate=6.l 50 |t min/tt |tag >|156%[-665 665.0 -666.9 ft:Very closely oo 9 FJ fractured zone !100% ' _-a \ L |4 XN 3 7 wo \ =I a g \MW J o [4 |667.3 -669.8 ft:Healed \ \:discontinuities NN 5 c on | 5 |>150 25 |36%Ra i S vo 100%!EP |S .Run 150:°Ly |Drill Rate-6 £\minéft =\ -670 |©' 4 oO f 7badiS}\ 5 =! =g >9 @ |J,PL,SM,Ca 63° L 2 oa gl °Run 151: | z A tf ltt}$9 |fea%J,PL,SM,Ca a Drill Rate-8g=t |100%mint )'\ =>I 4 gy 8 » 2 Q cart oO \ 4[ra s bs @ |J,PL,SM,Ca 66° a a \ <<s 1ZzoON R4 to=U by R5 4=' \°Run 152:3].Ld J,PL,R,Ca 37 Drill Rate=7omL;minétaod\>ob evs 5.0 ; 4 «|>182 59 |so09%@ |J,PL,R,Ca/Ch 46°}-rovO100%\ =. 1 Zz Pov.o \ =I _XN RL hes 1 s y J,PL,SM,Ga/Py<x NEeL<yn = >N a ros.g 8I aL .153 9 |'100%RS | a roy Run 153: e \100%Drill Rate=9 wo N |min/ft oO LO}680 - os 4=Log continued on next page i) N a zZ <xE o-¢ 4 RECORD OF DRILLHOLE DH14-10 SHEET 35 of 36 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:8/14/14 -8/19/2014 APPROX.ELEVATION:1478 ft AZIMUTH:10° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:N:3.226.171 _E:1,884,559 fon)Ty;:i Sha R u ness infiting ;Py-F rite @ Axal 8 HE Boesine lin FG,Biss,fpcoae,Sede |Abaneuax|oe ee eeFo38Ol)FR Procure Ekreguiar VELVery Rough GaCalete -ML-Sill su Sulphide 85 Neueswu19DESCRIPTION872/es DISCONTINUITY DATA z |.aapr TESTS a =zi|=x rea)=oO x5x|tox ae WATER LEVELS <a jbo 2166 ROD FRACTURES |Feo TYPE and =QzW/Rew A HSS red©&|G=/5)2]%PERFOOT |29%SURFACE ag |QuS|gro SExs 8 ss0-4 2 o a |&389g |as 002 PS eh DESCRIPTION e |"5 (2 "ese a = 627.3 -692.0 \ DIORITE:Dark greenish ty |gray to pate greenish gray,\ medium to coarse grained,\ -fresh to moderately |5.3 4 weathered (FR-MW),and "50 , ®@||J,PL,SM,Ca/Ch 35 FR strong to very strong (R4-{153 100% R85).Joints are smooth to »100% a very rough,planar to p 7% |= stepped,and Ca and Ca/Ch |'|&|infilled with pyrite crystals,\ g and very close to widely Ly «|spaced.(Continued)\ ;|8 NN £ros.=\ ,|@ |J,PL,SM,Ca/Ch 69° [S t ,_|Run 154: | 2 \Drill Rate=6 i |mintfa]J,C,R,ChiCa +685 |¢ro 49 4 &154 59 ||g0%Faro<' °@ |J,PL,SM,Ca 54° 3 a 98% A \ I nu |R5 4 oO 'N:na@ |8 .| ros.2 ' aa IN a 2 \/4 5 |is)\ a a[o)a Jff£\Run 155: 0 ty |@ 1J,PL,R 57°Drill Rate=83vo42minfft I 690 N 185;42 100%FR | wo [74 100% 8 . =r e .SM 68° a an J,C.rm 4d |g NX £a2\[878.71 q-|Borehole completed at 692.0 692.0 feet: us Bottom of i)hole = -! 2 1 4 iv a < z <EL 4< ES a i}>|695 _ [oa < iva @ al er of z oO + So NE 4 < Zz <Ee< S|.- 5 a o = sh 4 ny 700 Log continued on next page "| 8 SS a DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards 5 SUSITNA-WATANA HYDRO pritter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH14-10 CLIENT:Alaska Energy AuthorityDRILLINGDATES:8/14/14-8/19/2014EQUIPMENT:Burley 6500 DATUM:Ground Surface APPROX.ELEVATION:1478 ft APPROX.COORDS:_N:3,226,71 SHEET 36 of 36 INCLINATION:-60° AZIMUTH:10° E:1,884,559 TABSticharpd715 -720 BORINGMETHODDESCRIPTION GRAPHICLOGDEPTHrn[evev.RUNNUMBERTyJit B-BoddingF-Fault FQ-Faliation SH-Shear CO-Contact V-Vein OR-OrthogonalFR-Fracture Hrregular Infitting -Calcite me Ep-EpidoteFeOxFonOxide GougeHieHematite ML-Siit DISCONTINUITY DATA ROD %CORERECOVERYB38 TYPE and SURFACE DESCRIPTION ROCKSTRENGTHINDEXGRAPHIC:LOGNOTES TESTS WATER LEVELS Notes: 1.Exploration location provided inAlaskaStatePlaneCoordinates, Zone 4,NAD83,US ft based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna BoroughLIDARdata,NAVO88 vertical datum, 3.Vibrating Wire Piezometer wastapedtoasacrificialtremiepipe and grouted in place with bentonite;cement slurry at 251.1 ft depth. 4.1-inch Schedule 40 PVC TAC conduit installed to approximately 251 ft depth and filled withpropyleneglycolantifreeze.Top ofHWTsurfacecasinghas2.7 ft of stickup above the ground surface. 5.TAC placed in TAC conduit and is removable.TAC sensors are located at 3,6,9,12,15,20,25, 50,75,100,125,150,200,and 250 ft depth.0 ft =elevation +/- 1478 ft. 6.Discontinuity graphic log is a depiction of discontinuity anglemeasuredfromthelefthand margin of the log column.WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]2 SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 1 of 11 INCLINATION:-60°1/13/16ticharpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]PROJECT NUMBER:1039556001 DRILLING DATES:9/15/2014 -9/19/2014 APPROX.ELEVATION:1672 ft AZIMUTH:035° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,766 _E:1,884,641 8 MYJoint B-Bedding BL Planar His ibe Beawte Ep-Epidote.a artz °Arial =F-Fault FO-Foliation C-Curved |K-Slickensided x-Breccia FeOx-iron Oxide Sa-Sand 0 Diametral x im >|x Sone OR Oat Steno Boost”Srehbate Hm-Hematite eer 5o2Po3|4 |) &[FaFrecue Hrregular __VA-Very Rough Ca-Calcte _ML-Silt SuSuiphide |3 SH'veerswrloDESCRIPTION9K2]es DISCONTINUITY DATA zs,aapao|Z z=l/Z_|2|99 =Oo vix|tox «WATER LEVELS =a jis OO |RAD |FRACTURES |Ewa TYPE and F [oee|zu |S kshral@jw=/3|¢%PERFOOT |25%SURFACE a8 |2H we?82X38loaoxSBI8|n+0 He Pe gh DESCRIPTION gs iA le2eo z 0.0 -6.2 Ka TY 0 -11.8ft:OVERBURDEN:Loose to °No medium dense moist,D Nt circulation greenish gray,angular,fol a poorly graded GRAVEL with |,Run 1:Drill 7 silt and sand 15 Rate=2_|(GP-GM){COLLUVIUM]5 WN 1)31 |bya matt Do a 8 OH 48%J £p 3 ° £oy i =| 4 -_P Ht58 o +414 5 ot|.5 4 @ i 31 Run 2:Drill 8 yr jet 37 |lawa rae ;<b|100% min/ft a 3 /y 4Pyle) o onyg| y 5 |Top of Rock=6.2 ft 1666.4 a =62-430 \'|62 Run 3:Drill 2]DIORITE:Greenish grayto +,_|Rate=5 o@|greenish gray with red tints,\min/ft -|medium to coarse grained,|J,PL,SM,FeOX 9°4 &|_fresh to slightly weathered =|'-](FR-SW),and strong to very |">=|strong (R4-R5).Joints are I a =|smooth to rough,planar to \3.0 ®J,PL,SM,FeOx/Silt 63°k. 4 @|stepped,FeOxstained,Ca f-/ |3)40S|infilled,and very close to \ \yo moderately spaced..75% a Ly _| &E \ , 4 >N |6.2-8.0 ft:Moderately spaced |}/_|8 |discontinuities-10 |an a N "5 °t 7 |-Run 4:Drill |8.0-13.0 ft:Widely spaced \wel Eu Rate=3 |discontinuities n Té LB min/t S t+Ly 4 .50%4 ar 100%!¢::1 N a [74 Run 5:Drilt 4 ]jate=4 N min/ft r |en 12.6 ft: F 13.0 -18.0 ft:Moderately spaced |.'J,PL,SM,FeOx 60°R4 |sw 8 oom ot 7 discontinuities Ly "urtace'4 casing |J,PL,SM,FeOX a s §.4 ." 5.0 41.8-16.8 ft:\ |5 Circulation \100%good with ry _|casing, p15 15.0 -18.0 ft:widely spaced \J,PL,R,FeOX creamy white 7 discontinuities \' Ly | \ a l | \ Ly | \ | i \Run 6:Drill 4 in / ]Rate=4 |min/ft N 17.4 ft: Lo,|J,PL,R,FeOxX/Ca Circulation -18.0 -22.0 ft:Moderately spaced |\5.0 briefly lost 7 discontinuities .6 5.0 by vu 100%J,PL,R,FeOx i 19.0 -19.8 ft:Red tint \ | L | '|J,PL,SM,FeOX +20 . 4 Log continued on next page WATANA201-=-z SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 RECORD OF DRILLHOLE DH14-11 SHEET 2 of 11 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:9/15/2014 -9/19/2014 APPROX.ELEVATION:1672 ft |AZIMUTH:035°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:N:3,226,766 _E:1,884,641 8 Mdjoint B Bedding PLbanar PO Paiched SeBiote Ep-Epidote Ge dust °Anal z FFaut FO-Foliation ©C-Curved --K-Slickensided +BxBreccia ©FeQx-ron Oxde Sa-Sand 2 Diametral x |h Sle |-|GET,Bonne HEP sheer”Fey,Se SS”|eek.Fe 2 8 SB]&|FeFractice Frreguiar__VR-Very Rough Ca-Calcta MLS 5u-285%NouESweToDESCRIPTION2738|#8 DISCONTINUITY DATA zis nee WATER LEVELSFaajEsi2/60]Roo FRACTURES |Ein TYPE and @ 133i Eg SSSA yp &=2/3)°R]%Penroot |2$%SURFACE $9 /2#2/2E2/Sine K|a9 a i)a avroo?be 2 DESCRIPTION s 5 ewse z 6.2 -43.0 ,20 -26.8 ft: DIORITE:Greenish gray to _|Circulation = greenish gray with red tints,5.0 5% medium to coarse grained,!g |5-0 Ra |SW -fresh to slightly weathered '4 (FR-SW),and strong to very os 100% strong (R4-R5).Joints are I smooth to rough,planar to »: 1 stepped,FeOx stained,Ca a Run 7:Drill 4 intilled,and very close to j of Rate=4 moderately spaced.\5 min/tt (Continued)7.me -22.0 -25.0 tt:Closely spaced 'F 4 discontinuities ,2 j a -5.Pe '@||J,PL,SM,FeOx/Ca 40°<| |7 5.0 48%e J,PL,R,FeOx 16°\maceS|too%t if @ |J,PL,A,FeOXx 64° |os 7.:e J,PL,SM,FeOx 12°|25.0 -42.0 ft:Moderately spaced ; discontinuities 1 N a 1 |4 4 NY : S 7. is]2 { L $s N Run 8:Drill 4 o = £-@ ||J,PL,K/SM,FeOx/ca 23°mint =1 =N _o 7.@ |J,PL,SM,FeOx/Ca 56°4 @ 2 .ze3r |OY §. @||u,ST,R,Feox/Ca 44°9/14/14;12:30 5 | L g |5.0 4 8 .8 |>9 |78%=\100% Lap [a N @||J,PL,SM,FeOx 38°| oO /.WPT 2 g , DH14-10-1 fa]>N id J,PL,SM,FeOx 4°(15.3ft toiSg) FR to 31.8ft) |>Sw 4 °Hole2BgNadvanced to £=?31.8 ft on 5 | £[o>;@ |J,PL,SM,FeOXx 69°9/15/14 a c-|ind N w 9 31.8 -36.8 ft: a 8 /4 Circulation = 5 i 8 |25%,tan x £so @ ||J,PL,SM,FeOx 34°o @ RS <s i Z oO N e J,PL,SM,FeOx/Ca 17° ER os 5.0 - E 3.0 3).9 |59 |72% a ra 100% oL 4xy3.Run 9:Dri </°Rate=3FA; @®|J,PL,SM,FeOx 57 min/t eh .4 Z 7.@ |J,C,SM,FeOx 68° t+'| =\ a /.|¥ -°37 ft * 4 z @)|J:PL.SM,Feox 39 9/18/14;07:45 N g sol =|4 =\26 @ |||u,PLR,Feox o° 6 7.10;72% <100%Rug nt al .mint 7 Ob 40 . os tH 4 3 Log continued on next page 5 Zz DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards E SUSITNA-WATANA HYDRO praitter:T.Fisher CHECK DATE:12/9/14 LOC. PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 ATION:Susitna River,Talkeetn:a Mountains,AK RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy Authority DRILLING DATES:9/15/2014 -9/19/2014 EQUIPMENT:Burley 6500 DATUM:Ground Surface APPROX.ELEVATION:1672 ft APPROX.COORDS:_N:3,226,766 SHEET 3 of 11 INCLINATION:-60° AZIMUTH:035° E:1,884,641 1/13/15ticharpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]BORINGMETHODDESCRIPTION GRAPHICLOGDEPTH(ft)|ELEV.RUNNUMBERPL.Banar8-BeddingFO-Foliahon C-Curved Contact OR-Orthogonal ST-SteyFirreguiar U-Undulating ness PO-Polshed K-Shickensided SM-Smooth R-Rough Ch-ChloriteVA-Very Rough =Ca-Calcite infilBrBotte CL-Clay Ep-Epidote:FeOx tron OxideG-GougeHm-HematiteML-Silt Geeduare sa-Sand 3e-Sericite i-Silica su-Sulphide DISCONTINUITY DATA FRACTURES %PER FOOT nwtrowo?CORERECOVERYBUAXIS.TYPE and SURFACE DESCRIPTION og z r wiROCK STRENGTHINDEXWEATHINDEXGRAPHIC)LOGNOTES TESTS WATER LEVELS 45 50 -55 60 3.78-in.ODCoring-TripleTube(HQ3,2.4-in.CoreDiameter)withfreshwater6.2 -43.0 DIORITE:Greenish gray to greenish gray with red tints, medium to coarse grained, fresh to slightly weathered (FR-SW),and strong to very strong (R4-R5).Joints are smooth to rough,planar to stepped,FeOx stained,Ca infilled,and very close to moderately spaced. (Continued)NZbaaolo100%_e \i634. 43.0 -45.0 ALTERED DIORITE: Grayish green,medium to coarse grained,moderate to completely weathered (MW-CW),and extremely weak to medium strong (RO-R3).Joints are rough, planar,and FeOx stained. Shears are smooth,planar, and Ca infilled. Discontinuities are moderately to very closely spaced. i 43.0 ML |1633. 45.0 -60.2 DIORITE:Greenish grey, medium to coarse grained, fresh to slightly weathered (FR-SW),and strong to very strong (R4-R5).Joints are smooth to rough,planar, FeOx stained,Ca infilled, and very close to moderately spaced. 45.2 ft:Felsic/quartz vein,1 side welded,the other FeOx discontinuity46.0 -51.8 ft:Ca healed fractures 48.7 -49.2 ft:Closely spaced discontinuities \49.2 -51.8 ft:Moderately spaced discontinuities 49.9 ft:Approximately 1/2 inch Ca \healed open fracture 51.8 -59.0 ft:Very closely spaced discontinuities;Fracture zone 59.0 -64.0 ft:Moderately spaced discontinuities Log continued on next page .|45.0 jnjooOaae Oe 100%: 12 &aePdOINalsolo100% J,PL,R,FeOx/Ca J,PL,R,FeOx SH,PL,SM,Ca V,PL,SM,FeOx J,PL,R,Ca J,PL,SM,Ca J,PL,R,FeOx J,PL,SM,FeOX J,PL,SM,Ca J,PL,SM,FeOx 47° 49° 414 54° 35° 30° 6° 40° 26° R5 |FRto sw RO to MW to R3 |CW FR to SW R4 to RS MW zat ¥ 9/17/14;08:00 40 -61.8 ft: Circulation = 75%,tan Run 11:Drill Rate=4 min/ft Run 12:Drill Rate=6 min/ft Run 13:Drill Rate=3 min/ft ss2t ¥ 9/19/14;08:20 Run 14:Drill Rate=6 min/ft WATANA201-zZ SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy AuthorityPROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 ORILLING DATES:9/15/2014 -9/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1672 ft SHEET 4 of 11 INCLINATION:-60° AZIMUTH:035° -Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO_pnitter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,.766__E:1,884,641[ay Ty)3s infilling J -Pyrite @ Axai 8 Ps,pore,ee SE,ES.Bi,SEE |CanesxVT>lo Wen OR Orhsgonal Sr-sieype Btoue”Ch ehierite Him Hematite SiSian bofFs38Be)&|Fr fractue Fireguiar-_VB-Very Rough Ca-Caleita -ML-Sil supe |ESS Wearewi|6 DESCRIPTION oR s3/ee DISCONTINUITY DATA x espe STS a 2 ZI iz }2/68 €OT vii |tox WATER LEVELSZz&|=s/2!/33 |pop |FRacruRes |S¥o TYPE and 2,|Seu|eeu S465 .,5 ew =|5|#ax SURFACE 28 |/OwS|Seoigens 8 a Go |e Poe &DESCRIPTION B7 |EA|S49"loom ynr-60 hela 8 8°oO}a meer ec o£ 60.2 -64.8 7 60.2 ALTERED DIORITE:5.0Grayishgreen,medium to *14|5.0 MW-coarse grained,moderate =¥4 to highly weathered (MW-N 100%@ |J,PL,SM,Ca 50°.HW),and weak to medium it NXstrong(R2-R3).Joints are = a smooth to rough,planar or re 61.8-81.8 ft:qcurved,FeOx stained,and y @ |J,C,R,FeOx/Ca 67°No Ca infilled.Shears are &R2 to circulation slickensided,planar,FeOx At R3 |MWstained,and Ca infilled.=. a :cannes NN .Run 15:Drill 4Discontinuitiesarevery736'@ |u,PL.R,FeOx/Ca 70°Run15:Drclosetomoderatelya16|*57%Pp:°HW min/ftspaced.y ”100% =\ i 63.3 ft:Highly weathered zone x MW 7 64.0 -64.8 ft:Closely spaced i]®SH,PL,K,FeOx/Ca 25° discontinuities =\N:41615.9 -65 64.8-1015 \|648 Run 16:Drill _ DIORITE:Greenish gray,bos Rate=5 medium to coarse grained,\min/ft fresh to moderately \@ |J,1,R,Feox/Ca 60° weathered (FR-MW),and | -medium strong to very on 4 |Strong {R3-R5).Joints are I 40%3 |smooth to very rough,\au °$planar to stepped,FeOx rv 16)49 |'400%,"ST 90 FR to L §|stained,and Ca infitled with |' ,sw J £|occasional pyrite.Shears N 100%e J,PL,R,Ca 20° £|are slickensided,undulating +,||orstepped,and Ca or Ep \ °_.|_infilled.Discontinuities are !hd J,PL,R,FeOx 20 i |widely to very closely | + @)spaced. a { a s . F @|64.8 -73.2 ft:Moderately spaced |,' |mur tz:Dat + O|discontinuities (a c N min/ft <t 7 e ||u,PL,R Feoxica 18° 70 ||3.0 4 ie g S 17|39 |'00%=ros il2>\100% =8g ' °RS .\4Fieinoa\°J,R,FeOX 30°CG c !3 a 5 =f 2 +y |Run 18:Drill 4 -r \\Rate=73S\min/tt =x a roe.FRaOo\ =:I 4 x =73.2 -75.5 ft:Closely spaced \@ J,C,R,FeOx 48°ne <™|discontinuities ir '|\z ° 50 @ (J,PL,R,SM,FeOx 70°S| t 5.0 @ jJ,PL,R,FeOx/Ca 52°4 2,'4 18}9 }lig0% a 100%a |*°@/J,PL,R,FeOx/Ca 74° =ta 4>75 |@ |J,PL,SM,FeOx/Ca 66° <°J,PL,VR,FeOx/Ca 15°c 75.5 -78.3 ft:Moderately spaced |, 5 discontinuities an (dl On (4 Fe NN =1 \RL N Run 19:Drill 4 $t 7 Rate=3 4 \R4 to min/ft3.u @ |J,C,AR,Ep/Ca 52°R5 S|he 5.4 a 78.3 ft:Shear,moderately '19|5:9 |Ieee,e SH,U,K,Ep/Ca R3 |FRto2)weathered,Ca/Ep infilling,altered |*> Mw =approximately 2 inches oneither {,"100% A Si |4 ty 78.3 -81.0 ft:Very closely spaced,R4 to =discontinuities,Fracture zone},_|RSwo\go 1 OF a0 L - .be 4 -og continued on next page o N < Zz <E<E-4 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/15/2014 -9/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1672 ft SHEET 5 of 11 INCLINATION:-60° AZIMUTH:035°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,766 _E:1,884,641 Q emt BBleddh PLP Bo eoined Brae Ep-Epidot Okdow |o Ana-Jot janar ;:- .2 FFaut FO-Folaton C-Cuved --K-Slickensided BxBreccia ESGion Oxide Sasa C1 Diametrat -SH-Shear CO-Contact U-Undulating ==SM-Smooth CL-Clay G-Gouge Se-Sericite onxWw8rf[ond >V-Vein R-Ont ST-St R-Rough Ch-Chiorite =Hm+Hematite Si-Silica 5 op =NOTESFe\|=8)2 wi &|FR-Fracture Fleregular VR-Very Rough Ca-Calcite -ML-Silt Su-Suiphide 6 S 9 a TESTSurlDESCRIPTIONSr]es DISCONTINUITY DATA z |e arazziz|3/56 =Oo]xix]tox|««xx WATER LEVELS <a jes OO ROD FRACTURES |Ew TYPE and 2 SFU |ESh|Ss SHSa</Feiz w ex ZO |[OGa/<Fa;5eNefe)ajuris|«a %PEAFOOT |293 SURFACE £9 jer2z|¥52/8en0 FR=a .a BBeR atee 2 2 DESCRIPTION x 5 eeso uy x 64.8 -101.5 \ ” DIORITE:Greenish gray,t 7]medium to coarse grained,\ ,$.0 fbfreshtomoderately5.0 bo lepe7weathered(FR-MW),and .19 6%ree ae 4 medium strong to very os 100% strong (R3-R5).Joints are | smooth to very rough,N a planar to stepped,FeOx /|81.8 -91.8 ft:4stained,and Ca infilled with \ j Circulationoccasionalpyrite.Shears \when are slickensided,undulating 7.°flushingorstepped,and Ca or Ep vi @ [4 PLR Ca 34 Run 20:Drillaintilled.Discontinuities are °-4.4 widely to very closely | @ |4,PL,SM,Ca 52 Rate=4spaced.(Continued)on I - . \5.0 481.0 -87.5 ft:Moderately spaced |./Bodiscontinuitiesoq20.88%R5 FR \400% 5 I |@ |J,PL,SM,Ca 45° _ | NX Ly | \ _1 4 NX 5 aoO\=l a s \Run 21:Drill 4 2 r 7.Rate=8=<VO minft=87.5 -91.8 ft:Ca healed fractures Ny|87.5-93.8 ft:Widely spaced rv of-|discontinuities J,PL,SM,Ca 0 7 @|88.0 and 90.1 ft:discontinuities ! ©|have moderate weathering s a o -2 '5.0 4 5°(a)|*o1|5-9 R4 to]ow=7.4 R5 =.100% 90 |%. 4aaaJ,PL,SM,CL/Ca 20°no o \ 5 =| -\ S|Bs)by 4i\ \WPT DH14-4ga.(71.8 -91.8)a = Lsim ion i=]oS ,Run 22:Drill -im €N Rate=3 a 8 ir /.|minéft =|ab °\ _=<|5 oo ion <S |Zz a \=93.8 -101.8 ft:Closely tovery fF |5 d<=closely spaced discontinuities \503)!22)°° x a l,7.100% ()]"+95 !7]=' &I '| xs |R3 to|SW to; bf [y R4 |MW q =\oO \5xNSH,ST,K 26 Sil t 7 -Run 23:Drill J$1 Rate=7 <\minéftqby =vr =>NXaLo)\aT+|3 +f ':4iya"| -\4 -!S XN f /. -100 Log continued on next page |WATANA201-z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO paiter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 VAB/tSricharpdr-105 r-110 115 -120 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy Authority DRILLING DATES:9/15/2014 -9/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1672 ft SHEET 6 of 11 INCLINATION:-60° AZIMUTH:035°WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]Zz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO paiten:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,766 __E:1,884,641 [=]yy Shape Roughne:33,toil -Pynte @ Acal 2 FPut -FOPeinten --GtGumed Koickorsed Brbrecia -ESGrrenOxide Suse”O DiametralGSle)»[IE Romana Gee Suse”ee,Som Sam |poe28AS|&Lr rractie Piregular VALVey Rough CaCalete,-MLSil 80 Sulphide F3 So g TSSOoDESCRIPTION2K2/es DISCONTINUITY DATA =|ane WATER LEVELS2xixz|oo Eu [s]xox|ZoxfeaageooRQ0FRACTURES|Sy TYPE and g SSS /ESs ARS 5 2 /e=|5|z#]*PERFOOT |2.9%SURFACE $9 |P22)E52 |8 tnaooScSBES|ur owe PB 2%DESCRIPTION ao 5 ote zTOTS-T0d.2 Tt Moderate To T ms 3 |completely weathered (MW-CW)|af on 5.of @ ||SH,PL,K,Ca 25° !5.0 :R3 to|SW to |>23 O%,Ra |MW 4 9 :\(1584.100% 101.5 -105.2 7 11015) ALTERED DIORITE:=101.8-111.8Grayishwhite,medium to RO to |HW to,ft:Circulation 4 coarse grained,moderate '=\R2 |CW =40%to completely weathered aN (MW-CW),and extremely 7]weak to medium strong =\Run 24:Drill = (RO-R3).Joints are smooth,*@ |J,PL,SM,CL 53°Rate=3 planar,and clay infilled.a \mirvft Shears are slickensided,\ planar,and Ca infilled.7]\0 @ |SH,PL,K,Ca 51°R3 4 101.8 -104.0 ft:Moderately N 24}9-9 |Isao,spaced discontinuities 'f104.0-112.2 ft:Widely spaced =100%Mwy Igdiscontinuities"14580 4 105.2 -196.8 .|105.2DIORITE:Greenish gray,t ,|Jmediumtocoarsegrained,\5freshtoslightlyweathered!4 |(FR-SW),and strong to very |*£1 strong (R4-R5).Joints are "52slickensidedtoveryrough,' |planar to stepped,Ca/Ep 'Run 25:Drill -|&|infilled na Rate=6 -|min/t =\J,C,R,Ca/Ep Ly |%|105.2 -106.7 ft:Felsic vein,\4 @ |slight to moderately weathered [-!Rat&|(SW-MW),gray,fine to coarse >aS.S|grained,Ca infilling.Felsic +O |veivDIORITE vy sol ie @)|J,PL,SM,Ca/Ep 40°\|oS N BoSs)L >|fas]5°|f40%.FRios\9 Ss \ 3 |100%; "i N _| oo l" 9 \ =| \8 t +.re \4 ©| a XN fs r./ os ;111.8 -121.8 4 <\e J,PL,SM o°ft:No6|112.2 -134.3 ft:Closely to Ly yPL,circulatio©]moderately spaced discontinuities |," |ulation a \ °|»Run 26:Drill 4 =a @||u,PLR,Ca/Ep 37°Rate=62\min/ft o \ |>@ ||,PL,SM,CaveEp 28° or $.0 J |26|>9 ||eae, [" 100%*J,PL,R,Ca/Ep 20° \ u - 'N Ly _| \ | ,°J,PL,SM,Ca 13°as |€A | Ly | vO @ ||J,PL,SM,Ca/Ep/Py 33° NN ir /.Run 27:Drill 4 |°Rate=9 117.3 ft:Moderately weathered \®J,PL,VR,Ca 32 min/ft approximately 2 inches oneither +/_| side of discontinuity \ ; .5.0 4 raz]2 |fre%4 soe ° x 100%J,PL,SM,Ep +| 4 \ { N a |@ |J,PL,SM,Ep/Py 50° 4 Log continued on next page PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 7 of 11 INCLINATION:-60°PROJECT NUMBER:1039556001 DRILLING DATES:9/15/2014 -9/19/2014 APPROX.ELEVATION:1672 ft AZIMUTH:035°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,766 ___E:1,884,641 9 yet Bed PLA Bo Buered Beant Ep-Epi Sedu @ AsalAas|stare .:2 FFaut FO-Folaion ©C-Curved -K-Siickonsided ©BxBreccia FeOron Oxide SaSave!ODiametralijaeeaa==e 2 8 |)&|FR-Fracue Hereguir__'VF-Very Rough Ca-Calcite ML-Silt SuSupnide |3 So B voarsw=19 DESCRIPTION 214 2 gS DISCONTINUITY DATA z |. ae WATER LEVELSZzz=|Fs/2|88]|pop |rractunes |Fwo TYPE and 24 |Soe ELS)ABER5@je=|/3/2]%PERFOOT |29%SURFACE ag Que #52 [8 eno120aoOxSBIR|av owo?e PZ 3 A DESCRIPTION ©5 peroy =_ 105.2 -196.8 i DIORITE:Greenish gray,|>_|medium to coarse grained,;5.0 tresh to slightly weathered 5.0 6 -(FR-SW),and strong to very |27 76% 4 strong (R4-R5).Joints are ' 100% slickensided to very rough,| planar to stepped,Ca/Ep N |infilled (Continued)'a 121.8 -126.8 4 ;°J,PL,SM,Ep 38°ft:No 'circulation rv..except on 120.5 -120.9 ft:Fractures,;flush d r possibly mechanical N t J,PL,R,Ep/Ca 15° roof8-8 ft:tastes”8 Ca healed ! 5 °J,PL,VR,Ep/Ca 10° =N .= by |50 |Run 28:Drill2886%Rate-9|100%mint L425 I 4 {«J,PL,SM,Ca 25° 'N by |t |J,PL,SM,Ep 22° L \4 N 8 bo $ _£.126.8 -131.8 J 2 fo7 ft:No=\circulation ='N |bs @ j{J,PL,SM,Ep 47°Run 29:Drill 4s|ol Rate=93.J,PL,SM,Ep 46°RN,mindt :M4 » a 2 I 5.0 - °o)|29}59 |'400%£| 100%e J,ST,SM,Ep/Ca 10°+I|130 |\RS |FR _| wo S /| a}|=!pas N ao i F r id 42\WPTagNDH14-12-6sg=L ,|(111.8-=]S \@ |J,PL.R,Ca 46°131.8 ft) JCc -=\|8 rv x a IaL°\ 4&§ie ®||u,PL.R.Ca 33°@|133.3 -134.4 ft:Brecciated and oeES|healed with Ca rect |®J,PL,SM,Ep o + S L p74 5.0 4 5.0 @ |J,PL,R,Ca 47°ES 134.4-156.8 ft:Widely to |30 94%\ a moderately spaced discontinuities;a 100%\ Ol _z 135 |Run 30:Drill <r 7.Rate=6c;minéft ab . a 2 Tr 7 S \wT”_'\ aL ae a$Run 31:Drill=.Rate=6Ety|min/ftz z .i 5.0 4 2 t 34,°°Fl gayoOos°e J,C,VR,Ep 16°x |100% +L \ =qu ;;,”139.2 ft:1/4 inch felsic/quartsaadvein,dipping 20 degrees with ( respect to core axis \2 J,PL,R,Ep/Ca 7° -[4 4140Logcontinuedonnextpage WATANA201---Z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc.SUSITNA-WATANA HYDRO pritter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 W13/15richarpdWATANA2014LOGS11-24-14.GPJ_WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]RECORD OF DRILLHOLE DH14-11 SHEET 8 of 11 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:9/15/2014 -9/19/2014 APPROX.ELEVATION:1672 ft ©AZIMUTH:035°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.766 __E:1,884,641 a Ty j hness:Infilling Py-Pyrite @ Axal 8 Ps eee,Es SS EE eesnzen SEE |Sorenz|e alg]»|Bert,atin Hee Bier”ee Som.Saat |zoe.-H|s 8 &lw)>|FRFractuwe Trreguiar-_VB-Very Rough Ca-Calcle.-ML-Sill suSuipide |2m ge NOTES a=DESCRIPTION go KEYS]yw DISCONTINUITY DATA r coe TESTSa|¢2 fz 1/2/53 =vigx|tox WATER LEVELSZz=/Fs}/2/88]Rao |rractunes |$¥a TYPE and Gg,Soe Esk AaRR ,RS @|h=/2)2]«PERFOOT |2O%SURFACE ag |QeS|Se9/sen5 &8 6 |S jz)*80%g DESCRIPTION 29 |TEA)sus oso y=449 o BSSS8|y+ows PB ge fa}7)moreoc,©105.2 -196.8 / DIORITE:Greenish gray,|| medium to coarse grained,\ ;30freshtoslightlyweathered5. -(FR-SW),and strong to very |a 94% 4 strong (R4-R5).Joints are vq 100% slickensided to very rough,{ planar to stepped,Ca/Ep » a infilled (Contnued)I.a 141.8-151.8 4 |@ ||J,PL.SM,Ep/Ca 30°relation ty |except on i \ ;\flush | .. f ¢ \ 'Run 32:Drill N 0 Rate=-6 - ty 50 min/t 7 7 32) "96% \100% i 145 17>@ |J,PL,SM,Ca 58°= N PSY t >| a '»J,1,R,Ca 3°4 N 3 aag\ i &|1468-151 8ft:Cahealed .!Run 33:Drilt J3racturesby|Rate=8 =min/tt 3 \ _ros5s\@ |J,PL,SM,Ca 64°7 =|as |FR &r a or |J,C,R,Ga 78°L-g I 5.0 4 3 |33]>|[66%$an 100% -N "af150oOr7.oO \xz 1 N ||g L |Ee \ 2 \ 2 X Ee I /.151.8 -156.8 ft:Ca healed "Ora2fractures,muttiple mechanical .!Aura Drill 7 S|breaks ait8amintt a | a io)\ 4£t 7] 2 .@ |J,U,R,Epica 46° ©]153.6 ft:1/4 inch healed Ca filled |\ a discontinuity r,7 5.0 2 !34|5-9 |'100% rn 7.100% 155 1 4 N 7 | L » 4 I /.] | N 156.8 -161.4 ft:closely to very f+,_|-Dri ,closely spaced discontinuities Vv ;@ |SH,C,K,Ca 49°pune.Drill 7 N min/ft ir ' L .1 5.0 4 h/.35 5.0 50%meee 'eae a 158.8 ft:Xenoliths Ne 100% q he ! N +160 ; [/Pi ww 4 Log continued on next page Zz.DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards SUSITNA-WATANA HYDRO pritter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy Authority DATUM:Ground Surface SHEET 9 of 11 INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:9/15/2014 -9/19/2014 APPROX.ELEVATION:1672 ft AZIMUTH:035° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3,226,766 __E:1,884,641 Qa ian B-Beddi PL-PI Hoe nated pean Ep-E aes ©Axa);-Beddi i Boh 12FratFOFolaionC-Cuved --KSlchonsded Br Brocéa FBOFonOxide Sa'Send |_C Diametralz|5 Sia]»[HEN Rome Gee Se Soke Same'|eaePo=8 Sw)&|eracure Freguar -VALVery Rough GaCalate,MLS SuSupticee |250 B NOTES w/o DESCRIPTION g ey 2|ee DISCONTINUITY DATA x eae TESTS a |<=fz 13/53 =s-viex|tox WATER LEVELS iva &|F=s/Z]O06]ROO |FRACTURES |¥qo TYPE ard 2.Sou EE |SKS52jw-|3)£]%|PERFOOT |9%SURFACE 28 /989/G29|ssnOo||&g 2 poo DESCRIPTION eo |E=|E4*owen wx|160 oa BBIR|Veo Ol Ps gs ©.a eefemeten ind 105.2 -196.8 , :160-161.8DIORITE:Greenish gray,t am ff ft:No medium to coarse grained,\ ;38 me circulation fresh to slightly weathered 0 " -(FR-SW),and strong to very |35 50 %rere + strong (R4-A5).Joints are on 100%}FH slickensided to very rough,I planar to stepped,Ca/Ep \ a infilled (Continued)a Run 36:Drill 4 \ j Rate=5 ®(J,PL,RC.64°minét161.4 to 166.0 ft:Widely spaced |»f a discontinuities oo =4 i 162.4 ft:1/2 inch Ca vein broken [oH 7 r sil q ;\ ;#FR F 161.8 -166.8 ft:Ca healed |»aan 4 fractures an 36)"50% |100%@ |J,PL,R,Ca 62° 165 165.6 ft:Shear,slightly to vo 4 moderately weathered (SW-MW)!approximately1 inch on one side |®SH,U.K,CL 25°Swir4.a Ms NY 166.0 -170.0 ft:Closely to very |'MW a closely spaced discontinuities .|7 $166.0 {t:2 inch felsic vein,welded |."contact,dipping 30 degrees with ! | Zz |respect to core axis,slightly to »Run 37:Drill _ £|moderately weathered Pr 7 Rate=9 =vo min/t =|166.8 -170.0 ft:Fractures 'a >on 4 3 \ 5 168.4 ft:Felsic/Quartz vein \ os /ras a 2 y 5.0 ||b FR a iS)L >37|5°|[aa$vy 100% 170 ||470.0-175.5 ft Widely spaced |R4 to 4 rr)&|__discontinuities "bd J,PL,SM,Ep 18°R5 a]|=! =g ' =L 3 t 7 |4 e \ g '=5 2 . £e aQ.\FL >|171.8-176.8 4 -|=\ft:No 4 8 t 7 |circulation 2 Q v oa]i)\Po Run 38:Drill _ x £[74 ae Rate=9 <=e 1 Pe minift 2 3 N Eelrros8.0 8 7 5.0 |by=' 38 er @ jJ,PL,SM,&60;»° a a 100%|+} ene S oh 175 \4 oe 'e SH,|,K,Ca 14°<L ,1,K, a 175.5 -190.0 ft:Moderately to OO °x closely spaced discontinuities !J,PL,SM,Ep/Ca 22 FR to Br | sw 4 2 7. 6 \ z . a 176.8 -181.8 ft:Ca healed ty _|1768-1968 | <fractures \ft:Noz|.. <N circulation bs by ad J,PL,R,Ep/Ca 5°except on =\flush i 5.0 J,PL,SM,Ep/Ca 5°4 oe)»5.0oin'.39)52% :S Run 39:Dritl=.i 100%Rate=8 af Ly |mint 7 _\ |e J,PL,SM,Ep/Ca 16° N = [7 pbk _s180Logcontinuedonnextpage a a DEPTH SCALE:1 inch to 2.5 feet LOGGED:J.Holland <.zZ DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:P.Richards g SUSITNA-WATANA HYDRO pritter:T.Fisher CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/15/2014 -9/19/2014 DATUM:Ground Surface APPROX.ELEVATION:1672 ft SHEET 10 of 11 INCLINATION:-60° AZIMUTH:035° -z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO patter:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6500 APPROX.COORDS:_N:3.226.766 _E:1,884,641oOType.Shape Roughness Infiling Py-Pyrite @ AxalB-Beddi i Poli Bi .8 Py ieee,Re Rie,BEE Beith,SEE |SoaresxIGz=|e Vien”GRonhogonal Si'Sepped'Ringe”EhGhtrie Hmtetame sac |SapFe¥8 HB)&|eRFracue trreguiar”__-VA-Very Rough Ga-Galcte -ML-Silt Su-Suiphide |3S'NOTES w=165 DESCRIPTION Qt 42)]#e DISCONTINUITY DATA =ase TESTS a Zz XZ jz _|2|56 =on visx |Zox "WATER LEVELS=@ jf=s/2]60]Aap |FRactuRes |So TYPE and ¢,|Soa ESE |A Hse5#iu-)3)g¢]%PERFOOT |29%SURFACE 26 |282)oE2)8 tNeis}zZ Z480a-o «BSBES|uw owe Ps eh DESCRIPTION x B geeseey = 105.2 -196.N DIORITE:Greenish gray,t ylmediumtocoarsegrained,\ ;5.0 fresh to slightly weathered 5.0 -(FR-SW),and strong to very |39 52%Rate ee 4 strong (R4-R5).Joints are in 100%}@ |J,PL,SM,Ep/Ca 56°slickensided to very rough,| planar to stepped,Ca/Ep \ a infilled (Continued)in 7.Run 40:Drill a j Rate=6 \min/ft on @||J,PL.SM,Ep/Ca 36° 7 181.8-186.8 ft:Ca healed .!q fractures rn /_| \ a \5.0 «J,PL,SM,Ep/Ca 27° 2 [./”5.0vO40 86%@||J,PL,SM,Epica 39° .\100% -185 §4 \| |3 N =Vv »J,PL,K,Ep/Ca 7 -=.|4 A en2 .] a &|186.8-191.81t:Cafiledhealed |.Run 41:Drill ||fractures Lo /@ |4,PL.SM,Ep/Cca 28°Rate=7 2 \min/ft 8 | |s [7 ' a” +\ a ] oO XN g I atLS|5.0 - 3 L '41|20 R5 |FR 2 an 100%@||J,PL,SM,Ep/Ca 40° 190]|190.0-191.8 ft:Closely to very |>4 wo |Closely spaced discontinuities vo 5 g !f=}N =(s)Ly |r oO]191.8-196.8 ft:Ca healed \7 \g °fractures N e J,PL,SM,Ca 40° ==rv.' =&'Run 42:Drill_|191.8-196.8 ft:Moderately to [|Rale-6 1 iy closely spaced discontinuities ,_minvft g \«J,1,R,Ca 26° =| b-' 4zr7.®JST,R.Ca 63° a \ <\ z \ zr ie 9.0 7 5.03)|42 84% Q r 100%a 105 "°@||J,PL,SM,Ep/Ca 38° hg _ oc NN <Lra \aa\o EF | e d,PL,SM,Ca 25°4 Z /. \nd i 5 \_1501.6 wt Borehole completed at 196.8}J $ <xBE< S|.4 - a 9 vt te 4 % a 8=y 200 Log continued on next page 7 oN < z <E < = a Mo: PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetnz untains RECORD OF DRILLHOLE DH14-11 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/15/2014 -9/19/2014 AK EQUIPMENT:Burley 6500 DATUM:Ground Surface APPROX.ELEVATION:1672 ft APPROX.COORDS:_N:3,226,766 SHEET 11 of 11 INCLINATION:-60° AZIMUTH:035° E:1,884,641 1/13/16richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}DEPTH(tt)-205 i 210 215 -220 BORINGMETHODDESCRIPTION GRAPHICLOG(tt)DEPTH[evevRUNNUMBER8-BeddingFO-Foliation CO-Contact V-Vein R-OrihogonalFR-Fracture Pro C-Curved U-UndulatirST-St o L-leregular hness: PO-Polished K-Siickensided SM-Smooth R-Rough Ch-ChioriteVA-Very Rough =Ca-Calcite Infilting CL-ClayCi Ep-Epidot oe can'p-Epidote artz FeOx-lron Oxide 3a-Sand 3e-Sericite 3i-Silica 5u-Sulphi G-GorHimHematiteML-Silt FRACTURES PER FOOT atooe Rao %CORERECOVERYBZza DISCONTINUITY DATA TYPE and SURFACE DESCRIPTION ROCKSTRENGTHINDEX36.2k14.5k7.25k3.62kGRAPHIC]LOG3POINTLOADTESTS(psi)NOTES TESTS WATER LEVELS Notes: 1.Exploration location provided inAlaskaStatePlaneCoordinates, Zone 4,NAD83,US ft based on location recorded with a recreational grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna BoroughLiDARdata,NAVD88 vertical datum, 3.Vibrating Wire Piezometer was taped to a sacrificial trenve pipe, placed alongside the temperature acquisition cable (TAC)conduit, and grouted in place with bentonitecementslurryat125.0 ft depth. 4.1-inch Schedule 40 PVC TAC conduit installed to approximately 176 ft depth and filled with propylene glycol antifreeze.Top of HWT surface casing has 3.3 ft of stickup above the ground surface. 5.TAC placed in TAC conduit and is removable.TAC sensors are located at 3,6,9,12,15,20,25, 50,75,100,125,and 150 ft depth.0 ft =elevation +/-1672 ft. 6.Discontinuity graphic log is adepictionofdiscontinuityangle measured from the left hand margin of the iog cokumn.WATANA201yz SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:J.Holland CHECKED:P.Richards CHECK DATE:12/9/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-12 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/21/2014 -9/24/2014 DATUM:Ground Surface APPROX.ELEVATION:1639 ft SHEET 1 of 10 INCLINATION:-60° AZIMUTH:41°T/13/15richarpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.646 _E:1,884,513Ti78JonB-Bedding Bena «=PO Does oboe Ep-Epidote Oeduat @ AnalgF-Fautt FO-Foliation ©C-Curved -K-Slickensided @x-Breccia. FeOx-kon Oxide Sa-Sar 0 Diametral x NT >|a wen choles sreeole Beene1"Gr eabete Hm-Hermatite oes soe-Fo|2 8 Sg)&|Feracwe Frou VAVoy Rough CaGalete Moin Su-Supnide |380 |'csswu16DESCRIPTION2K3)e@s DISCONTINUITY DATA x | aoe a |Z =/=.|/2|82]roo |rractumes |5 Oo 1xGx|tox!«xx0 WATER LEVELS =&lfe/S}oo S |370 TYPE and Zo /QZu eeu SONS «a =(a=|/3)2 %PERFOOT |2%SURFACE &9 |£e2Z/¥EZ|Seno KRaoOxSBIR|avrowe 2 &DESCRIPTION x 5 eso xlp&|Top of Rock=0 ft ,_g 0.0-11.9«|DIORITE:Greenish gray,r yi]8}phaneritic,medium to \ =!coarse grained,slightly ! -=|weathered (SW),and |Bottom of | 21 strong (R4).Joints are oe 24 NO CORE surface=|smooth to rough,planar,{casing at 3.12|stepped,or undulating,N ft 9 . a io |FeOx stained,Ca infilled,rv a =|and close to moderately Loz)A2)spaced |*Run 1:6&44 min/fta|\4 NzI | >\ g | a fd \ 4 C)[.7 2 '|47 @ |J,PL,R,FeOX 65°Ee N 47 eh o™ :1 83%@ J,PL,R,FeOx 70° a 2 a J.PL;R,FeOX 70°,|5 ls \100%- fol \oO N rs}) \ i s .le®|¥,PL,R,Feox Sw 4 wo L ,|J,PL,R,FeOX ='|e ||u,PLR,Feox a \@®:|J,PL,R,FeOx 4 on Run 2:2|@ |J,PLR,FeOx mint i 5 ty.te!J,PL,R,FeOX | =\ ;@ J,PL,R,FeOx WPT: &.DH14-12-1 3 L |(5-25ft)=an-z 45 4=45 =Ly)fa)45 |sees\: @|9.7-20.3 tt:Fracture zone,FeOx{|100% 10 |&|_stained \ 4 a ry | °'y8N L s v4 4 +!Nn \ S r 74 g 716287 Run 3:2 r =|11.9-22.8 i 11.9 min/ft 4 |ALTERED DIORITE:Grayto |='|light gray,phaneritic," @]|medium to coarse grained,a \ |2|moderately weathered IN 35 4|(MW),and medium strong "SB et ao@|(R3).Joints are rough to =a]?0%'E |smooth,planar,stepped,or "Ss 97%t Eb 33&|undulating,FeOXx stained,|4 y o 3 [Ca or Clay infilled or Ca &£76|healed,and ciose to Wy :J,PL,SM,FeOx ¢|Moderately spaced.=\ 2 /bis [5 _ W *Run 4:2 =\min/tt a iy "MW =ANS ft=\ i S 4Ly5.0 \4|50 4=\100%£ 4 E='NS iqa: a 21.4 -22.4 ft:Fracture zone =i 1 4 q =\te Log continued on next page l WATANA201SUSITNA-WATAN ae A HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 RECORD OF DRILLHOLE DH14-12 SHEET 2 of 10 VW/13/15richarpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB_[WATANADRILLHOLE]PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:9/21/2014 -9/24/2014 APPROX.ELEVATION:1639 ft AZIMUTH:41° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:N:3,226,646 _E:1.884.513OoTy;ery Infilling ;Py-Pyrite @ Axal 8 Bh igen,Eo ee,bets ESN SES |Coaneraz{5 Zig»(feey,Rane Ge Bee”ee Soe,Soe”|eeesFe=8 a ||FaFractre regu VA-Very Rough Ca-Gaicte -_ML-Silt uSuptide |SSB 'cersBEloDESCRIPTION3143)es DISCONTINATY DATA z |e al WATER LEVELSFs&|F=|2)83)rap |eractunes |Sto TYPE and 2,|SSH/ELE AES yral&oS 5 w %PERFOOT |29%SURFACE a9 |2e2 eee 82xa &a 8898 nvowe 3 3 &DESCRIPTION c 5 jeese 2 -& 129 11.9 -22.8 it 4 0%.ES 4ALTEREDDIORITE:Gray to |='é ° light gray,phaneritic,S J,PL,R,FeOx 45 Run 5:4 medium to coarse grained,ofa |E @ %4,PL,R,FeOXx 80°|min/tt moderately weathered N S ;J,PL,R,FeOx 45 (MW),and medium strong it :s 7 (R3).Joints are rough to =4 R3 |MWsmooth,planar,stepped,or *=undulating,FeOX stained,4 \: Ca or Clay infilled or Ca XS S 4 healed,and close to H Somoderatelyspaced.=45 4 'dl(Continued)"i169 5 |5-9 |faga @)J,PLR,LL 75°KX *|22.8 -31.7 22.8 : 4DIORITE:Gray to greenish b '|90% gray,phaneritic,medium to \ coarse grained,slightly 'J,PL,R,FeOX/LL 20° weathered (SW),and ' strong (R4).Joints are an 7 rough to smooth,irregular,1 stepped,or undulating,\ FeOX stained,clayandCa [|/-! 1 95 infilled,and close to \ j 3 4 moderately spaced.>PL,A,Stained soe L_}Run 6:5 v4 .:|PL,R,Stained 70°rnin \; Aa 1 |24.4 -24.7 ft:Fracture zone '7 2 a Prod\s 2)25.6 -28.1 ft:Fracture zone,i :' G|FeOx stained \d 2 rs -J,PL,R,FeOx 10°7 = \ i ,a =\36 ae =r/4 6 |O°|56%)fF.) 5 ,100%WerT:| 5 |:DH14-12-2 a 4 :(25.2-45.5ft} @ \ 38 N 4 :ros if E i &\:@,|PL,R,Ca/CL/FeOX 55° =7 8 jPL R CaFeox 70%) -L .PL,Ca/FeOX 70 +30 3 \/.]4 =!Run 7:7 8 [L .,mint e vO ; 2 !: 7 =|>R4 |Sw ;1611. 2)31.7-37.9 Hy {317 'S|ALTERED DIORITE:Gray to =J,PL,R,Feox 35°q ©}fight gray,phaneritic,CH "Q|medium to coarse grained,a : 'y ° ©|moderately weathered 7\| ": J,PL,R,FeOx 30 |(MW),and medium strong 7 4 ©](R3).Joints are smooth to =} «|rough,planar,stepped,or \ undulating,FeOX stained,|Ca and Ch infilled,and . close to moderately i ° 7 spaced.x J,PL,R 25°, 32.6 -33.3 ft:Fracture zone We \SW to -35 34.2 -35.5 ft:Fracture zone \Mw + a ,Run 8:8 N J,PL,R,FeOx 50°minitt a=4 S 36.3 -37.9 ft:Fracture zone A J,PL,R,FeOx nN J,PL,R,FeOX "i = ="|{8 "x,1606.2\|373 4 L | .J,PL,SM,Ca/FeOX 85°}-_] NN r'|J,ST,R,FeOx 60°a 4 \J,U,R,FeOx 20° '\ Logcontinued on next page ' a DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO pritten:B.Edmonds CHECK DATE:11/14/14 1/13/15PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetn untains,AK CLIENT:Alaska Energy Authority DRILLING DATES:9/21/2014 -9/24/2014 EQUIPMENT:Burley 5500-3 RECORD OF DRILLHOLE DH14-12 DATUM:Ground Surface APPROX.ELEVATION:16339 ft APPROX.COORDS:_N:3.226.646 __E:1,884,513 SHEET 3 of 10 INCLINATION:-60° AZIMUTH:41° r-45 r-50 richarpdq-55 11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]a Ty Roughness Infilling Py-Pyritefo)J-Joint PQ-Potished Bt-Biotite Ep-Epicote.Qtz-Quartz =F-Fautt -ed K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand-SH-Shear U-Undulating -SM-Smooth CL-Clay G-Gouge Se-Sencite oWwga>|Vein ST-St R-Rough Ch-Chiorite =Hm-Hematite S-Silica 5 of NOTESsSufeFRFractureVR-Very Rough -Ca-Caicite ML-Silt Su-Suiphide rs}$8 R TC)DESCRIPTION e 2|28 DISCONTINUITY DATA z cake TESTS z x 90 =(3)vipx|tax e WATER LEVELS c Z|og |Rao Eye TYPE o”|xox/e KESx<z|Cu a4 and FQ |8g0/s20 ows 83x5|«|*29%SURFACE ag |2eecesissna 8 a 9 a ssee oe DESCRIPTION e-|5 2"ooee = 37.9 -56.9 8 0%_| DIORITE:Light greenish 80% pun esgraytogreenishgray,°lun 9: phaneritic,medium to °J,PL,R,FeOXx 70 Pp]min/tt coarse grained,slightly e P FeOxs ° weathered (SW),and |J,PL,R,FeOx/Cl 50°.4 strong (R4).Joints are bi J,PL,R,FeOX 50°N\. smooth to rough,planar,%J,PL,R,FeOx 45° stepped,or undulating,J,PL,R,FeOx 50° FeOX stained,clay or Ca id J,PL,R,FeOx 35°F 4 infilled,or Ca healed,and °closeto widely spaced.Py 'ie a Feo Bee(Continued)9 62%>PLR,SS\ Run 10:5 J,PL,R,FeOX 28°mint - e J,PL,R,FeOX 10°4 2as]-J,PL,R,FeOX 50° 8 J,PL,R,FeOx/Ca 35° =o 3 J,PL.R,Clean 55 47.3 tt:Direct =10 64%J,PL,R,FeOx 55°Shear @{48.0-48.9 ft:Fracture zone 4 E R4 |SWasw 2 Sw 28 4 £ =49.5 -49.6 ft:Broken core el 4 gox=Run 11:5 8|50.5 -50.9 ft:Fracture zone x min/ft fd o 4 2Ee J,PL,R,FeOx §5° 2 J,PL,SM,LL,FeOX 60° '5 |52.0 -55.5 tt:Healed breccia J.1,R,FeOx 70 TN WPT: 4 O}52.2 -53.5 ft:Fracture zone J,PL,R,FeOx 55”DH14-12-3 are)1 (45.2-65.2f) £4 «© isd oo 54.5 -55 ft:Fracture zone KX J,PL,R,FeOX 60° ] no Run 12:J,PL,R,FeOx/Ca 50°RumaJ,PL,R,FeOx tS56.0 -56.5 ft:Fracture zone J,PL,R,FeOx 40°oe 4 56.9 -60.2 50 4 ALTERED DIORITE:Light 25 pegraytogray,phaneritic,12)10%. medium to coarse grained,Py moderately weathered J (MW),and medium strong (R3).Joints are smooth to R3 |MW rough,planar,stepped or undulating,FeOX stained, clay infilled or Ca healed,4 and close to moderately spaced. Log continued on next page WATANA201yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO parler:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 RECORD OF DRILLHOLE DH14-12 SHEET 4 of 10 VA3/15ticharpdWATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB{[WATANADRILLHOLE]PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60° PROJECT NUMBER:1039556001 DRILLING DATES:9/21/2014 -9/24/2014 APPROX.ELEVATION:1639 ft ©AZIMUTH:41°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,646 _E:1,884,513 a Ty;: .ness Infilting .Py-Pynte @ Axal 8 PR eseeae,Fits OR,Beak,ftom,Seder |Comery x |g zle|,|Sere Bote Gane Bee”Bee,Soom,Sam'|soers=8 Sa)&|eRFrecue Fkreguer -VR-Very Rough |CaCalate.-ML-Silt 5 Sulphide a9 z NOTES ">lo DESCRIPTION go Kya|ve DISCONTINUITY DATA =capo TESTS a z Zz i/=12/60 =oa visx|tox WATER LEVELSFa@|Fs!2]56]Rap |FRacTURES |Feo TYPE and C,\oeu|eeu |SSSS ypra@ja-|35|g@]%PERFOOT |a5%SURFACE a8 \9f9/Seo|sen5 8 a _- °=g37e|v+oee be sf DESCRIPTION e-"5 |F"*pesoge = 1 60 57.0-60-2 ff Fracture zone a srsee 12 10%xX R3 |MW | 60.2 -74.6 "|60.2 Run 13:5 DIORITE:Light greenish LY mirvit gray to greenish gray,\ phaneritic,medium to '-4 coarse grained,slightly | weathered (SW),and "4 strong (R4).Joints are I smooth to rough,planar,\@ |PL,AR,FeOx 55°a stepped,or undulating.fr 7 °FeOxX stained,Ca or clay 5.0 @ |PL,R,FeOx 55 infilled or Ca healed,and .13]59 |.[oe PL,R,FeOx 55° close to widely spaced.ry ° \100%4 | 60.6 -61.4 ft:Fracture zone \@|(J,PL,SM,CL 40° r/hd J,PL,R,FeOX 50S ;@ 9 |,PL,R,FeOX 40°. q .|©|!PL.R,FeOXx 70° OF @ ||u,PLR,Feox 20°, i] |65 » -5 _| 65.2 -68.9 ft:Fractu he q |©)/J,PLR,Feox 40° oral z :icture Zone \ ' y : 'ai Run 14:5 :a minft . ee pes ' : 4 3 |48 : : g N LS.: 5 in om b o |:3 4 =N 4:I 5.0 fb EG og R4 |Sw o '14|59 ;3Ey\e 3 4 2 I'100%}i WPT: s |i DH14-12-4 a \Bons (65.2-85.2ft) 5 r.” of :J,PL,R,FeOx 50°[s)\7 s .| <rT 7 LPS »@Y,PL,SM,CL 85°|}-_|N \J,PL,SM,CL 60° --70 |,|_ =ry J,PL,R,FeOx 30°Run 15:6 8 \ ; min/ft =)fo &|71.0-72.7 ft:Fracture zone F >|J,PL,R,FeOX 50°4 a \\, =| 'NN 2 r 7 - a '£0 Fy6)f.7>)£18]&9 |60%§.!100%4 be 3 vy J,PL,R,FeOX | N Ly | 4 hera @ J,PL,R,FeOx 746-797 7 |748 75 ALTERED DIORITE:Light =i” gray to gray,phaneritic," medium to coarse grained,[Ly Run 16:5 moderately weathered N min/tt (MW),and medium strong it (R3).Joints are smooth to =}7 rough,planar,stepped or " undulating,FeOX stained,a \clay infilled or Ca healed,Ny and close to moderately a 4 Mw 4 spaced.=!@ ||SH,PL,SM,G WtaT-"|7 =\N At 75.2 -85.2 ft:Shear zone,=\\ 4slickensidesandgougepresentS 7 77.3 ft:Shear with1 inch of gouge|&\->11570. Log continued on next page an DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO priter:8.Edmonds CHECK DATE:11/14/14 VAI3/A5ticharpd11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE}WATANA201RECORD OF DRILLHOLE DH14-12 SHEET 5 of 10 PROJECT:2014 Susitna-Watana Geotech CLIENT:Alaska Energy Authority DATUM:Ground Surface INCLINATION:-60°PROJECT NUMBER:1039556001 DRILLING DATES:9/21/2014 -9/24/2014 APPROX.ELEVATION:1639 ft AZIMUTH:41° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3,226,646 _E:1,884,513 8 am B-Bedding BL Pianar PO-|eres Bite Ep-Epidote.Cocoa @ Anal=F-Fault FO-Foliation C-Curved K-Slickensided Bx-Breccia.©FeOx-ron Oxide Sa-Sand ©Diametral «|E ale][Wert Romie See MSE ee,etme Soe [onr=2 8 a a =FR-Fracture t-kregular VRVey Rough Ca-Calcite ML-Silt 3u-Sulphide:z 8%EA NOTES uw 16 DESCRIPTION 2 i 2|es DISCONTINUITY DATA zs a TESTS o ==|=.)2|88 ROD FRACTURES |Ew is)x6x|tox BE WATER LEVELSFa@|Fei 2/85 Elo TYPE and Zo [Seu eeu/SSA5 o[o}ze jem}5S)&%PERFOOT |2O%SURFACE ag |2ee G22/8ine Ba°c 3 a4 DESCRIPTION a 5 eer Ye 80 79.7 -106.9 1797/46 Ra Sw _ DIORITE:Light greenish roy |gray to greenish gray,\Run 17:6phaneritic,medium to |mint coarse grained,slightly | a weathered (SW),and vo 4 strong (R4).Joints are | smooth to rough,planar,' stepped,or undulating,p 7 | a FeOX stained,Ca or clay '4 infilled or Ca healed,and N close to widely spaced.ty |5.0(Continued)\17 5.0 a '100%7 fs \ \ \ EB 82.6 ft:Healed breccia zone |\cs 7 ,| t/-85 !4 |*Run 18:4 85.5 -90.2 ft:Fracture zone,\os min/tt FeOx stained | 86.5 ft:Lost Circulation paolo100%WPT:R4 |Sw DH14-12-5 (85-105ft) -90 Run 19:6 min/ft td J,U,BR,FeOX 30° 91.5 -95.4 ft:Fracture zone,\@ |J,PL,R,FeOx 70° FeOx stained \ vo 100%3.78-in.ODCoring-TripleTube(HQ3,2.4-in.CoreDiameter)withfreshwaterf93.4 -96.8 ft:Mafic dike,fine N grained rv | ¥94.5 ft 9/22/14;07:40 }-95 ' \@ |J,PL,R,FeOx 70°Run 20:3 min/ft L aa - ®J,PL,R,FeOx 30° 96.8 -97.3 ft:Altered zone,\ moderately weathered,medium strong (R3) 96.8 -98.7 ft:Fracture zone \20 63% |100% \ I N t 7. R MW 7397.2 ft 9/24/14;08:004ES}coalidR4 |SWTTT"ly-4a,NO---=|pi-=©aeolo1!|mnLog continued on next page _ DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards2DRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:J.Holland SUSITNA-WATANA HYDRO ornter:B.Edmonds CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:_Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH14-12 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/21/2014 -9/24/2014 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface APPROX.ELEVATION:1639 ft SHEET 6 of 10 INCLINATION:-60° AZIMUTH:41° APPROX.COORDS:_N:3,226,646 _E:1,884,513 1/13/16richarpdDEPTH(ft)BORINGMETHODDESCRIPTION GRAPHICLOGDEPTH(thy'Veuev.RUNNUMBERB-BeddingFO-Foliation CO-Contact OR-Orthogonal BL BenarC-Curvedire U-Undulating Si-StST P St Roughness infilliPO-Polished K-Slickensided M-Smooth R-RoughVR-Very Rough te POINTFRACTURES PER FOOT Nnewoo?CORERECOVERYDISCONTINUITY DATA a9DIPwrtCORE80AXISTYPE ard SURFACE DESCRIPTION IGRAPHIC|LoGROCKSTRENGTHINDEX|36.2k14.5RERSRNOTES TESTS WATER LEVELS i 105 110 F115 3.78-in.ODCoring-TripleTube(HQ3,2.4-in.CoreDiameter)withfreshwater79.7 -106.9 DIORITE:Light greenish gray to greenish gray, phaneritic,medium to coarse grained,slightly weathered (SW),and strong (R4).Joints are smooth to rough,planar, stepped,or undulating, FeOxX stained,Ca or clay intilled or Ca healed,and close to widely spaced.(Continued) 100.0 -100.6 ft:Fracture zone 102.1 -105.4 ft:Fracture zone aedTT belajo32%Pa°oo21 100% 1546.4 106.9 -114.8 ALTERED DIORME:Light gray to brown,phanenitic, medium to coarse grained, moderate to highly weathered (MW-HW),and weak to medium strong (R2-R3).Shear zone is smooth,planar,and clay infilled. 110.0 -111.7 ft Gouge "1539.6 106.9 22 30% 114.8 -175.0 DIORITE:Light grey to greenish grey,phanentic, medium to coarse grained, fresh to slightly weathered ({FR-SW),and strong to very strong (R4-R5).Joints are tough to smooth,planar, stepped,or undulating, FeOX stained,Ca or clay infitled or Ca healed,and close to widely spaced. 114.8 -121.0 ft:Slightly weathered,strong (R4) Log continued on next page "1114.8 23 61%°o24 100% ind J,PL,R J,PL,R J,1,R,FeOx SH,PL,SM,CL J,PL,R,FeOX J,PL,A,FeOx J,ST,R,FeOX J,PL,R,FeOX J,PL,R,FeOx J,PL,R,FeOx J,U,R,FeOx J,ST,R,FeOX 0° 18° rq |SW 80° 70° MW taR2HW R3 |MW 60°NN45°60 I 70°bh]60°k_ R4 |SW 75°| 65°™ Run 21:9 min/ft Run 22:4 min/ft WPT: DH14-12-6 (105.2-125.24t) Run 23:3 min/ft Run 24:§ minsft WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]zy SUSITNA-WATANA HYDRO DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH14-12 DATUM:Ground SurfaceCLIENT:Alaska Energy AuthorityDRILLINGDATES:9/21/2014 -9/24/2014 EQUIPMENT:Burley 5500-3 APPROX.ELEVATION:1639 ft SHEET 7 of 10 INCLINATION:-60° AZIMUTH:41° APPROX.COORDS:_N:3,226,646 __E:1,884,513 V13/15richarpd11-24-14.GPJ)WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]T Shape infil 7:8 J ornt B-Bedding PL-Planar PO-i leper)orbits Ep-Epidote.oe arte °Anal2F-Fautt FOFoliaton C-Curved _-K-Slickensided --Bx-Breccia. -FeOx-ron Oxide |Sa-Sand O Diametrat ba a E >a sven OR oonesnal sreeead Boron Gh cterite Bee atte Sone 5aPFe284pw)=|Fe Frecture Fireguar-VBLVery Rough Gacalete, MLSiN SuSuipnide |SX 8 z NOTES w=|DESCRIPTION o LY4 S|wy DISCONTINUITY DATA x gay TESTS a Zz z iz /2/66 oa visx|tox Bi WATER LEVELS ©@ |Fej)5|oo]Roo TYPE and Fo [Seu e2a|SSR8 wofe)eis iz]«%SURFACE £Q |eF2/¥EZ/SeeoaB39DESCRIPTIOI&G Rete && L420 114.8 -175.0 \24 [88%DIORITE:Light grey to 7 R4 |SW Run 25:7greenishgrey,phaneritic,min/ftmediumtocoarsegrained,i fresh to slightly weathered ' -(FR-SW),and strong to very |,"> strong (R4-R5).Joints are I rough to smooth,planar,N stepped,or undulating,/| L FeOX stained,Ca or clay \Ltti |i infilled or Ca healed,and \54closetowidelyspaced.7.at @|J,ST,R,FeOx 70°rp(Continued),25)82%@ jJ,U,R,FeOx/Ca 60° a '100%S 120.1 -120.9 ft:Fracture zone c i '\ r 120.6 -124.4 ft:Healed breccia,|,'> diorite clasts with mafic matrix,{ fresh,very strong (R5)N '|121.0 -134.6 ft:Fresh,veryp-125 strong (R5)1 .Run 26:8 min/ft \ gs _i)"| g ; °J,PL,R,FeOx 30° Fe .\ a o ae s 0=\=@ (J,PL,R,FeOx 65° =7)|26)59 |Tea,RS)FA L 2g .\100%WPT: x 'DH14-12-7 a .125.2-145.2ft@|128.6-128.8 ft:Fracture zone ,;KAN () L 8 N <7.B (J,PL,R,Stained 65° =\J,Pi,R,FeOx/Ca 65°SS S|129.7 -130.2 ft:Fracture zone » =cor) |130 g / 2 @ |J,U,R,Stained 60°Run 27:15 g 'URS min/t i e "|22 ®jJ,PL,R,FeOX 65°2 1 ee =.a7|22 Hlo1% 2 \100% -'N &7. a |Run 28:5o\mint -bod 7 °J,Pl,R,CL 20° e ”\28 " ||2g)#8 Frage if 134.0 -134.4 ft:Fracture zone .!100% /| 134.6 -135.6 ft:Slightly ; L135 weathered,strong (R4)\@\J.,R,CaCLFeOX «65°na |sw7nd Run 29:6 135.6 -137.2 ft:Fresh,very .!min/tt strong (R5)/[4 ®|J,PL,R,FeOx 65° |rs |FR /.] r \ 137.2 -138.5 ft:Slightly \38weathered,strong (R4)/2g;-'100% |100%4 |SW|N ° e J,U,Rh,Ca/CL/FeOX 20°R co 138.5 -144.1 ft:Fresh,very l strong (R5)» a can \ ;R5 |FR N [+Log continued on next page WATANA201-zw DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,inc.SUSITNA-WATANA HYDRO pritter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-12 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/21/2014 -9/24/2014 DATUM:Ground Surface APPROX.ELEVATION:1639 ft SHEET 8 of 10 INCLINATION:-60° AZIMUTH:41°1/13/16richarpdLOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX,COORDS:N:3,226,646 _E:1,884,513 a ;Shape Roughness nfitling Py-Pyrie @ Axial g aa Po rotn ee od Keine gore Ep Eordote gz Quartz O Diametral x |&ee eeFe38ZWl2%|FRracture Heregular VR-Very Rough Ca-Galcite-_ML-Silt Su-Sulphide 285 q NOTESwuloDESCRIPTIONg}*4 2]BY DISCONTINUITY DATA =z].aoe Ss a |Z z={Z_|2]99 E o-v&x|tax WATER LEVELS iva &jae/3]°9 ROD FRACTURES |4/2 TYPE ard ro |Ozu)Gzu ASSESOoaelu |S|@ %PERFOOT |20%SURFACE aS |Ous|cgrossin & 4 o x 8898 |vv eee bs 3 DESCRIPTION e-|5 3M"ora = 4 114.8-175.0 29 100%140 DIORITE:Light grey to mm ' greenish grey,phaneritic,\Run 30:6 medium to coarse grained,'minét fresh to slightly weathered =;i (FR-SW),and strong to very |@||J,PL,R,FeOx 35° strong (R4-R5).Joints are I rough to smooth,planar,\ stepped,or undulating,/ L FeOxX stained,Ca or clay |@ |J,PL,R,FeOx 70°R5 |FRinfilledorCahealed,and .|po] close to widely spaced.om 38 J.PLR.FeOX 70(Continued)\.!+PL,R,Fe!° 30 96%#is PLR FeOx 65°} a '100% i'"|143.0 ft:1 inch thick quartz vein ! N =/ 144.1 -144.4 ft:Slightly '@J,PL,R,FeOX 85°}--_!"Aq |swweathered,strong (R4)N @)J,PLR,CaCl 75°7 -_| 7 \-145 144.4 -156.1 ft:Fresh,very { strong (R5)»Tripped out\/to change bit ( -NN S ,.Run 31:48g\ ; minft &.@ |J,PL,R,FeOx 65° -|147.0 tt:1/2 inch thick quartz vein |,' | :.I 5.0 @.J,PL,R,Stained 75°--__| =7 [31}P|t00%@ ||¥,PLR,Feox 20° -£g .|100%WPT: £t @ |J,PL,R,FeOx 60°DH14-12-8 2 vo (145.2-175tt) 2 \ a 8|149.0 ft:2 1/4 inch thick quariz ' |veins vo +\nu \ 150 |3 'sie)\ =RS |FR Run 32:5 '.3 .minéft i \ a ®\ a \ S / .vqie|@ |J,PL,R,FeOx 55° nm i XN [] 3 vy 88 ,fo),32 5.0 100%°J,PL,R,Stained 60°:e L §vo 100%J,PL,R,Ca/FeOx 70 hy S | ”N on a |@ J,PL,R,FeOx/Ca 80°}- _| 7. \ | t-155 ' . \@ |J,ST,R,FeOx 60°Run 33:6! .minitt 156.1 -157.1 ft:Slightly \. t weathered,strong (R4)7 156.2 -156.9 ft:Fracture zone | >R5 |Sw \ 157.1 -168.1 ft:Fresh,very .!5.0 @ |J,PL,R,FeOX/CL 65° strong (RS)a 33)2-9 |fzge,@ PL,R,FeOx/Ca 752+ '100% a N '. o R4 |FR NN a ro \ ! , /4]= Log continued on next page WATANA2014LOGS11-24-14.GPJWATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO patter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 RECORD OF DRILLHOLE DH14-12 CLIENT:Alaska Energy AuthorityDRILLINGDATES:9/21/2014 -9/24/2014 DATUM:Ground Surface APPROX.ELEVATION:1639 ft SHEET 9 of 10 INCLINATION:-60° AZIMUTH:41°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 APPROX.COORDS:_N:3.226.646 _E:1,884,513 a Vee B.Begd are Boeienes Selon Ep-Epidot eco ©AsalJai-Beddi -Planas -Fool -- ;2 FFaut FO-Folalen -O-Curved KSlickensided BxBrecda FeOxtonOxide Sea”|Ci Diametral==|SHShear CO-Contact||U-Undulating -SM-Smooth ChGiay G-Gouge Se-Sencita oeVein-st -|i-:=>==3 8 a wi 2 |FR-Fracture hhogonal kreguiar VAVery Rough GaCalote rer?80 Sulphide es 3 B wensBESDESCRIPTION2}-42)#e DISCONTINUITY DATA z |,cae WATER LEVELSao\2 z }=./2/82]rap |rractunes [Sy 2 |Sox|29x)aangxahel2)Co Foe TYPE and Zo 824 eeu eS tdOoaie-ls)@ %PERFOOT |20%SURFACE SQ |@a2|e528 ensoOo=ag¢a|avo?by 24 DESCRIPTION Fa 5 ioeso wy = |160 114.8 -175.0 N 33 74%|[2 °J,PL,R,Stained 20° _|DIORITE:Light grey to t 7greenishgrey,phaneritic,\Run 34:7mediumtocoarsegrained,|min/ft fresh to slightly weathered |. -(FR-SW),and strong to very |,'7 strong (R4-R5).Joints are | tough to smooth,planar, stepped,or undulating,I fn L FeOX stained,Ca or clay .4 infilled or Ca healed,and |@ J,PL,R,Stained 80°--_ closeto widely spaced.Ly |5.0(Continued)VI 34|2-9 Hl logo, -'100%7 1.74 @ |J,PL,R,Stained 70°\*ec 160.1 ft:1 inch thick quartz vein 1 PS 3 N . =L J,PL,R,Stained 75°Ra |-Rafw 4:\8 OLR Stained 5 <\g N ad a£\165 |=4 N a |°R,Stai °Run 35:6EvJJ,PL,R,Stained 65 minft €I +BS \4Qaros 2 \fo]!o 'N L £t 7 J,PL,A,Stained 75°4wi'|50 Bs PL LAL Stained ep o N 50 @ |J,PL,R,FeOX/CL 60°fe]r 7d 35)96% L ='|100%4 &|168.1 -175 ft:Slightly weathered,° 81 strong (R4}L >|@ ||J,PL,R,FeOxica 25° ®\ a i L =||4 p>\£i oS Nro)LefJo vO @||J,PL.A,FeOxica 40° T r ,PL,A,Fe5°{\Run 36:8 x £'min/tt=a ro L |170.9-171.5 ft:Fracture zone vy 4gNN 5 4 R4 |SW-{ loot mel \4w|172 ft:a vq 48 Regainx|36!48 |i)87%circulation -! ce rit 100% 4a\ <\ Zz \=bos St ®||,PL,R,FeOx/Ca 35°174 tt Lost 4 -|.circulationcS}vy =L 175 ||1497.4 7&Borehole completed at 175.0 Fs - bt ze 4 Lo} + 8 <L 4zang < 4 >}4 o wt + VL 4 Log continued on next page WATANA201-z DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,inc.SUSITNA-WATANA HYDRO paiter:8.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 a Mo: PROJECT:2014 Susitna-Watana Geotech PROJECT NUMBER:1039556001 LOCATION:Susitna River,Tatkeetn untains,AK RECORD OF DRILLHOLE DH14-12 CLIENT:Alaska Energy Authority DRILLING DATES:9/21/2014 -9/24/2014 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface APPROX.ELEVATION:1639 ft APPROX.COORDS:_N:3,226,646 __E:1,884,513 SHEET 10 of 10 INCLINATION:-60° AZIMUTH:41°1/13/15richarpdDEPTH(ft)---180 r-185 --190 f-195 BORINGMETHODDESCRIPTION GRAPHICLOGDEPTHtft)jevev.RUNNUMBERTy;InfillpintB-Bedding PtPianarFO-Foliation C-CurvedCO-Contact U-UndulatingOR-Orthogonal =ST-Stbirregular L-ClayCh-Chlorite Ca-Calcite V-Vein FR-Fracture Py-PyriteEp-Epidote.Otz-Quartz FeOx-lron Oxide 3a-Sand se-Sencite i-Siica 3u-Sulphide G-GougeHm-Hematte ML-Silt DISCONTINUITY DATA FRACTURES PER FOOT nwtoa® TYPE and SURFACE a DESCRIPTIONCORERECOVERYROD % 3398 9 é c awROCK STRENGTHINDEXWEATH.INDEX36.2k14,5kGRAPHIC;LOG7.25%3.62hR6R5R4R3R2POINTLOADTESTS(psi)RANOTES TESTS WATER LEVELS Notes: 1.Exploration location provided in Alaska State Plane Coordinates, Zone 4,NAD83,US ft based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna BoroughLIDARdata,NAVD88 vertical datum. 3.Vibrating Wire Piezometer was taped to a sacrificial tremie pipeandgroutedinplacewithbentonite cement slurry at 160.6 ft depth. 4.1-inch Schedule 40 PVC TAC conduit installed to approximately 150 ft depth and filled withpropyleneglycolantifreeze.Top of|HWT surface casing has 4.5 ft of Stickup above the ground surface. 5.TAC placed in TAC conduit andisremovable.TAC sensors are located at 3,6,9,12,15,20,25, 50,75,100,125,and 150 ft depth.0 ft =elevation +/-1639 ft. 6.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand margin of the log column.WATANA2014LOGS11-24-14.GPJ.WATANA2014GINTLIBRARY.GLB[WATANADRILLHOLE]-yz DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. SUSITNA-WATANA HYDRO pranter:B.Edmonds LOGGED:P.Richards CHECKED:J.Holland CHECK DATE:11/14/14 -yz.ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-R EP-01 1 21 5 2011 QUARRY A GEOLOGIC LOGS (Originally presented by Golder 2012) PROJECT:Large Railbelt Hydro Watana Quarry A RECORD OF DRILLHOLE G11-DH01 CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 SHEET 1 of 11 INCLINATION:-90 iz DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.222597 _E:1,884,686 a ROCK TYPE JJom -FO-Folafion ST-Stepped SM-Smooth Gegante 9 : @ Axal =F-Faut PL-Planar [rreguiar R-Rough CT-Contact FS z=C Diametral x K ©|BBeddng Curved P-Polished VRV Rough --RD-Redrilled Panta 29%ba NOTES z=|e 8 U-Undulating -K-Slickensided -Fr-Fractue --_FeOyciron Oxides HES |BUS 208 TESTSaySloDESCRIPTIONSlawlo]2 DISCONTINUITY DATA g-a ase WATER LEVELSFSContinuedfromnon-cored a 42]£5 |pap |FRACTURES |Eu TYPE and Q.lex Zle z|S 35K GRAPHIC©|borehole.See Borehole log @ |verty |3]80 PERFOOT |99%SURFACE gg 'eae gens & o 4 report So}m [|e aveee Ps gh descrenion |§°552 Vez ge Pere 2z|00-319 Fatd ee e [PLR,age=|Fresh to slightly weathered ls"04 Feox|(FR-SW),jointed (rust,yellow [fs %q@|FeOx staining),whitish green,js"0 -2 medium grained,strong to nee 1 |50%|0%NO CORE NO CQRE, ®%|very strong (R4-R5),a oC DIORITE/QUARTZ DIORITE . =}(TONALITE)= JER 3 Surface .els.t,73°i o [-]Run 1:Broken core 0.3-1.6 feet and |§"onroe 23coreloss,inferred greater than10 |=feet above tofractures/foot.Numerous very tight i le J,PL,SM,We 27 feettoopen,FeOx-stained in-situ 5 e FeOx ° 'hela |discontinuities.=JPL,sm,19°9 below Run 2;Numerous very tight to open,|8 FeOx ground in-situ discontinuities,some holding |=surface)water as core dries out.by JPLC sealed withfseSMR,34°Bentonite a k 4 :e aveLST,9°fe 2 |98%|91%\ i FR R4 iis oi to to _5 @ |J,PL-I,VR 63°sw R5 le @ |J,PL-I,VR 63° 5 5 5 J,PLA,F 4 :°|smr 4 4 5 4 elim 568° j :J,PLA,4 ;@SM-R,79°L__|:FeOx 5 4 J,PL-C,°r :©||sm,Feox 76 1 4 3 |100%|34% 9.8-13.75 feet:Zone of increased |*®jJ,PL.SM 64° ; 10 discontinuities,estimated 0%RQD ink.4 this interval.: i 1 inch Sch. JPLLR,gy sw R4 40 PVC pipe”le 8 FeOx 61°al :|J,PL4,.R 4 =le @|J,PL-ST,73°6 iq SM,FeOx ai lsaa J,PL,SM,0olsq®lFeox |9?7 =£fs ®|J,.PL.sm,47°==.FeOxop)8 5co}g ;J in]5ras 4 |}100%]62%JPLEs:oe |smR 45°aft |©Sl-15 "FeOx 8-3-11 4 Fat =10:27 AMoO5Zz4 x ls al 5 4 rat ie .FR R4=to to rt i"Sw R5 4 s 5=a '. Z|5 Jfe: =5 |100%|83%4 +5 aL le =°5<=J,PL, s @|SM-R,61°ls |FeOx20Logcontinuedonnextpage' 7 %=a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Figuref=]ive]Dp ai .8 és JE Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan A-3oO Oo Associates RECORD OF DRILLHOLE G11-DH01 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 2 of 11 INCLINATION:-90 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION.South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,222,597 _E:1,884,686 ROCK TYPE ;Ca-Calite @ Avail8JointpunoaehinerarenckClaygz(Diametral<3 F-Fauit eguiar R-Rough CT-Contact zx 6xrir©|B Bedding CCuved P-Polished VRV Rough --RD-Rednilied Zuu 220 bay NOTESEswfe)U-Undulating --K-Slickensided =Fr-Fracture FeOxlron Oxides BE 3 fa wQ z 4 ae TESTSmySloDESCRIPTION2baelo]cz DISCONTINUITY DATA g 5 aap WATER LEVELSz.wut ©=x<=a Z|ye FRACTURES |Ewa TYPE and Q |x Zhe =|4 85S GRAPHICnaRQDpanxole[4 No gk8&pepyH 3 83 rer Fo 63%J DESORIBTION 38 ls 3 ha to «)$eno x|209 a ()oe vvooo Pas +PCST S BSrYVecerr Pree Ff &00-319 PL-ST, Fresh to slightly weathered 'SM-R,52°2oar | (FR-SW),jointed (rust,yellow ®e FeOx 33°8-8-11 FeOx staining),whitish green,|J,PL-I,VR,79°FR 13:40 a medium grained,strong to 5 |100%]83%FeOx 63 to | very strong (R4-R5),@|]J.PL-l VR,39°sw DIORITE/QUARTZ DIORITE e FeOx 17° (TONALITE)(Continued)Sek sw 21.5-22 feet:Increasing number of FeOQx '7 discontinuities:slightty weathered e e|J.PL.SM,50°(SW),yellowrust coloration,strong FeOx 76° (R4)rock,xenoliths to 0.1 ft size.J.PL-L SM Z @ FeOx 82°4 ere 52° FeOx a J,PL,|SM-R,3 FeOx 80°;--_J 6 |95%|76%J,PL, SM-R, -25 FeOx > J,PL-C, °PMR 72°|ay a J,PL-ST RS JSM-R,FR FeOx eyJ,PL °Fismr,79 -FeOx 70°".q J,PL, SM-R, FeOx a e J,PL,SM,23°| FeOx ;.J,PL-ST,28.5-29.5 feet:Felsic porphyritic SM-R 6°crystals weathered orange/red.bal FeOx.1 a J,PL-C,4 ry SM,FeOx, &7 |100%]75%e Ca 182gJ,PL,SM,18°;a =FeOx,C 1 inch Sch. _30 2 1 PLC 3 40 PVC pipe g @ |SM-R,62° ||FeOx30.7-31.2 feet:Zone of @ ly PL 61° 5 yelloworange-colored discontinuities )SM R sw R4 | in slightly weathered (SW),strong »eo 66° {R4)rock,orange/red felsic i oe VRrphyriticcrystals.@]U FL VR,69°|Porehyniconsias 3 2489.1 FeOx PJ -31.9 -35.1 31.9 J,PL-l = x Fresh to slightly weathered SM-R, 6 (FR-SW),fractured,light FeOx a green,fine grained J.PL a groundmass,medium to @SN-R Bie b__|4 2 coarse grain porphyry,strong FeOx. =to very strong (R4-R5),@)PL.sm,81°-}--] &DIORITE/QUARTZ DIORITE Feox8(TONALITE)AND ANDESITE -PORPHYRY (DACITE)ZONE 4 irry 3 Run 8:First 1 foot of cuttings turn 8 |114%|103%=orangish then turn gray.ate3s J 2485.9 ol et SM.36°4 &35.1-40.5 36.1 Plier |87oOFreshtoslightlyweathered'SM-R ° FR R4 z (FR-SW),jointed (rust,yellow .FeOx 50 to to =]FeOx staining),whitish green,ely PL 59° SW RS 4dfea]medium grained,strong to elowr efFG}very strong (R4-R5),e eMR.oe PYoDIORITE/QUARTZ DIORITE J PLA "iL (TONALITE)SMR,| FeOx 59°=®|s:PL se, ||FeOx 43°ES °JPL,SM,43.<P @ }FeOx 48° 7 $J,PL,SM9|100%|70%e|FeOx 76°JPL -ae SM-R,4 g FeOx J,PL,>PL, Rs |SMR,73°&0 @ ||Feox asr4Logcontinuedonnextpage 7 =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fig2 .an:igureFayr..DRILLING CONTRACTOR:Discovery Drillin CHECKED:R.Dugan8€.=Golder ry Drilling 9 A-3 oO oO &,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 {ANCDRILLHOLE]BSavikko2/16/12YA.GPJWATANA_MWH_LIB.GLB10395560LRIRECORD OF DRILLHOLE G11-DHO01 PROJECT:Large Railbelt Hydro Watana Quarry A PROJECT NUMBER:103-95560 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK_EQUIPMENT:Hydrocore 28 Longyear CLIENT:MWH Americas Inc. DRILLING DATES: DATUM:NAD83,AK S.P.24 ELEVATION:2521 ft COORDS:_N:3,222,597 _E:1.884.686 SHEET 3 of 11 INCLINATION:-90 AZIMUTH:0 Q ROCK TYPE Joie SM:h Ce-Catcte g .heel a2F-Faut CT-Contact mx Bx _- i VR-V.Rough ==9xifB-Bedding 'oud!RD-Readrilled eww Ezu 5a?NOTES el U-Unduating FeOx-Iron Oxides Bez ou 3 FS $4 Fa TESTS u lo DESCRIPTION .z DISCONTINUITY DATA 8 6 as.WATER LEVELSfa)z Etev.JO]J &ira 3|52 TYPE and g,|x Zio =|4 SSS GRAPHIC4z/96 Zo ju ble rows 8{e)DEPTH |5 |OG SURFACE 8 "|8ine0 2 a wy [=|8 pescrPvion |§"/323 Veree weve ge xy 40 JPLT "31 2480.5 SM-R, |405-466 40.5 evenANDESITEPORPHYRYSMR,7.({DACITE)-DIORITE/QUARTZ 3 Fi 0:,4 DIORITE (TONALITE)ZONE,IPL Cc 2 contacts are transitional over SM R ,63°0.1-0.2 feet and also finite mo 19°FeOQx i Run 10.Rust-yellow-colored in-situ J,PL-C,q discontinuities in diorite,very tight to SM-R °partially open,white calcite infilling.FeOx'58 Some felsic porphyritic crystals JPL a weathered orange.SM-R,65°7 FeOx J,PL,SM, FeOx J,PL,SM,|FeOx,Ca J,PL,SM, FeOx J,PL,SM, 45 FeOx 4 J,PL,SM,°FeOx,Ca 27°J,PL,SM,56 a aes srl 2474.4 SMR,85 |466-870 v1 466 FeOx L Fresh to slightly weathered Vy J,PLA 4 (FR-SW),jointed (rust,yellow vy SMR, FeOx staining;white,light a FeOx 5green/white Ca coating),vy J,PL,SM,49 porphyritic crystals and vy FeOx,Ca gn.r volcanic &granodiorite vy,J,PL,SM,-| xenoliths have orientations v Ca 90 degrees to core axis,dark VYgreen,aphanitic groundmass,VY -strong to very strong (R4-R5),vy 4 ANDESITE PORPHYRY vy@|(CACITE)vv 2 vy a s uw.1 inch Sch. 4°vw J,PL,SM 'e o 40 PVC pipeCoVve''46°z vy @ |FeOx 51°sw R5 vy J,PL,SM, v FeOxBEVv 4 vv vy Ww L wy.J Vvvy J,PLC,440vvSM-R,Ca _VY 4 VY v J,PL-CVv.'° yw sme 43° a vv J,P,SM-R,73 4VYFeOx vv VY v 55 55-56 feet:Broken core,vy _ wedge-shaped core fragments.Vvvy J,PL-l 42°vy SM-R |vy J,PL,SM,gas 7 vy,J,PL,SMVv.+44°vy a Run 13:Zone of lowangle joints [VV 4 (e.g.,30 degree angle)encountered.|vvv J,PL,SM,vv Ca(RO)10° |VY Coating 4 Vvvy J,PL,SM 58° ™ vvavy J WwVY. =60 Ivy Log continued on next page 7” a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj€.A\z Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan ren&,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 {ANCDRILLHOLE]BSavikko2/16/1240395560LRHWATANA.GPJSWATANA_MWH_LIB.GLBRECORD OF DRILLHOLE G11-DH01 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 4 of 11 INCLINATION:-90 Log continued on next page PROJECT NUMBER:103-95560 ;DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,22 884 686 2 ROCK TYPE tucint --FO-Foliation SM-Smooth Gray 9 xPaF-Fautt CT-Contact ie 5rfr©|B-Bedding hivves VRV.Rough --RD-Redrilled z i ny z°ny 5 NOTES Fels io}ating FeOx-tron Oxdes Bez Qe2 5 TESTS w -1o DESCRIPTION 9 -z DISCONTINUITY DATA w bb a WATER LEVELSa12z|SEY 12)we 3 GRAPHICx&=|53 |Rao TYPE and fo If blz zre}&|oepry |3]88 SURFACE 38 =z\f/\ 60 a 9 (ft)4 y @ DESCRIPTION x E 22\exzeg 'pe Ss 46.6 -87.0 V Fresh to slightly weathered vy J,PL,SM,(FR-SW),jointed (rust,yellow vy Possible K FeOx staining;white,light vy -greenwhite Ca coating),vy 13 96%4 porphyritic crystals and vy J,PL,SM,volcanic &granodiorite vy FeOx xenoliths have orientations vy a 90 degrees to core axis,dark Vv Jgreen,aphanitic groundmass,VYstrongtoverystrong(R4-R5),vv ANDESITE PORPHYRY VY (DACITE)(Continued)VY .v 4 v Run 14:Very tight to partially open [VYjoints,some hold water after core Was dries out.VYLoWa 4 62.0-64.5 feet:Broken core,too vwmanydiscontinuitiestocount.Vv 14 50% Extremely weak (RO)white infilling on” +65 discontinuities oriented less than 30/,V._]degrees.vv yy Ww -wy J,PL,SM,4 Vv Gray White 68°w Coating a v a vy J,PL,SM JVv.FeOx vv J,PLC,vv SM,FeOx 68°VY J,Pll, -vv SMR,4 VY FeOx yy J,PL, yy SM-R, a WY.Yellow/Green 4 vy Coating 25°E vf 15]90 |65x yoke 353:5 =uy SMR 1 inch Sch70|=vy FR R4 a ae | S vw to to 40 PVC pipe z vy sw R5 vv L v |i PL.SM 4 vy @ |FeOx otovyJ,PL,SM, vy FeOx v J,PL-C,i Run 16:Very tight,in-situ joints,vw SM 7 yellow-white-green calcite coating.y Felsic porphyritic crystals to 0.25 vy Celow'Greeninchsize.vY.9 a Ww J,PL,SM 39° 4 vy J,PL,SM 43° "y J,PL,SM,"yy Ca r vv 7 Vv vv 9,v 16 95%J,PL-vv J,PL-NYL75vv 4 WY ™ vw L 7 4 v 7 J,PL,SM L ™| yy yv a7 a yy J,PL,SM t- ]7 YYvy 17 99% v i vy J,PL,4vYJ,PL-C, vy SM wy --80 Ne 4 Ty GolderAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Discovery Drilling DRILLER:G.Cormier LOGGED:E.Cannon CHECKED:R.Dugan CHECK DATE:9/7/2011 Figure A-3 [ANCDRILLHOLE]BSavikko2/16/121A.GPJWATANA_MWH_LIB.GLB10395560LRIRECORD OF DRILLHOLE G11-DHO01 SHEET 5 of 11 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 INCLINATION:-90 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.222.597 _E:1,884,686 ROCK TYPE - it Joint -FO-Foliation -$T-Stepped -SM-Smooth.GAG BME ©Waal "PL-Planar F-lrreguaar R-Rough y CD DiametratF-Faut CT-ContactC-Curved P-Polished VR-V.RoughB-Bedding RD-RedrilledU-Undulating K-Slickensided Fr-Fracture FeOx-lron Oxides DISCONTINUITY DATA. FRACTURES |$2 TYPE andPERFOOT|29%SURFACE 8 NOTES [SRMMW=WEATHERINGINDEXISRMSTRENGTHINDEXPOINTLOADTESTS(pst)TESTS WATER LEVELS GRAPHICDESCRIPTIONELE. RaDDEPTH(ft)BORINGMETHOD"FRGRAPHICLOG14.5k7.25k3.62k726DEPTH(ft)DESCRIPTIONRUNNOCORERECOVERY GRAPHICLOGIH!WwcwR6Rt36.2kRSR4R3R2RO5,RSR4R3RRtn+toewol BP 46.6 -87.0 Fresh to slightiy weathered (FR-SW),jointed (rust,yellow FeOx staining:white,light a green/white Ca coating), porphyritic crystals and volcanic &granodiorite xenoliths have orientations a 90 degrees to core axis,dark green,aphanitic groundmass, strong to very strong (R4-R5), ANDESITE PORPHYRY (DACITE)(Continued) 171104%|99%4 J,PL-l, @||SM-R,Ca,34°rRFeOxSW Run 18:Numerous white-yeliow infiled,very tight to tight,Lt Calcite-infilled joints at less than 30 degree angle;some joints core parallel.Felsic porphyritic crystals up to 0.25 inch in size.Xenoliths up to 0.75 to 1.5 inch size. 18|98%|93% J,°¢SM-R 81°;}-_]4 J <<ccccccceccccccececececcccc<KKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKKRKKIKKKKKKKKKKKKKKKKKKKKKKKKKKKKK2434.0 87.087.0 -202.0 Fresh (FR),jointed (rust, yellow FeOx staining;white, tight green/white Ca coating), a porphyritic crystals and volcanic &granodiorite xenoliths have orientations 90 degrees to core axis,dark a green,aphanitic groundmass, strong to very strong (R4-R5), ANDESITE PORPHYRY (DACITE)19|102%|102% 1 inch Sch.Re 40 PVC pipe R5 88.4 feet:In-situ, 75 degree angle, 0.5 inch wide calcite vein containing country rock angular fragments.TwooONQ2WirelineJd,PL-C, SM,Ca 7°4 J,PL-C, SM,14°Green/Yellow Staining 92.2 feet.Granodiorite xenolith 1.5 inches in size on long axis. FR e J,PL,SM 18° 20|101%|101% 95.65 feet:In-situ,caicite-infilled joint 1/16th to 1/8th inch wide.J,PL,SMFeOx "19°| Run 21:In-situ,very tight to partially open,white joints.Granodiorite xenolith 1 inch in size,also some dark green/black voicanic xenoliths, Porphyritic crystal fabric oriented 9q degree angle. 21;100%|100% J,PL-l,SM,446 7 Ca 34 <<cccccccccccccececccccccecccccccccccccCCCCKCCKCKr-100 Log continued on next page =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon f-)€.E Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan aw ®. . .A Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 Figure A-3 [ANCDRILLHOLE]BSavikko2/16/12RECORD OF DRILLHOLE G11-DH01 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 6 of 11 INCLINATION:-90 10395560LRHWATANA.GPJWATANAMWH_LIB.GLBAssociates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK_EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,222,597 _E:1.884686 a ROCK TYPE sont FO-Folstin -ST-Stepped -_SM-Smooth oon g c bg Denetral=F-Fautt -Planar \-Irreguiar R-Rough CT-Contact zx FexHTo|BBedding CCuved P-Polished VR-V.Rough --_-RD-Redrilled zuw aan 5a!.NOTES F e s io}U-Undulating K-Slickensided -Fr-Fracture FeQx-Iron Oxides a =g G wi 3 FS 3g &Fa TESTS w Q DESCRIPTION g rev.lo >DISCONTINUITY DATA Py PA aap WATER LEVELSFda12)¢S FRACTURES |Fva TYP!Q |x Blo -]SSKX GRAPHIC5&verty |5]88 RGD |'peRFooT |$3 SURFACE a8 iz =a7 os sve 8L49942m|@|2 aveoee Peg DESCRIPTION |§°VF SE Veeee Pere gz87.0 -202.0 v. Fresh (FR),jointed (rust,vy yellow FeOx staining;white,vylightgreen/white Ca coating),"y -porphyritic crystals and vy 21 |100%|100%4 volcanic &granodiorite vyxenolithshaveorientationsvy 90 degrees to core axis,dark vy a green,aphanitic groundmass,v Jstrongtoverystrong(R4-R5),vv ANDESITE PORPHYRY vy (DACITE)(Continued)wv -ov 4 yy VY wv a VY 4 104.2 and 107.0 feet:In-situ joints,[VY 15 degree angle,very tight to vy 22)98%|98%partially open,infiled with caicite,at 7 Vv. |405 least 6 joints observed.w _| v yvWadLLvv ZyW wv WY Ss vv vy 7 vv yy vw. vv 4 Wa vy w L vy 4 o "y£vy 23 |102%|102%2 v °FR +410 |=vY fe J,PL,SM 9 R4 1 inch Sch._I a VY to 40 PVC pipe g vv R5yy = vv 4w™ a yy w™ a Run 24:Very tight calcite veins,VY q some core-axis parallel.Angular,vy light and dark green volcanic,and VYgranodioritexenolithsto1inchsize.Vv. a Long axes of xenoliths have 40 vy degree angle orientation.vv 4 vy. yy i v™4 WY Vv.vy 24 |100%|100%vy =v _115 vv yy yY115.7 feet:Calcite crystals 0.5 inch yy. =by 1 inch size appear oriented 90 v 4degrees.vyv w™ uv =Was - Wy117.5 feet:In-situ joint,partially open|V.,to open,calcite infilled,22 degree v -angle.vw -| vyvy 25 |100%|100%v SS VY JuY. vy wy +120 . aa . _Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.AF Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan n3eA:- [ANCDRILLHOLE]BSavikko2/16/12VA.GPJWATANA_MWH_LIB.GLB40395560LR!RECORD OF DRILLHOLE G11-DHO1 SHEET 7 of 11 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 INCLINATION:-90PROJECTNUMBER:103-95560 ;DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.222.597 _E:1.884.686 2 ROCK TYPE Joint FO-Folation -ST-Stepped SM-Smooth -CACakete 2 @ Acai =?PL-Planar -Irreguiar R-Rough Clay <z=O Diametral zs |e ©BBedting co P-Polished VRV.Rowgh Gy eomact str =O%ar NOTESFow8U-Undulating --K-Slickensided Fr-Fracture --Feox tron Oxides beg Sug z z 5g TESTSWWQDESCRIPTIONgELV.|o wh DISCONTINUITY DATA g 2 5 aif WATER LEVELS=a z FRACTURES w gtx =|SSSR GRAPHICce3[oem |3|88 |800 |'eenroor |g82 |Onecce |ee fF ol@ -a[seks x490-42 6 ty)|e)ow awoo2 be gh DESCRIPTION |§ |/2 =3 fee exe go =87.0 -202.0 v Fresh (FR),jointed (rust,vy yellow FeOx staining;white,vylightgreenAwhiteCacoating),vy -porphyritic crystals and vy 25 |100%|100%| voicanic &granodiorite vyxenolithshaveorientationsvy 90 degrees to core axis,dark Vv t green,aphanitic groundmass,vv |strong to very strong (R4-R5),vv ANDESITE PORPHYRY Wad (DACITE)(Continued)vy Vv L vy _ vv VY WW t Ww 4 vy vy 26 |100%|100% vo p 125 Run 26:Light and dark green,vw 4 aphanitic,volcanic xenoliths.vyCailcite-infilled joints.vy J,PL,SM,Vv e Green/Whitd 5° L vy Coating 4 oy wv VY a Run 27:Granodiorite xenolith up to [Y,7 1.25 inch size.yy vv VY a Was 4 VY vy vy a VY _ w™o Vv.£vy 27 |100%|100%o Vv=FR .v.-130 |=v 1 inch Sch. | 5 vy a 40 PVC pipe 7" Zz vw R§& My a yY | v™.VYvy” a Run 28:Porphyritic crystal texture wae 7 oriented 80 degree angle.v™ vy u. a yy =Vv,J,PL-l,SM,5,0vveCa71 a ae =VY vyv 28|100%|100%@jJ,PlL,SM 75°w JPL SM,72°4 t-135 vy Slight 4 vy Green v CoatingVvVv v™ L ov | Vv'Naeyw S VY 4 VYvY.VY a VY 4 vyvy 29)100%|100%Vv v J,PL,0 r vy ©|[sw-R,ca 2?4 yV™vyv140Logcontinuedonnextpage _] =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fié.A Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan D3e&,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 - RECORD OF DRILLHOLE G11-DH01 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 8 of 11 INCLINATION:-90 J Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocere 28 Longyear COORDS:_N:3.222.597 _E:1.884.686 2 ROCK TYPE Joint -FO-Foliation -ST-Stepped SM-Smooth.Gran 9 x otra=F-Faut PL-Pianar I-trreguiar R-Rough CT-Contact z =O Diarretralxim©|B-Bedding Curved P-Polished VRV.Rough --_RD-Rediilled Panta)29i5 bap NOTESiw8U-Unduating --K-Slickensided Fr-Fractue --_-FeOy-iron Oxides SES aug 258 TESTSwiEloDESCRIPTION2)ae.lol wz DISCONTINUITY DATA o-5 aoe WATER LEVELSz:ww x ex =a 2]g>FRACTURES |Ewa TYPE and Q te ry <|N 55S GRAPHIC5FpertH13]33 RQD |PER FOOT ab SURFACE 38 iz >3)="gsee 8140-4 {e]aveeebag%Description |§"5 se Vergy pose g x87.0 -202.0 v Fresh (FR),jointed (rust,vy yellow FeOx staining;white,vylightgreen/white Ca coating),vy -porphyritic crystals and vy 29 |100%|100%R4 4 voicanic &granodiorite vy to xenoliths have orientations vy RS 90 degrees to core axis,dark vy -green,aphanitic groundmass,v a strong to very strong (R4-R5),fv' ANDESITE PORPHYRY vv (DACITE)(Continued)w -vy J VY VvVv Run 30:Numerous core-axis paralie vv -and subparaliel joints with calcite VY = infilling,very tight to partiaily open;yydrillinghaspartedsomejoints,while Wad 30|100%|100%R4othersarestillin-situ at time of a 445 boxing core.WY i” yw VY ae vya vy J VY WV VvVv a Run 31:Largest continuous core vy q stick recovered from core barrel at yy3.95 feet length.vy VY |WY.J vVv v148.6 feet:Calcite clast 0.75 by1 |v. a inch size.vv a a Ww &vy 31]98%|98%g wy FR|iso {2 VY 1 inch Sch. 4 a vv 40 PVC pipeogvy<vvy J,PL,SM, .vy e GreenWhita0°4 Vv.CoatingWw VYNad f Run 32:Green-white calcite-infiled [VY 4 =joints,porphyritic crystals to 0.5 inch [/¥ ©size,light and dark green aphanitic VYSvolcanicxenolithsto1.5 inch size.vy of}.vw 7 =x vv @||J,PL.smM 32°R4 2 vw to 8 153.7 feet:Calcite vein 3/8 inch vy R5 -wide.vy 4 iv]Yy3vy 32|100%|85%I Vv St 155 wy 4 =vy a vvre)Vv z VvEsvw a v YT Vv®w e 4 PL,SM,45°a vy a a Vvi Vv.x v 4 s v =vv FS wv Fan WY 4faVv 3 wv 3 %4 vv 3]98%|98%i J,PL,SM,psaLvyCa q 9 vw< z Vv.zt yyeyv J,PL,SM, =f 160 . aon e 4 =Log continued on next page =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj3 :an Igure8ADRILLINGCONTRACTOR:Discovery Drilling CHECKED:R.Du gre)::R.Dugan8€.|=Golder A-3 Oo RECORD OF DRILLHOLE G11-DH01 PROJECT:Large Railbeit Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 SHEET 9 of 11 INCLINATION:-90 [ANCDRILLHOLE]BSavikko2/16/12VA.GPS WATANAMWH_LIB.GLB10395560LRtAssociates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 ATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,222,597 _E:1,884 686 a ROCK TYPE Joint.-«FO-Foliation -«ST-Stepped =»SM-Smooth g x @ Axal:no sis |son [Seew8B-Bedding i Unauiating --K-Slickensided Fr-Fractrs ze 3 %a 3 Z a5 q woaesoODESCRIPTIONoevevloxDISCONTINUITYDATAZ-b aor WATER LEVELSFeaZ|©|pap |FRACTURES |Ewa gla Z]}0 <|AS5S GRAPHICray&|veptH |Z]88 PERFOOT |80%38 ">od bes 'Sins &a oj]m [Fi @ nvooe Rag4 DESCRIPTION |8"5 32 Vex ce ese287.0 -202.0 Vv bel Ca 1/32 Fresh (FR),jointed (rust,Vy inch thick yellow FeOx staining;white,vy light green/white Ca coating),vyporphyriticcrystalsandvy 98%4 volcanic &granodiorite vyxenolithshaveorientationsvy 90 degrees to core axis,dark vygreen,aphanitic groundmass,Vv | strong to very strong (R4-R5),Was ANDESITE PORPHYRY v FR (DACITE)(Continued)Wad R4 Nae to ™R5 4 WasVYvu.vy 4 VY vv 100%|89% vy wy J,PL,SM,4 165.2-165.5 feet:Broken core,low vy e Ca 1/16-1/8 19°FR Raanglemainjointsplusbrokenwedges|Vv inch thick toofcore,interpreted as FR-SW,Wad SwR4-R5 zone.Was VYWasuv v™ vy +f WY VYWaaVY 4 VY VY vv e J,PL,SM 21° vv 4 o vy s vw 103%J,PL,SM,2 vy e Slight F =v Green 1 inch Sch._ISswCoating40PVCpipe z vy le J,PL,SM, vy Ca vw ©)4,PL,SM,2 vy Slight vy greenVvoatin vv .J.PL,SM, Run 36:Light and dark green vv Slight + xenoliths.VY Green VY Coating R4 yY FR to vw R5 4 173.1 feet:In-situ joint,calcite v™.infilling,tight,21 degree angle.Ww yy VY 4 VY wavy 100% yyvy.7]wv. vY VM a 4 WadVYVY.vv tvy.yw vv vv 4 wv Vvvy 97% WW VY 7]vy Vvv J,PL,[VY °SM-R,Ca | Log continued on next page =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiEeGolderDRILLINGCONTRACTOR:Discovery Drilling CHECKED:R.Dugan n3€ [ANCDRILLHOLE)BSavikko2/16/12410395560LRHWATANA.GPJWATANA_MVWH_LIB.GLBRECORD OF DRILLHOLE G11-DH01 SHEET 10 of 11 PROJECT:Large Railbelt Hydro Watana QuarryA CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-90 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2521 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,222,597 _E:1,884,686 ROCK TYPCK TYPE Jdoint -FO-Fotation-ST-Stepped =SM-Smooth Segal @ Anal F-F:PL-Planar |-Irreguiar R-Rough ContautC-Curved P-Polished VRV.Rough -_&T-ContactB-Bedding RD-RedrilledU-Undulating K-Siickensided -Fr-Fracture FeOx-iron Oxides DISCONTINUITY DATA FRACTURES |Ew TYPE and Q DEPTH PERFOOT |293 SURFACE 5g(ft)a«oo2 Pg g 4 DESCRIPTION |&iNOTES TESTS WATER LEVELS GRAPHICISRM(INDEXPOINTLOADISRMSTRENGTHINDEXTESTS(psi)DESCRIPTION ELEV.FRRQD 145kT25k3.62k725DEPTH(ft)BORINGMETHODRE362kGRAPHICLOGRUNNOCORERECOVERYMW=WEATHERINGswHWR5R4R3R2ReRSR4R3R:R4187.0 -202.0 [ Fresh (FR),jointed (rust, yellow FeOx staining;white, light greenAwhite Ca coating), -porphyritic crystals and volcanic &granodiorite xenoliths have orientations 90 degrees to core axis,dark green,aphanitic groundmass, strong to very strong (R4-R5), ANDESITE PORPHYRY (DACITE)(Continued) 37|97%|97% J,PL,SM,lca 68°P| 38]96%|96% 185.6 feet:Granodiorite xenolith with 1.5 inch long dimension oriented 90 degree angle. 1 inch Sch. 40 PVC pipe 186.5 feet.Cross-cutting, Caitcite-infiled joints in X-pattern,one -joint is 30 degree angle,up to 1/8th inch wide,wispy;cross-cut by 15 degree angle joint,very tight to tight, wispy. i Run 39.Light and dark green, aphanitic and granodiorite xenoliths to 1.5 inch size,with long axis oriented 90 degree angie. 187.4 feet -In-situ joint,calcite 39 |102%|102%infilling,very tight to tight, 20 degree angle. R4 FR to 4 R5Tre)oNQ2Wireline192.45 feet:Muttilithic xenoliths up to} 2 inch size. J,PL-C, suM,.ca 194.4 feet:Three very tight to tight, in-situ caicite-infiled joints, 30 |195 degree angie,hoiding water after core dries out. 40|101%|101% 1 inch Sch. 40 PVC - slotted pipe J,PL,SM, Slight Green Coating Run 41:In-situ joint,very tight to 50° tight,calcite infilling, 15 degree angle. 200.0 feet:In-situ joints,calcite 41 100%|100%infilled,very tight to tight,20 degree i angle;also two core-parallel,verytightandopen,FeOx-stained,in-situ pints.Parraarararararararararararara)ara)ararararaararaaararararaaraeOFaaaaaOLOaaAATECte<<<eeeseeeseeeeseeeeseeeeeeeeeeeeeKKKKKKKKSSKaan _ -4 K4 Logcontinued on next page =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon f..€.E Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan riew2. . ; .&,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 [ANCDRILLHOLE]BSavikko2/16/12JA.GPJWATANAMWH_LIB.GLBPROJECT NUMBER:103-95560 RECORD OF DRILLHOLE G11-DH01 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc. DRILLING DATES: LOCATION:South Bank Susitna River,Talkeetna Mtns,AK_EQUIPMENT:Hydrocore 28 Longyear DATUM:NAD83,AK S.P.Z4 ELEVATION:2521 ft COORDS:_N:3,222,597 E:1 SHEET 11 of 11 INCLINATION:-90 AZIMUTH:0 884 686ROCKTYPE DESCRIPTIONDEPTH(ft)BORINGMETHODGRAPHICLOG8 Bedding ivf FO-Folation ST-Stepped SM-SmoothPL-Planar \-Irreguiar R-RoughC-Curved P-Polished VRVRough gy coralUndulatingK-Slickensided Fr-Fracture FeOx-lron Oxdes @ Axal CO Diametral ISRMINDEXELEv. DEPTH (ft)RUNNO.CORERECOVERYOISCONTINUITY DATA (SRMSTRENGTHINDEXFRACTURES |Eva TYPE andPERFOOTaORSURFACE3DESCRIPTION RQD GRAPHIC.LOGNnwvoaoSl P FRsw-CWMW=WEATHERINGHwRSRaR3R2_ReRSR4R3R2NOTES TESTS WATER LEVELS GRAPHIC 200.4-201 feet:Caicite-infilled joint Zone with two joints at 20 degreeangleandtwojointswith0degreeange.TNQ2Wireline202.0 feet:Calcite grain 1 inch in size at bottom of hole.<<<ccccc<<<<cececccs41 2319.0 100%100%FR to Boring completed at 202.0 ft. Notes: 1.Elevation term calculated using NAVD88 vertical datum. 2.1-inch Schedule 40 closed-end PVC pipe installed to bottom of hole, last 10 feet slotted,no sand backfill. -205 3.NQ drill rod and metal cap used as protective surface casing (approximately 2.3 feet above to 2.7 feet below ground surface).Casing set with Bentonite to approximately 3 a feet below ground surface. 4.Water level readings were measured post-driling once the PVC had been installed. §.Beginning at Run 20 (92.0 feet), the tail end of the drill skid was anchored to the bedrock.The core could then be broken free with less a dri movement. 6.Core was removed from inner barrel by tapping the exterior of the barrel with a hammer. 7.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand margin |210 of the fog column. 215 202.0 1 inch Sch. 40 PVC -4 slotted pipe =--10395560LRIalg Id.(Pi colder DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Discovery Drilling DRILLER:G.Cormier LOGGED:E.Cannon CHECKED:R.Dugan CHECK DATE:9/7/2011 PROJECT:Large Railbeit Hydro Watana Quarry A RECORD OF DRILLHOLE G11-DH02 CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 2 of 12 INCLINATION:-90 [ANCDRILLHOLE]BSavikko2/16/12NA.GPJWATANAMWH_LIB.GLB10395560LRLJ Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.223.063 __E:1,884,284 8 ROCK TYPE some FO-Folation -ST-Stepped SM:th CaCalcte 5 @ Axal x F-Fautt PL-Planar I-irrequiar R-Rough Cr -Centact ==C Diametralrfr©|BBedding Curved P-Polished VRV.Rowh --RD-Redrilled gu a Boi 5oe NOTESEe=iS}U-Undulating K-Slickensided Fr-Fracture FeOx-iron Oxides oz 8 &a 3 Zz Z 5 z TESTSur|o DESCRIPTION Q |2 DISCONTINUITY DATA io 5 ase WATER LEVELSa>.r=ELEV.iS}wa =rey Es =<x xxx GRAPHICzContinuedfromnon-cored a Z|=2 |roo FRACTURES |EW¥a TYPE ard 2,te Sle EIS SESoOborehole.See Borehole log @ |veptH |3)89 PERFOOT |28%SURFACE ag lez Bika 8 a report.o |m [#|2 avons bg g vescrmrion |§*|e 28\Vex oo\eese gz 16-196 v]2466.5 Slightly weathered (SW),vy 1 |100%|0% a jointed (calcite infilled,very vy 7 tight to partially open,FeOx "yystained),fine grained vy J.PL,SM °groundmass,medium strong wy ®reox.|78°FP] L to strong (R3-R4),ANDESITE vy J,PL 1 PORPHYRY (ODACITE)YS e SM-R,23° vy »FeOx 33°vy J,PL-I,SM,L-vy FeOx °4vw®14,PL,sm,90 vy FeOx vy 2 |102%|28% ls oe YY J,PL,aot |ZY |_|Run 1:Low angle discontinuities v.@ =|SM-R,47°8-8-11(e.g,25 degree angie),porphyritic [VY FeOx 13:45felsiccrystalsto1/8th inch size.VY.. w J,PL,SM .Run 2:Dark green volcanic xenoliths]vy °FeOx 70°[---]7 to.0.5 inch size.Joints hold water v longer.vv Ww |vv e J,PL,SM 23° JadJ,PL,Vv.@ |SM-R,63°Run 3:Some joints holding water vy FeOx after core is dry.vvrVv 4 VvVv.J,PL-C,°vy ®|Feox 65 uY.@ |J,PL,FeOx59° vv 1 vv WY.u™.3 |100%]27%JPLSM=v.PL,SM,apeiosvy°FeOx 10 7 vy R3 YY SW to v R4gvwJ,PL,SM,776 toot |FF J2vv|Feox m7 8-7-11 s WY.18:53 N VYCgv, a >Vv 4WYJ,PL,SM,34012.2-12.7 feet:Broken core,FeOx Vv FeOxstainingonfractures.vyvy J,PL,SM,36° |vy FeOx 3°-]flvyJ,PL-I,SM, ,vw ®|Feox 66 v J,PL,SM,43.7-14.7 feet:Broken core,FeOx [VY FeOx -staining on fractures.v™4 Waa yNad 4 |100%|15% |v.1 inch Sch. _|15 w 40 PVC pipet v,15.5-16.0 feet:Broken core,FeOx |', staining on fractures.vy L v 4VvJ,PL,wY.@SM-R,85°vy'.FeOx v J,PL,SMvrPL,SM,24.L.uy.Tan 24 5.5a,¢VY Coatingv.(RO)1/32"99°17.7-19.6 feet:Broken core.vy thick 0 r Ww J,PL4,SM,30° a FeOx,Ca yy J,PL,SM,Vv FeOx éi |vv J,PL,SM,44°vy FeOx Oy Cy Po vvaf 2a2i.g |5 |100%)9%17wv]19.6- 20 vv w FR R4 v J,PL-C,°to to uw SM 49 sw R5 =Vvv vy J,PL,SM,92Vv_L Log continued on next page L Gard DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureDRILLINGCONTRACTOR:Discovery Drillin CHECKED:R.Dugan€2 Golder yong g A-4 PROJECT:Large Railbelt Hydro Watana Quarry A RECORD OF DRILLHOLE G11-DH02 CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 3 of 12 INCLINATION:-90 BSavikko2/16/12PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 __E:1,884 284 a ROCK TYPE Jedoit -FO-Foliation -ST-Stepped -SM-Smootn Gage g x ©Anal =I F-Fault PL-Planar (-Irreguiar R-Rough CT-Contact Fd Pal O Diametrai i i urved P-Polished VR-V.Rough Shs =O%5 Eaoz=w @ |BBedding Undusting K-Slickensided Fr-Fracte -RO-Redriled &ra xZa Zong NOTES Fols °FeOx-lron Oxides REZ Ovz 568 TESTS w 1]o DESCRIPTION Q -=DISCONTINUITY DATA h aor WATER LEVELS a |Z z LEY [2]vs reactnes |3za |meen Tvl =#le AER GRAPHICira272ar=xi'5 &|verry [3]88 |"OP |Perroot |aS%|_surrace 8 lr ee,"leans 8oO(o)(ft)Ee y awoo2 Pg gW OESCRIPTION |&B22 gigs pese es xz19.6-118.1 oY sag FeOx Fresh to slightly weathered Vv 5 |100%|9%° a (FR-SW),jointed (FeOx vy ®|J,PL,SM 64 staining),light green aphanitic vygroundmass,felsic porphyritic |v,J,PL, 3 crystals up to 3/8th inch size,vy °SM-R,39 5 dark green aphanitic volcanic vy FeOx xenoliths up to 1.5 inches size,vystrongtoverystrong(R4-R5),v ANDESITE PORPHYRY vy(DACITE)(Continued)Vv J,PL,5 yY @ SM-R 69 aRun6:Porphyritic crystal fabric at [VY 65 degree angle.yY.5 5WY.6 |100%]79%e |J,PL,SM 65° =25 Wad 4 w™. V™vy. a Vv J,PL,SM,.vy ba FeOx 50 v™ Ww S Wa v™ wev J,PL,SM,sp -, vv *\Feox 76°--_] Run 7:Dark green volcanic clasts toy Vv.e JPL 28°1.5 inches size.Very tight to partially iM.SN-Ropendiscontinuitieswithcalciteinfill.yy.FeOx Ca v J,PL.SM,ggeVv171 i vv *|Feox had 4 vVv J,PL,SM,°vw 9,9 °FeOx 86 vy 7 |100%|80% ; 30 vy 1 inch Sch._| 30.2 feet:Core-parallel fracture,vw J.PL 3 40 PVC pipe rough,white/orange coating.@laap °ug ing ng vy SM-R +f=vv 4 8 wyv5wy jo [2 PL.SM,740 te to L g vy FeOx sw R5 4 vv Vvwv >J,PL,33° -Run 8:Dark green volcanic xenoliths!V.e,{SMR 45°-4 4 up to 2 inches size.Wa J,PL, yy.SM-R,Ca vv @ |J,PL.SM 64° r ww ©)[J,PL,SM 40°4 v v,Vv o wy 8 1100%|77%e@||J,PL,SM 44 Vv.t 35 Vv J,PL-l,°_ Y.oe SM-R 72 _-vy”ae yiv J,PL,° 7 vy Pi ismr 7 Ww J,PL,SM, yy e White/Gree8° r YY.Coating 7 vy P|yy 37.7-38.2 feet:Broken core.Wa >> Zz VY = VYNaeWy @ |J,PL,SM 52° T 39.0 feet:Core-parailel discontinuity),V,7 FeOx staining,vv 9 |100%|31% v J,PL-CVv''o) |40 Wad °SM,Ca 13 _| yy J,PL,SM =17°WY VY v™ a ™4 vy Log continued on next page a a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FjEeGoldDRILLINGCONTRACTOR:Discovery Drilling CHECKED:R.Dugan igure =Golder A-4&,10395560LRHWATANA.GPJ=WATANAMWH_LIB.GLB[ANCDRILLHOLE]Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT:Large Railbelt Hydro Watana Quarry A RECORD OF DRILLHOLE G11-DH02 CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 SHEET 4 of 12 INCLINATION:-90 &,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 _E:1,884,284OoROCKTYPEsoitFO-Folation -_ST-Stepped SM-Smooth Ce Cakate o @ Acai2PL-Pianar I-{rregui R ClClay z z=Cl Diametrat=Frau CCuved Polished VRV-Rowgh -C1-Contact sux |sox oveWwbe=eS w 8 ing U-Undulating K-Slickensided Fr-Fracture Fee des 8 =3 a a 2 FS Far g vers we 9 DESCRIPTION 2]ae |o z DISCONTINUITY DATA g b aaPp WATER LEVELS <a JZ]eS FRACTURES |$wa TYPE and Qo de Blo «|4 BBX GRAPHIC5&|perm [3]88 |POO}PeRroot |asx SURFACE a8 "oye Kleseg 8 a 9 (ft)a w a+eo bg gH DESCRIPTION %z22 ezen\bese g z 19.6 -118.1 Vv Fresh to slightly weathered vy 9 |100%|31%a {FR-SW),jointed (FeOx vy ee.J,PL,SM 16°q staining),light green aphanitic vy J,PL,SM 45°ground mass,felsic porphyritic }V.,crystals up to 3/8th inch size,|V'r J,PLL ge -dark green aphanitic volcanic vy SM-R,Ca | xenoliths up to 1.5 inches size,Vvstrongtoverystrong(R4-R5),vv ANDESITE PORPHYRY VY (DACITE)(Continued)vv z y J,PL,4 vv le Gray/Green 3. v Clay"vy 10}100%!98%Coating 45 ym _ VY VY VYttVY @jJ,PL.SM 74°4 VY ae VY a Wasvv 7 VvWasVv a v J,PLA,2 vw *\sme 6 7 WasWasvv =VY 4 y™ VYyy”.11)100%|94% |v,1 inch Sch. _|50 vv 40 PVC pipe vv v.Vv J,PL-C,° z 2 vv *|Ism.ca 74 4 @ vv s Ww J,PL-L FR R4 3 wy Ssmr'84 to to i z vy J,PL-l,Sw RS 4 vy e®|SMR,63° Vy FeOx 42° vy J,Pt-l, .vy SMR 7 VYWadxyy e J,PL-l,Ca 21°od vw.@||J,PL,39°4 5 y SM-R,Ca g ve 12}100%|84%=|¥,|J,PL,62°zp 55 v SM-R a 8 wyVv J,PL-ST,e_|Ww "|Ism.ca'44vvorVv,J,PL,7 =v els 47° =vw e SMR,Ca erxvySMR,Ca or Ww 4 z Ww mo Run 13:1/8th inch wide caicite VY a infiled joints.VY J,PL,SM °OL Vv od Ca *66ov4 7 s vv J,PLA, x Wy le)|SM-R,40° =VY ®Green 33° =P 58.3 feet:Clayisil infiled in-situ joint]VV,Coating + 35 degree angle, 1/8th inch wde,[Vv<extremely weak (RO),green infilling.vw 13)100%]81%aye SM, <YY @ |J,PL,SM 59°St 60 vy -| rm vv oO VY SL vv ww y IVY |,J,PL-C,Logcontinued on next page Zz ,=F="a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fig8ADRILLINGCONTRACTOR:Discovery Drillin CHECKED:R.Dugan igure:€.©Golder ry Drilling "R.Dug A-4 oO PROJECT:Large Railbelt Hydro Watana Quarry A RECORD OF DRILLHOLE G11-DH02 CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 5 of 12 INCLINATION:-90 &,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 ___E:1,884,284aoROCKTYPEFO-Foliation ST-Ste Ca-Cakite @ Axal Joi |-Stepped SM-Smooth Q2eeePL-Plarar |-lrreguiar R-Rough eyact z.z 7 (0 Diametrat x 5 @ |BBedding C-Cuved P-Polished VRV.Rowh RD Redrilled zu z2u sae NOTESFEel2is}lating =K-Slickensided -Fr-Fracture FeOx-lron Oxides Go bz ave 5 g 2 Fa TESTS wi 19 DESCRIPTION 2]aa lo]DISCONTINUITY DATA y 5 ae WATER LEVELS Z i "}2]/wy FRACTURES |Ew fe [va Slo -|4 S58 GRAPHIC 5 3 |ccem [2 89 |°2°|PeRroor e832 SURFACE ag ole in gene 8aolm|*|8 avooebg gq cescrPTiION |87/332 Veeee wes gz196-1181 v SM CaFreshtoslightlyweatheredvv13]100%|81%@ |J,PL,SM 60° (FR-SW),jointed (FeOx q staining),light green aphanitic vwgroundmass,felsic porphyritic [V\,crystals up to 3/8th inch size,vy a dark green aphanitic volcanic vy 4 xenoliths up to 1.5 inches size,vy et:PL.SM.75°strong to very strong (R4-R5),Vv Ca PJ ANDESITE PORPHYRY vv J PLC i (DACITE)(Continued)vy esq 78°F-| vv 63.6 feet -Core-parallel,in-situ W™. calcite infitled joint,tight te open,v™.14)100%|96% -65 hokds water longer.vy._| ™ VY Vv i vv J,PL,SM,4 uy Clay/Silt vy e Coating,44°uw.@ {Ca oJ 66.8 feet'Core-parallel discontinuity|™Extremely i moist to wet cilay/sit infilling up to v Weak (RO)7 1/16th inch wide.a)J,PL,SM vyNaeav J,PL,SM 7 v ,.1 o vy en,77°| VY v J,PL,SMVv,° 7 Wy ne | w J,PL,SM, ™Ca ™15}104%}88% |70 a7 1 inch Sch._| WY ef JPL SM,792 40 PVC pipe WY FeOx -- Vvv.L-2 vw.4 g vw se aie SM,99°s vy FR R4 I vy to to..g vy @ |Rs 28°sw R5 4 72.2-83 feet:Zone of fewer vy |mh a porphyritic crystals.vyv eo |fePL agevvSMR,Ca i v™"4 Nae a vy @ |2 PL,SM,gge SL vv FeOx 4 a vv °vv =vy 16 |102%|101%Sl 75 wy a vv. a ™ Vv-|v J,PLiPL,° aL vy ©)Ismeca 2?4 z=voa]VY=yy J,PL,SM, 3 y @ |White 58° of vv Coating 4 z =vw z wy aol Ww 4 a v °J,PL-l,33°x Wy SM-R,Ca Ss vw Zz oy 17 |100%|100%e vy SL 80 ww _ 2 wy "|[sur681.25 feet:In-situ,calcite infiled -|v<joint, 10 degree angle,up to 1/16thp *vZeinchwide;cross-cuts 1.5 inchsize |,| fas light green volcanic xenolith.vyxv a Log continued on next page "=a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi3ADRILLINGCONTRACTOR:Discovery Drilling CHECKED:R.D igurers)::R.Dugan:€.©Golder dA Qo RECORD OF DRILLHOLE G11-DH02 CLIENT:MWH Americas Inc.PROJECT:Large Railbelt Hydro Watana Quarry A DATUM:NAD83,AK S.P.24 SHEET 6 of 12 INCLINATION:-90 [ANCDRiLLHOLE]BSavikko2/16/12NA.GPJWATANA_MWH_LIB.GLB&,10395560LRAssociates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 _DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 _E:1,884,284 Q ROCK TYPE Joint -- FO-Folation -ST-Stepped =SM-Smooth Gaal 9 @ Axal 'PL-Planar Irregular R-Rough Clay Zz =CO Diametralx=3 A petking CrCurved P-Polished VR-V Rough By tact 3 hx Ox -NOTESESwg"0 UUnduating --K-Slickensided -_Fr-Fracture FeOx iron Oxides Beg §i 3 z 32 z TESTSwWQDESCRIPTIONQev.lo z DISCONTINUITY DATA g b at WATER LEVELS s a _J2]¢$FRACTURES |$¥o TYPE and ole Zlho Bd Exe etrctst GRAPHIC5&|verte {3 |88 |82°|Perroor |a83 SURFACE a8 "Oe "lgune 8aojm[Fl]2 vvooe hs a]cescrrion |§°V5 oF WVezee bese gz19.6 -118.1 v Fresh to slightly weathered vy 17 |100%|100%.(FR-SW),jointed (FeOx vy q staining),light green aphanitic Vygroundmass,felsic porphyritic [Vv ° crystals up to 3/8th inch size,vw id J,PL,SM 34t-dark green aphanitic volcanic vy + xenoliths up to 1.5 inches size,[V. strong to very strong (R4-R5),vv ANDESITE PORPHYRY vv L (DACITE)(Continued)vw | v vy J,PL,SMovelec atvy18|104%]89%| t+85 7 e J.PL,SM,3g _| v «\a 55°ve J,PL,SM, vy Ca -wy J,PL,SM 7 2 @ fart SM.ggvya v J,PL,SMv,.A ° i Ww PlFeox ||vyv.J,PLv>A ° 7 ©||sm-rica 24v™a Vy 4 vvvy”v J,PL-ST,° ;vy P|sm.ca &4 v89.4 feet:In-situjoint,33 degree |vangie,planar,smooth,extremely Vv,19/102%]89% 909 weak (RO)calcite coating,less than vv 4 inch Sch. |0.7 mm wide.7 40 PVC pipe VY o vw 5 £vw J,PL,SM,4 @ Vv bet fot t 4 White Light 5. s yy by Gray 23 FR R4nNvadCoatingtotofe]v, -Zz vy Sw R5 = WwWasMV, a v J,PL,°4ve*|smRca 4 vv vy J,PL ° -wy,©Ism-rk,ca 4 vo , wy 20|100%}91%@ |4,PL.SM 53 -95 vw 4 v™vy”.VYVv.J,PL,SM,° a vy >Ca 62 4 Nad J,PL, ae e SM-R,Ca,24°Wad FeOx i vy J VYNadvadEzv™4 vy”VY Vv98.8 feet:In-situ joint,35 degree vyEangle,extremely weak (RO)calcite |',4 infiling, 1/16th inch wide.vy 21]97%|91%o fd:PL SM.65°vv e (53 47vwJ,PL-ST, 100 vy Ca a v.e J,PL,m1vvSM-R, ]vy FeOx,Ca i YW d vy Log continued on next page _i a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj€MF Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan 4. RECORD OF DRILLHOLE G11-DHO02 SHEET 7 of 12 [ANCDRILLHOLE}BSavikko2/16/12PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 INCLINATION:-90 PROJECT NUMBER:103-95560 /DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 _E:1,884,284aoROCKTYPE ;FO-Foliat ;Ca-Cakite @ Anal g yon pL Planar Pines RRoer n Cre act 2 =x C DiametralkeC-Curved P-Polished VR-V.Rough ==z ae g B-Bedding UUnduating --K-Slckensided Fr-Fracture Peg GN ag ez 3 ra 3 Z z e q veers w=|9 DESCRIPTION 2Tanw lol &DISCONTINUITY DATA 3 5 aap WATER LEVELS s x 121 25 |pop |Fractures |Ewe TYPE and Q.ie Ble <|ASES GRAPHICe)&|oeptH |3}88 PERFOOT |293 SURFACE 38 ra 8 S|8ine 8 @ ot m [ele wvooebs gq vescrpnon |§°/3 3 2Wesee bese yg19.6 -118.1 v Fresh to slightly weathered vw 21|97%|91%ef le PL,SM.gage-(FR-SW),jointed (FeOx a a 4 staining),light green aphanitic vygroundmass,felsic porphyritic vycrystalsupto3/8th inch size,vy a dark green aphanitic volcanic vy 4 xenoliths up to 1.5 inches size,vystrongtoverystrong(R4-R5),Vv ANDESITE PORPHYRY vv i (DACITE)(Continued)Ww a v Vvv J,PL,SM, Run 22:Porphyritic crystal fabric,/\/V ,,*)Ica 46 and light and dark green volcanic VY 22 |100%|100% -105 xenoliths to 1.5 inches size,oriented WW e J,PL,SM,53°4 80-90 degree angle.Ww e Ca 58°uw.J,PL,SM, Wy White L v,Coating °vy @/J,PL,SM,68 4 vy Ca vy @ |J,PL,SM,58° vy Ca a Vv 4 vwVv J,PL-l,SM,eno vw ba Ca 50 Vv Vv i Run 23:Numerous in-situ joints,very vv J,PL,SM,°q tight to partially open,white calcite v ®Ca 37 infill,vy WW a vy - v™ VvVv |no vy 23)100%|98%@ [EPLST.55°FR Ra 4 inch Sch. vy SM,Ca ay Ai 40 PVC pipe 7 v J,PL,vy *!|sm-r.ca 3 |6g wy | 2 v J,PL,° s vy *|Ismeca 76 g Ww-z yy 4 VY Vv.Vv.J,PL,°vy.*|Ismrica 3|vv 4 vw J,PL,SM, Vv Ca,Was °Extremely 32° a v™Weak (RO)1 vy.Coating v J,PL,SM ev+a ' y™.24|100%|97%bd Ca $8 115 vw 4 VY.yy 7 @ [2PL SM.57-VY|vy J VY VY wv B VY +f VY Ww Vvv -v,]2322.9 = .4181-1233 vv 118-4Slightlyweathered(SW),Vv ° calcite infilled joints (very tight [YV,P }J.PL,SM 65 a to partially open, 12 degree vy | angle,some hoid water as vycoredries),aphanitic ground vy 25|100%|82%mass,strong (R4)ANDESITE vyPORPHYRY(DACITE)Vv »J,PL-C,33°Sw R4 I 120 ww SM,Ca 4 v VvVv120.6 feet:In-situ joint, 1/8th inch Vv a wide,gray green siit infill.wy e SMca"15°| Xv 5 "J,PL,SM,32° Logcontinued on next page = at DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj(=E Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan ron 10395560LRHWATANA.GPJWATANA_MWH_LIB.GLBFe,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 RECORD OF DRILLHOLE G11-DH02 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 8 of 12 INCLINATION:-90 &,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION.South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 __E:1,884,284 ROCK TYPE ;Ca-Caleit @ Axal9sontFO-FolatonST-Stepped -_SM-Smooth crclay g x Ps Dermetral=F-Fauitt -Planar sHrreguiar R-Rough CT-Contact wx xrxA©|B Bedding Curved P-Polished VR-V.Rough -RD-Redrilled Zuw zou ba?NOTES Fo |cS)U-Undulating --K-Slickensided -_Fr-Fracture FeOx-lron Oxides BEB au Fs FS S8 Fy TESTS wW "10 DESCRIPTION g rev.to z DISCONTINUITY DATA é 5 aap WATER LEVELS z .Wu =a Z|«>FRACTURES |$¥u TYPE and Qo |x Z]o =|SBS GRAPHIC s €|peer ||99 |ROP |PeRroor |SURFACE a8 w >Oe {|Sine xaojm[Fl e avoe2e bsg DESCRIPTION |5°333 Vezee bese @ v :Ca vy 25|100%|82%gs Vv vv sw R4 Vv 122.5-123.3 feet.Broken core,vy a possible core-paratiel fracture.vv .J,PL-l,SM,rvCaeeVv.2317.7[123.3 -130.0 v|123.3 Fresh to slightly weathered vy (FR-SW),jointed,aphanitic vy .J,PL-C,gsgroundmass,felsic porphyritic Vy SM,Ca crystals,dark green,strong to vyverystrong(R4-R5)v ANDESITE PORPHYRY vw 26 |102%|85%-125 {DACITE)vy -- vy v™Vv of |U.PL-C,Ca2° -vv J,PL-C,Ca39° Vv. eo)feet 31°'c VY SM-R,Ca sw L v 4 se =[gates 5 Run 27:Calcite joints holding water.ww |wy ] Vad128.5-130 feet In-situ,core-parallel,Ww e J,PL,SM,92calcite-infilled joints 1 mm thick.vy Ca L wy 4 VY vw 1"27|100%|98%;|agg)------------2311.0 le J,PL-C,490 1 inch Sch._ 130.0 -202.2 v-]130.0 @ |SM,Ca 56°40 PVC pipe Fresh (FR),jointed (calcite vy J,PL,SM, infilled),aphanitic vy Ca |groundmass,felsic porphyritic |”, -£1]crystals to 3/8th inch size,vy 4 @]|dark green,strong to very vy=|strong (R4-R5)ANDESITE vy|PORPHYRY (DACITE)vSo VvILzvy 4 vy R4 Vv.to vv R5 vy f Was 4 VvWad=VYStvy : a vv g wy 28|100%|94%J.PL-ST. x vy le |J.PL-ST, gge >t 135 v ,Ca 5 _ 8 y @ |u,PL,sm,59 a Nad Ca -Ww FRuy135.8 feet:Diorite xenolith 0.2 foot iny Vv.9 i size.vy 7 =|vy, z vy, a VY or Vv 4 S v =vwVv3wy ar w 4 a Vv |Vv x v s vy z vv 298 |100%|100% E wy=-140 vy 4 el Vv a Vv oO vv $Vv a vy.4 wv. Log continued on next page = a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon . 8 A Id DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan Figure=Golder 4 Oo {ANCDRILLHOLE]BSavikko2/16/1210395560LRHWATANA.GPJ=WATANAMWH_LIB.GLBRECORD OF DRILLHOLE G11-DH02 SHEET 9 of 12 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-90 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mins,AK _EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223.063__E:1,884,284OoROCKTYPE j 'Ca-Calcte @ Anal 8 ae 2 |oz,|cose=iT oO B-Bedding urved P-Polished VR-V.Rough RD-Rednilled 2 iS 2 2%Fav.NOTESe=9 UUndulating --K-Slickensided =Fr-Fracture FeOx-Iron Oxides oE g ow 3 z 89 a TESTS w g DESCRIPTION g ete.Jo x DISCONTINUITY DATA is b asp WATER LEVELS Fa a jzZ|es FRACTURES |Suwa TYPE and Q tx Blo <|X SKS GRAPHICfs}©|pep |3|88 |82°]PeRFoor ne SURFACE 38 lee oe Kees 8oO9(ft)&uw a xvoo?Ps g A DESCRIPTION 3 B22WVeoxe9 8299 2 130.0 -202.2 v Fresh (FR),jointed (calcite vy 29 |100%|100%a infilled),aphanitic vy 7 groundmass,felsic porphynitic vycrystalsto3/8th inch size,vydarkgreen,strong to very vy =strong (R4-R5)ANDESITE vy | PORPHYRY (DACITE)vy J,PL-C.ry(Continued)vy Ld SM,Ca 27 vy”.EB 141.5 feet.In-situ joint, 12 degree 7 V.4 angle,calcite infill,very tight to tight Pv. Vvvv 30|97%|91% 145 Was + J,PL-l,SM,440™.©!ICs 33 VY VY g y 4 VY Mv,Vv VYVv.y J,PL-C,0 r wy ®||smr,ca 39 7 WasVY Vv. a Vv J,PL,° wv *)|sm-R.ca "1 4 vv yyvy' r ;as @ |[3 PL.SM,35°7 149.2-149.8 feet:Zone of increasing',V,Capercentageoffelsicporphyriticvy.crystals.yy 31 |102%|102% |450 yy 1 inch Sch._| vy 40 PVC pipe VYvy”2 v J,PL-ST, -£v el," §9°4 ®wy,SM,Ca Ra s vy 92:PL,g77-f-__}|FR to N vy SM-R,Ca R5 Z g v 7VY.VY yy vv e.|u:PL.SM.476 -Vv Ca = Vv VY VYVY.L.Wad - VYWasyy 32 |100%|100%J PLCVv,7 7,°r-155 vy e SM-R,Ca 21 4 Vv.J,PL,SM,°YY @ Ie 64 vv5 Vy Jd vv @ ||J,Pt.SM 32°v™ vv i vy J,PL,SM,950 7 WY.e Ca 22 vv VYvy”.4 vvi}VvVv J,PL-l 0vy*Isw-R,ca 4° in vy q vy 33]96%|92% w-160 v J,PL,SM,°4vw,e Ca 69)a Vv VvVv J,PL,SM,596 i yy.e Ca 29 |Wadvv Log continued on next page ; __DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiFGolderDRILLINGCONTRACTOR:Discovery Drilling CHECKED:R.Dugan nA.-v7 +DRILLER:G.Cormier CHECK DATE:9/7/2011 7 Associates RECORD OF DRILLHOLE G11-DH02 SHEET 10 of 12 {ANCDRILLHOLE]BSavikko2/16/12VA.GPJWATANA_MWH_LIB.GLB10395560LRPROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-90 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK.EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,063 __E:1,884,284 oO ROCK TYPE FO-Foiation ST-Stepped SM-Smooth Ca-Calcite o @ Axal 2 ot Bi -Planay direguiar R-Rough Cr act s x 5 x D DiametratFF-Polis!VR-V.Rough ==zh g BBedding Uunduating =K-Slickersided Fr-Fractue =Oyu Bea |&i 3 z g 5 z woesiEloDESCRIPTION2aelolweDISCONTINUITYDATAs-5 aap WATER LEVELSz_jz]ge FRACTURES |$y @ |x Zhe =|SHES GRAPHIC x 3 DEPTH |5 88 RGD |PER FOOT aS3 SURFACE a8 *Qe "g sve g®ej m [Fl 2 avoo2 bs gq oescrpion |§°5 Se Veree peso 2 &130.0 -202.2 v Fresh (FR),jointed (calcite vy 33}96%|92%infilled),aphanitic vy 7 groundmass,felsic porphyritic vycrystalsto3/8th inch size,"dark green,strong to very vy JPLstrong(R4-R5)ANDESITE vy e sm RG 0°d PORPHYRY (DACITE)vy -R,Ga (Continued)Vv wyVv Run 34:Dark green volcanic xenolithy Vv.e J,PL,SM,59°7 to 1.5 inches size.yy Ca Vvvv 34|100%]94% 165 Ww - wyVv vy [LPL SM.geeVv,Ca avWaswyVv v J,PL,SM,2vy®Ica 62 4 vyVv J,PL-l,°Ww *||smrica 1v.4VY vyWasVY.Ww a Vv vy J,Pel v 351102%|98%¥, v le |SM-R,Clay 70°. 170 w Coating - sorveors ||iFv v J,PL-ST,°vy *Ismca'4” o Vv<Vv 4 2 J,PL,SM,a2wy|Ica 42 R4iSW™.FR to R5Sv z vy 4 Vv vy vvv™Y Run 36:3.2-foot-long core stick VY 4 recovered from core barrel.Dark yygreenvolcanicxenolithto2inchesvysizewithlongaxisacrosscoreaxis.y vy 4 yv vv 36 |100%|100%v.ms wy J,PL,SM "| VY 6 Cca "*§9° vw fe |J,PL,SM,67°Vv Ca a vv vv wyVv vy J,PL,SM, 7 VY @ |Gray 51° VY Coatingvy®|J,PL-C,63°VY.SM,Gray 4 Nad Coating VM VY Ww 4 vy 37|98%|86% vy 180 v _vy”™. VY vy JWasfva Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fié.EME Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan renevy'DRILLER:G.Cormier CHECK DATE:9/7/2011 7LfAssociates RECORD OF DRILLHOLE G11-DH02 SHEET 11 of 12 [ANCDRILLHOLE}BSavikko2/16/1210395560LRHWATANA.GPJWATANA_MWH_LIB.GLBPROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-90 PROJECT NUMBER:103-95560 _DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear.COORDS:_N:3,223,063 _E:1,884,284oOROCKTYPEFO-Folation ST-St Ca-Cakite @ Axal -.|'-Stepped SM-Smooth oOgoortPuPlana|-Irreguiar R-Rough Cre ey act z x 5 x O Diametral-B-Beddi a P-Polished VR-V.Rough =ui =a =o w g PS Undulating --K-Slickensided Fr-Fracture pegavides Be 5G 3 Z 2 ba NOTES B=19 DESCRIPTION Slaw lolz DISCONTINUITY DATA is 5 ase WATER LEVELS Fe =12]22 |oop |Fractures [Sua]Treaa |,|=Sle 5/8 FBR oo GRAPHIC rs]@ |veptH |3]83 PERFOOT |29%|SURFACE a8 Sine # a °@ [©]@ xnvooe Pa gy OESCRIPTION |§ [/%Z2WVez ge bese os 130.0 -202.2 Vv, Fresh (FR),jointed (calcite v 37]98%|86%J,PL,SM,ge -infilled),aphanitic vv ©|Ica 28 a groundmass,felsic porphyritic w J,PL-C,25° crystals to 3/8th inch size,vy SM-R,Ca dark green,strong to very vy e J,PL,30° a strong (R4-R5)ANDESITE vy SM-R,Ca J PORPHYRY (DACITE)vw(Continued)Vv VY vy a Run 38:Light and dark green vy J,PLC,° 7 volcanic xenoliths to 2 inches size fv ®lsu.ca 7 P ] across core axis.Vvvv 38)100%|95% 1 185 v.4 WasWasNaeVv . L Vv 1 inch Sch.4 w 40 PVC pipe vv -vy J,PL .J wy,oe?|TSMR,Ca 32.vy J,PL, v SM-R,Ca o 7 wy,©)jaeu 35 VY SM-R, 4 vv White Infill vy Vv a v J,PL,SM,°vw P Ca 3 4 vv yY 39]100%|100% |490 189.85 feet.Diorite xenolith 1.5 v. inches in size.vy 7 vv VvVv -£vv 4 g wy R4 S|191.45 feet:Light green volcanic vy FR to "|xenolith greater than 2 inches in size.|V R5goVv a z vy 4 Ww = VY 4Vv| v | a 193.0 feet:Light green volcanic VY rH |4 xenolith 3.5 inches in size.v™I vv cS vv ja] IL v.roVv 4 Vv d,PL-C,o [4 vy @lsuca 9 = vY 40]100%|100%i l-195 vy | v ; | vy 1 inch Sch.I vy,40 PVC -[4 vy slotted pipe t+ a Vv a) VY =_ vY co vv omen vv :L.v 4 197.2 feet.Core-paraltel in-situ joint,}Y.v = caicite infiling,very tight to tight.yy 4 vy 4 \vy St || wy J,PL-ST, = vy °SM Ca *61°om v , :om t 201.0 feet In-situ joint, 10 degree |v,tinch sor Fy |- angle,calcite infilling,very tight to v i - tight Possible diorite xenolith 0.75 [vv 44)100%|100%Slotted pipe -s [| inch in size.WY with sand 4] yY backfill | +200 vy ae vv ry vv {J vy ro |vv |4 vv | Log continued on next page pe _ a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj€.A\z Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan igure -Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 A-4 [ANCDRILLHOLE]BSavikko2/16/12'AGPJWATANAMWH_LIB.GLB10395560LR!RECORD OF DRILLHOLE G11-DH02 SHEET 12 of 12 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-90 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2441 ft AZIMUTH:0 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.223.063 __E:1,884,284 8 ROCK TYPE JeJoint --« FO-Folaton -ST-Stepped -SM-Smooth.GBCalote Q ©hal =F-Fautt Pl -Plarar irregutar R-Rough CT-Contact 5.5 x UO Diametrai ior -Polished VR-V.Rough ==E o|2 8 GBedrd Undulating --K-Slickensided Fr-Fractre -RO-Redwiled gm 3 $i 3 z z e z cersw=|e DESCRIPTION 2 ne lol DISCONTINUITY DATA é a cat WATER LEVELSza2]25 |pop |FRACTURES |Fyn TYPE and o te Zlo c|AKSA |,GRAPHIC6@|verry |3]83 PERFOOT |28%SURFACE a8 |or Hgese 8aelmFl2vveooebag%oescnipron |5°V5 eF\exe pose gzvR4 1 inch Sch.[J i vy 41|100%]100%FR to 40 PVC =VM 2238.8 RS slotted pipe -wm_E]|7Boringcompletedat202.2 ft.202.2 with sand backfill Notes: 1.Elevation term calculated using a NAVD88 vertical datum. d 2.1-inch Schedule 40 closed-end PVC pipe installed to bottom of hole, last 10 feet slotted,one 60-pound 1 905 bag of sand used as backfill ( 3.5 _|feet of backfill in the drillhole). 3.4.5-inch-OD steel casing and metal cap installed over PVCSs(approximately 3.7 feet above to 1.3 i” feet below ground surface)and set in! surface overburden sluff. 4.Water level readings were =measured post-drilling once the PVC 4 had been installed. 5.Core was removed from inner barrel by tapping the exterior of the -barrel with a hammer.+ 6.Discontinuity graphic log is a depiction of discontinuity anglemeasuredfromthelefthandmargin r of the log column.4 r-210 - i 215 _ f-220 4 =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FjEeEGolderDRILLINGCONTRACTOR:Discovery Drilling CHECKED:R.Dugan nA.&.Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 7 RECORD OF DRILLHOLE G11-DH03 CLIENT:MWH Americas Inc.PROJECT:Large Railbelt Hydro Watana Quarry A DATUM:NAD83,AK S.P.Z4 SHEET 1 of 11 INCLINATION:-79 iZ DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 _E:1,885,723 Q ROCK TYPE sont FO-Folaion ST-Stepped__SM-Smooth ii g x oan wal=Fran Bee biome,Rah,Siena sis |sen oe'Ww=o w g B-Bedding U-Undulating --K-Siickensided =Fr-Fracture RO-Redriled es ere 5 ef 3 Z Fs be Nears wl --10 DESCRIPTION Q euv.|o Fa DISCONTINUITY DATA é bb athé WATER LEVELS =Continued from non-cored a =|25 |pap |FRACTURES |Eve TYPE and Q.|e slg fed Rx crcts r GRAPHIC |borehole.See Borehole log &DEPTH 5 38 PERFOOT |25%SURFACE 38 -\gina & Io {Eh pot ®)&aves Pag OSCRPTON |S ost Veeee ese ez] 3)00-7 y 25 rest£|Slightly weathered (SW),v Bentonite |jointed (some FeOx staining),vw 1}50%|0%5 |dark green,aphanitic vy[ S|groundmass,felsic porphyritic vy 4 #|crystals to 3/8 inch size,vy@|medium strong to strong vy 2 |60%|0%Surface Z|(R3-R4),ANDESITE Vv metal casing .|__|PORPHYRY (DACITE)vy (approx.2.8 |y™.JPL feet apove tov.each 77°.2 feet Run 2:Numerous very tight to vv SMR,Ca -below partially open joints,some calcite .@ |J,PL-4I SM 54°ground -infiled,some clean.Joints hold Vv.surface)| water after core dries out.vyyy @ PLC,gos swvyFeOx _vy el PL 799 avy.SM-R,Ca -- wv.3 |100%|56%go PEL SM.742Vv,FeOx ojvv|Jpt.sm,7S5vyPossibleK 7] vy @ |J,PL-c,54° vy SM,FeOx ve R3 r wy.to 4 v.R4 vv ae ee ee v4 2441.17.0-27.0 Vv.7.0 7 Fresh to slightly weathered vy(FR-SW),jointed (some FeOx vy stained),dark green,vy J,PL-C,ago a aphanitic,felsic porphyritic vy @/SM,FeOx 75.4 crystals up to 0.25 inch,vy |J,PL-ST, 3 medium strong to strong ve 9 SM,FeOx 82° {R3-R4),ANDESITE Vv.@ td,PU,SM,64°|.PORPHYRY (DACITE)v™|Brown Silt 62 a VY e Coating 55°ad "J,PL-C, WY 4 |100%|26%SM,FeOx iY J,PL,SM -10 yy FeOx 12°ae Vv.J,PL-l,SM, 2 vy FeOx 3 Vv J,PL-C,: /=)14.0 feet Granodiori i Ww SM.ca OY 1 inch Sch 4 >11.0 feet:jodiorite xenolith 1.5 vw eo |J,PL,SM,68°en. G|_inch size.Vv FeOx °40 PVC pipe v 24zvyJ,PL,SM 54°"y J,ST,SM, i vy FeOx 4 <vy J,PL,SM 6 vy r)J,PL,0 5 vy SM-R v }__ ol v J,PL-l 13.1 he 2 vy e SM-R,441°SW aie 3 W FeOx to 17:37 8 Wa @|J.PL-C,74°FR .v |SM,FeOx wae](MW | a vy 8-13-14 fal ™.5 |100%|0%R3 16:27 =yy @ |J,PL,SM 54° ah 15 Ww 4 4 3 wy o yw JPLC,aoezwSM,FeOx |ral a Vv a vy J,PL-C,©5 Ww ©|Ismr 29 2xP wy 7 s vyVv J,PL,°=vv ©|surk 61 ab wy fed Wad 4 <WY eo [PEST gy.R3 =WY.6 |100%|50%SM,FeOx to s ™.R4 of}.Vv,4 9 vy$Vv J,PL-C>v ,,2 vy su 77°|_| vy20Logcontinuedonnextpage T %a\)DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8(=A \s Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan rere oO oO Associates RECORD OF DRILLHOLE G11-DH03 PROJECT:Large Railbeit Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 SHEET 2 of 11 INCLINATION:-79 [ANCDRILLHOLE]BSavikko2/16/12PROJECT NUMBER:103-95560 ;DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK_EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 __E:1,885,723 a ROCK TYPE ,FO-Fol rT.7 Ca-Cakite @ Axal 9g vont Barer cineguar =RtRogh SeClay Z =2 Diametralx=F-Fautt eg ough CT-Contact rad FerPr©|BBedding C-Cuved P-Polished VR-V.Rough RD Redrilled zu =?w 5a?NOTES els fe}U-Undulating =K-Slickensided --Fr-Fracture FeOx-Iron Oxides GEZ Ges 55 B g TESTS Ww 10 DESCRIPTION Q .z DISCONTINUITY DATA é B aor WATER LEVELS o 12 ze LEY 12]ve |oo]rractures |See |rveeaa |2,|lx Ble <|S%k5 GRAPHIC 3 @ |veetH |3|88 PERFOOT |89%SURFACE 88 7.oe 'Bins 8|oo 12 oj m ||aveoe bs gq Descrrrin |§°/332 Verge pose 2s7.0 -27.0 v Fresh to slightly weathered vy il J,PL,SM 67°(FR-SW),jointed (some FeOx Yy | ] stained),dark green,vy »iJ,PL,SM -aphanitic,felsic porphyritic Vv 6 |100%|50%ein '§6°= crystals up to 0.25 inch,vy FeOx medium strong to strong vy(R3-R4},ANDESITE wv a PORPHYRY (DACITE)Vv J (Continued)vwvv 22.3-22.45 feet.Fractured zone,vy e J,PL,SM,55° - 65 degree angle,FeOx staining on 7 _V FeOx 4 xenoliths,silt/clay coatings.vy R3 wy J,PL-C sw to vv @ |SM-R,61°to R4 a yY FeOQx FR 4 y™@ {[J,PL,48° vw 7 |100%}43%SMR, vy”.FeOx i 25 vv.J,PL,SM 4 ¥qe OM asCamw ||WadwLWw 4 vy ™. ee ee V4 2421.5 27.0-111.4 vi]27.0 7 Fresh (FR),jointed (FeOx vy J,PL-C, stained,calcite infilling),dark Vy \@||SM-R,40° green,aphanitic,felsic vy FeOx -porphyritic crystals up to 0.25 Vy q inch,medium strong to very vystrong(R3-R5),ANDESITE v PL,SM ° PORPHYRY (DACITE)vw e Peow *87 L vy @ |J,PL,SM,62°4 o Yy FeOx £vv 8 1 104%]90%|[LPLST.462':a I-30 13 corteldiorte xenottn VY SM,FeOx 1 inch Sch. |30 feet:Granodiorite/diorite xenolith [40 PVC pipe _&| 2 inches in size.vy z yw ww J SM L wv.ey fase SM:az 4 vy w™ VY b-vy."q Vv.Vv J,PL,SM,0 vy »FeOx 32 vw J,PL, a Vv @ SMR,°2 vw FeOx,Light 8 R4VvGreen© Vv °Staining FR to WY J,PL,RS r Ww SM-R,4 VY.FeOx Ww”9 1102%|85% vee-35 yy a VY Vv35.5 feet:Granodiorite xenolith 2.51 V inches in size.vv e s PL.SM,38° a w”.'eOx 4 WY.Wasvv a Ww ole:PL,SM,g5°J vv WY VY Ww J,PL, 7 vv 10|100%|93%°Sah 84 vy”nz vv 4 VvYy J,PL,vv @ ||SM-R,Note26° i 40 "y ot Log continued on next page 7 =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj"dD a:igureADRILLINGCONTRACTOR:Discovery Driliin CHECKED:R.Dugan€.=Golder ry Driling 9 A-5 10395560LRHWATANA.GPJWATANA_MWH_LIB.GLB&,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 {ANCDRILLHOLE]BSavikko2/16/12YWA.GPJWATANA_MWH_LIB.GLB410395560LRIRECORD OF DRILLHOLE G11-DH03 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 INCLINATION:-79 SHEET 3 of 11 Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 PROJECT NUMBER:103-95560 ORILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK_EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.223.402 _E:1,885,723 3 ROCK TYPE Jedoint - FO-Foliation -ST-Stepped SM-Smootn Eacarcte Q @ Anal =FFaut --PL-Planar \-Iegular R-Rough CTContact Zz =C1 Diametral Del ir (o)BBedding C-Curved P-Poiished VR-V.Rough RD-Redrilled Zu os z 2%ba?NOTESE=s ic}U-Unduiating K-Slickensided Fr-Fracture FeOx-Iron Oxides G z=g G y g 3 ES B a TESTS wu lo DESCRIPTION 2lan lol &DISCONTINUITY DATA 3 5 aap >WATER LEVELSFea12)28 |2o5 |Fractures |Eyo TYPE and «Blo <|SS55 |GRAPHICfe]@ |ver |3)88 PERFOOT |293 SURFACE ole Ti8ene & Lo 12 6 fy |=;&ntowe Pa 34 DESCRIPTION 22 ezeg\bese o 27.0-111.4 v.J,PL-C, Fresh (FR),jointed (FeOx vy hd SM,FeOxstained,calcite infilling),dark vygreen,aphanitic,felsic vy -porphyritic crystals up to 0.25 vy 93%4 inch,medium strong to very vystrong(R3-R5),ANDESITE vy J,PL-CPORPHYRY(DACITE)Vv aes r i Vv SM,FeOx |(Continued)vy @ |J,PL,SM,q vRun11:Joints,calcite infiled,very 7.FeOx tight to tight (some FeOx stained).Vv @ |J,PL,SM,Granodiorite xenoliths to over 2 vy FeOx,Ca L inches in size.vy 4 vyY.e J,PL,SM,42.0-42.25 feet.Cross-cutting in-sity VY'FeOx joints, 34 degree and 21 degree [V.e J,PL,Lt angle,very tight to tight,FeOx VY.SN-R,-| staining,joints hold water longer as yy FeOx core dries out.WY.90% vw J,PL-U, +45 vw @ SM,FeOx,4 Vv Ca VYy™. a vv.J,PL-ST,»vv @ |SM-R,Wa FeOx vv @J,PL, yY SM-R, a vv FeOx q vu'WasWas i VY 4 ww le |J.PLC,vy SM,FeOx |wy vv 7 s w 95% 2 v |\S wy FR ts Jinch Sch.__a |50.2-50.3 feet:In-situjoint,calcite }Y,4 PL SM R5 40 PVC pipe infilling,tighttotight,wispy.vo So!,Z |__infilling,very tight to tight,wispy.vv e FeOx v J,PLVv1 a 5 vy *SMR,4 vv FeOx,Note VY . y™.J,PL-ST, a y.SM,FeOx 4 wv J,PL-l v @)SM-R,Vv.. vv FeOx L uy : ww J,PL,SM53.4 feet.Sill/clay infilled joint,FeOx Ww 4 Note 33staining.ve,J,PLA,LE wv SN-R,a vy le |FeOxVy96%J,PL-C, vy SM,FeOx -55 vv 4 yy wyv J,PL,SM f Ww ©|Feox 7 Vv. VYNad J,PL,SM, a Run 14:2.75-foot-long core stick [VY @)|FeOx,Gray 44°4 retrieved from core barrel.vy Coating WY J.PL. WM ®|sM-R, Y yy FeOx VY | VvVv 94%Vv |wVY.| vy”wy +-60 , aoe _Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fié.EMF Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan reed e RECORD OF DRILLHOLE G11-DH03 SHEET 4 of 11 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-79 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 _E:1,885,723 ROCK TYPE Cac yeJ-Joint Ep Folation _ST-Stepped SM-Smooth crcay.me g x .Demet=r F-Fault Planar (-Irreguiar R-Rough CT-Contact zx 5 oxto@|BBeding Cruved P-Polshed VR-V.Rough --RD-Redrilled arn zou 5a?NOTES ae l=Sj ing KSlickensided -Fr-Fracture FeOx-Iron Oxides GEB gus 56n8 TESTS wu DESCRIPTION 9 Fa DISCONTINUITY DATA PA aoe WATER LEVELSa2zpigwirap|FRacTuREs |Eve TYPE and Q |oe :Blo en ASSES GRAPHIC i]&|oeptH |5 |83 Penroot |ag%SURE ee zg |F felted Elgere 8 Leo +°i vvooehagf Descnnion |8"/ss2\Vezee wereg x27.0-111.4 vy Fresh (FR),jointed (FeOx vystained,calcite infilling),dark vy green,aphanitic,felsic vy -porphyritic crystals up to 0.25 vy 14]97%|94% inch,medium strong to very vystrong(R3-R5),ANDESITE vyPORPHYRY(DACITE)vy LPL a Contin Vv ,PL-C,°(Continued)Ww >sm,FeOx 32 v J,PL-lVv,5 ° vy dour =83 yY FeOx\vy VY VYvy” =yy vv J,PL-l,SMvy15|100%|93%le Ca Vv i 65 vw vy VYWadVv a vy J,PL, yy @SM-R,83° yy FeOx Vv J,PL,Vv 0 [Run 16:Light green volcanic and v™ed SM-R,36 7] granodiorite/diorite xenoliths to 1.5 }_V.FeOx inches size.vy Vv. _67.9 feet:In-situ joint,calcite infiing,bY v 4 27 degree angle,1/8th to 1/4th inch }*vthick,offset 1/4th inch (sinistral)by [Y\,joint (calcite,very tight, 63 degree vyangle).ve 5 v 4 °wy&vy 16|102%]99% g Vv.FR R4 . =Vv 1 inch Sch.70 |S v J,|,SM,5 to ch.__4 3 wv S|Febx Se.P|R5 40 PVC pipe >v J,PL,SM,vv FeOx,Ca VY a vy J vY vv vw J,PL,SM al vy "lFreox |77">7 5 vy J,PL 5 vv *lFeox Ca 75°| Vv. |Vv a” g vy S yy Oo VY a]vv 4 os!VYavw 47|99%|99%SR'o | ° 2 74.6 feet:Granodiorite/diorite vv °eur.57 SL 75 xenolith greater than 2 inches size.[VY e0x =f Vv omVv5adJ,PL, 9 W @SM-R,79°}-__]2 WW FeOx r Ww »[YPLSM,go.4 bo WY FeOx,o)7 White 2 yw Coating iL v @|J,PL-ST,72°q z vy SM,Feox |s v. =|yy $Wwxfvy e@ (PLC.ash,|7 <vy SM,FeOxSvy18]100%|96%Vv ral Ww | <weZzVvsswy $20 ve=Log continued on next page 77 a =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fjco]3 €.r YY:Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan reee3-v7.'DRILLER:G.Cormier CHECK DATE:9/7/2011 7 3 Associates [ANCORILLHOLE]BSavikko2/16/12VA.GPJWATANAMWH_LIB.GLB10395560LRIRECORD OF DRILLHOLE G11-DH03 SHEET 5 of 11 PROJECT:Large Railbelt Hydro Watana QuarryA CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-79 PROJECT NUMBER:103-95560 ;DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 _E:1,885,723 2 ROCK TYPE Join ---FO-Folaton -ST-Stepped -SM-Smooth.Greate g x @ Axal =F-Fautt PL-Planar i-Irreguiar R-Rough CT-Contact Fa Ee O Diametral i Bedding Curved P-Polished VR-V.Rough Shi SOx ean NOTE=w 8 "3 U-Undusti KSlickensided -Fr-F RD-Redriled "ra "Fa Z2Qre Ss Fels ic}ng ens 7-Fracture FeOx-lron Oxides GFZ OUZ 55e8 TESTS W 9 DESCRIPTION g ete.|o x DISCONTINUITY DATA é bh aap ™WATER LEVELS z |S]wa FRACTURES |E °==|SKS GRAPHIC 5 3 DEPTH |5 88 RQD |Per FOOT e833 SURFACE 38 f oe Elgess 8|go 12 o[wm |*)2 avooe ba gy oescrprion |§°352 Ver ee bese gz27.0 -111.4 v Fresh (FR),jointed (FeOx Vystained,calcite infilling),dark y green,aphanitic,felsic vy a porphyritic crystals up to 0.25 vy 18/100%]96%4 inch,medium strong to very vy JPL.SMstrong(R3-R5),ANDESITE vy Brows ,PORPHYRY (DACITE)vw 6 \sitclay 68°L.(Continued)Vv nulay Jvv.Coating, vy FeOx Run 19:Three joints (calcite infill,vyverytighttotight);dark and light yY t green aphanitic volcanic xenoliths,v 4 porphyritic texture oriented 67 vy degree angle.vyVv VY. E 82.3 feet.Granodiorite/diorite vv 4 xenolith 1 inch size vv vw 19)100%|100% vo }-85 vy 4 wv v™ y™ uv.L vy J vv WY VY L vy a 87.25 feet:Dark green aphanitic Was volcanic xenolith greater than 2 vy”inches size.Wasnmyv™4 v J,PL,SM,450oyeFeOx,Ca 12 vv aa VY f @ wy£vy 20|100%]86% 2 v FR R4 . I-90 |=vv to 1 inch Sch. _l 2 vw R5 40 PVC pipe z vv VY a vy 4d vw J,PL,SM, Vv @ |FeOx,Tan 69°vy,Sand Infill > L ¥ 4d 92.25 feet:Granodiorite/diorite VY xenolith 2 inches maximum vW™dimension.uw .Ww 4 vy Ww VY sg vvVv.J,PL-C 7 Vv e Y 4,56°Ww 2t!103%|97%SM,FeOx Vv,J,PL-l,SMv@ea 58° 1 95 vv FeOx,Ca i WY VY VY a ov a adNaeoY.of!PL,SM,age]| EB Run 22:Light green aphanitic vw FeOx,Ca 4 volcanic xenolith to 2 inches size,Vv J,PL,SM, porphyritic texture oriented 90 yw @ |Yellow 59° degree angle.vY Staining =v™.vY 7 v,vy 22 |102%|102% wy5vy J vyyv Vvv100Logcontinuedonnextpage 4 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.ENF Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan reeFaDRILLER:G.Cormier CHECK DATE:9/7/2011 - Associates {ANCDRILLHOLE]BSavikko2/16/1210395560LRHWATANA.GPJWATANA_MWH_LIB.GLBRECORD OF DRILLHOLE G11-DHO03 SHEET 6 of 11 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-79 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.223.402 _E:1,885,723 A ROCK TYPE joe FO-Folation ST-St SM-h CaCabcte o : @ Axa id FFaut _-Pt-Planar |-Irreguiar R-Rough CTContact 3.ie ©)Diametral x ir o |BBeddng CCuved P-Polished VR-V.Rough RD.Redrilled zw z2%boP NOTES223U-Undulating -K-Slickensided --Fr-Fracture FeOx-lron Oxides GE Fs ou 2 FS FS 3 Fa TESTS wu |o DESCRIPTION °z=DISCONTINUITY DATA é 5 as,WATER LEVELS4ZzzLBM12)ws FRACTURES |Ewa TYPE and ole Zlo x|&k5A GRAPHIC s €|peprn |Z)89 |FOO]perroot |Sx SURFACE B83 |%oye S|Sens £ a 9 (@ |e]8 nwo?Ps g 4 DESCRIPTION a2 ZEB2\oroglfoosmoa xL-100 = B a=@aeee eorex 27.0-1114 Vv. Fresh (FR),jointed (FeOx vystained,calcite infilling),dark vygreen,aphanitic,felsic vy °5 PLL SM-porphyritic crystals up to 0.25 vy 22 |102%|102%e[d,PL-l SM,740 |4 inch,medium strong to very vy Ca strong (R3-R5),ANDESITE vyPORPHYRY(DACITE)vyLo(Continued)vy = vy Vv. 102.7 feet:Granodiorite/diorite vy a xenolith 2 inches in size,long axis v q J,PL,SM,85°+ oriented 90 degree angle vy FeOx,Ca oy VY wvSsvw J Vv vy 23|98%|98%vyr-105 ¥Vv 4 VY J,PL-C,FR R4 vy e SM,FeOx,18°to Gg vw Ca RS 4 v J,PL,SM,°wy e Ca 76 v Mv, -w ;J,PL-ST. 7 vv.®lsM,FeOx 70wy tL 107.9 feet:Granodiorite xenolith vv -| greater than 2 inches in size.y. vy VY 5 vw -| vgvw 24|100%|79%o v =v.1 inch Sch. =Vv -110 2 vy 40 PVC pipe" g ™. q Ww JPL,d YM 2338.7 @ MR Lightgs>|__|111.4-111.9 111.4 Coating MW R3 Slightly to moderately 2338.2 to to a weathered (SW-MW),jointed,vy 111.9 SW R4 d whitish green,fine to medium vygrain,medium strong to strong vy(R3-R4),GRANODIORITE vwVv. D Upper contact has wispy,light |v 4 green altered contact,65-90 vv degree angle,finite boundary,ae lower contact has 1/16th to VY L 1/8th inch thick wispy light uw.4 green contact,53-90 degree Was i. ange.on vv 25|104%]102%]fs JPL,SM,FED)ini v "Gray 76° a Fresh (FR),jointed (some v 8)Gray 1 see |115 FeOx stained),dark green,vv Coating 75°aphanitic,felsic porphyritic VY Gi cl ,crystals up to 0.25 inch,wv Con ay RAmediumstrongtostrongWYoating FR-(R3-R4),ANDESITE vy JPL-U :RS 4 PORPHYRY (DACITE)uy.Ssm.ca 80°--_J 115.85 feet:Granodiorite xenolith Wad 0.5 to 0.75 inches in size.yy J,PL,SM,°j vy %ca ar --7 vyVv v i vv J,PL,SM,Vv.@J FeOx,Gray 72°7 vy 4 Coating 87°ivw,26|99%|97%JPL, vy SMR, -v FeOx 4 WwWv™.vw 120 . v -| Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.Ye Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan rece-v7 'DRILLER:G.Cormier CHECK DATE:9/7/2011 - Associates NA.GPJWATANA_MWH_LIB.GLB40395560LRIRECORD OF DRILLHOLE G11-DH03 CLIENT:MWH Americas Inc.PROJECT:Large Railbelt Hydro Watana Quarry A DATUM:NAD83,AK S.P.24 SHEET 7 of 11 INCLINATION:-79 {ANCDRILLHOLE}]S8Savikko2/16/12PROJECT NUMBER:103-95560 ;DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 _E:1,885,723 a ROCK TYPE Joint --FO-Foliation --ST-Stepped --SM-Smooth CacCalcte ©x @ Axal =Ffout Gcuved P-Porshed URV Rough St-Contact sx 3 Ox serene.oV.©E es ui g B-Bedding Th onduating --K-Slickensided Fr-Fracture FO Reed ies Sze 5S 2253 vcore w=19 DESCRIPTION 2 Taw Is]DISCONTINUITY DATA g-5 aoe WATER LEVELS s &2|¢$FRACTURES |$a Qo |e Z]o |S SKA GRAPHICx@|veptn |3]88 Rap PER FOOT aos SURFACE sg .od in i gene g +1207 are aR oe veooe begq vescrrrion |8”522 WVexzoe\peseg x 3-:v Fresh (FR),jointed (some vy FeOx stained),dark green,vy aphanitic,fetsic porphyritic YY -crystals up to 0.25 inch,vy 26|99%|97%J medium strong to strong vi @ [2 PL,SM,ge (R3-R4),ANDESITE vw FeOx,Ca PORPHYRY (DACITE)v a (Continued}vvWad 7 v™ Vvvv J,PL,SM, -123.05 feet:Granodiorite xenolith [VY Ooo Note 78°4 0.5 inches in size.vy VY VY}-vv - vy vv 27]103%|103%ae 125 vv = NadVY VY S vw vy 7 vyVY.Waa a vy q vyWadvv i vy q vvv.J,PL,°vy *|sm-R,ca 9°Pp] Ss VY +f 2 wy£vy 28/101%]97% o v |a30 |=Ww FR na 1 inch Sch. |oO VY R5 40 PVC pipe g Wad=wy @ |[i PLSM,49°vy Ca,FeOx a vy d NaeVY VY i v™= VY VY vy +vy Pot |||J vVy @|J,PL,SM 63° vv =VY VY . YY 29 |100%|100%je)|pep e Vv F-135 vv a NadWadVY |vy d Wasvy a 136.8 feet.Granodiorite xenolith2 vwinchesinsize.Vv - VYWadVY i VY.4v™.Vvvy 30 |100%|100%Vv. Vv r 139.0 feet:In-situ joint,planar,vv 4 calcite infill,up to 1/8th inch thick.Vv.vv VvVv140Logcontinuedonnextpage 7 >DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj€.A\:Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan gureEz,Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 {ANCDRILLHOLE]BSavikko2/16/1210395560LRHWATANA.GPJ.=WATANA_MWH_LIB.GLBRECORD OF DRILLHOLE G11- PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc. DHO03 DATUM:NAD83,AK S.P.24 SHEET 8 of 11 INCLINATION:-79 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3.223.402 _E:1.885.723 a ROCK TYPE Jedoint --FO-Foliation -ST-Stepped SM-Smooth Gaal 9g @ Asal =FFautt PL-Planar |-Irregular R-Rough CT Contact 2 =Ci Diametrat ax Ox x (5 ©|BBedding CCuved P-Polished VR-V.Rouh --_RD-Redrilled zuw zou boe.NOTES Fo |8 U-Undulating --K-Slickensided -Fr-Fracture FeOxlron Oxides ang aud FS Esa a TESTS we Q DESCRIPTION 2]av lo Fa DISCONTINUITY DATA g 5 apo WATER LEVELSZzaZ|gs Fractures |$y Q |x Zle xz}S88 GRAPHIC a &|erty |3 88 ROD |PER FOOT a5 SURFACE 38 .Qe in gene 8 a °(ft)m ied ntoa?bs &DESCRIPTION a 222)eseo bese so x140111.9 -202.0 v Fresh (FR),jointed (some vy FeOx stained),dark green,vy aphanitic,felsic porphyritic vy -crystals up to 0.25 inch,vy 30]100%|100%J medium strong to strong vy(R3-R4),ANDESITE vyPORPHYRY(DACITE)vy J PLASM |'Continued)Vv .PL-l,'77°J(vv °Ca 7 wy 142.7 feet:Light green aphanitic vv b volcanic xenolith 4 inches in size.yy 4 143.3 feet:In-situ joint,15 degree w IPLangle.very tight to partially open,at [Vv SM R Gfeast8otherverytightjointsWadeeHR,Gray aso -calcite-infilled joints in Run 31.wY Green Silt 39°= m congVv,ry vy 31]100%|96%Gray Silt 145 vy Infilling/Coating |Vv _ wv VY vy t VY | VY VY W =vy.4y™.vy 147.6-149.6 feet:Approximately Vy core-parallel,calcite-infilled joints,vyaundulating,very tight to open.vy 7 VvVY.vy |ww 4 v 2 vv 32 |100%|100%g wy Ra 1inch Sch150|=v FR to inch Sch.4v.J,PL-C,2 40 PVC pipe8vy°SM,ca 1°RS pp VvYY J,PL-C, -vy e SM,Note 14?4 Yv 3-5 v VYWad =vy +f vy vy WY. |yy 4 yy wv Ww J,PL,SM, a yy @®|FeOx,Gray 64°4vyCoating w 33|100%]88% v Vv = Vv155WY.4 WYWadVY -156 feet:Granodiorite xenolith 2 yw”4 :a vinchesinsize.w *J.PL,SM 37° vy @ ||u,PL,SM,29°vy Ca -y 4 WY e J,PL,SM,68° wvWad &vv 4 wyVy 34 |100%|92% Vv v. s Vv yy q Nad"v160Logcontinuedonnextpage 4 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FjA*DRILLING CONTRACTOR:Discovery Drillin CHECKED:R.Dugan igure€=Golder ry Paling 3 A5i?Associates DRILLER:G.Cormier CHECK DATE:9/7/2011 [ANCDRILLHOLE]BSavikko2/16/12NA.GPJWATANA_MWH_LIB.GLB10395560LRRECORD OF DRILLHOLE G11-DH03 SHEET 9 of 11 PROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.Z4 INCLINATION:-79PROJECTNUMBER:103-95560 ;DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185LOCATION:South Bank Susitna River,Talkeetna Mtns,AK_EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 _E:1,885,723 Q ROCK TYPE 'Joint FO-Foliation -ST-Stepped «SM-Smooth -C4-Calelle 9 @ Axal PL-Planar -z Ci-Clay z z=O Diametral=FFaut C-Cuved Ppowsned UR Rough CU-Cottact Parity 20%xr ©|B-Bedding '-V.Roug|RD-Redrilled any i BaeFo|8 U-Undulating --K-Slickensided Fr-Fracte --Feoytron Oxides &ze Sao 2258 nearsW9DESCRIPTIONQeteV.lo wit DISCONTINUITY DATA g =b ane WATER LEVELS Fe a Z/eS FRACTURES |Ew 2 lax ©=|4 8Sa GRAPHIC5&|vepm [3]88 |RP]Perroor |283 SURFACE a3 7.Se Elexes 8L160-4 7 j{m |F|nvoo2 Ps g4 DESCRIPTION |§°332 Vexee eese ge111.9 -202.0 v Fresh (FR),jointed (some vy FeOx stained),dark green,vyaphanitic,felsic porphyritic vy -crystals up to 0.25 inch,vy 34)100%|92%4 medium strong to strong vy J,PL-C, (R3-R4),ANDESITE vy @ SM,Note 26° PORPHYRY (DACITE)Vv 3-6 .(Continued)vy fe [J PL.SM,gee 7vwNote3-7 Vv Run 35:Light green volcanic vxenolithsto1inchsize.Porphyritic vy @ J,PLC,25° s texture oriented 66 degree angie.v SM-R,Ca 4vyej)J,PL,SM,78° vy Ca wy =vv 4 vY vy 35]100%|100% ve J,PL,165 vy .SM-R,Light,50 7] vy e Green 31°vy Silt/Clay vy J,PL, =Vv SM-R,Ca 4vv ad wv vv |vv a Ww vvyY.nm Vv 168.1 feet:Granodiorite/diorite YY 1 xenolith 3/4 inch in size.vyvy J,PLA, a v.SM-R,Ca °v e .4WwWePossible44°2 wy 36|100%|72%©TeX uy,20°g 469.7-170.0 feet:Zone of insitu |',Cat R4 4 inch SchL-joints, 10-30 degreesangle,vei Vv.inch Sch. _|70 3 fight to partially open,calaite infited.vw SMR Ca FR A 40 PVC pipe =170.5-172.0 feet:Broken core zone,vvinterpretedasatleast3naturalv J,PL-C, L fractures.vy Ps SM,Ca,age 4 vy Possible vy e FeOx 2 vy J,PL,SM a vy Ca Vv J,PL-l,y 172.3-172.8feet Atleast3 other vy @,|SM-R,Light$1°in-situ joints,very tight to partially v Green Clay 66°open,some calcite infilled,some vv J,PL,SM, -clean.Wad Ca 4 172.8-177.0 feet.Atleast 5 other v™4 J,ST,SM,31°in-situ joints,very tight to partially yy Green Clayopen,calcite infilled.yw Infill sg VY.vv vwy.37|101%]88% v p 175 yy J,PL,SM 4 v 1 .1 o vy ®|Io.27 WasVY |vv 4 VYy™.Wy a ™.4 Wasv™.Was a vy”-_wv Vv.vy 38|100%]97% L wv VY 7 Vvvv J,PLC, a SM-R,Ca i 180 - pose e +Log continued on next page a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fj€.AF Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan rer)eiAssociatesDRILLER:G.Cormier CHECK DATE:9/7/2011 RECORD OF DRILLHOLE G11-DH03 SHEET 10 of 11 [ANCDRILLHOLE]BSavikko2/16/12&,10395560LRHWATANA.GPJWATANA_MWH_LIB.GLBPROJECT:Large Railbelt Hydro Watana Quarry A CLIENT:MWH Americas Inc.DATUM:NAD83,AK S.P.24 INCLINATION:-79 PROJECT NUMBER:103-95560 DRILLING DATES:ELEVATION:2448 ft AZIMUTH:185 LOCATION:South Bank Susitna River,Talkeetna Mtns,AK EQUIPMENT:Hydrocore 28 Longyear COORDS:_N:3,223,402 _E:1,885,723 g ROCK TYPE JeJoint --FO-Foliation -ST-Stepped SM-Smooth _Gawente 9 x @ Axel 7 PL-Planar I-irreguiar R-Rough Y z z=C DiametratxF-Fault CT-Contact rx OxxaoOB-Bedding C-Curved P-Polished VR-V.Rough RD-Redrilled z iat)=Su boe NOTES=.|¥8 U-Unduating -K-Slickensided =Fr-Fracture Feox-iron Oxides aEe aus 2408 TESTSiEloDESCRIPTIONSOTuwlol&DISCONTINUITY DATA -5 aae WATER LEVELSZzx.ww Er paead =a Zi 2e>FRACTURES |$Wa TYPE and Q fo Blo =]SSA GRAPHIC 5 #|verry |Z)88 |ROP)Perroor |ab%SURFACE 38 jee ie be "igens & 1804"ion a avons bg ga vernon |5°/%32 Vez ee \wese 2 x 411.9 -202.0 v.bad with Light'20 Fresh (FR),jointed (some vy Green FeOx stained),dark green,vy «Crystals 54° aphanitic,felsic porphyritic vy J,PL,SM, -crystals up to 0.25 inch,vy 38]100%|97%Ca Vein medium strong to strong vy 1/8th Inch 78°(R3-R4),ANDESITE vy e Wide 28°PJPORPHYRY(DACITE)v J,PL,SM IQUCD)a son ty vv J,PL,SM a teoee 3/4th inch thick zone of Vvwispy,light green mineralization Vv JPL.SM(harder than knife blade)."y e PL,SM,9° v Ca u™ a Vv.a vy e J,PL-C,22°183.25 feet.Granodiorite/diorite Vv SM xenolith 2 inches in size.VY J,PL,SM,.., vy ®|Dark Gray 63 a yY Clay v™Coating vv 39|104%|104%VY i 185 vv _ ™. Vvvy J,PL,SM, i WY e Dark Gray 58°1 inch Sch. Was Clay 40 PVC pipeVvCoatingvvJ,PL1,SM, vv e Light Green24 fo Run 40:Joints upto 116th inch =FY »Coming 66°un ,ing.ythick,light green caicite coating.vw LPL,SM v Vv,Vv J,PL,SM,epo 'wy log SM 58 Z vv @ |J,PL,SM,64° VY Light Green Mv i 188.8 feet:Granodioritediorte Vy bovine | xenolith 1.5 inch in size.7 JPL,SM,.2]189.4 feet.Granodiorite/diorite vv 40/100%|84%®|Light Green61 mee'O |xenolith 0.75 inch in size.VY.Coating R4 |190 |=ww FR to 4 el v RSgvw.=WY.@ ||J.PLC,ca27°Wad L vy 4 wv Na vy L W Lj 4 vy LJ vy 4 VY [4 L VY.FI i” Nas 4 Vv._ 193.6 feet:Diorite xenolith greater vv Ky than 3 inches in size.vy”=4 - Ww [4 Vv + v 41|100%|96%J,PL,SM,39 = vw ie")Note 3-ie |= p19 eo fest S™57 tinch Sch.|EL [4 vw J,PL,SM ed pine EvwCaslottedpipeFY Was 'om L vy Fy |4 vv FSvv.im vv = b-Vv 'oma JVv v J,PL-C,°omwy©|sm 65 = VY i a Wad TI 4V| Vv = vy 42|98%|77%i vy 1 inch Sch.-_ r vy J,PL,° 40 PVC FH -|4vy°SM-R,Ca 63 slotted pipe - vy with sand - Vv = w™J,PL,backfill = y 200 Log continued on next page a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.A Golder DRILLING CONTRACTOR:Discovery Drilling CHECKED:R.Dugan gueAssociatesDRILLER:G.Cormier CHECK DATE:9/7/2011 LOC PROJECT:Large Railbelt Hydro Watana Quarry A PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE G11 CLIENT:MWH Americas Inc. DRILLING DATES: ATION:South Bank Susitna River,Talkeetna Mtns AK EQUIPMENT:Hydrocore 28 Longyear -DHO03 DATUM:NAD83,AK S.P.Z4 ELEVATION:2448 ft COORDS:_N:3,223,402 _E:1 SHEET 11 of 11 INCLINATION:-79 AZIMUTH:185 885,723 [ANCDRILLHOLE]BSavikko2/16/12VA.GPJWATANA_MWH_LIB.GLB(ft)DEPTHBORINGMETHROCK TYPE ODDESCRIPTION GRAPHICLOGFO-Foliation PL-Planar ST-Stepped I-lrreguiar P-Polished K-Slickensided VR-V.RoughFr-Fracture RD-Redniled-CurvedB-Bedding 1Unduiating FeOx-lron Oxides NG{SRMINDEX(SRMINDEXDISCONTINUITY DATA STRENGTHPOINTLOADTESTSELEV. FRACTURES PER FOOT nwvrOooO? TYPE and SURFACE DESCRIPTION ROD RUNNOCORERECOVERYDEPTH (ft)cw362k14.5k7.25k3.62kFRMW>=WEATHER!HWRSIR4IR3NOTES TESTS WATER LEVELS GRAPHIC 205 210 t-215 r-220 NQ3Wiretine441.9 -202.0 Fresh (FR),jointed (some FeOx stained),dark green, aphanitic,felsic porphyritic crystais up to 0.25 inch, medium strong to strong (R3-R4),ANDESITE PORPHYRY (DACITE) {Continued)<<ccc<<<eeeSMR,Note6a"4 60° 42)98%|77% 2249.7 No Boring completed at 202.0 ft. Notes: 1.Elevation term calculated using NAVD88 vertical datum. 2.1-inch Schedule 40 closed-end PVC pipe installed to bottom of hole, last 10 feet slotted,one 60-pound bag of sand used as backfill ( 3.5 feet of backfill in the driilhole). 3.NQ drill rod and metal cap used as protective surface casing (approximately 2.8 feet above to 2.3 feet below ground surface).Casing set with Bentonite to approximately 0.25 feet below ground surface. 4.Water level readings were measured post-drilling after PVC had been installed. 5.Split liners were used to remove core on all NQ3 runs except for Runs 5,11 and 21 where extracting core from spiit liners was difficutt so the core was removed by tapping the exterior of the barrel with a hammer. 6.Discontinuity graphic log is a depiction of discontinuity angle Measured from the left hand margin of the log column. Additional Discontinuity Descriptions: 3-1 PL,SM-R,Trace Fine Grained Possible Pyrite 3-2 PL,SM-R,FeOx,Trace Very Fine Grained Possible Pyrite 3-3 PL,SM,Silt/Clay Infilling Up To 0.75 Inch Thick With Rock Fragments 3-4 PL,SM,FeOx,Gray Coating (Possibly Cuttings) 3-5 PL-C,SM,Trace Indescent Yellow Very Fine Grained Metallic Mineralization 3-6 PL-C,SM,Trace Iridescent Yellow Grained Mineralization 3-7 PL,SM,Trace Very Fine Grained iridescent Yellow Metallic Mineralization 3-8 PL,SM,1/4 inch Thick LightGreenClay/Ca Coating,Extremely Weak (RO) 3-9 PL,SM-R,Silt/Clay With 1/8th Inch Rock Fragments 3-10 PL,SM,Ca With Infill ( 1/8th Inch Thick;Extremely Weak (RO); Sit,Sand,Ca) 202.0 1 inch Sch. 40 PVC slotted pipe -» with sand backfill SRSGAROORRERRERE10395560LRtGy IdAgaotes DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Discovery Drilling DRILLER:G.Cormier LOGGED:E.Cannon CHECKED:R.Dugan CHECK DATE:9/7/2011 an ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100years.1 6-1 434-REP-01 1 21 5 2012 QUARRY M GEOLOGIC LOGS (Originally presented by Golder 2013a) PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 1 of 13 INCLINATION:-70°ECannon3/8/1312.GPJ LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WéDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/29/12 to 9/8/12 ELEVATION:2000.8 ft AZIMUTH:66° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 _E:1,886,861Oo;'Shay Roughness lofilling Py-Pyrite @ Axalro)J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotite Ep-Epddote Qtz-Quartz 2 F-Faut FO-Foliation =C-Curved K-Slickensded Bx-Breccia ©FeOx-lron Oxide Sa-Sand ODiametral x -ol]>i wen OrOnh sonal seen?aoe Cr eerite Bree te eSemote bof,FE >w 9)4S)8)&[FR Frecure Tiveguiar VR-Vey Rough CaCacte MUSH Su-Sunide |2S @ a NOTES wu 10 DESCRIPTION 972)es DISCONTINUITY DATA x aapé TESTS a Zz =/E_}|2]98 Eu a |xbx|toxl x xs WATER LEVELS =@|Fe)2)69]Rao |Fractures |Fya TYPE and To |SZHEZH/NORS w5&/e-)3)2 %PERFOOT |293 SURFACE aS |oug ane SSNs &a:E\lo lz gsee|n+002 Pa oh DESCRIPTION ge °5 |F"wese 9 x 0.0-1.0 =jVeryloose,very soft,moist \to wet,green to dark brown,iORGANICS+SILT,fibrous ae 999.9 7 a pL CPT#ML)1.0 7 1.0-2.0 Soft,moist to wet,brown, SILT,few to little organics 998.9 a n {roots,wood)- 4 My jo 2.0 20-114 o(\Dense to very dense,moist,Dagdarkgreenishgray,poorly O 4 graded GRAVEL,is) Tust-stained surfaces,Diorite }o (\Ti gg |[NIAandAlteredDioriteclaststo)0.9 feet size (TALUS)[o -(GP)LO 7 e(\Driller indicates drilling through b-5 harder and softer zones in Runs |,©)4 1,2 and 3 in overburden andbedrock.by ie NIA fo) i bO 4 °(\ 3 , L 2 L Q 4 A of\ ;ea }| | €a 21 32 ||N/A ©ced»3 O L g |fe)4 2 o(\Drilling RategO(8/29/2012):410 |?Oo 0 to 18.8 feet 4 5 iP (soil and =°Q rock),3.5 D>D hours,5.4 i £Xe 29 oe feet/hour J 5 b : as ©|Top of Rock=11.4ft 1990.4 3 14% 11.4-104.6 x.$11.4 71% Slightly weathered to fresh ty _| L (SW-FR),iron-oxide-stained \@ |PL.SM,FeOx 69°4 joints,rehealed calcite joints,©)|pL SMR,FeOx 44°very close to wide spaced L ,:, fractures,xenoliths (fine ion »J,PL-l,SM,FeOx 4 127% a grained),dark greenish gray,|9/8/12;WD 4 Medium grained,strong to \ very strong (R4-R5),r 7 @/J,PL,SM,FeOx 72° DIORITE N r 11.4-12.6 feet:Broken core,7 @ ||J,PL,SM,FeOx 31°7 possible mechanical breaks in \ ,42additiontonaturalbreaks.N 424|*L ,| |\416100%@|J,PL,SM,FeOx 74 L |SW |R4 \@ |J,PL-C,SM-R,FeOx 51°to |to | |FR RS J N L >| \ | \ a Ly || \ \18L>5 |20 @ |J,PL-ST,SM,FeOx 68° L |_|on 4 \88% |'@ |J,PL,SM,FeOx 58° "4 a |Hole 4 |S ri advanced to "oq 6 |*|163%18.8 feet on x 100%8/29/12. =LI ®420Logcontinuedonnextpage >DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureAvgDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine€2)¥Golder reeAssociates PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 DATUM:Ground Surface ELEVATION:2000.8 ft SHEET 2 of 13 INCLINATION:-70° AZIMUTH:66°ECannon3/8/13LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 _E:1,886,861 T Sha i 8 Jet 5-Bedding PL-Panar Honoree Braeite Ep-Epidote.ote arte @ Axes =F-Faut FO-Foliaton -C-Curved K-Slickensided -Bx-Breccia =FeOx-lron Oxide Sa-Sand DO Diameval i >SH-Shear CO-Contact Y-Undulating SM-Smooth Cl Clay |G-Gouge _3e-Sencite kanxlwQOa|&>Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte Hm-Hematite Silica 5OFs NOTESFelsSig{8 2 |FR-Fracture tirregular VR-Very Rough CaCalcite -ML-Su-Sulphide 56 2B TESTSwufoDESCRIPTION972/28 DISCONTINUITY DATA z |, ase o 12g z/=,/2/28]ep FRACTURES |wu atx 5x |tox|x xxx WATER LEVELS z ae|2/°9 'a0 CTURES |3y2 TYPE and =Sze ezZuNeRs 2fo}x w=)S &%PERFOOT |29%SURFACE a3 |eho whe Sins &ES co)4 geeg|av coe Pa gh DESCRIPTION eo "5 eeso 9 =y 20 11.4-104.6 C :@ |EL SM,rex 37 Slightly weathered to fresh ty ||J,PL,SM,FeOx 53° (SW-FR),iron-oxide-stained joints,rehealed calcite joints,|a very close to wide spaced L 40 ° 4 fractures,xenoliths (fine os 40 d @ |J,PL,SM,FeOx 67 Pograined),dark greenish gray,|6 63% medium grained,strong to 100% |very strong (R4-R5),/-J,PL-U,SM,FeO:° 7 DIORITE (Continued)7 SM FeO 9 ' i rosa |© ';|e J,PL,SM,FeOx 25 R4 q \:!to rv.@ |J,PL,SM,FeOx 58°R5 !i |S 3.0 | 4 / 4 7 |39 |leo,e J,PL,SM,FeOx 26° \ \100% }-25 M4 4 |®|J,PL,SM,FeOx 63° NN r 7d25.75 feet:In-situ joint,13°dip @ |J,PL,SM,FeOx 53° w.r.t.core axis,planar,smooth,||4 iron-stained,tight to open |*°26.4-27.15 feet:Generally 7 2.0 @ |J,PL,SM,FeOx 51 sw core-axis-parallel,in-situ joint,|8 2.0 95%to LL planar-iregular,smooth-rough,\FR qiron-stained,very tight P74 100%@ |J,PL-l,SM-R,FeOx 69°PJ| NN L P74 At 27.8 feet,4 _,|drill bit tripped 5 .:out for 2 t 7 _|'@ |J,PL-,SM-R,FeOx 70°P|sharpening.\| iya8 '7°N 5 r," 4 °\ |e J,PL-C,SM-R 37° I-30 15 Ls 5.0 =nN +9 |59 |lsqc% i ,3 .100% .x=r 7a ®||J,PL,SM,FeOx,Ca 32° q2 8 N 4 e J,PL,SM,FeOx 39° L {4 '{e J,PL-C,SM,FeOx 41° "4 Loss of circulation begins inRun |.R5a10.Driller indicates hard rock in / 7 Runs 10,11 and 12 -some oer e J,PL,SM,FeOx 44° iron-stained joints may be I mechanically broken » a \"4 3.0 _ !10|39 |}93% 7.400%@ |J,PL,SM,FeOx 48° i 35 34.9 feet:In-situ joint,65°dip |Drilling Rate a w.r.t.core axis,planar-irregular,N (8/30/2012):partially open,iron-oxide staining,F /_|18.8 to 50.8quartz\feet (rock). i N 7.75 hours, ty °J,PL,SMR,FeOx 35°4.1 feet/hour \ , FR 'Changed drill a am °bit at 35.8 \e J,PL,SM-R,FeOx 19 feet.7 \4.9 /o 401 89% .|00% °@)||J,PLASM FeOx,Ca 36”4 38.25 feet:In-situ felsic intrusion,'° diffuse contacts,orangish tan,51°)\°7] dip w.r.t.core axis,approximately |@,|J,PL,SM,FeOx 45° L 0.4 inches wide >+@ |J,PL,SM,FeOx 49°4 v7 : 1 XN i |} L-40 .|12 |170%e _|Log continued on next page =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiEWGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igureF:A-9&,103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 DATUM:Ground Surface ELEVATION:2000.8 ft SHEET 3 of 13 INCLINATION:-70° AZIMUTH:66°ECannon3/8/13312.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 _E:1,886,861 a ape Roughness.Infilling Py-Pyrite @ Axialfo)J-Joint B-Bedding PL-Planar PO-Polisnhed Bt-Biotte Ep-Epidote _Qtz-Quartz . =F-Faut FO-Foliation --C-Curved K-Slickensded Bx-Breccia. FeOx-Iron Oxide Sa-Sand O Diametral ry o |2 le Vien ORGrhogenal Sisenpe”Rough”Chcherte Amtiteie Ssea |bo?e =2 io}i y &|FR-Fracture imeguiar VR-Very Rough Ca-CalciteML-Sit Su-Sulphide ze %g veerswe|e DESCRIPTION eee]es DISCONTINUITY DATA x aap Qo |Z Zz \zE_|2|98 z oT visx|tox |<xxx WATER LEVELS fr @ lFe/Z]OG |)Rad |FRACTURES |Sve TYPE and 2,Sea/ezs ABSSOoeje |S|2 %PERFOOT |20%SURFACE a6 (ous wee 8x6 Aive)oO e SBe8\nwrowo?e he oh DESCRIPTION e A loesm oy osy4°114-1046 .J-PL,SM,FeOx,Ca 51° Slightly weathered to fresh va(SW-FR),iron-oxide-stained \ ,|joints,rehealed calcite joints,I ° b very close to wide spaced '3.0 ®(J,PL-C,SM,FeOx 66 4 fractures,xenoliths (fine vq 42 3.0 70%/@||J,PL,SM,FeOx,Ca 45° grained),dark greenish gray,|° medium grained,strong to '100% a very strong (R4-RS),/@||J,PL,SM,FeOx 42°| DIORITE (Continued)| \@!J,PL,SM,FeOx 74° '4 i an @ |J,PL,SM-R,FeOx,Ca 60°q NX Ly | \ j L \@/J,PL-l,SM,FeOx,Ca 73°SW 4 7 [to \ , FR N 7.4-45 Be @|J,PL-C,SM,FeOx,Ca 727 ||13)94% rv 100% \ 5 i ie J,PL-C,SM,FeOx,Ca 11°7 \ /- \ | 5 \4 oo { XN a 7.4 \ =| 2 N e 44 @)J,PL,SM-R,FeOx 7? s &|3.0 4 a \3.02)14;100%;j! 8 \100%l @,|J,PL-l,SM-R,FeOx 44°RS£: 50 3 » 4 a 4oO|fe)N g =7 Hole 4 2 \ |advanced to 6 |51.3 feet:in-situ rehealed calcite |.20 50.8 feet on ©|joint,51°dip w.r-t.core axis,very |,20 8/30/12. tight to partially open.Orange to 15)'100% =red iron-oxide-staining margin on I 6 4 joints in Run 15.100% 45 | L \= 53.15-53.35 feet:In-situ felsic 4intrusion,fresh (FR),|approximately 63°dip w.r.t.core \ axis,cross-cut by very tight 7 @ |J,PL,SM-R,FeOx 63°FR -tehealed calcite joints,light 4 reddish gray,fine grained,very l strong (RS),contact zone N approximately 0.25 inches wide /- i 55 \20 4 .16|°"||97% ',100% - N - 7. | \@ |J,PL,SM-R,FeOx §2° / ]4 .|||u,PL,SM,FeOx 40° oo a |4 N t io 5.05.0 |\V7 94%J os 100% { XN +60 ; os 4 Log continued on next page &,103-95560W/Ty GolderAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-9 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 DATUM:Ground Surface ELEVATION:2000.8 ft SHEET 4 of 13 INCLINATION:-70° AZIMUTH:66° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 _E:1.886.861 8 }loint B-Beddi PLPlanar ion:deem feBette Ep-Epidote ote uartz @ AxazrF-Fault FO-Foliation C-Curved_K-Skckensided =Bx-Breccia FeOx-iron Oxide Sa-Sand UO Diametral x lt o|2 le Ven GROdhogonal StStepped”Rough Chote Hieremaite Sigma |SOP aie2°z w %|FR-Fracture Giregular VR-Very Rough Ca-Cakite ML-Sit 5u-Sulphide 285 EA NOTES w=16 DESCRIPTION @ KH 2|ee DISCONTINUITY DATA =aae TESTS o 12 z=j=5/2/83]rap |rractures |$#So |xOn|Zon lx aus WATER LEVELS iv a€/2/°9 5S 3x2 TYPE and Zo |Sza|ezZH)8 ORoéa=|5)2 %PERFOOT |29%SURFACE SQ jeez wE2 Brno60ao&88e8|n+02aF Pe gh DESCRIPTION Fe 5 wese og 11.4-104.6 \i Slightly weathered to fresh ry |! (SW-FR),iron-oxide-stained \i joints,rehealed calcite joints,| -very close to wide spaced L '50 4 fractures,xenoliths (fine on 5.0 i i J,PL,SM-R,FeOx 59° grained),dark greenish gray,|7 94%e J,PL.SM.FeOx 42°Medium grained,strong to \100%|eee re a very strong (R4-R5),pr 7 4 DIORITE (Continued)an | '@/J,PL,SM,F ° rd |J,PL,SM,FeOx,Ca 73°| S i J L '!@ |J,PL-C,SM,FeOx,Ca 47° L' |[ Gg N . 4 h 7 4 |:e J,PL,SM,FeOx,Ca 42° \ |a 5.0 .@ |J,PL,SM,FeOx 66°465vo3.0 |Pw . 18 88% r/4 100%|'=(| r >'e J,PL-U,SM,FeOx 14° \ |i -L y |@/J,1,SM-R,FeOx 72°4 7 i 1 \ .r 7 4\ ,®|J,PL-C,SM-R,FeOx 63° $. E on L &i @||J,PL-C,SM,FeOx,Ca 44°7 @ XN ='FR |R57015L>5.0 4 ">faa}59 |100%6 ! g N 100%| T o ie 4 £!@ |J,PL,SM,FeOx 50° 3 ' in '+| t |+@ |J,PL-ST,SM,FeOx 60°4 \ 'en | | L \|«J,PL,SM,FeOx 22° 4 ie |@ |J,PLU,SM,FeOx,Ca 53° '| -[74 d J ; \ I 7. ! 75 !5.0 e J,PL-U,SM,FeOx,Ca 13°a: |20;59 |iga%}t] vO 100%|@/J,PL,SM,FeOx,Ca 78° sg N _] in /. | L >@ |J,PL,SM,FeOx 61° EB |@ |J,PL-I,SM,FeOx 64°7 \ . on +\4 \ Z : ° |@/J,PL,SM-R,FeOx 69'rh]\,;$90 i '.21]©Hoag}[1 | "4 400%@|J,PL,SM,FeOx,Ca m7 | I .|| = [7 4 480togcontinuedonnextpage° DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine ho.103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 DATUM:Ground Surface ELEVATION:2000.8 ft SHEET 5 of 13 INCLINATION: AZIMUTH:66° -70°ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 3800-3 COORDS:_N:3,226,024 _E:1,886,861 TQPmt B-Bedding PL.PL Bena PoBocred BrBolte --EpEpid bduan |OANA! 2 F-Faut FO-Foliation -C-Curved KSlickensded BycBreceia FeOxironOxide 32-Sand 0 Diametal xr im Oo;2 /]e ven OR Onhogenal Si-Seped”ROUGH Chchiite Hmicnatte SSiea boe.Fe 3 9 Z wy %|FR-Fracture Pieguke =Vi-Very Rough CaCacte MSI Su-Sulphide 280 a NOTES w=10 DESCRIPTION 9 to 3]aS DISCONTINUITY DATA z eae TESTS o lz Zz /E_|2/981 rao |eractures Ee S-]xbx|tox|x xxx WATER LEVELS mz 2 jae/Z2/°9 c URES |$2 TYPE and Fo (Sea e2a|SSRS wo x &(e°|3|8 %PERFOOT |20%SURFACE 9 geez GG2/8en0e &L-go +=*BB98|vv oo?Pass DESCRIPTION 5"|G eeee 2 x 114-1046 . )|J,PL-C,SM-R,FeOx a7” Slightly weathered to fresh 7.(SW-FR),iron-oxide-stained \ joints,rehealed calcite joints,l @/|J,PL,SM,FeOx,Ca 74° a very close to wide spaced '5.0 [-- fractures,xenoliths (fine \os 5.0 4grained),dark greenish gray,t 21 94% medium grained,strong to »100% a very strong (R4-R5),Drilling Rate DIORITE (Continued)|(8/31/2042): .50.8 to 112.8 /.feet (rock), 82.0 feet:Felsic intrusions,\7.5 hours,8.3 -approximately 28°dip w.r.t.core i feet/hour axis,diffuse contacts,light »FR R5 reddish tan,fine to medium \/grained,approximately 0.25 to 0.5 e |7 ° inches wide,lighter colored core N J,PL-1,SM-R,FeOx 7a p--- a below intrusions y\|@ |J,PL-C,SM,FeOx §3° N |a5 "4 49 @ |J,PL-U,SM,FeOx 60° |22 5.0 80%@ (J,PL,SM,FeOx,Ca 52° \ /.98% \ 5 | \ 7 @||J,PL-C,SM,FeOx 40° \ | sg 'N on |||,PL,SM,FeOx 33° =\' o | 2 N e on @ ||J,PL,SM,Feox ar L &|a \ bay / 5 \ ¢|@||J,PLC,SM,FeOx 43° P 90 |Run 23:Broken core,possible ,28 SW |R4"|mechanical breaks in addition to |\" }23)>30%to togj|natural breaks.|s00%,bE J,PL-U,SM,FeOx 90°FR |RS =r _=/ ] 2 |8 \ I 74 @ =|J,PL-l,SM,FeOx 47° 5 \ \ \/.] i !@||J,PL,SM,FeOx 43° Vv ,©}|J,PL,SM,FeOx 40° N =\/a | N 'e M o ;| J,PL,SM,FeOx 70'P| -95 \5.0 >24]5°||7o% an 100% =N 7 \e@ J,PL-C,SM,FeO:42°."nx rr |rs |(C L on |«J,PL,SM,FeOx,Ca 24° N /. \ L | N an 5.0 @:|J,PL,SM,FeOx,Ca 45° l 5.0 :'25 97%@ ||J,PL,SMR,FeOx 28° in 100% ! N t 100 , oo 7 Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€:=Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine 9e 103-95560WiLA Associates DRILLER:T.Fisher CHECK DATE:1/9/13 LOC PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 ATION:Susitna River,Talkeetna Mountains,AK-_. RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:2000.8 ft COORDS:_N:3,226,024 _E:1,886,861 SHEET 6 of 13 INCLINATION:-70° AZIMUTH:66° fan}Ty .Shape Ri {nfilling ;Py-Pyrite @ Axal 5 d-Jont B-Bedding PL-Pianar PO-Polished Bt-Biotrte Ep-Epidote Qtz-Quartz =F-Fault FO-Foliation --C-Curved K-Slickensided Bx-Breccia FeOx-Iron Oxide Sa-Sand 0 Diametral x |2 le Yvert”GRonhogonal Si-Senped”Rmowh -GhGheete Hmehetaite -Sesnea”PrPe28aw]&(er Fracture ireguiar -_VR-Very Rough Ca-Calctte Sift ju-Suipnide |3S 0B Wearew |o DESCRIPTION Qh 2]es DISCONTINUITY DATA x ase ESTS a |zZ z /E_}2/98 =n Oo]xbxitox|xxx WATER LEVELS x ajite 2/09 RAD FRACTURES |$2 TYPE and Fy |o2u ezu NOGA woOoeiw-i5)2]%PERFOOT |29%SURFACE SG |eeZWE2Z|San0 KR1004°=S898|a+ ooe Ps gh DESCRIPTION g-|G ese 2 x 11.4 -104.6 'i 14 Slightly weathered to fresh YI(SW-FR),iron-oxide-stained |joints,rehealed calcite joints,| ! -very close to wide spaced '50 7 fractures,xenoliths (fine 4 25 5.0 97%grained),dark greenish gray,I Medium grained,strong to \100%ag very strong (R4-R5),/o 4 DIORITE (Continued)FR |R65 N /. a | t = t i}'|@J,PLI,SM,FeOx,Ca 81°}_| bf L .* @ |J,PL-ST,SM-R,FeOx 50°q |i 1 4902.5 1 104.6 -105.3 H \104.6 MW |R3 -105 Moderately to slightly =50 to to _ weathered (MW-SW),S1901.9,.|5.0 ||Soo,sw |R4jointed,close spaced ,105.3 ° fractures,quartz veins to 7.100% 0.25 inch width,rusty brown, a medium grained,medium N !7 strong to strong (R3-R4),°ALTERED DIORITE is ©@ J.BL SM,FeOx 30° 1053-1344 |J,PL,SM,FeOx 62 -Fresh (FR),s +4 iron-oxide-stained joints,4 !| rehealed calcite joints,very t !: close to wide spaced \i ° ag fractures,xenoliths (fine /@ |J.PL.SM,FeOx 63 | grained),dark greenish gray,||medium grained,very strong \|J.PL.SM.FeO:149°7)R5),DIORITE ,PL,SM,xaaio©)|5)PL SM,FeOx aay =£I 4[a] @ '\ fe]'4 °|-110 |5 .5.0 s "i jaz}59 |iga% re]|100%@ |[J PLC,SM,Feox 25° =/L = 4 4 £'@ ||J,PL SM,FeOx 34° g \@ |4,PLASM,FeOx,Ca 56°os =]4 NX |FR |R5|@ |J,PL,SM,FeOx,Ca 51°HoleL pa @ |J,PLU,SM,FeOx,Ca 58°advanced to 1 ,;@J,PL-l,SM-R,FeOx,Ca 88°MSS 112.8 feet on .8/31/12. L /- _ | N /.] I 115 I 3.0 4 y 28|5 Higa%)| 100%|| L \.! 4 /.]||Drilling Rate \|||@|ld,PL-C,SM,FeOx 42°(9/4/2012): ::|112.8 to'|!e J,PL,SM,FeOx,Ca 34°119.3 feetlr|(rock),0.75 q .!i yy hours,8.7 )i feet/hour LL ,New drill bit J s 15 installed at |117.8 feet.'29)15 |100%|ee | L \100%|J 7.|Hole @ |J,PL-I,K,SM,FeOx 63°advanced to|30 93%||||_ 119.3 feet on 7.{|9/4/12. y_120 Log continued on nextpage _ ine DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiEGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure =A-9 4103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-5 DATUM:Ground SurfaceCLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 ELEVATION:2000.8 ft SHEET 7 of 13 INCLINATION:-70° AZIMUTH:66°)12.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannon3/8/134103-95560WéLOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:__N:3,226,024 _E:1,886,861 o ¥Shay Roughness Infilling Py-Pyrite @ Axal J-Joint B-Bedding PL-Planar PO-Polished Bt-Biotite Ep-Epidote Qtz-Quartz .2 F-Faut FO-Foliation ©C-Curved --K-Slickensided Bx-Breccia FeQx-lron Oxide Sa-Sand O Diametral 5 a |2 le Vien”GRonnogenal St-stepeed”Rough Chehbrte Rmetetatte Ssica |OR.=.2 oO)2]B]&|FR Frcure Gone Fimeguiar_VR-Very Rough CaCalcte-ML-Sit su-Suiphide |FSH B veersGeloDESCRIPTIONon2ie$DISCONTINUITY DATA x aap™ a =z |x 31606 Eu oO x bx ton eye WATER LEVELS z &|be|S|OS |RQD |FRACTURES |$¥u TYPE and Fy /S28\/e2u)eRe 2&é|BE)5,2)%PERFOOT |29%SURFACE 2G jek2(8E2Z|Senn RL120-4"ev tf g8e8|v+ooe pag DESCRIPTION |b ese 2s 105.3 -134.4 \ Fresh (FR),ty]iron-oxide-stained joints,\ reheaied calcite joints,very | -close to wide spaced |>35 4 fractures,xenoliths (fine "4 30|35 H lassgrained),dark greenish gray,!° medium grained,very strong 100%o -(R5),DIORITE (Continued)7 7 @ |J,PL,SM,FeOx,Ca 49 4 { »e J,PL-ST,SM,FeOx,Ca 31° Ly | i Vy e J,PL-C,SM,FeOx 24°4 N ty |\ |@/J,PL-C,SM,FeOx 76° | L | \ { XN L 125 4 £9 i |a1|59 ||/ea% rv.400% \ 5 I \@ |J,PL-C,SM,FeOx 59°1 ty |®)(J,PL,SM,FeOx,Ca 43° \ I =»FR |R5 4 I /.] 1 . |74 . J o IoON Q r 7.E \ ;@ (J,PL-C,SM,FeOx §3° J a \ é I'@ ||J,PL,SM,FeOx,Ca 31° :\130 |5 LS 5.0 4 N [32]©|tee5ig\100% F 2 RB "@||J,PL,SM,FeOx 38°4 =.oe in ae ||4 N\ ry 7 @ J,PL-U,SM,FeOx,Ca 2° I -'J,PL-U,SM,FeOx 0°4 ly /. I \@ |J,PL,SM,FeOx,Ca 48° =in |4 |4874. 134.4-138.9 Hi 134.4 NIA Highly to moderately = 1 435 weathered (HW-MVW),5.0 4 iron-oxide-stained joints,4a \33 5.0 31%tehealed caicite joints,light N ;NIAgray,medium grained,very a 100% weak to medium strong =\ |[(R1-R5),ALTERED YeDIORITE==\NIA HW |R1Stoto Uy MW |R3 d NS a NIA L.AL 4 Ay 5.0S1870.3.44)5.0 ||720%@ ||4,PL,SM,Feox 30° 7-.[138.9 L 100%e : °\/|J,PL-C,SM,FeOx 47 FR |RS i N ==-_140 Log continued on next page - -"a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FidureAGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine g eH A-9AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-5 SHEET 8 of 13 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/29/12to 9/8/12 ELEVATION:2000.8 ft AZIMUTH:66° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 __E:1.886.861 8 YEnt -_g-Bedding PlPenar PoBeisned -«B'Bcte --Ep-Epidote Gadus |ee=F-Faut FO-Fokation -C-Curved K-Sickensdied Bx-Breccia FeOx-lron Oxide Sa-Sand DO Diametral xc 15 g |2 le Vier ORGrhogonal Stisepeed Roh Chchibte «Hmiicmate see |OP =Fe 2 is}a Wi %|FR-Fracture tiregular VR-Very Rough CaCaicite -ML-Sit Su-Sulphide FS 6 2 &NOTES w>lo DESCRIPTION 278]es DISCONTINUITY DATA x |, aape WwATER DIELSoFs&|Fe|/Z|83]Rao |Fractures |$¥a TYPE and Q |SSSIELEIABSS y ©é BY)S|uz]%PER FOOT a8 SURFACE a8 eee @EZ/B2nesao8Baggl|aecne Pag DESCRIPTION 3 5 eere 9 & 138.9 -195.0 ' Slightly weathered to fresh >|i (SW-FR),iron-oxide-stained , : joints,rehealed calcite joints,!'° -very close to moderate _'5.0 TF ©)[2 PL SM,FeOx " R5 Drilling Rate | fe graben),devh grearvah 34]&9 |b72%|@ |J,PLC,SM,FeOx 74°(9/5/2012): gray,medium grained,»100%119.3 to a strong to very strong 7.|162.8 feet q (R4-R5),DIORITE |(rock),9.25 (Continued)\:hours,4.7 /feetvhour Ss |4 »|@ J,PL-C,SM,FeOx 80°|_| I | a N |di J,PL,SM,FeOx,Ca 7° 4d sa : ' .!@ |J,PL,SM,FeOx 68° r-145 os 5.0 4 .35]°°|sre PL-C,SM,FeO:° |100%J,PLC,SM,FeOx 57 L }4 NX /-* Dy ©|J,PL,SM,FeOx 74° L '>e J,PL,SM,FeOx 40°4 > 1 i} ||i \|° i /|@ |J,PL-C,SM,FeOx 57 At 147.8 feet,7 o @ |u,PL-C,SM-R,FeOx 56”Grill bit tripped 5 \'out for 2 /.]!sharpening. g Fy 1 : 4 »'i @ |J,PL,SM,FeOx 60° §4 : c !|FR150|.5.0 |4 "i +Jae}5°|tage;af3.100%@ |J,PLA,SM-R,FeOx 44°: =aa 421:R4 fo]\to°7.RS a ,@ |J,PL-C,SM,FeOx,Ca 61° 2 N &/ c '@ |J,PL,SM,FeOx 54° or ' 4 €os 35 1 e J,PL,SM,FeOx 41° wi N or ms 1 7 3 | =»°J,PL-U,SM,FeOx,Ca 5°3 4]i I ,'', 2 \ytd ©155 !8.0 = Q >37|59 ||7a%)|: KS 100%pda da a N :I e J,PL,SM,FeOx 43° oy t 7 | "|i@ |J.PL.SM,FeOx,Ca 49°4 2]'y wo N aL 4a |-| 6 |z |fd >NX .| &4 et --4 ao \i:=7 f !°on 50 '1 @ |J,PL-C,SM,FeOx 70' o 38|59 |66%!|| OL \fo = N in 100% S ,@ J,PL,SM,FeOx,Ca 80° <NN 1 ZL vo |. =160 Log continued on next page °7 =<=4 s DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8€.EY'Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine rene€oO ==-a &.Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 9 of 13 INCLINATION:-70°ECannon3/8/13)12.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WsDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:8/29/12to 9/8/12 ELEVATION:2000.8ft AZIMUTH:66° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 _E:1,886,861oO'ype :Shape Roughness Infilling Py-Pyrite @ Axal J-Joint 8-Bedding PL-Pianar PO-Polished Bt-Biotrte Ep-Epidote Qtz-Quartz2F-Fault FO-Foliation C-Curved K-Slickensided Bx-Breccia -FeOx-Iron Oxide Sa-Sand O Diametral c 9 |2 le Vien”OROrnogenal StStepped Roun. Choherte Harmate sci”|bOP.==|S QO)Ale]&[FR Frecue Sonal Timeguar -VR-Vey Rough GaCalcte MLSif 5u-Sulphide 24a Fa NeuesFeoDESCRIPTION242)ee DISCONTINUITY DATA zl.aR WATER LEVELSfa}Z z /Eo|zZ 88 RQD |FRACTURES |E¥o TYPE and 25 [$28 Een SEEN y5éwr!5 fd %PERFOOT |29%SURFACE 26 |2#zZ BEZ|S eno Kaoc4ssee|nwo we he of OESCRIPTION m1 &oes oy fF180138.9.196.0 .JPL,SM,Fe0x Ca Slightly weathered to fresh 7.(SW-FR),iron-oxide-stained joints,rehealed calcite joints,| -very close to moderate '50 4 spaced fractures,xenoliths is 5.0 4 °(fine grained),dark greenish '38 66%@ |J,PL,SMR FeOx,Ca 62 gray,medium grained,\100% a strong to very strong a 4 (R4-R5),DIORITE |(Continued)\®|J,PL,SM,FeOx 64° 7.> |f Hole 4 .advanced to |162.8 feet on FR 9/5/12. \Changed drill r y bit at 162.8 7 a @ J,PL-C,SM,FeOx,Ca 73°|feet. N 165 os 50 4 |D 0, . 39 62%@ |J,PL,SM,Feox 55° /.|100% =I 4 N 7 | a \®|J,PL-C,SM,FeOx 63°4 7d @ |J,PL,SM,FeOx 65 MN\ L a 4 c | oD N i s ;@ |J,PL,SM-R,FeOx 67 P|4 o NN 5 7 ©(170 |£.5.0 @ |J,PL-ST,SM,FeOx 51°%J==. "i " -|40)5 ||80%RS }|400% Pz ?| 2 | 8 .@!J,PL-ST,SM,FeOx 72°| L |4 XN 7.e J,PL-C,SM,FeOx,Ca 0° 172.7-175.6 feet:Low angle | -discontinuity defined at 174.2 feet 4 approximately 0.1-inch-wide zone [/ of iron-oxide-staining and calcite,\awen DORE .@ |J,PL,SM,FeOx 51°sw i ;°J,PLC,SM,FeOx,Ca 8°FR 1 NN /.@ |J,PL-ST,SM,FeOx 54° i 175 !5.0 7 >a1}5 |j65% |100%hed J,PL,SM,FeOx,Ca 38° =» = Jw \ aN = 7-4 I N 7.oe J,PL-C,SM,FeOx 38° s |4 'N\ va ,5.0 |,42}9 ||40%4 eo 100% \ °@ ||J,PL-ST,SM,FeOx 33° N 180 ; os tS 4 Log continued on next page mn DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureavaDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.ValentinePFGolder A-9Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° SHEET 10 of 13 ECannon3/8/13103-95560WATANA2012.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:8/29/12 to 9/8/12 ELEVATION:2000.8 ft AZIMUTH:66° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 __E:1,886,861 T i 78Jot---B-Bedding PUPaner POBoened «Botte -_Ep-Epidote Gadus |eh=F-Fautt FO-Foliation -C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand 0 Diametral x 15 og |ele Vien”ORonmogenal ST-Stepped”Rough”EhChBrte |Rmiiotatite «Stier |bop.P e 2 i}zd wu 2 |FR-Fracture Kiregular vRvey Rough Ca-Calcite ML-Sift 5u-Sulphide zs 7 g NOTES w 10 DESCRIPTION oH 2|#8 DISCONTINUITY DATA x a-ap TESTS ao |Z Zz /E_|2|98 z a vbx|tox|«xxx WATER LEVELS z @ |re|Z|8S |Rap |Fractures |F¥e TYPE and 2,|S2a/EZa/ASER y x e |a=|3)2 %PERFOOT |29%SURFACE 29 |gve ag Banoa9eB88e8|n+0202 ps gh DESCRIPTION &5 eese Oo f-180 738.9-195.0 v @ |,PL.SM,FeOx,Ca 60°Slightly weathered to fresh ty coe . (SW-FR),iron-oxide-stained \ joints,rehealed calcite joints,| a very close to moderate |'5.0 ; 4 spaced fractures,xenoliths v7 50 @:|J,PL,SM,FeOx,Ca 44° (fine grained),dark greenish |42 40%sw gray,medium grained,\100%fo =strong to very strong rosa . FR | (R4-R5),DIORITE \ , e J,PL,SM,FeOx 32 (Continued)\ +|\an, i |@ J,PL-SM,FeOx 79°Drilling Rate 4 N sy (9/6/2012): rv.162.8 to \ ;202.8 feet \(rock),8.75 a >hours,4.6 7 v4 feet/hour | 184.65 feet:In-situ,calcite vein,|\ 1 185 20°dip w.r.t.core axis,up to ly /5.0 _ imately 0.5 inches thickapproximatelyIncnestnici |43 5.0 78% L >400%@ ||J,PLU,SM,FeOx,Ca 25° "4 s 1 4 \ in /-e J,PL-l,SM,FeOx,Ca 30° ! a |S e J,PL,SM-R,FeOx,Ca 27°FJ 'an |R4 |'to L @;/J,PLSM,FeOx,Ca 47°R5 .@ |J,PL-U,SM,FeOx,Ca 49°7 3 . o aa |8 vy FR a N @ |J,PL,SM,FeOx,Ca 53° 2 L 8 \/ c \ 190 |3 '5.0 7 lr "7 5.0N\44 74%2)\So \100% x L a 7.Da \7 £|8 Nra)L >°J,PL-ST,SM,FeOx 36° "4 =i}4 |S @ |J,PL-ST,SM,Ca 60° \| |N @®|J,PL,SM,FeOx 50° q in an @ |J,PL,SM,FeOx 55° |@ ||J,PLC,SM,FeOx 25° 194,1-195.0 feet:Atleast four |,45|""|156%in-situ rehealed calcite joints,57°|.100%}fdipw.r.t.core axis,up to partially |,|° open \1817.y 195 795.0-195.5 7 1196.0 MW]RO 7 Moderately to slightly =\\a17.ey to[|weathered (MW-SW),R3 Ch:d drill[|jointed,rehealed calcite 7 195.7 CW }_RO bit at 195.5. -joints,light greenish white,=\si64 SW |R3 feet.4 fine to medium grained,"96.4weaktomediumstrong|* (R2-R3),ALTERED oq L DIORITE I = 195.5 -195.7 ' Completely weathered (CW),|[,">5.0 homogeneous,light gray,|46 5.0 96% |very fine grained with few to \R4 little fine-to medium-sand r 7 100%FR |to T sized rock fragments and \R5 minerals,extremely weak N(RO),CLAY SEAM Ly | a 195.7 -196.2 \4 Slightly weathered (SW),|tehealed calcite veins,light L ,green,medium grained,en =! 4200Logcontinuedonnextpage° >?DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fig @EGDRILLINGCONTRACTOR:Crux Subsurface,Inc CHECKED:C.Valentine ur©Golder Inc.:C. . SSoCciates DRILLER:T.Fisher CHECK DATE:1/9/13 ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13}.GLB[ANCDRILLHOLE]103-95560W.RECORD OF DRILLHOLE DH12-5 SHEET 11 of 13 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/29/12 to 9/8/12 ELEVATION:2000.8 ft AZIMUTH:66° LOCATION.Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.226.024 _E:1,886,861 T i i8fontB-Bedding SUPanr --FOBoIened -Bediotte Ep-Epdote Cte Gusrte @ &aal =F-Fauk FO-Fokation -C-Curved K-Shckensed Bx-Breccia FeOx-lIron Oxde Sa-Sand D Dameral x o|2 le Wien”GRonhogena St'Stepped ARough.-ChEhBrte Maetiomatte Srsiea”|OP =Fe 2 9 Fe w %|FR-Fracture Hiregular VR-Vey Rough CaCacte MLSit 1u-Sulphide zs 2 g NOTES wo DESCRIPTION 9 KH =|#Y DISCONTINUITY DATA z aak>TESTS a {2 z lz |2|/&3 =ox |tox|x xxx WATER LEVELSZzalteBO|RQD |FRACTURES |$Wo TYPE and 2,|S20/E25/SSKRraawezw%PERFOOT |29%SURFACE as |2ue SEZ Bene 8 medium strong (R3),\|»PL-C,. ALTERED DIORITE b>| [4%96%FR 196.2 -210.8 \ Fresh (FR),rehealed calcite }!e J,PL-C,SM,Ca,ML,42°if joints,moderate to very wide |.>'fine-medium Sa Infill spaced fractures,dark a ; |' greenish gray,medium ;23 Igrained,very strong (R85),\47 100% a DIORITE (Continued)in / |400% | 200.7 feet:In-situ calcite vein,=}'17°dip w.r.t.core axis,up to 4 F 0.1-0.2 inches wide (Hole Run 48:Broken core,at least 13 |\advanced to discontinuities interpreted as r vi]202.8 feet on mechanical breaks \ |FR |RS 9/6/12. gg N ty | \ N 44 L 42 505 v4 {48 98%| (98% N hy a I ! N rv | \! |Lt | he | \: N a in /.]_ \ g . 30fyrosi].R4- L 8 y 49|39 |'100%FR |to 2 |100%fo]\"oO :| cK-210 |S | 4 a onoOI g \_1802.7 a =|210.8-211.3 #210.HW =2]Highlyto moderately =802.2 to |RO&||weathered (HW-MW),e114 Mwy to ©||rehealed caicite joints,L }18 R3 gradational contacts above 14 50/°°74% -and below,light greenish |100%R4 4 gray,medium grained,'i to extremely weak to medium ly / R5 strong (RO-R3),ALTERED | L DIORITE N 4 211.3-216.8 [74Fresh(FR),®|J,PL,SM,FeOx 64° iron-oxide-stained joints,N PSgqrehealedcalcitejoints,very r yl a wide spaced fractures,\ medium grained,strong to 1 very strong (R4-R5),| DIORITE vq-215 Run 51:Broken core,at least 12 |30 4 discontinuities interpreted as »51 "100%a mechanical breaks [" Drilling Rate \ , 100%FR (9/7/2012): a N 202.8 to | ty 227.8 feet ao R5 (rock),5.75 i hours,4.3797., i 216.8-217.4 yo p16.d feet/hour J Fresh (FR),gradational ee 796.§contact with upper and lower +3 tock,light greenish orangish \pI74 gray,medium grained,very r" a strong (R5),FELSIC j 4 IGNEOUS ROCK (estimated ||18 | as Granite)r,,.]52 16.4 100%| a 100%4 'iif"7.4 |: : yt|53 00%iyo dd=Lil .-220 Log continued on next page ---DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fié.s Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine 29 e4AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-5 CLIENT:MWH Americas Inc. DRILLING DATES:8/29/12 to 9/8/12 DATUM:Ground Surface ELEVATION:2000.8 ft SHEET 12 of 13 INCLINATION:-70° AZIMUTH:66°ECannon3/8/134103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,226,024 __E:1,886,861TiShai -8 Joint B-Bedding BlPanar -POBohed -«BtBcte --«Ep-Epidote erduaree @ Anal 4 F-Faut FO-Folation ©C-Curved _-K-Slickensided =Bx-Breccia.©FeOx-lron Oxide Sa-Sand DO Diametral -SkH-Shear CO-Contact U-Unduiating =SM-Smooth Cl-Clay |-Gouge Se-Sericite wnxw9a[sg >V-Vein OR-Orthogonal $T-Stepped R-Rough Ch-Chlorte Hm-Hematite SiSilica 5 ops NOTESr==9 i Fa fe |FR-Fracture irregular VR-Very Rough Ca-Cakite ML-Sit Su-Sulphide oO $@ a TESTS Ww 109 DESCRIPTION e942]es DISCONTINUITY DATA x ase a Zz zr ix 2/05 ryelt wu WATER LEVELSFa@/Fe/Z]60]Rap |FRACTURES |Fo TYPE and 2,|SSS|ELBINSEA y &Fs w=zg Fe %PER FOOT 29%SURFACE ag |}ous gE2Z Bins|on0 12 io)x 88gR|n+0 08 Pe ew DESCRIPTION eo e wese a x 217.4 -233.6 CFresh(R5),rehealed calcite |;,||joints,very wide spaced \ fractures,light to dark | -greenish gray,medium ;34 4 grained,very strong (R5),v7 53 34 100%DIORITE (Continued)|% '100% L | a 221.4 feet:In-situ,calcite vein,\ 7 07°dip w.r.t.core axis,! planar-curved,up to 0.1 inch ' wide,feldspar crystals within 2 fot a inch wide zone centered on veins |J appear altered (tan color)N Ly _| \ | L 4 t 7.®J,PL,SM-R,FeOx,Ca =61° \ \ NX -225 77 5.0 4 |54}©9 |'100% a 100% \ S I = N so\ ; FR R5 'Run $4855:Zones of0.5to |>1 0.75 feet wide lighter colored 7 Diorite intermixed with darker 1 green Diorite,gradational contacts \ L ly 7 Hole _ |advanced to o \227.8 feet on o by _|9/7/12.New E \Grill bit r a .installed at 7 @ [ 227.8 feet. fe]fo(3)an|230 |&|s 5.0 = nN ot t55;©|oo%re)|le]N 400% =/ i D Vo 7 £l 8 >"4 5 |4 N L | \ | Ss XN 4 Ly _| \14781.@ |J,PLA,SMR 69°233.6 -234.5 A 233.4 uo Pp]cw |RO |Completely to highly =)to |to 4 weathered (CW-HW),y 7804 HW |R3originaligneousmineralogy=}.° texture visible,moderate \234.8 pj PL,SM 60 spaced fractures,light Ly _|--235 green,fine to medium \50 7 grained,extremely weak to |56|7 82% medium strong (RO-R3),L 100%ALTERED DIORITE vq ° -234.5 -247.8 |4 Fresh (FR),rehealed calcite |* veins,dark greenish gray,\ommediumgrained,strong to ( a very strong (R4-R5),N R4 | DIORITE \7 FR to |RS N\ a ly /-Drilling Rate 4 |(9/8/2012): \227.8 to ty _|5.0 247.8 feet |a 57}©|oo%|_|(rock),3 :hours,6.7 | 100%:feet/hour ion ||-240 '4 Log continued on next page n=DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiWFGoldDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure er older A-9AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-5 SHEET 13 of 13 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-70° PROJECT NUMBER:103-95560 DRILLING DATES:8/29/12 to 9/8/12 ELEVATION:2000.8 ft AZIMUTH:66° LOCATION:Susitna River,Talkeetna Mountain EQUIPMENT:Burley 5500-3 COORDS:_N:3.226.024 __E:1,886,861a>>zECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Type Sha Roughness infilling Py-Pyrite @ AxalJ-Joint B-Bedding PL-Planar PO-Polished Bt-Biotrte Ep-Epidote Qtz-Quartz F-Faut FO-Fohation -C-Curved K-Slckensided Bx-Breccia FeOx-iron Oxide Sa-Sand OD Diametrat SH-Shear CO-Contact U-Undulating SM-Smooth Cl-Clay G-Gouge 3e-;V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte Hm-Hematite SilicaFR-Fracture Virreguiar VR-Very Rough Ca-Cakite ML-Sitt 3u-Sulphide DISCONTINUITY DATA TYPE and ZoSURFACE28 g DESCRIPTION e NOTES TESTS WATER LEVELSLOADTESTS(psi)DESCRIPTION RQD FRACTURES %PER FOOT BB8EIlnwr0eaeGRAPHICLOGDEPTH|ELEVRUNNUMBERCORERECOVERYROCKSTRENGTHINDEXINDEX36.2kry iva Qo oODEPTH(ft)BORINGMETHOD39DIPwrtBOAXIS234.5 -247.8 \ Fresh (FR),rehealed calcite +, veins,dark greenish gray,\ medium grained,strong to | a very strong (R4-R5),» DIORITE (Continued)\57 '100% Run 58:Broken core,\ | ! discontinuities from 246.5-247.8 : 7 feet interpreted as mechanical i : breaks,0.2 to 0.5 feet wide v7zonesoflightergreencorewithin)R4 darker green core,diffuse \FR to contacts.r 7 R5 i 245 5.0 5.0 Coring(HQ3,2.5-in.CoreDiameter)!58 vo 100% 100% \__4767.9 |Boring completed at 247.8 247.8 ft. Notes:4 1.Drillhole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation &estimated from 2011 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. S 3.Vibrating Wire Piezometer {Slope Indicator,P/N:52611040, S/N:12-6866)was taped to sacrificial tremie pipe,placed alongside the temperature a acquisition cable (TAC)conduit,= and grouted in place with cement bentonite slurry at 227.3 feet depth. -4.Top of HWT surface casing 4 has 2.4 feet of stickup above ground surface. 5.Discontinuity graphic log is af-255 depiction of discontinuity angle 4 measured from the left hand margin of the log column. 6.Loss of circulation at 32.6 feet, grout annulus of HWT casing to 4 50.8 feet,drilling fluid still returns via annulus,continued loss of circulation throughout drilling. 7.Abbreviation "w.r.t”indicates "with respect to". 8.Water level estimate while L drilling (WWD)using a portable water level indicator. 9.Point load test rock strengths presented as equivalent uniaxial -compressive strength (UCS)4 based on a K value of 19 forconversionbetween|s(50)and equivalent UCS. -260 4 E A-9 4103-95560W,a =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi>Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure -,Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 DATUM:Ground Surface ELEVATION:1935.5ft SHEET 1 of 19 INCLINATION:-80° AZIMUTH:55°3/8/13ECannon012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560W:DRILLER:T.Fisher CHECK DATE:1/9/13 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.803 _E:1,885,929 8 JJont =B-Bedding eUPanar PG Bcisned srBette Ep-Epidote ote Gusta @ Anal4F-Faut FO-Foliation --C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametral a >SH-Shear CO-Contact U-Undulating ==SM-Smooth CL-Clay -G-Gouge e-Sencite KawrzWw9ao|%>Vein OR-Orthagonal ST-Stepped R-Rough Ch-Chiorite Hm-Hematite Silica 5OF=NOTESFelsSiala&|FR-Fracture Firregular VR-Very Rough CaCalcite -ML-Sit Su-Sulphide 5508 TESTSw 19 DESCRIPTION 9 -2|ere DISCONTINUITY DATA x aap is)z rT /Z_|2|96 Pars WATER LEVELS z a |Ee|/2|00]Rao |FRacTURES |Ye TYPE and Q SSS ELS AHSi<|®2/z i Py xx £9 16Ga/Seal|aune &oO e lw s id %PER FOOT 204 SURFACE 26 |PH2/HEZ/Seno RK > 6 |o |z 3geg|a+r ove pe eh DESCRIPTION g7 |"8/2"loeso gy =| 0.0-1.5 1] Very loose,very soft,moist,{ green and brown,iORGANICS+ORGANIC A i -SILT,fibrous aa '= | 934. 15-50 15 Frozen,dark brown,SILT, a trace subrounded mult-lithic 7 cobbles to 4 inches,Vs to approximately 0.25 inches 1 50 NIA NIA thick,trace wood fragments,,| a with excess ice to iG 4 approximately 20-30%visible :i ice by volume as clear and | white individual ice crystals a up to 0.06 inch thick 4 (ML,Nbe-Vx) L_5 Top of Rock=5 ft 930._| 5.0-11.1 5.0 Moderately to slightly 7 NIAweathered(MW-SW),NO CORE iron-oxide-stained joints and a >|fractures,very close to close ) 4 2 spaced fractures,dark€|grayish green,strong to very&|strong (R4-R5),\ -|WEATHERED DIORITE /.3.3 ;e|5.PLC.SM.Feo:39°4 2 hPL,»FeOx8BEDROCK/TALUS 2|45 0% <Run 2:5.0-6.2 feet,possible core 73%2'5 |loss.Numerous mechanical '4 °J,PL-I,SM,FeOx 9 MW]R4 a Nn breaks.a to to 4 3 ) §sw;R5 g fz] a &- 4 8 yl ' is) Z >NO CORE & 6 2.0 :°io 3]27 |1 0%:924,ee 4 11.1 -20.0 11.1 74%;J,PL,SM,FeOx 10°11.1-12.2 Slightly weathered to fresh NIA feet:Broken (SW-FR),iron-oxide-stained °core, i joints,rehealed caicite joints,o|*'BC om reox on numerous J very close to close spaced >:mechanical fractures,dark greenish gray fractures with zones of red tint,NO CORE medium grained,strong to @+-d-PL_SM,FeOx 42° -very strong (R4-R5),q DIORITE/FRACTURE ZONE e J,PL-l,SM-R,Ca 20° NIA | .e J,PL-+,SM-R,Ca 25°a 444}59 ||ea%J,PL,SM-R,Ca 30° -15 88%4 SW |R4 °to |to°J,PL,SM,Ca 36 FR |R5 ®J,PL-U,SM,Ca & y e||J,PL.sM 47 | J,PL-SM,SM,FeOx,Ca 29° Se nae ee{i @ J,PL,SM-R,Ca,FeOx 34°4 3.2 ye5)34 t based |°é J,PL-ST-C,SM,FeOx,20° L 94%Ca 2 |29 915.f :@ (J,PL,SM,FeOx,Ca 55° _| Log continued on next page ine DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureA\DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine€F Golder A-10LA?Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 2 of 19 INCLINATION:-80°4103-95560WATANA2012.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]Cannon3/8/13DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Tatkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1,885,929 8 J-Joint B-Bedding Sener irae:seco fBotte Ep-Epidote.oer uartz @ Axa! =F-Fautt FO-Foliation -C-Curved K-Slickensided Bx-Breccia FeOxiron Oxide Sa-Sand OD Diametral x IG ol zie Yvon GROrhogonal STSepped'Rage Chchbte |Hmnchate some |Soe.e =>2 9 be]Wi %|FR-Fracture Frreguiar VR-Very Rough CaCalcite ML-Sit 3u-Sulphide 24h,QR NOTES e a wi oous TESTSWwfoDESCRIPTION9-73]as DISCONTINUITY DATA z ar a z Tix |2/96 Eu o_|xOx|tox|xxxx WATER LEVELS z a |FelS|oo |Rap |FRACTURES |S¥o TYPE and Fo |SZR/EZEISCRS g[o]2 jue 2 id %PER FOOT aks SURFACE zo ous ez gsre sL290+=°B8gR|avooe ba gh DESCRIPTION 5 |%eeee 2 & 20.0 -23.9 20.0 re |No recovery and core loss 5 15%|from 20.3 to 23.9 feet.= ;Based on recovery from 20.0 1 -to 20.3 feet,lithology inferred 0.0 4 as:Completely to highly 16 } weathered (CW-HW),tan,6 NIA NO CORE clay and gravel sized rock 0%CW a fragments,extremely weak to RO 4 (RO),ALTERED i HW DIORITE/FRACTURE ZONE ||a !Changed drill a ;bit at 22.6 aRun6:No recovery.NO CORE feet 1 |NIA 912.eo PL SMR 622LBS-28 23.9)|27 @ [3 PL SM,FeOx 59° 1 Moderately weathered to 44 e 'pb 7 ou fresh (MW-FR),7 J,PL,SM,FeOx 38 MW |R3 iron-oxide-stained joints,61%to to |25 rehealed calcite veins,close FR |R5 _ to moderate spaced \e J,PL,SM,FeOx 10°'ti fractures,dark greenish ae Rategray,medium grained,weak (7/29/2012): to very strong (R2-R5),e J,PL,SM-R,Med-Coarse 97.MW |R2 0 to 50.3 feet a ALTERED Sa Infill to to (soil and J DIORITE/FRACTURE ZONE SW |R4 rock),11 :N/A hours,4.6Run7:25.4-26.6 feet,broken ;feet/hourcore,possible mechanical breaks '@ J,PL,SM,Ca 11° -in addition to natural breaks.4 Run 8:Clay seam with 00°to 04°NIA|. dip w.rt.core axis.From 6 i -29.1-29.8 feet,highly weathered 32 3 HW |RO 4 _.|(HW),light green,extremely weak 8 "0%|to to s (RO),clay and core loss 81%3 NIA i FR R4 £ a & &4 oO NO CORE °906.2 l-39 |-€}298-402 4 |29.8 _| a Moderately weathered to ae-|fresh (MW-FR),* or)=-..v7]|iron-oxide-stained joints,=\18x|rehealed calcite joints,very \24 Be-@|close to moderate spaced i 9 0%.4 E |fractures,dark greenish aN 75%af8|gray,medium grained,weak 'to strong (R2-R4),Ly L ALTERED DIORITE NN 4 4 \ Run 9:Broken core,mainly S NIA | inferred as mechanical breaks a \I NO CORE L N 4 A=\ NY "a L oy 4 S 41a50 @ |J,PL,SM-R,CL 86° aN 10}""|(64%Mw |R2 | .to |to 435a\82%FR R4 aN @)|J,PL,SM,FeOx 45° A i=\i a Ss 4 At i f=\' S |: a | L N 4 i=Y \ A -=@ |J,PL,SM-R,Ca,FeOx 56°+ sy 4 42=11 .73% L-A '95%ad J,PL-C,SM,CL 33° q oS A=\ N- 40 - : - 4Logcontinuedonnextpage -',DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiEEGoldDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igurefap,FOleer A-10Associates RECORD OF DRILLHOLE DH12-6 SHEET 3 of 19 ECannon3/8/13312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 ; DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 ___E:1,885,929 Bo y : .Shay Infilling .'y-Pyrite @ Axal 9 a eo rere Be'roc eperae,,dete |Openersxriro|@ le Ven ORSrhogonal 8srUpdating RRow Chchirte He cetatte sion boeere3QO)A |B)&Fre recur equar VR-VeryRough CaCakie ML-Sif Susupnide |25H RB NOTES Ww |e DESCRIPTION 29 73]28 DISCONTINUITY DATA =ase TESTS a |z z |x |2156 =ox x|tox|«xxx WATER LEVELS S @ |Fo 68 |RQD |FRACTURES |E¥o TYPE and Q |SSH\/ESSABSS o =|u=|5]}2)%|Perroor |29%SURFACE ag (2e2/gE2|82n0 fLao12ic)x agsglavowe paged DESCRIPTION e715 esse gy x 895.9 40.2 -45.1 40.2 4Slightlyweatheredtofreshtvl42(SW-FR),iron-oxide-stained 11 :73% a joints,rehealed calcite joints,95% 4 very close to close spaced °FR |R5 fractures,dark greenish os gray,strong to very strong 06 ine a (R4-R5),DIORITE 12}06 0%.a /wt a 100%i°J,PL-U,SM-R,Ca,FeOx 42° . e J,PL,SM,FeOx,Ca 30°Changed drill - 4 bit at 42.6 422feet. 43.4 feet:In-situ calcite vein,43°|13 *64%SW]R4 dip w.r.t.core axis,0.25-0.5 7 88%to to i inches wide,calcite crystals to °FR |R50.06 inch size.43.4-44.4 feet ° numerous mechanical breaks.7. °J,PL-U,CL,Mi,Med.Sa 0 @ |J,PL,SM,FeOx 55° t 45 891.@ ||J,PL,SM,Feox 30°4 45.1 -46.7 : 45.1 oe 45.1-46.7 Completely to highly "NIA feet:Broken weathered (CW-HW),dark 2.4 3 cw |RO core,natural a greenish gray to orangish 14 25 16%}to to an 4 light greenish gray,medium 7 /HW |R4 mechanical to sand sized,angular,96%3 breaks extremely weaktostrong,:889.5 =NIA inferred. ERED DI rocl 46.7 2 -|fragments,FRACTURE |ZA 889.cw |Ro 4 ao 3 J 47.2 @ ||J,PL-U,SM,FeOx 22° 7 - 47.Run 15:Completely weathered (CW),@ |J,PL,SM,Ca 58° L iron-oxide-stained contact at ,:arnen core 4 _.||46.7 feet with 68°dip w.r.t.Ad J,PL-C,SM,Ca 14°fect@||core axis,close spaced 3.0 SW |R4 a @ ||fractures,light tan,clay to 15|21 |fg50%,®|J,PL-C,SM,FeOx,Ca =63”to |to breaks on a &||coarse gravel sized,CLAY :°FI&||SEAM/SHEAR ZONE 97%@ |J,PL-C,SM,FeOx,Ca 54 Ry]R8 reeled as 7 og|472-503©]Slightly weathered to fresh |(SW-FR),iron-oxide-stained--50 1.4]joints,rehealed calcite joints,886 + "+very close to close spaced3||fractures,dark greenish gray 50.3 NIA Hole g with red tint,medium {NO CORE advanced to _=|grained,strong to very 1.0 :'FR |R3 50.3 feet on2||Strong (R4-R5),se}19 ||on.to |to 7/29/12.Drill 75DIORERACTUREZONE, bit changed oO}s53-620 53%:MW |R4 at 50.3 feet. i Moderately weathered to Boe6:| fresh (MW-FR),jointed,é ie on coreclosespacedfractures,dark feat *ferredreddishgray,medium NIA at A endgrained,medium strong to nal oho an -strong (R3-R4),ALTERED bres alle 4 DIORITE/FRACTURE ZONE reaKs. NIA L J 0.0 5.0 NIA 17 N/A NO CORE 55 Run 17:No recovery,driller 0%_ indicates encountering zones that were harder and easier to drill NIA NIA e 1 r 24 @ ||J.PLA,SM-R,FeOx 35°q --R3 Run 18:Broken core 57.2-58.0 18 2.3 4,PLA,SM-R,FeOx FR |tofeet,58.6-60.2 feet,and 60.7-62.0 -to |R4feet,inferred natural and 91%Mw 5 mechanical breaks.From 4 61.2-62.0 feet,clay and angular |NIArockfragments 1 t t 19 [50%||jo J,PL+l,FeOx 10° y_80 --continued on next page a 7 DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiY"Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine NerPYGolder,103-95560WiDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 4 of 19 INCLINATION:-80°ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.803 _E:1,885,929 a yy ' .Shay Re ui Infilling .Py-Pyrite @ Axai 8 Pea fgets,Scie SEE Re,Birth,SES |Soaresximol?le wen OR Oaegenal Seen Brewer Chehorte Smrtttatte stom?baer.Fe =fe}Z Ww %|FR-Fracture kimegular VRVey Rough CaCakte MUSit Su-Sulphide zs ae NOTES u 1o DESCRIPTION eo KJ 2]ee DISCONTINUITY DATA x aapé TESTS a |Z ZF /E_|2|99 =5-eisxl|tox|= xxx WATER LEVELSZz®Fels]OO}RAO |FRACTURES |2H TYPE and 2,|S2e E2S|AseS ,Oo 2 |w=|5)ye)%PERFOOT |29%SURFACE $9 /GeZ/PEzZ/8ins 8604°he gge2|aveoe bag DESCRIPTION §|eee Bz 50.3 -62.0 ; Moderately weathered to fresh (MW-FR),jointed,21closespacedfractures,dark 25 R2 -reddish gray,medium 19)™50% :FR |to 4 grained,medium strong to 84%|@ (J,PL,SM 50 to |R4strong(R3-R4),ALTERED A MW DIORITE/FRACTURE ZONE a (Continued)874.4 :d 620-672 62.0 @)J,PL,SM 78°-- __| ror ade gtained joints.:J,PL-C,SM,FeOx 61° ,i 2rehealedcalcitejoints,very !é |J,PL,SM,FeOx,Ca 28°5 close to close spaced ar ,e@/7 PL SM,FeOx 18°7 fractures,dark greenish gray 20}2 46%J,PL,SM,FeOx 75°with zones of red tint,100% 7 J,PL,SM,FeOx 36 medium grained,strong to 00% tr very strong (R4-R5),7 2 4 DIORITE#FRACTURE ZONE @ |[¥.PLU,SM,FeOx,Ca 30 Re|FR to |65 @ ||J,PL,SM,FeOx,Ca 27°RS _|e J,PL,Ca,FeOx 21° 24 «J,PL,SM,FeOx,Ca 26° _21 '56%4 84% r 869.i 7 67.2 -77.0 67.2 | Moderat thered tWeKirRyweameredt |J@ ||4,PL,SM,Fedx 22° -iron-oxide-stained joints,°4 |rehealed calcite joints,very 24 i °J,PL,FeOx " §close to close spaced 22 73% fractures,dark 96%° |&greenish-reddish-whitish °©|J,PL,SM,FeOx,Ca 45 qQ|gray,medium grained,§medium strong to strong MWo|(R3-R4),ALTERED ¢|DIORITE/FRACTURE ZONE to |-79 3 FR _l N 3 Run 22:Numerous mechanical 24=|breaks 23 26 75%e J,PL,SM,FeOx 41° -@]Run 23:Numerous mechanical ° 7 5 |breaks 90% ° i a Run 24:Broken core 72.2-72.9 ° q feet and 73.6-75.1 feet,natural &ef |[¥:PL SMR,Ca 39°and mechanical breaks inferred.i J,PL,SM-R,Ca,FeOx =25 2 Drilling Rate 4 29 :R3 (7/30/2012): 2.9 50.3 to 95.52438%i,feet (rock), w 100%:11 hours,4.1 - @ |J,PL,SM,FeOx,Ca 61°feet/hour ad J,PL-C,SM,FeOx 5° t-75 = sw 4 \ 7 2 toeJ,PL-C,SM,FeOx 15)FR L 859.7 'tl 77.0 -87.3 \[77.0 48 7 Slightly weathered to fresh by _| ; . (SW-FR),iron-oxide-stained [\"25}59 ||i74%Run 2 rejoints,calcite rehealed joints,1 95%numerous _-very close to close spaced L 'mechanical 4 fractures,xenoliths (fine or breaks.Atgrained),dark greenish gray (77.0 feet.wit aon erainceaa ium L '@ |J,PL,SM,FeOx 55°gradational strong to very strong an ferreted | (R3-R5),DIORITE |s @ |J,PL,SM,FeOx 60°between _"7 °J,PL,SM,FeOx,Ca 33°altered aiorte1}i an lorte;_80 Log continued on next page T aS DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiA\z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igurePAolderA-10AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 LOCATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1935.5ftCOORDS:_N:3,225,803 __E:1,885,929 SHEET 5 of 19 INCLINATION:-80° AZIMUTH:55°ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]a Ty;Shape nfilling Py-Pyrite @ Axal °J-Joint B-Bedding PL-Pianar PO-Polisned Bt-Biotite_Ep-Epidote Qtz-Quartz " F-Faut FO-Foliation -C-Curved K-Slickensded Bx-Breccia FeOx-lron Oxide Sa-Sand O Diametal=:$H-Shear CO-Contact U-Undulating SM-Smooth CL-Clay G-Gouge se-Sericite EAM=w oO ivf [og >V-Vein OR-Orthogonal $T-Stepped R-Rough Ch-Chiorte =Hm-Hematite Silica Zz a eS NOTESFelsS|ais %|FR-Fractu Eirregular VRVery Rough CaCakite ML-Sitt 3u-Sulphide 5698 TESTSwuloDESCRIPTIONgr2/es DISCONTINUITY DATA xz |, asP So z ZT iz |2/98 =ou x |tox|x xxx WATER LEVELS =aQife lore)RQD FRACTURES |Ra TYPE and =os in]Ez gia SN52jut/5|BP]%PERFOOT |39%SURFACE 28/222 (G22 /8en5 880iro|o |Bgeg|ar0ooe Pag DESCRIPTION e-1 5 peso gy © 77.0 -87.3 y t "|y|[¥,PL.SM,Ca,FeOx,CL,395Slightlyweatheredtofresh7.M (SW-FR),iron-oxide-stainedjoints,calcite rehealed joints,[|!2.0 @||J,PLC,Ca,Feox 35° D very close to close spaced >26|21 |Iso%@ J,PL-C,SM,FeOx 31°4 fractures,xenoliths (fine 4 le |).PLU.SM.Feo.70°grained),dark greenish gray I 95%:>|)PL SM Feo x a2withzonesofredtint,'VFL,OM,x LL.medium grained,medium 7 4 J strong to very strong i(R3-R5),DIORITE \(Continued)7.e J,PL,SM,FeOx,Ca 25° a fl 4 >||J,PLC,SM,FeOx 43°a33n ¥ 7 R4 10/1/12;VwP |FR to z '43 @ (2:PL,SM,Broken Rock -ges RS 4 (4 43 Infill ,27 58% \100% L 85 7.@||J,PL,SM,FeOx 48°am |@||J,PL,SM,FeOx,Ca 40° ' '| EB 87.2-90.2 feet:Core axis parallel \|7 joint infilled with caicite up to0.1 [|@|J,PL,SM,FeOx,Ca 72°b|inches thick,with several ' secondary cross-cutting joints {e J,PL,SM-R,Ca,FeOx 25° -N »PL,,Ca, | 7 4849.e 2 873-802 873 J,PL,SM,FeOx 38' Slightly weathered to fresh a (SW-FR),close to moderate 3 J spaced fractures,dark ss r 7 57°S greenish-whitish gray,strong 28 37 86%J,PL,SMR,Ca R4 $|(R4),ALTERED 97%&]DIORITE/FRACTURE ZONE ° r le 847.1 . 1 ©]89.2-94.9 89.2 e J,PL-C,SM-R,Ca,FeQx 41 &|Slightly weathered to freshc|(SW-FR),iron-oxide-stained- 90 |(4 joints,rehealed calcite joints,= w |close to moderate spacedoffractures,dark greenish gray @.(J,PL-C,SM,FeOx 45° with zones of red tint,e i =|medium grained,strong to 19 @||J,PL,SM,FeOx 4 SW 7 2]very strong (R4-R5),29|2.9 &&DIORITE/FRACTURE ZONE 95%e J,PL,SM,FeOx,Ca 18° R4 'e||J,PL,SM,Feo:50°to 1 MN RS Changed driftodJ,PL,SM,FeOx 35°bit at 92.2 feet. i ®||,PL,SM,FeOx 36° Run 30:Broken core,numerous 27 ° mechanical breaks.30|33 €J,PL,SM,FeOx,Ca 27 t 82%e J,PL-C,SM-R,Ca,FeOx 15° 842.4 -95 94.9-95.5 94.9 CW 4 Core toss,unit inferred as Zin |NO CORE \to }ROcompletelytohighty955NIAHW Hotweathered(CW-HW),calcite .oe edt |and iron-oxide stained joints,aevare Ce J clay,fine to coarse gravel rr et onsized,extremely weak (RO),0/12. INFILL/FRACTURE ZONE :e J.PL-ST,SM,FeOx 5° a 95.5 -98.9 3.4 oh sw |R4 J Stightly weathered to fresh 31 3.4 32%to to Run 31: (SW-FR),iron-oxide-stained :FR |RS 96.3-97.3 joints,rehealed calcite joints,100% 3 feet,in-situ close to moderate spaced ®|J,PL-C,SM,FeOx 65 joint 05°dip -fractures,dark greenish gray w.rt.core 4 with zones of red tint,le!|J,PL,SM,Feox 45°axis medium grained,strong to °J.PL.SM-R,Ca,FeOx 34°very strong (R4-R5),838 oo o- |.DIORITE/FRACTURE ZONE 98 9 :J30MW|R3°:t toa!@ |4,PL,SM,CL 60°sw |Rd 100 91%@ |J,PL,SM-R,FeOx,Ca 86.7"a Log continued on next page =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fiqure=G Id.DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine g =Golder A-10 103-95560WAssociates DRILLER:T.Fisher CHECK DATE:1/9/13 3/8/13ECannon103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 6 of 19 INCLINATION:-80° Associates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 __E:1,885,929OoTypeRiInfillingPy-Pyrite @ Axalre)J-Joint B-Bedding PO-Poiished Bt-Botte Ep-Epidote.Qtz-Quartz oO4F-Faut -FO-Folation urved K-Slickensided Bx-Breccia FeOx-lron Oxide Sa-Sand Diametral x |i g|2 le Vven”OR-onhagonal Si-Sepeed Rikon hGhbrte Hmritette Sai'|SOFeo|s CO)Ae)&|rFracture VR-Vey Rough Ca-Calcte' ML-Sit Su-Suiphide |2S wogesWw 1lo DESCRIPTION f<)==bd y DISCONTINUITY DATA =a WATER EVELSZ&|Fe|Z|/83]rao |Fractures TYPE and 2,SPS)E25)5 SkK 5 eije-i5|Bi %PER FOOT SURFACE 29/222 (82 |S tan400aoO4B8gR|avons DESCRIPTION x 5 ose 98.9 -122.2 : Moderately to slightly i weathered (MW-SW),t o iron-oxide-stained joints,3.9 at ty 'or Sty neers ca 2 Mw-clay-infilled joints,close to 32|3:3 |bogs t °ree x,Ga. to Run 32: 4 wide spaced fractures,dark S |i J,PL,CL 28°SW Broken coretannishgraywithzonesof91%: : ROD ' red tint,medium grained,:estimated &medium strong to strong visually at 20 4 (R3-R4),ALTERED i ventDIORITE/FRACTURE ZONE J.PL.SM,FeOx 6o°-pet (Continued),PL,1 J,PLC,SM,FeOx 3° | 34 .33 3.2 63%J,PL-l,SM-R,FeOx,Ca 29' 5 97% | J,PL,SM-R,FeOx 17° r 105 4 @/J,PL,SM,FeOx,Ca 74° J,PL-C,SM-R,FeOx,Ca 27° f 43 J,PL,SM-R,FeOx,Ca 70°\R3 1 4.3 to4100%aie @}J,PLC,SM-R,FeOx,Ca 747 |R4 _-'0 4 =®|J,PL.SM,FeOx,Ca 63°sw 3 to E FR a a Run 34:Broken core 109.1-109.7 7 2 feet,natural and mechanical9breaksinferred.At 108.4 feet,°in-situ joint,11°dip w.r.t.coret440&axis,rough,iron-oxide-stained,4 |partially open to open 'J,PL,SM,FeOx,Ca 50° -3s :J,PL,SM,FeOx 50° a a A =35|25 |lea%J,PL-C,SM,FeOx 32° i @|Run35:Broken core 109.7-110.4 7 '|feet,natural and mechanical 100%8&|breaks inferred. J,PL,SM-R,FeOx 26° -J,PL-ST,SM,FeOx 51°7 J,PL,SM-R,FeOx,Ca 38°Drilling RatefF7/3142012):4 28 "BS J,PL,SM,FeOx,Ca 21°es to 188 Run 36:Broken core 114.3-114.8 36)23%J,PL-C,SM,FeOx 48°feet (rock),7feet,natural and mechanical 96%=Ours,&. a breaks inferred.In-situ caicite feet/hour 4d veins 0.1 to 0.5 inches wide.J,PL,SM-R,FeOx 25° 115 F J,PL,SM,FeOx,Ca 85° @J,PL,SM,FeOx,Ca 84°---_ | J,PL-ST,SM,FeOx,Ca 30° ,49 |.| 37 49 76%J,PL,SM,FeOx,Ca 69 FR |R4to 100%|R5 J,PL-ST,SM,FeOx,Ca =77°- _| J,PL,SM-R,FeOx 37° a :J,PL,SM,FeOx,Ca 66°7 400 38 |44%]pod @|J,PL-U,SM,FeOx,Ca 74°}___|Log continued_on next page ae DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiADRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure2)Golder a A-10 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 DATUM:Ground Surface ELEVATION:1935.5 ft SHEET 7 of 19 INCLINATION:-80° AZIMUTH:55°ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1,885,929 5 Shape Roughness Infilling Py-Pyrite @ Axalfe)J-Joint B-Bedding PL-Planar PO-Polshed Bt-Broiite_Ep-Epidote Qtz-Quanz =F-Fautt FO-Foliation C-Curved |K-Siickensided Bx-Breccia =FeOx-lron Oxide Sa-Sand O Diametral E Pe ee ge=els 9)SB]&|FRerecue Pimeguar_VR-VeryRough CaCakte MLSit su-Suiphie |Shin B NOTES wu |o DESCRIPTION gk 2|e¥DISCONTINUITY DATA =ase TESTS fa)x=>is WATER LEVELSzz/Es|2/88]rao |Fractures |Evo 1 Q KON EQ |SSXox<q |/2e\z a py ox PE and Zo |8Za(|<24 ene 8rol@|u=|3)2 %PERFOOT |20%SURFACE Fas}eZee BonnL-1204".-B8¢e|wv eee Pa DESCRIPTION S|&eeEe fs 98.9 -122.2 Moderately to slightly @)(J,PL-C,SM,FeOx 38° weathered (MW-SW), iron-oxide-stained joints,23 . -clay-infilled joints,close to 38)25 |b44%°J,PL,SM-R,FeOx 7 sw Run 38: 7 wide spaced fractures,dark to Brok.%roKen coretannishgraywithzonesof100FR. :.:120.75-122.2Tedtint,medium grained, :feet,naturalYegacreneo815.@)|J,PL,SM,FeOx 47 and 4 (R3-R4),"1224 °mechanical;DIORITE/FRACTURE ZONE [|\°/122.e ||,PL.SM,Feox 22 mecha(Continued)/.]inferred. a 122.2 -146.5 |@)J,PL,SM,FeOx 74° _Slightly weathered to fresh \ (SW-FR),iron-oxide-stained §-f_/_|24 e||J,PLL SM.ca 44°joints,rehealed calcite joints,39)23 |is7%,a- FR 123.4 feet: close to moderate spaced \!9 Zone of -fractures,xenoliths (fine 7 86%in-situ calcite 4 grained),dark greenish gray 4 veining,with zones of red tint,{approximatelyfelsic/quartz intrusions,\0.75 inches L425 medium grained,medium (oo wide _| strong to very strong |1 (R3-R5),DIORITE \ vl @ J,PL,SM-R,FeOx §2° -I J N 7. |di J,PL-l,SM,FeOx 33° F >48 @||J,PL,SM-R,FeOx ar 4 ]40}48 |lr @||J,PL,SM,FeOx 36° 'o od Run 40:Broken core 127.7 to N 5 ®|J,PL,SM,FeOx,Ca 63 129.8 feet from low angle D 100% -fractures,inferred mechanical - _.|breaks.{e J,PL,SM,FeOx,Ca 9° o N sw oO /.]di J,PL,SM,FeOx 33°to g FR : e .f @ |J,PL,SM,FeOx 49° 8 os i °I fL439||129:8-131.25 feet:JN ns Hole ||Core-axis-parallel fracture,00)/.RS advanced toNdipw.r.t.core axis,planar-curved,1429.8 feet on63|smooth-rough,iron-oxide-stained |734M2gandrehealedcalcitejoints.24 . L.>4 141]244 100%4 =|° :.400%@!|J,PL,SM,FeOx,Ca 44 3 7. .\4d '@!|J,PL,SM,FeOx 43° v4 ®||J,PL-C,SM,FeOx 43° |@)J,PL-C,SM,FeOx 72° \ F /| 4 i \e J,PL,SM,FeOx 41° a 7-@ |J,PL,SM,FeOx,Ca 47° 4d \ \47 "4 Jaz}9 |i38%. FR r-135 .!94%e J,PL,SM,FeOx 22 | ne e |(J,PL SMR,FeOx 16° \ > =s v4 \ \ s \'+4 ! 'N 7. \s J,PL-C,SM,FeOx 38° F .!®|J,PL,SM,FeOx 65°4 t 7 Fr sw Run 43:Broken core 137.2-137.8]*\43/>73%to feet,interpreted as mechanical FR -breaks '94%- v4 { N I 140 . or LU 4 Log continued on next page =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fiqurer.\¥:Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine gPEA-10&,103-95560WiAssociates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 8 of 19 INCLINATION:-80°ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB{ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3.225.803 _E:1,885,929 T i PmaWontB-Bedding BUPona oBcined BrBette Ep Epidote Goda |OMe4F-Fautt FO-Folaton -C-Curved K-Slickensided @x-Breccia. FeOx-Iron Oxide Sa-Sand O Diametral x |b o|2 le Yvon GRSnhogenal STSepped RRowh -Ghéhknte Hmtesatte Sees?|bap-2 oO}4 wl &|eRFracture osonat VRvey Rough CaCacte MLSit™3u-Sulphk 2258 NOTESteSsSgidwoiairmegui'ery Roug!a-Calkite L-Sitt u-Sulphide real 2 a TESTSa 10 DESCRIPTION 9-2/2 DISCONTINUITY DATA zi,aoro(2 FIE_121881 rao |rractures |va 3 xbx|tox|x xxx WATER LEVELS ina ae/2/°9 %Fao TYPE and Zo [82a <E8|o ano5éwm)3 a %PERFOOT |29%SURFACE so rz waz BrnoL440aoOsagea|nv0cow?bg oh DESCRIPTION s 7 eexze 122.2 -146.5 LC "TT |,J,PLC,SN-R,FeOx,Ca 0” Slightly weathered to fresh ty _|'' (SW-FR),iron-oxide-stained \' joints,rehealed calcite joints,.l 47aclosetomoderatespaced43 73%4 fractures,xenoliths (fine ion oa%3%)ae 18grained),Gar ovens gray |°@)J,PL,SM,FeOx,Ca 73°P- _]|Core-axis-parallel a felsic/quartz intrusions,rv in-situ joint q medium grained,medium \ \strong to very strong N : (R3-R5),DIORITE L |(Continued)| E (@ |J,PL,SM,FeOx 58°4 iN i |i ros i i}io i}||sw |Raie©.J,PL,SMR,FeO °fo |feaRun44and45:Broken core L .43 »PL,SM-R,x,Ca 78°--_|eR |R5 4 146.3-146.6 feet,natural and on a4|43 63%mechanicai breaks inferred.||'100%|Driling Rate 445 r,7d e J,PL,SM-R,FeOx 19°(8/1/2012):4 |@ |1J,PL,SM-R,FeOx 36°129.8 to \159.4 feet ie @|[J,PL-C,SMR FeOx 42°(rock).379 .\l feet/hour 7 r 7 4791.2 :146.5 -154.1 146.5 O07 ||NIASlightlyweatheredtofresh45|07 0%; 5 (SW-FR),iron-oxide-stained |_|rE 7 joints,rehealed calcite joints,46 100%]"100%4 Installed new very close spaced fractures,Tr 04 >>drill bit at xenoliths (fine grained),dark 0.3 147.2 feet. Z greenish gray with zones of 4 _ |fred tint,felsic/quartz 133% &|_intrusions,medium grained,22 .MW |R3@|medium strong to very 47)2.2 ||0%to |to i |strong (R3-R5),SW |R4O|DIORITE/FRACTURE ZONE 100%7 ©fo) oO sc Run 45:Broken core 146.5-147.2--150 |4 |feet,natural and mechanical 4 N breaks inferred.aa 3 1s "h uw!RO 149.7-150.2 =-oy feet: B |Run 47:Broken core,numerous 48 18%ai I tr bs 1.5-inch-wide Y §|natural fractures.60% ; :zone of oO :>>MW-HW, medium sand a Run 48:Broken core,numerous Z 7 to fine gravel 7 naturai fractures,1 ft core loss.sized,R2-R4, ALTERED 1 aa DIORITE i Run 49:Broken core,numerous 49 19 0%.sw RS 7 natural fractures.R489% -783.0 4 154.1-170.1 \.[184.4]° Slightly weathered to fresh r 7 J,PLC,SM,FeOx 6 (SW-FR),iron-oxide-stained \ ; a joints,rehealed caicite joints,4 ° _]185 very close to moderate '26 ,BL mv MegOx fae Felsicspacedfractures,xenoliths 7 50 28 " on 'intrusions at (fine grained),cat greenish |46%156.2 feet gray with zonesof red tint,N 93%;0 (0.4 inches -felsic/quartz intrusions,r 7 ° 'J,PL,SM,FeOx 46°wide)and 4 medium grained,medium |4 J,PL,SM 39 156.45 feet strong to very strong \'{1 inch wide), (R3-R5),DIORITE aa |R4 tan with red a \ \FR to tint,; 4 \i @ |J.PL.SM,FeOx 59°R5 approximately t 7 |J,PL-C,SM,FeOx 63°Se Palais\i : !24 1 i ° a Run §1:Broken core \511 25 ||aq%+@ jd,PL SM,FeOx 52 Hole q 158.25-158.6 feet,natural and '|e J,PL,SM,FeOx 40° mechanical breaks inferred.|96%aaa cod toMW-SW,coarse sand to anguiar |_.4 feet on a fine gravel sized,DIORITE rock 8/1/12.Newfragmentsomdrillbit 4 159.8 feet:In-situ quartz vein {installed at with red tint on margins,32°dip \{52 |Q3 83%;|159.4 feet. +60 w.rt.core axis,0.5 inches wide fF /_|53 0.3 |80% Log continued on next page 7 -+=DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.LY'Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine IN 40.DRILLER:T.Fisher CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-6 SHEET 9 of 19 DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 ___E:1.885.929 a Shape Roun!Infilling Py-Pyrite @ Axalro)J-Joint B-Bedding PU-Planar PO-Polishe Bt-Biotite Ep-Epidote Qtz-Quartz D =F-Fautt FO-Folation c.urved K-Siickensied _8x-Breccia FeOx-lron Oude Sa-Sand O Diameval z |e Ae ee eg==°ad uw 2 |FR-Fracture irregular vey Rough CaCakite -ML-Silt Su-Suiphide 20 ES NOTES Ww 16 DESCRIPTION Q 42]28 DISCONTINUITY DATA =ae TESTS [o)z =/E_|Z|98 Eu oO xox Zox|xxxx WATER LEVELS z a2 kel|>|oo RQD FRACTURES Bye TYPE and Fo |Sz28 ean NBN 1ie)iw)35)2 %PERFOOT |292 SURFACE 29 |2ezZ/8R2Z (Senn &|s60-42 6 ca gegslaecoe Pas DESCRIPTION eG eos2 9 x 154.1-170.1 wi 83% Slightly weathered to fresh t vl @/J,PL,SM,FeOx 7”bh](SW-FR),iron-oxide-stained \ joints,rehealed calcite joints,|23 -very close to moderate '53|2-5 |I gq,«J,PL,SM,FeOx,Ca 23°4 spaced fractures,xenoliths v7 4 ° (fine grained),dark greenish |92%@||,PLC,SM,FeOx 40 gray with zones of red tint,N 1 felsic/quartz intrusions,p 7.| medium grained,medium strong to very strong \At(R3-R5),DIORITE t 7.14(Continued)i 54 73%@ |J,PL-C,SM-R,FeOx 45°R4 -|100%|be 4 Run 84:Broken core ie e|||J.PL,SMR,Feox 45° 163.15-163.5 feet,natural and | I mechanical breaks inferred.'19 4 os ; e J,PL ° \55 2.2 32%,PL,SM,FeOx 20° |S 86%e J,PL,SM,FeOx 29 ER i 165 "4 J,PL,SM,FeOx 9 4 I NX Ly | | \ \@ J,PL-C,SM-R,FeOx 23° 2 \| |rd J,PL,SM,FeOx 31° an J,PL,SM,FeOx 25° a L'@ |J,PL,SM-R,FeOx 51°| aa \ ,44 @||J,PL,SM,FeOx 44 \4.6 i L 56 70%L RS Drilling Rate J \96%|(8/2/2012): >|159.4 to ov ry 176.1 feet €4 (rock),5.75 t a hours,2.9 4 ©>feet/hour e t 7 |8 vO @ ||J,PL-C,SM-R,FeOx,Ca 17° L170 |$\_4768.= "A 170.1 -177.4 #170.4 e J,PL,SM,FeOx,Ca 41°os |Moderately to slightly a NIA &|weathered (MW-SW),=}iron-oxide-stained joints a y 2.4 »eOx,C.° I |rehealed calcite joints,close +\57|21 |157%J,PL,SM-R,FeOx,Ca 33 Mw |R3 Run 57: 7] '5 |to moderate spaced H °to to Broken core O|fractures,dark =100%e J,PL,R,FeOx,Ca 9 FR |R4 170.25-170.5 tannish-greenish gray,feet,natural of medium grained,medium a \and 4 Ss strong to strong (R3-R4),\mechanical 3 ALTERED DIORITE H ° breaks =@|(J,PL-ST,SM-R,FeOx 48)inferred. Cc YS er "iy ®||J,PL-U,SM,FeOx 33°7 &NreA @ ||u,PL,SM,FeOx 26°=!36PoS |iy a 58]>9 ||79%2 ne 92% a z o @||J,PL.SMR FeOx,Ca 35°oy 175 _| 2 4<)Run 58:Broken core 175.8-176.1 x @ |J,PL,SM,FeOx,Ca 57 *feet,natural and mechanical Cy * ar breaks inferred.=4 S S 59|22 |ha NIA NO CORE |te Hole ca)a [° }05 tr bi advanced tobs=04 @|13,PL,SM,FeOx wr 176.1 feet on Sr A o%J,PL,SM,FeOx 8°Breit2.4 z 4760. $177.4 -196.2 .W774 Ld J,PL,SM,FeOx 37° (4 Slightly weathered to fresh t J e J,PL,SM,FeOx,Ca 32°Sr (SW-FR),iron-oxide-stained |\3.2 ; _ a joints,rehealed calcite joints,.l 60|35 ||]o0%Run 60: a close to moderate spaced L |. Broken core fractures,dark greenish gray os 90%@ |J,PL,SM,FeOx,Ca 57 177.45-177.8 > <; \i feet,natural6|with zones of red tint,|. qNimediumgrained,strong to \rs and s very strong (R4-R5),r 7 i mechanical DIORITE \ey db da @ |J,PL-t,SM,FeOx,Ca 59°breaks |;|j inferred. 180 . L Li |4 -continued on nextpage=DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Figure8WcIdDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine g :older A-108PYGolder... PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 10 of 19 INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 __E:1,885,929 7 - 8 Ad joint B-Bedding Fr lanar PO.Bolsned atte Ep-Epidote.Cede @ Axal =F-Faut FQ-Folation -C-Curved K-Slickensided Bx-Breccia. FeOx-Iron Oxide Sa-Sand 0D Diametral x 15 g|zle Ver”OR-Onhogonal StStepped”Rough Chetite Hmficrate sane”|5OP =Pe 2 9 Z W %|FR-Fracture Firreqular VR-Very Rough CaCakite ML-Sitt 3u-Sulphide 280 a NOTES Ww 106 DESCRIPTION Qk Ss]ge DISCONTINUITY DATA x aap TESTS a |Z z=iZ_|2|96 €oH ykx|tox|xxx WATER LEVELS S &jes Oo |RAD |FRACTURES |S¥o TYPE and g,,[SSR/ESH ASFA y, o @|u=)3/2)%PERFOOT |25%SURFACE 28 |2¥2/8e2 Siro f|go"8 =gaea|v+oee Peek DESCRIPTION 5 |ease 2 kz 177.4 -196.2 i : Slightly weathered to fresh L YI ||||@ |J,PL,SM-R,FeOx,Ca 61° (SW-FR),iron-oxide-stained \\e J,PL-C,SM,FeOx 34° joints,rehealed calcite joints,|21 | |®J,PL,SM,FeOx 36° -close to moderate spaced L '61 2.1 48%|q fractures,dark greenish gray |\°7 °with zones of red tint,I 100%|||.||@ J,PL,SM,FeOx 18 medium grained,strong to \e J,PL,SM,FeOx,Ca 33° a very strong (R4-R5),r" ;J DIORITE (Continued)an \ L ,_||Je J,PL-C,SM,FeOx 16° i \ ; t @ 1J,PL,SM,FeOx 50° 4 >@|J,PL,SM,FeOx 38° VO 1 J i Run 62:Broken core 186.9-187.2,'7 feet,natural and mechanical ,5.0breaksinferred.I 5.0»62)79%°J,PL-C,SM,FeOx 3x -185 ie 100%+ \ NX 'on ItL]4 \FR |R4 7.4 to \ , |R5 |@ (J,PL,SM,FeOx 54° y Run 63:188.8-190.3 feet:In-situ}';7 calcite joint,06°dip w.r.t.core yo axis,tan clay infill,up to 0.25 |° inches wide,white and red.\°J,PL-C,SM,FeOx 4 a Broken core 189.8-190.3 feet,ry st bd J,PL,SM,FeOx 48° Jturalandmechanicalbreak:|ered Meonanical breans ;J,PL,SM,FeOx 50° g .29 ze ne |63 3.1 85%@,|J,PL-l,SM-R,FeOx 45° ara |94%7 2 | &in ®J,PL,SM,FeOx,Ca 6 :IL19015|s =ai \fod 3 |@ |J,PL-C,SM,FeOx 68° N\F =eo #8 7 &|64)-84%oe @||J.PL-ST,SM,FeOx,Ca 42° 3 L >95%J,PL,SM,FeOx,Ca 13° oF =191.9 feet:In-situ quartz vein,I °4 60°dip w.r.t.core axis,0.5 inches|\®J,PL,SM-R,FeOx 37 wide,clear and white rev. \ ;@ |J,PL,SM-R,FeOx 58° L \ 4 in / |@)(J,PL,SM-R,FeOx 44° | \3.5 |rn /.65 3.6 94%@ (J,PL-C,SM,FeOx 54°SW | |97%to R4 |\° |«J,PL-C,SM,FeOx 25°FR 'on i i f-195 |+4 L '1 ®|J,PL,SM,FeOx 63° 'I i @ |J,PL,SM,FeO 57N* ,PL,,FeOx ° f L 742.e e+7 198.2 -198.0 7 196.2 7:PL SM,Feox 0 SSCompletelytomoderately=e J,PL,SM-R,FeOx 40°weathered (CW-MW),joints cw |Ro-with 10°to 30°dip w.r.t.core \to to an 4 axis structure,close spaced N 34 ji @ |J,PL,SM,FeOx,Ca 55°mw |R2 Drilling Rate Fastatce tust brown wo ee|34 @ |[ULPLC,SMR,FeOx,Ca 25°adnMediumtocoarsesand=r . |sized,medium grained,S 4740.91%Lill 222.2 feet extremely weak to weak yn 198.0 T]:(rock),8 7 (RO-R2),ALTERED =\j i hours,5.8 DIORITE S iy feet/hour 198.0 -199.8 "y sw .Slightly weathered to fresh to |R4 4 (SW-FR),iron-oxide-stained =|/_3.0 ety FR joints,close spaced 738 167 3.0 57%i |,|@ J,PL-C,SM-R,FeOx 47° fractures,light gray,fine to - :3 j -200 ont gray fa |_||i ||| _|Log continued on next page at,DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi"Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure E A-10&,103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}]ECannon3/8/13Associates DRILLER:T.Fisher CHECK DATE:1/9/13 ECannon3/8/13012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 DATUM:Ground Surface ELEVATION:1935.5ft SHEET 11 of 19 INCLINATION:-80° AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 __E:1.885.929 8 Pat B-Bedding Bibiana BovEcished orBce Ep-Epidote Ole Qustz @ Axal =Shee EGcarat Gtang Suen?erica Eeeren Ome $2 oe [ee-o |>Me :T Re 7 n-i bate.z.|#S|S15)x [Pham omen SS Bam Sem fear S|220g NOTES ws 1 DESCRIPTION oH 2|e¥DISCONTINUITY DATA =].aap TESTS ao |Z z=Z|2|98 aT 3x5 |tox|x xxx WATER LEVELS x a |Re/Ss]C9]RAD |FRACTURES |sav TYPE and 2.|aen pean)ASSES wofe]e |W )5)2]%|PERFOOT |20%SURFACE 29 /2e2/G52/8tKe 8oOoaSggslavon?be gh DESCRIPTION eo 5 wore gy fF-200 medium grained,strong 7 199.8 |100%(R4),ALTERED DIORITE =@ |J,PL-C,SM-R,FeOx 60° T7998 -204.2 *Blighty westhored to fresh a rn 3.0 J.PL,SM,FeOx 25°R4 .(SW-FR),iron-oxide-stained N 67|32-9 |I57%aoe swjoints,rehealed calcite joints,|\400%to close spaced fractures,dark =fo '° greenish gray with red tint .!@ ||J,PL,SM-R,FeOx,Ca 32 FR L transitioning to light gray and a \.Run 67: q rust brown,medium grained,NN Broken core strong (R4),ALTERED v7]201,9-202.2 DIORITE (Continued)=feet,naturalan 5 a R4 i + =|@ |J,PL,SM,FeOx 61°FR |to mechanical202.8-203.0 feet:Zone of more S R5 . felsic,42°dip w.r.t.core axis,a o J,PL-C,SM,Ca 36°inferred. medium grained,Diorite =\'>' -tra4.h @ |J,PL,SM,FeOx 48° 4 "5 204.2 -205.2 "204.2 47 Fresh transitioning to =\5.0 MW |R2 moderately weathered with =F 68 42%o J.PL,SM-R,FeOx,Ca 8°fo to}-205 depth (MW-FR),moderate ©7334 |94%4 4 spaced fractures,light gray P b05 4transitioningtorustybrown,«|Z NIA fine to medium grained,"ZA a strong (R4)transitioning to A J weak (R2),ALTERED CFA DIORITE iz NIA205.2 -219.0 SA Completely to moderately Arweathered(CW-MW),light FA q gray to greenish gray,clayto fz j medium sand sized,FA 08 NIA extremely weak (RO)clay,ZA 69 L weak to medium strong ZA 45%4 _ |(R2-R3)diorite,SHEAR EAA|ZONE/CLAY SEAM with eZ NIA ®|ALTERED DIORITE i §|FRAGMENTS/CLASTS AA | 9 ZBeAe78Le NIA i 14210|iz 40 4 2 20 40 3 35%NIA = a a 4 £ &NIA Zz |e©c)LA MW |R3%Z|NIAZAZA| Z | A NIAFF28rAA73.8 4 ZA 66%NIAAZz t-215 ZA 4 FHAZA NIAZA L 4]4 ZASAee NIA CZ |Zz)ZI NO CORE J ZA NA A 172}59 |FamtAhy 4 LEA fey 4Z58%NIAVEZee i AZAneg. 4 \219.0 sw |Ré"4 |||NAL |to |to |i |\FR |R5 1 220 L 4 Log continued on next page [ 7 =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FigureAY\z DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.ValentineeAGolder A-10 4103-95560WiAssociates DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 12 of 19 INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 ___E:1,885,929 8 Pint B-Bedding PiPner poboened Orble -_Ep-Epidote Gadus |oA! 4 F-Fautt FO-Folation -C-Curved KSlickensided Bx-Breccia. FeOx-iron Oxide Sa-Sand DDiametral x |G Ae ea eTFe2O/a ial &FR ractu osors!Firaguar VlveyRough Cacakte MUSH”SuSuphide z6 2 g NOTES Ww jo DESCRIPTION 2K 42/es DISCONTINUITY DATA x ase TESTS ao 12 EiE_12/98 =3 vx |tox|x exe WATER LEVELSFS@|kelZ}/83 |Rap |FRactures |$¥o TYPE and 2,|S2S/E25 |A SSS[e}&wr)a)%PERFOOT |29%SURFACE ag ee2 O52 |S thn|290 a . SBe8l|n+owel PS DESCRIPTION fa Bo ose Zz219.0-222.5 \29 i ||Run 72: Slightly weathered to fresh t »J 5.0 : 4 Possible core (SW-FR),rehealed calcite \72 8%NIA °rv Pe SM,Fosspie 35°loss of clay joints,close spaced |58%°||chanical real from -fractures,dark greenish L e@|iJ.PL SM 45°216-218.1 7 gray,medium grained,vq 41 PL,SM,Ca 5 SW R4 feet.Broken strong to very strong I 73 1.2 63%@|J,PL,SM,Ca 76°to to core 219-221 (R4-R5),DIORITE \°FR |R5 feet,natural a (Continued)in 7 92%and | hanical7164@|J,PL,SM,CL 71°breaks222.5 -2236 7)22.5 :uo p--- inferred.Highly weathered (HW),light a iy |Hole r red 0.25-inch-thick calcite '7 HW |RO advanced to q vein with 37°dip w.r.t.core a X |r J,PL,SM 39°222.2 feet on axis,close spaced fractures,\1715.3 |8/3/12. light green,clay to medium \223.4 @ |J,PL,SM,CL 63° 5 grain size,extremely weak Ly :4 (RO),ALTERED DIORITE on 223.6 -234.3 |5.0 Fresh (FR),rehealed calcite |,74 5.0 90% a joints,close to moderate 4 e J,PL,SM 40°225 spaced fractures,dark \100%7 greenish gray,medium '@ |J,PL,SM-R,CL 68°grained,strong to very I / -, strong (R4-R5),DIORITE \ .N »: °4 7 !J,PL-ST,SM,Ca 65)_ { N : L Wea a '4 | NN Vv 17 e J,PL,SM,Ca 20° _!75|19 ||e7%7 55)ty 89%°@ \e J,PL,SM,CL 24 R4 3 a N FR to = »roy J 14 |RS Installed new &\ ,76 14 55%drill bit at , o 229.1 feet.€' 9 J,PL,SM,Ca 32° " 230 |3 ral 100%»PLSM, "iPe \«J 25° | |e 4 29 ||oD {.5 \7 95%'@||J.PL,SM 45° oO in a 100% {@ |J,PL.SM-R 47° oT \ ° 7 5 V a e J,PL-C,SM,Ca,FeOx 22 Drilling Rate °i |(8/4/2012): c \222.2 to Sy-rs.e J,PL,SM-R,Ca 30°242.2 feet 4 5 an (rock),6.5 oO \°hours,3.1Wwby|40 J,PL-C,SM,Ca,FeOx =32 feet/hour -.\. 4drm_|1704.878|+9 |75%2 234.3 -236.8 234.3 |sg qoaSlightlyweatheredtofreshby|° x|_(SW-FR),rehealed calcite \ :°of 238 joints,very close to |:e°'Be ati Med.Sa oe Run 78: "7 8 moderate spaced fractures,||vee "SW |R3 Broken core x)light green,medium grained,\os i to to 235.1-236.2 a medium strong to strong {!FR |R4 feet,naturalaI"(R3-R4),DIORITE N +an 4 bel a :mechanical 2 |NIA NO_CORE breaks ®702.'inferred we 236.8 -237.7 x |d o Completely weathered (CW),12-2z-4 5 cW ;RO=light greenish gray,fine A NIA>grained,extremely weak LEANNA >J.PL.SM-R,CL 33°ee [\(RO),SHEAR/CLAY ZONE _/l77 4701.48 7 PL,SHER,Sw&i 237.7-238.0 \238.079]||45%to 7 oa Slightly weathered to fresh by 92%:FR (SW-FR),rehealed calcite vy ° °R4ajoints,upper contact 37°dip |°J,PL,SM 33°toOFwrt.core axis,light '@ @/J,PL,SM,Ca 74°FR 4 ; bing lg L 2.R5Ngreenishgraytransitioningtoom|I yj J,PL,SM,Ca 29 S dark greenish gray,medium |'|ile J,PUI,SM,Ca 20° <grained,strong to very N i | z |540 strong (R4-R5),ALTERED rsd pbb :' 4 E Log continued on next page =DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8DRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure 8 er A-10 Oo lates DRILLER:T.Fisher CHECK DATE:1/9/13 ECannon3/8/13103-95560Wi2.GPJ__LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]RECORD OF DRILLHOLE DH12-6 SHEET 13 of 19 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 ; DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1.885.929oOTypeStapeRoughnessInfillingPy-Pyrite @ Axalfo)J-Joint B-Bedding PL-Pianar PO-Polished Bt-Biotite Ep-Epidote Qtz-Quartz . z F-Fault FO-Foiiation C-Curved K-Slickensided Bx-Breccia FeOx-tron Oxide SaSand O Diametral z (6 o |2 le Viven”GROnhogenal StStepped'ReRough -GhGhRte Hmrehate Segue |bOP =re 2 9 i Wi %|FR-Fracture tiregular VR-Vey Rough CaCakite ML-Silt 3u-Sulphide ss Ps fa NOTES w=|o DESCRIPTION 2K 3/ee DISCONTINUITY DATA =aap TESTS i)Zz z jz _|2|99 =Oy Bx |tox!x vex WATER LEVELS @ aire 3|o9 ROD FRACTURES |320 TYPE and Fae)Fagoany E2S NBON w8@|w=)5)2 %PERFOOT |25%SURFACE ge gue age Sina &|240 a °o @ Sg8gs|anvon®Pe g a DESCRIPTION ©5 pero 2 & [DIORITE Tv :[ 738.0 -253.5 |46 , Fresh (FR),\79 5.0 45%a J,PL-I,SM,Ca 36° iron-oxide-stained joints,|29%:i J,PL,SM,Ca 33 -rehealed calcite joints,very '92%.+ close to close spaced 'on 04 |. fractures,xenoliths (fine \10 \NO CORE iN grained),dark greenish gray,\80;-35%:|||ejb cM 692 a medium grained,strong to a 358%. ;ie °4 very strong (R4-R5),\ ° DIORITE.Core loss \NIA Hole assumed at 241.2-241.8 ty |advanced to feet,and 242.4-243.3 feet.\NO CORE 242.2 feet on a (Continued).!8/4/12.4 rm ! | @ |J,PL,SM,FeOx 52° a N j L | \ |39 |s 81 5.0 59%-.e J,PL,SM 22 =245 'on 78%4 | '\ L || i \ |t 1%J,PL,SM 16°|4 \J,PL-C,SM 27° eo FR |Rai|to a N .R5 4Ie@||J,PL,SM g Run 82.Driller extra helper \os - 20 dropped core when transferring |Nicoretosplitlinertray.Fracture \A a index unknown.RQD estimated fF 7 _| and may be conservative.\ ; 7 o \3 Ly | NIA +&'|4 ®. 50Fs};/wf -8 \a2]5-0 |Fyeg!NIA J,PL,PL-C,PL-U,SM, :.CTEc=\oF +-250 6 L ,100%7 A er 3 1 NIA N=L -D 'on 4 =| &'NIA hd a {4 aN 7 @/J,PL,SM 74° | i 253.5 feet:Contact between rock|-'J,PL,SM 9°7 units,25°dip w.r.t.core axis ,4 685.9 253.5 -250.1 4 253.5 Completely to highly = a weathered (CW-HW),some . q apparent original rock mass a \; intact,close to moderate \5.0spacedfractures,greenish A 83 L 255 gray,clay and fine to =100%= medium sand sized,. extremely weak to very weak a \(RO-R1),ALTERED NN i DIORITE A =CW |RO 7 .to |toAyHW|R1 -a 4 =\aoS: 4 "fp NIA NO CORE a N | J "\43 7 34)59 ||42%' L =680.3 86%i 4 259.1 |sw |R34°J,PL-C,SM-R 12°to |to|FR |R4y 260 Log continued on next page 7T DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi€.Ay4 Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine M410,'DRILLER:T.Fisher :i?Associates CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 14 of 19 INCLINATION:-80° DRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12 to 8/7/12 ELEVATION:1935.5 ft AZIMUTH:55° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1,885,929 a ry .Shape Infiilling By Pymte @ Axialra)J-Joint B-Bedding PL-Planar Po-Polished Bt-Biottte_Ep-Epidote =Qtz-Quartz z F-Fau FO-Folation -C-Cur -Slickensided Bx-Breccia FeQx-tron Oxide Sa-Sand ©Diametral z {5 ola lal .|Yentt Semitinn Gisaumoe Search SoMa Schie Seer®|bopaeao;4 |w &|FRFracture gona Pireguer Unvey Rough CaCacte MLSR®-StSuihide 2258 NOTESae|=a |u|]oous TESTSw--10 DESCRIPTION 9 f=38]#S DISCONTINUITY DATA x ase Oo |2 z j=5|2)]88 Fractures |Eva 9 |x9n |£ou|ans WATER LEVELS z a2 lee/5/09 ae)TYPE and Fe (Sze /eeu |NOLN w[e)ae jw)Ss rd PERFOOT |29%SURFACE 28 |ob9 Bee gy38e 8560a6|Oo |x awvoo?PS DESCRIPTION eB."pore gy x 259.1 -264.4 i Slightly weathered to fresh (SW-FR),reheailed calcite °PL.SM cy joints,very close to 43 |4,PLS 35 a Moderate spaced fractures,g4|5-9 T 4 dark greenish gray,medium ° grained,medium strong to 86%4 J,PL SM 32 strong (R3-R4), a DIORITE/FRACTURE ZONE @ |J,PL,SM-R,Ca 57°sw |R3 4 (Continued)to to . ;°J,PL-C,SM-R,Ca 0°FR |R4Run84:Numerous mechanical .1". breaks.RQD interpreted as poor Z to very poor.J,PL,SM 49°4 Drilling Rate Run 85:Broken core,natural and 24 J,PL,SM 39°ota pea i mechanical breaks inferred.85 5 J,PL,SM,Ca 45°feet.6.75 7 73%hours,6.2ZZABTS.° feet/hour264.4 -265.5 264.4 A Highly to slightly weathered HW |RO 1 265 (HW-SW),jointed,dark to to 4 greenish gray,medium NIA NO CORE SW |R2grained,extremely weak to ZEA BTA: weak (RO-R2),ALTERED 265.5 a DIORITE/FRACTURE ZONE 265.5 -272.2 bad J,PL,SM,FeOx 38°7 Slightly weathered to fresh (SW-FR),rehealed calcite joints,close spacedffractures,dark greenish 34 7 gray,medium grained,40 s medium strong to strong 86)35% {R3-R4),78%,*®J,PL-C,R,CL,Sa o° 5 DIORITE/FRACTURE ZONE ° a 4 Run 86:Broken core.Core axis sw |R3Eeparalleljointfrom267.4-268 feet,to to -=natural and mechanical breaks 4ainferred.A NO CORE FR |R4 2 [) |970 §@||PL 30° J 0 oo 26 Kd id J,PL-U,SM,Ca 5°g 27 |[aed i x 87 41% |2 96%: 8 @ =|J,PL-ST,SM 48° ii s 667.4 _ ©272.2 -275.8 272.2 "J.PL,SM,Ca 34° 6 Completely to slightly coe c weathered (CW-SW),' or internal original rock +4 <structure present,closeéspacedfractures,light Auigreenishgray,clay to -L medium sand sized clasts 4Wandweatheredrock,cw |ROfe)extremely weak to medium 48 to torstrong(RO-R3),ALTERED ag|50 NIA sw]R3 =DIORITE/FRACTURE ZONE af 275 273.5 feet:In-situ joint,26°dip 96%oO w.r.t.core axis z 663.9 al.275.8-282.2 275.4 °)7 PL 40 :oO Slightly weathered to fresh 7 0 os {SW-FR},rehealed calcite @/J,PLC,SM,Ca ™ 7 joints,close spaced °fractures,dark greenish&-gray,medium grained,4 Zz medium strong to strong¢(R3-R4),@ |J,PL-C,SM,Ca 56°z DIORITE/FRACTURE ZONE 20 nsst0|la J,PL,SM 26°sw |R65 4 2 89 38%|||¥:PL.FinetoMed Sa 45 to 100%Infill _ FR =@ |J,PL,SM 55 ao nz 4 N fa !| =3.0 i 4 | a 3 +0 t |J,PL-ST,SM-R,Ca 18 R3 N 90 |to$|R4 S 280 Log continued on next page 7 =a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon Fi8EFGoldDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure%BA older A-10 g Associates PROJECT NUMBER:103-95560 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 DATUM:Ground Surface ELEVATION:1935.5ft SHEET 15 of 19 INCLINATION:-80° AZIMUTH:55°012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}ECannon3/8/13103-95560WrDRILLER:T.Fisher CHECK DATE:1/9/13 LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1.885.929aOyy;ape Rou Infilling "Py-Pyrte @ Axal 9 Frat FOfolien Cuned --KSlekenoned |BeBrecsia FLOR ome Sees?|Ci Diametral->SH-Shear CQO-Contact U-Undulating =SM-Smooth CL-Clay G-Gouge |3e-Sericite EAM=lu 8 a x >V-Vein OR-Orthogonal ST-Stepped R-Rough Ch-Chlorte =-Hm-Hematite i-Silica 29Or=>NOTESeSs$4 aio @ |FR-Fracture Litegular VR-Very Rough Ca-Calcite ML-Silt $u-Sulphide 56 2 g TuiJoDESCRIPTION21743zBDISCONTINUITYDATAzleaeWATER LEVELSFa@|Fe|Z/89 |Rao |Fractures |$¥e TYPE and 2,(SSHELS SSSRfo]2 |w-|5|@ %PERFOOT |29%SURFACE a8 |gus oe2 Bins &a ic)x 88eg|nwo?Pos DESCRIPTION eo "5 lee a x280275.8 -2622 Toomey PY ; Slightly weathered to fresh hd J,PL,SM 36 (SW-FR),rehealed calcite z joints,close spaced 3.0 ae sw |R3-fractures,dark greenish go}39 |lao%e J,PL-C,SM,Ca 15°to |to Run 90:gray,medium grained,:FR |Ra Brok :medium strong to strong 100%a roxen core(R3-R4),279.2-282.2 L DIORITE/FRACTURE ZONE feet up to 15 (Continued)657.dip w.r.t.core 282.2 -290.8 282.2 O7 axis,natural j to sli 91)0.7 ||0%@ |J,PL,SM °andModeratelytoslightlyasPL,48 mechanical a weathered (MW-SW),jointed --|100%S R2 breakswithclayinfill,rehealed Tae to inferredcalcitejoints,very close to 92 "4 09 R4 . close spaced,dark greenish .t °J PLC.SM CL 43°gray,medium grained,weak 9,rPLG,, . +to strong (R3-R4),100%Se,1 pr sé.cL 34°ADIORITE/FRACTURE ZONE J,PL,SM,CL 44 Hole !NO CORE advanced to @_1J PL.c.sM sic ape onr-285 ift 3.0 ate @ ||J,PL,SM,Ca 31° i 93}35 |j24a% 79%"tsmene.e)|J,PL,SM,ca 45°ww Sw -e J,CL-Med.Sa Infill 42° R3 to R4eJ,PL,SM 41° 8 ®|J,PL-ST,SM,Ca 63° £ a a [ay o5 °44L-290 |=oa]44 |lean,@||J,PL,SM,Ca 40° "100%e J,PL,SM,Ca 18 g 649.|.=|290.8 -292.2 290.8©|Moderately weathered (MW),6 |original igneous crystals©|visible,light greenish gray,MW |R2mediumgrained,weak (R2),[ ALTERED 647.7}\_DIORITE/FRACTURE ZONE /222929 292.2 -297.2 Moderately to slightly -weathered (MW-SW), rehealed calcite joints,close to moderate spaced -d J,PL,SM,CL 33°fractures,dark greenish |gray,medium grained,weak to strong (R3-R4), ©p |J,PL,SM-R 62° DIORITE/FRACTURE ZONE 3a mw |R395|54%to to L-295 100%SW |R4 e J,PL-C,SM 30° e J,PL-C,SM,Ca 22° ®||J,PL,SM 34°[-642.8 ° 072.3422 "bord @ |4,PL,SM,Ca 57 Fresh (FR),rehealed calcite |, joints,very close to vy a moderate spaced fractures,! dark greenish gray,medium |5.0 @ |J,PL,SM 48° grained,strong to very ee]5.0 | R4 strong (R4-R5),DIORITE \96 92%FR |to : '100%@J,PL-i,SM-R,CL 86°|-_]RSon ( [;e J,PL-C,K,SM,Ca 20° -300 . 4 LE ° Log continued on next page vars DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FjA\4 DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentin igure :,Inc.aon ie€2 Golder A-10Associates PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 16 of 19 INCLINATION:-80°ECannon3/8/134103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]PROJECT NUMBER:103-95560 DRILLING DATES:7/29/12to 8/7/12 ELEVATION:1935.5ft AZIMUTH:55° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1,885,929 s)Pat B-Bedding PL-Planar eae:Aeon inche Ep-Epidote ob uartz @ Axal =F-Fautt FO-Foliabon -Curved K-Slickensided Bx-Breccia FeOx-lIron Oxde Sa-Sand O Diametral zs {i eo 12 le Von OROrhogonal St-Sloapes”Rovere”Chchbte Hietieatte Seas'|Foe.Fe =9 I Wi)2%|FR-Fractu Liveguer =VR-VeyRough CaCacte MUSH SuSuiphide |23 3 z NOTES w=lo DESCRIPTION 24 3/ee DISCONTINUITY DATA =|,aaR WATEREy°z z=|E5|/2/88 |rao |rractures |FH Qo |MOx|EOx|x xxx LEVELS z &joe/2|°9 <S |322 TYPE and Fy.|Sse eeu asa 2fe}eiu |5|@ %PERFOOT |20%SURFACE a6 [ee2|eh2|San0 F300a6S89e|arone PEs DESCRIPTION =5 wer a 297.2 -342.2 \"i i J,PL'SM,Ca aT Fresh (FR),rehealed calcite +,_|1 : joints,very close to \f moderate spaced fractures,.|28 Py FR |R4cargeenshamymeaum|>| e5|£9 I som Je |fneismcs on fstrong(R4-R5),DIORITE |100%i 5 (Continued)|.e@ |J,PL.SM 55° EB on J,PL-C,SM,Ca 0°77 ! N b 74 5 ! N e J,PL,SM,CL 43° L 7 |' |@ =|J,PL,SM,CL 48° sg XN7 50 !Run 97:Extensive rehealed |5.0 ¢MW |R3calcitejoints| 97 77%!:@ }J,PLCk 52°to to -305 on 400%:FR |R4| N by |e J,PL,SM,CL 22° \ 5 | \ie J,PL-C,SM,Ca 40° ra |e J,PL,SM,Ca 17° |is in / @ J,PL,SM 67° ! N 1 ly /. o |Drilling Rate 2 |oe J,PL,SM,CL 12°(8/6/2012):e "4 284 to 332.2 =&1 feet (rock),a N @ /J,PL,SM 47°7.25 hours,g a 9.0 :6.6 feet/hour oO \5.0 <!98 43%@ J,PL,SM,Ca 80° f-310 b L 100% Y N \ a 'fe]XN eox=|>:@ ||J,PLC,SM,Ca 29gsom\™=' fo]NX re(s)ne 'i .|L ®|J,PL,SM 63° NX an ®J,PL,SM,CL 65° ! =N t ,|@ /J,PL,SM,Ca 48° R4 \FR |to a ir /.|R5 | |*50 °J,PL,SM,Ca 8° v4 99]°|[68%a,PL SM,CL 71° 315 .!100% . a r 7 ;°J,PL-C,SM,Ca 12° \: ! 1 N L 7 ; N\ a Pov ad e J,PL,SM 42° \ |e J,PL-C,SM,CL 25° \'J,PL,SM,Ca 28°-4 Ly | i vo 'J,PL,SM,Ca 33° N i]1 t |43 i)||@|[JPLC,SMR,Ca 39° vo 100)"”|144%|| |N 100%| |:[]@ ||J,PLsm 27° L S| \,;| N ' |p74 Lt FJ |320 Log continued on next page am a DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon FiEWGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.Valentine igure eh {A-10AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc.DATUM:Ground Surface SHEET 17 of 19 INCLINATION:-80°2.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]ECannon3/8/134103-95560WiPROJECT NUMBER:103-95560 DRILLING DATES:7/29/12to 8/7/12 ELEVATION:1935.5ft AZIMUTH:55°LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 5500-3 COORDS:_N:3,225,803 _E:1,885,929 D Ty Sha Roughness infilling Py-Pyrite @ Axalfo)J-Joint B-Bedging Pl Planar Po-Balshed Bt-Biotite Ep-Epidote Qtz-Quariz .F-Faut FO-Foliation -C-Cu K-Siickensided Bx-Breccia.=FeOx-lIron Oxide Sa-Sand 0 Diametal x {6 ol la],[even SRS Segauaane Suse Ce GR BS Py'-Vein --|-'=Ce =is}|wil &PR Fracture ogenal Eireguar VVeyRough CaCacte MUSH SySuohide Z6 2 3 NOTES u>lo DESCRIPTION one Pre DISCONTINUITY DATA x ase TESTS a Zz Xr iz 3,96 =Oo xix|tox|= xxx WATER LEVELSZz@jFelZ!/66 |Rad |FRACTURES |$e TYPE and 2,(S25 e2o a 2as 2S2|w=|5)2]%PERFOOT |29%SURFACE &8 |oeo/geolasne &320-4 aa 8898 veo Pg DESCRIPTION S|5 (Fees g 297.2 -342.2 a j Fresh (FR),rehealed calcite 7]43joints,very close to \43 ©moderate spaced fractures,I 100;44%©)[JPL SM,Ca 46 -dark greenish gray,medium ' 100%J grained,strong to very 7 strong (R4-R5),DIORITE \a7 i4 A e o(Continued)>|401]07 64%|J,PL,SM,Ca 51 1 |[|100% »@ |J,PL,SM-R §1° 7 | a \4 '@ ||J,PL-C,SM-R,Ca 31° | .Run 102:Broken core '7 325.6-327.2 feet,numerous 4 5.0 e J,PL,SM,Ca 16° mechanical breaks interpreted I 5.0alongrehealedcalciteveins\402)62% t-325 om 100%4 \ 'N is °J,PL-C,SM-R,Ca 20° |\4 N om o J,PL-I,SM-R,Ca 37° | a \ 4 fs | '\ 7”@ (J,PL-I,SM-R,Ca 67° a ;@ J,PL,SM,Ca 81°---a a N a &|od J,PL-ST,SM,Ca 34°4 N2 8 hhoal 30 im @ |J,PL.sM 60° .I ,*%FR |R4330|F '100%to 7Be/.]R5 8 .!@ J,PL-C,SM,Ca 61° a =/ -2 I °o No/J ° a 331.85 feet:Clay seam |@U,PLLR 80°|] _approximately 1 inch wide,70°to |. 80°dip w.r.t.core axis /°Hole@/J,PL,SM,Ca 79°-} _|advanced to!332.2 feet on .'8/6/12.J | \e J,PL-!,SM,Ca 22° rv-\a @ |J,PL-C,SM,Ca 62°7 5.0 Run 104:Broken core ;404 5.0 60%332.6-337.2 feet due to core axis |, t-335 parallel reheated calcite joint,(100%_j inferred mechanical breaks.N /4 ®|J,PL,SM,Ca 64° 'PSN 4 7. \ 'e J,PL,SM,Ca 15° | XN ior eu,PL,SM 71° r 337.8-339.1 feet:Core-axis .!7 parallel fracture,rehealed calcite |2.0 !joint,extensive calcite veins \/4 105 5.0 86%|e J,PLU,SM,Ca 0° | t N 100% 4 ros.F. \ |@ |J,PL,SM,Ca 51° »!L 340 os r : 7Logcontinuedonnextpage -DEPTH SCALE:1 inch to 2.5 feet LOGGED:E.Cannon .FigureAYgDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:C.ValentinegeAolder A-10AssociatesDRILLER:T.Fisher CHECK DATE:1/9/13 PROJECT LOC. NUMBER:103-95560 PROJECT:2012 Susitna-Watana Geotech ATION:Susitna River,Talkeetna Mountain RECORD OF DRILLHOLE DH12-6 DATUM:Ground SurfaceCLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 s_AK EQUIPMENT:Burley 5500-3 ELEVATION:1935.5 ft COORDS:_N:3,225,803 SHEET 18 of 19 INCLINATION:-80° AZIMUTH:55° E:1,885,929 DEPTH(ft)BORINGMETHODDESCRIPTION GRAPHICLOGWellinBt-BntteBx-BrecciaPraPO-PorshedCulK-Sickensided U-Undulatng $M-Smooth CL-ClayST-Stepped R-Rough Ch-Chionte-ireguiar VR-VeryRough Ca-Calcte 8-BeddingFO-Fokation Py-t ie a-SandEp-EpidoteFeOx-tron Oxde @ Axal O Diametral 3e-SenciteG-Gouge +Sica 5u-Sulphide Hm-Hematite ML-Sit DISCONTINUITY DATA POINTCORERECOVERYFRACTURES PER FOOT TYPE and SURFACE OESCRIPTIONRUNNUMBER ROCKSTRENGTH(INDEXWEATH.9 z [rd wi GRAPHIC}LOGINDEXR4145k725k3.62kLOADTESTSR2725(Psi)R3R41NOTES TESTS WATER LEVELS 297.2 -342.2 Fresh (FR),reheated calcite joints,very close to moderate spaced fractures, dark greenish gray,medium grained,strong to very strong (R4-R5),DIORITE (Continued)NZaahJ,PL,SM,Ca 5.0105 100% 342.2 -343.2 Slightly weathered to fresh (SW-FR),rehealed caicite joints,very close to close spaced fractures,light green,medium grained, strong to very strong (R4-R5),ALTERED DIORITE Coring(HQ3,2.5-in.CoreDiameter)--350 343.2 -352.2 Fresh (FR),reheaied calcite joints,close to moderate spaced fractures,dark greenish gray,medium grained,strong to very strong (R4-R5),ALTERED DIORITE TWHt || i :J,PL-C,SM,Ca5.0106)59 |72% 100% J,PL,SM J,PL,SM,Ca "4588. J,PL-C,SM oN107 J,PL-C,SM,Ca J,PL-C,SM,Ca J-Base of Core 53° FR 46° sw to FR 55° 32° R4 to 52°RS 39° FR 42° 24° -355 -360 Boring completed at 352.2 ft. Notes: 1.Drillhole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. 3.Vibrating Wire Piezometer (Slope indicator,P/N:52611040, S/N:12-6868}was taped to sacrificial tremie pipe,placed alongside the temperature acquisition cable (TAC)conduit, and grouted in place with cement bentonite slurry at 320.5 feet depth. 4.1-inch Schedule 40 PVC TAC. conduit installed to approximately 255 feet depth and filled with propylene glycol antifreeze.Top of HWT surface casing has 3.1 feet of stickup above ground Log continued on next page B52.4 Drilling Rate (8/7/2012): 332.2 to 352.2 feet (rock),4 hours,5 feet/hour 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}Cannon3/8/13GP coerAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-10 PROJECT NUMBER:103-95560 PROJECT:2012 Susitna-Watana Geotech LOCATION:Susitna River,Talkeetna Mou ntain: RECORD OF DRILLHOLE DH12-6 CLIENT:MWH Americas Inc. DRILLING DATES:7/29/12 to 8/7/12 s,AK EQUIPMENT:Burley 5500-3 DATUM:Ground Surface ELEVATION:1935.5ftCOORDS:_N:3,225 803 SHEET 19 of 19 INCLINATION:-80° AZIMUTH:55° E:1,885,929 3/8/13ECannon012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]DEPTH(ft)BORINGMETHODDESCRIPTION GRAPHICLOG(ft)DEPTH|ELEVRUNNUMBERInfillingBtBotteBxBreccia CL-CtayCh-Chiorite Ca-Calite ShajPL-PlanarC-CurvedB-BeddingFQ-Foliation SH-Shear CO-Contact U-UndulatingV-Vein OR-Orthogonat Si Stepped R-RoughFR-Fracture L-Irregular VR-Very Rough @ AxalEp-Epidotcoiron¢O DiametralFeOx-iron Oxide G-GougeHm-Hematite ML-Sitt DISCONTINUITY DATA FRACTURES PER FOOT ntT0@02 TYPE and SURFACE DESCRIPTION RQD %CORERECOVERY99090BOTA 36ROCKSTRENGTH|gINDEXRERS2kR4R3R2R14IGRAPHIC|LOGNOTES TESTS WATER LEVELS 365 -370 [--375 r-380 surface. 5.TAC (BeadedStream,S/N 2120)placed in TAC conduit and permanently grouted in place as TAC conduit separated during install.TAC sensors are located at 3,6,10,20,35,50,75,100, 125,150,200,and 250 feet depth,0 feet depth =elevation 1935.5 feet. 6.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand margin of the fog column. 7.Circulation maintained while drilling. 8.Abbreviation "w.r.t"indicates "with respect to”. 9.Water level estimate from vw. 10.Point load test rock strengths presented as equivalent uniaxial compressive strength (UCS)based on a K value of 19 forconversionbetween|s(50)and equivalent UCS.103-95560W,GP cotaerAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:T.Fisher LOGGED:E.Cannon CHECKED:C.Valentine CHECK DATE:1/9/13 Figure A-10 ECannon3/8/1312.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WiRECORD OF DRILLHOLE DH12-7 SHEET 1 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12 to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.226.407 __E:1,887,554T;hness i 78MdJointB-Bedding Be Ponar Bo Borshed feBie Ep-Epidote Ob Cunrte °Axal =F-Faut FO-Foliation -C-Curved K-Slickensided Bx-Breccia. FeOx-lron Oxide Sa-Sand O Diametratz=>SH-Shear CO-Contact _U-Unduiating +SM-Smooth Cl-Clay -G-Gouge _3¢-Sericite LAxriQg/|Ble >|v-vein OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte Hm-Hematite i Silica bor.NOTES Fels o)ai#%|FR-Fracture Hirregul VR-Very Rough CaCakite ML-Sift 1u-Sulphide Soak T! uw 19 DESCRIPTION 24 2 zs DISCONTINUITY DATA zi,ath WATER LEVELS [rd &@ |Fei Z|OO]Rao |FRACTURES |S20 TYPE and 2 |SSH/ELH |S SES GRAPHIC 5 &|a=5 ze,%PER FOOT ab SURFACE ag 989 ba2 gina 8LoaoBBee|nwvoae be g DESCRIPTION fa 5 oso gy F 0.0-6.0 lol 1] Firm,moist,dark brown,(NSILTwithsand,cobbles and boulders present p r |(Mu)0)8) 3 oy 5 PL a [a] g ey] &dy £L ' L w Ly N lo 3 ih NIA = -|a -£LW Lj3}hy 5 bo Cement5=LI a 1 Bentonite >,Grout =& oO D i Top of Rock=6 ft Pi 2019. 6.0 -73.4 \|6.0 No core Fresh to slightly weathered t 7 recovered 6.0 (FR-SW),extremely close to \to 7.1 feet. wide spaced fractures,| ---_stained,clay and Ca filled |*discontinuities,light vq greenish gray to greenish ( gray,Medium to coarse ' bE grained,strong to very 7strong(R4-R5),DIORITE an @ |J,PL,R,Stained 50° N L _|6.0 -28.6 feet:Slightly weathered |\'° -(SW),close to moderately close .|43 %ary 'Stained aediscontinuities,greenish gray,45 4)DD eens o strong (R4)r/4 1 78%*)|(4 PLR Stained 6 Drill Rate: j 96%Run 1 =10.8 = N10LY @ |J,PLR,Stained et feethour. \ | XN -[7]J,PL,R,Stained 54° | NX by, =\ -8 |13 @ J.PL.R,Stained 49° 5 bl |17 |bese,SH,U,K,Stained 72 PSSa. 76%|b Drill Rate: [>]° z ®|SH,PL,K,Stained 64°Run 2 =10.2fo8LYP|SW)RA feet/hour. <\ £\qi \ -Py fr 7d o anx=oD N ="Oo @ |J,PL,SM,Stained 7 NN|15 jo |®@ |J,PL,R,Stained 68° +7 |5.0 ¢J,PL,R,Stained §3°4 \: \@/J,PL,R,Stained 72° |3|©|||ga% |,Orill Rate: ae 100%Run 3 =4.8 ' \feet/nour. L in 7 @)(J,PL,R,Stained 46° | a by\ I \ 18.1 -19.4 feet:Extremely N closely fractured roy] \ \3.0- L 5.0 9\/.]4 66% |100%J,PL,SM,CL 12° » . -,7"1]:fos20Logcontinuedonnextpage -bs -DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi=Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon Mat=2 .. -'?Associates DRILLER:N.Ameson CHECK DATE:1/9/13 ECannon3/8/13103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}RECORD OF DRILLHOLE DH12-7 SHEET 2 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6C0O COORDS:_N:3,226,407 ___E:1,887,554 Q Rint B-Bedding SPena ©EG Borned «Brute Ep Epdote Cerdusre Daiaie '=Sie Bhar COConod -Gundcang SxSeeranet ExBiecse Felson Onde Se eee PeiTo|>Ni 7 T-Re 7 n ;5aY.NOTES=e 2 9 Z g z ER fracture OR-Onthogonal Preyer Gece Rough aca Msn”ane SSapnide z $9 Ey TESTS Ho DESCRIPTION 24 2 zs DISCONTINUITY DATA z oar 7 WATER LEVELS <a jEsjZ2 RQD |FRACTURES |$¥o Q |SSH ZS |A HSA GRAPHIC z a lhe|g)°R)|"eeereme [gee]|Reese fg 528|528 as 8a619|&B88R |avowe PZ gi DESCRIPTION e-;5 |*feesee x- 20 60-734 7 a JPL SM:Stained 55° Fresh to slightly weathered by || {FR-SW),extremely close to 4 : wide spaced fractures,'i @ |J,PL,SM,Stained 64°Drill Rate: o stained,clay and Ca filled |Ru Aate 25discontinuities,light "4 50 of feeth =te. greenish gray to greenish j 50 !eeunour. i 4|;"66%|gray,medium to coarse N '°|{ a grained,strong to very (74 100%strong (R4-R5),DIORITE ;°(Continued)|@||J,PLR,Clean ry) bl' ' N ,@|J,PL,R,Stained 71° ry 7.Pp] ' -L y @ |J,PL,R,Stained 48° oT i SW |R4' 24.6 -24.9 feet:Broken core L >roe|25 oq :|| \i @ J,PL,R,Stained 77°ds 30 62%!||o (2:PLR FeOx 68° i \ ;ho J,PL,R,Stained 65 Drill Rate: \100%|Run 5 =6 ir 7.. feet/hour. |'@!J,PL,R,Stained 75°| -L >-. e J,PL,SM,CL 44° 4 \ NN 0 LY ||@|'g/d.PLR CL 3 @ (J.PL.SM,CL 74° @ |J.PL.SM,Stained 51° t-_| 'i J,PL,R,Stained 52°Hole 28.6 -33.7 feet:Fresh (FR),rv {advanced to a ;greenish gray,very strong (R5)\ \ :28.3 feet on :9/5/12.N I?@ |J,PL,SM,Stained 68° :| = ”N30 'Ly | \e J,PL,R,Ca 34° |5.0>6|©|)90%i |@||u,PL,SM,Ca 37° a ; \ \100%FR R5 f t |' \IL ( NX ty _| \ Ss N a i}| |'1 33.7-34.2 feet:Slightly |of L weathered,many healed and vq @ |J,PL,SM,CL 64°SW |R4staineddiscontinuities,strong {! (R4)\| 34.2 -35.6 feet:Fresh (FR),t ,_|greenish gray,very strong (R5)\:FR R5i35t \Lost ry.5.0 °J,PL,R,Ca 31°circulation at 35.6 -36.4 feet:Slightly 7 |3 ||syop 35.0 feet a weathered (SW),strong (R4)\»° roy 100%:4 RCL 5 Sw |R4 Occasional \: 36.4 -37.4 feet:Fresh (FR),l . 5 >>wate "greenish gray,very strong (R5)N Fe be 36.0 i 36.4 -39.3 feet:Broken Core ro oe Ba |FR |RS tween 36. \°"and 36.3 feet. \i Ee 37.4 -39.3 feet:Slightly \eB Biss weathered (SW),strong (R4)ry 7a ;iS L.|5 aa |hs Sw |R4\ |5.0 toh _ L »+:e PL,R,C 54° Ly 8 5.0 68%; J,PL,R,CaCoring(HQ3,2.5-in.CoreDiameter)39.3 -43.2 feet:Fresh (FR), greenish gray,very strong (R5)100%FR |RS y 40 Log continued on next page 1 [ . | ns DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards FiGolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon MataLA1.a -&,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/13312.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]4103-95560WrRECORD OF DRILLHOLE DH12-7 SHEET 3 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12 to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:_Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226.407___E:1,887,554 a Mi joint B-Bedding Benes Hin irom eaette Ep-Epidote oe arte @ Axal 4 F-Faut FO-Foliaton -C-Curved K-Slickensided Bx-Breccia FeOlron Oxide Sa-Sand O Diametral -.SH-Shear CO-Contact U-Undulating SM-Smooth CL-Clay G-Gouge 3e-SenicitexritQ|2%|e],|vven”-SRGanogonal ST-Stepped R-Rough Ch-Ghiorte Hm-Hematite SiSilca bof.NOTES F el 9 d fd &|FR-Fracture L-lregular VR-Very Rough Ca-Calcite ML-Sit $u-Sulphide 3 $9 a TESTS wi g DESCRIPTION 2 2 zs DISCONTINUITY DATA =aiar WATER LEVELS z a |Ee!Z!GG |RQD |FRACTURES |$0 TYP Oo)xox |tOxl x xxx GRAPHIC &3 BE 3;°8|"x PER FOOT 28%SURFACE 8 a3 See gee 840aoe8B98|x40 02 be gh DESCRIPTION oe 5 eesm OY & 6.0-73.4Freshtoslightly weathered L ;_: (FR-SW),extremely close to \| wide spaced fractures,' :I ; , -stained,clay and Ca filled |*@ |J,PLR.Ca 68°a Drill Rate: discontinuities ,light 4 ; pe |Run 8 =6.3 greenish gray to greenish i 50 !i |if feet/nour. gray,medium to coarse \8 68%|i ||®|SH,PL,K,Stained 66°FR |RS a grained,strong to very r 7 100%i PY strong (R4-R5),DIORITE '1 (Continued)\ I / e J,PL,SM,Stained 39° a !4 |@ |J,PL,SM,CL 55° 43.2-52.5 feet:Slightly |weathered (SW),close to qmoderatelyclosediscontinuities,.° |light greenish gray,strong (R4)N @ J,PL,R,Stained 81 | rh? | XN 45 ie i NX 38 ,fvm .oy |".°\ , 9 60%|J,U,R,Stained 5 Drill Rate: N 100%Run 9=6.3 i"/.:feet/hour. \ a N r 7 WJ t 0 47.3 -49.4 feet:Broken core \ |i J,PL,SM,FeOx 12 N t L 7 @j)J,U,R,Ca 68°Sw)R4 =I J,PL,SM,FeOx 15° oa N E he a &\a N L590 |§!4 8 t 7 J .@|J,PL,SM,FeOx 80° \; 3 |9.0 2 =r ,10)°°21%Drill Rate: ;2 Vy 100%||ff ®|J,PL,R,FeOx 66°Run 10=5.2 8 N dt |feevhour. °1/4 atl, 5 51.9 -52.0 feet:Porphyritic \ i texture \:\ 52.5 -55 feet:Fresh (FR),'on greenish gray,very strong (R5).' L L >|\!08 5 [.WW)%62%@/J,PL,R,Ca 72°}|FR;RS Drill Rate: -Vv)4.100%'@/J,PL,SM,Stained 787 Run 11232 |feet/hour. NN ra 55 55.0 -63.5 feet:Slightly | weathered (SW),close to L >moderately close discontinuities,|,|greenish gray,strong (R4)1 L \@ |J,PL,SM,Ca 67° 74 50 |5.0 e J,Pt,R,CL 28°12|.; Drill Rate: a 57.0 -58.3 feet:Broken core ,100%Run 12 =12 (feet/hour. -SW |R4vqt-I »| hd |@ |J,PL,R,Ca 52° ty |r¥@,|SH.PL,K,Ch ar" an 43,42 | NN 60 boy |100%|_| Log continued on next page 7 =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi\¥"DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E,Cannon igure=Golder A-11-Associates DRILLER:N.Arneson CHECK DATE:1/9/13 RECORD OF DRILLHOLE DH12-7 SHEET 4 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12 to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226.407__E:1.887554 8 Pint B-Bedding BC Bhnae Bo etrted face Ep-Epidote oe arte @Axal x F-Fautt FO-Fokation =C-Curved K-Sickensded =Bx-Breccia.«=FeOx-lron Oxide Sa-Sand O Diametal x ir Q 2 xr Sven OR Oanegenal sis one Bowen Ch Corte Foe reheatte aad 5ae.NOTEScewfs)4 w %|FR-Fracture imegular VR-Very Rough _Ca-Calcte -Su-Suiphide a6 o &TESTS uw 19 DESCRIPTION oe ee zs DISCONTINUITY DATA z I.ah WATER LEVELSSsa|Fo|Z RQD |FRACTURES |$¥u SSO ESS |S KSA GRAPHIC &3 |BE|Z/°R!"«|perroor |283 SURFACE £8 |SE8/GE2 2x0 &60 a o rg S898 16 TT 3 4 DESCRIPTION &5 ese ge £ 6.0-73.4 N Fresh to slightly weathered t 7. i \;.(FR-SW),extremely close to Vv +@'SH,U,K,Stained 75°| wide spaced fractures,'| -stained,clay and Ca filled L ®|4,PL,SM,CL 65°set tenn fo]|4S LLL)|||le |upim.siines 16 Di ate: gray,medium to coarse '13)64%'SW |R4 feouhour 4+grained,strong to very .7 100% : strong (R4-R5),DIORITE '|(Continued)N ; 62.4 -63.2 feet:Extremely close |\os i Oo a discontinuities )7>:SH,U,K,Stained 35° 63.5 -67.7 feet:Fresh (FR).vo { greenish gray,very strong (R5)|| a |*24M7faa}27 |soo%|:||!yh Drill Rate: |*100%|Run 14 =4.7 --65 in feet/hour. \ >FR |RS Holer4|@ J,PL,SM,Stained ar |advanced to L I t 65.4 feet on '|9/6/12. r 7 Replaced drilt' 1 zs bit at 65.4 i N 15 76%!'feet. ros 1009 ' Drill Rate:vy 00%Pf Run15=9.2|feet/hour.67.7 -73.4 feet:Slightly L i @/J,U,SM,FeOx 74° 5 weathered (SW),close to os |-- _|Moderately close discontinuities,|° |greenish gray.strong (R4)N @)jJ,PL,SM,CL 44 a rosa||s -a N |e L |[o]"74 ! e +70 TT [NnNae 45 S |16|"5 |100%sw |Ra Drill RatxL rill Rate: i =v4 100%Run 16 =9 £\||feet/hour. 5 N I (3)Ls ek {+ 72.1 ft3[y ®|J,PL,SM,Clean 62 10/1/12 Go)\ | 5 r NX E [,/4952. oO 73.4 -133.5 4 173.4 @ |J PL SM.CL 54°MW |R3WwModeratelyweatheredto=@ |PL.SM.CL 65°-4BS'.A at]|re ee fy |a x ,extremely close aa HW |R2gtoverywidespacedy'@ |J,PL,SM,CL 60° i]fractures,clay and FeOx "H : "|75 filled discontinuities,light =5.0 be a gray to light greenish gray,.50gmediumtocoarsegrained,Le \17|1 Drill Rate:<|very weak to moderately t '100%|Run 17 =9.4weak(R1-R3),ALTERED Hi ily feethour. lo DIORITE =I 4 . (a)73.4 -73.6 feet:Moderately rs !|a weathered({MW),close to "Abamoderatelyclosediscontinuities,=||©medium weak (R3)@ (J,U,R,FeOx 44°Sr 73,6 -74.9 feet:Highly weathered|"”_S (HW),weak (R2)@ |J,U,FeOx 59° <73.9 -74.2 feet:Extremely closely Ht j MW |R3 >fractured =\oe 74.9 -82.7;Moderately NESaweathered(MW),close to vi a moderately close discontinuities,|=\':-medium weak (R3)5.0 @|J,PL,R,Ca 76°|_| =76.1 -76.8 feet:Quartz intrusion |//_\0 |&a 78.0 -78.5 feet:Quartz intrusion |.18 5.400%I )t N a \100%i ° &"y @)|J,PLR,FeOx 40 <7]|Z|-80 =\1=Log continued on next page =DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi8erDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:£.Cannon Neeea"|- 2 ates DRILLER:N.Arneson CHECK DATE:1/9/13 ECannon3/8/13312.GPJ_LIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE]103-95560WyRECORD OF DRILLHOLE DH12-7 SHEET 5 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12 to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,407 __E:1,887,554 =)Re B-Bedding PL Pinar BO Bored bscte Ep-Epidote ae arta @ Axal2F-Fauk FQ-Fohation C-Curved K-Shckensdied Bx-Breccia.=FeOx-Iron Oude Sa-Sand O Diametal =>SH-Shear CO-Contact U-Undulating SM-Smooth CL Clay -G-Gouge 3e-Sencite kaw NxHT)9 |2 \|ea V-Ven_OR-Orthogonal_ST-Stepped _R-Rough Ch-Chiorite -Hm-Hematite +Stica boP,JOTES i =|9 Zz u 4 FR-Fracture Lirregular VR-Very Rough Ca-Cakite ML-Silt 5u-Sulphide 55 %a TESTSiEloDESCRIPTION272&3 DISCONTINUITY DATA =la ash WATER LEVELSESa/Es|z ROD |FRACTURES |EUm PI 2 |SSH/ELH/AGES GRAPHIC &3 |BE/3||%|perroor |a3 SURFACE £8 (B89 §e3|ssen 8|80 a o «SBsg|n+owe Pe gh DESCRIPTION %5 ewse 9 & 73.4 -133.5 A Moderately weathered to =\completely weathered(MW-CW),extremely close a i -to very wide spaced NN 50 R3fractures,clay and FeOx 4 5.0 filled discontinuities,light =)18 100%Mw gray to light greenish gray,ro"100% a medium to coarse grained,w yveryweaktomoderatelyrd ' weak (R1-R3),ALTERED W DIORITE (Continu =\ 82.7 -100.5 feet:Highly S i a weathered (HW),massive,light |//gray,medium weak to weak =i Regained(R3-R2)ye j circulation at =\83.1 feet N i A=\ \ &\ r-85 \§.0 a 19|©9 |400% 100%" L =\ \: Ht : =\i kN : i Hw : =\ 4 = \ -A ==i $\ Q A§aN a A 2 =\ 6 NS°Ht <=\-90 wo N 5.0 "i ||20|°°|100%3}\100% =a ' .2 =)t R 5 Ht HW |tooO=\R3 \ L 4=\ N 92.6 -94.0 feet:Felsic intrusion Le \ a '[|0.4 93.4 -94.0 feet:Extremely close 15%>>discontinuities in '2 cL I yy Replaced drill dt bit at 93.8 ne |(J,PLR,Clean 45°feet. £y[-95 Ls "At I! F =5.095.6 -96.2 feet:Felsic Dike ao 22)38%- ,Drill Rate: -=\100% ' Run 22 = S |15.8 4 .|feet/hour. NG 'dl J,PL,R,Clean . 7 4 "=\ 5 S "=\ AL 46 L 46\23|39%} a \100%99.7 feet:1/2-inch thick felsic |\° intrusion fi ||100 . -PH Log continued on next page DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fiaur5GolderDRILLINGCONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon Mt 1,Associates DRILLER:N.Arneson CHECK DATE:1/9/13 - 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB{ANCDRILLHOLE}ECannon3/8/13RECORD OF DRILLHOLE DH12-7 SHEET 6 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12 to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3,226,407 __E:1,887,554 Q Pint Bedding SUPanar «BOBoened «BBs Ep Epidote ;Ckrdust |OAs=F-Fautt FO-Foliation -C-Curved K-Sickensed Bx-Breccia. FeOxron Oxide Sa-Sand O Diametal -SH-Shear CO-Contact U-Undulating SM-Smooth Cl-Clay G-Gouge 5e-Sericit oOxHtoOo]2 |>|Vven -OR-Orthogonal ST-Stepped R-Rough Ch-Chiorte Hm-Hematite Skea bof.NOTESCre|=iS}i u @&|FR-Fracture Hrregular VR-Very Rough =Ca-Caicite ML-Silt 3u-Sulphide 3 6 2 &TESTS we Q DESCRIPTION 2 e744 z zs DISCONTINUITY DATA zs ar WATER LEVELS Fed a |Eo|2Z/}60]RaD |FRACTURES |Fa QS |SSSESN |A HSS GRAPHIC 8 z(R=|3 2 |%|Perroor |383 SURFACE #g |S82lSe2/e2n0 ©L009 |2 8 8898|n+008 Pe gh DESCRIPTION &®eeoe ©© 734-1335 Hl |HWModeratelyweatheredto=i completely weathered *Drill Rate:(MW-CW),extremely close a 'Run 23 = r to very wide spaced N 46 15.3fractures,clay and FeOx a 46 5 feet/hour.filled discontinuities,light =23 39%]|;mw |R3graytolightgreenishgray,"100%, j a medium to coarse grained,a \very weak to moderately N weak (R1-R3),ALTERED a DIORITE (Continued)=100.5 -102.7 feet:Moderately [,*a weathered (MVV),massive,=\j H medium weak (R3)NG , 102.7 -111.0 feet:Highly "i ;weathered (HW),massive,light |=\ a gray,moderately weak to weak » (R3-R2)AL ' \ Gy 405 S 8.0 R2wy24|5 ||55%,|to S 100%R3 AL a aN "=\ NY Ht HW a "ey R BN | i;e SH,PL,Healed 12° - Le a 107.9 -108.2 feet:Clay seam v7]:@J,PL,CL 80°$2 Hole ='advanced to S N :107.8 feet on|108.5 -113.6 feet:Altered/shear |//"4 9/7/12. E|zone =fs Many healed L &ye :discontinuities °m \a3 R2 from 108.5to&S a to 111.0 feet. :Ht a R3gs=j110|3 N 43)1 PEa.5.0 : "a -9,Ly |O%.Drill Rate: g \86%S Run 25 =9.4 =4 rs °feet/hour. -@|111.0-123.1 feet:Completely [=oe SH,PL,R,Healed 3 =weathered (CW),massive,light s a8|gray,very weak to weak (R1-R2)|"\a., \a : a A=\ \ "=\ \ .a=\ \ A=\ s \ A S A 115 =45 |)PE'5.0 Ht 26 0%.=I 90%f cw |Ri A.Ly \ 4 =iX\| -116.9 feet:1/2-inch thick quartz |7 n intrusion =\ea |fy .117.9-118.7 feet:Qtz healed s (27)O41 Fr0%= shear a 0.1 ! : \100%SB @ |SH,PL,Healed,Qiz 63° Hw vf | : =45 ILLy28)49 ||0%SL 4 ,|SY 92% Ae I 120 Log continued on next page -DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fi"Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon ernra*RILLER:N.Arneson HECK DATE:1/9/ -Associates a CHEC vrs 2.GPJLIBRARY-ANC(2-8-13).GLB[ANCDRILLHOLE}Cannon3/8/13103-95560WiRECORD OF DRILLHOLE DH12-7 SHEET 7 of 8 PROJECT:2012 Susitna-Watana Geotech CLIENT:MWH Americas Inc.DATUM:Ground Surface INCLINATION:-80° PROJECT NUMBER:103-95560 DRILLING DATES:9/5/12 to 9/8/12 ELEVATION:2025.1 ft AZIMUTH:65° LOCATION:Susitna River,Talkeetna Mountains,AK EQUIPMENT:Burley 6000 COORDS:_N:3.226.407 _E:1,887,554 a ty Shay Roughness Infilling .Py-Pyrite @ Axalre)J-Joint B-Bedding PL-Planar PO-Polished BtLBiotte Ep-Epidote Qtz-Quartz A g F-Faukt FO-Folation -C-Curved K-Slickensided Bx-Breccia FeOx-lron Oxde Sa-Sand O Diametrat a >SH-Shear CQ-Contact U-Undulating =SM-Smooth CL-Ciay G-Gouge 3e-Sencite EnoxWwQOa|%OR-Orthogonal ST-Stepped R-Rough Ch-Chiorite -_Hm-Hematite Silica SOF NOTES Fels Sig Zz Firreguiar VR-Very Rough Ca-Cakite ML-Sitt Su-Sulphide 55 a TESTS w=|o DESCRIPTION 278 zs DISCONTINUITY DATA z |,aap WATER LEVELS Fd aiFs|Z|60 FRACTURES |$Y 2 |SSSlESK|ABSA GRAPHIC &3 Be Z)Ou PER FOOT a5%SURFACE £2 |8a9 See ges 8o°a avooe®Pe gh DESCRIPTION ete lpws2 9 x; 120 734-1335 7 Many healedModeratelyweatheredto=RI discontinuities. completely weathered 7 »SH,PL,K 6(MW-CW),extremely close a r to very wide spaced IN 45fractures,clay and FeOx Ht 49 filled discontinuities,light =28 cwgraytolightgreenishgray,4 '92%3/8-inch g medium to coarse grained,=\R2 bentoniteveryweaktomoderatelyNchipsealweak(R1-R3),ALTERED Hf DIORITE (Continued)= -120.9 feet:Weak (R2)4123.1 -127.4 feet:Moderately =weathered (MW),massive,medium weak (R3),Porphyritic |"texture NY y "=\ NN AL L425 \38A:9 |MW |R3=\29 100%'Drill Rate: 100%Run 29 =12 |=\feet/hour. N "=\ N 4 a Ly 127.4 feet:Becomes weak (R2)|//_'z= _-A \T s A== L 8 \ a ® " 8 S L130 |5 NY 48"i |-|30}°°||96%mw |Re]N 96% =Ht a >=\ &: 8 a .A=\ XS "a=\ x a so 4 4 \e J,PL,SM,CL 42° 893. 133.5-143.5 "133.9 Slightly weathered (SW),rv.Colorado a close to wide spaced \°JPLSM.C 5° Silica Sand -4 fractures,light greenish gray,|PL,SM,Ca 3 LANSI/NSX 61 medium to coarse grained,_ strong (R4),DIORITE "4 -135 1 5.0 | |>31|5°|}|90% \ |400% L \4 Ly | \i 4 |»SW |R4 = -ca rH | = »C4 an 1-1/2 inch i t |slot-4 PVC el |4|*screen i 4 |5.0 = a \32|59 |}loan S|| on 100%- 4 »_ +p 7 <td140Logcontinuedonnextpage -DEPTH SCALE:1 inch to 2.5 feet LOGGED:P.Richards Fié.Golder DRILLING CONTRACTOR:Crux Subsurface,Inc.CHECKED:E.Cannon Mat-.Associates DRILLER:N.Arneson CHECK DATE:1/9/13 PROJECT:2012 Susitna-Watana Geotech PROJECT NUMBER:103-95560 LOCATION:Susitna River,Talkeetna Mountains,AK RECORD OF DRILLHOLE DH12-7 CLIENT:MWH Americas Inc. DRILLING DATES:9/5/12 to 9/8/12 EQUIPMENT:Burley 6000 DATUM:Ground Surface ELEVATION:2025.1 ft COORDS:__N:3,226.407__E:1,887,554 SHEET 8 of 8 INCLINATION:-80° AZIMUTH:65°ECannon3/8/13DEPTH(ft)BORINGMETHODDESCRIPTION GRAPHICLOG8.BeddingFO-Foliation ShayBL-PlanarC-Curved Irregu ul U-Undulatingsistped InfillBL-BioitePO-PorshedK-Slickensided 8 x-Breccia -CL-Clay-Rough Ch-Chiorte VR-Very Rough Ca-Calcte Ep-EpidoteFeOxlronOxide @ Axal O Diametral G-GougeHm-Hematite ML-Sitt CORERECOVERYPER FOOT RUNNUMBERFRACTURES NTOOD OISCONTINUITY DATA Ua«282 3 TYPE and SURFACE DESCRIPTION ROCKSTRENGTH|yINDEXR6R5R4(psi)R2725NOTES TESTS WATER LEVELS GRAPHIC R1133.5 -143.5 Slightly weathered (SW), close to wide spaced fractures,light greenish gray, medium to coarse grained, strong (R4),DIORITE (Continued) "74I t 439DIPwet32 94%3.0 5.0 100% -145 Coring(HQ3,2.5-in.CoreDiameter)143.5 -150.0 Moderately weathered (MW), very close to wide spaced fractures,light greenish gray, medium to coarse grained, moderately weak (R3), ALTERED DIORITE 1877.4 33 N/A5.0 22 2.2 100% . J,PL,R,Ca J,PL,R,Ca J,PL,R,Ca J,PL,R,healed Ca J,PL,R,Ca 44° 30°sw |R4 22° 30° 75°74 10°MW |R3 DTTTTTTTOrill Rate: Run 34 =9.4 feet/hour. -150 p 155 -160 Boring completed at 150.0 ft. Notes: 1.Drillhole location provided in Alaska State Plane Coordinates, Zone 4,NAD83,USFT based on location recorded with a recreational-grade GPS receiver. 2.Ground surface elevation estimated from 2011 Matanuska-Susitna Borough LIDAR data,NAVD88 vertical datum. 3.1.5-inch Schedule 40 PVC pipe installed to 150 feet depth, 14.5-inch inch slot-4 PVC screen between 136.3 to 146.3 feet depth. 4.Top of PVC pipe has 2.5 feet of stickup above ground surface. §.Discontinuity graphic log is a depiction of discontinuity angle measured from the left hand margin of the log column. 6.Water level estimate obtained using a portable water level indicator. 7.Point load test rock strengths presented as equivalent uniaxial compressive strength (UCS)based on a K value of 19 forconversionbetweenIs(50)and equivalent UCS. 150.0 rh A 103-95560WATANA2012.GPJLIBRARY-ANC(2-8-13).GLB{ANCDRILLHOLE]a=GolderAssociates DEPTH SCALE:1 inch to 2.5 feet DRILLING CONTRACTOR:Crux Subsurface,Inc. DRILLER:N.Arneson LOGGED:P.Richards CHECKED:E.Cannon CHECK DATE:1/9/13 Figure A-11 pz ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-R EP-01 1 21 5 APPENDIX B Rock Core Photographs ---z..ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100years.1 6-1 434-REP-01 1 21 5 WATANA DAM SITE ROCK CORE PHOTOGRAPHS (2012 Photographs originally presented by Golder 2013a) ©)NeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 ons rr ne pv ceesey a mentee igi ot oaone mees eaeesnin at on Box:1 Alasea Energy Avtror ity (AEA) nwa-WatanaTop(ft):5.4 -Betton .F-27012 1° Bottom (ft):19.2 .-Box tof ° -Deas ¢rom S.Ate to IA DeePhotoDate:7/19/2012 @Comments:er es PT a I Bore Hole:DH12-1 Box:2 Alaska Energy Avthority (AEA)Top (ft):19.2 Svusitna-Wartana Bottom (ft):32.8 DWIaA-2 2 7-18-2012 Photo Date:7/19/2012 >Box A sfComments:Deeth from N42 to B2.8F+ tne DH12-1 Page 1 of 122 5.4 ft to 32.8 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 .en Me,XK + Box:3 Alos*e Energy Avtbordy (AEA) Top (ft):32.8 Susitna-Wotana Bottom (ft):46.7 Dpia-t F-18-2012 Photo Date:7/19/2012 Box 3 of ; Comments:Deeth from ZLB te 1.444 Bore Hole:DH12-1 « Box:4 |5 Alosya Enerqy Autherety CAPA). ° . Top (ft):46.7 !Susitna-Warana - ;: Bottom (ft):60.3 |Po DAVQ-1 ©9 18-2012,Feta 2OrR .- Photo Date:7/19/2012 Berteem 4630 +e 60.34 «.Comments: DH12-1 Page 2 of 122 32.8 ft to 60.3 ft @)NiwwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 Box:5 Alesee Energy Av thority CAEA)* Top (ft):60.3 °Susitna-W atanaBottom(ft):73.6 a S iv 2012 » Photo Date:7/19/2012 Depth from 60.3 to 73.6 ¢+Comments: 2a BEES. oer a.Te Bore Hole:DH12-1 . " Box:6 |t Masta Encegy Avior (AEA):A s(tna-o r'Top (ft):73.6 .--pH F-\4-2012,.Bottom (ft):87.8 i,°"s fox ©<€7 ;'$..*Phote Date:7/19/2012 %Degas fren 43.04 be,873 >omments:xa n . DH12-1 Page 3 of 122 60.3 ft to 87.8 ft @)MWH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Box:7 Susttna-Werana : Top (ft):87.8 DHA Ai 2ora ; Bo &» . Bottom (ft):102.6 on From 83.56 40 102.0%- Photo Date:7/19/2012 bd Comments: Bore Hole:DH12-1 |§----= Box:8 |R Alaska Energy Avthority AEA Top (ft):102.6 |B Susitre-Wetana,*. i Ponn-l p1a-20/2Bottom(ft):116.3 $Dt -,.,Box .Photo Date:7/19/2012 ]From 102.6 to I[6.3 FFComments:4 '4 ° *¢rr .oa re ere arty we ee ee Te%ee ee ee i 3 etree:Fiennes BS ay DH12-1 Page 4 of 122 87.8 ft to 116.3 ft @)N.ww H cy -Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 . Box:9 Alaska Energqy Author:'1 CAFASuSifna-Wa tanaTop(ft):116.3 DH 12-3 F-19-22 LF"10-20z.Bottom (ft):130.4 Box %of Photo Date:7/20/2012 From NGZE to IZA Comments: S poetTipe"fae rae Bore Hole:DH12-1 Aleske Eaee94 Avtherity (AEA)Box:10 ;.Susitna Weatane .Top (ft):130.4 |, Dwi2-1 3-20-Zorz .- Bottom (ft):144.2 kb ._Box 10 ofPhotoDate:7/20/2012 |Pal From 1.44 to Ita te , Comments:ia home AGDH12-1 Page 5 of 122 116.3 ft to 144.2 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 4.(AF Box:11 Alaska Eaerqy Avthor ny A)> Top (ft):144.2 |.Susitna-Watans 90-2012:..2 Bottom (ft):157.8 |.a Cae -+os ::oXpoteDate7/20/2012 y Derth from HV.ae to 157.86 | et eet |Pobintve eee SAYERA Bore Hole:DH12-1 Box:12 Alaska Enee 4 Avthority (AFA) Top (ft):157.8 Su sitna-We "ne Bottom (ft):171.7 DHI2 re :J-20-2012PhotoDate:7/20/2012 Boxts of | Comments:From 152.5 €+to nu tt DH12-1 Page 6 of 122 144.2 ft to 171.7 ft Core Box Photographs@)NuewH. Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 Q |.--_ Box:13 Alaske Energy Authority (AEA) Top (ft):171.7 Sositra-Watana Bottom (ft):185.6 DpI2-1 F-20-2012 Photo Date:7/22/2012 Bor J3oF Be) Comments:From tlt ft to 185,604+ .9 oe Hole:sata Alaska Enerq4 Avthonty (AEA) Top (ft):185.6 Susiton Wate,ne iova 9-28Bottom(ft):199.8 Bo.i of.O-2012,&F-32019 . Photo Date:7/22/2012 From BE 185.6 fr to 19184 Comments:Be RE hg i ue a Re at Oe Pt NR Oe as 171.7 ft to 199.8 ftDH12-1 Page 7 of 122 @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment ae Hole:ee Alaska Enerqy Avthority (AEA) Top (ft 199.8 Susitna Watanaop(ft):. ; -1+22-20Bottom(ft):212.8 DH a 5 4;2 re . Photo Date:7/22/2012 Box 1?of ° Comments:Feom MISF4 +o All & -_in a A a A stat Oe Pot te ty Bore Hole:DH12-1 Box +8 Alaske Evergy Avthorty (AEA)]Top (ft):212.8 Susi ra-Watana ; Bottom (ft):227.2 ..pa!-c "9-22-Fora To ..|Photo Date:7/22/2012 Gor hia.£40 2970 FF ' .f Comments:or a Sn wu oes +rad "°a BOF ee oe ad aa sd oye a wet aS,ae 'ott:to eta a DH12-1 Page 8 of 122 199.8 ft to 227.2 ft @)NV.ww H.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment sore Hole:mes Aloske Energy Avthority (AFA)Ox: Top (ft):227.2 5 ri ht Mop aie,.Bottom (ft):240.6 e Bead of . .Photo Date:7/22/2012 Comments:From 223.2fF 4 AIG GFF a en Pe irrmers We ex eT ra er4weeeSae*a 'aa a wo.':2SEEfeeeeEeteaetetEeetsae Bore Hole:DH12-1 nein mneperses pve winner nee nngeeee an@n -rer aeBox:18 Alaska Energy Avthority CAF'-Wear®oaAan .Top (ft):240.6 7 ORI FDQBONA ¢Bottom (ft):254.4 Vox 1%o%: eer xe ASY.4 FEPhotoDate:7/23/2012 From No .ane +. ee Be eeaaeaeeeCCtyweeneecComments:esSegeeg eg aeTTAwnaaeAaWS wa ee eee DH12-1 Page 9 of 122 227.2 ft to 254.4 ft @ mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 ..; Box:19 Alaska va Authority (AEA)-. Top (ft):254.4 Susitna-W atone bs-20 . Bottom (ft):268.3 °at Rt 7 3-R - Photo Date:7/23/2012 x 149 °r 568.3 6 ° Comments:From 254.44¢to ACB.. FRR RR ee gg OF OE ET gg FOTNTH at Fe ee a Aa |? Vee rk,me:rateswieeeifee.Pc Bore Hole:DH12-1 Alaska Energy Avthority (A EA)Box:20 Susitna-Watana .Top (ft):268.3 DHia-)4-23-2012 ,,- Bottom (ft):281.9 .Box 20 "of 3 PhotoDate:7/24/2012 From 268.344 to 2BlI FtComments: Di Noestah inane 3 SEgsi x nag "ane - DH12-1 Page 10 of 122 254.4 ft to 281.9 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-1 Alaske Energy Authority (AEA)Box:21 Susitne:War ana , Top (ft):281.9 DHIy-1 4F-23-2ND 44-24 Zora " ; Bottom (ft):295.1 Box 2)of q5\p ft °Photo Date:7/24/2012 From abl.dts te 21918 Comments: 0 toe Padaneaed isa on Bore Hole:DH12-1 Box:35 ,Alaska Energy Authority AED Top (fi):295.1 Susit na-Wo fansop(ft)::DHI-l F-2 ZO/2,Bottom (ft):300.4 Box'22 of 22 . . Photo Date:7/24/2012 From Bam et te 300O.4F+BonComments: =.« a innit itRt.ranpee tae DH12-1 Page 11 of 122 281.9 ft to 300.4 ft @ Ni W H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment General Comments: *Depth increases from upper left to lower right. ¢Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. *Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. ¢Black lines across a fracture label a fracture as interpreted as a mechanical break. e Blue markings represent notes. DH12-1 Page 12 of 122 295.1 ft to 300.4 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-2 heat.Box:1 ooo AREA i {:oF Sustak-WeBottom(i 360 Fem no veTbe Ture 2 ottom (ft):.boy |a - Photo Date:7/28/2012 FLOM 17.670 26.0' Comments: ewe pb ope dite $cirngsyom:aRGAEPRESTeEeHFewite=v enh ep piles =.af . +@ 3 7 BS.Se ve bcd sep me I eeghtaer NEY J Bore Hole:DH12-2 perk oat CA ' . Su srdhe -Da TAR .Box:2 ed oe-7 nea Wa tent,Pr-7.OX ; -gfseven5(2M 26.0"TO 18 |bob aottom(ft):..: . : 3 !0n78 |Photo Date:7/28/2012 |J",,&Féin 2b il Comments:we DH12-2 Page 13 of 122 12.0 ft to 39.8 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-2 |os a LER a ,> Box:3 1F F Sosa Watana eA 7 \;L.Dwi2-2 hy lane eto |;Top (ft):39.8 [fi 7 Box Sof git MIDeL,.an Bottom (ft):544 |}7..Fam FBO”©bord cay :.¥Photo Date:7/28/2012 |}.#-Fim 39809" Comments:i ay erie acne:remanentie _ ie Baars a ae * Bore Hole:DH12-2 Box:4 Top (ft):54.4 Bottom (ft):69.9 Photo Date:7/28/2012 Comments: DH12-2 Page 14 of 122 39.8 ft to 69.9 ft ©N.ww H.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-2 |F.AER.son L - Box:5 :Gushin«cantann ve wobagfq DHI2-Z - 7 *Bex SOF fim OFF TOBSO Byeor ,{elim (A47836 Top (ft):69.9 Bottom (ft):83.5 Photo Date:7/28/2012 Comments: iT re Pa:ars BicreasesRTRianeteheeaWye ne Bore Hole:DH12-2 Box:6 Top (ft):83.5 Bottom (ft):97.3 Photo Date:7/28/2012 Comments: aeons cS a . - saknenns aap ahh oP REOe aeAenea18]'7 S SUORR +ge,EES . '5 Fae eaten 4= 'Eee "si -*oe tts ba Nie iat ale Sa eS uit tS rane r a -rae pemree =: "P -=-"ee --can fie PTswe.=ag ee oe a."Mee arte haath a,Shes Mg Nat AE BE eae ae oe ht ;RE Sas fades yaia Sate erate bere heo FSRLSORE EEE SINGH sect''abe =;at ':Ae ab de ae c NRTA er Bie EMT,Po ee Seas:hated k EE AS EOE df matte Bem thn ae ee *+t La cr .-_2 4 .°*a q 2 ...ry s a La cy . YFaFy8 1 2 3 aioe g +a8 DH12-2 Page 15 of 122 69.9 ft to 97.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-2 d HER oo.Box:7 IE,'.|Supt re lkang nm AEATop(ft):97.3 DH/2 ye 1]Su sitaar Wrote Bottom (ft):111.7 6 bah 3TG \I|Ay Dwia-2 Photo Date:7/28/2012 jComments: Bore Hole:DH12-2 | a -Fi R =)Box:8 ce Aer -tntana AEA atone,r -wwtah bo aaTop(ft):111.7 |fF oe DPHZ-2.> Bottom (ft):126.1 |F LZON Ne Tel.|bor 8 tePhotoDate:7/28/2012 ||GLAM 1t7"T0726.|® Comments:evan eee eee ':pepe = DH12-2 Page 16 of 122 97.3 ft to 126.1 ft @ NiwwH.Core Box Photographs Page 17 of 122 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-2 AEA Box:9 Sogrina WO ata :DA -2 eTop(ft):126.1 or a oF ;ul 1Bottom(ft):141.1 Feo /2l../Te IM Photo Date:7/28/2012 Comments: .ABoreHole:DH12-2 OY LET i edents .Box:10 "3 -BHIZ2.Box 102 Ly"f e - Top (ft):141.1 gi ktm (Y.f Te IPAZ Bottom (ft):155.2 |B Photo Date:7/28/2012 7 1 pile --sinc het A eamComments:}iiSeton dial BRT eel ETEea eaten anf feeHer6-a sr osentccmpytign Yb tt Jactes!ae .pe--- DH12-2 126.1 ft to 169.4 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment : .ert tertBoreHole:DH12-2 |}/-eT aateneBox:11 fg -pute,2 e _- a OoTop(ft):155.2 ||."OM PER TOMAR omBottom(ft):169.4 Photo Date:7/28/2012 Comments: Bore Hole:DH12-2 Box:12 Top (ft):169.4 Bottom (ft):183.3 Photo Date:7/28/2012 Comments: 7FMARE My ®>carne mgirsee!5 A DH12-2 Page 18 of 122 155.2 ft to 197.5 ft @)N..eH.Core Box Photographs General Comments: Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Upper Left Abutment Bore Hole:DH12-2 ei Box:13 Top (ft):183.3 Bottom (ft):197.5 Photo Date:7/28/2012 Comments:=Tm é a <nied 3,anyonGalnseSheetsSe)AESTaesaiicerth=hab cee piceuanatas mast NEsal:aon pas ar eran -are =. Bore Hole:DH12-2 Box:14 Suseia-WATANA Top (ft):197.5 Bottom (ft):200.0 Photo Date:7/28/2012 Comments:Lew RES aware ¢Depth increases from upper left to lower right. *Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. ¢Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. ¢Black lines across a fracture label a fracture as interpreted as a mechanical break. ¢Blue markings represent notes. DH12-2 Page 19 of 122 183.3 ft to 200.0 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 j Box:1 ' Top (ft):8.5 ° Bottom (ft):24.6 Photo Date:9/1/2012 Comments:ATC MEE e:: ee:q f%A |A y ae Be . ied .a -aan oti/Reain ee'ial Fal Paaga27aLtSteeyeeTP,' RP Bd Paniigres Bore Hole:DH12-3 Bere :-coBox:216 mo "3 Top (ft):24.6 ee Bottom (ft):37.2 |b .pee oe ne . Photo Date:9/1/2012 ree : Comments: ” ek Fi sD :awwig<4 at 3,is:jase Ae ee By | =aa CF eae :a"F Sas aR ;eareee pearsaieGAStiaSa.*ay <7AefSEREDFeSILOSA DH12-3 Page 20 of 122 8.5 ft to 37.2 ft @)NesH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 ee Box:3 one" Top (ft):37.2 ta Foe BV.nS a s Bottom (ft):50.5 pide . Photo Date:9/1/2012 Comments: eS SatiaBSSyPEESEVR2dSaA A :Oa eG a .pee'Le ey Terr 3eT:ES Wakai ate KS,I hort 3 Bore Hole:DH12-3 Box:4 Top (ft):50.5 Bottom (ft):63.7 ° Photo Date:9/1/2012 Comments:_ fs «gE i es rshita en RNEHHyiatTighaERS>ia Za EReae DH12-3 Page 21 of 122 37.2 ft to 63.7 ft @ Mi W H @ Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 - Box:5 Top (ft):63.7 Bottom (ft):78.0 Photo Date:9/1/2012 Comments: Via 4 eeaysnaSaraeeSamatad Bore Hole:DH12-3 Box:6 Top (ft):78.0 Bottom (ft):91.4 Photo Date:9/1/2012 Comments: DH12-3 Page 22 of 122 63.7 ft to 91.4 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 Cer ma aBox:7 Sega Wy = Top (ft):91.4 ra re Bottom (ft):105.9 om agit inst 9 - PhotoDate:9/1/2012 r Comments:.| Bore Hole:DH12-3 Box:8 Top (ft):105.9 Bottom (ft):119.9 Photo Date:9/1/2012 Comments: E ECT aSatLeietsLan.pheiticsy DH12-3 Page 23 of 122 91.4 ft to 119.9 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Site Name:Watana Dam Site Bore Hole:DH12-3 Box:9 Top (ft):119.9 Bottom (ft):133.4 Photo Date:9/1/2012 Comments: Bore Hole:DH12-3 Box:10 Top (ft):133.4 Bottom (ft):147.9 Photo Date:9/1/2012 Comments: DH12-3 Project: Site Location aeHEFSuseing,WO nbaey -weyza. a;ett-LDatancr Page 24 of 122 Susitna-Watana Hydroelectric Project Bypass Tunnel,Upstream of Dam 119.9 ft to 147.9 ft @)NV,ww H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 apy \a:Ret -.Box:11 mena hata ate o , Top (ft):147.9 CFT os . Bottom (ft):161.7 Roe _ Photo Date:9/1/2012 Comments: TreS BR Reel om=ew2 a SAREE,.owe Bore Hole:DH12-3 Box:12 Top (ft):161.7 Bottom (ft):175.8 3 tA ye oe 4WN]Oro A>. Photo Date:9/1/2012 ©a,”Pion CasComments: Fea ealen 9 AM.A SI'*SeatSioa wean ffSahatacetee{A = .aaawake DH12-3 Page 25 of 122 147.9 ft to 175.8 ft @)mwu.Core Box Photographs Susitna-Watana Hydroelectric Project Bypass Tunnel,Upstream of Dam Client:Alaska Energy Authority Project: Site Name:Watana Dam Site Site Location Bore Hole:DH12-3 Box:13 Top (ft):175.8 Bottom (ft):189.2 Photo Date:9/1/2012 Comments:I; %.Ni] Bore Hole:DH12-3 Box:14 Top (ft):189.2 Bottom (ft):203.0 Photo Date:9/1/2012 Comments: DH12-3 Page 26 of 122 on ae ee,eeneniiePaacteye4cpeat area aS SRE Boe cat os 4 éa ae 175.8 ft to 203.0 ft ORS. @)eH.Core Box Photographs ¥y > Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 _rt KBox:15 _plah wa pane*"ce aT 'Top (ft):203.0 ure is ors tSBottom(ft):217.3 plon- Photo Date:9/1/2012 Comments:es FPaN Lot Gea=f seth'ZERS oSeyby aad anETESSrevere,A aaa aR oo beeaooaos>ENS PT a hia wh! 'bg PyPaemneanesSichaBaleBoreHole:DH12-3 cnBox:16 rer,ta TAA, Top (ft):217.3 sif12-3 . Bottom (ft):231.0 Photo Date:9/1/2012 Comments: 2 , oy Eyer oreo ie :WwPe at Si osSaran=oy 8 a.|;A fs 5.5ve,vad a”ee ag'ss .osFo ;bate .awe 765 or A < :PRS erinPS WY3Pee,©Sa aay TU fees eeet Pan 9 Fas g *,edBC ee DH12-3 Page 27 of 122 203.0 ft to 231.0 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 - -;_ Box:17 , Top (ft):231.0 Bottom (ft):244.2 Photo Date:9/1/2012 Comments: .+ng Tee +,ex 7”a”wend,Bpee aN Ba >”oe >'aoe \3ast tceaSySeASbos Bore Hole:DH12-3 Box:18 Top (ft):244.2 Bottom (ft):257.5 Photo Date:9/1/2012 Comments:' ”>_- ,_ee Os tile fe eh,ee yore of ."Gi EA "ite . -a -= . .\=re fa pet fan3 as aye Se . Ls " phe Alt ak Fueled porta Sarre.oyRednecksisonNT52530 DH12-3 Page 28 of 122 231.0 ft to 257.5 ft @)NV.ww H @ Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of DamI: Bore Hole:DH12-3 ar meee onres ;Box:19 aes -_. Top (ft):257.5 Hie a9 Bottom (ft):272.0 Berd OF el ap LIZO{post 257.9PhotoDate:9/1/2012 Comments:Lo "\9m : aa rn a oe ee _a |eR Ae 20%Fi BS oe 4sexPeenfAPcelBes:Sy aesans Detartreon aa a |iin ey ne FT pe PowayMony:tia EE pins NGAriccoTsamearawdoedtenstysSadslggcx,"y ;2 [el CARTON tail,m Meee,echVaESH GHaM,!.>+. .+'>-..'TTS : Bore Hole:DH12-3 4 DoeBox:20 Moyhyae pacana Top (ft):272.0 Bottom (ft):286.5 Photo Date:9/1/2012 Comments: r=Fn"a finan 'exvs mont |saatidwel ones--Foe(ees eyaE| DH12-3 Page 29 of 122 257.5 ft to 286.5 ft @)mwu.Core Box Photographs Project:Susitna-Watana Hydroelectric Project Site Location Bypass Tunnel,Upstream of Dam Client:Alaska Energy Authority Site Name:Watana Dam Site Bore Hole:DH12-3 Box:21 Top (ft):286.5 Bottom (ft):300.0 Photo Date:9/1/2012 Comments: Bore Hole:DH12-3 Box:22 Top (ft):300.0 Bottom (ft):313.9 Photo Date:9/1/2012 Comments: DH12-3 See EAS Page 30 of 122 -BEE, Bata Ca ----al 9 286.5 ft to 313.9 ft ©NV.ww H a Core Box Photographs Susitna-Watana Hydroelectric ProjectClient:Alaska Energy Authority Project: Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 ees Box:23 Sootreascatete ky Top (ft):313.9 Bottom (ft):327.5 Photo Date:9/1/2012 Comments: Bore Hole:DH12-3 Box:24 Top (ft):327.5 Bottom (ft):342.3 Photo Date:9/1/2012 Comments: gern eeBeOROTT.mat.,Wades vt STFSery DH12-3 Page 31 of 122 313.9 ft to 342.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 Box:25 Top (ft):342.3 Bottom (ft):356.0 Photo Date:9/1/2012 Comments: Bore Hole:DHi2-3 -_---aBox:26 |BS socthe win fan,Top (ft):356.0 |Bis can-3 on 2 Bottom (ft):371.0 *Cox 2.OF a=t ee ' Photo Date:9/1/2012 |By fica BSL ¢Comments:4 : 3 moe 5,*.scl 3 ill ae AeTe+Cont,Sad SPegPENNERPTraeees >iENPa8LSeTMESLEAAIOS DH12-3 Page 32 of 122 342.3 ft to 371.0 ft @)NesH.Core Box Photographs Client:Alaska Energy Authority Site Name:Watana Dam Site Bore Hole:DH12-3 Box:27 Top (ft):371.0 Bottom (ft):385.0 Photo Date:9/1/2012 Comments: Bore Hole:DH12-3 Box:28 Top (ft):385.0 Bottom (ft):399.4 Photo Date:9/1/2012 Comments: | DH12-3 Project: Site Location Susitna-Watana Hydroelectric Project Bypass Tunnel,Upstream of Dam Page 33 of 122 mize Stare.ANCEwesase -a ,:=7” 371.0 ft to 399.4 ft @ NIWH m Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Bypass Tunnel,Upstream of Dam Bore Hole:DH12-3 |F a Box:29 Top (ft):399.4 Bottom (ft):400.5 Photo Date:9/1/2012 Comments: General Comments: *Depth increases from upper left to lower right. ¢Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. *Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. *Black lines across a fracture label a fracture as interpreted as a mechanical break. ¢Blue markings represent notes. DH12-3 Page 34 of 122 399.4 ft to 400.5 ft @)NiewH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 Box:1 Top (ft):17.9 Bottom (ft):31.9 Photo Date:9/1/2012 Comments: Bore Hole:DH12-4 Box:2 Top (ft):31.9 Bottom (ft):45.8 Photo Date:9/1/2012 Comments:a wo >a"a eeteRP DH12-4 Page 35 of 122 17.9 ft to 45.8 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 Box:3 Top (ft):45.8 Bottom (ft):60.4 Photo Date:9/1/2012 Comments: ei Neem Bore Hole:DH12-4 Box:4 Top (ft):60.4 2YBottom(ft):74.9 Bord of omPhotoDate:9/1/2012 «Flom UO Comments: DH12-4 Page 36 of 122 45.8 ft to 74.9 ft @)NewH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 Box:5 Top (ft):74.9 Bottom (ft):88.3 Photo Date:9/1/2012 °. Comments: "] Bore Hole:DH12-4 _AGABox:6 Supine -Watarta Top (ft):88.3 ° Bottom (ft):102.3 Photo Date:9/1/2012 Comments: DH12-4 Page 37 of 122 74.9 ft to 102.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 . Box:7 Top (ft):102.3 Bottom (ft):115.8 Photo Date:9/1/2012 Comments: Q =ae . : r -a a” Bore Hole:DH12-4 |;aR 7Box:8 /E.Gf Beart wok ane tofTop(ft):115.8 |Ff ,pni2-4 ouBottom(ft):130.8 Rox oO ..oYPhotoDate:9/1/2012 coo (]5%TD |5 Comments: DH12-4 Page 38 of 122 102.3 ft to 130.8 ft @)N:ww H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location .Right Abutment Bore Hole:DH12-4 " Box:9 IF AEPOx:a Susitth-6 FTNTop(ft):130.8 ;Pad a4 4Bottom(ft):144.9 ..Ss BHO Lg +0 )HU:;Photo Date:9/1/2012 Ceom \2P Comments: Bore Hole:DH12-4 Box:10 Top (ft):144.9 Bottom (ft):158.9 Photo Date:9/1/2012 Comments: DH12-4 Page 39 of 122 130.8 ft to 158.9 ft @ AY |WH ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 |k j Box:11 _©Sysdnb-wutatd Top (ft):158.9 |- Bottom (ft):172.3 Photo Date:9/1/2012 Comments: Bore Hole:DH12-4 Box:12 Top (ft):172.3 Bottom (ft):186.9 Photo Date:9/1/2012 Comments: DH12-4 Page 40 of 122 158.9 ft to 186.9 ft @)Nee.Core Box Photographs Client: Site Name: Alaska Energy Authority Project: Site Location Susitna-Watana Hydroelectric Project Right AbutmentWatanaDamSite Bore Hole:DH12-4 EABox:13 A San Walon Top (ft):186.op (ft)86.9 O ,ovrBottom(ft):200.8 >OF,, Le)Photo Date:9/1/2012 bet [BUA 10 qo8Comments:a eel be”My eaetie Wa hrae bee Ba Bore Hole:DH12-4 le Box:14 . Top (ft):200.8 Bottom (ft):215.6 Photo Date:9/1/2012 teComments:_ =aaeee3Aisinbeansomeeee) Hq aa ase STRING TS apesTree eee $rf DH12-4 Page 41 of 122 186.9 ft to 215.6 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 GRPTGLAEVIS -nc A . Box:15 ap Top (ft):215.6 Bottom (ft):230.1 Photo Date:8/27/2012 Comments: Bore Hole:DH12-4 Box:16 Top (ft):230.1 Bottom (ft):244.8 Photo Date:8/27/2012 eeComments:;_SE a aE seg ee.;'4 ied A nae :9 Bere |ue eels7 TN cepa \ v A,:ges ia as G pane . Ppon es sc ”1 4 DH12-4 Page 42 of 122 215.6 ft to 244.8 ft &NV,wu H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right AbutmentBoreHole:DH12-4 |teil at sae ke tae ¢Aes Mies be ceeENEeont ne RedBox:17 |sy - Top (ft):244.8 Bottom (ft):259.0 Photo Date:8/28/2012 Comments: Bore Hole:DH12-4 Box:18 Top (ft):259.0 Bottom (ft):273.7 Photo Date:8/28/2012 Comments: .pea "oeseme ONnab DH12-4 Page 43 of 122 244.8 ft to 273.7 ft @)M WH ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 -OO .mos Box:19 A 'AER , Top (ft):273.7 a Bottom (ft):288.2 €Ber 14 Photo Date:8/29/2012 +Flom 273.7 fo 288A Comments: Bore Hole:DH12-4 Box:20 Top (ft):288.2 Bottom (ft):302.5 Photo Date:8/29/2012 Comments:ee 'ant hetesBe)oe ee me BS ys2atCOEFe ERVIN °*aes ge ry 5 ot ' behets we he TBR.Apne Ce peta a geeerate|te aie eee Ek Seadtan Cade Aa A Avg oe Meats iiDH12-4 Page 44 of 122 273.7 ft to 302.5 ft @)NvwwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH12-4 AE A &Bon. :porns cctung :;7 oyBox:21 Du2-4 "REP ro Top (ft):302.5 Box 2 oF \bursitnce Lestat 7 _ ; .me 72 BSA apd 3°MY Bor 21 :aoBottom(ft):316.7 :|FDOK ZC RHPPhotoDate:8/30/2012 ,i so - Comments: Oecprt tTDagwieneR RE - "oaREY IY,pa-=i. Bore Hole:DH12-4 Box:22 Top (ft):316.7 Bottom (ft):331.4 . Photo Date:8/30/2012 Comments:ee ee leans _.rains raat pan ee Ld QE is ':-he Sani ¢RtnTONS3ssIAtiagneinat HP hesrehNSONinset enate .Ee ere ge ee AY ee DeSASLiret DH12-4 Page 45 of 122 302.5 ft to 331.4 ft @)mw.Core Box Photographs Project:Susitna-Watana Hydroelectric Project Site Location Right Abutment Client:Alaska Energy Authority Site Name:Watana Dam Site Bore Hole:DH12-4 Box:23 Top (ft):331.4 Bottom (ft):346.1 Photo Date:8/30/2012 Comments: Bore Hole:DH12-4 Box:24 Top (ft):346.1 Bottom (ft):350.0 Photo Date:8/31/2012 Comments: DH12-4 ry AER a oan-4pteBC acdQCROMWE[350-9 clom 3404 to3LGhand . sda Page 46 of 122 331.4 ft to 350.0 ft @)N.ww H.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment General Comments: ¢Depth increases from upper left to lower right. *Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. ¢Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. *Black lines across a fracture label a fracture as interpreted as a mechanical break. ©Blue markings represent notes. DH12-4 Page 47 of 122 346.1 ft to 350.0 ft @ mwu.Core Box Photographs Bottom (ft):39.2 Photo Date:8/19/2012 Comments: Se si Traeee I$-DHI2-8 "Box Ack 2012 to 814-Aale a3 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left AbutmentBoreHole:DH12-8 |Kya htaduedeken Ae...imcoe a Box:1 '4 Alaska Epergy Avthortt CAEA)Top (ft):0.0 °Susitne-We 5 201dBottom(ft):20.5 .DHI2-8 B-1F-QOlD,te 6PhotoDate:_8/18/2012 From 20%+o 20.SeComments:Box Lot ne ; ..re ere Ne Fe eerste &, .,.:tsewetAeFrere:ZoejiP3ts ;Ree ah ie es eed 2 oo) mts e e2 o ame.oh age -_,fyale2wdaiiwaeEiASTa:=:De poet «OREN OESasa RY,Bore Hole:DH12-8 Seeatrsaw L 3 t4Nnh wd Box:2 .Authort (AEA)Top (ft):20.5 Alaska.Erergy Avtherity From,20:5 40 39.9 f+nabendeeaieaa-4 uw ¥¥-rs SATUS NBSfatfi.Per paean y wee aue,:TR"WER Sais:Seea3.)gt ROS nw "ne!44 43 40 "sh 37 38 99 40 41g?aid aPeacrcreCa=ay Hh 33 a6 38 IB ,--eres oe_nee yg ee yee R ms DH12-8 Page 48 of 122 0.0 ft to 39.2 ft @)N,wH ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 ;i Box:3 Alaska Eneray Authority (AFA)/ : -+ Top (ft):39.2 he Susitra-Wa et 012Bottom(ft):57.7 .Ar S '* Photo Date:8/20/2012 .ry ° Comments:Frem 34.Aft to 5H 7 rt 's.c403.4 4 3 Bore Hole:DH12-8 Alosta Energy Authority CAEA) : .Susitagg LWWctana.Box:4 DWIys %Z-Jo-pom - ° Top (ft):57.7 ;_Box 4 of -7.Bottom (ft):71.6 .From SAP to Ho F+ Photo Date:8/21/2012 oe ._ Comments:ras $=%*,%,areal HA ied »m7 oy 29021 97 23 Ey 25 a 77,78 ae 304 Git 33,34 38 M37 38 39 60 41 a? DH12-8 Page 49 of 122 39.2 ft to 71.6 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 17 Meera es Aa Box:5 Top (ft):71.6 Bottom (ft):84.8 Photo Date:9/1/2012 Comments: Bore Hole:DH12-8 :. Box:6 Alaska Energy Authority (AEA) Top (ft):84.8 Guid -Wetana Bottom (ft):99.2 pRB BPI 2OND Photo Date:8/21/2012 Bo &of Comments:From gush re§>a ..re DH12-8 Page 50 of 122 71.6 ft to 99.2 ft @)NiesH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 oo Alaska Energy Avthoeity (AEA)4 a -:ae ae Ss Susitnea-Watana op (ft)::DH 8-2 D012 : . Bottom (ft):113.4 Box Jor . &.. Photo Date:_8/22/2012 From 99.24 +o 113.4 a 4 9 we rs ,to a oe ae RET RT ar Tarr err rears ;1.& note Hole:mS Alosve Energy Avthority (AEA)OX:+ Top (ft):113.4 °Dusitre:were o ne: -pHR-B $-22-2012 -co _- Bottom (ft):126.6 |* Fox 3 efPhotoDate:8/22/2012 Fem URUK te 126.6 FF " Comments:°. ".wt iwBEESalteaeamaeamen|wy -"Sige:ear¥;te DH12-8 Page 51 of 122 99.2 ft to 126.6 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 Box:9 Alaske Energy Authority CAEA Top (ft):126.6 Susitne-Wa tanaop{ft DHI2-8 =:§-A2-201dBottom(ft):140.4 Box 9 ofPhotoDate:8/23/2012 From 126.64 +e 140.4 ¥+Comments: v4 >.:"3 oye,a aaa Wes a 90 Fn"9292 Mh as 2 a7 28 ae 30 an A 93 3a "os”he "Sy Se'se 40 AN ay ag ae as 46 87 wv ws wes aye penne + et riennici bp POE ae -ead .Bore Hole:DH12-8 "oe *: Box:10 Aleka Energy Authority CAFEA)Top (ft):140.4 Gust pee Wak ane ,. 6 Bottom (ft):153.8 .DHIAB B-AB-2el2r,. .°Photo Date:-_8/23/2012 Box 10 of ° . Comments:Frome HOY +s (53.oft Rares crperas.Was: DH12-8 Page 52 of 122 126.6 ft to 153.8 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 :Alaska Energy Avtheetty (ABA)Box:11 Susitnay Wiatana % Top (ft):153.8 DHia-B@ Brad-x0/2 Bottom (ft):168.1 Box 11¢ Photo Date:8/23/2012 From 15384 te 168.16+ Comments:7 ween ERa = Bore Hole:DH12-8 Box:12 Alaska Energy Autherity (AEA)Top (ft):168.1 GS ositva-\WatanaBottom(ft):182.5 *'Da-8 B--Y3-2012 &giay-aeia Photo Date:8/24/2012 Box 12%ofComments:;Frm 168.1%to east Se Ww "room a7 ”ad Lid ”,7 27?0 6te fF7 78 Wo awn32,Ma a ad 3 iy 39 46 'a?a3 a"43.ae a?e re 2 DH12-8 Page 53 of 122 153.8 ft to 182.5 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 4 .4 Bone 3 ¥Alaska Enerqy Authority CA EA)2 ;:itna-Watana ° Top (ft):182.5 Sus a 2,. :7,4..ff z .1 a ° Bottom (ft):196.3 .Bok#ie ge BAH DOR|. Photo Date:8/24/2012 . ox > eames "From LBLE to 196.3£+ i a Soa ten dh Dea 'i eT FT ay wepuss 2 we 0 TOE 9T e 9e 4 By "a Fe”anen wn "a Jso 4 Bore Hole:DH12-8 Alaska Ene FY Aothority (AEA)Box:14 Susidna-Watana.Top (ft):196.3 DH -8 B-24-2012 . Bottom (ft):210.0 Bow "14.68 ..- Photo Date:8/24/2012 From 146.3 £4 40 210.0 ianComments: DH12-8 Page 54 of 122 182.5 ft to 210.0 ft @)NwwH.Core Box Photographs bCea) a .oy426344454847chay30,8052 59 $4 45 54,57 8 58 4 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment FrBoreHole:DH12-8 /Autheri (AEA)Box:15 ae :\Alaske Energy ut tyTop(it):210.0 Gusiteay WatanapanePHI2-Bs 3 AN-2NA sy.+Bottom (ft):224.2 7 °5 of be a PhotoDate:8/24/2012 |BRE ©",°Bo 15.Ananth 7 ,Comments:is From 210.04 te AALAFE . ; i STH TPS iat ete ar ae)aul a We TIO aT 2375 Mas 26 2728 3@ 30 31 FR 33 se 35 fl 37 38 39 40 41 42 43 46 4540 87 Ea Av S0 $1 52 53 34 v ccm sF se 38 ¢ivcetgsaeia ;sa ca an Bore Hole:DH12-8 . Box.16 Alaskan Energy Authority (AEA):pitnae Wark anaTop(ft):224.2 Sus!CAR-Y -14.-25-20Bottom(ft):237.9 -pHra-e=24208 «8-25-2013 Photo Date:8/25/2012 fox 16 of__339.454Comments:From 22418 to re ay hou ts oy 9 20 9y 99 73 33 7 9778 36 30 31 FR aa34 33 &a 30 4a a poe DH12-8 Page 55 of 122 210.0 ft to 237.9 ft @)mwu.Core Box Photographs eennastiith, Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 Box:7 Alaske Energy Avthonty (AFA)-Cusiina-WotaneTop(ft):237.9 *D :3 8 °"G-25-2012 *Bottom (ft):251.4 - *Box [F of . phate Date:8/25/2012 From 237.9 ¢tt0 ASL YE omments: a 23 ay 2499 28 ”yo sy PR 3a"aa ae ay”seo 90 do)ay tag 4a as 4a a7 th ites at BY sa 5g se sr sa 30 4 -a eee OeeS .Y Bore Hole:DH12-8 |.'+(AEA Box:18 R\acks Energy Act hor ety ) ;caneTop(ft):251.4 ||ererne E 25-20N2 rrBottom(ft):264.2 :oe Wr Se gf)..|Photo Date:8/26/2012 |bond Qsinke re AGH.afr 7Comments: go an ro DH12-8 Page 56 of 122 237.9 ft to 264.2 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment :-Cee .EBoreHoleDiasAlaskeEnergyAuthorityCAEA)0 : tanaTop(ft):264.2 Suse na a*uoBottom(ft):278.2 prize 8a 2 PhotoDate:8/26/2012 Gor Lic a Comments:Feee acy.aft to AtB.AFt . . - 4BoreHole:HI Cakray Putho city (AEA).. Ox:0 AA ASO epee UES om -eeTop(ft):278.2 2 Q-LO-IAD ; Bottom (ft):292.1 ex Jo of aA VA frPhotoDate:-_8/26/2012 Sco UFR AET FO Comments: DH12-8 Page 57 of 122 264.2 ft to 292.1 ft @)MWH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment Bore Hole:DH12-8 S]aske Eacegy Autharty (AEA)-jaBox:21 susana-Watana_") Top (ft):292.1 SHt2-Q ST 2QE-29012 j Bottom (ft):305.8 __Box R2]lefeofSO |-; Photo Date:9/1/2012 Fron ada.LF te 205.3 +.,. Comments: Bore Hole:DH12-8 wtDlaska-Erergy potinarity CA EA)OoBox:22 Gusitea:Warars a mee:en Top (ft):305.8 oeis-S B-3G-2°1A _ Bottom (ft):319.2 Bx Wot me Photo Date:8/27/2012 From DOS.BE to ZITA He C ts:.ommen's -Tee dee as ae ar ae ce 30 8!A 3S ae 35 aE Oe)a3 4a 47 a Sai (53 34 53 30 37 58 rm DH12-8 Page 58 of 122 292.1 ft to 319.2 ft @)N..eH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Lower Left Abutment :-OY weerBoreHole:DH12-8 i;A och biter 4 rActharity C AFA)- Topi 39 Sustina Vi atans 8op(ft):.ee aeBottom(ft):333.3 ney 43 a5PhotoDate:9/1/2012 ee ae Comments::FromBihact ot6 323.23 ++ ,cals _-_ Bore Hole:DH12-8 ; . Box:24 rawnae Frees,suthe ory ¢cA cA)Top (ft):333.3 aoe ap 8-29-2613 : Bottom (ft):346.3 : Gor 24,685 Photo Date:9/1/2012 From 333.34+to 3 46.5 Ge ;Comments:. DH12-8 Page 59 of 122 319.2 ft to 346.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Site Name:Watana Dam Site Bore Hole:DH12-8 Box:25 Top (ft):346.3 Bottom (ft):354.2 Photo Date:9/1/2012 Comments: Project: Site Location Susitna-Watana Hydroelectric Project Lower Left Abutment a)Alaska Energ4Suge{fa tans pHia-8 <§On aoe az A uth aci ty CAEA) 9-2F-24012 354204 BOu ae.ee go qs me,ae eo fear se':. General Comments: ¢Depth increases from upper left to lower right. *Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. *Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. ¢Black lines across a fracture label a fracture as interpreted as a mechanical break. ¢Blue markings represent notes. o DH12-8 Page 60 of 122 346.3 ft to 354.2 ft @)NeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b SusrTNA-WIATANA HEP .4}Box:1 DH4 an oe . Top (ft):84.7 Box 7 rer ict 10 84 ,_ Bottom (ft):98.4 Prog 23,20")Photo Date:8/23/2014 Comments: ry fiSrreserstaearm.soe ;--SEER ETS.SHS aecra | Bore Hole:DH14-9b ieBox:2 a Top (ft):98.4 Ee ore fo . | 9 . Bottom (ft):111.9 23,204 * Photo Date:8/24/2014 :hog 2)e: eComments:. :©' Dry Core Photograph pao come apetone ten nA a ah 'ettetals . pln oe res . DH14-9b Page 61 of 122 84.7 ft to 111.9 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b |i}PEA | Box:3 |)Sositna-tdane HEP.;s i Top (ft):1119 |,DHI44b c Bottom (ft):126.1 |:Boy-32F--------;Photo Date:8/24/2014 |)FRGn?I 4120.1 iComments:Aus 24,2614 Bore Hole:DH14-9b Box:4 : Top (ft):126.1 Bottom (ft):140.0 Photo Date:8/25/2014 or Netw te OSComments: DH14-9b Page 62 of 122 111.9 ft to 140.0 ft @)NiwwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b \creBox:5 Svsitan-ba fist AE?Top (ft):140.0 Pajn ; Bottom (ft):154.4 oes yap0"1544PhotoDate:8/25/2014 .Aug a5 0Comments:i PTT paren ot prey2eeeaaaJoncaPecanetate7,Roy :,i : Bore Hole:DH14-9b Box:6 |Suatne- LO AERA HEY ° Top (ft):154.4 |DWWWAb : Bottom (ft):168.0 |Box bo of 0!-(fu):ERON att ye ey _2i a iPhotoDate:8/25/2014 Ae45 kk eed £2 : Comments:.,; EA a aA A NE ; ay eed eee*bo.aoesiaG8aytacttesates2ectala”aeaiinttemSRSirele,KE DH14-9b Page 63 of 122 140.0 ft to 168.0 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b PE ae Box:7 kee ae Top (ft):168.0 1 Bier s " . Bottom (ft):181.9 ban 7 98.0 40 1B}Photo Date:8/26/2014 ee nal ° Comments:FGA Se oo oe ee a co a a vs wy ene ees ey He A whe +wet Ce eee OReno=<Sica a eR:a ee zereaes)pas Bore Hole:DH14-9b 73 7 eC Box:8 Questa --Lderpa HEY? Bottom (ft):196.2 Coy 9.ae . . . Photo Date:_8/26/2014 FRoIN BA +O nes : : Comments:' DH14-9b Page 64 of 122 168.0 ft to 210.2 ft 4H)NwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b REA :Sen -tTa&fe na HEIBox:9 o :”DAIE-IL¢Top (ft):196.2 boven >. Bottom (ft):210.2 L FRONT -74>.GOH @ Photo Date:8/26/2014 9:Roy 207Comments:a BArepiese GX }nSants=aislesaSSe pap een sf 1:8 =Se ee 2 7 a sf » Bore Hole:DH14-9b ),t!”a +LyBox:10 |.Susidm--iadone HEP 'onTop(ft):210.2 .D4i4eib .ow . . Bottom (ft):224.3 eyes 4 12 cfr ® : Photo Date:8/27/2014 1714102 TC xa;Feta1 QNe: | .°. Comments:Poy.26,2¢if *.e =iSCe 4 aed NY aytoe ae Avast?"2.AByelakecin ee 44 Pid eee Pi se |pS eS"4 yt a eae a----pe SERENEAGeee Fabs;haw oe,j 'Nar 2 cal °2 :ae ree oT eee ees ce sera a .to ae eragmmont pe ;Cig ee cea=oh i .=_"'*s . :3 ™ 7 ='..wo..Pee f DH14-9b Page 65 of 122 196.2 ft to 224.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b |.cee * Box:11 Top (ft):224.3 Bottom (ft):238.4 Photo Date:8/27/2014 Comments: a eaten]eseyFdwhFOesoree:ee ey Bore Hole:DH14-9b .=° i LER \le onBox:12 Loukannt Ra Q}-. Top (ft):238.4 oe -_re o yy oo tf Bottom (ft):252.7 2 DR Of :ee,; SSN es . * -Photo Date:8/28/2014 eae s+34 "ys Comments:Bog.SE Far « DH14-9b Page 66 of 122 224.3 ft to 252.7 ft @)New.Core Box Photographs on 4 tawd &sem iog74Hy upnentl san . eat cee SeinttRoea>6 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b HER ehene Hew - :Syst ink Ctre13oHKeaTop(ft):252.7 Bow IBcf,2b” Bottom (ft):266.4 |”FRI 24 le *.°@ Photo Date:8/28/2014 _ tug a youl . Comments:°. -red ae Bore Hole:DH14-9b Box:14 ae ne * Top (ft):266.4 Seller dare |uPBottom(ft):280.0 s-yehoaiqof 6PhotoDate:8/29/2014 "pe pUadte BOP . Comments: Mig:eeeeeSree xg 2 snapew ire fae Pe oe pews M4058 Se et eeeasement! DH14-9b Page 67 of 122 252.7 ft to 280.0 ft @)NI W H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b |F AEA ,;fo TYBox:15 |i!Sustde toc HEP ag URS s HP-Fb NS 4Top(ft):280.0 |h CHI °oat Sate,;Boy IS oF a3 °t:i aeBottom(ft):293.6 ¥otoF . «cme Photo Date:9/6/2014 ets 2014 a . .- - Comments:Av4,ad : - SS ee ee Bore Hole:DH14-9b KERBox:16 Soydth Watery HED Top (ft):293.6 Bottom (ft):307.7 Photo Date:9/7/2014 Comments: Pa ES?y 's ae a . .ce LO gD:a vata fou E. reg oie "a:te gs A.oh Fy nk ks einentleates 1!Suatrlllty,oe desaatASpenaleeeESSPnggiFOSPeete1Saar, .>zo30 4.*HF a >41 2 [woe +ope et woe el:.38 2 a}7e DH14-9b Page 68 of 122 280.0 ft to 307.7 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-Sb fai ERBox:17 Susivna liana HEP Top (ft):307.7 DH4-4b Bottom (ft):322.6 Cox 17%CF 42 Photo Date:11/21/2008 FRenisett TOBLL Comments: b wi °ntmioe no ryeahag Bore Hole:DH14-9b Box:18 Top (ft):322.6 Bottom (ft):336.9 Photo Date:9/7/2014 Comments: W e ga av!Fee errr aadhat =y i2H Ts } DH14-9b Page 69 of 122 307.7 ft to 336.9 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b "Ep :' Box:19 f<Pusidna:boatena HEV?8 Top (ft):336.9 ae tVe .. Bottom (ft):350.4 "oOLGOBPhotoDate:9/8/2014 3 33 voComments: Bore Hole:DH14-9b |AS HEBox:20 |Reel Susidna=biatana SapTop(ft):350.4 |Ba p Hit:ee cBottom(ft):365.0 .on "450.H 10 Ba 3050PhotoDate:9/8/2014 ,° Comments: DH14-9b Page 70 of 122 336.9 ft to 365.0 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b |fy Way - a Box:21 ap pion WEE :ae nhMNTop(ft):365.0 a 'Bottom (ft):379.7 oo Wf 4550 fo 314 *PhotoDate:9/9/2014 Le ot ° Comments: eR A YS?Ht amass "a7 aime "=-----ma Doses hes &6 ares"ete eg Bore Hole:DH14-9b :r)iBox:22 Do5i\e Loatuny HEP Bottom (ft):394.0 Voy1 of }i Photo Date:9/9/2014 caus BAF $634.0 s) Comments:on)4,aie Oo oO Oe ed ted he --SR.Gl}Bemeeren pean ieee=prem DH14-9b Page 71 of 122 365.0 ft to 394.0 ft @)mwu.Core Box Photographs Susitna-Watana Hydroelectric Project Site Location Right Abutment Dry Core Photograph Client:Alaska Energy Authority Project: Site Name:Watana Dam Site Bore Hole:DH14-9b AE H > Box:23 Sublet HEYTop(ft):394.0 DHI-ITbBottom(ft):408.0 Photo Date:9/9/2014 Comments: d 1 Bore Hole:DH14-9b |ALHA Box:24 |@ Susan Lota,Hep Top (ft):408.0 OAM-Ab ,oO - Bottom (ft):421.9 Bex 24 js Photo Date:9/10/2014 ERtiv |WHS +e was Comments:SFET NO IDI DH14-9b Page 72 of 122 394.0 ft to 421.9 ft @)NeH.Core Box Photographs 20 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-95 |AER -ee Box:25 |B 1 Dystnk tide HEP Xn ,all ° Top (ft):421.9 |ff LA bs MN .©Dox 25 OF & Bottom (ft):435.7 From dad qo 43 . Photo Date:9/10/2014 Sept.1D °ha Comments: tyarr fe2 a1eee,hie8)pete preemieeG:came"amin TG Bore Hole:DH14-9b Box:26 itat Suhre au A \, Top (ft):435.7 "Oa:4 €Bottom (ft):449.7 Vee as ara +aPhotoDate:9/11/2014 week Meaty Ott \Comments:2) DH14-9b Page 73 of 122 421.9 ft to 449.7 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b |*AG -oe aT ell Box:27 byitena -Wektath HE?7 Top (ft):449.7 CHM AY . . . Bottom (ft):464.2 bor 14 oF rvs :Photo Date:9/11/2014 Fron WAX 7 oA ° Comments:Seet.\WU FS ganaSieSEReed Sey om cata i £ & Bore Hole:DH14-9b te n ,Box:28 Soodnn-todd ana HEP eTop(ft):464.2 Wheeasany @ Bottom (ft):478.5 ex 26 6 495 a Photo Date:9/12/2014 pacnyaar To TH ° Comments:Se pet N ap ."@ e an A OP:MaakiagtP-ay pt a;sDE SEAL AS DH14-9b Page 74 of 122 449.7 ft to 478.5 ft @)NiwwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b fiers i 4) Box:29 Zunrdink "Astana HE a)' bb)_ . Top (ft):478.5 ofae ;Bottom (ft):492.4 Fee i dps to:HAZ .6 - Photo Date:9/12/2014 Sept.Te thy nowt -°8 *6Comments:a Me . ; ?-"'. .dS,am *-nr ee {.:mas : Bore Hole:DH14-9b Box:30 Srstene Weta HeP 9 ' ° ANTop(ft):492.4 bot 30 or +Bottom (ft):506.2 cas 19.4 $0 SO Photo Date:9/12/2014 Geet:14514 Comments:; a 4,*.a1heen DH14-9b Page 75 of 122 478.5 ft to 506.2 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b Aen oe a Box:31 pysitnk-oekua HEP Top (ft):506.2 .be Oe .Bottom (ft):520.5 maT HOsLk0 $20.5 , Photo Date:9/13/2014 59 pt:gnu 'y . ; Comments: Bore Hole:DH14-9b pcr ;Yep : Box:32 dni Lo atana FFI . :OH 4b :Top (ft):520.5 49 oF - ° Bottom (ft):535.0 Flow 5% Photo Date:9/13/2014 ba gh.13,2014 .€Comments:0 ;eet fa] Shera DH14-9b Page 76 of 122 506.2 ft to 535.0 ft @)MeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b He ." Box:33 othe tadancg fie pe a ) Top (ft):535.0 2 CGBottom(ft):549.0 Pe IFO Photo Date:9/14/2014 Comments: Bore Hole:DH14-9b CENBox:34 . se IETop(ft):549.0 bibdate Leal HEP Bottom (ft):562.9 DRI f°Photo Date:9/14/2014 By We Yt GuanComments:Feet ;Seok.26 I . 4 ar ee >T +Te | DH14-9b Page 77 of 122 535.0 ft to 562.9 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b Box:35 Top (ft):562.9 Bottom (ft):577.6 5i0 4a»Waa 77& Photo Date:9/14/2014 Cop}wh 901Comments:vy Bore Hole:DH14-9b A a \on a0 Suey nin-Weiada HEPTop(ft):577.6 PltBottom(ft):591.8 box 3 of Photo Date:9/15/2014 (ED WAS TA I> Comments: eS hei le:aS ay, DH14-9b Page 78 of 122 562.9 ft to 591.8 ft ©)NewH.Core Box Photographs Page 79 of 122 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b |[ud her .eBox:37 |Fy sustaa "Watana HEP é 6 ea Top (ft):591.8 |he CHA Se nm °toy 7 Bottom (ft):605.8 'Ba te L-65:8RSW;Photo Date:9/15/2014 Deer:(5,20HComments:ee ="mnie!tht et ae ot me J s |enanl _ Bore Hole:DH14-9b KE Ox ie Box:38 Swotkna-Oalang HEP 4Top(ft):605.8 OWU-@b ; Bottom (ft):620.3 Box 38 OF . . . Photo Date:9/16/2014 FROM To UPS : .- " .. Comments:Seer 157 Qarue .3 =4 yore wfim baal beaten dfamct oe DH14-9b 591.8 ft to 620.3 ft @)mwu.Core Box Photographs Page 80 of 122 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment :-eAsoeHoleDH14seean "Walaa.HO .oy Top (ft):620.3 Pox3d OF 350Bottom(ft):635.0 Feo UPD 1 LS.: PhotoDate:9/16/2014 sept 16,204 Comments:we ne ee _. =a]: iY:a roan lf:rs _=-an Bore Hole:DH14-9b Box:40 Swoitaa Welana WEP . Top (ft):635.0 OAV, Bottom (ft):649.5 Gey AD OF , ° Photo Date:9/17/2014 FON\YOO ro WAS ,2 Comments:*Sept gow °. G ©eee i"tahoeiceet%.- Ad po DH14-9b 620.3 ft to 649.5 ft CH)N.wu H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b Ae n Box:41 !Suntan (atane firey' fh (ttyTop(ft):649.5 Ber ka ;Bottom (ft):664.1 trOn]Lvee voieldt Photo Date:9/17/2014 a ca 5 Comments: = ret ta:# al 2S Boe EATERin BOTTSScabanas ura9 are seen sants rte cary yaar:ares itespeers saree ee caranmete3fenfi"Be sas Tit gStut iPELE2 =isc.ws Be ary z Bore Hole:DH14-9b |vg He ;Soe Box:42 wha aosidna Gstana Hero %. :aa QEnd-4h l.Top (ft):664.1 |3 4 Ror 4 ne |12 OBA MasBottom(ft):678.4 4 aaPhotoDate:_9/17/2014 |4 ad IF,20 4Comments:-ey aeons veyEeStARfbeThaturefareteowneSeein§.\ sae OETAeR=nwy.acres 3 ores en 2 ew :\ DH14-9b Page 81 of 122 649.5 ft to 683.6 ft @)mwu.Core Box Photographs Comments: prin Ss om Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-9b per )SaySupe-L GG he f oy Box:43 .PHIY-Ab ayTop(ft):678.4 ox 42,OF Bottom (ft):683.6 EPO GBA TC.(BR ::Seek .it,2 OHPhotoDate:9/17/2014 - a Me te >BELA Bote -_-” ro bam ow @ z a ; . . . : oo.soe _sale seana ett Sakti hah tien Snel ES BEE mRa:wf os > : , . L :6 a °:re ne ae Ea ER ee Gg IY a SA ee oy a "<ot . 7 e General Comments: DH14-9b Page 82 of 122 678.4 ft to 683.6 ft @)NieeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 SSucidna Walana Hydro ZoryBox:1 »DHM-tr0O ,&(4 204eTop(ft):0.0 Bort [*of 49 na *Bottom (ft):24.8 \he A eePhotoDate:_11/21/2008 Dees 9 aieComments:° Bore Hole:DH14-10 WATANA 'HYDRE DoldBox:2 aay DHIH-/e Agast 15,2Ol4op(ft):24.8 B x a is 43 . Bottom (ft):45.0 o ° Photo Date:11/21/2008 Comments: so "a a .SA wc:[maw ue a DH14-10 Page 83 of 122 0.0 ft to 45.0 ft @)mwu.Core Box Photographs Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Location Left Abutment \NATANA?Hyde TOWDHY4-lo |6S S44 .Box 23 of 49Depth.79°of:0%LX -"EW Soe pp cA ie Ae)ee ea Rae @oao4 2 6 yoke « . et FF 8 WATAMA Udeo ZortlDHI4-lo "g-16-19.Bex 44 49 Client: Site Name:Watana Dam Site Bore Hole:DH14-10 Box:3 Top (ft):45.0 Bottom (ft):60.8 Photo Date:11/21/2008 Comments: Bore Hole:DH14-10 Box:4 Top (ft):60.8 Bottom (ft):76.4 Photo Date:11/21/2008 Comments: DH14-10 Page 84 of 122 45.0 ft to 76.4 ft @)Mes.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 e WATANA Ryde Zoi,Box:5 DH l-te.-[F-49 -.- Top (ft):76.4 °.Ber 5 &449 . ° Bottom (ft):90.2 ° 5 Photo Date:11/21/2008 Depth -7O4 +e o%f+. Comments:: Ree een paeat cee Sd,eth ReinEV os is .f ar Sve.af Se,eits a ”.oRce)eeaia args Bore Hole:DH14-10 WATANA Hydro ZoiyBox:6 Dt 14-lo 8-18-14 Top (ft):90.2 Box 6 &49 Bottom (ft):104.3 -¢ Photo Date:11/21/2008 Comments: ate Bees iy eo ee DH14-10 Page 85 of 122 76.4 ft to 104.3 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 |WATANA H YDRO Zoid .Box:7 DHI4-lo Box 7 of 49 B-1B (4Top(ft):104.3 \ ,, Bottom (ft):118.3 D epth:[04.3 +to'\lIe>Photo Date:11/21/2008 . Comments: Bore Hole:DH14-10 WATANENA Iyieo 2JomBox:8 DH J4-10 &-le-1d 2Top(ft):118.3 Es £49 . Bottom (ft):132.8 Box * ° Photo Date:11/21/2008 ||29 8 .Comments:if ap ph:le 2 'te \as \ EN eo wot SS oe ve,tees eet DH14-10 Page 86 of 122 104.3 ft to 132.8 ft Core Box Photographs@)NweH. Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 -WATANA HY¥Dko ZOTDIly-”a neBox:9 Bex "JTet Y¥9 Top (ft):132.8 i ?aye Bottom (ft):147.8 _Dipti:52.8 wb 147-8 ae Photo Date:11/21/2008 ; . ° Comments: aa Hole:DH14-10 Wf ATANA WYPRO Zoi4ox:10 Daw =B=4 2Top(ft):147.8 ¢Bottom (ft):162.7 Bex 10 44 - Photo Date:11/21/2008 Depth:47.9 te |%2.F OMComments:©, . DH14-10 Page 87 of 122 132.8 ft to 162.7 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 WATANA Hydro ZoiBox:11 DAlY-10 B-(7 -{4 . Top (ft):162.7 Box ll of 49 Bottom (ft):176.5 |: Photo Date:11/21/2008 Depth :(62-7 te 46.SComments:T 4 PENSE AED ie ''$F.Fi ' Bore Hole:DH14-10 WATANP Hydro 2ST Box:12 DUId-10 BIN te Top (ft):176.5 Bor 2 "F 44 . Bottom (ft):190.9 . Photo Date:11/21/2008 Derk.(26-5 to 20.4 S Comments:;- PSSAONENEN RN DH14-10 Page 88 of 122 162.7 ft to 190.9 ft @)NiwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 .WATANA Zo (4 Box:13 :Duiy-i0 B+20-14 Top (ft):190.9 Be 13 of 49 > Bottom (ft):204.9 ° Photo Date:11/21/2008 |..Depth:(AOA te ZOVA er Comments:i . Bore Hole:DH14-10 .WATAN A Vydeo ZoiBox:14 .Dui-1o =Bs Za-(4Top(ft):204.9 .Bax 14 of . Bottom (ft):218.6 °-Tee Photo Date:10/20/2014 Depth:204.9 +o V\B && Comments: DH14-10 Page 89 of 122 190.9 ft to 232.8 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 WATAWA Hydro ZotBox:15 pine :ie ee .Top (ft):218.6 x I 9 Bottom (ft):232.8 A:118.6 7132 g War:' :puPhotoDate:_10/20/2014 Dep te Comments: Bore Hole:DH14-10 ATANA HYDRO oly Box:16 DHt-10 8-2\-14 Top (ft):232.8 Rex %of Bottom (ft):246.3 .° : Photo Date:_10/20/2014 Derth:2822 4572463 Pe Comments:i:; tchdea ips Wet dai tens Wack SoweeeLun P ys Ree.”we _-.- DH14-10 Page 90 of 122 218.6 ft to 246.3 ft @)eeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 |Psvrehed ° HYDRO ZorATANA:Box:17 Wit 8 aloe Top (ft):246.3 .eBottom(ft):260.8 Depth :-246 Zz 4+e zZ COB RK. Photo Date:11/21/2008 s Commerts: Bore Hole:DH14-10 Su-WA HEP Zon Box:18 Du 1W-(lo eB-2z1 -14¢ Top (ft):260.8 ° .Box 18 of H9 Bottom (ft):275.2 Hh tes:8PhotoDate:11/21/2008 'Dep te = Comments:-ee TO erentns eam eenNSetgh n ee care DH14-10 Page 91 of 122 eo275.2 Ot 246.3 ft to 275.2 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 GP Su-We HEC 24\4Box:19 Ditd-lo ,a-2e2(%.Top (ft):275.2 Box \%0&6 49Bottom(ft):289.4 Photo Date:11/21/2008 Dep:245.740 2874 4 |Comments:- . BET ae Bore Hole:DH14-10 u-Wa WEP zou Box:20 PH-1e 6-22-iY Top (ft):289.4 ;+Box 20 of,' Bottom (ft):302.8 g OPhotoDate:10/20/2014 Deh:284.4 42 B02:' Comments:; DH14-10 Page 92 of 122 275.2 ft to 302.8 ft @)NieeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Su be HEP 2c Vay |Box:21 DAH -le B-22-(4 . Top (ft):302.8 Bex 21 of ¥ Bottom (ft):316.6 16.6 Photo Date:10/20/2014 °_Derth:302.8 te?i Comments: Bore Hole:DH14-10 4 Box:22 U 10 8-23 -\4 Top (ft):316.6 DH!Box 22 &. Bottom (ft):330.4 , Photo Date:10/20/2014 Degh:316-6 to:330.4 e Comments:ca ae DH14-10 Page 93 of 122 302.8 ft to 344.4 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 <u-We HEP Zot eR nly, Box:23 pie io 0-23-14 _ Top (ft):330.4 a x) Bottom (ft):344.4 - tA:350,244 4 Photo Date:10/21/2014 :enih |4 fe.sad Comments:sa Fo ppppenemanemmaeepecee ore | Ory Core Photograph Uitian crepes)'/savenanap | vant f es 2 8 1 Bore Hole:DH14-10 J al :Hid -toBox:24 D Box 24 ofTop(ft):344.4 . .: Bottom (ft):358.3 Depth.24-4 4358-3 ty Photo Date:10/20/2014 \Comments:a a : "A MS erty,Bae a 2 2 cg?eee a Lan 8 cm ot ot a8 2 ow ac al 7 3 DH14-10 Page 94 of 122 330.4 ft to 372.3 ft @ N.ww H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 -Su-we HEP 204 Box:25 TDAI4-(©B24 =4 \ °aRor2Top(ft):358.3 a s Bottom (ft):372.3 .358.3 opted GFPhotoDate:10/20/2014 Dep -+ Comments:_-_. ;ped ."one 'iy pee oye eee ee " .eet un:. *.gal hn aWfafin B aepres hadFPwos PY Sean Bore Hole:DH14-10 Su-we HEP zou Box:26 Dd 14-16 B-24-14 oo .eTop(ft):372.3 Box 26 of Bottom (ft):386.0 De paid F185 360 % Photo Date:10/20/2014 Comments: DH14-10 Page 95 of 122 358.3 ft to 386.0 ft @)MWH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Su Wa HEP Zor Box:27 Du.0 8-25-14 eTop(ft):386.0 Box 27 ©e Bottom (ft):399.6 i Depths:286°to anqe oe e Photo Date:10/20/2014 ' Comments: a "3 OBS :.ite.im cece ie 2 3 ar ae ' Bore Hole:DH14-10 Box:28 Su Wa WET Zor Top (ft):399.6 Dawe 0 2-264 Bottom (ft):413.5 Box ZB of Photo Date:10/20/2014 ©4:399.6 4 413.”a.:.ineComments:3 Der .Zs Woe!pig Sai DH14-10 Page 96 of 122 386.0 ft to 413.5 ft @)NwvH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Ss u-Wa KEP 2014Box:29 ||.Du sy Top (ft):413.5 : te Box 24 ce . - 7 Bottom (ft):427.4 . Photo Date:_10/20/2014 Depth 43.5 te YLt4 Comments: Bore Hole:DH14-10 "Su.(Wa HEP sonBox:30 .DHIY-lo 8-26-14 Top (ft):427.4 Le Bax Bo of % Bottom (ft):441.0 °ig Photo Date:10/20/2014 Deph:F274 to HS Py e |Comments:e : a 7 et Ne i cg :"LY NGRE ce eesi-a z é >Gz Ras »ie Le ;: DH14-10 Page 97 of 122 413.5 ft to 441.0 ft @)mwu. Photo Date:10/21/2014 Comments: Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Su-We HEP zouBox:31 o .a D4 -lo B-26-\4 © Top (ft):441.0 Box Bl of Bottom (ft):454.1 Depth:441°to 454.1 St Dry Core Photograph Bore Hole:DH14-10 Box:32 Top (ft):454.1 Bottom (ft):467.8 Photo Date:10/20/2014 Comments: arife eeere DH14-10 Page 98 of 122 441.0 ft to 481.8 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Su-Wa HEP 2014 ;HI4-10 B-24-14Box:33 D 33.afTop(ft):467.8 Box °°aeBottom(ft):481.8 .407.8 UB Re){\Photo Date:10/20/2014 'D epth .1B | Comments:.' 7 pert aie SA coe oh ba et f bi wg gy Gee PTE le 8 "4'7e 8 SeesiTe Te ee Bore Hole:DH14-10 Su-Wa HEP Zon, Box:34 Dumto 8-27-14 Top (ft):481.8 Box BY of Bottom (ft):495.5 : &YI5-5 Photo Date:10/20/2014 Depth:8/2 to ts Comments:, DH14-10 Page 99 of 122 467.8 ft to 495.5 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 5 Su-Wa HEP Zon wy ;"y oeBox:35 DH hy B23 -I4 oD |Top (ft):495.5 e "*Bex 35 of ry 9 Bottom (ft):507.8 °id :3PhotoDate:10/20/2014 a De ph:HIE G*Ide oF.fyComments: :.af iee :a Bore Hole:DH14-10 Sa be iE Zo Box:36 DHI4-0 8-23-14 ;Top (ft):507.8 Bex 36 of Bottom (ft):521.7 4h.587-8 4,59217 o.co tPhotoDate:10/20/2014 Der s Comments: DH14-10 Page 100 of 122 495.5 ft to 521.7 ft ©)NweH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 1"Su-Wa HEP 20M Box:37 DH I4 -1O 8-ZE-|4 Top (ft):521.7 |--_Beta 7-of Bottom (ft):535.2 Photo Date:10/20/2014 D epth:521.7%4,279.0.Fe -S Comments: Rit ae Bore Hole:DH14-10 a Z Box:38 ""DuH-10 g-28-14 .'e Top (ft):535.2 . . -Ba 3B Ff TO,4 Bottom (ft):548.8 ||Deph:Sb5-2f.5 Don +4PhotoDate:10/20/2014 \Comments: ihe oa ecren ' DH14-10 Page 101 of 122 521.7 ft to 561.2 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 ,Su-wWa HEP 2014 Box:39 DHI-16 4-G-(4 Top (ft):548.8 Bex 3a of Bottom (ft):561.2 Dept:548.8 te S612 + Photo Date:9/7/2014 G Comments: 'rey abe Penny coke ee PEELS Loe pase oaapaDrE:aE BS Bis : Bore Hole:DH14-10 Sues WEP 20 Box:40 DAW (Oo Qe (4Top(ft):561.2 B Bottom (ft):574.2 ce),om aesPhotoDate:9/7/2014 Depth:te 5Tha Comments: DH14-10 Page 102 of 122 548.8 ft to 574.2 ft @)N,ww H.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 |---as .Su-fa HEP zor : ne ->De 7-HTop(ft):574.2 |F ¥'oo a Bottom (ft):587.8 |::a oo -:Rox 41 of -a | Photo Date:9/7/2014 Comments:7 Depth:SA2 4.587.8 ia ee -_-on * 5 .as 1 ee.a et,pimaudikctitts bat kaieel ae ie ck,teeters iene.le eeeuy Sate st 8 a Te eae ee ee Bore Hole:DH14-10 Suwa PEP 2014 Box:42 Daeio 4 F 4 Top (ft):587.8 Bex 42 of j Bottom (ft):600.9 Photo Date:9/8/2014 Comments: DH14-10 Page 103 of 122 574.2 ft to 600.9 ft @)Mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Oy Su-be HEP 204Box:43 .DH to o.21g 4 Top (ft):600.9 Bex 43 of Bottom (ft):614.6 ?th.G00¥te lo Photo Date:9/8/2014 |!.Depth:6004 t Glt&Le Comments: Dry Core Photograph -Ty)-&:.Ger i>ReesaNbe | nat ty es ere ee2iatee ee {2 a?a ae 2 3) note Hole:rte .Su We-HEP 214 :¢°an oF --o-fe Top (ft):614.6 |"DH eB.fe Box 44 ofBottom(ft):627.8 |-Photo Date:_9/8/2014 Depth:GIN.6 +629F _ Comments: DH14-10 Page 104 of 122 600.9 ft to 627.8 ft @)NiewH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Sul\wa HEP Zoly _ Box:45 -/U 7-6-4 Top (ft):627.8 |.DH Bex 45 ofBottom(ft):641.6 |»Pe --_eon _ Photo Date:9/8/2014 ae Ww:627.8 4.G4\.6 , &Cc .'e ' : Comments:\Dd r # . : "at aa 2 *fan me ;n°a 28?ne ba Be ; Bore Hole:DH14-10 SueWs HEP 2014 7 ee: Box:46 "DH le ar vo ee Top (ft):641.6 ||"ts Bow 46 Ng Bottom (ft):654.7 "Pert:G4A\.6 +Goat g.e Photo Date:_-_--9/9/2014 LY,- Comments: DH14-10 Page 105 of 122 627.8 ft to 654.7 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Su-We WEP ZemBox:47 DH fo |AeA IH _Top (ft):654.7 ..ox 47 of .Bottom (ft):667.3 e " Photo Date:9/9/2014 Derth.COBNF 4,667.3 -Q Comments: Bore Hole:DH14-10 =Wa.HEP a Box:48 Du -10 4-9-4 Top (ft):667.3 -g Ge Bex 48 of o- ts aBottom(ft):680.8 @ .8PhotoDate:9/10/2014 |-Derth 6673 te C25Comments:.=-. es Tes he:ana;Sa DH14-10 Page 106 of 122 654.7 ft to 680.8 ft @)NeeH.Core Box Photographs General Comments: Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-10 Susitna-lustana HEP ZolyBox:49 yiM-10 9-94.14Top(ft):680.8 D Bex 49 of 49Bottom(ft):692.0 -aan ; . -_ Photo Date:9/10/2014 |-+f,e :Comments:;Depths 660.8 tb G12: DH14-10 Page 107 of 122 680.8 ft to 692.0 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 Su be HEP 2oM : Box:1 DH -4 G-15-I4Top(ft):0.0 Bex |ofBottom(ft):14.3 goe- Photo Date:9/15/2014 Deeph:O +t0]43 $+Comments:a] Ress wn fe HE Bore Hole:DH14-11 Box:2 Top (ft):14.3 Bottom (ft):27.9 Photo Date:9/16/2014 Comments: aaa oe 7 oma "|Cee he =4 " e q 'ab ak 've mney wieynwepee!teea 'sha i .Se DH14-11 Page 108 of 122 0.0 ft to 27.9 ft @)NiwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 |Suu HEP ZorBox:3 tary:DHMH GSHTop(ft):27.9 3 }Bottom (ft):41.3 --BeOx e . .Photo Date:9/16/2014 to 4.93 .:Comments:: a ra coma -8 Tote alae 7 6 TST oe 8 4 eaemy ennai:we 6 Bore Hole:DH14-11 |.Q ss lua Wer.JoBox:4 |° :9-14 Top (ft):41.3 |_DHIY |Box Yot Bottom (ft):54.4 --'to 54.4 fPhotoDate:9/17/2014 |-Dep:*I 3 #9 7Comments:[a 1C §re rr .SeeaeZea)*Tg 3 i 4a DH14-11 Page 109 of 122 27.9 ft to 54.4 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 Sau.Wa HEP Zoi Box:5 Di ye 9-16-14 Top (ft):54.4 °-Box 5 of :67.2 %&Bottom (ft):67.2 Deh cu +67.2PhotoDate:9/17/2014 ep Comments:-_- Bore Hole:DH14-11 o Uete "09 Box:6 PH -Ht F-/F-/4 Top (ft):67.2 Bottom (ft):81.5 Photo Date:9/17/2014 Comments: ' i.a 5 =a DH14-11 Page 110 of 122 54.4 ft to 81.5 ft @)MH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 |.Sa-wo HEP Poy Box:7]:De ee 4-19-14 ' Top (ft):81.5 Box F of /'of Bottom (ft):94.4 e EP Death:CbS &AN fF Photo Date:9/17/2014 "&'& Comments: Bore Hole:DH14-11 Box:8 Top (ft):94.4 Bottom (ft):107.5 Photo Date:9/17/2014 Comments: DH14-11 Page 111 of 122 81.5 ft to 107.5 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 Suelde HEP 2014 Top (ft):107.5 Box 7 of Bottom (ft):120.9 .me 4 (120%fePhotoDate:9/18/2014 Depts:107.5 40 | Comments:amrc ean 2 iyabeeLaeiF:a +,OO a bi gh han Rex?=yee 3 acsx'Bron SP a ety 4 Bore Hole:DH14-11 Box:10 |=.WereTop(ft):120.9 |:ey _DH -lo of-aBottom(ft):134.2 |e PE on Photo Date:9/19/2014 '* .1>4 26Comments:Depts.o.4 te . Ts)years:& 5ARERFEetn ; DH14-11 Page 112 of 122 107.5 ft to 134.2 ft @)NwsH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 |Sy.ua HEP 2ery '.|Box:11 thy!” ..9-18 -KTop(tt):134.2 ;DHM-H Rexel of | Bottom (ft):147.3 , exe . Photo Date:9/18/2014 D Ih:\3giz do (47.3 f ' Comments:ep Bore Hole:DH14-11 .ST 7mWEP 2Bon 4:Box:12 '»DRM |Dept Top (ft):147.3 Boye of Bottom (ft):161.8 |° Photo Date:9/19/2014 CD:pth:(72 +,[(olb49Comments:.j DH14-11 Page 113 of 122 134.2 ft to 161.8 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 Su-We HEP _Zol4 Box:13 ey, 9./B214 _. Top (ft):161.8 DIM Box M$oh Bottom (ft):175.0 7 Photo Date:9/19/2014 Pebaal biG bplrso ftComments: SuntWeHEP 2014 TtBoreHole:DH14-11 Box:14 IT-14 4 : Top (ft):175.0 ---_.LH:q q-a ifBottom(ft):188.4 Pox 14 0 :-eo,. Photo Date:9/20/2014 Comments: Naat ate r beat fom,;tae ::PEED 5eter ba Babelinva DH14-11 Page 114 of 122 161.8 ft to 188.4 ft &NiwwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Left Abutment Bore Hole:DH14-11 .Su-We HEP Zeit Box:15 e DHA vl J-19>| Top (ft):188.4 Bue IS of IS Bottom (ft):196.8 =.bed -ae or to th:ad te .fyPhotoDate:9/20/2014 :«Depir'[@a%4 \NG-8 Comments:-_wo ... ATE ee oe:&&"EN wa Fh OS - |fiw 5llMeee gol Aah Pte. General Comments: DH14-11 Page 115 of 122 188.4 ft to 196.8 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-12 .Ae a covetana HEPBox:1 OH in?' Top (ft):2.4 Box2 of .Bottom (ft):17.9 pvp)4A ro 194 Photo Date:9/21/2014 sept Ft,Pow" Comments: Bore Hole:DH14-12 ALA ee 'Box:2 Susna toda,HEp 'A 4 Top (ft):17.9 a 4-12--Bottom (ft):31.2 ox 2 OF 'NRPhotoDate:9/21/2014 Fdom 12.1 TO 3 Comments:Sep.ZL 2014 DH14-12 Page 116 of 122 2.4 ft to 31.2 ft @)NweH.Core Box Photographs Dry Core Photograph &*+&.pn edo pptBennie”0a wit Bore Hole:DH14-12 Ack ' Box:4 bos\tnn WatankSuPp Top (ft):44.7 OW <- Bottom (ft):58.5 Lof of -.* Photo Date:9/22/2014 Cowart 7 BT ; Comments:Sot.ay22014 DH14-12 Page 117 of 122 Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-12 |S Box:3 3 Top (ft):31.2 Bottom (ft):44,7 Photo Date:9/22/2014 Comments:Ee ele 5 dass 'airs Ta ETnnSraeey ey:z Vaan6 ii cae era caeSesasaneBECineasrcaayeaeSS.SS=ePa ; 31.2 ft to 58.5 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-12 AEA Box:5 Snidnk -Watne HED*DHIA-IZTop(ft):58.5 Boy 5 0Fof 4%Bottom (ft):71.7 Fabnr569 ORF Photo Date:11/21/2008 sept 22,20K Comments: Bore Hole:DH14-12 ACK Box:6 SOB.Wotunk HEP _.)oo, Top (ft):71.7 ee oe2 f oo " Bottom (ft):85.2 .CoN At Lo B62 , Photo Date:9/22/2014 sesh.qa ° . , Comments:a ies}' , >i GD |eres ere ran 5 parriere tr baveaunl prob memumammapunsme ae a "5 ">RPfpSNRITELYeesereG--aL)Al keieEYSEINEohi*a 2 7 myB'OI en OD WE Ts ai)ae se DH14-12 Page 118 of 122 58.5 ft to 85.2 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment :Par)Bote Hole:DH sae bes be "o5ene WPOx:caidaowPAowTop(ft):85.2 Panay B52 10%?UL Bottom (ft):99,7 "yt Ly Wt Photo Date:9/23/2014 Comments: Bore Hole:DH14-12 Box:8 bo Wn Let Wer Top (ft):99.7 Heia-iBottom(ft):113.0 .Sete oi 1 ye * Photo Date:9/23/2014 . 5 29%aes ; Comments:be.F .Bt reese _ DH14-12 Page 119 of 122 85.2 ft to 113.0 ft @)mw.Core Box Photographs Client:Alaska Energy Authority Project: Site Name:Watana Dam Site Site Location Bore Hole:DH14-12 (x epBox:9 hovink adatenh 4 'y Top (ft):113.0 Malar tere SBottom(ft):127.3 Fao OWI a Photo Date:9/23/2014 t Heys 1 Qn -”._ Comments:\v Bore Hole:DH14-12 bey LC Box:10 redo Ditana HEP Top (ft):127.3 ane ggBottom(ft):141.1 'Caen WS TAH Photo Date:9/23/2014 oak 23,200Comments: DH14-12 Page 120 of 122 Susitna-Watana Hydroelectric Project Right Abutment = Ls *Sea .& Preyer PO OE ee |ate Satay :AemarANS:d mano i one Aaa ae 3 S wet By .on 'B bs a ;Fy z Ce :i."A AS i ' .: ,f gains os eee7aWZ,i @.7 @©8 «©+2@ 3 4 113.0 ft to 141.1 ft @)NweH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-12 |goe Box:11 Top (ft):141.1 Bottom (ft):155.2 Photo Date:9/24/2014 Comments: |Gayo reied er a255settMeee lchy eeeSyruk Tee ea So)ot pica tgadt eet ps yr gen eter B Bore Hole:DH14-12 hep 4 Box:12 Sostna-batun HEP Top (ft):155.2 OAM. Bottom (ft):169.4 Boyi2 oF , .2 Photo Date:9/24/2014 CRIM ANGS->to 164.4 ° °:Comments:Sept.VA,201\4 - :ee Tar ed ¥Tee Caeom i oerer ee een ek a >|a Sea agi ete Tas eimai | =inv >taeaamntng Je aariinc seinsed ea ergis:aeoneicasl Sy ier ) DH14-12 Page 121 of 122 141.1 ft to 169.4 ft @ NM W H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Right Abutment Bore Hole:DH14-12 res q Box:13 Sastinw -lalena HEP anaes & Top (ft):169.4 Rav iPor,' Bottom (ft):175.0 |:pean riad 10 [P50 _-© Photo Date:9/24/2014 Comments: LAT i REIS REETTE «aS EI NG MRIS agay:. General Comments: DH14-12 Page 122 of 122 169.4 ft to 175.0 ft -zZ-.-ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-01 1 21 5 QUARRY A ROCK CORE PHOTOGRAPHS (Originally Presented by Golder 2012) *,TF ji Ke F SAORER NTA Se ana_+? eetTeasdwees Bs,MatOS|weyx.Vict?*TEWEY5.ities :4 « tae ee Ls - eM Seen * . a FORE ew Pa«Se ee"S 6 ey. NOTES DRILLHOLE G11-DH01.9.4 TO 17.8 FEET DEPTH. 3)BOX WIDTH IS 2.0 FEET 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION tS 0.1 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS STATE OF ALASKA ALASKA ENERGY AUTHORITY =ALASKA a ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 2/13/12 FIGURE B-1 vo woe a . nad ve a tae 0 eR yayPEAeyae: mat.vt a Saat pe: 4 aeotwok fh owk oe vmBereFAMee” . DRILLHOLE G11-DH01.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS MECHANICAL AND NON-NATURAL BREAKS 26.4 TO 35.2 FEET DEPTH.| STALE OF ALASKA ALASKA ENERGY AUTHORITY ==ALASKA@K-ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 42/2/11 FIGURE B-2 O i!4-{a5)|*fete rt wey seme J ay re Ele ete Sp *-SRee se FO a ms ee fe See #SAD pits 5.wyPeseaeFS5 PCRLEDENPLESSISSTcpengrearpgsenetye:feet eeta ESaONaweeg aaSA)va7 8 |-39 wo 1 e DRILLHOLE G11-DH01.35.2 TO 43.4 FEET DEPTH. ae eee :4 ae «erg LOo*.an 2 ..3 'a”aw r TO Re OCI mad BEN Pe bot Aas.oe 4veeiaeode 4EYleFe NOTES a Ss . -te 32 -.;al A -7 8 9 BS :::*s nh FSi b -en te BETS TALENT REEca DRILLHOLE G11-DH01.43.4 TO 53.0 FEET DEPTH. 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS STATE OF ALASKA ALASKA ENERGY AUTHORITY SENLIA SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-3 pane we weoats wah ones veedced JosFaBwSaati arraed "mb,*t es :no eyes <olrnsiam =m2 .eee ee 73 saad'oP em nite oy fe de gnen *"™ eed 4.,'Eadie"glen 'ssbute:aa".Set A in wwemonawbse.se 3 sothag vy areeo 'y is 7 8 3 *1 2 3 4 hye fe ET OY. mesTS 10 a A ae ee ray dae aon,: ” -o9/]-2 tet ee eee ki DRILLHOLE G11-DHO1.53.0 TO 61.4 FEET DEPTH. "arteNeena .nate akewntbem>.BEE ag Satta5| +o Renin heenmewereSeeSRE. TORee ah eae BOCTE ma tN wt} Cle ewehate,vp facie ae 7 8 g L 1 2 3 4 S>6 7 8 3 1 NOTES DRILLHOLE G11-DH01.61.4 TO 69.9 FEET DEPTH. 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH !S 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X”REPRESENTS INFERRED MECHANICAL BREAKS 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT STATE OF ALASKA ALASKA AL AYASKA/=AAALASKA SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-4 oO { p :eee om BANS 5 Tees Sa?4J a 'ye "'Bee See ee .:3 Wo -oh eae aes wear ey st ren ' aS are [7 coe 3 a' e Cardeeaeeenamsnautas a a :ot CLE O04-aoa = '--ay...Be meetin SS eaeoe"ip ves -.$royess,Fae hs.enna.3.Y.Tk t |Wmetsle 4 awe rx,re]yer PAR OT Rae earae,§ -s °Ly *=,.ow 1 .yy :vo ied Le °«Rae e 5 >oe ©: ;nee te ae " a a ,t s , me g 4,i we 'ae .:{2 hs a Ne ie .Parr enOe ae ,eee os 'ae So ge ah Bt te fee re ee tee Seo” f .i an SE ETO aa ie gif ihswineareata satenapeaacuenemaren sir 2-4 a ie iia.f ain J an J gS.am neg EsselmaIate 1d fenton”pabeateryes 1 rg DRILLHOLE G11-DHO01.69.9 TO 78.5 FEET DEPTH. 3 g jd wyil ed a." at we ee we ee BE See DRILLHOLE G11-DHO1. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS 78.5 TO 87.0 FEET DEPTH. STATE OF ALASKA ALASKA ENERGY AUTHORITY = ==>ALASKA @e->ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-5 PRS -eeeesia REAP RE Tae I Eeoo aes | ;eg coneats a SATOWNees fr aot rab DRILLHOLE G11-DH01.87.0 TO 95.4 FEET DEPTH. ? =ade namsnerapessathctinte'timrentilatelites”Dont ttnatement.Oea nat wietetee i been iattite!<n wey tt Fe,Renter wa 4 cen eX bie aiiadear an eee So tras pacar bt 6 area mete ee mney mn .v "mS ” .ow eg .7 tg”s=a r .nA Fe glen Leep on é ,pases 7,ar hee x Pech eamenos'raAasneagae Tahu = Es ™,_a ”ba EswaeRtsBeassTintSasMOEnsteteeaeeDTeaESeeesae:«Oe tome sede FE 4 Poop ee Tl wh ye SenneaneaodTiaEAPiattainINreteraraee:.fe wotgeit.hated Soe Ste aay ot te * ae Seen ' ae”a awh Sp UEOdeeeeeet iJ ML Cr ee A a won dece TE rare . a ertent PE ata Pannen?chenataien - *a 5 ton i'Go ueYatdareswanetoyieeS73CO. :VemTgUtawntameesLo. « ;"S ane ae a -:Se,ress bebe wa C307 oN-=;* oS 6 7 8 93 'd 1 | DRILLHOLE G11-DHO1.95.4 TO 104.2 FEET DEPTH. : NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH STATEOFALASKA 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS ALASKA ENERGY AUTHORITY =ALASKA@lE_ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-6 Beis er.peerTee ee yerteraiideYenTiosae(ET orl 2leehes. Mee fn OPS wpe ars aesvee ChenRte"ia wb©PESage om gSsar,eee or cna ThatweNieraamy2oe Ys #$SraSnated .esate feeet say ates Bee cae wa*sion Wis aoaeeoe we atid'nt Wives BC wedge feig oyilio1é34 DRILLHOLE G11-DHO1.104.2 TO 113.2 FEET DEPTH.eee nee rapeenenne rail Saye ey ee eaenSaAie|ilealeeeee eTRareSerraeserene Me RE fe Circa icemanoteotTame RET ag owereeeeae 4 reese mere eg tem ': :wswoeetagMO . 2 RM EP ae isSisRe:eBOe aig aes :Cpt, CaelAePAEvo Bart Maeeeidetdieeeie"6 ' Ft -Ne the wien é naan 2 sees:sa wt et ikeereSpearante= DRILLHOLE G11-DHO1.113.2 TO 122.4 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH STATE OF ALASKA ALASKA ENERGY AUTHORITY 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS f=ALASKAmxENERGYAUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-7 DRILLHOLE G11-DHO1.122.4 TO 131.3 FEET DEPTH. \ en a a cnard +7 , :eatina"PE:ane wi lett ee 8wePavereCfq Mem Fg?ry-_eure og beer ot OR iB . ° 5eera«oh ber we and af ag)MCT attra Be ee kt eee5oeaw.Ho :ae ; ite.+re E-greetings Riis gamete me nels ay ote faaeth ow by DA MG eae yA anew rere oe : , 3 x "ad ee2i rey +Ceara we:ee Rd a eS *-cee le .Ixyww oe et a eee TR a7 cabana aerpee Gucenas red«a se i ce Ma,-o.Wetec .Bey i toeeene us - |Rae.ee 5 oem herent Ee ee ee oe me”.reroseveer;|rae cag mrey eae iS atnames aitald ik tiatedsETARemnantaeeeemaea!we ter Se -:-a "eee rnaa ae es run k aaaiahad pm: wtalber esPOOTeekedtltitee.os eats we. :?8 3 s 7 eo 3 4 EaFR DRILLHOLE G11-DHO1.131.3 TO 140.5 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE re NIE ALASKA ENERGY AUTHORITY5)RED "X"REPRESEN RRED MECHANICAL BREAKS (=ALASKA SUSITNA-WATANA HYOROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-8 aaaadota tn eeoeBee,ad ee SIROAi$me cr Nah!AMS.ba Fe ae ee AASon ale aeTAN ae 3,ow.2 age a:'2 : ::,re saaaten ' 7 cotesae we wee *se }EN cot phe Go!cee:xy eresin:soe "4 e eraPEHie ietsatia see tak eee!=wet 2B .ee te Saal See sees tgs)eg ;ABs:a -. :te ree:x)_-_---:=erm _&-8s :+HH'x a fs a 4a ra is 7 a g Py 1 2 3 a Rp 6 7 B a -d {i DRILLHOLE G11-DHO1.140.5 TO 149.6 FEET DEPTH. at ”;rs eCCINE ys we I Be et ge geetes co yoo?Se"hc rr Piiad Cerulean nahenoninrhhe 8 3°r=).é DRILLHOLE G11-DH01.149.6 TO 158.8 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS STATE OF ALASKA ALASKA ENERGY AUTHORITY /EALASKAaENERGYAUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-9 ,epee awer anes 2 ornae ew wwe|ot <mee otse esetcarenSTaeaeSeapicaSE PES STFaee,= Rene eae ny ooed : :epee sate ap otel,say a coteAon,pees OE Beto k Perea meee .aed,hag ae ke meet eepoueneTie 8 oe ry :Swat -sane eS est ¥ro " 3 Rh 5 harrr n -+e suey,Aw hte tee egettairsoa,bate pene al f Parl vee Xp yt iese aR cee ie oh nyt Se eon .3¥Ve _*bee "ioe 5weet;Yeonsba5%:aPalif0actatSpbeattedtioilpt :ma)4 %GF (8 (9 »2 3 4 §6 7 8 31) DRILLHOLE G11-DHO1.158.8 TO 167.8 FEET DEPTH. oncinease iY+ . . PV oe ee ahsavottetomnt4."+ a St olA Re Fe Me ot CO meter meer g rs er bayoRey. DRILLHOLE G11-DHO1.167.8 TO 176.7 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH AASEAAay5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS =ALASKA(ME ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-10 wet ohepe AEA gem ;>aePteteEeenage,eras ree:ee of PE aomoaReOFSeeeaapassacreatesCoan Odd Le teeameoF ¢"neeess?Bees f Page”7 acka DRILLHOLE G1 1-DHO1.176.4 TO 186.0 FEET DEPTH.nd Ta Te er ey he oe we PA RET A eg:aie en eewreeis rhea anonthe iON A TY OS ate sawDRILLHOLEG11-DH01.186.0 TO 195.2 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS = ix ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-11 f J ies raaet °rr .has 2 te eet a 5 FS eal Ane ead ear 'Ee Vy ccc a wa elle te a om ee Yr.:.a :,J Ba *."a ete es Om att ge El man A ce.Sewers .ng;v iol oe:et a Bei NON POE ONION tersenne totesfneelA4f4a,«'wtSichamenend,nani Pr RN BPP Tere S fee oo eenensOt ened oexaed..é.ng |na os ¥ ._oeirer +wahJPeregia3:Sr aeseee RES,ee'y* an eed .ng -'Lt fo BP Pond eee Ps ee -EA .nay pera -me , 5 .. Yy,ewe TOP a tate ee eat te chert f RQ yf greau2# .o_Le "ae '4QeBeCopfeeWrgo'4gy,SSP ewe AEs 'awe .yer fu] £+Oi Gee ae eric ae . a ..aotegg PEO IAT SM DF pare ea PAS 0 ad,J 2 aname toe - -.id beaceeeeiss|a Be _.rep . .a a)4 Y e wm +a a :;are,ve *epee)ware i s v4*-wee oe tt pe rreeme pinay des .reat Patella ou.Ske ee 'ha2aot23a678gi) DRILLHOLE G11-DH01.195.2 TO 202.0 FEET DEPTH,BOTTOM OF HOLE 'BOh). yey we .ek alee ee aecawGz3Par]ee ete,SA -ome Neer ote ER .:Be :wi : Pz ord *.a Paar 2:\ow.*ageR*:. te : .ane .."No.. > . ¢*eho bro -oat aL NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET §3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA EHERGN AUTHORITY5)RED "X"REPRE RED MECHANICAL BREAKS =_(=ASSIAAUTHORITY SUSITNA-WATANA HYOROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH01 12/2/11 FIGURE B-12 ee ba* DRILLHOLE G11-DH02.1.5 TO 10.0 FEET DEPTH. .,w a Soy Pees Pay NAO SHS Basis yt Mw Waris 7 8 'y & -Coat at 7meCpeeTey ¢¢net .'ee qa NOTES DRILLHOLE G11-DH02. 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS 10.0 TO 17.7 FEET DEPTH. STATE OF ALASKA ALASKA ENERGY AUTHORITY =ALASKA@e_>ENERGY AUTHORITY SUSITNA-WATANA HYOROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-13 OEaTE ee me ;Se DRILLHOLE G11-DHO2.17.7 TO 25.5 FEET DEPTH. reer" DRILLHOLE G11-DH02.25.5 TO 34.3 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH STATEOFALASKA 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS ALASKA ENERGY AUTHORITY ==ALASKA =ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRYA GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-14 |a ee ee a DRILLHOLE G11-DH02.34.3 FT TO 42.2 FEET DEPTH. -e .-,_..RH 7 fa,SE fatty cota.arty”0 tone Se watlameantenFeancaceEiERIEIeIEOEAeeDEPnnaRieseOeFhnneeeTieeeFefe*7st es ° .<Sm oy r PO tana pew statin!4,gon batt"NF (aiee,an ae-a ea ca a:vy "9 ”oor vOPyoezte.-Ce C-oe gal "*» qi=emma -<.et "wa i.a Oa|yi 24 . ;.. + . -o . a ”*Fy :-° P Rood mabe {a danetnaneh Rh asin ay or Piaget +:- .-an oe Pw *a.at OR Denegpa.lied rieJyyeeaeatespeasoeaeeweee7pesa3prvi athentealidel -_ Oe op nrwerd aw -ryae:7s,;S32 by _ A »3 °ee eek ue .ary "NOenwe fT .-ee Ie rt *;"|:»a Sew aad:4 ay «Sunes § -ay im aus pontling bap,in aaah pcemenler sumedataenrednaneel »_tee Citieddemaeanh ca : a ae nm ee MeFallSitefo Le"oe és .-ae "* v3 'Pe re oe .fe Lope steers Bow 1 ae Oe]wren,0s *cC, JNOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET DRILLHOLE G11-DH02.42.2 TO 51.0 FEET DEPTH. 4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS =AA x ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-15 - = a rE Mn hat !ad eeeeeretnanaTinea ..toe "7 ;A 3 O35 &om ; :wee et we :ares ee 7m ee Ce "Ce .eeeeth te Oe ee ee a site lia Sooke tie ohae RE SOcoi a :Botan Lieoenoid hee tee eeAOcalraery Toi.,Ba fae meee tae :wa :|a 1a i se Yer ner eee a sof ar we Be et \-°£SIEtormsrl:.ao i)f -> « * °*°af eeb:ino ie ree a DRILLHOLE G11-DH02.59.8 TO 68.2 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET €4wtaofdBey8iOy= eg'RE2m--4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS STATE UF ALASKA ALASKA ENERGY AUTHORITY =ALASKAqmENERGYAUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-16 .peareneeGeter v ve vee ads -wn bow ¥eae mas at oh wll Os:ere erynatsikeeeaneohApeaTaueae<wDtt buat he er *havesaby:metergape.0 -pas pied wo spre pape a EET A Ce Be 3 a caihnscthenere hoonaee” ".a).9 5d:£3 _liad f "7 8 9 ad 1 a 3 4 »es S ia ow beet |} DRILLHOLE G11-DH02.68.2 T077.2 FEET DEPTH.a epson °5 a eee chin vane ane reagan tNRR .rd e.ft-.Yeon.FsprpseneagaNEEcagoyeERSERETEBONyenQEmmIBaEENITHeATERBitsmimesagentey: we i at EN wath ste oe -Mlle:>"Nb mye reeEN tee PR yee + ea as rn gee,io Mew.fom Ae RIOTS %2!boon Sal i al bicak Miaee skdimenyee 3 ioewhPtypbeep iDRILLHOLEG11-DHO02.77.2 TO 86.2 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS LASKA/=AASKA SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-17 433 3 .2” :os v fe] oeaatau:Ft 3. 'oe.Loe .7heA.GR BL Nr Re ge mre - FRE he ee! LdciMieterei teele le: ne ee ee tee ee a wee 2 gg mocnparsccmaprae:"Nes NNER:ie uit:"¥i ee Sar:Fae aeareemybaneCantysalewybenntheePeNEtercatheVatngafotSeteeeenentnetiedatiinedameaeeeeae. ;7 ceetaowt.*.per Pe rn)ob igeepeeekeyh a,JM ste é a a if?-«ee ara soe Mee i en 1a oY ad ot Og y <-Duten wea: SEER EAR CIEE ae G EMT MIM ID he, DRILLHOLE G11-DH02.94.6 TO 103.5 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET STATE OF ALASKA4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS =ALASKA@E-ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-18 DRILLHOLE G11-DHO02.103.5 TO 112.2 FEET DEPTH. +Seren ate oy Ft eee am<tee eaenet cee CF .Peete eee ed aber Me re DRILLHOLE G11-DH02. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS 112.2 TO 121.3 FEET DEPTH. STATE OF ALASKA ALASKA ENERGY AUTHORITY /E ALASKAaENERGYAUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-19 ther Set ca eon ne pyYAeos4,Foyer ite of Ay DRILLHOLE G11-DHO2.121.3T0O 128.9 FEET DEPTH. avowA Re3 DRILLHOLE G11-DH02.128.9 TO 137.6 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA Ee pity5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS =- E>ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-20 <abagi sate,Ye SPF SA te ee!"QR bail z pene Nd wade Ve eh baMDFoe 'teee aaa ett .wane ”»*:otal os OtRhos -oil See mee wn"4 ae at aot .Aceon +.on ed seem ene i eo 3 .aa . p ] 1 é 3 4 6 oO?"sO 2 3.°«4 >6 7 8 pee ft ;De ge phe DRILLHOLE G11-DHO2.136.7 TO 146.7 FEET DEPTH. a as Me!cn the OM a Ee " os apm me fe :Clee.%"es Tees Sw we ae ad.enn on we Peer} DRILLHOLE G11-DH02.146.7 TO 155.5 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH STATE OF ALASKA 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS ALASKA ENERGY AUTHORITY JE ALASKAirENERGYAUTHORITY SUSITNA-WATANA HY DROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-21 4Se agen aee &eer yeae eh are Kaestatin ye i,:©BiPETEP.cae wee 7 a asec ath OEpg _tote fi "oo aa .fae 'err |eoaaeleetetearegetnswfe ¥TN eG tl oe pmOE A i tees anew ated °a aan Coane -or -wed ; 0 an PeeSageOE TMOGA otal ';: :3 1 + ew) ™»meee * a Sc ana ae3 ner -einwelng of pk ST: NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS DRILLHOLE G11-DH02.164.4TO 172.8 FEET DEPTH. STATE OF ALASKA ALASKA ENERGY AUTHORITY /=AASKA@xENERGYAUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-22 < DRILLHOLE G11-DH02.of,SSSxsin>Ag nt wotanpeng,bog SeEt aean DRILLHOLE G11-DH02.181.9 TO 190.6 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH or5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS /EALASKAl=ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-23 a a Nnala ieaeanatea.JIE,nt ee eet ae y . -pee ene i.we 1 Lg Sythe .$3%Bo.-6 vad td =r '4 Xe TARE EEE OS =gen ap .=]t |: y ¥.XL .;=:: : .:4 .°'a x E ;i-aie - 5 _ . a ': 3 4 o 7 a 9 ©1 2 3 4 ®6 7 |8 9 i %. A RR ara gs ca en eer ry " a NE ren cr Sc aneuaaal ph ey2ALk NOTES DRILLHOLE G11-DH02.199.0 TO 202.2 FEET DEPTH,BOTTOM OF HOLE [BOH). 1)DEPTH INCREASES FROM 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS UPPER LEFT TO LOWER RIGHT STATE OF ALASKA ALASKA ENERGY AUTHORITY = =_ >ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH02 12/2/11 FIGURE B-24 oo ee eeEITSeone cene TOTP eane @ POPE eo 'Sd wn 2 eeeafOYrete>RadGSssNSoePereysi. : DRILLHOLE G11-DHO03.8.7 TO 17.0 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH STATEOF ALASKA 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS ALASKA ENERGY AUTHORITY = >ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 FIGURE B-2512/2/11 -___-si nie : en -7 : -- * q =.cane ene asl.oe = ot ee ee ok ete eee Somaya \i,ee iA. .:orIeule Ea PE ew meperns fg te 4%'aah en a =--oe Te weteeee et ee me we tSereen ----_-_--<<da eencatheth "Sas abgOE ig AD pS:-¢ppt SM ae i a i,My Be y -»."a oon as 5 toe . e c-yf 'Wares ry ae mee. :Pa a . _cons meeeye Bs a eee a - mi SEeeerae.°-'7.Wek OThokeeh”' 7 .a cad rare as n Pen tee”r-0 "yy ke '4 % el QS BO i 4 ©-' sok ne !GY QE Oe ck ape Pe ; ; 'mone '.'\Re>Oo oe:o ai |ae EP eT Ser 'ce 4 tin dheaaninhallabiceirenaitetuaintinad ayeeaereeeteeecateMeanieeewweeBoneamenGNeBmreyBe _Oe Rayte)<9 ehEO a aaa #*oe Ae ;ee Mg Fe ea eTadly rome LE epeeemg LE.ety.,: othad ,be5ATOReat; ,: ant et we peer"henner heomaetooenT . ------7 8 . :a \>'::2 a Ke]6 '-bd 8 ;oo -aa Oana aE BAL CE "F:DRILLHOLE G11-DHO03.26.0 TO 34.5 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS /=ALASKA<a ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 42/2/11 FIGURE B-26 eeFTeaearneeeees oe ERO STITT soy pen are im 3,a ae ¢atom nevinnd |ann'Jieeres:a aacin 4eesicommieiadioe ae Sha EAE een sere eeagine TealtORPeOteeteeeaeoaFaeMEDPpagets r véé5"tneARE Lon ee aicie ne iSe .syatte:"i !Se ge lye be rschy%ioe =root,le ke et awe tof : ;allantghelomahieeiateeiatiRaahcehdoei..grams FTA La eae Me ial re i ere Cam NOTES DRILLHOLE G11-DHO03.43.4 TO 52.5 FEET DEPTH. 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS STATE OF ALASKA ALASKA ENERGY AUTHORITY => =_ >ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-27 a ean egrecersi norprerices 5 54 "Is 7 (fiepaafemothen mee ete ist nce teak TY TERS are ee,ETE fseee..aa caetrr TAN,oe A ee ape eesae ah A a en nS Fi EO wae enewe meen .sans Oy en eee . oat .a.mn , 7 stantnatapeaperte 2 Pate oe ute "at ae ms A4provepmerdttNEeSBTRayTaweewowaeeeee« Aeoeteleeaedoe=v a iremeenagdeeeenatesabe 0 a 2,vineee »"oa *yh.: +}rn pale:Sie PR mye vente O84 in 7,¢ ,:TO.ver ..<4, DRILLHOLE G11-DHO3.52.5 TO 59.3 FEET DEPTH. |Seas te ' cae seems SOR Rp Mec ne Pedro eee ae ee oe i PMS tenes cate a at A :ae ceoponfoveosTESww ar..[few ee>Pe me on .POE Fsa x 0 pane J,ee Onn - : ae ieee eevee)ee ee eeatermeapeathlenetLegyewe:7)Te .¢Te ;.' «erg ers, DRILLHOLE G11-DH03.59.3 TO 70.2 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALA ASApry5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS f=i>ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-28 aap Panecome . -sa OEr cea .oo2WeyerTy ye et ae 2'Be fading Aira is tier ze is Gate,ees»-5 'tes ian Weegad-obntindlpaterutmeapenemene onan ane el 2 ef ca a i fe?pron 4 ve °|4 STE ar renee mete MO OTOO SR eT SE ---/ 2 tI _ioe aoa Ta ,;;ram 'se os eo Baia ©{van ew Sr igcet yy .Sak ALY RPO TION :séBeekTn aCo,;Si4.Ee:vy .ce pes'errene Sree ries weet wat a eer .;fi Wass vee fe .CO fuse reds TP oi t4, ateneatnnanlia eemet BES.[1n\n ans -qos ' +;: yx ias Fspeasneeeboa®ate tn Lt kn ON..aghtenshpebinennwswarencmadenee+EN . ox 1 c 3:4 io , .a .ve im qa"3 6 ?8 3.19Divimasmeans'°:?8 a.9 -a ET DRILLHOLE G11-DHO03.79.2 TO 88.2 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKANESS SORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS =ALASKA @mg ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-29 Sad .ON Pie Pp saty baie peer N ft ree Be eatisetir Me,she 2sSenecio ag:;5 "6Na ei lay oemSraataeP-aewage 3 om °wy tw *8 4 ry DRILLHOLE G11-DHO03.88.2 TO 97.2 FEET DEPTH.We ee ee -wsa ModSoretonminedoy ae'*optimal MU eSonate? est ve DRILLHOLE G11-DHO03.97.2 TO 106.3 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS =ALASKA(@-ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-30 Pt an atoCaren "- nb re ananic row bedSeeAe01EOSet 4 2 4 DRILLHOLE G11-DHO3.106.3 TO 115.3 FEET DEPTH. 2 eI, on a cat Soantacheereieee)-7'eo ?m e 3 aq NOTES mastDRILLHOLEGi1-DHO03.115.3 TO 124.3 FEET DEPTH. 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS .-:hia'-»6 7.8 mii!eae WaBae. STALE OF ALASKA ALASKA ENERGY AUTHORITY ==>ALASKA x ENERGY AUTHORITY SUSITNA-WATANA HYOROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-31 aeDix:TSTeee FI ee nt PEER.:sot oe ,aoe -oo aos Roe . Lae ' .te ;1 ,47894»c DRILLHOLE G11-DH03.124.3 TO 132.9 FEET DEPTH. See a =ae <= BengMNreg seer "7 9 6 7 8 iz)"tdxeheeWEFMEWSCPRee DRILLHOLE G11-DHO3.132.9 TO 142.0 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH nee5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS = E>ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-32 is -A cern dn pie,aes dein mirbtendtatm me wna«gi mle Ng hg AB aha Yaa cinAalain Binge Stnne atime oe YT I. DRILLHOLE G11-DH03.142.0 TO 150.9 FEET DEPTH. Gaerneone Lind in Sony atin at "s Te pica net'8 °ce eae SL el nla ek te me.ute wee.eee Je aalgEewnataenear DRILLHOLE G11-DHO03.150.9 TO 159.9 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH STATEOF ALASKA 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS ALASKA ENERGY AUTHORITY /=ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-33 "legion &ote Cnaece bbesetaSagitanatnbaityminpommennpeyoaeeErtomcommento G om ata tenseef?ars * ¢"2%- --Be I ed meteca OCISOr '«'°7 :)g 2 1 >&SE |DRILLHOLE G11-DHO3.159.9 TO 168.7 FEET DEPTH.tS aad peers ye cones.eee 7 naa pa OES Gansuw Sib a vere _-FS a ee a cyeeoi,7 sed ewe -.7SteneS,ee ENet,Pre ik ee ee eg art mesa we Y . *oes * vata :Re,eeeeeeeeeeewipers_-.mB 9 2Po.DRILLHOLE G11-DHO03.168.7 TO 177.5 FEET DEPTH.NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH !S 2.0 FEET 4)WET CORE PHOTOGRAPH ALASKA ENERGY AUTHORITY5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS ALASKA/=ENERGY AUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-34 Ie eReRey ee Feteee nee nie'ca sanateRPTL Se aee se)'Seesvreasetsa?77ee «;8 Fhe catedEONSGeETM eget REE Ceca ot ree ae ae panel sink5 ait asied 2 OP oe Pd|Foeadrkeedrat ti Oe ats ka id La ERREEeneeo gmtikCtSantinirooney are ah vanceSanevr-.tee)pean Chatstare Peer nine te ate.a DRILLHOLE G11-DHO03.186.5 TO 195.1 FEET DEPTH. NOTES 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS STATE OF ALASKA ALASKA ENERGY AUTHORITY JE ALASKAaeENEAGYAUTHORITY SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/14 FIGURE B-35 CARPE cementintntren nent wees ee- ¥-aan omaioreaten ereneien-aaaeiad vom ad ra as 3 NOTES 4"7 t=] 1)DEPTH INCREASES FROM UPPER LEFT TO LOWER RIGHT 2)NUMBERED SCALE DIVISION IS 0.1 FEET 3)BOX WIDTH IS 2.0 FEET 4)WET CORE PHOTOGRAPH 5)RED "X"REPRESENTS INFERRED MECHANICAL BREAKS DRILLHOLE G11-DHO3.195.1 TO 202.0 FEET DEPTH,BOTTOM OF HOLE 'BOH). STALE OF ALASKA ALASKA ENERGY AUTHORITY /ZALASKA<=_ALASKA SUSITNA-WATANA HYDROELECRTIC PROJECT QUARRY A GEOTECHNICAL CORE PHOTOS -DRILLHOLE G11-DH03 12/2/11 FIGURE B-36 oO -zZ ALASKA ENERGY AUTHORITY SUSITNA-WATANA HYDRO AEA11-022 Clean,reliable energy for the next 100 years.1 6-1 434-REP-01 1 21 5 QUARRY M ROCK CORE PHOTOGRAPHS (Originally presented by Golder 2013a) @)NV.wH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 Raste Evers Avtherty (AFA)- Box:1 as . A : Top (ft):0.0 -Gusitean Wat ane see.° °°°iBottom(ft):18.8 ||De aa g-21PhotoDate:_8/30/2012 ||Son +LyComments:Fron GOFr %IS. a ee Bore Hole:DH12-5 Box:2 Top (ft):18.8 Bottom (ft):32.8 Photo Date:8/30/2012 Comments:a cre "-<5 es TL yLocedaachichindind : DH12-5 Page 1 of 29 0.0 ft to 32.8 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 Alaa Erergy Authority CAEA)Box:3 Ses -tpae wataneTop(ft):32.8 SRIA-E B-3°peor Bottom (ft):45.1 Sse 30 ;Photo Date:-_8/30/2012 Sronr 30.844 40 45]Fe Comments: VL arpa |?HEPES om WERE Roe as Bore Hole:DH12-5 Piases.Ereray Autrecity (AEA) .Ses rae 'a aFTareBox:4 DHa-T B-3e-A012 > Top (ft):45.1 Sono Bottom (ft):58.4 From 45.1 F+9S 4 FF Photo Date:8/31/2012 ee ee we ce ence een age Comments:i ee TRE -_ DH12-5 Page 2 of 29 32.8 ft to 58.4 ft @)NeeH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 Alaske Ene sy futherity CAEA}Box:5 . Top (ft):58.4 Susitna-Watene -Bottom (ft):72.5 3.DH iR-7F ¢g-3I-26Q " Photo Date:8/31/2012 Box 5 0G . Comments:from 54 to 40.5 7 a amoade ESTE Laie Bore Hole:DH12-5 F es a "= Box:6 [Alaska Energy Avtherity (AEA) Top (ft):72.5 |;Susitne-Watana ry Bottom (ft):86.3 ||.DHIa-5 B-3l-AGIA , Photo Date:9/4/2012 4 Box 6 of Comments:i From FL 5SF+to 86.3 ft nw (- DH12-5 Page 3 of 29 58.4 ft to 86.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 A r-y EA)7 Box:7 Sosa zrergy putrenty (ATop(ft):86.3 a Bottom (ft):99.9 Photo Date:8/31/2012 Comments: Bore Hole:DH12-5 AUASKO Enerey Auther,ty (AEA)Box:8 .Se Siana-Wa tang ° Top (ft):99.9 DHI2-_ Bottom (ft):113.8 a 7 8-31-2012 &Th oe Photo Date:9/4/2012 |.Bex B of Gy "y Comments:From 99944 to 113.54 DH12-5 Page 4 of 29 86.3 ft to 113.8 ft @)NiewH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 ia .;rity (AZA)Box:9 |'petiteeeeErnetaeeTop(ft):113.8 |+per 12'time eS m .="¢&@)Bottom (ft):127.8 fp ngs Oem ru BOI g q SaSe”4 HeePhotoDate:9/5/2012 ayifeS Comments:'- ,22gckle .oe LL 8 er te }QT.oFrere!# ee A Bore Hole:DH12-5 Box:10 Top (ft):127.8 .>sitew WatanaBottom(ft):141.4 .x oo,%n-S 4.5.Zor. Photo Date:9/5/2012 Bow [Oe ._ ' Comments:From,IAFBL4 to [YLY "4 --- SiMOUENY Depa bees es -.v --ety ''ory _ DH12-5 Page 5 of 29 113.8 ft to 141.4 ft @ NMWH i Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 Alaska Energy Asthority (AtaBox:11 Susit na:Woda aa 3 SARA) Top (ft):141.4 a.P DBAS 4-F-3 3Bottom(ft):155.3 3 AGI2Q Photo Date:9/5/2012 Bon,I]of Comments: _From J 4iidfo155.3 + Bore Hole:DH12-5 . . :Flaske Eneesy 2RothactGaTopffis|os "Susitna:Watana a «op (ft):.ae ..' Bottom (ft):169.4 |+7 E a DH ta-5 WF 2e1Q i Photo Date:9/6/2012 |#ond Box 1 oe Comments:From 155.3 to 164.4 ft ne F en i !ha3 DH12-5 Page 6 of 29 141.4 ft to 169.4 ft @)MeeH.Core Box Photographs Comments: Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 Alaska Energy Asthocin,(Aix,Bla.E .Sm,Box:13 |}.i Susi tna-Watane My SAEA)aii ° Top (ft):169.4 rn):.Pore 4-6-2012 ca ?- Bottom (ft):183.3 ox 13 t ; : Photo Date:9/6/2012 ox '7 ©Comments:Yrew 1644 Ft to 1333 fy > r ?:°"°Ag 'we we a a ”ee 20 2)TT ty PP ae pe 27 te Pe Yt 3 Om 8s oe _Pod .-a .-_eo sy <-sof == Bore Hole:DH12-5 ="Alack F --pee:a : .4 Box:14 .ner Avthoe ty (AEA) : ne .a Susitna -Watoana 'Top (ft):183.3 :DHIQ-5 .%6-2c12Bottom(ft):197.3 # °Tg aS en.. Photo Date:9/7/2012 Box 14 of - From 1833f+to 1978f /_f/. DH12-5 Page 7 of 29 169.4 ft to 197.3 ft @)Ni WH a Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 Alaska Ene Author ad |G rBox:15 Sus;my mty (AEA)vsitna-WatanaTop(ft):197.3 D H 12.5 , Bottom (ft):210.9 q-E-AOI Photo Date:9/7/2012 Box IS of iComments:From lVREt++09 lO.9f+ 7 3 | , Bore Hole:DH12-5 |}; -Z Bone Alaska Energy Auvtherityca za)_a! :USitrnae WatangTop(ft):210.9 DHIn-S 5 Bottom (ft):224.6 o 7-7-2¢12 © Photo Date:9/7/2012 Box 16 of Comments:From 210.1 £+40 Adid.6F¢ font a es ¢an ele on eee Bee rr ee en ee ee er eel :| DH12-5 Page 8 of 29 197.3 ft to 224.6 ft @)N,wH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-5 .eens Katherity CAEA)Box:17 ;¥e EnetayTop(ft):224.6 Aste ©ver . Bottom (ft):237.8 Carer WF 4.202:Photo Date:9/8/2012 -5eaeS |4 - Comments:Sa \tO*\O ai 8 é¢ BSGERSREETS Bore Hole:DH12-5 Alaska Fs ,Authe TO aRBox:18 |!bus)52 rity (AEA)Usitra-WatsTop(ft):237.8 |arfana Bottom (ft):247.8 DHI2-5 q-G-202 Photo Date:9/8/2012 |:ee Box Bo (R . Comments::a Sera mC|From ABA Be te QNRB Es Boy iy5Ra. if TY | 'ei fi é StF A296 tera ee | "+.rs oe a S -i DH12-5 Page 9 of 29 224.6 ft to 247.8 ft @)NWH &Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M General Comments: ¢Depth increases from upper left to lower right. *Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. ¢Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. *Black lines across a fracture label a fracture as interpreted as a mechanical break. *Blue markings represent notes. DH12-5 Page 10 of 29 237.8 ft to 247.8 ft @)N.wu H &Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Alaska Evecgy Acthersty (AEA)Box:1 Susitra:WatanaTop(ft):0.0 DHA-G Fe 24-20NR Bottom (ft):17.9 Bax L of a4 wn, Photo Date:9/1/2012 Comments: Frore 0.0 ft to 12.4%, ' Bore Hole:DH12-6 Box:2 Eaoyy-A utherity CA EA) Top (ft):17.9 Watene Bottom (ft):35.3 Photo Date:9/1/2012 Comments: we La Merryi'aenerCe DH12-6 Page 11 of 29 0.0 ft to 35.3 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Box:3 Alast4 Every;Authorts {AEA Top (ft):35.3 Susituas Watana :- . .”elds "2082Bottom(ft):49.0 Dit la-G >Wee INPhotoDate:9/1/2012 Box 3 of Comments:From 3o.3i+te WhO 4+ Bore Hole:DH12-6 |}.Alaska Energy A utharnty (AEA) Box:4 °Susitna-Watang aia oo 7 Top (ft):49.0 |,pen-6 3-30-20Ie ) Bottom (ft):68.1 "Box 40F 2Y - " Photo Date:9/1/2012 From "10H to 63)a >. |w. Comments:, ae ; DH12-6 Page 12 of 29 35.3 ft to 68.1 ft @)NsH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH1i2-6 :. Box:5 -Alesta Enecay Av thority (AEM ?ron tt 63.1 Si Ws 2 >.>. ::1-6 "F -30-2ol '° Bottom (ft):82.2 DH Photo Date:9/1/2012 Comments: Bore Hole:DH12-6 Box:6 Alaska Energy A v thority CA EA) Top (ft):82.2 Susitina Wetane aorBottom(ft):95.5 oe ¢ee : PhotoDate:_9/1/2012 196 955 eyComments:From 2.2 15. DH12-6 Page 13 of 29 68.1 ft to 95.5 ft @)MWH..Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 "ft EA $Box:5 Alaska Energy Avthor y (AEA) fae fanaTop(ft):95.5 Susitra We 2 3-20/2 *.«Bottom (ft):109.1 ee ne os ny”We 20 12 , ; :OX -''''Photo Date:9/1/2012 Fam GSS +0 BAER ,Comments:; ;104% Bore Hole:DH12-6 » Box:8 Alaska Enec3y Authority CAEA)- F hae "4Top(ft):109.1 Set ee BIH 20(2Bottom(ft):122.2 na Box gof st e hePhotoDate:9/1/2012 Comments: Co Se dt egUS?otto Brey:,. .Be coyFyoe DH12-6 Page 14 of 29 95.5 ft to 122.2 ft 'N,ww H.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Box:9 Alaska Energy Avthoriiy (AEAY Top (ft):122.2 Susit aye Watana o Bottom (ft):135.9 -Dira-6 BE2OIL mA B-\ 2012 " , | PhotoDate:9/1/2012 |.Box FoF 247 . , Comments:;Feom 127.2f+to 135.446 Bore Hole:DH12-6 Alaska Energ Authority CAEN,Box:10 Susit na- Wata no.DHIa-6 =FI AOITop(ft):135.9 Box 10 of 24Bottom(ft):149.0 From (35.7 ft to 19110PhotoDate:9/1/2012 |:; ; ;oy Comments:' . DH12-6 Page 15 of 29 122.2 ft to 149.0 ft @)NMWH *Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Alasta Eatery.Avtheedty CAEADBox:11 SuUsitna-Watana Top (ft):149.0 DPHIR-G 4-202 R B-A-2OND Bottom (ft):163.3 Box 11 eo €Z4From14%,04+to 163.3 ft > Photo Date:9/1/2012 Comments: EA Amae?|.<8 Alaska Enieceyy Avr woorty CAFA)4BoreHole:DH12-6 Box:12 Susitna:Wata na, Top (ft):163.3 *Dh ar coh RO Sa .° Bottom (ft):177.4 Box +oe to 144444PhotoDate:9/1/2012 From -°]6Comments: ¥VE I-6-6||Ne tetoreeyh>bo 3G *7 & DH12-6 Page 16 of 29 149.0 ft to 191.1 ft @)N.wtH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Alaska Faer 44 Au torety (AEA)RT '.4Box:13 Cysitwar Watana . Top (ft):177.4 --pHR-G -S-3-201 Bottom (ft):191.1 ,Cox 1304724 LLPhotoDate:9/1/2012 -Feoce 1T#48?to [4],|:. - Comments: Bore Hole:DH12-6 ¥ Box Alaska Energy Artherity (AFA)' Ox:14 Susitmas Watans .Top (ft):191.1 pHri-¢5-3-2oreBottom(ft):204.5 |--.ex'14 of WM oPhotoDate:9/1/2012 Leon ted 44 40 DEN | Comments:G _ heeeNeFA DH12-6 Page 17 of 29 177.4 ft to 204.5 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Alaska Enerqy Avthardy CAEN)Box:15 Guntnes We tant ; Top (ft):204.5 :pHR-<|S.Bo CN ;x 156 cpa nkieatBottom(ft):224.4 Be wy OAC 5+40 EES BKPhotoDate:9/1/2012 cn Comments:_- Bore Hole:DH12-6 Alaska Energy Authority CAE) Box:Susitna.Wataneaon16DHI2-6 =FH-AWRTop(ft):224.4 Box 1G of ui oeBottom(ft):238.4 Fyonn D244 £4 to DIRT EFPhotoDate:9/1/2012 _ Comments: 4 issisiknacs AR . DH12-6 Page 18 of 29 204.5 ft to 238.4 ft @)N.ww H.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M : .\Bore Hole:DH12-6 Q Alaska Ener,Asher ity WEA),Box:17 , Susitna-VWlatana ° Top (ft):238.4 |f.PHIA-G ronal 3-5-3200,Bottom (ft):253.3 |::Bex |7 of 2 +o Photo Date:9/1/2012 |-.oO From ABBA +e a5334 ; ° Comments:' ee coe a coe . Bore Hole:DH12-6 Alaska Foy AcAnority CA FA),Box:18 yO et gasetna-Wetana aTop(ft):253.3 |Fo tee .piaae6 Bee .Bottom (ft):269.5 2 Bex IZ 0 aes E ©Photo Date:9/1/2012 -From 25336 te O154Comments: w _ pad Boy.nays Nees a ge SE re2dsaPeteiaDa< DH12-6 Page 19 of 29 238.4 ft to 282.9 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Alasva Eaegy AAkerity (AEA)ro u. Box:19 *Susttne-waren ere im Pare Bs . Top (ft):269.5 5 PAAG Base!*. Bottom (ft):282.9 oon 2645 te ty 62 94PhotoDate:9/1/2012 . Comments: Bore Hole:DH12-6 |bvBone50 Alaska Fuergy A vther:ty (AEA)v4 aa -Susitna-WatanaTop(ft):282.9 DHUA-6 g-5-2012?Z ¥-%-Zota - Bottom (ft):297.0 Box 2o ef 2 Photo Date:9/1/2012 From 262.Tt te ATFOFComments: *Ad .4 sal " ' .2 -vy . eck "ae reAGae:t-Bi ty,rect&yn.Wa oe|Cree aoe ACS es Shen@BS87&8 Oe 4 pg gO ;. m 2 ¥=1 cocoa an NE -ir hn::Va27123:.gee acl DH12-6 Page 20 of 29 269.5 ft to 310.3 ft @)N,ww.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-6 Alas ko Faergy hothority (AEA)Box:21 Susitna:Watana Top (ft):297.0 "pin é c 24 "6°ROID e o Bottom (ft):310.3 From AAt.0Ft +6 3/6.24 Photo Date:9/1/2012 . Comments: Bore Hole:DH12-6 ;Alaska Energy Authority (AEA)Box:22 Susi-tra-WatanaTop(ft):310.3 DAIA-G Bie 2%yasBottom(ft):323.4 .Bex ASO.BEA to 323.444PhotoDate:9/1/2012 : Comments: DH12-6 Page 21 of 29 297.0 ft to 337.5 ft @ NMIW H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M aBoreHole:DH12-6 /'Alaska Erecgy Authorty CAEA)Box:23 .Susie WW otane --Z-22 Top (ft):323.4 De 3tL nie dare BB -Bottom (ft):337.5 |f -"ae 32340 +337.5 FtPhotoDate:9/1/2012 ||.-- ° os Comments: B le:DH12-Bore Hole a Alaske Energy Avivorty (AEA)Ox:Susitna-warana -20).Top (ft):337.5 DHraaG &H-2012 -N Bottom (ft):352.2 : .Box ,24 of 24 £,BON.4 Photo Date:9/1/2012 ;Feors 3345 44 4035 2.2 : Comments:,- DH12-6 Page 22 of 29 323.4 ft to 352.2 ft @)N.wu H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M General Comments: *Depth increases from upper left to lower right. ¢Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. ¢Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. *Black lines across a fracture label a fracture as interpreted as a mechanical break. *Blue markings represent notes. DH12-6 Page 23 of 29 337.5 ft to 352.2 ft @)AT W H ®Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-7 a _ Box:1 Top (ft):7.1 Bottom (ft):21.9 Photo Date:9/6/2012 Comments: ro Laisa5See Bore Hole:DH12-7 Box:2 Top (ft):21.9 Bottom (ft):36.0 Photo Date:9/6/2012 Comments: DH12-7 Page 24 of 29 7.1 ft to 36.0 ft @)NiwH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-7 Box:3 Top (ft):36.0 Bottom (ft):50.7 ° Photo Date:9/6/2012 Comments: EOF Ain ae :4 -a fSAREETETaldiceow: Bore Hole:DH12-7 Box:4 ner:Top (ft):50.7 ina -2 2atenBottom(ft):63.6 |Fs pone "nePhotoDate:9/6/2012 -"Boy Hook,u .Comments:From SOF tolo »* Sator eerie ,:ae 7 f age eee an ate - P 4 <er RN eon Banh,CAD Yas,.-Pree tie cer A ee OE DH12-7 Page 25 of 29 36.0 ft to 63.6 ft @)mwH.Core Box Photographs Client: Site Name: Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Watana Dam Site Site Location Quarry M Bore Hole:DH12-7 Box:5 Top (ft):63.6 Bottom (ft):77.8 Photo Date:9/7/2012 Comments: PEM wovenpar2-7 \ lsat ieeranaeseneesPeshee "enolareonion aoeoomspicapeehr ; -SA gamaetreg eC GD Ly Nee ele gee EOP Bore Hole:DH12-7 Box:6 Top (ft):77.8 Bottom (ft):91.8 Photo Date:9/7/2012 Comments: -RASotttaun"ctana ;Dut _- | ©box 6 He Jo al 8 -SRTTOTRIPREEETOTEY.peli araack .i tausey AAT CGYNger ae ie ro et eee : .kane TPR,ae soadinLoe -_-awe!salamemres het aan .7isites,ances ereoensmad Ce en ee ( a _.nes ...RE a a me Perera -:agnuns -. . ede sapere sere fen a es cee arene pana 4 7 vith ope peanut -; >6s 7 #gf m +2 3 4 ©8 7 8 of wre 2 a sf ew a Y eB Hg tS Por peliayemu gg gf ee af ?4 1 DH12-7 ee Oy ele *3 « Page 26 of 29 63.6 ft to 91.8 ft @)NwsH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-7 AER '\ Box:7 supilen talent:DIZ iTop(ft):91.8 Box F of,0/055Bottom(ft):105.5 LC 2OM Photo Date:9/8/2012 3 Comments: Bore Hole:DH12-7 Box:8 Top (ft):105.5 Bottom (ft):119.9 Photo Date:9/8/2012 Comments: are DH12-7 Page 27 of 29 91.8 ft to 119.9 ft @)mwu.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-7 Aen 'aut: .Suprine-Daten 5ror1195'B Hae : :..*e bg A a,Bottom (ft):135.3 ra fo \)5° Photo Date:9/8/2012 Comments: Bore Hole:DH12-7 a Box:10 Top (ft):135.3 Bottom (ft):149.6 Photo Date:9/8/2012 Comments: suds--et nai”_.dhmremientnataner : .CORE SSS WOW cP SIT.PE EON SOP,SOO OOO aes 8 8 ek ey a Ag wg to DH12-7 Page 28 of 29 119.9 ft to 149.6 ft 3)NV.wH.Core Box Photographs Client:Alaska Energy Authority Project:Susitna-Watana Hydroelectric Project Site Name:Watana Dam Site Site Location Quarry M Bore Hole:DH12-7 Box:11 Top (ft):149.6 Bottom (ft):150.0 Photo Date:9/8/2012 Comments: ib Pee oe.GOA TTP om 7 Paar anyaOtSBRorteeeeee,eeoatPeteaePRAMy7se a ae' ,7wetae RS *besa )"eo -™¥gon paPiNe.eal @ *eT can Latant3ete37 ot eT 2 af ere General Comments: ¢Depth increases from upper left to lower right. *Core boxes are 5 feet long,engineering rule marked in feet and tenths of feet on all photographs. ¢Red and green lines are used to assist with core orientation.Looking down the core axis toward bottom of hole,the red line is to the left and the green line is to the right. *Black lines across a fracture label a fracture as interpreted as a mechanical break. ¢Blue markings represent notes. DH12-7 Page 29 of 29 149.6 ft to 150.0 ft eea':|neal3tenaal