Loading...
HomeMy WebLinkAboutWind MonitoringTower Install DougVaught V3 Energy 2007Wind Monitoring Tower Installation Alaska Energy AuthorityAlternative Energy and Energy EfficiencyDoug Vaught, P.E.V3 Energy, LLC, presentingPresentation developed by Mia Devine Meteorological Tower• (Met tower)•100-feet tall•Guyed tower•Tilt-up tower Met Tower Kit• Tower sections•Grounding rods•Anemometers•Vane•Temperature sensor•Data Logger The Equipment•NRG Symphonie data logger•MMC data chip•SCM chip•Desiccant pack•Sampled every 2 seconds•Averaged every 10 minutes Slope & Offset• Transfer function convertselectric signal into m/s ordegree value•Anemometer: use defaultslope & offset for NRG#40•Vane: Must specify the offset! Site Selection• Local knowledge•Wind-shaped vegetation•Snow-swept areas General Installation Steps• Clear the site and measure anchor points•Layout tower uphill and downwind General Installation Steps• Select Anchor Type:–Screw-in–Duckbill/ arrowhead with drive rod–Rock anchor General Installation Steps• Install the anchors General Installation Steps• Lay out main tower: - 10’ and 5’ sections - attachments - base plate•Paint tower sections General Installation Steps• Align the base plate with the anchors•Level the base plate•Secure the base plate with rebar General Installation Steps• Horizontally assemble - bolt in tower section- slip on guy wire collars(red tag determines level)- elevate on tires/ blocks General Installation Steps• Assemble the gin pole- safety cable- safety ropes General Installation Steps• Lay out guy wires–Red tag has the lifting eye–Be careful not to mix up wires Laying Out Guy WiresRear anchor guy wiresGin Pole lifting eyesSide anchor guy wires • Wire sensors•Mount the booms with hose clamps•Wrap sensor wires down the tower & tapeGeneral Installation Steps General Installation Steps• Connect the winch- 12 volt battery Other Winch Options General Installation Steps• Support and raise gin pole General Installation Steps• Final arrangement of booms and sensors- Don’t stand under the tower or guy wires! General Installation Steps• Erect tower while controlling side guy wires - positioning of people during the lift- 4 levels of guy wires General Installation Steps• Hold tower back when nearly vertical General Installation Steps• Move gin pole wires from winch anchor to rear/downhill anchor General Installation Steps• Straighten tower by adjusting guy wire tension General Installation Steps• Attach, wire, and configure data logger•Program the vane offset General Installation Steps• Clean-up and final check of site SummaryPhotos Courtesy of Doug Vaught (V3 Energy, LLC), Rebecca Garrett, Hannah Willard, Mia Devine, and Zach AdamPresentation Contacts:James Jensen, Project Manager, AEAMartina Dabo, Development Specialist, AEA907-269-3000Doug Vaught, 350-5047For more information and wind data:www.akenergyauthority.org/programwind.html