HomeMy WebLinkAboutElfin Cove Utility Commission Electric Utility Upgrade Project July 15, 2006 DraftBusiness Operating Plan of the Elfin Cove Utility Commission Electric Utility Upgrade Project JULY 15,2006 DRAFT |Elfin Cove Utility Commission P.O.Box 2 Elfin Cove,AK 99825 Phone:(907)239-2226 Fax:(907)239-2226 TABLE OF CONTENTS I.EXECUTIVE SUMMARY .....cccccccccssssccccecssssssssssssssnessnussusnsvsssssccnssccccsccccsscsssscssccccsssscssccccesssssssseseasacensene 2 Il.BACKGROUND ccsccsccsscscccccscccccccccccccccccssssseesssscceesssssesssessccseseessesensnecsecccccecenccccnsccccssccscessesssesceccssseseeses 3 Selected Statistics -Elfin Cove ..c.sccsssssssssssssssssssssccceessscsesssssessessesesesscssscsessesssnssssssssssssseeveussusssssasssssesesssavesensessensos 3 TIL.FACILITY UPGRADE .........cssssscccesssenccnssscesssssaccecsseeecesssccecesnseteesenceeceescccesessnecessacecsnssecesseauaeassscaesanee 4 Electric Utility Upgrade Description .....ssssessseessesssesssessesssesssessnssssesssssnsssscsssessusssnessssssecsorsssressessesssissnsacaensecneesess 4 Project Exclusions ......ccccssssssssssesessssssessesssessessnssusssesssssaesssssusssessessssssessessucssecaneeneenssasesusessessecuecusensesseeaeequssueavenseeseesess 4 Electric Power Generation Facility Capactty...csccsessssssseceessssssssssesssessessnessssnsssssssssssessssssnsssessnasussscsaversesseceaeenes 4 Site Plan and Project Layout.....ssscssssssesseesseessessssesseessessnsessesseessessseessessssesseenseessecssstsseessessesssssrsseeanensacssssessscssesenessnes 4 TV.PRIMARY OPERATOR ....sccccccccssssssssssesseetecceccccccssccssscecccccccccccessecesssecccecesecessssseseesccccecenensssssssccceseseancas 7 Contact Information ....cccscccssssesssssssscsessscssesssssessssssssssuscsesasscassessessassessessssesssaesessessasseseassssssueseseseaesceaeasasstsaqeaeacseaseeee 7 Turnover and Assumption of Responsibilities /Sustainability......ce cscessesseesssesseessssssenseecsessneesneecueecneenneesneees 7 Staffing and Training.....sescsssesesesssssessseeesessesssnssissssssssssssscessesssnssnsississssssssssssssseessuscusceseesssssssssanssesaneassassseaseds 7 Financial Responsibilities ......csccssssssssesssssessessnesssessssssssesseceseeseesessncanecseessseseesscsseesessesssssseeanesnesseessessesseseneeseessssessssenss 8 Operations and Maintenance Guidelines......scscsessesssesssssesreessesssssssssessesssesesssssasssesssssessnsesssssessssssssnsenessssseseassenss 9 Renewal and Replacement Guidelines ......sessssesssesseereesseeneessessssssssssaneeseesessscssssesssecsseqnecscssessseessesnseneenecsseeseensensees 9 V.REGULATORY REQUIREMENTS visscccssssssssscsssssscsssssssssssscsscssscssccsssesacsusescssccsscssnsassacsnsesssccsssesanssseeoses 10 VI.FINANCIAL INFORMATION ......cccccssssssccccsssecceensnsceccnsnscecccenscccnssssnsesesensstensanssssecasenseccesanssessossnenesesaaes 11 Key Financial Assumptions .....sccessssssssssssssssssssesseeneessssssserssssssssassassareneenessssnssnessensesvessenesnecnessessseneeneaneassseseensenessees 11 Key Operating Assumptions .....ssecsssssesssesssssssesneesssessssssesssessssssseasscssesssesasecenscasecssccasessuessucessessccssessesssesssecesesaneessess 11 Explanation of Financial Terms ......cssssssssesssecsseeseecssesssessecssscsnesssessscsssscssessscssscssscesscessensseanecsssesasenacssnecasseeseensensaees 11 Subsequent Operating Year Revisions .....sssscsssssssecssesseesserssesssesassssseessesssssssssssesssecsseesseassessessseceseessussseessecessseaesnsees 12 TABLES Table A:40 Year Estimated Utility Net Income and Cash flow.....csccsssesseeeessssssssesesneenserseensessesseenmesnesneensens 13 Table B:Power Generation and Consumption Summary ...esesssscseesseressssseeeessersensennenesseeneeneeaseneeaeeneenees 14 Table C:Annual O&M Schedule ......ccsccsessssssssssssssescssessssscsesssecscssseaesesceseessnsesseseceacacseesesesssesesceascedcaanesssseeseeseatees 15 Table D:40 Year O&M Schedule.....cccccccsceccssssssssssessessssescsscscsscsssssseesssessssesscssssssessesescessscesesevseserasaeeassseesessenensenss 16 Table E:Annual Fuel Costs ..cccccccccssssssssssssesssecssssssnsessececcessssssceesseacasaeceenessesensoesceasasasseseasaasassesoseasseseseenessesenseess 17 Table F:Annual G&A and Depreciation Expenses .....c.scsscssecssssssesnessessneesnecsnecsneeseenssenmesneeaeerarenneeeneecanersseey 18 Table G:40 Year R&R Schedule ......cccsssesesssssssscscsesssescsesesesssesesesesssecesesesessesesseceesesseesesesesesssessaeacaeaeeeecensereeeeeesesens 19 Table H:40 Year Renewal and Replacement Cash flow.......ccsessessssssesesssessneesneeseesnerneennverneceneeeaneensenarecnrennseey 20 APPENDIX A:PRIMARY OPERATOR STATEMENT OF QUALIFICATION ......cccscssssssocsnsnsncccccnccceressrsesensnseess 21 APPENDIX B:O&M AND R&R COsT ESTIMATE ADDITIONAL RELATED AND ATTACHED DOCUMENTS 1.SITE CONTROL DOCUMENTS 2.GRANT AGREEMENT SEE BACK COVER FOR CD VERSION OF THIS PLAN. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 1 of 21 I.EXECUTIVE SUMMARY This Business Operating Plan (the "Plan”)provides a guideline for the Elfin Cove Utility Commission (the "Utility”)maintenance,operation and sustainability of Elfin Cove Utility Commission's Utility Upgrade (the "Facility”). The Utlity will be responsible to operate and sustain the newly installed Facility and associated electric power generation equipment.This Plan has been developed to assist the Elfin Cove Utility Commission with that effort and estimates the minimum resources required to sustain the Facility; however,this Plan does not include discretionary expenses that may be incurred by the Primary Operator,which are not required for the primary function of electric power generation and distribution.For the new Facility,the Plan includes minimum estimates of operation and maintenance needs and costs,renewal and replacement needs and costs,a per kilowatt hour (kWh) surcharge for residential and commercial users,and total electrical costs.For the utility,Table A:40 Year Estimated Utility Net Income and Cashflow includes projections of utility revenues and expenses with resulting annual net income and cashflow as well as the estimated retail price per kilowatt hour. The Rural Power System Upgrade Program will construct a new Electric Power Generation Facility in Elfin Cove.The Elfin Cove Facility will consist of three diesel engine generators,automated switchgear,fuel handling,and a step-up transformer bank. The Facility will be turned over to the Primary Operator after the satisfactory completion,as determined by AEA or its representative,of a 14-day test period.After this test period,AEA will provide written notice (Certificate of Substantial Completion)stating that the Facility is ready for Beneficial Occupancy.Upon receipt of this Certificate,the Elfin Cove Unlity Commission will become the Primary Operator and will assume responsibility for the use,day-to-day operations,and long-term maintenance of all Facility components,except those noted elsewhere in the Plan.When the project has been completed (the Facility is complete,ctews have demobilized,invoices have been paid and there are no outstanding issues),the AEA will issue,through its Grants Manager,a Notice of Project Completion. Document Interrelationships Attached to this Plan are: @ Site Control Documents e Grant Agreement Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 2 of 21 II.BACKGROUND The Alaska Energy Authority is a state-owned corporation that assists in the development of safe, reliable,and environmentally sound energy systems for Alaska's communities.AEA will coordinate the planning,construction and funding of the Elfin Cove Utility Project. Elfin Cove lies on the northern shore of Chichagof Island,70 miles west of Juneau and 33 miles west of Hoonah.Elfin Cove is a protected,flask-shaped harbor,which provides safe anchorage and proximity to the Fairweather fishing grounds.The harbor is a natural spot for fish buyers and supplies.Ernie Swanson built a store,restaurant and dock here in the 1920s.His wife,Ruth, applied for a post office in 1935,and gave it the new name of Elfin Cove.John Lowell,another fish buyer,arrived in the 1940s and built a second dock,a warehouse,store and restaurant.Today,Elfin Cove is a fishing community. More than half of the homes are fully plumbed,using individual surface water collection systems, and septic tanks with leach fields or beach outfall.A water and sewer feasibility study has been conducted.Funds are needed to replace septic tanks with a community sewage collection system. No landfill 1s available;the community currently uses an unregulated refuse burn area on tidelands. A State-owned seaplane base is available.Moorage for 25 marine vessels is available.Skiffs are the primary means of local transportation.Freight arrives by float plane or boat.Elfin Cove is a fish- buying and supply center for fishermen.Most residents participate in commercial fishing,sport fishing and charter services,so the economy is highly seasonal.26 residents hold commercial fishing permits.Summer lodges and local retail businesses also provide seasonal employment. Selected demographic and historical data for the community is provided below: Selected Statistics -Elfin Cove Population 2005 29 2000 32 1990 57 1980 28 1970 49 Housing (2000 Data) Occupied Housing 15 Vacant Housing Due to Seasonal Use 10 Other Vacant Housing 10 Economic Data (2000 Data) Unemployment Rate 23.1% Median Household Income $33,750 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 3 of 21 III.FACILITY UPGRADE The Rural Power System Upgrade Program will construct a new Electric Power Generation Facility in Elfin Cove that will consist of three diesel engine generators,automated switchgear,fuel handling, and a step-up transformer bank. Electric Uulity Upgrade Description The AEA contracted with Alaska Energy &Engineering,Inc.to develop a CDR for the Electric Power Upgrade Project,which was submitted to AEA on February 16,2006.The purpose of the CDR is to provide a concept design and construction cost estimate for upgrades to the electrical generation system for the community of Elfin Cove.This Plan is based upon the information contained in the CDR. The new Elfin Cove Electric Power Generation Facility will be located on Community of Elfin Cove property in the heart of the community,co-located on a parcel with the community building. The power plant upgrade will include three new generators,programmable automatic paralleling switchgear,remote radiators with variable speed control,a fire suppression system,critical grade exhaust silencers,and automatic fill day tank,a heat exchanger for generation heat recovery,and all required engine coolant piping and ventilation equipment. Project Exclusions AEA will not take responsibility for the following,which are not a part of this project: e Off-site fuel storage @ Abandonment or decommissioning of existing facilities e Environmental cleanup The AEA will not provide any guarantees,warrantees or ongoing support,other than that which is defined in the Plan.However,manufacturer warranties will be transferred at the time of project turnover (defined in Section IV.Primary Operator). Electric Power Generation Facility Capacity The proposed capacity of the Elfin Cove Facility will be 364 kW,using three generators,taking into account the 2%annual growth in consumption over the next ten years.The initial annual estimated kW generation is 347,500;growing to 376,000 kWh by year five and 415,000 kWh by year ten. The generators are proposed at 190 kW,110 kW,and 64 kW.The proposed 64kW genset will be the prime genset for approximately eight months out of the year.This unit will be powered by a marine jacketed engine to provide for additional generation heat recovery.The Facility's power generation capacity is in excess of its present usage. Site Plan and Project Layout The following diagrams detail the site plan and project layout: Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 4 of 21 Site Plan 2”DISPENSING PIPELINES EXISTING TANK "3Ae le/}Si EX:STING 3” BARGE FILL AND FARM TO RECEIVE MINOR UPGRAOES 7, é 'POWER PLANT FUEL PIPELINE UPGRADED DISTRIBUTION AND SERVICE METERS ON? HARBOR FLCATS rf HARBOR SITE NEW V *POWER PLANT SITE, SEE SH2 iy Zovorce.ten®TRANSMISSION CABLE ROUTE USS 2947 PRE-PAY />METER FOR*COMMUNITY BOATELFIN\\/DRY-DCOCK GRIDCOVE Ay / 1"=150"- PRQUOCT:ELFIN COVE owwr UTD /CLZ|SMEI"=150"Stole of AghaENERGYINFRASTRUCTUREPROJECTSorsoeOG|we 4/10/06 Me OPA Tara ° TITLE:FILE HAE SHEET OF ED.B13 pbapak teh are BALASKY vENLARGEDAREASITEPLANELFIN-PP-SITE SH1 2 ey arenomys,Menke BaD0 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 5 of 21 Project Layout [ae 16) AUTOMATIC FILL 1C0/GALLON DAY TANK :CENJ3,64kW :FIRE SUPPRESSION H g CONTROL PANEL &f {==> AGENT RACK d HH HCSPITAL GRADE Hr q fn a]&|EF-]STATION SERVICE PANEL &SILENCER,TYP(3)oy TRANSFORMER SIs. GEM2 (__o }t=t=sao110kW,Hi 1 ]0 r we bed +2 'ix|er-2 76° iN CEN#1 (oo Ye\190kW i : HEAT EXCHANGER,PLMP,f :VALVES,ETC \| RELOCATED sf q ENTRY/z cf STORAGE ;Ss |\master}GEN |GEN |GEN;#1 |#2 |#3 '] AUTOMATIC wa A \PARALLELING RADIATOR VFO INSTALL SHED ROOF SW:TCHGEAR PANELS OVER RAD:ATCRS PROUEET:ELFIN COVE own em:ITD/CLZ|scar 3/16°=1°Stoty of ENERGY INFRASTRUCTURE PROJECTS nem BG |owe 4/10/06 Ma."Poe ot Comin ott Vetnomic Onmcorent THE:ALE NAME 'SHEET OF *an ore a foie TBALASKAPOWERPLANTRENOVATIONPLANELFIN-PP=PLANS HH D 2 tare "anencraqa,noe $3009 ° Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 6 of 21 IV.PRIMARY OPERATOR The Primary Operator for the Elfin Cove Facility will be the Elfin Cove Utility Commission,which is owned and operated by the Community of Elfin Cove Nonprofit Corporation.A detailed statement of qualification for the Primary Operator is included as Appendix A:Primary Operator Statement ofQualification. Contact Information Primary Operator:Elfin Cove Utility Commission Primary Contact Name:Jane Button and Hap Leon,Project Managers Phone:(907)239-2226 Fax:(907)239-2226 Address:P.O.Box 2,Elfin Cove,AK 99825 Usage:The Corporation will own the Facility and operate it through its subsidiary,Elfin Cove Utility Commission. Turnover and Assumption of Responsibilities /Sustainability The Facility will be turned over to the Primary Operator after the satisfactory completion,as determined by AEA or its representative,of a 14-day test period.After this test period,AEA will provide written notice (Certificate of Substantial Completion)stating that the Facility is ready for Beneficial Occupancy.Upon receipt of this Certificate,the Elfin Cove Utility Commission will become the Primary Operator and will assume responsibility for the use,day-to-day operations,and long-term maintenance of all generation facility components. When the project has been completed (the Facility is complete,crews have demobilized,invoices have been paid and there are no outstanding issues),the AEA will issue,through its Grants Manager,a Notice of Project Completion.This Notice is included in the Grant Agreement;see Additional Related and Attached Documents. The Primary Operator is responsible for the long-term sustainability of the Facility for the benefit of the local community.The complete Facility will be maintained according to guidelines outlined in this plan,all manufacturers'recommendations for maintenance,and all state and federal laws,codes and regulations governing operation.The Primary Operator is responsible to establish and manage accounts for the O&M and R&R to ensure that sufficient resources exist to sustain the Facility as specified in the Plan. Staffing and Training The Primary Operator will designate an Operations and Maintenance Manager (the "Manager”)for the Facility.The Manager will be the point of contact for communications between the Primary Operator and all other interested parties.The Primary Operator will name the Manager prior to the start of operation.The Manager will manage the Primary Operator's enterprises and will be given complete responsibility for operating the Facility in compliance with this Plan. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 7 of 21 It is recognized that there will be,from time to time,turnover in various operational,maintenance and administrative positions.Because all functions are essential to the successful operation of the Facility,replacements will be recruited and trained as necessary.The Manager will be responsible for maintaining adequate staffing and training at all times,and when the Primary Operator lacks trained operators and administrative staff,training will be obtained to ensure sustained Facility operation. The Primary Operator's manager and bookkeeper may,as needed,participate in business plan training conducted by the Alaska Energy Authority.Additionally,as applicable,the Primary Operator will utilize the AEA Circuit-Rider Training Program for on-site,hands-on training,as well as other training programs offered by AEA,the Alaska Vocational Technical Center (AVTEC)in Seward and others. Financial Responsibilities There are two cost categories that will be incurred in the ongoing operation and upkeep of the Electric Utility equipment -O&M and R&R. The Primary Operator will incur a number of expenses relating to the O&M of the equipment. O&M items are defined as expenses that are incurred on a regular basis (administration,audits,etc) and maintenance expenses that are incurred on an annual basis.O&M expenses are detailed in Tab C:Annual OM Schedule and a narrative detail is provided in Section VIL.Financial Information to address estimates and assumptions. R&R costs are those expenses defined as items costing greater than $5,000 and/or that are not replaced on an annual basis.Table G:40 Year R¢*R Schedule details the anticipated items,the frequency of their replacement and their present day value. The Primary Operator will maintain separate O&M and R&R accounts and will maintain a sufficient account balance to meet the O&M and R&R financial goals in this Plan.The Manager will be authorized to draw against the O&M funds for routine expenses of the Facility;however,individual expenditures in excess of $5,000 will require authorization of the Primary Operator's management ot governing body.See Appendix A:Statement ofQualification for an overview of the Primary Operator's fiscal controls and accounting procedures. At least once a year,no later than May 31",the Primary Operator will develop a budget for theupcomingfiscalyear,July 1*through June 30",for both O&M and R&R.This will include an update of actual expenses and projections and assumptions used in this Plan,as described in Section VIII.Financial Information,Subsequent Operating Year Revisions.Additionally,Tables A-H should be updated. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 8 of 21 Operations and Maintenance Guidelines The Primary Operator will establish an account to fund the Facility O&M so that the O&M schedule can be completed and the Facility operations can be sustained into the future (this is anticipated to be an active non interest-bearing account).Section VILL.Financial Information provides Table C:Annual OC7M Schedule and Tabk D:40 Year O@7M Schedule as a guide to plan for annual maintenance activities. Renewal and Replacement Guidelines The Primary Operator will establish a renewal and replacement account,which will ensure capitalization of an amount sufficient to maintain the R&R Schedule (see R¢*R Fund Account- Sample Documents for "How to Establish a RC*R Account').Section VIL.Financial Information provides Table G:40 Year RC*R Schedule as a guide to plan for annual R&R activities and Tab H:40 Year Re>R Cashflow as a guide to estimate annual R&R required contributions.These costs are based on the R&R cost estimate provided by Alaska Energy &Engineering,Inc.See Appendix B:O&M and Re¢>R Cost Estimate. The Primary Operator will use the estimates in this Plan for year one contributions,and in subsequent years will recalculate contributions based upon actual costs. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 9 of 21 V.REGULATORY REQUIREMENTS The Primary Operator is responsible for ensuring adherence to all applicable state and federal regulations.The Facility will be provided with,and will have on-site,if applicable,any of following spill response and related regulatory plans that need to be implemented: e Environmental Protection Agency (EPA)Spill Prevention Control and Countermeasures (SPCC)Plan (40 CFR Part 112)-This plan confirms compliance of the Facility with the spill prevention and operating requirements of 40 CFR Part 112.A Registered Professional Engineer must certify the plan. This plan will also include operator guidelines for spill training,drills,prevention and response and other related environmental information to ensure the environmental integrity of the Utility and the community. This plan includes commitments and guidelines for spill prevention,response,and other related environmental information to ensure the environmental integrity of the Facility and the community. The plan will be developed near the end of Facility construction.The Primary Operator will participate in development and review of the plan as requested. The Primary Operator must be certificated by the Regulatory Commission of Alaska. The Primary Operator will apply to the State of Alaska,Department of Environment Conservation for a Construction Permit prior to facility construction and for a Diesel-Electric Generator Facility General Operating Permit. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 10 of 21 VI.FINANCIAL INFORMATION All estimates and assumptions contained in this Plan are preliminary and are anticipated to change as the project progresses.Actual expenses may vary throughout the life of the Facility and,therefore, should not be considered as final estimates. Key Financial Assumptions e Annual inflation rate of 1.5%. e Annual investment rate of 3%. e Itis assumed that R&R funds will be deposited into an interest-bearing bank account. Fees are assumed to be 1%,beginning when the account balance is estimated to be $100,000. e Annual collections rate of 100%. e Detailed assumptions regarding labor rates,required labor hours,and other operating costs are provided in the tables that follow. e Fuel costs for the first year are estimated to be $3.80 per gallon. e Annual kWh usage for Elfin Cove is estimated to grow at 2%annually. Key Operating Assumptions Line loss and unbilled production are assumed to be 12%per year. Initial first year power generation is estimated to be 347,500 kWh for Elfin Cove. Initial annual billed kWh is estimated to be 305,800 kWh for Elfin Cove. Energy is produced at 14 kWh/gallon on average. Explanation of Financial Terms e Total Annual Billed kWh -The annual estimated kWh of demand from all users groups (residential,community,commercial,etc)that is billed for payment. e Assumed Annual Collectable kWh -The annual estimated kWh that is deemed to be collectable upon billing for payment. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 11 of 21 Subsequent Operating Year Revisions Starting with the second year,as operating experience specific to this Facility is obtained,the projections and assumptions upon which the Plan is based will be reviewed and modified.The following guidelines are for use in subsequent operating years in updating and modifying Plan projections and assumptions: Step 1:Review previous years'O&M and R&R costs and compare to current projections Step 2:Adjust O&M and R&R projections and assumptions based upon actual experience Step 3:Recalculate per kWh O&M surcharge based upon updated demand estimates Step 4:Recalculate per kWh R&R surcharge based upon updated demand estimates Step 5:Update Table A:40 Year Estimated Utility Net Income and Cashflow Step 6:Establish updated retail rate per kilowatt hour Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 12 of 21 Inflation Rate : TABLEA 40 YEAR ESTIMATED UTILITY NET INCOME AND CASHFLOW Annual Profit Margin: Annual Revenue Annual Expenses Net Annual Cashflow Before Taxes s ae General&Year Estimated en Estimated O&M Fuel Costs |Administrative |Depreciation Total Income Net Income Plus:less:R&R AnnualRetailPriceKwll/Year Anaual Expenses (Table F)Expenses (Fable )Expenses Before Year|Before Taxes Depreciation Cash Deposit Cashflow$/KwH (Table B)Revenue (Tables C&D)(Table F)Taxes (Table F)|(fables G&H) i|ts 0462]]305,800|[$141,393]{$40,001|$90,598[$_1,500[$1,200]$_133,389|[$8003][1 [S$8003]][$ 1,200/$6,110|]$3,087"2 |/s 0466]|311,916)[$145,403][$40,092]$93,790]$1,523 $1,218]$137,229]|$8,234)|2/19 8234)18 1,218]8 6,238]]$3,2133}[$so470f |318,154]|$149,063]1§41,303]$97,107($1,545]$1,236]$141,192]]/$8471]|3 |S 8471]|$ 1,23618 6,363]1 $3,3454[fs 0475]|324517]|$153,998]|}§41,922]$100,535/$1,509]$1,255]$145,281]|$8717]|4s 3,717]|$-1,255])8 6490]1 $3,481"5 |1$0497]|]331,008]|$164,527}|$42,551|$104,084/$1,592]$6,987]$155,214;|S 9,313]f 5 |S 9,313]]$698718 6620}]$9,680"6 |{$s 0501]]-337,028]|$169,144]|$43,189]$107,758]$1,616]$7,006]$159570}|$9,574]|6 [S$9,574]]$7,006]$10,129;|$6,451"T |{S$0.505 344,380 |1$173,009]]$ 43,837|$111,562/$ 1,040/$7,025|$164,065]]$9,844)|718 9844]}8 702518 10331;1$65388|{S$_0.506 351,268 s_177,766||$_44,495/$115,500]$_1,665|$6,044]$167,703]|$10002]|8 {$s 10,002]{s 6044|$10538]}$5,508"9 ||$oso]|358,293}|$182,843]|$ 45,162|$119,577]$1,690]$6,064]$_172,493||$10350]|9 |$10350]|$6004]$10,749]|§_5,604ao}]s 0532]|305,459]|§194,486]]$ 45,840/$123,799]$-1,715|$12,124]$183,477]|$11,009]J 10]$11,009]|$12,124]$10,964]|$-12,169'i1{]$0536]|372,768]|$199,896||$46,527|$128169]$1,741]$12,145]$198,581]|S 11,315]|11]$11,315]|$12,145]$14,911]|$8,549'12/[$s 0540]]380,224]|$205,482]|$47,225]$132,693]--1,767[$12,166 |$193,851]|$11,631]|12]$11,031]|$12,166]$15,209]|$8,588|1i3{|S 0538]|387,828]|$208820]|$47,933]$137,377|$1,793}$9,896)$197,000]|$11,820]|13]$11,820]|$9,890]$15,513]|$6,203|w4}$-05437]395,585]|$214,774]|$8 48,6521 §142,226]1,820]$9,917]$__202,617||$12,157]|14]$8 12,157]|$9,917 |$15,823 $6251154}]$0545]|403,497 |$219,710]|$49,382]$147,247]$1,848|$8,796 |$207,273]|$12.436]|15|$12436);|$ 8,796/$16,140]|$5,09316||$0.549 411,567 $226,058}|$ 50,123|§152,445/$-:1,875]$8,819 |$213,262]]$12,796]|16|$12,796)]$8819/$20,578]|$1,036171|$0.554)|419,798]|$232,612]]$50,875|$§157,826[$ 1,903]$ 8841]$219,440]]$13,167]J 17 [$8 13,107]|$8,841]$20,990]|$1,018|18[]$0.555]|428,194]|$237,784]|$51,638]$163,397/$1,932]$_7,357|$_2243241 |$13,459]|18 |$13,459]|$ 7,357/$21,410]|$(593) 1914s 0560]]436,758 |$244,774]|$8 52,413|$1691058 -1,961]$7,380]$_230,919)|$13,855]|19]$13855]]1§7380/8 21,8381 ]$G03) 20}]}$0580]|445,493]|$258,499]|$53,199]$175.1378 1,990]$13,541 |$243,867)]$14,632]|20/8 14632]]$13,541]$22,275]|$5,89821{[s 0585]|454,403/|$265,955]|$53,997]$181,319 |$2,020[$-13,565|$250,901]]$15,054]J 21]$15,054]|$13,505]$27,204]|$1,35522|/$0590}|463,491]|$273,656]|$54,807]$187,720|$2,051]$13,589 $258,166]|$15,490}|22|$15,4901 18 13,589]$27,8091 |$1,270234]$0590]|472,761]|$_278,968]|$55,629|$§194,346)$2,081]$11,121]$263,178 ||$15,791]|23 |$15,791]|$11,121]$28,366]|$(1,454)'m1 {S$0596)|482,216]|§287,185]|$56,403|$201,207/$2113 |$11,146]$270,929]|$16,256}|24]16,256)|8 11,146]$28,933]|$(1,531) 25 ||$0.618 491,860 ||$303,828]|$57,310|$208,309|$2,144]$18,867]$286,630]|$17,198]|25|$17,198]|$ 18,867|$29,512]|$6,553-26||s 0623]|-501,097]|$312,595]]$58,170]$215,603]$2,176 |$18,892}$_294,901||$17,094]|20]$17,6094]|$18,802]$35,119]|$1,46827{|s 0629}|511,731 ||$321,652]|$59,042]$223,276[$2,209]$18,918]$303,445]|]$18,207]|27]$18,207]]$18918]$35,821||$1,30428|{$s 0.631]|521,966]|$329,579]]}$59,928]$231,157]$-2,242|$17,590]$310,924]|$18,655]|28]$18655]]$17,596]$36,538]$(286) 2911$0.637]{532,405]|$339,245 1$ 60,827|$239,317]$2,276 |$17,623]$320,043||$19,203]|29]$19,203]|$17,023 |$37,268]|$(443)301]$0650]|543,053]|$353,025 1$61,739 |$247,765|$2,310]$21,228]$333,042]|$19,983]|30]$19,9831 |$21,228]38,014/]$3,1973111s0656]]553,914]|]$363,343 |$62,605]$256,511]$2,345]$21,256]$342,777||$20,567]|31]$20,5671 1 $21,256]$44,313 ||$(2,491)32[|$0.662}}564,993}|$374,005]]$63,605]$265,566|$2,380|$-21,284/$352,835]|$21,170]|32]$21,170]|$21,2848 45,1991 |$-(2,745)|33 1$0.664]|576,293]|$382,519||$64,559|$274940|/$2,415 |$18,952 $300,867]|$21,652]|33 |$21,652]]$18952]$46,103]|$(5,500) 34]|$0670]|-587,818]|$393,902]|$65,528 |$284640[$---2,452/$18,981]$371,006]|$22,296]|34|$22,296]|$18,981]$47,025]|$(5,748)3541s 0604]|599,575]|§398027]|$66,511]$294094|$2,488]$11,804 $375,497]|$22,530]|35]$s22,530]|$11,8041$47,966]|$(13,632) 36 [|$oo71]|611,506]|$410,183]|$67,508]$305,096 $2,526]$11,834]$386,965]|$23,218]|36]$8 23,218]|$11,8341 55,041]|$(19,989)37 [$s 0678}|623,798 ||$422,744]|$68,521]§315,866 |$2,564|$11,864|$398,816]|$23,9291 |37|$23,929]]$11,864]$56,142]|$(20,348)38]]$0.682 636,274 ||$433,768]]$69,549 $327,016|$2,602]§__-10,047|$409,215]|$24,553]|38]$24,5531]$§10,047|$57,205]|$(22,664) 39)1$0689]|648,999]|$447,184]|$70,592]$338,560|$2,641/$-10,079|$421,872]|$25,312]|39]$25,312]1$10,079[§58,410]|$(23,019)40 |{8 0.751 661,979 ||S 497,410]|$8 71,651]$350,511 |$2681]$44,411]$8 469,254||$28,155]|40]$28155118 4441115 59,578||$12,989 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 13 of 21 TABLE B Power Generation and Consumption Summary Total Generated Annual Line Total Billed Assumed Year KwH/Year Loss and KwH/Year Collectable Unbilled KwH/Year 1 347,500 41,700 305,800 305,800 2 354,450 42,534 311,916 311,916 Assumed Collection Rate 3 361,539 43,385 318,154 318,154 2 4 368,770 44,252 324,517 324,517 5 376,145 45,137 331,008 331,008 6 383,668 46,040 337,628 337,628 7 391,341 46,961 344,380 344,380 8 399,168 47,900 351,268 351,268 Annual Line Loss/Unbilled 9 407,152 48,858 358,293 |358,293 be 12.00%:=| 10 415,295 49,835 365,459 365,459 11 423,601 50,832 372,768 372,768 12 432,073 51,849 380,224 380,224 13 440,714 52,886 387,828 387,828 14 449,528 53,943 395,585 395,585 15 458,519 55,022 403,497 403,497 16 467,689 56,123 |411,567 411,567 17 477,043 57,245 419,798 419,798 18 486,584 58,390 428,194 428,194 19 496,316 59,558 436,758 436,758 20 506,242 60,749 445,493 445,493 21 516,367 61,964 454,403 454,403 22 526,694 63,203 463,491 463,491 23 537,228 64,467 472,761 472,761 24 547,972 65,757 482,216 482,216 25 558,932 67,072 491,860 491,860 26 570,111 68,413 501,697 501,697 27 581,513 69,782 511,731 511,731 28 593,143 71,177 521,966 521,966 29 605,006 72,601 |532,405 532,405 30 617,106 |74,053 543,053 543,053 31 629,448 75,534 553,914 553,914 32 642,037 77,044 564,993 564,993 33 654,878 78,585 576,293 576,293 34 667,975 80,157|587,818 587,818 35 681,335 81,760 599,575 599,575 36 694,962 83,395 611,566 611,566 37 708,861 |85,063 623,798 623,798 38 723,038 |86,765 636,274 636,274 39 737,499 88,500 648,999 648,999 40 752,249 |90,270 |661,979 |661,979 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 14 of 21 TABLE C ANNUAL "0 and M"SCHEDULE Rate Per Fringe Total Hourly Position Hour Rate Cost Duties Operator 1 -Primary «|&20.00 11.0%||$22.20 Maintenance&PrimaryOperations _ Bookkeeper 8 15.00]11.0%||S 16.65]|Payroll,Accounts Payable -Backup Operator $15.00 11.0%$16.65 Backup Primary Operator Annual O&M Costs: Labor Costs Hours/Hourly Monthly Labor Month Cost Cost Annual Costs BookkeeperBookkeeper --(asé'isé's SCsSYSCSC(80,00 $16.65]|1$333.00 Subtotal AdministrativeLabor |20.00 ||$333001 |$|3,996 Operators a __:- Primary 600 |[$622.20]|$133200]|7 Backup |40 [I$1665]]$666.00 a a a Subtotal Operator Labor 100 []|st $199800)|$23,976 Materials:Z a BOMaterials&Equipment _7 7 -a ---7 S$8,669 "FireSystemInspection Outside Contractor)= ti(iti'"'i;:'*dT 1,250 Other Costs: _---7 Training (Lump Sum)$1,000 Insurance Oe 7 7 1,200 Total Annual O&M Costs _OO oo $40,091 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 15 of 21 TABLE D 40 YEAR "0 and M"SCHEDULE Annual O&M Total Billed Assumed O&M Surcharge'Year Expenses KwH/Year Collectable $/KwHKwH/Year 1 $40,091 305,800 305,800 ||$ 2 $40,692 311,916 311,916 ||$ 3 $41,303 318,154 318,154 ||$ 4 $41,922 324,517 324.517 ||$ 5 $42,551 331,008 331,008 ||$ 6 $43,189 337,628 337,628 ||$ 7 $43,837 344,380 344,380 ||$ 8 $44.495 351,268 351,268 ||$ 9 $45,162 358,293 358,293 ||$ 10 $45,840 365,459 365,459 |1$ 11 $46,527 372,768 372,768 |1 $ 12 $47,225 380,224 380,224 ||$ 13 $47,933 387,828 387,828 ||$ 14 $48,652 395,585 395,585 ||$ 15 $49,382|403,497 403,497 ||$, 16 $50,123 411,567 411,567 ||$0.122 17 $50,875 419,798 419,798 |1$0.121 18 $51,638 428,194 428,194 ||$0.121 19 $52,413 436,758 436,758 ||$0.120 20 $53,199 445,493 445,493 1 1$0.119 21 $53,997 454,403 454,403 ||$0.119 22 $54,807 463,491 463,491 ||$0.118 23 $55,629 472,761 472,761 ||$0.118 24 $56,463 482,216 482,216 ||$0.117 25 $57,310 491,860 491,860 ||$0.117 26 $58,170 501,697 501,697 ||$0.116 27 $59,042 511,731 511,731 ||$0.115 28 $59,928 521,966 521,966 ||$0.115 29 $60,827 532,405 532,405 ||$0.114 30 $61,739 543,053 543,053 ||$0.114 31 $62,665 553,914 553,914 ||$0.113 32 $63,605 564,993 564,993 ||$0.113 33 $64,559 576,293 576,293 ||$0.112 34 $65,528 587,818 587,818 ||$0.111 35 $66,511 599,575 599,575 ||$0.111 36 $67,508 611,566 611,566 ||$0.110 37 $68,521 623,798 623,798 ||$0.110 38 $69,549 636,274 636,274 ||$0.109 39 $70,592 648,999 648,999 ||$0.109 40 $71,651 661,979 661,979 ||$0.108 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 16 of 37 TABLE E ANNUAL FUEL COSTS i Estimated Total Total Fuel Assumed Year Fuel Cost per Generated Usage @ von annual Collectable vk otGallonKwH/Year ||14 KwH/Gallon KwH/Year w 1 $3.65 347,500 24,821]|$90,598 305,800 |1$0.296 2 |$3.70 354,450 25,318 ||$93,796 311,916]|$0.301 3 $3.76 361,539 25,8241 }$97,107 318,154]]$0.305 4 $3.82 368,770 26,341 ||$100,535 32451711$0.310 5 $3.87 376,145 26,868 ||$104,084 331,008 |1$0.314 6 $3.93 383,668 27,405 ||$107,758 337,628 |1$0.319 7 $3.99 391,341 27,953 ||$111,562 344,380]1$0.324 8 $4.05 399,168 28,5121 |$115,500 351,268 |1$0.329 9 $4.11 407,152 29.082 ||$119,577 358,293 |]$0.334 10 $4.17 415,295 29,664 ||$123,799 365,459 1$0.339 11 $4.24 423.6011]30,257 ||$128,169 372,768 1|$0.344 12 $4.30 432,073 30,862 ||$132,693 380,224|1$0.349 13 $4.36 440,714 31,480 ||$137,377 387,828 |1$0.354 14 $4.43 449,528 32,109]|$142,226 395,585 |]$0.360 15 $4.50 458,519 32,751 ||$147,247 403,497|]$0.365 16 $4.56 467,689 33.406 ||$152,445 411,567|]$0.370 17 $4.63 477,043 34,075 ||$157,826 419,7981|1$0.376 18 $4.70 486,584 34,756 ||$163,397 428,194]1$0.382 19 $4.77 496,316 35,451 ||$169,165 436,758|]$0.387 20 $4.84 506,242 36,160 ||$175,137 445,493]1$0.393 21 $4.92 516,367 36,883 ||$181,319 454,403 |]$0.399 22 $4.99 526,694 37,621 ||$187,720 463,491 |1$0.405 23 $5.06 537,228 38,373 ||$194,346 472,7611|$0.411 24 $5.14 547,972 39,141 ||$201,207 482,216|]$0.417 25 $5.22 558,932 39,9241 1$208,309 491,860|}$0.424 26 $5.30 570,111 40,722 ||$215,663 501,697}|$0.430 27 $5.38 581,513 41,537 ||$223,276 511,731 |1$0.436 28 $5.46 593,143 42,367 ||$231,157 521,966|1$0.443 29 $5.54]|605,006 43,215 ||$239,317 532,405|1$0.450 30 $5.62 617,106 44,079 ||$247,765 543,053 |1$0.456 31 $5.71 629,448 44.9611 |$256,511 553,914|1$0.463 32 $5.79 642,037 45,860 ||$265,566 564,993 |1$0.470 33 $5.88 654,878 46,777 ||$274,940 576,2931|$0.477 34 $5.97 667,975 47,713 ||$284,646 587,818 |1$0.484 35 $6.06 681,335 48,667 ||$294,694 599,575|1$0.492 36 $6.15 694,962 49,640 ||$305,096 611,56611$0.499 37 $6.24 708,861 50,633 ||$315,866 623,798}1$0.506 38 $6.33 723,038 51,646 ||$327,016 636,274|1$0.514 39 $6.43 737,499 52,678 ||$338,560 648,999 |1$0.522 40 |$6.52 752,249,53,732 ||$350,511 661,979 ||$0.529 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 17 of 21 TABLE F ANNUAL "G and A"AND DEPRECIATION EXPENSES Annual General &Administrative Costs: $ Office Expenses $1,500 Other -Interest Expense $- Total Annual O&M Costs '$1,500 Annual R&R Depreciation Expense: Depreciation-Other Year Depreciation R&R Assets Total Annual Depreciation 1 [$-|$1,200 $1,200 2 $-$1,218 $1,218 3 $-$1,236 $1,236 4 $-$1,255 $1,255 5 $5,713 |$1,274 $6,987 6 |$5,713 |$1,293 $7,006 7 $5,713 |$1,312 $7,025 8 $4,712 |$1,332 $6,044 9 |$4,712 |$1,352||$6,064 10 =|$10,752 |$1,372 $12,124 11 $10,752 |$1,393 $12,145 12 |$10,752 |$1,414 $12,166 13 «|$8,461 |$1,435 $9,896 14 |$8,461 |$1,456 $9,917 15 |$7,318 |$1,478 $8,796 16 |$7,318 |$1,500 $8,819 17 +4 7,318 |$1,523 $8,841 18 1$5,811 |$1,546 $7,357 19 |$5,811 |$1,569 $7,380 20 $11,949 |$1,592 $13,541 21 |§$11,949 |$1,616 $13,565 22 1$11,949 |$1,640 $13,589 23 $9,456 |$1,665 $11,121 24 ($9,456 |$1,690 $11,146 25 |$17,151 |$1,715 $18,867 26 |$17,151 |$1,741 $18,892 27 |$17,151 |$1,767||$18,918 23 |$15,802 |$1,794 $17,596 29 $15,802 |$1,821 $17,623 30 |$19,380 |$1,848 $21,228 31 |$19,380 |$1,876 $21,256 32 1$19,380 |$1,904 $21,284 33 «|$17,019 |$1,932 $18,952 34 1$17,019 |$1,961 $18,981 35 |$9,813 |$1,991 $11,804 36 |$9,813 |$2,021 $11,834 37 1$9,813 |$2,051 $11,864 38 $7,966 |$2,082 $10,047 39 |$7,966 |$2113]|$10,079 40 |$42,267 |$2,145 $44,411 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 18 of 21 TABLE G 40 YEAR "R and R"SCHEDULE Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 19 of31 Year of Present Day ||Annual Inflated DepreciationActivityR&R Activity Value Total Value R&R Activities:Cost Activity Year Term 5 Replace Values/Gauges $437 Upgrade Floors/Walls/Ceilings 1,973 B2|Refurbish Electric Systems $686 10/20/30/40 3 Top End Overhaul/Battery/Alternator 22,197 C1{Replace Ramps $s :40 20 |Repair Ballasts/Lenses 420 []$25,028 [|$26,563 B2}Pump Replacement $404 10/20/30/40 :3 10 Refurbish Electric Systems $686 C2]|ReplaceDayTank &Electrical System $43,950 40 |»| Pump Replacement 404 B2]Replace Values/Gauges $437}4}5/15/25/35 3 Floor/Roof Repair 533 B3|Floor/Roof Repair $533|10/20/30/40 3 Repair Roof 511 C3|UpgradeFloor/Roofs $7,729 20/40 10 Change Door Hardware 584 B3|Repair Siding/Overhead Door $-_||_5/10/15/25/30/35 3 Upgrade Floors/Walls/Ceilings 1,973 C3{ReplaceWalls/Window Units/Specialities $6,957 0 |2| Repair Ducts/Grilles 901 B3E Repair Roof $SIL 10/20/35 3 Repair Fire Suppression System 3,000 B3|Change Door Hardware $584 10/30 3 Repair Ballasts/Lenses 420 B3|ReplaceWindow Sealsand Glazing $:20 3 Overhaul Genset/Controls 35,500 |]$44,511 |]$50,893 |B3|Upgrade Floors/Walls/Ceilings $1,973 5/10/15/25/30/35 3 15 Replace Values/Gauges $437 C3|Replace Doors &PaintTrim $1,762 20/40 3 Upgrade Floors/Walls/Ceilings 1,973 C4[Replacement MechanicalSy $48,200 |40 20 Top End Overhaul/Battery/Alternator 22,197 B4|Repair Ducts/Grilles $901 10/:30 3 Repair Ballasts/Lenses 420 4 $25,028 |]$30,828 C4{Refurbish Ducts/Grilles $3,180 20/40 10 20 Pump Replacement $404 Bal Repair Fire SuppressionSystem $3,000 10/30 10 Refurbish Electric Systems 686 C4[ReplaceFire Suppression System $34,500|40 20 Refurbish Switchgear/Controls 13,500 B5|Replace Breakers/Fuses $1,740,20 3 Floor/Roof Repair 533 B5|Repair Ballasts/Lenses $420||5/10/15/25/30/35_3 Repait Roof 511 C5][Replace Fixtures/Devices/Alarms $5,521 20/40 10 Upgrade Floor/Roofs 7,729 Bo|Overhaul Genset/Conwols $35,500 10/30 5 Replace Doors &Paint Tam 1,762 B5|Replace Panels /Switches/Motors/Controls 1 $8,500.40 a. Replace Breakers/Fuses 1,740 C6|ReplaceGenerators/Feeders &Conductors $62,000 20/40 15 Refurbish Ducts/Grilles 3,180 C5|ReplaceConductors/Transformers/Panels |$22,600 |40 a. Replace Fixtures/Devices/Alarms 5,521 B6|Refurbish Switchgear /Controls $13,500 20 10 Replace Generators/Feeders &Conductors 62,000 }]$97,565 ||$129,464 C6]Replace Switchgear/Controls $170,200.40 20 25 Replace Values/Gauges $437 Bo|Top End Overhaul/Battery/Alternator $22,197 5/15/25/35 s Upgrade Floors/W'alls/Ceilings 1,973 Top End Overhaul/Battery/Alternator 22,197 Repair Ballasts/Lenses 420 $25,028 [1 $35,777 30 Refurbish Electric Systems $686 Pump Replacement 404 Floor/Roof Repair 533 Change Door Hardware 584 Upgrade Floors/W'alls/Ceilings 1,973 Repair Ducts/Gnilles 901 Repair Fire Suppression System 3,000 Repair Ballasts/Lenses 420 Overhaul Genset/Controls 35,500 ||$44,000|$67,759 35 Replace Values/Gauges $437 Repair Roof 511 Upgrade Floors/Walls/Ceilings 1,973 Top End Overhaul/Battery/Alternator 22,197 Repair Ballasts/Lenses 420 |]$25,538 |]§42,368 40 Pump Replacement $404 Refurbish Electric Systems 686 Replace Panels/Switches/Motors/Controls 8,500 Floor/Roof Repair 533 Replace Day Tank &Electrical System 43,950 Upgrade Floor/Roofs 7,729 Replace Walls/Window Units /Specialities 6,957 Replace Doors &Paint Tam 1,762 Replacement Mechanical Systems 48,200 Refurbish Ducts/Grilles 3,180 Replace Fire Suppression System 34,500 Replace Fixtures/Devices/Alarms 5,521 Replace Conductors/Transformers/Panels 22,600 Replace Generators/Feeders &Conductors 62,000 Replace Switchgear/Controls 170,200 ||$416,720 |{§744,767 TABLE H 40 YEAR RENEWAL AND REPLACEMENT CASHFLOW R &R Fund Balance A dssume R&R Year Beg.of Annual Renewals/Interest End of Collectable SurchargeYearDepositsReplacementsEarnings(Net Year KwlI/Year $/KwllBalanceofFees)Balance 1 §-|$_6,116 $ ___-1$6,116}|305,800}|$0.020 2 |]s6116/8 6238)|$183/$12,538]|311,916}|$0.0203$ 12,538/$6,363 $376|$19,277]|_-318,154]|$0.0204[4s 19,277]8 6,490 §578|$26,346]|324,517]|$0.0205|I$26346/$6,620]$26,5631 $--|s -6403]|331,008]|$0.020 6 $6403/$10129, |$ 128]/$16659]|337,628]|$0.030 7 |{$ 16659]$10,331]S383]$27,324]|344,380]|S 0.030_8 {|{8 27,324]8 10538]-|$ 546/$38409]|351,208]|$0.0309$38,409]$10,749 $768}$49,926 358,293}|$0.030 10||S49,926]$10,964]$50,8931$(I$9,977}|365,459]|$0.030i|{s 997718 14,911 {Ss 2001 $25,087}|_372,768]|$0.040-12 $25,087]$15,209 $502}$40,798]|380,224]|$0.040 13°118 40,798/$15513[Ss B1G J $ -57,127|| -387,8281 |$0.04014|[$57,127]$15,823 _[81143]74,093]|_395,585]|§0.04015||$74,093]$16140/$ 30,828/$865|$60,270]|403,497]1$0.040_16||S 60,270)$_20578)$1,205}$82,054]|411,567]|S 0.05017||$____82,054]$20,990 $1641]$104,685]|419,798)|$0.05018|[$104,685]$21,410 18 2,094]$128,188]|428,194]|$0.05019|]$128188]$21838;=|S 2,564/$152590]|436,758,|$0.05020.|18 152,5901$22,275]$129,4641$463 |$45,863]|445,493}|$0.05021-4 $s 45,803/$27,264]=TI 74,045 454,403]|$0.060 22,|1$74,045)27,809;«|$s -1,481 |]$103,335 463,491}|§0.06023||$1033351§283606] |$ 2067|$133,768]|472,761]|$-_-0.06024||$133,768]$28,933 ||_|$2,675 |$165,376]|482,216)|$0.0602511$165,376]$29,512]$35,777]$2,592 |$161,703 491,860]|$0.060_26||S 161,703|$35119]TS 3,234)$200,055]|501,697]|$0.07027||$ 200,055/$35821;- |$ 4,001]$239,878]|511,731]|$0.07028«||$239,878]$36,538]$4,798]$281,213]|521,966]|}$0.07029$281,213]$37,268] -|[$5,624]$324105]|532,405]|$_0.07030||s_324105]$3a014|$67,759]$5,127]$299,487]|543,053]|§_0.07031|[$299,487]$44313]tS 5,990 $349,790]|553,914]|$0.08032$349,790]$45,199 $6,996]$401,985]|__564,993]|$___0.08033.|{$401,985]§$46,103 $8,040]$456,128 576,293]|$0.080 34.«||$456,128]$47,025 {$9,123}§512,276]|587,818]|§0.08035||$__512,276/$47,966]§42,368 §9,398 |$527,272 599,575]{$0.08036d[S$527,2721$55,041 -|$ 10,545]$592,859]|611,566]|$0.09037$592.859 $56142]- |[$ 11,857]$660,858]|_-623,798||$-_-0.09038$660,858/$57,265,|$13,217]$731,339]|--636,274||$0.09039«||S 731,339]$58,410 $14,627 |$804,376 648,999 ||$0.090"ao ||8804376 [8 50.578 |8 _744,767|5 -|s 119.187 ||661.979 ||$0.090 Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 20 of 21 Inflation Rate :f.-:-: Reinvestment Rate : Invested Escrow Fees: Initial KwHI Collectable : Initial Cost per KwII: 5 year step cost increase : APPENDIX A:PRIMARY OPERATOR STATEMENT OF QUALIFICATION The Primary Operator Statement of Qualification includes: 1.A description of the Primary Operator,its personnel and experience,and its responsibilities and functions.This discussion includes a description of the ability and history of the Primary Operator to operate an electric power generation facility and utility as a business and/or its history of operating other business enterprises,as well as a description of the Primary Operator's fiscal controls and accounting procedures.This discussion details organization history,management and structure;identification of key personnel,their experience and responsibilities;and,proposed organization of the electric utility management and operations,including an organizational chart. 2.A description of the Primary Operator's,if any,staffing or training needs. 3.A description of the training plan proposed by the Primary Operator to address current and future needs. Elfin Cove Utility Commission Electric Utility Upgrade Business Operating Plan Page 21 of 21 ELFIN COVE UTILITY COMMISSION/ COMMUNITY OF ELFIN COVE NON-PROFIT CORPORATION Community History Elfin Cove lies on the northern shore of Chichagof Island,70 miles west of Juneau and 33 miles west of Hoonah.The area encompasses 10.7 sq.miles of land and 0.1 sq.miles of water.The area's maritime climate is characterized by cool summers and mild winters.Summer temperatures range from 52 to 63,while winter temperatures range from 26 to 39. This protected,flask-shaped harbor was originally called "Gunkhole"by fishermen anchoring here. Its safe anchorage and proximity to the Fairweather fishing grounds made this a natural spot for fish buyers and supplies.In the 1920's,Ernie Swanson built a store,restaurant and dock and his wife, Ruth,applied for a post office in 1935,and gave it the new name of Elfin Cove.John Lowell, another fish buyer,arrived in the 1940s and built a second dock,a warehouse,store and restaurant. Today,Elfin Cove is a fishing community. More than half of the homes are fully plumbed,using individual surface water collection systems, and septic tanks with leach fields or beach outfall.A water and sewer feasibility study has been conducted and funds are needed to replace septic tanks with a community sewage collection system. Residents currently use an unregulated refuse burn area on tidelands.A hydroelectric project has been engineered and is under consideration for the future. Transportation infrastruction in Elfin Cover includes a State-owned seaplane base and moorage for 25 marine vessels.Skiffs are the primary means of local transportation.Freight arrives by float plane or boat. Description of Business History Elfin Cove is a fish-buying and supply center for fishermen.Most residents participate in commetcial fishing,sport fishing and charter services,so the economy is highly seasonal.Twenty- six residents hold commercial fishing permits.Summer lodges and local retail businesses also provide seasonal employment. Community of Elfin Cove Non-Profit Corporation The Community of Elfin Cove Non-Profit Corporation (CECNPC)successfully provides several setvices to the community of Elfin Cove. COMMUNITY OF ELFIN COVE NON-PROFIT CORPORATION Current Departments Description Elfin Cove Utility Commission Electric Utility Elfin Cove Fuel Retail fuel sales,fuel dock Building Operations Committee |Community building management Water Board Oversees water issues Emergency Medical Services Provides emergency medical care Elfin Cove Utility Commission/Community of Elfin Cove Non-Profit Corporation Electric Utility Business Operating Plan Appendix A-1 The Elfin Cove Utility Commission has been providing electric power to Elfin Cove residents since 1982.It services 36 residential accounts,30 commercial accounts,six community accounts and one Federal/State account.Customers are billed monthly for electric services and pay with cash,money order or check.The rate per kilowatt is currently 42 cents plus a fuel surcharge of 21.2%.For residential customers,PCE contributes 22.53 cents per kWh for the first 500 kWh.After 500 kWh, the charge is 42 cents per kWh plus the surcharge.Commercial,and the Federal/State,accounts pay 42 cents per kWh plus the 21.2 %surcharge.About 347,540 kWh were generated in FY 2005 (uly 04 -June '05)and 297,167 were sold.Total revenue of $130,737 was generated. The Elfin Cove Utility Commission purchases the electric power plant's fuel from Elfin Cove Fuel in Elfin Cove.The ECUC last paid $3.26 for #2 diesel to run the electric utility. Description of Fiscal Controls and Accounting Procedures The Community of Elfin Cove Non-Profit Corporation operates on a July through June fiscal year. Debbie Hemenway is the treasurer of the board and oversees expenditures overall.At the most recent meeting of CECNPC,it was agreed to have two signers on checks and in addition to the treasurer,those with check signing authority are the secretary,chair and vice-chair.Altman,Rogers &Co.of Juneau investigated the tax status of CECNPC and found that as a government entity, CECNPC is not required to file tax returns. Management and Structure The Community of Elfin Cove Non-Profit Corporation is governed by a seven-member board. Gordy Wrobel is the chair of the board and is the main contact for the CECNPC.There are no employees of the CECNPC itself;however,the Elfin Cove Utility Commission,Elfin Cove Fuel and the Building Operations Committee have hired positions.The organizational chart below shows the various components of the CECNPC's overall structure. Elfin Cove Utility Commission/Community of Elfin Cove Non-Profit Corporation Electric Utility Business Operating Plan Appendix A-2 Community of Elfin Cove Non-Profit Corporation Organizational Chart CECNPC Board of Directors ECUC Elfin Cove Fuel Elfin Cove Water Building Operations Comittee (advisory Board of Directors)(advisory Board of Directors} || MaryJo Lord Jim Lord MaryJo LordJimLewisJaneButtonBookkeeperFuelDockManagerManagerOperatorBookkeeper/Billing Clerk Scott Raymer Back-up Operator The CECNPC board consists of seven members including the Chair.Board members and specific positions are listed below. COMMUNITY OF ELFIN COVE NON-PROFIT CORPORATION FY2006 BOARD MEMBERS Gordy Wrobel,Chair Patti Lewis,Vice-Chair Jane Button,Secretary Joe Kulavik,Member Debbie Hemenway,Treasurer Therese Harvey,Member Zane Gibbons,Member Elfin Cove Utility Commission/Community of Elfin Cove Non-Profit Corporation Electric Utility Business Operating Plan Appendix A-3