HomeMy WebLinkAboutWEATS Modeling Feasibility Studies Hybrid Power Systems 08-2007Modeling & Feasibility StudiesJames JensenAlaska Energy AuthorityWEATSAug 2007 Modeling of Hybrid Power Systems•Electric load•Thermal load•Renewable resource•Diesel generators•Energy storage•Economics Modeling ToolsGarbage In = Garbage OutINPUTOUTPUTFANCY COMPUTER MODEL Modeling Inputs•Wind Resource•Electric Load•Thermal Load•Potential Load Growth•Economics Wind ResourcePower = ½ x air density x swept area x WIND SPEED x WIND SPEED x WIND SPEED Wind Resource•AEA’s Anemometer Loan Program•Wind Resource Map•Airport Weather Stations Village Electric Load•Take direct measurements•Estimate based on historical data in other villagesJanuaryJuly AK Village Electric Load Calculator Village Thermal Load•Space Heat•Hot Water Village Thermal Load•Estimate based on energy audit information and average temperatures•Take direct measurements Economics•Capital cost of wind turbines and related equipment•Installation cost•Annual O&M costs•Inflation Rate•Cost of diesel fuel Factors that Can’t be Modeled•Land Use•FAA•Avian Issues•Geotechnical Issues•Noise and Visual Impact•Community Acceptance Feasibility Study Example•Port Heiden, AK The Computer Model•HOMER is available FREE at www.nrel.gov/homer•Developed by the National Renewable Energy Laboratory•Other Models (Hybrid2 and RETScreen) Wind Turbines in Port Heiden Diesel Generators in Port Heiden Wind Resource in Port Heiden Thermal Load in Port Heiden Dump Load in Port Heiden Electric Load in Port Heiden Economics of Port Heiden System Generator Control Uses for HOMER•Optimization- least cost solution•Simulation- simulate time step by time step operation for the entire year•Sensitivity Analysis- what if….? Optimization for Port HeidenRanked by lowest Total Net Present Cost Simulation for Port HeidenWind+ Diesel Diesel OnlyWind OnlyVillage Electric Load Sensitivity Analysis HOMER is Versatile•Quick analysis based on rough estimates- Annual averages for resources and loads- Cost per kW or unit for equipment•Detailed analysis for project feasibility-measured data at hourly or shorter time steps- accurate price quotes and cost curves•But never for design HOMER Limitations•Load Growth•Diesel Price Fluctuations•Turbine Availability•Solution: Additional spreadsheet analysis