Loading...
HomeMy WebLinkAboutSolar Tour 2013Lifetime 12 months 8 weeks 4 weeks 7 days 24 hours eeeRecietere=nc-™Ne,meReeESRTemeeengaFri Oct 01 2010 -Fri Jan 04 2013 AKST Total Energy =9.40 MWh Nenane "Teen Coy heyLL.kW 361K PY AOoyxy Q20W T Yn ne sélay pe valsYRITC+eo Coune;)MN 2 ih Fa atsInetLyf/, 24 hours12months8weeks4weeks7daysLifetime BOODG: fends qualPPiePoiates =13.5 MWhTotalEnergyThuMar102011-Fri Jan 04 2013 AKST David Lockard From:Karl Hulse <KHulse@crweng.com> Sent:Thursday,January 03,2013 2:35 PM To:David Lockard Ce:Andy Horazdovsky Subject:FW:Perryville Bulk Fuel Upgrade Project -NACE Coating Inspections David- Below is the cost information |received from the NACE inspector (QA Services Inc}.The overall cost will depend upon Greer's ability /willingness to stage the work for efficient inspections.For an estimate of overall costs,QA Services felt it was reasonable to assume 10 three hour inspections (2EA for pre blast,post blast,prime,intermediate and final coating steps).This equates to 30 hours at $80 per hour =$2,400. QA Services indicated they could provide an inspector for tomorrow's inspection.He will meet us at Greer (Anch Tank location)at 10:30 AM. I'll give you a call after 3:30 to discuss. Thanks,Ce Karl Karl Hulse,PE CRW Engineering Group,LLC www.crweng.com From:QA Services Inc.[mailto:inspections@qaservicesak.net] Sent:Thursday,January 03,2013 2:15 PM To:Karl Hulse Subject:RE:Perryville Bulk Fuel Upgrade Project -NACE Coating Inspections Mr.Hulse, This is a very exceptional coating system specified and should result in a minimum service life of 30 years,if applied properly.To assure the integrity of the coating system,our general hold points are as follows: -Pre-blast inspection to assure no surface contaminates are present,blast media new and properly stored,blast equipment has deliquescent dryers for the air,environmental conditions are acceptable,etc. -Post blast inspection to assure proper profile and appearance per SSPC SP10.At this time we inspect coating materials for freshness and type.We witness mixing and thinning and the start of the coating process. -After completion of the prime coat,we conduct a random dry film thickness survey and visual inspection of surfaces coated (prime coat is the most critical).After prime coat has been approved,we verify intermediate coatings are acceptable and witness mixing and thinning. -After intermediate coat application,we conduct random DFT survey as well as visual inspection for conformance.We also verify coatings cured properly prior to finish coat application.Once again,we inspect finish coat products and witness mixing and thinning. -Final inspection consists of verification of total system dry film thickness survey,proper curing and visual inspection for holidays.We generally do not conduct mechanical holiday detection on coatings that are not in immersion service. 4 ro?penhouse ,f/) oe ,:cs vietaneVevrSStours7.2 1 itnAS.Siete Oar"te TW SAV:Se Map.oF more sitesat.tte'AlaskaSolarTour.org:"ig Pea RSSa TAL ETA SL aaee-cea RFeSWorld'S|3 ea solar.event is comingto townt Find out how your neighbors trim their energy bill,generate their own electricity,and improve the world for our children by living sustainably today in Anchorage and Eagle River. An educational program brought to you by members of our community,ACAT.org,&ases.org. ACAT is a non-profit organization promoting education &research in the application of technology for sustainable living in Alaska since 1993.Join your friends and carpool on this self directed tour. Maps of participating sites are available online at AlaskaSolarTour.org atl re.7 ALASKA Your Cleanhadiu29)A EAP Renewaole Erergy COMER FOR Mall a::.|Alaska Proect ¢THE ENVIRONMENT BeerrereALASKACENTERFOR APPROPRIATE TECHNOLOGY Please visit alaskasolartourorg for updates on this tour Anchorage Solar Tour:Tour day is Saturday,June 8th,2013 -Tour Starts At 9:45am Start Of Tour Meeting Location:Meet at downtown Kaladi Bros.Coffee (621 W.6th Ave)by 9:45am.Tour organizer Andy Baker (cell 350-2084)will be there and the group will walk across Town Square Park to the Solar Building @ 10am.There is plenty of free parking downtown on Saturday mornings,however the annual Womens 10K Run will block off some of the streets,so plan to arrive downtown by 9:30am so you have plenty of time to park before the tour starts.You can meet up with other tour goers at this first site and car pool to other sites,the time slots for other tour site visits are given below. Sites Times Building Address Area of town Site#1 10am--11:30am Solar Building 441 W.Sth Avenue Downtown Site #2 11:30am-1pm_Kittleson House 5976 Muirwood Drive Sand Lake Area Site #3.1pm-2:30pm H2Oasis Water Park 1520 O'Malley Road South Anchorage Site #4.2pm-4pm Lowe Residence 18700 England Circle Potter Marsh Hillside Site #5 2:30pm-4pm White Residence 12141 Galena Circle Upper Hillside Site #6 3pm--4:30pm Solcab House 19949 Meadow Canyon Drive _Eagle River Site #1:Solar Building -Downtown Anchorage -441 W.5:Avenue ae Solar ding *:i ee) .av.ees : Sour,Emtaliniioss Kiccrpleted arreraeaEPYpanelinstalistionSempleted4/27795 WanmaiotaMieanaInget]Ol mealMEN Bsance inmohalBaaeSausamaes Commercial office building.The solar building features a photovoltaic solar array of 96 Trina Solar tsm180-da01 at 180 watts =17.28 kilowatts output.Three SMA 6000 watt inverters convert the dc power into ac and feed it into the building electrical service.This system is now the largest net metered solar PV array in the Anchorage area,the local utility is ML&P.Part of the south facade was used to place the panels at 90 degree tilt.This incorporates the array into the existing building envelope with very little maintenance requirements.Building Owner:Steve Zelener;Architect: Mayer Sattler-Smith;Contractor:Renewable Energy Systems.This tour site is open from 10am to 11:30am;tours will start at the 5tn Avenue street entrance to the building.If you arrive while a tour is in progress,please wait outside until the next tour starts. Site #2 -Kittleson House -Sand Lake Area,Anchorage -5976 Muirwood Drive This cutting edge house was designed from the start with the correct roof angle and orientation for great solar gain. Here is how owners Nicholas &Joann Kittleson describe the solar performance of their 2,000 sq ft house (new in May 2011):"Amazing!Passive overheats house unless we regulate by opening windows.In winter we use HRV to keep and circulate heat.Our domestic hot water has been provided nearly completely by solar collection since early March.”Built by Levi Smith of Alaska Decks &More LLC,with solar energy consulting by YourCleanEnergy LLC.The passive solar performance is enhanced by a large area of south facing Shiloh windows,moderate east and west window area,and minimal windows on the north side.The active solar hot water system consists of two Heliodyne 4 ft x 10 ft cold climate flat plate collectors,plus two 80 gallon storage tanks inside the building envelope.Federal Tax Credit of $4,000.5Star+rebate =$7,500. This tour site is open from 11:30am to 1pm,park on street. Site #3 -H2Oasis Indoor Water a Park -South Anchorage -1520 O'Malley Road Oo of | Commercial water park.Solar Thermal System Pre-heats Pool Water In Summer Months:A total of 60 Vortex 4ft x 12ft polyethylene flat plate collectors are located on the roof,along with a 50 gallon Progressive Tube Solar Water Heater. City water is used as make-up water for the large swimming pools and this enters the facility at 45F.The solar thermal collectors heat the city water up to about 120F before it is piped into the pool that is maintained at 85F.It is necessary to climb a steep set of stairs to access the roof and see the collectors. The owner of contact is Dennis Prendeville and the system was installed by the staff of H2Oasis. This site is open from 1pm to 2:30pm;please park in the H2Oasis customer parking lot. r Marsh Hillside tig 7FOFniewits,ah This owner built-custom 5+star home was completed in the fall of 2012 and is thought to be the first of it's kind to hold an "off-grid”status that meets all building code requirements for the Municipality of Anchorage.At least 80%of the energy needed is produced by our hybrid off-grid renewable energy system (by Alaska Efficient Energy Solutions) harnessing both wind and solar. In order to accomplish this,the building location had to work with the many elements of nature that are unique to the lot.The home was developed with an orientation facing Northwest so it could deflect high winds,as well as capture majestic views of Cook Intlet and the Alaska Range.This energy efficient home has a high insulation value,a natural gas high efficiency hydronic system and Energy Star appliances.It was also constructed using the "remote wall”concept of CCHRC (Cold Climate Housing Research Center).The idea of using this wall design was to create a higher R-value that makes for an extremely air tight home and eliminates thermal bridging.In addition to these features and benefits,the owners believe this home is the first of it's kind to obtain financing through a local bank (FNBA)with an off grid status. Off Grid RE System Consist of the following equipment: 12 -Sharp 240 W PV Panels 1-Xantrex XW MPPT 80 600 solar charge controller 1 -WattSun AZ-225 Solar Tracker 1 -Xantrex XW SCP (system control panel) 1 -UGE 1000 W EDDY GT/X VAWT 1 -Xantrex BSM (battery status monitor) 12 -Surrette 4KS 21ps 4 V batteries 1 -Xantrex XW AGS (automatic generator start) 1-Xantrex XW Hybrid Inverter/Charger 1 -Cummins Onan 20KW Natural Gas backup Generator 1-Xantrex XW Power Distribution Panel This tour site is open from 2pm thru 4pm Driving directions to 18700 England Cir,'& Anchorage,AK 99516 ”-a ?AK-1 S/Seward Hwy §"8,,ww Kise Rd vas ." ne Verde Pak " 1.Head on AK-1 &Hwy at oF mi 4, f"2.Take the Old Seward Highway exit toward Rabbit Creek Road *=3.Tum left onto Old Seward Hwy 4.Continue onto Rabbit Creek Rd §.Turn right onto Golden View Dr 6.Tum jeft onto Romania Dr T.Tum right onto Portugal Pi 8.Take the 1st right onto Finland Dr %.Tum right onto England Ave 7Ayyreydi10,Engiand Ave tums right and becomes England Cir Destination wil be on the left 2384 18700 England Cir tet”ce4Anchorage,AK 99516 e eee) Site #5 -White Residence -12141 Galena Circle -Upper Hillside oo ass.Pe OE tte 2 ae BE ee A complete energy rehab of the home was finished in 2012 changing the energy efficiency improvements included: -new spray foam insulation installed throughout all walls and A frame roof. -Replacement of heating system with 95%efficient Viessmann boiler and DHW tank -Replacement of all lighting to CFL -Replacement of existing windows to energy start certified alternatives -Installation of HRV system and wood stove -Installation of Viessmann flat plate solar thermal collectors (x3)for DHW -provides roughly 40%of annual DHW needs Solar System Audit and Design:YourCleanEnergy,LLC Solar Installer:Bowman Mechanical In 2012,an earth sheltered solar greenhouse was also installed on the property.The greenhouse is heated (in part) through a small solar electric system and a hydronic/wood heating system.For the greenhouse,we had Anchorage Excavation &Concrete do the block work for the structure (owner designed/finished it up). This tour site is open from 2:30pm to 4pm.Please park in the driveway and allow room for other vehicles. Site #6 -Solcab House -Eagle River -19949 Meadow Canyon Drive Solcab -The house faces south for maximized solar exposure.The first floor elevation,generated by the shadow line at winter solstice of Mt.Gordon Lyon,approximate 5 miles to the south,will ensure that the house will get solar exposure even at the shortest day of the year.The structural system is made up of post and beam with a super-insulated exterior shell finished with corrugated metal for ease of maintenance and added security for potential wildfires.The main space of the home is a south facing room with floor to ceiling glass.An intimate window seat to the west is centered on the view of volcano Mt.Redoubt.Over the open stair are monitor windows,allowing for ever-changing light conditions to be announced within the house.The interior of the house is revealing its structure and materiality in a cabin like reference to its location and the informal life style of its occupants. The 1800 sq ft,home,designed by architect Klaus Mayer,was built in 2000. This site is open from 3pm to 4:30pm;please park in the driveway,leave room for others. Please visit alaskasolartourorg for updates on this tour Anchorage Solar Tour:Tour day is Saturday,June 8th,2013 -Tour Starts At 9:45am Start Of Tour Meeting Location:Meet at downtown Kaladi Bros.Coffee (621 W.6th Ave)by 9:45am.Tour organizer Andy Baker (cell 350-2084)will be there and the group will walk across Town Square Park to the Solar Building @ 10am.There is plenty of free parking downtown on Saturday mornings,however the annual Womens 10K Run will block off some of the streets,so plan to arrive downtown by 9:30am so you have plenty of time to park before the tour starts.You can meet up with other tour goers at this first site and car pool to other sites,the time slots for other tour site visits are given below. Sites Times Building Address Area of town Site#1 10am-11:30am Solar Building 441 W.Sth Avenue Downtown Site #2.11:30am--i1ipm_Kittleson House 5976 Muirwood Drive Sand Lake Area Site #3 1Ipm--2:30pm H2Oasis Water Park 1520 O'Malley Road South Anchorage Site #4.2pm-4pm Lowe Residence 18700 England Circle Potter Marsh Hillside Site #5 2:30pm-4pm White Residence 12141 Galena Circle Upper Hillside Site #6 3pm--4:30pm Solcab House 19949 Meadow Canyon Drive _Eagle River Site #1:Solar Building -Downtown Anchorage -441 W.5th Avenue pemrpieted Se Commercial office building.The solar building features a photovoltaic solar array of 96 Trina Solar tsm180-da01 at 180 watts =17.28 kilowatts output.Three SMA 6000 watt inverters convert the dc power into ac and feed it into the building electrical service.This system is now the largest net metered solar PV array in the Anchorage area,the local utility is ML&P.Part of the south facade was used to place the panels at 90 degree tilt.This incorporates the array into the existing building envelope with very little maintenance requirements.Building Owner:Steve Zelener;Architect: Mayer Sattler-Smith;Contractor:Renewable Energy Systems.This tour site is open from 10am to 11:30am;tours will start at the St Avenue street entrance to the building.If you arrive while a tour is in progress,please wait outside until the next tour starts. Site #2 -Kittleson House -Sand Lake Area,Anchorage -5976 Muirwood Drive tébdeeEt:17Hi4 RZ a ™| i * This cutting edge house was designed from the start with the correct roof angle and orientation for great solar gain. Here is how owners Nicholas &Joann Kittleson describe the solar performance of their 2,000 sq ft house (new in May 2011):"Amazing!Passive overheats house unless we regulate by opening windows.In winter we use HRV to keep and circulate heat.Our domestic hot water has been provided nearly completely by solar collection since early March.”Built by Levi Smith of Alaska Decks &More LLC,with solar energy consulting by YourCleanEnergy LLC.The passive solar performance is enhanced by a large area of south facing Shiloh windows,moderate east and west window area,and minimal windows on the north side.The active solar hot water system consists of two Heliodyne 4 ft x 10 ft cold climate flat plate collectors,plus two 80 gallon storage tanks inside the building envelope.Federal Tax Credit of $4,000.5Star+rebate =$7,500. This tour site is open from 11:30am to 1pm,park on street. Commercial water park.Solar Thermal System Pre-heats Pool Water In Summer Months:A total of 60 Vortex 4ft x 12ft polyethylene fiat plate collectors are located on the roof,along with a 50 gallon Progressive Tube Solar Water Heater. City water is used as make-up water for the large swimming pools and this enters the facility at 45F.The solar thermal collectors heat the city water up to about 120F before it is piped into the pool that is maintained at 85F.It is necessary to climb a steep set of stairs to access the roof and see the collectors. The owner of contact is Dennis Prendeville and the system was installed by the staff of H2Oasis. This site is open from 1pm to 2:30pm;please park in the HzOasis customer parking lot. Site #4 -Lowe Residence -18700 England Circle -Potter Marsh Hillside =a"Te geBF :;coos :ee:of This owner built-custom 5+star home was completed in the fall of 2012 and is thought to be the first of it's kind to hold an "off-grid”status that meets all building code requirements for the Municipality of Anchorage.At least 80%of the energy needed is produced by our hybrid off-grid renewable energy system (by Alaska Efficient Energy Solutions) harnessing both wind and solar. In order to accomplish this,the building location had to work with the many elements of nature that are unique to the lot.The home was developed with an orientation facing Northwest so it could deflect high winds,as well as capture majestic views of Cook Intlet and the Alaska Range.This energy efficient home has a high insulation value,a natural gas high efficiency hydronic system and Energy Star appliances.It was also constructed using the "remote wall”concept of CCHRC (Cold Climate Housing Research Center).The idea of using this wall design was to create a higher R-value that makes for an extremely air tight home and eliminates thermal bridging.In addition to these features and benefits,the owners believe this home is the first of it's kind to obtain financing through a local bank (FNBA)with an off grid status. Off Grid RE System Consist of the following equipment: 12 -Sharp 240 W PV Panels 1--Xantrex XW MPPT 80 600 solar charge controller 1 --WattSun AZ-225 Solar Tracker 1 -Xantrex XW SCP (system control panel) 1-UGE 1000 W EDDY GT/X VAWT 1 -Xantrex BSM (battery status monitor) 12 -Surrette 4KS 21ps 4 V batteries 1 -Xantrex XW AGS (automatic generator start) 1 --Xantrex XW Hybrid Inverter/Charger 1-Cummins Onan 20KW Natural Gas backup Generator 1-Xantrex XW Power Distribution Panel This tour site is open from 2pm thru 4pm Driving directions to 18700 England Cir,'a Anchorage,AK 99516 ”a ?AK-1 S/Seward Hwy 4 7 ne aya Klatt Ret%, 41.Head on AK-1 Hwy sy 2.7 mi .*y f”2.Take the Old Seward Highway exit toward iN Rabbit Creek Road - +=3.Turn left onto Old Seward Hwy 4.Continue onto Rabbit Creek Rd §.Turn right onto Golden View Dr 6.Turn left onto Romania Dr T.Turn right onto Portugal Pt 6.Take the 1st right onto Fintand Dr 9.Turn fight onto England Ave+7749«910.England Ave tums right and becomes Engtand Cir Destination will be on the left 208 18706 England Cir 1m ,; ; ; .. Anchorage,AK 99516 Upp _,;BS Site #5-White Residence-12141 Galena Circle-"Upper Hillside :Ps }sh neni*.we 3 2Acomplete¢energy rehab of the home was finished iin 2012 changing the energy rating from 0 to 5 stars.Major energy efficiency improvements included: -new spray foam insulation installed throughout all walls and A frame roof. -Replacement of heating system with 95%efficient Viessmann boiler and DHW tank -Replacement of all lighting to CFL -Replacement of existing windows to energy start certified alternatives -Installation of HRV system and wood stove -Installation of Viessmann flat plate solar thermal collectors (x3)for DHW -provides roughly 40%of annual DHW needs Solar System Audit and Design:YourCleanEnergy,LLC Solar Installer:Bowman Mechanical In 2012,an earth sheltered solar greenhouse was also installed on the property.The greenhouse is heated (in part) through a small solar electric system and a hydronic/wood heating system.For the greenhouse,we had Anchorage Excavation &Concrete do the block work for the structure (owner designed/finished it up). This tour site is open from 2:30pm to 4pm.Please park in the driveway and allow room for other vehicles. Site #6-Solcab House-Eagle River-19949 Meadow Canyon Drive Solcab -The house faces south for maximized solar exposure.The first floor elevation,generated by the shadow line at winter solstice of Mt.Gordon Lyon,approximate 5 miles to the south,will ensure that the house will get solar exposure even at the shortest day of the year.The structural system is made up of post and beam with a super-insulated exterior shell finished with corrugated metal for ease of maintenance and added security for potential wildfires.The main space of the home is a south facing room with floor to ceiling glass.An intimate window seat to the west is centered on the view of volcano Mt.Redoubt.Over the open stair are monitor windows,allowing for ever-changing light conditions to be announced within the house.The interior of the house is revealing its structure and materiality in a cabin like reference to its location and the informal life style of its occupants. The 1800 sq ft,home,designed by architect Klaus Mayer,was built in 2000. This site is open from 3pm to 4:30pm;please park in the driveway,leave room for others. AEA Solar Projects Page 1 of 5 a AEA Home |Board |Management |Programs |Notices |Alaska Energy |FAQs The State of Alaska §Publications §Links §Statutes §Regulations §By-Laws aw'[B|w)due.ceeve.a She Alaska Energy Authority is involvedin a-gcowing-number of solar projects around Alaska.Solar Jn interestis increasing because of thetomg-Reuss-aLdaylight assecieted-with-the-summertime-eme-e-fational.efiod-te-drive.doua-solar PV system prices.As a result,solar energy projects are growing-irr |rhe yeasi »theiL_presence-ardc-eapatititice A&frisinvotvedin.anumberofsolarprojectsthataretistedbelow 4n az Alaska Technical Center -Kotzebue The Alaska Technical Centerin Kotzebue offers raining and expertise in numerous matters andtechnicalsubjects.The facility uses exterior sola 'Pane Is to supplementthe-wine-ernergy-obteined_bythe-lecalwind-fernr.Axreyesse diese!use fir power 9 16. wf EinaieroyinAGMieireMeanHUW onerererot.|NSA 3 NIteyA yt!Ale AMiey eee HEN eeeaiieetpalalaFh oe aah ag .eaeae Sat weTagg = Exterior of the Alaska Technical Center with mounted solar panels on the wall Bering Strait Native Corporation -Nome Bering Strait Native Corporation offers public services to the people of Northwest Alaska in the Seward Peninsula region.Solar panels were installed on their office building in 2008 to provide the building with 16.8 Kilowatts of power.The solar PV array displaces 3000 gallons of diesel fuel per year.BSNC has conducted further solar projects through the installatior\of two solar water heaters on local apartment buildings. «yyy |Source:Energy Alaska Wiki 7.P ox!nat iy http://www.akenergyauthority.org/solarprojects.html 5/16/2013 AEA Solar Projects Page 2 of 5 Jzf|Sad aa ee eeenet_-i BSNC Office with Solar PV ArrayDenaliEducationCenter-McKinley Village Solay thermal wate The Denali Education Center is a facility located approximately 6 miles south of Denali National Park. They host youth camps and other informational gatherings reiated to the park and the outdoors.The solar system includes a 1/4 -mile hot water loop for the various cabins fed by 1300 sq.ft.of solar thermal panels. Source:Anchorage Daily News http://www.akenergyauthority.org/solarprojects.html 5/16/2013 AEA Solar Projects Page 3 of 5 Solar Panel System at the Denali Education Center Kaltag qesate' The village of Kaltag isjlocated inwitbLundin|fim AEA)SBSRepewebleEmeray[oN Coo Hive has ) eae Fas)ZL b/p bo tovdtare ai rel nycdon,-==on a sernax tn Kalteg ||be veduce Gal ernanptin||at the power hove.PVs a conex container Proposed Design for the Solar Panel System in Kaltag Lime Village shite,YIn1997,Lime Village built a 4kw photovoltaic (PV)solar system battery storage and inverter inConjunctionwith77kwofdieselgenerationinahybriddiesel-PWS&ystem.No operational data isavailablefromthistimeperiod.The system was upgraded to 12kW in 2003 and the battery system was http://www.akenergyauthority .org/solarprojects.htm!5/16/2013 AEA Solar Projects Page 4 of 5 replaced.The system ran for one month,+ ; '16%v i t ;ns of di wet in February 2003.The system hasnotoperatedsince.T! The Lime Village solar projectis an example of the challenges of testing high-penetration renewable energy pilot projectsin remote locations. 1 ;.1 i Solar Panel System in Lime Village Lime Village Electric Utility Summary Program Information Solar Energy Basics Solar Projects in Alaska Solar Data Solar Links Back to Home Page >AEA Contact senses. Rich Stromberg, Solar Program Manager Tel.(907)771-3053 Fax (907)771-3044 E-mail:rstromberg@aidea.org '7)771-3044 il:jcraft@aidea.org t tt"*YIDEN Alaska Industrial Development and Export Authority Last Updated:8/2/12 http://www.akenergyauthority.org/solarprojects.htm]5/16/2013 AEA Solar Energy Page 1 of 2 ey AEA Home |Board |Management |Programs |Notices |Alaska Energy |FAQs The State of Alaska anne§Publications §Links .4§Statutes Solar Energy P rou)des ,ney net or coger "4§Regulations \,The Solar Energy Program ie-+i i the use of solar energy within By-L an the sta aska.Solar energy igeht in the summerémewhen the§By-Laws midnight sun can be seen thro uch of the state.Summer lodges,fish camps,and communities with seasonal industrial toads may find solar pjotovoltaic or solarviableoptions.#:eeearch-deve and-inetatiatibA-o thermal to be arourrttirerstate.:th rie mort!C the econo mics Ho werer lon.oy wove of Solachateang)>in Abeko gwermenremannee--|owes ae eee Solar Panel System in Nome Program Information Solar Energy Basics Solar Projects in Alaska Solar Data Solar Links David Lockard, Solar Program Manager Tel.(907)771-3062 http://www.akenergyauthority.org/programsalternativesolar.htm]5/16/2013 AEA Solar Data t44, BSNC Solar Data 2009 BSNC Solar Data 2010 BSNC Solar Data 2011 Anchorage -Measured data in Anchorage,AK.2.75 hours of solar energy -annual average AEA Headquarters Solar Data -Midtown Anchorage Avg Watts per Sqm AEA Offices -Anchorage,AK Pa) SD deg WAT pes Program Information Solar Energy Basics Solar Projects in Alaska Solar Data Solar Links Back to Home Page >AEA Contact Sastre.. Rich Stromberg, Solar Program Manager acdTel.(907)771-3053 tFax(907)771-3044 E-mail:rstromberg@aidea.org Josh Craft, Asst.Solar Program Manager Tel.(907)771-3043 \Fax (907977 1-3044 _aU/\craft@aidea.org Page 2 of 3 http://www.akenergyauthority.org/solardata.htm]5/16/2013 AEA Solar Links ey AEA Home {|Board |Management |Programs |Notices |Alaska Energy |FAQs Page 1 of 2 The State of Alaska §Publications §Links §Statutes §Regulations §By-Laws >Solareeeaerarnnrts. ic Solar Energy Links Alaska Organizations Alaska Solar Tour AlaskaSun Anchorage Solar Building Cold Climate Housing Research Center -Solar Power Cold Climate Housing Research Center -Solar Thermal Solar Heat Alaska International Organization American Solar Energy Society Renewable Energy Word Solar Energy Solarenergy.net Solar Energy Industries Association Solar Energy International Solar Electric Power Association Government Agencies National Renewable Energy Laboratory Solar Program U.S.Department of Energy Solar Program US DOE SunShot Initiative Program Information Solar Energy Basics http://www.akenergyauthority.org/solarlinks.html *5/16/2013 AEA Solar Links Page 2 of 2 Solar Projects in Alaska Solar Data Solar Links Back to Home Page >>AEA Contact Busiamiat:. Rich Stromberg, Solar Program Mahager |CE Tel.(907)771-305 Fax (907)771-30 E-mail:rstrombefg@aidea.org Josh Craft, Asst.Solar Program Manager Tel.(907)771-3043 Log Fax (207)771-3044 \d th bf ADEN os 'ADOOE READER®.Alaska Industrial Development : and Export Authority Last Updated:7/31/12 '(Thank You for Visiting Our Website ) Alaska Energy Authority 813 West Northern Lights Boulevard,Anchorage,AK $9503 907-771-3000 (Phone)907-771-3044 (Fax)Toll Free (Alaska Only)888-300-8534 State of Alaska |AEA Home |Board |Management |Programs |Notices |Alaska Energy |FAQs http://www.akenergyauthority.org/solarlinks.html 5/16/2013 AEA Solar Basics Page 1 of 3 ty AEA Home |Board |Management |Programs |Notices |Alaska Energy |FAQs The State of Alaska eerte§Publications §Links §Statutes §Regulations §By-Laws larE ielectrowignrepolavin tyansm bed Lion Lhe S$knrSolarenergyis. T :; i i .There are two types of solar projects:solar thermal and solar electric.These are explained below. Solar Thermal fer haxting purpord»Solar thermal projects involve the use of solar energy 4e-heatahome through-thetrse-ofheated-wateramrotirermetheds..Typically,pipes are arranged such that a cluster of pipingpassesthroughasolarpanelrege.Radiant pre env?yYincreasesthetemperaturewithinthatsectionofpipesatheatwi-be spreadsthroughoutthepipedloop.Mary-times-the-pipe-is-doubled overte-atewtferfurtrer-heateec: t t Solar Thermal yt used in the heating of H2Oasis water facilities panaly Solar Electrie-Phety VO La 12 CE le etyle )q Suns .f Solar electric projects comes the energy from the gutrays into electricity to feed the buildingaconeduniforfhegridtowhichit|.Solar panels are used to collect the wiraviotee ae As atwavetengtenergyofthesun.A converter is then used to change the energy into electricitythatcanbetransferedintoagrid.This is commonly used in off-grid battery systems whenconnectiontoanoverallgridisnotavailable.X\of fey http://www.akenergyauthority.org/solarenergybasics.html 5/16/2013 AEA Solar Basics Page 2 of 3 The Achorage Solar Building in downtown Anchorage with its southem wall covered in solar panels. Program Information Solar Energy Basics Solar Projects in Alaska Solar Data Solar Links Back to Home Page >AEA Contact age. ar Program Manager ace Tel.(Q0Q)771-3053 a Fax (907)%71-3044 E-mail:rstrofberg@aidea.org /YY?' Josh Craft, Asst.Solar Program Manager Pe edTel.(907)771-3043 Fax (907)771-3044 E-mail:jcraft@aidea.org Khe bdADEN ae Alaska Industrial Development 'LOSE”READER” and Export Authority Last Updated:7/30/12 http://www.akenergyauthority.org/solarenergybasics.html 5/16/2013 AEA Solar Data Page 1 of 3 ety AEA Home |Board |Management |Programs |Notices |Alaska Energy |FAQs The State of Alaska §Publications §Links §Statutes §Regulations §By-Laws his data i i iti f future use 1 Statewide Maps -Modeled data from satellite measurements PV Gotm Rachanon Arenal we tereteFalPiste.1 acy South.Lataude tm =a cat : Annual PV Solar Radiation Map Annual Direct Solar Radiation Map Pv Ect Racor ainatPhareFeemyBoum,Usage Tay F Le oneo,ee June PV Solar Radiation Map June Direct Solar Radiation Map Drect Normal Solar Radeation weet eeeCrotonTracheaConcemearerPooareiest: NREL PVWatts™ViewerThePVWatts™toolis an estimate of solar energy potential at any given location across the state.Users should bearin mind that it is only an estimate and actual solar PV or solar thermal system performance willvarybasedonyourexactsiteconfigurationandyear-to-year variability of sunshine.AEA advises using thistoo!as a best-case estimator for system production. More information about the PVWatts™Viewer can be found at http://Awww.nrel.gov/rredc/pwwatts/about.html Northwest Arctic Region -Measured data in Nome,AK BSNC Solar Data 2008 http://www.akenergyauthority.org/solardata.html 5/16/2013 ye ASSIGN numbereEine”AEEE Budgeting Form Project Code Yoo Project Name _Solar Rregram:Techyica\Acsistance Budget Start 7/1/13 Project Manager LOCKD Budget End 6/30/14 Program SOLAR Track Subcategories No Action _Initial Budget Allocation Aw project coeds too AEEE (State Cap.)Other State Federal Other specify here Personnel $15,000.00 Contractual Supplies Equipment Travel $5,000.00 Grant Not Categorized Total $20,000.00 $0.00 $0.00 $0.00 Total Budget:$20,000.00 nding Sources (provide information about the funding source;AR codes,contract,RSA,etc.) ites to inspect the projects and document grant compliance. PN AV wos a\rask&ns Koved VWmS.yhThis budget will cover AEA solar program staff time and two or three trips to RE Fund grant-funded solar project Kero bod yb spe Same,Dust be Sore yo bill time and"hravel related fe REF prajects Purpose/Scope of Work (add more rows as needed) to REF 500003,-Sy¢ The solar program budget will be used for the following purposes,in priority order: Review,analyze and process RE Fund grant applications in the solar technology area Respond to requests for solar energy information and resources from Alaska residents Alaska and encourage sustainable solar energy development in Alaska. &Ux pre. Organize and oversee an Alaska Solar Energy Working Group to assess the performance of existing solar projects in Drak A wevry 3 err A Sr relotked Wn Schedule (add more rows as needed) Fiscal year 2014. C:\Users\sskaling\Documents\Sean's Documents\Budget\AEEE Budget Drafts FY 14-15\AEEE budgets FY14-15.xlsx Page 74 of 82 411901 Solar FY14 2:58 PM 7/22/2013 AEEE Budgeting Form Project Code Hh})0 a O Project Name Solar Program Budget Start 7/1/13 Project Manager LOCKD Budget End 6/30/14 Program SOLAR Track Subcategories No Action Initial Budget Allocation Special Instructions (if matching federal funds,or any other special situation,provide details here.) Approval Signatures Date Project Manager >,<2)ZZ Se)a>)4DeputyDirector,Sean Skaling Son Controller,Amy Adler Executive Dir.,Sara Fisher-Goad DM Sacko, C:\Users\sskaling\Documents\Sean's Documents\Budget\AEEE Budget Drafts FY 14-15\AEEE budgets FY14-15.xlsx Page 75 of 82 411901 Solar FY14 2:58 PM 7/22/2013 Mieve}yore vs -Kelteds |,Low prebley. Good :A pperek eleNot547ood-Ayyars,[%omer ZL Lx yey Fp ontves to |llvx\du -Hrd Sk,toxic f Net ved clole [eral r ver,:cages era SE NER ERTS GPE IS ERT ELSEtf ga SIO PNGNA Ga TE ere enero omens-Sunmodule Protect guarantees 31%nmorere power!i 2 oe.wet ee ate Pate coon cae =carro 3 3 The glass-glass design on Sunmodule Protect allows better cell protection from the elements which equates to more guaranteed power in each system. Sixteen years ago,we were the first to introduce the 25-year warranty.Once again we're proud to debut the best power-performance guarantee in the industry -our new 30-year linear warranty. New 30-year linear warranty Linear performance guarantee ®@ Linear performance guarantee for SolarWorld Sunmodule Protect TT :Linear performance guarantee for SolarWorld Sunmodule Plus 0.35%de ; * MADE IN USA ':Competitor's tiered performance guarantee 'gra dation i Ferformance quaranteéé ae,a 90% £3 36.85%-” cs wu wv 2 8 80% oe 3 oO = 0% 1 5 10 5 20 25 30 Years Our new warranty guarantees power degradation of only 0.35%per year -that's half the degradation rate of a traditional linear warranty.By the end of 30 years,we guarantee performance at 86.5%. More power means your SolarWorld solar system will have a faster and higher return on your investment. Of course,a warranty is only as strong as the company behind it.And with SolarWorld's history of industry-leading quality for over 35 years,our new warranty is rock solid.In fact,in over 35 years,Solar- World has never had a recall and our warranty return rate is lower than 1/10 of a percent. Increased returns* pons -cewyeerneee on ows _nn teorprenne een :ge ene van Py bee Yen Nees Fae hy3s0kW«$25,981 Ss $275 «$2058 SOOkW $51,962 $48,150 $40,316 |lil |[IMW $103,924 $96,300 $80,632 *compared with a standard 25-year linear guarantee,assuming a commercial retail power SOLARWORLD rate of $0.1012 cents per kilowatt-hour and an annual utility inflation rate of 3 percent NY pe a I ER a aR RE MRE ee TR a Ei cm aaA aa RS AREY ALOE I ERmEOBE et ma os wo Mme ae tte cs dete poe By purchasing the solar modules (hereafter referred to as:products)from SolarWorld Americas LEC('SolarWorld”),you have chosen a level of quality,which meets the highest requirements.SolarWorldassumesthatuseinaccordancewithregulationswillreliablymaintainthefunctionoftheproductstoproduceelectricity(hereinafter referred to as:functional capability)as well as reliably maintaining theperformanceoftheproducts.As a sign of our confidence in this quality,SolarWorld is happy to grantyouastheend-user of the products (i.e.,the person who put the products into operation correctly forthefirsttimeorthepersonwhohaslegitimatelypurchasedtheproductsfromsuchanend-customerwithoutanymodifications)the rights which are presented below: A Limited product warranty: 1.SolarWorld provides you with a warranty for the functional capability of the products until ten yearshaselapsedsincethepurchaseoftheproductandthattheproduct: +will not suffer from any mechanical adverse effects,which limit the stability of the solar module. A condition for this is correct installation and use in accordance with regulations,as described in the installation instructions enclosed with the product. wilj not be subject to any clouding or discoloration of the glass. with its cable and connector plug will remain safe and operational,if they are installed profes- sionally and are not permanently positioned in water (puddle).However,damage to the cable,which is caused by abrasion on a rough lower surface owing to insufficient fixing or owing tounprotectedrunningofthecableoversharpedges,is excluded.Any damage caused by animals (e.g.,rodent bites,birds,insects)is also exempted. with its aluminium frames will not freeze up when it is frosty if it is installed correctly.The ap-pearance of the product as well as any scratches,stains,mechanical wear,rust,mould,opticaldeterioration,discoloration and other changes,which occurred after delivery by SolarWorld,do not represent defects,insofar as the change in appearance does not lead to a deterioration inthefunctionalcapabilityoftheproduct.A claim in the event of glass breakage arises only to the extent that there was no external influence. 2.If the products exhibit one of the above mentioned defects during this period and this has an effectonthefunctionalcapabilityoftheproduct,SolarWorld will repair the defective products,supply replacement products or provide the customer with an appropriate residual value of the products as compensation at its discretion. B Limited performance guarantee: 1.SolarWorld guarantees that the actual output of the product will amount to at least 97 %of effec-tive output during the first year after purchase of the product and as of the second year after pur-chase of the product,the effective output will decline annuatly by no more than 0.35 %for a period of 29 years,so that by the end of the 30th year after purchase an actual output of at least 86.85 %ofeffectiveoutputwillbeachieved.in the event of a negative deviation of actual product performancefromtheso-called threshold values,SolarWorld will either supply you with replacement products, which make it possible to maintain actual performance,carry out repairs,which make it possible to achieve actual performance or provide you with financial compensation for the lower performanceoftheproduct.During the first 15 years of the guarantee period SolarWorld will exclusively eithersupplyreplacementproducts,which make it possible to maintain the actual performance or carryoutrepairs,which make such an actual performance possible.After 15 years of the guarantee period SolarWorld is free to also grant financial compensation for the lower performance of the products. 2.When replacement products are supplied,there is no entitlement for the use of new products orthosewhichareasgoodasnew.On the contrary,SolarWorld is authorised to also supply used and/ or repaired products as replacements. C Further conditions of entitlement: 1.The period of the performance guarantee under B)is restricted to a period of 30 years from thepurchaseoftheproductandwillnotbeextendedevenintheeventofarepairorexchangeofa product. 2.The effective output and the actual output of the products are to be determined for the verification of any guarantee case using standard test conditions,as described under IEC 60904.The decisivemeasurementofperformanceiscarriedoutbyarecognizedmeasuringinstituteorthrough SolarWorld's own measurements (the assessment of measurement tolerances is undertaken in accordance with EN 50380).The guarantee does not cover transport costs to return the products orforanewdeliveryofrepairedorreplacementproducts.It also does not cover the costs of the instal-lation or reinstallation of products,as well as other expenditure by the end-customer or seller. 3.Ownership of all products which have been replaced passes to SolarWorld. 4,The term of the rights granted to you in this Certificate in paragraphs A)and B)starts with theoriginalpurchaseoftheproducts,insofar as they were purchased by the original end-customerafter06.03.2013.SolarWorld retains the right to adjust voluntary special services in accordance with this document at any time.However,any product purchases,which have already been concluded, remain unaffected by this -including the voluntary special services in accordance with this docu- ment.You can find out about the current status of this document at any time under www.solarworld-usa.com. 0 Assertion of daims: The assertion of the services specified under A)and B)requires you (i)to inform the authorised seller/dealer of the product of the alleged defect in writing,or (ii)to send this written notification directlytotheaddressmentionedinG),if the seller/dealer who should be informed no longer exists (e.g.owing to business closure or insolvency).Any notification of defects is to be added to the original satesreceiptasevidenceofthepurchaseandthetimeofthepurchaseoftheSolarWorldproducts.Theassertionshouldtakeplacewithinsixweeksoftheoccurrenceofthedefect.The connecting factor fortherecognitionoftheoccurrenceofadefectisacknowledgementofmaterialand/or processing errorsforclaimsfromtheproductguarantee(letter A).For claims from the performance guarantee (letterB)the connecting factor is acknowledgement of the lower performance of the products.The return of products is permitted only after the written consent of SolarWorld has been obtained. E Use in accordance with this Limited Warranty. Limited Warranty Sunmodule Protect --vaiatomosos208 anal enorbentin bins SAN Sao lee Se eA La ae wee ee Eale pot vee ati eset aN Seale in 2tn tae 1.The services described above can be ensured only if the product is properly assembled,used and operated.Services provided by SolarWorld must therefore be withdrawn if the defects to the product are not exclusively based on the products themselves;e.g.in the following cases: a.Delays on your part or on the part of the fitter in observing the assembly,operational and maintenance instructions or information,if this leads to defects and/or a loss of the products' performance. b.Exchange,repair or modification of the products,if this was not undertaken correctly and profes- sionally. c.incorrect use of the products. d.Vandalism,destruction through external influences and/or persons/animals. e.Incorrect storage or inappropriate transport before installation,if this leads to defects and/or a loss of the products'performance. f.Damage to the customer system or incompatibility of the customer's system equipment with the products,if this leads to defects and/or a loss of the products'performance. g.Use of products on mobile units such as vehicles or ships. h.Influences such as dirt or contamination on the faceplate;contamination or damage by e.g. smoke,extraordinary salt contamination,or other chemicals. i.Force majeure such as flooding,fire,explosions,falling rocks,direct or indirect lightning strikes, or other extreme weather conditions such as hail,hurricanes,whirlwinds,sandstorms or other circumstances outside the control of SolarWord. 2.The entitlements referred to under A)and B)will not be granted if and as soon as the manufac-turer's labels or serial numbers on the PV modules have been changed,deleted,peeled offormadeunrecognizable. F Exclusive remedy: The remedies set forth in this Limited Warranty are the exclusive remedies available to you as a product purchaser.SolarWorld shall not be liable for damage,injury or loss arising out of or related to a product except as set forth in this Limited Warranty.In particular,under no circumstances shalt SolarWortd be liable for incidental,consequential,special or other indirect damages in any way con- nected with a product.SclarWorld's aggregate liability,if any,shall be timited to a product's purchase price or any service furnished in connection with a product,as the case may be. G Your contacts: To receive service under this Limited Warranty,please contact the authorized seller/dealer of your product or SolarWorld at the following addresses:Customer Service,SolarWorld Americas LLC,4650 Adohr Lane,Camarillo,CA 93012,USA.Email:customerservice@solarworld-usa.com.Phone: (805)388-6590.Fax:(805)388-6395. H Choice of law: This Limited Warranty,including without limitation the rights and responsibilities granted hereunder, shall be governed and construed in accordance with the laws of the State of Oregon,without regard to the conflicts of taw provisions thereof. §Validity: The following table contains all the current products to which this Limited Warranty is to be applied. Products,which do not appear in this list,are also not subject to this Limited Warranty. Sunmodule Protect/black SW 265 mono SW 270 mono SW 275 mono SW 280 mono SW 285 mono SW 290 mono SW 295 mono SW 300 mono J Exclusion of liability: This Limited Warranty is expressly intended to exclude all other express or implied warranties,includ- ing without limitation the warranties of merchantability and fitness for a particular purpose,to the periods set forth herein.This Limited Warranty gives you specific legal rights,and you may also have other rights which vary from state-to-state.Some states do not allow limitations on implied warran- ties or the exclusion or limitation of damages,so some of the above limitations may not apply to you. K Severability: if any provision of this Limited Warranty is held unenforceable or illegal by a court or other body ofcompetentjurisdiction,such provisions shall be modified to the minimum extent required such thattherestofthisLimitedWarrantywillcontinueinfullforceandeffect. Camarillo,06.03.2013 Kevin Kilkelly,President J ndjtenamandraSolarWorldAmericasLLCVicePresident,Sales and Marketing SolarWorld Americas LLC fiifSOLARWORLD Na,