Loading...
HomeMy WebLinkAboutSusitna-Watana Hydro Project Engineering Feasibility Report - Appendix B (B1-B3) WF479_218900_Alaska_Raiibeit/2180_Lineament Report October 2013,modified 01.08.14 440000 6905000 490000 495000 Notes: 1.See Figures A0.2, A0.3, A0.4, and AO.5 for explanation. 2.Data frames have been rotated 15° eastof north. 3. Geology by Wilson etal., 2009 4. Coordinates on NAD83 UTM Zone6North meters. §. Elevation from INSAR data and USGS SRTM data. ---------- Fault, solid where certain, long dashed line where Explanation Lineament group mapped forthis study coinciding >) with previously mapped fault or lineament ------ Quatemary fault, solid where well constrained, long dashed fine where moderately constrained, short dashed line where inferred (Alaska DGGS, 2012) Faults Compiled byFCL 4 (Wilson etal., 2009; Csejtey etal., 1978) approximate, short dashed line where inferred, dotted where concealed-- ee See Figure A0.3 for explanation of o---Oo LineamentLineaments Mapped byFCL (this study) numbered attributes for mapped eeeeecocos lineaments Note: Geologic units from Wilson etal., 2009, Talkeetna Mountains and Anchorage Quadrangles except units Ttw, knl,and Jtxc which are from Wilson etal., 1998.Lie Date STATEOFALASKA ALASKA ENERGY AUTHORITY => ALASKA eo ENERGY AUTHORITY Castle Mountain Extension Area DRAFT SUSITNA-WATANA HYDROELECTRIC PROJECT 69050006900000500000689500068900006885000 L 6880000 Plate A-CME