HomeMy WebLinkAboutSusitna-Watana Hydro Project Engineering Feasibility Report - Appendix B (B1-B3) WF479_218900_Alaska_Raiibeit/2180_Lineament Report October 2013,modified 01.08.14
440000
6905000
490000
495000
Notes:
1.See
Figures
A0.2,
A0.3,
A0.4,
and
AO.5
for
explanation.
2.Data
frames
have
been
rotated
15°
eastof
north.
3.
Geology
by
Wilson
etal.,
2009
4.
Coordinates
on
NAD83
UTM
Zone6North
meters.
§.
Elevation
from
INSAR
data
and
USGS
SRTM
data.
----------
Fault,
solid
where
certain,
long
dashed
line
where
Explanation
Lineament
group
mapped
forthis
study
coinciding
>)
with
previously
mapped
fault
or
lineament
------
Quatemary
fault,
solid
where
well
constrained,
long
dashed
fine
where
moderately
constrained,
short
dashed
line
where
inferred
(Alaska
DGGS,
2012)
Faults
Compiled
byFCL
4
(Wilson
etal.,
2009;
Csejtey
etal.,
1978)
approximate,
short
dashed
line
where
inferred,
dotted
where
concealed--
ee
See
Figure
A0.3
for
explanation
of
o---Oo
LineamentLineaments
Mapped
byFCL
(this
study)
numbered
attributes
for
mapped
eeeeecocos
lineaments
Note:
Geologic
units
from
Wilson
etal.,
2009,
Talkeetna
Mountains
and
Anchorage
Quadrangles
except
units
Ttw,
knl,and
Jtxc
which
are
from
Wilson
etal.,
1998.Lie
Date
STATEOFALASKA
ALASKA
ENERGY
AUTHORITY
=>
ALASKA
eo
ENERGY
AUTHORITY
Castle
Mountain
Extension
Area
DRAFT
SUSITNA-WATANA
HYDROELECTRIC
PROJECT
69050006900000500000689500068900006885000
L
6880000
Plate
A-CME