Susitna Project Watana and High Devil Canyon RCC Dam Cost Evaluation Final November 16, 2009
Susitna Project Watana and High Devil Canyon RCC Dam Cost Evaluation Final November 16,2009 EL.1770 Pe/y |1 f 1 1 ','t 1 1 mf -t |14)dt tb tt iifi|UZCONSOLIDATION PNINSTRUMENTATIONGROUTING DRAINAGE |GALLERY High Devil Canyon -RCC Concept Prepared By: oe 2 >.1/1REMCONSULTANTS,ING. HATCH AGHES Jack Linnard Consulting Susitna RCC Dam Cost Evaluation Final November 16,2009 Prepared by: R&M Consultants Hatch Acres Jack Linnard Consulting 11/16/09 R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation EXECUTIVE SUMMARY At the time of the Susitna Project studies studies for the 1983 FERC License Application and 1985 amendment to the License Application,roller compacted concrete (RCC)texchnology was not regarded as sufficiently developed to use in the construction of large dams.Over the past 30 years, however,roller compacted concrete has developed as a construction material for dams of increasing size and techniques of material placement and composition of the RCC mix has been refined with experience.The Alaska Energy Authority is considering materials of construction for the Watana and High Devil Canyon dams other than using earth embankment and rockfill structures and has identified roller compacted concrete as having potential for cost savings in construction of Susitna project dams. R&M Consultants study team (R&M)was engaged by the Alaska Energy Authority (AEA)to develop a conceptual design and perform concept level cost estimates for a RCC dam at the Watana site and at the High Devil Canyon site.The study was scoped to consider the full height Watana and High Devil Canyon RCC dams to be mutually exclusive single dam operations and the costs to be based on taking the organization and results of the 1982 Acres Feasibility Study updated to December 2008 dollars as sufficient for the purposes of the current concept study. In conducting the study we reviewed the environmental conditions reported in the 1983 and 1985 FERC license applications and associated environmental studies at the sites including reviewing the hydrology,geology and seismicity for the Watana and High Devil Canyon locations and found present conditions to be consistent with that reported.It is noted that the geology at the HDC site is drawn from the general geologic studies of the Susitna Project and the conditions at the High Devil Canyon site reported in the 1974 Kaiser report. The Watana RCC dam cost estimate utilizes the information and the format of the 2008-based cost estimate HDR/DTA updated to the extent that it is possible to maintain an "apples to apples” comparison of the concepts.In areas where there are modifications to the earth embankment dam project due to the alternate RCC dam configuration,new quantities and unit prices were developed reflecting the change in technology.We have stated costs of the RCC concepts in December 2008 dollars to be consistent with the HDR/DTA cost estimate. The cost estimate summary,Table ES-1,summarizes the estimated cost of the Watana RCC dam and High Devil Canyon RCC dam options.A detailed summary of costs is presented in Appendix B and detailed costs are included in Appendix C for Watana RCC dam and Appendix D for High Devil Canyon RCC dam.The cost estimates focus on the RCC dam and scales the cost of project features/facilities such as the power tunnel/power conduits,powerhouse,switchyards,transmission lines,site road and rail access,operations support facilities and similar features as they are affected by details of the RCC dam options. 11/17/2009 1/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation In developing the RCC dam costs,the access tunnels,underground powerhouse and hydraulic works in the Watana 2008 basis estimate were retained for both of the RCC dams and both RCC concepts studied have been estimated with identical 1200 megawatts of installed capacity in the powerhouses. The use of RCC allows different project arrangements for project facilities including cofferdams, spillway,intakes,water conveyances and powerhouse that could provide additional cost savings potential.The use of a surface powerhouse with short penstocks at both of the RCC dams has potential for substantial saving in cost due to elimination of a large amount of underground work for access and hydraulic tunnels and chambers and powerhouse but the surface powerhouse concept was not developed due to not being in the scope of the present study which concentrated mainly on the RCC dam structure and surface access and support requirements. Costs of RCC materials and a conceptual design for the prospective RCC dams was based on experience in the past decade at other locations in the world where RCC dams have been constructed,particularly dams in the height class of the full height Watana dam and High Devil Canyon dam which are in the 800 to 1,000-foot high class.It is noted that RCC dams have been constructed in Mongolia and other cold regions locations. We have found no fatal flaw in the basic concept of building the Full Watana Dam or High Devil Canyon dam using RCC (detailed geologic investigation,including drilling,at the HDC site is needed to confirm no fatal geological flaw exists at that site as our study is based on data from the 1974 Kaiser report as mentioned above).We estimate that the RCC option offers a potential reduction in capital cost compared with the embankment dam option. Our cost analysis has made as direct a comparison as is reasonably possible between the estimated costs of the RCC option and the embankment option,and we the embankment option at Watana is estimated to require 6 years to construct after completion of diversion construction.We estimate the capital cost on the same basis (December 2008 dollars)for the Watana RCC dam is $6.6 billion and will require 4.5 to 5 years to construct after diversion and the High Devil Canyon RCC alternative is $5.4 billion and will require 3.5 to 4 years to construct after diversion based on volumes and production rate of a large RCC production installation. Optimization of the RCC design will almost certainly result in a further decrease in the estimated cost of construction in particular the use of a surface powerhouse mentioned above would significantly reduce the amount of subsurface work and potentially shorten the construction schedule.It is noted that,if built using RCC,either the Full Watana Dam or High Devil Canyon would set a new precedent for height of an RCC dam,and there will inevitably be some associated risk.Further study of the concept is required to understand the issues associated with an RCC dam of this size at these sites. It is possible that developing the RCC concept to its final design configuration and moving toward construction could result in development opportunities for basic industries in Alaska in producing cement and pozzolans and perhaps fly ash. Access and logistical considerations including road,rail and air transport are of concern at a remote site such as the Susitna Project sites.Housing for Owner representatives,engineering,scientific and 11/17/2009 2/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation construction personnel,over the life of the project construction is assumed to be in modern long term type camp accommodations that meet current codes and standards for these type facilities. Provision of on-site medical and recreational facilities and support for workers under the federal and state regulations is an important consideration. If AEA determines to move forward with the Susitna Project it is imperative that a preliminary Notice of Intent be filed with FERC at the earliest possible date under the Alternative Licensing procedure (ALP).Permitting for the project by FERC requires regulatory compliance issues be resolved satisfactorily as early as possible.The time required to review and confirm the results of environmental and regulatory matters is significant but we feel can be shortened by addressing as soon as possible the pertinence of the regulatory issues and draft settlement agreements as of the 1985 final project report(s)through records searches and obtaining Agency support and participation to address the issues and seek FERC and agency agreement that a short licensing review can be done ASAP.We recommend a two-year precursor program to pursue the objective of achieving FERC and agency agreement for a short (fast track)licensing review (see Section 8 of this report for details).In pursuing this objective,it will be important to engage a diverse team including personnel necessary to conduct the precursor engineering,environmental,and economic studies that would ultimately support the Application for License.The study team should include a licensing consult to better ensure a successful effort.Additionally,establishment of an external review panel would provide benefits in the early design stages.We estimate the cost of precursor studies and further evaluation over the next two years to be on the order of $8.35 Million. Table ES-1 Summary of Cost of RCC Dams for the Susitna Project Watana RCC HDC RCC Description $1,000 $1,000 Engineering 4%,Env.2%& Regulatory 1%$341,700 $281,400 Dam &Power Facilities $4,304,100 $3,700,600 Transmission Features $322,000 $119,400 Other Tangible Property $11,900 $11,600 Main Construction Camp $244,200 $189,100 Construction Management 4%$195,300 $160,800 Total Subtotal $5,419,200 $4,462,900 Total Contingency $1,155,000 $954,000 Total (Millions of Dollars)$6,600 $5,400 11/17/2009 3/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table of Contents 1.Introduction 8 2.Project Description 9 2.1 SUSItNa Project...eee cssssesesesesescsesstecsesesssssessssuseesasscssussacseacucasssseseeseasscacaceeseectacaesesecseseateeses 9 2.2 RCC Dam Project Scope..c.ccecccccccsscssscsscssessessssesesctecssesseceseeseeseecsstsseesseseseeseesseeecsessessueesseeaes 11 2.3 Dam Sites Considered 00...ce eee sscescssecereeseseeesseseseeesecseeseatesaesanesseconseeeeeesansscessseesnesneeenseseaes 11 3.General Setting 13 3.1 Air TEMpPer ature...ee ceseseesececssecscsecseeecssesseceseesesossesseeseesceaeseessseeeseneatensesseesecaesassesersaeses 13 3.2 HY CrolOQy .00..ee eeeseeeeeesseecesssseerscsssaesesscevsceescacsesacsaceessssesssesacsessensaenenetecsesasaceeesseaeesseeetaeeetaeesea 13 3.3 GOOlOGIC ee eeeecesesesneeesssscscsescsesssscesesesescscscsesesaeeeacasessssaasasatsestusscatecsesaesensueaseseecacnenseeteneees 15 3.4 S@ISIMICITY oo eee teeeesceeeeseescseucestscuesscsenescscueeacsenacsseesseserseceacsceecssecaeecaesseasieeeeseneeseetsecaeeeeuees 23 3.5 Environmental Setting...ce esesscesessessssseeneesesescscsceseeeescnenseseeseseseetseecseaeeeessesearseaeeeeetsees 26 3.6 LANG OWNETSNIP ou...eeseceetscsteescscecsescscsescsaecsessssssesesersesacasstseneseesenstacieaseceseeeesacteaeeeeeretees 26 4.Watana Site 28 AD RCC Da...cceecesecnecescesenssssessecscsscesasssessssscsessesaseacerasseraresseasenassesacesesnecacessesaensesereetsees 28 4.2 Other Engineered Structures...ssecesessssseeseseeeeescseseseseeseseseseacessenessseeesecacaeeeseeeesesesesesaees 36 5.High Devil Canyon Site 42 5.1.RCC Gravity Arch Dam Design Considerations...ccs eceesecssscescesscseseeeserssestseseetetseseeseneaees 42 5.2 Other Engineered Structures...cc esesesesscecseseesssserseseasssssscesteeeeeeaeeeacseaeeeeseeseeesecsseseesseeseess 49 6.Roller Compacted Concrete 52 6.1 Technology (advantages and limitations of the material)...ee eesssecteneseteeeseseseeesees 52 6.2 Discussion of other Dam Technologies Watana Site «0.0.0...ccescesesesesseseteeesseseeseseseeseeesees 52 6.3 Materials Specifics ........cc eeeeessessseccsseseteeseeecssencesenscseesecsessesssassesacscseesssscsesaesesaeeeesesneassassaseneess 54 6.4 CONstruction CONSIAerations.........ee eeceseececeeeeseeeseeeeseececeacscenessscenesescacenesesasseseeseseseeetsusesseseeaees 57 6.5 SCHECAUIC......eee eseseseseseseseeceeenceeseecescsenssssenesescsenacsesseseeeeasseseracecsceneesscuesseseasseseesessaceneaesesesenenes 59 7.Construction Costs 60 7.1 Upper Susitna RCC Dam Costs oo...esesesseeesserecscetecseeceecsesesecacececeeesesesacaeenacaceeseeeeeseeeses 60 7.2 Project ACCESS ......ccessscsecescsessssesssstcseseseresescscasassesseseacassescscecusesecessneeeseacaeessssceerecetstesaresseaeaeees 69 7.3.Camp/Project Village for Watana and HDC oo eeseseseseneneneneesssseeasarscsenseceeeeeesarerees 72 74 Review of Acres Cost Estimate Back Up Material ........cc csccscsccessessseseeseceseeseseessassesersseeees 72 TS COSt SUMIM ALY...ee eceseceeeeeseeseeceererescesersccscescesccusessesaessaeessnsensesaessesasaesaseeseseeesareseessseesaeeenees 73 8.Project Timeline for Licensing and Construction 76 8.1 A Brief Review of the Susitna Project...essseesstceecsessesessesssssesesesseresessessnseecssessessseeeseores 76 8.2 Proposed Project FERC Licensing Schedule oo...eeeeeeececesesesesesesesesesesseeseeecssseseeeseeecseseeees 78 8.3.Stakeholder &Resource Agency Coordination and Settlement Process..........cccssceeeee 79 8.4 Issue Evaluation,Study Planning and Impact AnalySis 0.00...ccccseseessseeccecsessereersecseseeeees 81 8.5 FERC Licensing Procedure &Changes Since 1985.0...eeecsssessssessessscecesesceecseseenereessens 84 11/17/2009 4/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 8.6 Selection of the FERC Licensing Process ........ceessssssscesesescesceesseeteceseesaceeasieeessreasasecneetees 85 8.7 Permitting and Other Approvals...ccesessescsesssescsctscssscsessssessesesssessscscseseaseseseasassesenessens 86 8.8 Plans to Support Application for LICENSE 0...ee eestetseeesceeetceeesenescesscncesescecacaeeetatstaeeeteneees 87 8.9 Preliminary Application Process and Development Application to FERC for Susitna PrOjOCE oo.eeeseccsecssececsescseceseeecscscscssecsessseceessvseseesssneesucsessasecscessseseceassessssessecassescasaeeesessenstevaeraeeties 90 9.List of References 91 10.CLOSURE 95 Figures Figure 2.1-1 Location Map Figure 2.1-2 Proposed Dam sites Figure 2.1-3 Profile through Susitna Alternative Sites Figure 2.1-4 Watana Embankment Dam General Arrangement Figure 2.1-5 Watana Reservoir General Map Figure 2.1-6 High Devil Canyon General Arrangement Figure 2.1-7 High Devil Canyon Reservoir General Map Figure 3.1-1 Air Temperature Figure 3.1-2 Monthly Flow Statistics Figure 3.1-3 Watana -Flood Frequency Analysis Figure 3.1-4 High Devil Canyon -Flood Frequency Analysis Figure 3.1-5 Average Annual Flow Figure 3.3-1 Regional Geology Figure 3.3-2 Watana Top of Bedrock and Surficial Geologic Map Figure 3.3-3 Watana Scheme Plan Showing Extent of Shear Zone Figure 3.3-4 River Channel Dam Axis Foundation Area Geologic Profile Figure 3.3-5 Watana Borrow Area Site Map Figure 3.4-1 Effects of Present vs WCC (1982)Attenuation Models on the Mean Deterministic Response Spectra (5%Damping)Predicted at the Watana Site Figure 3.4-2 84th Percentile Deterministic Response Spectra (10%Damping)at the Watana Site for Active Earthquake Sources Figure 3.4-3 Deterministic Response Spectra (10%Damping)at the Watana Site for the WCC (1982) Maximum Credible Detection Level (Random Local)Earthquake Figure 3.4-4 Recommended Deterministic Response Spectra (10%Damping)for Conceptual Design of a RCC Dam at the Watana Site (M7.5 Wadati-Benioff Subduction Earthquake) Figure 4.1-1 Watana RCC Dam Concept and Stepped Spillway Plan and Detail Views Figure 4.1-2 Watana RCC Dam Concept and Stepped Spillway Sections and Details Figure 4.1-3 Watana RCC Concept and Stepped Spillway Section Views Figure 4.2-1 RCC Placement Scheme Showing w/Gap for Passing Construction Flood (from Dak Mi 4 project,Vietnam) Figure 4.2-2 Son La Plant Vietnam Illustrating RCC Dam w/Surface Powerhouse Figure 5.1-1 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Site Plan View Figure 5.1-2 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Site Plan View 11/17/2009 5/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Figure 5.1-3 Figure 5.1-4 Figure 5.1-5 Figure 5.2-1 Figure 6.2-1 Figure 7.1-1 Figure 7.2-1 Figure 8.1-1 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Surface Powerhouse Watana Arch Dam Alternative 2002 Cost Curve RCC Concrete Dams in USA Access Roads Susitna Project Licensing Schedule 11/17/2009 6/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Appendices Appendix A -Property Ownership Table Appendix B -Cost Estimate Summary Table Appendix C -Cost Estimate Detail -Full Watana RCC Appendix D -Cost Estimate Detail -High Devil Canyon RCC 11/17/2009 7/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 1.Introduction R&M Consultants,Inc.(R&M)formed a team under the R&M/AIDEA term agreement that includes Hatch Acres Corporation (HAC)and Jack Linnard Consulting (R&M/HAC)to investigate the feasibility of Roller Compacted Concrete (RCC)technology for the Susitna Project embankment dam concepts that had been developed during the licensing studies concluded in 1985.The scope of services was amended to include a review of regulatory and FERC licensing activities and timelines for precursor activities to issuance of a FERC license and to develop a recommended licensing phase strategy for the project. AEA provided R&M/HAC with scanned copies of documents and reports from the early 1980's feasibility study and preliminary licensing efforts as well as updated design discussions and cost estimates based in the 1980's estimates by HDR/DTA.R&M/HAC performed additional document recovery from R&M/HAC files and the ARLIS collection located at the UAA Consortium library in Anchorage.The documents collected and reviewed cover the Susitna Project timeline from pre- 1960's through the early 1980's and the current documents produced by HDR/DTA for AEA. The Susitna Project studies since the earliest USBR study in 1948/49 and 1953 covered a number of potential dam sites including:Olson,Devil Canyon,Devil Creek,Watana,Vee,McLaren,and Denali and reports were issued by USBR in 1961 and USACE in 1975/79.Kaiser Engineers in 1974 studied Susitna I (High Devil Canyon),Susitna II (Olson)and Susitna Ill under a reassessment of the USBR plans.Ultimately a proposed plan to develop Devil Canyon and Watana was pursued by the Alaska Power Authority based on recommendations of the USACE.The Devil Canyon/Watana plan culminated in preparation of a draft application for license by APA in 1985/86 but the effort was terminated for economic reasons. Original Cost estimating take-offs and calculation documents were recovered from team files and used to verify the unit price calculations and adjustment of the unit prices to December 2008 cost basis to reflect modern practices of heavy civil construction. The licensing timeline was examined and updated to reflect the teams understanding of changes in regulatory considerations and licensing strategy options. 11/17/2009 8/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 2.Project Description 2.1 Susitna Project The Hydroelectric potential of the Susitna River has been studied over the past 50-plus years beginning with the U.S.Bureau of Reclamation (USBR)studies in the early 1950s,followed by the U.S Army Corps of Engineers (USACE)studies and review in the 1970's and studies by Kaiser Engineers in the same time period.The Alaska Power Authority (APA);(now the Alaska Energy Authority or AEA) commissioned comprehensive studies and analyses to determine if hydroelectric development of the Susitna River were viable.Based on those studies,the APA submitted a license application to the Federal Energy Regulatory Commission (FERC)in 1983 for a two dam project on the Susitna River. The project included dams at the Watana site and the Devil Canyon site and was named Watana/Devil Canyon project (FERC preliminary license P-7114).The license application was amended in 1985 for construction of the two dam project but with the Watana dam being constructed in two stages which became known as the Staged Watana/Devil Canyon project estimated to cost $5.9 billion (1985 dollars). In March 1986 the Susitna project was put on hold by the State of Alaska and the project license surrendered to the FERC. The Alaska State Legislature,through the FY 2009 capital budget,authorized the AEA to reevaluate the Susitna Project.The authorization included a Railbelt Integrated Resource Plan (RIRP),to evaluate various sources of electrical power to satisfy the long term energy needs for the Railbelt-portion of Alaska. Initially AEA commissioned review and analysis of the Susitna Project based on updating the costs to December 2008 and reevaluating options for dams at the Devil Canyon site and Watana site using the originally selected earth and rock materials for embankment dam construction. AEA became aware of the possible advantages of using Roller Compacted Concrete (RCC)in place of earth or rock embankments and commissioned R&M/HAC to study and develop a concept for a Watana RCC dam and expanded the scope to include a RCC dam at the High Devil Canyon site as a single dam alternative to Watana/Devil Canyon and to develop cost estimates for those two dams. RCC technology was in the early stages of development in the early 1980's and was not considered a viable alternative construction method at the time of the earlier studies,however,RCC technology has now developed to the point of being a viable and cost-effective alternative material to embankment and rockfill for dam construction in many circumstances and has been used for dams in cold regions.Table 2.1-1 presents information on the Watana and High Devil Canyon embankment and RCC dams to provide the reader with relative scale of the embankment and RCC concepts. For the RCC dam concepts the heavy hauling capability of a railroad to support transport of cement, pozzolans and other materials from sea port to the project site is provided by rail connection along the south access corridor from Gold Creek to Watana and from Gold Creek to High Devil Canyon. Permanent road access to both sites is also provided along the south corridor from the Parks Highway.No road access would be provided from the Denali Highway to the either Watana or High Devil Canyon sites.The present study also includes a review of the project development timeline including precursor confirmation/update studies of environmental factors,sites and FERC licensing. 11/17/2009 9/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Confirming studies will be based on the original 1986 reports/study results and include review of those studies and changes in the environmental concerns since that time. Table 2.1-1 Tabulated Information on Watana and High Devil Canyon Dam Embankment and RCC Concepts Feature Watana Watana High Devil High Devil Canyon Canyon Dam Type Embankment ”Rcc®Embankment Rcc® ) Dam Structure 63 million »15 million®48 million »11.6 million® Volume (cubic yards) Dam -_Height 880)”880 ?4 g55 24)g55 94 (ft) Powerhouse 1200 1,200 800 [6x170 1,200 Installed [6x200 Units]®|[6x200 Units]2 Units]”[6x200 Units]”Capacity (MW)4) Annual 3,250 3,100 [1,800 3,400 3,872?) *°2Generation[2,670 firm]®)firm]*[2,460 firm]?(GWh) Crest Elevation 2225)2225 9)1775»1775 (ft) Average 1465”1465 »1030 1030 ” Tailwater (ft) Normal Max 2200 ”2200 ”1750”1750» Pool (ft) Design Head 735”735”720”720 » (ft) Reservoir Area 37,800 ”37,800 24,200 ®24,200 ® (Acre) Reservoir Vol.9.47 9.47 5.73)5.7? (Mil.Ac-ft)[4.4 live]»[4.4 live]» 1)1982 Acres Feasibility Study 2)2008 HDR/DTA study 3)1974 H.Kaiser Study ®This Study 11/17/2009 10/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 2.1.1 Location The Susitna River headwaters lie in the Alaska Range about 90 miles south of Fairbanks (see Figure 2.1-1).The river heads at the Susitna Glacier and flows in a southerly direction for about 94 miles to the Oshetna River then Westerly for about 89 miles through the Devil's Canyon to Gold Greek then southerly about 136 miles to terminate at the west shore of Cook Inlet just west of Anchorage.The total length of the river is about 319 miles and,generally,the Lower Susitna Basin is the basin area below Gold Creek and the Upper Susitna Basin is the basin area above Gold Creek.The Susitna River Basin is situated between the two largest Alaska population centers of Anchorage and Fairbanks and is entirely within the South-central Alaska Railbelt region.The Susitna Project dam sites are located along about 115 miles of the main stem in the Upper Susitna River Basin from above Portage Creek (below Devil's Canyon)to about 12 miles upstream of the McLaren River (Denali dam site). 2.2 RCC Dam Project Scope The RCC dams study included reviewing relevant Susitna Project documents from all available sources from the 1970's studies by Kaiser and USACE and the Acres and Harza-Ebasco studies and reports from the 1980's studies and FERC license application.The concept studies do not include detailed analysis of power plants,transmission facilities or support facilities that are included in the original non-RCC dam cost estimates with the exception of surface access by road and rail to the High Devil Canyon and Watana sites. A study of the geology and seismicity of the Susitna Project setting was conducted using geological and geotechnical study results from the earlier Susitna Project studies and reports as well as updated information from technical sources in the public domain. There are currently high RCC dams constructed in a number of locations around the world for which materials design,construction technology and performance are known.For the present study RCC design and costs were developed from current and recent RCC dam construction projects of similar magnitude including successful RCC designs for both domestic and international projects some of which are in cold regions. 2.3 Dam Sites Considered The particular dam sites included in the present study are the Watana site at about River Mile 184.4 and the High Devil Canyon site at about River Mile 156.5.As mentioned above this included reviewing relevant Susitna Project documents from all available sources from the 1970's studies by Kaiser and USACE and the Acres and Harza-Ebasco studies and reports from the 1980's studies and FERC license application.A project location map showing all proposed Susitna dam site locations noted in past studies and a profile through the proposed Susitna projects is included on Figures 2.1- 2 and 2.1-3.Note that Figure 2.1-3 is an updated profile of the river and the river miles scale is based on the River Mile Index by R&M/Acres in 1981.It should be noted that the Watana and High Devil Canyon sites are only two of the twelve potential dam sites previously identified (shown on Figure 2.1-2).Several of these schemes are mutually exclusive.The Watana site precludes full development of the High Devil Canyon,Devil's Creek,Susitna II and Vee,but fits well with Devil Canyon.High Devil Canyon site precludes Watana and full Devil Canyon but fits well with Vee or 11/17/2009 11/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Susitna II.Figure 2.1-3 shows the reservoir scheme for the pairings of Devil Canyon and Watana as well as High Devil Canyon and Vee. The number of turbines and output at each dam for the present study is assumed to be as established in studies currently being performed by HDR/DTA as reported in the Project Evaluation - Interim Memorandum -FINAL-prepared by HDR/DTA dated March 16,2009. Specific project details are: 2.3.1 2.3.2 Watana site,River Mile 184.4. This alternative comprises construction of a large storage reservoir on the Susitna River at the Watana site with a new RCC dam approximately 850 feet high,and an underground powerhouse containing 6 turbines,with a total installed capacity of 1,200 megawatts (MW). Full pool level (full service level or FSL)is El.2050 feet.This alternative was originally conceived as an embankment dam in the 1982 Acres Feasibility Study and 1985 Harza Ebasco FERC license amendment (see Figure 2.1-4 and 2.1-5). High Devil Canyon site,River Mile 156.5. This alternative comprises construction of a large storage reservoir on the Susitna River at the High Devil Canyon site with a new RCC dam 810 feet high with an underground powerhouse containing 6 turbines modeled on the configuration used at the Watana site with a total installed capacity of 1,200 MW.It should be noted that this concept had an installed capacity of 800 MW in the 1982 Acres Feasibility Study (as did the Watana site).The head is similar to Watana and flow is slightly larger,so we have assumed the same installed capacity as for the updated Watana would be appropriate.This alternative was originally conceived as an embankment dam in the 1974 Kaiser study and 1982 Acres Feasibiliy Study (see Figure 2.1-6 and 2.1-7).The High Devil Canyon alternative would have significant storage for providing power in winter and the reservoir would extend upstream from the Watana site at full pool level (full service level or FSL)of El.1750 feet. 11/17/2009 12/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 3.General Setting 3.1 Air Temperature The following Table 3.1-1 summarizes maximum,minimum and mean monthly temperatures at the Susitna Project site and is taken from the 1983 Acres Feasibility Study.Our review of nearby weather records since 1982 indicates no significant departure from the indicated average temperatures for purposes of the present concept study.From Table 3.1-1 and Figure 3.1-1 it is apparent that,for planning purposes,RCC placement scheduling should be during a 5 month to 5.5 month construction season in which temperatures are suitable for RCC dam construction. Table 3.1-1 Temperature at the Susitna Project Site (from 1982 Acres Feasibility Study) Max Min Mean Max Min Mean °F °C January 79 -4.8 1.6 -13.4 -20.4 -16.9 February 13.5 -0.4 6.6 -10.3 -18.0 -14.1 March 19.4 3 11.2 -7.0 -16.1 -11.6 April 32.9 14.2 23.5 0.5 -9.9 -4.7 May 45.7 29.1 37.4 7.6 -16 3.0 June 58 39.9 49 14.4 44 9.4 July 60.2 43.8 52 15.7 6.6 11.1 August 56 41.1 48.6 13.3 5.1 9.2 September 47.1 32.6 39.9 8.4 0.3 4.4 October 30.4 17.5 24 -0.9 -8.1 -44 November 15.7 3.7 9.7 -9.1 -15.7 -12.4 December 9.2 -3.4 2.9 -12.7 -19.7 -16.2 The record suitable construction season for RCC is highlighted in gray. 3.2 Hydrology The hydrology of the Upper Susitna basin was reviewed using stream flow data from the USGS stream gage at Gold Creek located at the lower end of the Upper Susitna basin.This data was then scaled to each dam site of interest based on drainage area to estimate the stream flows at the respective sites. At the High Devil Canyon site,the scale factor is 0.931 (Kaiser,1974),and the Watana Dam site was found to have a scale factor of 0.821.The stream flow data in the updated analysis included 54 years of record compared to the 28 years of record available during the original feasibility study by Acres (Acres 1982)and included stream flow records for October 1949 through September 1996,October 2001 through September 2008. The average annual flow at Watana Dam is estimated as 8,000 cfs with the updated longer flow record,an insignificant increase compared to 7,990 cfs as reported in the 1982 Feasibility Study 11/17/2009 13/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation (Acres,1982).The High Devil Canyon average annual flow is estimated as 9,100 cfs.Table 3.1-2 and Figure 3.1-2 show the updated monthly flow statistics for each dam site. Table 3.1-2 Estimated Monthly Flow Statistics (Oct 1949 -Sep 1996,Oct 2001 -Sep 2008) Watana Site High Devil Canyon Site Month Average Minimum |Maximum |Average Maximum Flow (cfs)Flow on Flow on Flow (cfs)Minimum Flow on Record Record Flow on Record (cfs)(cfs)Record (cfs)(cfs) January 1310 595 2013 1486 675 2283 February 1164 594 1842 1320 674 2089 March 1064 586 1560 1207 665 1769 April 1395 612 3489 1582 694 3956 May 11390 3075 22118 12916 3487 25081 June 21766 12726 41526 24682 14431 47090 July 19639 13144 28242 22270 14905 32026 August 17554 7290 31091 19906 8267 35257 September 11291 4181 21765 12804 4741 24681 October 5210 2565 10410 5908 2909 11805 November 2215 998 4428 2512 1132 5021 December 1563 711 2680 1772 806 3039 3.2.1 Flood Frequency Analysis A flood frequency analysis using the updated stream flow data,confirmed very similar flow magnitudes and occurrence intervals to those used in the original feasibility study.Figures 3.1-3 and 3.1-4 show the results of the analysis using the USGS Bulletin 17B methodology and HEC-SSP software for the two dam sites. 3.2.2 The additional years of flow record do not indicate a significant change in annual peak flood frequency.The flood of record occurred on June 7,1964 with an estimated flow of 70,500 cfs at the Watana Dam site.Therefore,the design inflows remain largely unchanged compared to the 1982 Feasibility Study;Table 3.1-3 presents the results of flood flow analysis. Inflow Design Flood Table 3.1-3 Flood Flows at Watana and High Devil Canyon Sites Watana High Devil Canyon 5-year recurrence flow 48,000 cfs 54,000 cfs Inflow Design Flood (10,000-year 156,000 cfs 177,000 cfs recurrence flow) Probable Maximum Flood 326,000 cfs 370,000 cfs 11/17/2009 14/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 3.2.3 Dependable Flows for Power Generation The updated hydrology analysis shows that the average annual flow has not changed with additional years of streamflow data.The driest year on record was 1969 with an estimated annual flow at the Watana Dam site of 4,500 cfs.However,the two wettest years (calendar years)on record were recorded in 1990 and 2005,when the estimated average annual flows at the Watana Dam site were 10,600 cfs and 10,400 cfs,respectively.Figure 3.1-5 shows the annual average flows at the two dam sites for the period of record.We examined the stream flow record excluding the two wettest years and the driest year and found the average flow changed very little (less than 1%). 3.3 Geologic The area of study is located within the Coastal Trough Province of south-central Alaska (see Figure 3.3-1 for Regional Geology).The Susitna River is glacier-fed,with headwaters on the southern slope of the Alaska Range.From its proglacial channel in the Alaska Range,the Susitna River passes first through a broad glaciated,intermontane valley of knob and kettle,and braided channel topography. Swinging westward along the edge of the Copper River lowlands,it enters the deep valleys which include the proposed damsites,swinging through the Talkeetna Mountains until it emerges into a broad glacial outwash valley leading to Cook Inlet near Anchorage. 3.3.1 Watana Site The geology at the Watana site was examined to determine potential issues that would influence design of the RCC dam option.The major sources of information used were the 1982 Feasibility Study (Acres 1982)and 1983 License Application (Harza Ebasco 1983). Review included: e geology as it affects foundation excavation depth and treatment, e potential borrow areas for sources for material for aggregate production,and e seismicity review and update. 3.3.1.1 Overburden At the Watana site,overburden thickness on the dam abutments may reach 70 feet or more.Above elevation (El.)1900 feet,overburden thickness averages 20 feet with local zones to 50 feet on the south abutment.On the north abutment,this thickness reaches 50 to 60 feet.At the upper areas of the abutments,near the top of the slopes,overburden consists of glacial till,alluvium,and talus. Below El.1900 feet,overburden consists primarily of talus with an average thickness of 10 feet. Subsurface investigations show the contact between the overburden and bedrock to be relatively unweathered. The river alluvium beneath the embankment dam concept developed in the 1982 Acres Report is up to 140 feet thick,averaging about 80 feet.Subsequent to 1982,drilling and seismic surveys performed in winter from the surface of the ice on the river provided more information about the bedrock surface.Drawings in the 1985 Harza-Ebasco report show that the 140 feet maximum depth of alluvium occurs only at two kettlehole depressions in the bedrock surface.Both of these 11/17/2009 15/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation depressions are located below the upstream shell of the embankment dam and will not be under the RCC dam.On the proposed axis of the RCC dam,(which is also the axis of the embankment dam) the surface of the river alluvium lies between El.1458 feet and El.1462 feet.The lowest point on the bedrock on the axis of the RCC dam is apparently above El.1350 feet,rising to about El.1370 feet at the downstream toe of the RCC dam.Thus we have estimated the maximum thickness of alluvium below the RCC dam is approximately 110 feet.See Figure 3.3-2 taken from Fig E.6.2.6v of the 1983 FERC application. 3.3.1.2 Bedrock Lithology The Watana dam site is underlain primarily by an intrusive dioritic body which varies in composition from granodiorite to quartz diorite to diorite.The texture is massive and the rock is hard,competent, and fresh except within locally developed sheared and altered zones.These rocks have been intruded by mafic and felsic dikes which are generally only a few feet thick.The contacts are healed and competent.The rock immediately downstream and south of the dam site is an andesite porphyry.The nature of the shear zone at the contact between the andesite and the diorite is poorly understood.However,where mapped or drilled,the shear zone is generally weathered and fractured up to 10 to 15 feet below bedrock surface.(See Figure 3.3-3 taken from Plate 9.4 from the 1982 Feasibility Report) 3.3.1.3 Bedrock Structures Joints There are two major and two minor joint sets at the Watana site.Joint Set I,which is the most prominent set,strikes 320°and dips to 80°NE to vertical;(See Figure 3.3-4 taken from Figure 5-9 of the Harza-Ebasco report,August 1983). Shears and Fracture Zones Several shears,fracture zones,and alteration zones are present at the Watana site.For the most part, the shears and fracture zones are small and discontinuous. Fracture zones range from 6 inches to 30 feet wide (generally less than 10 feet).These zones are closely spaced joints that are often iron oxide stained and/or carbonate coated.Where exposed,the zones tend to form topographic lows. Alteration zones are areas where hydrothermal solutions have caused the chemical breakdown of the feldspars and mafic minerals.The degree of alteration encountered is highly variable across the site. These zones are rarely seen in outcrops as they are easily eroded into gullies,but were encountered in all the boreholes.The transition between fresh and altered rock is gradational.The thickness of these zones ranges can be up to 20 feet,but they are usually less than 5 feet thick. 3.3.1.4 Structural Features As described previously,the Watana site has several significant geologic features consisting of shears and fracture,and alteration zones. 11/17/2009 16/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation The two most prominent fracture zone areas have been named the "Fins"and the "Fingerbuster." The original feasibility report refers to the Fins and Fingerbuster as:"highly fractured and altered materials within the actual shear zones,which would pose serious problems for conventional tunneling methods and would be unsuitable for founding massive concrete structures.Layouts should be kept within the confines of these bounding zones".The embankment dam foot print is within the confines of these bounding zones as is the conceptual RCC dam footprint.(See Figure 3.3-3 taken from Plate 9.4 from the 1982 Feasibility Report). The "Fins"is located on the north bank of the river upstream from the diversion tunnel intake.The area is characterized predominantly by sound,jointed bedrock.The rock mass also contains steeply inclined northwesterly trending zones of closely fractured rock up to 15 to 20 feet wide,5 to 10 feet wide zones of weak,friable altered rock,and shears which measure one inch to approximately one foot in thickness.These zones have contributed to the erosion of steep gullies,which are separated by intact rock ridges. The "Fingerbuster"is located downstream from the dam site and is exposed in a 40-foot wide,deep, talus-filled gully just upstream of the andesite porphyry/diorite contact.The rock is moderately close to closely fractured rock with local shears and alteration zones.Slickenslides indicate vertical displacement. A prominent alteration zone was encountered on the south bank where a drill hole encountered approximately 200 feet of hydrothermally altered rock.Although core recovery in this boring was good,the quality of rock was relatively poor. 3.3.1.5 Groundwater Conditions The groundwater regime in the bedrock is confined to movement along fractures and joints.In general,the water table is a subdued replica of the surface topography.The groundwater table on the north abutment is generally from 5 to 30 feet below the surface except in areas with steep terrain,i.e.the "Fingerbuster",where it reaches depths of 60 to 90 feet.Numerous icings can be found on both abutments in the winter,particularly on the steep slopes of the south abutment. Groundwater conditions on the south abutment and on the lower north abutment are further complicated because of the existence of permafrost,discussed below. 3.3.1.6 Permafrost Conditions Permafrost conditions exist on the north-facing slopes and below approximately El.1750 feet on the north abutment of the dam site area.Measurements indicate that permafrost exists to depths of approximately 120 feet on the south abutment and up to 60 feet on the north abutment. Temperature measurements show the permafrost to be "warm"(within 2°F below freezing). 3.3.1.7.Bedrock Transmissability Transmissability of water through the bedrock does not vary significantly within the site area, generally ranging between 3.28 x 10°feet/sec to 3.3 x 10°feet/sec. 11/17/2009 17/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 3.3.1.8 Relict Channel A relict channel exists north of the Watana dam site.The maximum depth of overburden in the thalweg of the relict channel is approximately 450 feet. The 1982 Acres Feasibility Report calls for a 10-foot high freeboard dike at this location.Further study could lead to reducing the freeboard requirement because the RCC dam will not require the same amount of freeboard that the embankment dam must have (see Section 4.2),further study of the RCC option could eliminate the need for this dike altogether. 3.3.19 Seepage As a result of construction of the Watana Dam,regardless of dam type,and the impoundment of the reservoir,there will be a tendency for seepage through the foundation rock.The potential for seepage in the foundation of the dam is not high and the bedrock foundations are amenable to grouting. Buried channels which bypass the dam present the only other potential seepage paths.At the Watana site,the Fog Lakes area is not expected to pose seepage problems because of the low gradient and long travel distance (approximately 4 to 5 miles)from the reservoir to Fog Creek. During early evaluations,the relict channel north of the Watana site was presumed to pose the greatest potential for seepage through the overburden deposits from the reservoir to Tsusena Creek. Preliminary evaluations also indicated seepage through the buried channel area could result in piping and erosion of materials at the exit point on Tsusena Creek. A further potential impact could be saturation of the various zones in the buried channel combined with thawing of permafrost in this area.The stratigraphy of the relict channel was defined during 1980,1982 and 1983 explorations.The results of these explorations indicated that there are no apparent widespread or continuous units within the relict channel that are susceptible to liquefaction.In addition,it appears that multiple periods of glaciation resulted in over-consolidating the overburden deposits within the relict channel,thereby minimizing their potential for liquefaction. Seepage normally occurring through the foundation rock below the dam will be controlled by two means:the installation of a grout curtain and by a pattern of drain holes drilled from the gallery within the dam.All of the previous studies have assumed the river alluvium will be removed below the dam.This treatment would reduce or prevent seepage as well as controlling uplift pressures in the rock below the dam. Inspection and drainage galleries will extend through the dam and into the abutments.Should excessive seepage develop during impoundment,it will be possible from these galleries to re-grout to reduce the seepage flow and to drill additional pressure relief drains.Extensive instrumentation of the dam and abutments will be placed during construction for long-term,post-construction monitoring of seepage. Preliminary assessment of seepage rates through the Watana Relict Channel,assuming conservative permeability rates,indicates that the total seepage quantity is negligible and that there appear to be 11/17/2009 18/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation no impacts on project operation.Nevertheless,since some uncertainties still exist (in particular, permafrost degradation),remedial measures have been planned to control seepage.First,a drainage gallery would be constructed in overburden across the relatively narrow relict channel exit area at Tsusena Creek.In addition,if required,a positive seepage barrier such as a slurry wall would be built across the throat of the relict channel where the width of unit 'K'(alluvium)is minimal. 3.3.1.10 Permafrost Thawing of permafrost will primarily affect reservoir slope stability and liquefaction potential.The RCC dam would likely perform better than an embankment dam in the event of a landslide resulting from thawing of permafrost soils that is large enough to generate a surge wave on the reservoir. Permafrost thawing can also induce settlement of surface facilities constructed in areas of deep overburden north of the Watana dam site,especially where the permafrost is in contact with the reservoir or raised water table,i.e.freeboard dike. With regard to settlement,it is anticipated that the airstrip,the camps,and other support facilities as well as site roads,will all encounter areas of permafrost.Although the soils in this area are not ice rich,some settlement may occur because of thawing of the permafrost. Some of the fractures in the rock on the north and south abutments of the Watana dam are ice-filled to depths of approximately 60 and 120 feet respectively.In places,thawing may be necessary prior to grouting of the cutoff. Some of the likely impacts of permafrost degradation are common to both the embankment dam and the RCC dam options.Thawing of the ground could result in settlement of surface facilities in areas of deep overburden.With adequate structural design,it is possible to mitigate the hazards of settlement in permafrost areas.In the case of the main construction camp,a large pad of granular material will be provided which will evenly distribute the load and insulate the subsoil,hence, retarding thaw rates.Maintenance grading of the airstrip will be necessary to offset the effects of differential settlement. 3.3.1.11 Borrow Sites A total of seven borrow sites and three quarry sites have been identified for dam construction material delineated as sites A,B,C,D,E,F,H,I,J,and L (see Figure 3.3-5 taken from Harza Ebasco 1983,Figure E.6.2.13).Borrow Sites D and H are considered as potential sources for impervious material (and therefore not of interest for the RCC alternative);Sites C,E,and F for granular material; Sites I and J for pervious gravel;and Quarry Sites A,B,and L for rock fill.Quarry Site A and Borrow Site E are considered as the primary material sites for this project based on the exploration investigations to date.Many of these borrow sites were considered for sources for embankment, core materials and filters and are less applicable to construction of the RCC dam.Sources of concrete aggregate are suggested in the report as Borrow Sites E,C,F and riverbed alluvium;all will require processing.Quarry Site L and Borrow sites C,F,H,and I are considered secondary (back-up) sources of material because of the lengthy haul distance to the dam site,adverse environmental impacts,insufficient quantities,and poor quality material.Due to the lack of bedrock outcrops, Quarry Site B is no longer considered as a viable material site.Borrow Site J would likely not be used 11/17/2009 19/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation because the water level in the river would be higher due to the damming and diversion of the river, which would not coincide with excavation of borrow material. The different requirements,volume and properties mean that the optimum quarry areas for RCC aggregate will be different from those investigated for an earthfill dam.The requirements for the aggregate are not very demanding and assessment of investigation results indicate that good aggregate sources on both abutments should be available with 50-70 feet of overburden to be removed. In summary,estimated reserves of borrow and quarry materials from the primary sources are: e Quarry Site A =70 to 100 million cubic yards e Borrow Site E =80 to 90 million cubic yards 3.3.1.12 Geologic Hazards There are two known major geologic structures that can have an effect on the construction and operation of the power facilities at the Watana site,as mentioned previously.These are the "Fins" feature upstream from the Watana site,and the "Fingerbuster”zone downstream from the Watana site.All of the main project features have been located between the two features,thus avoiding these shear zones. 3.3.2 High Devil Canyon Site The geology at the High Devil Canyon site was examined to determine potential issues that would influence design of the RCC dam option.The major sources of information used were the 1974 Kaiser Study (Kaiser 1974). In order to make a preliminary assessment of the technical feasibility of constructing the High Devil Canyon site (River Mile 156.5),a geologic reconnaissance of that site and other areas of interest was made in late June 1974.The prime objectives of this reconnaissance were to identify the type of rock,assess its general condition,and to assess any features of terrain and geologic structure which would affect location,design and construction of the project.In addition,it was necessary to assess the availability of construction materials,and of materials suitable for use as concrete aggregates. The reconnaissance was made in a fixed wing aircraft for general overall observations supplemented by use of a helicopter to provide access for on-the-ground observations. 3.3.2.1 Topography The topography at the High Devil Canyon site conforms generally with the one inch to the mile maps prepared by the United States Geological Survey.The canyon is generally V-shaped.The average slope of the north abutment is about 45 degrees for the first 500 feet above the river;above this the slopes flatten to about 25 degrees up to a height of 1,000 feet above the river.The average slope of the south abutment is about 45 degrees for the first 200 feet above the river;above this the slope averages about 25 degrees for the next 800 feet .In the steepest part of the canyon,rock walls on each side rise almost vertically for several hundred feet above the river level.At the higher elevations on both sides of the river the terrain becomes more rounded.While the north abutment of the canyon is covered with dense forest extending to the uplands,the forest on the south abutment 11/17/2009 20/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation thins several hundred feet above the river to patches and islands of trees,and the uplands have very little tree cover. 3.3.2.2 Geology Glacial Deposits The site area has been extensively glaciated and is mantled with glacial and non-glacial deposits. The glacial materials consist primarily of moraines and eskers composed of erratic lenses and layers of sand,rounded to angular gravel and cobbles,boulders,silt and considerable rock flour.Some older glacial deposits exhibit considerable weathering evidenced by iron stains and chemical alteration. Material size ranges from rock flour to boulders three feet in diameter,with a high percentage of material larger than four inches in diameter.Because of the high content of rock flour,and with the exception of occasional granular pockets or stringers of sand,the moraines should be impervious. Talus and Swamp Deposits The non-glacial materials are primarily talus,outwash,and swamp deposits.Talus material,unsorted, angular to subangular,occurs generally on the south abutment area and also near the base of gullies and cliffs on both sides of the canyon.It is almost entirely granitic in composition and is derived from adjacent outcrops.The blocks range in size from a few inches to 15 feet in maximum dimension.Deposits on the upper bench areas probably do not exceed 10 feet in thickness; however,on the steep slopes of both abutments they average about 20 feet in thickness and locally may be as much as 40 feet in thickness. Swamp and muskeg deposits occur on benches on the south abutment in areas of poor drainage. The deposits are composed of moss and low shrubs mixed with fine sand,gravel,and silt.These deposits generally are less than three feet thick and are underlain by moraine and outwash. River Terraces and Gravel Bars River-deposited terraces and gravel bars occur several miles upstream of the dam site.They are composed of coarse to fine sand,subrounded to rounded gravel and boulders observed to five feet in diameter.The terrace gravels on the river floor extend to about 60 feet above the river level with an unknown thickness below river level.The rock composition of the materials varies from phyllite to granite to basalt. Bedrock The bedrock on the site,as observed in massive outcrops on both sides of the river is a fine-grained granitic rock composed mainly of quartz,feldspar,biotite,and hornblende.Well-developed sets of regional joints occur in the dam site area.The major joint set has a strike that is almost perpendicular to the river channel;it averages about N 25 degrees W but varies from due north to N 45 degrees W.The dip averages 80 degrees east but varies from 65 degrees east to vertical. Two prominent and well-developed shear or fault zones occur on the north abutment,but are obscured by overburden on the left abutment.These two zones have caused the formation of near- vertical V-shaped gullies;they appear to have a general strike of N 25 degrees W and a dip ranging from 80 degrees NE to vertical.These two fault or shear zones are located upstream of the proposed dam,on the north abutment;on the south abutment they may intersect the proposed diversion 11/17/2009 21/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation tunnels near their entrances.In that area on the south abutment,however,a diabase-like intrusion is exposed,and it appears that this under-material has deflected the course of the river at this point. From aerial and ground reconnaissance and air photo interpretation there does not appear to be any faulting or rock structure dislocation paralleling the river. The steep escarpment faces in the river canyon have resulted in large blocks 15 to 20 feet high distinctly separated from adjacent bedrock on the north abutment.No conspicuous faults or displacement features were noted in the south abutment escarpment area adjacent to the river. There appears to be no appreciable depth of weathered rock on either abutment. The granitic bedrock materials are adjudged to be well suited for the construction of a rockfill dam and would also be suitable for use in the manufacture of concrete aggregates.The occurrence of natural sands and gravels appears to be limited to small river terraces and gravel bars located upstream of the damsite.These deposits are composed of fine to coarse sand,subrounded to rounded gravel and cobbles,and boulder ranging up to five feet in diameter.The rock materials include greywacke,phyllite,granite,and basalt.A terrace deposit ranging in height to 60 feet above river level is located about 3-1/2 miles upstream of the site. Glacial deposits at elevations ranging upward from the 2,000-foot contour are comprised largely of a silty rock flour with inclusions of generally angular rock fragments.These areas are generally barren except for a thin muskeg cover.The silty rock flour appears to be suitable for use as impervious material and similar glacial till has been used for that purpose in other northern areas.From on-site observations,the exploitation of moderate quantities of impervious materials appears to be economically feasible. Permafrost may be encountered in access road construction and the exploitation of borrow materials.It will be encountered in transmission line construction. Reservoir Geology Aerial reconnaissance supplemented by a study of existing geological data indicates that the reservoir basin will be tight (not prone to significant leakage or having low permeability)at the selected site for High Devil Canyon dam. North Abutment The most obvious features of the north abutment of High Devil Canyon dam are the two well- developed shear or fault zones. The sheared rock is not well healed,and intensive fracturing with open crevices is common.It was not possible to estimate a lateral or vertical displacement in the fault zone.As noted above,fissures 15 to 20 feet deep were observed in the steep escarpment faces near the river. The upstream toe of the dam is located several hundred feet downstream of the nearest shear zone. While further geologic investigation is required,the occurrence of the shear zones would appear unlikely to affect the stability or performance of an RCC dam. South Abutment There is no observable evidence that the two shear zones of the north abutment extend to the south. If these zones do continue on the south abutment,they might intersect the upstream ends of the 11/17/2009 22/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation diversion tunnels but this occurrence would present no major construction problems.The rock structure of the escarpment face at the river shows no conspicuous faults or displacement features and joint faces are well healed.The diabase intrusion at the bend upstream of the dam is an extremely competent,fine-grained dark grey rock mass;it displays a uniform set of joint planes dipping about 5 to 10 degrees southeast. This abutment will require more excavation to remove deposits of soft overburden and to remove or spread talus materials.The bedrock appears to be tight,and no particular problems are anticipated in cut-off curtain grouting. The Riverbed Due to the depth and velocity of river flow,no observation of riverbed was possible.The depth of boulders and gravel above bedrock may range from 30 to 60 feet. It will be necessary to excavate to sound bedrock below the dam foundation. 3.4 Seismicity Generally the Susitna project dams are in Seismic Zone 4.To determine any recent changes in the project seismicity and seismic design parameters for Susitna Project dams,R&M reviewed the Woodward Clyde Consultants report (WCC 1982),which summarized the seismic studies performed for the Susitna Hydroelectric Project between 1980 and 1981,relative to (i)the current understanding of the seismic environment,and (ii)FERC's state-of-practice for evaluating seismic hazards for hydroelectric projects (e.g.Idriss and Archuleta,2007).We found that,in general,the seismic hazard determined in the 1980's studies has not changed but there is a much better understanding of the seismicity of the project area that will benefit design of structures.It should be noted that the M7.9 Denali earthquake originating on the Susitna Glacier fault (November 3,2002), was within the range identified as a potential earthquake in the 1980's studies. The following summarizes our basic findings relative to the deterministic aspects of the seismic hazard (it was beyond our scope and time available to re-evaluate the probabilistic hazard),and preliminary seismic ground motion parameters for use in the conceptual evaluation of an earth embankment,rock fill or RCC dam at the Upper Susitna dam sites. A.WCC (1982)considered four seismic sources to be 'active';defined as faults where there is some evidence of,or are suspected to have,ruptured the surface during the past 100,000 years,including two shallow crustal sources:the Denali fault (right-lateral strike slip mechanism),with a maximum credible earthquake (MCE)of M8,and located about 44 miles north of the project;the Castle Mountain fault (right-lateral strike slip mechanism),with a MCE of M7.5,and located about 66 miles south of the project -and two distinct sources along the Aleutian (Pacific plate -North American plate)subduction zone:the shallow inter-plate (megathrust)zone,with a MCE of M9.2,and located about 40 miles south of the project (see 3.4.A.2);and the deep intra-plate (Wadati-Benioff)zone,with a MCE of M7.5,and passing under the project at a depth of about 31 miles.Additionally,WCC considered the possibility of a random M6 earthquake as the maximum credible event that could occur in the vicinity of the project,without rupturing the surface,which they designated the 'Detection Level Earthquake' 11/17/2009 23/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation (DLE).Briefly,this model is still valid relative to the present understanding of the seismic environment in south-central Alaska,with two general exceptions. 1.Based on literature by others,we consider there are two additional seismic sources which meet WCC's definition of 'active',and are close enough to produce notable ground motions at the Upper Susitna dam sites,including:the Susitna Glacier (thrust)fault,with a MCE of about M7.2,located about 40 miles north of the project (this is the fault along which the 2002,M7.9 Denali Earthquake originated (Crone et al.,2004);and the Susitna Seismic Zone,a band of historic earthquakes that do not coincide with any known faults (Ruppert et al.,2008),with a MCE of about M7.4,located about 25 to 30 miles west of the project (Note that WCC recognized this zone,but did not treat it as a distinct active source).And, 2.WCC assumed a great,inter-plate (megathrust)subduction earthquake could rupture to within 40 miles of the Upper Susitna dam sites;however,our evaluation considered a greater distance,about 94 miles,based on the extent of rupture interpreted (by others) during the 1964,M9.2 Great Alaska Earthquake -the limits of a megathrust earthquake used in recent,in-depth studies by others of the seismic hazard in Alaska (Wesson et al., 1999 and 2007)and Anchorage (URS 2008). B.Based on a review of the Alaska Earthquake Information Center (AEIC)database,there have been at least 10 earthquakes since the WCC seismic studies with M,>5 that occurred within about 125 miles of the Upper Susitna dam sites,including the 2002 Denali Earthquake (M7.9) about 45 miles north of the project,and a M6.5 earthquake in 1992 about 94 miles west of the Watana project and approximately 60 miles west of the HDC site. C.The most significant difference between the method applied in the WCC studies and current state of practice pertains to the attenuation models used to predict spectral ground motions. Briefly,WCC developed their attenuation models based on works that were published between 1973 and 1980,while we used the attenuation models referenced in the FERC's state-of- practice for evaluating seismic hazards for hydroelectric projects (e.g.Idriss and Archuleta, 2007),and used in recent,in-depth studies by others of the seismic hazard in Alaska (Wesson et al.1999 and 2007)and Anchorage (URS 2008). 1.Figure 3.4-1 illustrates the effect of this difference,comparing the mean deterministic response spectra provided in WCC (1982)with the spectra we predicted using attenuation models by Campbell and Bozorgnia (2008),Chiou and Youngs (2008),and Idriss (2008)for the crustal faults;by Atkinson and Boore (2003),Gregor et al.(2002),Youngs et al.(1997), and Zhao et al.(2006)for inter-plate (megathrust)subduction earthquakes;and by Atkinson and Boore (2003),Youngs et al.(1997),and Zhao et al.(2006)for intra-plate (Wadati-Benioff)subduction earthquakes. 2.Table 3.4-1 summarizes the peak horizontal ground accelerations,and Figure 3.4-2 illustrates the 84"percentile deterministic response spectra predicted at the Upper Susitna dam sites for each of the 'active'seismic sources described in 3.4.A,using the recent attenuation models cited in 3.4.B.1.Note that all of these attenuation models 11/17/2009 24/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation predict ground motions for a 5 percent damping ratio.The spectra in Figure 3.4-2 are for a 10 percent damping ratio,which we determined using an average of the correction factors recommended in FEMA (2000),Malhotra (2006),and Newmark and Hall (1982). Table 3.4-1 -Estimated Peak Horizontal Ground Acceleration (on Rock) Upper Susitna Dam Sites Peak Horizontal Ground Acceleration,g (WCC Earthquake Source (MCE)1982) Mean 84"Percentile Subduction Zone Wadati-Benioff (M7.5)0.33 0.63 Megathrust (M9.2)0.13 (0.35)?0.25 (0.55)? Known Crustal Faults Denali (M8)0.08 (0.2)0.15 Susitna Seismic Zone (M/7.4)0.08 0.15 Unknown Local Source,(DLE,M6) @ 3 miles 0.29 -0.39 0.50 -0.66 @ 6 miles 0.17 -0.25 (0.5)0.31 -0.42 *WCC assumed the rupture occurs to within 40 miles of the site,we used a distance of 94 miles (see 3.4.A.2.above) D.WCC (1982)concluded that the maximum credible earthquake that could be expected in the vicinity of the project,without rupturing the surface (the 'Detection Level Earthquake',DLE), would produce the strongest (largest)peak and spectral ground motions at the Upper Susitna dam sites.However,WCC's probabilistic assessment of the seismic hazard indicated that the uniform risk was dominated by shallow inter-plate (megathrust)subduction earthquakes,while the other sources,including the Denali fault and the DLE,only accounted for a minor percentage of the total hazard.Therefore,WCC recommended that design ground-motion criteria (at both the Upper Susitna dam sites)be based on the maximum credible megathrust subduction earthquake,not the DLE. NOTE:Based on our evaluations,we concur with WCC''s conclusion that the DLE,should it occur close to the project,would produce the strongest ground motions at the Upper Susitna dam sites.Table 3.4-1 and Figure 3.4-3 illustrate the 'range'of peak and spectral ground motions that we predicted for a M6 earthquake generated from strike-slip to thrust faulting (with and without surface rupture),occurring within 3 to 6 miles of the site,using the recent attenuation models for crustal sources cited in 3.4.C.1.However,it was beyond our scope and time available to define the characteristics of such a random local earthquake (i.e.distance and fault type).Therefore,further design effort will be required to reconcile the concept, assessment and treatment of the seismic hazard associated with the DLE. E.As a consequence of (i)considering the rupture area from the maximum characteristic megathrust subduction earthquake to be 94 miles from the project (vs.40 miles by WCC;see 3.4.A.2),(ii)using the most recent attenuation models (see 3.4.C),and (ili)neglecting at this 11/17/2009 25/95 FINAL R&M Consultants -Hatch Acres AEA Susitna RCC Dam Cost Evaluation 3.5 time consideration of the DLE (as did WCC),our evaluations indicated that the deterministic ground motions at the Upper Susitna dam sites will be controlled by the maximum characteristic intra-plate (Wadati-Benioff)subduction earthquake;not an_inter-plate (megathrust)subduction earthquake as concluded in the WCC studies.Table 3.4-1 and Figure 3.4-4 provide the 84"percentile deterministic peak and spectral ground motions we recommend for conceptual evaluation of a RCC dam at the Upper Susitna dam sites.Note that the vertical motion spectra in Figure 3.4-4 was determined by applying an average of the correction factors recommended in Malhotra (2006),and Newmark and Hall (1982;same as in FEMA,2000)to the horizontal motion spectra. Environmental Setting The major environmental issues of importance considered in the 1985 license amendment application (APA 1985)for the staged Susitna Project include: 3.6 Project induced change in the seasonal patterns of flow in the river below the dams and the potential for resultant impacts on fish habitat,particularly salmonid spawning and incubation habitat. Project induced changes in water quality and temperature below the dams and the potential for resultant impacts to fish (primarily salmonid)populations. Potential loss of terrestrial habitat,particularly winter browse habitat for moose,and denning and foraging habitat for bear,due to inundation of lands by the reservoir Potential loss of habitat and/or habitat degradation due to construction of project facilities including the construction camp,access road and borrow sites,particularly as it impacts moose,and bear. Potential interferences with caribou movement due to project access road and Watana reservoir. Potential loss of bald and golden eagle nesting sites through construction activities and/or inundation. Potential loss of cultural resources (historic and prehistoric sites and artifacts)due to construction activities and/or inundation. Potential socioeconomic impacts to local communities due to the influx of project workers into these communities. Potential recreational impacts due to loss of the white water resources of Devil's Canyon through inundation. Land Ownership The 1985 Application for license amendment (Harza-Ebasco 1985,Volume 1 Exhibit A)included a tabulation of the federal land within the project boundary (see Appendix A,Table of Property 11/17/2009 26/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Ownership in the 1980's).Included in the list of federal lands are both those that had been selected,but not conveyed to non-federal owners and those lands which had been selected by and conveyed to non-federal owners as of 1985. Subsequent to the 1985 effort,the process of transfer of land from federal ownership to non-federal owners has continued.A review of right of way issues would be required to better describe current land ownership status affecting project facilities and access. 11/17/2009 27/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 4.Watana Site This section describes the design for a RCC dam at the Watana site (river mile 184.4)to examine the feasibility to construct a full height RCC dam at the site and as the basis of a cost estimate to be compared to the full height earth embankment dam originally proposed for the Watana site. 4.1 RCC Dam To realize the scale of the prospective projects it is notable that the full Watana earth embankment dam,at a height of 885 feet,is in the class of highest earthfill dams in the world.Oroville dam on the Feather River,near Oroville,California is an earth-fill dam that rises 754 feet and Nurek dam on the Vakhsh River in Tadjikistan is 1,083 feet high.Roller Compacted Concrete dams have been successfully constructed in cold regions such as the 219-foot high Taishir RCC Dam in Mongolia.It is notable that if constructed today,the full Watana dam would be the highest RCC dam in the world by around 150-feet;the Miel I RCC dam in Columbia is 616 feet high.It is noted that the proposed Bashadam in Pakistan is in the final planning stage and will be 892 feet high when completed and the 710-foot high Longtan Dam on the Hongshui River,China,is scheduled for completion in 2009. The original Susitna Project design did not consider an RCC dam since the technology was in its infancy at the time of the original study in the early 1980's.RCC dam technology has advanced significantly to date and is to the stage where confidence in RCC as a dam construction material is high based on actual experience with the techniques of construction and materials.Construction of a dam at the Watana site with RCC has a high potential for construction cost savings vs.the earthfill/rockfill dams originally proposed in at least the following areas: e Schedule e Reduction in material quantities in the dam e¢Modifications to the earthfill dam project configuration to realize cost saving in the: o Spillway o Diversion scheme o Power intakes and conduits o Power house -surface vs.underground e Potential reduction in construction camp -for example,the construction camp for the original Watana design was sized for around 3600 workers in the original cost estimate. In order to demonstrate fully the feasibility of the RCC dam option,and thus realize the advantages of the potential costs savings mentioned above,it will be necessary to resolve a number of important questions that are outside the scope of the present assignment.These include: e Establishing adequate sources and current costs for basic construction materials to be used for the RCC mix. e Carrying out a thermal analysis of the dam to determine the requirements for cooling the RCC and to determine what maximum rate of RCC placement can be achieved without causing excessive cracking of the RCC. e Determining the required depth of foundation excavation and the foundation treatment.. e Confirming the feasibility of discharging the design flood by means of a stepped overspill on the downstream face of the dam. 11/17/2009 28/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation e Complete recommended analysis necessary to complete the seismicity study for the next stage of RCC dam analysis.This may include identification of appropriate time histories to be used in time history analyses. e Performing preliminary design of a surface powerhouse with power intake in the RCC dam and surface power conduitss. Given the unprecedented nature of the project and the limited budget available for determining the feasibility of using RCC to construct Watana dam,the RCC project cost estimate discusses potential issues associated with the dam size,and extrapolates from successful smaller RCC dam designs to develop the configuration of the envisioned RCC project.Further,the cost estimate is based on construction at the original Watana dam site,and on the axis of the original earthfill dam.We have not attempted to optimize the dam axis or project layout to specifically suit the RCC option.It is probable that a complete exploration of all issues associated with a RCC dam of this size,including analysis of alternative alignments and locations,could reduce the cost further. 4.1.1 Dam Configuration Considerations Our understanding of the design development of a RCC dam is that it will be based on the following considerations: *Crest Elevation -An RCC dam may have a lower crest elevation than an earth fill dam as less flood freeboard is required and,depending on downstream foundation conditions, overtopping for extreme events may be acceptable.In addition,because the RCC dam does not require any provision for the loss of freeboard in an earthquake (seismic slumping)that the earth embankment dam must have,the dam crest may be lower.Furthermore,the settlement of the RCC dam will be less than that of the embankment dam for two reasons:a) the body of the RCC dam is relatively rigid and does not develop post-construction settlement as the embankment dam does;and b)the total mass of the RCC dam is less than that of the embankment dam with the result that it does not develop as much foundation settlement.These considerations could lead to a significant reduction in the required freeboard and therefore a lower crest level for the same full supply level (reservoir elevation) as the embankment dam alternative. »RCC Dam Configuration -RCC dams are designed to the same principles and standards as concrete gravity dams.Design loadings and factors of safety are per FERC guidelines, including;waves and freeboard,earthquake,and silt loads. «Seismic loading is expected to control design:specifically shear stresses at or below RCC- rock interface.Within the dam,tensile and shear strength can be controlled to meet any feasible loading.For a dam of this height,an increase in base length will maximize shear resistance and reduce tensile stresses.Steepening the upper portion of the dam may allow interface shear stress criteria compatibility without increasing mass. The project configuration General Arrangement Plan and Sections and Details are shown in Figures 4.1-1 through 4.1-3. 11/17/2009 29/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 4.1.2 Seismic Part 3.4 of this report summarizes the results of our review of the seismic studies completed for the Susitna Hydroelectric project between 1980 and 1981 (WCC,1982),and the preliminary seismic ground motion parameters recommended for use in the conceptual evaluation of an RCC dam at the Watana site.Based on that review,and neglecting at this time consideration of a random local earthquake that could occur close to the site on a yet unknown fault (as did WCC),we consider that the deterministic ground motions at the Watana site will be controlled by the maximum characteristic intra-plate (Wadati-Benioff)subduction earthquake,M7.5,occurring at a depth of about 31 miles under the site;i.e.the Maximum Credible Event (MCE);with estimated peak and spectral 84"percentile deterministic peak and spectral accelerations summarized in Table 3.4-1 and Figure 3.4-4,respectively.The specific ground motion parameters used in our preliminary analysis of the RCC dam are discussed below. 4.1.3 Foundations Foundation conditions and foundation treatment will require examination of suitability for the envisioned RCC dam.This includes curtain grouting (often assumed to have a depth of 50%of the headwater depth of impoundment)and consolidation grouting (depending on the foundation conditions).A drainage curtain downstream of the grout curtain,which will be located near the upstream face of the dam,will be employed to ensure low pore pressures within the concrete and to control uplift pressures in the foundation.Grouting and drainage galleries are included in the body of the dam and will extend into the abutments. The bedrock profile along the Watana Dam axis is shown on Figure 3.3-4 (Harza-Ebasco 1983).The Section is drawn looking upstream.The bedrock surface in the valley bottom is as follows (from right bank to left bank looking downstream): Right Abutment: e HD 83-4:Deeply weathered and altered diorite to depth of 25 feet along inclined hole (i.e. weathered to 17 feet depth) e HD 83-45:Diorite,unweathered,hard,strong Valley Bottom: e HD 83-10:diorite,fresh,closely to moderately fractured,hard,strong e HD 83-13:Weathered diorite.Depth of weathering is not known because the drill hole only penetrated the rock for 5 feet e HD 83-44:Diorite and monzonite,unweathered,hard,strong e HD 83-42:Diorite,altered,hard,strong e HD 83-43:Diorite-monzonite,hard,strong for about 10 feet with 10 feet of intensely fractured altered zone before reaching good rock e HD 83-12:Diorite,altered,chlorite and talc in joints,low strength to the end of hole 10 feet into bedrock. e HD 83-11:Diorite,little weathering,hard,strong Left Abutment: e HD 83-46:Diorite,unweathered,hard,strong 11/17/2009 30/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation From review of the drill holes,the conclusion is that the bedrock surface is expected to have been scoured by glaciation and be generally sound.Hard fractured bedrock under the dam footprint will require consolidation grouting to a depth that will be determined according to the imposed stresses. Initial estimate for consolidation grouting is 65-foot deep holes at 23-foot centers in both directions on the dam footprint In addition,fracture zones and altered zones should be excavated to at least 3 times their width or to 16-foot depth,whichever is the greater,and filled with concrete.It is not necessary to excavate the bedrock unless it cannot be grouted adequately to carry the stresses imposed by the dam. 4.1.4 RCC Dam Design Analysis A preliminary RCC dam analysis has been carried out using CADAM,a computer program for design and analysis of gravity dam structures.CADAM was developed in the context of research and development activities with guidance from the industrial chair on the Structural Safety of Existing Concrete Dams in Montreal,Canada at Ecole Polytechnique de Montreal. The CADAM program performs 2D stability analyses on gravity sections.Some of its features are: e Accepts basic structural dimensions and generates geometry and properties of a section. e Normal and floodwater levels are input for hydrostatic and uplift calculations. e Various options are available for uplift distribution (USBR,USACE,FERC). e Sliding friction parameters for concrete lift joints and rock contact can be specified. e Earthquake analysis can be carried out with the pseudo-static or pseudo-dynamic approach. The pseudo-dynamic (Chopra's Method)of analysis was used as required by FERC guidelines. e Crack "chasing”for static and dynamic loads was included in the analysis. Three dimensional finite element analysis will be required during future detailed design.The analysis should include dynamic and thermal stress analyses. 4.1.4.1 Basic Information It is understood that the following details define the conceptual Watana RCC dam at present: e Full supply level (FSL,spillway crest)El.2185 feet e Dam crest El.=FSL +5feet (gated spillway) or FSL +25 feet (ungated spillway) e River bed level El.1450 feet e Approximate lowest foundation level (RCC dam)_El.1350 feet 414.2 |Dam Alignment Experience on other RCC dam projects in recent years has found that the optimized embankment dam volume is seldom on the same axis as the optimum RCC dam.Significant reduction in total dam volume could be achieved by modifying the dam axis for the RCC dam,a dam with a much smaller footprint than the original earth embankment dam.For purposes of this study,the original axis has been used for the RCC dam.The axis shown on the figures has been selected based on a limited 11/17/2009 31/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation examination of the site characteristics and optimization of axis location and alignment will lead to a better solution for the RCC dam location and design. 4.1.4.3 Dam Section Seismic conditions appear to dominate design,and to address this,the dam configuration concept maximizes the base length to increase the sliding resistance at the critical section.The RCC dam arrangement has two sections;a base section that is envisioned to be constructed quickly in the base of the river channel,and a more conventional RCC dam section above the base.The base would have 1:1 slopes both upstream and downstream to El.1550 feet.The base section would incorporate the cofferdam and diversion water conveyances.We have considered the base platform to be constructed separately from the upper part of the upper main dam.The principal reasons for this are: e Because of its dimensions,the base platform has lower and more uniform stress distribution, meaning that less stringent RCC properties are required. e For approximately half of its depth,the base platform is below river grade and,on the upstream side,will be either backfilled during construction or in the short term by bedload solids deposition cast against the cofferdam. e Alluvial material may be suitable for aggregate in the RCC of the base platform,that may not be suitable for the high strength RCC that is needed in the remainder of the dam because of the variable nature of the materials. e The time required to set up the more sophisticated systems for RCC with properties identical to the upper part of the dam (especially the crushing plant)would almost certainly delay the start of dam base RCC production. 4.14.4 Galleries As shown on Figure 4.1-2,five grouting/drainage galleries are initially proposed in the main dam: the lowest gallery will be on top of the base platform at about El.1550 feet and the top most gallery just below spillway crest at about El.2140 feet with three intermediate galleries at equally spaced elevations between the top and base galleries.For preliminary planning purposes,galleries are assumed to be 12 feet high by 10 feet wide.This is a simple and practical arrangement;all seepage is drained by gravity,no works are below flood TWLs and no pumping or other power dependent emergency activities are required.Incorporation of a drain near to dam heel may bring significant cost reductions along with operational disadvantages. In addition,an inspection and instrumentation gallery is proposed in the base section located over the one-third point on the dam base.This gallery will also be 12 feet high by 10 feet wide. 4.1.5 Loading The following load cases were assumed for the preliminary design and analysis: Case 1 --Normal A.Design weight 11/17/2009 32/95 FINAL R&M Consultants -Hatch Acres AEA --Susitna RCC Dam Cost Evaluation B.Hydrostatic forces for normal maximum reservoir level of El.2185 feet C.Ice--12 thousand pounds (kips)per linear foot D.Uplift and seepage forces. Case 2 -Probable Maximum Flood (PMF) A.Dead weight B.Hydrostatic forces for maximum reservoir level of El.2211.8 feet C.Uplift and seepage forces. Case 3 -Post Seismic A.Dead weight B.Hydrostatic forces for normal maximum reservoir level of El.2185 feet and normal tailwater level of El.1478 feet C.Ice -12 kips per linear foot D.Maximum Credible Earthquake (MCE):Seismic inertial and hydrodynamic forces for MCE with horizontal peak ground acceleration (HPGA)of 0.63 g and vertical peak ground acceleration (VPGA)of 0.42 g.(MCE parameters used in seismic analysis to determine post seismic conditions.) E.Uplift and seepage forces. Each of the load cases along with the new procedures related to seismic stability now required by FERC are discussed below (see Table 4.1-1): Case 1 --Normal is based on hydrostatic loading on the spillway combined with an ice loading applied at the crest of the spillway. Case 2 -Flood is based on a PMF reservoir level of El.2211.8 feet.Nappe forces on the overflow sections were not included in the analysis. Case 3 -Post Seismic:FERC no longer requires that factors of safety during earthquake loading be evaluated.FERC states that due to the "oscillatory nature of earthquakes,and the subsequent structural responses,conventional moment equilibrium and sliding stability criteria are not valid when dynamic and pseudo dynamic methods are used.”FERC's new Case 3 loading condition looks at the stability consequences of a seismic event.The structure was analyzed under maximum credible seismic conditions to determine the extent of cracking in the base.After the extent of cracking is known,the section is reanalyzed under normal loading (Case 1)to determine the post seismic safety parameters. The CADAM program performs a pseudo-dynamic analysis based on peak ground acceleration using Chopra's method.The response spectra for the selected seismic event with 10%damping was used to determine the peak spectral acceleration for the estimated natural period of the dam. The results are used to determine the length of crack to be used in the post seismic analysis that includes crack lengths and subsequent uplift. 11/17/2009 33/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation FERC minimum factors of safety for facilities having high or significant hazard potential are as follows for these load cases: Table 4.1-1 FERC Minimum Factors of Safety against Sliding Failure (FERC Engineering Guidelines Chapter 13) Case 1-Normal Case 2 -Flood Case 3 -Post Seismic (Usual)(Unusual)(Extreme) Minimum Sliding Safety Factors 3 2 1.3 (SSF) CADAM analysis was run for a section of the dam through the middle of the channel with the base of the base platform at El.1350 feet and the upper section at El.1550 feet.In summary the analysis criteria were as follows: Cohesion at lift joints:50 ksf Friction angle:Concrete /rock foundation and concrete to concrete construction joints assumed phi value of 48 degrees Concrete density:150 pounds per cubic foot (pcf) Concrete tensile strength:33 ksf Concrete dynamic tensile strength:48 thousand pounds per square foot (ksf) Uplift pressures:A drain efficiency of 66.7%was assumed in this analysis.Post-seismic uplift is assumed to be a modified uplift pressure distribution that applies full hydrostatic pressure over the length of any crack(s)that may form during the seismic event. Load Case 2 -Flood:Nappe weight and forces are not considered downstream of the crest.A tailwater at El.1491 feet was assumed for PMF. Load Case 3 -Post Seismic:Pseudo-dynamic analysis was performed using CADAM in accordance with Chopra's procedure to determine post seismic conditions.Chopra's pseudo- dynamic analysis procedure accounts for modal deformations whencalculating accelerations over the dam height.The input used for the dynamic analysis input variables based on the estimated MCE response spectra and the assumed dam geometry are presented in Table 4.1-2. Reduction in vertical seismic component:Vertical seismic component reduced to 0.67 of the MCE value since horizontal and vertical seismic accelerations will not occur at the same time. 11/17/2009 34/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 4.1-2 -Pseudo-dynamic Analysis CADAM Input Variables Horizontal peak ground acceleration (HPGA)0.63 g Vertical peak ground acceleration (VPGA)0.42g Horizontal spectral acceleration (HAS)0.42 g Concrete Young's modulus,(E,)3,605,000 psi Foundation Young's modulus,(E;)5,400,000 psi Dam damping (g)0.05 Foundation damping (7,)0.10 Wave reflection coefficient (@ )0.5 Velocity of pressure waves (C )4,720 ft/sec 4.1.6 Results The Watana RCC Dam preliminary design was based on the CADAM analysis results for a variety of dam geometries.The assumed base with a top at 1550 feet would have upstream and downstream faces unformed and uncompacted;i.e,these face are overbuilt by 1 to 2 feet so that the design section is properly compacted.This requires extra material,but very rapid placement rates can be achieved by avoiding forms.CADAM stability analysis results for the selected load cases are summarized below in Table 4.1-3. Table 4.1-3 -CADAM Analysis Results Summary Load Case Sliding Factor of Safety Base Cracking (%) (SSF) Case 1 -Normal 3.43 0 Case 2 -Flood 3.20 0 Case 3 -Post Earthquake 2.93 57.7 These results meet FERC guidelines for gravity dams.It is important to note that the stability analysis was found to be sensitive to the seismic parameters,the location of the drainage within the dam,and material properties of the RCC.Small changes in the location of the drainage galleries results in an increase in the external base cracking under seismic loading.The high sliding factors of safety for the "Post Earthquake”case do not represent as conservative a design as may be assumed by the comparison of the analysis results to the FERC required minimum factor of safety.However,it should be noted that optimization of the design will likely lead to reductions in section dimensions and corresponding reductions in dam volumes. 11/17/2009 35/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Load Case 3 analysis results show over half the base of the dam would be cracked after a MCE event but that FERC recommended SSF of 1.3 would be met.It is likely that base cracking that may occur during a seismic event would become a "closed crack”post-seismic.Typically an earthquake recovery plan would include an assessment of drain pressures in order to assess any changes in uplift pressures and their effect on sliding stability.Partial cracking of the dam's base during the MCE is acceptable. 4.1.7 Thermal Stresses The long-term annual average temperature in the project area is about 32°F (0°C).This is the temperature that the concrete in the dam will eventually cool down to.This is the most important input to thermal stress analyses.The second most important is the coefficient of thermal expansion (Cte)of the concrete,which we know will be close to Cte of the aggregates,therefore it is very important that samples from anticipated aggregate sources be extracted and sent to known labs for analysis of Cte during the final design process. 4.2 Other Engineered Structures This section describes the analysis elements that went into the development of the conceptual design used in the cost estimate.Given the limited budget and schedule,this should not be considered a thorough or complete exploration of all the issues associated with a dam of this size. Replacement of one dam design for another affects more than just the dam.Many features of the project general arrangement can be modified to work more efficiently with the RCC dam.These include: e Cofferdams e Diversion water conveyance Spillways Intakes,powerhouse and water conveyances 11/17/2009 36/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 4.2.1 Cofferdams and Diversion Scheme The 1982 Acres scheme provided for two 38-foot diameter circular tunnels and an upstream cofferdam designed to operate with a maximum water level of El.1536 feet at the intake portal.A tunnel diversion is also possible for the RCC dam alternative.However,the smaller footprint of the RCC dam and the lesser consequences of overtopping the unfinished RCC dam during construction than an unfinished earth embankment dam may make diversion water conveyances built within the body of the dam a more convenient and economical choice than the diversion tunnel scheme.The most likely choices for the diversion scheme would be tunnels similar to the 1982 Acres scheme or incorporating the diversion conveyances and upstream cofferdam into the main dam as has been done at several recently constructed RCC dams.We have used the internal diversion for the RCC dam concept for our study in part to better illustrate the internal diversion concept.A more detailed comparison of a tunnel diversion scheme to other options is recommended for further study to determine the diversion scheme most suitable for the project. The optimization of the diversion water conveyance is contingent on time of closure by pre- cofferdams and time of starting RCC placement for cofferdams constructed in the low flow season. Closure has been assumed to take place in April to allow the RCC cofferdam construction time to advance as far as possible before the summer flood season.It is envisioned that pre-cofferdams will be required for construction of cofferdams and RCC production must be well advanced before starting construction of cofferdams.This is normal in current RCC dam construction practice,but it is important to emphasize schedule constraints as pre-cofferdams will each be relatively large embankment structures each requiring a slurry trench cutoff or jet grouting to bedrock in order to control the flow of water into the excavation for the main cofferdam and the main dam. As mentioned,the protection level required for an RCC dam is considerably less than for an earth embankment dam.For an RCC dam,the risk period is during the foundation preparation period. Once RCC placement has commenced,damage and delays due to overtopping do not justify a high protection level,such as the 1:50-year flood as proposed (correctly)for the earth embankment dam alternative.A more appropriate flood protection level for an RCC dam alternative would be 1:5-year. The updated hydrology at Watana shows a 1:5-year flood inflow of 48,000 cfs and this flow was used for diversion conduit design. The invert of the diversion conduits (diversion conveyance)would be located at approximately the level of the existing river bed at both the upstream and downstream ends.Assuming a maximum upstream water level of El.1550 feet against the main upstream cofferdam,and a diversion conduit invert at the inlet of El.1460 feet (the assumed upstream bed elevation),two 27-foot diameter pipes would have a capacity of 48,000 cfs including inlet,outlet and friction losses.The tailwater elevation for this magnitude flow was estimated from the river slope,the river cross section,and the estimated bed roughness.It was found to be about El.1466 feet at 48,000 cfs flow.For that flow with the outlet invert at El.1450 feet the diversion pipe outlets would be fully submerged and outlet losses would be minimal.The outlet velocity would be about 42 fps,which would require some erosion protection downstream from the outlet. A potential construction procedure that maintains RCC placement even during flows which exceed the design diversion flood is to construct the dam with a lower crest elevation section in the middle 11/17/2009 37/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation as shown on Figure 4.2-1.As placement proceeds,flood flows exceeding diversion capacity can pass over the lower section.This is the practice elsewhere in the world on RCC dams and construction continues during floods. 4.2.2 Spillway 4.2.2.1 Selection of Spillway Type The spillway configuration is expected to change from the embankment dam scheme by eliminating the side channel spillway and emergency spillway and instead incorporating an overflow section into the RCC dam.The spillway design influences the layout and construction of the dam.Two obvious options are possible: e Ungated °Gated An ungated spillway has advantages over a gated spillway including: e Community acceptance (no possibility of operator error) e Reduced O&M costs e Reduced peak outflow resulting from attenuation of peaks due to routing of flood through the reservoir above FSL. Stepped spillways have been adopted for many RCC dams,where the downstream face is normally constructed in steps.Many hydraulic models have been constructed and compared with prototype performance.There is certainly no prior experience of stepped spillway performance over an 800- foot drop,but we would expect significant dissipation of energy over the course of the fall. Until such time as the following are developed,it will not be possible to develop an optimum spillway arrangement: e Confirm inflow floods. e Confirm reservoir elevation-volume relationship. e Confirm flood hydrographs. e Carry out flood routing for ungated spillway arrangement. e Frequency of spillway operation. 4.2.2.2 Selection of Spillway Design Floods Normal design practice for projects of this magnitude requires the project to be capable of passing the PMF routed through the reservoir without endangering the dam.In addition to this requirement, the project should have sufficient spillway capacity to safely pass a major flood of lesser magnitude than the PMF without damaging the main dam or ancillary structures.The flood frequency analysis presented in Section 3.2,above,produced the values in Table 4.2-1 below. 11/17/2009 38/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 4.2-1 Spillway Design Flows for Watana Month US Standard Metric Average annual flow 8,100 cfs}229 m/s Maximum average monthly flow (June)41,500 cfs}1,175 m*/s Minimum average monthly flow =(March)590 cfs 17 m?/s Design flood inflow (1:10,000 year)156,000 cfs|4,417 m?/s PMF (probable maximum flood)326,000 cfs}9,231 m?/s The spillway was sized for a peak inflow of 156,000 cfs,which is equal to a 1:10,000 year reservoir inflow event.The spillway would be un-gated with the crest at El.2185.0 feet,corresponding to the normal maximum operating water level (Acres 1982).The spillway would comprise eleven 50-foot wide spill bays and ten 6-foot wide piers for a total spillway length of 610 feet.The piers would support a roadway across the spillway and likely be round-nosed or elliptical and tapered to the downstream edge to facilitate a gradual expansion and more evenly distributed flow over the spillway chute.Figure 4.1-1 shows a plan view of the spillway. The ungated spillway would be designed for a capacity of 156,000 cfs with a reservoir level of El. 2202 feet,including the flow contraction effects of the piers and abutments.The PMF flow of 326,000 cfs was calculated to result in a water level of up to El.2211.8 feet,overtopping the dam by up to 2 feet,however this is without taking into account attenuation of outflows due to reservoir storage above FSL.Considering attenuation would likely result in no overtopping occurring. The spillway chute would be stepped,with step heights and lengths of approximately 15 feet following the design criteria of Chanson (Chanson 2001)to maximize the energy dissipation before the tailrace.The river channel is only approximately 400 feet wide downstream of the dam, necessitating a reduction in the width of the spillway chute from 610 feet at the top to 400 feet near the bottom.The spillway is assumed to be faced with conventional concrete.The residual energy at the bottom of the chute at design flow is approximately 55 feet,reducing the need for an expensive energy dissipater design and instead allowing for a more conventional stilling basin with apron and end sill.Figure 4.1-2 and Figure 4.1-3 shows sections and details of the stepped spillway and the stilling basin. The spillway design presented herein is conceptual and a hydraulic model study would be required to confirm design of both the stepped spillway and the stilling basin. 4.2.3 Power Intake Particularly when the powerhouse is a surface powerhouse located at the toe of the dam,the power intake can be incorporated into the body of the dam.There are numerous examples of this.A good example is the 2400 MW Son La Plant in Vietnam.See Figure 4.2-2.Substantial cost savings can be expected to result from the elimination of a separate intake structure and the corresponding reduction in power conduit length. 11/17/2009 39/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 4.2.4 Powerhouse An underground powerhouse is a logical choice for the embankment alternative at the Watana site given the inherent risk associated with locating water conveyance near embankment structures.The restricted topography and favorable geological conditions also supported the selection of an underground powerhouse in the south abutment.The competency of the granite bedrock indicates the possibility of excavating an underground chamber and various tunnels with a minimum of support.Deep drilling,of course,would be required to fully outline the problems which may arise during construction of the powerhouse chamber and the various tunnels. With a concrete dam,the powerhouse could be moved to the toe of the dam with intakes and water conveyance integrated into the dam structure.This would eliminate extensive underground works for penstock,surge tanks,powerhouse,transformer gallery,tailrace and access tunnels.This would also eliminate much of the risk associated with subsurface construction;however,the weather would have a greater effect on surface powerhouse construction. The shorter distance between intake and powerhouse may somewhat reduce the total head on the project;however,the shorter water conveyance would reduce the head loss during generation so it would be difficult to estimate if the surface powerhouse would produce more or less power at the site. A surface powerhouse profile from the Son La project is shown on Figure 4.2-2.This is a major reconfiguration of the project that has not been fully explored to date;however,the influence on the total cost of the project is expected to be significant. 4.2.5 Comparison of Material Quantities between Embankment and RCC Concepts An effective method of observing some fundamental differences between alternative dam designs is to compare some of the major quantity numbers that were used to develop the cost estimate.The quantities were developed to the level of conceptual dam design.Further refinement may have the potential to increase or decrease the material requirements and corresponding costs. The Watana Embankment dam in the 1992 Acres Feasibility Study was estimated to have a volume of the rockfill of 62 million cubic yards.Our study has a volume of the gravity RCC dam estimated at 15 million cubic yards,which is 24.2%of the volume estimated for the embankment dam alternative. When comparing volumes of material it is also important to note that the RCC will be far more homogeneous allowing transport and placement with the same equipment spread.Some variation in the RCC mix may be developed during final design and special procedures will occur were there are interfaces between RCC and conventional concrete as well as at cold joints and structures within the dam such as galleries,spillways and other water conveyances;see Table 4.2-2. Note that this report on an RCC dam option for Watana is based on a structure with the same axis as the embankment dam option.Watana dam has not been looked at from a Gravity-Arch point of view,but it may be worthwhile to explore the viability of this approach due to potential further 11/17/2009 40/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation savings in the dam structure cost by the further reduction in materials quantities due to the thinner section of the G-A structure. Table 4.2-2_Comparison of selected Quantities Watana Embankment vs.RCC Concept Item Embankment Scheme RCC Scheme Cofferdams (CY)364,100 NA” Main Dam (CY)61,578,000 15,000,000 Foundation Exc.(CY)11,932,500 3,977,499 Surface Prep.(SF)10,058,000 3,228,618 Contact Grouting (LF)687,000 350,000 Grouting Galleries Exc.(CY)43,000 90,400 Spillway Exc.(CY)2,958,500 13,000 Spillway Concrete (CY)”129,800 174,000 Spillway Gates (US$)*)$14,208,000 NA 1 RCC Cofferdam incorporated into main dam (pre cofferdam not included for either scheme) 2)Conventional concrete only (RCC included in main dam quantities) 3)RCC concept uses ungated spillway 11/17/2009 41/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 5.High Devil Canyon Site This section describes the project layout associated with an RCC dam at the High Devil Canyon site (at river mile 156.5).This is the basis of a cost estimate to be compared to the full height earth embankment dam originally considered for construction at the High Devil Canyon site as an alternative development to the schemes developed for the license application.Given the limited budget and schedule,this should not be considered a thorough or complete exploration of all the issues associated with a dam of this size. 5.1 RCC Gravity Arch Dam Design Considerations This section describes the preliminary design efforts for a RCC gravity arch dam at the High Devil Canyon site (HDC). 5.1.1 Layout The limited information available makes it necessary to ensure that a conservative approach to layout is followed to ensure the legitimacy of the conclusions. In this case,cross-sections were prepared from the digitized 100'contour interval surface topography.In order to establish dam foundation levels,the rock surface contours were prepared by assuming that the depth of overburden varies from 30 feet at El.1800 down to 100 feet at El.1000 feet.This assumption was based on the conditions at Watana as shown by borehole logs and on the geotechnical observations in the 1974 study (Kaiser 1974).On this basis,with crest El.1775 feet (for a rockfill structure with gated spillway),the HDC dam would have minimum foundation level of El. 900 feet and a maximum height of 875 feet Figures 5.1-1 to 5.1-5 shows the preliminary layout of the HDC dam developed on the basis of the above criteria.This layout results in a crest length of approximately 3600 feet measured along the upstream edge of the crest.Only the central 1700 feet are curved,with a radius of 1500 feet.Gravity sections have been adopted for the left and right abutment closure sections. The preliminary nature of this layout is emphasized,noting that it is based on approximate topography,even more uncertain foundation levels and with no directly determined subsurface information at all from the site therefore subsurface conditions were inferred from . The preliminary section arrangement to be used for the initial finite element runs was based on the designed cross-section of a similar height dam in South America. Following initial assessment of the ungated spillway arrangement,the dam crest was set at El.1770 feet (for FSL of 1750 feet)and the crest width at 30 feet.Figure 5.1-5 shows details. Subject to stability verification,the section of the gravity arch above El.1335 is identical to the non- arch gravity section to the abutments (see 5.1.2 following). Preliminary calculations indicate that this section on the Figure 5.1-3 alignment with the inferred rock surface contours will have an RCC volume of about 11.6 million yd 11/17/2009 42/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 5.1.2 Dam Axis and Section As distinct from the Watana study,the HDC assessment commenced with the adoption of a gravity- arch section.The gravity-arch (G-A,often referred to as arch-gravity)option combines both arch and gravity action to resist the applied loads. In simplified terms,whereas a gravity section resists applied loads by its own mass and the shear strength of the concrete-rock foundation interface,the G-A section partially transfers the loads to the abutments.Obviously,for given loading conditions,the thinner the arch section,the greater the strength requirement for both the dam concrete and the abutment supports. It is not the intent of this report to discuss dam types and design methods in depth.It is noted that EM 1102-2-2201 (USACE 1994),gives a good introduction to arch dam layout and design. Although both HDC and Watana comply with the USACE basic criterion for consideration of an arch dam (crest length/height preferably <3,but up to 6 acceptable),the long,shallow abutments are not appropriate for a thin arch dam (especially without intensive investigation of abutment properties), but both may well be suitable for G-A design. Two of the most important dams in the USA are G-A:Hoover and Glen Canyon.The more recent of the two,Glen Canyon (completed in 1965)is the most relevant as far as the Susitna dams are concerned.Glen Canyon has a maximum height of 710 feet,a crest length of 1,560 feet and a constant radius of approximately 900 feet. Preliminary layouts of HDC as a G-A dam focused on applying a constant radius over the entire length.This approach resulted in either excessively flat radii (>2,000 feet)which will reduce arch action,excessive crest length (25%longer than optimum straight axis)or unfavorable alignment of overflow section relative to river alignment. 5.1.3 Foundations Foundation conditions and foundation treatment will require examination of suitability for the envisioned RCC dam.This includes curtain grouting (often assumed to have a depth of 50%of the headwater depth of impoundment)and consolidation grouting (depending on the foundation conditions).A drainage curtain downstream of the grout curtain,which will be located near the upstream face of the dam,will be employed to ensure low pore pressures within the concrete and to control uplift pressures in the foundation.Grouting and drainage galleries are included in the body of the dam and will extend into the abutments. 5.1.4 Analysis The High Devil Canyon Gravity Arch Dam initial concept consists of a gravity arch dam tangentially flanked on each side by straight gravity dam segment abutments.Because the structural behavior of the arrangement is 3D and is not strictly an arch,a general 3D structural analysis is required.A cursory Finite Element Analysis (FEA)was performed on the initial trial layout of the dam.The layout and cross-section of the dam is shown in Figures 5.1-2 and 5.1-3. The FEA was performed using SAP2000.Only a linear analysis of the dam was performed to obtain a qualitative assessment of the structural performance of the dam.The analysis does not consider 11/17/2009 43/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation dam-water interaction,reservoir boundary absorption,water compressibility,or dam-foundation rock interaction.As reported by Anil K.Chopra,Earthquake Response Analysis of Concrete Dams,Chapter 15,Advanced Dam Engineering,1988,these have a significant effect on the deformation and stresses of an arch dam.However,specialized computer programs such as EACD-3D (available online: http://nisee.berkeley.edu/documents/SWSC/EACD-3D-2008.rar)are required to analyze these effects. The key features and limitations of the analysis are: e FEA Model Dam and foundation "half-space”modeled using 8-node solid elements Solid element dimensions were on the order of 75-100 feet Dam model included 694 solid elements Material properties »RCC:E =5,080,000 psi,up =0.20,y =150 pcf =Rock:E =5,080,000 psi,uw =0.22,y =170 pcf o No-tension nonlinear elements not included (for joints) o Zero mass foundation e Loads and load cases o Dead Hydrostatic (normal water elevation) Earthquake -horizontal MCE response spectrum Case I-Dead +Hydrostatic Case III-Dead +Hydrostatic +Earthquake Loads not included #Hydrodynamic *Vertical earthquake motion =PMF hydrostatic =Ice =»Temperature »Uplift pressure ie) [e) [2] [e)000005.1.4.1 Static Loads Analysis The static loads considered in the FEA consist of the dead load of the dam and the hydrostatic water pressure assuming a water elevation of 1750 feet.The results are identified as Case I. 5.1.4.2 Seismic Analysis The seismic load analysis was performed using a response spectrum analysis (RSA).The process consists of performing a modal analysis of the dam/foundation to obtain the frequencies and modal shapes for several modes (12 in this analysis)and applying a selected earthquake response spectrum to obtain the corresponding deformation response of the dam.The response spectra analysis by Woodward Clyde Consultants (WCC,1982)as discussed in Section 3.3 was used for the analysis. Based on the current results the M7.5 Wadati-Benioff zone (intra-plate)subduction earthquake, occurring directly under the dam site,this response spectrum was selected as a basis for Maximum Credible Event (MCE).This represents an 84th percentile deterministic acceleration response spectra 11/17/2009 44/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation event generating a horizontal peak ground acceleration (HPGA)of 0.46 g.A damping factor of 10% was used in the analysis. The RSA was performed by applying the response spectrum to the foundation boundary independently in two orthogonal horizontal directions,one in the direction of the valley and one across the valley.The two structural responses were then combined by the root sum squared (RSS) method.The resulting combined response is treated as acting in both a positive and negative direction.The positive and negative responses are added in turn to the combined dead load and hydrostatic load response to obtain an envelope of the overall response,identified as Case III.The two enveloped responses are identified in the analysis as Case III Max for maximum tensile stresses and Case III Min for maximum compressive stresses. 5.1.4.3 The following tables show the results of the analysis.Table 5.1-1 lists the crest displacements. Analysis Results Table 5.1-1 Crest displacements (inches) Case Radial Tangential Vertical Case I -0.76 0.01 -0.42 +5.82 +1.10 +0.71CaseIl-6.56 -1,09 -1.14 *Negative radial displacement is in the D/S direction Table 5.1-2 lists the stress range on the U/S and D/S faces for the arch and cantilever loading directions. For comparison,the following stress criteria are presented.For an extreme load case (MCE)the factor of safety for compressive and tensile stresses are 1.1 and 1.0,respectively,(Table 11-1.1,Chapter 11 - Arch Dams,Engineering Guidelines For The Evaluation Of Hydropower Projects,FERC).Assuming a compressive strength of f',=4350 psi,the allowable compressive stress would be f,=3955 psi. For tensile stresses,a comparison value is based on the discussion and Figure 15-38 in Earthquake Response Analysis of Concrete Dams,Chapter 15,Advanced Dam Engineering.Here the "apparent” tensile strength under seismic loading is f,=3.4f',?=906 psi. The apparent tensile strength is not an "allowable"tensile stress value.If predicted tensile stresses are below this value but extend over large areas of the dam,the results are still suspect and the analysis should be re-run to account for redistribution of tensile stresses due to joint and crack opening. 11/17/2009 45/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 5.1-2 Stresses (psi) Case Face /Load Direction |Stress Approximate Location 109 |At crest at right abutment. -336 |At crest at crown cantilever section. Upstream /Cantilever -374 |Near base at crown cantilever section. 72 |At crest at right abutment. -309 |At crest at crown cantilever section. At base just upslope left of crown cantilever Case ]Upstream /Arch Downstream /Arch Downstream /Cantilever -850 .section. 838 |At base just upslope right of crown Case III Max Upstream /Arch cantilever section. 691 |At crest at crown cantilever section. At base just upslope left of crown cantilever section. About 150 feet below crest right of crown cantilever section. About 240 feet below crest left of crown Upstream /Cantilever 1366 Downstream /Arch 925 Downstream /Cantilever 874 ..cantilever section. Case III Min Upstream /Arch -1340 |At crest at crown cantilever section. .t base j i Upstream /Cantilever -1922 A ase just upslope left of crown cantileversection. Downstream /Arch -1263 About 150 feet below crest right of crowncantileversection. At base Just upslope left of crown cantilever section.Downstream /Cantilever -2299 5.1.4.4 Discussion Under the MCE earthquake loading,the stresses found in the analysis exceed the assumed design stress criteria.Considering the exclusion of the additional interaction effects mentioned above and the vertical component of earthquake motion,it would be expected that a comprehensive analysis of the dam would indicate greater stresses than found in the present analysis.However,it is expected that the initial concept could be refined based on the present analysis results to reduce the stress in the regions of high tensile stress.The refined model could then be analyzed by the more comprehensive methods mentioned above for the final design iteration.The dam appears to be feasible and would merit additional design development if its estimated cost is competitive with the Watana RCC gravity dam. 5.1.4.5 Thermal Stresses The thermal stress situation is even more important for the G-A case as the structure must remain in compression under all circumstances.The dam will be constructed and will attain maximum internal temperatures in the warmer months and will cool down rapidly during the winter.This cooling will cause contraction that under critical circumstances could produce cracking across the structure. 11/17/2009 46/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation The keys to controlling this tendency are: e Place RCC at the lowest economically feasible temperature e Keep amount of cement in the RCC to the minimum amount necessary to achieve the target strength. Until detailed thermal!stress analyses are carried out,the permissible maximum placement temperature cannot be precisely defined,however a value of 50°F (10 °C)can be considered a good starting estimate.. There are many tools available for controlling and reducing the placement temperature of the RCC. The most economical of these is to ensure a low temperature of the aggregate,which makes up at least 75%by weight of the total mix.In Alaska,this result can be achieved by producing aggregate, to the maximum extent possible,during the winter months. Obviously,there will be a cost penalty associated with crushing and stockpiling aggregates during the winter months,however any such cost will be insignificant compared to the cost (and energy demana)of aggregate cooling during the summer. In order to keep the cement content to a minimum and still achieve the specified 1-year strengths,it will be necessary to introduce a substantial pozzolanic component into the mix. 5.1.5 Results The dam layout adopted as a starting point for the HDC gravity-arch option was based on arrangements adopted for relatively similar structures already constructed or designed.The number of sites suitable for G-A dams is not large and the number actually built is even less. For this reason,there are not a vast number of examples from which to draw experience.At least 3 G-A dams have already been constructed with RCC (two in South Africa and one in China).None of these was over 300 feet high.On the other hand,two of the most important US dams (Hoover and Glen Canyon)are G-A type and are over 700 feet high. Many other RCC dams are curved in plan,but with relatively large radii and the designers have considered it prudent to not take any arching action into account in distributing stresses within the structures. When the arching action is considered,3-dimensional analysis is required.Before the development of finite element analysis (FEA),it was necessary to design G-A (and thin arch)dams using time and labor-intensive manual calculations involving multiple curved beam-cantilever deflection equations. For preliminary analysis of the proposed dam arrangement,the well-known FEA program,SAP 2000 has been used. The short-coming of SAP 2000 is that it is a general analysis program and has not been developed to meet the specific and subtle demands of dam designers.Two principal problems for the current application are: 11/17/2009 47/95 FINAL R&M Consultants -Hatch Acres AEA --Susitna RCC Dam Cost Evaluation 1.SAP 2000 Lacks node generation capability meaning that a coarse block pattern (in this case 100 feet)has to be adopted so that model development does not become excessively time-consuming, 2.SAP 2000 lacks the ability to incorporate zero tension blocks without overly complicating the model and introducing distortions. The second point is quite important as it means that the contraction joints included at the interface between the gravity abutments and the central G-A portion of the dam cannot be properly modelled.Obviously,tensile stresses cannot be transmitted across these joints and the distribution of tension within the G-A section will be considerably different from that shown in the analysis results.E.g.,the tendency for development of high tensile stresses in the upper central part of the dam will be substantially reduced. The first point means that the distribution of stress within the structure is already quite approximate. Overall,it can be concluded that SAP 2000 is not the ideal program for advanced analysis of this kind of dam.The results can be described as providing a basis of reference,but by no means definitive results. For more advanced analysis,the use of more sophisticated FEA programs,such as ANSYS or FENAS will have to be used.Both of these programs also incorporate thermal stress analysis modules. There is no point in trying to refine the analyses at this stage because of the data shortcomings (especially the very uncertain precision of the foundation contours. For present purposes,the following recommendations are put forward: 1.Carefully check RCC volume using the section shown on Figure 5.1-3.and foundation contours, 2.In order to account for uncertainties in the analyses,increase total volume for cost estimation by 10%. Finally,it is emphasized that if the HDC option is to be taken further,the most critical activities will be produce accurate site topography and carrying out sub-surface geotechnical investigation.Only when this information is available will it be possible to commence optimization of the dam layout and details. 11/17/2009 48/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 5.2 Other Engineered Structures Many features of the project general arrangement can be modified to work more efficiently with the RCC dam.These include: e Cofferdams,diversion and construction water conveyance e Spillways e Intake,penstock and surge chamber e Powerhouse and tailrace 5.2.1 Cofferdams and Diversion Scheme A tunnel diversion is considered the most likely choices for the diversion scheme at HDC similar to the 1982 Acres scheme for Devil Canyon. Given the higher strength requirements of the gravity-arch RCC dam,incorporating cofferdams constructed under sub-optimal conditions into the main dam structure is likely not practicable.The cofferdams are likely to be relatively large embankment structures each requiring a slurry trench cutoff or jet grouting to bedrock in order to control the flow of water into the excavation for the main cofferdam and the main dam. The protection level required for an RCC dam Is considerably less than for an earth embankment dam.For an RCC dam,the risk period is during the foundation preparation period.Once RCC placement has commenced,damage and delays due to overtopping do not justify a high protection level,such as the 1:50-year flood as proposed (correctly)for the Watana earth embankment dam alternative.A more appropriate flood protection level for an RCC dam alternative would be 1:5-year. The updated hydrology at High Devil Canyon shows a 1:5-year flood inflow of 54,000 cfs and this flow is appropirate for diversion conduit design. 5.2.2 Spillway As for the Watana RCC option,the ungated stepped spillway has been developed with this initial HDC layout (Figures 5.1-1 through 5.1-5).Table 5.2-1 lists the spillway design flows for the High Devil Canyon site. For preliminary axis alignment of any concrete dam incorporating the spillway works,the key considerations for selection are: e Ensuring that the spillway crest is oriented more or less normal to the river alignment downstream of crest so that the discharge is directed into the river in the direction of natural flow. e Minimizing total volume of concrete in the dam. e Minimizing adverse slopes (i.e.downhill in the direct of horizontal thrust). e Based on the proposed 10%increase in flows and floods from Watana to HDC,the principal flow and flood data for HDC would be as follows: 11/17/2009 49/95 FINAL R&M Consultants -Hatch Acres AEA Susitna RCC Dam Cost Evaluation Table 5.2-1 Spillway Design Flows for High Devil Canyon US Standard Metric Average annual flow 9,000 cfs 255 m?/s Maximum average monthly flow (June)48,580 cfs 1,325 m?/s Minimum average monthly flow (March)650 cfs 18 m?/s Design flood inflow (1:10000 year)177,000 cfs 5,010 m?/s PMF (probable maximum flood)370,000 cfs 10,480 m?/s The spillway would be ungated with the crest at El.1750.0 feet,corresponding to the normal maximum operating water level (Acres 1982).The spillway would comprise thirteen 50-foot wide spillbays and twelve 6-foot wide piers for a total spillway length of 722 feet.The piers would support a roadway across the spillway and likely be round-nosed or elliptical and tapered to the downstream edge to facilitate a gradual expansion and more evenly distributed flow over the spillway chute. Figure 5.1-2 shows a plan view of the spillway. The ungated spillway would be designed for a capacity of 177,000 cfs with a reservoir level of El. 1767.4 feet,including the flow contraction effects of the piers and abutments.The PMF inflow of 370,000 cfs would result in a water level of up to El.1774.4 feet,overtopping the dam by up to 4.4 feet,however this is without taking into account attenuation of outflows due to reservoir storage above FSL.No routing of the PMF has been carried out to date,but it can be anticipated that,given the large area of the reservoir,it will be possible to safely pass the routed PMF outflow without recourse to auxiliary spilling installations and without overtopping of the dam.It may,however,be necessary to increase the height of the dam by 1 or 2 feet. For these reasons,an upstream water level at El.1774 feet is adopted for the PMF design case. The spillway chute would be stepped,with step heights of approximately 28 feet following the design criteria of Chanson (Chanson 2001)to maximize the energy dissipation before the tailrace. The river channel is only approximately 500 feet wide downstream of the dam,necessitating a reduction in the width of the spillway chute from 722 feet at the top to 500 feet near the bottom. The spillway is assumed to be faced with conventional concrete.The residual energy at the bottom of the chute at design flow is approximately 120 feet,reducing the need for an expensive energy dissipater design and instead allowing for a more conventional stilling basin with apron and end sill. Figures 5.1-3 and 5.1-4 show sections and details of the stepped spillway and the stilling basin. It is important to emphasize that the spillway design presented herein is conceptual and a hydraulic model study would be required to confirm design of both the stepped spillway and the stilling basin. The unit discharge for the proposed HDC spillway is under 270 cfs/ft (25 m?/s/m),well within the range of experience for stepped spillways on RCC dams.The downstream face slope of 0.46H:1V is steeper than most known examples and the height is beyond precedent.As an example,Upper Stillwater in Colorado,one of the most successful stepped spillways in the US,has a downstream slope of 0.6H:1V and a height ofjust over 200 feet. 11/17/2009 50/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Despite the above,there is no hydraulic reason to question the proposed design,particularly when the proposed 28-foot step height is taken into consideration (compared to the usual values of 3 to 4 feet). 5.2.3 Power Intake Particularly when the powerhouse is located at the toe of the dam,the power intake can be incorporated in the body of the dam.There are numerous examples of this arrangement.A good example is the 2400 MW Son La plant in Vietnam.See Figure 4.2-2.Substantial cost savings can be expected to result from the elimination of a separate intake structure and the corresponding reduction in power conduit length. 5.2.4 Powerhouse As with Watana,the risk associated with locating water conveyance near embankment structures and the restricted topography and favorable geological conditions led to selection of an underground powerhouse in an abutment of the Dam for the original HDC concept proposed by Kaiser in 1974. Little is know about rock condition at the HDC site and a complete geotechnical program is required to fully define the site geologic conditions to identify problems which may arise during construction of the powerhouse chamber and the various tunnels. With a RCC dam,the powerhouse could be moved to the toe of the dam with intakes and power conduits integrated into the dam structure.This would eliminate extensive underground works for penstock,surge tanks,powerhouse,transformer gallery,tailrace and access tunnels. The shorter distance between intake and powerhouse may somewhat reduce the total head on the project,however the short water conveyance would reduce the head loss during generation.A surface powerhouse scheme concept for High Devil Canyon is shown on Figure 5.2-1.This is a major reconfiguration of the project that has not been fully explored to date,however the influence on the total cost of the project is expected to be significant.Please note that the cost estimate in this report has assumed an underground powerhouse with associated underground works as originally proposed. 5.2.5 Comparison of Material Quantities between Embankment and RCC Concepts The High Devil Canyon site has been developed to some degree,however very little information is available detailing the effort.The best information we have found on the layout of the project is shown on Figure 2.1-6 and in Section 8 of the 1992 Acres Feasibility Study.The volume of the rockfill in the 1982 Acres Feasibility Study is described as 48 million cubic yards.Our study has a volume of the gravity arch dam estimated at 11.6 million cubic yards,which is 24.2%of the volume estimated for embankment dam alternative. 11/17/2009 51/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 6.Roller Compacted Concrete 6.1 Technology (advantages and limitations of the material) Roller Compacted Concrete (RCC)is a well established material that has been used successfully for dam construction since the 1980's.The American Concrete Institute,Subcommittee 207.5 (ACI 207.5R)defines RCC as "Concrete compacted by roller compaction;concrete that in its unhardened state will support a roller while being compacted.”RCC has the same ingredients as conventional concrete which is comprised of cement,water and aggregates.As opposed to the wetter mixtures found in conventional concrete that promotes flow of the mix into structures requiring form work, RCC is a much drier mix and can be placed and compacted in place in less time than conventional concrete by use of conveyors and earth-moving equipment,spread by bulldozers,and compacted by vibratory rollers.When a RCC layer is placed,it can immediately support the earth-moving equipment to place the next layer. At the Susitna sites the RCC material will have advantages over the embankment dam materials previously considered for the Watana and High Devil Canyon sites and some limitations. Advantages: e Low cost for Roller Compacted Concrete in place cost quite small compared to conventional concrete. e Well suited to dam construction. e Less than half the volume in RCC dam than in embankment dam -less equipment and labor required for placement. e Lower volume may allow dam completion in less time -reduce construction schedule. e Smaller footprint -less clearing and excavation. e RCC dams can allow overtopping during construction saving substantial construction time and cost on diversion structures. e Locate spillway on dam. e Intake and powerhouse located at toe of dam. e Low temperatures of aggregate would reduce cooling costs. e Provides opportunity for development of industry in Alaska for cement and pozzolans. Limitations: e Cost dependent on location of source of cement and pozzolans (imported materials dependent on world demand). e No currently developed sources in Alaska of Cement,flyash or pozzolan. e Transportation of large volume of material if no local source developed could burden infrastructure. e Placement of material is not possible in severe weather conditions. 6.2 Discussion of other Dam Technologies -Watana site The choice of dam type was examined in several of the previous Susitna Project studies.The 1975/79 USACE,1974 Kaiser,1982 Acres and 1985 Harza/Ebasco studies concluded that a central impervious 11/17/2009 52/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation core embankment dam was the appropriate choice at the Watana site,however advances in dam construction technology since the 1980's may provide opportunities to employ other dam technologies cost effectively besides the RCC dam subject of this study. This is a very large dam and any alterative should be considered only if there are precedent projects of near comparable size.Alternative technologies that could be examined include: e Concrete arch e RCC gravity arch -probably best option e Concrete faced rockfill dam e Asphalt core embankment dam 6.2.1 Concrete arch The 1982 Acres report compared an embankment dam to a concrete arch at this site.An arrangement for the arch dam is included as Figure 6.2-1.The 1982 analysis indicated the cost of the embankment option was somewhat lower than the arch option.The basic geometry of the site is such that a thin arch is unlikely to be the optimal choice;however a gravity arch is worth considering. Changes in construction technology since the 1982 study would tend to favor present costs for embankment dam construction over concrete arch dam construction because of cost reductions in large earth moving operations using modern larger mining equipment that would increase efficiencies of the embankment placement. 6.2.2 RCC gravity arch The topography lends itself to the introduction of some upstream curvature in the RCC gravity dam option.Increasing the curvature opens up the possibility of developing a gravity arch arrangement, along the lines of,e.g.,Glen Canyon dam and Hoover dam. This option would combine the advantages of RCC construction with the reduction in volume of RCC associated with the gravity arch design concept.This concept could be well suited to the conditions at the Watana site and has the potential to be the preferred dam type for the Watana site. 6.2.3 Concrete Faced Rockfill dam The concrete-faced rockfill dam (CFRD)may have advantages over the earth-core rockfill dam.The CFRD is considered to have high safety performance characteristics,especially resistance to failure with earthquake shaking.It is appropriate for use for very high dams.Crest settlements are relatively low,and decrease in rate rapidly after the first few years.The drainage characteristics of the CFRD and inherent stability of the material would also allow consideration of having a steeper upstream slope than the embankment dam,thereby reducing the total volume of material required. Further evaluation may have value. 6.2.4 Asphaltic Concrete Core Embankment Dam Asphaltic concrete central core dams have been in use since 1962.Compared with impervious earth core,the placement of asphaltic concrete is less influenced by bad weather conditions.This enables the contractor to extend the working season and conduct an almost continuous operation,keeping 11/17/2009 53/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation the construction on schedule.Experience from Norway,which is somewhat comparable to the conditions at the Upper Susitna sites,have found that the construction season is approximately one month per year longer than for impervious embankment core placement. Challenges associated with asphaltic concrete core dams are limited experience with this dam type within the United States and no precedents for a dam of this height.This dam type is not recommended for further consideration for this project. 6.3 Materials Specifics The RCC mix will be developed based on the availability of materials and how appropriate they are for the climatic conditions.The mix design is based on the standard high cementitious (cement plus supplementary cementitious materials,such as fly ash or natural pozzolans)approach which requires that each horizontal lift surface be covered by the subsequent RCC layer prior to the initial set of the placed material.For a dam the size of Watana or HDC,the initial set will have to be delayed to not less than 24 hours,t.e.,the mix will be highly retarded.The type and dosage of set retardant will be determined by trial mixes,however the dosage of retardant will likely not be less than 1%(measured as %of total cementitious material). The critical parameter for RCC dams,especially when seismic loading is significant,is the direct tensile strength across the horizontal lift joint.All other parameters and requirements devolve from this.The compressive strength (sc),which is easy and cheap to measure,is often used as a proxy for direct tensile strength (st)across the lift joint.For the G-A dam option,the lateral strain (parallel to the dam axis)becomes equally important. 6.3.1 Watana RCC Mix We estimate that the principal mix criterion for Watana dam should be a target of 230 psi (1.6 MPa) direct tensile strength across lift joints at an age of 365 days.This in turn,indicates a 365 day compressive strength of around 3,600 psi (25 MPa).Table 6.3-1 shows the preliminary mix design for the Watana RCC option. There are a number of assumptions in Table 6.3-1,but it is sufficiently accurate to make an order of magnitude estimate of materials quantities in combination with the volume.Applying the proportions given in Table 6.3-1 to the estimated quantity of RCC (approximately 15 million cubic yards)for the dam,it is estimated that the following quantities of principal materials will be required, measured in short tons: e 26,307,000 tons of processed aggregate e 877,900 tons cement (type 1 acceptable if no thermal problems) e 1,643,400 tons supplementary cementitious material -most likely fly ash but if a source can be developed also pozzolans. These quantities relate only to the RCC dam.Additional quantities of aggregate and cement will be required for other components of the project not changed from the original design in this conceptual study. 11/17/2009 54/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 6.3-1 -Preliminary Watana RCC Mix Design Mix (%)SSD Mix |SSD Mix |Specific Ingredients |by weight prop prop gravity |Volume |Volume (Ib/cy)(kg/m?)(ft*)(cy) Fly Ash 5.41%219.1 130 2.5 1.404 0.052 Cement 2.89%117.1 70 3.15 0.596 0.022 Retarder (1%of CM)0.08%3.36 2 11 0.049 0.002 Water 5.05%202.3 120 1 3.277 0.121 Air 0.00%0 0 0 0.000 0.000 Subtotal 13.43%542.86 322 5.326 0.197 Aggregate 50-20 mm 27.7%1121.85 672 2.65 6.784 0.252 20-10 mm 17.7%716.85 429.6 2.65 4.335 0.162 10-5 mm 13.8%558.9 333.6 2.65 3.380 0.125 5-Omm 274%1109.7 664.8 2.5 7.113 0.264 Subtotal 86.6%3507.3 2100 21.613 0.803 TOTAL 100.00%|4050.36 2422 26.939 1.00 6.3.2 High Devil Canyon RCC Mix The mix will be developed based on the availability of materials and how appropriate they are for the climatic conditions.The mix design is based on the standard high cementitious (cement plus supplementary cementitious materials,such as fly ash or natural pozzolans)approach which requires that each horizontal lift surface be covered by the subsequent RCC layer prior to the initial set of the placed material.For a dam the size of HDC,the initial set will have to be delayed to not less than 24 hours,i.e.,the mix will be highly retarded.The type and dosage of set retarder will be determined by trial mixes,however the retarder dosage will likely not be less than 1%(measured as %of total cementitious material). The critical parameter for RCC gravity dams,especially when seismic loading is significant,is the direct tensile strength across the horizontal lift joint.All other parameters and requirements devolve from this.The compressive strength (sc),which is easy and cheap to measure,is often used as a proxy for direct tensile strength (st)across the lift joint.For the G-A dam option,the lateral strain (parallel to the dam axis)becomes equally important. We estimate that the principal mix criterion for HDC dam should be a target of 290 psi (2 MPa)direct tensile strength across lift joints at an age of 365 days.This in turn,indicates a 365 day compressive strength of around 4300 psi (30 MPa).Based on experience with similar materials and strength RCC the following basic mix (Table 6.3-2)is proposed.Values are based on the theoretical air-free density (TAFD) 11/17/2009 55/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 6.3-2 -Preliminary High Devil Canyon RCC Mix Design Mix (%)-|SSD Mix |SSD Mix |Specific Ingredients |by weight prop prop gravity |Volume |Volume (Ib/cy)|(kg/m')(ft*)(cy) Fly Ash 6.02%244.4 145.00 2.50 1.57 0.058 Cement 3.12%126.4 75.00 3.15 0.64 0.024 Retarder (1%of CM)0.09%3.7 2.20 1.10 0.05 0.002 Water 5.14%208.7 123.80 1.00 3.34 0.124 Air 0.00%0.0 0.00 0.00 0.00 0.000 Subtotal 14.37%583.2 346.0 5.605 0.208 Aggregate 50-20 mm 25.90%1051.0 623.5 2.65 6.35 0.235 20-10 mm 16.48%668.8 396.8 2.65 4.04 0.150 10-5 mm 12.84%521.1 309.2 2.65 3.15 0.117 5-Omm 30.40%1233.4 731.7 2.50 7.86 0.291 Subtotal 85.63%3474.3 2061.2 214 0.8 TOTAL 100.00%4057.48 2407.21 27.02 1.00 There are a number of assumptions in the above Table,but it is sufficiently accurate to make an order of magnitude estimate of materials quantities in combination with the volume.Applying the proportions given in Table 6.3-2 to the estimated quantity of RCC in the dam (Approximately 11.6 million yd?it is estimated that the following quantities of principal materials will be required, measured in short tons (and with an allowance of 10%for waste): e 19,978,000 tons of processed aggregate e 728,000 tons cement (type II preferred) ¢1,404,000 tons supplementary cementitious material (SCM)-most likely fly ash but if a source can be developed also pozzolans (see Section 7.1.3). These quantities relate only to the RCC dam.Additional quantities of aggregate and cement will be required for other components of the project not changed from the original design in this conceptual study. 6.3.3 The aggregate processing operation for Watana and High Devil Canyon RCC dams are essentially the same,the difference being the volume of Watana is greater than HDC;aggregate processing will be discussed in detail for Watana only.The total aggregate demand for the Watana dam is about 26 million tons (23.6 million tonnes).In order to ensure shape and ultimate strength requirements,the crushing plant can be assumed to have four stages of processing including a jaw crusher stage,,two cone crusher stages and,one Vertical Shaft Impact crusher stage. Aggregate 11/17/2009 56/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Assuming that the base platform is constructed using alluvial material,the mass of aggregates to be processed from quarry rock is reduced to about 22.5 million tons.Assuming that aggregate production starts 12 months prior to the start of RCC placement,average monthly production of about 232,000 tons will be necessary.Therefore,two 500 tons/hr crushing systems per abutment will be required.Note that "crushing system”means a plant designed to produce the required amount with the required gradation and shape of aggregate,including any necessary recirculation of product. The mix design indicates that the RCC will contain approximately 25%sand (5 mm to Omm)by volume of RCC in place (no air entrainment).The volume of RCC required at Watana is approximately 15 million cy.Thus the RCC requires 3.75 million cy of sand. The only large source of sand for fine aggregates that has been identified is the Susitna River alluvium.The Winter 1983 Geotechnical Exploration Program (Harza-Ebasco 1983)shows that the alluvium in the vicinity of Watana Dam site contains 38%sand (5 mm to 0 mm)overall,and 55%of the alluvium is coarser than 4.75 mm (i.e.gravel size).The portion of the riverbed to be excavated for dam construction would not be sufficient to produce the required volume of sand,so a significant volume of sand will need to be developed by processing quarried rock. The availability of materials was not previously studied for the High Devil Canyon site,so further geotechnical investigations are recommended if the project is to be further investigated. 6.4 Construction Considerations This section examines issues associated with the RCC dam construction including assumptions of how material is transported to the RCC dam,mix placement rates,and length of construction season. The issues associated with construction materials will affect both dam design and the cost estimate: e Environmental conditions,rainfall work stoppage and change in properties,cold weather considerations,construction season due to temperature,material properties,and the optimum construction period rate of RCC placement e Source and transportation of construction materials to dam site. e Transportation of concrete to the dam by conveyor. e Techniques for spreading and compacting and creation of;horizontal joints,vertical joints, contraction joint spacing,forming joints in RCC,sealing of contraction joints,curing,and constructing galleries. 6.4.1 Cooling Concrete During Construction The long-term annual average temperature in the project area is understood to be near freezing and the groundwater at the dam site is about 34 to 35°F;based on this information,groundwater will likely be used to supply mix water for the RCC and cooling water for the curing of the RCC. 6.4.2 Process Plant Staging Table 6.4-1 attempts to relate historical performance with required RCC production.This assessment is considered to be quite conservative and it may well be possible to construct the dam in four seasons,but we have conservatively assumed 5 seasons will be required. 11/17/2009 57/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation The placement program in Table 6.4-1 below proposes ten each 8 cubic yard mixers.These would be expected to be twin-shaft type plants (as manufactured by,for example,Liebherr).Two separate RCC production stations are assumed to be established;one on each abutment.Each station would be independent and complete,including quarry,aggregate processing facilities and main aggregate stockpiles containing up to 5 million tons of aggregate. Table 6.4-1 RCC Placement Estimate (based on Watana Quantities) Parameter US Standard Metric Quantity 15,000,000 cy 11,468,300 M? Construction season (months/year)5.5 mn/yr 5.5 Mn/yr Construction seasons 5 yr 5 Yr Placing days/year 165 yr 160 Yr Total placing days 825 dy 800 Dy =x months 25 mn 25 Mn Nominal monthly capacity 600,000 cy 458,732 M? Average daily placing rate 20,000 cy 15,291 M? Required daily average capacity 44,920 cy 34,344 M? Required maximum month 1,200,000 cy 917,464 M? Required nominal capacity 15,000,000 cy 11,468,300 M? Mixer capacity,8.0 cy 6.0 M? Total mix time -start charge to 2 min 2 Min complete discharge,min batches/mixer/hour 30 Perhr 30 Per hr Vol/mixer/hour 235.0 cy 180.0 M? Total #of mixers 10 Ea 10 Ea Nominal hourly production 2,350 cy 1,800 M? Daily hours 20 hr 20 Hr Nominal daily production 47,000 cy 36,000 M? Nominal monthly 1,175,000 cy 900,000 M? Ratio nominal to average 1.96 1.96 Long term average monthly 600,000 cy 458,732 M? Total RCC placed 15,000,000 cy 11,468,300 M? A considerably less expensive mixing alternative that may be considered once the aggregate and cementitious material properties are determined would be a continuous mixer such as the ARAN Modumix III (MM Ii)with 650 cy/hr (500 m?/hr)capacity.This may be the preferred choice,provided ice is not required to cool the mix.We estimate an amount of $20 million would cover the cost of setting up four complete MM III,or similar,mixers at the site (less than $2/cy). Conveying concrete to negative pressure (vacuum)chutes will minimize segregation in the chute during transport from mixer to placement area. 11/17/2009 58/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation A high placement rate will require consideration of an RCC cooling system.Cooling of RCC lifts is possible using suitable PVC tube grids with chilled water circulated to control temperatures due to heat of hydration in the RCC mix (local groundwater temperature is estimated to be around 33°to 34°F). 6.4.3 Weather and Construction Season Table 3.1-1 shows the temperature levels recorded at the site.The following weather related issues have been considered for planning purposes: 6.5 Tunneling (for diversion works and abutment grouting/drainage galleries)can proceed at any time of the year.Excavation and foundation preparation work should be able to be carried out for at least 9 months of the year. Aggregate production for RCC should be possible for 12 months of the year,with reduced efficiency in mid-winter.Emphasis would need to be placed on winter production of aggregate to ensure low temperatures in the stockpiles used for summer production. Aggregate stockpile temperatures -with careful management,it may be possible to maintain cold temperatures in the stockpile and avoid expensive forced cooling (ice,wet belts,etc.). RCC Placement can occur at temperatures at or near 32°F (0°C)with 23°F (-5°C)lower limit so placement should be based on a 5 to 5.5 month construction season. Schedule The Kaiser report-included a schedule for construction of the High Devil Canyon embankment dam project that showed a 6.5-year schedule for dam construction.The RCC option has been estimated assuming a 5.5-year schedule though there is a high probability that 4.5 years is achievable.The start of the diversion and site preparation for both schemes is in the initial 12 to 18 months of the dam construction schedule. 11/17/2009 59/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 7.Construction Costs The Cost estimate study comprised: e Establishment of cost for Susitna Project Watana and High Devil Canyon RCC options e Review of cost supporting basic construction costs;including transportation,transmission and camp facilities e Review of cost estimate background data to consider differences in construction techniques to see if original estimate is appropriate for current construction methods e Examine the Harza Ebasco Joint venture cost estimate for staged Watana and develop comparable costs to those used in the HDR/DTA cost estimate 7.1 Upper Susitna RCC Dam Costs There are many elements that would influence the cost of construction of the Susitna Project RCC dams.The most influential elements are the unit price for RCC and the volume required to construct the dam.There are no directly comparable domestic projects to either the envisioned Watana or High Devil Canyon RCC dam.The most recently completed domestic large RCC dam project is the Olivenhain Dam near Escondido,CA which has approximately one-tenth the volume of the envisioned Watana RCC dam.Even though the Olivenhain dam is much smaller than the Susitna Project dams,the use of US contractors and the availability of cost data and information from the Olivenhain site makes the cost comparison valuable for establishing the unit cost for RCC at the Susitna sites. 7.1.1 Comparison to the Olivenhain Project Construction on the Olivenhain Dam began in the fall of 2000 and was completed in 2002.Cost information provided by the Portland Cement Association (PCA)indicates the cost per cubic yard of concrete for the RCC dam was $54.43 per cubic yard.This cost includes the cost of materials delivered to the site and the cost of handling which comprised mixing,transporting,spreading, compacting and curing.Figure 7.1-1 shows the long-term cost trend data for RCC dams from the PCA that relates the volume of RCC used in the project plotted against cost per cubic yard.From this figure it can be seen that the Olivenhain Dam's RCC unit cost is significantly higher than the long-term trend.The reason for this can be better understood by analyzing factors specific to Olivenhain.Cost factors compared include:cost of aggregate production,climatic factors,materials logistics,RCC mix design,and construction wage rates. Aggregate Production -All aggregate at Olivenhain was quarried and processed from hard granite at the project site using crushers to achieve the material gradations required for RCC production.To ensure a constant source of power for the crushers and other equipment,Kiewit Pacific Co.,the general contractor,utilized onsite generators for all electric power requirements.The added equipment,maintenance and fuel costs associated with on site power generation was a significant cost factor for the project.The remoteness of the Susitna Project dams will require a similar arrangement unless transmission facilities are constructed early and power from the Railbelt grid is provided. 11/17/2009 60/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Climatic factors -High desert temperatures in California necessitated onsite chillers to produce chilled water to extract heat resulting from the temperature rise during the RCC curing process,this was essential to control cracking of the RCC during curing.Some of the water for the chillers had to be purchased and was not sourced from the site.At either Upper Susitna site,it is assumed that water needed for construction will be drawn from the nearby river or from groundwater sources.The cool temperature of the locally drawn water should eliminate the need for onsite chillers.Aggregate production during winter and the ambient temperature of the site should keep the stockpile temperature just above freezing.The project location climate will reduce the Upper Susitna construction season for RCC placement which has been estimated to be feasible for 5 to 5.5 months per year at the location.This will result in RCC placement equipment sitting idle for over half the year.Extreme temperatures and weather place additional stress on equipment and labor forces leading to higher costs. Materials Logistics -Restrictions placed on delivery times for materials at Olivenhain presented a challenge for contractors as barely enough fly ash could be stockpiled on site to allow for continuous concrete placement.The Upper Susitna projects will require an even larger quantity of fly ash and cement resulting in similar challenges to ensure a steady supply of materials without impeding work progress.The significant quantities of fly ash and cement required for Upper Susitna projects will likely require multiple sources.Attempting to maintain consistency in the quality of fly ash across multiple sources will be crucial to ensuring the integrity of the finished RCC and will present a challenge for quality control during construction.All fly ash for the Olivenhain project was sourced from California or Nevada.Watana will not have the benefit of a nearby source and additional import costs will be incurred as a result unless a dedicated natural pozzolan source can be identified and developed. Mix Design -The RCC mix design for Olivenhain dam consisted of 225 Ib/cy of fly ash and 125 Ib/cy of cement.This mix is very similar to the proposed Watana RCC mix of 219 Ib/cy of fly ash and 117 lb/cy of cement.A large RCC dam currently under construction in Missouri,the Taum Sauk Upper Reservoir Rebuild Project,is utilizing a 50%fly ash,50%cement mix.The total volume of concrete is approximately 2.7 million cubic yards.If cost data becomes available for this project it will be useful to compare it to the Upper Susitna and Olivenhain projects. Construction Wage Rates -Wage rates provided by the Alaska Department of Labor and Workforce Development and the California Department of Industrial Relations were reviewed to compare labor costs for the Olivenhain and Upper Susitna projects.For Olivenhain,San Diego,CA wage rates were used to approximate costs for the project site at Escondido,CA similarly Anchorage prices were considered to approximate the costs for the Susitna labor rates.Comparing San Diego and Anchorage data indicates that the average labor costs for Anchorage for construction labor classes expected for RCC construction are slightly higher than for San Diego.The only exception for the labor classes listed is equipment operators where the wage rates are comparable.We concluded that labor costs for San Diego and Anchorage are comparable for purposes of comparing Upper Susitna to Olivenhain.The major difference between Upper Susitna and the Olivenhain project is the construction camp and worker support costs which are stated separately from the labor rates. To escalate the costs from the Olivenhain project to a comparable basis for Upper Susitna construction,we have used recognized Construction Cost Trends compiled by the U.S.Bureau of Reclamation (USBR).These trends suggest that the construction cost index for concrete dams 11/17/2009 61/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation decreased in the first quarter of 2009 after increasing in every quarter since April 2002.As the downturn in worldwide economies abates,the long-term increasing trend of construction costs is likely to resume.Table 7.1-1,below,outlines the adjustment of the Olivenhain Dam cost of $54.43 per cubic yard to fourth quarter 2008 dollars using the USBR index.The 3rd Quarter 2001 index is used as a Starting point as this is the approximate timeframe for Olivenhain bid pricing information. Table 7.1-1 -USBR Cost Index Escalation of Olivenhain Costs USBR Construction Index -Concrete Dams USBR Index -4th Quarter 2008 334 USBR Index -3rd Quarter 2001 229 USBR Index -Ratio 2008 /2001 1.46 Olivenhain Dam RCC Cost 2001 ($/cy)$54.43 Olivenhain Dam RCC Cost 2008 ($/cy)$79.39 The USBR construction index for "Earth Dam Structures”was also reviewed as an RCC dam is more similar to a hybrid concrete and earth dam structure.The ratio for the earth dam structure is equal to 1.49,which is similar to the 1.46 factor for concrete dams. There are currently no reliable developed sources in Alaska able to produce either Portland cement or fly ash in the quantities required by the Upper Susitna RCC dams.Consequently,the cementitious material would have to be imported from the world market which might include Asia,Canada,the Lower 48 states or Latin America.The following paragraphs present two options for importing fly ash and cement. There are numerous fly ash and cement suppliers throughout the U.S.and Asia that could potentially be utilized.However,it is unlikely that one single supplier could provide all of the materials required. Table 7.1-2 summarizes cement and fly ash materials quotes from various sources outside Alaska. Our review of material price quotes indicates significant variation in the cost.For our analysis we have used cement from Seattle at $82/ton and from China at $75/ton.Fly ash assumptions are that material will be available either from the central US or Asia at $55/ton. Quotations have been obtained for haulage of cementitious materials.The cost to transport fly ash or cement by railcar across the U.S.has been estimated at $0.02 per ton-mile.After reaching the west coast,the materials would be loaded onto a container vessel for transport to Anchorage,AK. Shipping costs for fly ash and cement are approximately $108 per ton by container vessel traveling from Seattle to Anchorage.This cost includes all port and loading fees.Upon arrival in Anchorage, the containers would be loaded onto rail cars for transport approximately 160 miles north to Gold Creek.Rail transport costs have been estimated at $0.03 per ton per mile in Alaska.After arriving at Gold Creek,the containers would continue to the project site by rail or be loaded onto trucks for transport by road.Road transportation costs are estimated at $0.20 per ton per mile for the approximately 50 miles from Gold Creek to the Watana project site. 11/17/2009 62/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 7.1-2 Material Quotes from Domestic and International Sources (2008 &2009 Information) Cost Source $/ton |Source Location Cement ENR Magazine -Construction Economics 82 Seattle Cement Pricing -online quote 79 China Elite Global Trading -online quote 77 China Portland Cement Supplier -online quote 75 China Alibaba supplier -online quote 58 China Fly Ash SGTC -web 50 India Neelkanth Traders -web 49 India Al Haddad Inter Commodities --web 90 Saudi Arabia Ash Grove Resources -email 40 Kansas TxDot -report 55 Texas Salt River Materials Group -email 68 California Michigan.gov -report 40 Michigan A scenario was developed with fly ash from the central US shipped to Seattle,WA by rail (2500 miles at $0.02/ton/mile)and further shipped to Anchorage by ship or barge and a similar exercise with fly ash originating in Shanghai,China.For both scenarios,the arrival of material in Anchorage would require it to be loaded on to railcars for transport approximately 160 miles North to Gold Creek. From there the containers would be either routed on to the project site by rail or be loaded onto road trucks and transported another 50 miles directly to the stockpile location at the Watana site. Alaska rail transport costs were estimated to be $0.03 per ton per mile.Transport by road truck in Alaska was estimated to cost $0.20 per ton per mile. Table 7.1-3,below gives a summary of the cost of materials delivered to site assuming transport from Anchorage by rail and road to the project site.Savings would likely be realized if the road segment were to be replaced by rail.The capital cost of access roads or rail upgrades is not included in the calculations for Table 7.1-3. 11/17/2009 63/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Table 7.1-3 Transportation of Cement and Fly Ash Analysis Cement Fly-ash Central Seattle Shanghai USA Shanghai (USD/ton)|(USD/ton)|(USD/ton)|(USD/ton) Cost at Source 83 75 55 55 Shipping to port in Anchorage incl.loading & port fees 108 151 158 151 Transfer to site -Rail (approximately 160 miles)4.8 48 48 48 Transfer to site -Truck (approximately 50 miles)10 10 10 10 Total $205.8 $240.4 $227.8 $220.8 Based on this analysis,a reasonable estimating cost for cement and flyash would be $225/ton.For this study we have used precedents on other projects and included expected efficiency effects of a large scale operation (20%reduction)and used the cost of $180/ton for either cement or fly ash at site with transport by ship-rail-truck;ship-rail transport would likely reduce the cost but final decision on access mode to site must first be made. Bid tabulations provided by PCA for several RCC projects support the rough assumption below regarding the percentage breakdown of costs for RCC projects.It is anticipated that these same ratios will apply to Susitna: Materials -60% Labor -20% Equipment -20% If the cost for RCC concrete at Olivenhain is escalated by the USBR factors to $79.39/cy in 2008 dollars,the costs can be divided as follows according to the percentage breakdowns: Labor -$15.88/cy Equipment -$15.88/cy Materials -$47.63/cy To adjust these values to the Susitna site per the discussion above,the following factors need to be considered; e Labor costs are considered to be the same for both sites.The California (San Diego)labor rates were shown as comparable to Anchorage);however the Upper Susitna sites are more remote and will require a camp and associated support facilities.Olivenhain and the expected Upper Susitna RCC operations are six days a week,double shift.The costs 11/17/2009 64/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation of the construction camp at the Upper Susitna sites are not included in the labor for unit rates but is a separately stated cost line item in the cost estimate,see below for more discussion. Equipment -costs are factored up to account for equipment that is inactive for about six months or more out of the year;this factor is approximately 1.8 to account for full utilization and full equipment costs for half the year and "idle equipment”charges of 75% of the full costs for the down time.This is considered a conservative assumption for several of the large equipment items such as mixing plant,conveyors,and crushing plant as these would be purchased and then sold or salvaged at the end of the project. Material transportation -the transportation analysis above shows that the transportation costs will be greater for Upper Susitna than for Olivenhain and the cost factors for various materials should be refined for the analysis as follows: o Fly ash costs should be increased by a factor of 2.6 o Cement costs should be increased by a factor of 1.7 o Set retarder will be transported as liquid in bulk and is expected to be similar to cement in cost increase (1.7) o Aggregate processing and other costs are expected to decrease to reflect the availability of some fine aggregate that can be processed from alluvial sources, availability of water for mixing and cooling and less cooling cost,are taken for this analysis as 0.8. Table 7.1-4 RCC Unit Cost Estimate Category Materials Escalated Adjustment |Susitna Unit Olivenhain to Watana |Estimate Costs ($/cy)($/cy) Labor 15.88 1.0 15.88 Equipment 15.88 1.8 28.58 Materials Fly ash (9%)4.29 2.6 11.15 Cement (23%)10.95 1.7 18.61 Set retarder (0.6%)0.29 17 0.49 Aggregate and other costs 32.10 0.8 25.68 (67%) Total unit costs:79.39 100.40 Examining the adjusted cementitious materials cost from Table 7.1-4 (cement at $22.56/cy and fly ash at $14.29/cy)and taking the weight of materials per yard from Table 6.3-1 (cement at 117.1 11/17/2009 65/95 FINAL R&M Consultants -Hatch Acres AEA --Susitna RCC Dam Cost Evaluation lb/cy and fly ash at 219.1 Ib/cy)yields a cost of $385/ton for cement and $130/ton for fly ash.With the pricing assumption for cement and fly ash at $180/ton we calculate the cost of cementitious material as being [$180/ton x (117.1 Ib/cy+219.1 Ib/cy)/2000 Ib/ton]=$30.26/cy which is within a dollar of the escalated Olivenhain costs which is reasonable considering the larger scale and less restrictive access.We have used $100/cy for RCC in this estimate. Construction cost indices were reviewed as a test of relative costs of construction at Olivenhain near Escondito vs Watana site.Review of city cost indexes in the R.S.Means Heavy Construction Cost Data index suggests a premium allowance for Alaskan material and installation is necessary.Table 7.1-5 shows the city index data for site work and concrete between San Diego and Anchorage.The city indexes listed below are relative only and are based on a baseline of 100.00 for the 30 major city U.S. average. Table 7.1-5 RS Means comparison of San Diego to Anchorage Division |Material |Installation |Total City Index Anchorage Site Work 143.7 133.7 136.4 Concrete 153.60 113.50 133.70 City Index -San Diego Site Work 101.2 100.7 100.8 Concrete 112.90 107.90 110.40 Ratio Anchorage/San Diego Site Work 1.42 1.33 1.35 Concrete 1.36 1.05 1.211 The ratio of estimated Upper Susitna to Olivenhain RCC costs of 1.36 is quite similar to ratio of material cost for Anchorage to San Diego,which provides some level of comfort that the process for transferring costs makes sense. 7.1.2 Comparison to PCA trend The PCA trend analysis indicates a much lower cost per unit than indicated by the modification to the Olivenhain cost numbers (see Figure 7.1-1).The size of the Upper Susitna projects will include economies of scale,however there will also be logistical challenges that will occur for an enterprise of this size.Given the number of unknowns,the modified cost of the Olivenhain project is considered more appropriate than a trend line based on a curve fit number.There remains the potential for refining the estimate and potentially reducing the estimated cost of the dam construction. 7.1.3 Construction Materials (Portland cement and Pozzolan) Large supplies of Portland cement and supplementary cementitious material (SCM)will be required for this project.SCM will be either fly ash or pozzolans processed from natural deposits.These materials are available from sources in the Lower 48 states or from abroad. A project of the scale of Watana or High Devil Canyon dam as an RCC project could provide the impetus for establishing cement and/or pozzolan industries in Alaska. 11/17/2009 66/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation To develop a viable source for cement and/or pozzolan in Alaska would require a significant investment and would depend greatly on whether the permitting and access issues can be resolved in a timely manner.In order to determine if the materials are available locally to develop these materials,we have performed a desk study of geotechnical resources that may supply the material required .for these industries. 7.1.3.1 Location of Limestone Deposits for Portland Cement Production Several areas have been identified as having limestone deposites that may have the potential for development into sources of cement.The locations are as follows: 1)Kings River -Deposits of limestone on Kings River (approx.61°51'07"north and 148°33' 31"west)were staked and future plans for a $5 million dollar cement manufacturing plant to be constructed near Sutton,adjacent to the Alaska Railroad spur were announced by Kaiser Permanente Co.in August 1960 (Alaska Division of Mines,1960).The deposit is between 8 and 17 miles north of the Glenn Highway at elevations ranging from 2,500 to 6,000 feet. Eight (8)to 17 miles of haul road would need to be constructed to connect the site with the Glenn Highway.The deposit is about 65 miles south of the proposed dam site but approximately 150 miles along existing highways or the Alaska Railroad. The deposits are extensive and preliminary sampling and testing indicates nearly pure calcium carbonate (Mihelich and Jasper,1961). 2)Cantwell-Windy Area -Deposits in this area have been evaluated by the U.S.Geological Survey since 1931.Prior to November 1960,claims were purchased by Alaska Portland Cement,Ltd.,a California corporation.Additionally,Alaska Portland Cement,Ltd.,along with Bechtel Corporation and Allis Chalmers investigated construction of a cement plant.One deposit was estimated at exceeding 200 million tons (Alaska Division of Mines,1960). The Windy deposit is situated at 63°26'45"north and 148°57'00"west and is located in the southeastern corner of Denali National Park and is within the area designated as "wilderness”. The limestone outcrops at altitudes of 2,600 and 3,200 feet.The lower outcrops are slightly over 1 mile northwest of Mile 323.1 of the Alaska Railroad.Core drilling (12 test holes with over 3,000 feet of core)and sample testing results are available (Rutledge et al,1953). Numerous other deposits of similar limestone have been identified in the Windy Creek and West Fork of the Chulitna River areas including Foggy Pass (Warfield,1962).These other deposits are not as accessible to the railroad as the Windy deposit. 3)Fox -A small deposit of limestone has been identified within the Birch Creek Schist at the junction of the Elliott and Steese Highways near Fox.The deposit was mapped as approximately 15 feet thick (Rutledge et al,1953). This deposit is approximately 200 miles north of the proposed access to the dam site. 4)Seldovia -Limestone deposits at Seldovia Bay have been considered for use in industry and agriculture since about 1911.After World War II,consideration was given to the use of 11/17/2009 67/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 7.1.3.2 the material for the production of cement.The Alaska Cement Corp.obtained claims and also considered several locations for a cement plant (Rutledge,1953).No production from this site has been made. The deposit is located on the Kenai Peninsula,approximately 260 miles southwest of the dam site.Barge loading and unloading facilities would need to be constructed both near the deposit site and in the Anchorage area. Location of Pozzolanic Material Deposits of natural pozzolans,tuffaceous materials or basalt deposits could be used to develop local sources of pozzolans for use in RCC mix. 1)liamna Quadrangle -Pozzolans have been evaluated to a limited extent in Alaska since about the early 1950s.Initial testing by the Bureau of Reclamation of pumice from Katmai National Monument indicated that the material would be satisfactory in strength development but is not outstanding (Rutledge,1953).Further testing by the Bureau of Mines (1966)indicted that Katmai National Monument pumice (Dossier No.1)is a good pozzolan, possibly an excellent one. Pumice as a lightweight aggregate occurs east of Katmai National Monument on Augustine Island.Between 1946 and 1949,pumice was mined on Augustine Island by the Alaska Katmalite Corp.(Detterman and Reed,1980).A major deterrent to developing a mining operation on the island is the continued threat of a major volcanic eruption. Detterman and Reed (1980)map numerous volcanic rocks including lava flows,pyroclastics, pumice,scoria,tuff,basalt and andesite within the Iliamna quadrangle.The Iliamna quadrangle is located between about 250 and 300 miles southwest of the proposed dam site. Land status within the area is rather complex including federal,state,native and private ownership.Mining operations for pozzolan within the area would require the development of mine roads and barge loading and unloading facilities both near Iliamna and in the Anchorage area. 2)Talkeetna Mountains and Healy Quadrangles -The proposed dam site lies within the Talkeetna Mountains USGS quadrangle.Csejtey et al,1978 and Csejtey,1974 map undivided sedimentary and volcanic rocks in the northern Watana Creek area.The volcanic rocks include volcanic ash or fine-grained tuffaceous material and flows and dikes of andesitic to latitic feldspar porphyry.Metabasalt also occurs in the area. Richter (1963)mapped rhyolite flows or welded tuff within about four (4)miles northwest of the proposed High Devils Canyon dam site.The deposit was characterized as a small outcrop of relatively soft,unaltered rhyolite flow or welded tuff which appeared to unconformably overlie the sedimentary rocks.Richter further considered that this rock represents an erosional remnant of a post-Mesozoic volcanic sheet. 3.)Mount McKinley Quadrangle -Gilbert et al,1976,mapped rhyolite,andesite and basalt flows in the Polychrome Mountains area within the eastern part of Denali National Park. 11/17/2009 68/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation These deposits are about 75 to 100 miles northwest of the proposed dam site.Material from this general area was tested in about 1965 by the Bureau of Mines.Testing is referenced in Bureau of Mines (1966)with the results from Katmai;however actual test results have not been located. 7.1.3.3 Viability of Developing Local Cementitous Products Materials are available and the project is large enough to attract the attention of manufacturers of cementitous products.However further evaluation would be required to establish if efficiencies would have significant effect on the cost of materials for construction of the dam. 7.2 Project Access Access to the Susitna Project Dam Sites was considered by the USACE in their 1975 Susitna Project report.The USACE study was expanded in the early 1980's Susitna Project Studies for APA to include alternatives for access corridors from the Parks and Denali Highways along the north and south sides of the Susitna River for access to all the selected Susitna Project dam sites that may be proven feasible.A report on the Access Planning Study by R&M for Acres was issued in January 1982 anda Supplement to the Access Planning Study was issued in September 1982. The USACE identified an access corridor beginning at the Parks Highway near Chulitna Station then paralleling the Alaska Railroad south and east to a crossing of the Susitna River then proceeding east up the south side of the Susitna River to the Devil Canyon site and on to the Watana site via the north end of Stephan Lake and the west end of Fog Lakes.Also a rail head was planned at Gold Creek in the USACE study. Both a road and railroad are considered essential for access to the projects for construction of the RCC dam.A railroad because of the quantities of bulk materials to be moved to the construction site and weights anticipated for large components such as gates,penstocks,turbines,generators and transformers and becausea railroad would lessen the impact of project traffic and heavy haulage on the Alaska highway system.In addition,the fact these material and equipment items will likely be brought to Alaska by barge and/or ship from the source either via Seattle or other foreign or domestic port to Anchorage or Whittier for trans-loading onto railcars for movement to the Project site.Shipping possibilities include rail barge for much of the materials which would allow the loaded rail cars to pass through Whittier or Anchorage directly to the project site without trans-loading. Materials shipped in sea containers (CONEX's)could be offloaded from a container ship in Anchorage and loaded on rail cars for hauling to the project site.With a road,trucks,buses and passenger vehicles associated with the project can move by the Parks Highway to the Susitna Project road and travel directly to the project(s). Based on the 1982 Acres Feasibility Study (Acres 1982),access to the High Devil Canyon and Watana Sites is practicable via the south corridor from Gold Creek to High Devil Canyon with the road then extended to Watana in the north corridor for purposes of cost estimating.The selected access plan for construction and operation of the Susitna Project RCC dams should comprise a road commencing near MPP 156 on the Parks Highway,proceeding southeast and crossing the Susitna River at Gold Creek on a major bridge,turning northeast to High Devil Canyon damsite along the south side of the 11/17/2009 69/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Susitna River,and proceeding on along the south side of the Susitna River to Watana damsite (see Figure 7.2-1).To accommodate the access to the High Devil Canyon site,the cost of the Devil Canyon road has been increased proportionally to the additional distance from Devil Canyon to the High Devil Canyon site.A rail road spur line extension from Gold Creek to High Devil Canyon and on to Watana is considered practicable as well and has been included in the cost estimate for both the High Devil Canyon RCC dam and the full height Watana RCC dam. 7.2.1 Watana Site Access 7.2.1.1 Roads For the Watana RCC dam the main access road will originate at MP 156 on the Parks Highway,cross the Susitna River and proceed via Gold Creek along the south side of the Susitna River.In addition to the main access,several additional roads will be required to the construction camp,support facilities,airstrip,and tank farm.Haul roads to the borrow areas and construction roads to the dam and all major structures will also be required.These roads with the exception of the haul roads are shown on Figure 7.2-1. The construction roads will be 40-foot wide gravel surfaced roads with small radius curves and grades limited to 10 percent.Major cut and fill work will be avoided.A gravel pad approximately 5 feet thick will be required for the roads.This gravel pad will provide a drivable surface and also will provide for road construction requirements over the sporadic permafrost areas. 7.2.1.2 Railroad A railhead will be constructed at Gold Creek and railroad access constructed to the Watana site along the South access corridor to provide for heavy hauling requirements for RCC dam construction;see Figure 7.2-1. 7.2.1.3 Bridges No major temporary bridges at the Watana site will be required for the construction of the Watana development.The crest widths of the upstream and downstream cofferdams will be planned to provide suitable access to the north bank of the Susitna River during construction. The completed main dam crest will provide permanent access across the Susitna River for project operational purposes. 7.2.1.4 -Airstrip A permanent airstrip would be constructed at a suitable location near the main construction camp. The runway is assumed to be 6,000 feet in length based on the project final report and to be capable of accommodating the C-130 Hercules aircraft,as well as small jet passenger aircraft.If construction personnel transport were to be done by using Jet aircraft such as the Boeing 737-400 or similar,the runway would require greater length and to be constructed to generally higher standards than that serving the C-130 aircraft.Roads will connect the airstrip to the camp,village,and dam site.A small building will be constructed to serve as a terminal and tower and a fuel truck/maintenance facility will be constructed.Also a helicopter pad will be provided. 11/17/2009 70/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation A temporary airstrip would also be constructed to support the early phases of mobilization and construction.This temporary runway will be 2,500 feet in length and will be located in the vicinity of the main construction camp.The airstrip will be capable of supporting smaller type aircraft. The temporary airstrip would eventually be incorporated into one of the main haul roads after the permanent airstrip is in service. 7.2.1.5 Access Tunnel The concept for the Watana powerhouse presented in the project feasibility studies in the 1980's was for an underground powerhouse and appurtenant facilities.Thus for the base case RCC dam an underground powerhouse is also provided which requires that an access tunnel be provided to the underground powerhouse and associated works.As assumed in the 1980's studies the main access tunnel will be approximately 35 feet wide and 28 feet high.The tunnel will allow permanent access to the operating facilities development and will also be utilized during construction as the main construction tunnel.Construction adits will branch off to the various components of the development during construction.It would be possible to construct a surface powerhouse in close proximity to the RCC dam and reduce the extent of tunnelling and underground works presently in the cost estimate to a much lower number.Future studies are recommended to develop the surface powerhouse concept further. 7.2.2 High Devil Canyon Site Access 7.2.2.1 Roads For the High Devil Canyon RCC dam the main access road will originate at MP 156 on the Parks Highway,cross the Susitna River and proceed via Gold Creek along the south side of the Susitna River.At High Devil Canyon the main access road will enter the site from the south (assumed to be an extension from the previously considered Devil Canyon site access road).A low level bridge crossing the Susitna River could be located just upstream of the dam for the construction phase prior to availability of the cofferdams for access across the river.In addition to the main access,several auxiliary roads will be required to the camp,support facilities,tank farm,borrow sites,and construction areas.These roads with the exception of the haul roads are shown on Figure 7.2-1. The construction roads will be gravel-surfaced roads 40 feet wide with small radius curves.Grades will be limited to 10 percent.Major cut and fill work will be avoided where possible.A gravel pad, approximately five feet thick,will be required for the roads.This will provide a drivable surface and also will protect against settlements and heaving caused by localized frost sensitive soils and permafrost. 7.2.2.2 Railroad A railhead will be constructed at Gold Creek and railroad access constructed to the High Devil Canyon site along the South access corridor to provide for heavy hauling requirements for RCC dam construction;see Figure 7.2-1 11/17/2009 71/95 FINAL R&M Consultants -Hatch Acres AEA Susitna RCC Dam Cost Evaluation 7.2.2.3 Bridges A low level bridge constructed upstream of the dam will be used during abutment excavation.Once construction of the cofferdams are complete,the crests of these structures will be used for river crossing. After completion of the main dam,the crest of the dam will provide access across the Susitna River. 7.2.24 -Airstrip The same sort of airstrip (6,500-foot)as considered for the Watana site has been assumed for the HDC site.The airstrip will be capable of accommodating both C-130 Hercules aircraft and small jet passenger aircraft and a helicopter pad will be provided.An airstrip that could accommodate larger jet aircraft such as the Boeing 737-400 is not included in the cost estimate and would require further study to determine the economic feasibility of transporting personnel by air to the HDC project during construction when permanent road and rail road are available for the relatively short trip from the Parks Highway. 7.2.2.5 Access Tunnel The concept for the HDC powerhouse is identical to the Watana powerhouse presented in the project feasibility studies in the 1980's was for an underground powerhouse and appurtenant facilities.Thus for the base case RCC dam an underground powerhouse is also provided which requires that an access tunnel be provided to the underground powerhouse and associated works. As assumed in the 1980's studies the main access tunnel will be approximately 35 feet wide and 28 feet high.The tunnel will allow permanent access to the operating facilities development and will also be utilized during construction as the main construction tunnel.Construction adits will branch off to the various components of the development during construction.It would be possible to construct a surface powerhouse in close proximity to the RCC dam and reduce the extent of tunnelling and underground works presently in the cost estimate to a much lower number.Future studies are recommended to develop the surface powerhouse concept further. 7.3 Camp/Project Village for Watana and HDC The 1982 Acres Feasibility Study cost estimate had assumed for the Watana embankment dam a camp for 3,600 workers,a project village and support facilities.Considering the RCC dam alone the smaller volume of the RCC dam would logically reduce the workforce required.The RCC dam is approximately one-fourth the volume of the embankment dam,and assuming the embankment dam construction workforce size is directly related to the volume of the dam,the estimated number of construction workers required for the RCC dam is estimated to be one-fourth of those required to construct the embankment dam.One-quarter of the total main construction camp cost was reduced by 75%which resulted in the camp for the RCC dam construction costing about 20 percent less than that for the embankment dam concept (factor of 18.75%was used in calculations). 7.4 Review of Acres Cost Estimate Back up Material Review of Hatch Acres internal records has recovered detailed cost estimate backup records that were the basis for the cost estimate labor and equipment production rates that were used in the 11/17/2009 72/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 1982 Acres Feasibility Study.We have examined these estimates to review equipment production rates and labor assumptions to determine if they are consistent with modern equipment and labor practices for large earthwork projects. The 1982 and 1985 Estimates were prepared in significant detail regarding construction costs - including direct labor,permanent materials,construction supplies,construction equipment costs,and subcontracts.We have found no reason to question the various production rates,equipment spreads,etc -inasmuch as total progress on such a Project as Susitna is affected by climatic conditions more so than manpower or size of equipment. Labor wage rates have increased since the 1982,1985 estimates by factors of 1.65 and 142 respectively.Equipment costs have at least doubled -largely influenced by fuel costs.Materials for construction (cement,rebar,farm lumber,etc)have been volatile in costs recently,but ENR records suggest the average annual increase over the years has been in the 3-4%range. Estimates of Overhead/Profit/Supervision were added using a factor that was not clearly documented in the records uncovered.This factor may in part recognize the significant overtime factors for these remote jobs,which could be in excess of 16%of all labor (6-10's =60 hr work for 70 hrs pay). The 1982 and 1985 cost estimates were prepared in great detail and we are not prepared to comment on the calculations in any detail -other than to say that the production rates,manpower spreads and equipment choices are appropriate for this work.Nevertheless,the calculations have been used to develop unit prices which then were extended to takeoff quantities. Construction efficiencies have improved in earthwork and tunnelling,however the use of the very large mining equipment that could improve the productivity of earthwork are limited by the size of the site and expected grades for transfer of material from borrow areas to the work site.Tunnel boring machines are not expected to be efficient given the relatively short length of the tunnels on the project. 7.5 Cost Summary The Watana RCC dam cost estimate utilizes the information and the format of the 2008-based cost estimate HDR/DTA updated to the extent that it is possible to maintain an "apples to apples” comparison of the concepts.In areas where there are modifications to the earth embankment dam project due to the alternate RCC dam configuration,new quantities and unit prices were developed reflecting the change in technology.We have stated costs of the RCC concepts in December 2008 dollars to be consistent with the HDR/DTA cost estimate. The cost estimate summary,Table 7.5-1,summarizes the estimated cost of the Watana RCC dam and High Devil Canyon RCC dam options.A detailed summary of costs is presented in Appendix B and detailed costs are included in Appendix C for Watana RCC dam and Appendix D for High Devil Canyon RCC dam.The cost estimates focus on the RCC dam and scales the cost of project features/facilities such as the power tunnel/power conduits,powerhouse,switchyards,transmission lines,site road and rail access,operations support facilities and similar features as they are affected by details of the RCC dam options. 11/17/2009 73/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Costs estimated for the full height Watana RCC dam are based on the Watana earth embankment dam as escalated from the 1982 estimate to December 2008 by HDR/DTA and this is the basis AEA regards as the current base for cost estimates under the current studies.The R&M teams'analysis of costs for the Watana RCC dam retained all costs by detailed account category and subcategory as stated in the 2008 base estimate and modified only the costs directly relevant to the RCC dam concept in place of the earth embankment dam.The cost of the High Devil Canyon dam was also drawn from the Watana 2008 base costs with adjustments for volume of an embankment dam at the HDC site from which to estimate the HDC RCC dam.In developing the RCC dam costs,the access tunnels,underground powerhouse and hydraulic works in the Watana 2008 basis estimate were retained for both of the RCC dams and both RCC concepts studied have been estimated with identical 1200 megawatts of installed capacity in the powerhouses. The embankment dam concept for High Devil Canyon was not developed to the level of the Watana estimate used as the basis for the HDR/DTA cost estimate.To develop our comparison embankment dam cost for High Devil Canyon,we have utilized a portion of the site selection cost estimate summaries presented in Table 8.3 of the 1982 Acres Feasibility Study which includes preliminary cost information on both High Devil Canyon and Watana.We have assumed that the cost of the High Devil Canyon "Reservoir,Dams and Waterways”portion of the cost estimate is proportional to the ratio of the High Devil Canyon to Watana "Main Dam"and "Spillway System”costs form the above referenced table times the Watana "Reservoir,Dams and Waterways”costs. The level of study for the RCC alternative is far less extensive than that for the embankment dam. The material and equipment costs used for the RCC unit price costs are considered to be conservative and we applied higher contingencies to the portions of the project that were modified for the RCC dam configuration than had been used in the HDR/DTA cost estimates.The modified items were approximately one third of the total costs,so the contingency was adjusted to 21.67%to reflect one third of the permanent features of the project (RCC)at 25%contingency and two thirds (unchanged by RCC)at 20%contingency. Table 7.5-1 Summary of Costs of RCC Dams for Watana and High Devil Canyon Sites Watana RCC HDC RCC Description $1,000 $1,000 Engineering 4%,Env.2%& Regulatory 1%$341,700 $281,400 Dam &Power Facilities $4,304,100 $3,700,600 Transmission Features $322,000 $119,400 Other Tangible Property $11,900 $11,600 Main Construction Camp $244,200 $189,100 Construction Management 4%$195,300 $160,800 Total Subtotal $5,419,200 $4,462,900 Total Contingency $1,155,000 $954,000 Total (Millions of Dollars)$6,600 $5,400 11/17/2009 74/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation It should be noted that all estimates shown include the underground powerhouse scheme developed for the embankment dam options.Use of intakes integral to the dam,water conveyances through the RCC dam and a surface powerhouse directly downstream of the RCC dam represent potential for significant cost savings in project construction.The surface powerhouse configuration would eliminate significant tunnelling and excavation for these features and reduce project head losses. To determine an order of magnitude cost for the surface powerhouse,we have utilized comparison tables developed by the USBR.The USBR table shows relative powerhouse structure and equipment costs for a range of installed capacities.The relative costs can be updated to reflect broad changes in the costs of equipment and structures using the USBR cost indices.The powerhouse structure costs can then be estimated as a percentage of the updated (2008)cost of the large generating equipment.Preliminary estimates of the potential reduction in cost (based on the estimated cost of excavations and rule of thumb costs for surface powerhouses)indicate that the cost reduction may be on the order of $500 million;however a more in depth study would be required to adequately address the issues associated with a design change of this scope. 11/17/2009 75/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 8.Project Timeline for Licensing and Construction In formulating our view of the Project timeline for licensing and construction of the Susitna Project we reviewed the March 16,2009,HDR/DTA Final Report,and several documents prepared by Acres International and Harza Ebasco during the 1980's for the Alaska Power Authority (APA).We also have considered the observations made during the 1980's timeframe by James Thrall,PhD,who was involved in the Harza Ebasco studies for APA resulting in the 1985 Amendment to the License Application,and Nan Nalder,MPA,who served as Staff in the Federal Energy Regulatory Commission (FERC or Commission)Hydropower Licensing Division when the 1982 Draft and 1983 Final Original Applications for License prepared by Acres were filed and under FERC Staff review.Their experience and insights are reflected in statements regarding the activities during the 1980's and recommendations based on that experience and current knowledge of the FERC licensing process and experience with Alaska hydroelectric projects from the 1980's up to the present. The following paragraphs provide our thoughts regarding the original (1980's)project schedule information provided in the HDR/DTA Final Report and includes identified concerns which are summarized graphically in the proposed schedule for Susitna Project Licensing in the attached Figure 8.1-1.The following paragraphs recommend issues that need to be considered by the Alaska Energy Authority (AEA),known as the Alaska Power Authority (APA)during the time that the Original Application was filed with the FERC and the subsequent investigations and revised Application up through the date when the Susitna Hydroelectric Project (Susitna Project or Project)was cancelled in 1986. 8.1 A Brief Review of the Susitna Project Beginning in the 1950's,State-and Federally-sponsored studies were performed to assess the potential for hydropower development in the Susitna River Basin.In 1980,APA contracted with Acres American,Inc.(Acres),now known as Hatch Acres Corporation (HAC)to conduct studies and investigations in support of an Application for FERC License.The Acres feasibility study,completed in 1982,reaffirmed prior conclusions of the U.S.Army Corps of Engineers (USACE)that a two-dam project at the Watana and Devil Canyon sites represents the preferred plan for development of the hydro potential of the Susitna River.An independent review was conducted by Battelle Pacific Northwest Laboratories who concluded that the Susitna Project,over the long term,was the preferred means for providing power to the Railbelt.Based on this consistent analytical support for the Susitna Project,the APA filed its Final Application for License with the FERC in February 1983 (1983 Application). In May 1985,APA concluded that substantial benefits would be realized with modification of the construction plan proposed in the 1983 Application to change the construction staging from two to three stages.This approach was driven by interest to reduce the initial costs of construction by reducing overall labor and material requirements for the Watana development.The proposed three- year staging would permit development of generation capacity from the Project to more closely match the estimated Railbelt load growth and replacement of existing fossil-fuel generation capacity. This proposed modification required preparation and filing of an Amendment to the Application for License.APA engaged the services of the Harza/Ebasco team to prepare the Amendment to the 11/17/2009 76/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation License.In November 1985,APA provided a Draft Application for Amendment to License (Draft Amendment)for review and comment by stakeholders. The Draft Amendment included an economic re-evaluation that again presented the conclusion that the Susitna Project would be,over the long term,the least cost resource to meet future load growth in the Railbelt region of Alaska (Railbelt).APA's guiding policy to develop the hydropower potential of the Susitna River was "no net loss of beneficial habitat for fish and wildlife.”The 1985 Draft Amendment includes plans for mitigation of potential project-related adverse effects.Mitigation measures proposed in the Draft Amendment contemplate an investment of over $300,000,000 over the life of the Project.Measures include special design features to accommodate water quality concerns,habitat modification to facilitate fish migration and spawning,and a comprehensive monitoring program that would be implemented over the life of the project. In 1986,the APA abandoned its pursuit of a FERC license for numerous reasons including financial feasibility. In 2008,the Alaska State Legislature authorized AEA to perform an update of the project.That authorization included preparation of a Railbelt Integrated Resource Plan (RIRP)to evaluate the ability of the Susitna Project and other potential energy sources to meet long term demand in the Railbelt region of Alaska. The HDR/DTA Final Report addressed the proposed project development alternatives as presented in the 1985-86 FERC Amendment documents,Notes from 1985-86 regarding FERC likely acceptance are noted at the Staged alternative: e Watana Dam comprised of a large storage reservoir with an 888-foot high rock fill dam,and a powerhouse containing 6 units with total installed capacity of 1,200 MW. e Low Watana Dam would include a 700-foot high dam with powerhouse containing 4 units and total installed capacity of 600 MW. e Watana/Devil Canyon comprised of Watana Dam discussed above and a second 646-foot high concrete dam and reservoir located downstream at Devil Canyon.The downstream reservoir would re-regulate flow from Watana.A powerhouse would have an installed capacity of 680 MW.The proposed Application for License would present a sequenced approach for construction.Combined installed capacity would be 1,880 MW. e Staged Watana/Devil Canyon (low Watana Dam,Devil Canyon and high Watana).Watana Dam would be initially constructed at 700-feet with a powerhouse containing 4 units and space for two additional units.Following completion of Low Watana,the construction crew would demobilize and move downstream to Devil Canyon,and later move upstream to Watana to raise the dam.This proposed scheme would be difficult to present to FERC in a comprehensive Application for License unless APA were to state unequivocally that they would construct all three proposed facilities.If APA were to adopt this approach,APA would need to prepare a description of the approach and the planned facilities and consult with 11/17/2009 77/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation FERC Staff in the Office of Energy Projects (OEP),Division of Hydropower Licensing (DHL)and the Office of General Counsel (OGC). e Devil Canyon comprised of the Devil Canyon Dam and powerhouse containing 4 turbines with a total installed capacity of 680 MW. AEA requested R&M Consultants,Inc.(R&M),and its subconsultant Hatch Acres Corporation (HAC) including Jack Linnard Consulting,to conduct a review of the Susitna Project based on data presented in the HDR/DTA Final Report and prepare analyses of:a full Watana RCC Dam development,and a High Devil Canyon RCC dam development.This section of the report addresses the regulatory and environmental issues and provides recommendations should AEA determine that the Susitna Project is feasible and authorize preparation of an Application for License for the preferred alternative project configuration. 8.2 Proposed Project FERC Licensing Schedule It is noted that the project schedule in the HDR/DTA report is based on the 1985-86 application schedule and related recommendations on the Integrated Licensing Process (ILP).For reasons discussed below at Section 8.4,we provide options for consideration by AEA regarding the selected FERC pre-filing licensing process. First,and perhaps most critical in terms of moving the project along,there is no time allotted in the presented schedule to advertise for and select a contractor or contractors to carry out the licensing precursor work.Given the magnitude of the proposed effort it will be necessary to competitively bid this work.A diverse team including an engineering design team,an environmental firm,a geotechnical/earth-science firm and a licensing consultant will be required.This process will take significant time and until the team is on board the other activities shown on the schedule will not proceed.Thus the procurement process to acquire the services of the team should be initiated as soon as possible. Second,there are concerns with the assumption that:"Roads and staging will be state permitted outside the FERC project and will begin several years before FERC license,including pioneer and permanent roads,airports,bridges,construction camps,staging areas,and towns.Building roads in this way is the quickest way to meet the projected timeline although there is some uncertainty whether permits could be obtained to construct these facilities before the project license is issued.” The proposal to begin construction of major infrastructure for the project prior to receipt of a license is very unlikely to be acceptable to FERC.In the past,FERC has closed down construction of roads to access project sites where construction was begun prior to license issuance.FERC regulations require approval of the construction package prior to commencement of construction of any and all project facilities.Even if FERC were to waive the regulations requiring approval of construction of project- related infrastructure,such a venture would be a major risk for the state if the sole purpose of roads and any other infrastructure were to facilitate development of the hydro project.The assumption that "Construction will begin immediately upon issuance of the license”and several related assumptions provide similar challenges for the reason that the construction package,including all related permits,must be filed for Federal Energy Regulatory Commission approval prior to commencement of construction. 11/17/2009 78/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Third,we recommend that an outreach effort to stakeholders be initiated and maintained;it should commence immediately.Furthermore,in keeping with the FERC pre-filing requirements, consultation with all stakeholders should be documented.Summary reports of such consultations should be prepared and copies provided to consulted federal and state agencies with a request for their concurrence on the summary reports. Finally,the time allotted for FERC issuance of a license extends for a longer period than is justified given review of recent FERC proceedings.FERC Staff cannot provide a schedule for license processing through decision regarding issuance of an Order Issuing License.We anticipate that issuance of the license will include a requirement for an Environmental impact Statement (EIS).We also anticipate that the "Applicant”for License will prepare the environmental document required by the FERC regulations for a NEPA format as opposed to the Environmental Exhibit E,following guidance in the FERC document:"Preparing Environmental Documents -Guidelines for Applicants, Contractors,and Staff issued September 2008.The environmental document "Preliminary Draft Environmental Assessment”or a Draft Environmental Impact Statement prepared by a third-party contractor agreed to by the Applicant and FERC staff will need to be prepared.That NEPA document provides information that FERC Staff can adopt and augment with their own independent analysis to prepare the FERC EIS.Once FERC Staff complete their NEPA document and prepare an Order Issuing License for consideration by the FERC Commissioners,unless there are significant issues that are not resolved in the FERC Staff NEPA document,the Order is set for issuance at the next available Commission meeting. We note that once the Commission issues an Order Issuing Original License for a Major Unconstructed Project (License Order),there is opportunity for Applications for Rehearing that FERC may or may not entertain.Unless there is a Request for Stay of License accepted by the Commission, Applications for Rehearing do not affect the effective date of the License.Following considerations for Rehearing and Commission action either to reject or amend the license as issued,the License is determined Final.If a party who filed request for rehearing still has major problems with the license as issued,the party could request review in the U.S.Court.If a Court grants a petition to review the FERC license,the time when the license is final could be significantly delayed.We do not include the potential for a Stay of License or a U.S.Court proceeding in the proposed schedule as there is no possible way to estimate the delay associated with such actions by third parties. A revised Project Licensing Schedule is presented as Figure 8.1-1. 8.3 Stakeholder &Resource Agency Coordination and Settlement Process At the time that the Susitna licensing work was discontinued in 1986,APA was engaged in a settlement process.At that time settlement between an applicant and stakeholders,undertaken without FERC participation,was considered risky and there was some resistance from the attorneys to this program.Nevertheless APA decided to attempt to settle as many of the environmental issues as possible and take the agreements reached to FERC for approval and incorporation into the license terms.It was felt that some of the issues (in particular,in-stream allocations)might not be settled and APA might only achieve partial settlement. 11/17/2009 79/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Nevertheless APA elected to pursue the settlement.This process was to have consisted of the following steps: e Issue Identification -In consultation with the agencies and other stake holders,APA expended considerable effort to identify all the issues having merit for consideration.After several weeks of effort APA developed a list of 52 issues,with a general agreement from the principal participants (the resource agencies'technical representatives). e Preparation of "White Papers”and "Issue Documents”-APA's environmental consultants were tasked to prepare white papers or issue documents for each identified issue (and in some cases for sub-issues).These Issue Documents would provide the basis for settlement negotiations with the stake holders and would be revised as necessary to reflect the results of the negotiations.As issues were resolved and agreement reached the Issue Document would become the Settlement Document. From the outset,there was a clear understanding that these Settlement Documents were the product of the project's technical participants from APA,APA's consultants and the resource agencies and could be subject to rejection in whole or in part by higher level management from any of the participant organizations.It was also understood that settlement was focused on reaching agreement with the resource agencies.Although environmental NGO's and other stakeholder representatives (particularly Native organizations including some with land rights important to the project)were invited to participate,many of these entities either had not all committed to the process or lacked the time or expertise to participate. At the time of project shut down draft documents were completed or under preparation for about half of the 52 issues.A number of these had been presented to the stakeholders and there was a general consensus that some issues would be relatively easy to settle.For example,the recommended treatment of archaeological and historic sites had been well defined by the regulatory agencies and other stakeholders and their requirements presented no problem for APA.Other issues,particularly those related to fisheries and in-stream flow impacts and wildlife mitigation strategies were seen as requiring substantial additional effort to resolve. Finally,at the time of project shut down there was a general understanding between APA and the stakeholders that additional studies were to take place over the coming years.The accepted approach of the project was to continue some level of basic data collection and refinement of impact analysis/mitigation planning and implementation throughout the licensing,design and construction phases of the project.In essence the project was to follow an adaptive management approach for some of the issues. Both issue identification and formulation of a process to resolve the issues will have to be revisited during the licensing process.The record of the settlement process initiated but not completed during the previous licensing effort can provide a basis for beginning this process but will not be sufficient to achieve settlement.While the license process itself requires AEA to work with all stakeholder groups to identify issues and develop study plans to address the identified issues,all aspects of the project will require some level of re-analysis in light of differences in the proposed project development and changes in the natural environment and regulatory climate.Thus, 11/17/2009 80/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation considerable work remains to be done before meaningful discussions on issue settlement will be possible. Early engagement with the resource agencies and other stakeholders will be essential to this process. Initiating pre-application coordination immediately will benefit both the scoping/issue identification and study plan definition phase of the licensing process and the timely completion of a meaningful issue resolution process. 8.4 Issue Evaluation,Study Planning and Impact Analysis One strategy that has been proposed is to rely heavily on the substantial amount of work done for the previous application to prepare an Application for FERC License.While this past work undoubtedly will be of great value it will not be sufficient in-and-of itself to support preparation of an Application for License to meet today's regulatory requirements.This is true for two main reasons: (1)due to the amount of time that has passed since this work was completed in the 1980's and now in 2009 looking forward,the agencies and the FERC will require a comprehensive review of data collected,development of study plans in consultation with the agencies,and FERC approval if the Integrated Licensing Process (ILP)is adopted as the preferred path forward,and conduct of field and office studies;and (2)the project that will be proposed for development today will vary significantly from the 1980s scheme and two to three years of field work and re-analysis will be necessary to prepare an application. Issues and impacts presented in the 1980 application will have to be re-evaluated in light of these changes.Discussed below are some of the more critical issues and the steps necessary to bring them up to date. 8.4.1 Fisheries Impacts Fisheries impacts of concern include: e Effects of impoundment alteration of water quality (temperature,suspended sediment)and the resultant effects on downstream main-stem Susitna habitat including over winter use of the main-stem river. e Effects of impoundment on grayling populations above Watana. e Effects of seasonal and daily alteration in flows due to operation of the project for power production on movement of fish through the system and on spawning and rearing in the main-stem river,side channels and tributary streams (including changes in groundwater regimes and resultant effects on upwelling in side-stream spawning habitats). 11/17/2009 81/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 8.4.2 Effects of seasonal alteration in flows on downstream channel morphology and resultant effects on access to major clear water stream and side channel slough spawning and rearing habitat. Wildlife Impacts Wildlife impacts of concern include: 8.4.3 Loss of moose and other wildlife habitat by inundation. General loss or degradation of habitat due to construction of and presence of project facilities (roads,villages,camps etc.). Blockage or interference of wildlife movements by roads. Inundation of critical habitat areas (mineral lick). Potential blockage of migratory movements through creation of the reservoir and potential for mass drowning of caribou. Socioeconomic Impacts Socioeconomic impacts of concern include: 8.4.4 Effects of construction work force on local communities (need for increased infrastructure including law enforcement,housing,support services,etc.)and on area fish and game resources. "Post construction effects from the project's "boom and bust”economy. Other Impact Areas While the above noted areas are only a partial list of the impact areas of concern they do include many of the more significant areas that will require re-evaluation during licensing of the project. Other areas include: Geology &Soils -geologic mapping and in-depth analysis of rock and soils in vicinity of proposed project features Water Use &Quality:Installation of stream gages and collection of hydrologic data;water quality sampling &temperature monitoring to develop a current baseline.FERC generally requires 2-years of current data to support an application for license. Hydrology -We note that the 1983 FERC Application included the hydrologic record from 1950 to 1981.The HDR/DTA Study notes at 2.1 Hydrologic Analysis that "The project team recreated the 1950-81 record form synthesized gage record hydrology transposed from raw daily flow data from US Geological Survey (USGS)gauge 1529000 at Gold Creek using a 11/17/2009 82/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation straight drainage area proration,and found correlation between the new record and annual average flow from the original study.Based on this hydrology,a full record was developed for the period 1950 to 2007.The hydrology of the upper Susitna Basin is dominated by melt water from snow and glaciers in the spring and summer,and substantial freezing during the winter months.As a result,a majority of the flow occurs between mid-April and mid- October.”Note that FERC generally requires 2-years of current on-site data from installed stream gages. e Vegetation mapping and wildlife habitat mapping e Update to cultural resource studies -project is reported to impact 140 sites e Recreation use analysis and scenic value of the area.This is an area where it is important to identify upfront any groups that could be mobilized to oppose the project due to potential impacts on white water recreation,angling,and hunting. e Land Use and Land Ownership within the proposed Project Boundary and adjacent property e Review of Comprehensive Plans filed with FERC and assessment of consistency of proposed Project with these plans e Analysis of carbon emissions and value of the proposed annual generation in avoiding greenhouse gas (GHG)and potential retirement of older fossil generation in the Railbelt Region.The HDR/DTA Final Report includes an observation regarding lack of consensus on the manner in which precipitation and runoff might be affected by impacts of either natural variability and/or potential man-made global climate changes.For their report,they assumed that future hydrologic conditions will be similar to those of recent past experience.This assumption would need to be investigated in preparing an application for license.FERC staff is now requesting information in support of assumptions regarding Greenhouse Gases (GHG) and potential climate change in applications. This Project re-evaluation will be a two step process.First,given both the amount of time that has passed since the 1980s and the fact that the alternative selected for development today likely will be substantially different it will not be possible to simply reuse the past work to prepare a license. Accordingly,a critical first task for preparing the new license application will be to identify the differences in the effects of the project identified in the 1980's to those of the alternative selected today.For example,an alternative such as low Watana would not have the storage of the 1980's project and will not be operated in the same manner.Thus,the minimum flow regimes proposed in the original studies will not apply and will require a new in-stream flow analysis including re- evaluation of the project's effect on downstream access to side channel and tributary stream habitats.Additionally,water quality effects of a smaller reservoir will be different and reanalysis of both seasonal temperature and suspended sediment loads would be necessary. Similar re-evaluations will be required for both wildlife and socioeconomics.A different (smaller) inundation zone will have different (likely reduced)impacts on wildlife.Different sized work forces 11/17/2009 83/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation and revised construction schedules,combined with changes that have taken place over the past 25 years in local communities and state-wide population and infrastructure will require a complete re- evaluation of the social and economic impacts of the project. Finally,regardless of the alternative selected for development it will be necessary to update land status and land ownership as this has almost certainly changed substantially over the past 25 plus years. 8.5 FERC Licensing Procedure &Changes Since 1985 There have been significant changes in the FERC pre-filing licensing process since the Application for License was prepared in the 1980's.Two of these changes and implications for preparing an Application for License today are noted below. 8.5.1 1986 Electric Consumers Protection Act (ECPA) FERC's authority to serve as a virtual "one-stop shop”as was the case in 1983 when the Original Application for License for the Susitna Project was filed and 1985 when the Amendment Application was underway,was significantly limited by Congress in adding Section 10(j)to the Federal Power Act: "in order to adequately and equitably protect,mitigate damages to,and enhance,fish and wildlife (including related spawning grounds and habitat)affected by the development,operation,and management of the project,each license issued under this Part shall include conditions for such protection,mitigation and enhancement.Subject to paragraph (2),such conditions shall be based on recommendations received pursuant to the Fish and Wildlife Coordination Act (16 USC 661 et seq)from the National Marine Fisheries Service,the United States Fish and Wildlife Service,and State fish and wildlife agencies.”(10(j)recommendation)Paragraph 2 provides the Commission with authority under certain circumstances where a recommendation is found inconsistent with the Federal Power Act or other law,to attempt to resolve any consistency and,if after this attempt,the Commission does not adopt in part or whole a "10(j)recommendation”,FERC may publish findings that the condition is not accepted. ECPA also provided clarification regarding 4(e)recommendations that limited FERC's policy to reject or modify certain recommendations included in federal land management agency proposed 4(e) recommendations.FERC can attempt to consult with a 4(e)land management agency (e.g.US Forest Service (USFS)and US Bureau of Land Management (BLM))to request modification of a draft 4(e) condition,but cannot change these conditions. These changes will shape the pre-filing consultation process for an Application for License that is prepared in today's regulatory regime.For the Susitna Project,this will require that a comprehensive pre-filing consultation with the Federal and State resource agencies be conducted with the understanding of the potential implications of 10(j)conditions submitted by the US Fish and Wildlife Service (FWS)and the Alaska Department of Fish and Game (ADF&G)and/or 4(e)conditions submitted by Federal land management agencies. 11/17/2009 84/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 8.5.2 Final Rule and Tribal Policy Statement,July 23,2003,Integrated Licensing Process;Traditional Licensing Process;and Alternative Licensing Process The Commission revised its hydropower licensing regulations to create a new licensing process,the Integrated Licensing Process (ILP)in which a potential license applicant's pre-filing consultation and the Commission's scoping pursuant to the National Environmental Policy Act (NEPA)are conducted concurrently,rather than sequentially.The revised rules also provide for increased public participation in pre-filing consultation;and development by the potential applicant of a Commission- approved study plan.The ILP imposes a rigid schedule on Applicants and participants during the pre- filing period. The Traditional Licensing Process (TLP)and the Alternative Licensing Procedure (ALP)were retained as options.However,in the Final Rule,FERC adopted a policy whereby the ILP is the default process and applicants who wish to use either the TLP or ALP are required to file a request to use an alternative to the ILP that is supported with a "showing of good cause”,including specific reasons why the ILP is inappropriate for a particular proceeding,and statements of support from federal and state agencies for use of either the TLP or ALP.Criteria for such a request include five factors:(1) likelihood of timely license issuance;(2)complexity of the resource issues;(3)level of anticipated controversy;(4)the amount of available information and potential for significant disputes over studies,and (5)the relative cost of the traditional process [or ALP]compared to the integrated process.” Changes in the Final Rule will require APA to consider which of the three licensing processes is best suited to preparation of the Application for License for the Susitna Project. 8.6 Selection of the FERC Licensing Process The HDR/DTA Final!Report is premised on use of the "modern Integrated Licensing Process (ILP”), however no reasons for use of the ILP are presented. While the ILP may be attractive in that strict deadlines are imposed and are not extended absent an overwhelming showing that the extension is necessary and in the public interest,other aspects of the ILP may not be appropriate for the Susitna Project licensing.An ALP appears to offer significant flexibility to APA not available in the ILP. A discussion of the ILP vs ALP using three of the FERC factors listed above follows: e Likelihood of timely license issuance:Once the ILP is in play,extensions of time are problematic and the 3-year period allowed under the ILP does not provide for unanticipated delays that could occur with a complex project as in the case of the Susitna Project.The ALP includes many of the benefits of the ILP,but allows development of a schedule that can be modified without preparation and filing of an application to the FERC to modify the schedule as is the case with the ILP. ¢Complexity of resource issues:While there are many reports that have been prepared since the 1950's and the 1983 Application for License and 1985 Draft Application for Amendment to the 1983 License Application that identify resource issues and provide detailed 11/17/2009 85/95 FINAL R&M Consultants -Hatch Acres AEA --Susitna RCC Dam Cost Evaluation environmental information,we cannot anticipate that additional issues will not be raised and new studies required to support an Application for License today.The resource issues associated with Susitna Project are "complex”and may require significant level of effort to address.The ILP does not allow flexibility;the proposed studies and related plans are filed with FERC and approved.Modifications to study plans require a request for amendment to modify approved study plans.The ALP allows flexibility in adjusting studies to fit seasonal limitations and site access difficulties that may prevent adherence to a rigid study schedule. e Level of anticipated controversy:We do not know at this time whether there will be objections to developing the Susitna Project that could rise once AEA issues a Notice of Intent to File an Application for License and the related documents that are now required by the FERC regulations for all three of the alternative licensing processes.If National environmental organizations determine that the Susitna Project proceeding provides an opportunity to raise issues and objections,such controversy could impact the rigid schedule imposed by the ILP.The ALP would appear to provide the flexibility that could be required should this situation occur. 8.7 Permitting and Other Approvals Requirements to prepare and file applications for Alaska State permitting have noticeably changed since 1985.Notes regarding these permits and other approvals follow: Approvals and permits required to conduct studies required to prepare Application for License: e Requests for land easements from land owners -we have found that the requirements to prepare and file a request for land easement have significantly increased over the past 2 years.Contact with land owners to conduct any ground-disturbing activities (e.g drilling and seismic refraction investigations)and installation of stream gages require application for approval from land owners. e Installation of stream gages requires a Title 16 Habitat Permit from the Habitat Division of the Alaska Department of Fish &Game to conduct studies "in the wet”;this encompasses the Susitna River and tributaries. e Coastal Project Questionnaire from ADNR Division of Coastal and Ocean Management is required -will require provision of completed Title 16 Habitat Permit and any permits from land owners to conduct ground-disturbing activities in the course of conducting pre-filing studies. Approvals,permits,and plans required to support the Application for License The State permitting process is dynamic and we have identified approvals and permits that will be required as of the date of this report.Applications for approvals and permits include,but are not limited to the following: e Application for Water Right -Alaska Department of Natural Resources -Water Resources Section.Documentation that APA has consulted with ADNR-Water Resources regarding their 11/17/2009 86/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation interest in obtaining a water right.FERC requires documentation that the request has been filed in the Application for License. e Application for Nationwide Permit -US Army Corps of Engineers (USACE)and related Clean Water Act 404(b)permit.Requires wetland delineation -would need to be updated from 1985 record. e Documentation of consultation with Federal and State land management agencies regarding need to acquire easement or other approvals to occupy land with in the Project boundary. e Documentation of consultation with Alaskan Natives regarding occupation of lands of concern -see Tribal Policy in July 23,2003,Tribal Policy issued by the FERC. e AEA will be required to prepare a Coastal Project Questionnaire (CPQ)for the Watana and/or High Devil Canyon development as it is located within the coastal zone and would affect the Alaska Coastal Management Plan (ACMP)(personal conversation Nan Nalder with Jim Renkert,Alaska Department of Natural Resources,Division of Coastal and Ocean Management 09-04-09).Requirement for the CPQ could considerably affect the schedule for issuance of a FERC license as FERC is required to receive a Determination of Consistency with the ACMP.The CPQ requires that all approvals and permit applications are complete,even if a draft is appropriate,before DCOM can begin the formal review of the Watana and/or High Devil Canyon development and at the close of the review period advise FERC regarding Consistency with the ACMP.This will also require consultation with the local entity responsible for compliance with the ACMP. 8.8 Plans to Support Application for License If AEA elects to adopt an accelerated Project development schedule,there are several plans that will be required to move forward in an expedited manner.While the FERC regulations are not clear regarding these plans,AEA would be well served to consult with FERC staff at the beginning of the licensing process to include preparation of the following plans that may be required during the pre- filing consultation process to avoid delay following license issuance where FERC requires plans pursuant to License Articles and establishes schedules for preparation,review and comment,and approval by federal and state agencies prior to submission to FERC for review and approval.We have found that the FERC License Articles requiring plans post-issuance when a licensee wants to commence construction can significantly delay getting into the field at the earliest opportunity. Plans,including Protection,Mitigation,and Enhancement (PME)measures required to address potential project-related effects,protect resources of concern and address potential project effects during construction and operation include: e Preparation of Plans required to support the Application and also the Construction Document Package that would be provided to FERC for review and approval to commence construction: o Erosion Control and Sediment Management Plan based on actual site,geological,soil, surface water and groundwater conditions,including measures to be implemented. 11/17/2009 87/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation o Spill Prevention and Containment Plan that addresses how handling of materials on site will be managed,including hazardous substances such as fuels,lubricants, chemicals,and cement,etc. Spoil disposal Plan -measures that address storage and disposal of excess construction and slide material,etc. e Proposed overall Compliance Management Plan -early preparation of this Plan would greatly enhance the ability of AEA to "hit the ground running”once a license is issued.FERC licenses typically require preparation of this plan under Article 401.Once the FERC FEIS is issued,AEA would have a very good idea of what the License Articles will contain. e Based on recent experience with FERC licensings and a review of the 1983 and 1985 licensing documents,Environment Plans that may be required to be developed in consultation with federal and state agencies,land owners,and other interested persons/organizations could include: Instream Flow Management Plan -including PME measures to provide ecological releases from proposed dams and overall plan to address health of the fishery and related invertebrates in the Susitna River. Long-term Stream Gaging Plan and Reporting Protocol.May include ramping rates and stream flushing flow requirements. Proposed Project Flow Metering and Recording Plan -proposed installation of flow metering devices to monitor flow from impoundments through penstocks/water conveyances. Fish and Fish Habitat -20 species are known to inhabit the Susitna basin.The most important are 5 species of Pacific Salmon,rainbow trout,Dolly Varden,char,arctic grayling and burbot.The majority of fish production occurs outside the area of anticipated project effects.Devil's Canyon would bar upstream passage.Mitigation measures,including flow constraints we proposed in 1985 to address the most critical habitat and use in the middle river for chum and sockeye spawning in side sloughs and Chinook salmon rearing in side channels.A plan to address project-related concerns on these species would need to be developed in consultation with federal and state agencies. Wetlands Delineation -much of the area to be affected by the Project is classified as wetlands,as is the case for much of Alaska.Areas of palustrine or lacustrine wetlands that would be permanently lost due to project construction are extensive. Consultation with land management agencies,ADF&G,FWS,USACE,and other entities would be required to identify wetlands associated with the proposed project going forward.Discussions of wetland loss associated with the Watana and Devil Canyon developments are documented in the Acres and Harza/Ebasco license 11/17/2009 88/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation applications.APA proposed mitigation for lost wetlands in the 1985 Amendment Application. Terrestrial Connectivity Plan to address wildlife use of the area and identify major corridors that may require consideration in siting Project facilities and development of potential PME measures. Plans associated with mammals of concern -e.g potential interference with caribou movements at the Watana reservoir site;potential loss of terrestrial habitat, particularly winter browse for moose and denning and foraging habitat for bear due to inundation behind proposed dams.Winter habitat loss for moose associated with the 1985 Amendment application cited a loss of 38,152 acres of winter habitat loss. APA proposed mitigation for this loss. Nesting Survey Plan to identify nests of species of concern,avoid nests with proposed project facilities,and develop any long-term monitoring plan.Potential loss of bald and golden eagle nesting sites through construction activities and/or inundation. Vegetation Management -plan to minimize clearing of any areas of concern and measures to revegetate disturbed areas. Cultural Resources -potential loss of cultural resources (historic and prehistoric sites and artifacts)due to construction activities and/or inundation.Requirement to prepare plans to protect any resources eligible for listing under the National Historic Protection Act.If required,detailed plans and measures to avoid impacts must be prepared in consultation with the State Historic Preservation Officer and other entities and filed generally 60 -90 days in advance of commencement of construction.Note that the FERC is not consistent with the timing of this requirement. Recreational Plan that addresses loss of the white water resource of Devil Canyon through inundation.Note that there may be other recreational concerns since the 1985 investigations of recreational use of the Susitna River. Socioeconomic Resources -The major project-related impacts identified in 1985 were project-induced population influx into the communities in the Project area and the ability of these communities to provide services to temporary construction personnel for the duration of project construction.The communities of Talkeetna and Cantwell were forecast to experience a 10%or greater population increase over the baseline due to influx of construction workers.Other potentially affected communities include Trapper Creek (8%)and Nenana (6%). 11/17/2009 89/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 8.9 Preliminary Application Process and Development Application to FERC for Susitna Project If AEA elects to adopt an accelerated project development schedule for the Susitna Project,it is imperative that,as soon as possible,a preliminary Notice of Intent (NOI)to file for a license and Pre-Application Document (PAD)be distributed to stakeholders and that the request to use the alternative licensing process (ALP)be filed with FERC.Also,it is imperative that the steps listed below in the Applicant's Pre-Filing Process be implemented at the earliest possible date to allow the precursor studies discussed above to be initiated as soon as possible to ensure the project license application can move forward. The steps under the Alternative Licensing Process are as follows (ref:18cfr 4.34(i)): Applicant's Pre-Filing Process e Form working group with state and Federal agencies,citizens groups and Indian Tribes (Alaska Native stakeholders) e Prepare communications protocol e Issue notice of intent (NOI)and preliminary application document (PAD)to stakeholders,request to FERC to use alternative licensing process (ALP),and issue newspaper notice e FERC approves use of alternative process e Issue information package e Conduct cooperative scoping to identify issues e Conduct studies (precursor studies) e Prepare development application and preliminary draft environmental review document e File at FERC final application and preliminary draft environmental review document FERC Application Process e Notice of application issued e Additional Information Requests (AIR)from FERC and response to AIRs (if necessary) e Notice of Ready for Environmental Analysis issued e Federal and state agencies provide recommendations,terms and conditions e Issue Environmental Assessment (EA)or draft Environmental Impact Statement (EIS) e Resolve issues and respond to comments e Issue final EA or EIS e Commission issues order e License compliance and administration/dam safety and inspections 11/17/2009 90/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 9.List of References Acres,1982.Susitna Hydroelectric Project,Feasibility Report.Volumes 1-7.Prepared for the Alaska Power Authority Alaska Division of Mines.November 1960.Mines Bulletin.State of Alaska Department of Natural Resources,Division of Mines and Minerals,Vol.VIII,No.11. Alaska Power Authority (APA),Susitna Hydroelectric Project,Introduction to the Amendment to the License Application before the Federal Energy Regulatory Commission,November 1985 Alaska Dept Labor pamphlet,Issue 17,as of 9/1/2008 Atkinson,G.M.,and Boore,D.M.2003.Empirical ground-motion relations for subduction-zone earthquakes and their application to Cascadia and other regions.Bull.of the Seismological Society of America,93(4):1703-1729. Bureau of Mines.May 5,1966.Test results on Katmai National Monument pumice sample. Memorandum King to Herdlick.U.S.Department of the Interior,Bureau of Mines,Spokane Office of Mineral Resources. Campbell,K.W.,and Bozorgnia,Y.2008.NGA Ground motion model for the geometric mean horizontal component of PGA,PGV,PGD,and 5%-damped PSA at spectral periods between 0.01 s and 10.0 s.Earthquake Spectra,24(1):139-172. Chanson,H.2001."Hydraulic Design of Stepped Spillways and Downstream Energy Dissipators."Dam Engineering,Vol.11,No.4,pp.205-242. Chiou,S.-J.,and Youngs,R.R.2008.An NGA model for the average horizontal component of peak ground motion and response spectra.Earthquake Spectra,24(1):173-215. Chopra,A.K.,1988,Advanced Dam Engineering,Earthquake Response Analysis of Concrete Dams, Chapter 15. Crone,AJ.,Personius,S.F.,Craw,P.A.,Haeusster,P.J.,and Staft,L.A.2004.The Susitna Glacier thrust fault:Characteristics of surface ruptures on the fault that initiated the 2002 Denali fault earthquake. Bull.of the Seismological Society of America,94(6B):S5-S22. Csejtey,Jr.,Bela.1974.Reconnaissance geologic investigations in the Talkeetna Mountains,Alaska.U. S.Geological Survey Open-file Report 74-147. Csejtey,Jr,Bela.1978.Reconnaissance geologic map and geochronology,Talkeetna Mountains quadrangle,northern part of Anchorage quadrangle,and southeast corner of Healy quadrangle, Alaska.U.S.Geological Survey Open-file Report 78-558-A. 11/17/2009 91/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Detterman,R.L.and Reed,B.L.1980.Stratigraphy,structure,and geology of the Iliamna quadrangle, Alaska.U.S.Geological Survey Bulletin 1368-B. Federal Emergency Management Administration (FEMA).2000.Prestandard and Commentary for the Seismic Rehabilitation of Buildings.FEMA 356.Prepared by American Society of Civil Engineers. FERC,200_,Engineering Guidelines For The Evaluation Of Hydropower Projects Geophysical Monograph 179,American Geophysical Union,Washington,D.C.GEOTECHNICAL MEMORANDUM Seismic Setting,Watani Dam Site 15 June 2009 Susitna Hydroelectric Project Page 6 GEOTECHNICAL MEMORANDUM Seismic Setting,Watani Dam Site 15 June 2009 Susitna Hydroelectric Project Page 5 Gilbert,W.G.,Ferrell,V.M.and Turner,D.L.1976.The Teklanika Formation --a new Paleocene volcanic formation in the central Alaska Range.Alaska Division of Geologic and Geophysical Surveys Geologic Report 47. Gregor,N.J.,Silva,WJ.,Wong,LG.,and Youngs,R.R.2002.Ground-motion attenuation relationships for Cascadia subduction zone megathrust earthquakes based on a stochastic finite-fault model.Bull. of the Seismological Society of America,9(5):1923-1932. Harza-Ebasco Susitna Joint Venture,September 1983,"Winter 1983 Geotechnical Exploration Program,Volume 1,Main Report” Harza-Ebasco Susitna Joint Venture,November 1985,"Susitna Hydroelectric Project,Draft License Application,Volume 1,Exhibit A,Project Description. Harza-Ebasco Susitna Joint Venture,November 1985,"Susitna Hydroelectric Project,Draft License Application,Volume 12,Chapter 6 -Geological and Soil Resources” HDR/DTA dated March 16,2009,Project Evaluation -Interim Memorandum -FINAL HEC-SSP software Idriss,ILM.2008.An NGA empirical model for estimating the horizontal spectral values generated by shallow crustal earthquakes.Earthquake Spectra,24(1):217-242. Idriss,LM.,and Archuleta,RJ.2007.Evaluation of earthquake ground motions (Draft 06.5).[Chapter 13,Engineering Guidelines for the Evaluation of Hydropower Project].Division of Dam Safety and Inspections,Office of Energy Projects,Federal Energy Regulatory Commission Kaiser (Henry J.Kaiser Company),Reassessment Report on Upper Susitna River Hydroelectric Development for The State of Alaska,September 1974 Malhotra,P.K.2006.Smooth spectra of horizontal and vertical ground motions.Bull.of the Seismological Society of America,96(2):506-518. 11/17/2009 92/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Mihelich,M.and Jasper,M.W.January 1961.Report on preliminary investigation of the Kings River area limestone deposits,Anchorage quadrangle.State of Alaska Division of Mines and Minerals Report PE-085-22. Newmark,N.M.,and Hall,WJ.1982.Earthquake Spectra and Design.Monograph Series,Earthquake Engineering Research Institute. Reed,B.L.and Nelson,S.W.1980.Geologic map of the Talkeetna quadrangle,Alaska.U.S. Geological Survey Miscellaneous Investigations Series Map I-1174. Richter,Donald H.July 1963.Geology of the Portage Creek -Susitna River area.Alaska Division of Mines and Minerals Geologic Report 3. Ruppert,N.A.,Ridgway,K.D.,Freymueller,J.T.,Cross,R.S.,and Hansen,R.A.2008.Active tectonics of interior Alaska:Seismicity,GPS geodesy,and local geomorphology.In:Active Rutledge,F.A.,Thorne,R.L,Kerns,W.H.and Mulligan,J.J.1953.Preliminary Report:Nonmetallic deposits accessible to the Alaska Railroad as possible sources of raw materials for the construction industry.United States Department of the Interior,Bureau of Mines Report of Investigations 4932. Tectonics and Seismic Potential of Alaska (Freymueller,et al.eds).Geophysical Monograph 179, American Geophysical!Union,Washington,D.C. USACE Engineer Manual 1110-2-2201,Arch Dam Design,U.S.Army Corps Of Engineers,May 1994 USGS Stream Gauge Data USGS Bulletin 17B methodology and HEC-SSP software URS (URS Corporation).2008.Site-Specific Probabilistic and Deterministic Seismic Hazard Analyses and Development of Earthquake Ground Motions for the Port of Anchorage Expansion Project, Alaska.Prepared for Terracon Consultants,Inc. Warfield,R.S.1962.Some nonmetallic mineral resources for Alaska's construction industry.United States Department of the Interior,Bureau of Mines Report of Investigations 6002. WCC (Woodward-Clyde Consultants).1982.Final Report on Seismic Studies for Susitna Hydroelectric Project.Prepared for Acres American Inc. Wesson,R.L.,Boyd,O.S.,Mueller,C.S.,Bufe,C.G.,Frankel,A.D.,and Peterson,M.D.2007.Revision of time-independent probabilistic seismic hazard maps of Alaska.U.S.Geological Survey Open-File Report 2007-1043. Wesson,R.L.,Frankel,A.D.,Mueller,C.S.,and Harmsen,S.C.1999.Probabilistic seismic hazard maps of Alaska.U.S.Geological Survey Open-File Report 99-36. Youngs,R.R.,Chiou,S.-J.,Silva,WJ.,and Humphrey,J.R.1997.Strong ground motion attenuation relationships for subduction zone earthquakes.Seismological Research Letters,68(1):58-73. 11/17/2009 93/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Zhao,J.X.et al.,2006.Attenuation relations of strong ground motion in Japan using site classification based on predominant period.Bull.of the Seismological Society of America,96(3):898-913. 11/17/2009 94/95 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation 10.CLOSURE This report,including the estimate contained herein,has been prepared by R&M Consultants and Hatch Acres Corporation (R&M and HA)for the sole and exclusive use of the "Client”for the purpose of assisting the management of the Client in making decisions with respect to the potential development of the Susitna Hydro Project;and shall not be (a)used for any other purpose,or (b) provided to,relied upon or used by any third party. This report contains opinions,conclusions and recommendations made by R&M and HA,using its professional judgment and reasonable care.The estimate has been prepared by R&M and HA, using their professional judgment and exercising due care consistent with the agreed level of accuracy.Any use of or reliance upon this report and estimate by Client is subject to the following conditions: (a)the report and estimate being read in the context of and subject to the terms of the Agreement "AIDEA/AEA Term Agreement for Engineering Services 2007 Hydroelectric, Heavy Civil &Specialty Services -FERC dated April 8,2008 between R&M Consultants Inc. and Alaska Industrial Development and Export Authority/Alaska Energy Authority”(the "Agreement”),including any methodologies,procedures,techniques,assumptions and other relevant terms or conditions that were specified or agreed therein; (b)the report,including the estimates contained herein,being read as a whole,with sections or parts hereof read or relied upon in context; (c)the conditions of the site may change over time (or may have already changed)due to natural forces or human intervention,and R&M and HA take no responsibility for the impact that such changes may have on the accuracy or validity or the observations,conclusions and recommendations set out in this report; (d)the estimates are based on several factors over which R&M and HA has no control,including without limitation site conditions,cost and availability of inputs,etc.,and R&M and HA take no responsibility for the impact that changes to these factors may have on the accuracy or validity or this estimate;and the report and estimate are based on information made available to R&M and HA by the Client or by certain third parties,and unless stated otherwise in the Agreement,R&M and HA have not verified the accuracy,completeness or validity of such information,makes no representation regarding its accuracy and hereby disclaims any liability in connection therewith. 11/17/2003 95/95 FINAL Figures NOTICE TO READER-Many of the Figures have been taken from previous Susitna Project reports and the conventions for cardinal direction are inconsistent from report to report in many cases,i.e.North is the top of the page on some figures and the bottom of the page on others.The Figures were not re-drawn for this report.New figures use the convention of North at the top of the sheet.Many old figures use the convention of stream flow from left to right; the Susitna River in the area of the Susitna project flows from east to west. List of Figures Figure 2.1-1 Location Map Figure 2.1-2 Proposed Damsites Figure 2.1-3 Profile through Susitna Alternative Sites Figure 2.1-4 Watana Embankment Dam General Arrangement Figure 2.1-5 Watana Reservoir General Map Figure 2.1-6 High Devil Canyon General Arrangement Figure 2.1-7 High Devil Canyon Reservoir General Map Figure 3.1-1 Air Tempreature Figure 3.1-2 Monthly Flow Statistics Figure 3.1-3 Watana -Flood Frequency Analysis Figure 3.1-4 High Devil Canyon -Flood Frequency Analysis Figure 3.1-5 Average Annual Flow Figure 3.3-1 Regional Geology Figure 3.3-2 Watana Top of Bedrock and Surficial Geologic Map Figure 3.3-3 Watana Scheme Plan Showing Extent of Shear Zone Figure 3.3-4 River Channel Dam Axis Foundation Area Geologic Profile Figure 3.3-5 Watana Borrow Area Site Map Figure 3.4-1 Effects of Present vs WCC (1982)Attenuation Models on the Mean Deterministic Response Spectra (5%Damping)Predicted at the Watana Site Figure 3.4-2 84th Percentile Deterministic Response Spectra (10%Damping)at the Watana Site for Active Earthquake Sources Figure 3.4-3 Deterministic Response Spectra (10%Damping)at the Watana Site for the WCC (1982) Maximum Credible Detection Level (Random Local)Earthquake Figure 3.4-4 Recommended Deterministic Response Spectra (10%Damping)for Conceptual Design of a RCC Dam at the Watana Site (M7.5 Wadati-Benioff Subduction Earthquake) Figure 4.1-1 Watana RCC Dam Concept and Stepped Spillway Plan and Detail Views Figure 4.1-2 Watana RCC Dam Concept and Stepped Spillway Sections and Details Figure 4.1-3 Watana RCC Concept and Stepped Spillway Section Views Figure 4.2-1 RCC Placement Scheme Showing w/Gap for Passing Construction Flood (from Dak Mi 4 project,Vietnam) Figure 4.2-2 Son La Plant Vietnam Illustrating RCC Dam w/Surface Powerhouse Figure 5.1-1 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Site Plan View Figure 5.1-2 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Site Plan View Figure 5.1-3 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views 11/17/2009 FINAL R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Figure 5.1-4 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views Figure 5.1-5 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views Figure 5.2-1 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Surface Powerhouse Figure 6.2-1 Watana Arch Dam Alternative Figure 7.1-1 2002 Cost Curve RCC Concrete Dams in USA Figure 7.2-1 Access Roads Figure 8.1-1 Susitna Project Licensing Schedule 11/17/2009 FINAL FAIRBANKS niveRcnaght NARS,_-.-ay, e X .&t&oe s 25 LOCATION MAP =Seg hj waSEGEND.w VY spRoPOSED OAM SITES & BY,ov \a «z AA i ey e aNe: *i ! "ep i ceBy2 20 9 SCALE IN MILES LOCATION MAP FIGURE 1.1 Figure 2.1-1 Location Map PrSCALE IN MILES LESEND TYONE”AY DAMSITE sc \ f i6.L(cast fom(GF '(3 :aRoom4",7.O/,TH,ig JO aSeyivaaee _£08 _s 5S ee <oe SUSITNA IL )K AV4LoKerpres™"\(NO DEFINE,Ra )\GR (6nd CREEK LOCATION)2 vee ",Tbe;y x %[ *'"wi ™'e >ff \TYONE.S=i e Ty f ™ 4eTALKEETNARIVE\TYONE LAK \ s \SUSITNE >\¢ave "'.i titee\3)oo ee ee -"eh fDAMSITESPROPOSEDBYOTHERS\yaw!AGHeS a ow FIGURE 4.1 Figure 2.1-2 Proposed Damsites ALGId.z =zafo)=im)3 ><oc =<Z <1905'-z a ZoO=o Ww a :<2050'-i =<2535)_i 2 75az®2350 7 2 2395'L_-2500 >Qa 2200't t s 6O=2000 =1750"2300° a tr w 2 1450'1500s)je)z a ba fe) 3 0 < ©1000 -_!_Ff 1020!ul_870'500 0 8 a g 3S S S q <4 3 S S ---aad -N N N N N N RIVER MILES <=a Zz =<- 2 P 19C5'-zZ 4 2 1905"ra belPs)2 Bp Ww Oo Go 3 oO rw)Q v <2050'-2 w ES S1 <2059'8 Ww <$i 5 a +--6 a 3 7 -2350_4 - 5 5 2200'i --->a [220¢"{I ----* &&-5 8 7a2+«ic 4750'Crea rasnecpera pone siya 2300'-2 -2300'i as |ca ef a o DEVIL CANYON WITH WATANA COMBINATION HIGH DEVIL CANYON WITH VEE COMBINATION ERSa Profile Through Alternative Dam Sites RAM CONSULTANTS, SUSITNA PROJECTsea CAATGH AGHf Figure 2.1-3 Profile through Susitna Alternative Dam Sites rere .7tieseneaantiiaesDOWNSTREA,COF FERDAM WN 3,227,000 OIVERSION TUNNEL PORTAL DIVERSION TUNNEL AND TAILRACE PORTAL DIVERSION TUNNELS _ -CREST EL.15 46 IE J ssracan _ -- - _ ey TAILRACEare\if TUNNELS Ps mie 4NS%;axe tt ta \Geo2s7 ;SS ,4 ae -wo ACCESS ROAD rl _SPILLWAY APPROACH CHANNET(oe.TLE at ; --- Sate SHRENES Za NES VED ne .'CF :oe oes aes.\eeae ee a roy,POWER S are WAG SA od SURGE . _":INTAKE ae é Ts CHAMBER ;:Bes PARR ' ME oe AREA S 4 8,228,==S "ae ==CONTROL BUILDING oN Le™,=. :IESEL,GENERATORS SN , 'Teka .=TRANSFORMER -GALLERY .2-345 KV TRANSMISSION a Bees |LINES TO GOLO CREEK\SWITCHYARD ;= \a X 7 . °200-400 FEET (tINCH =200 FEET) -a nna eet , -LEVEL NwelaVEINSEL2185\ &, ALASKA POWER AUTHORITY #3,230,000 Pas :/SS SUS'TNA HYDROELECTRIC PROJECT WATANA ,'GENERAL ARRANGEMENT J )FREEBOARD DIKE EMERGENCY -EXHIBIT F li PLATE F4 ' Via, .2200/_- Figure 2.1-4 Watana Embankment Dam General Arrangement HY CATER ,'fod fi «' " |has ae Peritie|Ocean ||_/Wert 4,Na as ; ; = UPPER SUSITNA RIVER PROFILE lg J I LOCATION MAP RIVER MILEB RO 880 Epcot Nf)F,\ /as '\.yyw. NBASIY,BOUNDARY 3 "rol , ==f "Us ™ ce VL D)Windy Cros y PA ""s Je Pupona/Vad \ ar ae \ ( ¢Q }>4 a wy )if ¥ \)On”BefB re DEVIL,CANYON }a awsSOOAMSITES"C2 SV GES ?i A <A/G Kt wy go "°ey,fixe re )hyatl\rt "i on rail \N f a \)(aaa 7 'Ewatana i -,Mis \DAMSITE >5 i '3 fe -_prong Oh eC|™Q (7&aN af oe,(_Sy N"\an re a (eo))&one Lake ,,\Ty onfgYe,Pra}°Susitna Lone iS v SOUTHCENTRAL RAWLBELT AREA,ALASKA \"Sy eo Lon INTERIM REPORT WO.1 To fi rane TNA S oa i)Lows]UPPER SUSITNA RIVER BASIN("SELECTED 2 DAM PLAN SCALE oe q\i SE TeMlies y a Lone Lauive Roo GENERAL PLAN /Te Glen HI . {_ALASKA DISTRICT,CORPS OF ENGINEERS 2 _nk Cray,Ud nN)ANCHORAGE,_-Y {y a.ae DECEMBER (978 melon FLE NO 2-80U-92-04-0F APPENDIX1 PLATE 6-1 Figure 2.1-5 Watana Reservoir General Map 1600 .eaiF<-y/mn \:a ,"==<Sen =\Gaew To Fa Harman EE x ELEVATIONWWFEETGROUT CURTAIN}Tesay oO 7 SECTION THRU DAMSCALE:B NWMAL max[*G10 eis” =99 te 4 a NORMAL MAX.<fr 4 ,B00 spare =eens se __.RESERYVIOR LEVEL,P . °ITCHYA -;T SwITCHYARD sere resr-NG at pone A 1600 p--u aaiS.'sent bs I a '=we oe -o ACGESS ROD pop be hod-8 =-7 Ne i!'-s -EXISTING GROUND SURPAGE-"woo INTAKE 5 Is .--oseraebs= 7)afi&1800 NN eh -ot ._-Ye it On.CONCH 7 /-TRANSFO3MER ABD CRAFT .S wot GINED FuRNeLS n Tet GAE GALLERY ,=__tC OUTLET STRUCTUREe*a on oe,GENERAL ARRANGEMENT ©noc \eave mouse cae aN ve tantSCALE:A br af Tf =MAINIFOLD 2-24 DIA CONCRETE LIRED EL.1050'4 ooe _$QusTRucTIoN ue if Lf...tale f FUNNELS :| _...BONCRETE PLU lwo (==t ;poo a UGATE /SURI6 SHAFT 1 n L 1 4 4 i l L L S05 b n i i Ls I ”LL sa i i L j L t 1 rt 4 L i Ln i 1 .620 r T7059)2000 2509SPILLVAYSOMTROLgsCRESTEL.775 STATIONING (h FEET"Sl staver _suore|AT @ OF OFM s =-POWER FACILITIES PROFILERe.CALE.6 mel Se NORMAL MAX.n S_SEE wt eLiven'tsa;t we 73-4004)FKED WHEEL GATES}-tn >=woo 225,rn Ss -=SPILLWAY CONTROL.t B00.4 BEORICK SURFACE-Se y i STRICTURE (7 Re or SetBURTACEz'---(Ef , z ;EXSAVATION FCA CORE fy VZ4 ,-shout om LORes 1600 =100 s Fi =s noo Y.U7 eee 1509 b}--_------ .Lee '7 . E wooo"NG id i -_ace ae sss OO NTF,T2st ese a =00 7 LONG)TUDINAL SECTION THRU ¢OF DAM SCALE;B rH|i*s!yi1000 STATIONING IN FEET SALLLWAY PROFILES aco moreno?an ALASKA POWER AUTHORITYAl,-SCALE A BUSITNA HYD30ELECTRIC PROJECT 200 400 FEETo SCALE © HIGH DEVIL CANYON .NOTE HYDRO DEVELOPMENT THIS DRAWHNG ILLUSTRATES A PRELAANART CCNCESTUAL PROJECT LAYOUT PREPARED FOR COMPARISON OF LATE)ALIERMATIVE SITE CEVELOPMENTS ONLY ae MARCH 1982+ened KE REAW wicoRPORETID 8.4 Figure 2.1-6 High Devil Canyon General Arrangement (-sF™ - ”> asSf puts " \NV g9 ,éav nol CreekHIGH0.C,DAMSITE}ry(SUSITNAI)=*y \\,Tol ar 'yif}2"ioe u .VEE DAMSITE =cy GREEK ut Lg far S174 ee.\(SUSITNA Ir)2 \g susyTya B .|Ds Bs ¥ ''7,&2 -*,roy }LS 2:Ye,. gt 'y "”d )A A [ce v{io '.PN 4y,:pa ON ?' (LSy6 "Md 6 7 o ee \%.,Tyone Loke f ay 5 -eN\= 2 |}ry Susing Loke iN v SOUTHCENTRAL RAILBELT AREA,ALASKA / !'e a)o INTERIM REPORT NO.1 om TR auxceria XS ook UPPER SUSITNA RIVER BASIN ¢(:r ALTERNATE HIGH D.C. q ( ----e-e-omen 4 DAM PLAN X 2)§3 -3 2OMiles y /Row i SENERAL an \f To Gean Highwo Y\ALASKA DISTRICT,CORPS OF ENGINEERS --VN?)ANCHORAGE,ALASKAyfr.Anchoroge iN i SL ae --een STs men 6€ UPPER SUSITNA RIVER PROFILE RIVER MILES [20-2190 aNBASINBOUNDARY}prre"x f mores 0.OLSOw.WEE.int ee OAMSI'TES AE Srowe FOXLOCATIONPURPOSESOn 2.THE Susivaa |,Vi.@ 144 SYSTEM eis PROPOSES MITHALLYOyNERYJ.KAISER Corp any SEPTEMBER ESTE.SUSITHA 5Oa1SALSOCALLE®MAUSER DAM, FILE NO 2-SOU--92-04-01 APPENOX |PLATE B-4Figure2.1-7 High Devil Canyon Reservoir General Map Degree(F)70 60 50 40 30 20 10 -10 Air Temperature at Susitna Project Site 4,Rec Placement Window -o Max -=-Min -a-Mean RCC Placement Limit Lower limit 23°F a saa Jul Figure 3.1-1 Air Temperature Flow(cfs)Flow(cfs)Monthly Flow Statistics -Watana Dam Site 45000 --Average Notes: -&Minimum on Record A 1)USGS data from Gold Creek gaging station (¢USGS40000+- ;15292000 SUSITNA R AT GOLD CREEK AK)modified to [|-4-Maximum on Record W,'fatana Dam site. 2)Period of record =54 years:October 1949 -September 35000 1996;October 2001 -September 2008.|_} 30000 i a25000{\20000 /a \ 5000 0 T T T 7 T T 7 T T 7 7 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month Monthly Flow Statistics -High Devil Canyon Dam Site 50000 -?Average Notes: 45000 +-&Minimum on Record A 1)USGS data from Gold Creek gaging station («#USGS |___J Maxi R d 15292000 SUSITNA R AT GOLD CREEK AK)modified toaximumonRecorHighDevilCanyonDamsite. 40000 2)Period of record =54 years:October 1949 -September/\1996;October 2001 -September 2008.35000 /Yo \30000 /\ 20000 //\\15000 /iy yoo N \10000 ///NN aN 0 7 T T T T 7 T 7 t t - Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month Figure 3.1-2 Monthly Flow Statistics Bulletin 17B Plot for Watana Hevu Annual Peak Flow Retum Period Return Period 1.0 1.1 2 5 10 50 100 500 1000000.0+----111nei--_+-_---a 100000.0-Flow(cfs)10000.0 I 0.9999 0.999 0.99 0.9 05 02 01 002 Lj T i 0.005 0.001 0.0001 Probability mumene Computed Curve om aosce 5 Percent Confidence Limk Figure 3.1-3 Watana -Flood Frequency Analysis 1.0 Oulletin 1 7D Plot far I ligh Devil € Retum Period 1 Annual Peak Flow Retum Period 50 100 500 1000000.0 Flow(cfs)re tei ae amet a sma tee _vee een ees oh wot See ee ee -_ns ee ee ne wen 100000 Oo ee TC oe 10000.0 0.9999 ---Computed Curve --.16 Pemont Canfidence lime 0.999 0.99 05 Prohahility oO Dihcened Fuect<(iledhuill platting prcitine<) 02 j I on re ri-a.is Tene gencee ramonea= ME me te ee Li Lj Lj 0.1 0.02 0005 0.001 0.0001 aman 5 Percent Confidence Lint Figure 3.1-4 High Devil Canyon -Flood Frequency Analysis Flow(cfs)Flow(cts)13000 120C0 11000 190C0 9000 4000 13000 12000 11000 10000 ¢000 €000 Annual Average Flow Watana Site IN i Y ApeAtvartiy: Notes: 1)Period of record:calendar yaars 1950-1995 and 2002-2007. -e-Annual Flow -_ om Average Annual Flow =8,000 cts 1950 1955 1960 1965 1970 T T T T 1975 19&0 1985 1990 1995 2000 20C5 Annual Average Flow High Devil Canyon Site 4 .|a I WW WA ALAN ThryPUTTfimfeet Noles: 1)Pericd cf record:calendar years 1950-1995 and 2002-2007. -e-Annual Flow -- =-=Avorage Annual Ficw =9,100 cts 1970 T T T T 1975 1980 1¢85 1990 1995 20C0 2005 Calendar Year Figure 3.1-5 Average Annual Flow T33N !Zz a4OpavaNEISTEMAT'FaviNsst ay yestCTsATAOR .VAT wa =\Ny jsJ=wll n 'rive yTeyes Pr WANPiareieIris7eyodeaeyheon)ol le .7.!<a .SpliseTi pss A NR,Lede stg hySASS byaleetseu Reve (hash On ayMa"€ High DevilAN ANCanyonSite1%VPRO zRAWEee Cys - "J a Z LPNS CeO--ty ?pl}wat yaNZIT LD,Abo>>>>a>Dybo>>>>ap>pteLESS3op.Lp Me R2E ED enavwk AAAAAAAARv4AAAAAAAAANAAAAAARAAAAAAAAI A AAAAAAAKAAAI @ AA AAAAAZAAAA] AAA AAAAMAAAAAI T eR AAA AAAKAAAAAI set g°stV AAR AAAAAINEArn,AAAAAIAKAANANRAAARYAAAAI ARAAAAAAAAAAAARAAA AANA] NAAAAAAAAAAAAWAAAAAAAAAAAAS A AA ARAAKAAARAAAANI AAKRAAAAAA AAAAA AAAAAI AAAAAI AARYAAAAAASN accu Modified from Csejtey,et ol,I978 CENOZOIC QUATERNARY a ---4rr TERTIARY MESOZOIC CRETACEOUS UNDIFFERENTIATED VOLCANIC AND VOLCANICLASTIG ROCKS |GRANODIORITE,DIORITE ,BIOTITE-HORNBLENDE GRANODIORITE, |BIOTITE GRANODIORITE !SCHIST,MIGMATITE,GRANITIC ROCKS MAFIC INTRUSIVES GRANODIORITE,QUARTZ DIORITE REGIONAL GEOLOGY UNDIFFERENTIATED SURFICIAL DEPOSITS UNDIVIDED GRANITIC ROCKS ARGILLITE AND GRAYWACKE TRIASSIC r DATTAeSaS PALEOZOIC$$er LLL THRUST FAULT vo an”°°DOTTED WHERE CONCEALED INTENSE SHEARING seewvreeseyee? Vv AMPHIBOLITES,GREENSCHIST,FOLIATED DIORITE BASALTIC METAVOLCANIC ROCKS,METABASALTANDSLATE BASALTIC TO ANDESITIC METAVOLCANICS LOCALLY INTERBEDDED WITH MARBLE TEETH ON UPTHROWN SIDE,DASHED WHERE INFERRED, POSSIBLE THRUST FAULT,TEETH ON UPTHROWN SIDE PROPOSED DAM SITES °]4 8 | SCALE IN MILES FIGURE 4.1 ARS Figure 3.3-1 Regional Geology LEGEND LITHOLOGY: 2 2 Rg 8 8 2 -7 ew NM.AOFA8 OF TALUSOUTWAS.TILE, -were ee ery ee eee . «aa,=COORITE TO QUARTZ DIORITE,INCLUDES MINORGY'ae:Coo]Setesace -ETT TT]ANDESITE PORPHYRY,MCLUDES MiMOR DACITE sen ANO LATITE &3.225.000 a J OIORITE PORPHTYRY pom ee Zs CONTACTS:a -----SURFIKIAL DEPOSITS ---BEDROCK/SURFICIAL DEPOSITSStOROCA CONTOUR LINES:TOP OF BEDROCK CONTOUR ENTERVAL 100 FEET,60 CONTOURS DAGMED(EXCEPT IN RIVER) -----TOP OF BEDROCK,CONTOUR INTERV,20 FEET APHY,CONTOUR INTER UAL GO FEETwamm=e TOP OF BEDROCK IN RIVER CHANNEL,OTHER:CONTOUR INTERVAL 20 FEET ?SPRINGS ROTES6,TOP OF BEDROCK CONTOURSAntIIFERREDBABEDOntGEOLOGICMAPPINGANDSUGSUFACEEXPLORATIONS,ANDARESUBALCTTOVERIFICATIONTHROUGHFUTUREDETAREDearrots Sve cate wee -ane TIS,wee oe ee wee OS OO a ee-- _"Sj oo- N32ZLSLOO 7 WATANA DAMSITE/' ff?Ta ano uTwAsH TOP OF BEDROCKREFERENCE!RADE ap snowcoe.reTe=(3209|AND SURFICIAL GEOLOGIC MAP COOROIMNATES (0 PEET,ALASKA STATE PLANE (ZONE 4)FIGURE £.6.2.6 Figure 3.3-2 Watana Top of Bedrock and Surficial Geologic Map em RVER BED ALLUVILM EXCA\ATEO IW TS AREAFORPLUNGEPOOL.- DIVERSION INANE WATANA SCHEME WP! TN lies ALASKA POWER AUTHORITYmAemoPLYSUSITNAHYDROELECTICPROJECT ae ©PLAN THIS DAOAING LUSTRATES 2 PRELSMNORY CONCEPTUBL FROMCT LavouTwePREPAREDFORCOMPARGONOF PLATE en?ALTERKATIVE STE DEVELOPMENTS D8LY j Wee MARCH i982 9 4' ACHES AMERICAN NOOR*OMMED ° Figure 3.3-3 Watana Scheme Plan Showing Extent of Shear Zone ELEVATION (FEET) 1800 5 a0 + 1480+ 4TO-+4 440 +4 \480 4 1440-4 1430 4 1420 4 1410 +4 400 4 YY 1390 4 380 1470-4 (350 To 1165 LEGEND b al Permeabitity Scate Grain Size:Percent By WeighttAh«cm een,asofb ae SOILHD63-45 HD 83-13 HD 83-44 HD 83-42 HD 83-43 HD 83-12 HD 83-11 HD 83-46 /tira)keen sort Grover)Groin sizeEL.1463.5 HD 83-10 €L.14620 Sand Olsiritution.4.EL.1458.5 €L.1459.9 'EL.1461.1 EL.1459.0 EL.1459.1 EL.1461.8 Detemined by4.094 Boulder EL.1459.4 . -.Unitted Soilts.-hou PEs.Fines Lub Sieve Anotyses":*River (c&wu M cimsal Lato Tri 18 i ChassificotionaSPNATeeuvhsaaneeswareVlyLinn?Peat ead OrganiAeeSLTopofAfuvium,--jHYt4 aa ar t=»Cley iAraaNSe4aBoulde-19 20 30 40 Gommasyee=Grovelly Sond with Cofbles and solutders =>one oe |Pa Depth merkers ot -- {''rfva-=_- _ete See _--t-_one Sola)/10 1.Intervels LY (45)_}9008 valve shownOWA3-4 js,J Grovelly _,]<>---se "rae er a,«4 én porenthesiaprojected30™Send Sh ->oT ee -_-a =efoplaseofsection---="nr eee Cosbles and __----Comme Curve-_-_--_--§ \356 cd =>-<-S Seacy Grevel|with eM.=Senady Greve!with <_ancy Gravel)wit Permecbittt le ROOLC:4 ort Reco ScaleBoulderCobbiesaadBeuldens2reSeCobbiesaadBoulders7cecmeobilttyScaleSerconenn -_-_-"TO 60.0 Cond'?--as ae "SLEL 9 50 wo ROCKBouldersaeol7 £00,a " |i %--\'epee eee on Olde Tan __-+TD saz ty if 1, aaD"cored / ?---Test k LL #OD (Rock Quality Designation}\Se Cobble ond ce oa Bedrock (ue (AS h20n0 H .oN 1 Boulder Zone aE,i:+Cove Recovery_-?TO 87.5 1D 894Ade TO 89.5 , 4 Core toss ftaterval :!(horizontal sco varies)°TD i077 A oiorste,hydrothermally alteredzoaLH89190FRET:ad DorIte,unaltered:4 8 TO 418.0 L SECTION 8-B VIEW LOOKING UPSTREAMixTO1195paTO127.8 bs) HD 83-44 «bad bed 40HD83-10 HD 83-13 :HD 63-11 W900 Fa 500 Fo om rac04 |:I GM :14404 : "GE.POST A 14304 en on EET 420-7 1 ew b=taro 4 |"OM anne8&Rar |SRE1400-5 |e 'HE j ow kee 3 (3904 |Hf :jsw;+|Ororite ond :cM i:i Monreoite,»i rorS[[77 |eawearher.''vor tte,1300 -)|SH x \hard strong Biorite,altered,i Vite Ceethering,4 N r bm onion)(je ond "herd,strong 1 ole ia foinrs,.:Ti Weathered diorite L fatensely froctured,low orteng f grades to grenodioritetyidolteredrane'Hl below 83.81370+4 em]ppies };TO 87.5 TD 895 -TO 89.4 f --"4 Vary eloselyfractured tponelocoily1 1360 4 i T ; t t pom Pe Pid j[Copan ON Water Loss __tjOvorite,freshcloselytamoderately fractered,Complete T 7.7 ALASKA POWER AUTHORITY18504hord,strang h Weter Loss 0 OF. |Water Loess SUSITNA HYDROELECTRIC PROJECT |2/3 worer Lose et HUES }WATANA DEVELOPMENTissowie |RIVER CHANNEL Se ' -DAM AXIS FDN. AREA GEOLOGIC PROFILE B-B NARZA-EBAECESUSHINAJOINT DaTeANCHORAGE,ALASKA |AUGUST!FIGUREeT Figure 3.3-4 River Channel Dam Axis Foundation Area Geologic Profile FOG LAKES RELICT CHANNEL /\ :QUARRY C_?.SITE A x$KATANA DAM SITE Peoino sire «tS / <Twatana RELICT CHANNEL"N \ )BORROW WATANA BORROW SITE MAP LOCATION MAP SCALE °4 8 MILES LEGEND Cc 7]BORROW /QUARRY SITE LIMITS t 2 MILES9SCALEHRTEMneemmel FIGURE £.6.2.13 Figure 3.3-5 Watana Borrow Area Site Map SpectralAcceleration,g1.50 1.25 1.00 0.75 0.50 0.25 0.00 ||I |_ i l |||Pot r ---e Mw9.2 Inter-Plate (Megathrust)Subduction Earthquake @ 40 milest ---WCC,1982 ..i -4{---Mw8 Denali Earthquake @ 44 miles ' r 4 =--WCC,1982 . f i Fob i || i |-a. i - r 4 |poy |1 }i ||il |i__ | |- ;oot 14 i i : i t 1 Fy ;| ;4 | . !: s a ee ee i | T 7 r * i 1 i 0.1 1 10 Period,seconds Figure 3.4-1 Effects of Present vs WCC (1982)Attenuation Models on the Mean Deterministic Response Spectra (5%Damping)Predicted at the Watana Site SpectralAcceleration,g1.50 1.25 1.00 0.75 0.50 0.25 0.00 |maeittli | | --W adati-Benioff Subduction (Mw7.5) |t | arit:--Megathrust Subduction (Mw9.2) l l --Denali (Mw8)ey 'oe||=Susitna Seismic Zone (Mw7.4) ;:! { 'po |a boot "yt lt ;i |NOTE:Spectra for the other active sources (Susitna =|"| ae Sa Se ee SO Se eee a s+|Glacierand Castle Mountain faults)are not shown,asi i ;)|the maximum characteristic earthquake is less than and ::;rT |the distance from the Watana sile is greater than,the a :i :;.|values for the Denali fault and Susitna Seismic Zone. ||hy Pop | a toi [a | |!| Le aneeeeenece nee nn ee on - | ,||| -man-7 -.4 ; ||i rs! 0.01 0.1 1 10 Period,seconds Figure 3.4-2 84th Percentile Deterministic Response Spectra (10%Damping)at the Watana Site for Active Earthquake Sources 1.50 '; ¥H ;Hi H H!i i |:Poof og ¥ ; +t pore et "y !||po ||ae ol || Bands delineate the range of maximum predicted spectra for the 1.25 =WCC (1982)maximum credible Detection Level Earthquake H yaa Y (Mw6),generated from strike-slip faulting (w/surface rupuire) {',\to thrust faulting (w/and w/o surface rupture),occurring within ,'3 to 6 miles of the Watana dam site. |a i |Pott yy 1.00 es :*$n|Li!mane .pn mm booppe rt g _!oe i.'s |--Meanbei { =:rea.|--=84th Percentile ;&0.75 -=WCC (1982)Mean}------£:T ': c r :;otzFit %pol 0.50 -! |bof ot |a_i ot oi |an .footbed eat i bob oa |0.25 - foi boi tiie i ot t }t I 1 .ee 0.00 '.rr 0.01 0.1 1 10 Period,seconds Figure 3.4-3 Deterministic Response Spectra (10%Damping)at the Watana Site for the WCC (1982) Maximum Credible Detection Level (Random Local)Earthquake SpectralAcceleration,g1.50 TF rT fo!1 \i Leeder fe nad |aun a Z :_3 i ||'4 |i Poy pid1.25 a i om Horizontal Motion fo] i : i i ==Vertical Motion ;}|:cent ennndininefeme i i : mes |!a 1.00 aeironsiit a 5 pod Gpoien a 0.75 i ;i {1 Po TT:$t 0.50 foifor | atHi i i |i ;i Hl i i i 0.25 |j |a |foo}toadr i | |>.ew!iy ! ,"+ *TenetiiI|foi]0.00 a --- 0.1 1 10 Period,seconds Figure 3.4-4 Recommended Deterministic Response 10 Spectra (10 %Damping)for Conceptual Design of a RCC Dam at the Watana Site (M7.5 Wadati-Benioff Subduction Earthquake) 4800 |1700 7 1600 oe /ip1500"y i)H -DETAIL _1-XC SCALE:1”=200° 41600 \rs EL.1700 \=/n 200 400 1700 :} 1800 EL.1850 1900 2000 2100 2200 ACCESS TO GROUTING AND DRAINAGE GALLERIES PLAN ;Watana RCC Dam Concept and Stepped Spillway RSME SCALE:1°=600 erase RAM CONSULTANTS,ING. a Plan and Detail Views '-=SUSITNA PROJECT H ATH ACHESacaLIALULLAUNLY Figure 4.1-1 Watana RCC Dam Concept and Stepped Spillwav Plan and Detail Views 2300 ;--- SPILLWAY CREST : So ;z 7 a "--*-** -aes oe = ; = se ao .>8 7 .--An 7159 8 2100 ---cnr''* . ».f 'SS _ *. ° ° Ms eA &&oh *»: zs = :==2000 in 5 a :& . » v . 1900 +=he ee aa: GROUTING AND == DRAINAGE GALLERIES s .:Se . (TYP)an Ss ;o ae 1700 e == =21700 -- ra id °Fay [os =areas 2 1550 4500 eaten is conn meiner mnie icc micas S seen es em te -- INSTRUMENTATION GALLERY BASE PLATFORM 1300 ' ELEVATION THRU GALLERIES SECTION.(B\1"=300"WA1-V 2300 STEPPED SPILLWAY =-=aN (ar eee etgeanitif ; 2100 is if =aSp¥x f oF 1900 =SS -i:{|Saas meee ee -------¥f qj -----.---.---=--, <---FySSwe 1700 Ne va 100 \e=ria=imin|aeDIVERSIONPIPES4 1300 SCALE:1”=300' -_-_ 0 300 600 DOWNSTREAM ELEVATION SECTION C 1"=300"\Q1-y Watana RCC Dam Concept and Stepped Spillway maRSMmmElevationViews"sesSUSITNAPROJECTHATGHpears Figure 4.1-2 Watana RCC Dam Concept and Stepped Spillway Elevation Views "a +e EL.2150.0 A BAFFLEWALL4 yt EL.2000.0 \_GROUTING AND DETAI L (2 DRAINAGE GALLERIES 1"=30 4 \- EL.1850.0 15.20°,;8 V __20.00"5.20.)8 EL.1700.0 8 CONVENTIONAL _.re) CONCRETE e /BASE PLATFORM (2)-27'DIA i A EL.1550.0 DIVERSION PIPES/U/S COFFERDAM CON i Lo oo]_EL.1450.0 \; Se x os 'a 4 F OOS OR N EL.1350.0 DETAIL (3 1°=30"- SLURRYrototodobot1ototetotod TRENCH CONSOLIDATION DRAINAGE CREST EL.2210.0 yw PMFEL.2211.8 GROUTING PIER EL.2204.0 4100.00"Atels.| |'SPILLWAY CREST EL.2185.0SECTION(A\|NA grout CURTAINTn300"Gy |\FLOW |\s 3.00'__|2 a ola >ele Sle |/ __CONVENTIONALxEe:CONCRETE =>j 'W__TWLEL.1478.0 g\ja SPILLWAY =|e |.PIERS DETAIL 4»a 1 "=30"Ye) 4 \___41 |s__|EL.1447.5 |0 v Watana RCC Dam Concept and Stepped Spillway IRS Me Sections and Details "™""""n"™:"*SCALE:1”=200 SECTION (8B DETAIL a SUSITNA PROJECT HATCH At tyooaor =ee - 0 200 400 V=30 Ne,h=so Qlcy AEA y Figure 4.1-3 Watana RCC Dam Concept and Stepped Spillway Sections and Details Figure 4.2-1 RCC Placement Scheme Showing w/Gap for Passing Construction Flood (from Dak Mi 4 project Vietnam) El.228.0 El.143.5 Ol 1A A i al SS_Figure 4.2-2 Son La Plant Vietnam Illustrating RCC Dam w/Surface Powerhouse SOLID WASTE LANDFILLANDINCINERATION VILLAGE CONSTRUCTION CONSTRUCTION CAMP scwnce 7 aeTREATMENT. OUTFALL 0 1000 WATER TREATMENT 1000°SCALE:1”= 2000 High Devil Canyon RCC Gravity Arch Dam Concept EEIRSMmamProjectLayout""™""swumn 8SUSITNAPROJECTHATHACRES Figure 5.1-1 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Project Layout ALtIh.POWERHOUSE 1-4 A-4 TRANSFORMER GALLERY H UPSTREAM MAIN ACCESS i TUNNEL LOS N Soa =Vad MN PE GowaSS-TAILRACE Le eae ee,TUNNEL 4 >S<"saN N aa""a = Wa " SURGE CHAMBER DOWNSTREAM A L COFFERDAM 4 oor --ee Zz - --_IN ae \S$"-_-x cs S ; _a STN REXNSDIVERSIONxs PLAN SCALE:1”=500' ee 0 500 1000 ee >=Sete ae - \ DIVERSIONINTAKE ae COFFERDAMNN.Ss.|R LE” High Devil Canyon RCC Gravity Arch Dam Concept ERSMm@mPlanViewRAMCONSULTANTS,INC.SUSITNA PRO HATH AGRES Figure 5.1-2 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Plan View EL.1770 EL.1700 25 | EL.1550 SPILLWAY SLOPE CHANGE EL.1390 a EL.1400 EL.1250 30' D/S COFFERDAM (TYP) _|EL.1100 -U/S COFFERDAM CONSOLIDATION |SN peaNAeINSTRUMENTATIONGROUTING GALLERY SECTION A 1°=200'QI) . High Devil Canyon RCC Gravity Arch Dam Concept IRSMmml SCALE:1°=200 Section View REM CONSULTANTS,INC. Cre 0 200 400 SUSITNA PROJECT HATGH ACRESAEA Figure 5.1-3 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section ALtIS.1900 ;-----__----- 1800 - 1700 1600 1500 1400 1300 GROUTING AND IA ' S >1550oo- DRAINAGE GALLERIES (TYP)N\ 1200 >1400 =>4250\ 1100 1000 « />4100 900 INSTRUMENTATION XK 1900 GALLERY ELEVATION THRU GALLERIES SECTION /B QI=Y1°=300' 1800 1700 1600 1500 1400 1300 1200 1100 1000 -mnie 900 SCALE:1”=300' DOWNSTREAM ELEVATION SECTION C 1°=300'j- High Devil Canyon RCC Gravity Arch Dam Concept gIRSMm Elevation Views ™"°Nmn™™NeSUSITNAPROJECTHATGHACHES Figure 5.1-4 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Elevation Views Xrefs:PME EL 1777 iliCREST EL 1770 PIER EL 1754 \Ae ole"E E \W__NORMAL MAX WL EL 1750 ==\FLOW SPILLWAY 1 s A LI LayPIERS=-CONVENTIONAL I a BAFFLE CONCRETE (TYP) T GALLERY EL 1700 \wat /\, CREST BRIDGE PEIR DETAIL STILLING BASIN DETAIL DAM CREST DETAIL 1.)DETAIL (2.DETAIL 3 :Ny13.33 |/Nv }YW ssTWLEL.1030 / CONVENTIONAL 2 = cone FA < - --'41 _EL.1000 Ay SPILLWAY STEP DETAIL STILLING BASIN DETAIL (4.\SECTION (B\To gor Qin 1"=30'Ye) SCALE:1”=30' As 0 30 60 High Devil Canyon RCC Gravity Arch Dam Concept RSME |Section and Detail Views ""°™*™"™"* cca:1"=80 SUSITNA PROJECT HATGH AGREie]50 100 AEA Figure 5.1-5 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Section and Detail Views Xrefs:TRANSFORMER GALLERY POWERHOUSE SS TAILRACE <q 42-72 Se OG o-" o pea/a iiey - __”%-_t=on yoo PLAN High Devil Canyon RCC Gravity Arch Dam Concept sg§IRSMmmSCALE:1°=300 Powerhouse Layout RGM CONSULTANTS,INC,0300 600 SUSITNA PROJECT H ATGH AGRESAEAI Figure 5.2-1 High Devil Canyon RCC Gravity Arch Dam Concept and Stepped Spillway Surface Powerhouse WATANA-ARCHDA M ALTERNATIVE FIGURE a&20 Figure 6.2-1 Watana Arch Dam Alternative 140 120 100 Cost(dollars)©°60 2002 Cost Curve RCC Concrete Dams in USA (Project bid unit prices are adjusted to a common cementitious content of 150 Ibs cement +90 Ibs fly ash or 195 Ibs cement for an all cement mix) 40 20 10 100 Volume (2000's of cubis yards) 1,000 10,000 Figure 7.1-1 2002 Cost Curve RCC Concrete Dams in USA Pip ey now,|Rew Rew,ae peem |Row eae as co ye is or Ra EE4PIG1SahaPOCRSSeifEss:Liss, 3 WO gaa Aspen yy Fr leon Gree Tits Ts, Ls THs. Legend: fran ---Access Road Alignment.Cy NS one ..'5 ed |gp.|eon a Railroad Alignment"(p Costs ,SE.at |Dam Sites od ; p iS ep "e 3 |LD a ,ape ee WatanaJj.f£Dam Site + °4 ®maEes Sal ee plfe A YY Nessso 6K apn ALASKA POWER AUTHORITYmo,:fa ai ,we os [vo ,SS:'\7 SUSITNA HYOROELECTRIG PROVEGT ae ,Toe TEN,sae wie Sy ee Ree ON ase!Taw i ACCESS PLAN RECOMMENDED ROUTE REFERENCE:BASE MAP FROM USGS,:250,000 PLATETALMEETNAMOUNTAINS,ALASKA Liaw<Aaaoew MARGH (982 35HERESAMERICANINCORPORATED a Figure 7.2-1 Access Roads 2011 2012 2013 2014 2015 FMAM3)3 AS OND FMAMJJ AS ON OD FMAMJ4)A_S ON D FMAMJJ A SOND FMAMJ)JAS OND 1 2 3 4 5 6 7 8 9 10 11 12 1 Completion of HDR report 2 'State decision,solicit proposals,contract licensing/design team 3 Agency coordination 4 Application for Preliminary Permit 5 Permitting (Water Rights,Camp,field collections,etc. 6 Review previous analyses,adjust,and prepare PAD 7 Submit PAD/NOI 8 Scoping,study plan development,dispute resolution 9 Field studies 10 Analysis,prepare/submit PLP 11 Comission completes EIS,develops terms and conditions 12 License issued Figure 8.1-1 Susitna Project Licensed Schedule R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Appendix A - Table of Property Ownership in 1980s 11/17/2009 FINAL 1 16 -LANDS OF THE UNITED STATES (**) The Susitna Hydroelectric Project will include numerous parcels of federal land within the project boundary as defined in Exhibit G of this application.Ownership was verified using the Bureau of Land Management (BLM)Alaska Automated Land Record System which has an approximate accuracy of 70 percent.Ownership was further verified from BLM individual case files bringing the accuracy to 95 to 98 percent.The following is a tabulation of those lands with ownership and acreage.Included in the list of federal lands are both those _lands which have been selected,but not yet conveyedto non-federalownersandthoselandswhichhavebeenselectedbyandconveyedto non-federal owners. 851011 A-16-1 NeeeDAMSITES,QUARRYSITES AND RESERVOIR AREAS (Federal Ownership) SEWARD MERIDIAN,ALASKA U.S. ACREAGE SELECTED AND ALREADYTOWNSHIP/Section owNER?/PLATE U.S.ACREAGE*CONVEYED*- T31N,RIW Section 1 BLM (1)G6 640.0 0 Section 2 BLM (1)G6 640.0 0 T32N,R1W Section 35 Knikatnu G6 0 320.0 Section 36 CIRI G6 0 28.5 T31N,RIE Section 1 CIRI G7 0 235.5 Section 2 CIRI G7 0 340.7 Section 3 CIRI G7 0 376.5 Section 4 CIRI G6&G7 0 188.2 Section 5 CIRI G6 0 19.4 'Section 6.BLM (1)G6 607.4 0 Section 7 BLM (1)G6 152.1 0 Section 8 BLM (1)G6 160.0 0 Section 9 BLM (1)G6 60.0 0 Section 10 BLM (1)G7 00.6 0 Section 11 BLM (1)G7 00.5 0 *Areas shown are true areas at elevation. a/Land Owner (1)Selected by Cook Inlet Region Incorporated (2)Partially selected by Cook Inlet Region Incorporated (3)Selected by Ninilchik Native Association,Inc;Salamatoff Native Association,Inc.;Seldovia Native Association,Inc.; Tyonek Native Corporation;Knikatnu,Inc.;Alexander Creek, Inc.;and Chickaloon-Moose Creek Native Association,Inc. (4)Selected by State of Alaska b/ands selected by Cook Inlet Region Inc.are subjected to being conveyed at any time, 851011 A-16-2 DAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) TOWNSHIP/Section OWNER T32N,RIE Section 31 CIRI Section 32 Knikatnu Section 33 CIRI Section 34 BLM (1) T31N,R2E Section 1 Tyonek Section 4 BLM (1) Section 5 CIRI Section 6 CIRI Section 7 BLM (1) Section 8 BLM (1) Section 12 -Tyonek Section 13 CIRI Section 24 BLM (1) T32N ,R2E Section 22 BLM (1) Section 27 BLM (1) Section 31 BLM (3) Section 32 Knikatnu Section 33 Knikatnu Section 34 Tyonek Section 35 Tyonek Section 36 Tyonek T31N,R3E Section 13 BLM (1) Section 14 BLM (1) Section 15 BIM (1) Section 16 BLM (1) Section 17 BLM (1) Section 18 CIRI Section 19 CIRI Section 20 CIRI Section 21 CIRI 851011 U.S.ACREAGE SELECTED AND PLATE U.S.ACREAGE ALREADY CONVEYED* G6 0 264.4 G6 0 370.0 G6&G7 0 251.8 G7 22.9 0 G8 0 189.3 G7&G8 137.4 0 G7 0 200.2 G7 0 275.0 G7 57.9 0 G7 00.7 0 G8 0 197.1 G8&G9 0 207.5 G9 07.4 0 G8 00.2 0 G8 51.2 0 G7 01.1 0 G7 0 48.0 G7&G8 0 222.3 G8 0 176.6 G8 0 161.8 G8 0 120.9 G10 43.4 0 G10 97.8 0 G10 108.8 0 G10 17.2 0 G9&G10 59.9 0 G9 0 148.0 G9 0 157.9 G9&G10 0 149.3 G10 0 226.2 A-16-3 DAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE U.S.ACREAGE ALREADY CONVEYED* T31N,R3E (Cont.) Section 22 Knikatnu G10 0 148.0 Section 23 CIRI G10 0 201.0 Section 24 Tyonek G10 0 323.4 T31N,R4E Section 2 CIRI G12 0 51.7 Section 3 CIRI G11&G12 0 268.6 Section 9 BIM (1)Gll 38.3 0 Section 10 CIRI Gll 0 0 Section 15 CIRI Gil 0 300.0 Section 16 CIRI Gll 0 95.6 Section 18 BLM (1)G10 00.2 0 Section 19 CIRI (3)G10 0 374.4 Section 20 CIRI G10&G11 0 445.7 Section 21 CIRI Gil 0 391.5 Section 29 BLM (1)G10&G11 02.7 0 T32N,R4E Section 25 CIRI G12 0 32.6 Section 26 BLM (3)Gl2 225.0 0 Section 34 BLM (1)G12 130.0 0 Section 35 Tyonek G12 0 388.0 Section 36 Tyonek G12 0 262.9 T31N,R5E Section 3 BLM (1)G13&G615 420.0 0 Section 4 BLM (1)G13 480.0 0 Section 5 BLM (1)G13 360.0 0 T32N,R5E Section 13 BLM (3)G16 60.0 0 Section 14 BLM (3)G16 260.0 0 Section 15 BLM (3)G14&G16 400.0 0 Section 16 BLM (3)G14 330.0 0 Section 17 BLM (3)G14 30.0 0 Section 19 BLM (3)G13&G14 160.0 0 Section 20 BLM (3)G13&G14 560.0 0 Section 21 BLM (3)G13&G14 640.0 0 851011 A-16-4 DAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE U.S.ACREAGE ALREADY CONVEYED* T32N,R5E (Cont.) Section 22 BLM (3)G13,14,15 640.0 0 Section 23 BLM (3)G15&G16 631.1 0 Section 24 BLM (3)G10&G11 75.2 0 Section 25 BLM (1)G15 560.3 0Section26KnikatnuG150372.2 Section 27 Knikatnu G13&G15 0 238.3 Section 28 CIRI G13 0 47.3 Section 29 BLM (3)G13 640.0 0 Section 30 Tyonek G13 0 38.1 Section 31 Tyonek G13 0 127.7 Section 32 Tyonek G13 0 196.5 Section 33 Tyonek G13 0 204.3 Section 34 |BLM (1)G138&G15 598.4 0 Section 35 BLM (1)G15 303.5 0 Section 36 BLM (1)G15 329.3 0 T3IN,R6E Section 1 BLM (1)G17 233.8 0 Section 2 BLM (1)G17 01.9 0 T32N,R6E Section 2 BLM (3)G18 09.3 0 Section 3 BLM (3)G18 01.0 0 Section 10 BLM (3)G18 201.0 0 Section 11 BLM (3)G18 70.6 0 Section 13 BLM (3)G18 482.3 0 Section 14.BLM (3)G18 243.2 0 Section 15 BLM (3)G18 507.2 0 Section 16 BLM (3)G18 00.7 0 Section 21 BLM (3)G15,16,18 162.5 0 Section 22 BLM (3)G17&G18 640.0 0 Section 23 BLM (3)G17&G18 640.0 0 Section 24 BLM (3)G17&G18 640.0 0 Section 25 BLM (1)G17 640.0 0 Section 26 BLM (1)G1?640.0 0 Section 27 BLM (1)G17 640.0 0 Section 28 BLM (1)G15&G17 630.2 0 Section 29 BLM (1)G15 496.0 0 Section 30 BLM (3)G15 382.2 0 Section 31 BLM (1)G15 333.6 0 851011 A-16-5 aooDAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) TOWNSHIP/Section OWNER U.S.ACREAGE SELECTED AND T32N,R6E (Cont.) Section 32 BLM (1) Section 33 BLM (1) Section 34 BLM (1) Section 35 BLM (1) Section 36 BLM (1) T31N,R7E Section 1 BLM (1) Section 2 BLM (1) Section 3 BLM (1) Section 4 BLM (2) Section 5 BIM (1) Section 6 BLM (1) Section 10 BLM (3) Section ll BLM (2) Section 12 BLM (2) Section 13 BLM (3) Section 14 BLM (3) T32N,R7E Section 3 BLM (3) Section 4 BLM (3) Section 7 BLM (3) Section 8 BLM (3) Section 9 BLM (3) Section 10 BLM (3) Section 16 BLM (3) Section 17 BLM (3) Section 18 BLM (3) Section 19:BLM (3) Section 20 BLM (3) Section 21 BLM (3) Section 22 BLM (3) Section 27 BLM (3) Section 28 BIM (3) 851011 PLATE U.S.ACREAGE ALREADY CONVEYED* G15 256.1 0 G15&616 184.9 0 617 257.8 0 G17 396.5 0 G17 633.3 0 G19 338.0 ) G19 634.4 0 G19 629.8 0 G17&G19 495.8 0 G17 332.4 0 G17 302.3 0 G19 88.1 0 G19 311.4 0 G19 621.8 0 G19 141.4 0 G19 01.1 0 G20 246.4 0 6188620 160.7 0 G18 166.5 0 G18 331.0 0G18&G620 517.5 0 G20 31.9 0 G18 141.8 0 G18 637.5 0 G18 563.9 0 G18 601.8 0 G17&G18 640.0 0 G17,G18&G20 391.6 0 G19&G20 60.7 0 619 174.4 0 617&G19 624.1 0 A-16-6 DAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE U.S.ACREAGE ALREADY CONVEYED* T32N,R7E (Cont.) Section 29 BLM (3)G17 640.0 0 Section 30 BLM (1)G17 605.5 0 Section 31 BLM (1)G17 640.5 0 Section 32 BLM (2)G17 640.0 0 Section 33 BLM (3)G17&G19 640.0 0 Section 34 BLM (3)G19 423.5 0 Section 35 BLM (3)G19 53.5 0 Section 36 BLM (3)G19 11.0 0 T33N,R7E Section 27 BLM (4)G21 80.2 0 Section 28 BLM (4)G21 40.0 0 Section 33 BLM (4)G620&G621 74,0 0 Section 34 BLM (4)G20&G621 182.9 0 T30N,RSE Section 4 BLM (3)G23 08.2 0 T31N,RSE Section 1 BLM (3)G24 56.9 0 Section 7 BLM (3)G19 386.4 0 Section 8 BLM (3)G19&G24 535.0 0 Section 9 BLM (3)G24 576.7 0 Section 10 BLM (3)G24 372.9 0 Section 11 BLM (3)G24 138.5 0 Section 12 BLM (3)G24 287.9 0 Section 13 .BLM (3)G23&624 598.6 0 Section 14 BLM (3)G23&G624 612.2 0 Section 15 BLM (3)G23&G24 640.0 0 Section 16 BLM (3)G24&G623 280.3 0 Section 17 BLM (3)G19,G22&G24 334.7 0 Section 18 BLM (3)G19 353.1 0 Section 21 BLM (3)G23 182.3 0 Section 22 BLM (3)G23 248.9 0 Section 23 BLM (3)G23 09.1 0 Section 24 BLM (3)G23 55.1 0 Section 27 BLM (3)G23 06.1 0 Section 28 BLM (3)G23 245.8 0 Section 33 BLM (3)G23 138.4 0 851011 A-16-7 DAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) TOWNSHIP/Section OWNER PLATE T30N,R9E Section 1 BLM (3)G26 Section 12 BLM (3)G26 Section 13 BLM (3)G26 T31N,ROE Section 6 BLM (3)G24 Section 7 BLM (3)G24 Section 17 BLM (3)6248625 Section 18 BLM (3)G23&G24 Section 19 BLM (3)G23 Section 20 BLM (3)G23&G24 Section 21 BLM (3)G25 Section 22 BLM (3)G25 Section 23 BLM (3)G25 Section 25 BLM (3)G25 Section 26 BLM (3)G25 Section 27 BLM (3)G25 Section 28 BLM (3)G25 Section 36 BLM (3)G625&G626 130,RIOE Section 6 BLM (3)G26 Section 7 BLM (3)G26&G27 Section 8 BLM (3)G27 Section 9 BLM (3)'627 Section 10 BLM (3)G27 Section 11 BLM (3)G27 Section 12 BLM (3)G27 Section 13 BLM (3)G27 Section 14 BLM (3)G27 Section 15 BLM (3)G27 Section 17 BLM (3)G27 T3IN,RLOE Section 31 BLM (3)G26&G27 851011 A-16-8 U.S.ACREAGE AL U.S.ACREAGE SELECTED AND READY CONVEYED* 143.0 105.3 05.8 49.2 00.7 178.0 450.2 175.3 432.8 499.3 267.1 185.4 280.1 316.2 309.3 107.8 408.1 216.0 389.3 313.7 170.8 96.4 312.9 254.6 120.2 105.1 251.1 77.9 143.2 ooooooocococoocoeoeceaeoooocoooco DAMSITES,QUARRYSITES AND RESERVOIR AREAS (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE -U.S.ACREAGE ALREADY CONVEYED* T29N,RI1E Section 1 BLM (3)G29 45.2 0 Section 2 BLM (3)G29 199.2 0 Section 3 BLM (3)G29 222.6 0 Section 4 BLM (3)G29 68.2 0 Section 5 BLM (3)G29 176.6 0 Section 6 BLM (3)G29 135.3 0 Section 9 BLM (3)G29 00.4 0 Section 10 BLM (3)G29 204.5 0 T30N,RI1E Section 7 BLM (3)G27&28 293.8 0 Section 8 BLM (3)G28 01.8 0 Section 17 BLM (3)G28 241.0 0 Section 18 BLM (3)G27&G28 280.4 0 Section 20 BLM (3)G28 445.9 0 Section 21 BLM (3)G28 00.9 0 Section 25 BLM (3)G29 21.2 0 Section 28 BLM (3)G28&G629 177.9 0 Section 29 BLM (3)G28&29 480.0 0 Section 32 BLM (3)G29 482.7 0 Section 33 BLM (3)G29 437.3 0 Section 34 BLM (3)G29 640.0 0 Section 35 BLM (3)G29 471.8 0 Section 36 BLM (3)G29 35.6 0: TOTAL 61,628.0+7,430+ 851011 A-16-9 ELECTRICAL TRANSMISSION LINE CORRIDOR RIGHT-OF-WAY ACREAGES (Federal Ownership) SEWARD MERIDIAN,ALASKA TOWNSHIP/Section OWNER T13N,R2W Section 4 U.S.Army Section 5 U.S.Army Section 7 U.S.Army Section 8 U.S.Army Section 18 U.S.Army Section 19 U.S.Army Section 30 U.S.Army Section 31 U.S.Army T14N,R2W Section 19 U.S.Army Section 20 U.S.Army Section 21 U.S.Army Section 22 U.S.Army Section 28 U.S.Arny Section 33 U.S.Army TIAN,3W Section 9 U.S.Army Section 10 U.S.Army Section 11 "U.S.Army Section 13 U.S.Army Section 14 U.S.Army Section 24 U.S.Army T31N,1W Section 3 BLM (3) Section 4 BLM (3) Section 5 BLM (3) Section 6 BLM (3) T32N,RI1E Section 13 BLM (3) Section 23 BLM (3) Section 24 BLM (3) Section 26 BLM (3) 851011 U.S.ACREAGE SELECTED AND PLATE U.S.ACREAGE*ALREADY CONVEYED 630 10.21 0 G30 35.51 0 G30 37.20 0 G30 06.36 0 G30 30.68 0 G30 30.66 0 G30 30.31 0 G30 04.46 0 G30 33.66 0 G30 31.36 0 G30 38.29 0 G30 03.06 0 G30 31.12 0 G30 36.52 0 G30 19.56 0 G30 33.29 0 G30 05.31 0 G30 14.15 0 G30 44.50 0 G30 24.64 0 G39 62.74 0 G39 54.77 0 G39 62.74 0 639 61.36 0 G39 11.77 0 G39 34.22 0 G39 33.23 0 639 07.35 0 A-16-10 ELECTRICAL TRANSMISSION LINE CORRIDOR RIGHT-OF-WAY ACREAGES (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER Section 27 BLM (3) Section 28 BLM (3) Section 29 BLM (3) Section 30 BLM (3) T32N,R2E Section 3 BLM (3) Section 4 BLM (3) Section 8 BLM (3) Section 9 BLM (3) Section 17 BLM (3) Section 18 BLM (3) T33N,R2E Section 25 BLM (4) Section 34 BLM (4) 'Section 35 BLM (4) Section 36 BLM (4) T32N,R3E Section 2 BLM (3) Section 3 BLM (3) Section ll BLM (3) Section 12 BLM (3) T32N,R4E Section 7 BLM (3) Section 8 BLM (3) Section 13 BLM (3) Section 14 BLM (3) Section 15 BLM (3) Section 16 BLM (3) Section 17 BLM (3) T32N,R5E Section 18 BLM (3) Section 19 BLM (3) Section 20 BLM (3) SEWARD MERIDIAN SUB-TOTAL 851011 PLATE U.S.ACREAGE*'ALREADY CONVEYED 639 38.03 0 G39 38.03 0 G39 37.95 0 G39 02.70 0 G39 41.90 0 G39 20.02 0 G39 36.99 0 G39 24.88 0 G39 07.91 0 G39 42.13 0 G40 34.20 0 C40 09.28 0 G40 44.90 0 G40 07.81 0 G40 19.69 0 G40 37.52 0 G40 22.42 0 G40 40.01 0 c4o 34.69 0 G40 15.67 0 C40 37.10 0 G40 37.10 0 G40 35.22 0 G40 37.10 0 G40 21.43 0 G40 16.45 0 G40 20.47 0 G40 07.68 0 1,598,31+ A 16 11 ELECTRICAL TRANSMISSION LINE CORRIDOR RIGHT-OF-WAY ACREAGES (Cont'd) FAIRBANKS MERIDIAN,ALASKA U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE U.S.ACREAGE*ALREADY CONVEYED T12S,R7W Section 7 AK R.R.G46 0 43.77 Section 17 AK R.R.G46 0 15.71 Section 18 AK R.R.G46 0 14.52 T7S,R8W Section 24 USAF G48 23.27 ) Section 25 -USAP G48 51.86 0 Section 26 USAF G48 51.86 0 T7S,R7W Section 5 USAF G48 48.93 0 Section 6 USAF G48 02.76 0 Section 7 USAF G48 51.36 0 Section 8 USAF G48 00.50 0 Section 18 USAF G48 51.86 0 Section 19 USAF G48 28.59 0 T6S,R7W Section 4 BLM (4)G49 49.43 0 Section 9 BLM (4)G49 48.70 0 Section 16 BLM (4)G49 48.25 0 Section 17 BLM (4)G49 00.45 0 Section 20 BLM (4)G49 34.86 0 Section 21 BLM (4)G49 13.81 0 Section 29 BLM (4)G49 49.63 0 Section 32 -BLM (4)G49 51.78 0 FAIRBANKS MERIDIAN SUB-TOTAL 681.90+ TOTAL 2,280.21+ 851011 4-16-12 FAIRBANKS MERIDIAN,ALASKA ACCESS CORRIDOR RIGHT-OF-WAY ACREAGES (Federal Ownership) TOWNSHIP/Section OWNER U.S.ACREAGE SELECTED AND T18S,R4W Section Section Section Section Section Section Section T19S,R4W Section Section Section Section Section Section Section Section Section T20S,R4W Section Section Section Section Section Section Section Section T218,R4W Section Section Section Section Section Section 851011 BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM. BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM BLM PLATE U.S.ACREAGE*ALREADY CONVEYED 653 19.80 0 653 24.74 0 G53 00.23 0 G53 02.09 0 G53 23.43 0 G53 20.00 0 G53 06.41 0 G53 29.59 0 G53 06.41 0 653 29.94 0 653 20.70 0 G53 08.41 0 653 23.57 0 G53 04.95 0 653 25.35 0 G53 25.61 0 G53 25.35 0 653 26.73 0 G53 18.93 0 G53 08.25 0 G53 22.64 0 G54 12.48 0 G54 24.86 0 G54 24.97 0 G54 28.28 0 G54 34.94 0C65403.36 0 G54 24.63 0 G54 24.38 0 C54 24.38 0 A 16-13 ACCESS CORRIDOR RIGHT-OF-WAY ACREAGES (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE U.S.ACREAGE*ALREADY CONVEYED Section 27 BLM G54 00.11 0 Section 34 BLM G54 25.30 0 Section 35 BLM G54 01.00 0 [22S ,R4W Section 3 BLM G54 24.39 0 Section 10 BLM G54 24.53 0 Section 15 BLM G54 26.96 0 Section 16 BLM G54 08.55 0 FAIRBANKS MERIDIAN SUB-TOTAL 686.25+ SEWARD MERIDIAN,ALASKA T31N,RIW Section 3**BLM (1)G59 26.20 0 Section 4**BLM (1)G59 27.92 0 Section 5**BLM (1)G59 12.92 0 Section 6**BLM (1)G59 21.80 0 132N,RIE Section 23 BLM (3)G58 14.19 0 Section 24 BLM (3)G58 27.63 0 Section 26 BLM (3)G58 12.91 0 Section 27 BLM (3)G58 29.85 0 Section 28 BLM (3)G58 24.33 0 Section 29 BLM (3)G58 13.52 0 T32N,R2E Section 2 BLM (3)G57 15.01 0 Section 3 BLM (3)G57 28.29 0 Section 4 BLM (3)G57 06.29 0 Section 8 BLM (3)G58 07.92 0 Section 9 BLM (3)657&G658 31.71 0 Section 17 BLM (3)G58 21.70 0 Section 18 BLM (3)G58 13.94 0 Section 19 BLM (3)658 13.94 0 851011 A-16-14 JitliACCESS CORRIDOR RIGHT-OF-WAY ACREAGES (Cont'd) U.S.ACREAGE SELECTED AND TOWNSHIP/Section OWNER PLATE U.S.ACREACGE*ALREADY CONVEYED T33N,R2E Section 35 BLM (4)G57 19.42 0 Section 36 BLM (4)G57 26.34 0 132N,R3E Section 2 BLM (3)G57 01.15 0 Section 3 BLM (3)G57 37.09 0 Section Il BLM (3)G57 28.62 0 Section 12 BLM (3)G57 20.09 0 Section 13 BLM (3)G57 07,22 0 T32N,4E Section Il BLM (3)G56 22.96 0 Section 12 BLM (3)G56 16.60 0 Section 13 BLM (3)G56 21.23 0 Section 14 BLM (3)-G56 10.80 0 Section 15 BLM (3)G56 26.86 0 Section 16 BLM (3)G57 24.72 0 Section 17 BLM (3)G57 24.75 0 Section 18 BLM (3)G57 24.45 0 T32N,R5E Section 3 BLM (3)G56 47.60 0 Section 4 BLM (3)G56 26.86 0 Section 5 BLM (3)G56 28.06 0 Section 8 BLM (3)G56 26.46 0 Section 10 BLM (3)G56 25.32 0 Section 15 BLM (3)G56 09.51 0 Section 17 BLM (3)G56 09.62 0 Section 18 BLM (3)G56 23.69 0 SEWARD MERIDIAN SUB-TOTAL 863.59+ TOTAL 1,549.84+ 851011 A-16-15 R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Appendix B - Cost Estimate Summary Table 11/17/2009 FINAL SUSITNA PROJECT -SUMMARY OF ESTIMATED CONSTRUCTION COST FOR RCC ALTERNATIVES AT WATANA AND HIGH DEVIL CANYON Line Item Name Full Watana RCC High Devil Canyon RCC Total Estimated Const.Costs (Billions $)$6.6 $5.4 FERC Line #Line Item Name Full Watana RCC High oe 71A Engineering 4%,Env.2%&Regulatory 1%$341,700,000]$281,400,000 Subtotal $341,700,000 |$281,400,000 Contingency (20%)$68,000,000 |$56,000,000 Total $409,700,000 337,400,000 330 Land and Land Rights $120,900,000 |$120,900,000 331 Power Plant Structure Improvements $158,700,000 |$158,700,000 332.1-.4 Reservoir,Dams and tunnels $2,306,874,000 |$1,803,156,000 332.5-.9 Waterways $557,539,000 |$551,570,000 333 Waterwheels,Turbines and Generators $487,000,000 |$487,000,000 334 Accessory Electrical Equipment $57,100,000 |$57,100,000 335 Misc Power Plant Equipment $32,450,000 |$32,450,000 336 Roads,Rails and Air Facilities $583,500,000 |$489,700,000 Subtotal $4,304,063,000 |$3,700,576,000 Contingency (21.67%)$933,000,000 |$802,000,000 Total $5,237,063,000 |$4,502,576,000 350-390 Transmission Features $322,030,000 |$119,374,000 Subtotal $322,030,000 |$119,374,000 Contingency (20%)$64,000,000 |$24,000,000 Total $386,030,000 |$143,374,000 General Plant 389 Land and Land Rights $-$- 390 Structures and Improvements $-$- 391 Office Furniture and Equipment $-$- 392 Transportation Equipment $-$- 393 Stores Equipment $-$- 394 Tools Shop and Garage Equipment $-$- 395 Laboratory Equipment $-$- 396 Power-Operated Equipment $-$. 397 Communications Equipment $-$- 398 Miscellaneous Equipment $-$- 399 Other Tangible Property $11,850,000 |$11,600,000 Subtotal $11,850,000 |$11,600,000 Contingency (20%)$2,000,000 |$2,000,000 Total $13,850,000 |$13,600,000 By:R&M/HAC Page 1 of 2 Summary Of RCC Alternatives SUSITNA PROJECT -SUMMARY OF ESTIMATED CONSTRUCTION COST FOR RCC ALTERNATIVES AT WATANA AND HIGH DEVIL CANYON FERC Line #Line Item Name Full Watana RCC High eee Indirect Costs 61 Temporary Construction Facilities 0}$- 62 Construction Equipment 0;$- 63 Main Construction Camp $244,249,700 |$189,100,000 64 Labor Expense $-$- 65 Superintendence $-$- 66 Insurance $-$- 68 Mitigation $:$- 69 Fees $-$- Subtotal $244,249,700 |$189,100,000 Contingency (20%)$49,000,000 |$38,000,000 Total $293,249,700 {$227,100,000 71B Construction Management (4%)$195,300,000 |$160,900,000 72 Legal Expenses $:$- 75 Taxes $-$- 76 Administrative &Gen.Expenses $-$- 77 Interest $:$: 80 Earnings/Expenses During Construction $-$- Subtotal $195,300,000 |$160,900,000 Contingency (20%)$39,000,000 |$32,000,000 Total $234,300,000 |$192,900,000 Total Subtotal $5,419,192,700 |$4,462,950,000 Total Contingency $1,155,000,000 |$954,000,000 Total (Millions of Dollars)$6,600 |$5,400 By:R&M/HAC Page 2 of 2 Summary Of RCC Alternatives R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Appendix C -- Cost Estimate Detail -Full Watana RCC 11/17/2009 FINAL HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb 061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories l Description Quantity [Units Unit Price Line Price Total Notes/Remarks 330 Land and Land Rights 041 Land |1|LS $ 120,870,000.00 |$120,870,000 02 Land Rights Included Above 0.3 Misc Charges in Credit Above included Above [ty |$120,900,000 [TT] 331 Powerplant Structure Improvements 0.1 Powerhouse 0.11 Powerhouse and Draft Tube 0.111 Excavation [Powerhouse Vault Rock 122,500|CY $90.12 |$11,040,000 [Draft Tube Rock 25,200|CY $90.12 |$2,271,000 0.113 Surface Preparation'Grouting Powerhouse 99,000/SF $3.33 |$330,000 Draft Tube 76,500|SF $3.33 |$255,000 Grout Curtain-Drilt holes 43,800|LF $27.63 |$1,210,000 Grout Curtain-Cement 17,500|CF $81.10 |$1,419,000 0.114 Concrete and Shot Crete Powerhouse Concrete 32,600|CY $692.87 |$22,588,000 Powerhouse Concrete Overbreak 2,400/CY $447.211 $1,073,000 Powerhouse Reinforcing Steel 1,630|/TON $2,858.29 |$4,659,000 Powerhouse 4"Shotcrete 41,000|SF $10.14 |$416,000 Draft Tube Concrete 12,000|CY $692.87 |$8,314,000 Draft Tube Concrete Overbreak 2,500|CY $447.211 $1,118,000 Draft Tube Reinforcing Steel 990/TON $2,858.29 |$2,830,000 Draft Tube 2"Shotcrete 6,100 |/SF $5.45 |$33,000 0.115 Support and Anchors Powerhouse Rockbolts 1"@ 25'Hy 970/EA $1,234.86 |$1,198,000 Powerhouse Rockbolts 1"@ 15'1,970|EA $735.81 |$1,450,000 Powerhouse Steel Mesh 44,600|SF $5§.81/$259,000 Powerhouse Steel Support 137|TON $12,671.94 |$1,736,000 Draft Tube Rockbolts 1°@ 25'Hy 150/EA $1,234.86 |$185,000 Draft Tube Rockbolts 1°@ 12'390/EA $528.34 |$206,000 Draft Tube Rockbolts 1°@ 9'190/EA $432.12 |$82,000 Draft Tube Steel Mesh 18,900|SF $6.55 |$124,000 0.117 Holes (U/S of Powerhouse)15,000|LF $51.32 |$770,000 [Hotes (Powerhouse Crown)28,500|LF $51.32 |$1,463,000 0.118 Structural Misc Steelwork [Powerhouse and Draft Tube-Steel Crane Rails ALS $10,276,309.00 |$10,276,000 0.119 Architectural-Powerhouse ALS $2,927,898.00 |$2,928,000 y 0.11¢Mechanical Draft Tube Gates 4|SETS $427,880.00 |$1,712,000 Draft Tube Gate Guides 6|SETS $202,680.00 |$1,216,000 Draft Tube Crane 1|LS $1,140,000.00 |$1,140,000 0.12 Access Tunnels and Portals 0.121 Excavation Main Tunnel 50,250|CY $97.45 |$4,897,000 Transformer Gallery Tunnel 17,750\CY $97.45 |$1,730,000 Grouting Gallery Tunnel 1,900)CY $396.04 |$752,000 Surge Chamber Access Tunnel 7,250\CY $145.22 |$1,053,000 Penstock Access Tunnel 61,500/CY $145.22 |$8,931,000 Penstock Elbow Access Tunnel 15,000|CY $145.22 |$2,178,000 Access Shaft Tunnel 1,300|CY $145.22 |$189,000 By:DTA edited for RCC by R&M/HAC Page 1 of 16 Alternative:Full Watana RCC HDRA/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres mb 061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks Connector Tunnel 1,900;CY $379.26 |$721,000 Portals Overburden 6,000/CY $17.14 |$103,000 Portals Rock 3,000 |CY $49.31 |$148,000 0.123 Surface Preparation Main Tunnel Slab 53,100/SF $2.21/|$117,000 Penstock Access Slab 65,200|SF $2.211 $144,000 Horizontal Portal 200|SF $2.30 |$- Inclined Portal 2,100|SF $3.33 |$7,000 0,124 Concrete and Shot Crete Main Portal Concrete Siab 30/CY $406.27 |$12,000 Concrete Walls 570|CY $406.27 |$232,000 Concrete Overbreak 50|CY $368.48 |$18,000 Reinforcing Stee!40|TON $2,887.51 |$116,000 Tunnels Concrete Slab Main Tunnel 1,950;CY $503.90 |$983,000 Concrete Plugs Penstock Elbow ACC 15,000|CY $755.86 |$11,338,000 Concrete Overbreak Main Tunnel 6"1,000|CY $346.43 |$346,000 Reinforcing Steel 70|TON $2,887.51 |$202,000 2"Shotcrete Main Tunnel 20,100|SF $5.26 |$106,000 2"Shotcrete Transformer Gal 7,100|SF $§.26 |$37,000 2 *Shotcrete Surge Chamber Acc 3,900|SF $5.26 |$21,000 2"Shotcrete Penstock Access 24,700|SF $§.26|$130,000 2°Shotcrete Penstock Elbow Acc 7,100|SF $5.26 |$37,000 2"Shotcrete Access Shaft 300|SF $5.26 1$2,000 2"Shotcrete Grout Gallery 800|SF $5.26 |$4,000 2"Shotcrete Connector Tunnel 800|SF $§.26 |$4,000 0.125 Support and Anchors Main Tunnel Rockbolts 1"@12'1,200|EA $528.34 |$634,000 Rockbolts 1"@ 9'250/EA $432.12 |$108,000 Steel Mesh 63,000|SF $6.37 |$401,000 Steel Support 66|TON $12,801.49 |$845,000 Main Tunnel Portal [Rockbolts 1°@15'50\EA $735.79 |$37,000 Transformer Gallery Tunnet Rockboits 1°@12"410/EA $528.34 |$217,000 Rockbolts 1"@ 9"7O|EA $432.12 |$30,000 Steel Mesh 22,500|SF $5.89 |$133,000 Steel Support 24|TON $12,801.49 |$307,000 Grouting Gallery Tunnel Rockboks 3/4"@ 6'160|EA $327.15 |$52,000 Steel Mesh 160;}SF $6.37 |$1,000 Steel Support 2|TON $12,801.49 |$26,000 Surge Chamber Access Tunnel Rockbolts 1"@12'230/EA $528.34 |$122,000 Rockbolts 1°@ 9!50/EA $432.12 |$22,000 Steel Mesh 12,050|SF $6.37 |$77,000 Steel Support 14|TON $12,801.49 |$179,000 Penstock Access Tunnel Rockbolts 1"@12'1,430|EA $528.34 |$756,000 Rockbolts 1°@ 9'240/EA $432.12 |$104,000 Steel Mesh 77,500}SF $6.37 |$494,000 By:DTA edited for RCC by R&M/HAC Page 2 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by HatchAcres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines)FERC Line #Sub Categories Description Quantity _|Units Unit Price Line Price Total Notes /Remarks ___]Steel Support 58/TON $12,801.49 |$742,000 Penstock Elbow Access Tunnel Rockbolts 1"@12'420|EA $528.34 |$222,000 Rockbolts 1"@ 9°120/EA $432.12 |$52,000 Steel Mesh 22,500|SF $6.37 |$143,000 Steel Support 30|TON $12,801.49 |$384,000 Access Shaft Tunnel Rockbolts 1"@12'20|EA $528.34 |$11,000 Rockbolts 1"@ 9'20|EA $432.12 |$9,000 Steel Mesh 930/SF $6.37 |$6,000 Steel Support 8/TON $12,801.49 |$102,000 Connector Tunnel Rockboits 3/4"@ 6'160/EA $327.15 |$52,000 Steel Mesh 160|SF $6.37 |$1,000 Steel Support 2|TON $12,801.49 |$26,000 0.129 Architectural-Main Portal Doors 2|SETS $158,371.90 |$317,000 0.12¢Mechanical Ventilation System Included in (63.81 and 63.82) 0.13 Access Shaft | 0.131 Excavation Rock 13,700|CY $227.67 |$3,119,000 0.133 Surface Preparation Shaft 64,000|SF $3.33 |$213,000 0.134 Concrete and Shot Crete [Concrete Lining 3,350/CY $944.82 |$3,165,000 [Concrete Overbreak 6"1,220|CY $551.14 |$672,000 0,135 Support and Anchors -Rockbolts 3/4"@ 6'1,050/EA $327.15 |$344,000 0.138 Structural Misc Steelwork 50|/TON $7,395.00 |$370,000 0.139 Architectural-control Building 0.13¢Mechanical Elevators 1|LS $2,368,815.00 |$2,369,000 0.14 Fire Protection Head Tank 0.141 Excavation 1,150|CY $588.80 |$677,000 0.143 Surface Preparation 2,800|SF $2.30 |$6,000 0.144 Concrete &Shotcrete Concrete 250/CY $963.72 |$241,000 Concrete Overbreak 6”45\CY $406.27 |$18,000 Reinforcing Steel 10/TON $2,858.29 |$29,000 0.145 Support and Anchors Rockbolts 1"@ 12!25|EA $528.34 |$13,000 Rockbolts 1"@ 9'10/EA $432.12 |$4,000 Steel Mesh 1,200|SF $6.30 |$8,000 Steel Support 2/TON $12,671.95 |$25,000 0.148 Misc Steelwork ALS $73,297.50 |$73,000 0.14¢Mechanical Piping/Valves (Inctuded in 335.12) 0.15 Bus Tunnels (totals for 3 Bus Tunnels) 0.151 Excavation [Rock Horizontal 2,700|CY $213.70 |$577,000 [Rock Inclined 1,300|CY $601.04 |$781,000 0.153 Surface Preparation-Tunnels 7,100/SF $3.33 |$24,000 0.154 Concrete and Shotcrete Concrete Slab 350|CY $818.84 |$287,000 Concrete Overbreak 12”250/CY $472.41 |$118,000 Reinforcing Stee!18/TON $2,858.29 |$51,000 2"Shotcrete 2,200 |/SF $5.26 |$12,000 0.155 Supports and Anchors By:DTA edited for RCC by R&M/HAC Page 3 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb 061109,R&M 11/16/09 Aiternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes /Remarks Rockboits 1"@ 25'60/EA $1,234.86 |$74,000 Rockbolts 1"@ 12'140\EA $528.34 |$74,000 Rockbolts 1"@ 9'50/EA $432.12 |$22,000 Steel Mesh 6,800/SF $6.30 |$43,000 Steel Support 11[TON $12,671.94 |$139,000 0.16 Transformer Gallery Tunnel 0.161 Excavation-Rock 26,800|CY $87.44!$2,343,000 0.163 Surface Preparation 24,600|SF $2.30 |$57,000 0.164 Concrete and Shotcrete Concrete Base Siab 2,400|CY $1,228.27 |$2,948,000 Concrete Overbreak 12°H/6"V 770|CY $377.93 |$291,000 Reinforcing Steel 120|TON $2,858.29 |$343,000 0.165 Support and Anchors Rockbolts 1"@ 25'600/EA $1,234.86 |$741,000 Rockbolts 1"@ 15'270|EA $735.81 |$199,000 Steel Mesh 20,700/SF $§.81/$120,000 Steel Support 29/TON $12,671.94 |$367,000 0.167 Drainage Holes 8,300/LF $47.95 |$398,000 0.17 Cabie Shafts | 0.171 Excavation Rock 3,400|CY $601.04 |$2,044,000 0.173 Surface Preparation Shafts 41,400|SF $3.33 |$138,000 0.174 Concrete and Shotcrete [Concrete Lining 1,040/CY $1,763.66 |$1,834,000 |Concrete Overbreak 6"B00;CY $881.83 |$705,000 0.175 Supports and Anchors-Rockbolts 3/4"@ 6'650/EA $327.15 |$213,000 0.178 Structural Misc Steelwork 18/TON $15,602.00 |$281,000 0.179 Architectural-Enclosures 1|LS $199,317.00 |$199,000 0.17¢Mechanical Hoist 2|EA $476,960.00 |$954,000 0.18 Dewatering (during Construction) 0.181 [Dewatering (Power Facilities)1/LS $1,336,798.50 |$1,337,000 0.19 Instrumentation] 0.191 [Instrumentation 1/LS $1,714,813.50 |$1,715,000 0.2 Misc Buildings (Control Buildings)1|LS $4,433,085.00 |$4,433,000 0.3 Permanent Town |(included in 63.5)LT 7 $158,700,000332_.Beservolr,Dams and Waterways os ee Reservoir [Reservoir Clearing 3,005.85 same as embankment dam)nents sauce,DVerSiON Schemes /Cofferdams.::ee omen ae S 0.21]|Diversion Schemes ||0.211 Excavation Rock 287,800 CY $50.18 $14,442,000 (03.31.311 Rock Waste)Soil 432,000 CY $11.53 $4,981,000 (03.31.311 Overburden above)0.212 Water Conveyance Diversion Pipes Steel Pipe 9,997,000 LB $5.00 $49,985,000 use unit price from 0.818 rounded up to $5/ibConcretePipeSupport(coventional concrete)18,400 CY $544.85 §$10,025,000 use unit price from 0.614ReinforcingSteel400TON$2,887.51 $1,155,000 use unit price from 0.614EmergencyRelChambers|Concrete Plug 15,300/CY $755.86 |$11,565,000[4"Shotcrete 2,790|/SE $10.13 |$28,000 Use same concrete plug and gate system0.21¢Mechanical as in embankment dam sheme[Upstream Lower Gates |[Gate Equipment 2|EA $§,073,120.00 |$10,146,000 By:DTA edited for RCC by R&M/HAC Page 4 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:OTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks Upstream Upper Gates |Gate Equipment 2|EA $2,840,080.00 |$5,680,000 [Trashracks iLS $1,777,500.00 |$1,778,000 Downstream Lower Outlet [Stopiog Guides 1/LS $142,200.00 |$142,000 |Stoplogs includes follower ILS $1,967,100.00 |$1,967,000 Downstream Upper Outlet ___|Stoplog Guides 1/LS $82,950.00 |$83,000 Low Level Rel [Slide Gates Include Steel Liner QIEA $3,517,470.00 |$31,657,000 eee0.22 rrr"Upstream Cofferdam re * 0.221 Cofferdam RCC 978,000 CY $100.00 (incorporated in the main dam) 0.222 Pre-cofferdam Rock Fill 23,400 CY $10.90 $255,000 23333 CY,calculated 0.223 Cutoff Slurry Wall excavation 5,100 CY $488 $25,000 4,850 CY from embankment dam slurry wall 46,000 SF $72.44 $3,332,000 43,6000 SF from embankment dam 0.22d Dewaterin{{same as embankment dam) initial Dewatering 1LS $5,807,685.00 |$5,808,000 [Dewatering Maintenance 1LS $377,$22,378,000 023 0"™..Down Stream Cofferdam ae ee ES eg 4 - 0.231 Cofferdam RCC 261,300 CY $100.00 (incorporated in the main dam) 0.232 Pre-cofferdam Rock Fill 23,400 CY $10.90 $255,000 0.233 Cutoff Slurry Wall Excavation 5,100 CY $-4.60 $23,000 Slurry Wail 46,000 SF $o.72.44 $3,332,000 wren d ee oe ee ||| 0.3 ca setrenonn Main Damo:aaa 0.31 MainDam _| 0.311 Excavation Overburden above el.1470 675,333|CY 11.53 |$7,787,000 Overburden beiow el.1470 1,773,333 |CY ]11.06 |$19,613,000 The ratio of foot print area of RCC dam /Embankment Rock Usable above el.1470 429,667 |CY 5 43.03 18,489,000 dam =0.321 Rock Usable below el.1470 159,333 |CY $43.72 |§6,966,000 Rock Waste above el.1470 650,000|/CY $43.03 27,970,000 Rock Waste below el.1470 289,833|/CY $50.18 |$14,544,000 0.312 Dam RCG 11,900,000 CY $100.00 $=1,190,000,000BaseRCC3,100,000 CY $100.00 $310,000,000 0.313 Surface Prep/Grouting Surface Preparation (same as embankment dam) Under Core/Filters above el.1500 1,675,000|SF $3.11 /$5,209,000 Under Core/Filters below el.1500 613,000/SF $3.11 |$1,906,000 Under Shell above el.1500 5,186,000/SF $2.15 1 $11,150,000 Under Shelt below el.1500 2,584,000|SF $2.15 |$5,556,000 Consolidation Grout : Drill Holes 350,000 LF $11.91 $4,169,000 687,000 LF from embankment dam Cement 350,000 CF $67.81 $23,734,000 687,000 CF from embankment dam Grout Curtain Drill Holes 465,000 LF $26.76 $12,443,000 465,000 LF from embankment dam Cement 186,000 CF $81.10 $15,085,000 186,000 CF from embankment dam Dental Concrete .(same as embankment dam) l {|||_|Dental Concrete |85,000|CY L$365.33 |$31,053,000 | By:DTA edited for RCC by R&M/HAC Page 5 of 16 Alternative:Full Watana RCC HDR/AEA S'Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Tu rbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks'|0.317 [___[Drainage | ||Hoies 136,000|LF $51.32 |$6,980,000 0.318 Bridge Precast Bridge Beams 25,500 CY $544.85 $13,894,000 Unit price from item 0.614 Concrete Road Deck 5,400 CY $544.85 $2,942,000 Unit price from item 0.614 Piers 500 CY _§$54485 $272,000 ___Unit price from item 0.614 f.0.92 7")LS Grout Galleries/Portals oo...;ee!:"et (3 portals ,muttiply by 3) 0.321 Excavation 'Tunnels/Shafts-Core Area [Rock Horizontal 77,400|CY 394.80 30,558,000 13000 CY Portals [Overburden Rock 10,000/CY $17.16 |$172,000 3600 CY [Rock 3,000 |CY $49.16 |$147,000 1000 CY 0.323 Surface Preparation Portals Horizontal 100|SF $2.30 |$:30 SF Inclined 500|SF $3.33 |$2,000 200 SF 0.324 Concrete and Shotcrete Tunnels-Core Area Concrete Plugs 1,000|CY $428.32 |$428,000 Concrete Slab 2,300|/CY 944.82 |$2,173,000 Concrete Overbreak 6"1,150|CY $755.86 |$869,000 Reinforcing Steel 80|TON 2,887.51 |$231,000 2"Shotcrete 15,000|SF $5.26 |$79,000 Tunnels-Access Concrete Slab 1,600 /CY §944.82 |$1,512,000 Concrete Overbreak 6°800/CY 755.86 |$605,000 Reinforcing Steel 60/TON §2,887.51 |$173,000 2"Shotcrete §,400|SF 5.26 |$28,000 Shatts [2"Shotcrete 5,000|SF $5.26 |$26,000 Portals [Concrete 60/CY $406.36 |$24,000 20 CY [Reinforcing Steei 6/TON $2,887.51 |$17,000 2 TON 0.325 Support and Anchors Tunnels-Core Area Rockbolts 3/4"@6'1,800/EA $$27.15 |§589,000 Steel Mesh 3,000/SF $5.37 |§16,000 Steel Support 20|TON 5 12,801.49 |$256,000 Tunnels-Access Rockboits 3/4"@6'1,200/EA $327,15 393,000 Steel Mesh 1,100|SF $§.37 6,000 Steel Support 20|TON $12,801.49 256,000 Shafts [Rockbotts 3/4°@6'350/EA $327.15 |$115,000 [Steel Mesh 1,000|SF $5.37 |$5,000 Portals [Rockbolts 1°@15'30/EA $735.81 |$22,000 0.329 Architectural Portal Doors /[Portal Doors 2|EA $42,123.66 |$84,000 0.331 instrumentation 1LS $10,821,538.50 $10,822,000 This cost is taken as 50%of embankment dam 0.4 Retict Channel |(same as embankment dam) 0.41 Shore Protection 0.411 [Excavation |.[Overburden Stripping 2'thick 2,200/CY $11.56 [$25,000 By:DTA edited for RCC by R&M/HAC Page 6 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines)FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes /Remarks 0.412 Fill Dump and Spread____[Filter Material -2'layer 2,200/CY $31.93 [$70,000 [Rock Spalls/Rip Rap-3'Ave 3,300/CY $9.86 |$33,000 Shore Pratection [Rip Rap 24,000|CY $24.26 |$582,000 [Waste Rock 24,000/CY $22.78 |$547,000 0.44 Channel Fitter Blanket 0.442 Fill Coarse Fitter 2,900,000 |CY 33.85 |$98,165,000 Fine Fitter 2,180,000|CY 43.65 |$95,157,000 Rip Rap 182,000|CY 24.26 |$4,415,000 0.443 Surface preparation Foundation Prep Clearing and Grubbing 460|ACRE $3,963.11 |$1,823,000 Excavation 2,236,000|CY $15.62 |$34,926,000 $2,306,874,000 0.5 Outlet Facilities 0.51 Outlet Facilities-(Intake Civil Work Include in Power Intake )(same as embankment dam) 0.511 Excavation inlet |(included in 332.611) Outlet (Included in 332.521) Tunnels [Rock Horizontal 83,000|/CY $103.00 |$8,549,000 [Rock Inclined 9,000 /CY $183.49 |$1,651,000 0.513 Surface Preparation'GroutingInlet[(Included in 332.613) Outlet (Included in 332.523) Tunnels 323,500/SF $2.30 |$744,000 Contact Grouting TLS $569,428.05 |$569,000 0.514 Concrete and Shotcrete Intet |(Included in 332.614) Outlet (Included in 332.524) Tunnels Concrete Lining 27,200/CY $944.82 |$25,699,000 Concrete Overbreak 6"6,200|CY 440.92 |$2,734,000 2°Shotcrete 12,000|SF $5.26 |$63,000 3°Shotcrete 19,400/SF ]7.69 |$149,000 0.515 Support and AnchorsInlet|(included in 332.615) Outlet (Included in 332.525) Tunnels [Rock Bolts 1*@6'2,400/EA $327.15 |$785,000 |Steel Mesh 94,500/SF $6.37 |$602,000 0.51¢Mechanical Inlet Trash Racks/Guides 1|LS 1,540,500.00 1,541,000 Gate Equipment 2|EA 3,317,040.00 6,634,000 Stoplog Guides 2|SETS 213,940.00 428,000 Outlet Fixed Cone Valves 6 +1 Spare 1LS $4,500,630.00 |$4,501,000 Ring Follower Gates 6IEA 1,936,494.80 |$11,619,000 Steel Manifold Liner 1,950|TON 8,952.53 |$17,457,000 Misc Mechanical Equipment 4LS 948,000.00 |$948,000 .Misc Electrical Systems oe.; ALS 237,000.00 |$237,000 e952 "Main (Chute }Spillway (Includes Civil Works for Outlet Facilities)"ee wee 3 0.522 Stepped Spiltway Conventional concrete 89,000 CY $54485 $48,492,000 89,000 CY,calculated,unit price from item 0.614 By:DTA edited for RCC by R&M/HAC Page 7 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti tor 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb 061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories |Description Quantity [Units |Unit Price |Line Price |Total Notes /Remarks Reinforcing steel 2,150 TON $2,887.51 $6,208,000 2,142 TON,calculated,unit price from item 0.614 0.523 Stilling Basin Conventional concrete 85,000 CY $544.85 $§$46,312,000 8,400 CY,calculated,unit price from item 0.614 Reinforcing Steel 185 TON $2,887.51 $534,000 183 TON,calculated,unit price from item 0.614 Excavation Rock 13,000 CY $50.18 §652,000 (03.31.311 Rock Waste) 0.524 Consolidation Grouting Drill Holes 7,000 LF $11.91.$83,000 (caln for only stilling basin area) Cement 7,000 CF $67.81.$475,000 |Grout Curtain 0.525 Support and Anchors Drainage Tunnel (Assume drainage tunnel /gallery for spillway stilling [Steel Support 7|TON $12,801.49 |$90,000 basin,same as for embankment dam sheme) [Steel Mesh 1,000|SF $§.87 |$6,000 Rockbolts Drainage Gallery [3/47 @ 6 576/EA $330.19 |$190,000 Rockbolts Approach [t*@ 15°275|EA $741.28 [$204,000 Rockbolts Chute and Structure [1"@ 15'112/EA $741.28 |$83,000 Rockbotts Vaive Block/Bucket {1"@ 15°46/EA $741,28 |$34,000 Slab/Wall Anchors [1*@ 10°9,300/EA $474.06 |$4,409,000 0.527 Drainage | Dritl Holes [Box Drains (To Drain Tunnel)54,000/LF $47.95 |$2,589,000 [3"Relief 640|LF 49.50 [$32,000 0.52¢Mechanical Gate Equipment 3/EA §4,249,280.00 |$12,748,000 Stoplog Guides 3/SETS 92,196.88 |$277,000 Stoplogs Includes Follower 1|SET 945,840.00 946,000 Misc Electrical 1Ls 237,000.00 237,000 0.6 Power Intake (inc Inlet exec and Inlet Structure Civil Works for Outlet)(same as embankment dam) 0.61 Intake Structure and Approach 0.611 Excavation Overburden 524,000|CY $14.87 |$7,792,000 Rock Usable 1,306,000/CY $40.27 |$52,593,000 Rock Waste 138,000|/CY $40.30 5,561,000 0.613 Surface Preparation[Horizontal 25,600/SF $2.30 |$59,000 [Inclined 88,300/SF $3.33 |$294,000 0.614 Concrete and Shotcrete Structure Concrete Structure 121,000|CY 544.85 65,927,000 Concrete Overbreak 12"H/6"V 2,600|CY.336.99 876,000 Reinforcing Steel 7,870|TON 2,887.51 22,725,000 0.615 Supports and Anchors-1"@ 15'400|EA 735.81 294,000 0.61c Mechanical Trashracks and Guides 6|SETS 1,080,960.00 6,486,000 Gate Equipment 6/EA 1,902,720.00 11,416,000 Bulkhead Gates Guides 6|SETS 225,200.00 1,351,000 Bulkhead Gates inc Follower 1|SET 698,120.00 698,000 Shutter with Guides 6|SETS $720,640.00 4,324,000 Iceboom with Hoist 6|SETS §1,238,600.00 |$7,432,000 Iceboom Guides 6|SETS 563,000.00 |$3,378,000 Intake Service Crane 1JEA 693,700.00 694,000 Bubbler System ILS 948,000.00 948,000 By:DTA edited for RCC by R&M/HAC Page 8 of 16 Alternative;Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost tor 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 DollarsFullWatanaRCC(6 Turbines)FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks |_|.|Misc Electrical 1jLS $237,000.00 |$237,000 0.61d L__[Intake Building 1|LS $237,000.00 |$237,000 0.7 Surge Chamber (same as embankment dam) 0.71 Surge Chamber 0.711 Excavation [Chamber Rock 101,000/CY $90.12 |$9,102,000 [Vent Shaft Rock 2,200|CY $601.04 |$1,322,000 0.713 Surface Preparation 29,700|SF $2.30 |$68,000 0.714 Concrete and Shotcrete Concrete 6,000 |CY $513.35 3,080,000 Concrete Overbreak 1,000'CY 440.92 441,000 Reinforcing Steel 300|TON J 2,858.29 857,000 4"Shotcrete 38,400|SF 7]10.13 389,000 Vent Shaft [2"Shotcrete 5,900|SF $5.26 |$31,000 0.715 Supports and Anchors Rockbolts 1"@25'HY 570|EA ]1,234.86 704,000 Rockbolts 1°@ 15'2,110|EA 735.81 1,553,000 Steel Mesh 28,900|SF §.81 |§168,000 Steel Support 66|/TON 12,671.94 |§836,000 Vent Shaft [Rock bolts 3/4"@ 6'370|EA $327.15 |$121,000 {Steel Mesh 1,200/SF $6.30 |$8,000 0.717 Drainage Holes (In Chamber)15,500|LF $47.95 |$743,000 0.71¢Mechanical Stoplog Guides 2|SETS $709,380.00 |$1,419,000 Stoplog Includes Follower 1|SET $3,558,160.00 |$3,558,000 0.8 Penstocks (same as embankment dam) 0.81 Penstocks _| 0.811 Excavation Tunnels [Rock Horizontal 53,400/CY $144.77 |$7,731,000 [Rock Inclined 54,000|CY $286.15 |$15,452,000 0.813 Surface Preparation/Grouting Surface Preparation[Tunnels 378,000/SF $3.33 |$1,259,000 Contact Grouting |Contact Grouting 1|LS $574,582.80 |$575,000 Consolidation Grouting [Consolidation Grouting 1/LS $797,268.00 |$797,000 0.814 Concrete and Shotcrete Concrete Liner 37,200|CY 970.01 |$36,084,000 Concrete Overbreak 6"10,600|CY >692.87 |$7,344,000 Reinforcing Steel 27|TON 2,858.29 77,000 3"Shotcrete 34,000/SF $7.69 261,000 2"Shotcrete 20,800/|SF $§.26 109,000 0.815 Support and Anchors Rockbolts 1"@ 25'150|EA $1,234.86 185,000 Rockbotts 1"@ 6'4,200|EA 327.15 1,374,000 Steel Mesh 193,000|SF 6.37 1,229,000 0.818 Structural Misc Steelwork 2,400/TON 9,673.24 23,216,000 09 Tailrace Works (1 Portal with Combined Tailrace/Diversion Tunnel (same as embankment dam) 0.91 Tailrace Tunnels/Portals 0.911 Excavation Tunnels [Rock 135,000 |CY $103.00 |$13,905,000 Portals By:DTA edited for RCC by R&M/HAC Page 9 of 16 Alternative:Full Watana RCC HDA/AEA Susitna Hydroelectric Project Cost E for 1982 quantities-Alternatives By:DTA with edits tor RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres mb 061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) IFERC Line #Sub Categories Description Quantity _|Units Unit Price Line Price Total Notes/RemarksOverburden3,200|CY 17.14 §5,000 Rock Usable 46,000 |CY 49.16 2,261,000 Rock Waste 14,500|CY 4 49,16 713,000 0.913 Surface Preparation Tunnels [Tunnels 266,000/SF $3.33 |$886,000 Portals [Horizontal 600|SF $2.30 |$1,000[Inclined 6,000|SF $3.33 |$20,000 0.914 Concrete and Shotcrete Tunnels Concrete Lining 14,500/CY 440.92 |$6,393,000 Concrete Overbreak 6"7,500|CY 314.94 |$2,362,000 2"Shotcrete 45,600|SF 5.26 1$240,000 Reinforcing Steel 22;TON 2,887.51 |$64,000 Portals Concrete Base Slab 100|CY $651.93 |$65,000 Concrete Wallis 2,900/CY $651.93 |$1,891,000 Concrete Overbreak 12"H/6"V 110/CY $471.65 |$52,000 Reinforcing Steel 195|TON $2,887.51 |$563,000 0.915 Support and Anchors Tunnels Rockbolts 1°@ 12'2,750|EA 5 528.34 |$1,453,000 Rockbolts 1"@ 9'480/EA 5 432.12 |$207,000 Steel Support 132/TONS §12,801.49 |$1,690,000 Steel Mesh 133,000/SF §6.37 |$847,000 Portals |Rockbolts 1*@ 15 110}EA $735.81 |$81,000 0.91¢Mechanical ck sum Stopiog Guides 1}SET $112,600.00 |$113,000 $557,539,000StoplogsIncludesFollower1|SET $751,200.00 |$751,000 $_2,864,400,000 |for embankment dam $3,202,800,000333Waterwheels,Turbines and Generators 0.11 Turbines and Govemors 0.111 [Supply _|6IEA $- 0.112 [Instat |6/EA $- 0.2 Generators and Exciters 0.21 Generators and Exciters (Supply and Install) 0.211 [Generators and Exciters 6/EA $- lL]l $_487,000,000.00 $487,000,000334AccessoryElectricalEquipment 0.1 Connections,Supports and Structures 0.11 Structures | 0.111 [Structures (included Beiow)(Inciuded Below) 0.12 Conductors and Insulators 0.121 Generator Isolated Phase Bus 1/LS $7,584,000.00 |$7,584,000 0.122 HV Power Cables and Accessories TLS $3,081,000.00 |$3,081,000 0.123 LV Power Cables and Accessories 1|LS $1,422,000.00 |$1,422,000 0.124 Control Cables and Accessories ILS $2,607,000.00 |$2,607,000 0.125 Grounding System 1LS $355,500.00 |$356,000 0.13 Conduits and Fittings 0.131 [Conduits and Fittings TiLS $948,000.00 |$948,000 0.2 Switchgear and Control Equipment 0.21 [Auxiliary Transformers 0.211 [___|Auxiliary Transformers 4/EA $83,811.00 |$335,000 By:OTA edited for RCC by R&M/HAC Page 10 of 16 Alternative:Full Watana RCC HOR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity -_|Units Unit Price Line Price Total Notes /Remarks 0.22 Circuit Breakers Generators 0.221 [Circuit Breakers Generators 6|EA $1,504,300.00 |$9,026,000 0.23 Surge Protectors and Generator Cubicles 0.231 [Surge Protectors and Generator Cubicles ijLs $1,090,200.00 |$1,090,000 0.24 Switch boards | 0.241 |Switch boards 1/LS $1,848,600.00 |$1,849,000 0.25 Auxiliary Power Equipment 0.251 [Auxiliary Power Equipment 1jLS $521,400.00 |$521,000 0.3 Cubicles and Appurtenances 0.31 Control,relay and meter boards 0.311 [Control,relay and meter boards 1|LS $2,133,000.00 |$2,133,000 0.32 Computer Control System 0.321 [Computer Control System (Inciuded in Trans-Ems) 0,33 Supervisor and Telemeter System 0.331 [Supervisor and Telemeter System Included in Trans EMS) | 0.4 Power Transformers 0.41 Power Transformers 0.411 [Power Transformers 10/EA $2,000,000.00 |$20,000,000 || 0.5 Lighting System | 0.51 Powerhouse and Transformer Gallery 0.511 {Powerhouse and Transformer Gallery 1/LS $1,824,900.00 |$1,825,000 0.52 Access Tunnels and Roads 0.521 [Access Tunnels and Roads ILS $402,900.00 |$403,000 | 0.6 Misc.Electrical Equipment 0.61 Misc.Electrical Equipment 0.611 Me Electrical Equipment 1/LS $782,100.00 |$782,000 | 0.7 Surface Accessory Equipment 0.71 34.5 kV and LV Equipment 0.711 Switchboard 1LS $213,300.00 |$213,000 0.712 Cables |1/LS $450,300.00 |$450,000 0.713 Aux Transformers 1|LS $284,400.00 |$284,000 0.73 Diesel Generator-Standby 0.731 [Diesel Generator-Standby 2|EA $347,550.00 |$695,000 0.74|-Exterior Lighting 0.741 [Exterior Lighting 1jLS $355,500.00 |$356,000 0.75 Mimic Board-Control Building 0.751 [Mimic Board-Control Building WLS $1,185,000.00 |$1,185,000 $57,100,000335MiscPowerplantEquipment| 0.1 Auxiliary Systems-Underground 0.11 Station Water Systems 0.111 [Station Water Systems 1/LS $4,977,000.00 |$4,977,000 0.12 Fire Protection Systems 0.121 [Fire Protection Systems 1jLS $2,844,000.00 |$2,844,000 0.13 Compressed Air Systems 0.131 [Compressed Air Systems 1jLS $3,555,000.00 |$3,555,000 0.14 Oil Handling Systems 0.141 [Oil Handling Systems TLS $2,370,000.00 |$2,370,000 0.15 Drainage &Dewatering By:DTA edited for RCC by R&M/HAC Page 11 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity _|Units Unit Price Line Price Total Notes /Remarks 0.151 [Drainage &Dewatering 1jLs $5,214,000.00 |$5,214,000 0.16 Heating,Ventilation and Cooling System 0.161 [Heating,Ventilation and Cooling System 1|Ls $3,555,000.00 |$3,555,000 0.17 Miscellaneous | 0.171 [Miscellaneous ALS $2,370,000.00 |$2,370,000 0.2 Auxiliary Systems-Surface Facilities 0.21 [Auxiliary Systems-Surface Facilities 0.211 [__JAuxiliary Systems-Surface Facilities 1|LS $711,000.00 |$711,000 0.3 Auxiliary Equipment | 0.31 Powerhouse Cranes 0.314 [Powerhouse Cranes 2\EA $1,783,800.00 |$3,568,000 0.32 Elevators 0.321 [Elevators {1s $545,100.00 |$545,000 0.33 Miscellaneous Cranes and Hoists 0.331 [Miscellaneous Cranes and Hoists 1jLS $505,500.00 |$506,000 0.34 Machine Shop Equipment 0.341 [Machine Shop Equipment TLS $2,022,000.00 |$2,022,000 0.4 General Station Equipment {Included in Mechanical And Electrical Systems) 0.5 Communications Equipment 1jLS $213,300.00 |$213,000 $32,450,000 336 Roads,Rails and Air Facilities 0.1 Roads 0.11 Pioneer Roads and Bridges 0.111 Gold Creek-Watana Road (58 mi) Clearing 546|ACRE $11,416.62 |$6,235,000 Waste Excavation 1,570,824|CY $9.51/$14,939,000 Common Excavation 1,407,288|CY $8.32 |$11,709,000 18"Culverts 16,723|LF $62.55 |$1,046,000 36"Culverts 5iLS $32,760.98 |$158,000 D-1 Base Material 321,146|/TON $45.47 |$14,603,000 Fabric 16,428 /SY $6.73 |$104,000 Maintenance 121|MV/YR $9,008.99 |$1,089,000 0.112 Gold Creek-Parks Road (41.25 Miles ) Clearing 98!ACRE $11,416.62 |$1,123,000 Waste Excavation 228,086 |CY $9.51 |$2,169,000 Common Excavation 165,200|CY $8.32 |$1,374,000 18"Culverts 2,453/LF $62.55 |$153,000 36"Culverts OjLS $35,451.31 |$9,000 D-1 Base Material §9,371|TON $45.47 |$2,700,000 Fabric 3,986|SY $6.73 |$27,000 Maintenance 22|MUYR $9,008.32 |$199,000 0.113 Devil Canyon Low Level Crossing Crossing (7.88 Miles) Clearing 170|ACRE $11,416.62 Waste Excavation 498,845/CY $9.51 Common Excavation 549,417|CY $8.32 Rock Excavation 749,641 |CY $28.45 18"Culverts §,100|LF $62.55 Bridge 1/LS $_120,000,000.00 D-1 Base Material 36,966 |TON $45.47 Maintenance 118|M/YR $11,258.74 By:DTA edited for RCC by R&M/HAC Page 12 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks 0.114 Gold Creek-Watana (41.25 miles)1|LS $28,132,000 0.12 Permanent Roads and Bridges 0.124 Parks Highway to Watana (62 mi)62|Ml $3,000,000.00 |$3,000,000 0,125 Susitna Bridge 40800/SF $450.00 |$18,360,000 0.2 Rail Facilities 0.24 Permanent Railroad (including railheads) 0.244 Gold Creek to Watana-Rail R-1,(33 Mi) Clearing 671/AC $11,416.62 |$7,662,183 Waste Excavation 1687883|CY $9.51|$16,051,766 Common Excavation 3307678 |CY $8.32 |$27,519,880 Rock Excavation 9114|CY $28.51 |$259,867 Borrow 449500|CY $11.88 |$§,340,060 Subballast 711055 |CY $18.15 1 $12,902,807 Grade "A"Base Material 6650|CY $35.45 |$235,729 D-1 Base material 2400|TON $43.20 |$103,680 A.C.Surfacing 2200;TON $198.00 |$435,600 Dock Lumber 16|MBF $1,258.60 |$20,138 18°Culvert 20093/LF $68.26 |$1,371,458 36"+Culverts OjLS $92,160.00 |$: Fabric 12930|SY $9.00 |$116,369 Thaw Pipes 41843/LF $95.04 |$3,976,745 Topsoil &Seed 431|AC $10,800.00 |$4,653,257 Rail Yard Control Devices 1|LS $1,800.00 |$1,800 Bridges O|SF $900.00 |$. Trackage 325940/LF $350.00 |$114,079,000 Maintenance Rail 406|Mile-years $10,000.00 |$4,060,000 Railhead 7Ilyears $75,000.00 |$525,000 0.13 Site Roads 0.131 Construction Roads [Site Roads 20|Mile $12,554 ,637.23 |$251,093,000[Maintenance 141|MUYRS |$223,092.85 |$31,456,000 0.132 Permanent Roads [Permanent Roads 6/MILE $1,287,997.42 |$7,728,000 By:DTA edited for RCC by R&M/HAC Page 13 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti tor 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by HatchAcres_mb_061109,R&M 11/16/09 Alternatives-2008 Doilars Full Watana RCC (6 Turbines) FERC Line #Sub Categories Description Quantity {Units Unit Price Line Price Total Notes/Remarks[| 0.3 Airstrip _| 0.31 Airstrip Permanent Airstrip tLS $12,798,000.00 |$12,798,000 9 years maintenance savings 1Ls Temporary Airstrip 1|LD $2,133,000.00 |$2,133,000 0.4 Saved Maintenance 1/LS $(11,385,762.69)|$(11,386,000) 583,520,338 Transmission Plant 350 Land and Land Rights Land and Land Rights Transmission |58/MILE $86,720.00 |$5,030,000 Substations (4 Sites)O}LS $2,607,000.00 |$: 5,030,000 352 Substation and Switching Station 0.1 Switchyard 0.14 [Switchyard 2|Ls $14,000,000.00 |$28,000,000 28,000,000 353 Substation/Switching Station Equipment Ester O/LS $57,922,800.00 |$: Willow OLS $3,613,020.00 |$: Knik Am OjLS $29,838,300.00 |$: University O|Ls $88,685,400.00 |$: Devil Canyon ojLs $35,585,550.00 |$: Willow Energy Management System (EMS) Equipment and System Costs OILS $27,326,100.00 |$- Microwave Communication Equipment O|LS $11,660,400.00 |$- EMS Control Center Building OjLS $9,148,200.00 |$: a and Devil Canyon in-plant Monitor and Control Equipment OjLs $8,619,690.00 |$: 354 Steel Towers and Fixtures | Towers (Including Foundation and Hardware)58 [miles $4,500,000.00 |$261,000,000 261,000,000 356 Conductors and Devices Conductors O|MILE $218,281.33 |$: Submarine Cables Q;EACH $15,808,340.56 |$: 359 Roads and Trails Roads and Trails 200/MILE $75,744.00 |$15,149,000 Clearing and Roads 340|/MILE $37,872.00 |$12,876,000 ck sum 28,000,000 $322,030,000 General Plant! 389 Land and Land Rights Land and Land Rights $- By:DTA edited for RCC by R&M/HAC Page 14 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana RCC (6 Tu FERC Line #Sub Categories l Description rbines) Quantity {Units Unit Price Line Price Total Notes /Remarks L ||4 390 Structures and improvements Structures and improvements 391 Office Furniture and Equipment Office Furniture and Equipment 392 Transportation Equipment | Transportation Equipment Lf 393 Stores Equipment!_| Stores Equipment 394 Tools Shop and Garage Equipment Tools Shop and Garage Equipment |395 Laboratory Equipment|[ Laboratory Equipment |396 Power-Operated Equipment | Power-Operated Equipment 397 Communications Equipment Communications Equipment [||ff edwo}ooMiscellaneous Equipment | Miscellaneous Equipment LE TT ff399OtherTangibleProperty-_| Other Tangible Property =LS $11,850,000.00 11,850,000 Saved Maintence =us $(231,219.51)$(231,000) Indirect Costs $11,600,000 Temporary Construction Facilities Temporary Construction Facilities [|ft Main Construction Camp 0.1 Main Construction Camp Saved Maintence 61 62 Construction Equipment _| Construction Equipment 63 Site Preparation Buildings utilities MAIN CONSTRUCTION VILLAGE site prep buildings utilities 118 $624,355,816 1LS $(12,182,552.51) 6455000 29643000 24025000 60123000 5 $-300,615,000.00 6387000 19753000 9699000 By:DTA edited for RCC by R&M/HAC Page 15 of 16 Alternative:Full Watana RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with edits for RCC by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_mb_061109,R&M 11/16/09 Alternatives-2008 Dollars Full Watana ACC (6 Turbines) FERC Line #Sub Categories [Description Quantity [Units |Unit Price |Line Price |Total Notes/Remarks 36439000 §$ 182,195,000.00 $300,615,000 §$244,249,688 Camp cost to reflect lower volume (0.8125) 64 LaborExpense ||[Labor Expense (Included In Direct Costs) 65 Superintendence |__| Superintendence (Included In Direct Costs) 66 Insurance [|[|| Insurance |(Included In Direct Costs) 68 Mitigation Fishery,Terrestrial and RecrationalMitigation (Not included in 1982 study)$- | 69 Fees Fees Subtotal $_4,882,000,000 Contingenc 21,313 |%$ =1,040,500,000 Subtotal TIA Engineering (4%),Enviornmental (2%),Requlatory(1%)and Construction Man Z\%$341,700,000 71B Construction Management (4%)4%$195,300,000 72 Legal Expenses 0\%75 Taxes |01% 76 Administrative &Gen.Expenses Ol% 77 Interest O% 80 Earnings/Expenses During Construction O1% Total Project Cost |$_6,459,500,000 By:DTA edited for RCC by R&M/HAC Page 16 of 16 Alternative:Full Watana RCC R&M Consultants -Hatch Acres AEA -Susitna RCC Dam Cost Evaluation Appendix D - Cost Estimate Detail -High Devil Canyon RCC 11/17/2009 FINAL HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109,R&M 11/16/09 Alternatives-2008 DollarsHighDevilCanyonRCCGravityArch(6 Turbines)IFERC Line #Sub Categories l Description Quantity [Units Unit Price Line Price Total Notes /Remarks 330 Land and Land Rights 01 Land 1}LS $120,870,000.00 |$120,870,000 0.2 Land Rights included Above 0.3 Misc Charges in Credit Above Included Above TL]|$120,900,000 LT Tf 331 Powerplant Structure Improvements 0.1 Powerhouse 0.11 Powerhouse and Draft Tube 0.111 Excavation] [Powerhouse Vault Rock 122,500|CY $90.12 |$11,040,000 [Draft Tube Rock 25,200/CY $90.12 |$2,271,000 0.113 Surface Preparation'Grouting Powerhouse 99,000|SF $3.33 |$330,000 Draft Tube 76,500|SF $3.33 [$255,000GroutCurtain-Drill holes 43,800|LF $27.63 |$1,210,000 Grout Curtain-Cement 17,500|CF $81.10 |$1,419,000 0.114 Concrete and Shot Crete Powerhouse Concrete 32,600|CY $692.87 |$22,588,000 Powerhouse Concrete Overbreak 2,400/CY $447.21 |$1,073,000 Powerhouse Reinforcing Steel 1,630/TON $2,858.29 |$4,659,000 Powerhouse 4"Shotcrete 41,000/SF $10.14 |$416,000 Draft Tube Concrete 12,000|CY $692.87 |$8,314,000 Draft Tube Concrete Overbreak 2,500|CY $447.21 |$1,118,000 Draft Tube Reinforcing Steel 990|TON $2,858.29 |$2,830,000 Draft Tube 2"Shotcrete 6,100/SF $5.45 |$33,000 0.115 Support and Anchors Powerhouse Rockbolts 1"@ 25'Hy 970|EA $1,234.86 |$1,198,000 Powerhouse Rockbolts 1"@ 15'1,970|EA $735.81 |$1,450,000 Powerhouse Steel Mesh 44,600|/SF $5.81 |$259,000 Powerhouse Steel Support 137|TON $12,671.94 |$1,736,000 Draft Tube Rockbolts 1"@ 25'Hy 150/EA $1,234.86 |$185,000 Oraft Tube Rockbolts 1"@ 12!390/EA $528.34 |$206,000 Draft Tube Rockboits 1"@ 9'190/EA $432.12 |$82,000 Draft Tube Steel Mesh 18,900|SF $6.55 |$124,000 0.117 Holes (U/S of Powerhouse)15,000|LF $51.32 |$770,000[Holes (Powerhouse Crown)28,500|LF $51.32 |$1,463,000 0.118 Structural-Misc Steelwork [Powerhouse and Draft Tube-Steel Crane Rails ILS $10,276,309.00 |$10,276,000 0.119 Architectural-Powerhouse ILS $2,927,898.00 |$2,928,000 y 0.11¢Mechanical Draft Tube Gates 4|SETS $427,880.00 |$1,712,000 Draft Tube Gate Guides 6|/SETS $202,680.00 |$1,216,000 Draft Tube Crane HLS $1,140,000.00 |$1,140,000 0.12 Access Tunnels and Portals 0.121 Excavation| Main Tunnel §0,250|CY $97.45 |$4,897,000 Transformer Gallery Tunnel 17,750/CY $97.45 |$1,730,000 Grouting Gallery Tunnel 1,900/CY $396.04 |$752,000 Surge Chamber Access Tunnel 7,250/CY $145.22 |$1,053,000 Penstock Access Tunnel 61,500|CY $145.22 |$8,931,000 Penstock Elbow Access Tunnel 15,000/CY $145.22 |$2,178,000 Access Shaft Tunnel 1,300/CY $145.22 |$189,000 Connector Tunnel 1,900/CY $379.26 |$721,000 Portals Overburden 6,000/CY $17.14 |$103,000 Portals Rock 3,000/CY $49.31 |$148,000 0.123 Surface Preparation By DTA;edited by R.HAC Page 1 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity -|Units Unit Price Line Price Total Notes /Remarks Main Tunnel Siab 53,100/SF $2.2115 117,000 Penstock Access Slab 65,200 |/SF $2.2115 144,000 Horizontal Portal 200|SF $2.30 |$: Inclined Portal 2,100|SF $3.33 |$7,000 0,124 Concrete and Shot Crete Main Portal Concrete Slab 30|CY $406.27 |$12,000 Concrete Walls S570\CY $406.27 |$232,000 Concrete Overbreak 50\CY $368.48 |$18,000 Reinforcing Steel 40|/TON $2,887.51 |$116,000 Tunnels Concrete Slab Main Tunnel 1,950|CY $503.90 |$983,000 Concrete Plugs Penstock Elbow ACC 15,000/CY $755.86 |$11,338,000 Concrete Overbreak Main Tunnel 6"1,000|CY $346.43 |$346,000 Reinforcing Steel 70|TON $2,887.51 |$202,000 2 "Shotcrete Main Tunnel 20,100/SF $5.26 |$106,000 2"Shotcrete Transformer Gal 7,100)SF $5.26 |$37,000 2"Shotcrete Surge Chamber Acc 3,900|SF $5.26 |$21,000 2"Shotcrete Penstock Access 24,700|SF $5.26 |$130,000 2"Shotcrete Penstock Elbow Acc 7,100|SF $5.26 |$37,000 2"Shotcrete Access Shaft 300|SF $5.26 |$2,000 2 "Shotcrete Grout Gallery 800/SF $5.26 |$4,000 2 "Shotcrete Connector Tunnel 800|SF $5.26 |$4,000 0.125 Support and Anchors Main Tunnel Rockbotts 1*@12'1,200|EA $528.34 |$634,000 Rockbolts 1°@ 9"250/EA $432.12 |$108,000 Steel Mesh 63,000|SF $6.37 |$401,000 Steel Support 66/TON $12,801.49 |$845,000 Main Tunnel Portal [Rockbolts 1*@15'50|EA $735.79 |$37,000 Transformer Gallery Tunnel Rockbolts 1°@12'410/EA $528.34 |$217,000 Rockbolts 1"@ 9"JO|EA $432.12 |$30,000 Steel Mesh 22,500|SF $5.89 |$133,000 Steel Support 24|TON $12,801.49 |$307,000 Grouting Gallery Tunnel Rockbolts 3/4"@ 6'160/EA $327.15 |$52,000 Steel Mesh 160|SF $6.37 |$1,000 Steel Support 2|TON $12,801.49 |$26,000 Surge Chamber Access Tunnel Rockbolts 1"@ 12°230)/EA $528.34 |$122,000 Rockbolts 1"@ 9'5O|EA $432.12 |$22,000 Steel Mesh 12,050|SF $6.37 |$77,000 Steel Support 14|TON $42,801.49 1 $179,000 Penstock Access Tunnel Rockbolts 1"@12'1,430/EA $828.34 |$756,000 Rockbolts 1"@ 9°240/EA $432.12 |$104,000 Steel Mesh 77,500 |SF $6.37 |$494,000 Steel Support 58/TON $12,801.49 |$742,000 Penstock Elbow Access Tunnel Rockbotts 1°@12'420|/EA $528.34 |$222,000 Rockbolts 1"@ 9'120/EA $432.12 |$52,000 Steel Mesh 22,500|SF $6.37 |$143,000 Steel Support 30/TON $12,801.49 |$384,000 Access Shaft Tunnel By DTA;edited by R.HAC Page 2 of 17 Alternative High Devil Canyon RCC HDRA/AEA Susitna Hydroelectric Project Cost E:for 1982 quantities-AlternativesBy:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by HatchAcres_kcm_083109;R&M 11/16/09 Alternatives-2008 DollarsHighDevilCanyonRCCGravityArch(6 Turbines)FERC Line #Sub Categories Description Quant Units Unit Price Line Price Total!Notes /Remarks Rockbotts 1°@12'20|EA $528.34 |$11,000 Rockbolts 1°@ 9'20\EA $432.12 1 $9,000 Steel Mesh 930/SF $6.37 |$6,000 Steel Support 8/TON $12,801.49 |$102,000 Connector Tunnel Rockbolts 3/4"@ 6'160/EA $327.15 |$52,000 Steel Mesh 160/SF $6.37 |$1,000 Steel Support 2|TON $12,801.49 |$26,000 0.129 Architectural-Main Portal Doors 2|/SETS $158,371.90 |$317,000 0.42c Mechanical Ventilation System Included in (63.81 and 63.82) 0.13 Access Shaft [| 0.131 Excavation Rock 13,700\CY $227.67 |$3,119,000 0.133 Surface Preparation Shaft 64,000|SF $3.33 |$213,000 0.134 Concrete and Shot Crete [Concrete Lining 3,350|CY $944.82 |$3,165,000 {Concrete Overbreak 6"1,220|CY $551.14 |$672,000 0.135 Support and Anchors -Rockbolts 3/4"@ 6'1,050|/EA $327.15 |$344,000 0.138 Structural Misc Steelwork 50|TON $7,395.00 |$370,000 0.139 Architectural control Building 0.13¢Mechanical Elevators 1|LS $2,368,815.00 |$2,369,000 0.14 Fire Protection Head Tank 0.141 Excavation]1,150ICY $588.80 |$677,000 0.143 Surface Preparation 2,800/SF $2.301 $6,000 0,144 Concrete &Shotcrete Concrete 250/CY $963.72 |$241,000 Concrete Overbreak 6"45,CY $406.27 |$18,000 Reinforcing Steel 10/TON $2,858.29 |$29,000 0.145 Support and Anchors Rockboits 1°@12'25|EA $528.34 |$13,000 Rockboits 1"@ 9'10/EA $432.12 |$4,000 Steel Mesh 1,200|SF $6.30 |$8,000 Steel Support 2}TON $12,671.95 |$25,000 0.148 Misc Steelwork 1/LS $73,297.50 |$73,000 0.14¢Mechanical Piping/Vatves (Included in 335.12) 0.15 Bus Tunnels (totals for 3 Bus Tunnels) 0.151 Excavation] |Rock Horizontal 2,700|CY $213.70 |$577,000[Rock Inclined 1,300|CY $601.04 |$781,000 0.153 Surface Preparation-Tunneis 7,100|SF $3.33 1 $24,000 0.154 Concrete and Shotcrete Concrete Slab 350/CY $818.84 |$287,000 Concrete Overbreak 12"250/CY $472.41 |$118,000 Reinforcing Steel 18|/TON $2,858.29 |$51,000 2"Shotcrete 2,200/SF $§.26 |$12,000 0.155 Supports and Anchors Rockbolts 1"@ 25'6O|EA $1,234.86 |$74,000 Rockbolts 1"@ 12'140/EA $528.34 |$74,000 Rockbolts 1"@ 9'50/EA $432.12 |$22,000 Steel Mesh 6,800|SF $6.30 |$43,000 Steel Support 11/TON $12,671.94 |$139,000 0.16 Transformer Gallery Tunnel 0.161 Excavation-Rock 26,800 /CY $87.44 |$2,343,000 0.163 Surface Preparation 24,600|SF $2.30 |$57,0000.164 Concrete and Shotcrete [Concrete Base Slab 2,400|CY $1,228.27 |$2,948,000'|Concrete Overbreak 12°H/6°V 770|CY $377.93 |$291,000 By DTA;edited by R.HAC Page 3 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #/Sub Categories Description Quantity _|Units Unit Price Line Price Total Notes /Remarks [Reinforcing Steel 120|/TON $2,858.29 |$343,000 0.165 Support and Anchors Rockbolts 1"@ 25'6O0/EA $1,234.86 |$741,000 Rockboits 1"@ 15'270|EA $735.81 |$199,000 Steel Mesh 20,700|SF $5.81|$120,000 Steel Support 29|TON $12,671.94 |$367,000 0.167 Drainage Holes 8,300|LF $47.95 |$398,000 0.17 Cable Shafts | 0.171 Excavation Rock 3,400|CY $601.04 |$2,044,000 0.173 Surface Preparation Shatts 41,400|SF $3.33 |$138,000 0.174 Concrete and Shotcrete [Concrete Lining 1,040/CY $1,763.66 |$1,834,000 [Concrete Overbreak 6”800/CY $881.83 |$705,000 0.175 Supports and Anchors-Rockbolts 3/4"@ 6'650/EA $327.15 1$213,000 0.178 Structural Misc Steelwork 18|TON $15,602.00 |$281,000 0.179 Architectural-Enclosures 1|LS $199,317.00 |$199,000 0.17¢Mechanical Hoist 2\EA $476,960.00 |$954,000 0.18 Dewatering (during Construction) 0.181 [Dewatering (Power Facilities)ILS $1,336,798.50 |$1,337,000 0.19 Instrumentation | 0.191 [Instrumentation 1LS $1,714,813.50 |$1,715,000 0.2 Misc Buildings (Control Buildings)1jLS $4,433,085.00 |$4,433,000 0.3 Permanent Town (included in 63.5) rot Jf $158,700,000 fo 3822 «cosmo,Reservoir,Dams and Waterways 7 :wantin:Reservoir | [Reservoir Clearing 37,500|ACRE $3,005.85 |$112,719,000 (same as embankment dam) Diversion Tunnels /Cofferdams Diversion Tunnels /Portals 0.211 Excavation] Upper Tunnet[Rock 221,000/CY $92.33 |$20,405,000 Lower Tunnel [Rock 208,000/CY $92.33 |$19,205,000 |Excavate Concrete for Plug 700|/CY $96.92 |$68,000 Upstream Upper Portal [Rock Usable (Face Only)11,200|CY $49.16 |$551,000 Upstream Lower Portal (Including Most Exc for Upper Portal) [Rock Usable 108,000/CY $49.16 |$5,309,000 [Rock Waste 21,750|CY $49.16 |$1,069,000 Downstream Portals Overburden 17,000|CY $17.14 |§291,000 Rock Usable 120,000|CY $49.16 |§§,899,000 Rock Waste 28,000|CY $49.16 1,376,000 Emergency Rel Chambers Excavate Concrete for Plugs 1,800/CY $101.98 |$184,000 Gate Chamber 4,700|CY $110.73 |$620,000 Access Tunnel to Gate Chamber [Rock 19,100|CY $97.15 [$1,856,000 0.212 Fill Temp for Coffer Dam to Construct Upstream Portals 23,000|CY $11.66 |$268,000 0.213 Surface Preparation\_grouting Upstream Upper Portal[Horizontal 3,200/SF $2.30 |$7,000[inclined 8,600/SF $3.33 1 $29,000 Upstream Lower Portal[Horizontal 1,300|SF $2.30 |$3,000 [Inclined 14,900|SF $3.33 |$50,000 Downstream Upper Portal[Horizontal 6,100|SF $2.30 [$14,000 By DTA;edited by R.HAC Page 4 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes /Remarks [Inclined 20,500/SF $3.33 |$68,000 Downstream Lower Portal |Horizontal 600/SF $2.30 |$1,000 [Inclined 5,600|SF $3.33 |$19,000 Grout Upper Tunnel Plugs [Drill Holes 4,100/LF $26.76 |$110,000 [Cement 820/CF $81.10 |$67,000 Grout Lower Tunnel Permanent Plugs[Drill Holes 2,050/LF $26.76 |$§5,000 [Cement 410|CF $81.10 |$33,000 0.214 Concrete and Shotcrete Upper Tunnel Concrete Lining 42,400|CY $566.89 |$24,036,000 Concrete Lining Overbreak 6°10,200;CY $314.94 |$3,212,000 Reinforcing Steet 24|TON $2,887.51 |$69,000 2°Shotcrete 56,000|/SF $§.26 |$295,000 Lower Tunnel Concrete Lining 37,600/CY $566.89 |$21,315,000 Concrete Lining for Plug 6,200|CY $428.32 |$2,656,000 Concrete Lining Overbreak 6"10,000|CY $314.94 |$3,149,000 Reinforcing Steel 24/TON 2,887.51 |$69,000 2"Shotcrete 57,900|SF $5.26 |$305,000 Upstream Upper Portal Concrete Headwall 3,200/CY $651.93 2,086,000 Concrete Lining 1,300|CY $651.93 848,000 Concrete Slab 750/CY $651.93 489,000 Concrete Piers 800/CY 651.93 522,000 Concrete Overbreak 12"H/6"V 300/CY $472.41 142,000 Reinforcing Steel 400|TON $2,887.51 1,155,000 Upstream Lower Portal Concrete Headwall 4,500/CY 651.93 |$2,934,000 Concrete Lining 3,000|/CY $651.93 |$1,956,000 Concrete Slab 300/CY 651.93 |$196,000 Concrete Piers 700/CY §651.93 456,000 Concrete Overbreak 12°H/6"V 350|CY $472.41 165,000 Reinforcing Steel 600|TON $2,887.51 1,733,000 Downstream Upper Portal Concrete Headwall 500|CY q 651.93 |$326,000 Concrete Siab 100/CY §651.93 |$65,000 Concrete Overbreak 12”H/6"V 100/CY §472.41 |$47,000 Reinforcing Steel 40/TON §2,887.51 |$116,000 Downstream Lower Portal Concrete Headwail 2,500/CY $651.93 |$1,630,000 Concrete Slab 100|CY $651.93 |$65,000. Concrete Overbreak 12"H/6"V 150|CY $472.41 {§71,000 Reinforcing Steel 170/TON $2,887.51 |§491,000 Downstream Flip Bucket Concrete Slab 800/CY $651.93 |$522,000 Concrete Walls 2,300/CY $651.93 1,499,000 Concrete Invert 1,200|CY $651.93 782,000 Concrete Overbreak 12"H/6"V 410|CY $4241 17,000 Reinforcing Steel 280/TON $2,887.51 809,000 Downstream Retaining Wall Concrete Slab 200/CY $651.93 |$130,000 Concrete Walls 2,000/CY $651.93 |$1,304,000 Concrete Overbreak 12"H/6"V 110/CY $472.41 1$52,000 Reinforcing Steel 90|TON $2,887.51 260,000 Emergency Rel Chambers[Concrete Plug 15,300|CY $755.86 |$11,565,000[4*Shotcrete 2,790 /SF $10.13 |$28,000 By DTA;edited by R.HAC Page 5 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/MHatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by HatchAcres_kcm_083109;R&M 11/16/09 Aiternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Tota!Notes/Remarks [Access Tunnel to Gate Chamber |[2"Shotcrete 12,800|SF $5.26 |$67,000 0.215 Supports and Anchors Lower Tunnel Rockbotts 1"@ 12'3,650|EA $528.34 |$1,928,000 Rockbolts 1"@ 9'620/EA $432.12 |$268,000 Steel Mesh 217,100|SF $6.37 |$1,383,000 Steel Support 220|/TON $12,801.49 |$2,816,000 Upper Tunnel Rockbolts 1"@ 12'3,530/EA §528.34 |$1,865,000 Rockboits 1"@ 9"600|EA 4 432.12 |$259,000 Steel Mesh 210,200|SF 4 6.37 |$1,339,000 Steel Support 213/TON $12,801.49 |$2,727,000 Upstream Lower Portal {Rockbotts 1*@ 15'240/EA $735,81 |$177,000 [Anchors 1"@ 25'290/EA $1,234.86 |$358,000 Upstream Upper Portal (included in Rockboits 1"@ 15'Lower Portal) Anchors 1°@ 25'130/EA $1,234.86 |$161,000 Downstream Lower Portal [Rockbolts 1"@ 15°200/EA $735.81 |$147,000 Downstream Upper Portal|Rockbolts 1"@ 15'100|EA $735.81 |$74,000 [Retaining Wall Anchors 1°@25'100;EA $1,234.86 |$123,000 Emergency Ret Chambers Rockbolts 1"@ 25"100/EA 1,234.86 |$123,000 Rockbolts 1"@ 15'125|EA >735.77 92,000 Steel Mesh 3,600|SF 6.37 23,000 Steel Support 14/TON 12,801.49 179,000 Metal to Roof Anchors 3/4"@ 6'20/EA 342.42 7,000 Access Tunnel to Gate Chamber Rockbolts 1*@ 12'775\EA $528.34 |$409,000 Rockbolts 1"@ 9"240/EA $432.12 |$104,000 Steel Mesh 39,900/SF 6.37 |$254,000 Steel Support 55|TON 12,801.49 |$704,000 0.218 Structural-Misc Steelwork 2,775|SF 93.61 |g 260,000 0.21c Mechanical Upstream Lower Gates [Gate Equipment 2|EA $5,073,120.00 |$10,146,000 Upstream Upper Gates|Gate Equipment 2|EA $2,840,080.00 |$5,680,000[Trashracks 1/LS $1,777,500.00 |$1,778,000 Downstream Lower Outlet [Stopiog Guides 1LS $142,200.00 |$142,000|Stoplogs includes follower AILS $1,967,100.00 |$1,967,000 Downstream Upper Outiet [Stoplog Guides 1|LS $82,950.00 |$83,000 Low Level Rel [Slide Gates Include Steel Liner QIEA $3,517,470.00 |$31,657,000 0.22 Upstream Cofferdam 0.221 Excavation] Overburden Removal 1,000|CY 11.56 |$12,000 0,222 Fill Rock Fill 38,400/CY $10.90 |§419,000 Fine Filter 16,600|CY q 36.84 612,000 Coarse Fitter 15,900|CY §30.05 |$478,000 Rock Shell 196,500|CY §10.50 |§2,063,000 By DTA;edited by R.HAC Page 6 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost tor 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #|Sub Categories Description Quantity {Units Unit Price Line Price Total Notes /Remarks |Closure Dike §8,500|CY $10.90 |$638,000 [Rip Rap 21,200 |CY $24.26 |$514,000 0.223 Cutoff Slurry Wall[excavation 4,850|CY $4.88 |$24,000 [slurry wall 43,600/SF $72.44 |$3,158,000 0.220 Dewatering [Initial Dewatering 1|LS $§,807,685.00 |$5,808,000 [Dewatering Maintenance 1j)L$$22,377,990.00 |$22,378,000 0.23 Down Stream Cofferdam 0.231 Excavation| overburden 5,000/CY >11.56}$58,000 Rock 500|CY 9.91 |$5,000 Removal of Cofferdam 14,500|CY J 13.48 |$195,000 0.232 Fill | RipRap |1,800|CY $24.26 |$44,000 Cicsure Dike 15,200|CY $10.90 |$166,000 0.233 Cutoff Slurry Wall__[Excavation 1,830|CY §4.60 |$8,000 16,500|SF 72.44 |$1,195,000 0.31 0.311 Excavation] Overburden above el.1470 675,333|CY $11.53 |$7,787,000 The ratio of foot print area of Overburden below el.1470 1,773,333|CY 19,613,000 RCC dam /Embankment Rock Usable above el.1470 429,667/CY 18,489,000 dam =0,321 Rock Usable below el.1470 159,333|CY 6,966,000 Rock Waste above el.1470 650,000|CY 27,970,000 Rock Waste below el.1470 289,833|CY 14,544,000 0.312 Dam RCC EERE cy 1,162,100,000 Base RCC 0CY . 0.313 Surface Prep/Grouting Surface Preparation (same as embankment dam) Under Core/Filters above el.1500 1,675,000|SF $3.11 |$5,209,000 Under Core/Fitters below el.1500 613,000|SF $3.11 |$1,906,000 Under Shell above el.1500 5,186,000|SF $2.15 |$11,150,000 Under Shell beiow el.1500 2,584,000|SF $2.15 |$5,556,000 Consolidation Grout a 687,000 LF from embankment Drill Holes LF $11.91 §$3,037,000 dam ,687,000 CF from embankment Cement 350,000 CF $67.81 $23,734,000 dam Grout Curtain 465,000 LF from embankment Drill Hoies 465,000 LF $26.76 $12,443,000 dam 186,000 CF from embankment Cement 186,000 CF $81.10 $15,085,000 dam [Dental Concrete (same as embankment dam) |[Dental Concrete 85,000/CY $365.33 |$31,053,000 0.317 Drainage _[[Holes 136,000 |LF $51.32 1$6,980,000 0.318 Bridge Precast Bridge Beams 25,500 CY $13,894,000 Unit price from item 0.614 Concrete Road Deck 5,400 CY $2,942,000 Unit price from item 0.614 Pies 500 CY $272,000 Unit price from item 0.614 Grout Gaileries/Portals OER ALTE LLL Om i es 'Bi emer"3 portals ,multiply by 3) 0.321 Excavation|[Tunnels/Shafts-Core Area [[Rock Horizontal 77,400|CY $394.80 |$30,558,000 By DTA;edited by R.HAC Page 7 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kem_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Totai Notes/Remarks Portals ]Overburden Rock 10,000|CY $17.16 |$172,000 [Rock 3,000/CY $49.16 [$147,000 0.323 Surface Preparation Portals Horizontal 100|SF $2.30 |$: Inclined 500|SF $3.33 |$2,000 0.324 Concrete and Shotcrete Tunnels-Core Area Concrete Plugs 1,000/CY 428.32 428,000 Concrete Slab 2,300/CY 944.82 2,173,000 Concrete Overbreak 6"1,150/CY 755.86 869,000 Reinforcing Steel 80/TON 2,887.51 |$231,000 2"Shotcrete 15,000|SF 5.26 |$79,000 'Tunnels-Access Concrete Slab 1,600|CY 944.82 |$1,512,000 Concrete Overbreak 6"800|CY 755.86 |$605,000 Reinforcing Steel 60|TON 2,887.51 173,000 2"Shotcrete 5,400|SF 5.26 |§28,000 Shafts |2"Shotcrete §,000|SF $5.26 |$26,000 Portals (Concrete 60|CY $406.36 |$24,000 [Reinforcing Steel 6|TON $2,887.51 |$17,000 0.325 Support and Anchors 'Tunnels-Core Area Rockboits 3/4"@6'1,800/EA 327.15 |$589,000 Steel Mesh 3,000/SF 5.37 |$16,000 Steel Support 20/TON 12,801.49 |$256,000 Tunnels-Access Rockboits 3/4"@6'1,200/EA 327.15 |$393,000 Steel Mesh 1,100|SF 5.37 |$6,000 Steel Support 20|TON 12,801.49 |$256,000 Shafts |Rockbotts 3/4*@6'350/EA $327.15 |$115,000 [Steel Mesh 1,000|SF $5.37 |$5,000 Portals [Rockbotts 1"@15'30/EA $735.81 |$22,000 0.329 Architectural Portal Doors __|....[Portal Doors $42,123.66 |$84,000 instrumentation:5 i ee ee eae Oa nG A Aaa NEE erence This cost is taken as 50%of 0.331 Instrumentation 1LS $10,821,538.50 $10,822,000 embankment dam 0.4 Relict Channel |i (same as embankment dam) 0.41 Shore Protection 0.411 Excavation Overburden Stripping 2'thick oicy $11.56 |$: 0.412 Fill Dump and Spread [Fitter Material -2'layer o|Ccy $31,93 |$: [Rock Spalls/Rip Rap-3'Ave O|CcY $9.86 |$: Shore Protection ]Rip Rap o|cy $24.26 |$: iWaste Rock olcy $22.78 |$- 0.44 Channel Filter Blanket 0.442 Fill | Coarse Filter O|CcY 33.85 : Fine Filter OiCY $43.65 : Rip Rap O|CY $24,26 : By DTA;edited by R.HAC Page 8 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes /Remarks 0.443 Surface preparation Foundation Prep Ciearing and Grubbing O|ACRE $3,963.11 |$: Excavation O|CY $15.62 |$-$- 0.5 Outlet Facilities 0.51 Outlet Facilities-(Intake Civil Work Include in Power Intake )(same as embankment dam) 0.511 Excavation] Inlet |(Included in 332.611) Outlet (Included in 332.521) Tunnels ___[Rock Horizontal 83,000|/CY $103.00 |$8,549,000 [Rock Inclined 9,000|CY $183.49 |$1,651,000 0.513 Surface Preparation'Grouting \ Inlet |(Included in 332.613) Outlet (Included in 332.523) Tunnels 323,500|SF $2.30 |$744,000 Contact Grouting 1/LS $569,428.05 |$569,000 0.514 Concrete and Shotcrete Inlet |(included in 332.614) Outlet (included in 332.524) Tunnels Concrete Lining 27,200|CY $944.82 |$25,699,000 Concrete Overbreak 6"6,200|CY $440.92 |$2,734,000 2"Shotcrete 12,000|SF $5.26 |$63,000 3"Shotcrete 19,400|SF $7.69 |$149,000 0.515 Support and Anchors Inlet |(Included in 332.615) Outlet (Included in 332.525) Tunnels [Rock Bolts 1°@6'2,400/EA $327.15 |$785,000 [Steel Mesh 94,500/SF $6.37 |$602,000 0.51¢Mechanical Inlet Trash Racks/Guides 1LS $1,540,500.00 |$1,541,000 Gate Equipment 2|EA $3,317,040.00 |$6,634,000 Stoplog Guides 2|SETS $213,940.00 |$428,000 Outlet Fixed Cone Valves 6 +1 Spare 4LS J 4,500,630.00 |$4,501,000 Ring Follower Gates 6|EA 1,936,494.80 |$11,619,000 Steel Manifold Liner 8,952.53 17,457,000 Misc Mechanical Equipment 948,000.00 948,000 _. Misc Electrical Systems ; 237,000.00 237,000"Main (Chute )Spillway (Includes Civil Works for Outlet Facilities)Ce :BEE Stepped Spitlway ren 89,000 CY,calculated,unit price Conventional concrete o 79,00G CY $544.85 $43,043,000 from item 0.614 SS be 2,142 TON,calculated,unit price Reinforcing steel TON $2,887.51 $5,688,000 from item 0.614 0.523 Stilling Basin 8,400 CY,calculated,unit price Conventional concrete 85,000 CY $544.85 $46,312,000 from item 0.614 183 TON,calculated,unit price Reinforcing Steel 185 TON $2,887.51 $534,000 from item 0.614 Excavation Rock 13,000 CY $50.18 $652,000 (03.31.311 Rock Waste) 0.524 Consolidation Grouting Drill Holes 7,000 LF $11.91 $83,000 (caic for only stilling basin area)Cement 7,000 CF $67.81 $475,000|||__|Grout Curtain ||||[0.525 ||Support and Anchors i [|} By DTA;edited by R.HAC Page 9 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks(Assume drainage tunnel/ Drainage Tunnel gallery for spillway stilling basin,same as for embankment Steel Support 7(TON $12,801.49 |$90,000 dam sheme) Steel Mesh 1,000|SF $§.87 |$6,000 Rockbolts Drainage Gallery |3/4*@ 6 576|EA $330.19 |$190,000 Rockbolts Approach[1*@ 15°275\EA $741.28 |$204,000 Rockbolts Chute and Structure [i*@ 15°112/EA $741.28 |$83,000 Rockbolts Valve Block/Bucket jv @ 15°46/EA $741.28 |$34,000 Slab/Wall Anchors ji"@ 10°9,300|EA $474.06 |$4,409,000 0.527 Drainage _| Orill Holes |Box Drains (To Drain Tunnel)54,000/LF $47.95 |$2,589,000[3"Relief 640/LF $49.50 |$32,000 0.52c Mechanical Gate Equipment 3|EA $4,249,280.00 |$12,748,000 Stoplog Guides 3|SETS $92,196.88 |$277,000 Stoplogs Includes Follower 1|SET $945,840.00 |$946,000 Misc Electrical 1LS $237,000.00 |$237,000 06 Power Intake (Inc Inlet exec and Inlet Structure Civil Works for Outlet)(same as embankment dam)0.61 Intake Structure and Approach 0.611 Excavation]Overburden §24,000/CY 14.87 |§7,792,000 Rock Usable 1,306,000 /CY 5 40.27 |$52,593,000 Rock Waste 138,000|CY $40.30 |$5,561,000 0.613 Surface Preparation[Horizontal 25,600|SF $2.30 |$59,000[Inclined 88,300/SF $3.33 |$294,000 0.614 Concrete and Shotcrete Structure Concrete Structure 121,000|CY $544.85 |$65,927,000 Concrete Overbreak 12°H/6"V 2,600/CY $336.99 |$876,000ReinforcingSteel7,870|TON $2,887.51 |$22,725,000 0.615 Supports and Anchors-1°@ 15'400/EA $735.81 |$294,000 $156,121,000 0.61¢Mechanical Trashracks and Guides 6|SETS $1,080,960.00 |$6,486,000 Gate Equipment 6|EA §1,902,720.00 |$11,416,000 Bulkhead Gates Guides 6|SETS 225,200.00 |$1,351,000 Bulkhead Gates inc Follower 1|SET 698,120.00 |$698,000 Shutter with Guides 6|/SETS 720,640.00 |$4,324,000 Iceboom with Hoist 6/SETS 1,238,600.00 |$7,432,000 Iceboom Guides 6|SETS 563,000.00 |§3,378,000 Intake Service Crane 1|EA 693,700.00 694,000 Bubbler System 1/LS §948,000.00 948,000 Misc Electrical 1jLS §237,000.00 237,000 0.61d Intake Building 1jLs $237,000.00 237,000 0.7 Surge Chamber (same as embankment dam)0.71 Surge Chamber 0.711 Excavation ]Chamber Rock 101,000/CY $90.12 |$9,102,000[Vent Shaft Rock 2,200/CY $601.04 |$1,322,000 0.713 Surface Preparation 29,700|SF $2.30 [$68,0000.714 Concrete and Shotcrete [Concrete 6,000|CY $513.35 |$3,080,000[Concrete Overbreak 1,000|CY $440.92 |$441,000 By DTA;edited by R.HAC Page 10 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #|Sub Categories Description Quantity _|Units Unit Price Line Price Total Notes /Remarks [Reinforcing Steel 300|TON $2,858.29 |$857,000 |4*Shotcrete 38,400/SF $10.13 |$389,000 Vent Shaft] [2*Shoterete 5,900|SF $5.26 |$31,000 0.715 Supports and Anchors Rockbolts 1"@25'HY 570|EA $1,234.86 704,000 Rockbolts 1"@ 15'2,110/EA §735.81 1,553,000 Steel Mesh 28,900|SF $5.81 168,000 Steei Support 66|TON 12,671.94 836,000 Vent Shaft||Rock bolts 3/4"@ 6'370/EA g 327.15 |§121,000 [Steel Mesh 1,200|SF 7 6.30 |$8,000 0.717 Drainage Holes (In Chamber)15,500 |LF 47.95 |$743,000 0.71¢Mechanical Stoplog Guides 2|/SETS $709,380.00 |$1,419,000 Stoplog Includes Follower 1|SET $3,558,160.00 |$3,558,000 $24,400,000 0.8 Penstocks (same as embankment dam) 0.81 Penstocks 0.811 Excavation Tunnels [Rock Horizontal 53,400/CY $144.77 |$7,731,000 [Rock Inclined 54,000|CY $286.15 |$15,452,000 0.813 Surface Preparatiov/Grouting Surface Preparation[Tunnels 378,000|SF $3.33 |$1,259,000 Contact Grouting [Contact Grouting 1/LS $574,582.80 |$575,000 Consolidation Grouting [Consolidation Grouting 1|LS $797,268.00 |$797,000 0.814 Concrete and Shotcrete Concrete Liner 37,200|/CY $970.01 36,084,000 Concrete Overbreak 6"10,600|CY $692.87 7,344,000 Reinforcing Steel 27|TON 2,858.29 77,000 3°Shotcrete 34,000/SF $7.69 |§261,000 2"Shotcrete 20,800/SF $5.26 |$109,000 0.815 Support and Anchors Rockbotts 1"@ 25'150/EA ]1,234.86 |$185,000 Rockbolts 1°@ 6'4,200|EA ]327.15 |$1,374,000 Steel Mesh 193,000/SF ]6.37 |$1,229,000 0.818 Structural Misc Steelwork 2,400|TON $9,673.24 |$23,216,000 $95,693,000 0.9 Tailrace Works (1 Portal with Combined Tailrace/Diversion Tunnet (same as embankment dam) 0.91 Tailrace Tunnels/Portals 0.911 Excavation]_ Tunnels [Rock 135,000|CY $103.00 |$13,905,000 Portals Overburden 3,200/CY §17.14 |§55,000 Rock Usabie 46,000/CY 49.16 |$2,261,000 Rock Waste 14,500|CY $49.16 |§713,000 0.913 Surface Preparation Tunnels [Tunnels 266,000|SF $3.33 |$886,000 Portals [Horizontal 600/SF $2.30 |$1,000[Inclined 6,000/SF $3.33 |$20,000 0.914 Concrete and Shotcrete Tunnels Concrete Lining 14,500|CY $440.92 |$6,393,000 Concrete Overbreak 6"7,500|CY $314.94 |$2,362,000 2*Shotcrete 45,600/SF $5.26 1$240,000 By DTA;edited by R.HAC Page 11 of i7 Alternative High Devil Canyon RCC HDRA/AEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Aiternatives By:DTA with RCC edits by R&M/MHatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Totat Notes /Remarks [Reinforcing Steel 22|/TON $2,887.51 |$64,000 Portals Concrete Base Slab 100|CY $651.93 |$65,000 Concrete Walls 2,900;CY $651.93 |$1,891,000 Concrete Overbreak 12"H/6"V 110/CY $471.65 |$52,000 Reinforcing Steel 195|TON $2,887.51 |$563,000 0.915 Support and Anchors Tunnels Rockbolts 1"@ 12'2,750|EA $528.34 1,453,000 Rockbotts 1"@ 9°480/EA $432.12 207,000 Steel Support 132|TONS $12,801.49 1,690,000 Steel Mesh 133,000|SF $6.37 |§847,000 Portals |Rockbolts 1"@ 15 T1D}EA $735.81 |$81,000 0.91¢Mechanical Stoplog Guides 1/SET $112,600.00 |$113,000 Stoplogs includes Follower 1/SET $751,200.00 |$751,000 for embankment dam $ $2,354,700,000 |3,202,800,000 333 Waterwheels,Turbines and Generators 0.11 Turbines and Govemors 0.111 [Supply |6|EA $: 0.112 [instal |6IEA $: 02 Generators and Exciters 0.21 Generators and Exciters (Supply and Install) 0.211 [Generators and Exciters 6/EA $- {[J $__487,000,000.00 $487,000,000 334 Accessory Electrical Equipment 0.1 Connections,Supports and Structures 0.11 Structures | 0.111 [Structures (included Below)(Included Below) 0.12 Conductors and Insulators 0.121 Generator Isolated Phase Bus 1|LS $7,584,000.00 |$7,584,000 0.122 HV Power Cables and Accessories 1Ls $3,081,000.00 |$3,081,000 0.123 LV Power Cables and Accessories 1jLS $1,422,000.00 |$1,422,000 0.124 Control Cables and Accessories 1Ls $2,607,000.00 |$2,607,000 0.125 Grounding System 1|LS $355,500.00 |$356,000 0.13 Conduits and Fittings 0.131 [Conduits and Fittings 1|Ls $948,000.00 |$948,000 0.2 Switchgear and Control Equipment 0.21 Auxiliary Transformers 0.211 [Auxiliary Transformers 4jEA $83,811.00 |$335,000 0.22 Circuit Breakers Generators 0.221 [Circuit Breakers Generators 6/EA $1,504,300.00 |$9,026,000 0.23 Surge Protectors and Generator Cubicles 0.231 [Surge Protectors and Generator Cubicles 1Ls $1,090,200.00 |$1,090,000 0.24 Switch boards | 0.241 [Switch boards 1/LS $1,848,600.00 |$1,849,000 0.25 Auxiliary Power Equipment 0,251 [Auxiliary Power Equipment 1|LS $521,400.00 |$§21,000 0.3 Cubicles and Appurtenances 0.31 Control,relay and meter boards 0.311 [Control,relay and meter boards i1/LS $2,133,000.00 |$2,133,000 0.32 Computer Control System 0.321 |Computer Control System (Included in Trans-Ems) 0.33 Supervisor and Telemeter System 0.331 [Supervisor and Telemeter System Included in Trans EMS) By DTA;edited by R.HAC Page 12 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with ACC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kem 083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines)FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes/Remarks 0.4 Power Transformers | 0.41 Power Transformers 0.411 [Power Transformers 10;EA $2,000,000.00 |$20,000,000 [||| 0.5 Lighting System | 0.51 Powerhouse and Transformer Gallery 0.511 [Powerhouse and Transformer Gallery 1Ls $1,824,900.00 |$1,825,000 0.52 Access Tunnels and Roads 0.521 |Access Tunnels and Roads 1j|LS $402,900.00 |$403,000 I 0.6 Misc.Electrical Equipment 0.61 Misc.Electrical Equipment 0.611 Mise neers Equipment 1|LS $782,100.00 |$782,000 0.7 Surface Accessory Equipment 0.71 34.5 kV and LV Equipment 0.711 Switchboard 1/LS $213,300.00 |$213,000 0.712 Cables |ALS $450,300.00 |$450,000 0.713 Aux Transformers 1/LS $284,400.00 |$284,000 0.73 Diesel Generator-Standby 0.731 [Diesel Generator-Standby 2|EA $347,550.00 |$695,000 0.74 Exterior Lighting 0.741 __[Exterior Lighting 1jLS $355,500.00 |$356,000 0.75 Mimic Board-Control Building 0.751 [Mimic Board-Control Building 1jLS $1,185,000.00 |$1,185,000 |]$57,100,000 335 Misc Powerplant Equipment |0.1 Auxiliary Systems-Underground 0.11 Station Water Systems 0.111 [Station Water Systems 1|Ls $4,977,000.00 |$4,977,000 0.12 Fire Protection Systems 0.121 [Fire Protection Systems 1/LS $2,844,000.00 |$2,844,000 0.13 Compressed Air Systems 0.131 [Compressed Air Systems 1/LS $3,555,000.00 |$3,555,000 0.14 Oil Handling Systems 0.141 [oil Handling Systems TLS $2,370,000.00 |$2,370,000 0.15 Drainage &Dewatering 0.151 [Drainage &Dewatering 1jLS $5,214,000.00 |$5,214,000 0.16 Heating,Ventilation and Cooling System 0.161 [Heating,Ventilation and Cooling System 1/LS $3,555,000.00 |$3,555,000 0.17 Miscellaneous | 0.171 [Miscellaneous 1LS $2,370,000.00 |$2,370,000 0.2 Auxiliary Systems-Surface Facilities 0.21 [Auxiliary Systems-Surface Facilities 0.211 [Auxiliary Systems-Surface Facilities 1LS $711,000.00 |$711,000 0.3 Auxiliary Equipment | 0.31 Powerhouse Cranes 0.311 [Powerhouse Cranes 2|EA $1,783,800.00 |$3,568,000 0.32 Elevators || 0,321 [Elevators |1/1LS $545,100.00 |$545,000 0.33 Miscellaneous Cranes and Hoists 0.331 [Miscellaneous Cranes and Hoists 1jLs $505,500.00 |$506,0000.34 Machine Shop Equipment 0.341 [Machine Shop Equipment 1LS $2,022,000.00 |$2,022,000 0.4 General Station Equipment (Included in Mechanical And Electrical Systems) 0.5 Communications Equipment 4{Ls [$213,300.00 |$213,000|[|$32,450,000 By DTA;edited by R.HAC Page 13 of 17 Alternative High Devil Canyon RCC HDFVAEA Susitna Hydroelectric Project Cost Esti for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by HatchAcres_kem_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories l Description [Quantity [Units]Unit Price |Line Price |Totat Notes /Remarks 336 Roads,Rails and Air Facitities.01 Roads 0.11 Pioneer Roads and Bridges 0.111 Gold Creek-High Devil Canyon Road (17.31 mi)(17.3/12.3=1.4 HDC 5mi u's of DC) Clearing 158 ACRE $11,416.62 $1,806,000 Waste Excavation 454,997 CY $9.51 $4,327,000 Common Excavation 407,628 CY $8.32 $3,391,000 18”Culverts 4,844 LF $62.55 $303,000 36"Culverts 1.4 LS $32,760.98 $46,000 D-1 Base Material 93,022 TON $45.47 $4,230,000 Fabric 4,469 SY $673 $30,000 Maintenance 35 MYR $9,008.99 $315,000 Parks Hwy to Goid Creek Pioneer Road -16 miles 16 MILE $820,000.00 $13,120,000 0.112 High Devil Canyon-Watana Road (41.25 Miles ) Clearing 369 ACRE $11,416.62 Waste Excavation 855,321 CY $9.51 Common Excavation 619,500 CY $8.32 18°Culverts 9,200 LF $62.55 36"Culverts 1LS $35,451.31 D-1 Base Material 222,640 TON $45.47 Fabric 14,946 SY $6.73 Maintenance 83 MVYR $9,008.32 0.113 Devil Canyon Low Level Crossing Crossing (7.88 Miles) Clearing 170 ACRE $11,416.62 Waste Excavation 498,845 CY $9.51 Common Excavation 549,417 CY $8.32 Rock Excavation 749,641 CY $28.45 18"Cutverts 5,100 LF $62.55 Bridge 1LS $-120,000,000.00 D-1 Base Material 36,966 TON $45.47 Maintenance 118 MYR $11,258.74 0.12 Permanent Roads and Bridges 0.124 Upgrade Denali Highway (1986 Cost Estimate)(23 Miles)OLs $20,839,410.00 0.125 Build Highway from the North to Site (1986 Cost Estimate)(42 Miles)oLs $92,925,330.00 || L | 0.13 Site Roads 0.131 Construction Roads |Site Roads 20|Mile $12,554,637.23 |$251,093,000 [Maintenance 141/MUYRS 1|$223,092.85 |$31,456,000 0.132 Permanent Roads [Permanent Roads 16/MILE $1,287,997.42 |$20,608,000 Hurricane to Gold Creek (16 mi)16/MILE $2,285,000.00 |$36,560,000Bridges1LS$32,000,000.00 |$32,000,000 0.2 Rail Facilities 0.24 Permanent Raitroad (including railheads) 0.244 [___[Gold Creek to High Devil Canyon-Rail By DTA;edited by R.HAC Page 14 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost Esti tor 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity |Units Unit Price Line Price Total Notes /Remarks R-1,(19 Mi Clearing 220/AC $11,416.62 |$2,510,025 Waste Excavation §52927 |CY $9.511 $§,258,337 'Common Excavation 1083550|CY $8.32 |$9,015,133 Rock Excavation 2986|CY $28.51 |$85,129 Borrow 147250|CY $11,88 |$1,749,330 Subbailast 232932 |CY $18.15 |$4,226,781 Grade "A"Base Material 6650;CY $35.45 |$235,729 D-1 Base material 2400|TON $43.20 |$103,680 A.C.Surfacing 2200|TON $198.00 |$435,600 Dock Lumber 16|MBF $1,258.60 |$20,138 18"Culvert 6582 |LF $68.26 |$449,271 36"+Culverts O|LS $92,160.00 |$: Fabric 4236|SY $9.00 |$38,121 Thaw Pipes 13707|}LF $95.04 |$1,302,727 Topsoil &Seed 1411AC $10,800.00 |$1,524,343 Rail Yard Control Devices O/LS $1,800.00 |$: Bridges OILS $900.00 |$: Trackage 134323 )}LF $350.00 |$47,013,125 Maintenance Rail 98|Mile-yearg $10,000.00 |$980,000 Railhead 7lyears $75,000.00 |$525,000 0.3 Airstrip 0.31 Airstrip Permanent Airstrip 1LS $12,798,000.00 |$12,798,000 9 years maintenance savings 1|LS Temporary Airstrip 1/LD $2,133,000.00 |$2,133,000 0.4 Saved Maintenance 1|LS $(9,554,896.95)|$(9,555,000) $489,688,469 Transmission Plant 350 Land and Land Rights Land and Land Rights Transmission l 17|MILE $86,720.00 |$1,474,000 Substations (4 Sites)OILS $2,607,000.00 |$: |$1,474,000 352 Substation and Switching Station 0.1 Switchyard 0.11 [Switchyards HDC and Gold Creek 2|Ls $14,000,000.00 |$28,000,000 $28,000,000 353 Substation/Switching Station Equipment Ester o|Ls $57,922,800.00 |$: Willow OjLS $3,613,020.00 |$: Knik Arm OjLS $29,838,300.00 |$: By DTA;edited by R.HAC Page 15 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost tor 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kcm_083109;R&M 11/16/09 Alternatives-2008 Doilars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity [Units Unit Price Line Price Total Notes /Remarks University ojLs AIA88,685,400.00 ALADevil Canyon OoTrn35,585,550.00 359 Willow Energy Management System (EMS) Equipment and System Costs Microwave Communication Equipment EMS Control Center Building Watana and Devil Canyon in-plant Monitor and Control Equipment Steel Towers and Fixtures Towers (Including Foundation and Hardware) Conductors and Devices (INCLUDED ABOVE) Roads and Trails |__| Conductors Submarine Cables 17 MILE 0 MILE 0 EACH AAALH27,326,100.00 11,660,400.00 9,148,200.00 8,619,690.00 4,500,000.00 218,281.33 15,808,340.56 AAASPea4,310,000 76,500,000 4,300,000 76,500,000 Roads and Trails 100|MILE 75,744.00 7,574,000 Clearing and Roads 40/MILE 37,872.00 AIA1,515,000 9,100,000 $119,374,000 General Plant! 389 Land and Land Rights Land and Land Rights 390 Structures and Improvements Structures and Improvements [|[|J | 391 Office Furniture and Equipment Office Fumiture and Equipment Transportation Equipment | Transportation Equipment Stores Equipment] Stores Equipment 394 Tools Shop and Garage Equipment Tools Shop and Garage Equipment || 395 Laboratory Equipment || Laboratory Equipment[|[|J 396 Power-Operated Equipment [| Power-Operated Equipment Communications Equipment| Communications Equipment 398 Miscellaneous Equipment | Miscellaneous Equipment ||[|Tf399OtherTangibleProperty_| Other Tangible Property $11,850,000.00 $11,850,000 By DTA;edited by R.HAC Page 16 of 17 Alternative High Devil Canyon RCC HDR/AEA Susitna Hydroelectric Project Cost for 1982 quantities-Alternatives By:DTA with RCC edits by R&M/Hatch Acres By:Leanne Andruszkiewicz,EIT Date:1/25/09 Reviewed By:David Elwood,EIT Date:1/25/09,Modified by Hatch Acres_kem_083109;R&M 11/16/09 Alternatives-2008 Dollars High Devil Canyon RCC Gravity Arch (6 Turbines) FERC Line #Sub Categories Description Quantity {Units Unit Price Line Price |Total Notes /Remarks Saved Maintence TLS $(231,219.51)|$(231,000)} $11,600,000 indirect Costs |_| 81 Temporary Construction FacilitiesTempoConstructionFacilities|82 Construction Equipment ||Construction Equipment I ||63 Main Construction Camp | 0.1 Main Construction Camp 1LS $624,355,816 $624,356,000 Saved Maintence 1LS $(12,182,552.51)$(12,183,000) Camp cost to reflect lower 64 Labor Expense $189,096,532 volume (0.8125)[Labor Expense|(included In Direct Costs) 65 Superintendence |_| Superintendence (Included In Direct Costs) 66 Insurance [|[| Insurance _|(Included In Direct Costs) 68 Mitigation Fishery,Terrestrial and RecrationalMitigation,(Not included in 1982 sty $200,000,000 |$:$- 69 Fees | Fees Subtotal $4,020,609,001 Contingency 21.313/%$856,912,396 Subtotal 71A Engineering (4%),Enviornmental (2%),Requlatory(1%)7|\%$281,442,630 71B Construction Management (4%)4%$160,824,360 72 Legal Expenses 0% 75 Taxes Lf 0% 76 Administrative &Gen.Expenses O1% 7 Interest O% 80 Earnings/Expenses During Construction 01% Total Project Cost $5,319,788,388 By DTA;edited by R.HAC Page 17 of 17 Alternative High Devil Canyon RCC