Loading...
HomeMy WebLinkAboutMetlakatla to Karchikan Intertie 2013 proposal 1ee Commonwealth '360-466-2214 '2021 E.College Way,Suite 101associates,inc.i Wwww.cai-engr.com +Mount Vernon,WA 98273 July 26,2013 P-13-148 Mr.C.Paul Bryant,General Manager Metlakatla Power &Light PO Box 359 Metlakatla,AK 99926 SUBJECT:PROPOSAL -PROJECT MANAGEMENT SERVICES FOR INTEGRATED MANAGEMENT OF BOTH THE TRIANGLE LAKE WATERSHED FEASIBILITY PROJECT AND THE METLAKATLA TO KETCHIKAN INTERTIE Dear Mr.Bryant, Commonwealth Associates,Inc.(Commonwealth)is pleased to submit this proposal to Metlakatla Power &Light (Metlakatla)to provide project management services. Commonwealth would be pleased to help you meet your project goals.When you select a consultant,you want one that can take your project,assess your specific requirements,and do the work in an efficient,cost-effective manner.Commonwealth is that consultant. Commonwealth is an employee-owned and -managed firm specializing in services for the electrical power industry.With a staff of over 260 employees,we offer a complete package of services to assist our clients with the successful planning,operation,maintenance,siting, permitting,design,and construction of their electric generation,transmission,substation and distribution projects.Commonwealth has several offices from which to draw expertise.Our headquarters is in Jackson,Michigan,and we have principal offices in Mount Vernon, Washington,near Atlanta,Georgia,and in Columbus,Ohio. You will find Commonwealth is well qualified and ideally suited to meeting your utility's needs for professional project management services.Commonwealth has significant experience with all aspects of project management as well as providing full services for substation,transmission and distribution design,including construction management.We have extensive experience in providing professional services to electrical utilities as well as other clients.Western clients served by Commonwealth include: w Southeast Alaska Power Agency (SEAPA)2 Snohomish County PUD a Ketchikan Public Utilities |Seattle City Light m SE Conference rT]Klickitat County PUD w City and Borough of Sitka rT]Okanogan County PUD a PacifiCorp 7 Puget Sound Energy =Modesto Irrigation District r Whatcom County PUD m Pacific Gas and Electric |Inland Power and Light m=Tacoma Power a American Energy,Inc. m Douglas County PUD 7 Sacramento Municipal Utility District Connect With Confidence JACKSON,MI:ATLANTA.GA |MOUNT VERNON,WA on Commonwealthassociates,inc. Mr.C.Paul Bryant P-13-148 July 26,2013 Page 2 Commonwealth fosters an environment for innovation and technical excellence.We encourage employees to obtain professional licensure and support their participation in professional organizations,such as the Institute of Electrical and Electronics Engineers,the American Society of Civil Engineers,and the National Society of Professional Engineers.Commonwealth is a member of the Rocky Mountain Electric League (RMEL)and the Northwest Public Power Association (NWPPA). Meeting the project goals is important to you and to us.We know that good communication between your staff and ours is the key to the success of your projects.We'll work closely with you and your teams to make sure we all understand the goals of the project and how the goals will be reached. Metlakatla's RFP specifies a 20-page maximum exclusive of resumes,cover sheets,introductory letters and tabs.This proposal complies with this requirement. Thank you for your consideration of Commonwealth.If you have any questions or would like additional information on Commonwealth's capabilities and experience,please call me at 360- 404-1126.You may also find additional information on our web site:www.cai-engr.com.We look forward to having the opportunity to provide professional project management services to Metlakatla. Yours very truly, W\LO.Xb- Mark A.Schinman,P.E. Project Manager Approved for Submittal, un Pdbite John P.White,P.E. fice President,Western Operations Enclosure Connect With Confidence JACKSON,MI:ATLANTA,GA :MOUNT VERNON,WA PROPOSAL PROJECT MANAGEMENT SERVICES FOR INTEGRATED MANAGMENT OF BOTH THE TRIANGLE LAKE WATERSHED FEASIBILTY PROJECT AND THE METLAKATLA TO KETCHIKAN INTERTIE P-13-148 -= Commonwealthassociates,inc. SUBMITTED TO: Metlakatla Power &Light July 26,2013 Connect With Confidence a Commonwealthassociates,inc. SECTION 1.QUALIFICATIONS OF THE FIRM Commonwealth's staff has Alaska experience going back to 1976, when Commonwealth personnel worked on the 6-mile Snettisham rebuild project near Juneau.They coordinated the realignment survey, worked on the design,and served as design representative during construction. Commonwealth has performed con- sulting services in Fairbanks and Homer. In 1996,Ketchikan Public Utilities (KPU)retained Commonwealth to provide consulting services relative to the organization and management of the Swan-Tyee Intertie project. Other projects in which Common- wealth personnel have had signifi- cant involvement include an early design review for the Swan Lake 115 kV transmission line and Green Lake 69 kV transmission line (13 miles). More recently,Commonwealth served as the project manager for the Swan-Tyee Intertie,Solomon Gulch Hydro Electric Project's Low Level Outlet Works,Solomon Gulch Anchor Block Enhancements,war- ranty inspection of the STI,and some annual maintenance man- agement work. Commonwealth provided design services for Ketchikan Public Utilities for the rebuild of their Bethe Substa- tion. Commonwealth has prepared transmission line routing studies for the City and Borough of Sitka. Commonwealth analyzed theSEAPAelectricalsystemproviding both static and dynamic computer models. Commonwealth is presently working with SEAPA as the Project Manager for the Kake-Petersburg Intertie. P-13-148 Commonwealth is eager to provide professional project management services for the integrated management of both the Triangle Lake Wa- tershed Feasibility Project and the Metlakatla to Ketchikan Intertie (Project). Commonwealth is an employee-owned and -managed corporation dedi- cated to helping you meet your project goals by providing you with the high-quality engineering and consulting services necessary to achieve project success.When you work with Commonwealth you can "Connect with Confidence.”That means you can expect: if echnical Design Attentiveness Commonwealth's complete package of services facilitates our clients' successful licensing,design,and construction of electric generation fa- cilities,transmission line,substation,and distribution projects. Commonwealth knows that each client is unique and that each project has a different set of needs to be addressed.Our experience with hun- dreds of utility standards and procedures,participation in professional and technical organizations,and mix of engineering expertise provide opportunity for development of innovative solutions to our clients' problems. At the core of Commonwealth's strength is our talented staff.We foster an environment to promote our employees'abilities to serve our cus- tomers.This includes providing innovation and technical excellence. We encourage employees to achieve professional status by licensure in their profession.We support our staffs participation in professional organizations and participation in professional conferences and com- mittees,such as the Institute of Electrical and Electronics Engineers,the American Society of Civil Engineers,the National Society of Professional Engineers,and the Edison Electric Institute. Connect with Confidence Page 1 a Commonwealthassociates,inc. Commonwealth's services include: Project Management services Owner's engineering services Power and energy services Overhead transmission line engineering Underground transmission line engineering Substation engineering Industrial IC&E Distribution line engineering, overhead and underground Electrical systems studies Due diligence reviews Route selection Environmental studies / permitting GIS mapping Land acquisition Construction support Data resources TRANSMISSION 2000®software P-13-148 Specialized Experience Project Management Services Commonwealth furnishes a variety of services designed to aid clients in achieving successful completion of their hydro,transmission line and substation projects.This encompasses project management services as well as project control.Commonwealth uses a team approach,with spe- cific services tailored to meet the exact needs of each client.Each staff member is dedicated to serving our client's best interest,working in partnership as an extension of the client's staff.Project challenges are anticipated in advance and good communication among all project par- ticipants is facilitated. Commonwealth offers the most up-to-date computer methods available for project control services.Commonwealth uses software such as Mi- crosoft Project and Primavera to assist with planning and scheduling; budget monitoring and performance evaluation;estimates and cash flow information processing;status reports;and resource planning and monitoring. Transmission and Distribution Line Engineering Commonwealth's diverse staff represents one of the most experienced transmission and distribution (T&D)technical resources available to the electric energy industry worldwide.Our projects include the design of new facilities as well as expansion and upgrading of existing ones. These facilities range in voltage from 4.8 kV to 765 kV and vary in engi- neering costs from a few thousand to several million dollars.We are actively engaged in the development and assessment of the most ad- vanced overhead,underground,and submarine power delivery systems and use the latest in technological tools,such as PLS-CADD,to comple- ment our engineering skills.We emphasize flexibility in our offering of services and are available to manage entire projects or provide special- ized assistance to your staff. Hydro Commonwealth has experience in project management services for hy- droelectric generation facilities.Project examples are highlighted later in this document. Substation Engineering Commonwealth's substation engineering staff is highly experienced in designing additions to existing substations as well as developing new substations from the "ground up."We have completed hundreds of sub- Connect with Confidence Page 2 ee Commonwealthassociates,inc. station projects ranging from small 2.4 kV distribution substations to large 500 kV bulk transmission facilities,some of which were completed using a turnkey approach.Some projects have required innovative de- signs to overcome aesthetic or geological concerns.Recent projects have reflected modern trends to utilize transmission assets more effi- ciently with the installation of phase shifting transformers,static VAR compensators and flexible AC transmission systems (FACTS). Electrical Systems Commonwealth's electrical systems engineering staff provides a broad spectrum of electrical systems analyses to utilities,independent power producers,governmental agencies,industrial firms,and contractors of- fering turnkey services.We use a variety of software packages,includ- ing our own TRANSMISSION 2000®suite of programs,to conduct our studies.We specialize in evaluation of high-voltage power systems ranging from 34.5 kV to 765 kV. Economics,Cost of Service,Rate and Financial Analysis The Commonwealth team has public sector experience in economic and financial analysis and management.Experience includes cost-of-service analysis and rate design as well as economic analysis of power delivery projects. MA intertie Termination; Tie Triangle Lake-"to Intertie :.*Y .\on. 4 itLake aka Hassler Lake Py : Google earth me¥19 A Connect with Confidence P-13-148 Page 3 er Commonwealth associates,inc. SECTION 2.RATES,FEES AND ESTIMATED COST Included is a draft prelimi- nary schedule.As Com- monwealth learns more about the project,it will be modified appropriately. Commonwealth's cost esti- mate for the project is based on the schedule provided, and Phase 1 is to the right. If the schedule is extended for any reason,costs will increase. The 2013 Category Labor Rate Summary is included. Commonwealth adjusts its rates every calendar year based on labor cost experi- ence.Our 2014 Category Labor Rates will be provided when they are available and will be used for billing start- ing January 1,2014. The cost estimates provided for Phase 1 and Phase 2 assume a Category Labor Rate escalation rate of 4% annually. Commonwealth =proposestheworkbedoneonatime and expense or materials basis. We would like to emphasize that a cost estimate for a project such as this is diffi- cult to prepare due to un- knowns that may occur. Metlakatla and Common- wealth have a good relation- ship that will allow us to negotiate any necessary changes in a manner that is satisfactory to both parties. Please refer to Section 9 for assumptions on which this proposal is based. P-13-148 Phase 1 Project Meetings Kick Off Meeting Stake Holder Meetings (24 Meetings,8 in SE) Public Meetings (Four in SE) Project Team Meetings (20 Meetings,4 in SE) Miscellaneous Meetings RFP Processes Submarine Cable Environmental Permitting and Compliance,FERC Cable installation Design KPU Termination Design Cable Purchase KPU Termination Construction Cable Installation Contractor Construction Management/Inspection Hydro Environmental Permitting and Compliance Substation Design Substation Construction Substation Construction Management /Inspection Intertie Connection Design Intertie Construction Intertie Construction Management/Inspection Hydro Design Engineer Hydro Installation Contractor Hydro Construction Management/Inspection Other Electrical System Studies Chester Lake Review Economic Analysis Load Forecast Indexing Weather Station Data Monthly Progress Reports Manage Sub Consultants and Contractors Develop Project Budget &Maintain Develop Cash Flow Analysis &Maintain Develop Critical Path Schedule &Maintain Faciltiate Power Sales Agreements Material Expediting Develop Plan of Operations and Maintenance Total Expenses Total with Expenses Contingency Grand Total Page 4 Hours Cost 40 $6,560 434 §66,376 96 $15,744 436 S$61,904 100 $16,400 -§- -§- -§- 94 5S 13,432 -§- 94 S$13,432 94 $13,432 94 =$13,432 94 S$13,432 53 $7,570 94 S$13,432 94 S$13,432 53 $7,570 94 S$13,432 165 $25,620 8&8 S$13,664 88 $13,664 94.§13,432 106 $16,397 53 $8,198 53 $8,198 106 $16,397 79 =«OS 12,298 634 $98,381 69 S$10,760 69 $10,760 69 §$10,760 110 $17,080 88 $13,664 88 =S 13,664 3,922 $592,518 S 24,960 $617,478 10%5$61,748 $679,226 Connect with Confidence aus Commonwealth associates,inc. 2015 2016 Construction Between Construction Close Out Phase 2 Mobilization Season Seasons Season Jan -Mar 2015 April to Sep 2015 Sep to Mar 2016 Apr to Oct 2016 Oct to Nov 2016 Totals 3 Months 6 Months 7 Months 7 Months 1.5 Months Hours Costs Direct Project Management Labor hours Project Manager 320 960 400 1120 240|3,040 Administrative Assistant (6)960 560 1120 240]2,880 Estimated costs Project Manager labor cost $52,160 |$156,480 |$67,600 |$189,280 |$40,560 $506,080 Project Manager Relocation $11,804 |$20,884 |$21,792]$25,424]$6,356 $86,259 Single Office Cost &vehicle $10,631 |$41,806 |$17,101 |$§2,437 |$-$121,974 Administrative Assistant labor cost $-$57,600 ]$34,9441 $69,888 |$14,976 $177,408 Work Related Expenses $7,567 |$11,199 |$6,507 |$7,264 |$460 $32,996 Support Labor hours Scheduling Support 40 120 35 112 20)327 |$28,771 IT Assistance 50 60 20 30 Oo]160 |$16,276 Project Management Support 192 576 240 672 144]1824 |$307,953 Client Executive 30 40 20 40 10}140 |$32,490 Others 130 320 120 370 40|980 |$105,456 Estimated costs Labor Cost $- Totals $142,077.60 |$446,368.24 |$211,440.85 1 $520,578.58 |$95,197.23 |9,351 $1,415,662 | Cost per Month $47,359 |$74,395 |$30,206 |$74,368 |$63,465 Activities Relocate PM Construction Season Review season Construction Season Close Office Kickoff Meeting Office Open Prepare for next season Office Open PM Returms to WA Secure One Office in Metlaktla PM Returns to WA in Metlaktla Project Procedures Manual PM retums to SE Update Critical Path Schedule Update Cash Flow Spreadsheet Hire Administrative Assistant Connect with Confidence P-13-148 Page 5 a Commonwealth associates,inc. METLAKATLA POWER &LIGHT COMMONWEALTH ASSOCIATES,INC. CATEGORY LABOR RATE SUMMARY BUSINESS YEAR 2013 BALING LABOR GHLLiING RATECATEGORYTITLEPERHOUR EXEMPT EMPLOYEES 42 ENGINEER X 216 ao ENGINEER IX,LAND SERVICE SPECIALIST IX.PROJECT MANAGER IX.FIELO PROJECT REPRESENTATIVE IX 179 38 ENGINEER Vill,ENGINEERING SPECIALIST Vill,CONSULTANT Vill,LAND SERVICES SPECIALIST Vill,PROJECT MANAGER 156 Vili,FIELD PROJECT REPRESENTATIVE Vilt 36 ENGINEER VII,ENGINEERING SPECIALIST Vil,ENVIRONMENTAL SPECIALIST Vil,LAND SERVICES SPECIALIST Vit,135 ADMINISTRATIVE SPECIALIST Vi,PROJECT MANAGER Vil,FIELD PROJECT REPRESENTATIVE Vii 32 ENGINEER VI.ENGINEERING SPECIALIST VI,ENVIRONMENTAL SPECIALIST Vi,LAND SERVICES SPECIALISTVI,125 ADMINISTRATIVE SPECIALIST VI,PROJECT MANAGER Vi,FIELD PROJECT REPRESENTATIVE VI nN ENGINEER V,ENGINEERING SPECIALIST V.ENVIRONMENTAL SPECIALIST V,LAND SERVICES SPECIALIST V,LAND Wi2 SERVICES SUPERVISOR,PURCHASING AGENT V,ADMINISTRATIVE SPECIALIST V,PROJECT MANAGER V.,FIELD PROJECT REPRESENTATIVE V 26 ENGINEER TV.ENGINEERING SPECIALIST IV,ENVIRONMENTAL SPECIALIST IV,LAND SERVICES SPECIALIST IV,TECHNICAL 101 EDITOR IV.PURCHASING AGENT IV,ADMINISTRATIVE SPECIALIST 1V,PROJECT MANAGER IV,FIELD PROJECT REPRESENTATIVE IV 26 ENGINEER It,ENGINEERING SPECIALIST NI.ENVIRONMENTAL SPECIALIST Ili,LAND SERVICES SPECIALIST ill,83 CARTOGRAPHER Ill,PROGRAMMER Ii,TECHNICAL EDITOR It,PURCHASING AGENT Il,ADMINISTRATIVE SPECIALIST I, PROJECT MANAGER lil,FIELD PROJECT REPRESENTATIVE It! 23 ENGINEER 11,ENGINEERING SPECIALIST If.ENVIRONMENTAL SPECIALIST tl,LAND SERVICES SPECIALIST It,86 CARTOGRAPHER It,PROGRAMMER HI,TECHNICAL EDITOR Il,PURCHASING AGENT Il,ADMINISTRATIVE SPECIALIST It, PROJECT MANAGER II,FIELD PROJECT REPRESENTATIVE Hl a ENGINEER I,ENGINEERING SPECIALIST |,ENVIRONMENTAL SPECIALIST 1,LAND SERVICES SPECIALIST I,CARTOGRAPHER ri) |,PROGRAMMER |.TECHNICAL EDITOR I,PURCHASING AGENT |,ADMINISTRATIVE SPECIALIST 1,PROJECT MANAGER 1, FIELO PROJECT REPRESENTATIVE I NONEXEMPT EMPLOYEES 19 ADMINISTRATIVE ASSISTANT V,CADO OPERATOR V,DESIGNER V.TECHNICIAN V 86 17 ADMINISTRATIVE ASSISTANT IV,CADDO OPERATOR IV,DESIGNER IV.TECHNICIAN iV 74 16 ADMINISTRATIVE ASSISTANT Ilt,CADD OPERATOR iti,DESIGNER tt),TECHNICIAN Hl 64 15 ADMINISTRATIVE ASSISTANT Il,CADO OPERATOR Wi,DESIGNER I,TECHNICIAN ti 34 a ADMINISTRATIVE ASSISTANT ,CADD OPERATOR ,DESIGNER ,TECHNICIAN "4 Notes:1 CADDO charges are mciuded in sates.2 dertuals may move between Cateparies of tine of promoton'Rates are based on Nat 30 iworces part after Net 30 may be saresed #1 5%tafe tee per manth4)Hany govervnent encry lakes 8 legusiatve actan that ypoees new faxes,tees oF Charges On serices proveted by Ci or te en omayWWOvCeAUCmewfaxesfeesOFCharpesafactus!Coal mourred winout an addtany mary COMMONWEALTH ASSOCIATES,INC. EXPENSE BILLING RATE SUMMARY BUSINES YEAR 2013 8-1/2"x 11"$0.10/sht.PRODUCTION COPIES (NOTE 1)41"x47"$0.16/sht. Large format drawings $1.00/sq_ft. OUTSIDE REPRODUCTION _At cost EPRI SOFTWARE Such as TLWork &SG Work EPRI royalty fee for non EPRI members {if use requested by client} 2) ENGINEERING SOFTWARE (NOTE ETAP,TLCADD.T2000,WinIGS Such as ASPEN,CAPE,CAPTOR,CDEGS,EMTP.$10.00/hour POWER GENERATION ANALYSIS PROGRAMS $100.00 Per Run VEHICLE USAGE _At prevailing rate REQUIRED EXPENSES TRAVEL,LODGING AND MEALS _At cost or specified per diem MAIL DELIVERY SERVICES Fed-Ex,UPS,USPS.etc.At cost SUBCONTRACTORS _Cost plus 7% OTHER MISC.CLIENT OR PROJECT _At cost Notes. 1 No change for reproduction uniess the totel number of reproduced sheets is greater than 100.2.Engineenng software surcharges are apphed to ail iabor hours of sysiem anatys:s proyects. P-13-148 Page 6 Connect with Confidence ar Commonwealth associates,inc. SECTION 3.GENERAL EXPERIENCE OF FIRM 4Commonwealth was established in 1988,following the closing of anoth- ow.[Sort]er engineering firm's Jackson,Michigan,office.Our founders had"/+.«: d)worked closely together on domestic and foreign electric transmission-|ae rt ape.EEE and distribution projects for many years out of the Jackson office.Ra-s Ae ther than leave Jackson,this team of individuals took action to incorpo- os ee rate under a name -Commonwealth Associates,Inc.-that was,and is,:a well known and respected in the electric power industry. a OY .. rey The group devoted itself to structuring a new employee-owned compa- ny with the intent of upholding the previous Commonwealth Associates, Inc.'s reputation for providing high-quality engineering and consulting services.Other talented individuals,many of whom had worked previ-Headquarters ously with the founders,were brought in to add their expertise.The P.O.Box 1124 new company flourished and,in 1992,Commonwealth opened a princi-seoeson,Mit92041'24 pal office in the state of Washington to serve clients in the western Unit- Tel.:517-788-3000 ed States.Another principal office was opened near Atlanta,Georgia,in Email:caiinfo@cai-engr.com 2008.Next,the Columbus,Ohio,office opened in 2012. Pacific Northwest Today,Commonwealth's staff of approximately 260 professional and 2021 E.College Way,technical employees represents one of the most skilled,experiencedMountVernon,WA 98273 technical resources available to analyze,plan,design,and constructTel:360-466-2214 electric power generation and delivery projects.In addition to licensed Email:cainw@cai-engr.com engineers and engineering specialists,we have experts in environmen- tal sciences,licensing,Geographical Information Systems (GIS),survey- Southeast ing,right-of-way acquisition,and construction management,many with 114 Town Park Drive Suite150 more than 20 years of experience in their field of expertise.Many of our Kennesaw,GA 30144 professional engineers are active members of the Institute of ElectricalTel.:678-223-7020 ane "and Electronics Engineers,American Society of Civil Engineers,EdisonEmail:caise@cai-engr.com Electrical Institute,and National Society of Professional Engineers, Midwest which allows for interaction with our peers and access to problem- 670 Morrison Road,Suite 240 solving resources directed to the power generation and T&D industries. Gahanna,OH 43230 Tel.:614-729-2500 Commonwealth's methods and tools have evolved over the years to in-il:-@cai-F ;Email:CAl-ColumbusOffice@cal corporate emerging technologies and meet new challenges,and our de-gr.comenance votion to engineering excellence and client satisfaction has never *Commonwealth also has satellite wavered. offices in Dayton,Ohio,and Roa- noke,Virginia. Connect with Confidence P-13-148 Page 7 mee Commonwealth associates,inc. SECTION 4.PROJECT RESUMES Commonwealth has considerable experience working on projects located in Alaska,as demonstrated below, as well as on projects that are remotely based and require intense logistical coordination.Commonwealth's staff has experience working in many environments,including rugged Alaska,the desert and windy areas of central Texas,and the densely wooded areas of western Washington and the San Juan Islands.The Com- monwealth team is a hardy group and includes ocean and river kayakers,fishermen,hunters,hikers,and ski instructors.Examples of our applicable experience are: SEAPA,Kake-Petersburg Intertie:Project Management services for the Kake-Petersburg Intertie.Planning and preliminary design have begun for a new electrical transmission line intertie that will extend west across the Ton- gass National Forest,from the Petersburg area to Kake on Kupreanof Island. The intertie will transmit power to Kake at either 69 or 138 kV and con- sist primarily of single wood pole structures.Engineering studies and the NEPA process are well underway.Contact:Trey Acteson,SEAPA,CEO, 1900 First Avenue,Suite 318,Ketchikan,Alaska 99901,907-228-2281. The present total dollar value of the installed system is approximately $70M depending on the route selected.Key employees for this project as it progresses include Mark Schinman,Dean Scott,Lloyd Marquardt,John White and Paul Reed. SEAPA -Swan-Tyee Intertie Project Management,Southeast Alaska: Project Manager for SEAPA's 57-mile Swan-Tyee Intertie.The line was designed for 138 kV and operates at 69 kV.Work included overall project management during the construction phase.Contributing to the success of this project was the excellent communication among all parties.Com- monwealth opened an office in Ketchikan to facilitate communication and management.This was a unique project due to its remote location and extensive use of helicopters for construction.Dave Carlson (SEAPA Re- tired CEO),60832 Scotts Bluff Place,Bend,Oregon 97702,907-317-1365. Completed in 2009,$1,126K.Key employees included Dean Scott,Mark Schinman and John White. SEAPA -Solomon Gulch Hydroelectric Project Low Level Outlet Works and Anchor Block Enhancements,Valdez,Alaska:Project Manager for the installation of a low level outlet for emergency use if de- termined the reservoir needed lowering and for enhancing the anchor blocks supporting the penstock.These were two separate SEAPA pro- jects.Work included management of several RFP processes resulting in the hiring of engineering and construction firms to complete the work as well as purchasing a long-lead material item.Work also included man- agement of the projects to completion and interfacing with the project owner,Copper Valley Electric Association,and FERC for necessary ap- provals.Contact:Dave Carlson LLC,(SEAPA Retired CEO),60832 Scotts Bluff Place,Bend,Oregon 97702,907-317-1365.Completed 2012,Project Management services were $52K.Key employees included Mark Schinman and John White. Connect with Confidence P-13-148 Page 8 a Commonwealthassociates,inc. P-13-148 Douglas County PUD,Douglas to Rapids:Overall project design and construction management of a 13-mile 230 kV tubular steel transmission line connecting the Douglas and Rapids Switchyards near East Wenatchee,Washington.These functions included assisting the District with finalizing the route selection,completing a conductor study to de- termine an appropriate conductor for the project,developing steel pole concept and loading drawings and procurement specifications,develop- ing plan and profile drawings,compiling a material list,and writing a technical specification for the line construction.The steel pole line was designed to support a 1590 kcmil ACSR/TW conductor.Commonwealth is providing an Owner's Representative and Observers during the construc- tion phase.The construction phase duties will include coordination and providing a communication conduit among all key stakeholders:the own- er,contractor,engineer,material suppliers,property owners,and permit representatives.Contact:Jerry Kyle,Douglas County PUD,1151 Valley Mall Parkway,East Wenatchee,WA 98802,(509)881-2234.Approxi- mately $1,000K.Key employees include John White,Dean Scott,Brian White,Mark Schinman,Claude Smith,and Paul Reed. Douglas County PUD,Pangborn Substation:This project had three phases.For Phase 1,Commonwealth developed substation conceptual designs providing different reliability levels for a potential new high tech load as well as a cost estimate for each design.Completed in 2006, $10K.Phase 2 was the design ofa 115 kV transmission tap,a 115 kV ring bus,a 13.2 kV 2-bank substation with 4 feeders designed for each bank. The substation's two power transformers operate in parallel.The ratings of the transformers are 25/33.25/41.75 MVA at 55°C.The design started in September 2006,and the substation was energized in October 2007.Phase 2 design cost,$544K.Phase 3 involved construction man- agement of the installation of the required facilities.Contact:Jerry Kyle, Douglas County PUD,1151 Valley Mall Parkway,East Wenatchee,WA 98802,(509)881-2234.Key employees included John White and Mark Schinman, Transmission Line Design Projects:Commonwealth has been respon- sible for approximately 200 transmission design projects ranging in volt- ages from 69 kV to 500 kV in the last five years.Additional information can be provided on request. Connect with Confidence Page 9 a Commonwealth associates,inc. SECTION 5.ADDITIONAL REFERENCES John L.Duhamel Copper Valley Electric Association,Inc. PO Box 45 Glennallen,AK 99588 907-822-3211 Duhamel@cvea.org Chris Lee,P.E. Snohomish County PUD PO Box 1107 Everett,WA 98206 425-783-4310 cklee@snopud.com Dave Carlson Dave Carlson LLC (SEAPA Retired CEO) 60832 Scotts Bluff Place Bend,Oregon 97702 907-317-1365 Trey Acteson SEAPA,CEO 1900 First Avenue,Suite 318 Ketchikan,Alaska 99901 907-228-2281 tacteson@seapahydro.org SECTION 6.APPROACH TO PROJECT Commonwealth has reviewed the RFP's scope of work and will provide the project management services as described in this proposal. Commonwealth's Project Manager and project team are quite familiar with Southeast Alaska through earli- er projects in which they have partic- ipated. For project success,it is essential that Commonwealth establish posi- tive relationships with Metlakatla and other project participants.The pro- ject management emphasis will be to develop a goal-oriented team ap- proach with all major participants: Metlakatla,Environmental Consult- ants,Design Engineers,General Contractors,key Material Suppliers, other subconsultants and contrac- tors,agencies,and other groups as necessary. P-13-148 Introduction Commonwealth is proposing to perform project management services to Metlakatla. Commonwealth's approach to project management of the Project will be to work in partnership with Metlakatla as an extension of Metlakatla's staff and/or act as their agent,as appropriate.Commonwealth will pro- vide a central hub for coordination and communication among all project participants.Commonwealth's Project Manager will provide a single point of contact for both Metlakatla and the project participants. Commonwealth will develop RFPs so that Metlakatla can enter into con- tracts with the necessary subconsultants and contractors;assist with ad- vertising the RFPs;review proposals;assist Metlakatla in reaching a decision on awarding the work;assist with developing appropriate con- tracts from a technical perspective;and,after the notice to proceed is is- sued by Metlakatla,manage the subconsultants and contractors,tracking their progress and budgets,approving invoices,reviewing change order requests,and providing recommendations and coordination between the vendors as appropriate.All contracts will be between Metlakatla and the subconsultant,vendor and contractors.Commonwealth,as the Project Manager,will not be a party to these contracts. During Phase 1,the Commonwealth team will work primarily from its Mount Vernon offices and will travel to Southeast Alaska when necessary. It is assumed that many meetings will take place via teleconference.This approach provides solid communication while helping keep costs down. Connect with Confidence Page 10 a Commonwealthassociates,inc. Commonwealth's approach to pro- ject management is to be pro-active, look ahead,anticipate,and include input from all major participants; including Metlakatla,the Construc- tion Management team,the Engi- neers,the Environmental Inspection/ Compliance teams,and the Contrac- tors. Quality,timely,open,complete communication among all parties is a key to project success.Common- wealth will facilitate this. Commonwealth is prepared to begin work on the Project on August 16, 2013,as indicated in the RFP,or after notice to proceed is received. Commonwealth assumes we will be managing,providing project man- agement services,for numerous consultants and contractors during the Project that will be under con- tract with Metlakatla.Examples of those under contract with Metlakatla include: e Hydro design engineers *Transmission line design engineer for the hydro interconnection ¢Substation design engineers for the hydro substation e Economic analysis consultants e System study consultants e Transmission line contractors for the hydro interconnection Submarine cable contractors Hydro construction manager Hydro contractors Load forecast and economic anal- ysis consultants Geotechnical,surveyor work,etc., would be subconsultants to those listed above. Should Commonwealth hire a sub- consultant directly,there is a 7% management fee,as noted in the included billing rates. P-13-148 During Phase 2,Commonwealth's Project Manager will work in an office established in Metlakatla.It is assumed this office will be needed only during construction of the hydro portion and not necessary during com- pletion of the intertie. Commonwealth's Project Manager will be supported by a team of Com- monwealth professionals for both phases.Duties of team members for example will be developing and maintaining the critical path schedule and cash flow charts,organizing and preparing the monthly progress re- ports,drafting various RFPs for the hiring of consultants and contractors and evaluating the responses,and managing consultants.Other members of the team will be available to provide their individual in-depth expertise in the areas of management,design,technical (both civil and electrical), and construction of similar remote-access hydro and transmission line projects. Commonwealth has highly experienced information technology (IT)per- sonnel to support the project team with the setup and maintenance of an FTP site,SharePoint site as well as a project web site (optional),to allow easy data access by all project participants. Background The Triangle Lake Watershed Feasibility Project will provide additional hydroelectric power to Metlakatla and,with construction of the 14-mile wood-pole 34.5 kV transmission line and a 3-mile submarine cable, Metlakatla's system will be interconnected with electric systems of Ketchikan,Wrangell,Petersburg and potentially Kake. Commonwealth understands the proposed Triangle Lake hydroelectric project will be located on the west side of Annette Island.A run-of-river project configuration has been developed.A low embankment dam with an integral ungated spillway and intake for the penstock would be con- structed at the north end of the lake.A 65-inch-diameter pipeline would proceed from the intake down to the powerhouse.The powerhouse would be constructed near tidewater at Hassler Harbor.The powerhouse would be constructed to house two horizontal Francis turbine generators, switchgear,and a control panel.It is assumed that existing logging roads would be upgraded for construction.The penstock assumes a surface run pipeline,which would be built on a newly constructed road.The pipeline would be laid on bedding and cans welded together.Thrust blocks will be required at locations where there are sharp changes in direction.The en- tire pipeline would be covered in bedding for protection. The feasibility of raising the dam height at Chester Lake to expand hydro- electric capacity will also be reviewed by a subconsultant. Connect with Confidence Page 11 a Commonwealthassociates,inc. Commonwealth has found that a critical path schedule provides the following advantages: e Structure and detail for quality of up-front planning Enables selective reporting Agency activities Environmental activities Engineering activities Clearing activities Material procurement activities Construction activities Enables "What If analysis A "look ahead”view to help an- ticipate schedule impacts e Keeps the project moving ac- cording to plan A critical path schedule will be de- veloped. Commonwealth has recently com- pleted an Electrical System Study for SEAPA's electrical system,including Ketchikan.Because of _thisknowledgeandbackground,Com- monwealth is in a unique position to do additional system studies that may be required.Should this be determined necessary,a cost esti- mate to do the work can be pre- pared. A contributing factor for project suc- cess is quality communication.This is one of the reasons the Swan-Tyee Intertie was successful.It is im- portant that Commonwealth coordi- nate and communicate with all team members,consultants,contractors, critical agencies and entities in- volved with the Project. P-13-148 Construction of the 14-mile overhead intertie will be completed and en- ergized in midsummer 2013.Review of the submarine cable specifica- tions have been completed and updated.Permitting is approximately 95%complete.Energy production and construction cost studies were performed for the Triangle Lake,Lower Todd Lake and Chester Lake Hy- dro Upgrade Projects in July 2011 and January 2012. For the Triangle Lake Project,Commonwealth understands Metlakatla has funds available from the Alaska Renewable Energy Fund.The funded project tasks include:1)establishment of a local project office,2)prepa- ration of a feasibility study,3)completion of applicable permitting,4)a plan of integration of the proposed hydro plant with other energy genera- tion,5)utility agreements for power sales,6)an economic feasibility study,7)35%design documents,8)final design documents and 9)a con- struction cost estimate. For the Intertie,we understand AEA grant funds are also available.The grant funds are to complete the design of the 34.5 kV transmission inter- tie.The proposed intertie will follow an existing road and require a sub- marine cable to interconnect the Metlakatla electric system with the Ketchikan electric system.In addition,grant funds will be used to com- plete design upgrades to the various control systems of the Metlakatla electric system (including the governor and SCADA systems).These up- grades are necessary to accommodate the connection between the Metlakatla and Ketchikan electric systems.The grant tasks included in the draft award document include setting up a local project office,completion of all permits and final design,negotiation of applicable power sales agreements,and preparation of an economic feasibility study and a con- struction cost estimate. Scope of Work Commonwealth will provide a project management office to coordinate, manage and implement the milestones of the grants to provide efficient and effective use of funds and expedite both projects toward completion in a timely manner.Commonwealth will provide project management support to Metlakatla for the following: e Assist Metlakatla with developing a staffing plan for Project duties and responsibilities including,but not limited to,the name and con- tact information of the Project Manager and any key personnel as- signed to the Project by Metlakatla. e Provide the Project Manager's resume. e Develop a Project budget detailing design,construction,management, bonding and insurance costs,and other costs needed to complete the Project. Connect with Confidence Page 12 ames Commonwealth associates,inc. Commonwealth's project manage- ment team will develop a Project Procedures Manual to assist in monitoring of the project.The Pro- ject Procedures Manual will include: e Listing of all participating entities with the appropriate contact in- formation (addresses,email, and phone numbers). ¢Communication flow chart.This document will establish docu- ment control and communica- tion relationships and _identify responsibility and accountability e Payment procedure outline.A flow chart will be developed for each contract,identifying check lists and the requirements nec- essary prior to providing pay- ment for services rendered. Commonwealth understands _that95%of the necessary environmental and permitting work for the intertie is complete.Commonwealth also un- derstands that EPS out of Anchor- age has essentially completed the design of the KPU interconnection and the submarine cable.A contrac- tor needs to be hired to install it. Schedule,costs,performance,and issues of concern will all be included in monthly progress reports.By identifying issues of concern,we can solve problems early before they cause a significant impact on the overall project.Early resolution of the issues will assist in completing the project within the established schedule and budget. P-13-148 Prepare a spending plan that details a schedule of reimbursement over the expected design and permitting phase to bring the Project to construction ready. Prepare a project development plan detailing a time schedule for permitting,design and construction,commissioning and commercial operation,and project budget through completion of design and per- mitting with the following milestones: -For the hydro project, o Completion of applicable permitting,including the NEPA pro- cess and FERC permitting if required o Development of an Integration plan into the preferred trans- mission line route o Final design and permitting -For the intertie, o Completion of permitting requirements o Completion of the submarine cable and interconnection with KPU Perform an analysis of economic feasibility based on a Project cost estimate and a best estimate of a cost of power and transmission line cost of operations to the delivery point of power. Prepare a summary of agreements with utilities that will be needed for future operations. CBIR,1 Fema ARE TLL Alyiatesawme * Commonwealth understands the design of the submarine cable and interconnec- tion is nearly complete.The work has been done by EPS and they are under con- tract to finish the work. Develop a plan of operations,maintenance and ownership for the Project. Provide 35%design documents with construction cost estimates. Provide final design documents with revised construction cost Connect with Confidence Page 13 a Commonwealth associates,inc. Commonwealth's IT staff can easily provide a secured separate FTP site for information exchange for the identified project participants.The FTP site will facilitate all project par- ticipants having access to necessary electronic documents for successful project completion.Project partici- pants with the appropriate user names and passwords will be able to upload and download electronic data from the site. Early in the project,the Common- wealth team could,at Metlakatla's discretion,create a project-specific web site to allow easy exchange of information with the public.A project- specific web site would allow inter- ested parties to view general project data,schedules,and news items.A web site would keep the public in- formed and promote goodwill.To see a sample project web site,visit: www.ccfreeway.com.Common- wealth can provide this service on a time and expense basis,and an es- timate can be provided if desired. Success of the Project will require good communication and documen- tation of decisions and action items. All participants will be required to strive for open discussion.Commu- nication will take place both informal- ly and formally through face-to-face visits,phone,email,letters,and re- ports. The project office Commonwealth will be establishing in Metlakatla is anticipated to be approximately 1,200 square feet in size with suffi- cient room for approximately six desks to provide work areas for the Project Manager,administrative as- sistant,and other project team members.There will be storage area for files,radios,boots,rain gear,etc.A meeting space will also be provided.It is anticipated that this office will only be necessary during the hydro construction. P-13-148 estimates. Obtain necessary permits as feasible. Additional Duties In addition to the above,Commonwealth will provide project manage- ment support to Metlakatla for the following: 1. 10. 11. 12. Review relevant project documents and studies,including ongoing work tasks by consultants.Coordinate and attend a kick-off meeting with Metlakatla and stakeholders,including,KPU,SEAPA,AEA,IPEC and the Southeast Conference. Monitor and manage any EIS and permitting consultants and con- tractors currently working on the project. Monitor and manage the economic analyses that will be performed by a consultant and need to be updated from time to time as new in- formation becomes available.Commonwealth can provide this eco- nomic analysis at additional cost. Recommend additional analyses as required to accurately identify the cost of the projects,the cost of power delivered over the project to KPU and SEAPA. Manage and coordinate the completion of the intertie design with the present consultants and EPS and coordinate with KPU as necessary. Review past studies that have been done with regard to system sta- bility within the existing KPU and SEAPA transmission systems,and through coordination with KPU and SEAPA,and recommend addi- tional studies as required to ensure that new loads delivered over the intertie do not impact the stability of existing utility systems. Commonwealth can provide these studies analysis at additional cost. Develop and update project development schedules with decision milestones. Coordinate and hold monthly meetings with the stakeholders,which may be via teleconference;some face-to-face meetings will be re- quired.Prepare agendas and keep notes/minutes from the meetings. Travel to Metlakatla to attend Project-related public informational meetings throughout the project development stages. Review from a project management perspective al]submittals and reports from consultants/contractors and disseminate to appropri- ate parties.Review and approve all invoices for payment. Assist Metlakatla in the preparation of all RFPs or bidding documents required for the project.This will include the development of addi- tional task orders for transmission projects,contracts for final de- sign,construction of the project and construction management, inspection and environmental monitoring activities. As the projects move forward to construction,monitor and manage the work and schedule of design and construction of the Project;re- view payment requests and recommendations from the Construction Connect with Confidence Page 14 a Commonwealthassociates,inc. All meetings will have an agenda that is initially drafted by the Project Manager and distributed prior to the meeting.The agenda will then be modified and approved by the partic- ipants at the beginning of the meet- ing.After the meeting,a summary of decisions and assigned actions will be provided in the meeting notes. Use of agendas helps the partici- pants stay on the subject matter for effective use of time and also as- sures that all necessary subjects are discussed.The meeting notes will provide necessary documentation. For Phase 2 Commonwealth has budgeted for one project vehicle to provide local transportation in and around Metlakatla.The project vehi- cle will primarily be used by the Pro- ject Manager.However,it will also provide temporary transportation for individuals who need to carry out intermittent project duties from the project office.|Transportation toSoutheastAlaskaisbudgetedforas indicated in the cost summary. Transportation to project camps and to construction locations along the transmission line routes has not been budgeted. P-13-148 13. 14. 15. 16. 17, 18. 19, 20. 21. 22. 23. Manager,General Contractor,Engineer,other contractors and con- sultants and check that required documentation is submitted;meet with the Project participants as necessary;track and respond to Pro- ject correspondence,ensuring proper tracking and managing of Pro- ject documents such as requests for information,submittals,and change order requests;oversee proper maintenance of project com- pletion and progress charts;prepare weekly and monthly reports; check proper documenting of progress and maintenance of extensive document and photo records by the Construction Manager.The Pro- ject Manager will be the agent for Metlakatla in reviewing and rec- ommending change orders in a timely fashion. Provide facilitation assistance to Metlakatla in the development of any required power sales agreements,interconnection agreements and,in general,the business plan development for the project. Monitor and provide project management for the design,including the contract of the Design Engineer. Manage the Environmental Consultant to provide coordination with all critical agencies and entities involved in permitting and construc- tion activities,including,but not limited to:FERC,US Forest Service, Army Corps of Engineers,support entities,State of Alaska,Coast Guard and other appropriate agencies as needed. Forecast cash flow requirements so that Metlakatla can have ade- quate funds available when needed to meet obligations during all phases of the project. Assist Metlakatla in determining the best and most appropriate method in contracting for the construction of the project (owner- supplied materials or contractor-supplied). Expedite receipt of critical equipment as needed for a smooth con- struction process. Maintain a local office in Metlakatla during the construction phase of the hydro project as the principal working location for the Construc- tion Manager,inspectors,and environmental monitors.An office is not expected to be required until the project reaches construction- ready status. Oversee compliance with all state and federal permits. Prepare and deliver presentations on project status,both written and oral with audiovisual assistance as needed,to Metlakatla per- sonnel. If needed assist in selecting a consultant to prepare a load forecast for the MP&L service area. If needed assist in selecting a consultant to evaluate Metlakatla's hy- dro resources indexed to weather station data. Connect with Confidence Page 15 a This is a high level schedule based on our current understanding of the Project. Commonwealth Adjustments will be made and a detailed schedule will be developed early on in Phase 1. UaeABaia I ID {Task Name [2014 [2015 |2016 _ -__Qr2..ar3s |ora |awa |atr2|ar3_!aa |ata |a2 |ata |atra |ata |atr2 |aera Tara _| 1 Phase1 2 Notice to Proceed 8/16 "3 |Kick Off Meeting 4 Monthly Stake Holder Meetings 5 Overhead portion of intertie compled "6|Submarine Cable 7 Environmental Permitting and Compliance 8 |Cable Installation Design 9 KPU Interconnection Design 10 Submarine Cable Purchase 11 KPU Substation Interconnection Construction "a2 |Submarine Cable Installation 13 Construction Management/Inspection 14 |Intertie Energization with KPU 45 Hydro "16 Environmental Permitting and Compliance 17 FERC Permitting if Requried 18 Substation Design |19 |Intertie Connection Design 20 Hydro Design Engineer "24 |Other Sub Consultants )22 |Electrical System Studies 23 Chester Lake Review 247 Economic Analysis 25-Load Forecast 26 Indexing Weather Station Data 27 Monthly Progress Reports 28 Develop and Maintain Project Budget 29 Prepare Cash Flow Analysis and Update "30 Critical Path Schedule w/updates 31 Facilitate Power Sales Agreements 32 Material Expediting 33 |Planof Operations and Maintenance 34 Phase 2 35 Office Open in Metlakatla "36 Office Open in Metlakatla 37 Hydro Plant Substation Construction |38|Substation Const Mgmt./Inspection 39 Hydro Plant Intertie Construction 40 Intertie Const.Mgmt/Inspection "41 Hydro Plant Construction A |Hydro Const.Mgmt./Inspection 43 Hydro In Operation | Note:Scheduled times generally include both the RFP process and the time to do the work.Red tasks indicate critical path. Commonwealth understand submarine cable delivery can be 12-18 months.Cables often come from Europe or China. P-13-148 Page 16 OO _--- Commonwealthassociates,inc. SECTION 7.KEY PERSONNEL The project team that Commonwealth proposes to assign to this project is highly experienced and led by a seasoned project manager.Commonwealth and the project team have many years of experience and famili- arity with Alaska,hydro/transmission/substation construction and design,and electric utilities.The Com- monwealth staff is knowledgeable of the project to be constructed. Commonwealth is pleased to offer Mark Schinman,P.E.,as the proposed Project Manager.Key team mem- bers,many of whom have significant Southeast Alaska experience,and their roles are indicated on the organ- izational chart below.Other members of the Commonwealth staff are available to provide additional support as required. Quality Control.Project Manager} 'MarkSchinman)P.Eig Project Management Support.Technical Support, LN.robe Uddin PEJosephLowdenischeduingAnn,Stevens"R'¢Environmental Manage'David shafert PE Electrical *Alaska experience **Commonwealth Employee or Subconsultant,details to be determined. Resumes of key individuals are included at the end of this proposal. Connect with Confidence P-13-148 Page 17 a Commonwealthassociates,inc. SECTION 8.CAPACITY OF FIRM Commonwealth has the capacity to complete the required work.The Commonwealth team's depth of experience,as indicated in the provided Project management support for |resumes,is significant. Commonwealth's proposed Project Manager,Mark Schinman,P.E.,|Commonwealth's staff of approximately 260 professional and technicalincludes,Lloyd Marquardt,P-E..|employees represents one of the most skilled,experienced technical re-Dean Scott,P.E.,and Paul Reed,... PE.sources available to analyze,plan,design,and construct electric power generation and delivery projects.Commonwealth's entire staff of pro- fessional and technical employees is available to draw from to meet pro- ject needs. SECTION 9.EXCLUSIONS,CONDITIONS OR QUALIFICATIONS This proposal assumes mutually agreeable contract terms and conditions can be developed. Commonwealth is presently contracted with SEAPA for project management work and has worked for Ketchikan Public Utilities in the recent past.Commonwealth believes this work can be completed without any conflicts of interest developing and will bring possible issues to Metlakatla's attention should they arise. We request Metlakatla bring to Commonwealth any possible conflicts of interests so solutions can be found. SEAPA is aware we are submitting this proposal and has expressed no concerns. Developing necessary power contracts with KPU,SEAPA and other agencies may be complicated.Common- wealth thinks its best role in this process will be as a facilitator bringing positive solutions to all involved parties.Commonwealth understands the utilities'and agencies'policy makers will be the decision makers and each will have attorneys,technical experts and staff as advisors. Assumptions for Commonwealth's cost estimates follow: e Ifthe schedule provided is extended for any reason,the cost estimates provided will increase. ©We have assumed one year for NEPA compliance and FERC permitting,if required.Many projects take longer than this.FERC permitting may or may not be required.Itis unclear at this point. e Travel expenses assume Metlakatla will pay directly for local travel via its contracts for local air trav- el between Ketchikan and Metlakatla. e Phase 1 assumes 24 stakeholder meetings:8 in Southeast Alaska and the balance by teleconference. e Phase 1 assumes four additional trips to Southeast Alaska for various meetings. e Phase 1 assumes monthly progress reports. e Phase 1 assumes participation in four public meetings in Southeast Alaska arranged by others;for example,the Environmental Consultant or community groups. e The Phase 2 office will be open two summers during the hydro construction in Metlakatla. e Phase 2 office includes a single 1,200-square-foot office and a vehicle in Southeast Alaska.The cost estimates provided assume 4%annual labor rate increases. e Cost estimates assume the project moves forward without delays caused by lack of funding,permit- ting delays,etc.,similar to the schedule provided. Connect with Contidence P-13-148 Page 18 a Commonwealth associates,inc. SECTION 10.ADDITIONAL INFORMATION None Connect with Confidence P-13-148 Page 19 >a Commonwealth associates,inc. RESUMES Resumes of key staff follow in alphabetical order. Connect with Confidence P-13-148 Page 20 Currents Consutting Water &Power ServicesPAULT.CARSON,P.E. Consulting Engineer EDUCATION REGISTRATIONS/PROFESSIONAL AFFILIATIONS BSME-University of Notre Dame-1974 MSME-University of Washington-1977 Professional Engineer -1980 (Washington,Alaska, California,and Oregon) SUMMARY OF EXPERIENCE Mr.Carson is a registered professional engineer with 37 years of mechanical engineering experience,including 35 years in design,planning,estimating,and construction management of hydroelectric,navigation,fish passage,and water resource projects.His experience includes design and specification of mechanical systems,shop drawing review,field inspections,turbine-generator performance testing and operational testing of mechanical systems.Paul has served on a variety of independent peer review panels and Boards of Consultants for major hydroelectric and flood control projects. He has prepared final design plans,specifications,and cost estimates for a wide range of hydraulic machinery required for hydroelectric plants,navigation projects,flood control,and fish passage systems.In each of these assignments,Mr.Carson was directly involved in the sizing of major project features and equipment and in the development of operating plans and control schemes.Specific equipment experience includes:intake,emergency closure and outlet gates;gate operators;butterfly,spherical,polyjet and free discharge valves;steel penstocks and branched outlets;centrifugal and mixed flow pumps;Francis,Pelton and Kaplan type hydraulic turbines;overhead cranes and hoisting equipment;diesel generators;compressed air,HVAC and related auxiliary equipment. RELEVANT PROJECT EXPERIENCE Gulf Intercoastal Waterway West Closure Complex -penstock modifications and a new 15.9 MW Hurricane and Storm Damage Risk Reduction, Independent Review Panel,2009 to 2012,Corps of Engineers,New Orleans District.Served as mechanical engineer on the independent review panel for the West Closure Complex pump station and navigation gates.Pumping station includes 13 flowerpot style engine driven pumps with station capacity of 19,100 cfs.Gate systems include a 225ft W x 32ft H sector type navigation gate and five 16ft x 16ft sluice gates.Total Complex cost of $1.4 billion. Bart Lake Project,2006 to 2011,Alaska Electric Light and Power.Served on FERC Board of Consultants for this new 16 MW development.Project includes a 30 ft high rockfill dam,7700 ft long penstock,powerhouse with 16 MW vertical pelton unit, remote camp facilities and transmission line. Blue Lake Expansion Project,2007 to present,City and Borough of Sitka,Alaska -Now serving as client's staff for technical review and management of final design and construction services for this 15.9 MW expansion of the City's existing 6 MW Blue Lake Hydro facility.Project work includes an 83 ft raise of an existing 200 ft high concrete arch dam,a new 1100 ft intake tunnel,intake structure,surge chamber, P-13-148 'Mediterranean-Dead Sea Project, powerhouse.Construction began in late 2012. Israel;MDS Corporation,1986-1991 -Lead Mechanical Engineer. Supervised the mechanical engineering aspects of the final feasibility study for this major ocean diversion and power project.Major features included a sea intake,108 MW pumping station,20-km canal,5.8- meter-diameter 80-km-long tunnel,regulating reservoir with gated inlet and outlet,and 800 MW underground four-unit hydroelectric power station.Work included equipment layouts,equipment conceptual design,cost estimates,corrosion studies,and control/operating scheme development.Mechanical systems included: station drainage and flooding protection;equipment cooling and underground machine hall HVAC;access tunnel and cable shafts ventilation;station cranes and hoists;service and potable water;compressed air;and emergency power supply. Navajo Dam _Hydroelectric Facility,City of Farmington,New Mexico -Project Manager for all engineering activities during design and construction management of this hydropower development at an existing federal dam.Major efforts during the project development included negotiating agreements with the Page 21 U.S.Bureau of Reclamation and Navajo Indian Nation, two FERC license amendments,final design of the 110-inch penstock,30 MW power plant,400 kW diesel generator standby set,115 kV switchyard and 25-mile transmission line,construction cost estimates,and preparation and management of five supply and construction contracts.Successfully handling a major fire and contractor's default,Mr.Carson managed completion of the project within one month of the original schedule for approximately 91 percent of the estimated cost. IHNC -Lake Borgne Flood Protection,Independent Review Panel,2008 to present,Corps of Engineers, New Orleans District.Now serving as mechanical engineer on the independent review panel for floodwalls,navigation passage gates,gate operating systems,and ancillary mechanical systems on this flood protection improvement project for the City of New Orleans.Work includes review of 150 ft W x 20 ft H navigation sector gate and 62 ft by 192 ft concrete barge gate. Rocky Reach Hydroelectric Project,1996-2003 Juvenile Fish Bypass System,Columbia River, Washington,Chelan County Public Utility District No.1 -Project Startup Manager and Lead Mechanical Engineer,responsible for design of mechanical and control systems for this $110 million fish protection project.Lead Mechanical engineer responsible for design of attraction control gates,pumping system and controls for the juvenile fish surface collector and gatewell collector systems.The project consists of a series of prototype systems (1996 to 1999)to collect downstream migrating juvenile salmon and steelhead in the powerhouse forebay and route them downstream past the dam.Mr.Carson was responsible for design of three 22 x 38 ft venturi control (slide)gates,weir flow control gates and a 500 cfs attraction water pumping system with controls for the 1997 prototype, an automated weir gate control system and intake screen cleaner for the 1998 prototype,and a 50 by 60 foot movable entrance wall for the 1999 prototype.For the permanent system,Mr.Carson led design of 6,000 cfs pump station equipment package and flow control systems which include more than 20 weir,ring- follower and bulkhead slide gates.The controls included three Ethernet based communications system and four Allen Bradley PLC based distributed control systems.Mr.Carson led the startup effort on site, including chief-of-test role for all functional and performance testing and training of owner's operating and maintenance staff.This permanent construction culminated a 7-year program of fish passage design services throughout which Mr.Carson served as the lead mechanical engineer for the program. P-13-148 Green Lake Hydroelectric Project,City and Borough of Sitka,Alaska -Lead Mechanical Engineer. Supervised plant start-up and testing including generating unit performance testing and modifications. Assisted in the final design of piping diesel generator and mechanical systems for this 16.5-MW project and participated in the initial FERC Part 12 safety inspection. Panama Canal Third Locks Expansion,INCA Engineers for Autoridad del Canal de Panama,2010- 2011,Provided design review services for chamber filling valves,bulkheads,culvert valves,and water saving basin conduit valves for the Atlantic and Pacific lock expansions.Equipment included more than 270 hydraulically operated sluice valves (gates)ranging in size from 4.3m x 5.8m to 4.9m x 6.7m. Lower Baker Second Powerhouse Project,2005 to present,Puget Sound Energy.Serving on FERC Board of Consultants for expansion of the Lower Baker development.Work includes a tunnel extension and new 30 MW powerhouse. Fort Peck Penstock Replacement,Montana;1987- 1991,U.S.Army Corps of Engineers,Omaha District -Project Engineer,responsible for all engineering services on this $13 million rehabilitation project which involved the demolition and reconstruction of the Power Plant No.1 penstock system.This system consists of a 24-foot,8-inch diameter tunnel extension section,a trifurcation branching into three 14-foot- diameter penstocks,and three 14-foot-diameter butterfly valves,each rated for a maximum pressure of 350 feet of water.Engineering services included plans, specifications,cost estimates,and shop drawing review for demolition,purchase of new butterfly valves and new penstock system fabrication and _installation. Design included evaluation of construction access and sequence options,preparation of CPM construction schedule,detailed analysis of trifurcation and valve friction losses,and selection of ultrasonic flow measurement system. Round Butte Fish Passage Design Program,Oregon; Portland General Electric Company 1997-2010-Lead Mechanical Engineer for concept development,design and construction management of a 9000 cfs capacity selective water withdrawal and fish passage system at Round Butte Dam.This facility includes a 260 ft high intake tower,constructed in the wet,with top and bottom screened selective withdrawal structures. Mechanical systems included four 42 ft x 12 ft bottom control gates operating at 200 ft depth,six 14 ft x 24 ft surface exclusion baffle sets,flow control weirs,fish separators,a fish pumping system,floating structure Page 22 buoyancy control systems and three screen cleaning systems for the fish collection screens. Carmen Smith Hydro Project Improvements,2010 to present,Eugene Water and Electric Board.Lead mechanical engineer for design of powerhouse improvements and fish passage systems,including turbine bypass and shutoff valves,fish attraction dewatering pumps,screen cleaners,flow control gates and control systems. Swan Lake Hydroelectric Project,Alaska;City of Ketchikan -Lead Mechanical Engineer.Supervised planning,design,estimates,and construction management for all mechanical aspects of this project. The project consisted of a 174-foot-high concrete arch dam,intake structure with hydraulically operated 9'-6" by 17'-0"fixed wheel gate,2,300-foot-long reinforced concrete power tunnel,11'-0"penstock,twin 66-inch- diameter butterfly valves rated at 391-foot head,22 MW powerhouse,dewatering and drainage pumping systems,barge handling facility,site support facilities, housing,and 30 miles of 115 kV transmission line. Ozark and Webbers Falls Projects,Arkansas;Corps of Engineers,1988-1991,Little Rock District-Project Manager.Managed this three-part investigation and analysis of turbine shaft and fastener failures on eight large tubular type hydraulic turbines.With runner diameters of 8.0 meters and unit ratings of 22 MW (combined capacity of 35,500 cfs),these machines are among the largest inclined Kaplan turbines ever constructed.This study work involved an international literature search for documentation of similar failures, an extensive finite element analysis of the turbines vibrational behavior and stresses (ANSYS application of a PC system)and a field testing program involving 82 instrumentation channels monitored under 25 different test conditions.Also coordinated the work of two major subconsultants for instrumentation planning and turbine design review. Lake Washington Ship Canal,Washington;1985- 1987,U.S.Army Corps of Engineers,Seattle District-Project Mechanical Engineer responsible for the rehabilitation design for the 20-foot-high by 80- foot-wide saltwater barrier gate hoisting system and corrosion protection system associated with rehabilitation of the large dock (80 feet by 600 feet)at the Hiram Chittenden Locks in the Lake Washington Ship Canal. Bonneville Lock Floating Guidewall,Oregon;1986- 1989,Corps of Engineers,Portland District-Lead Mechanical Engineer.Responsible for piping and leakage detection systems for 820-foot-long navigation P-13-148 lock guidewall structure.Designed flooding and chamber pressure equalizing system for fixed guidewall sections and ballast control system for 48- foot by 398-foot floating guidewall segment. Abiquiu Dam Emergency Gate,New Mexico;U.S. Army Corps of Engineers,Albuquerque District - Lead Mechanical Engineer.Supervised conceptual design and design memoranda preparation for addition of two high pressure slide gates to an existing Corps of Engineers flood control dam.Gates are 5'-0"wide by 9'-0"high with a design head of 318 feet and combined discharge capacity of 8,200 cfs. John Day Fish Sampling Facility;U.S.Army Corps of Engineers,Portland District-Mechanical Design Supervisor.Supervised development of Feature Design Memoranda,design criteria,and final design plans and specifications for mechanical components of this juvenile fish sampling facility.Features included: fishway switch gates;fish process water system;fish elevator;screen cleaning devices;facility HVAC system;potable and wastewater piping;cranes and hoists;compressed air system;and wastewater and anesthetic waste treatment system. River Mill Dam Fish Ladder,Estacada Oregon; 2004-2008,Portland General Electric.-Lead Mechanical Engineer.Responsible for final design plans and specifications and construction support for all ladder and attraction pumping systems including adjustable weirs,200 cfs ladder attraction pumps, screen cleaners and entrance/exit gate systems. Henry M.Jackson Project,Stage IT,Washington; Snohomish County Public Utility District'- Mechanical Design Supervisor.Supervised mechanical engineering services during planning, design,and construction of this major project expansion.The design entailed raising the existing earth/rockfill dam from 200 to 292 feet,and increasing the reservoir capacity from 35,000 acre-feet to 154,900 acre-feet.A new 92-foot-diameter morning glory spillway was constructed to extend the existing spillway shaft by 90 feet.New mechanical systems included a hydraulically operated 16-foot by 22-foot power intake gate rated for 108-foot head,a three-panel 20-foot by 66-foot selective withdrawal system,18- inch Howell Bunger valve,and a 60-kW hydroelectric turbine generator used for station power at this isolated site. Eagle Mountain Pumped Storage Project,California -Project Mechanical Engineer.Developed equipment arrangements,cost estimates,and operating schemes for this 1,000-MW project.Prepared powerplant- Page 23 related sections of Exhibits A,B,and F for this project's FERC license application. Town Bluff Hydropower Project,Beaumont,Texas; U.S.Army Corps of Engineers-Lead Mechanical Engineer.Responsible for reviewing mechanical designs by the Corps of Engineers for this 6-MW project near Beaumont,Texas.Also reviewed contract bids and equipment inspection reports,and witnessed testing and start-up of the plant. Lake Kinneret Pumped Storage Project;Israel,Israel Electric Corporation -Lead Mechanical Engineer.For this site selection study,prepared design layouts,cost estimates and conceptual designs for four 500-MW pumped storage __alternatives.Work _included determination of pumped-storage dynamic benefits along with machinery characteristics and incremental costs to support economic analyses of the project. Spinney Mountain Water Supply Project,Colorado; City of Aurora -Lead Mechanical Engineer. Supervised all mechanical design and construction activities including shop drawing review and field inspections,start-up and testing.The project consisted of a dam,outlet works with submerged operator,8-foot by 8-foot slide gates,6 butterfly valves from 18-inch to 96-inch-diameter,5 fixed cone free discharge valves ranging from 12-to 84-inch diameter,and conduit dewatering and drainage pumping system. Eklutna Water Project Energy Recovery Stations, Alaska;Anchorage Water and Wastewater Utility - Project Manager and Lead Mechanical Engineer. Supervised mechanical design and _construction management services for two pumping station and energy recovery facilities with capacities of 800 kW and 210 kW.Services included design of a new powerhouse at one site and equipment and structure modifications to convert a pumping station to an energy recovery facility.Responsible for turbines, valves,pumping equipment,and piping design.Work included establishment of acceptable pressure transients in two pipelines measuring 48 inches in diameter by 23.7 miles and 54 inches in diameter by 8.5 miles,respectively.Provided shop drawing review, construction inspection and a startup assistance. North Umpqua Hydroelectric Project -Resource Utilization Study,Pacific Power and Light,Oregon - Project Manager responsible for supervising studies and conceptual engineering for improvements to this existing 185 MW project.His activities included system-wide generation modeling,detailed facilities inspections,turbine-generator performance testing (10 units),upgrade evaluations for existing turbines and P-13-148 generators,conceptual design and cost estimates of new power facilities to be added at four operating dams.Evaluations of rehabilitation and upgrade options for the 10 turbine-generators considered repair to like new condition or runner replacement along with evaluated costs for operation maintenance and overall life-cycle cost.Services included preparation of FERC license exhibits A,B,C and F,presentations at public and agency meetings and systems operations modeling to support upgrade and licensing decisions. Upper American River Project,California, Sacramento Municipal Utility District -Project Engineer responsible for condition assessment, operations analysis and development of a detailed computer simulation model for this 685 MW hydroelectric project on the American and Rubicon River systems in California.Work included detailed assessment of the physical project condition, development of a 23-year daily hydrology record from available regulated flow records,preparation of a computer simulation model and a comprehensive study of the project's hydrologic resource utilization. American Falls Hydroelectric Project;Idaho Power Company 1975-1976-Field Engineer.Served as Idaho Power Company's on-site representative responsible for the acceptance of welds,weld radiographs,and general fabrication of an 18-foot-diameter penstock constructed for the 100-MW American Falls Hydroelectric Project. Lead Mechanical Engineerfor studies,design, construction management and start-up of the following projects: e Swan Lake,Alaska -2 x 11.25 MW Francis e Henry Jackson,Washington -New 1,100 cfs Power Intake,Outlet Works Rehabilitation Roberts Tunnel,Colorado -1 x 5.5 MW Francis Twin Reservoirs,Washington -2 MW Pelton, 1,200 ft.head e Beaver Falls and Ketchikan Lakes,Alaska -5- Unit,7.25 MW total,Automation and Rehabilitation e Bear Valley Dam,California -Outlet Works Reconstruction e §=©Abiquiu Dam,New Mexico -8,200 cfs Outlet Gate Addition (preliminary design) e Klamath River,Oregon &California -Mechanical Systems Rehabilitation (design only) e Lewis River,Washington -Mechanical Systems Rehabilitation (design only) e Seven Oaks,California -Outlet Works for 556 ft head Green Lake,Alaska -2 x 8.25 MW Francis Page 24 Technical Papers and Presentations "Optimizing Frequency Regulation of Isolated Hydroelectric Projects,"Presented in Waterpower '83 Conference, Knoxville,Kentucky "Corrosion of Stainless Steel Hydraulic Turbines:Case Histories of the Hoover Dam and Swan Lake Project."Co- authored with Don T.Klodt.Presented at the Fourth Annual Hydro Power Machinery Symposium,1986, Anaheim,California. "Hydroelectric Equipment and Plant Upgrades."Presented at NELPA Winter Conference,1993,Portland,Oregon. "The Impact of FERC Relicensing on Project Economics and Competitiveness"Co-presented with Tim Bachelder. Presented at Western States Coordinating Council Environmental Committee Meeting,September 1995, Spokane,Washington. "Basin Analysis:Today's Tool for Tomorrow's Reality”Panelist and Presenter at Hydrovision 2000 Conference, Charlotte,North Carolina. Professional History 2001 to present Principal,Currents Consulting,Seattle WA 2002 to 2003 Technical Director,EES Consulting Inc.,Kirkland,WA 1995 to 2001 Manager of Engineering,Western Region Northup Devine &Tarbell (purchased by Duke Engineering &Services in 1998) 1991 to 1995 Manager of Engineering (last position),Raytheon Infrastructure Services,Inc.,Bellevue,WA Hydroelectric Design Center 1977 to 1991 Chief Mechanical Engineer (last position),R.W.Beck and Associates 1975 to 1976 Field Engineer,Idaho Power Company 1974 to 1975 Design Engineer,United Technologies,Inc. P-13-148 Page 25 ae Commonwealth associates,inc. JOSEPH P.LOWDEN Project Management Support Specialist QUALIFICATIONS SUMMARY Mr.Lowden has 20 years of experience in successfully managing accounts in the professional services,corporate,and government markets.He is highly skilled in relationship management and has extensive experience in project management,software and workflow products and services, accounting services,and coordination of technology-related solutions.He specializes in using Primavera Project Planner software to support project management of electric transmission line and substation projects. EMPLOYMENT HISTORY 2012-Present Commonwealth Associates,Inc.,Jackson,Michigan 2011-2012 Professional Educational Services Group,Caledonia,Michigan 2007-2009 Xerox/Michigan Office Solutions,Grand Rapids,Michigan 2002-2006 Thomson-Reuters,Dexter,Michigan 2002 RJ Michaels Creative Group,Inc.,Jackson,Michigan 2001 Analysts International /Sequoia Services,Lansing,Michigan 1997-2001 Great Lakes CompuNet/Alphanet Services,Jackson,Michigan 1996-1997 Data Management Consultants,Inc.,Hillsdale,Michigan 1994-1996 Aeroquip Corporation,Spring Arbor,Michigan 1992-1994 Commonwealth Associates,Inc.,Jackson,Michigan REPRESENTATIVE EXPERIENCE American Electric Power:Prepares schedules for numerous substation projects to track the Protection and Control,Below Grade,Above Grade and Quality Control design phases. National Grid:Prepares schedules to track the Design,Permitting,Cost Estimates,Material Lists, EMF,and Mapping aspects of various transmission line projects. Michigan Office Solutions:Document Management Consultant responsible for tailoring hardware, software,and document management solutions for corporate clients across a 3-county territory. Managed projects from installation to training and service contracts.Received an award for top sales performance. Thomson Reuters:Senior Account Representative responsible for new and incremental sales of integrated tax/accounting software and training solutions.Chosen as lead for a new division - payroll service bureau sales team.Was listed among the top 25 performing representatives annually from team of 80. Analysts International:Account Manager responsible for developing new business for information technology services.Managed manufacturer relationships and set up customer/vendor events. Code:21 (07/12)Connect with Confidence P-13-148 : Page 26 ---- Commonwealih associates,inc. JOSEPH P.LOWDEN,Cont. Great Lakes CompuNet:Vice President of Sales responsible for developing and contributing to the revenue growth of Business,Education,and Government market accounts.Provided implementation solutions of Novell,Microsoft,Compaq,Hewlett Packard,Cisco and Nortel equipment.Composed and presented proposals and quotations for hardware,software,Internet access,e-mail,anti-virus,backup storage,labor hours,and design solutions. Purchased all hardware/software for internal use and for Novell/Microsoft Local and Wide Area Network projects.Coordinated Local and Wide Area Network,Internet and Intranet projects Data Management Consultants,Inc.:Systems Consultant responsible for scheduling and coordinating technical services with clients for LAN/WAN installations,developing configurations, and troubleshooting network problems. Aeroquip Corporation:Network Administrator responsible for managing daily data backups, troubleshooting computer problems,providing user training,and assisting with production and procurement scheduling. EDUCATION BA,Business Administration,Grand Valley State University -Seidman School of Business,1992 Code:21 (07/12)Connect with Contidence P-13-148 Page 27 >a Commonwealthassociates,inc. LLOYD B.MARQUARDT,PE Section Manager/Electrical Engineer QUALIFICATIONS SUMMARY Mr.Marquardt has over 37 years of diversified experience in project management,system design and planning,and field installation and start-up.He has extensive experience in all areas of electric utility operations,planning,underground and overhead distribution design,problem investigation, testing,and troubleshooting. Professional Background: 2007-Present Commonwealth Associates,Inc.,Mount Vernon,Washington 1995-2007 LM Technical Services,Inc.,P.S.,Lake Stevens,Washington 1991-1995 R.W.Beck,Seattle,Washington 1990-1991 Electro-Test,Inc.,Bellevue,Washington 1986-1990 Cegelec ESCA Corporation,Bellevue,Washington 1983-1986 City of Pierre,Pierre,South Dakota 1975-1983 Northwestern Public Service Company,Huron,South Dakota REPRESENTATIVE EXPERIENCE Division Engineer responsible for distribution design,operations,and maintenance of overhead and underground 4 kV,12.5 kV,and 13.8 kV distribution systems. Relay Engineer responsible for transmission and distribution system protection settings,substation design,substation operations and maintenance,SCADA installations,substation testing and commissioning. Responsible for system planning,design,operations,and maintenance of a municipal electric system.Designed a 12 kV underground system to completely replace all overhead distribution in the city.Was responsible for designing,procuring,installing,and operating a combination SCADA/Load Management System.Specified all underground cable,switches,and equipment for conversion projects and provides detailed design for construction crews to install underground cables and remove overhead conductors. Consolidated Edison:Designed a power control and SCADA system in New York City. Los Angeles Department of Water:Responsible for designing a water SCADA system in California. Responsible for testing all types of electrical equipment and systems,conducting research,and troubleshooting specific problem areas. Reviewed sites for proper compliance with necessary codes,NESC and NEC requirements,reviewed test results,and made recommendations as to the resolution of problems encountered and preventative maintenance procedures to be followed. Field Project Manager responsible for all electrical issues on movable bridge rehabilitation and on- call maintenance services for floating and movable bridges and other transportation projects. Code:40 (7/12)Connect with Confidence P-13-148 Page 28 re Commonwealth LLOYD B.MARQUARDT,PE,Cont. associates,inc. Responsible for review and approval of all project electrical submittals,design changes,schedules, and on-site inspections.Researched issues for compliance with necessary codes,regulations,and specifications and coordinated with contractors to resolve disputes and problems in a timely fashion.Developed and evaluated estimates and negotiated final design change orders to resolve field problems. Investigated and evaluated cause and effect of electrical failures due to lighting,power surges, harmonics,construction accidents,auto accidents,equipment malfunctions,fires,storms,and natural disasters. Provided investigative services and expert witness testimony for accidental contact accidents and other situations involving personal contact with electrical lines or equipment both in public and utility electrical systems. Project Manager of substation design,substation modification,and transmission line projects. EDUCATION BS,Electrical Engineering,South Dakota School of Mines &Technology,1975 General Electric Protective Relay Seminar,1979 REGISTRATION Professional Engineer in California,Oregon,Utah,Washington and Alaska. LICENSES FCC Amateur Radio Extra Class License PROFESSIONAL AFFILIATIONS Institute of Electrical and Electronics Engineers International Association of Electrical Inspectors National Society of Professional Engineers Code:36 (7/12)Connect with Confidence P-13-148 Page 29 Resume -David T.Perry Throughout a productive business career spanning 40 years,Mr.Perry is recognized as innovative and willing to take on challenges to accomplish company goals both in domestic and international assignments. His career has been both interesting and diverse.His strengths are the ability to adapt well to new and different assignments,technical ingenuity to solve complex problems and hands-on experience in project management,development,design,construction and operation.He has also developed an in-depth awareness of multi-cultural issues. Mr.Perry has worked on a number of hydro projects over the years and has worked in remote locations. The work scope for these projects was as owners representative doing detailed development,construction overview and providing recommendations on O&M issues.The feasibility of the projects were reviewed including a risk matrix and detailed reports were provided for review and Board approval for investment. He has worked in remote areas of the Philippines,India and China on hydro projects. The Bakun project was in a very remote area in the mountains in Northern Luzon.He worked closely with the indigenous tribes to gain approval for the project,completed all development activities and overviewed construction to protect the owner's interest.This project was very remote and required airlifting of materials and supplies during the rainy season and movement of equipment through the mountains during the dry season.The transmission was run through the mountains and materials were airlifted to the sites. The project in the Himalayas'was also remote near the China/India border in the State of Sikkim.For this project the scope of work was to review the cost and schedule,performance,environmental issues,local issues/relationships and create a financial model.This was completed to review the feasibility of investment into the project and generate an accurate valuation of the project over its life.This project was a run-of-river in three stages. Ambuklao was in the Philippine mountains.This project was seriously damaged during a large earthquake. The study was done to rehabilitate and upgrade the project and determine the cost,schedule and performance to create an accurate financial model and risk matrix for investor review. He has also worked in India as a potential owners representative on a large reservoir type project of 400MW.Construction was started on the project and the scope was to assess the technical issues arising during construction,provide and accurate cost and schedule model,review the status of financing and provide a recommendation on feasibility of investment. He has also done technical due diligence on hydro projects in China for investors. Areas of Expertise -Project Development -Asset Management -Conceptual Engineering -Power Plant Rehabilitation and Expansion -Project Acquisition Due Diligence -Project and Construction Management -Contract Negotiations -Budgeting and Organization He has established a successful company providing services to major foreign and US investors and closed financing for projects totaling approximately $3 billion.He has provided development,engineering, construction and commercial expertise.The services included review and recommendations for improvements at operating plants (both plant performance and organizational),rehabilitation of existing plants (scope definition and cost/schedule),leading the commercial development efforts for a number of projects and development of regional strategy for company growth.He is experienced in coordination of project activities with all the stakeholders.He has represented Companies dealing with Government officials,project partners,contractors and others to efficiently develop and construct infrastructure projects. P-13-148 Page 30 Career Overview Tecumseh Energy Services Executive Vice President/President 1996 -Present Mr.Perry founded Tecumseh Energy in 1996 to provide consulting services to the IPP industry.Tecumseh Energy has worked with many international and domestic independent power producers completing due diligence,engineering studies,construction,asset management,finance studies,financial models and contract negotiations in the US,North Africa,Middle East and Asia.Mr.Perry has been involved in project acquisitions,construction and operations of infrastructure projects including rehabilitation of existing projects and improving operating project efficiency and organizations.Mr.Perry has closed project financing for projects totaling over $3 billion.Since 1996,Tecumseh Energy has provided consulting services to Globeleq,BTU Ventures,Ogden Energy,Sabah Shipyard,CMS Energy,PacifiCorp, Harbin of China,Globeleq,China Machine New Energy Corporation and Ever Electrical.During its first year,Tecumseh Energy concluded the sale of Ever Electrical's interest in the Bakun Hydro Project to Pacific Generation and assisted in closing the financing.He was assigned by PacifiCorp to the Board of Directors for the Bakun Project and worked closely with the partners to develop,finance and construct the greenfield facility. Bakun is a 70MW run-of-river hydro project located in a remote area in the Philippines.Other hydro projects include development of a rehabilitation plan for a 75 MW Ambuklao hydro project in the Philippines that was damaged during a major earthquake,feasibility review and construction overview of a 400MW hydro project in India,due diligence review of three hydro projects in a remote location in the Himalayan mountains in India and initial development of a 200MW run-of-river project in the Philippines. He has also assisted project companies with technical and commercial expertise to assist in hydro project acquisition in the US and internationally and operating reviews to improve performance including upgrades to increase output.During the development/construction,he has worked closely with local communities in remote locations,provided technical/economic input for development,monitored construction progress and worked with contractors to resolve issues during design and construction and support the start-up and operation of the project. He lead the development for one of the investors for the successful bid on Taweelah B project which after rehabilitation and expansion is 2000 MW and 160 million gpd of desalinated water.He is very familiar with the US market and has performed due diligence reviews,financial models,and marketing studies on a number of US power plants which were being studied for acquisition.He has experience in both financing and technical areas for most technologies,including renewable,During this time he has lived for extended periods in Philippines,India,Tunisia,Singapore,Saudi Arabia,UK and UAE and has worked in many other countries in Asia and Middle East.He has provided advice and has led the project management and development of a number of projects in these countries.He worked with a Saudi utility involved in power and water supply and distribution.Many of the projects required modifications and rehabilitation to improve the project performance. Globele Vice President Business Development Asia 2008 -2009 Globeleq is an international company developing power projects in low-income countries around the world. Mr.Perry was Vice President Business Development Asia.The responsibilities included establishing an Asia office in Singapore and leading due diligence reviews for potential projects and acquisition of existing projects.These reviews covered technical,financial,operations and other aspects to provide a complete picture of the project and the risk issues.Globeleq is a Company funded and owned by the British Government.The projects reviewed in detail were infrastructure projects in India,Bangladesh,Indonesia, P-13-148 Page 31 Sri Lanka and the Philippines.The majority of the projects reviewed for investment were renewable, including solar,biomass,hydro and wind.Other projects included natural gas,coal and transmission.He was responsible for Asia development,budget preparation and presentations to the Board of Directors.As a part of this function,major construction projects were analyzed based on construction costs,plant performance,operating costs and other factors and financial models were constructed to determine the economic feasibility.The project sizes that were reviewed ranged from approximately $20 million to $1 billion P-13-148 Page 32 Professional Engineer -State of Michigan Education -Penn State University -Engineering -1969 Contact Information: Home §17-423-2036 Mobile 517-990-5102 Email dtperry@tc3net.com david.per tecumsehenergy.com Address: 9870 Matthews Highway Tecumseh,MI 49286 P-13-148 Page 33 O_O Commonwealth associates,inc. PAUL W.REED,PE Transmission Section Manager QUALIFICATIONS SUMMARY Mr.Reed has 14 years of experience providing transmission line design.His design responsibilities have included wood and tubular steel structures,drilled-shaft concrete pier foundation design,H-frame structures,lattice towers,distribution under build,route selection studies,right-of-way support,relocations,maintenance projects,thermal rerates,rebuild projects,cell site collocation,communications,and new construction projects up to 500 kV.He is proficient in PLS-CADD,MicroStation,SAG 10,ProjectWise,and Microsoft Office applications. EMPLOYMENT HISTORY 2010-Present Commonwealth Associates,Inc.,Mount Vernon,Washington 2006-2010 HDR Engineering,Inc.,Bellevue,Washington 1999-2006 Puget Sound Energy,Bellevue,Washington REPRESENTATIVE EXPERIENCE Public Utility District No.1 of Douglas County:Section manager responsible for providing project engineering and on site Owner's Representative Services.Overall project design and construction management of a 13 mile 230 kV Tubular Steel Transmission line connecting the Douglas and Rapids Switchyards near East Wenatchee,Washington.Finalized the route selection;completed a conductor study;developed steel pole concept,loading drawings and procurement specifications;developed plan and profile drawings;compiled a material list and wrote a technical specification for line construction.Completed all tasks on schedule and on budget.Providing an owner's representative and observers during the construction phase. Duties include construction coordination;acting as communication conduit between key stake holders,including the owner,contractor,engineer,suppliers,property owners and permit representatives. Duke Energy:Project Engineer responsible for the design effort for a 4 mile,69kV transmission line reconductor/rebuild.The new wood pole line was designed for ACSS TW conductor intended to operate at 200 deg C.with 12kv distribution under build including field review,engineering design,ROW support,construction drawings,material procurement and construction support. Pacific Gas and Electric:Project Manager responsible for the design of 13 60kV double circuit tubular steel poles outside Cottonwood and Red Bluff Substations.The design included field review,line modeling,steel load and concept drawings,and construction drawings. TransAlta Energy:Project Engineer responsible for the thermal rating of three 500 kV,steel H- frame,line sections outside of the Centralia Steam Plant for NERC FAC-008 compliance. Puget Sound Energy: Project Manager responsible for performing a thermal rerate from 50 degree C to 75 degree C of 8.3 miles of 795 ACSR from PSE's Lynden substation to Scheutt substation.The design included 12.5 kV underbuild.Mr.Reed was responsible to conduct field inventory,verify integrity of LiDAR survey,develop model in PLS-CADD,perform structure checks,analyze clearances, Code:36 (1/13)Connect with Contidence P-13-148 Page 34 er Commonwealth PAUL W.REED,PE,Cont.associates,inc. engineer cost effective solutions,provide construction drawings,develop material lists,provide construction support as required,and produce conformance to record drawings. Project Manager responsible for the field inspection and structural analysis of two lattice towers.The two towers support a double circuit 115kV water body crossing at Agate Passage on Bainbridge Island,Washington.Mr.Reed was responsible for conducting a climbing inspection investigation,model towers in PLS Tower,develop loading,run structure checks,and make recommendations regarding maintenance and future use of the towers. Project Manager responsible for the design,engineering,and administration on several ongoing communications projects involving the site lease of transmission voltage power poles.Using utility records and field observations,a structural line model was created to review addition of new communication facilities against current NESC strength provisions. City of Shoreline:Project Engineer responsible for a feasibility study to evaluate the existing Seattle City Light (SCL)corridor along the east side of Highway 99 in Shoreline,Washington. Developed the SCL ultimate layout for future facilities within their corridor and developed 3 alternatives that met both SCL's electrical needs and Shoreline's proposed expansion of road right-of-way.This work was completed under contract with HDR Engineering,Inc. Haida Energy:Project Engineer responsible for the design effort for the 12.1 mile,34.5 kV transmission line portion of a5 MW hydroelectric project in southeast Alaska.This involved field survey,engineering design,cost estimating,design of a water crossing at Hetta Inlet,a submarine cable study,a communications design with Optical Ground Wire (OPGW),and coordination with Alaska Power and Telephone,the local utility.This work was completed under contract with HDR Engineering,Inc. EDUCATION BS,Forest Engineering,University of Washington,1998 NESC 2002/2007/2012 Course -Changes and General Overview Design of Transmission Line Structures and Foundations Course,University of Wisconsin at Madison,2001 Cold Regions Engineering Short Course,University of Washington,2012 REGISTRATION Professional Engineer (Civil)in Alaska,Arizona,California,Colorado,Idaho,Montana,New Mexico,Nevada,Oregon,Utah,Washington and Wyoming. Code:36 (1/13)Connect with Confidence P-13-148 Page 35 a Commonwealth associates,inc. MARK A.SCHINMAN,PE Consultant QUALIFICATIONS SUMMARY Mr.Schinman has over 40 years of professional experience in the electric utility industry.His background includes management of all aspects of public electrical utilities including customer service;electric rates;cost of service studies;budgeting;engineering management as related to hydro,substations and transmission and distribution lines (overhead and underground); project management;planning;human relations,personnel,contract negotiations;public presentations;working with community groups,government agencies,the IBEW and elected officials.Mr.Schinman retired as General Manager of Snohomish County Public Utility District in 1999. EMPLOYMENT HISTORY 2004-Present Commonwealth Associates,Inc.,Mount Vernon,Washington 2000-2004 EES Consulting,Inc.,Kirkland,Washington 1998-1999 Snohomish County PUD,Everett,Washington 1998 EES Consulting,Inc.,Kirkland,Washington 1984-1997 Snohomish County PUD,Everett,Washington 1983-1984 Truckee Donner PUD,California 1969-1983 Snohomish County PUD,Everett,Washington 1967-1969 U.S.Army REPRESENTATIVE PROJECTS Southeast Alaska Power Authority (SEAPA): Provide Project Management services for the Kake-Petersburg Intertie.Planning and preliminary design has begun for a new electrical transmission line intertie that would extend west across the Tongass National Forest,from the Petersburg area to Kake on Kupreanof Island. The intertie would transmit power to Kake at either 69 or 138 kilovolts (kV)and consist primarily of single wood pole structures.This is an ongoing project. Solomon Gulch Hydroelectric Project Low Level Outlet Works and Anchor Block Enhancements,Valdez,Alaska:Project Manager for the installation of a low level outlet for emergency use if determined the reservoir needed lowering and for enhancing the anchor blocks supporting the penstock.These were two separate SEAPA projects.Work included management of several RFP processes resulting in the hiring of engineering and construction firms to complete the work as well as purchasing a long-lead material item. Work also included management of the projects to completion and interfacing with the project owner,Copper Valley Electric Association,and FERC for necessary approvals. Provided support for the project management activities for the Swan-Tyee Intertie in Alaska.Commonwealth was selected by the project's owner,SEAPA,to provide project management services for the Swan-Tyee Intertie 138 kV transmission line and the associated substation modifications.The Swan-Tyee Intertie is a 57-mile tubular steel transmission line that interconnects two remote hydro sites in southeastern Alaska.The geography consists of mountainous and timbered terrain,as well as avalanche zones.Work included construction management,contract drafting and management,budget tracking, scheduling,interfacing with the U.S.Forest Service,and report writing. Code:38 (4/13)Connect with Confidence P-13-148 Page 36 a Commonwealth MARK A.SCHINMAN,PE,Cont. associates,inc. Various Projects:Project Manager for numerous transmission line and overhead and underground distribution line designs,routing studies,and analysis for both new lines and rebuilds or enhancements of existing lines.Projects included 20-mile 138 kV lines to single transmission and distribution poles for cellular antenna collocations.Design work included both laminated wood and steel poles.Performed electrical substation design,cost estimating, and construction-related work,including serving as the owner's agent for a city in Canada fora design/build process to construct a 130 MVA,138 kV to 13.8 kV substation. Snohomish County Public Utility District: Project Manager for the replacement of approximately 7 miles of deteriorated underground cable at 13 different locations. Project Manager for Providence Everett Medical Center to Delta Feeder in Marysville, Washington.Provided engineering and design,including construction bidding documents and construction support to rebuild and extend 2,100 feet of 12 kV.Work included conversion of 1,500 feet of existing single-phase overhead distribution to three phase using 336AAC.Work included trenching and installing approximately 600 feet of new 1000 kCM URD feeder. General Manager and Deputy General Manager for a major Northwest public utility overseeing nearly 1,000 employees and a $350 million annual budget.Responsible for management of all administrative and operational functions,while reporting to a three- member elected board of commissioners.Accomplishments included a reduction of spending by 15 percent,improved employee communications and morale,improved relationship with staff and the Board of Commissioners and renewal of the IBEW union contract. Also served as Assistant General Manager,Employee Resources and Safety responsible for the Employee Relations and Safety departments.Significant accomplishments included a change in approach from a "personnel department”to a high-performance team serving the internal customer-our employee.Responsible for organizational development,project management, strategic planning,conflict resolution,change management,restructuring and team building. Prior to that,served as Assistant General Manager,Customer Services responsible for a large and technically complex organization with a wide variety of areas,including Conservation, Customer Engineering,Customer Service (including call center,walk-in customers and credit and collections),Community Relations Local Offices,Electric Rates,and Cost of Service Studies. Code:38 (4/13) Multiple Projects:Project Manager of an Engineer/Procure/Construct team bidding on multiple design/build projects in Canada.The projects included large substations (for example, a 400 MVA 230 kV to 138 kV substation),long 260 kV transmission lines,and 260 kV switching stations. Connect with Confidence P-13-148 Page 37 a , Commonwealth MARK A.SCHINMAN,PE,Cont. associates,inc. Truckee Donner PUD:Acting Manager on an interim basis while on leave from Snohomish County PUD.Responsible for complete management of the PUD,including hiring a new general manager. EDUCATION MBA,Business Administration (with honors),City University,Seattle,Washington,1981 BS,Electrical Engineering,University of Washington,1967 Public Utilities Executive Course,University of Idaho,1982 REGISTRATION Professional Engineer in Washington and Alaska PROFESSIONAL AFFILIATIONS American Public Power Association,Past Chair of Energy Services Committee Northwest Public Power Association,Life Membership Award,Vice Chair of Conservation Committee Code:38 (4/13)Connect with Confidence P-13-148 Page 38 er Commonwealth associates,inc. DEAN K.SCOTT,PE Civil Engineer QUALIFICATIONS SUMMARY Mr.Scott has more than 43 years of professional experience in the planning,design and construction of electric transmission/distribution lines and related facilities.He served as the Regional Manager of Commonwealth's Northwest office for 13 years,during which time he was responsible for business development,project management,project coordination,and quality control.Under Mr.Scott's leadership the office grew from one to twelve employees with annual revenues of over $1,000,000.He also has served as Project Manager on numerous multi-project electric utility assignments that have included transmission,distribution,substation,and fiber optic projects.His professional experience includes the management of design teams consisting of engineers,designers,CADD operators,subcontractors,and support staff.Responsibilities have included oversight of multiple projects,development of design criteria,technical reviews, scheduling,and budget control., EMPLOYMENT HISTORY 1991-Present Commonwealth Associates Inc.,Mount Vernon,Washington 1979-1991 R.W.Beck and Associates,Seattle,Washington 1973-1979 Gilbert/Commonwealth,Inc.,Jackson,Michigan 1968-1973 Commonwealth Associates Inc.,Jackson,Michigan REPRESENTATIVE EXPERIENCE Public Utility District No.1 of Douglas County:Responsible for the overall project design and construction management of a 13 mile 230 kV Tubular Steel Transmission line connecting the Douglas and Rapids Switchyards near East Wenatchee,WA,Commonwealth assisted the District with finalizing the route selection;completed a conductor study to determine an appropriate conductor for the project;developed steel pole concept and loading drawings and procurement specifications;developed plan and profile drawings;compiled a material list;and wrote a technical specification for the line construction.All tasks were completed according to schedule and budget..Commonwealth is providing an Owner's Representative and Observers during the construction phase and duties will include construction coordination and providing a communication conduit between all key stake holders,which include the owner,contractor, engineer,material suppliers,property owners and permit representatives. Southeast Alaska Power Agency (SEAPA):Owner's Representative during construction of the 57-mile,138 kV Swan-Tyee Intertie project,which interconnects the communities of Ketchikan, Wrangell,and Petersburg.Facilitated communication among the owners,contractors,material suppliers,engineer,U.S.Forest Service,construction manager,inspectors,environmental monitors and numerous permitting agencies.This project was constructed with the transport of all labor,materials,and equipment via helicopters due to the extreme terrain and lack of access roads.This project was successfully completed and energized in 2009,ahead of schedule and under budget.The Swan-Tyee Intertie has been proclaimed by SEAPA and all involved to be a grand success. Puget Sound Energy:Project Manager for the design of Puget Sound Energy's Ellensburg 230 kV transmission section of the IP project in eastern Washington.Provided engineering and Code:40 (3/13)Connect with Confidence P-13-148 Page 39 a Commonwealth associates,inc.DEAN K.SCOTT,PE,Cont. design services for the tubular steel transmission line approximately three miles long.The line was designed for a twin-bundle 1272 kcmil ACSR BITTERN conductor. Snohomish PUD:Regional Manager responsible for providing oversight and QA/QC on numerous transmission and distribution projects for Snohomish PUD from 1998 to 2005. Projects included distribution and transmission design,structure analysis for cellular antenna sites,and construction observation.Representative projects include:Sultan to Goldbar 115 kV line,with distribution underbuild;Paine Field to Mukilteo 115 kV line,with distribution underbuild;Machias 12.5 kV distribution reconductor;Bunk Foss 12.5 kV distribution reconductor;and numerous tubular steel pole cellular antenna pole modifications. Puget Sound Energy:Project Manager for the 65-mile-long Puget Sound Energy's Sedro Woolley-Sammamish 230 kV upgrade project.The project involved field data collection, clearance and structure strength evaluation,development of a stringing plan,and new line design at various locations. Grant County PUD:Project Manager responsible for numerous Grant County PUD transmission and distribution projects.Typical transmission projects included:Bassett Junction,Babcock to White Trail,and Burke/Braden/White Trail.These 115 and 230 kV lines used both steel and wood pole structures and included distribution underbuild.Engineering services included acquiring aerial photography,geotechnical investigations,alignment surveys,line layout using PLS-CADD software,material lists,and development of plan/profile and framing drawings. Grant County PUD:Project Manager for the original design and the later addition of fiber optic cable and overhead shield wire modifications on the Grant County PUD Sand Dunes to Potholes 230 kV transmission line.Project work also included design of the 230 kV Y2K bypass at Potholes Substation. Chelan County PUD: Project Manager on three 115 kV transmission lines and three 115/12.5 kV substations for Chelan County PUD,Wenatchee,Washington.The lines total approximately 22 miles in length,with approximately 8 miles requiring distribution underbuild.Engineering services included routing and siting,permit assistance,and design. Project Transmission Engineer responsible for transmission siting evaluations,conceptual design,and cost estimates on the Haines-Skagway Region Feasibility Study Supplemental Investigations.A potential power tie of Juneau,Alaska,to the West Creek Hydroelectric Project and a possible Canadian interconnection were evaluated in this study. EDUCATION BS,Civil Engineering,Indiana Institute of Technology,1968 REGISTRATION Professional Engineer in Michigan,Washington and Alaska PROFESSIONAL AFFILIATIONS American Society of Civil Engineers,Institute of Electrical and Electronics Engineers (IEEE) Code:40 (3/13)Connect with Contidence P-13-148 Page 40 ee Commonwealth associates,inc. DAVID A.SHAFER,PE Vice President/Manager,Electrical Systems Engineering QUALIFICATIONS SUMMARY Mr.Shafer has more than 38 years of experience in electrical engineering involving electric power systems studies,protection coordination studies;economic studies;electrical design of transmission lines and substations;electrical effects analysis,including EMF and radio and television interference;induced voltages and public involvement programs. EMPLOYMENT HISTORY 1988-Present Commonwealth Associates,Inc.,Jackson,Michigan 1978-1988 Gilbert/Commonwealth,Inc.,Jackson,Michigan 1973-1978 Toledo Edison Company,Toledo,Ohio REPRESENTATIVE EXPERIENCE Various Projects:Project Manager for numerous studies to evaluate the electrical effects of high- voltage transmission lines and substations.This included calculations and field measurements of electrical fields,magnetic fields,audible noise,and radio and TV interference for pre-and post- construction of high-voltage transmission projects for the following:Bangor Hydro-Electric Company 345 kV transmission in Maine,Benham Holway 345 kV transmission in Oklahoma, Consumers Power Company 345 kV transmission in Michigan,Delmarva Power and Light Company 138 kV transmission in Delaware,and Wisconsin Electric Company 138 kV transmission in Wisconsin. Bangor Hydro-Electric Company: Project Engineer for the Second 345 kV Tie Line to New Brunswick responsible for economic evaluation and need,planning studies,calculations,and field measurements of electric and magnetic fields,corona-caused radio and TV interference,and audible noise generated by the line.Also testified at licensing hearings. Project Engineer responsible for preparing a transmission planning study of the 115 kV and 46 kV subtransmission serving the city of Bangor,Maine.Work included evaluation of overhead and submarine river crossing alternatives,115 kV versus 46 kV alternatives,and alternative locations for a new substation. East Kentucky Power Cooperative:Electrical Engineer responsible for performing a comprehensive 20-year planning study of the 345 kV and 138 kV bulk power transmission system. Also,evaluated 345 kV and 765 kV transmission alternatives for the addition of a new generating unit and to strengthen interconnections with neighboring utility systems. Alaska Power Authority:Project Engineer for the 345 kV Anchorage-Fairbanks Intertie Project. This project consisted of a 300-mile-long transmission intertie between two isolated electrical systems.The final design made use of three static var compensators.Responsibilities included feasibility evaluation,transient stability analysis,spinning reserve and load shedding analysis, planning of transmission system additions associated with the intertie,participation in a public involvement program,and evaluation of bids. Code:42 (7/12)Connect with Confidence P-13-148 Page 41 ee Commonwealth DAVID A.SHAFER,PE,Cont. associates,inc. Aspen Environmental Group:Project Manager responsible for the study of EMF levels for several route options and alternative circuit configurations for two segments of the proposed San Diego Gas and Electric Company (SDG&E)Miguel-Mission 230 kV #2 project.The analyses evaluated alternatives to the segments modeled in SDG&E's Magnetic Field Management Plan for the project. Memphis Gas,Light,and Water:Project Manager responsible for preparing an independent engineering assessment and needs analysis for a proposed 161 kV transmission line. West Virginia Public Service Commission:Project Engineer responsible for assisting the West Virginia Public Service Commission in evaluating the need for and the transmission system impact of a new 765 kV transmission line from Wyoming,West Virginia,to Cloverdale,Virginia.The evaluation included review of the APCO application;interviews with AEP planning engineers and review of their power flow studies;and analysis of other data available through the Public Service Commission.Project responsibilities included preparing a report,providing expert testimony,and attending public hearings. Kentucky Public Service Commission:Project Manager for an independent assessment of all proposed new power plants in Kentucky.The study evaluated the capability of the present transmission grid in the state to accommodate all proposed merchant plants. Rhode Island Public Utilities Commission:Project Manager for an analysis of the cost effectiveness of various overhead and underground transmission designs to reduce electric and magnetic field levels. EDUCATION MBA,Eastern Michigan University,1985 BS and MS,Electrical Engineering,Ohio State University,1973 REGISTRATION Professional Engineer in Indiana,Kentucky,Michigan,North Carolina,Ohio,Tennessee and West Virginia PROFESSIONAL AFFILIATIONS Institute of Electrical and Electronics Engineers (IEEE),Senior Member 'National Society of Professional Engineers Michigan Society of Professional Engineers PUBLICATIONS Coauthor,"The Anchorage-Fairbanks Transmission Intertie:Electrical System Studies,"presented at the 1982 Transmission &Distribution Expo,Atlanta,Georgia,December 13-15,1982. Coauthor,"The Evolution ofNew Transmission Line Design Requirements,"presented at the Power- Gen Americas '93,Dallas,Texas,November 17,1993.: Code:42 (7/12)Connect with Confidence P-13-148 Page 42 mG Commonwealthassociates,inc. N.ROBERT UDDIN,PE Electrical Engineer QUALIFICATIONS SUMMARY Mr.Uddin has more than 37 years of diversified engineering experience within the electric utility industry and private sector.He has served as lead engineer and project manager for the design of electrical power distribution,underground transmission,control systems,and CATV systems.He has a strong background in the development of computer-based solutions to various engineering and management problems;design of electrical power systems;and development of operating procedures,construction standards,and purchasing specifications for electrical components.His present focus is design and project management of underground transmission systems.He is a senior member of the Institute of Electrical and Electronic Engineers and a member of the IEEE Standards Association and several Working Groups of the IEEE Insulated Conductors Committee. EMPLOYMENT HISTORY 2001-Present Commonwealth Associates,Inc.,Jackson,Michigan 1998-2001 SIGMA Technologies,LLC,Toledo,Ohio 1996-1998 Benchmark Engineering Group,Inc.,Toledo,Ohio 1975-1996 First Energy Corporation (Toledo Edison Company),Toledo,Ohio REPRESENTATIVE EXPERIENCE Midwest Independent System Operator (MISO):Project Manager/Engineer for several engineering feasibility studies to analyze proposed generation interconnections to specific portions of the electrical transmission grid.The work included developing cost estimates and identifying required construction to connect new generation or to reconnect existing systems for improved reliability.Also identified the various ownership points and construction permitting requirements for the transmission owners and the interconnect client.Frequently,the proposed generation interconnect projects required new high-voltage and extra-high-voltage substations and miles of transmission lines. National Grid: Underground Distribution Manhole and Duct System,Lynn and Swampscott, Massachusetts:Project Manager/Underground Design Engineer responsible for determining project costs and developing construction,bid,and permit specifications and drawings.This was a 3-part project to build a new underground manhole duct bank system parallel to the existing combined system,then upgrade and relocate seven 13.8 kV feeders.Approximately 2.75 miles of urban streets with utilities dating back to the 1800s and earlier were involved. Meadowbrook Substation Upgrade,Chelmsford and Lowell,Massachusetts: Underground Design Engineer responsible for the relocation and conversion to underground of four 23 kV circuits and 13.2 kV circuits and the addition of three new 13.2 kV circuits.Designed 2400 feet of conduit and vault systems in city streets and one mile of double-circuit overhead distribution line.Determined project costs and developed construction,bid and permit specifications,and drawings. Gary/Chicago International Airport Authority:Project Manager/Underground Design Engineer for a Gary/Chicago International Airport Authority project to relocate one 34.5 kV,one 138 kV,and two 345 kV transmission lines to allow for runway expansion.The economic analysis of the options Code:36 (5/13)Connect with Confidence P-13-148 Page 43 a Commonwealth N.ROBERT UDDIN,PE,Cont. associates,inc. resulted in a plan for a new 345/138 kV substation with 138 kV and 34.5 kV underground transmission.Served as Owner's Engineer providing support during construction. Northern Indiana Public Service Company (NIPSCO): BP Whiting Refinery Expansion:Project Manager and Owner's Engineer responsible for the relocation of overhead transmission lines to underground to provide electrical clearance.The project required movement of massive refinery equipment from the shipping canal to the refinery over more than a mile of public roadways and involved designing the relocation of 34 kV and 12 kV overhead electrical facilities.Provided engineering support and developed methods to obtain clearances to overhead 138 kV transmission lines. Schahfer Generating Station:Project Manager/Analyst responsible for preparing an evaluation of the output circuit power capabilities for Generator 16.These medium voltage circuits are comprised of multiple cables per phase laid in a concrete covered trench installed between the generator and the step-up transformers.Power capacity limitations were developed based upon the heat dissipation characteristics of the system. Wolverine Electric Power Supply Cooperative:Project Manager/Engineer for the replacement of a failed 69 kV underground crossing of the Grand River in Grand Haven,Michigan.The project involved designing new terminal structures,analyzing cable sheath voltage,specifying and sizing new cable and terminations,and the installing 900 feet of 3-phase 1000 KCMIL EPR cable by horizontal directional drill. Tieton Hydropower,LLC:Project Manager/Engineer for the substation portion of Tieton Hydropower,LLC's Hydroelectric Generation Project at Rimrock Reservoir in Washington.The project involved installation of 19 MW of generation anda 115 kV transmission line to PacifiCorp's Tieton Substation near Yakima,Washington.Project responsibilities included specification of cable, vacuum breakers,high-voltage switches,primary and secondary terminations,termination structures and foundations,control house,protection and control,and the substation ground grid. Vectren:Project Manager /Engineer responsible for analyzing and designing a replacement fora failed 4.16 kV underground feed to Berry Plastics.The design provided one underground and two aerial circuits each with approximately 14 MVA of capacity.Of note was the use of cable bus along the face of the building to maintain the architectural aesthetics of the recently renovated facility. UTEC Constructors and Wisconsin Electric Power Company:Project Manager/Engineer for the design of eight miles of an HPFF pipe-type 138 kV underground cable system under the streets in downtown Milwaukee,Wisconsin.Project responsibilities included specifying cables,manhole structures,and substation connections;calculating cable pulling tensions and bending radii;and estimating costs in a densely developed underground environment.The project involved coordination with the general contractor and various subcontractors,river and interstate highway crossings and complex permitting requirements. EDUCATION BS,Electrical Engineering,University of Toledo,1975 REGISTRATION Code:36 (5/13)Connect with Confidence P-13-148 Page 44 a Commonwealth N.ROBERT UDDIN,PE,Cont.associates,inc. Professional Engineer in Illinois,Indiana,Michigan,Ohio and Rhode Island PROFESSIONAL AFFILIATIONS AND AWARDS National Society of Professional Engineers (NSPE) 2013 Engineer of the Year,Jackson Chapter of MSPE Michigan Society of Professional Engineers (MSPE),Vice President -Mid-Michigan Region Michigan Society of Professional Engineers (MSPE),Vice President,Past President -Jackson Chapter Institute of Electrical and Electronic Engineers (IEEE),Senior Member IEEE Power &Energy Society IEEE Insulated Conductors Committee (ICC),Senior Member IEEE Standards Association,IEEE Standard 1793,Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines,Contributing Author IEEE Insulated Conductors Committee,Technical Editor,Working Group C29W,Guide for Working Procedures on Underground Transmission Circuits with Induced Voltages,Published May 2013 Code:36 (5/13)Connect with Confidence P-13-148 Page 45 -__-s Commonwealth associates,inc. BRIAN L.WHITE,PE Senior Engineer QUALIFICATIONS SUMMARY Mr.White has more than 43 years of overhead and underground transmission line design experience and nearly 30 years of experience in supervising transmission work groups for an electric utility.His background includes public speaking and negotiating with Indian tribes.He held the positions of Manager of Transmission Engineering and Manager of Transmission and Distribution Engineering Services for many years before retiring from Snohomish County Public Utility District No.1. EMPLOYMENT HISTORY 1978-2009 Snohomish County Public Utility District No.1,Everett,Washington 1970-1978 Pacific Gas &Electric Company,San Francisco,California REPRESENTATIVE EXPERIENCE Public Utility District No.1 of Douglas County:Design Engineer responsible for the overall project design and construction management of a 13 mile 230 kV Tubular Steel Transmission line connecting the Douglas and Rapids Switchyards near East Wenatchee,WA, Commonwealth assisted the District with finalizing the route selection;completed a conductor study to determine an appropriate conductor for the project;developed steel pole concept and loading drawings and procurement specifications;developed plan and profile drawings;compiled a material list;and wrote a technical specification for the line construction.All tasks were completed according to schedule and budget..Commonwealth is providing an Owner's Representative and Observers during the construction phase and duties will include construction coordination and providing a communication conduit between all key stake holders,which include the owner,contractor,engineer,material suppliers,property owners and permit representatives. Snohomish County PUD: Project Manager for the North County Transmission Line Project,which was the largest transmission line project ever undertaken by Snohomish County PUD at a total cost of $27 million. Project Manager for the Village Substation and 115 kV and 12 kV lines.Personally negotiated with the Tulalip Tribes for political and financial support for this $6.9 million project. Manger of Joint Use for all joint use attachments.Implemented the use of NJUNS computer software. Presenter for Snohomish County PUD Guest Speaker Program.His presentation on the North County transmission project was most requested program in 1998. Pacific Gas &Electric Company:Electrical Engineer responsible for the design of overhead and underground transmission lines. EDUCATION MS,General Engineering,University of Santa Clara,1978 BS,Electrical Engineering,Washington State University,1970 Code:32 (11/12)Connect with Confidence P-13-148 Page 46 a BRIAN L.WHITE,PE,Cont. Commonwealth associates,inc. AA,General Engineering,Peninsula Junior College,1967 REGISTRATION Registered Professional Engineer in California and Washington PROFESSIONAL AFFILIATIONS LineSoft/Itron User Group Advisory Board,2002-2008 Institute of Electrical and Electronics Engineers,Senior Member Code:32 (11/12)Connect with Confidence P-13-148 Page 47 ---- Commonwealth associates,inc. JOHN P.WHITE,PE Vice President,Western Operations QUALIFICATIONS SUMMARY Mr.White has over 30 years of professional experience in the electric utility industry.His background includes engineering,management,planning,and operational responsibilities related to transmission,substation,and distribution facilities.He has experience in leading large organizations,managing projects,negotiating contracts,design,developing budgets,and participating in public involvement activities associated with project permitting.John has had engineering,planning,and operational responsibilities for utility systems from 4 kV through 230 KV. EMPLOYMENT HISTORY 2005-Present Commonwealth Associates,Inc.,Mount Vernon,Washington 1994-2005 Snohomish County Public Utility District No.1,Everett,Washington 1979-1994 Puget Sound Power and Light (now Puget Sound Energy),Bellevue, Washington REPRESENTATIVE EXPERIENCE Commonwealth Associates,Inc.: Public Utility District No.1 of Douglas County:Executive Client Liaison responsible for the overall project design and construction management of a 13 mile 230 kV Tubular Steel Transmission line connecting the Douglas and Rapids Switchyards near East Wenatchee,WA, Commonwealth assisted the District with finalizing the route selection;completed a conductor study to determine an appropriate conductor for the project;developed steel pole concept and loading drawings and procurement specifications;developed plan and profile drawings; compiled a material list;and wrote a technical specification for the line construction.All tasks were completed according to schedule and budget..Commonwealth is providing an Owner's Representative and Observers during the construction phase and duties will include construction coordination and providing a communication conduit between all key stake holders,which include the owner,contractor,engineer,material suppliers,property owners and permit representatives. Regional Manager responsible for an engineering and construction management staff of 23.Led the development of Commonwealth's Northwest office from 11 people to its current staffing level of 23. Project Manager responsible for the development of the transmission planning process for Columbia Grid's Transmission Planning and Expansion Functional Agreement (PEFA).Led the efforts of the transmission planning representatives from six utilities and various interested parties to create the planning process for the PEFA,which was accepted by the FERC. Project Manager responsible for a system impact study focusing on distribution efficiency initiatives.The study examined potential costs,savings and operational implications of implementing efficiency measures on 19 distribution circuits which the client utility believed were likely best candidates for the anticipated efficiency measures.The study included potential impacts to the distribution,substation and transmission facilities. Code:42 (1/13)Connect with Confidence P-13-148 Page 48 a Commonwealih JOHN P.WHITE,PE,Cont. Project Engineer responsible for 138 kV line to integrate a wind generation project in Texas. Design included working with developer and local serving utility to meet needs of both. Snohomish PUD: Assistant General Manager,(Power and Business Services)responsible for negotiations with BPA for long-term energy and transmission contracts;planning and development of the PUD's supply and demand side strategies for resources (in addition to BPA),and development of rate structures to meet the overall District goals of resource diversity and cost control. Assistant General Manager,(Electric Systems)responsible for the planning,engineering,design, construction,maintenance,and operation of the PUD's transmission and distribution system. Developed and presented numerous reports including recommendations to the Snohomish PUD Board of Commissioners. Puget Sound Energy: Project Manager to consolidate four system operation centers.The 18 month effort included developing alternative solutions,building consensus for the preferred action,planning and implementation through the consolidation.It also involved selection ofIT support systems and expansion of operating system to facilitate change and communication and team building for the impacted staff. Managed a system operation center responsible for day-to-day operation of the transmission and distribution system (4 kV through 115 kV),including switching and clearance orders for lines and substations in a 3-county area. Conducted long and short-term system planning studies necessary to ensure reliable,cost- effective delivery of energy on the transmission system (55 kV to230 kV)and the underlying distribution facilities.Work included the development of 5-year capital plans for transmission, distribution,and substation infrastructure. Managed the ten person engineering staff responsible for Puget's system in Pierce County, Washington. Project Engineer/Manager of numerous design projects from 4 kV to 115 kV voltage levels. This work included overhead and underground projects. Developed annual project and program budgets to ensure funding for system infrastructure improvements,customer-driven projects,and ongoing operation and maintenance. EDUCATION Certificate of Accomplishment,Public Utilities Executive Course,University of Idaho,1993 MS,Systems Management,University of Southern California,1988 BS,Electrical Engineering,University of Idaho,1979 REGISTRATION Professional Engineer,Electrical in Washington,Texas,Montana,Colorado and Idaho Code:42 (1/13)Connect with Confidence P-13-148 Page 49 wm Commonwealth JOHN P.WHITE,PE,Cont. PROFESSIONAL AFFILIATIONS Institute of Electrical and Electronics Engineers (IEEE) Northwest Public Power Association ColumbiaGrid Planning and Expansion Work Group Facilitator -2006 &2007 Planning and Expansion Work Group Lead -Transmission Improvement Group,2005 Electric Power Research Institute -Underground Distribution Committee,1996 -2000 Independent Grid Operator (IndeGO)Formation Committee,1996 -1998 Code:42 (1/13)Connect with Confidence P-13-148 Page 50