HomeMy WebLinkAbout2021-01-29 BPMC Agenda and docsBRADLEY LAKE PROJECT MANAGEMENT COMMITTEE REGULAR MEETING AGENDA Friday, January 29, 2021 At 10:00 AM To participate dial 1-888-585-9008 and use code 212-753-619# 1. CALL TO ORDER 2. ROLL CALL (for Committee members) 3. PUBLIC ROLL CALL (for all others present) 4. AGENDA APPROVAL 5. PUBLIC COMMENTS 6. APPROVAL OF PRIOR MINUTES - December 2, 2020 and December 11, 2020 7. NEW BUSINESS 8. EXECUTIVE SESSION • Discussion of potential Required Project Work which the immediate knowledge of which would clearly have an adverse effect upon the finances of the Authority or the Project. • Discuss matters with Committee Counsel the immediate knowledge of which could have an adverse effect on the legal position of the Committee. 9. COMMITTEE REPORTS A. BUDGET REPORT (i) Budget to Actual Report (7/1/2020 – 11/30/2020) (ii) Proposed Budget Amendment 4 (additions of SQ Line O&M Costs) 10. OPERATORS REPORT 11. COMMITTEE ASSIGNMENTS 12. MEMBERS COMMENTS 13. NEXT MEETING DATE – March 26, 2021 – Regular Meeting 14. ADJOURNMENT Bradley Lake Budget to Actual Expense Report 07/01/2020 to 11/30/2020 Page 1 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT Schedule A-1 Expenses for the period 07/01/20 to 11/30/20 FY19 FY20 FY21 FY21 ACTUALS ACTUALS BUDGET ACTUALS Replace/Automate Fish Water Valve Actuators 17,142        2,931           40,000 Replace 1988 Suburban Ambulance 5,350          - Tire Machine 15,246 - Battle Creek Bridge Repair - - - 99,302 UPS Replacement 65,696 37,000 IRIS Air Gap Monitoring System (computer) 41,720 45,000 Replace Dump Truck and Sander 170,000 166,608 Rough Terrain Fork Lift (with Plow) 131,593 - Pick up Truck 41,484 - KVM switch for Emerson - 3,000 Spare Trash Pump - 20,000 Housing Preliminary Design - 10,000 4,750 Emerson Cybersecurity Update - 137,000 13,856 Total Non R&C Capital Purchases 37,738 283,425 462,000 284,515 CAPITAL PURCHASES NOT FUNDED BY R&C FUND Page 2 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2020 THROUGH 11/30/2020 FY 21 FY 20  FY21 Approved  Budget   BUDGET %   07/01/2020 ‐  11/30/2020  HEA Actual  CEA Actual  AEA Actual  Total Actual   (Over) Under  Budget to Date   FY20 Approved  Budget  FY20 Actual  Summary by expense type AIDEA Staff Professional Services (Direct)‐                        ‐                            ‐                       ‐                       15,529                15,529                 (15,529)                 ‐                       ‐                       Labor & Benefits 1,413,289            588,872                   474,289              10,612                212                      485,113               103,759                1,219,936           1,011,432           Travel 44,950                 18,729                     472                      20                        ‐                       492                       18,237                  45,950                10,512                Training 49,300                 20,542                     12,004                ‐                       ‐                       12,004                 8,538                     49,300                14,875                Contractual 844,340               351,806                   142,677              ‐                       85,985                228,662               123,144                869,842              655,575              Contractual ‐ Design Services 59,000                 24,583                     ‐                       ‐                       ‐                       ‐                        24,583                  ‐                       ‐                       Consulting‐Administrative 2,500                    1,042                       ‐                       ‐                       988                      988                       55                          ‐                       ‐                       Supplies & Materials 389,345               162,226                   62,663                ‐                       ‐                       62,663                 99,563                  346,345              262,370              Other Costs 70,818                 29,507                     14,873                12,151                100                      27,124                 2,383                     67,818                65,648                Equipment, Furniture and Machinery 170,000               70,834                     17,582                ‐                       ‐                       17,582                 53,252                  176,000              127,535              Maintenance Projects ‐                        ‐                            ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       313                      Administrative Costs 1,294,574            539,407                   21,766                ‐                       366,073              387,839               151,568                1,192,464           1,373,624           Indirect Costs 1,330,587            554,409                   603,909              ‐                       ‐                       603,909               (49,500)                 1,383,388           1,251,242           5,668,703            2,361,957           1,350,235          22,783                468,886              1,841,904          520,053                5,351,043          4,773,126          FERC 535 ‐ Operation Supervision & Engineering Operations Sup/Eng Bradley Lake Operating Labor & Benefits 107,453                44,772                 41,048                ‐                       ‐                       41,048                 3,724                     107,453              89,713                Travel 10,450                  4,354                    270                      ‐                       ‐                       270                       4,084                     10,450                246                      Training 9,300                     3,875                    2,076                   ‐                       ‐                       2,076                    1,799                     9,300                   991                      Contractual 11,000                  4,583                    ‐                       ‐                       ‐                       ‐                        4,583                     1,000                   173                      Supplies & Materials 4,000                     1,667                    2,013                   ‐                       ‐                       2,013                    (346)                       4,000                   3,698                   Indirect Costs 155,698                64,874                 57,882                ‐                       ‐                       57,882                 6,992                     155,698              128,545              Bradley Lake Operating Total 297,901                124,125               103,289              ‐                       ‐                       103,289               20,836                  287,901              223,366              FERC 535 ‐ Operation Supervision & Engineering Total 297,901                124,125                103,289                ‐                         ‐                         103,289                20,836                  287,901                223,366                FERC 537 ‐ Hydraulic Expenses Hydraulic Expenses Bradley Lake Operating Labor & Benefits 84,192                  35,080                 30,361                ‐                       ‐                       30,361                 4,719                     84,081                67,694                Travel 10,000                  4,167                    129                      ‐                       ‐                       129                       4,038                     10,000                ‐                       Contractual (37,000)                 (15,417)                32,071                ‐                       ‐                       32,071                 (47,488)                 22,000                ‐                       Contractual ‐ Design Services 59,000                  24,583                 ‐                       ‐                       ‐                       ‐                        24,583                  ‐                       ‐                       Supplies & Materials 59,000                  24,583                 2,267                   ‐                       ‐                       2,267                    22,316                  19,000                9,806                   Equipment, Furniture and Machinery 32,000                  13,333                 ‐                       ‐                       ‐                       ‐                        13,333                  81,000                13,368                Indirect Costs 114,320                47,633                 43,223                ‐                       ‐                       43,223                 4,410                     107,519              98,886                Bradley Lake Operating Total 321,512                133,962               108,050              ‐                       ‐                       108,050               25,912                  323,600              189,754              Bradley Battle Creek Diversion Bradley Battle Creek Diversion Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       ‐                       FERC 537 ‐ Hydraulic Expenses Total 321,512                133,962                108,050                ‐                         ‐                         108,050                25,912                  323,600                189,754                FERC 538 ‐ Electric Expenses Electric Expenses Bradley Lake Operating Labor & Benefits 218,044                90,852                 119,423              ‐                       ‐                       119,423               (28,571)                 208,745              210,745              Travel 7,000                     2,917                    73                        ‐                       ‐                       73                         2,844                     7,000                   3,140                   Training 25,000                  10,417                 9,928                   ‐                       ‐                       9,928                    489                        25,000                13,884                Contractual 2,000                     833                       ‐                       ‐                       ‐                       ‐                        833                        7,000                   2,587                   Supplies & Materials 41,732                  17,388                 22,194                ‐                       ‐                       22,194                 (4,806)                   50,732                14,111                Other Costs 5,000                     2,083                    ‐                       ‐                       ‐                       ‐                        2,083                     ‐                       ‐                       Equipment, Furniture and Machinery 73,000                  30,417                 8,578                   ‐                       ‐                       8,578                    21,840                  63,000                91,512                Indirect Costs 262,004                109,168               137,562              ‐                       ‐                       137,562               (28,394)                 242,067              257,551              Bradley Lake Operating Total 633,780                264,075               297,757              ‐                       ‐                       297,757               (33,682)                 603,544              593,531              FERC 538 ‐ Electric Expenses Total 633,780                264,075                297,757                ‐                         ‐                         297,757                (33,682)                 603,544                593,531                FERC 539 ‐ Misc. Hydraulic Power Generation Expenses Misc Hydro Power Exp Bradley Lake Operating Labor & Benefits 105,047                43,770                 29,780                ‐                       ‐                       29,780                 13,990                  104,936              70,195                Training 15,000                  6,250                    ‐                       ‐                       ‐                       ‐                        6,250                     15,000                ‐                       Contractual 287,525                119,802               85,781                ‐                       ‐                       85,781                 34,021                  287,525              185,822              Supplies & Materials 17,900                  7,458                    8,663                   ‐                       ‐                       8,663                    (1,205)                   17,900                31,569                Other Costs 65,468                  27,278                 ‐                       ‐                       ‐                       ‐                        27,278                  ‐                       ‐                       Indirect Costs 114,320                47,633                 42,168                ‐                       ‐                       42,168                 5,465                     107,519              98,544                Bradley Lake Operating Total 605,260                252,191               166,393              ‐                       ‐                       166,393               85,798                  532,880              386,130              BRADLEY CIRCUITS/RADIO TO BERNICE LK Other Costs ‐                         ‐                        14,873                ‐                       ‐                       14,873                 (14,873)                 35,695                35,696                BRADLEY CIRCUITS/RADIO TO BERNICE LK Total ‐                         ‐                        14,873                ‐                       ‐                       14,873                 (14,873)                 35,695                35,696                BRADLEY CIRCUITS BERNICE LK TO ANCH Other Costs ‐                         ‐                        ‐                       12,151                ‐                       12,151                 (12,151)                 29,773                29,194                BRADLEY CIRCUITS BERNICE LK TO ANCH Total ‐                         ‐                        ‐                       12,151                ‐                       12,151                 (12,151)                 29,773                29,194                FERC 539 ‐ Misc. Hydraulic Power Generation Expenses Total 605,260                252,191                181,266                12,151                  ‐                         193,417                58,774                  598,348                451,020                FERC 541 ‐ Maintenance Supervision & Engineering Maint Supervision/Eng Bradley Lake Operating Labor & Benefits 270,154                112,564               39,835                ‐                       ‐                       39,835                 72,729                  114,456              84,904                Indirect Costs ‐                         ‐                        58,266                ‐                       ‐                       58,266                 (58,266)                 155,698              121,096              Page 3 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2020 THROUGH 11/30/2020 FY 21 FY 20  FY21 Approved  Budget   BUDGET %   07/01/2020 ‐  11/30/2020  HEA Actual  CEA Actual  AEA Actual  Total Actual   (Over) Under  Budget to Date   FY20 Approved  Budget  FY20 Actual  Bradley Lake Operating Total 270,154                112,564               98,101                ‐                       ‐                       98,101                 14,463                  270,154              206,000              FERC 541 ‐ Maintenance Supervision & Engineering Total 270,154                112,564                98,101                  ‐                         ‐                         98,101                  14,463                  270,154                206,000                FERC 542 ‐ Maintenance of Structures Maintenance of Structures Bradley Lake Operating Labor & Benefits 77,639                  32,350                 27,225                ‐                       ‐                       27,225                 5,125                     76,499                62,612                Contractual 59,000                  24,583                 140                      ‐                       ‐                       140                       24,443                  91,000                3,682                   Supplies & Materials 100,713                41,964                 2,027                   ‐                       ‐                       2,027                    39,937                  88,713                39,489                Equipment, Furniture and Machinery 52,000                  21,667                 9,005                   ‐                       ‐                       9,005                    12,662                  32,000                22,552                Indirect Costs 105,421                43,925                 38,946                ‐                       ‐                       38,946                 4,979                     97,823                91,244                Bradley Lake Operating Total 394,773                164,489               77,342                ‐                       ‐                       77,342                 87,147                  386,035              219,579              BRADLEY CIRCUITS/RADIO TO BERNICE LK BRADLEY CIRCUITS/RADIO TO BERNICE LK Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       ‐                       BRADLEY CIRCUITS BERNICE LK TO ANCH BRADLEY CIRCUITS BERNICE LK TO ANCH Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       ‐                       FERC 542 ‐ Maintenance of Structures Total 394,773                164,489                77,342                  ‐                         ‐                         77,342                  87,147                  386,035                219,579                FERC 543 ‐ Maintenance of Reservoirs, Dams & Waterways Maint Res, Dams, WWays Bradley Lake Operating Labor & Benefits 40,744                  16,977                 160                      ‐                       ‐                       160                       16,817                  45,080                1,335                   Travel 5,000                     2,083                    ‐                       ‐                       ‐                       ‐                        2,083                     ‐                       ‐                       Contractual 21,500                  8,958                    ‐                       ‐                       ‐                       ‐                        8,958                     6,500                   ‐                       Supplies & Materials 15,000                  6,250                    ‐                       ‐                       ‐                       ‐                        6,250                     ‐                       ‐                       Indirect Costs 56,689                  23,620                 249                      ‐                       ‐                       249                       23,371                  56,322                1,693                   Bradley Lake Operating Total 138,933                57,888                 409                      ‐                       ‐                       409                       57,479                  107,902              3,027                   BRADLEY POWER TUNNEL MAINT (Dam) Contractual ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         15,000                ‐                       BRADLEY POWER TUNNEL MAINT (Dam) Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         15,000                ‐                       FERC 543 ‐ Maintenance of Reservoirs, Dams & Waterways Tota 138,933                57,888                  409                        ‐                         ‐                         409                        57,479                  122,902                3,027                    FERC 544 ‐ Maintenance of Electric Plant Maintenance of Elec Plant Bradley Lake Operating Labor & Benefits 309,110                128,796               139,404              ‐                       ‐                       139,404               (10,608)                 273,620              249,706              Travel 4,500                     1,875                    ‐                       ‐                       ‐                       ‐                        1,875                     4,500                   ‐                       Contractual 86,000                  35,833                 4,666                   ‐                       ‐                       4,666                    31,167                  49,000                19,661                Supplies & Materials 38,000                  15,833                 4,396                   ‐                       ‐                       4,396                    11,437                  70,000                66,370                Indirect Costs 423,178                176,324               185,726              ‐                       ‐                       185,726               (9,402)                   368,424              362,402              Bradley Lake Operating Total 860,788                358,661               334,191              ‐                       ‐                       334,191               24,470                  765,544              698,139              FERC 544 ‐ Maintenance of Electric Plant Total 860,788                358,661                334,191                ‐                         ‐                         334,191                24,470                  765,544                698,139                FERC 545 ‐ Maintenance of Misc. Hydraulic Plant Maint of Misc Hydr Plant Bradley Lake Operating Labor & Benefits 69,297                  28,874                 28,418                ‐                       ‐                       28,418                 457                        69,395                62,843                Contractual 3,900                     1,625                    ‐                       ‐                       ‐                       ‐                        1,625                     3,900                   6,763                   Supplies & Materials 58,000                  24,167                 20,916                ‐                       ‐                       20,916                 3,251                     63,000                93,510                Maintenance Projects ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       313                      Indirect Costs 98,957                  41,232                 39,887                ‐                       ‐                       39,887                 1,345                     92,318                91,280                Bradley Lake Operating Total 230,154                95,898                 89,220                ‐                       ‐                       89,220                 6,678                     228,613              254,710              FERC 545 ‐ Maintenance of Misc. Hydraulic Plant Total 230,154                95,898                  89,220                  ‐                         ‐                         89,220                  6,678                    228,613                254,710                FERC 556 ‐ System Control & Load Dispatching System Cntl & Load Disp Bradley Lake Operating Labor & Benefits 21,140                  8,808                    13,636                ‐                       ‐                       13,636                 (4,828)                   21,140                37,091                Contractual 53,000                  22,083                 3,068                   ‐                       ‐                       3,068                    19,015                  53,000                57,365                Supplies & Materials 6,000                     2,500                    188                      ‐                       ‐                       188                       2,312                     6,000                   3,204                   Bradley Lake Operating Total 80,140                  33,391                 16,892                ‐                       ‐                       16,892                 16,499                  80,140                97,661                Bradley Battle Creek Diversion Bradley Battle Creek Diversion Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       ‐                        Snow Measurement Bradley Lake Operating Contractual 10,000                  4,167                    ‐                       ‐                       10,000                10,000                 (5,833)                   10,000                10,000                Bradley Lake Operating Total 10,000                  4,167                    ‐                       ‐                       10,000                10,000                 (5,833)                   10,000                10,000                 Seismic Service Bradley Lake Operating Contractual 62,000                  25,833                 ‐                       ‐                       24,557                24,557                 1,276                     62,000                56,310                Bradley Lake Operating Total 62,000                  25,833                 ‐                       ‐                       24,557                24,557                 1,276                     62,000                56,310                 Streamguaging Serv Bradley Lake Operating Contractual 183,615                76,506                 ‐                       ‐                       48,404                48,404                 28,102                  209,917              189,917              Bradley Lake Operating Total 183,615                76,506                 ‐                       ‐                       48,404                48,404                 28,102                  209,917              189,917              Permits Bradley Lake Operating Other Costs 350                        146                       ‐                       ‐                       100                      100                       46                          350                      758                      Bradley Lake Operating Total 350                        146                       ‐                       ‐                       100                      100                       46                          350                      758                      FERC 556 ‐ System Control & Load Dispatching Total 336,105                140,043                16,892                  ‐                         83,061                  99,953                  40,090                  362,407                354,646                Page 4 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2020 THROUGH 11/30/2020 FY 21 FY 20  FY21 Approved  Budget   BUDGET %   07/01/2020 ‐  11/30/2020  HEA Actual  CEA Actual  AEA Actual  Total Actual   (Over) Under  Budget to Date   FY20 Approved  Budget  FY20 Actual  FERC 562 ‐ Station Expenses Station Expenses Bradley Lake Operating Labor & Benefits 83,010                  34,588                 5,000                   10,612                212                      15,824                 18,764                  87,072                72,086                Travel 4,500                     1,875                    ‐                       20                        ‐                       20                         1,855                     4,000                   2,596                   Contractual 1,800                     750                       16,952                ‐                       3,024                   19,976                 (19,226)                 2,000                   51,167                Supplies & Materials 44,000                  18,333                 ‐                       ‐                       ‐                       ‐                        18,333                  22,000                613                      Other Costs ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         2,000                   ‐                       Equipment, Furniture and Machinery 13,000                  5,417                    ‐                       ‐                       ‐                       ‐                        5,417                     ‐                       ‐                       Bradley Lake Operating Total 146,310                60,963                 21,952                10,632                3,236                   35,820                 25,143                  117,072              126,462              FERC 562 ‐ Station Expenses Total 146,310                60,963                  21,952                  10,632                  3,236                    35,820                  25,143                  117,072                126,462                #N/A Weather Monitoring Power Sup Bradley Lake Operating Contractual ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       5,244                   Bradley Lake Operating Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       5,244                   #N/A ‐                         ‐                         ‐                         ‐                         ‐                         ‐                         ‐                         ‐                         5,244                    FERC 571 ‐ Maintenance of Overhead Lines Maint of OH Lines Bradley Lake Operating Labor & Benefits 27,459                  11,441                 ‐                       ‐                       ‐                       ‐                        11,441                  27,459                2,507                   Travel ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         10,000                4,530                   Contractual 100,000                41,667                 ‐                       ‐                       ‐                       ‐                        41,667                  50,000                66,883                Supplies & Materials 5,000                     2,083                    ‐                       ‐                       ‐                       ‐                        2,083                     5,000                   ‐                       Equipment, Furniture and Machinery ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       103                      Bradley Lake Operating Total 132,459                55,191                 ‐                       ‐                       ‐                       ‐                        55,191                  92,459                74,024                FERC 571 ‐ Maintenance of Overhead Lines Total 132,459                55,191                  ‐                         ‐                         ‐                         ‐                         55,191                  92,459                  74,024                  FERC 920 & 930 ‐ Administrative Expense AEA Bradley Fixed Admin Fees Bradley Lake Operating AIDEA Staff Professional Services (Direct)‐                         ‐                        ‐                       ‐                       15,529                15,529                 (15,529)                 ‐                       ‐                       Travel 3,500                     1,458                    ‐                       ‐                       ‐                       ‐                        1,458                     ‐                       ‐                       Consulting‐Administrative 2,500                     1,042                    ‐                       ‐                       988                      988                       55                          ‐                       ‐                       Administrative Costs 59,755                  24,898                 ‐                       ‐                       13,202                13,202                 11,696                  200,000              200,000              Bradley Lake Operating Total 65,755                  27,398                 ‐                       ‐                       29,719                29,719                 (2,321)                   200,000              200,000              Bradley Battle Creek Diversion Bradley Battle Creek Diversion Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       ‐                       Operating Committee Exp‐Audit Bradley Lake Operating Administrative Costs 19,900                  8,292                    ‐                       ‐                       ‐                       ‐                        8,292                     19,900                20,298                Bradley Lake Operating Total 19,900                  8,292                    ‐                       ‐                       ‐                       ‐                        8,292                     19,900                20,298                Operating Committee Exp‐Legal Bradley Lake Operating Administrative Costs 70,000                  29,167                 ‐                       ‐                       31,924                31,924                 (2,757)                   30,000                215,162              Bradley Lake Operating Total 70,000                  29,167                 ‐                       ‐                       31,924                31,924                 (2,757)                   30,000                215,162              Operat Committee Exp‐Arbitrage Bradley Lake Operating Administrative Costs 5,000                     2,083                    ‐                       ‐                       ‐                       ‐                        2,083                     3,000                   2,685                   Bradley Lake Operating Total 5,000                     2,083                    ‐                       ‐                       ‐                       ‐                        2,083                     3,000                   2,685                   Trust & Account Fees Bradley Lake Operating Administrative Costs 13,000                  5,417                    ‐                       ‐                       5,959                   5,959                    (542)                       11,918                12,118                Bradley Lake Operating Total 13,000                  5,417                    ‐                       ‐                       5,959                   5,959                    (542)                       11,918                12,118                Misc Admin Bradley Lake Operating Administrative Costs 18,900                  7,875                    12,360                ‐                       6,600                   18,960                 (11,085)                 11,646                12,000                Bradley Lake Operating Total 18,900                  7,875                    12,360                ‐                       6,600                   18,960                 (11,085)                 11,646                12,000                FERC 920 & 930 ‐ Administrative Expense Total 192,555                80,232                  12,360                  ‐                         74,202                  86,562                  (6,330)                   276,464                462,263                FERC 924 & 925 ‐ Insurance Premiums Insurance Premiums Bradley Lake Operating Administrative Costs 748,019                311,675               9,406                   ‐                       284,143              293,549               18,126                  631,000              653,129              Bradley Lake Operating Total 748,019                311,675               9,406                   ‐                       284,143              293,549               18,126                  631,000              653,129              FERC 924 & 925 ‐ Insurance Premiums Total 748,019                311,675                9,406                    ‐                         284,143                293,549                18,126                  631,000                653,129                FERC 928 ‐ Regulatory Commission Expenses FERC Admin Fees Bradley Lake Operating Administrative Costs 175,000                72,917                 ‐                       ‐                       ‐                       ‐                        72,917                  185,000              169,976              Bradley Lake Operating Total 175,000                72,917                 ‐                       ‐                       ‐                       ‐                        72,917                  185,000              169,976              FERC Related Prof Services BRADLEY FERC PART 12 INSPECTION Administrative Costs 75,000                  31,250                 ‐                       ‐                       ‐                       ‐                        31,250                  ‐                       ‐                       BRADLEY FERC PART 12 INSPECTION Total 75,000                  31,250                 ‐                       ‐                       ‐                       ‐                        31,250                  ‐                       ‐                       BRADLEY CONTRACTUAL ENGINEER‐FERC LICENSE ISSUES Administrative Costs 110,000                45,833                 ‐                       ‐                       24,244                24,244                 21,589                  100,000              88,256                Page 5 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2020 THROUGH 11/30/2020 FY 21 FY 20  FY21 Approved  Budget   BUDGET %   07/01/2020 ‐  11/30/2020  HEA Actual  CEA Actual  AEA Actual  Total Actual   (Over) Under  Budget to Date   FY20 Approved  Budget  FY20 Actual  BRADLEY CONTRACTUAL ENGINEER‐FERC LICENSE ISSUES Tot 110,000                45,833                 ‐                       ‐                       24,244                24,244                 21,589                  100,000              88,256                FERC 928 ‐ Regulatory Commission Expenses Total 360,000                150,000                ‐                         ‐                         24,244                  24,244                  125,756                285,000                258,232                Total Bradley Lake Budget 5,668,703            2,361,957           1,350,235          22,783                468,886              1,841,904          520,053                5,351,043          4,773,126          Page 6 of 9 BRADLEY LAKE R&C FUND DISBURSEMENTS AND REPAYMENTS SCHEDULE D Expenses for the Period 07/1/20 through 11/30/20 Actual Actual Actual Projected @06/30/20 TO REPAY @ 11/30/20 TO REPAY Budget Description Expense @6/30/20 Expense @6/30/21 FY21 R&C FUND PROJECTS Governor 0.00 4,052,070.14 0.00 4,052,070.14 0.00 Replace RFLS 0.00 251,092.69 0.00 251,092.69 0.00 Replace Runners 0.00 1,946,732.79 0.00 1,946,732.79 0.00 Replace cable from dam to power house 0.00 2,321,922.94 0.00 2,321,922.94 0.00 Replace power system stabilizer 0.00 619,205.10 0.00 619,205.10 0.00 Replace two RTUs 0.00 86,905.27 0.00 86,905.27 0.00 Culvert Repairs 0.00 675,966.79 0.00 675,966.79 0.00 Tower Repair for Jack Frost Heaves 0.00 887,596.62 0.00 887,596.62 0.00 Replace Plant and SCADA Controls 0.00 1,344,683.05 0.00 1,344,683.05 0.00 Vibration Monitoring System 0.00 490.00 0.00 490.00 0.00 Fire Alarm System Replacement 41,179.09 41,179.09 21,770.58 62,949.67 150,000.00 Battle Creek Diversion 0.00 1,170,000.00 0.00 1,170,000.00 0.00 Bradley Replace Electro-Mechanical Relays 0.00 1,277,197.06 0.00 1,277,197.06 0.00 Fishwater Screen Debris Removal 0.00 312,236.43 0.00 312,236.43 0.00 Turbine Nozzel Repair 0.00 1,428,861.07 0.00 1,428,861.07 0.00 Spillway Raise 0.00 0.00 0.00 0.00 0.00 SVC replacement Daves Creek | Soldotna 0.00 8,517,991.11 0.00 8,517,991.11 0.00 Equipment Storage Shed 0.00 510,550.13 0.00 510,550.13 0.00 Emerson Operating System Upgrade 0.00 622,665.00 0.00 622,665.00 0.00 Generator #2 Replacement 370,871.04 953,212.71 0.00 953,212.71 0.00 Road Grader 0.00 0.00 0.00 370,000.00 Battle Creek Construction 0.00 3,665,864.15 3,665,864.15 3,300,000.00 Battle Creek Cash Call-Expended 0.00 750,000.00 750,000.00 750,000.00 Repayment through Cash Call 0.00 (750,000.00) (750,000.00) (750,000.00) Needle Repairs 0.00 390,452.46 390,452.46 700,000.00 0.00 0.00 412,050.13 27,020,557.99 4,078,087.19 31,098,645.18 4,520,000.00 Current Year R&C Repayment (2,121,396.10) (610,449.00) Adjust to balance to $5million 0.00 (129,785.71) Interest in Fund Applied to Repayment (175,199.84) (128,881.76) Net Transfer from Revenue Fund (2,296,595.94) (869,116.47) Cumulative Prior Years R&C Repayments (23,240,089.01) (25,518,390.50) Due to (from) Utilities 18,294.45 (1,147,444.26) Adjust Due to R&C Actual 0.00 0.00 (23,221,794.56) (26,665,834.76) NET DUE TO R&C FUND 1,502,167.49 3,563,693.95 R&C FUND CASH FLOW PROJECTION Beginning Investment Balance 2,435,913.25 3,922,231.19 Disbursements-current year -Accrual (721,894.25) (4,078,087.19) Disbursements-prior year accrued 0.00 (406,104.23) Utilities' R&C Refund (88,383.75) (18,294.45) Net other cash inflow(outflow)0.00 129,785.71 Current year interest earnings 175,199.84 128,881.76 Participants Contributions to R&C Fund 2,121,396.10 610,449.00 Ending Investment Balance 3,922,231.19 288,861.79 Accrued Due to (from) Utilities (18,294.45) 1,147,444.26 R&C payable back to the revenue fund 0.00 0.00 Accrued R&C vendor Payable at Year End (406,104.23) 0.00 PROJECTED NET DUE + ENDING INVESTMENT BALANCE 5,000,000.00 5,000,000.00 REPAYMENT AMOUNT $1,649,677 X 25% $4,139,810 X 25% $238,606.15 X 25% $954,181.79 x 25% $756,665.11 x 25% all 4 years $1,455,830.05 x 25% all 4 years $1,401,948.53 x 25% all 4 years $1,834,499.92 x 25% yr 1 | 25% yr 2 | 50% yr 3 $3,330,802.80 x 25% yr 1 | 32% yr 2 | 25% yr 3 |18% yr4 $5,644,193.08 x 25% all 4 years 4th 1,411,048.27 $1,341,405.96 x 25% all 4 years 3rd 335,351.49 4th 335,351.49 $1,715,556.80 x 25% all 4 years 2nd 428,889.20 3rd 428,889.20 $412,050.13 x 25% all 4 years 1st 103,012.53 2nd 103,012.53 $5,270,000 x 25% all 4 years 1st 1,019,521.80 2,278,301.49 1,886,775.02 Page 7 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT Battle Creek Capital Purchases Schedule E Expenses for the period 07/01/20 to 11/30/20 FY19 FY20 FY21 FY21 Actuals Actual Budget Actual Used 2007 Chevrolet Silverado - Used 2006 Chevrolet Silverado - Battle Creek Diversion - 822,327 320,000 7,913 Total capital revenue fund purchases - 822,327 320,000 7,913 Battle Creek Capital Purchases Page 8 of 9 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE F BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2020 THROUGH 11/30/2020 FY 21 FY 20  FY21 Approved  Budget   BUDGET %   07/01/2020 ‐  11/30/2020  HEA Actual  CEA Actual  AEA Actual  Total Actual   (Over) Under  Budget to Date   FY20 Approved  Budget  FY20 Actual  Summary by expense type Contractual 111,000               46,250                     ‐                       ‐                       11,250                11,250                 35,000                  ‐                       ‐                       Administrative Costs 436,714               181,965                   83,351                ‐                       27,035                110,386               71,579                  395,424              580,606              547,714                228,215               83,351                ‐                       38,285                121,636               106,579                395,424              580,606              FERC 537 ‐ Hydraulic Expenses Hydraulic Expenses Bradley Battle Creek Diversion Contractual 66,000                  27,500                 ‐                       ‐                       ‐                       ‐                        27,500                  ‐                       ‐                       Bradley Battle Creek Diversion Total 66,000                  27,500                 ‐                       ‐                       ‐                       ‐                        27,500                  ‐                       ‐                       FERC 537 ‐ Hydraulic Expenses Total 66,000                  27,500                  ‐                         ‐                         ‐                         ‐                         27,500                  ‐                         ‐                         FERC 556 ‐ System Control & Load Dispatching System Cntl & Load Disp Bradley Battle Creek Diversion Bradley Battle Creek Diversion Total ‐                         ‐                        ‐                       ‐                       ‐                       ‐                        ‐                         ‐                       ‐                        Streamguaging Serv Bradley Battle Creek Diversion Contractual 45,000                  18,750                 ‐                       ‐                       11,250                11,250                 7,500                     ‐                       ‐                       Bradley Battle Creek Diversion Total 45,000                  18,750                 ‐                       ‐                       11,250                11,250                 7,500                     ‐                       ‐                       FERC 556 ‐ System Control & Load Dispatching Total 45,000                  18,750                  ‐                         ‐                         11,250                  11,250                  7,500                    ‐                         ‐                         FERC 920 & 930 ‐ Administrative Expense AEA Bradley Fixed Admin Fees Bradley Battle Creek Diversion Administrative Costs 314,664                131,110               1,285                   ‐                       7,602                   8,887                    122,223                117,274              117,325              Bradley Battle Creek Diversion Total 314,664                131,110               1,285                   ‐                       7,602                   8,887                    122,223                117,274              117,325              Operating Committee Exp‐Legal Bradley Battle Creek Diversion Administrative Costs 30,000                  12,500                 ‐                       ‐                       16,190                16,190                 (3,690)                   15,000                135,880              Bradley Battle Creek Diversion Total 30,000                  12,500                 ‐                       ‐                       16,190                16,190                 (3,690)                   15,000                135,880              Operat Committee Exp‐Arbitrage Bradley Battle Creek Diversion Administrative Costs 2,000                     833                       ‐                       ‐                       ‐                       ‐                        833                        2,000                   1,690                   Bradley Battle Creek Diversion Total 2,000                     833                       ‐                       ‐                       ‐                       ‐                        833                        2,000                   1,690                   Trust & Account Fees Bradley Battle Creek Diversion Administrative Costs 8,800                     3,667                    ‐                       ‐                       3,200                   3,200                    467                        4,800                   5,000                   Bradley Battle Creek Diversion Total 8,800                     3,667                    ‐                       ‐                       3,200                   3,200                    467                        4,800                   5,000                   Misc Admin Bradley Battle Creek Diversion Administrative Costs 100                        42                         24,103                ‐                       43                        24,146                 (24,104)                 100                      110                      Bradley Battle Creek Diversion Total 100                        42                         24,103                ‐                       43                        24,146                 (24,104)                 100                      110                      Professional consultants Bradley Battle Creek Diversion Administrative Costs 81,150                  33,813                 57,963                ‐                       ‐                       57,963                 (24,150)                 256,250              320,601              Bradley Battle Creek Diversion Total 81,150                  33,813                 57,963                ‐                       ‐                       57,963                 (24,150)                 256,250              320,601              FERC 920 & 930 ‐ Administrative Expense Total 436,714                181,965                83,351                  ‐                         27,035                  110,386                71,579                  395,424                580,606                Total Bradley Lake Budget 547,714                228,215               83,351                ‐                       38,285                121,636               106,579                395,424              580,606              Page 9 of 9 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECT2021 PROPOSED BUDGET - AMEND 4DATE: January 2021 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECT2021 Budget ContentsScheduleDescriptionPage #Overview of Budget Changes between FY20 Amended Budget and FY21 Proposed Budget - Amend 3 3Schedule A Budget Summary4Schedule A-1 Capital Purchases not funded by R&C5Schedule B Operations & Maintenance Budget6 - 14Schedule C Monthly Utility Contributions15Schedule D R&C Fund Disbursements and Repayments 16Schedule E Battle Creek Capital Purchases17Schedule F Battle Creek Administrative Costs18-19Schedule G Battle Creek Monthly Utility Contributions20`1/22/20211:51 PMH:\Accounting\AEA FY21 FS Shared Files\Bradley Lake\Budget\2021-BradleyBudget-Proposed Amend4-Jan2021.xlsx 2 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTOverview of Budget Changes between FY20 Amended Budget and FY21 Proposed BudgetFY20 Amended Budgeted Utility Contributions19,584,485From Schedule AREVENUESDecrease in interest income 11,000Increase in other available funds (1,325,513)(1,314,513)EXPENSESIncrease Operations & Maintenance447,660Decrease Renewals/Replacements (R&C Fund Repayments)(1,136,647)Decrease Non R&C Capital Purchases(33,000)Decrease Transfer To(From) Operating Reserve(27,963)Decrease Debt Service(1,325,513)Increase Arbitrage Transfer8,911(2,066,552)Net change in utility contributions(3,381,064)FY21 Budgeted Utility Contributions16,203,421Battle Creek-FY20 Amended Budgeted Utility Contributions2,562,036From Schedule AEXPENSESIncrease in Battle Creek Administrative costs152,290Increase in R&C Fund Payments1,104,000Increase in Transfer To(From) Operating Reserve42,638Increase in Debt Service1,764,993Decrease in Capital Purchases(105,000)Decrease in Cost of Issuance 9th Series0Increase in Capital Reserve Contribution492,0913,451,012Net change in utility contributions3,451,012Battle Creek-FY21 Budgeted Utility Contributions6,013,0481/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxOverviewPage 3 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTBudget SummarySchedule AFY2020 FY2021 FY2021 FY2021 Inc(Dec) FromFY2016 FY2017 FY2018 FY2019 FY2020 Approved Amend 3 Proposed Amend 4 FY20 ApprovedBradley Lake (excluding Battle Creek shown below)ActualsActualsActualsActualsActualsBudgetBudgetChangesBudgetBudget Revenues, Expenses & Changes in surplusRevenuesUtility Contributions (sch C) 17,828,513 17,172,295 18,373,909 18,132,905 18,507,495 19,584,485 15,841,345 362,076 16,203,421(3,381,064)Interest Income 1,930,547 1,991,555 2,064,454 1,946,023 1,887,786 1,810,000 1,910,000(111,000)1,799,000(11,000)Other Miscellaneous-R&C Fund Cash Call 0 0 17,251 2,501 0 0 750,000 750,000 750,000Other Available Funds1,325,513 0 1,325,513 1,325,51319,759,060 19,163,850 20,455,614 20,081,429 20,395,281 21,394,485 19,076,858 1,001,076 20,077,934(1,316,552)ExpensesOperations & Maintenance (sch B) 4,273,634 4,011,783 3,985,722 4,019,975 4,773,126 5,351,042 5,668,702 130,000 5,798,702 447,660Renewals/Replacements (R&C Fund Repayments) (sch D) 2,692,710 2,476,905 2,579,100 2,774,832 2,278,302 2,121,400 1,106,741(121,988)984,753(1,136,647)Renewals/Replacements (R&C Fund Cash Call) (sch D)0 750,000 750,000 750,000Non R&C Capital Purchases (sch A-1) 26,444 89 954,060 37,738 283,425685,000 462,000 190,000 652,000(33,000)Transfer To(From) Operating Reserve(9,747) (85,531) (112,145)38,816 112,715 112,715 84,752 0 84,752(27,963)Debt Service (net of Capital Reserve Reductions) 12,494,600 12,426,200 12,778,100 12,778,588 12,778,775 12,778,775 11,453,263 0 11,453,263(1,325,513)Arbitrage Transfer 281,419 334,404 270,777 431,480 168,938 345,553 301,400 53,064 354,464 8,91119,759,060 19,163,850 20,455,614 20,081,429 20,395,281 21,394,485 19,076,858 1,001,076 20,077,934(1,316,552)Surplus (Deficit) 0 0 0 0 0 0Other Project Costs - Battle Creek Revenues, Expenses & Changes in surplusRevenues - Battle CreekUtility Contributions (sch G) 0 800,000 333,860 000000Utility Contributions (sch G) 0 0 497,636 1,319,734 1,967,642 2,562,036 5,734,048 279,000 6,013,048 3,451,012Utility Contributions R&C Fund Cash Call0000Capital Reserve Contributions 0 0 2,796,378 000000Other Available Funds 000 0 00000Interest Income 0 0 14,758 67,492 47,620000000 800,000 3,642,632 1,387,226 2,015,262 2,562,036 5,734,048 279,000 6,013,048 3,451,012Expenses - Battle CreekBattle Creek Administrative costs (sch F) 0 0 137,456 527,723 580,606 395,424 547,714 0 547,714 152,290Renewals/Replacements (R&C Fund Repayments) (sch D)825,000 279,000 1,104,000 1,104,000Renewals/Replacements (R&C Fund Cash Call) (sch D)0000Capital Purchases (sch E) 0 800,000 333,860 0000000Capital Purchases - Revenue Fund (sch E) 0 0 16,500 149,941 822,327 425,000 320,000 0 320,000(105,000)Transfer To(From) Operating Reserve 0 0 8,760 82,038(11,713) (11,712)30,926 0 30,926 42,638Debt Service0 0 895,824 1,748,534 1,753,324 1,753,324 3,518,317 0 3,518,317 1,764,993IRS Subsidy00(571,876) (1,121,010) (1,129,282)00000Cost of Issuance 9th Series 0025,730 0 00000Capital Reserve Contribution 0 0 2,796,378 0 0 492,091 0 492,091 492,0910 800,000 3,642,632 1,387,226 2,015,262 2,562,036 5,734,048 279,000 6,013,048 3,451,012Surplus (Deficit)000 0000000Other InformationOperating Reserve * 1,116,353 1,030,822 918,677 957,494 1,070,208 1,070,208 1,133,740 1,159,740Operating Reserve - Battle Creek*8,760 90,798 79,085 79,085 109,543 109,543Monthly Contributions 1,654,119 1,628,614 1,651,614 1,511,075 1,632,040 1,632,040 1,320,112 1,350,285Monthly Contributions Battle Creek52,780 109,978 242,670 213,503 477,837 501,087*Required to be 20% of budgeted operating expense1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch APage 4 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTCapital Purchases Not Funded by R&C FundSchedule A-1FY17 FY18 FY19 FY20 FY20 FY21 FY21 FY21Approved Amend 3 Proposed Amend 4ActualsActualsActualsActualsBudgetBudgetChangesBudgetComments for FY21:Replace/Automate Fish Water Valves & Actuators 89 361,430 17,142 2,931 - 40,000 - 40,000 Actuator has failedEquipment storage shed (unheated bus barn) - 67,539 - - - - - 1 ton Flatbed with Plow - 57,016 - - - - - Battle Creek Bridge Repair Refurbishment (2) - - - - 220,000 - - - Mobil Crane 40 to 50 tons (used) - 88,875 - - - - - Replace Michigan Loader - 263,306 - - - - - Upgrade Crews Quarters\Residence Kitchen - 1,850 - - - - - Replace 1988 Suburban Ambulance - 59,430 5,350 - - - - 1/2 ton Pick up truck - 34,693 - - - - - Replace High Bay Lighting in Power Plant 19,920 - - - - - Turbine Nozzle Repair - - - - - - - Tire machine - - 15,246 - - - - Replace dump truck and sander - - - - 170,000 170,000 - 170,000 Budgeted in FY20, delayed due to COVID-19Pick up truck - - - 41,484 45,000 - - - UPS Replacement - - - 65,696 75,000 37,000 - 37,000 Need 2nd Battery ChargerRough terrain fork lift (with plow for snow) - - - 131,594 130,000 - - - IRIS Air gap monitoring system (computer) - - - 41,720 45,000 45,000 - 45,000 New generator analysis computerKVM switch for Emerson - - - - 3,000 - 3,000 Emerson upgrade causes need for new switchSpare Trash Pump - - - - 20,000 - 20,000 Leaking needles cause the trash pump to run all the time - need spareHousing Preliminary Design 10,000 - 10,000 New housing site evaluation and preliminary designHeavy Duty trailer for equipment - - - - - - - Need trailer to haul excavator and bulldozer up mountainEmerson Cybersecurity Update 137,000 - 137,000 Emerson Cybersecurity UpdateSQ Line Access Documentation 150,000 150,000 Update line access documentation, line documentation, and base mapsSQ Line Acquisition Costs - 40,000 40,000 AEA time and legal costs for SQ Line acquisitonTotal Non R&C Capital Purchases 89 954,060 37,738 283,425 685,000 462,000 190,000 652,000 Capital Project Description1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch A-1Page 5 of 20 ALASKA ENERGY AUTHORITYHEA2,891,705 HEA3,231,918 HEA3,905,222 HEA4,198,837 BRADLEY LAKE HYDROELECTRIC PROJECTCEA183,499 CEA183,491 CEA109,547 CEA101,785 Bradley Lake Operations and Maintenance BudgetAEA1,705,585 AEA1,458,178 AEA1,418,731 AEA1,681,784 Schedule B FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY Summary by cost typeLabor & Benefits1,889,814 1,578,236 311,578 1,572,497 1,307,514 264,983 1,219,935 1,011,432 208,503 1,413,288 32,500 1,445,788 225,853 Indirect Costs- - - 583,803 579,115 4,688 1,383,388 1,251,242 132,146 1,330,587 - 1,330,587 (52,801) Travel76,950 16,114 60,836 33,950 28,380 5,570 45,950 10,512 35,438 44,950 - 44,950 (1,000) Training49,300 14,046 35,254 49,300 20,957 28,343 49,300 14,875 34,425 49,300 - 49,300 - Contractual841,062 659,773 181,289 1,033,216 633,895 399,321 869,842 660,819 209,023 903,340 110,000 1,013,340 143,498 Supplies & Materials183,345 152,799 30,546 204,345 156,340 48,005 346,345 262,370 83,975 389,345 7,500 396,845 50,500 Other Costs387,818 276,371 111,447 69,818 31,293 38,525 67,818 65,648 2,170 70,818 - 70,818 3,000 Equipment, Furniture and Machinery7,000 25,562 (18,562) 7,000 6,879 121 176,000 127,535 48,465 170,000 - 170,000 (6,000) Maintenance Projects- 3,381 (3,381) - 44,926 (44,926) - 313 (313) - - - - Administrative Costs1,158,098 1,259,440 (101,342) 1,233,537 1,210,676 22,861 1,192,464 1,373,624 (181,160) 1,478,319 (20,000) 1,458,319 265,855 Battle Creek O&M- - - - - - - - - (181,245) - (181,245) (181,245) 4,593,387      3,985,722       607,665             4,787,467      4,019,975       767,492             5,351,042     4,778,370     572,672        5,668,702 130,000 5,798,702 447,660                    Bradley Lake O&M 4% charge to Battle CreekBattle Creek O&M- - - - - - - - - (181,245) - (181,245) (181,245) Bradley Lake O&M 4% charge to Battle CreekFERC 535 ‐ Operation Supervision & EngineeringOperations Sup/EngBradley Lake OperatingLabor & Benefits265,587 262,431 3,156 189,074 182,059 7,015 107,453 89,713 17,740 107,453 - 107,453 - Indirect Costs- - - 77,849 74,535 3,314 155,698 128,545 27,153 155,698 - 155,698 - Travel10,450 2,271 8,179 10,450 13,462 (3,012) 10,450 246 10,204 10,450 - 10,450 - Training9,300 3,452 5,848 9,300 4,305 4,995 9,300 991 8,309 9,300 - 9,300 - Contractual1,000 121 879 1,000 257 743 1,000 173 827 11,000 - 11,000 10,000 Supplies & Materials4,000 3,210 790 4,000 2,688 1,312 4,000 3,698 302 4,000 - 4,000 - Bradley Lake Operating Total290,337 271,485 18,852 291,673 277,306 14,367 287,901 223,366 64,536 297,901 - 297,901 10,000 FERC 535 ‐ Operation Supervision & Engineering Total 290,337          271,485          18,852                291,673          277,306          14,367                287,901        223,366        64,536           297,901                 ‐                          297,901                HEA10,000                      1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 6 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 537 ‐ Hydraulic ExpensesHydraulic ExpensesBradley Lake OperatingLabor & Benefits94,453 69,032 25,421 88,714 71,767 16,947 84,081 67,694 16,387 84,192 - 84,192 111 Indirect Costs- - - 41,515 42,543 (1,028) 107,519 98,886 8,633 114,320 - 114,320 6,801 Travel- - - - - - 10,000 - 10,000 10,000 - 10,000 - Contractual2,000 - 2,000 2,000 11,524 (9,524) 22,000 - 22,000 22,000 - 22,000 - Supplies & Materials2,000 976 1,024 2,000 2,636 (636) 19,000 9,806 9,194 59,000 - 59,000 40,000 Equipment, Furniture and Machinery- - - - - - 81,000 13,368 67,632 32,000 - 32,000 (49,000) Bradley Lake Operating Total98,453 70,008 28,445 134,230 128,470 5,760 323,600 189,754 133,846 321,512 - 321,512 (2,088) FERC 537 ‐ Hydraulic Expenses Total 98,453            70,008            28,445                134,230          128,470          5,760                  323,600        189,754        133,846         321,512                 ‐                          321,512                HEA(2,088)                       FERC 538 ‐ Electric ExpensesElectric ExpensesBradley Lake OperatingLabor & Benefits232,294 202,969 29,325 224,811 209,646 15,165 208,745 210,745 (2,000) 218,044 - 218,044 9,299 Indirect Costs- - - 102,222 110,544 (8,322) 242,067 257,551 (15,484) 262,004 - 262,004 19,937 Travel7,000 6,877 123 7,000 4,890 2,110 7,000 3,140 3,860 7,000 - 7,000 - Training25,000 231 24,769 25,000 12,406 12,594 25,000 13,884 11,116 25,000 - 25,000 - Contractual2,000 1,400 600 2,000 - 2,000 7,000 2,587 4,413 2,000 - 2,000 (5,000) Supplies & Materials9,732 5,513 4,219 9,732 4,503 5,229 50,732 14,111 36,621 41,732 - 41,732 (9,000) Equipment, Furniture and Machinery- - - - - - 63,000 91,512 (28,512) 73,000 - 73,000 10,000 Other Costs- 5,000 - 5,000 5,000 Bradley Lake Operating Total276,026 216,990 59,036 370,765 341,989 28,776 603,544 593,530 10,014 633,780 - 633,780 30,236 FERC 538 ‐ Electric Expenses Total 276,026          216,990          59,036                370,765          341,989          28,776                603,544        593,530        10,014           633,780                 ‐                          633,780                HEA30,236                      1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 7 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 539 ‐ Misc. Hydraulic Power Generation ExpensesMisc Hydro Power ExpBradley Lake OperatingLabor & Benefits179,530 172,689 6,841 168,044 116,910 51,134 104,936 70,195 34,741 105,047 - 105,047 111 Indirect Costs- - - 41,515 42,396 (881) 107,519 98,544 8,975 114,320 - 114,320 6,801 Training15,000 10,363 4,637 15,000 4,245 10,755 15,000 - 15,000 15,000 - 15,000 - Contractual287,525 212,841 74,684 287,525 147,555 139,970 287,525 185,822 101,703 287,525 - 287,525 - Supplies & Materials17,900 18,271 (371) 17,900 31,565 (13,665) 17,900 31,569 (13,669) 17,900 - 17,900 - Bradley Lake Operating Total499,955 414,164 85,791 529,984 342,671 187,313 532,879 386,130 146,749 539,791 - 539,791 HEA6,912 BRADLEY CIRCUITS/RADIO TO BERNICE LKOther Costs35,695 35,696 (1) 35,695 35,696 (1) 35,695 35,696 (1) 35,695 - 35,695 - BRADLEY CIRCUITS/RADIO TO BERNICE LK Total35,695 35,696 (1) 35,695 35,696 (1) 35,695 35,696 (1) 35,695 - 35,695 HEA- BRADLEY CIRCUITS BERNICE LK TO ANCHOther Costs29,773 29,728 45 29,773 29,524 249 29,773 29,194 579 29,773 - 29,773 - BRADLEY CIRCUITS BERNICE LK TO ANCH Total29,773 29,728 45 29,773 29,524 249 29,773 29,194 579 29,773 - 29,773 CEA - FERC 539 ‐ Misc. Hydraulic Power Generation Expenses Total 565,423          479,588          85,835                595,452          407,891          187,561             598,347        451,020        147,327         605,259                 ‐                          605,259                 6,912                        FERC 540 ‐ RentsFERC Land Use FeeBradley Lake OperatingOther Costs318,000 202,079 115,921 - (35,289) 35,289 - - - - - - - Bradley Lake Operating Total318,000 202,079 115,921 - (35,289) 35,289 - - - - - - - FERC 540 ‐ Rents Total 318,000          202,079          115,921             ‐                   (35,289)           35,289                ‐                 ‐                 ‐                  ‐                          ‐                          ‐                         AEA‐                             FERC 541 ‐ Maintenance Supervision & EngineeringMaint Supervision/EngBradley Lake OperatingLabor & Benefits272,586 263,101 9,485 195,817 181,894 13,923 114,456 84,904 29,552 270,154 - 270,154 155,698 Indirect Costs- - - 77,849 74,373 3,476 155,698 121,096 34,602 - - - (155,698) Bradley Lake Operating Total272,586 263,101 9,485 273,666 256,267 17,399 270,154 206,000 64,154 270,154 - 270,154 - FERC 541 ‐ Maintenance Supervision & Engineering Total 272,586          263,101          9,485                  273,666          256,267          17,399                270,154        206,000        64,154           270,154                 ‐                          270,154                HEA‐                             1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 8 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 542 ‐ Maintenance of StructuresMaintenance of StructuresBradley Lake OperatingLabor & Benefits94,453 70,197 24,256 85,438 67,934 17,504 76,499 62,612 13,887 77,639 - 77,639 1,140 Indirect Costs- - - 37,066 37,809 (743) 97,823 91,244 6,579 105,421 - 105,421 7,599 Contractual10,000 - 10,000 10,000 - 10,000 91,000 3,682 87,318 59,000 - 59,000 (32,000) Supplies & Materials53,713 57,919 (4,206) 53,713 46,903 6,810 88,713 39,489 49,224 100,713 - 100,713 12,000 Equipment, Furniture and Machinery7,000 8,513 (1,513) 7,000 6,879 121 32,000 22,552 9,448 52,000 - 52,000 20,000 Maintenance Projects- 2,581 (2,581) - - - - - - - - - - Bradley Lake Operating Total165,166 139,210 25,956 193,217 159,525 33,692 386,035 219,579 166,456 394,773 - 394,773 8,738 BRADLEY UPGRADE CREWS QUARTERS/RESIDENCE KITCHENContractual- - - 165,000 - - - - - - - - - BRADLEY UPGRADE CREWS QUARTERS/RESIDENCE KITCHEN- - - 165,000 - - - - - - - - - FERC 542 ‐ Maintenance of Structures Total 165,166          139,210          25,956                358,217          159,525          198,692             386,035        219,579        166,456         394,773                 ‐                          394,773                HEA8,738                        FERC 543 ‐ Maintenance of Reservoirs, Dams & WaterwaysMaint Res, Dams, WWaysBradley Lake OperatingLabor & Benefits50,610 9,314 41,296 45,552 4,723 40,829 45,080 1,335 43,745 40,744 - 40,744 (4,336) Indirect Costs- - - 19,932 87 19,845 56,322 1,693 54,629 56,689 - 56,689 367 Travel5,000 - 5,000 5,000 Contractual6,500 - 6,500 6,500 7,600 (1,100) 6,500 - 6,500 6,500 - 6,500 - Supplies & Materials15,000 - 15,000 15,000 Bradley Lake Operating Total57,110 9,314 47,796 71,984 12,410 59,574 107,902 3,028 104,874 123,933 - 123,933 16,031 BRADLEY NUKA REPAIRContractual15,000 - 15,000 15,000 - 15,000 - - - - - - - Supplies & Materials- - - - - - - - - - - - - Equipment, Furniture and Machinery- - - - - - - - - - - - - BRADLEY NUKA REPAIR Total15,000 - 15,000 15,000 - 15,000 - - - - - - - BRADLEY POWER TUNNEL MAINT (Dam)Contractual15,000 - 15,000 15,000 - 15,000 15,000 - 15,000 15,000 - 15,000 - BRADLEY POWER TUNNEL MAINT (Dam) Total15,000 - 15,000 15,000 - 15,000 15,000 - 15,000 15,000 - 15,000 - FERC 543 ‐ Maintenance of Reservoirs, Dams & Waterways Total 87,110            9,314               77,796                101,984          12,410            89,574                122,902        3,028            119,874         138,933                 ‐                          138,933                HEA16,031                      1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 9 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 544 ‐ Maintenance of Electric PlantMaintenance of Elec PlantBradley Lake OperatingLabor & Benefits379,102 291,662 87,440 342,265 285,366 56,899 273,620 249,706 23,914 309,110 - 309,110 35,490 Indirect Costs- - - 148,789 156,963 (8,174) 368,424 362,402 6,022 423,178 - 423,178 54,754 Travel4,500 - 4,500 4,500 216 4,284 4,500 - 4,500 4,500 - 4,500 - Contractual70,000 59,793 10,207 70,000 69,475 525 49,000 19,661 29,339 86,000 - 86,000 37,000 Supplies & Materials20,000 12,743 7,257 20,000 16,571 3,429 70,000 66,370 3,630 38,000 - 38,000 (32,000) Maintenance Projects- - - - 44,926 (44,926) - - - - - - - Bradley Lake Operating Total473,602 364,198 109,404 585,554 573,517 12,037 765,544 698,139 67,405 860,788 - 860,788 95,244 BRADLEY HIGH BAY LIGHTSSupplies & Materials- - - 30,000 - 30,000 - - - - - - - BRADLEY HIGH BAY LIGHTS Total- - - 30,000 - 30,000 - - - - - - - FERC 544 ‐ Maintenance of Electric Plant Total 473,602          364,198          109,404             615,554          573,517          42,037                765,544        698,139        67,405           860,788                 ‐                          860,788                HEA95,244                      FERC 545 ‐ Maintenance of Misc. Hydraulic PlantMaint of Misc Hydr PlantBradley Lake OperatingLabor & Benefits94,453 86,833 7,620 85,438 70,963 14,475 69,395 62,843 6,552 69,297 - 69,297 (98) Indirect Costs- - - 37,066 39,864 (2,798) 92,318 91,280 1,038 98,957 - 98,957 6,639 Contractual3,900 2,009 1,891 3,900 - 3,900 3,900 6,763 (2,863) 3,900 - 3,900 - Supplies & Materials35,000 49,502 (14,502) 35,000 33,168 1,832 63,000 93,510 (30,510) 58,000 - 58,000 (5,000) Maintenance Projects- 314 (314) - Bradley Lake Operating Total133,353 138,344 (4,991) 161,404 143,995 17,409 228,613 254,710 (26,097) 230,154 - 230,154 1,541 BRADLEY FISH WATER DSGN/MIDDLE FORK SHACK IMPRContractual- - - - - - - - - - - - - Supplies & Materials- 1,345 (1,345) - - - - - - - - - - BRADLEY FISH WATER DSGN/MIDDLE FORK SHACK IMPR Total- 1,345 (1,345) - - - - - - - - - - FERC 545 ‐ Maintenance of Misc. Hydraulic Plant Total 133,353          139,689          (6,336)                161,404          143,995          17,409                228,613        254,710        (26,097)          230,154                 ‐                          230,154                HEA1,541                        1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 10 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 556 ‐ System Control & Load DispatchingSystem Cntl & Load DispBradley Lake OperatingLabor & Benefits20,618 34,363 (13,745) 21,506 20,920 586 21,140 37,092 (15,952) 21,140 - 21,140 - Contractual53,000 35,618 17,382 53,000 44,800 8,200 53,000 57,365 (4,365) 53,000 - 53,000 - Supplies & Materials6,000 642 5,358 6,000 613 5,387 6,000 3,204 2,796 6,000 - 6,000 - Equipment, Furniture and Machinery- 16,254 (16,254) - - - - - - - - - - Bradley Lake Operating Total79,618 86,877 (7,259) 80,506 66,333 14,173 80,140 97,661 (17,521) 80,140 - 80,140 HEA- BRADLEY EMERSON ANTIVIRUS UPGRADEContractual- - - 40,000 41,740 (1,740) - - - - - - - BRADLEY EMERSON ANTIVIRUS UPGRADE Total- - - 40,000 41,740 (1,740) - - - - - - HEA-  Snow MeasurementBradley Lake OperatingContractual10,000 10,000 - 12,000 10,000 2,000 10,000 10,000 - 10,000 - 10,000 AEA- Bradley Lake Operating Total10,000 10,000 - 12,000 10,000 2,000 10,000 10,000 - 10,000 - 10,000 -  Seismic ServiceBradley Lake OperatingContractual62,000 61,285 715 62,000 61,569 431 62,000 56,310 5,690 62,000 - 62,000 AEA- Bradley Lake Operating Total62,000 61,285 715 62,000 61,569 431 62,000 56,310 5,690 62,000 - 62,000 -  Streamguaging ServBradley Lake OperatingContractual213,137 213,137 - 206,291 186,291 20,000 209,917 189,917 20,000 183,615 - 183,615 AEA(26,302) Bradley Lake Operating Total213,137 213,137 - 206,291 186,291 20,000 209,917 189,917 20,000 183,615 - 183,615 (26,302) PermitsBradley Lake OperatingOther Costs350 250 100 350 250 100 350 758 (408) 350 - 350 AEA- Bradley Lake Operating Total350 250 100 350 250 100 350 758 (408) 350 - 350 - FERC 556 ‐ System Control & Load Dispatching Total 365,105          371,549          (6,444)                401,147          366,183          34,964                362,407        354,646        7,761              336,105                 ‐                          336,105                 (26,302)                     1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 11 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 562 ‐ Station ExpensesStation ExpensesSVC/Substation Maintenance ContractLabor & Benefits123,726 111,165 12,561 94,718 83,226 11,492 59,774 72,086 (12,312) 55,712 - 55,712 CEA(4,062) Travel6,000 1,701 4,299 2,000 1,632 368 4,000 2,596 1,404 4,500 - 4,500 CEA500 Contractual4,000 - 4,000 32,000 35,207 (3,207) 2,000 51,167 (49,167) 1,800 - 1,800 CEA(200) Supplies & Materials16,000 2,678 13,322 21,000 17,692 3,308 12,000 613 11,387 10,000 - 10,000 CEA(2,000) Other Costs4,000 8,618 (4,618) 4,000 1,112 2,888 2,000 - 2,000 - - - CEA(2,000) Equipment, Furniture and Machinery- 795 (795) - - - - - - - - - CEA- Maintenance Projects- 800 (800) - - - - - - - - - CEA- - - Labor & Benefits1,573 (1,573) - - - 27,298 - 27,298 27,298 - 27,298 HEA- Contractual- 7,440 (7,440) - - - - - - - - - HEA- Supplies & Materials- - - - - - 10,000 - 10,000 34,000 - 34,000 HEA24,000 Equipment, Furniture and Machinery- - - - - - - - - 13,000 - 13,000 HEA13,000 SVC/Substation Maintenance Contract Total153,726 134,770 18,956 153,718 138,869 14,849 117,072 126,462 (9,390) 146,309 - 146,309 29,238 FERC 562 ‐ Station Expenses Total 153,726          134,770          18,956                153,718          138,869          14,849                117,072        126,462        (9,390)            146,309                 ‐                          146,309                 29,238                      FERC 563 ‐ Weather Monitoring Power SupBradley Lake OperatingContractual‐                   ‐                  - ‐                   ‐                  - ‐                 5,244            (5,244)            ‐                          ‐                         - - - Bradley Lake Operating Total ‐                   ‐                   ‐                      ‐                   ‐                   ‐                      ‐                 5,244            (5,244)            ‐                          ‐                          ‐                          ‐                             ‐                             1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 12 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY FERC 571 ‐ Maintenance of Overhead LinesMaint of OH LinesBradley Lake OperatingLabor & Benefits82,402 2,907 79,495 31,120 12,110 19,010 27,459 2,507 24,952 27,459 - 27,459 HEA- Travel49,000 5,265 43,735 10,000 8,180 1,820 10,000 4,530 5,470 - - - (10,000) Contractual86,000 56,046 29,954 50,000 17,875 32,125 50,000 66,884 (16,884) 100,000 - 100,000 HEA50,000 Supplies & Materials19,000 - 19,000 5,000 - 5,000 5,000 - 5,000 5,000 - 5,000 HEA- Equipment, Furniture and Machinery- - - - - - - 103 (103) - - - - Bradley Lake Operating Total236,402 64,218 172,184 96,120 38,165 57,955 92,459 74,024 18,435 132,459 - 132,459 40,000 BRADLEY JUNCTION SWITCH REMOVALTravel- - - - - - - - - - - - - Contractual- - - - - - - - - - - - - Other Costs- - - - - - - - - - - - - BRADLEY JUNCTION SWITCH REMOVAL Total- - - - - - - - - - - - - MARKER BALL REPLACEMENTLabor & Benefits- - - - - - - - - - - - - Travel- - - - - - - - - - - - - Contractual- 83 (83) - - - - - - - - - - Equipment, Furniture and Machinery- - - - - - - - - - - - - MARKER BALL REPLACEMENT Total- 83 (83) - - - - - - - - - - SQ LineLabor & Benefits- - - - - - - - - - 32,500 32,500 32,500 Travel- - - - - - - - - - - - - Contractual- - - - - - - - - - 110,000 110,000 110,000 Supplies & Materials- - - - - - - - - - 7,500 7,500 7,500 SQ Line Total- - - - - - - - - - 150,000 150,000 150,000 FERC 571 ‐ Maintenance of Overhead Lines Total 236,402          64,301            172,101             96,120            38,165            57,955                92,459          74,024          18,435           132,459                 150,000                 282,459                HEA190,000                    FERC 920 & 930 ‐ Administrative ExpenseAEA Bradley Admin FeesBradley Lake OperatingAdministrative Costs200,000 200,000 - 200,000 200,000 - 200,000 200,000 - 241,000 (40,000) 201,000 1,000 Administrative Costs2,500 - 2,500 2,500 Administrative Costs- 20,000 20,000 Travel3,500 - 3,500 3,500 Bradley Lake Operating Total200,000 200,000 - 200,000 200,000 - 200,000 200,000 - 247,000 (20,000) 227,000 AEA7,000 Operating Committee Exp‐AuditBradley Lake OperatingAdministrative Costs16,800 16,800 - 16,500 19,900 (3,400) 19,900 20,298 (398) 19,900                   ‐                         19,900 AEA- Bradley Lake Operating Total16,800 16,800 - 16,500 19,900 (3,400) 19,900 20,298 (398) 19,900 - 19,900 - Operating Committee Exp‐LegalBradley Lake OperatingAdministrative Costs25,000 115,610 (90,610) 25,000 140,453 (115,453) 30,000 215,162 (185,162) 70,000                   ‐                         70,000 AEA40,000 Bradley Lake Operating Total25,000 115,610 (90,610) 25,000 140,453 (115,453) 30,000 215,162 (185,162) 70,000 - 70,000 40,000 1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 13 of 20  FY18   FY19   FY20  FY18 Amended Budget  Actual  (Over) Under Budget to date  FY19 Amended Budget  Actual  (Over) Under Budget to date  FY20  Actual (Over) Under Budget to date FY21             Amend 3         Budget FY21             Proposed         Changes FY21             Amend 4         Budget  Increase (Decrease) From PY Operat Committee Exp‐ArbitrageBradley Lake OperatingAdministrative Costs3,380 2,535 845 2,935 2,785 150 3,000 2,685 315 5,000                      ‐                         5,000 AEA2,000 Bradley Lake Operating Total3,380 2,535 845 2,935 2,785 150 3,000 2,685 315 5,000 - 5,000 2,000 Trust & Account FeesBradley Lake OperatingAdministrative Costs11,918 11,918 - 11,918 11,918 - 11,918 12,118 (200) 13,000 - 13,000 AEA1,082 Bradley Lake Operating Total11,918 11,918 - 11,918 11,918 - 11,918 12,118 (200) 13,000 - 13,000 1,082 Misc AdminBradley Lake OperatingAdministrative Costs10,000 10,350 (350) 10,350 11,646 (1,296) 11,646 12,000 (354) 18,900 - 18,900 AEA7,254 Bradley Lake Operating Total10,000 10,350 (350) 10,350 11,646 (1,296) 11,646 12,000 (354) 18,900 - 18,900 7,254 FERC 920 & 930 ‐ Administrative Expense Total 267,098          357,213          (90,115)              266,703          386,702          (119,999)            276,464        462,263        (185,799)        373,800                 (20,000)                  353,800                 57,336                      FERC 924 & 925 ‐ Insurance PremiumsInsurance PremiumsBradley Lake OperatingAdministrative Costs525,000 580,915 (55,915) 600,834 599,218 1,616 575,000 613,782 (38,782) 692,019 - 692,019 AEA25,000 Administrative Costs56,000 43,790 12,210 56,000 18,422 37,578 56,000 39,347 16,653 56,000 - 56,000 HEA- Bradley Lake Operating Total581,000 624,705 (43,705) 656,834 617,640 39,194 631,000 653,129 (22,129) 748,019 - 748,019 748,019 FERC 924 & 925 ‐ Insurance Premiums Total 581,000          624,705          (43,705)              656,834          617,640          39,194                631,000        653,129        (22,129)          748,019                 ‐                          748,019                 25,000                      FERC 928 ‐ Regulatory Commission ExpensesFERC Admin FeesAdministrative Costs185,000 176,523 8,477 185,000 101,775 83,225 185,000 169,976 15,024 175,000 - 175,000 AEA (10,000) Bradley Lake Operating Total185,000 176,523 8,477 185,000 101,775 83,225 185,000 169,976 15,024 175,000 - 175,000 (10,000) FERC Related Prof ServicesFERC Part 12 InspectionAdministrative Costs- - - - - - - - - 75,000 - 75,000 AEA 75,000 Contractual Engineer‐FERC license issues- Administrative Costs125,000 100,999 24,001 125,000 104,560 20,440 100,000 88,256 11,744 110,000 - 110,000 AEA 10,000 Bradley Lake Operating Total125,000 100,999 24,001 125,000 - 125,000 100,000 - 100,000 185,000 - 185,000 85,000 FERC 928 ‐ Regulatory Commission Expenses Total 310,000          277,522          32,478                310,000          206,335          103,665             285,000        258,232        26,768           360,000                 ‐                          360,000                 75,000                      Total Bradley Lake Budget 4,593,387      3,985,722       607,665             4,787,467      4,019,975       767,492             5,351,042     4,778,370     572,671         5,668,702              130,000                 5,798,702              335,641                    1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch BPage 14 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTMonthly Utility ContributionsSchedule CFY2017 FY2018 FY2019 FY2020 FY2021 FY2021 FY2021 FY2020 toPercent Amended Amended Amended Amended Amend 3 Proposed Amend 4 FY2021Power PurchaserShareBudgetBudgetBudgetBudgetBudgetChangeBudgetChangeChugach Electric 30.4%5,941,176 6,025,086 5,778,204 5,953,680 4,815,770 110,070 4,925,841 (1,027,839) Municipality of Anchorage 25.9%5,061,732 5,133,216 4,922,868 5,072,376 4,102,908 93,778 4,196,687 (875,689) Chugach Electric Total8,918,678 203,848 9,122,528 Homer Electric 12.0%2,345,208 2,378,322 2,280,864 2,350,140 1,900,960 43,449 1,944,410 (405,730) Matanuska Electric 13.8%2,696,988 2,735,076 2,622,996 2,702,664 2,186,107 49,966 2,236,074 (466,590) Golden Valley Electric 16.9%3,302,832 3,349,470 3,212,220 3,309,780 2,677,187 61,191 2,738,379 (571,401) City of Seward 1.0%195,432 198,192 190,068 195,840 158,413 3,621 162,035 (33,805) Rounding3 (1) 5 - 100.0%19,543,371 19,819,362 19,007,219 19,584,485 15,841,345 362,075 16,203,426 (3,381,054) FY2018Percent FY2017 MonthlyFY2019 FY2020 FY2021 FY2021 FY2021Power PurchaserShareMonthlyAcceleratedMonthlyMonthlyAmend 3 MonthlyMonthly ChangesAmend 4 MonthlyChugach Electric 30.4%495,098 1,004,181 481,517 496,140 401,314 22,014 425,655 (94,826) Municipality of Anchorage 25.9%421,811 855,536 410,239 422,698 341,909 18,755 362,647 (80,789) Chugach Electric Total743,223 40,770 788,302 Homer Electric 12.0%195,434 396,387 190,072 195,845 158,413 8,690 168,021 (37,432) Matanuska Electric 13.8%224,749 455,846 218,583 225,222 182,176 9,993 193,226 (43,046) Golden Valley Electric 16.9%275,236 558,245 267,685 275,815 223,099 12,238 236,631 (52,716) City of Seward 1.0%16,286 33,032 15,839 16,320 13,201 724 14,002 (3,119) 100.0%1,628,614 3,303,227 1,583,935 1,632,040 1,320,112 72,415 1,400,181 (311,928) 1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch CPage 15 of 20 ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT R&C Fund Disbursements and Repayments Schedule D Actual ACTUAL Actual ACTUAL Actual ACTUAL PROJECTED PROJECTED TO REPAY TO REPAY TO REPAY TO REPAY Description Disburse at 06/30/18 Disburse at 06/30/19 Disburse at 06/30/20 Disburse at 06/30/21 R&C FUND PROJECTS Governor 0.00 4,052,070.14 0.00 4,052,070.14 0.00 4,052,070.14 0.00 4,052,070.14 Replace RFLS 0.00 251,092.69 0.00 251,092.69 0.00 251,092.69 0.00 251,092.69 Replace Runners 0.00 1,946,732.79 0.00 1,946,732.79 0.00 1,946,732.79 0.00 1,946,732.79 Replace cable from dam to power house 0.00 2,321,922.94 0.00 2,321,922.94 0.00 2,321,922.94 0.00 2,321,922.94 Replace power system stabilizer 0.00 619,205.10 0.00 619,205.10 0.00 619,205.10 0.00 619,205.10 Replace two RTUs 0.00 86,905.27 0.00 86,905.27 0.00 86,905.27 0.00 86,905.27 Culvert Repairs 0.00 675,966.79 0.00 675,966.79 0.00 675,966.79 0.00 675,966.79 Trans Towers Frost Jacking Repairs 0.00 887,596.62 0.00 887,596.62 0.00 887,596.62 0.00 887,596.62 Replace Plant and SCADA Controls 0.00 1,344,683.05 0.00 1,344,683.05 0.00 1,344,683.05 0.00 1,344,683.05 Vibration Monitoring System 0.00 490.00 0.00 490.00 0.00 490.00 0.00 490.00 Battle Creek Feasibility 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Fire Alarm System Replacement 0.00 0.00 0.00 0.00 41,179.09 41,179.09 150,000.00 191,179.09 Battle Creek Diversion 0.00 1,170,000.00 0.00 1,170,000.00 0.00 1,170,000.00 0.00 1,170,000.00 Replace Electro-Mechanical Relays 0.00 1,277,197.06 0.00 1,277,197.06 0.00 1,277,197.06 0.00 1,277,197.06 Fishwater Screen Debris Removal 0.00 312,236.43 0.00 312,236.43 0.00 312,236.43 0.00 312,236.43 Turbine Nozzle Repair 0.00 1,428,861.07 0.00 1,428,861.07 0.00 1,428,861.07 0.00 1,428,861.07 Spillway Raise 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SVC replacement Daves Creek | Soldotna 1,341,405.96 8,517,991.11 0.00 8,517,991.11 0.00 8,517,991.11 0.00 8,517,991.11 Equipment Storage Shed 0.00 0.00 510,550.13 510,550.13 0.00 510,550.13 0.00 510,550.13 Emerson Operating System Upgrade 0.00 0.00 622,665.00 622,665.00 0.00 622,665.00 0.00 622,665.00 Generator #2 Relacement 0.00 0.00 582,341.67 582,341.67 370,871.04 953,212.71 0.00 953,212.71 Road Grader 0.00 0.00 0.00 0.00 0.00 0.00 370,000.00 370,000.00 Battle Creek Construction 0.00 3,666,000.00 3,666,000.00 Battle Creek Cash Call 0.00 750,000.00 750,000.00 Repayment through Cash Call 0.00 (750,000.00) (750,000.00) Needle Rapairs 0.00 700,000.00 700,000.00 1,341,405.96 24,892,951.06 1,715,556.80 26,608,507.86 412,050.13 27,020,557.99 4,886,000.00 31,906,557.99 Current Year R&C Repayment (2,793,306.00) (2,746,068.00) (2,121,396.10) (2,088,753.22) Adjust bal to $5 mill (won't be corrected until year end) 0.00 0.00 0.00 0.00 Less Interest in Fund Applied to Repayment (226,781.00) (117,149.21) (175,199.84) (269,486.35) Net Transfer from Revenue Fund (3,020,087.00) (2,863,217.21) (2,296,595.94) (2,358,239.57) Cumulative Prior Years R&C Repayments (17,886,155.09) (20,465,255.55) (23,240,089.01) (25,518,390.50) Due back to Utilities 440,986.54 88,383.75 18,294.45 0.00 R&C Cumulative Interest (Retained) Applied As Part of Repayment 0.00 0.00 0.00 0.00 Net R&C Repayments (17,445,168.55) (20,376,871.80) (23,221,794.56)(25,518,390.50) NET DUE TO R&C FUND 4,427,695.51 3,368,418.85 1,502,167.49 4,029,927.92 R&C FUND CASH FLOW PROJECTION Beginning Investment Balance 3,219,624.39 1,013,291.03 2,435,913.25 3,922,231.19 Disbursements-current year (1,341,405.96) (999,608.45) (412,050.13) (4,886,000.00) Disbursements-prior year accrued (2,737,351.03) 0.00 (309,844.12) (406,104.23) R&C Repayment to utilities (1,147,663.37) (440,986.54) (88,383.75)(18,294.45) Net other cash inflow(outflow) 0.00 0.00 0.00 0.00 Current year interest earnings 226,781.00 117,149.21 175,199.84 269,486.35 Current year Participants Contributions to R&C 2,793,306.00 2,746,068.00 2,121,396.10 2,088,753.22 Ending Investment Balance 1,013,291.03 2,435,913.25 3,922,231.19 970,072.08 Accrued R&C Payable at year end-Due to Utilities (440,986.54) (88,383.75) (18,294.45) 0.00 Accrued R&C vendor Payable at year end 0.00 (715,948.35) (406,104.23) 0.00 PROJECTED NET DUE + ENDING INVESTMENT BALANCE 5,000,000.00 5,000,000.00 5,000,000.00 5,000,000.00 REPAYMENT AMOUNT $3,330,802.80 X 25% yr 1 | 32% yr 2 |25% yr 3 | 13rd yr 832,700.70 4th yr 599,544.50 $5,644,193.08 x 25% all 4 years 2nd yr 1,411,048.27 3rd yr 1,411,048.27 4th yr 1,411,048.27 $1,341,405.96 x 25% all 4 years 1st yr 335,351.49 2nd yr 335,351.49 3rd yr 335,351.49 4th yr 335,351.49 $1,715,556.80 x 25% all 4 years 1st yr 428,889.20 2nd yr 428,889.20 3rd yr 428,889.20 $150,000 x 25% all 4 years 1st yr 103,012.53 2nd yr 103,012.53 $520,000 x 25% all 4 years 1st yr 1,221,500.00 2,579,100.46 2,774,833.46 2,278,301.49 2,088,753.22 1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsx Sch D Page 16 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTBattle Creek Capital Construction PurchasesSchedule EFY18 FY19 FY20 FY20 FY21 FY21 FY21Approved Amend 3 Proposed Amend 4ActualsActualsActualsBudgetBudgetChangesBudgetCommentsBattle Creek Diversion 333,860 - - - - - Total Construction 333,860 - - - - - Used 2007 Chevrolet Silverado 8,800 - - - - - Used 2006 Chevrolet Silverado 7,700 - - - - - Battle Creek Diversion - 149,941 822,327 425,000 320,000 - 320,000 Claims consultantsTotal capital revenue fund purchases 16,500 149,941 822,327 425,000 320,000 - 320,000 Capital Construction Project Description1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch EPage 17 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTBattle Creek Administrative Costs BudgetSchedule F- - HEA262,438 HEA268,524 HEA92,569 CEA- CEA- CEA- CEA- AEA43,000 AEA191,550 AEA126,900 AEA273,900 BL O&M181,245 FY18  FY19  FY18 Amended Budget  Actual @ 12/31/18 (Over) Under Budget  FY19 Amended Budget  Actual (Over) Under Budget  FY20     Approved Budget  Actual (Over) Under Budget   FY21     Amend 3 Budget  FY21     Proposed Changes  FY21     Amend 4 Budget Increase (Decrease) from PY Summary by cost type- - - Administrative Costs43,000 137,435 (94,435) 453,988 527,724 (73,736) 395,424 580,606 (185,182) 255,469 255,469 (139,955) Battle Creek O&M ‐ Bradley Allocation- - - - - - - - - 181,245 181,245 181,245 Battle Creek O&M111,000 111,000 111,000 43,000            137,435        (94,435)        453,988        527,724        (73,736)        395,424        580,606       (185,182)  547,714                     ‐                              547,714                     41,290          Bradley Lake O&M 4% charge to Battle CreekBattle Creek O&M- - - - - - - - - 181,245 - 181,245 181,245 FERC 537 ‐ Hydraulic ExpensesHydraulic ExpensesBattle Creek OperatingLabor & Benefits- - - - - - - - - - - - - Indirect Costs- - - - - - - - - - - - - Travel- - - - - - - - - - - - - Training- - - - - - - - - - - - - Contractual- - - - - - - - - 66,000 - 66,000 66,000 Bradley Lake Operating Total- - - - - - - - - 66,000             ‐                    66,000            66,000 FERC 537 ‐ Hydraulic Expenses Total- - - - - - - - - 66,000 - 66,000 66,000 FERC 556 ‐ System Control & Load DispatchingStreamguaging ExpensesBattle Creek OperatingLabor & Benefits- - - - - - - - - - - - - Indirect Costs- - - - - - - - - - - - - Travel- - - - - - - - - - - - - Training- - - - - - - - - - - - - Contractual- - - - - - - - - 45,000 - 45,000 45,000 Supplies & Materials- - - - - - - - - - - - - Equipment, Furniture and Machinery- - - - - - - - - - - - - Bradley Lake Operating Total- - - - - - - - - 45,000 - 45,000 45,000 FERC 556 ‐ System Control & Load Dispatching Total- - - - - - - - - 45,000 - 45,000 45,000 FERC 920 & 930 ‐ Administrative ExpenseBattle Creek Admin FeesAdministrative Costs- 3,525 (3,525) 8,193 7,421 772 12,274 12,274 0 11,419 - 11,419 (855) Administrative Costs22,000 22,000 - 168,000 168,000 - 105,000 105,051 (51) 122,000 - 122,000 17,000 Battle Creek Admin Fees Total22,000 25,525 (3,525) 176,193 175,421 772 117,274 117,325 (51) 133,419 - 133,419 16,145 Operating Committee Exp‐Owners RepresentativeAdministrative Costs- 89,196 (89,196) 254,245 311,652 (57,407) 256,250       320,601 (64,351) 81,150                        ‐                              81,150                       (175,100) Operating Committee Exp‐Owners Representative Total- 89,196 (89,196) 254,245 311,652 (57,407) 256,250 320,601 (64,351) 81,150 - 81,150 (175,100) Operating Committee Exp‐LegalAdministrative Costs15,000 17,082 (2,082) 15,000 34,795 (19,795) 15,000         135,880 (120,880) 30,000                        ‐                              30,000                       15,000 Operating Committee Exp‐Legal  Total15,000 17,082 (2,082) 15,000 34,795 (19,795) 15,000 135,880 (120,880) 30,000 - 30,000 15,000  FY20    1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch FPage 18 of 20 FY18  FY19  FY18 Amended Budget  Actual @ 12/31/18 (Over) Under Budget  FY19 Amended Budget  Actual (Over) Under Budget  FY20     Approved Budget  Actual (Over) Under Budget   FY21     Amend 3 Budget  FY21     Proposed Changes  FY21     Amend 4 Budget Increase (Decrease) from PY  FY20    Operat Committee Exp‐ArbitrageAdministrative Costs2,000 2,180 (180) 2,000 1,690 310 2,000            1,690 310 2,000                          ‐                              2,000                         - Operat Committee Exp‐Arbitrage Total2,000 2,180 (180) 2,000 1,690 310 2,000 1,690 310 2,000 - 2,000 - Trust & Account FeesAdministrative Costs3,500 1,197 2,303 6,550 4,083 2,467 4,800 5,000 (200) 8,800 - 8,800 4,000 Trust & Account Fees Total3,500 1,197 2,303 6,550 4,083 2,467 4,800 5,000 (200) 8,800 - 8,800 4,000 Operating Committee Exp‐Other Administrative Costs500 2,255 (1,755) - 83 (83) 100                110 (10) 100                             ‐                              100                            - Operating Committee Exp‐Other Total500 2,255 (1,755) - 83 (83) 100 110 (10) 100 - 100 - FERC 920 & 930 ‐ Administrative Expense Total 43,000            137,435        (94,435)        453,988        527,724        (73,736)        395,424        580,606       (185,182)  255,469                     ‐                              255,469                     (139,955)      Total Bradley Lake Budget 43,000            137,435        (94,435)        453,988        527,724        (73,736)        395,424        580,606       (185,182)  547,714                     ‐                              547,714                     374,290        1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch FPage 19 of 20 ALASKA ENERGY AUTHORITYBRADLEY LAKE HYDROELECTRIC PROJECTBattle Creek Monthly Participating Purchaser ContributionsSchedule GFY2018 FY2018 FY2018FY2017 7/28/2017 2/2/2018 3/5/2018 FY2019 FY2020 FY2021 FY2021 FY2021 FY2020 toPercent Amended Amended Amended Amend 3 Amended Amended Amend 3 Proposed Amend 4 FY2021POWER PURCHASERShareBudgetBudgetBudget *(1)BudgetBudgetBudgetBudgetChangesBudgetChangeChugach Electric Association 39.38%315,040 157,520 236,521 249,416 519,711 1,008,930 2,258,068 109,870 2,367,938 1,359,008 Municipal Light & Power 0.00%- - - - - - - - - - Homer Electric Association 41.44%331,520 165,760 116,938 262,463 546,898 1,061,708 2,376,190 115,617 2,491,807 1,430,099 Matanuska Electric Association 17.88%143,040 71,520 107,389 113,244 235,968 458,092 1,025,248 49,885 1,075,133 617,041 Golden Valley Electric Association 0.00%- - - - - - - - - - City of Seward 1.30%10,400 5,200 7,808 8,234 17,157 33,306 74,542 3,627 78,169 44,863 Rounding1 - - - - 100.00%800,000 400,000 468,657 633,357 1,319,734 2,562,036 5,734,048 278,999 6,013,047 3,451,011 FY2018 FY2018 FY2021 FY2021 FY2021Percent March April-June FY2019 FY2020October 2020 - June 2021 ProposedFebruaru 2021 -June 2021POWER PURCHASERShareContibutionMonthlyMonthlyMonthlyBudgetChangesBudgetChugach Electric Association 39.38%- - 59,130 80,749 43,309 86,867 198,411 21,974 220,385 Municipal Light & Power 0.00%- - - - - - - - - Homer Electric Association 41.44%- - 29,235 51,985 45,575 91,411 208,789 23,123 231,913 Matanuska Electric Association 17.88%- - 26,847 36,663 19,664 39,441 90,086 9,977 100,063 Golden Valley Electric Association 0.00%- - - - - - - - - City of Seward 1.30%- - 1,952 2,666 1,430 2,868 6,550 725 7,275 - - - 100.0%- - 117,164 172,064 109,978 220,587 503,836 55,800 559,636 * (1) The calculation the FY2018 2/2/2018 Amended Budget is shown below.Original Corrected Contributions FY2018Capital Capital Other Prior to 2/2/2018Reserve Reserve Available Other AmendedContributionsContributionsFundsAvailable FundsBudget1,246,143 1,101,213 144,930 381,451 236,521 - - - - - 1,443,286 1,158,819 284,467 401,405 116,938 565,796 499,992 65,804 173,193 107,389 - - - - - 41,137 36,353 4,784 12,592 7,808 (1) 1 3,296,363 2,796,378 499,985 968,640 468,657 1/22/20211:51 PM2021-BradleyBudget-Proposed Amend4-Jan2021.xlsxSch GPage 20 of 20 Bradley Lake Operator Report Page 1 Bradley Lake Operator Report BPMC January 29, 2021 Unit Statistics: *as of January 21, 2021 For December: For January: Lake Level – 1146.5’ as of January 21, 2021 This is about 3’ above the average for this time of year. Capital Projects: 1) Unit 1 Needle Repair – This has been a long and difficult repair with much more damage than was first expected. As I write this the Unit is being prepared to return to service. Hopefully by the time the BPMC meets on the 29th the Unit will be back in service. Bradley Lake Operator Report Page 2 2) Mechanical Divider issue – Unit 1 dividers were replaced as a part of the Unit 1 needle job. 3) Unit 1 pole connections– We plan to Unit 1 pole connection prior to returning Unit 1 to service. 4) Unit 2 – We are going to do the needle repair on Unit 2 starting February 1, 2021. We hope this will be an easier repair. The goal is to be finished by March 1st. 5) Emerson Ovation cybersecurity – We are planning on doing the cybersecurity upgrade during the first week of February, concurrent with the Unit 2 repair. Operations, Maintenance, and Inspections: 1) Operations- Unit 2 was operational during the outage on Unit 1 and has carried the water (pun intended). 2) Safety meeting – Meeting was held on January 11, 2021. 3) Weather has been bad – rain on ice with freezing at night, nearly impossible to move around the site from late December to latte January. The final Divider arm being lowed to the runner pit