HomeMy WebLinkAbout2023-05-05 BPMC Agenda and docsBRADLEY LAKE PROJECT MANAGEMENT COMMITTEE MEETING AGENDA Friday May 5, 2023 Immediately Following the 8:30 am IMC Meeting To participate dial 1-888-585-9008 and use code 212-753-619# 1. CALL TO ORDER 2. ROLL CALL (for Committee members) 3. PUBLIC ROLL CALL (for all others present) 4. AGENDA APPROVAL 5. PUBLIC COMMENTS 6. APPROVAL OF MEETING MINUTES – March 24, 2023 7. NEW BUSINESS 8. OLD BUSINESS A. Railbelt Reliability Coordination Update Brian Hickey 9. OPERATORS REPORT HEA 10. COMMITTEE REPORTS A. Budget to Actuals Report Budget Subcommittee B. O&D Report 11. EXECUTIVE SESSION – (Bylaws Section 5.11.4) – To discuss confidential financial matters regarding Required Project Work and financing, the immediate knowledge of which may have an adverse effect on the Authority or Project. 12. MEMBERS COMMENTS 13. NEXT MEETING DATE – June 23, 2023 14. ADJOURNMENT Bradley Lake Project Management Commitee Repo rt on Railbelt Regional Coordina�on Overview: The Bradley Lake Project Management Commitee aims to both increase the project's capacity limit from its current level of 90 MW to its full capacity of 120 MW, and to ensure that energy and capacity are reliably and resiliently delivered to each of the project par�cipants. In addi�on, the Commitee seeks to eliminate large-scale, small signal instability oscilla�ons that arise when the Bradley Project interacts with the Summer Valley system during low lake levels. To achieve these objec�ves, the commitee has undertaken the development of a high-level regional transmission plan, known as the Grid Moderniza�on and Resiliency Plan (GMRP). The implementa�on of this Plan will result in various ancillary benefits to the grid. These benefits include an enhanced, resilient, and hardened grid that can withstand extreme weather and other disrup�ve events. Moreover, the modernized grid will be able to transfer more power between regions, reducing thermal reserves and resul�ng in lower fuel burn and carbon emissions. Addi�onally, the upgraded grid will have an improved capacity to integrate variable clean energy sources into the system. The following report provides a summary of our ac�vi�es with respect to this effort in the months of February, March, and April. It outlines the grant applica�ons filed, their details, and the progress made on them. Addi�onally, it highlights other ac�vi�es undertaken related to this task, including mee�ngs and presenta�ons. Grant Applica�ons: We have engaged several consultants to accomplish this effort including Electric Power Systems, Lee Thibert and Associates, Agnew Beck, LSI and Brownstein Hyat. The months of February, March, and April have been primarily devoted to developing and filing grant applica�ons. Two grant applica�ons were completed and filed during this period. The first was the GRIP Topic 2 Smart Grid applica�on, which was completed and filed on March 17th. The project aims to create a real-�me coordinated control system for three Batery Energy Storage Systems (BESS) and the High Voltage Direct Current (HVDC) Submarine Cable. The total project cost is $32.2 million, and the grant request is for $16.1 million, which requires a $16.1 million match. The second grant applica�on was the GRIP Topic 1 applica�on, which was completed and filed on April 5th. The project aims to rebuild exis�ng transmission lines from the Bradley Project to the Daves Creek substa�on, Eklutna Hydro to Lucas, and Teeland to Douglas to 230 kV. The total project cost is $402 million, and the grant request is for $100 million, which requires a $30 million match, and an addi�onal $272 million to complete. Addi�onally, work began on dra�ing the GRIP Topic 3 applica�on. The deadline for submission is May 19th, with a target submission date of Wednesday, May 17th. The project aims to construct a transmission line from Soldotna or Nikiski to Healy, including an HVDC submarine cable and batery energy storage in the three regions. The total project cost is $793 million, and the grant request is for $396.5 million, which requires a match of $396 million. The technical volume for the applica�on was completed in the first dra�, including overall requirements, bateries write-up, HVDC Submarine cable write up and work plan, and northern and southern overhead line segments and work plan. The es�mate, project schedule, abstract, budget and budget jus�fica�on, and statement of project objec�ves for the first dra� are also in process. Other Ac�vi�es: Apart from filing grant applica�ons, we also engaged in several other suppor�ng ac�vi�es. These include: • Presented the Grid Modernization plan to the Fairbanks Chamber of Commerce. • Recorded a segment of APA’s Alaska Powerline Podcast describing our efforts at Grid modernization and to obtain both State and federal funding for this effort. • Provided routine updates to the staff of the federal delegation and the Special Assistant to the Governor on our progress and providing them with a draft letter of support. • Presented the plan to the House Energy Subcommittee. • Connected Zach Fields with Matt Perkins from Alaska Renewables regarding Zach’s desire to include some grant matching funds for renewable energy projects. • Attended the ACEP Technical Advisory group review. • Met with Doug Tansy of IBEW 1547, regarding a potential letter of support for GRIP Topic Applications. • Kept abreast of Cook Inlet CCUS (carbon capture, usage and storage) efforts. Summary: We have made significant progress in filing grant applica�ons; however, from an expecta�on se�ng perspec�ve, it is important to remember that these awards are compe��ve and, in each category, (Topics 1, 2, & 3) we will be compe�ng against between ~150 and ~200 other applica�ons na�onally with 10 to 40 awards per category depending on Topic. I want to personally thank the team of u�lity professionals as well as our consul�ng team for the ir dedica�on and perseverance, this wouldn’t be possible with them. Given the comple�on and �mely filing of two grant applica�ons and the dra�ing of the third one, we are well way to comple�ng this process. Addi�onally, their efforts to connect with stakeholders, present their plans, and obtain support showcase the team’s commitment to this work and will be cri�cal to our overall success. The June DC trip will provide further opportuni�es to further this effort. Bradley Lake Operator Report Page 1 Bradley Lake Operator Report BPMC May 5, 2023 Unit Statistics: Generation Unit 1 (MWhrs) Unit 2 (MWhrs) Total (MWhrs) Feb. 2023 Mar. 2023 April 2023* 24,045 24,165 15,289 19,170 21,078 10,058 43,215 45,243 25,356 Hydraulics Avg. Lake Level (ft.) Usage (ac ft.) Fish water (cfs) Feb. 2023 Mar. 2023 April 2023* 1,129 1,111 1,089 2,473 2,872 2,406 54 44 48 Battle Creek Inflows to Bradley (ac ft.) Feb. 2023 Mar. 2023 April 2023 0 0 0 *Lake Level – 1,084.6’ As of April 27, 2023 Activities • Dam – Completed the monthly safety inspections. Completed Power Tunnel Gate testing. • Dam Access Road – No change from last report. • Battle Creek Diversion – No change from last report. • Bradley Lake new building and renovations – After presenting three bid options to the O&D committee they approved using the remaining previously approved budgeted funds to purchase a Pacific Home SmartWall Package. We will realize significant savings by relocating the build site adjacent to the existing employee housing. This will allow us to take advantage of the proximity of the sewer, power, domestic and fire water systems. The existing parking area near employee housing will be utilized eliminating the need to develop a new driveway to access the site. The 90% plan review is scheduled for 8 May 2023. Package delivery is expected by 1 July 2023. Bradley Lake Operator Report Page 2 • Needle Valve Rebuild- Voith Hydro Inc. was issued a purchase order to build twelve new needle assemblies (six per unit). Scheduled delivery is April 2024. • Fire system- RESPEC continues to submit documents for review on the project wide fire alarm system refresh. • Safety- There have been no lost time or reportable accidents for the months of March and April 2023. o Next safety meeting is 8 May 2023 • Barge trip – None scheduled. • Annual Maintenance Outage – Will be completed 5 May 2023. Pictures of equipment and inspections are attached. • Forced outage –None to report. • Contractors/ Visitors on site- o Hitachi Engineer was on site to replace the Gas Insulated Switch Gear (GIS) actuators for the ring buss breakers. o Emerson Tech was on site to push software patches on the Ovation system. o TEAM Inc tech was on site to complete the NDT on the turbine runner and dividers. o IRIS Tech was on site to install the air gap system on unit #1. o HEA relay tech was on site to perform relay inspection and testing. o Jess Russell HEA on site to work with the Emerson Tech. Bradley Lake Operator Report Page 3 Bradley Lake Hydro Project Tail Race with No Operating Units. Tail Race Pool Tail Race Stop Log Bradley Lake Operator Report Page 4 115KV Main Transformers Grounding the 115KV Line Bradley Lake Operator Report Page 5 13.8KV FS6 Circle Buss New FS6 Breaker Actuator in Place Speed Signal Generator/ Overspeed Protection Slip Rings and Brush Rigging Bradley Lake Operator Report Page 6 Unit 2- 13.8 KV Breaker Neutral Grounding Transformer Turbine Runner Gallery Needle Tip and Divider Bradley Lake Operator Report Page 7 Unit #2 Needle Cone as Found Needle Cone after Polished Out Needle Tip Pin Repair Needle Tip Polished After Repair Bradley Lake Operator Report Page 8 Turbine Pit / Divider Control Arms Turbine Spherical Valve (TSV) Closed Position Alaska Energy Authority Bradley Lake Budget to Actual Expenses 07/01/2022 to 03/31/2023 Page 1 of 13 FY21 FY21 FY22 FY22 FY23 FY23 BUDGET ACTUALS BUDGET ACTUALS BUDGET ACTUALS Replace/Automate Fish Water Valve Actuators 40,000 - - - - - Upgrade Crews Quarters and Residents Kitchen 10,000 10,375 139,000 7,318 159,000 57,487 Battle Creek Bridge Repair - 141,368 80,000 112,337 - - UPS Replacement 37,000 34,438 - - - - IRIS Air Gap Monitoring System (computer) 45,000 - 45,000 86,805 65,000 - Replace Dump Truck and Sander 170,000 166,608 20,000 - - 33,717 KVM switch for Emerson 3,000 - - - - - Spare Trash Pump 20,000 - - - - - Emerson Cybersecurity Update 137,000 138,555 - - - - Heavy Duty trailer for equipment - - 20,000 - 20,000 20,000 ABB Replace GIS Actuators - - 240,000 - 309,000 238,263 Replacement pickup truck - - 45,000 - - 46,299 Needle Valve rebuild - - 150,000 29,727 150,000 - Start new servo design - - 100,000 - 250,000 - Soldotna SVC Battery Replacement - - 70,000 76 - - North Fork Improvements - - - - 5,000 - Mini Excavator - - - - 100,000 94,465 Install New Bradley Microwave System - - - - 500,000 2,686 Total Non R&C Capital Purchases 462,000 491,344 909,000 236,264 1,558,000 492,916 BRADLEY LAKE CAPITAL PURCHASES NOT FUNDED BY R&C FUND ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT Schedule A Expenses for the period 07/01/22 to 03/31/23 Page 2 of 13 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual Summary by expense type Staff Professional Services (Direct) 277,000 207,750 - - 182,587 182,587 25,163 274,000 212,299 Labor & Benefits 1,997,876 1,498,407 673,879 21,064 406,886 1,101,829 396,578 1,307,994 1,150,586 Travel 84,950 63,713 1,270 - 5,023 6,293 57,420 38,450 10,436 Training 49,300 36,975 10,353 - 754 11,107 25,868 49,300 19,660 Contractual 1,215,727 911,795 316,211 - 265,702 581,912 329,883 1,156,343 1,069,547 Consulting-Administrative 249,375 187,031 - - 84,312 84,312 102,719 - 1,636 Supplies & Materials 329,232 246,924 65,497 - 6,940 72,437 174,487 429,345 213,468 Other Costs 79,318 59,489 22,845 19,047 240 42,132 17,356 97,318 63,178 Equipment, Furniture & Machinery 24,000 18,000 5,537 - - 5,537 12,463 73,000 5,084 Administrative Costs 1,492,905 1,119,679 21,165 - 848,718 869,882 249,797 1,884,844 1,968,101 Indirect Costs 1,486,285 1,114,714 859,883 - - 859,883 254,831 1,486,285 1,183,807 O&M 4% Allocation to Battle Creek (236,473) (177,355) - - - - (177,355) (190,710) - Total Bradley Lake Budget 7,049,495 5,287,121 1,976,640 40,111 1,801,161 3,817,912 1,469,209 6,606,169 5,897,803 FERC 535 - Operation Supervision & Engineering Operations Sup/Eng Bradley Lake Operating Labor & Benefits 108,311 81,233 76,280 - - 76,280 4,953 107,604 92,562 Travel 10,450 7,838 590 - - 590 7,247 10,450 1,715 Training 9,300 6,975 - - - - 6,975 9,300 4,087 Contractual 1,000 750 - - - - 750 11,000 - Supplies & Materials 4,000 3,000 314 - - 314 2,686 4,000 942 Indirect Costs 155,698 116,774 99,957 - - 99,957 16,817 155,698 127,416 Bradley Lake Operating Total 288,759 216,569 177,141 - - 177,141 39,428 298,052 226,723 FERC 535 - Operation Supervision & Engineering Total 288,759 216,569 177,141 - - 177,141 39,428 298,052 226,723 FERC 537 - Hydraulic Expenses Hydraulic Expenses Bradley Lake Operating Labor & Benefits 90,192 67,644 45,915 - - 45,915 21,729 84,192 69,712 Travel - - - - - - - 8,000 73 Contractual 123,000 92,250 87 - - 87 92,163 73,000 5,803 Supplies & Materials 32,000 24,000 1,804 - - 1,804 22,196 16,000 471 Equipment, Furniture & Machinery - - - - - - - 39,000 - Indirect Costs 114,320 85,740 65,265 - - 65,265 20,475 114,320 93,656 Bradley Lake Operating Total 359,512 269,634 113,071 - - 113,071 156,563 334,512 169,715 FERC 537 - Hydraulic Expenses Total 359,512 269,634 113,071 - - 113,071 156,563 334,512 169,715 FERC 538 - Electric Expenses Electric Expenses Bradley Lake Operating Labor & Benefits 218,044 163,533 135,255 - - 135,255 28,278 218,044 218,221 Travel 7,000 5,250 680 - - 680 4,570 7,000 4,381 Training 25,000 18,750 9,345 - - 9,345 9,405 25,000 10,743 Contractual 2,000 1,500 - - - - 1,500 5,000 - Supplies & Materials 9,732 7,299 253 - - 253 7,046 42,732 255 Equipment, Furniture & Machinery - - - - - - - 11,000 - Administrative Costs - - - - - - - - 37,738 Indirect Costs 262,004 196,503 162,584 - - 162,584 33,919 262,004 216,110 Bradley Lake Operating Total 523,780 392,835 308,117 - - 308,117 84,718 570,780 487,448 BRADLEY CIRCUITS/RADIO TO BERNICE LK BRADLEY CIRCUITS/RADIO TO BERNICE LK Total - - - - - - - - - FERC 538 - Electric Expenses Total 523,780 392,835 308,117 - - 308,117 84,718 570,780 487,448 FERC 539 - Misc. Hydraulic Power Generation Expenses Misc Hydro Power Exp Bradley Lake Operating Labor & Benefits 105,742 79,307 56,425 - - 56,425 22,882 104,788 68,784 Training 15,000 11,250 1,009 - - 1,009 10,241 15,000 4,831 Contractual 315,867 236,900 152,244 - - 152,244 84,657 287,525 228,838 Supplies & Materials 17,900 13,425 14,690 - - 14,690 (1,265) 17,900 29,833 Other Costs - - - - - - - - (714) Indirect Costs 114,320 85,740 75,774 - - 75,774 9,966 114,320 95,365 Bradley Lake Operating Total 568,829 426,622 300,141 - - 300,141 126,481 539,533 426,937 BRADLEY CIRCUITS/RADIO TO BERNICE LK Other Costs 35,695 26,771 22,845 - - 22,845 3,926 35,695 34,920 BRADLEY CIRCUITS/RADIO TO BERNICE LK Total 35,695 26,771 22,845 - - 22,845 3,926 35,695 34,920 BRADLEY CIRCUITS BERNICE LK TO ANCH Other Costs 29,773 22,330 - 19,047 - 19,047 3,283 29,773 28,734 BRADLEY CIRCUITS BERNICE LK TO ANCH Total 29,773 22,330 - 19,047 - 19,047 3,283 29,773 28,734 FERC 539 - Misc. Hydraulic Power Generation Expenses Total 634,297 475,723 322,986 19,047 - 342,034 133,689 605,001 490,592 FERC 541 - Maintenance Supervision & Engineering Maint Supervision/Eng Bradley Lake Operating Labor & Benefits 116,171 87,128 73,150 - - 73,150 13,978 114,758 100,394 Indirect Costs 155,698 116,774 99,957 - - 99,957 16,817 155,698 128,372 Bradley Lake Operating Total 271,869 203,902 173,107 - - 173,107 30,794 270,456 228,766 FERC 541 - Maintenance Supervision & Engineering Total 271,869 203,902 173,107 - - 173,107 30,794 270,456 228,766 FERC 542 - Maintenance of Structures Maintenance of Structures Bradley Lake Operating Labor & Benefits 86,639 64,979 41,756 - - 41,756 23,223 77,639 62,589 Contractual 56,000 42,000 38,714 - - 38,714 3,286 89,000 62,009 Supplies & Materials 94,000 70,500 3,915 - - 3,915 66,585 243,713 34,868 Equipment, Furniture & Machinery 19,000 14,250 4,325 - - 4,325 9,925 23,000 5,084 Administrative Costs - - - - - - - - 6,741 Indirect Costs 105,421 79,066 59,424 - - 59,424 19,642 105,421 80,072 Bradley Lake Operating Total 361,060 270,795 148,134 - - 148,134 122,661 538,773 251,363 Page 3 of 13 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual FERC 542 - Maintenance of Structures Total 361,060 270,795 148,134 - - 148,134 122,661 538,773 251,363 FERC 543 - Maintenance of Reservoirs, Dams & Waterways Maint Res, Dams, WWays Bradley Lake Operating Labor & Benefits 53,744 40,308 659 - - 659 39,649 40,744 431 Travel 1,000 750 - - - - 750 5,000 - Contractual 22,500 16,875 5,114 - - 5,114 11,761 6,500 - Supplies & Materials 20,000 15,000 - - - - 15,000 15,000 - Indirect Costs 56,689 42,517 323 - - 323 42,194 56,689 501 Bradley Lake Operating Total 153,933 115,450 6,096 - - 6,096 109,354 123,933 932 BRADLEY POWER TUNNEL MAINT (Dam) Contractual - - - - - - - 15,000 - BRADLEY POWER TUNNEL MAINT (Dam) Total - - - - - - - 15,000 - FERC 543 - Maintenance of Reservoirs, Dams & Waterways Total 153,933 115,450 6,096 - - 6,096 109,354 138,933 932 FERC 544 - Maintenance of Electric Plant Maintenance of Elec Plant Bradley Lake Operating Labor & Benefits 309,110 231,833 166,047 - - 166,047 65,785 309,110 258,335 Travel 4,500 3,375 - - - - 3,375 4,500 376 Contractual 58,000 43,500 3,122 - - 3,122 40,378 49,000 104,828 Supplies & Materials 43,000 32,250 7,540 - - 7,540 24,710 30,000 20,620 Indirect Costs 423,178 317,383 236,181 - - 236,181 81,202 423,178 354,987 Bradley Lake Operating Total 837,788 628,341 412,891 - - 412,891 215,450 815,788 739,147 FERC 544 - Maintenance of Electric Plant Total 837,788 628,341 412,891 - - 412,891 215,450 815,788 739,147 FERC 545 - Maintenance of Misc. Hydraulic Plant Maint of Misc Hydr Plant Bradley Lake Operating Labor & Benefits 69,297 51,973 42,975 - - 42,975 8,998 69,297 63,333 Contractual 3,900 2,925 7,276 - - 7,276 (4,351) 3,900 - Supplies & Materials 29,000 21,750 24,785 - - 24,785 (3,035) 34,000 70,114 Equipment, Furniture & Machinery 5,000 3,750 1,184 - - 1,184 2,566 - - Indirect Costs 98,957 74,218 60,419 - - 60,419 13,798 98,957 87,328 Bradley Lake Operating Total 206,154 154,616 136,640 - - 136,640 17,976 206,154 220,775 FERC 545 - Maintenance of Misc. Hydraulic Plant Total 206,154 154,616 136,640 - - 136,640 17,976 206,154 220,775 FERC 556 - System Control & Load Dispatching System Cntl & Load Disp Bradley Lake Operating Labor & Benefits 20,174 15,131 15,894 - - 15,894 (764) 19,708 17,143 Contractual 85,500 64,125 47,528 - - 47,528 16,597 53,000 88,680 Supplies & Materials 12,000 9,000 3,828 - - 3,828 5,172 6,000 6,442 Bradley Lake Operating Total 117,674 88,256 67,251 - - 67,251 21,005 78,708 112,264 Snow Measurement Bradley Lake Operating Contractual 10,000 7,500 - - 9,600 9,600 (2,100) 10,000 9,507 Bradley Lake Operating Total 10,000 7,500 - - 9,600 9,600 (2,100) 10,000 9,507 Seismic Service Bradley Lake Operating Contractual 62,000 46,500 - - 39,939 39,939 6,561 62,000 66,095 Bradley Lake Operating Total 62,000 46,500 - - 39,939 39,939 6,561 62,000 66,095 Streamguaging Serv Bradley Lake Operating Contractual 218,000 163,500 - - 96,593 96,593 66,907 218,000 189,594 Bradley Lake Operating Total 218,000 163,500 - - 96,593 96,593 66,907 218,000 189,594 Permits Bradley Lake Operating Other Costs 350 263 - - 240 240 23 350 238 Bradley Lake Operating Total 350 263 - - 240 240 23 350 238 FERC 556 - System Control & Load Dispatching Total 408,024 306,018 67,251 - 146,372 213,623 92,395 369,058 377,698 FERC 562 - Station Expenses Station Expenses Bradley Lake Operating Labor & Benefits 98,418 73,814 17,482 21,064 - 38,546 35,267 134,147 186,098 Travel 3,500 2,625 - - - - 2,625 3,500 241 Contractual 87,960 65,970 22,398 - - 22,398 43,572 61,600 209,009 Supplies & Materials 44,600 33,450 8,367 - - 8,367 25,083 15,000 49,923 Other Costs 1,500 1,125 - - - - 1,125 31,500 - Bradley Lake Operating Total 235,978 176,984 48,248 21,064 - 69,312 107,672 245,747 445,271 FERC 562 - Station Expenses Total 235,978 176,984 48,248 21,064 - 69,312 107,672 245,747 445,271 FERC 571 - Maintenance of Overhead Lines Maint of OH Lines Bradley Lake Operating Labor & Benefits 39,954 29,966 2,040 - - 2,040 27,925 27,963 12,984 Contractual 150,000 112,500 39,727 - - 39,727 72,773 100,000 20,523 Supplies & Materials 5,000 3,750 - - - - 3,750 5,000 - Equipment, Furniture & Machinery - - 28 - - 28 (28) - - Bradley Lake Operating Total 194,954 146,216 41,795 - - 41,795 104,420 132,963 33,507 FERC 571 - Maintenance of Overhead Lines Total 194,954 146,216 41,795 - - 41,795 104,420 132,963 33,507 FERC 920 & 930 - Administrative Expense AEA Bradley Fixed Admin Fees Bradley Lake Operating Staff Professional Services (Direct) 277,000 207,750 - - 163,625 163,625 44,125 274,000 212,299 Travel - - - - 1,577 1,577 (1,577) - 3,650 Training - - - - 754 754 (754) - - Consulting-Administrative - - - - 1,406 1,406 (1,406) - 1,636 Administrative Costs (80,600) (60,450) - - 80,736 80,736 (141,186) 2,500 59,087 Bradley Lake Operating Total 196,400 147,300 - - 248,097 248,097 (100,797) 276,500 276,672 Page 4 of 13 ALASKA ENERGY AUTHORITY BRADLEY LAKE OPERATIONS & MAINTENANCE SCHEDULE B BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual Bradley Lake Bond Financing Staff Professional Services (Direct) - - - - 18,962 18,962 (18,962) - - Bradley Lake Bond Financing Total - - - - 18,962 18,962 (18,962) - - BRADLEY HEA BESS Preliminary Study BRADLEY HEA BESS Preliminary Study Total - - - - - - - - - Bradley Battle Creek Diversion Bradley Battle Creek Diversion Total - - - - - - - - - General & Administrative Costs Administrative Costs 83,100 62,325 - - - - 62,325 - - General & Administrative Costs Total 83,100 62,325 - - - - 62,325 - - Shared - 100% AEA Bradley Lake Administrative Costs - - - - - - - - 69,726 Shared - 100% AEA Bradley Lake Total - - - - - - - - 69,726 Operating Committee Exp-Audit Bradley Lake Operating Administrative Costs 19,900 14,925 - - 32,520 32,520 (17,595) 19,900 22,494 Bradley Lake Operating Total 19,900 14,925 - - 32,520 32,520 (17,595) 19,900 22,494 Operating Committee Exp-Legal Bradley Lake Operating Administrative Costs 70,000 52,500 - - 86,636 86,636 (34,136) 70,000 231,567 Bradley Lake Operating Total 70,000 52,500 - - 86,636 86,636 (34,136) 70,000 231,567 Operat Committee Exp-Arbitrage Bradley Lake Operating Administrative Costs 5,000 3,750 - - - - 3,750 5,000 33 Bradley Lake Operating Total 5,000 3,750 - - - - 3,750 5,000 33 Trust & Account Fees Bradley Lake Operating Administrative Costs 13,000 9,750 - - - - 9,750 13,000 - Bradley Lake Operating Total 13,000 9,750 - - - - 9,750 13,000 - Misc Admin Bradley Lake Operating Administrative Costs 12,000 9,000 - - 13,604 13,604 (4,604) 12,000 12,976 Bradley Lake Operating Total 12,000 9,000 - - 13,604 13,604 (4,604) 12,000 12,976 Professional Consultants Bradley Lake Operating Labor & Benefits 682,080 511,560 - - 406,886 406,886 104,674 - - Travel 58,500 43,875 - - 3,446 3,446 40,429 - - Contractual 20,000 15,000 - - 119,570 119,570 (104,570) 111,818 84,662 Supplies & Materials 18,000 13,500 - - 6,940 6,940 6,560 - - Other Costs 12,000 9,000 - - - - 9,000 - - Bradley Lake Operating Total 790,580 592,935 - - 536,841 536,841 56,094 111,818 84,662 FERC 920 & 930 - Administrative Expense Total 1,189,980 892,485 - - 936,661 936,661 (44,176) 508,218 698,129 FERC 924 & 925 - Insurance Premiums Insurance Premiums Bradley Lake Operating Administrative Costs 1,015,505 761,629 21,165 - 634,787 655,951 105,678 1,382,444 1,187,246 Bradley Lake Operating Total 1,015,505 761,629 21,165 - 634,787 655,951 105,678 1,382,444 1,187,246 Risk Management Bradley Lake Operating Administrative Costs - - - - - - - 25,000 - Bradley Lake Operating Total - - - - - - - 25,000 - FERC 924 & 925 - Insurance Premiums Total 1,015,505 761,629 21,165 - 634,787 655,951 105,678 1,407,444 1,187,246 FERC 923 - Outside Services Employed Outside Services Employed Bradley Lake Operating Consulting-Administrative 249,375 187,031 - - 82,906 82,906 104,125 - - Bradley Lake Operating Total 249,375 187,031 - - 82,906 82,906 104,125 - - FERC 923 - Outside Services Employed Total 249,375 187,031 - - 82,906 82,906 104,125 - - FERC 928 - Regulatory Commission Expenses FERC Admin Fees Bradley Lake Operating Administrative Costs 150,000 112,500 - - - - 112,500 150,000 172,565 Bradley Lake Operating Total 150,000 112,500 - - - - 112,500 150,000 172,565 FERC Related Prof Services BRADLEY FERC PART 12 INSPECTION Administrative Costs 25,000 18,750 - - 435 435 18,315 25,000 57,905 BRADLEY FERC PART 12 INSPECTION Total 25,000 18,750 - - 435 435 18,315 25,000 57,905 BRADLEY CONTRACTUAL ENGINEER-FERC LICENSE ISSUES Administrative Costs 180,000 135,000 - - - - 135,000 180,000 110,022 BRADLEY CONTRACTUAL ENGINEER-FERC LICENSE ISSUES Total 180,000 135,000 - - - - 135,000 180,000 110,022 FERC 928 - Regulatory Commission Expenses Total 355,000 266,250 - - 435 435 265,815 355,000 340,493 O&M 4% Allocation to Battle Creek (236,473) (177,355) - - - - (177,355) (190,710) - Total Bradley Lake Budget 7,049,495 5,287,121 1,976,640 40,111 1,801,161 3,817,912 1,469,209 6,606,169 5,897,803 Page 5 of 13 Actual Projected Actual Projected Actual Projected @ 6/30/21 TO REPAY Budget @ 6/30/22 TO REPAY Budget @ 6/30/23 TO REPAY Budget Description Expense @6/30/21 FY21 Expense @6/30/22 FY22 Expense @6/30/23 FY23 R&C FUND PROJECTS Governor - 4,052,070 - - 4,052,070 - - 4,052,070 - Replace RFLS - 251,093 - - 251,093 - - 251,093 - Replace Runners - 1,946,733 - - 1,946,733 - - 1,946,733 - Replace cable from dam to power house - 2,321,923 - - 2,321,923 - - 2,321,923 - Replace power system stabilizer - 619,205 - - 619,205 - - 619,205 - Replace two RTUs - 86,905 - - 86,905 - - 86,905 - Culvert Repairs - 675,967 - - 675,967 - - 675,967 - Tower Repair for Jack Frost Heaves - 887,597 - - 887,597 - - 887,597 - Replace Plant and SCADA Controls - 1,344,683 - - 1,344,683 - - 1,344,683 - Vibration Monitoring System - 490 - - 490 - - 490 - Fire Alarm System Replacement 64,452 105,631 150,000 28,593 134,225 150,000 3,173 137,397 1,500,000 Battle Creek Diversion - 1,170,000 - - 1,170,000 - - 1,170,000 - Bradley Replace Electro-Mechanical Relays - 1,277,197 - - 1,277,197 - - 1,277,197 - Fishwater Screen Debris Removal - 312,236 - - 312,236 - - 312,236 - Turbine Nozzel Repair - 1,428,861 - - 1,428,861 - - 1,428,861 - SVC replacement Daves Creek | Soldotna - 8,517,991 - - 8,517,991 - - 8,517,991 - Equipment Storage Shed - 510,550 - - 510,550 - - 510,550 - Emerson Operating System Upgrade - 622,665 - - 622,665 - - 622,665 - Generator #2 Replacement - 953,213 - - 953,213 - - 953,213 - Road Grader - - 370,000 342,330 342,330 - - 342,330 - Battle Creek Construction 3,739,591 3,739,591 3,666,000 - 3,739,591 - - 3,739,591 - Battle Creek Cash Call-Expended 750,000 750,000 750,000 - 750,000 - - 750,000 - Battle Creek Cash Call-Paid by Utilities (750,000) (750,000) (750,000) - (750,000) - - (750,000) - Needle Repairs 1,482,791 1,482,791 1,500,000 - 1,482,791 - - 1,482,791 - Construct Additional Residence - - - 69,594 69,594 980,000 44,404 113,998 - Spillway Raise & Expansion Project - - - 547,699 547,699 800,000 555,734 1,103,433 1,500,000 5,286,834 32,307,392 5,686,000 988,217 33,295,609 1,930,000 603,310 33,898,919 3,000,000 Current Year R&C Repayment (2,209,060) (2,435,902) (2,757,013) Adjust balance to $5 million - - - Interest in Fund Applied to Repayment (269,487) (42,921) (47,787) Net Transfer from Revenue Fund (2,478,548) (2,478,823) (2,804,800) Cumulative Prior Years R&C Repayments (25,518,390) (27,707,352) (29,808,017) Due to (from) Utilities 289,586 378,159 982,197 Adjust Due to R&C Actual - - - (25,228,805) (27,329,193) (28,825,820) NET DUE TO R&C FUND 4,600,040 3,487,592 2,268,300 R&C FUND CASH FLOW PROJECTION Beginning Investment Balance 3,922,231 1,069,523 2,363,808 Disbursements-current year -Accrual (4,906,857) (514,976) - Disbursements-prior year accrued (406,104) (379,977) (473,241) Utilities' R&C Refund (18,294) (289,586) (378,159) Net other cash inflow(outflow) - - - Current year interest earnings 269,487 42,921 47,787 Participants Contributions to R&C Fund 2,209,060 2,435,902 2,757,013 Ending Investment Balance 1,069,523 2,363,808 4,317,208 Accrued Due to (from) Utilities (289,586) (378,159) (982,197) R&C payable back to the revenue fund - - - Accrued R&C vendor Payable at Year End (379,977) (473,241) (603,310) PROJECTED NET DUE + ENDING INVESTMENT BALANCE 5,000,000 5,000,000 5,000,000 REPAYMENT AMOUNT $1,649,677 X 25% $4,139,810 X 25% $238,606.15 X 25% $954,181.79 x 25% $756,665.11 x 25% all 4 years $1,455,830.05 x 25% all 4 years $1,401,948.53 x 25% all 4 years $1,834,499.92 x 25% yr 1 | 25% yr 2 | 50% yr 3 $3,330,802.80 x 25% yr 1 | 32% yr 2 | 25% yr 3 |18% yr4 $5,644,193.08 x 25% all 4 years $1,341,405.96 x 25% all 4 years (FY18) 4th 335,351 $1,715,556.80 x 25% all 4 years (FY19) 3rd 428,889 4th 428,889 $412,050.13 x 25% all 4 years (FY20) 2nd 103,013 3rd 103,013 4th 103,013 $5,286,834.31 x 25% all 4 years (FY21) 1st 1,321,709 2nd 1,321,709 3rd 1,321,709 FY22 ACTUALS 1st 247,054 2nd 247,054 1st 150,828 2,188,962 2,100,664 1,822,603 BRADLEY LAKE R&C FUND DISBURSEMENTS AND REPAYMENTS SCHEDULE D Expenses for the period 07/01/22 to 03/31/23 Page 6 of 13 FY21 FY21 FY22 FY22 FY23 FY23 Budget Actual Budget Actual Budget Actual Battle Creek Diversion 320,000 7,913 - - - - Battle Creek Associated Costs - - 15,000 22,196 15,000 11,986 Vent Enlargment - - 50,000 13,077 50,000 32,407 Pressure Sensor w SCADA - - 25,000 2,807 25,000 540 Power feed to LBC Bridge - - 25,000 19,548 - - Total Non R&C Capital Purchases 320,000 7,913 115,000 57,628 90,000 44,933 BATTLE CREEK CAPITAL PURCHASES NOT FUNDED BY R&C FUND ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT Battle Creek Capital Purchases Schedule E Expenses for the period 07/01/22 to 03/31/23 Page 7 of 13 BATTLE CREEK OPERATIONS & MAINTENANCE SCHEDULE F BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual Summary by expense type Direct Purchases/Travel - - - - - - - - - Staff Professional Services (Direct) - - - - 32,063 32,063 (32,063) 71,000 26,505 Labor & Benefits - - 28,078 878 16,954 45,910 (45,910) - 48,457 Travel - - 53 - 209 262 (262) - 358 Training - - 431 - 31 463 (463) - 682 Contractual 126,000 94,500 13,175 - 39,571 52,746 41,754 126,000 149,484 Consulting-Administrative - - - - 3,513 3,513 (3,513) - 60 Supplies & Materials - - 2,729 - 289 3,018 (3,018) - 9,628 Other Costs - - 952 794 10 1,756 (1,756) - 2,376 Equipment, Furniture & Machinery - - 231 - - 231 (231) - 239 Administrative Costs 54,900 41,175 882 - 35,611 36,493 4,682 11,900 131,166 Indirect Costs - - 35,828 - - 35,828 (35,828) - 50,826 O&M 4% Allocation to Battle Creek 236,473 177,355 - - - - 177,355 190,710 - Total Battle Creek Budget 417,373 313,030 82,360 1,671 128,251 212,283 100,747 399,610 419,780 FERC 535 - Operation Supervision & Engineering Operations Sup/Eng Battle Creek Operating Labor & Benefits - - 3,178 - - 3,178 (3,178) - 3,989 Travel - - 25 - - 25 (25) - 77 Training - - - - - - - - 192 Supplies & Materials - - 13 - - 13 (13) - 44 Indirect Costs - - 4,165 - - 4,165 (4,165) - 5,485 Battle Creek Operating Total - - 7,381 - - 7,381 (7,381) - 9,788 FERC 535 - Operation Supervision & Engineering Total - - 7,381 - - 7,381 (7,381) - 9,788 FERC 537 - Hydraulic Expenses Hydraulic Expenses Battle Creek Operating Labor & Benefits - - 1,913 - - 1,913 (1,913) - 3,019 Travel - - - - - - - - 3 Contractual 81,000 60,750 4 - - 4 60,746 81,000 66,287 Supplies & Materials - - 75 - - 75 (75) - 22 Indirect Costs - - 2,719 - - 2,719 (2,719) - 4,014 Battle Creek Operating Total 81,000 60,750 4,711 - - 4,711 56,039 81,000 73,345 FERC 537 - Hydraulic Expenses Total 81,000 60,750 4,711 - - 4,711 56,039 81,000 73,345 FERC 538 - Electric Expenses Electric Expenses BRADLEY CIRCUITS/RADIO TO BERNICE LK BRADLEY CIRCUITS/RADIO TO BERNICE LK Total - - - - - - - - - Battle Creek Operating Labor & Benefits - - 5,636 - - 5,636 (5,636) - 9,566 Travel - - 28 - - 28 (28) - 206 Training - - 389 - - 389 (389) - 461 Supplies & Materials - - 11 - - 11 (11) - 2 Administrative Costs - - - - - - - - 1,776 Indirect Costs - - 6,774 - - 6,774 (6,774) - 9,271 Battle Creek Operating Total - - 12,838 - - 12,838 (12,838) - 21,282 FERC 538 - Electric Expenses Total - - 12,838 - - 12,838 (12,838) - 21,282 FERC 539 - Misc. Hydraulic Power Generation Expenses Misc Hydro Power Exp BRADLEY CIRCUITS/RADIO TO BERNICE LK Other Costs - - - - - - - - 538 BRADLEY CIRCUITS/RADIO TO BERNICE LK Total - - - - - - - - 538 BRADLEY CIRCUITS BERNICE LK TO ANCH Other Costs - - - - - - - - 84 BRADLEY CIRCUITS BERNICE LK TO ANCH Total - - - - - - - - 84 Battle Creek Operating Labor & Benefits - - 2,351 - - 2,351 (2,351) - 2,952 Training - - 42 - - 42 (42) - 28 Contractual - - 6,344 - - 6,344 (6,344) - 9,860 Supplies & Materials - - 612 - - 612 (612) - 1,288 Other Costs - - 952 794 - 1,746 (1,746) - 1,742 Indirect Costs - - 3,157 - - 3,157 (3,157) - 4,044 Battle Creek Operating Total - - 13,458 794 - 14,251 (14,251) - 19,915 FERC 539 - Misc. Hydraulic Power Generation Expenses Total - - 13,458 794 - 14,251 (14,251) - 20,537 FERC 541 - Maintenance Supervision & Engineering Maint Supervision/Eng Battle Creek Operating Labor & Benefits - - 3,048 - - 3,048 (3,048) - 4,358 Indirect Costs - - 4,165 - - 4,165 (4,165) - 5,530 Battle Creek Operating Total - - 7,213 - - 7,213 (7,213) - 9,888 FERC 541 - Maintenance Supervision & Engineering Total - - 7,213 - - 7,213 (7,213) - 9,888 FERC 542 - Maintenance of Structures Maintenance of Structures Battle Creek Operating Labor & Benefits - - 1,740 - - 1,740 (1,740) - 2,721 Contractual - - 1,613 - - 1,613 (1,613) - 2,715 Supplies & Materials - - 163 - - 163 (163) - 1,604 Equipment, Furniture & Machinery - - 180 - - 180 (180) - 239 Administrative Costs - - - - - - - - 317 Indirect Costs - - 2,476 - - 2,476 (2,476) - 3,419 Battle Creek Operating Total - - 6,172 - - 6,172 (6,172) - 11,015 FERC 542 - Maintenance of Structures Total - - 6,172 - - 6,172 (6,172) - 11,015 FERC 543 - Maintenance of Reservoirs, Dams & Waterways Maint Res, Dams, WWays Battle Creek Operating Labor & Benefits - - 27 - - 27 (27) - 20 ALASKA ENERGY AUTHORITY Page 8 of 13 BATTLE CREEK OPERATIONS & MAINTENANCE SCHEDULE F BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual ALASKA ENERGY AUTHORITY Contractual - - 213 - - 213 (213) - - Indirect Costs - - 13 - - 13 (13) - 24 Battle Creek Operating Total - - 254 - - 254 (254) - 44 FERC 543 - Maintenance of Reservoirs, Dams & Waterways Total - - 254 - - 254 (254) - 44 FERC 544 - Maintenance of Electric Plant Maintenance of Elec Plant Battle Creek Operating Labor & Benefits - - 6,919 - - 6,919 (6,919) - 11,246 Travel - - - - - - - - 18 Contractual - - 130 - - 130 (130) - 4,839 Supplies & Materials - - 314 - - 314 (314) - 906 Indirect Costs - - 9,841 - - 9,841 (9,841) - 15,296 Battle Creek Operating Total - - 17,204 - - 17,204 (17,204) - 32,304 FERC 544 - Maintenance of Electric Plant Total - - 17,204 - - 17,204 (17,204) - 32,304 FERC 545 - Maintenance of Misc. Hydraulic Plant Maint of Misc Hydr Plant Battle Creek Operating Labor & Benefits - - 1,791 - - 1,791 (1,791) - 2,736 Contractual - - 303 - - 303 (303) - - Supplies & Materials - - 1,033 - - 1,033 (1,033) - 3,188 Equipment, Furniture & Machinery - - 49 - - 49 (49) - - Indirect Costs - - 2,517 - - 2,517 (2,517) - 3,744 Battle Creek Operating Total - - 5,693 - - 5,693 (5,693) - 9,668 FERC 545 - Maintenance of Misc. Hydraulic Plant Total - - 5,693 - - 5,693 (5,693) - 9,668 FERC 556 - System Control & Load Dispatching System Cntl & Load Disp Battle Creek Operating Labor & Benefits - - 662 - - 662 (662) - 542 Contractual - - 1,980 - - 1,980 (1,980) - 4,166 Supplies & Materials - - 160 - - 160 (160) - 303 Battle Creek Operating Total - - 2,802 - - 2,802 (2,802) - 5,011 Snow Measurement Battle Creek Operating Contractual - - - - 400 400 (400) - 493 Battle Creek Operating Total - - - - 400 400 (400) - 493 Seismic Service Battle Creek Operating Contractual - - - - 1,664 1,664 (1,664) - 2,147 Battle Creek Operating Total - - - - 1,664 1,664 (1,664) - 2,147 Streamguaging Serv Battle Creek Operating Contractual 45,000 33,750 - - 32,525 32,525 1,225 45,000 52,793 Battle Creek Operating Total 45,000 33,750 - - 32,525 32,525 1,225 45,000 52,793 Permits Battle Creek Operating Other Costs - - - - 10 10 (10) - 12 Battle Creek Operating Total - - - - 10 10 (10) - 12 FERC 556 - System Control & Load Dispatching Total 45,000 33,750 2,802 - 34,599 37,401 (3,651) 45,000 60,457 FERC 562 - Station Expenses Station Expenses Battle Creek Operating Labor & Benefits - - 728 878 - 1,606 (1,606) - 7,242 Travel - - - - - - - - 11 Contractual - - 933 - - 933 (933) - 5,338 Supplies & Materials - - 349 - - 349 (349) - 2,271 Battle Creek Operating Total - - 2,010 878 - 2,888 (2,888) - 14,862 FERC 562 - Station Expenses Total - - 2,010 878 - 2,888 (2,888) - 14,862 FERC 571 - Maintenance of Overhead Lines Maint of OH Lines Battle Creek Operating Labor & Benefits - - 85 - - 85 (85) - 67 Contractual - - 1,655 - - 1,655 (1,655) - 106 Equipment, Furniture & Machinery - - 1 - - 1 (1) - - Battle Creek Operating Total - - 1,741 - - 1,741 (1,741) - 174 FERC 571 - Maintenance of Overhead Lines Total - - 1,741 - - 1,741 (1,741) - 174 FERC 920 & 930 - Administrative Expense AEA Bradley Fixed Admin Fees Bradley Lake Operating Bradley Lake Operating Total - - - - - - - - - Battle Creek Operating Staff Professional Services (Direct) - - - - 32,063 32,063 (32,063) 71,000 26,505 Travel - - - - 66 66 (66) - 42 Training - - - - 31 31 (31) - - Consulting-Administrative - - - - 59 59 (59) - 60 Administrative Costs 43,000 32,250 - - 3,612 3,612 28,638 - 30,409 Battle Creek Operating Total 43,000 32,250 - - 35,830 35,830 (3,580) 71,000 57,016 Shared - 100% AEA Bradley Lake Administrative Costs - - - - - - - - 681 Shared - 100% AEA Bradley Lake Total - - - - - - - - 681 Shared - 100% AEA Battle Creek Administrative Costs - - - - - - - - 9,533 Shared - 100% AEA Battle Creek Total - - - - - - - - 9,533 Operating Committee Exp-Audit Battle Creek Operating Administrative Costs - - - - 1,355 1,355 (1,355) - 1,166 Battle Creek Operating Total - - - - 1,355 1,355 (1,355) - 1,166 Operating Committee Exp-Legal Page 9 of 13 BATTLE CREEK OPERATIONS & MAINTENANCE SCHEDULE F BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual ALASKA ENERGY AUTHORITY Bradley Battle Creek Diversion Administrative Costs - - - - - - - - 133 Bradley Battle Creek Diversion Total - - - - - - - - 133 Battle Creek Operating Administrative Costs 5,000 3,750 - - 3,610 3,610 140 5,000 17,373 Battle Creek Operating Total 5,000 3,750 - - 3,610 3,610 140 5,000 17,373 Operat Committee Exp-Arbitrage Battle Creek Operating Administrative Costs 2,000 1,500 - - - - 1,500 2,000 1,692 Battle Creek Operating Total 2,000 1,500 - - - - 1,500 2,000 1,692 Trust & Account Fees Bradley Battle Creek Diversion Bradley Battle Creek Diversion Total - - - - - - - - - Battle Creek Operating Administrative Costs 4,800 3,600 - - - - 3,600 4,800 4,058 Battle Creek Operating Total 4,800 3,600 - - - - 3,600 4,800 4,058 Misc Admin Battle Creek Operating Administrative Costs 100 75 - - 567 567 (492) 100 654 Battle Creek Operating Total 100 75 - - 567 567 (492) 100 654 Professional Consultants Bradley Lake Operating Bradley Lake Operating Total - - - - - - - - - Battle Creek Operating Labor & Benefits - - - - 16,954 16,954 (16,954) - - Travel - - - - 144 144 (144) - - Contractual - - - - 4,982 4,982 (4,982) - 739 Supplies & Materials - - - - 289 289 (289) - - Battle Creek Operating Total - - - - 22,368 22,368 (22,368) - 739 FERC 920 & 930 - Administrative Expense Total 54,900 41,175 - - 63,730 63,730 (22,555) 82,900 93,044 FERC 924 & 925 - Insurance Premiums Insurance Premiums Battle Creek Operating Administrative Costs - - 882 - 26,449 27,331 (27,331) - 56,628 Battle Creek Operating Total - - 882 - 26,449 27,331 (27,331) - 56,628 FERC 924 & 925 - Insurance Premiums Total - - 882 - 26,449 27,331 (27,331) - 56,628 FERC 923 - Outside Services Employed Outside Services Employed Battle Creek Operating Consulting-Administrative - - - - 3,454 3,454 (3,454) - - Battle Creek Operating Total - - - - 3,454 3,454 (3,454) - - FERC 923 - Outside Services Employed Total - - - - 3,454 3,454 (3,454) - - FERC 928 - Regulatory Commission Expenses FERC Admin Fees Battle Creek Operating Administrative Costs - - - - - - - - 1,685 Battle Creek Operating Total - - - - - - - - 1,685 FERC Related Prof Services BRADLEY FERC PART 12 INSPECTION Administrative Costs - - - - - - - - 566 BRADLEY FERC PART 12 INSPECTION Total - - - - - - - - 566 BRADLEY CONTRACTUAL ENGINEER-FERC LICENSE ISSUES Administrative Costs - - - - - - - - 1,075 BRADLEY CONTRACTUAL ENGINEER-FERC LICENSE ISSUES Total - - - - - - - - 1,075 Battle Creek Operating Administrative Costs - - - - 18 18 (18) - 3,419 Battle Creek Operating Total - - - - 18 18 (18) - 3,419 FERC 928 - Regulatory Commission Expenses Total - - - - 18 18 (18) - 6,745 O&M Allocation to Battle Creek 236,473 177,355 - - - - 177,355 190,710 - Total Battle Creek Budget 417,373 313,030 82,360 1,671 128,251 212,283 100,747 399,610 419,780 Page 10 of 13 FY21 FY21 FY22 FY22 FY23 FY23 Amended Amended Amended Budget Actuals Budget Actuals Budget Actuals SSQ Line Access Documentation 150,000 3,127 - 144,482 - 23,555 SSQ Line Acquisition Costs 40,000 46,029 - 2,026 - - SSQ Soldotna-Qtz Ck 230kV Construction - - 750,000 91,051 - 220,612 SSQ Line Due Diligence Inspect/Repair O/S Fire ZNE - - - 2,350 - - Total Non R&C Capital Purchases 190,000 49,156 750,000 239,908 - 244,167 SSQ LINE CAPITAL PURCHASES NOT FUNDED BY R&C FUND ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT SSQ Line Capital Purchases Schedule H Expenses for the period 07/01/22 to 03/31/23 Page 11 of 13 ALASKA ENERGY AUTHORITY SSQ LINE OPERATIONS & MAINTENANCE SCHEDULE I BUDGET TO ACTUAL EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 03/31/2023 FY 23 FY 22 FY23 Approved Budget BUDGET % 07/01/2022 - 03/31/2023 HEA Actual CEA Actual AEA Actual Total Actual (Over) Under Budget to Date FY22 Approved Budget FY22 Actual Summary by expense type Staff Professional Services (Direct)53,000 39,750 - - 26,401 26,401 13,349 42,000 8,473 Labor & Benefits 56,999 42,749 - - - - 42,749 85,820 5,158 Travel - - - - - - - - 404 Contractual 200,000 150,000 - - - - 150,000 250,000 182,178 Permitting - - - - - - - - 2,848 Supplies & Materials 25,000 18,750 - - - - 18,750 56,992 1,561 Other Costs - - - - 1,275 1,275 (1,275) 7,711 1,250 Administrative Costs 2,000 1,500 - - 2,628 2,628 (1,128) 2,000 66,128 Total SSQ Line Budget 336,999 252,749 - - 30,304 30,304 222,446 444,523 268,001 FERC 540 - Rents FERC Land Use Fee SSQ Line Operating Other Costs - - - - 1,275 1,275 (1,275) - 1,250 SSQ Line Operating Total - - - - 1,275 1,275 (1,275) - 1,250 FERC 540 - Rents Total - - - - 1,275 1,275 (1,275) - 1,250 FERC 556 - System Control & Load Dispatching Permits SSQ Line Operating Permitting - - - - - - - - 2,848 SSQ Line Operating Total - - - - - - - - 2,848 FERC 556 - System Control & Load Dispatching Total - - - - - - - - 2,848 FERC 571 - Maintenance of Overhead Lines Maint of OH Lines SSQ Line Operating Labor & Benefits 56,999 42,749 - - - - 42,749 85,820 5,158 Travel - - - - - - - - 404 Contractual 200,000 150,000 - - - - 150,000 250,000 182,178 Supplies & Materials 25,000 18,750 - - - - 18,750 56,992 1,561 Other Costs - - - - - - - 7,711 - SSQ Line Operating Total 281,999 211,499 - - - - 211,499 400,523 189,301 FERC 571 - Maintenance of Overhead Lines Total 281,999 211,499 - - - - 211,499 400,523 189,301 FERC 920 & 930 - Administrative Expense AEA Bradley Fixed Admin Fees SSQ Capital Acquisition SSQ Capital Acquisition Total - - - - - - - - - SSQ Line Operating Staff Professional Services (Direct)53,000 39,750 - - 26,401 26,401 13,349 42,000 8,473 Administrative Costs (21,500) (16,125) - - 628 628 (16,753) - 39,776 SSQ Line Operating Total 31,500 23,625 - - 27,029 27,029 (3,404) 42,000 48,250 General & Administrative Costs Administrative Costs 21,500 16,125 - - - - 16,125 - - General & Administrative Costs Total 21,500 16,125 - - - - 16,125 - - Shared - 100% AEA SSQ Line Administrative Costs - - - - - - - - 2,310 Shared - 100% AEA SSQ Line Total - - - - - - - - 2,310 Shared - 100% AEA Audit Shared - 100% AEA Audit Total - - - - - - - - - Operating Committee Exp-Legal SSQ Line Operating Administrative Costs - - - - - - - - 22,042 SSQ Line Operating Total - - - - - - - - 22,042 Trust & Account Fees SSQ Line Operating Administrative Costs 2,000 1,500 - - 2,000 2,000 (500) 2,000 2,000 SSQ Line Operating Total 2,000 1,500 - - 2,000 2,000 (500) 2,000 2,000 FERC 920 & 930 - Administrative Expense Total 55,000 41,250 - - 29,029 29,029 12,221 44,000 74,602 FERC 928 - Regulatory Commission Expenses FERC Admin Fees SSQ Line Operating SSQ Line Operating Total - - - - - - - - - FERC 928 - Regulatory Commission Expenses Total - - - - - - - - - Total SSQ Line Budget 336,999 252,749 - - 30,304 30,304 222,446 444,523 268,001 Page 12 of 13 Source Construction Funds at 12/17/20 Investment Expenses Calculated Capital Reserve at 12/17/20 Purchase of HEA SSQ Line Released from Capital Reserve Total Available Funding SSQ Line Series 10 Bond Proceeds 17,000,000 (225,252) (1,239,986) (13,566,179) 810,478 2,779,061 SSQ Line Bond Series 10 Funded Capital Projects Project Total Funding Project Budget Encumbered Total Actual Costs (Over) / Under Project Budget to Date SSQ Line - 69kV Remediation SSQ 2,779,061 1,545,814 1,260,508 435,720 1,110,094 Total 2,779,061 1,545,814 1,260,508 435,720 1,110,094 Source Construction Funds at 11/30/22 Investment Expenses Calculated Capital Reserve at 11/30/22 Earnings (Interest Income) Released from Capital Reserve Total Available Funding Required Project Work Bond Series 11 Funding 166,013,134 (157,250) (12,454,346) 1,437,542 - 154,839,080 BESS Required Project Work Bond Series 11 Funded Capital Projects Allocate Total Funding Project Budget Encumbered Total Actual Costs (Over) / Under Project Budget to Date BRADLEY HEA BESS Preliminary Study 35% 54,193,678 75,000 22,725 706 74,294 Total BESS Capital Projects 54,193,678 75,000 22,725 706 74,294 Transmission Required Project Work Bond Series 11 Funded Capital Projects Allocate Total Funding Project Budget Encumbered Total Actual Costs (Over) / Under Project Budget to Date 65% 100,645,402 - - - - Total Transmission Capital Projects 100,645,402 - - - - Total Required Project Work 154,839,080 75,000 22,725 706 74,294 ALASKA ENERGY AUTHORITY BRADLEY LAKE HYDROELECTRIC PROJECT Capital Projects Funded by Bond Proceeds Appendix A Expenses for the period 7/1/22 to 03/31/23 Page 13 of 13 Page 1 of 2 Bradley Operation and Dispatch Committee Report April - May 2023 Meeting Dates: April 10, 2023 Notable Discussions and Items: 2023-2024 Water Year Inflow Forecast: Two representatives from the NOAA River Forecast Center in Anchorage attended the meeting and provided the first preliminary project inflow forecast for this summer. Both Bradley Lake watershed and the Battle Creek diversion are expected to have near normal inflows of 102% and 103% respectively. While some areas on the Kenai Peninsula have abnormally high snowpack, the Nuka Glacier metering is only reporting 87% of average. The Railbelt utilities will be using this inflow data to develop their generation plans. May – June Project work: Martin Law provided an update on the plant outage work that was scheduled to begin on April 17 and run through May 5th. HEA outlined the planned microwave communication system upgrade that is scheduled for June which will limit the ability for the Utilities to dynamically control Bradley while the work is being performed. Residence Construction Plan: Martin Law provided a cost comparison between various vendors quotes for a prefabricated home package intended to address Bradley’s needs for additional housing. Martin was provided approval to proceed with the procurement of a package from Pacific Homes which appears to provide the best value. Construction is expected to remain with the currently approved budget and be completed by this winter. Page 2 of 2 Figure 1: April 21, 2023, Bradley Lake Level Report Lake Level and Water Availability: Lake levels have continued to decline as the Utilities continue to use their available water. April 1 reports show that MEA had fully used their allocation and GVEA only had 5,130 MWh remaining. HEA and CEA had 12,518 MWH and 16,565 MWH, respectively. Committee Assignments: • No assignments from the BPMC • CEA is continuing work to address SCADA challenges to allow HEA wheeling capacity as defined in the existing Bradley agreements. Next Meeting: May 12, 2023 Current lake level Average lake level