HomeMy WebLinkAbout2020-06-30 IMC Agenda and docs
INTERTIE MANAGEMENT COMMITTEE (IMC)
AGENDA
9:00 a.m. Tuesday, June 30, 2020
Alaska Energy Authority Board Room
813 W Northern Lights Blvd, Anchorage, AK 99503
To participate dial 1-888-585-9008 and when prompted, enter code 676-392-603#
1. CALL TO ORDER
2. ROLL CALL FOR COMMITTEE MEMBERS
3. PUBLIC ROLL CALL
4. PUBLIC COMMENTS
5. AGENDA APPROVAL
6. PRIOR MINUTES – March 27, 2020
7. NEW BUSINESS
A. FY21 IMC BUDGET AMENDMENT, MOTION TO APPROVE IMC/AEA
8. COMMITTEE REPORTS
A. OC REPORT Chair of OC
B. BUDGET REPORT AEA
9. MEMBERS COMMENTS
10. NEXT MEETING DATE – Friday, July 24, 2020
11. ADJOURNMENT
IMC/BPMC 2020 Schedule
July 24, 2020 Annual Meeting/elections
September 25, 2020
December 12, 2020 IMC approve FY20 refund &
BPMC approve FY20 audit/refund
Alaska Intertie FY21 Preliminary Budget - V3
Proposed
FY21
Budget
REVENUES
GVEA 1,255,200
ML&P 231,217
CEA 250,065
MEA 434,064
INTEREST
TOTAL REVENUES 2,170,546
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 8,000
8,000
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)50,000
Cell Phone Comm. Svc for Weather Monitoring (Verizon)15,000
SLMS Support and Intertie Ground Patrol 100,000
165,000
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700
MEA - Talkeetna Storage 7,200
7,900
FERC 569 Maintenance of Structures
MEA - Maintenance of Structures -
-
FERC 570 - Maintenance of Station Equipment
GVEA - Healy, Cantwell, Goldhill 65,000
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill 5,000
GVEA - Healy, Teeland, Goldhill Dampers -
GVEA - Healy SVC Fire Alarm Panel Replacement -
GVEA - Gold Hill SVC Fire Alarm Panel Replacement -
GVEA - Cantwell Install Breakers or Load Break Switches -
GVEA - Cantwell 4S2 Switch Repair -
GVEA - Replace Battery Healy SVC -
GVEA - Replace Battery Goldhill SVC -
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard 10,000
GVEA - Mobile Substation Site -
GVEA - Cantwell RTU replacement -
GVEA - Recloser Control Replacement -
GVEA - Transformer Protection Upgrades -
GVEA - Dissolved Gas Monitoring Gold Hill & Healy -
GVEA - Cantwell Standby Generator Replacement 75,000
GVEA - SVC Intertie Trust Fund Eligible Expenses -
CEA - AK Intertie Yard -
CEA - Teeland Substation 90,000
MEA - Douglas Substation 4,000
MEA - Douglas Substation 138 kV Bus Repair & BKR Inspections 75,000
GVEA - Douglas Substation OOS relaying and communications 50,000
CEA - Telecomm Support (Douglas Substation Communications)10,000
384,000
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 130,000
GVEA - Northern ROW Clearing 130,000
GVEA - Landing Pads -
GVEA - Re-level Structures & Adjust Guys -
GVEA - Repair Tower 748 -
GVEA - Repair Tower 692 -
MEA - Special Patrols [Incl Helicopter Inspections]3,000
MEA - Southern Maint (Incl Ground and Climbing Inspect)160,485
MEA - Southern ROW Clearing 125,000
MEA - TWR 195 Repair Monitoring -
MEA - Equipment Repair and Replacement 850,000
1,398,485
FERC 924 - Property Insurance
AK Intertie - Insurance 44,000
44,000
Intertie Operating Costs Total 2,007,385
FERC 570 - Maintenance of Station Equipment
MEA - Replace Protective Relay Schemes Douglas -
-
Intertie Cost of Improvements Total -
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 90,000
90,000
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)40,000
40,000
FERC 566 - Miscellaneous Transmission Expense
Misc Studies: System Reserves Study, PSS/E maint, AGC Study 290,000
LIDAR study (complete lidar, vegetation, PLS CADD file with drawings,
structure/foundation movement, infrared, and imaging)
300,000
Reliability Standards Update (Hdale Inc.)-
590,000
Intertie Administration Costs Total 720,000
TOTAL EXPENSE 2,727,385
SURPLUS (SHORTAGE)(556,839)
5/29/2020 1 of 3
Alaska Intertie FY21 Preliminary Budget - V3
True up
to
Contract GVEA MEA CEA ML&P TOTAL USAGE CAPACITY ADMIN CASH FLOW
MONTH Value MWH MWH MWH MWH MWH GVEA CEA MEA GVEA MEA ML&P CEA GVEA | MEA | ML&P | CEA TOTALS
Jul 6,621 6,000 2,107 0 0 14,728 $53,520 $0 $18,794 $165,360 $44,078 $51,217 $70,065 $60,000 $463,034
Aug 6,621 8,000 2,004 0 0 16,625 $71,360 $0 $17,876 $60,000 $149,236
Sep 6,621 7,000 1,884 0 0 15,505 $62,440 $0 $16,805 $60,000 $139,245
Oct 6,620 10,000 1,711 0 0 18,331 $89,200 $0 $15,262 $60,000 $164,462
Nov 6,620 8,000 1,715 0 0 16,335 $71,360 $0 $15,298 $60,000 $146,658
Dec 6,620 9,000 2,040 0 0 17,660 $80,280 $0 $18,197 $60,000 $158,477
Jan 6,620 10,000 2,454 0 0 19,074 $89,200 $0 $21,890 $60,000 $171,090
Feb 6,620 10,000 2,008 0 0 18,628 $89,200 $0 $17,911 $60,000 $167,111
Mar 6,620 6,000 1,855 0 0 14,475 $53,520 $0 $16,547 $60,000 $130,067
Apr 6,620 12,000 1,750 0 0 20,370 $107,040 $0 $15,610 $60,000 $182,650
May 6,620 10,000 2,011 0 0 18,631 $89,200 $0 $17,938 $60,000 $167,138
Jun 6,620 6,000 2,002 0 0 14,622 $53,520 $0 $17,858 $60,000 $131,378
TOTAL 79,443 102,000 23,541 0 0 204,984 $909,840 $0 $209,986 $165,360 $44,078 $51,217 $70,065 $720,000 $2,170,546
Total Energy:$1,119,826 Total Capacity :$330,720
204,984 MWH
187,902 MWH
204,984 MWH TOTAL MWH REVENUE 2,170,546$
O&M BUDGET - Operating 2,007,385
O&M BUDGET - Administrative 720,000
UTILITY FY 21 TOTAL O&M BUDGET 2,727,385
MEA 26.66% 20.79 MW SURPLUS (SHORTAGE) (556,839)$
ML&P 30.97% 24.16 MW
CEA 42.37% 33.05 MW Annual Participant Administrative Contribution 180,000$
GVEA 100.00% 78.00 MW Monthly Contribution per Participant 15,000.00$
156.0
Usage Rate per KWH 0.00892$
Capacity Rate per kW $2.12
Section 7.2.2 MINIMUM USAGE CONTRACT VALUE
ALASKA INTERTIE
FISCAL YEAR 2021
ENERGY PROJECTION
TOTAL INTERTIE PROJECTED ENERGY USAGE
Usage estimate reduced by 1/12 of Total for rate calculations
Alaska Intertie FY21 Preliminary Budget - V3
Annual System Demand
17 18 18 19 19 20 3 YR AVG.
SOUTHERN UTILITY PARTICIPANTS (MW)
ML&P 163.0 151.0 153.0 155.7 MW Draft APPROVED APPROVED APPROVED APPROVED APPROVED
CEA 212.4 213.5 213.0 213.0 MW 6/30/2021 6/30/2020 6/30/2019 6/30/2018 6/30/2017 6/30/2016
MEA 128.0 137.0 137.0 134.0 MW UNITS FY21 FY20 FY19 FY18 FY17 FY16
USAGE KWH 187,902,000 187,902,000 297,441,000 422,262,000 357,388,000 167,958,000
BUDGET $ 2,007,385 2,168,391 2,024,298 1,529,178 1,089,145 1,255,900
MITCR KW 156,000 156,000 156,000 156,000 156,000 156,000
TOTAL 502.7 MW
ENERGY (A)$.000/KWH $0.00892 $0.00964 $0.00568 $0.00302 $0.00254 $0.00624
NORTHERN UTILITY PARTICIPANTS (MW)
CAPACITY (B)$/KW $2.12 $2.29 $2.14 $1.62 $1.15 $1.33
GVEA 207 200 191 199.3 MW
TOTAL 199.3 MW
MITCR DETERMINATION
FY 21 KW CAP RATE CAP CHARGES
MEA 26.66% 20.79 MW 20,792 $2.12 44,078.46
ML&P 30.97% 24.16 MW 24,159 $2.12 51,216.53
CEA 42.37% 33.05 MW 33,050 $2.12 70,065.01
GVEA 100.00% 78.00 MW 78,000 $2.12 165,360.00
156.00 MW 156,000 330,720.00
(A) See Section 7.2.5 AK Intertie Agreement
(B) See Section 7.2.6 AK Intertie Agreement
MINIMUM INTERTIE TRANSFER CAPABILITY RIGHTS
(MITCR) DETERMINATION
FOR FISCAL YEAR 2021
Intertie Management Committee Meeting
IOC Report
June 30, 2020
1. Intertie Operating Committee
a. Developing overview document to describe ICCP data exchange requirements for
the purpose of providing clear direction to the SCADA and Telecommunications
Subcommittee.
b. Request AEA provide funding for the Douglas Substation microwave
communication project using the $6.9M grant, if available. ~$500k project cost.
c. Developing ShareFile site for IOC and all Subcommittees. The site will be used to
exchange and store information and documentation. Reviewing to insure
security concerns are addressed before proceeding.
d. LiDAR Project
i. GVEA working with contractor to determine schedule.
e. Marker Ball Project
i. Electric Power Constructors provided winning bid - $693k
ii. Phase 1, Stevens to Cantwell Scheduled July 13 thru 29
iii. Phase 2, Cantwell to Healy – MEA working with contractor to firm up
schedule.
f. Next regular meeting scheduled for August 6
2. Subcommittees
a. Dispatch and System Operations Subcommittee
i. Review current Railbelt maintenance scheduling process and reporting
methodology.
ii. Review current IOC Reliability Report for accuracy in providing data as
required by Railbelt Reliability Standards.
b. Engineering, Relay and Reliability Subcommittee
i. Review the attached United States Bulk Power System Executive Order
from the President. Provide initial analysis regarding potential impacts for
the Alaska Intertie asset.
c. Machine Ratings Subcommittee
i. Schedule meeting with the SSS to review Oscillation Study results. Work
with the SSS to determine the implementation of new settings and tuning
requirements for generation resources as required by the study.
d. SCADA and Telecommunications Subcommittee
i. The IOC is working on a document that will provide guidance to the
committee for what information is requested to be included in the ICCP
data transfer. Upon receiving the IOC document, review and provide
feedback to the IOC.
e. Operations, Maintenance and Scheduling Subcommittee
i. Coordinate a joint meeting with the Dispatch and System Operations
Chair to develop a process for insuring upcoming maintenance projects,
including projects that are tentative, are sufficiently coordinated
between the two subcommittees and other groups including the
Northern and Southern Controllers for the Alaska Intertie.
f. Budget Subcommittee
g. No Assignment
h. System Studies Subcommittee
i. Provide an implementation plan and schedule as required by the
outcome of the Oscillation Study performed by PTI. Provide plan and
schedule to the MRS chair for review. MRS to schedule a meeting with
the SSS.
ii. Send the June 4, 2020 system event to PTI for the purpose of evaluating
which Railbelt grid resources contributed to the osculation.
Alaska Intertie FY20 Status Report for the Period July 1, 2019 through April 30, 2020
Effective 7/1/19 Budget %(OVER)
Approved 07/01/19 ACTUALS UNDER
FY20 Budget 04/30/20 @ 04/30/20 Budget to Date
REVENUES
GVEA 1,709,506 1,424,588 1,426,202 (1,614)
ML&P 237,938 198,282 207,563 (9,282)
CEA 258,090 215,075 227,715 (12,640)
MEA 438,503 365,419 390,841 (25,422)
INTEREST / CAPITAL CREDITS - 16,168 (16,168)
TOTAL REVENUES 2,644,037 2,203,364 2,268,489 (65,125)
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 8,000 6,667 8,809 (2,142) Per GVEA
8,000 6,667 8,809 (2,142)
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)60,000 50,000 4,630 45,370 Per GVEA
Cell Phone Comm. Svc for Weather Monitoring (Verizon)15,000 12,500 10,018 2,482 Per AEA
SLMS Support and Intertie Ground Patrol 100,000 83,333 74,343 8,991 Per AEA
175,000 145,833 88,991 56,842
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 583 700 (117) Fixed
MEA - Talkeetna Storage 7,200 6,000 6,000 - Fixed
7,900 6,583 6,700 (117)
FERC 569 Maintenance of Structures
MEA - Maintenance of Structures 250,000 208,333 - 208,333 Per MEA
250,000 208,333 - 208,333
FERC 570 - Maintenance of Station Equipment
GVEA - Healy, Cantwell, Goldhill 63,812 53,177 96,281 (43,104) Per GVEA
GVEA - Healy, Teeland, Goldhill Dampers 200,000 166,667 59,016 107,651 Per GVEA
GVEA - SCADA Maintenance Healy, Cantwell, Goldhill 10,000 8,333 - 8,333 Per GVEA
GVEA - Healy SVC Fire Alarm Panel Replacement 15,000 12,500 - 12,500 Per GVEA
GVEA - Cantwell 4S2 Switch Repair 50,000 41,667 - 41,667 Per GVEA
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard 10,000 8,333 54,231 (45,898) Per GVEA
CEA - Teeland Substation 96,000 80,000 102,696 (22,696) Per CEA
MEA - Douglas Substation 5,000 4,167 53 4,113 Per MEA
CEA - Telecomm Support (Douglas Substation Communications)5,000 4,167 - 4,167 Per CEA
454,812 379,010 312,277 66,733
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 125,000 104,167 22,975 81,192 Per GVEA
GVEA - Northern ROW Clearing 75,000 62,500 89,493 (26,993) Per GVEA
MEA - Special Patrols [Incl Helicopter Inspections]25,000 20,833 - 20,833 Per MEA
MEA - Southern Maint (Incl Ground and Climbing Inspect)340,000 283,333 91,068 192,266 Per MEA
MEA - Southern ROW Clearing 125,000 104,167 2,316 101,851 Per MEA
MEA - Equipment Repair and Replacement 539,818 449,848 16,521 433,327 Per MEA
1,229,818 1,024,848 222,373 802,475
FERC 924 - Property Insurance
AK Intertie - Insurance 42,861 35,718 21,100 14,618
Per AEA (Gen Liab/
Commercial Umbrella) &
MEA (includes Aviation)
42,861 35,718 21,100 14,618
Intertie Operating Costs Total 2,168,391 1,806,993 660,250 1,146,742
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 89,000 74,167 51,234 22,933 Per AEA
89,000 74,167 51,234 22,933
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)40,000 33,333 9,220 24,113 Per IMC Chair
40,000 33,333 9,220 24,113
FERC 566 - Miscellaneous Transmission Expense
Misc. System Studies 300,000 250,000 69,023 180,977 per IOC
LIDAR Survey 300,000 250,000 - 250,000 per IOC
600,000 500,000 69,023 430,977
Intertie Administration Costs Total 729,000 607,500 129,477 478,023
TOTAL EXPENSE 2,897,391 2,414,493 789,727 1,624,766
SURPLUS (SHORTAGE)(253,354) (211,128) 1,478,762 1,689,891
6/18/2020 1 of 1
Alaska Intertie FY20 Status Report for the Period July 1, 2019 through April 30, 2020
Budgeted Usage Actual Usage to Date
GVEA MEA CEA ML&P TOTAL GVEA MEA CEA ML&P TOTAL
MONTH MWH MWH MWH MWH MWH MONTH MWH MWH MWH MWH MWH
Jul 8,750 2,080 - - 10,830 Jul 14,996 2,164 - - 17,160
Aug 6,300 1,949 - - 8,249 - Aug 17,753 2,039 - - 19,792
Sep 7,500 1,895 - - 9,395 Sep 3,638 1,956 - - 5,594
Oct 10,500 1,548 - - 12,048 Oct 10,207 1,752 - - 11,959
Nov 10,500 1,238 - - 11,738 Nov 9,686 1,774 - - 11,460
Dec 9,100 1,484 - - 10,584 Dec 10,837 1,900 - - 12,737
Jan 11,750 2,061 - - 13,811 Jan 16,001 2,513 - - 18,514
Feb 13,500 1,904 - - 15,404 Feb 14,144 2,046 - - 16,190
Mar 7,000 1,992 - - 8,992 Mar 8,747 2,194 - - 10,941
Apr 32,000 1,685 33,685 Apr 7,630 1,566 9,196
May - May -
Jun - Jun -
TOTAL 116,900 17,836 - - 134,736 TOTAL 113,639 19,904 - - 133,543
INTERTIE PROJECTED ENERGY USAGE TO DATE (MWH)134,736 INTERTIE ACTUAL ENERGY USAGE TO DATE (MWH) 133,543
Budgeted Operating Costs for the period Jul 19-Apr 20 1,806,993$ Actual Operating Costs for the period Jul 19-Apr 20 660,250$
(based on amended budget)
Budgeted Usage Revenue for the period Jul 19-Apr 20 1,298,855$ Actual (Billed) Usage Revenue for the period Jul 19-Apr 20 1,287,355$
(budgeted rate x projected usage)(budgeted rate x actual usage)
Estimated Budgeted Energy Rate per MWH 11.20$
(based on to date budgeted costs and usage)
Annual Budgeted Energy Rate (Billed Rate)9.64$ Projected Actual Energy Rate per MWH 4.13$
(based on minimum contract value)(based on to date actual costs and usage)
6/18/2020 2 of 3
ITF ALASKA INTERTIE TRUST FUND
Key Bank Trust Acct No. 0696488.22
Status Report as of April 30, 2020
BEGINNING BALANCE AS OF 07/01/2019 20,762.78$
INTEREST 53.46
DISBURSEMENTS (20,816.24)
ENDING BALANCE AS OF 04/30/2020 -$
History:
The ITF Alaska Intertie SVCs Fund was setup to account for a trust account
that AIDEA is custodian of for the benefit of the Utilities involved in the
Alaska Intertie Project. This Trust Account is for the purpose of paying for
expenses related to the Static Var System. The account is held at Key Bank.
Any disbursements will be requested by the operating committee or the
Utilities. No trust fee is charged to the account as AIDEA/AEA has a
blanket trust fee agreement with Key Bank for all accounts held by Key
Bank. This trust fund will last as long as the Intertie Mangement
Committee (IMC) requires it.
Also see, Memorandum of Understanding Between AEA and Intertie
Opearting Committee "Utility Participants" - Dated 07/12/1990
6/18/2020 3 of 3