HomeMy WebLinkAbout2021-05-21 IMC Agenda and docs
INTERTIE MANAGEMENT COMMITTEE (IMC)
REGULAR MEETING
AGENDA
Friday May 21, 2021
9:00 AM
Alaska Energy Authority Board Room
813 W Northern Lights Blvd, Anchorage, AK 99503
To participate dial 1-888-585-9008 and use code 212-753-619#
1. CALL TO ORDER
2. ROLL CALL FOR COMMITTEE MEMBERS
3. PUBLIC ROLL CALL
4. PUBLIC COMMENTS
5. AGENDA APPROVAL
6. APPROVAL OF PRIOR MINUTES – March 26, 2021
7. NEW BUSINESS
A. Review of OC Changes to draft FY22 IMC Budget Jeff Warner
B. Approval of FY22 IMC Budget Comment Period posting AEA
8. OLD BUSINESS
A. LIDAR Study status
B. Vegetation management plan development
C. Bylaw Amendments Kirk Gibson
9. COMMITTEE REPORTS
A. OC Report /Operators Report Chair of OC (CEA)
B. Budget to Actuals AEA
10. MEMBERS COMMENTS
11. NEXT MEETING DATE – June 25, 2021
12. ADJOURNMENT
Alaska Intertie FY22 Proposed Budget - Draft V5
FY21 Approved Proposed
FY18 FY19 FY20 ACTUALS FY21 FY22
Actual Actual Actual @ 03/31/21 Budget Budget
REVENUES
GVEA 1,819,599 1,856,523 1,554,543 1,398,049 1,255,200 1,703,854
ML&P 285,075 146,246 237,938 101,217 231,217
CEA 298,554 166,406 258,090 240,065 250,065 225,259 FY22 - CEA combined with ML&P
MEA 350,920 247,774 448,478 352,061 434,064 361,596
INTEREST 6,636 32,412 16,611 259
TOTAL REVENUES 2,760,783 2,449,361 2,515,661 2,091,650 2,170,546 2,290,710
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 7,624 7,199 9,675 7,462 8,000 8,000 Per GVEA
7,624 7,199 9,675 7,462 8,000 8,000
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)47,810 32,793 11,718 4,167 50,000 18,000 Per GVEA
Cell Phone Comm. Svc for Weather Monitoring (Verizon)11,736 12,022 12,022 8,898 15,000 12,000 Per AEA
SLMS Support and Intertie Ground Patrol 59,073 79,290 87,863 81,183 100,000 100,000 Per AEA
Misc Studies as needed (Cyber Security Study)- - - - - -
118,618 124,105 111,603 94,248 165,000 130,000
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 700 700 700 700 700 Fixed
MEA - Talkeetna Storage 7,200 7,200 7,200 5,400 7,200 7,200 Fixed
PSSE key replacement - - - -
7,900 7,900 7,900 6,100 7,900 7,900
FERC 569 Maintenance of Structures
MEA - Maintenance of Structures - - - - - - Per MEA
- - - - - -
- - - -
FERC 570 - Maintenance of Station Equipment
GVEA - Perform Maintenance - Healy, Cantwell, Goldhill 46,976 14,892 104,224 98,366 65,000 74,340 Per GVEA
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill 6,265 1,790 - - 5,000 5,000 Per GVEA
GVEA - Healy, Teeland, Goldhill Dampers - - 59,016 - - - Per GVEA
GVEA - Healy and Goldhill Digital Fault Recorders - - - - - 90,000 Per IOC
GVEA - Healy SVC Fire Alarm Panel Replacement - 1,697 - - - - Per GVEA
GVEA - Gold Hill SVC Cooling - - - - - 65,000 Per GVEA
GVEA - Cantwell Install Breakers or Load Break Switches - - - - 266,000 Per GVEA
GVEA - Cantwell 4S2 Switch Repair 3,778 - - - - Per GVEA
GVEA - Replace Battery Goldhill SVC 3,272 - - - - Per GVEA
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard 6,785 19,820 60,414 127,717 10,000 - Per GVEA
GVEA - Perform Maintenance, repaint Reactors Gold Hill SVC Yard - - - - - 80,000 Per GVEA
GVEA - Cantwell RTU, Recloser, & Transformer Protection replacement - - - - - - Per GVEA
GVEA - Cantwell Standby Generator Replacement 29,016 75,000 Per GVEA
CEA - Teeland Substation 70,882 82,890 113,849 115,680 90,000 85,000 Per CEA
MEA - Douglas Substation 72,440 91 96 18,667 4,000 - Per MEA
MEA - Douglas Substation 138 kV Bus Repair & BKR Inspections 75,000 Per MEA
MEA - Douglas Substation Breaker Replacement 119,645 - - - - Per MEA
GVEA - Douglas Substation OOS relaying and communications 610 - - 50,000 - Per GVEA
CEA - Telecomm Support (Douglas, Teeland, Anc-Fbks Leased Circuits)31,403 2,125 - - 10,000 - Per CEA
362,057 123,305 337,598 389,445 384,000 665,340
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 42,580 147,299 37,171 15,059 130,000 78,000 Per GVEA
GVEA - Northern ROW Clearing 15,321 99,382 89,493 36,721 130,000 73,000 Per GVEA
GVEA - Repair Tower 748 486,740 677,877 - - - Per GVEA
MEA - Special Patrols [Incl Helicopter Inspections]- 4,571 - 3,000 5,000 Per MEA Patrols and Contractor Inspections
MEA - Southern Maint (Incl Ground and Climbing Inspect)187,283 181,802 97,175 12,601 160,485 200,000 Per MEA structures 70-129
MEA - Southern ROW Clearing 39,184 76,703 38,023 228,413 125,000 150,000 Per MEA Clearing from structure 70-129
MEA - Equipment Repair and Replacement - 16,521 771,942 850,000 640,000 Per MEA 137 Marker Balls FAA and 1-10' H Pile at structure 319
771,108 1,187,634 278,383 1,064,736 1,398,485 1,146,000
FERC 924 - Property Insurance
AK Intertie - Insurance 35,466 33,909 36,253 21,369 44,000 35,650
Per AEA (Gen Liab/Commercial
Umbrella) & MEA (includes
Aviation)
35,466 33,909 36,253 21,369 44,000 35,650
Intertie Operating Costs Total 1,302,773 1,484,052 781,413 1,583,361 2,007,385 1,992,890
FERC 570 - Maintenance of Station Equipment
MEA - Replace Protective Relay Schemes Douglas 843,382 6,324 - - - - Per MEA
843,382 6,324 - - - -
Intertie Cost of Improvements Total 843,382.08 6,324 - - - -
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 99,383 85,139 101,058 103,738 90,000 100,000 Per AEA
99,383 85,139 101,058 103,738 90,000 100,000
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)22,364 18,211 11,533 9,996 40,000 17,500 Per IMC Chair
22,364 18,211 11,533 9,996 40,000 17,500
FERC 566 - Miscellaneous Transmission Expense
Misc Studies: System Reserves Study, PSS/E maint, AGC Study 15,680 20,719 69,023 68,978 290,000 200,000 per IOC
LIDAR study (complete lidar, vegetation, PLS CADD file with drawings,
structure/foundation movement, infrared, and imaging)
226,125 300,000 - per IOC
15,680 20,719 69,023 295,103 590,000 200,000
Intertie Administration Costs Total 137,427 124,069 181,614 408,836 720,000 317,500
TOTAL EXPENSE 2,283,583 1,614,445 963,027 1,992,198 2,727,385 2,310,390
SURPLUS (SHORTAGE)477,200 834,916 1,552,634 99,452 (556,839) (19,680)
5/14/2021 1 of 3
Alaska Intertie FY22 Proposed Budget - Draft V5
True up
to
Contract GVEA MEA CEA TOTAL USAGE CAPACITY ADMIN CASH FLOW
MONTH Value MWH MWH MWH MWH GVEA MEA CEA GVEA MEA CEA GVEA | MEA | CEA TOTALS
Jul 1,620 11,050 1,795 0 14,465 $97,903 $15,904 $0 $164,580 $45,365 $119,426 $26,459 $469,637
Aug 1,620 8,973 2,008 0 12,601 $79,501 $17,791 $0 $26,459 $123,751
Sep 1,620 13,749 1,952 0 17,321 $121,816 $17,295 $0 $26,459 $165,570
Oct 1,621 28,741 1,821 0 32,183 $254,645 $16,134 $0 $26,459 $297,238
Nov 1,621 10,171 1,786 0 13,578 $90,115 $15,824 $0 $26,458 $132,397
Dec 1,621 8,962 2,048 0 12,631 $79,403 $18,145 $0 $26,458 $124,006
Jan 1,621 12,043 2,395 0 16,059 $106,701 $21,220 $0 $26,458 $154,379
Feb 1,621 8,513 2,070 0 12,204 $75,425 $18,340 $0 $26,458 $120,223
Mar 1,621 5,617 2,168 0 9,406 $49,767 $19,208 $0 $26,458 $95,433
Apr 1,621 12,448 1,798 0 15,867 $110,289 $15,930 $0 $26,458 $152,677
May 1,621 9,247 1,966 0 12,834 $81,928 $17,419 $0 $26,458 $125,805
Jun 1,621 32,274 1,940 0 35,835 $285,948 $17,188 $0 $26,458 $329,594
TOTAL 19,449 161,788 23,747 0 204,984 $1,433,441 $210,398 $0 $164,580 $45,365 $119,426 $317,500 $2,290,710
Total Energy:$1,643,839 Total Capacity :$329,371
204,984 MWH
187,902 MWH
204,984 MWH TOTAL MWH REVENUE 2,290,710$
O&M BUDGET - Operating 1,992,890
O&M BUDGET - Administrative 317,500
UTILITY FY 22 TOTAL O&M BUDGET 2,310,390
MEA 27.50%21.50 MW SURPLUS (SHORTAGE)(19,680)$
CEA 72.50%56.60 MW
GVEA 100.00%78.00 MW Annual Participant Administrative Contribution 105,833$
156.1 Monthly Contribution per Participant 8,819.44$
Usage Rate per KWH 0.00886$
Capacity Rate $2.11
Section 7.2.2 MINIMUM USAGE CONTRACT VALUE
ALASKA INTERTIE
FISCAL YEAR 2022
ENERGY PROJECTION
TOTAL INTERTIE PROJECTED ENERGY USAGE
Usage estimate reduced by 1/12 of Total for rate calculations
5/14/2021
Alaska Intertie FY22 Proposed Budget - Draft V5
Annual System Demand
18-19 19-20 20-21 3 YR AVG.
SOUTHERN UTILITY PARTICIPANTS (MW)
DRAFT APPROVED APPROVED APPROVED
CEA 375.4 364.5 366.0 368.6 MW 6/30/2022 6/30/2021 6/30/2020 6/30/2019
MEA 137.0 137.0 145.0 139.7 MW UNITS FY22 FY21 FY20 FY19
USAGE KWH 187,902,000 187,902,000 187,902,000 297,441,000
BUDGET $1,992,890 2,007,385 2,168,391 2,024,298
MITCR KW 156,100 156,000 156,000 156,100
TOTAL 508.3 MW
ENERGY (A)$.000/KWH $0.00886 $0.00892 $0.00964 $0.00568
NORTHERN UTILITY PARTICIPANTS (MW)
CAPACITY (B)$/KW $2.11 $2.12 $2.29 $2.14
GVEA 200 191 204 198.3 MW
TOTAL 198.3 MW
MITCR DETERMINATION
FY 22 KWH CAP RATE CAP CHARGES
MEA 27.50%21.50 MW 21,500 $2.11 45,365.00
CEA 72.50%56.60 MW 56,600 $2.11 119,426.00
GVEA 100.00%78.00 MW 78,000 $2.11 164,580.00
156.10 MW 156,100 329,371.00
(A) See Section 7.2.5 AK Intertie Agreement
(B) See Section 7.2.6 AK Intertie Agreement
MINIMUM INTERTIE TRANSFER CAPABILITY RIGHTS
(MITCR) DETERMINATION
FOR FISCAL YEAR 2022
5/14/2021
Intertie Management Committee Meeting
Intertie Operating Committee Report
May 21, 2021
1. Intertie Operating Committee (IOC)
a. The IOC last met on April 30, 2021.
b. Alaska Intertie Vegetation Management Policy
i. MEA and GVEA have assigned Managers to work together to adopt best
practices from each respective utility to include in a single procedure for the
Intertie. The procedure will include clearing cycles.
c. Lidar
i. The contract for this work has the deliverables due by May 30, 2021. (This
looks to be on tract) The contractor has reported that they are in the final
approval phase and finishing the second review. When completed we will
have a final report to provide the committee. Some preliminary reports have
been produced and reviewed by this committee. The preliminary reports
have had a couple concerns that have been addressed from these reports.
We have fixed two hot spots, investigated two clearance issues and removed
one Eagles nest to date.
d. Current studies
i. The contract was awarded to EPS and they are well into the benchmarking of
the PSS/E model. The target completion for that task is May 31, at which point
EPS will transition to the analysis and report portion of the study.
e. Douglas Communication Project
i. SCADA subcommittee is in the final stages of finalizing the cost estimate to
improve communications between Teeland and Healy substations.
f. Budget
i. The IOC unanimously agreed remove the $285k line item that was
substantially related to replacing equipment used to serve distribution load
in the Cantwell area.
ii. The IOC unanimously agreed to include a $90k budget line item to add
digital fault recorders to Goldhill and Healy SVC’s
iii. The IOC unanimously agreed to add a $65k line item to improve airflow to
prevent overheating in the SVC building.
PART 2: EVENT SUMMARY
05/19/2021
TO01/01/2021 03/31/2021
IOC QUARTERLY RELIABILITY REPORT
Event
Num
Date/Time Duration Description Freq
extreme
Intertie Kenai
opened opened
Unit Line
Trip Trip
BESS Silos Load
Shed
Comments
1,121 01/12/2021 06:24:07 SPP Unit 13 trip during switching. 59.62 X 0.0 0.0 7.30.3
1,122 02/17/2021 03:32:59 HLP ST1 Trip 59.90 X 0.0 0.0 0.01.9
1,123 02/25/2021 16:07:38 SPP Unit 13 Ramp and Trip due to
node fault.
59.79 X 0.0 0.0 10.30.1
1,124 02/24/2021 05:35:07 HLP ST2 Trip 59.68 X 0.0 0.0 17.10.4
1,125 02/28/2021 12:16:12 HLP ST1 Trip 59.88 X 0.0 0.0 0.00.7
1,126 03/15/2021 20:36:21 HLP ST2 Trip 59.72 X 0.0 0.0 17.50.9
1,127 03/24/2021 13:06:14 NPC Trip (caused by NIS-NPC
138kV Line Tripping)
59.19 X 0.0 0.0 0.03.6
1,128 03/24/2021 13:36:38 HLP ST2 Trip 59.50 X 0.0 0.0 0.01.2
1,129 03/27/2021 14:33:41 HLP ST2 Trip 59.68 X 0.0 0.0 0.00.5
1,130 03/29/2021 07:40:24 BCT Unit 4 trip 59.74 X 0.0 0.0 0.06.6
1.62Average Duration
*has sub event
PART 2: EVENT SUMMARY
05/19/2021
TO04/01/2021 06/30/2021
IOC QUARTERLY RELIABILITY REPORT
Event
Num
Date/Time Duration Description Freq
extreme
Intertie Kenai
opened opened
Unit Line
Trip Trip
BESS Silos Load
Shed
Comments
1,131 04/26/2021 17:20:29 138 kV CSS to GHS Trip 60.19 X 0.0 23.3 0.02.1
1,132 04/28/2021 10:16:29 HLP ST1 Trip 59.82 X 0.0 0.0 0.01.7
1,133 05/02/2021 12:20:00 HLP ST1 Trip 59.83 X 0.0 0.0 0.07.7
1,134 05/03/2021 16:08:30 HLP ST1 Trip 59.77 X 0.0 0.0 12.10.6
1,135 05/04/2021 04:31:24 HLP ST2 Trip 59.69 X 0.0 0.0 0.00.8
2.58Average Duration
*has sub event
Effective 7/1/20 YTD Actuals as a OVER
Approved % of Total (UNDER)
FY21 Budget YTD Budget YTD Actuals Annual Budget YTD Variance
REVENUES
GVEA 1,255,200 960,440 1,398,049 111.4%437,609
ML&P 231,217 186,217 101,217 43.8%(85,000)
CEA 250,065 205,065 240,065 96.0%35,000
MEA 434,064 337,658 352,061 81.1%14,403
INTEREST / CAPITAL CREDITS - 259 0.0%259
TOTAL REVENUES 2,170,546 1,689,380 2,091,650 96.4%402,270
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 8,000 6,000 7,462 93.3%1,462
8,000 6,000 7,462 93.3%1,462
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)50,000 37,500 4,167 8.3%(33,333)
Cell Phone Comm. Svc for Weather Monitoring (Verizon)15,000 11,250 8,898 59.3%(2,352)
SLMS Support and Intertie Ground Patrol 100,000 75,000 81,183 81.2%6,183
165,000 123,750 94,248 57.1%(29,502)
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 525 700 100.0%175
MEA - Talkeetna Storage 7,200 5,400 5,400 75.0%-
7,900 5,925 6,100 77.2%175
FERC 570 - Maintenance of Station Equipment
GVEA - Healy, Cantwell, Goldhill 65,000 48,750 98,366 151.3%49,616
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill 5,000 3,750 - 0.0%(3,750)
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard 10,000 7,500 127,717 1277.2%120,217
GVEA - Cantwell Standby Generator Replacement 75,000 56,250 29,016 38.7%(27,234)
CEA - Teeland Substation 90,000 67,500 115,680 128.5%48,180
MEA - Douglas Substation 4,000 3,000 18,667 466.7%15,667
MEA - Douglas Substation 138 kV Bus Repair & BKR Inspections 75,000 56,250 - 0.0%(56,250)
GVEA - Douglas Substation OOS relaying and communications 50,000 37,500 - 0.0%(37,500)
CEA - Telecomm Support (Douglas Substation Communications)10,000 7,500 - 0.0%(7,500)
384,000 288,000 389,445 101.4%101,445
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 130,000 97,500 15,059 11.6%(82,441)
GVEA - Northern ROW Clearing 130,000 97,500 36,721 28.2%(60,779)
MEA - Special Patrols [Incl Helicopter Inspections]3,000 2,250 - 0.0%(2,250)
MEA - Southern Maint (Incl Ground and Climbing Inspect)160,485 120,364 12,601 7.9%(107,762)
MEA - Southern ROW Clearing 125,000 93,750 228,413 182.7%134,663
MEA - Equipment Repair and Replacement 850,000 637,500 771,942 90.8%134,442
1,398,485 1,048,864 1,064,736 76.1%15,873
FERC 924 - Property Insurance
AK Intertie - Insurance 44,000 33,000 21,369 48.6%(11,631)
44,000 33,000 21,369 48.6%(11,631)
Intertie Operating Costs Total 2,007,385 1,505,539 1,583,361 78.9%77,822
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 90,000 67,500 103,738 115.3%36,238
90,000 67,500 103,738 115.3%36,238
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)40,000 30,000 9,996 25.0%(20,004)
40,000 30,000 9,996 25.0%(20,004)
FERC 566 - Miscellaneous Transmission Expense
Misc. System Studies 290,000 217,500 68,978 23.8%(148,522)
LIDAR Survey 300,000 225,000 226,125 75.4%1,125
590,000 442,500 295,103 50.0%(147,397)
Intertie Administration Costs Total 720,000 540,000 408,836 56.8%(131,164)
TOTAL EXPENSE 2,727,385 2,045,539 1,992,198 73.0%(53,341)
SURPLUS (SHORTAGE)(556,839) (356,159) 99,452 -17.9%455,611
Alaska Intertie FY21 Status Report for the Period July 1, 2020 through March 31, 2021
5/12/2021 1 of 2
Alaska Intertie FY21 Status Report for the Period July 1, 2020 through March 31, 2021
Budgeted Usage Actual Usage to Date
GVEA MEA CEA ML&P TOTAL GVEA MEA CEA ML&P TOTAL
MONTH MWH MWH MWH MWH MWH MONTH MWH MWH MWH MWH MWH
Jul 6,000 2,107 - - 8,107 Jul 2,248 786 - - 3,034
Aug 8,000 2,004 - - 10,004 - Aug 7,617 1,628 - - 9,245
Sep 7,000 1,884 - - 8,884 Sep 12,672 1,651 - - 14,323
Oct 10,000 1,711 - - 11,711 Oct 14,089 1,817 - - 15,906
Nov 8,000 1,715 - - 9,715 Nov 14,115 2,065 - - 16,180
Dec 9,000 2,040 - - 11,040 Dec 14,530 2,154 - - 16,684
Jan 10,000 2,454 - - 12,454 Jan 16,895 2,197 - - 19,092
Feb 10,000 2,008 - - 12,008 Feb 23,148 2,082 - - 25,230
Mar 6,000 1,855 - - 7,855 Mar 14,870 2,210 - - 17,080
Apr 12,000 1,750 - - 13,750 Apr - - - - -
May 10,000 2,011 - - 12,011 May - - - - -
Jun 6,000 2,002 - - 8,002 Jun - - - - -
- -
TOTAL 102,000 23,541 - - 125,541 TOTAL 120,184 16,590 - - 136,774
INTERTIE PROJECTED ENERGY USAGE TO DATE (MWH)91,778 INTERTIE ACTUAL ENERGY USAGE TO DATE (MWH) 136,774
Budgeted Operating Costs for the period Jul 20-Mar 21 1,505,539$ Actual Operating Costs for the period Jul 20-Mar 21 1,583,361$
(based on amended budget)
Budgeted Usage Revenue for the period Jul 20-Mar 21 818,660$ Actual (Billed) Usage Revenue for the period Jul 20-Mar 21 1,220,024$
(budgeted rate x projected usage)(budgeted rate x actual usage)
Estimated Budgeted Energy Rate per MWH 13.70$
(based on to date budgeted costs and usage)
Annual Budgeted Energy Rate (Billed Rate)8.92$ Projected Actual Energy Rate per MWH 9.67$
(based on minimum contract value)(based on to date actual costs and usage)
5/12/2021 2 of 2