HomeMy WebLinkAbout2022-05-20 IMC Agenda and docs INTERTIE MANAGEMENT COMMITTEE (IMC)
REGULAR MEETING
AGENDA- REVISED-v2
May 20, 2022 9:00 AM
Alaska Energy Authority Board Room 813 W Northern Lights Blvd, Anchorage, AK 99503 To participate dial 1-888-585-9008 and use code 212-753-619#
1. CALL TO ORDER
2. ROLL CALL FOR COMMITTEE MEMBERS
3. PUBLIC ROLL CALL
4. PUBLIC COMMENTS
5. AGENDA APPROVAL
6. APPROVAL OF PRIOR MINUTES – March 25, 2022
7. NEW BUSINESS
A. FY22 IMC Budget Amendment AEA
B. FY23 IMC Budget AEA
C. Federal Funding Opportunities for Railbelt Transmission Upgrades
8. OLD BUSINESS
A. Strategic Plan for Intertie IOC
9. COMMITTEE REPORTS
A. Operators Report / OC REPORT Chair of OC
B. BUDGET to ACTUALS AEA
10. MEMBERS COMMENTS
11. NEXT MEETING DATE – June 24, 2022
12. ADJOURNMENT
813 West Northern Lights Boulevard, Anchorage, Alaska 99503 T 907.771.3000 Toll Free 888.300.8534 F 907.771.3044
REDUCING THE COST OF ENERGY IN ALASKA AKENERGYAUTHORITY.ORG
RGYAUTHORITY.ORG
MEMORANDUM
TO: Alaska Intertie Management Committee
FROM: Dona Keppers, Chief Financial Officer
THROUGH: Curtis W. Thayer, Executive Director, Alaska Energy Authority
DATE: May 18, 2022
RE: FY22 Budget Shortfall
The FY22 Alaska Intertie Budget to Actual Report for the period ended March 31, 2022 indicates
there is a $63,000 budget shortfall in the AEA Administrative (Personal Services, Travel and
Other Costs) cost category for FERC account 920. As of March 31, 2022, the Alaska Intertie
agreement threshold of $100,000 per line item has not been met. However, for the fiscal year
ended June 30, 2022, the shortfall is expected to be approximately $120,000 if the budget is not
increased at this time.
3Q22 costs are trending similar to the prior year and the annual administrative costs are
forecasted to total approximately $216,000 based on an average. Prior year actual spend was
$210,000 with a $90,000 FY21 approved budget amount. FY22 budget amount is currently at
$100,000 and if unadjusted, the by fiscal year will end at a deficit.
To meet threshold requirements, FY22 Budget Amendment 1, to increase the Administrative cost
budget by $120,000, is being presented for consideration. If approved, the FY22 AEA
Administrative Cost budget would be $220,000.
Page 1 of 4
Alaska Intertie FY23 Proposed Budget
FY22 Approved Proposed
FY20 FY21 ACTUALS FY22 FY23
Actual Actual @ 3/31/22 Budget Budget
REVENUES
GVEA 1,554,543 1,942,988 1,445,023 1,703,855 2,659,181
ML&P 237,938 111,217
CEA 258,090 290,065 198,801 225,259 405,435
MEA 448,478 460,479 291,246 361,596 440,368
INTEREST 16,611 903 100
TOTAL REVENUES 2,515,661 2,805,652 1,935,170 2,290,710 3,504,985
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 9,675 9,382 30,675 8,000 - Per GVEA
9,675 9,382 30,675 8,000 -
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)11,718 5,556 4,167 18,000 10,000 Per GVEA
Cell Phone Comm. Svc for Weather Monitoring (Verizon)12,022 11,904 9,020 12,000 13,000 Per AEA
SLMS Support and Intertie Ground Patrol 87,863 98,540 117,339 100,000 140,000 Per AEA
Misc Studies as needed (Cyber Security Study)- - - - -
111,603 116,000 130,526 130,000 163,000
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 700 700 700 700 Fixed
MEA - Talkeetna Storage 7,200 7,200 5,175 7,200 7,200 Fixed
PSSE key replacement - - -
7,900 7,900 5,875 7,900 7,900
FERC 569 Maintenance of Structures
MEA - Maintenance of Structures - - - - - Per MEA
- - - - -
- - -
FERC 570 - Maintenance of Station Equipment
GVEA - Healy, Cantwell, Goldhill 104,224 154,917 55,625 74,340 75,000 Per GVEA
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill - - - 5,000 5,000 Per GVEA
GVEA - Replace Healy Substation Breaker B17 - Per GVEA
GVEA - Healy, Teeland, Goldhill Dampers 59,016 - - - - Per GVEA
GVEA - Healy and Goldhill Digital Fault Recorders 51,451 90,000 Per IOC
GVEA - Healy SVC Fire Alarm Panel Replacement - - - - - Per GVEA
GVEA - Gold Hill SVC Fire Alarm Panel Replacement - - - - - Per GVEA
GVEA - Gold Hill SVC Cooling 460 65,000 Per GVEA
GVEA - Cantwell Install Breakers or Load Break Switches - - 1,681 266,000 156,000 Per GVEA
GVEA - Cantwell 4S2 Switch Repair - - - - - Per GVEA
GVEA - Replace Battery Healy SVC - - - - - Per GVEA
GVEA - Replace Battery Goldhill SVC - - - - - Per GVEA
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard 60,414 145,494 - - - Per GVEA
GVEA - Perform Maintenance, repaint Reactors Gold Hill SVC Yard 7,266 80,000 80,000 Per GVEA
GVEA - Mobile Substation Site - - - - - Per GVEA
GVEA - Cantwell RTU, Recloser, & Transformer Protection replacement - - - - - Per GVEA
GVEA - Recloser Control Replacement - - - - - Per GVEA
GVEA - Transformer Protection Upgrades - - - - - Per GVEA
GVEA - Dissolved Gas Monitoring Gold Hill & Healy - - - - - Per GVEA
GVEA - Cantwell Standby Generator Replacement 29,016 - Per GVEA
GVEA - SVC Intertie Trust Fund Eligible Expenses - - - - - Per GVEA
SVC ALASKA INTERTIE TRUST FUND - - - - - Per IMC
CEA - AK Intertie Yard - - - - -
CEA - Teeland Substation Communication 1,742 5,000 Per CEA
CEA - Teeland Substation 113,849 183,401 112,216 85,000 168,200 Per CEA
MEA - Douglas Substation 96 26,115 - - - Per MEA
MEA - Douglas Substation 138 kV Bus Repair & BKR Inspections - 25,000 Per MEA
MEA - Douglas Substation Breaker Replacement - - - - - Per MEA
GVEA - Douglas Substation OOS relaying and communications - - - - - Per GVEA
CEA - Telecomm Support (Douglas, Teeland, Anc-Fbks Leased Circuits)- - - - - Per CEA
337,598 538,943 230,441 665,340 514,200
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 37,171 68,204 86,845 78,000 100,000 Per GVEA
GVEA - Northern ROW Clearing 89,493 36,721 68,882 73,000 300,000 Per GVEA
GVEA - Landing Pads - - - Per GVEA
GVEA - Re-level Structures & Adjust Guys - - - Per GVEA
GVEA - Repair Tower 531 Foundation 50,000 Per GVEA
GVEA - Repair Tower 532 Foundation 50,000 Per GVEA
GVEA - Repair Tower 748 - - - Per GVEA
GVEA - Repair Tower 692 - - - Per GVEA
MEA - Special Patrols [Incl Helicopter Inspections]599 5,000 10,000 Per MEA
MEA - Southern Maint (Incl Ground and Climbing Inspect)97,175 138,199 62,612 200,000 140,000 Per MEA
MEA - Southern ROW Clearing 38,023 228,413 134,945 150,000 500,000 Per MEA
MEA - TWR 195 Repair Monitoring - - - Per MEA
MEA - Equipment Repair and Replacement 16,521 780,866 - 640,000 684,000 Per MEA
278,383 1,252,403 353,883 1,146,000 1,834,000
FERC 924 - Property Insurance
AK Intertie - Insurance 36,253 38,773 21,517 35,650 25,000
Per AEA (Gen
Liab/Comm Umbrella)
& MEA (incl Aviation)
36,253 38,773 21,517 35,650 25,000
Intertie Operating Costs Total 781,413 1,963,401 772,917 1,992,890 2,544,100
Page 2 of 4
FERC 570 - Maintenance of Station Equipment
MEA - Replace Protective Relay Schemes Douglas - - - - - Per MEA
- - - - -
Intertie Cost of Improvements Total - - - - -
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 101,058 210,409 162,363 100,000 200,000 Per AEA
101,058 210,409 162,363 100,000 200,000
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)11,533 30,890 15,616 17,500 20,000 Per IMC Chair
11,533 30,890 15,616 17,500 20,000
FERC 566 - Miscellaneous Transmission Expense
Misc Studies: System Reserves Study, PSS/E maint, AGC Study 69,023 186,675 69,952 200,000 216,000 per IOC
LIDAR study (complete lidar, vegetation, PLS CADD file with drawings,
structure/foundation movement, infrared, and imaging)
226,125
- -
Asset management plan 50,000 per IOC
Proposed Synchrophaser system 230,000 per IOC
Unbalanced Snow Load mitigation analysis and recommendations 50,000
Reliability Standards Update (Hdale Inc.)- - - per IOC
69,023 412,800 69,952 200,000 546,000
Intertie Administration Costs Total 181,614 654,099 247,931 317,500 766,000
TOTAL EXPENSE 963,027 2,617,500 1,020,848 2,310,390 3,310,100
SURPLUS (SHORTAGE)1,552,634 188,152 914,322 (19,680) 194,885
Page 3 of 4
Alaska Intertie FY23 Proposed Budget
True up
to
Contract GVEA MEA CEA TOTAL USAGE CAPACITY ADMIN CASH FLOW
MONTH Value MWH MWH MWH MWH GVEA MEA CEA GVEA MEA CEA GVEA | MEA | CEA TOTALS
Jul 32,301 1,918 0 34,219 $165,381 $9,820 $0 $209,820 $59,718 $150,102 $63,833 $658,675
Aug 36,741 1,968 0 38,709 $188,114 $10,076 $0 $63,833 $262,023
Sep 37,596 1,951 0 39,547 $192,492 $9,989 $0 $63,833 $266,314
Oct 40,739 2,003 0 42,742 $208,584 $10,255 $0 $63,833 $282,672
Nov 35,783 2,269 0 38,052 $183,209 $11,617 $0 $63,833 $258,660
Dec 35,761 2,455 0 38,216 $183,096 $12,570 $0 $63,833 $259,499
Jan 35,543 2,139 0 37,682 $181,980 $10,952 $0 $63,833 $256,765
Feb 30,397 2,018 0 32,415 $155,633 $10,332 $0 $63,833 $229,798
Mar 33,294 2,171 0 35,465 $170,465 $11,116 $0 $63,833 $245,414
Apr 38,537 1,906 0 40,443 $197,309 $9,759 $0 $63,833 $270,901
May 33,177 1,867 0 35,044 $169,866 $9,559 $0 $63,833 $243,259
Jun 38,652 1,811 0 40,463 $197,898 $9,272 $0 $63,833 $271,004
TOTAL 0 428,521 24,476 0 452,997 $2,194,028 $125,317 $0 $209,820 $59,718 $150,102 $766,000 $3,504,985
Total Energy:$2,319,345 Total Capacity :$419,640
452,997 MWH
415,247 MWH
204,984 MWH TOTAL MWH REVENUE $3,504,985
O&M BUDGET - Operating 2,544,100
O&M BUDGET - Administrative 766,000
UTILITY FY 23 TOTAL O&M BUDGET 3,310,100
MEA 28.40%22.20 MW SURPLUS (SHORTAGE)$194,885
CEA 71.60%55.80 MW
GVEA 100.00%78.00 MW Annual Participant Administrative Contribution 255,333.33
156.0 Monthly Contribution per Participant 21,277.78
Usage Rate per KWH 0.00512$
Capacity Rate $2.69
Section 7.2.2 MINIMUM USAGE CONTRACT VALUE
ALASKA INTERTIE
FISCAL YEAR 2023
ENERGY PROJECTION
TOTAL INTERTIE PROJECTED ENERGY USAGE
Usage estimate reduced by 1/12 of Total for rate calculations
Page 4 of 4
Alaska Intertie FY23 Proposed Budget
Annual System Demand
18 19 19 20 20-21 21-22 3 YR AVG.
SOUTHERN UTILITY PARTICIPANTS (MW)
CEA 375.4 364.5 366.0 349.8 360.1 MW PROPOSED APPROVED APPROVED APPROVED APPROVED APPROVED
MEA 137.0 137.0 145.0 146.0 142.7 MW 6/30/2023 6/30/2022 6/30/2021 6/30/2020 6/30/2019 6/30/2018
UNITS FY23 FY22 FY21 FY20 FY19 FY18
USAGE KWH 415,247,000 187,902,000 187,902,000 187,902,000 297,441,000 422,262,000
OPERATING BUDGET $2,544,100 1,992,890 2,007,385 2,168,391 2,024,298 1,529,178
MITCR KW 156,000 156,100 156,000 156,000 156,000 156,000
TOTAL 502.8 MW
ENERGY (A)$.000/KWH $0.00512 $0.00886 $0.00892 $0.00964 $0.00568 $0.00302
NORTHERN UTILITY PARTICIPANTS (MW)
CAPACITY (B)$/KW $2.69 $2.11 $2.12 $2.29 $2.14 $1.62
GVEA 200 191 204 204.7 199.9 MW
TOTAL 199.9 MW
MITCR DETERMINATION
FY 23 KWH CAP RATE CAP CHARGES
MEA 28.40%22.20 MW 22,200 $2.69 59,718.00
CEA 71.60%55.80 MW 55,800 $2.69 150,102.00
GVEA 100.00%78.00 MW 78,000 $2.69 209,820.00
156.00 MW 156,000 419,640.00
(A) See Section 7.2.5 AK Intertie Agreement
(B) See Section 7.2.6 AK Intertie Agreement
MINIMUM INTERTIE TRANSFER CAPABILITY RIGHTS
(MITCR) DETERMINATION
FOR FISCAL YEAR 2023
Alaska Intertie Strategic Planning Update May 20, 2022
Proposed Vision for the Alaska Intertie• Support the Railbelt Utilities’ consensus vision that was under discussion in August 2021:May 20, 2022| Pg. 2Railbelt Electric Utility VisionPowering Alaska’s Clean Energy Future Vision: The interconnected Railbelt electric system will provide a platform for economic vitality and enhanced quality of life for Alaskans thanks to: consistent, reasonable rates, a dependable and comprehensive electric system, a diverse and reduced‐carbon generation portfolio, and transparency and inclusion of diverse perspectives. Initial Goal: Improve the interconnected electric system from Homer to Fairbanks and drive the development of sustainable low‐cost, clean energy options.
Background• Alaska Intertie was commissioned in 1984• 170 miles from Healy Substation to Douglas Sub (near Willow) • Connected to the Southcentral area 230kV & 115kV transmission at Teeland Substation through 26 miles of 138kV transmission line owned by MEA • Three SVC systems (Teeland, Healy, & Gold Hill)• Rated transfer capacity is about 78MW (per AIA)• Capacity is limited by transient stability, not thermal rating of conductors or voltage dropMay 20, 2022| Pg. 3
Background• Transmission towers and conductors between Healy and Douglas Substations were designed to operate at 345kV• Currently operated at 138kV• 766 structures, mostly steel X towers• Bundled 954 MCM “Rail” conductorMay 20, 2022| Pg. 4
Selected Construction, Repair and Upgrade Events• 2020-2022: Marker ball replacement • 2018: Douglas Substation upgrade. $790k.• 2018: Tower #748 repairs for $1.2M• 2015: SVC’s replaced by Alstom Grid with a $10M state appropriation• 2012: Tower #195 replacement for $2.4M• 2007: Tower #692• 1984: Construction cost was $124 million in State appropriationsMay 20, 2022| Pg. 5
Ongoing Work• SVC scheduled maintenance• SVC POD tuning to address oscillation risk• Marker ball replacement• Development of preventive maintenance plan, leading to an asset management plan• Development of vegetation & wildfire management plansMay 20, 2022| Pg. 6
ReliabilityMay 20, 2022| Pg. 7• 2012-2021 Forced outage rate: 0.41%• 2012-2021 All outages: 1.28%• Compares favorably to NERC, which averaged 1.84% for 200kV+ lines, 2011-2015.Alaska Intertie All Outages Summary 2012‐2021 average duration: 15.9 hours2012‐2021 total count: 862012‐2021 average per year: 8.62012‐2021 longest outage: 275.6 hours2012‐2021 total duration: 1121.3 hours2012‐2021 all outages rate: 1.28%Alaska Intertie Forced Outage Summary 2012‐2021 average duration: 9.7 hours2012‐2021 total count: 372012‐2021 average per year: 3.72012‐2021 longest outage: 111.6 hours2012‐2021 total duration: 358.5 hours2012‐2021 forced outage rate: 0.41%
Challenges• Effects of unbalanced snow loading• Aging Equipment• Melting Permafrost•Erosion• Wildfire risk• Clearing vegetation• Access May 20, 2022| Pg. 8
Proposed Strategic Plan to accomplish Vision• Develop specifics of plan using a combination of bottom up and top down approaches • Bottom up• Asset management plan and software• GIS• Equipment database (e.g. Cascade, Maximo, etc.)• Structural analysis• LIDAR study collected detailed data• Update previous engineering analysis using modern tools• Equipment inspection schedules, standards & forms• Substation equipment maintenance plans• Vegetation & Wildfire management plans• History documentation of previous repairs/ maintenanceMay 20, 2022| Pg. 9
Proposed Strategic Plan to accomplish Vision• Combined bottom up / top down approach (cont.)• Top Down – set informed goals for performance based on cost-benefit analysis• Economic dispatch studies to determine value of improved transfer capacity• ACEP study• ERO IRP process• Resource evaluations (wind, hydro, etc)• Take advantage of geographically diverse wind resources• Example: MEA’s proposed Railbelt wind resource assessment• Electrical performance studies (e.g. refresh AEA’s 2017 Railbelt transmission plan)• Transient stability limits• Electrical losses• Railbelt Reliability standardsMay 20, 2022| Pg. 10
Proposed Strategic Plan to accomplish Vision• Proposed Components of the Strategic Plan• Periodically updated vision and associated specific objectives for cost, reliability, losses, and transfer capacity.• Funding plan –• Establish a reserve fund for capital expenditures• Consider financing if appropriate• Recurring study of estimated long-term repair and replacement costs (similar to BPMC’s D.Hittle report)• Asset inventories• Condition reports for various components (structures, foundations, lightning protection, etc.) • Preventive maintenance plan• Asset management plan, data & software• Vegetation management plan • Access plan (land based)• Real time data sharing • Appendices (background information)May 20, 2022| Pg. 11
Proposed Strategic Plan to accomplish Vision• Appendices• Clearing reports • Structure inspection reports• Snow Load Monitoring System information and reports• Electrical disturbance results with root cause analysis• Agreements (selected examples)• Alaska Intertie Agreement• Douglas substation lease• Maintenance agreements with utilities• 1986 transmission services agreement (TLS-DGS)• 1984 Joint Use agreement• Property transfer history (Cantwell distribution equip)• LIDAR study results and recommendations• System PSS/E studies• Economic dispatch studies• Reliability standards (pre-ERO) • Railbelt IRPs prepared by EROMay 20, 2022| Pg. 12
Loss Reductions & Transfer Capacity Increases• With a 230kV upgrade, transfer limit increases are likely to beabout 250%.• Transmission line voltage upgrade to 230 kV will cut the losses byabout 60%May 19, 2022| Pg. 13
Next Steps• Continued collaboration between IMC, IOC, and subcommittees todevelop ensure that the approach and progress is consistent with theIMC’s expectations.• Continued development of the Strategic Plan by the IOC and itssubcommittees. For example:• Vegetation management Plan–Maintenance Subcommittee• Asset Management Plan – Maintenance Subcommittee• Refresh 2017 Railbelt transmission plan – System Studies Subcommittee• Expeditiously arrive at a formal consensus regarding the ultimate uppervoltage at which the Intertie will be operated, based on economicdispatch studies and electrical performance studies (preliminaryindications are 230kV).• Will determine constraints on modifications to existing structures to addressstructural issues.• Will determine upgrades required between Teeland and Douglas substations.• Will provide a clear direction for voltage rating of any new equipment.May 19, 2022| Pg. 14
Questions?
Intertie Management Committee Meeting
Operator Report
May 20, 2022
1. Alaska Intertie usage report
a. MWh usage – Measured at Douglas Substation
GVEA MEA Total
i. July – April FY22 160,142 20,812 180,954
ii. July – April FY21 149,654 18,445 168,099
iii. Delta - FY22 to FY21 7.0% 12.8% 7.6%
2. Alaska Intertie trips
3. Date Event SCADA Indication Cause
1/19/2022
AK Tie
Trip
A-B phase fault between
Teeland and Douglas
Distribution fault, CEA Relay reaching too far
saw fault on MEA riser.
1/21/2022
AK Tie
Trip
B phase fault between
Teeland and Douglas
Distribution fault, CEA Relay reaching too far
saw fault on MEA riser. Relay settings
corrected by CEA.
1/29/2022
AK Tie
Trip
A phase fault between
Teeland and Douglas Unknown Cause, suspected snow unloading
2/17/2022
AK Tie
Trip
C phase fault between
Douglas and Healy Unknown Cause, suspected snow unloading
2/22/2022
AK Tie
Trip
A phase fault between
Douglas and Healy Unknown Cause, suspected snow unloading
3/11/2022
AK Tie
Trip
A phase fault between
Douglas and Healy
Unknown Cause, suspected line loaded with
snow touching trees
5/10/2022 Planned
Maintenance between
Teeland and Douglas
4. IOC quarterly Reliability Report
a. See attached
Intertie Management Committee Meeting
IOC Report
May 20, 2020
1. Intertie Operating Committee
a. The IOC focused on updating the proposed budget prior to, during, and after the IOC
meeting of May 6, 2020. This resulted in the budget that will be presented to the IMC
today.
i. Proposed expenditures changed to reflect current status of the marker ball
project, tree clearing plans, load break switches at Cantwell, and the Healy
breaker B17.
ii. Administrative costs incurred by AEA were discussed and justified.
iii. Billing by GVEA for electricity consumption was discussed, and GVEA’s
representative expressed the opinion that it the currently bills should more
logically be wrapped into GVEA’s own use, consistent with section 14 of the
Alaska Intertie Agreement.
iv. There was some discussion regarding the appropriate method of calculating
MITCR – should it be based on the coincident demand of the ML&P and CEA
service areas, or on the non-coincident demand (as was done historically). The
actual cost impact is minimal.
v. There was an exchange of email messages regarding the appropriate proportion
of administrative costs for CEA to pay. This could be a significant change in cost
allocation if CEA continues to pay ML&P share.
vi. Unclear if HEA plans to participate financially in the proposed synchrophasor
project.
b. Cantwell distribution equipment transfer – requested a review by AEA of the status.
c. Opportunities for improved utilization of Snow Load Monitoring System was discussed.
d. The need to standardize methods for Inadvertent Accounting was discussed.
e. Latest draft of the vegetation management plan and AEA’s suggested revisions were
discussed.
f. AEA’s David Lockard volunteered to coordinate efforts regarding wildfire management
plan improvements.
2. Maintenance Subcommittee
a. MEA sent a brief report on clearing activities.
b. The vegetation management plan was updated. Next step is to integrate AEA’s
comments.
c. The preventative maintenance plan continues to be developed.
d. Marker balls are being acquired, and scheduling of outages is in progress. Possible
delays until August.
e. Installation of load break transmission switches at Cantwell Substation will be
coordinated with the marker ball project to minimize outage time. Minor shipping
damage to switches needs repair.
f. MEA plans to prioritize clearing efforts to use more otherwise unused FY22 funds.
3. Systems Studies Subcommittee
a. Reported on progress toward corrective measures recommended based on the
oscillation study.
b. Worked toward a plan for a system-wide synchrophasor project. Received proposal
from Schweitzer Engineering Labs.
PART 2: EVENT SUMMARY
05/03/2022
TO01/01/2022 12/31/2022
IOC ANNUAL RELIABILITY REPORT
Event
Num
Date/Time Duration Description Freq
extreme
Intertie Kenai
opened opened
Unit Line
Trip Trip
BESS Silos Load
Shed
Comments
1,161 01/07/2022 02:28:42 HLP ST2 Trip 59.50 X 0.0 0.0 0.01.3
1,165 01/21/2022 08:34:57 Teeland-Douglas B-Phase line fault
trip.
60.63 X X 0.0 0.0 24.60.1
1,166 01/02/2022 02:12:04 NCC ST trip 59.83 X 0.0 0.0 0.00.5
1,167 01/29/2022 12:39:55 AK Intertie Trip - Teeland-Douglas
A-phase fault
60.73 X X 0.0 4.9 20.80.1
1,168 01/30/2022 14:35:24 SPP 11 trip due to fuel pressure
differential.
59.57 X 2.1 0.0 10.60.1
1,169 02/10/2022 17:46:31 Sullivan #9 - ramp to idle due to
water flow transmitter failure.
59.75 X 0.0 0.0 16.90.0
1,170 02/16/2022 19:51:27 Sullivan #9 trip due to IGV
feedback error.
59.71 X 0.0 0.0 16.50.2
1,171 02/15/2022 13:43:36 NPC GT3 Trip due to
communications failure to the unit
59.77 X 0.0 0.0 25.10.8
1,172 02/17/2022 18:39:51 Douglas 1B1 Trip due to C-ground
fault.
60.82 X X 6.4 19.3 24.40.0
1,173 02/22/2022 03:25:27 AK Tie Trip - Douglas-Healy loss of
Bradley AGC control
60.62 X X 11.7 10.0 25.30.0
1,174 02/24/2022 02:23:59 Sullivan 10 Ramp Down and Trip
(no tie outages)
59.72 X 0.0 0.0 11.10.0
1,175 03/11/2022 07:05:23 AK Intertie trip Teeland -Douglas
due to A-Phase Fault
60.62 X X 8.1 6.9 25.10.1
1,176 03/27/2022 21:11:19 HLP ST2 Trip 59.40 X 10.9 0.0 16.31.0
1,177 03/12/2022 00:06:53 NPC & BESS Trip 59.48 X 9.7 10.5 16.44.6
1,178 03/28/2022 10:24:39 HLP ST2 Trip 59.64 X 0.0 1.9 16.40.8
1,179 03/29/2022 02:48:41 HLP ST2 Trip 59.55 X 0.0 0.0 9.80.7
*has sub event
Event
Num
Date/Time Duration Description Freq
extreme
Intertie Kenai
opened opened
Unit Line
Trip Trip
BESS Silos Load
Shed
Comments
1,180 04/06/2022 23:37:09 NPC GT3 Trip (Thermocouple
failure)
59.76 X 0.0 0.0 1.10.6
1,181 05/03/2022 05:47:34 NPC GT3 Trip 59.73 X 0.0 0.0 15.03.0
0.77Average Duration
*has sub event
Page 1 of 2
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2021 THROUGH 03/31/2022
REVENUE
FY22 Approved
Budget
BUDGET %
07/01/2021 -
03/31/2022
Actuals
@3/31/22
YTD Actuals as a %
of Total Annual
Budget
OVER (UNDER) YTD
Variance
Revenue From Utilities
AKI-GVEA 1,703,855 1,277,891 1,445,023 84.8%167,132
AKI-CEA 225,259 168,944 198,801 88.3%29,857
AKI-MEA 361,596 271,197 291,246 80.5%20,049
Total Revenue From Utilities 2,290,710 1,718,032 1,935,070 84.5%217,038
Interest/Capital Credits 100 100
Total Revenue 2,290,710 1,718,032 1,935,170 84.5%217,138
EXPENSES-OPERATING
56200 Station Expenses
Golden Valley Electric
AK Intertie-Substation Electricity Usage 8,000 6,000 30,675 383.4%24,675
Golden Valley Electric Total 8,000 6,000 30,675 383.4%24,675
56600 Misc Transmission Expense
Alaska Energy Authority
AK Intertie-Cell Phone Comm. Svc. for Wx Monitorin 12,000 9,000 9,020 75.2%20
AK Intertie-Misc Studies as needed 200,000 150,000 69,952 35.0%(80,048)
Alaska Energy Authority Total 212,000 159,000 78,972 37.3%(80,028)
Chugach Electric Association
Chugach Electric Association Total - - - 0.0%-
Golden Valley Electric
AK Intertie-Private Line Telephone Service SCADA 18,000 13,500 4,167 23.2%(9,333)
Golden Valley Electric Total 18,000 13,500 4,167 23.2%(9,333)
Matanuska Electric Association Total - - - 0.0%-
56601 Weather Monitoring Batteries
Alaska Energy Authority
AK Intertie-SLMS Support and Intertie Grnd Patrol 100,000 75,000 117,339 117.3%42,339
Alaska Energy Authority Total 100,000 75,000 117,339 117.3%42,339
56700 Rents
Alaska Energy Authority
AK Intertie-Alaska Railroad 700 525 700 100.0%175
Alaska Energy Authority Total 700 525 700 100.0%175
Matanuska Electric Association
AK Intertie-Talkeetna Storage 7,200 5,400 4,800 66.7%(600)
AK Intertie-Equipment Rental - - 375 0.0%375
Matanuska Electric Association Total 7,200 5,400 5,175 71.9%(225)
57000 Maintenance of Station Equip
Chugach Electric Association
AK Intertie-Teeland Substation 85,000 63,750 112,216 132.0%48,466
AK Intertie-Douglas Substation Communications - - 1,742 0.0%1,742
Chugach Electric Association Total 85,000 63,750 113,958 134.1%50,208
Golden Valley Electric
AK Intertie-Healy, Cantwell, Goldhill 74,340 55,755 55,625 74.8%(130)
AK Intertie-SCADA Maint Healy, Cantwell, Goldhill 5,000 3,750 - 0.0%(3,750)
AK Intertie-Cantwell 4S2 Switch Repair 266,000 199,500 1,681 0.6%(197,819)
AK Intertie-Maint & Repaint Reactors Healy SVC Yd 80,000 60,000 7,266 9.1%(52,734)
AK Intertie-Healy&Goldhill Digital Fault Recorders 90,000 67,500 51,451 57.2%(16,049)
AK Intertie-Goldhill SVC Cooling 65,000 48,750 460 0.7%(48,290)
Golden Valley Electric Total 580,340 435,255 116,483 20.1%(318,772)
Matanuska Electric Association
Matanuska Electric Association Total - - - 0.0%-
Page 2 of 2
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2021 THROUGH 03/31/2022
REVENUE
FY22 Approved
Budget
BUDGET %
07/01/2021 -
03/31/2022
Actuals
@3/31/22
YTD Actuals as a %
of Total Annual
Budget
OVER (UNDER) YTD
Variance
57100 Maint of OH Lines
Golden Valley Electric
AK Intertie-Northern Maintenance 78,000 58,500 86,845 111.3%28,345
Golden Valley Electric Total 78,000 58,500 86,845 111.3%28,345
Matanuska Electric Association
AK Intertie-Special Patrols (Incl Foundation Insp)5,000 3,750 599 12.0%(3,151)
AK Intertie-Southern Maint. (Incl Ground Insp)200,000 150,000 62,612 31.3%(87,388)
AK Intertie-Equipment Repair and Replacement 640,000 480,000 - 0.0%(480,000)
Matanuska Electric Association Total 845,000 633,750 63,211 7.5%(570,539)
57102 Maint OH Lines-ROW Clearing
Golden Valley Electric
AK Intertie-Northern ROW Clearing 73,000 54,750 68,882 94.4%14,132
Golden Valley Electric Total 73,000 54,750 68,882 94.4%14,132
Matanuska Electric Association
AK Intertie-Southern ROW Clearing 150,000 112,500 134,945 90.0%22,445
Matanuska Electric Association Total 150,000 112,500 134,945 90.0%22,445
58302 Operating Committee Exp-Legal
Alaska Energy Authority
AK Intertie Operating - - - 0.0%-
AK Intertie-IMC Admin Cost (Audit, meeting, legal)- - - 0.0%-
Alaska Energy Authority Total - - - 0.0%-
58306 Misc Admin
Alaska Energy Authority
AK Intertie Operating - - - 0.0%-
AK Intertie-IMC Admin Cost (Audit, meeting, legal)17,500 13,125 15,645 89.4%2,520
Alaska Energy Authority Total 17,500 13,125 15,645 89.4%2,520
58307 Professional consultants
Alaska Energy Authority
AK Intertie-IMC Admin Cost (Audit, meeting, legal)- - - 0.0%-
AK Intertie-Insurance - - - 0.0%-
Alaska Energy Authority Total - - - 0.0%-
58401 Insurance Premiums
Alaska Energy Authority
AK Intertie-Insurance 21,517 16,138 21,488 99.9%5,350
Alaska Energy Authority Total 21,517 16,138 21,488 99.9%5,350
Matanuska Electric Association
AK Intertie-Insurance 14,133 10,600 - 0.0%(10,600)
Matanuska Electric Association Total 14,133 10,600 - 0.0%(10,600)
Total Station Expenses 2,210,390 1,657,793 858,485 38.8%(799,308)
Total Operating Expenses 2,210,390 1,657,793 858,485 38.8%(799,308)
EXPENSES-AEA ADMINISTRATION
Total Admin total 100,000 75,000 162,363 162.4%122,298
Total AEA Administration Expenses 100,000 75,000 162,363 162.4%122,298
Total Expenses 2,310,390 1,732,793 1,020,848 44.2%(677,010)
SURPLUS (SHORTAGE)(19,680)(14,761)914,322 894,148