HomeMy WebLinkAbout2022-06-24 IMC Agenda and docs INTERTIE MANAGEMENT COMMITTEE (IMC)
REGULAR MEETING
AGENDA
June 24, 2022 9:00 AM
Alaska Energy Authority Board Room 813 W Northern Lights Blvd, Anchorage, AK 99503 To participate dial 1-888-585-9008 and use code 212-753-619#
1. CALL TO ORDER
2. ROLL CALL FOR COMMITTEE MEMBERS
3. PUBLIC ROLL CALL
4. PUBLIC COMMENTS
5. AGENDA APPROVAL
6. APPROVAL OF PRIOR MINUTES – May 20, 2022
7. NEW BUSINESS
A. Approval of FY23 IMC Budget AEA
8. COMMITTEE REPORTS
A. BUDGET to ACTUALS AEA
9. MEMBERS COMMENTS
10. NEXT MEETING DATE – July 29, 2022
11. ADJOURNMENT
Page 1 of 4
Alaska Intertie FY23 Proposed Budget
FY22 Approved Proposed
FY20 FY21 ACTUALS FY22 FY23
Actual Actual @ 3/31/22 Budget Budget
REVENUES
GVEA 1,554,543 1,942,988 1,445,023 1,703,855 2,659,181
ML&P 237,938 111,217
CEA 258,090 290,065 198,801 225,259 405,435
MEA 448,478 460,479 291,246 361,596 440,368
INTEREST 16,611 903 100
TOTAL REVENUES 2,515,661 2,805,652 1,935,170 2,290,710 3,504,985
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 9,675 9,382 30,675 8,000 - Per GVEA
9,675 9,382 30,675 8,000 -
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)11,718 5,556 4,167 18,000 10,000 Per GVEA
Cell Phone Comm. Svc for Weather Monitoring (Verizon)12,022 11,904 9,020 12,000 13,000 Per AEA
SLMS Support and Intertie Ground Patrol 87,863 98,540 117,339 100,000 140,000 Per AEA
Misc Studies as needed (Cyber Security Study)- - - - -
111,603 116,000 130,526 130,000 163,000
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 700 700 700 700 Fixed
MEA - Talkeetna Storage 7,200 7,200 5,175 7,200 7,200 Fixed
PSSE key replacement - - -
7,900 7,900 5,875 7,900 7,900
FERC 569 Maintenance of Structures
MEA - Maintenance of Structures - - - - - Per MEA
- - - - -
- - -
FERC 570 - Maintenance of Station Equipment
GVEA - Healy, Cantwell, Goldhill 104,224 154,917 55,625 74,340 75,000 Per GVEA
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill - - - 5,000 5,000 Per GVEA
GVEA - Replace Healy Substation Breaker B17 - Per GVEA
GVEA - Healy, Teeland, Goldhill Dampers 59,016 - - - - Per GVEA
GVEA - Healy and Goldhill Digital Fault Recorders 51,451 90,000 Per IOC
GVEA - Healy SVC Fire Alarm Panel Replacement - - - - - Per GVEA
GVEA - Gold Hill SVC Fire Alarm Panel Replacement - - - - - Per GVEA
GVEA - Gold Hill SVC Cooling 460 65,000 Per GVEA
GVEA - Cantwell Install Breakers or Load Break Switches - - 1,681 266,000 156,000 Per GVEA
GVEA - Cantwell 4S2 Switch Repair - - - - - Per GVEA
GVEA - Replace Battery Healy SVC - - - - - Per GVEA
GVEA - Replace Battery Goldhill SVC - - - - - Per GVEA
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard 60,414 145,494 - - - Per GVEA
GVEA - Perform Maintenance, repaint Reactors Gold Hill SVC Yard 7,266 80,000 80,000 Per GVEA
GVEA - Mobile Substation Site - - - - - Per GVEA
GVEA - Cantwell RTU, Recloser, & Transformer Protection replacement - - - - - Per GVEA
GVEA - Recloser Control Replacement - - - - - Per GVEA
GVEA - Transformer Protection Upgrades - - - - - Per GVEA
GVEA - Dissolved Gas Monitoring Gold Hill & Healy - - - - - Per GVEA
GVEA - Cantwell Standby Generator Replacement 29,016 - Per GVEA
GVEA - SVC Intertie Trust Fund Eligible Expenses - - - - - Per GVEA
SVC ALASKA INTERTIE TRUST FUND - - - - - Per IMC
CEA - AK Intertie Yard - - - - -
CEA - Teeland Substation Communication 1,742 5,000 Per CEA
CEA - Teeland Substation 113,849 183,401 112,216 85,000 168,200 Per CEA
MEA - Douglas Substation 96 26,115 - - - Per MEA
MEA - Douglas Substation 138 kV Bus Repair & BKR Inspections - 25,000 Per MEA
MEA - Douglas Substation Breaker Replacement - - - - - Per MEA
GVEA - Douglas Substation OOS relaying and communications - - - - - Per GVEA
CEA - Telecomm Support (Douglas, Teeland, Anc-Fbks Leased Circuits)- - - - - Per CEA
337,598 538,943 230,441 665,340 514,200
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 37,171 68,204 86,845 78,000 100,000 Per GVEA
GVEA - Northern ROW Clearing 89,493 36,721 68,882 73,000 300,000 Per GVEA
GVEA - Landing Pads - - - Per GVEA
GVEA - Re-level Structures & Adjust Guys - - - Per GVEA
GVEA - Repair Tower 531 Foundation 50,000 Per GVEA
GVEA - Repair Tower 532 Foundation 50,000 Per GVEA
GVEA - Repair Tower 748 - - - Per GVEA
GVEA - Repair Tower 692 - - - Per GVEA
MEA - Special Patrols [Incl Helicopter Inspections]599 5,000 10,000 Per MEA
MEA - Southern Maint (Incl Ground and Climbing Inspect)97,175 138,199 62,612 200,000 140,000 Per MEA
MEA - Southern ROW Clearing 38,023 228,413 134,945 150,000 500,000 Per MEA
MEA - TWR 195 Repair Monitoring - - - Per MEA
MEA - Equipment Repair and Replacement 16,521 780,866 - 640,000 684,000 Per MEA
278,383 1,252,403 353,883 1,146,000 1,834,000
FERC 924 - Property Insurance
AK Intertie - Insurance 36,253 38,773 21,517 35,650 25,000
Per AEA (Gen
Liab/Comm Umbrella)
& MEA (incl Aviation)
36,253 38,773 21,517 35,650 25,000
Intertie Operating Costs Total 781,413 1,963,401 772,917 1,992,890 2,544,100
Page 2 of 4
FERC 570 - Maintenance of Station Equipment
MEA - Replace Protective Relay Schemes Douglas - - - - - Per MEA
- - - - -
Intertie Cost of Improvements Total - - - - -
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 101,058 210,409 162,363 100,000 200,000 Per AEA
101,058 210,409 162,363 100,000 200,000
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)11,533 30,890 15,616 17,500 20,000 Per IMC Chair
11,533 30,890 15,616 17,500 20,000
FERC 566 - Miscellaneous Transmission Expense
Misc Studies: System Reserves Study, PSS/E maint, AGC Study 69,023 186,675 69,952 200,000 216,000 per IOC
LIDAR study (complete lidar, vegetation, PLS CADD file with drawings,
structure/foundation movement, infrared, and imaging)
226,125
- -
Asset management plan 50,000 per IOC
Proposed Synchrophaser system 230,000 per IOC
Unbalanced Snow Load mitigation analysis and recommendations 50,000
Reliability Standards Update (Hdale Inc.)- - - per IOC
69,023 412,800 69,952 200,000 546,000
Intertie Administration Costs Total 181,614 654,099 247,931 317,500 766,000
TOTAL EXPENSE 963,027 2,617,500 1,020,848 2,310,390 3,310,100
SURPLUS (SHORTAGE)1,552,634 188,152 914,322 (19,680) 194,885
Page 3 of 4
Alaska Intertie FY23 Proposed Budget
True up
to
Contract GVEA MEA CEA TOTAL USAGE CAPACITY ADMIN CASH FLOW
MONTH Value MWH MWH MWH MWH GVEA MEA CEA GVEA MEA CEA GVEA | MEA | CEA TOTALS
Jul 32,301 1,918 0 34,219 $165,381 $9,820 $0 $209,820 $59,718 $150,102 $63,833 $658,675
Aug 36,741 1,968 0 38,709 $188,114 $10,076 $0 $63,833 $262,023
Sep 37,596 1,951 0 39,547 $192,492 $9,989 $0 $63,833 $266,314
Oct 40,739 2,003 0 42,742 $208,584 $10,255 $0 $63,833 $282,672
Nov 35,783 2,269 0 38,052 $183,209 $11,617 $0 $63,833 $258,660
Dec 35,761 2,455 0 38,216 $183,096 $12,570 $0 $63,833 $259,499
Jan 35,543 2,139 0 37,682 $181,980 $10,952 $0 $63,833 $256,765
Feb 30,397 2,018 0 32,415 $155,633 $10,332 $0 $63,833 $229,798
Mar 33,294 2,171 0 35,465 $170,465 $11,116 $0 $63,833 $245,414
Apr 38,537 1,906 0 40,443 $197,309 $9,759 $0 $63,833 $270,901
May 33,177 1,867 0 35,044 $169,866 $9,559 $0 $63,833 $243,259
Jun 38,652 1,811 0 40,463 $197,898 $9,272 $0 $63,833 $271,004
TOTAL 0 428,521 24,476 0 452,997 $2,194,028 $125,317 $0 $209,820 $59,718 $150,102 $766,000 $3,504,985
Total Energy:$2,319,345 Total Capacity :$419,640
452,997 MWH
415,247 MWH
204,984 MWH TOTAL MWH REVENUE $3,504,985
O&M BUDGET - Operating 2,544,100
O&M BUDGET - Administrative 766,000
UTILITY FY 23 TOTAL O&M BUDGET 3,310,100
MEA 28.40%22.20 MW SURPLUS (SHORTAGE)$194,885
CEA 71.60%55.80 MW
GVEA 100.00%78.00 MW Annual Participant Administrative Contribution 255,333.33
156.0 Monthly Contribution per Participant 21,277.78
Usage Rate per KWH 0.00512$
Capacity Rate $2.69
Section 7.2.2 MINIMUM USAGE CONTRACT VALUE
ALASKA INTERTIE
FISCAL YEAR 2023
ENERGY PROJECTION
TOTAL INTERTIE PROJECTED ENERGY USAGE
Usage estimate reduced by 1/12 of Total for rate calculations
Page 4 of 4
Alaska Intertie FY23 Proposed Budget
Annual System Demand
18 19 19 20 20-21 21-22 3 YR AVG.
SOUTHERN UTILITY PARTICIPANTS (MW)
CEA 375.4 364.5 366.0 349.8 360.1 MW PROPOSED APPROVED APPROVED APPROVED APPROVED APPROVED
MEA 137.0 137.0 145.0 146.0 142.7 MW 6/30/2023 6/30/2022 6/30/2021 6/30/2020 6/30/2019 6/30/2018
UNITS FY23 FY22 FY21 FY20 FY19 FY18
USAGE KWH 415,247,000 187,902,000 187,902,000 187,902,000 297,441,000 422,262,000
OPERATING BUDGET $2,544,100 1,992,890 2,007,385 2,168,391 2,024,298 1,529,178
MITCR KW 156,000 156,100 156,000 156,000 156,000 156,000
TOTAL 502.8 MW
ENERGY (A)$.000/KWH $0.00512 $0.00886 $0.00892 $0.00964 $0.00568 $0.00302
NORTHERN UTILITY PARTICIPANTS (MW)
CAPACITY (B)$/KW $2.69 $2.11 $2.12 $2.29 $2.14 $1.62
GVEA 200 191 204 204.7 199.9 MW
TOTAL 199.9 MW
MITCR DETERMINATION
FY 23 KWH CAP RATE CAP CHARGES
MEA 28.40%22.20 MW 22,200 $2.69 59,718.00
CEA 71.60%55.80 MW 55,800 $2.69 150,102.00
GVEA 100.00%78.00 MW 78,000 $2.69 209,820.00
156.00 MW 156,000 419,640.00
(A) See Section 7.2.5 AK Intertie Agreement
(B) See Section 7.2.6 AK Intertie Agreement
MINIMUM INTERTIE TRANSFER CAPABILITY RIGHTS
(MITCR) DETERMINATION
FOR FISCAL YEAR 2023
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2021 THROUGH 05/31/2022
REVENUE
FY22 Approved
Budget
BUDGET %
07/01/2021 -
05/31/2022 Actuals
YTD Actuals as a
% of Total
Annual Budget
OVER (UNDER)
YTD Variance
Revenue From Utilities
AKI-GVEA 1,703,854 1,561,866 1,924,719 113.0%362,853
AKI-CEA 225,259 206,488 216,440 96.1%9,952
AKI-MEA 361,596 331,463 345,760 95.6%14,297
Total Revenue From Utilities 2,290,710 2,099,817 2,486,919 108.6%387,102
Interest/Capital Credits 730 730
Total Revenue 2,290,710 2,099,817 2,487,649 108.6%387,832
EXPENSES-OPERATING
56200 Station Expenses
Golden Valley Electric
AK Intertie-Substation Electricity Usage 8,000 7,333 36,752 459.4%29,419
Golden Valley Electric Total 8,000 7,333 36,752 459.4%29,419
56600 Misc Transmission Expense
Alaska Energy Authority
AK Intertie-Cell Phone Comm. Svc. for Wx Monitorin 12,000 11,000 11,024 91.9%24
AK Intertie-Misc Studies as needed - - - 0.0%-
Alaska Energy Authority Total 12,000 11,000 11,024 91.9%24
Chugach Electric Association
Chugach Electric Association Total - - - 0.0%-
Golden Valley Electric
AK Intertie-Private Line Telephone Service SCADA 18,000 16,500 4,630 25.7%(11,870)
Golden Valley Electric Total 18,000 16,500 4,630 25.7%(11,870)
CEA|MEA|GVEA Studies
AK Intertie-Misc Studies as needed 200,000 183,333 69,952 35.0%(113,381)
CEA|MEA|GVEA Studies Total 200,000 183,333 69,952 35.0%(113,381)
56601 Weather Monitoring Batteries
Alaska Energy Authority
AK Intertie-SLMS Support and Intertie Grnd Patrol 100,000 91,667 150,692 150.7%59,025
Alaska Energy Authority Total 100,000 91,667 150,692 150.7%59,025
56700 Rents
Alaska Energy Authority
AK Intertie-Alaska Railroad 700 642 700 100.0%58
Alaska Energy Authority Total 700 642 700 100.0%58
Matanuska Electric Association
AK Intertie-Talkeetna Storage 7,200 6,600 6,000 83.3%(600)
AK Intertie-Equipment Rental - - 375 0.0%375
Matanuska Electric Association Total 7,200 6,600 6,375 88.5%(225)
56900 Maintenance of Structures
Alaska Energy Authority
Alaska Energy Authority Total - - - 0.0%-
57000 Maintenance of Station Equip
Chugach Electric Association
AK Intertie-Teeland Substation 85,000 77,917 112,749 132.6%34,832
AK Intertie-Douglas Substation Communications - - 1,742 0.0%1,742
Chugach Electric Association Total 85,000 77,917 114,491 134.7%36,574
Golden Valley Electric
AK Intertie-Healy, Cantwell, Goldhill 74,340 68,145 59,733 80.4%(8,412)
AK Intertie-SCADA Maint Healy, Cantwell, Goldhill 5,000 4,583 - 0.0%(4,583)
Page 1 of 4
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2021 THROUGH 05/31/2022
REVENUE
FY22 Approved
Budget
BUDGET %
07/01/2021 -
05/31/2022 Actuals
YTD Actuals as a
% of Total
Annual Budget
OVER (UNDER)
YTD Variance
AK Intertie-Cantwell 4S2 Switch Repair 266,000 243,833 1,681 0.6%(242,152)
AK Intertie-Maint & Repaint Reactors Healy SVC Yd 80,000 73,333 7,266 9.1%(66,067)
AK Intertie-Healy&Goldhill Digital Fault Recorders 90,000 82,500 51,451 57.2%(31,049)
AK Intertie-Goldhill SVC Cooling 65,000 59,583 460 0.7%(59,123)
Golden Valley Electric Total 580,340 531,977 120,591 20.8%(411,386)
Matanuska Electric Association
Matanuska Electric Association Total - - - 0.0%-
57100 Maint of OH Lines
Golden Valley Electric
AK Intertie-Northern Maintenance 78,000 71,500 97,809 125.4%26,309
Golden Valley Electric Total 78,000 71,500 97,809 125.4%26,309
Matanuska Electric Association
AK Intertie-Special Patrols (Incl Foundation Insp) 5,000 4,583 599 12.0%(3,984)
AK Intertie-Southern Maint. (Incl Ground Insp) 200,000 183,333 77,740 38.9%(105,593)
AK Intertie-Equipment Repair and Replacement 640,000 586,667 - 0.0%(586,667)
Matanuska Electric Association Total 845,000 774,583 78,340 9.3%(696,243)
57102 Maint OH Lines-ROW Clearing
Golden Valley Electric
AK Intertie-Northern ROW Clearing 73,000 66,917 68,882 94.4%1,965
Golden Valley Electric Total 73,000 66,917 68,882 94.4%1,965
Matanuska Electric Association
AK Intertie-Southern ROW Clearing 150,000 137,500 168,367 112.2%30,867
Matanuska Electric Association Total 150,000 137,500 168,367 112.2%30,867
58XXX Misc Admin
Alaska Energy Authority
AK Intertie-IMC Admin Cost (Audit, meeting, legal) 17,500 16,042 17,150 98.0%1,108
Alaska Energy Authority Total 17,500 16,042 17,150 98.0%1,108
58401 Insurance Premiums
Alaska Energy Authority
AK Intertie-Insurance 21,517 19,724 21,488 99.9%1,764
Alaska Energy Authority Total 21,517 19,724 21,488 99.9%1,764
Matanuska Electric Association
AK Intertie-Insurance 14,133 12,955 - 0.0%(12,955)
Matanuska Electric Association Total 14,133 12,955 - 0.0%(12,955)
Total Station Expenses 2,210,390 2,026,190 967,243 43.8%(1,058,947)
Total Operating Expenses 2,210,390 2,026,190 967,243 43.8%(1,058,947)
Page 2 of 4
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL EXPENSES
FOR THE PERIOD 07/01/2021 THROUGH 05/31/2022
REVENUE
FY22 Approved
Budget
BUDGET %
07/01/2021 -
05/31/2022 Actuals
YTD Actuals as a
% of Total
Annual Budget
OVER (UNDER)
YTD Variance
EXPENSES-AEA ADMINISTRATION
71001 Total Expense, Budget
Alaska Energy Authority Total 220,000 201,667 - 0.0%(91,667)
72510 Admin Per Diem-In State
Alaska Energy Authority Total - - 399 0.0%399
72512 Admin Per Diem-Out of State
Alaska Energy Authority Total - - 168 0.0%168
73115 Other Professional Services
Alaska Energy Authority Total - - - 0.0%-
73141 Legal Services-SOA
Alaska Energy Authority Total - - - 0.0%-
73150 AIDEA Staff-Prof Services
Alaska Energy Authority Total - - 120,731 0.0%120,731
73160 Temporary Staffing Services
Alaska Energy Authority Total - - 18,631 0.0%18,631
73905 Recording Fees
Alaska Energy Authority Total - - - 0.0%-
Total Total Expense, Budget 220,000 201,667 139,929 63.6%48,262
Total AEA Administration Expenses 220,000 201,667 139,929 63.6%48,262
Total Expenses 2,430,390 2,227,857 1,107,172 45.6%(1,010,685)
SURPLUS (SHORTAGE)(139,680) (128,040) 1,380,477 -988.3%1,398,517
Page 3 of 4
Alaska Intertie FY22 Budget to Actuals Status Report for the Period July 1, 2021 through May 31, 2022
Budgeted Usage Actual Usage to Date
GVEA MEA CEA ML&P TOTAL GVEA MEA CEA ML&P TOTAL
MONTH MWH MWH MWH MWH MWH MONTH MWH MWH MWH MWH MWH
Jul 11,050 1,795 - - 12,845 Jul 4,815 1,863 - - 6,678
Aug 8,973 2,008 - - 10,981 - Aug 12,415 1,905 - - 14,320
Sep 13,749 1,952 - - 15,701 Sep 3,283 1,870 - - 5,153
Oct 28,741 1,821 - - 30,562 Oct 13,008 1,959 - - 14,967
Nov 10,171 1,786 - - 11,957 Nov 8,519 2,300 - - 10,819
Dec 8,962 2,048 - - 11,010 Dec 6,423 2,343 - - 8,766
Jan 12,043 2,395 - - 14,438 Jan 20,852 2,350 - - 23,202
Feb 8,513 2,070 - - 10,583 Feb 36,168 1,996 - - 38,164
Mar 5,617 2,168 - - 7,785 Mar 30,015 2,207 - - 32,222
Apr 12,448 1,798 - - 14,246 Apr 24,644 2,019 - - 26,663
May 9,247 1,966 - - 11,213 May 27,507 2,143 - - 29,650
Jun 32,274 1,940 - - 34,214 Jun - - - - -
TOTAL 161,788 23,747 - - 185,535 TOTAL 187,649 22,955 - - 210,604
INTERTIE PROJECTED ENERGY USAGE TO DATE (MWH) 151,321 INTERTIE ACTUAL ENERGY USAGE TO DATE (MWH) 210,604
Budgeted Operating Costs for the period 2,026,190$ Actual Operating Costs for the period 967,243$
(based on amended budget)
Budgeted Usage Revenue for the period 1,349,783$ Actual (Billed) Usage Revenue for the period 1,878,588$
(budgeted rate x projected usage) (budgeted rate x actual usage)
Estimated Budgeted Energy Rate per MWH 11.18$
(based on to date budgeted costs and usage)
Annual Budgeted Energy Rate (Billed Rate) 8.92$ Projected Actual Energy Rate per MWH 3.83$
(based on minimum contract value) (based on to date actual costs and usage)
Page 4 of 4