HomeMy WebLinkAbout2023-07-28 IMC Agenda and docs INTERTIE MANAGEMENT COMMITTEE (IMC) REGULAR MEETING AGENDA July 28, 2023 9:00 AM Alaska Energy Authority Board Room 813 W Northern Lights Blvd, Anchorage, AK 99503 To participate dial 1-888-585-9008 and use code 212-753-619# 1. CALL TO ORDER 2. ROLL CALL FOR COMMITTEE MEMBERS 3. PUBLIC ROLL CALL 4. PUBLIC COMMENTS 5. AGENDA APPROVAL 6. APPROVAL OF PRIOR MINUTES – June 23, 2023 7. NEW BUSINESS A. Annual Meeting and Election of Officers 8. COMMITTEE REPORTS A. Budget to Actuals B. IOC Committee C. Operator’s Report 9. MEMBERS COMMENTS 10. NEXT MEETING DATE – September 29, 2023 11. ADJOURNMENT Alaska Energy Authority AK Intertie Budget to Actual Revenues and Expenses DRAFT 07/01/2022 to 06/30/2023 Page 1 of 4 FY23 Approved Budget BUDGET 07/01/2022 - 06/30/2023 Actuals YTD Actuals as a % of Total Annual Budget OVER (UNDER) YTD Variance Revenue From Utilities AKI-GVEA 2,659,180 2,659,180 1,632,895 61%(1,026,285) AKI-CEA 405,435 405,435 405,435 100%- AKI-MEA 440,368 440,368 450,409 102%10,041 Total Revenue From Utilities 3,504,984 3,504,984 2,488,740 71%(1,016,244) Interest - - 58,625 0% 58,625 Total Revenues 3,504,984 3,504,984 2,547,364 73%(957,619) Total Revenues 3,504,984 3,504,984 2,547,364 73%(957,619) 56200 Station Expenses Golden Valley Electric AK Intertie-Substation Electricity Usage - - 478 0%478 Golden Valley Electric Total - - 478 0%478 56600 Misc Transmission Expense Alaska Energy Authority AK Intertie-Cell Phone Comm. Svc. for Wx Monitorng 13,000 13,000 10,983 84%(2,017) AK Intertie-Miscellaneous Studies as Needed 330,000 330,000 - 0%(330,000) Alaska Energy Authority Total 343,000 343,000 10,983 3%(332,017) Golden Valley Electric AK Intertie-Private Line Telephone Service SCADA 10,000 10,000 4,399 44%(5,602) Golden Valley Electric Total 10,000 10,000 4,399 44%(5,602) Matanuska Electric Association AK Intertie-Miscellaneous Studies as Needed 216,000 216,000 13,242 6%(202,758) Matanuska Electric Association Total 216,000 216,000 13,242 6%(202,758) 56601 Weather Monitoring Batteries Alaska Energy Authority AK Intertie-SLMS Support & Intertie Ground Patrol 140,000 140,000 106,932 76%(33,068) Alaska Energy Authority Total 140,000 140,000 106,932 76%(33,068) 56700 Rents Alaska Energy Authority AK Intertie-Alaska Railroad 700 700 1,500 214%800 Alaska Energy Authority Total 700 700 1,500 214%800 Matanuska Electric Association AK Intertie-Talkeetna Storage 7,200 7,200 6,600 92%(600) AK Intertie-Equipment Rental - - 102 0%102 Matanuska Electric Association Total 7,200 7,200 6,702 93%(498) 57000 Maintenance of Station Equip Chugach Electric Association AK Intertie-Teeland Substation 173,200 173,200 65,070 38%(108,130) Chugach Electric Association Total 173,200 173,200 65,070 38%(108,130) Golden Valley Electric AK Intertie-Healy, Cantwell, Goldhill 75,000 75,000 121,946 163%46,946 AK Intertie-SCADA Maint Healy, Cantwell, Goldhill 5,000 5,000 - 0%(5,000) AK Intertie-Cantwell 4S2 Switch Repair 156,000 156,000 34,672 22%(121,328) AK Intertie-Maint & Repaint Reactors Healy SVC Yd 80,000 80,000 4,472 6%(75,528) Golden Valley Electric Total 316,000 316,000 161,091 51%(154,909) Matanuska Electric Association AK Intertie-Douglas Substation 25,000 25,000 - 0%(25,000) Matanuska Electric Association Total 25,000 25,000 - 0%(25,000) 57100 Maint of OH Lines Golden Valley Electric AK Intertie-Northern Maintenance 100,000 100,000 63,914 64%(36,086) ALASKA ENERGY AUTHORITY AK INTERTIE BUDGET TO ACTUAL REVENUE AND EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 06/30/2023 Page 2 of 4 FY23 Approved Budget BUDGET 07/01/2022 - 06/30/2023 Actuals YTD Actuals as a % of Total Annual Budget OVER (UNDER) YTD Variance ALASKA ENERGY AUTHORITY AK INTERTIE BUDGET TO ACTUAL REVENUE AND EXPENSES FOR THE PERIOD 07/01/2022 THROUGH 06/30/2023 Golden Valley Electric Total 100,000 100,000 63,914 64%(36,086) Matanuska Electric Association AK Intertie-Special Patrols (Incl Foundation Insp)10,000 10,000 488 5%(9,512) AK Intertie-Southern Maint. (Incl Ground Insp)140,000 140,000 18,494 13%(121,506) AK Intertie-Equipment Repair & Replacement 684,000 684,000 - 0%(684,000) Matanuska Electric Association Total 834,000 834,000 18,982 2%(815,018) 57102 Maint OH Lines-ROW Clearing AK Intertie-Northern ROW Clearing 400,000 400,000 20,961 5%(379,039) Golden Valley Electric Total 400,000 400,000 20,961 5%(379,039) Matanuska Electric Association AK Intertie-Southern ROW Clearing 500,000 500,000 525,520 105%25,520 Matanuska Electric Association Total 500,000 500,000 525,520 105%25,520 58306 Misc Admin AK Intertie-IMC Admin Cost (Audit, Meeting, Legal)20,000 20,000 11,838 59%(8,162) Alaska Energy Authority Total 20,000 20,000 11,838 59%(8,162) 58401 Insurance Premiums Alaska Energy Authority AK Intertie-Insurance 25,000 25,000 22,183 89%(2,817) Alaska Energy Authority Total 25,000 25,000 22,183 89%(2,817) Total Total Expense 3,110,100 3,110,100 1,034,647 33%(2,075,453) Total Operating Expenses 3,110,100 3,110,100 1,034,647 33%(2,075,453) 71001 Total Expense, Budget Administrative Support Services 200,000 200,000 160,781 80%(39,219) Alaska Energy Authority Total 200,000 200,000 160,781 80%(39,219) Total Total Expense 200,000 200,000 160,781 80%(39,219) Total AEA Administration Expenses 200,000 200,000 160,781 80%(39,219) Total Expenses 3,310,100 3,310,100 1,195,429 36%(2,114,671) Surplus (Shortage)194,884 194,884 1,351,936 694%1,157,052 Page 3 of 4 Alaska Intertie FY23 Budget to Actuals Status Report for the Period 07/01/2022 through 06/30/2023 Budgeted Usage Actual Usage to Date GVEA MEA CEA TOTAL GVEA MEA CEA TOTAL MONTH MWH MWH MWH MWH MONTH MWH MWH MWH MWH Jul 32,301 1,918 - 34,219 Jul 10,865 2,252 - 13,117 Aug 36,741 1,968 - 38,709 Aug 19,648 2,239 - 21,887 Sep 37,596 1,951 - 39,547 Sep 21,418 2,080 - 23,498 Oct 40,739 2,003 - 42,742 Oct 35,865 2,205 - 38,070 Nov 35,783 2,269 - 38,052 Nov 16,159 2,213 - 18,372 Dec 35,761 2,455 - 38,216 Dec 16,826 2,535 - 19,361 Jan 35,543 2,139 - 37,682 Jan 13,942 2,363 - 16,305 Feb 30,397 2,018 - 32,415 Feb 36,444 2,162 - 38,606 Mar 33,294 2,171 - 35,465 Mar 20,752 2,355 - 23,107 Apr 38,537 1,906 - 40,443 Apr 13,294 2,132 - 15,426 May 33,177 1,867 - 35,044 May 15,603 2,247 - 17,850 Jun 38,652 1,811 - 40,463 Jun 7,189 1,654 - 8,843 TOTAL 428,521 24,476 - 452,997 TOTAL 228,005 26,437 - 254,442 INTERTIE PROJECTED ENERGY USAGE TO DATE (MWH)452,997 INTERTIE ACTUAL ENERGY USAGE TO DATE (MWH) 254,442 Budgeted Operating Costs for the Period 3,110,100$ Actual Operating Costs for the Period 1,034,647$ (based on amended budget) Budgeted Usage Revenue for the Period 2,319,345$ Actual (Billed) Usage Revenue for the Period 1,302,743$ (budgeted rate * projected usage)(budgeted rate * actual usage) Estimated Budgeted Energy Rate per MWH 5.73$ (based on budgeted costs and usage) Annual Budgeted Energy Rate (Billed Rate)5.12$ Projected Actual Energy Rate per MWH 3.40$ (based on minimum contract value)(based on actual costs and usage) Page 4 of 4 Intertie Management Committee Meeting IOC Report July 28, 2023 1.Intertie Operating Committee a.On June 17th an underfrequency load shed event occurred. A preliminary report of the event is being drafted by southern controller, CEA, and will be provided once completed. Preliminary analysis shows a high oil temperature on CEA’s plant 2, unit 7, resulted in unit 7 tripping offline. This resulted in the loss of 35 MW and the majority of CEA’s spin. Since the Alaska Intertie was not connected, the only other remaining spin was from MEA and HEA, which was not sufficient to prevent UFLS. The system frequency dropped to approximately 58.94 Hz and stage one UFLS occurred. Additional information will be provided with the report from the southern controller. The Dispatch Subcommittee is working with the SSS to develop a draft policy to address how spinning reserves are allocated and scheduled to help prevent events like this one in the future. 2.System Studies Subcommittee a.The SSS presented an update on the sychrophaser project. Utilities are working with their IT departments to determine how to safely and securely move data. This effort is anticipated to run through the end of the year. Implementation of EPG’s software will follow, and implementation is expected to run through the second quarter of 2024. b.The SSS executed a contract with NREL (National Renewable Energy Laboratories) to explore the impact of IBRs on the system. The scope includes looking at the impact of known IBR projects such as solar, BESS, and wind projects that are in the planning or development stages. Preliminary data collection is planned to run through the third quarter of 2023. Modeling of the base cases will follow and run through the end of the year. Once validation of the base cases is complete, modeling of the system with IBRs will be done. Final modeling and a report on the results will be completed by the second quarter of 2024. 3.SCADA & telecommunications Subcommittee a.An agreement between AEA and CEA for the installation of AEA owned communication between Anchorage and Douglas using AEA provided funds is complete and pending final signatures from AEA and CEA. b.The subcommittee is also looking into a project to extend communication between Douglas and Healy through a similar agreement with AEA. A preliminary scope is being developed for this project. 4.Dispatch Subcommittee a.The subcommittee has been assigned the task of drafting a policy on allocation and scheduling of spinning reserves. The draft policy should be ready be the next IMC meeting. Intertie Management Committee Meeting Operator Report July 28, 2023 1. Alaska Intertie usage report a. MWh usage – Measured at Douglas Substation GVEA MEA Total i. July – June FY23 228,005 26,438 254,443 ii. July – June FY22 199,182 25,061 224,243 iii. Delta - FY23 to FY22 14.47% 5.49% 13.47% 2. No Alaska Intertie trips to report Date Event SCADA Indication Cause No trip events to report 3. IOC quarterly Reliability Report For generation trips or transmission line trips where the loss of load is known, the Railbelt-wide frequency response is calculated. The magnitude of the tripped power and the change in frequency from the pre-trip value to the peak or nadir are used to calculate the MW/0.1Hz value often known as ‘Beta’. Chugach has calculated the Beta for several events and the table of the results is pasted below. Events without data for the MW magnitude of the trip were excluded, as were events that did not cause a frequency deviation of greater than 0.2 Hz. Event Date MW Tripped Pre-Trip Frequency (Hz) High /Low Frequency (Hz) Frequency Response (MW/0.1Hz) Oscillation Event 6/16- 22/2023 - Untriggered Oscillation 0.2Hz/5 sec period Oscillation Event Sullivan 7 Trip (UFLS) 6/24/2023 34.3 60.013 58.946 UFLS Stage 1 EGS Unit Trip 7/3/2023 16.1 59.925 59.742 8.8 Nikkels 3 Trip 7/20/2023 17.3 60.017 59.782 7.4 Healy 2 Trip 7/24/2023 51.3 60.039 59.541 10.3 4. Sullivan 7 Trip Event Sullivan Unit 7 Trip event resulted in a UFLS activation for a 34.3 MW loss of generation. This appears to be a violation of the reliability standards. Analysis is underway. This is the second activation of UFLS this summer. Once again indications are the activation was contributed to by quality of spin issues. The Alaska Intertie was open for this event. Response was seen by EGS, Soldotna BESS, Nikiski. However, the total response fell short of the loss by over 10 MW. Event Description:Sullivan 7 Trip with UFLS Event Date:6/24/2023 Event Time:18:15:34 IOC Report # Railbelt Beta:3.2 MW/0.1Hz Chugach PFR:-2.4 MW/0.1Hz Pre Event Frequency 60.013 Hz Synchrophasor Frequency Minimum 58.946 Hz Sullivan 7 Tesla Frequency Deviation 1.067 Hz Time to Minimum Sec Time to Return to 60 Sec Primary Frequency Response (Beta) Generator Trip Summary Frequency Data EVENT SUMMARY Only enter data in shaded fields