HomeMy WebLinkAbout2025-05-02 IMC Agenda and docs INTERTIE MANAGEMENT COMMITTEE (IMC) REGULAR MEETING
May 2, 2025
9:00 am
Alaska Energy Authority Board Room 813 W Northern Lights Blvd, Anchorage, AK 99503 To participate dial 1-888-585-9008 and use code 212-753-619#
1. CALL TO ORDER
2. ROLL CALL FOR COMMITTEE MEMBERS
3. PUBLIC ROLL CALL
4. AGENDA APPROVAL
5. PUBLIC COMMENTS
6. APPROVAL OF PRIOR MINUTES – March 21, 2025
7. NEW BUSINESS
A. FY26 Budget
8. OLD BUSINESS
A. Repairs to Structure 616
9. COMMITTEE REPORTS
A. Budget to Actuals Mark Ziesmer
B. IOC Report Jon Sinclair
C. Operator Report Mike Miller
10. EXECUTIVE SESSION – (Bylaws Section 5.11.3 (a)) To discuss confidential matters
which by law are required to be confidential.
11. MEMBERS COMMENTS
12. NEXT MEETING DATE – June 20, 2025 at 9:00 am
13. ADJOURNMENT
Alaska Energy Authority
Alaska Intertie
Date: May 2, 2025
Proposed FY2026 Budget
Page 1 of 8
ALASKA ENERGY AUTHORITY
ALASKA INTERTIE
Proposed FY2026 Budget Contents
Description Page #
Budget Summary 3
O&M Budget 4-5
Grant Budget 6
Usage Projection 7
AK Intertie MITCR 8
Page 2 of 8
Proposed FY2026 Budget
Budget Summary
Revenues O&M Grant Total Total GVEA Total CEA Total MEA Total HEA Total
Revenue from Operations 4,023,927 - 4,023,927 2,495,127 371,920 1,156,880 - 4,023,927
Grant Match - 291,558 291,558 238,795 18,847 32,970 946 291,558
4,023,927 291,558 4,315,485 2,733,922 390,767 1,189,850 946 4,315,485
Expenses
Operations 3,212,700 - 3,212,700
Admin 567,000 - 567,000
Grant - 291,558 291,558
3,779,700 291,558 4,071,258
Surplus/(Shortage) 244,227 - 244,227
(Total Paid by Utilities)
Page 3 of 8
Proposed FY2026 Budget
data @ 2/7/25
FY25 Approved Proposed
FY22 FY23 FY24 Actual FY25 FY26
Actual Actual Actual @12/31/24 Amend Budget Budget
REVENUES
GVEA 2,075,166 1,632,539 3,896,647 1,641,366 3,061,282 2,495,127
CEA 265,259 405,435 471,717 300,792 462,878 371,920
MEA 413,239 450,409 674,787 429,442 821,110 1,156,880
INTEREST 2,241 58,625 106,406 81,092 - -
OTHER - 27,357 113,875 -
TOTAL REVENUES 2,755,905 2,574,364 5,263,432 2,452,692 4,345,270 4,023,927
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 45,889 478 - - - -
45,889 478 - - - -
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)5,556 5,788 2,315 - 6,000 6,000
Cell Phone Comm. Svc for Weather Monitoring (Verizon)12,025 11,983 12,007 5,001 13,000 13,000
SLMS Support and Intertie Ground Patrol 154,947 145,346 133,342 - 175,000 175,000
172,528 163,116 147,664 5,001 194,000 194,000
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 1,500 1,000 1,000 1,000 1,000
MEA - Talkeetna Storage 7,200 7,200 7,200 3,600 7,200 7,200
Equipment Rental 375 102 - - - -
8,275 8,802 8,200 4,600 8,200 8,200
FERC 569 Maintenance of Structures
MEA - Insulator & Str Replacement (Teeland to Douglas)- - - - - 350,000
MEA - Maintenance of Structures - - 5,204 - 150,000 100,000
- - 5,204 - 150,000 450,000
FERC 570 - Maintenance of Station Equipment
GVEA - HLSB17 Sync PT Replacement - - - - 25,000 50,000
GVEA - Healy, Cantwell, Goldhill 63,163 141,248 80,624 13,100 64,500 54,500
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill - 1,120 - - 10,000
GVEA - Replace Healy Substation Breaker B17 - - - 285,736 350,000 -
GVEA - Healy and Goldhill Digital Fault Recorders 53,255 - 6,046 - - -
GVEA - Gold Hill SVC Cooling 460 - 2,059 - - -
GVEA - Cantwell Install Breakers or Load Break Switches 182,606 - - - 650,000 -
GVEA - Cantwell 4S2 Switch Repair - 43,217 748 4,084 - -
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard - 4,472 - - - -
GVEA - Perform Maintenance, repaint Reactors Gold Hill SVC Yard 7,452 - - - - -
GVEA - Mobile Substation Site - - - - - 100,000
GVEA - SVC Insulator Replacements - Helay and Gold hill - - - - - 3,000
GVEA - SVC Capacitor Spares - - - 38,499 - -
GVEA - Redesign Healy SVC 138 kV Interconnection - - - - - 50,000
GVEA - Intertie - SVC Project - - - 120,000 -
CEA - Teeland Substation Communication - - 6,787 - 5,000 5,000
CEA - Teeland Substation 115,365 74,128 168,737 60,202 170,000 180,000
CEA - Douglas Substation Communication - - - 1,578 2,400 5,000
MEA - Douglas Substation - - 5,181 5,807 300,000 150,000
MEA - Douglas Substation 138 kV BKR Inspections - - - - 25,000 -
CEA - Telecomm Support (Douglas, Teeland, Anc-Fbks Leased Circuits)1,742 - - - - 100,000
424,043 263,065 271,301 409,006 1,711,900 707,500
Page 4 of 8
FERC 571 - Maintenance of Overhead Lines
GVEA - Northern Maintenance 107,641 99,464 99,237 50,058 - 103,000
GVEA-Private Line Telephone Service - - - - 85,000
GVEA - Northern ROW Clearing - 28 miles of ROW north of Indian River 68,882 328,252 626,189 33,148 550,000 600,000
GVEA - Northern ROW Clearing - Remote Sensing Analysis - - 335,516 - - -
GVEA - Landing Pads - - - - 75,000 60,000
GVEA - Re-level Structures & Adjust Guys - - - - - -
GVEA - Repair Tower 616 Foundation - - - - 500,000
GVEA - Repair Tower 531 Foundation - - 154,915 - - -
GVEA - Repair Tower 532 Foundation - - 154,915 - - -
GVEA - Helicopter Patrols - - - - 80,000 -
MEA - Special Patrols [Incl Helicopter Inspections]599 11,603 6,510 19,982 15,000 50,000
MEA - Southern Maint (Incl Ground and Climbing Inspect)191,358 78,729 - - 140,000 125,000
MEA - Southern ROW Clearing 168,367 525,520 287,124 47,854 300,000 175,000
MEA - Southern ROW Remote Sensing and Analysis - - 104,849 5,561 10,000 10,000
MEA - Equipment Repair and Replacement 76,494 803,393 152,755 - - 100,000
613,341 1,846,961 1,922,010 156,603 1,170,000 1,808,000
FERC 924 - Property Insurance
AK Intertie - Insurance 37,133 40,178 42,558 26,418 37,000 45,000
37,133 40,178 42,558 26,418 37,000 45,000
Intertie Operating Costs Total 1,301,209 2,322,601 2,396,938 601,628 3,271,100 3,212,700
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 235,608 190,236 254,493 121,460 250,000 300,000
235,608 190,236 254,493 121,460 250,000 300,000
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)29,276 14,579 20,672 4,697 20,000 20,000
29,276 14,579 20,672 4,697 20,000 20,000
FERC 566 - Miscellaneous Transmission Expense
Misc Studies: System Reserves Study (IBR), PSS/E maint,
230 kV Upgrade System Impact Study 145,327 150,368 57,544 7,500 515,000 180,000
LIDAR study (complete lidar, vegetation, PLS CADD file with drawings, structure/foundation
movement, infrared, and imaging)
- - - - 40,000 -
PSSE Maintenance - - - - - 27,000
EPRI (Annual Cost)- - - - - 40,000
145,327 150,368 57,544 7,500 555,000 247,000
Intertie Administration Costs Total 410,211 355,182 332,708 133,657 825,000 567,000
TOTAL EXPENSE 1,711,420 2,677,783 2,729,646 735,285 4,096,100 3,779,700
SURPLUS (SHORTAGE) 1,044,485 (103,419) 2,533,786 1,717,407 249,170 244,227
Page 5 of 8
Proposed FY2026 Budget
Utility Grant Matching Contributions
Snow Loading Grant to re-insulate from Douglas north 80 miles
(Proposed Allocation Option #2 - Revenue excluding Admin Fee from Allocation)
GVEA Grant Submittal to AEA ($13.8M grant with $3M in matching funds & $500k in-kind in-house labor) AEA to revise per agreed payment
(Anticipating May 2025 start??)
75,000$
Percent FY26
Power Purchaser Share Match Year Project Total Cost Grant Reimbursement Grant Match (Cash and In-Kind)
1 $300,000 $225,000 $75,000
GVEA 81.95% 61,463 2 $3,497,845 $2,623,384 $874,461
CEA 6.69% 5,018 3 $3,497,845 $2,623,384 $874,461
MEA 11.36% 8,520 4 $3,497,845 $2,623,384 $874,461
5 $2,965,356 $2,224,017 $741,339
100.00%75,000 Total $13,758,891 $10,319,169 $3,439,722
Synchrophaser System Grant
(Proposed Allocation Option #3 - Revenue Excluding Capacity and Admin Fee from Allocation)
Per GVEA Grant Submittal to AEA ($2.2M grant with $50k in matching funds & $500k in-kind in-house labor) AEA to revise budget for approved payment methods
Total Match Amount
9,839$
HEA is contributing because they are receiving benefit from the Synchrophaser System (Railbelt wide)
Percent FY26 This is 9.61% of the Total Match Amount and is based on their load ratio share per resolution.
Power Purchaser Share Match
HEA (Load Ratio Share) 9.61% 946
Year Project Cost
Railbelt Utilities
Combined Cash Match
Railbelt Utilities
In Kind Contribution Grant Contribution
1 $440,245 $9,839 $100,222 $330,183
GVEA 89.13% 7,927 2 $440,245 $9,839 $100,222 $330,183
CEA 0.00% - 3 $440,245 $9,839 $100,222 $330,183
MEA 10.87% 967 4 $440,245 $9,839 $100,222 $330,183
5 $440,245 $9,839 $100,222 $330,183
100.00%8,893 Total $2,201,225 $49,195 $501,110 $1,650,915
USDA CWDG - Integrated Vegetation Management
MEA submittal to USDA ($3.7M grant with 25% match requirement)
(Anticipating May 2025 start??)
Total Match Amount
$206,719
Percent FY26
Power Purchaser Share Match Year Project Total Cost Grant Reimbursement Grant Match (Cash and In-Kind)
1 $826,875 $620,156 $206,719
GVEA 81.95% 169,406 2 $561,974 $421,481 $140,493
CEA 6.69% 13,830 3 $1,411,322 $1,058,492 $352,830
MEA 11.36% 23,483 4 $670,188 $502,641 $167,547
5 $277,145 $207,859 $69,286
100.00%206,719 Total $3,747,504 $2,810,629 $936,875
DOE Resiliency Grant - AK Intertie Snow Load Resiliency
DOE Resiliency Grant - Synchrophasor Project - Five Year Average
USDA CWDG Grant
Page 6 of 8
Proposed FY2026 Budget
True up
to
Contract GVEA MEA CEA TOTAL USAGE CAPACITY ADMIN CASH FLOW
MONTH Value MWH MWH MWH MWH GVEA MEA CEA GVEA MEA CEA GVEA | MEA | CEA TOTALS
Jul 2,846 2,194 0 5,040 $94,316 $72,709 $0 $265,200 $82,280 $182,920 $47,250 $744,676
Aug 5,188 2,276 0 7,464 $171,930 $75,427 $0 $47,250 $294,607
Sep 2,177 2,143 0 4,320 $72,146 $71,019 $0 $47,250 $190,415
Oct 6,861 2,045 0 8,906 $227,374 $67,771 $0 $47,250 $342,395
Nov 8,868 2,158 0 11,026 $293,886 $71,516 $0 $47,250 $412,652
Dec 8,868 2,436 0 11,304 $293,886 $80,729 $0 $47,250 $421,865
Jan 9,537 2,446 0 11,983 $316,056 $81,060 $0 $47,250 $444,367
Feb 504 2,224 0 2,728 $16,703 $73,703 $0 $47,250 $137,656
Mar 838 2,365 0 3,203 $27,771 $78,376 $0 $47,250 $153,397
Apr 4,853 2,180 0 7,033 $160,828 $72,245 $0 $47,250 $280,324
May 4,853 2,299 0 7,152 $160,828 $76,189 $0 $47,250 $284,267
Jun 6,192 1,957 0 8,149 $205,203 $64,855 $0 $47,250 $317,308
TOTAL 0 61,585 26,723 0 88,308 $2,040,927 $885,600 $0 $265,200 $82,280 $182,920 $567,000 $4,023,927
Total Energy: $2,926,527 Total Capacity : $530,400
88,308 MWH
80,949 MWH
204,984 MWH TOTAL MWH REVENUE $4,023,927
O&M BUDGET - Operating 3,212,700
-
O&M BUDGET - Administrative 567,000
UTILITY FY 26 TOTAL O&M BUDGET 3,779,700
MEA 31.00% 24.20 MW SURPLUS (SHORTAGE) $244,227
CEA 69.00% 53.80 MW
GVEA 100.00% 78.00 MW Annual Participant Administrative Contribution 189,000.00
156.0 Monthly Contribution per Participant 15,750.00
Usage Rate per KWH 0.03314$
Capacity Rate $3.40
Section 7.2.2 MINIMUM USAGE CONTRACT VALUE
ALASKA INTERTIE
FISCAL YEAR 2026
ENERGY PROJECTION
TOTAL INTERTIE PROJECTED ENERGY USAGE
Usage estimate reduced by 1/12 of Total for rate calculations
Page 7 of 8
Proposed FY2026 Budget
Annual System Demand
22-23 23-24 24-25 3 YR AVG.
SOUTHERN UTILITY PARTICIPANTS (MW)
CEA 343.8 322.9 338.69 335.1 MW APPROVED APPROVED APPROVED APPROVED APPROVED
MEA 147.0 150.7 154.2 150.6 MW 06/30/2026 06/30/2025 06/30/2024 06/30/2023 06/30/2022
UNITS FY26 FY25 FY24 FY23 FY22
USAGE KWH 80,949,000 162,048,000 251,476,000 415,247,000 187,902,000
OPERATING BUDGET $ 3,212,700 3,271,100 3,710,200 2,544,100 1,992,890
MITCR KW 156,000 156,000 156,000 156,000 156,100
TOTAL 485.7 MW
ENERGY (A)$.000/KWH $0.03314 $0.01686 $0.01232 $0.00512 $0.00886
NORTHERN UTILITY PARTICIPANTS (MW)
CAPACITY (B)$/KW $3.40 $3.46 $3.92 $2.69 $2.11
GVEA 205.5 205.5 204 205.0 MW
TOTAL 205.0 MW
MITCR DETERMINATION
FY 25 KWH CAP RATE CAP CHARGES
MEA 31.00% 24.20 MW 24,200 $3.40 82,280.00
CEA 69.00% 53.80 MW 53,800 $3.40 182,920.00
GVEA 100.00%78.00 MW 78,000 $3.40 265,200.00
156.00 MW 156,000 530,400.00
(A) See Section 7.2.5 AK Intertie Agreement
(B) See Section 7.2.6 AK Intertie Agreement
MINIMUM INTERTIE TRANSFER CAPABILITY RIGHTS
(MITCR) DETERMINATION
FOR FISCAL YEAR 2026
Page 8 of 8
Alaska Energy Authority
AK Intertie Budget to Actual Revenues and Expenses
07/01/2024 to 03/31/2025
Page 1 of 4
FY25 Amended
Budget
Amended
Budget
07/01/2024 -
03/31/2025 Actuals
YTD Actuals as a
% of Total
Annual Budget
Over (Under) YTD
Variance
Revenue From Utilities
AKI-GVEA 3,061,282 2,766,102 2,338,233 76%(427,870)
AKI-CEA 462,878 394,128 394,128 85%-
AKI-MEA 821,110 642,539 620,782 76%(21,757)
Total Revenue From Utilities 4,345,270 3,802,769 3,353,143 77%(449,627)
Interest - - 99,441 0% 99,441
Other - - - 0%-
Total Revenues 4,345,270 3,802,769 3,452,583 79%(350,186)
Total Revenues 4,345,270 3,802,769 3,452,583 79%(350,186)
56600 Misc Transmission Expense
Alaska Energy Authority
AK Intertie-Cell Phone Comm. Svc. for Wx Monitorng 13,000 9,750 6,431 49%(3,319)
AK Intertie-Miscellaneous Studies as Needed 555,000 416,250 41,517 7%(374,733)
Alaska Energy Authority Total 568,000 426,000 47,948 8%(378,052)
Golden Valley Electric
AK Intertie-Private Line Telephone Service SCADA 6,000 4,500 - 0%(4,500)
Golden Valley Electric Total 6,000 4,500 - 0%(4,500)
56601 Weather Monitoring Batteries
Alaska Energy Authority
AK Intertie-SLMS Support & Intertie Ground Patrol 175,000 131,250 18,971 11%(112,279)
Alaska Energy Authority Total 175,000 131,250 18,971 11%(112,279)
56700 Rents
Alaska Energy Authority
AK Intertie-Alaska Railroad 1,000 750 1,000 100%250
Alaska Energy Authority Total 1,000 750 1,000 100%250
Matanuska Electric Association
AK Intertie-Talkeetna Storage 7,200 5,400 4,800 67%(600)
Matanuska Electric Association Total 7,200 5,400 4,800 67%(600)
56900 Maintenance of Structures
Matanuska Electric Association
AK Intertie-Maintenance of Structures 150,000 112,500 - 0%(112,500)
Matanuska Electric Association Total 150,000 112,500 - 0%(112,500)
57000 Maintenance of Station Equip
Chugach Electric Association
AK Intertie-Teeland Substation 175,000 131,250 60,202 34%(71,048)
AK Intertie-Douglas Substation Communications 2,400 1,800 1,578 66%(222)
Chugach Electric Association Total 177,400 133,050 61,781 35%(71,269)
Golden Valley Electric
AK Intertie-GVEA SVC Project 120,000 90,000 - 0%(90,000)
AK Intertie-Healy, Cantwell, Goldhill 64,500 48,375 13,100 20%(35,275)
AK Intertie-Cantwell Instl Brkrs or Load Brkr Swch 650,000 487,500 4,964 1%(482,536)
AK Intertie-Capacitor Spares - - 38,499 0%38,499
AK Intertie-HLSB Sync PT Replacement 25,000 18,750 528 2%(18,222)
AK Intertie-Replace Healy Substation Breaker 350,000 262,500 285,736 82%23,236
Golden Valley Electric Total 1,209,500 907,125 342,827 28%(564,298)
Matanuska Electric Association
AK Intertie-Douglas Substation 325,000 243,750 5,807 2%(237,943)
Matanuska Electric Association Total 325,000 243,750 5,807 2%(237,943)
57100 Maint of OH Lines
Golden Valley Electric
AK Intertie-Northern Maintenance - - 50,058 0%50,058
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL REVENUE AND EXPENSES
FOR THE PERIOD 07/01/2024 THROUGH 03/31/2025
Page 2 of 4
FY25 Amended
Budget
Amended
Budget
07/01/2024 -
03/31/2025 Actuals
YTD Actuals as a
% of Total
Annual Budget
Over (Under) YTD
Variance
ALASKA ENERGY AUTHORITY
AK INTERTIE BUDGET TO ACTUAL REVENUE AND EXPENSES
FOR THE PERIOD 07/01/2024 THROUGH 03/31/2025
AK Intertie-Landing Pads 75,000 56,250 - 0%(56,250)
AK Intertie-Special Patrols (Incl Foundation Insp)80,000 60,000 - 0%(60,000)
Golden Valley Electric Total 155,000 116,250 50,058 32%(66,192)
Matanuska Electric Association
AK Intertie-Special Patrols (Incl Foundation Insp)15,000 11,250 19,982 133%8,732
AK Intertie-Southern Maint. (Incl Ground Insp)140,000 105,000 - 0%(105,000)
Matanuska Electric Association Total 155,000 116,250 19,982 13%(96,268)
57102 Maint OH Lines-ROW Clearing
Golden Valley Electric
AK Intertie-Northern ROW Clearing 550,000 412,500 33,148 6%(379,352)
Golden Valley Electric Total 550,000 412,500 33,148 6%(379,352)
Matanuska Electric Association
AK Intertie-Southern ROW Clearing 300,000 225,000 47,854 16%(177,146)
AK Intertie-Southern ROW Remote Sensing 10,000 7,500 5,561 56%(1,939)
Matanuska Electric Association Total 310,000 232,500 53,415 17%(179,085)
58306 Misc Admin
Alaska Energy Authority
AK Intertie-IMC Admin Cost (Audit, Meeting, Legal)20,000 15,000 11,177 56%(3,823)
Alaska Energy Authority Total 20,000 15,000 11,177 56%(3,823)
58401 Insurance Premiums
Alaska Energy Authority
AK Intertie-Insurance 22,200 16,650 26,418 119%9,768
Alaska Energy Authority Total 22,200 16,650 26,418 119%9,768
Matanuska Electric Association
AK Intertie-Insurance 14,800 11,100 - 0%(11,100)
Matanuska Electric Association Total 14,800 11,100 - 0%(11,100)
Total Total Expense 3,846,100 2,884,575 677,331 18%(2,207,244)
Total Operating Expenses 3,846,100 2,884,575 677,331 18%(2,207,244)
71001 Total Expense, Budget
Alaska Energy Authority
Administrative Support Services 250,000 187,500 214,548 86%27,048
Alaska Energy Authority Total 250,000 187,500 214,548 86%27,048
Total Total Expense 250,000 187,500 214,548 86%27,048
Total AEA Administration Expenses 250,000 187,500 214,548 86%27,048
Total Expenses 4,096,100 3,072,075 891,879 22%(2,180,196)
Surplus (Shortage)249,170 730,694 2,560,705 1028%1,830,010
Page 3 of 4
Alaska Intertie FY25 Budget to Actuals Status Report for the Period 07/01/2024 through 03/31/2025
Budgeted Usage Actual Usage to Date
GVEA MEA CEA TOTAL GVEA MEA CEA TOTAL
MONTH MWH MWH MWH MWH MONTH MWH MWH MWH MWH
Jul 12,275 2,187 - 14,462 Jul 9,839 2,309 - 12,148
Aug 14,077 2,295 - 16,372 Aug 8,590 2,300 - 10,890
Sep 14,766 2,210 - 16,976 Sep 16,901 2,125 - 19,026
Oct 27,634 2,165 - 29,799 Oct 21,194 2,011 - 23,205
Nov 27,147 2,339 - 29,486 Nov 21,209 2,122 - 23,331
Dec 26,405 2,633 - 29,038 Dec 19,086 2,312 - 21,398
Jan 8,460 2,458 - 10,918 Jan 9,015 2,207 - 11,222
Feb - 2,261 - 2,261 Feb 308 2,175 - 2,483
Mar 5,060 2,466 - 7,526 Mar 4,303 2,162 - 6,465
Apr 5,310 2,258 - 7,568 Apr - - - -
May 4,060 2,321 - 6,381 May - - - -
Jun 4,060 1,935 - 5,995 Jun - - - -
TOTAL 149,253 27,527 - 176,780 TOTAL 110,445 19,723 - 130,168
INTERTIE PROJECTED ENERGY USAGE TO DATE (MWH)156,836 INTERTIE ACTUAL ENERGY USAGE TO DATE (MWH) 130,168
Budgeted Operating Costs for the Period 2,884,575$ Actual Operating Costs for the Period 677,331$
(based on amended budget)
Budgeted Usage Revenue for the Period 2,644,259$ Actual (Billed) Usage Revenue for the Period 2,194,632$
(budgeted rate * projected usage)(budgeted rate * actual usage)
Estimated Budgeted Energy Rate per MWH 15.36$
(based on budgeted costs and usage)
Annual Budgeted Energy Rate (Billed Rate)16.86$ Projected Actual Energy Rate per MWH 4.34$
(based on minimum contract value)(based on actual costs and usage)
Page 4 of 4
Intertie Management Committee Meeting
IOC Report
May 2, 2025
1.Intertie Operating Committee
a.The IOC has reviewed and recommends approval of the attached draft budget. Minor
changes have been made since the last review in March. These include additional
funding for the Douglas communication tower upgrade, increase in insurance and
administrative expenses, and increased cost for PSSE software. The increases total
approximately $200k in the budget since the last revision in March. In addition, the
anticipated grant costs have been updated.
b.Repairs to structure 616 are tentatively scheduled for the middle of July. This schedule
is based on the material lead times. Funding for the repair is included in the FY26
budget.
c.The Douglas control enclosure foundation repair is planned for June. Piles are on order,
the design is complete, and bidding will be done in May.
2.System Studies Subcommittee
a.Preliminary results are under review by the SSS for an impact study that focuses on
upgrading the Kenai to Anchorage and Anchorage to Healy transmission lines to 230 kV.
A summary report should be ready for the IMC to review at the next meeting.
b.The SSS has commissioned a study to analyze the impact of a high penetration of
inverter base resources on the Railbelt. The study is underway, but results are not
anticipated until the fourth quarter.
c.The RRC has requested that they attend the SSS as a nonvoting member and they have
requested a PSSE key. The IOC is requesting direction from the IMC on what interaction,
if any, the IMC or its subcommittee’s should have with the RRC.
d.Grant funding for the synchrophasor and snow unloading projects is anticipated in May.
Both projects will kickoff once funding is available.
3.Relay, Protection, & Control Subcommittee
a.The committee plans to review and determine what is needed to provide GVEA remote
access to Douglas after the Douglas control enclosure foundation repair is completed.
Alaska Energy Authority
Alaska Intertie
Date: May 2, 2025
Proposed FY2026 Budget
Page 1 of 9
ALASKA ENERGY AUTHORITY
ALASKA INTERTIE
Proposed FY2026 Budget Contents
Description Page #
Budget Summary 3
Date: May 2, 2025
O&M Budget 4-5
Grant Budget 6
Usage Projection 7
AK Intertie MITCR 8
Page 2 of 9
Proposed FY2026 Budget
Budget Summary
Revenues O&M Grant Total Total GVEA Total CEA Total MEA Total HEA Total
Revenue from Operations 4,023,927 -4,023,927 2,495,127 371,920 1,156,880 -4,023,927
Grant Match -83,893 83,893 69,389 5,018 9,487 946 83,893
4,023,927 83,893 4,107,821 2,564,516 376,938 1,166,367 946 4,107,821
Date: May 2, 2025
Expenses
Operations 3,212,700 -3,212,700
Admin 567,000 -567,000
Grant -83,893 83,893
3,779,700 83,893 3,863,593
Surplus/(Shortage)244,227 -244,227
(Total Paid by Utilities)
Page 3 of 9
Proposed FY2026 Budget
data @ 2/7/25
FY25 Approved Proposed
FY22 FY23 FY24 Actual FY25 FY26
Actual Actual Actual @12/31/24 Amend Budget Budget
REVENUES
GVEA 2,075,721 1,632,539 3,896,647 1,641,366 3,061,282 2,495,127
CEA 265,259 405,435 471,717 300,792 462,878 371,920
MEA 413,239 450,409 674,787 429,442 821,110 1,156,880
Date: May 2, 2025INTEREST 1,668 58,625 106,406 81,092 --
OTHER -27,357 113,875 -
TOTAL REVENUES 2,755,887 2,574,364 5,263,432 2,452,692 4,345,270 4,023,927
EXPENSES
FERC 562 - Station Operation Expenses
GVEA - Substation Electricity Usage 45,889 478 ----
45,889 478 ----
FERC 566 - Miscellaneous Transmission Expense
Private Line Telephone Service for AKI SCADA (GVEA)5,556 5,788 2,315 -6,000 6,000
Cell Phone Comm. Svc for Weather Monitoring (Verizon)12,025 11,983 12,007 5,001 13,000 13,000
SLMS Support and Intertie Ground Patrol 154,947 145,346 133,342 -175,000 175,000
Misc Studies as needed (Cyber Security Study)-----
172,528 163,116 147,664 5,001 194,000 194,000
FERC 567 - Transmission Expenses - Rents
Rents - Alaska Railroad 700 1,500 1,000 1,000 1,000 1,000
MEA - Talkeetna Storage 7,200 7,200 7,200 3,600 7,200 7,200
Equipment Rental 375 102 ----
PSSE key replacement ------
8,275 8,802 8,200 4,600 8,200 8,200
FERC 569 Maintenance of Structures
MEA - Insulator & Str Replacement (Teeland to Douglas)----350,000
MEA - Maintenance of Structures --5,204 -150,000 100,000
--5,204 -150,000 450,000
FERC 570 - Maintenance of Station Equipment
GVEA - HLSB17 Sync PT Replacement ----25,000 50,000
GVEA - Healy, Cantwell, Goldhill 63,163 141,248 80,624 13,100 64,500 54,500
GVEA - SCADA Maintenance Healy, Cantwell, Gold Hill -1,120 --10,000
GVEA - Replace Healy Substation Breaker B17 ---285,736 350,000 -
GVEA - Healy, Teeland, Goldhill Dampers -----
GVEA - Healy and Goldhill Digital Fault Recorders 53,255 -6,046 ---
GVEA - Healy SVC Fire Alarm Panel Replacement -----
GVEA - Gold Hill SVC Fire Alarm Panel Replacement -----
GVEA - Gold Hill SVC Cooling 460 -2,059 ---
GVEA - Cantwell Install Breakers or Load Break Switches 182,606 ---650,000 -
GVEA - Cantwell 4S2 Switch Repair -43,217 748 4,084 --
GVEA - Replace Battery Healy SVC -----
GVEA - Replace Battery Goldhill SVC -----
GVEA - Perform Maintenance, repaint Reactors Healy SVC Yard -4,472 ----
GVEA - Perform Maintenance, repaint Reactors Gold Hill SVC Yard 7,452 -----
GVEA - Mobile Substation Site ----100,000
GVEA - Cantwell RTU, Recloser, & Transformer Protection replacement -----
GVEA - Recloser Control Replacement -----
GVEA - SVC Insulator Replacements - Helay and Gold hill ----3,000
GVEA - SVC Capacitor Spares ---38,499 --
GVEA - Dissolved Gas Monitoring Gold Hill & Healy ----
Page 4 of 9
GVEA - Redesign Healy SVC 138 kV Interconnection -----50,000
GVEA - SVC Intertie Trust Fund Eligible Expenses -----
GVEA - Intertie - SVC Project ---120,000 -
CEA - AK Intertie Yard -----
CEA - Teeland Substation Communication --6,787 -5,000 5,000
CEA - Teeland Substation 115,365 74,128 168,737 60,202 170,000 180,000
CEA - Douglas Substation Communication ---1,578 2,400 5,000
MEA - Douglas Substation --5,181 5,807 300,000 150,000
MEA - Douglas Substation 138 kV BKR Inspections ----25,000 -
GVEA - Douglas Substation OOS relaying and communications -----
CEA - Telecomm Support (Douglas, Teeland, Anc-Fbks Leased Circuits)1,742 ----100,000
424,043 263,065 271,301 409,006 1,711,900 707,500
FERC 571 - Maintenance of Overhead Lines -
GVEA - Northern Maintenance 107,641 99,464 99,237 50,058 -103,000
GVEA-Private Line Telephone Service ----85,000
GVEA - Northern ROW Clearing - 28 miles of ROW north of Indian River 68,882 328,252 626,189 33,148 550,000 600,000
GVEA - Northern ROW Clearing - Remote Sensing Analysis --335,516 ---
GVEA - Landing Pads ----75,000 60,000
GVEA - Re-level Structures & Adjust Guys ------
GVEA - Repair Tower 616 Foundation ----500,000
GVEA - Repair Tower 537 Foundation -----
GVEA - Repair Tower 539 Foundation -----
GVEA - Repair Tower 569 Foundation -----
GVEA - Repair Tower 531 Foundation --154,915 ---
GVEA - Repair Tower 532 Foundation --154,915 ---
GVEA - Repair Tower 748 -----
GVEA - Repair Tower 692 -----
GVEA - Helicopter Patrols ----80,000 -
MEA - Special Patrols [Incl Helicopter Inspections]599 11,603 6,510 19,982 15,000 50,000
MEA - Southern Maint (Incl Ground and Climbing Inspect)191,358 78,729 --140,000 125,000
MEA - Southern ROW Clearing 168,367 525,520 287,124 47,854 300,000 175,000
MEA - Southern ROW Remote Sensing and Analysis --104,849 5,561 10,000 10,000
MEA - TWR 195 Repair Monitoring -----
MEA - Equipment Repair and Replacement 76,494 803,393 152,755 --100,000
613,341 1,846,961 1,922,010 156,603 1,170,000 1,808,000
FERC 924 - Property Insurance
AK Intertie - Insurance 37,133 40,178 42,558 26,418 37,000 45,000
37,133 40,178 42,558 26,418 37,000 45,000
Intertie Operating Costs Total 1,301,209 2,322,601 2,396,938 601,628 3,271,100 3,212,700
FERC 570 - Maintenance of Station Equipment
MEA - Replace Protective Relay Schemes Douglas ------
-----
Intertie Cost of Improvements Total ------
FERC 920 - AEA Administrative Costs
Personal Services, Travel and Other Costs 235,608 190,236 254,493 121,460 250,000 300,000
235,608 190,236 254,493 121,460 250,000 300,000
FERC 920 - IMC Administrative Costs
IMC Administrative Costs (Audit, meetings, legal)29,276 14,579 20,672 4,697 20,000 20,000
29,276 14,579 20,672 4,697 20,000 20,000
FERC 566 - Miscellaneous Transmission Expense
Misc Studies: System Reserves Study (IBR), PSS/E maint,
230 kV Upgrade System Impact Study 145,327 150,368 57,544 7,500 515,000 180,000
Page 5 of 9
LIDAR study (complete lidar, vegetation, PLS CADD file with drawings,
structure/foundation movement, infrared, and imaging)----40,000 -
PSSE Maintenance 27,000
EPRI (Annual Cost)40,000
Synchrophaser System (only applies if grant is eliminated)-----
145,327 150,368 57,544 7,500 555,000 247,000
Intertie Administration Costs Total 410,211 355,182 332,708 133,657 825,000 567,000
TOTAL EXPENSE 1,711,420 2,677,783 2,729,646 735,285 4,096,100 3,779,700
SURPLUS (SHORTAGE)1,044,468 (103,419)2,533,786 1,717,407 249,170 244,227
Page 6 of 9
Proposed FY2026 Budget
Utility Grant Matching Contributions
Snow Loading Grant to re-insulate from Douglas north 80 miles
(Proposed Allocation Option #2 - Revenue excluding Admin Fee from Allocation)
GVEA Grant Submittal to AEA ($13.8M grant with $3M in matching funds & $500k in-kind in-house labor) AEA to revise per agreed payment
(Anticipating May 2025 start??)
Date: May 2, 2025
75,000$
Percent FY26
Power Purchaser Share Match Year Project Total Cost Grant Reimbursement Grant Match (Cash and In-Kind)
1 $300,000 $225,000 $75,000
GVEA 81.95%61,463 2 $3,497,845 $2,623,384 $874,461
CEA 6.69%5,018 3 $3,497,845 $2,623,384 $874,461
MEA 11.36%8,520 4 $3,497,845 $2,623,384 $874,461
5 $2,965,356 $2,224,017 $741,339
100.00%75,000 Total $13,758,891 $10,319,169 $3,439,722
Synchrophaser System Grant
(Proposed Allocation Option #3 - Revenue Excluding Capacity and Admin Fee from Allocation)
Per GVEA Grant Submittal to AEA ($2.2M grant with $50k in matching funds & $500k in-kind in-house labor) AEA to revise budget for approved payment methods
Total Match Amount
9,839$
HEA is contributing because they are receiving benefit from the Synchrophaser System (Railbelt wide)
Percent FY26 This is 9.61% of the Total Match Amount and is based on their load ratio share per resolution.
Power Purchaser Share Match
HEA (Load Ratio Share)9.61%946 Year Project Cost Railbelt Utilities
Combined Cash Match
Railbelt Utilities
In Kind Contribution Grant Contribution
1 $440,245 $9,839 $100,222 $330,183
GVEA 89.13%7,927 2 $440,245 $9,839 $100,222 $330,183
CEA 0.00%-3 $440,245 $9,839 $100,222 $330,183
MEA 10.87%967 4 $440,245 $9,839 $100,222 $330,183
5 $440,245 $9,839 $100,222 $330,183
100.00%8,893 Total $2,201,225 $49,195 $501,110 $1,650,915
USDA CWDG - Integrated Vegetation Management
MEA submittal to USDA ($3.7M grant with 25% match requirement)
(Anticipating May 2025 start??)
Total Match Amount
$936,875
Percent FY26
Power Purchaser Share Match Year Project Total Cost Grant Reimbursement Grant Match (Cash and In-Kind)
1 $826,875 $620,156 $206,719
GVEA 81.95%169,406 2 $561,974 $421,481 $140,493
CEA 6.69%13,830 3 $1,411,322 $1,058,492 $352,830
MEA 11.36%23,483 4 $670,188 $502,641 $167,547
5 $277,145 $207,859 $69,286
100.00%206,719 Total $3,747,504 $2,810,629 $936,875
DOE Resiliency Grant - AK Intertie Snow Load Resiliency
DOE Resiliency Grant - Synchrophasor Project - Five Year Average
USDA CWDG Grant
Page 7 of 9
Proposed FY2026 Budget
True up
to
Contract GVEA MEA CEA TOTAL USAGE CAPACITY ADMIN CASH FLOW
MONTH Value MWH MWH MWH MWH GVEA MEA CEA GVEA MEA CEA GVEA | MEA | CEA TOTALS
Date: May 2, 2025 2,846 2,194 0 5,040 $94,316 $72,709 $0 $265,200 $82,280 $182,920 $47,250 $744,676
Aug 5,188 2,276 0 7,464 $171,930 $75,427 $0 $47,250 $294,607
Sep 2,177 2,143 0 4,320 $72,146 $71,019 $0 $47,250 $190,415
Oct 6,861 2,045 0 8,906 $227,374 $67,771 $0 $47,250 $342,395
Nov 8,868 2,158 0 11,026 $293,886 $71,516 $0 $47,250 $412,652
Dec 8,868 2,436 0 11,304 $293,886 $80,729 $0 $47,250 $421,865
Jan 9,537 2,446 0 11,983 $316,056 $81,060 $0 $47,250 $444,367
Feb 504 2,224 0 2,728 $16,703 $73,703 $0 $47,250 $137,656
Mar 838 2,365 0 3,203 $27,771 $78,376 $0 $47,250 $153,397
Apr 4,853 2,180 0 7,033 $160,828 $72,245 $0 $47,250 $280,324
May 4,853 2,299 0 7,152 $160,828 $76,189 $0 $47,250 $284,267
Jun 6,192 1,957 0 8,149 $205,203 $64,855 $0 $47,250 $317,308
TOTAL 0 61,585 26,723 0 88,308 $2,040,927 $885,600 $0 $265,200 $82,280 $182,920 $567,000 $4,023,927
Total Energy:$2,926,527 Total Capacity :$530,400
88,308 MWH
80,949 MWH
204,984 MWH TOTAL MWH REVENUE $4,023,927
O&M BUDGET - Operating 3,212,700
-
O&M BUDGET - Administrative 567,000
UTILITY FY 26 TOTAL O&M BUDGET 3,779,700
MEA 31.00%24.20 MW SURPLUS (SHORTAGE)$244,227
CEA 69.00%53.80 MW
GVEA 100.00%78.00 MW Annual Participant Administrative Contribution 189,000.00
156.0 Monthly Contribution per Participant 15,750.00
Usage Rate per KWH 0.03314$
Capacity Rate $3.40
Section 7.2.2 MINIMUM USAGE CONTRACT VALUE
ALASKA INTERTIE
FISCAL YEAR 2026
ENERGY PROJECTION
TOTAL INTERTIE PROJECTED ENERGY USAGE
Usage estimate reduced by 1/12 of Total for rate calculations
Page 8 of 9
Proposed FY2026 Budget
Annual System Demand
22-23 23-24 24-25 3 YR AVG.
SOUTHERN UTILITY PARTICIPANTS (MW)
Date: May 2, 2025
CEA 343.8 322.9 338.69 335.1 MW APPROVED APPROVED APPROVED APPROVED APPROVED
MEA 147.0 150.7 154.2 150.6 MW 6/30/2026 6/30/2025 6/30/2024 6/30/2023 6/30/2022
UNITS FY26 FY25 FY24 FY23 FY22
USAGE KWH 80,949,000 162,048,000 251,476,000 415,247,000 187,902,000
OPERATING BUDGET $3,212,700 3,271,100 3,710,200 2,544,100 1,992,890
MITCR KW 156,000 156,000 156,000 156,000 156,100
TOTAL 485.7 MW
ENERGY (A)$.000/KWH $0.03314 $0.01686 $0.01232 $0.00512 $0.00886
NORTHERN UTILITY PARTICIPANTS (MW)
CAPACITY (B)$/KW $3.40 $3.46 $3.92 $2.69 $2.11
GVEA 205.5 205.5 204 205.0 MW
TOTAL 205.0 MW
MITCR DETERMINATION
FY 25 KWH CAP RATE CAP CHARGES
MEA 31.00%24.20 MW 24,200 $3.40 82,280.00
CEA 69.00%53.80 MW 53,800 $3.40 182,920.00
GVEA 100.00%78.00 MW 78,000 $3.40 265,200.00
156.00 MW 156,000 530,400.00
(A) See Section 7.2.5 AK Intertie Agreement
(B) See Section 7.2.6 AK Intertie Agreement
MINIMUM INTERTIE TRANSFER CAPABILITY RIGHTS
(MITCR) DETERMINATION
FOR FISCAL YEAR 2026
Page 9 of 9
Intertie Management Committee Meeting
Operator Report
May 2 , 202 5
1. Alaska Intertie usage report
a. MWh usage – Measured at Douglas Substation, YTD
GVEA MEA Total
July-April FY25 110,445 19,723 130,168
July-April FY24 238,539 20,338 258,877
Delta – FY25 to FY 24 (-53.7%) (-3.02%) (-49.7%)
2. Alaska Intertie trips to report
There were no trips of the Alaska Intertie in the months of March or April.
3. IOC Quarterly Reliability Report
For generation trips or transmission line trips where the loss of load is known, the Railbelt-wide
frequency response is calculated. The magnitude of the tripped power and the change in frequency
from the pre-trip value to the peak or nadir are used to calculate the MW/0.1Hz value often known as
‘Beta’. Chugach has calculated the Beta for several events and the table of the results is provided below.
Events without data for the MW magnitude of the trip were excluded, as were events that did not cause
a frequency deviation greater than 0.2 Hz.
Event Date Time MW Pre -Trip High /Low Freq Resp
Tripped Freq (Hz) Freq (Hz)
(MW/0.1Hz)
Healy 1 Trip 3/5/2025 14:01:20 13 59.93 59.78 8.6
Healy 1 Trip 3/11/25 14:15:17 18.3 59.95 59.78 11.0
North Pole Trip 3/20/25 18:28:30 20.9 59.99 59.77 9.6
UVSS-HPSS Trip 3/28/25 06:30:19 36.2 59.96 59.58 9.4
SPP Trip 4/6/25 14:48:17 94.1 59.98 58.99 9.6