Loading...
HomeMy WebLinkAbout2025-07-25 IMC Agenda and docs INTERTIE MANAGEMENT COMMITTEE (IMC) REGULAR MEETING July 25, 2025 9:00 am Alaska Energy Authority Board Room 813 W Northern Lights Blvd, Anchorage, AK 99503 To participate dial 1-888-585-9008 and use code 212-753-619# 1. CALL TO ORDER 2. ROLL CALL FOR COMMITTEE MEMBERS 3. PUBLIC ROLL CALL 4. AGENDA APPROVAL 5. PUBLIC COMMENTS 6. APPROVAL OF PRIOR MINUTES – June 20, 2025 7. NEW BUSINESS A. Annual Meeting and Election of Officers 8. OLD BUSINESS A. 616 Structure Update B. Snow Load Resiliency and Synchrophasor Grants Update 9. COMMITTEE REPORTS A. Budget to Actuals Mark Ziesmer B. IOC Report Mike Miller C. Operator Report Mike Miller 10. MEMBERS COMMENTS 11. NEXT MEETING DATE – September 19, 2025 at 9:00 am (new date) 12. ADJOURNMENT Alaska Energy Authority AK Intertie Budget to Actual Revenues and Expenses 07/01/2024 to 06/30/2025 DRAFT Page 1 of 4 FY25 Amended Budget Amended Budget 07/01/2024 - 06/30/2025 Actuals YTD Actuals as a % of Total Annual Budget Over (Under) YTD Variance Revenue From Utilities AKI-GVEA 3,061,282 3,061,282 2,654,471 87%(406,812) AKI-CEA 462,878 462,878 462,878 100%- AKI-MEA 821,110 821,110 803,910 98%(17,200) Total Revenue From Utilities 4,345,270 4,345,270 3,921,259 90%(424,012) Interest - - 118,200 0% 118,200 Other - - - 0%- Total Revenues 4,345,270 4,345,270 4,039,459 93%(305,812) Total Revenues 4,345,270 4,345,270 4,039,459 93%(305,812) 56600 Misc Transmission Expense Alaska Energy Authority AK Intertie-Cell Phone Comm. Svc. for Wx Monitorng 13,000 13,000 6,431 49%(6,569) AK Intertie-Miscellaneous Studies as Needed 555,000 555,000 134,247 24%(420,753) Alaska Energy Authority Total 568,000 568,000 140,678 25%(427,322) Golden Valley Electric AK Intertie-Private Line Telephone Service SCADA 6,000 6,000 13,240 221%7,240 Golden Valley Electric Total 6,000 6,000 13,240 221%7,240 56601 Weather Monitoring Batteries Alaska Energy Authority AK Intertie-SLMS Support & Intertie Ground Patrol 175,000 175,000 18,971 11%(156,029) Alaska Energy Authority Total 175,000 175,000 18,971 11%(156,029) 56700 Rents Alaska Energy Authority AK Intertie-Alaska Railroad 1,000 1,000 1,000 100%- Alaska Energy Authority Total 1,000 1,000 1,000 100%- Matanuska Electric Association AK Intertie-Talkeetna Storage 7,200 7,200 7,200 100%- Matanuska Electric Association Total 7,200 7,200 7,200 100%- 56900 Maintenance of Structures Matanuska Electric Association AK Intertie-Maintenance of Structures 150,000 150,000 - 0%(150,000) Matanuska Electric Association Total 150,000 150,000 - 0%(150,000) 57000 Maintenance of Station Equip Chugach Electric Association AK Intertie-Teeland Substation 175,000 175,000 86,953 50%(88,047) AK Intertie-Douglas Substation Communications 2,400 2,400 4,108 171%1,708 Chugach Electric Association Total 177,400 177,400 91,061 51%(86,339) Golden Valley Electric AK Intertie-GVEA SVC Project 120,000 120,000 3,693 3%(116,307) AK Intertie-Healy, Cantwell, Goldhill 64,500 64,500 37,514 58%(26,986) AK Intertie-Cantwell Instl Brkrs or Load Brkr Swch 650,000 650,000 682,125 105%32,125 AK Intertie-Capacitor Spares - - 38,499 0%38,499 AK Intertie-HLSB Sync PT Replacement 25,000 25,000 94,455 378%69,455 AK Intertie-Replace Healy Substation Breaker 350,000 350,000 336,527 96%(13,473) Golden Valley Electric Total 1,209,500 1,209,500 1,192,813 99%(16,687) Matanuska Electric Association AK Intertie-Douglas Substation 325,000 325,000 286,046 88%(38,954) AK Intertie-Special Patrols (Incl Foundation Insp)- - 25,077 0%25,077 Matanuska Electric Association Total 325,000 325,000 311,122 96%(13,878) 57100 Maint of OH Lines Golden Valley Electric ALASKA ENERGY AUTHORITY AK INTERTIE BUDGET TO ACTUAL REVENUE AND EXPENSES FOR THE PERIOD 07/01/2024 THROUGH 06/30/2025 Page 2 of 4 FY25 Amended Budget Amended Budget 07/01/2024 - 06/30/2025 Actuals YTD Actuals as a % of Total Annual Budget Over (Under) YTD Variance ALASKA ENERGY AUTHORITY AK INTERTIE BUDGET TO ACTUAL REVENUE AND EXPENSES FOR THE PERIOD 07/01/2024 THROUGH 06/30/2025 AK Intertie-Northern Maintenance - - 86,109 0%86,109 AK Intertie-Landing Pads 75,000 75,000 - 0%(75,000) AK Intertie-Special Patrols (Incl Foundation Insp)80,000 80,000 - 0%(80,000) Golden Valley Electric Total 155,000 155,000 86,109 56%(68,891) Matanuska Electric Association AK Intertie-Special Patrols (Incl Foundation Insp)15,000 15,000 19,982 133%4,982 AK Intertie-Southern Maint. (Incl Ground Insp)140,000 140,000 - 0%(140,000) AK Intertie-Equipment Repair & Replacement - - 23,023 0%23,023 Matanuska Electric Association Total 155,000 155,000 43,005 28%(111,995) 57102 Maint OH Lines-ROW Clearing Golden Valley Electric AK Intertie-Northern ROW Clearing 550,000 550,000 581,075 106%31,075 Golden Valley Electric Total 550,000 550,000 581,075 106%31,075 Matanuska Electric Association AK Intertie-Southern ROW Clearing 300,000 300,000 50,220 17%(249,780) AK Intertie-Southern ROW Remote Sensing 10,000 10,000 5,561 56%(4,439) Matanuska Electric Association Total 310,000 310,000 55,780 18%(254,220) 58306 Misc Admin Alaska Energy Authority AK Intertie-IMC Admin Cost (Audit, Meeting, Legal)20,000 20,000 12,652 63%(7,348) Alaska Energy Authority Total 20,000 20,000 12,652 63%(7,348) 58401 Insurance Premiums Alaska Energy Authority AK Intertie-Insurance 22,200 22,200 26,418 119%4,218 Alaska Energy Authority Total 22,200 22,200 26,418 119%4,218 Matanuska Electric Association AK Intertie-Insurance 14,800 14,800 22,235 150%7,435 Matanuska Electric Association Total 14,800 14,800 22,235 150%7,435 Total Total Expense 3,846,100 3,846,100 2,603,359 68%(1,242,741) Total Operating Expenses 3,846,100 3,846,100 2,603,359 68%(1,242,741) 71001 Total Expense, Budget Alaska Energy Authority Administrative Support Services 250,000 250,000 331,053 132%81,053 Alaska Energy Authority Total 250,000 250,000 331,053 132%81,053 Total Total Expense 250,000 250,000 331,053 132%81,053 Total AEA Administration Expenses 250,000 250,000 331,053 132%81,053 Total Expenses 4,096,100 4,096,100 2,934,412 72%(1,161,688) Surplus (Shortage)249,170 249,170 1,105,047 443%855,876 Page 3 of 4 Alaska Intertie FY25 Budget to Actuals Status Report for the Period 07/01/2024 through 06/30/2025 Budgeted Usage Actual Usage to Date GVEA MEA CEA TOTAL GVEA MEA CEA TOTAL MONTH MWH MWH MWH MWH MONTH MWH MWH MWH MWH Jul 12,275 2,187 - 14,462 Jul 9,839 2,309 - 12,148 Aug 14,077 2,295 - 16,372 Aug 8,590 2,300 - 10,890 Sep 14,766 2,210 - 16,976 Sep 16,901 2,125 - 19,026 Oct 27,634 2,165 - 29,799 Oct 21,194 2,011 - 23,205 Nov 27,147 2,339 - 29,486 Nov 21,209 2,122 - 23,331 Dec 26,405 2,633 - 29,038 Dec 19,086 2,312 - 21,398 Jan 8,460 2,458 - 10,918 Jan 9,015 2,207 - 11,222 Feb - 2,261 - 2,261 Feb 308 2,175 - 2,483 Mar 5,060 2,466 - 7,526 Mar 4,303 2,162 - 6,465 Apr 5,310 2,258 - 7,568 Apr 4,932 2,046 - 6,978 May 4,060 2,321 - 6,381 May 6,980 2,129 - 9,109 Jun 4,060 1,935 - 5,995 Jun 2,767 2,609 - 5,376 TOTAL 149,253 27,527 - 176,780 TOTAL 125,124 26,507 - 151,631 INTERTIE PROJECTED ENERGY USAGE TO DATE (MWH)176,780 INTERTIE ACTUAL ENERGY USAGE TO DATE (MWH) 151,631 Budgeted Operating Costs for the Period 3,846,100$ Actual Operating Costs for the Period 2,603,359$ (based on amended budget) Budgeted Usage Revenue for the Period 2,980,510$ Actual (Billed) Usage Revenue for the Period 2,556,499$ (budgeted rate * projected usage)(budgeted rate * actual usage) Estimated Budgeted Energy Rate per MWH 18.17$ (based on budgeted costs and usage) Annual Budgeted Energy Rate (Billed Rate)16.86$ Projected Actual Energy Rate per MWH 14.34$ (based on minimum contract value)(based on actual costs and usage) Page 4 of 4 Intertie Management Committee Meeting IOC Report July 25, 2025 1. Intertie Operating Committee a. Repairs to structure 616 are tentatively scheduled for August. This schedule is based on the material lead times. Materials should have arrived in Anchorage the week of July 7th. Funding for the repair is included in the FY26 budget. b. The Douglas control enclosure foundation repair is in construction. Pile driving efforts were successful and the enclosure was set on the new foundation the week of July 14th. The station was put back in service on July 18th. c. The Committee discussed the possibility of coordinate with SOA to be more efficient with communications for the Alaska Intertie. The intention would be to explore leveraging SOA communications infrastructure in ways that would be more cost efficient than the current communications utilized by the Alaska Intertie participants. This effort will be an assignment for the SCADA/Telecommunications subcommittee to follow up on. 2. System Studies Subcommittee a. Preliminary results are under review by the SSS for an impact study that focuses on upgrading the Kenai to Anchorage and Anchorage to Healy transmission lines to 230 kV. The original scope of work has been studied and they have begun analysis including a second parallel intertie circuit as requested in a previous change order. Those findings are anticipated for October. b. The SSS has commissioned a study to analyze the impact of a high penetration of inverter base resources on the Railbelt. The study is underway and the hope is to have some preliminary results by the end of July. c. Grant funding for the Synchrophasor and snow unloading projects is awaiting grant contracts for review. GVEA will generate a MOU detailing cost sharing for the Synchrophasor project once the grant contract has been reviewed. Both projects will kickoff once funding is available. d. GVEA is creating a RFP for a Railbelt EMT model. The intent is to release an RFP and gather bids in time to evaluate including this project in the FY27 Budget. 3. Relay, Protection, & Control Subcommittee a. The committee plans to review and determine what is needed to provide GVEA remote access to Douglas after the Douglas control enclosure foundation repair is completed. 4. SCADA/Telecommunications Subcommittee a. Representatives from each utility are being solicited to provide their interest in establishing a backup GPS time system. 5. Operations, Maintenance, and Scheduling Subcommittee a. Tony Zellers will be routing a mutual aid agreement to the utility CEOs for signature some time this year. b. The Operations, Maintenance, and Scheduling subcommittee was tasked with reviewing the CTs and revenue metering for the Alaska Intertie. There is interest at the IOC in identifying any locations that may be deficient in metering infrastructure. Intertie Management Committee Meeting Operator Report July 25, 2025 1. Alaska Intertie usage report a. MWh usage – Measured at Douglas Substation, YTD GVEA MEA Total EOFY25 125,124 26,507 151,631 EOFY24 270,743 26,792 297,535 Delta – FY25 to FY 24 (-53.8%) (-1.1%) (-49.0%) 2. Alaska Intertie trips to report There were no trips of the Alaska Intertie in the months of June. 3. IOC Quarterly Reliability Report For generation trips or transmission line trips where the loss of load is known, the Railbelt-wide frequency response is calculated. The magnitude of the tripped power and the change in frequency from the pre-trip value to the peak or nadir are used to calculate the MW/0.1Hz value often known as ‘Beta’. Chugach has calculated the Beta for several events and the table of the results is provided below. Events without data for the MW magnitude of the trip were excluded, as were events that did not cause a frequency deviation greater than 0.2 Hz. Event Date Time MW Pre-Trip High /Low Freq Resp Tripped Freq (Hz) Freq (Hz) (MW/0.1Hz) AEP ST5 Trip 6/10/2025 18:38:50 17.2 60.03 59.78 7