HomeMy WebLinkAboutAEA - Gov Energy Meeting_Oct_2011Construction $124.9 Final Design $15.4 Geothermal $8.7 Other $22.7 Reconn & Feasibility $31.4 Energy Meeting Renewable Energy Fund Update October 21, 2011 Current Status  Renewable Energy Fund Status - Rounds I – V Grant and Funding Summary Round I Round II Round III Round IV Round V Total Applications Received 112 118 123 108 98 559 Projects Funded 781 30 25 74 tbd 207 Grants in Place 776 297 2011 39 0 165 Grants Cancelled 42 13 210 0 0 7 Amount Requested ($M) $453.8 $293.4 $223.5 $123.1 $130.6 $1,224.4 AEA Recommended ($M) $100.0 $36.8 $65.8 $36.6 tbd $239.2 Appropriated ($M) $100.0 $25.0 $25.0 $26.6 tbd $176.6 Cash Disbursed ($M) $51.3 $14.2 $5.4 $0 $0 $70.9 Available for reallocation ($M) $04/9 $05/9 $.18/9 $0 $0 $.1 1- Includes eleven projects from an earlier solicitation issued by AEA. 2- Nikolaevsk Wind Farm, Southfork Hydro, Galena Wood Heating project, and Fish Hook Hydro. Some funds transferred to Takatz Lake project; these plus other reallocated funds make Takatz Lake Hydro now fully funded ($2,000,000) per LB&A directive. 3- Angoon Heat Recovery project - completed with other funds. 4- Balance of Southfork Hydro, ($152,134), Haines Central Wood ($99,602), Cordova Wood Processor ($10,960), Fish Hook Hydro ($2,000,000), Ambler Solar ($529,430), Delta Junction Wind Assessment ($39,587), Nikiski Wind ($2,000,000), Manly Hot Springs Geothermal ($187,124), Ruby Hydrokinetic (~$150,000) and Tok Wind Assessment (~$75,000) projects. 5- Angoon grant balance ($545,934), Neck Lake Hydro balance ($85,525), and balance after grant amounts adjusted ($386,986). 6- Two projects (Reynolds Creek Hydro and Bethel Wind) remain unexecuted. For both, the grantee is responsible for the delay in getting the grant executed. 7- Kenai Winds grant combined with Round I grant for same project. 8- Yerrick Creek Hydro ($4,000,000) and Neck Lake Hydro ($90,000). 9- Available funds used for Round IV. 10- Yerrick Creek Hydro construction and Neck Lake Hydro study. 11- Nushagak Electric project funded with Round I funds, grant amended to reflect this.  Funding Allocation by Development Phase Rounds 1-4 0 2 4 6 8 10 12 2009 (Actual) 2010 (Actual) 2011 2012 2013 2014 2015 Million Gallons Diesel Equivalent per year Wind Solar Ocean/River Hydro Heat Recovery Geothermal Biomass - 20 40 60 80 100 120 140 $ Million Reconn / Feasibility Design Construction 4 10 22 45 54 55 9 0 10 20 30 40 50 60 # Projects (cumulative) Year Outlook  Construction Project Actual and Scheduled Completion Rounds 1-4  Construction Project Status See next page  Projected Cumulative Annual Fuel Savings Rounds 1-4 Construction Scheduled Project Financing: RE Fund = $98.9 million Other State = $32.9 million Fed/Local Match = $328.2 million  Projected Drawdown Rounds 1-3 Prepared Jan 2011 Oct 7 total = $70.9 million  Project Phasing Examples Round Project Reconnaissance Feasibility Final Design Construction 1 Tok Wood-fired Boiler Completed before applied Complete ($20.0) Complete ($231.2) Complete 10/10 ($3,245.3) 1 Ambler Photovoltaic Completed before applied Complete ($20.6 Reallocate $29.4) NO-GO (reallocate $500.0) 2 Akutan Hydro Preconstruction Completed before applied Complete ($65.7) Scheduled 2/11 ($96.3) 3 Construction Not scheduled ($1,391.0) 1 Eva Creek Wind Final Design/Permitting Completed before applied Complete ($1,463.2) Scheduled 3/12 ($1,300.0) 4 Construction Scheduled 3/13 ($1,463.2)