HomeMy WebLinkAboutDelta Greely School District - Biomass Case Study - August 2015 - REF Grant 2195395Quick Facts Total Project Costs: $2.8 million Funding: Renewable Energy Fund: $2 million Other State Funding: $800,000 Capital Costs Design: $248,086 Construction: $2,551,914 Equipment Chipper Make/Model: Rotochopper MC-266 Output: 200 yards/hour for Spruce trees Boiler Make/Output: Messersmith, 5.5 MMBtu/hr Diesel Fuel Offset Estimated annual: 60,000 gallons Actual annual: 29,000 gallons Comprehensive savings: 96,000 gallons (Sept. 2011-Dec. 2014) Fuel Savings Estimated Annual: $135,000 Actual Annual: $97,000 Comprehensive savings: $297,000 (Sept. 2011-Dec. 2014) Delta Junction, Alaska Biomass project saves teaching position and reduces fire risk Delta Junction Wood Chip Heating Project Overview In partnership with the Alaska Energy Authority (AEA), the Delta Greely School District designed and constructed a wood chip boiler system to heat the Delta School. Hot water is piped from the boiler to the school’s existing heating system. The diesel-based fuel system remains in place as an automatic backup. Objectives • Reduce the energy costs to the school district • Displace diesel fuel with a local wood fuel • Develop a chip industry in the Delta area • Create much needed jobs • Mitigate wildfire risk Reasons This Product Was Chosen The primary reason the community chose a wood chip heating system over an alternate renewable energy source was for the added benefit of reducing wildfire hazards in the area. There are more than four million acres of forest in the Delta Junction vicinity. The school also standardized their boiler equipment with Tok School’s wood heating equipment to stream- line operations and maintenance. Economic Feasibility The project became operational in September of 2011. Between September 2011 and December 2014, it pro- duced 9,988 MMBtu of thermal energy and displaced 96,000 gallons of diesel fuel. This displacement has saved the community $297,000. With proper main- tenance, the boiler life is expected to exceed 20 years. Additional benefits will be realized as well; the project will continue to use an energy source that keeps fuel payments in the local economy rather and creates local employment. Messersmith boiler system, photo cour- tesy of Delta Greely School District. “In 2015, Delta combined all K-12 students into the high school build- ing, allowing all students to be warmed by re- newable biomass.” Allocation of Funding The Alaska Energy Authority’s Renewable Energy Fund contributed $2 million for the purchase of the wood chip-fired boiler and the construction of the boiler storage facility. The state also granted $800,000 for the chip storage, vans, labor, and plumbing and piping costs. Fuel and Storage Wood chips are provided by Dry Creek’s Lumber and Milling Association for $63/ton. They are delivered from storage via a walking auger and dropped onto a conveyor belt that takes the chips into the boiler. The Delta High School Complex’s estimated energy need is 1,400 to 2,100 tons of wood chips per year. This roughly equates to 50 to 75 acres of low grade quality forest, a very low quantity in comparison with the four million available acres. Learning Experiences/Challenges Operating and maintaining a chip boiler is a commit- ment. The school maintenance worker was not origi- nally involved in the boiler’s design and was concerned about the impact to his job. He did eventually become a strong supporter of the project, but earlier input and support would have been beneficial and could have resulted in a more effective design. Fuel quality is extremely important to the successful generation of the biomass boiler. Silica-heavy pine needles, dirt, and other contaminants created clinkers (chunks of glass) in the combustion chamber and increased maintenance and downtime. It is a common misconception that allowing dirt and contaminants to be burned with the wood isn’t harmful, but doing so even for a short time proves detrimental to the system. In response to this situation, Delta began storing their wood in a dry, covered area with a concrete floor. Community Benefits Cost savings from the biomass boiler allowed the high school to add a teaching position in the fall of 2015 as well as restart the preschool program. In the school’s science classes, students participate in moisture test- ing and visit the boiler facility. Students in the career vocational program have the opportunity to train in boiler operations. Community members are excited about the educational experience because it has the potential to inspire even more growth and discovery in local biomass development. In the summer of 2015, Delta combined all K-12 students into the high school building, allowing all Delta Junction students to be warmed by a local, renewable energy resource. Project Contact Information Parties Involved: Laural Jackson, DGSD Superintendent Email: ljackson@dgsd.us Phone: 907-895-4657, ext. 21 Bill Burr, maintenance & operations director Email: bburr@dgsd.us Phone: 907-803-0003 Case Study Author: Zoe Tressel, AEA Intern Website: Akenergyauthority.org Boiler storage facility, photo courtesy of AEA. Hurst boiler, photo courtesy of Reba Lean. Delta Junction Wood Chip Heating Published August, 2015