Loading...
HomeMy WebLinkAboutCity of Pelican - Pelican Hydroelectric Upgrade Project_Aug_2015Pelican, Alaska Upgrade project improves facility safety & performance Quick Facts FERC Project Number: P-10198 Total Project Costs: $5.5 million Funding: REF, Denali Commission, & Local Funds Project Specs Turbine Make/Output: Francis, 650 kW Static Head: 130 feet Hydraulic Capacity: 60 cubic feet/second Annual Energy Generation: 1,000,000 kWh Diesel Fuel Off set Actual Annual: 76,000 gallons 2012-2014: 127,000 gallons Fuel Savings Estimated Annual: $225,000 Actual Annual: $339,000 2012-2014: $569,000 Benefi t/Cost Ratio: 1.42 Pelican Hydroelectric Upgrade Project Project Overview In partnership with the Alaska Energy Authority, the City of Pelican completed the design and construction of a 650 kW hydroelectric upgrade project in Peli- can, Alaska. Th e project involved the renovation and replacement of ineffi cient and failing equipment at the existing run-of-river facility. Its completion fully implemented a six-year energy infrastructure upgrade project within the community. Objectives Th e main objectives of this project were to repair and upgrade the former hydroelectric system, to provide long-term reliable service, and to improve system effi ciency and output. An additional objective was to reduce maintenance costs by removing the elevated wood fl ume and other project componenets. Pelican can now provide the community with electricity using a renewable resource that displaces costly diesel fuel. Economic Feasibility Th e project became operational in March of 2013. Since then, it has generated 1,713 Megawatt hours of electricity and 431 MMBtu of thermal energy. Th is has allowed the city to displace 127,000 gallons of diesel fuel and has saved them $569,000 in reduced energy costs. Over its 50-year projected lifespan, the project has a calculated benefi t/cost ratio of 1.42, meaning that the project will see a 142 percent return on investment. Project Specifi cations & History Th is project was an upgrade to the 1941 hydro project that supplied Pelican Cold Storage (a fi sh processing facility) and the community with power and pota- ble water. Th e old project was beyond the end of its useful life and at risk of failure. Th e upgrade project replaced the water conveyance system at the power & performance Former Pelican facility, new Pelican facility. Photo courtesy of AEA. “This historic hydro project has generated 100 percent of the community’s water supply and energy.” plant, built an access road to the dam for construction and maintenance, and upgraded the control system and turbine. Th e previous concrete intake structure was replaced with a new steel pipe and head box and the open wooden fl ume was replaced with a steel pipe pressure conduit. Construction crews also replaced the wood stave penstock with steel pipe and made minor upgrades to the power plant. Pelican was originally chosen as the construction site because of the close proximity of the hanging valley on Pelican Creek to the coast. A signifi cant drop in elevation at the preci- pice of any hanging valley is the ideal spot to construct a dam and water impoundment because it allows for increased static head and hydraulic capacity. Allocation of Funding Th rough the Alaska Energy Authority, the Renewable Energy Fund (REF) granted $1,896,836 that went toward design and constrcution. Th e Denali Commis- sion also supported design and construction through a $2,254,571.67 grant. Learning Experiences/Challenges 1. Pelican City is located close to a complicated tec- tonic junction between the Transition and Fairweather faults. Consequently, the upgrade had to use designs that consider strong ground motions (i.e. strongly attached foundation elements). 2. Hydropower has historically provided the majority of commercial and residential power needs for the community of Pelican. Between the years of 2009 and 2013, however, the hydro project was offl ine and all community power was provided by diesel generation. Th is tripled the cost of electricity for residents. Diesel fuel is currently used for space heating and some diesel power generation throughout the community, but the construction of the new hydroelectric project allowed for residents to reduce electric costs by $0.24/kWh. Community Benefi ts 1. Th e system continues to supply both electrical power and potable water for the town. During the construction phase, the local economy developed quite substantially as a result of local jobs and community support. 2. Th e renovated facility has reduced operating and maintenance costs and more than meets the long-term electric power needs of Pelican. Th rough the Alaska Renewable Energy project, the community was able to install a dispatchable electric boiler at the Pelican School for space and domestic water heating. Th is has allowed the School District to lower their additional costs and invest that money in school programs/facili- ties to better students’ educational experience. Project Contact Information Parties Involved: City of Pelican Email: cityhall@pelicancity.net Phone: 907-735-2202 Patricia Phillips, Pelican City Mayor Email: patricia@pelicancity.org Phone: 907-735-2202 Case Study Author: Zoe Tressel, AEA Website: Akenergyauthority.org Phone: 907-771-3000 Pelican Hydroelectric Upgrade Project Pelican City, Photo courtesy of Pelican.net Barber turbine & Kato generator, photo courtesy of UAF. “This historic hydroelectric project serves 100 percent of both Pelican’s water and energy supply.” Published August, 2015