Wind farm expansion further reduces energy prices
Quick Facts
Total Project Costs: $9,597,810
Funding: Renewable Energy Fund & Local Match
Capital Costs
Design: $668,355.57
Construction: $8,929,454.43
Equipment
Make/Model: (2) EWT DirectWind 52s
Rated Capacity: 900 kW each
Net Capacity Factor: 29%
Rotor Diameter: 52 meters
Hub Height: 50 meters
Total Rated Capacity (all turbines): 2.8 MW
Diesel Fuel Off set
Estimated Annual: Up to 200,000 gallons
Actual Annual: 78,000 gallons
Aug. 2013-Dec. 2014: 116,000 gallons
Fuel Savings
Estimated Annual: $744,000
Actual Annual: $266,000
Aug. 2013-Dec. 2014: $388,000
Benefi t/Cost Ratio: 1.78
Banner Peak Wind Farm Expansion
Project Overview
In partnership with the Alaska Energy Authority
(AEA), Nome Joint Utility Systems (NJUS) complet-
ed the expansion of the Banner Peak Wind Farm. In
addition to the existing 16 Entegrity 65 kW turbines,
two new 900 kW EWT DirectWind turbines were
installed.
Objectives
Th e objective of this project was to provide Nome
and the surrounding area with a reliable, renewable,
and cost-eff ective source of energy. Introducing wind
energy allowed them to reduce fl uctuating and expen-
sive diesel fuel.
Economic Feasibility
Th e turbines became operational in August of 2013.
Since then, they have produced 1,895 Megawatt
hours of electricity and displaced 116,000 gallons of
diesel fuel. Th is displacement has saved the commu-
nity $388,000. Over its 20 year projected lifespan,
the project has a calculated benefi t/cost ratio of 1.78,
meaning that the project will see a 178 percent return
on investment.
Project Specifi cations
Wind energy is ranked on a scale from 1 to 7, 1 being
poor and 7 being superb. Much of the Bering Strait re-
gion ranges from Class 4 to Class 7 winds, so projects
here tend to be very economical. Th e EWT turbines
were chosen aft er a detailed analysis of their specif-
ic suitability for village installations. EWT turbines
have complex controls, variable pitch blades, and state
of the art power electronics. Th ey can be integrat-
ed directly into existing utility grids and monitored
and controlled through internet connections. Th e
original Banner Peak wind project called for a power
sales agreement between Nome Joint Utilities Sys-
900 kW EWT DirectWind turbines, photo courtesy of AEA.
ices
tems (NJUS) and Banner Wind LLC in which NJUS
purchased power from Banner Wind. As of January
1, 2015, this agreement was terminated when Banner
Wind turned the wind farm over to NJUS. NJUS no
longer has to purchase power.
Allocation of Funding
Th e Alaska Energy Authority’s Renewable Energy
Fund (REF) granted $8,069,000 for design and con-
struction of the project. Local matching funds contrib-
uted $884,088 for the same project phases. In a diff er-
ent REF application, the state granted $801,000 and
local matches gave $89,000 for a transmission line that
would transfer power to NJUS communities.
Learning Experiences/Challenges
1. Th e expansion application originally called for the
installation of fi ve 600 kW turbines on Newton Peak
at a cost of $13,952,326. Due to a $4 million cap on all
Renewable Energy Fund (REF) projects, AEA recom-
mended partial funding of this project for $4,000,000.
In response, the wind farm was reduced to two EWT
900 wind turbines with an additional grant request of
4 million in 2013. Th e location was also changed from
Newton Peak to Anvil Mountain and then to Banner
Peak due to icing concerns and transmission costs.
2. Th e original Banner project began production in late
2008. Entegrity’s bankruptcy shortly thereaft er im-
pacted the initial operation during 2009 due to a lack
of spare parts and support. Banner was able to source
parts from elsewhere, and by the time they applied for
the expansion project they found turbines from Emer-
gya Wind Technologies that met their needs.
Community Benefi ts
1. Th e BSNC Board of Directors passed a resolution re-
quiring that 50% of all their profi ts from the Entegrity
turbines be reinvested in renewable energy projects in
the 17 villages that make up the Bering Straits Region.
Th is will enable more cost eff ective, better maintained
village projects in the future while continually creating
annual revenues to support more development.
2. Th e majority of villages in the region have a sub-
sistence lifestyle, as they lack a true cash economy.
High energy costs for gas, fuel oil, and electricity put
an even higher burden of distress on these residents.
Adding wind generation allows residents to continue
thriving off of their environment and greatly reduc-
es the need for diesel fuel. Th is project has reduced
residential electricity costs by twelve cents per kilowatt
hour (kWh).
Project Contact Information
Owner: Nome Joint Utility Systems (NJUS)
Phone: 907-443-6587
NJUS Contact: John Handeland
Email: johnh@njus.org
Electrical Engineer: Electrical Power Systems
Phone: 907-522-1953
Civil Engineer: BBFM Engineers, Inc.
Phone: 907-274-2236
Case Study Author: Zoe Tressel, AEA
Site: Akenergyauthority.org
Phone: 907-771-3000
Banner Peak Wind Farm Expansion
Meteorological tower, photo
courtesy of AEA.
Banner Peak turbines, photo courtesy of AEA.Published August, 2015
“EWT turbines
have complex con-
trols, variable pitch
blades, and state
of the art power
electronics.”