Loading...
HomeMy WebLinkAboutFSSLA 11 Ch 5 Sec 4 p 126 - 137 lns 14-16 (p137) - Whitman Lake Grant No 7040044 HCS CSSB 46(FIN), Sec. 4 -126- * Sec. 4. The following appropriation items are for capital projects and grants from the 1 general fund or other funds as set out in section 5 of this Act by funding source to the 2 agencies named for the purposes expressed and lapse under AS 37.25.020, unless otherwise 3 noted. 4 5 It is the intent of the legislature that the following appropriations and projects are needed to 6 carry out the state's energy policy described in AS 44.99.115. As the energy policy states, the 7 legislature recognizes the immense diversity of the state's geography, cultures, and resource 8 availability and the need to identify and assist with development of the most cost-effective, 9 long-term sources of energy for each community statewide. Therefore, the legislature intends 10 that the package of appropriations and projects listed below are all necessary to achieve a 11 statewide balance in addressing the state's diverse energy needs. 12 Appropriation General Other 13 Allocations Items Funds Funds 14 * * * * * * * * * * 15 * * * * * Department of Commerce, Community, and Economic Development * * * * * 16 * * * * * * * * * * 17 Alaska Industrial 500,000 500,000 18 Development & Export 19 Authority - Coal to Liquids 20 Certification Project (HD 21 1-40) 22 Alaska Energy Authority - 10,053,000 10,053,000 23 Homer Area Natural Gas 24 Pipeline (HD 33-35) 25 Alaska Energy Authority - 2,000,000 2,000,000 26 Metlakatla Indian 27 Community 28 Metlakatla-Ketchikan 29 Intertie (HD 1-5) 30 Alaska Energy Authority - 17,630,000 17,630,000 31 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -127- Nuvista Light & Power 3 Chikuminuk Hydroelectric 4 and Alternative Energy 5 Project (HD 36-38) 6 Alaska Energy Authority - 10,000,000 10,000,000 7 Southeast Energy Fund (HD 8 1-5) 9 Alaska Energy Authority - 65,700,000 65,700,000 10 Susitna Hydroelectric 11 Energy Plan (HD 12-35) 12 Alaska Energy Authority - 16,330,000 10,330,000 6,000,000 13 Energy Programs 14 Alaska Energy Plan 1,000,000 15 Implementation (HD 1-40) 16 Bulk Fuel Upgrades (HD 5,000,000 17 1-40) 18 Electrical Emergencies 330,000 19 Program (HD 1-40) 20 Rural Power System 10,000,000 21 Upgrades (HD 1-40) 22 Alaska Energy Authority - 36,620,231 36,620,231 23 Round IV Renewable Energy 24 Project Grants (AS 25 42.45.045) 26 Inside Passage Electric 475,000 27 Cooperative, Inc. - Hoonah 28 Heat Recovery Project (HD 29 5) 30 University of Alaska Center 1,330,467 31 for Energy and Power - 32 Pilgrim Hot Springs 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -128- Geothermal Assessment (HD 3 39) 4 Northwest Inupiat Housing 250,000 5 Authority - Upper Kobuk 6 River Biomass (HD 40) 7 Southeast Island School 300,000 8 District - Thorne Bay 9 School Wood Fired Boiler 10 Project (HD 1) 11 G&K, Inc. - Cold Bay 99,075 12 Electric Utility Wind 13 Energy Project (HD 37) 14 Kodiak Electric Association, 3,751,840 15 Inc. - Terror Lake 16 Hydroelectric Project (HD 17 36) 18 Kootznoowoo, Inc. - Thayer 1,060,500 19 Lake Hydroelectric Project 20 (HD 5) 21 Alaska Power & Telephone 380,000 22 Company - Upper Tanana 23 Biomass CHP Project (HD 24 6) 25 TDX Power, Inc. - Bethel 213,690 26 Renewable Energy Project 27 (HD 38) 28 Chugach Electric 500,000 29 Association, Inc. - Battle 30 Creek Diversion Project 31 (HD 33-35) 32 Alaska Village Electric 237,500 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -129- Cooperative, Inc. - Old 3 Harbor Hydroelectric (HD 4 36) 5 Lake & Peninsula Borough - 250,000 6 Port Heiden Wind Turbine 7 Project (HD 37) 8 Golden Valley Electric 1,463,200 9 Association - Eva Creek 10 Wind Turbine Purchase (HD 11 7-11) 12 Alaska Electric Light & 2,000,000 13 Power Company - Snettisham 14 Transmission Line 15 Avalanche Mitigation (HD 16 3-4) 17 Pelican - Hydroelectric 1,896,836 18 Upgrade Project (HD 2) 19 Tenakee Springs - Indian 203,000 20 River Hydroelectric Project 21 (HD 5) 22 University of Alaska Center 472,787 23 for Energy and Power - 24 Organic Rankine Cycle 25 Field Testing (HD 6) 26 Lake & Peninsula Borough - 369,900 27 Wood Boilers (HD 36) 28 Chitina Electric, Inc. - 277,000 29 Fivemile Creek 30 Hydroelectric Project (HD 31 6) 32 Ormat Nevada, Inc. - Mount 1,999,972 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -130- Spurr Geothermal Project 3 (HD 33-35) 4 Napaskiak Electric Utility 61,225 5 - Wind Power and Heat 6 Recovery (HD 38) 7 Alaska Village Electric 275,554 8 Cooperative - St. Mary's/ 9 Pitka's Point Wind 10 Construction (HD 39) 11 Louden Tribal Council - 100,000 12 Renewable Energy 13 Feasibility Study (HD 6) 14 Chugach Electric 600,000 15 Association, Inc. - 16 Transmission to Renewable 17 Energy Resources (HD 18 33-35) 19 Interior Regional Housing 154,477 20 Authority - Wood Heating 21 Feasibility Assessments 22 (HD 6) 23 Lime Village Traditional 25,000 24 Council - Photovoltaic 25 System Retrofit (HD 6) 26 Craig - Biomass Fuel Dryer 350,000 27 Project (HD 5) 28 Independence Power, LLC - 136,500 29 Fourth of July Creek 30 Hydroelectric Project (HD 31 33-35) 32 Kotzebue - Paper and Wood 85,000 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -131- Waste to Energy (HD 40) 3 Village of Atmautluak - 100,000 4 Wind Renewable Energy (HD 5 38) 6 Alaska Village Electric 137,750 7 Cooperative, Inc. - 8 Stebbins Wind Feasibility 9 (HD 39) 10 Elfin Cove - Hydroelectric 347,000 11 Project (HD 2) 12 Ketchikan - Whitman Lake 700,000 13 Hydroelectric Project (HD 14 1) 15 Alaska Village Electric 142,500 16 Cooperative, Inc. - Eek 17 Wind Feasibility (HD 38) 18 Organized Village of 145,000 19 Kwethluk - Wind Feasibility 20 (HD 38) 21 Sitka - Japonski Island 125,000 22 Boathouse Heat Pump (HD 23 2) 24 Alaska Village Electric 111,150 25 Cooperative, Inc. - 26 Marshall Wind Feasibility 27 (HD 6) 28 Nelson Lagoon Electrical 99,075 29 Cooperative - Wind Energy 30 Project (HD 37) 31 North Slope Borough - 210,000 32 Atqasuk Transmission Line 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -132- (HD 40) 3 Alaska Village Electric 90,000 4 Cooperative, Inc. - Kaltag 5 Solar Construction (HD 6) 6 Alaska Village Electric 142,500 7 Cooperative, Inc. - 8 Scammon Bay Wind 9 Feasibility (HD 39) 10 Chugach Electric 576,080 11 Association, Inc. - Stetson 12 Creek Diversion and Cooper 13 Lake Dam Facilities (HD 14 33-35) 15 New Koliganek Village 105,050 16 Council - Wind and Heat 17 Recovery Feasibility Study 18 (HD 37) 19 North Slope Borough - 298,000 20 Wainwright Wind Turbine 21 Design (HD 40) 22 North Slope Borough - 132,000 23 Kaktovik Wind Diesel (HD 24 40) 25 North Slope Borough - 298,000 26 Point Hope Wind Turbine 27 Design (HD 40) 28 North Slope Borough - 298,000 29 Point Lay Wind Generation 30 Design (HD 40) 31 Kenai Hydro, LLC - Grant 1,184,000 32 Lake Hydroelectric Facility 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -133- (HD 33-35) 3 Alaska Village Electric 85,000 4 Cooperative, Inc. - Selawik 5 Hybrid Wind Diesel System 6 Turbine Upgrade (HD 40) 7 Alaska Power Company - 2,000,000 8 Reynolds Creek 9 Hydroelectric Project (HD 10 5) 11 AVTEC - Hydroelectric 67,500 12 Training Facility (HD 13 33-35) 14 Alaska Village Electric 142,500 15 Cooperative, Inc. - Koyuk 16 Wind Feasibility (HD 39) 17 Chefornak - Wind 136,750 18 Feasibility (HD 38) 19 Alaska Village Electric 142,500 20 Cooperative, Inc. - Elim 21 Wind Feasibility (HD 39) 22 Akutan - Geothermal 2,695,000 23 Development Project (HD 24 37) 25 Akiachak Native Community 110,000 26 - Wind Feasibility and 27 Conceptual Design (HD 38) 28 ORPC Alaska, LLC - Cook 2,000,000 29 Inlet Tidal Generation 30 Project (HD 33-35) 31 Alaska Power Company - 468,000 32 Connelly Lake Hydroelectric 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -134- Project (HD 5) 3 False Pass - Wind Energy 69,075 4 Project (HD 37) 5 Native Village of Eyak - 75,000 6 Biomass Feasibility Study 7 (HD 5) 8 Eklutna, Inc. - Hunter 84,000 9 Creek Hydroelectric Project 10 (HD 13-16) 11 Port Graham Village 75,000 12 Council - Biomass Waste 13 Heat Demonstration Project 14 (HD 33-35) 15 Matanuska-Susitna Borough - 750,000 16 Susitna Valley High School 17 Wood Heat (HD 13-16) 18 Copper River School 565,485 19 District - Kenny Lake 20 School Wood Fired Boiler 21 (HD 6) 22 Alaska Power Company - 80,000 23 Schubee Lake Hydroelectric 24 Project (HD 5) 25 Bering Pacific Engineering 37,000 26 - Eska Creek Hydroelectric 27 Project (HD 12) 28 Metlakatla Indian 1,180,000 29 Community - 30 Metlakatla-Ketchikan 31 Intertie (HD 1-5) 32 Haines - Excursion Inlet 93,593 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -135- Hydro Project (HD 5) 3 Native Village of Cantwell 30,000 4 - Jack River Hydro Project 5 (HD 7-11) 6 Wrangell - Electric Vehicle 25,000 7 Feasibility Study (HD 2) 8 Sitka - Centennial Hall and 30,000 9 Library Renewable Energy 10 Feasibility Study (HD 2) 11 Sitka - Wastewater 20,000 12 Treatment Plant Renewable 13 Energy Feasibility Study 14 (HD 2) 15 Inside Passage Electric 599,200 16 Cooperative - Tenakee Inlet 17 Geothermal Resource Study 18 (HD 5) 19 Metlakatla Indian 500,000 20 Community - Triangle Lake 21 Hydroelectric Project (HD 22 5) 23 Alaska Energy Authority - 96,500,000 96,500,000 24 ARCTEC Energy Projects 25 AEA - Anchorage to Quartz 25,000,000 26 Creek Transmission Line 27 Maintenance and Repair (HD 28 16-32) 29 AEA - Battle Creek 15,000,000 30 Diversion (HD 33-35) 31 AEA - Cook Inlet Gas 2,000,000 32 Gathering System Remodel 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -136- (HD 12-35) 3 AEA - Daves Creek to 1,500,000 4 Seward Transmission Line 5 Completion (HD 33-35) 6 AEA - Girdwood and Sterling 4,000,000 7 Substation Improvements 8 (HD 16-32) 9 AEA - Homer Electric 25,000,000 10 Association Soldotna to 11 Nikiski Transmission 12 Upgrade (HD 33-35) 13 AEA - Quartz Creek to 10,000,000 14 Soldotna Transmission 15 Maintenance and Repair (HD 16 33-35) 17 AEA - Seward Power Plant 4,000,000 18 Integration (HD 33-35) 19 AEA - Soldotna to Quartz 5,000,000 20 Creek Transmission Study, 21 Design and Permitting (HD 22 33-35) 23 AEA - Teeland to Healy 5,000,000 24 Substation Improvements 25 and Repair (HD 7-11) 26 Alaska Energy Authority - 27 Energy Generation Projects 28 It is the intent of the legislature that the state's capital investment into energy generation 29 projects not exceed 50% of the total investment required to fully complete those projects. 30 AEA - Akiak Community 4,000,000 4,000,000 31 Electrical Generation 32 System Upgrade (HD 38) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 46(FIN), Sec. 4 -137- AEA - Copper Valley 10,000,000 10,000,000 3 Electric Association 4 Allison Creek Hydroelectric 5 Project (HD 12-35) 6 AEA - Golden Valley 10,000,000 10,000,000 7 Electric Association Eva 8 Creek Wind Farm (HD 7-11) 9 AEA - Gustavus Electric 1,300,000 1,300,000 10 Company Falls Creek 11 Hydroelectric Debt 12 Reimbursement (HD 5) 13 AEA - Ketchikan Whitman 8,025,000 8,025,000 14 Lake Hydroelectric Project 15 (HD 1) 16 AEA - Kodiak Electric 3,750,000 3,750,000 17 Association Terror Lake 18 Hydroelectric Facility 19 Expansion (HD 36) 20 AEA - Mount Spurr 18,000,000 18,000,000 21 Geothermal Project 22 Development (HD 12-35) 23 AEA - Sitka Blue Lake 28,500,000 28,500,000 24 Hydroelectric Project 25 Expansion (HD 2) 26 * * * * * * * * * * 27 * * * * * Department of Revenue * * * * * 28 * * * * * * * * * * 29 Alaska Housing Finance 30 Corporation 31 Alaska Gasline Development 21,000,000 21,000,000 32 Corporation - Year 2 33