Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appropriation - SLA 12, Ch 17, Sec 1, Pg 6-8, Lns 15-33,1-33,1-7
1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 160(FIN) am H, Sec. 1 -6- Alternative Energy and 4,800,000 3 Energy Efficiency (AEEE) 4 Programs (HD 1-40) 5 AVTEC Power Plant 400,000 6 Infrastructure Training 7 Systems Upgrade (HD 1-40) 8 Bulk Fuel Upgrades (HD 7,000,000 9 1-40) 10 Electrical Emergencies 330,000 11 Program (HD 1-40) 12 Rural Power Systems 13,000,000 13 Upgrade (HD 1-40) 14 Alaska Energy Authority - 25,870,659 25,870,659 15 Round V Renewable Energy 16 Project Grants (AS 17 42.45.045) 18 Sleetmute Heat Recovery - 126,682 19 Power Plant to Water Plant 20 (HD 6) 21 Togiak Waste Heat Recovery 443,030 22 Project (HD 37) 23 Shishmaref Heat Recovery 310,841 24 Project (HD 40) 25 Waterfall Creek 200,000 26 Hydroelectric Project (HD 27 37) 28 Tatitlek Heat Recovery 265,000 29 Project (HD 5) 30 Thayer Lake Hydropower 7,000,000 31 Transmission/Generation 32 (HD 5) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 160(FIN) am H, Sec. 1 -7- Packers Creek Hydroelectric 1,993,496 3 Project (HD 37) 4 Kobuk Biomass Design & 356,424 5 Construction Project (HD 6 40) 7 Chevak Wind Energy 240,260 8 Recovery -Chevak Water 9 System Heat (HD 39) 10 Pillar Mountain High 7,800,000 11 Penetration Wind Project 12 (HD 36) 13 Scammon Bay Hydro Design 80,723 14 & Engineering (HD 39) 15 Gambell Wind Energy 240,260 16 Recovery for Gambell Water 17 System Heat (HD 39) 18 Shaktoolik Surplus Wind 240,260 19 Energy Recovery for Water 20 System Heat (HD 39) 21 Surplus Wind Energy 264,459 22 Recovery for Mekoryuk Water 23 System Heat (HD 38) 24 Russian Mission Heat 555,000 25 Recovery System (HD 6) 26 Design & Construction of 1,215,224 27 Wood Heating in Interior 28 Alaska (HD 6) 29 Tanacross Woody Biomass 420,000 30 Community Space Heating 31 Project (HD 6) 32 Huslia Water System & 50,000 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 160(FIN) am H, Sec. 1 -8- Clinic Wood Boiler Project 3 (HD 6) 4 Nome Renewable Energy 4,069,000 5 Expansion/Optimization (HD 6 39) 7 Grants to Municipalities 8 (AS 37.05.315) 9 Adak - Road and 25,000 25,000 10 Infrastructure Systems 11 Maintenance Equipment (HD 12 37) 13 Aleknagik - Float Plane 2,500,000 2,500,000 14 Road (HD 37) 15 Aleutians East Borough - 2,000,000 2,000,000 16 Cold Bay Airport - Apron 17 and Taxiway Construction 18 (HD 37) 19 Anchorage - 64th Avenue 4,000,000 4,000,000 20 Upgrade and Reconstruction 21 (HD 16-32) 22 Anchorage - A Street and 4,000,000 4,000,000 23 48th Avenue Extension and 24 Upgrade - 51st Avenue to 25 Cordova Street (HD 16-32) 26 Anchorage - Anchorage 1,500,000 1,500,000 27 Football Stadium Building, 28 Turf Replacement (HD 29 16-32) 30 Anchorage - Anchorage 5,000,000 5,000,000 31 Museum - Alaska History 32 Gallery Renovation (HD 33