Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Tenakee Springs - Appropriations - Grants to Municipalities - AS 37.05.315 - SLA 13 Ch 16 Sec 1, Pg 26, Lns 18-20
1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -7- Interior Regional Housing 168,959 3 Authority - Biomass 4 Feasibility Studies in 5 Public Facilities, Interior 6 Region 1 (HD 38-39) 7 Alaska Power & Telephone 400,000 8 Company - Upper Tanana 9 Biomass CHP Project 1 10 (HD 38) 11 Copper Valley Electric 2,085,509 12 Association, Inc. - Allison 13 Creek Project 2 (HD 6) 14 Grants to Municipalities 15 (AS 37.05.315) 16 Adak - Streetlights and 30,000 30,000 17 City Hall Exterior 18 Lighting (HD 37) 19 Akhiok - Water and Sewer 955,000 955,000 20 Critical Repairs (HD 35) 21 Anchorage - 27th Avenue 500,000 500,000 22 Pedestrian Safety - 23 Minnesota Drive to 24 Blueberry St (HD 11-27) 25 Anchorage - 78th Avenue 1,000,000 1,000,000 26 Upgrade/ Jewel Lake Road 27 to Blackberry Street (HD 28 11-27) 29 Anchorage - Autumn Park 225,000 225,000 30 Estates/Spring Acres 31 Subdivision Repairs and 32 Drainage (HD 11-27) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -8- Anchorage - AVAIL 6,400 6,400 3 Alternative School 4 Interactive Display 5 Technology (HD 11-27) 6 Anchorage - AVAIL 5,000 5,000 7 Alternative School Library 8 Collection (HD 11-27) 9 Anchorage - Brentwood Drive/ 500,000 500,000 10 79th Avenue Area Drainage 11 (HD 11-27) 12 Anchorage - Campbell Creek 340,000 340,000 13 Stormwater Mitigation (HD 14 11-27) 15 Anchorage - Campbell Creek 160,000 160,000 16 Trail Surface and Safety 17 Improvements (HD 11-27) 18 Anchorage - CBERRRSA 1,200,000 1,200,000 19 Sand Storage Building 20 Phase II (HD 11-27) 21 Anchorage - CBERRRSA 1,400,000 1,400,000 22 Drainage and Rehabilitation 23 (HD 11-27) 24 Anchorage - Chugiak 600,000 600,000 25 Pedestrian Facility Bill 26 Stephens Drive (HD 7-11) 27 Anchorage - Chugiak 450,000 450,000 28 Volunteer Fire Department 29 Engine Replacement (HD 30 7-11) 31 Anchorage - Chugiak-Eagle 40,000 40,000 32 River Library Materials and 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -9- Technology (HD 11-27) 3 Anchorage - Chugiak-Eagle 75,000 75,000 4 River Parks & Recreation 5 Audio, Video and 6 Teleconference System (HD 7 11-27) 8 Anchorage - Design Upgrades 1,900,000 1,900,000 9 to Yosemite Drive (HD 10 11-27) 11 Anchorage - Eagle Academy 1,100 1,100 12 Science Equipment (HD 13 11-27) 14 Anchorage - Eagle Academy 40,000 40,000 15 Technology Upgrades (HD 16 11-27) 17 Anchorage - Eagle River 1,440,000 1,440,000 18 Parks and Recreation Eagle 19 River High School Stadium, 20 Trails, Lighting and 21 Equipment Improvements 22 (HD 11-27) 23 Anchorage - East Anchorage 500,000 500,000 24 Community Town Square 25 Park Planning (HD 11-27) 26 Anchorage - Fairview 398,000 398,000 27 Recreation Center Safety 28 Upgrades (HD 11-27) 29 Anchorage - Fire 750,000 750,000 30 Department Emergency 31 Communication and Data 32 Systems Upgrade (HD 11-27) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -10- Anchorage - Fire 350,000 350,000 3 Department Wildland Fire 4 Apparatus Replacement (HD 5 11-27) 6 Anchorage - Girdwood Road 250,000 250,000 7 Service Area Road and 8 Drainage Rehabilitation 9 (HD 11-27) 10 Anchorage - Girdwood 5,750,000 5,750,000 11 Volunteer Fire Department 12 Station 41 Renovation (HD 13 11-27) 14 Anchorage - Hightower Road 1,300,000 1,300,000 15 Upgrade Alyeska Highway to 16 Community Center (HD 17 11-27) 18 Anchorage - Intersection 1,500,000 1,500,000 19 Safety and Congestion 20 Relief Matching Program 21 (HD 11-27) 22 Anchorage - Little Tree 600,000 600,000 23 Drive/ 53rd Avenue Sidewalk 24 - 56th Avenue to Trena 25 Street (HD 11-27) 26 Anchorage - Mountain View 1,000,000 1,000,000 27 Drive Pedestrian Lighting 28 Improvements - Taylor 29 Street to Boniface Parkway 30 (HD 11-27) 31 Anchorage - Muldoon Library 40,000 40,000 32 Materials and Technology 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -11- (HD 11-27) 3 Anchorage - Nunaka Valley 800,000 800,000 4 Area Street and Pedestrian 5 Upgrades (HD 11-27) 6 Anchorage - Oceanview 287,500 287,500 7 Streetlight Conversion (HD 8 11-27) 9 Anchorage - Pavement Rehab 3,000,000 3,000,000 10 Matching Program (50/50 11 Local Match) (HD 11-27) 12 Anchorage - Pioneer Drive 2,400,000 2,400,000 13 Upgrade Muldoon Road to 14 Resurrection Drive (HD 15 11-27) 16 Anchorage - Project 80's 37,000,000 37,000,000 17 Deferred and Critical 18 Maintenance (HD 11-27) 19 Anchorage - Senate District 1,000,000 1,000,000 20 F Residential Pavement 21 Rehabilitation (HD 11-27) 22 Anchorage - Senate District 1,000,000 1,000,000 23 G Residential Pavement 24 Rehabilitation (HD 11-27) 25 Anchorage - Senate District 602,000 602,000 26 I Residential Pavement 27 Rehabilitation (HD 11-27) 28 Anchorage - Senate District 1,000,000 1,000,000 29 J Residential Pavement 30 Rehabilitation (HD 11-27) 31 Anchorage - Senate District 1,000,000 1,000,000 32 K Residential Pavement 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -12- Rehabilitation (HD 11-27) 3 Anchorage - Senate District 1,500,000 1,500,000 4 L Residential Pavement 5 Rehabilitation (HD 11-27) 6 Anchorage - Senate District 2,000,000 2,000,000 7 M Residential Pavement 8 Rehabilitation (HD 11-27) 9 Anchorage - Southcentral 5,000,000 5,000,000 10 Law Enforcement Tactical 11 Range/Construction (HD 12 11-27) 13 Anchorage - Sylvan Drive 1,500,000 1,500,000 14 Improvements (HD 11-27) 15 Anchorage - Toilsome Hill 3,000,000 3,000,000 16 Drive/Glen Alps Road, 17 Canyon Road Improvements 18 Phase II (HD 11-27) 19 Anchorage - U-Med District 20,000,000 20,000,000 20 Northern Access (HD 11-27) 21 It is the intent of the legislature that the Municipality of Anchorage and the Department of 22 Transportation and Public Facilities work with the public, including both the community and 23 U-Med organizations, and consider their input and desires on the design, construction, and 24 mitigation elements of the project. 25 Barrow - Volunteer Search 286,501 286,501 26 and Rescue Building 27 Renovations (HD 40) 28 Bethel - Sewer and Water 7,000,000 7,000,000 29 Project Institutional 30 Corridor (HD 37) 31 Cordova - Community Center 1,000,000 1,000,000 32 Construction Completion 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -13- (HD 35) 3 Delta Junction - LED 97,500 97,500 4 Lighting Upgrades (HD 6) 5 Delta Junction - Mid-Sized 175,000 175,000 6 Plow Truck with Sander (HD 7 6) 8 Dillingham - E911 Critical 200,000 200,000 9 System Upgrades (HD 36) 10 Dillingham - Landfill 1,900,000 1,900,000 11 Regulatory Compliance 12 Improvements (HD 36) 13 Elim - Community Fire 1,243,000 1,243,000 14 Response and Protection 15 (HD 39) 16 Fairbanks - Heavy Duty 625,000 625,000 17 Rescue Apparatus (HD 1-5) 18 Fairbanks - Local Road 1,000,000 1,000,000 19 Improvements (HD 1-5) 20 Fairbanks North Star 30,000 30,000 21 Borough - Arctic Light 22 Elementary School Security 23 Systems (HD 1-5) 24 Fairbanks North Star 17,000 17,000 25 Borough - B.E.S.T. 26 Correspondence School 27 Classroom Digital 28 Technology (HD 1-5) 29 Fairbanks North Star 30,000 30,000 30 Borough - Badger Road 31 Elementary School Security 32 Systems (HD 1-5) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -14- Fairbanks North Star 30,000 30,000 3 Borough - Barnette Magnet 4 School Digital Classroom 5 Technology (HD 1-5) 6 Fairbanks North Star 250,000 250,000 7 Borough - Big Dipper PA 8 and Sound System 9 Improvements (HD 1-5) 10 Fairbanks North Star 17,000 17,000 11 Borough - Chinook Charter 12 School Classroom Digital 13 Technology (HD 1-5) 14 Fairbanks North Star 35,000 35,000 15 Borough - Hutchison High 16 School Classroom and 17 Vocational Technology 18 Upgrade (HD 1-5) 19 Fairbanks North Star 30,000 30,000 20 Borough - Ladd Elementary 21 School Security Systems 22 (HD 1-5) 23 Fairbanks North Star 55,000 55,000 24 Borough - Lathrop High 25 School Classroom 26 Technology & Physical 27 Education Equipment (HD 28 1-5) 29 Fairbanks North Star 300,000 300,000 30 Borough - North Star 31 Volunteer Fire Department 32 Fire Engine Replacement 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -15- Project (HD 1-5) 3 Fairbanks North Star 40,000 40,000 4 Borough - North Star 5 Volunteer Fire Department 6 Station 3 Driveway Repair 7 Project (HD 1-5) 8 Fairbanks North Star 30,000 30,000 9 Borough - Ryan Middle 10 School Classroom Digital 11 Technology (HD 1-5) 12 Fairbanks North Star 46,950 46,950 13 Borough - School District 14 We the People Competition 15 (HD 1-5) 16 Fairbanks North Star 30,000 30,000 17 Borough - Ticasuk Brown 18 Elementary School Security 19 Systems (HD 1-5) 20 Fairbanks North Star 821,100 821,100 21 Borough - Weller 22 Elementary School Parking 23 Lot Safety Upgrade (HD 24 1-5) 25 Gustavus - Public Use 73,000 73,000 26 Restroom Construction (HD 27 31-32) 28 Houston - Cheri Lake Drive 623,253 623,253 29 Improvements (HD 7-11) 30 Houston - Community 350,000 350,000 31 Impact Assessment (HD 32 7-11) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -16- Houston - Fire Training 25,000 25,000 3 Facility (HD 7-11) 4 Houston - School Bus 450,000 450,000 5 Routes Rehabilitation and 6 Improvements (HD 7-11) 7 Hughes - Moose Loop 102,596 102,596 8 Subdivision Electrical 9 Distribution Lines Project 10 (HD 39) 11 Hydaburg - School District 150,000 150,000 12 Teacher Housing Unit (HD 13 34) 14 Juneau - Airport Snow 3,000,000 3,000,000 15 Removal Equipment Facility 16 (HD 31-32) 17 Juneau - Phase III Don 500,000 500,000 18 Statter Harbor New Haul 19 Out Facility (HD 31-32) 20 Juneau - Riverbend 30,000 30,000 21 Elementary School 22 Playground Equipment (HD 23 31-32) 24 Juneau - School District 147,300 147,300 25 Curricular Materials (HD 26 31-32) 27 Juneau - School District 30,000 30,000 28 Technology (HD 31-32) 29 Juneau - Thermal Imaging 35,000 35,000 30 Cameras for Capital City 31 Fire and Rescue (HD 31-32) 32 Kenai - Fire/ Rescue Boat 90,000 90,000 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -17- (HD 28-30) 3 Kenai - Public Safety 110,000 110,000 4 Building Upgrades (HD 5 28-30) 6 Kenai - State Personal Use 150,000 150,000 7 Fishery Capital 8 Improvements (HD 28-30) 9 Kenai - Water Storage 2,500,000 2,500,000 10 Reservoir Construction (HD 11 28-30) 12 Kenai Peninsula Borough - 50,000 50,000 13 Anchor Point Fire and 14 Emergency Medical Service 15 Area Sewer System 16 Replacement (HD 28-30) 17 Kenai Peninsula Borough - 3,472,619 3,472,619 18 Central Peninsula Landfill 19 Leachate Thermal 20 Evaporation Unit (HD 21 28-30) 22 Kenai Peninsula Borough - 2,000,000 2,000,000 23 Road Projects (HD 28-30) 24 Kenai Peninsula Borough - 1,000,000 1,000,000 25 Seward Bear Creek Flood 26 Mitigation (HD 28-30) 27 Kenai Peninsula Borough - 1,500,000 1,500,000 28 Soldotna High Schools 29 Artificial Turf Field (HD 30 28-30) 31 Ketchikan - Medical Center 15,000,000 15,000,000 32 Addition and Alterations 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -18- Phase I (HD 33) 3 Kodiak - Monashka 500,000 500,000 4 Pumphouse Upgrades (HD 35) 5 Kodiak Island Borough - 4,529,000 4,529,000 6 Landfill Leachate 7 Treatment Plant & Related 8 Phase III Improvements 9 (HD 35) 10 Koyukuk - Heavy Equipment 250,000 250,000 11 (HD 39) 12 Kwethluk - Aerial 23,435 23,435 13 Photography Mapping (HD 14 36) 15 Matanuska-Susitna Borough - 45,000 45,000 16 Academy Charter Classroom 17 Expansion and Library 18 Funding (HD 7-11) 19 Matanuska-Susitna Borough - 35,000 35,000 20 American Charter Academy 21 STEM Equipment and 22 Materials (HD 7-11) 23 Matanuska-Susitna Borough - 6,300 6,300 24 Big Lake Elementary School 25 Digital Literacy and Story 26 Telling (HD 7-11) 27 Matanuska-Susitna Borough - 5,000 5,000 28 Big Lake Elementary School 29 Indoor Physical Education 30 Equipment (HD 7-11) 31 Matanuska-Susitna Borough - 8,200,000 8,200,000 32 Bogard Road Extension East 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -19- (HD 7-11) 3 Matanuska-Susitna Borough - 35,000 35,000 4 Butte Elementary School 5 Portable Labs/ iPads (HD 6 7-11) 7 Matanuska-Susitna Borough - 40,000 40,000 8 Butte Elementary School 9 Sidewalks (HD 7-11) 10 Matanuska-Susitna Borough - 70,000 70,000 11 Butte Volunteer Fire 12 Department Mobile 13 Treatment Center (HD 7-11) 14 Matanuska-Susitna Borough - 2,000,000 2,000,000 15 Caswell Lakes Fire Station 16 13-1 (HD 7-11) 17 Matanuska-Susitna Borough - 1,000,000 1,000,000 18 Convention and Visitors 19 Bureau Gateway Center 20 Project (HD 7-11) 21 Matanuska-Susitna Borough - 35,000 35,000 22 Cottonwood Creek 23 Elementary School Outdoor 24 Signage (HD 7-11) 25 Matanuska-Susitna Borough - 2,500,000 2,500,000 26 Fisheries and Fish 27 Protection (HD 7-11) 28 Matanuska-Susitna Borough - 150,000 150,000 29 Fronteras Charter School 30 Rural Development 31 Application Costs (HD 32 7-11) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -20- Matanuska-Susitna Borough - 45,000 45,000 3 Glacier View School Van 4 (HD 7-11) 5 Matanuska-Susitna Borough - 5,000 5,000 6 Goose Bay Elementary 7 Library & Technology 8 Upgrade (HD 7-11) 9 Matanuska-Susitna Borough - 5,000 5,000 10 Knik Elementary School 11 Library & Technology 12 Upgrade (HD 7-11) 13 Matanuska-Susitna Borough - 5,000 5,000 14 Meadow Lakes Elementary 15 School Library & Technology 16 Upgrades (HD 7-11) 17 Matanuska-Susitna Borough - 150,000 150,000 18 Meadow Lakes RSA 27 North 19 Gunflint Trail Upgrade (HD 20 7-11) 21 Matanuska-Susitna Borough - 160,000 160,000 22 Michelle Drive and Gina 23 Circle Reconstruction (HD 24 7-11) 25 Matanuska-Susitna Borough - 25,000 25,000 26 Midnight Sun Family 27 Learning Crisis 28 Preparedness (HD 7-11) 29 Matanuska-Susitna Borough - 40,000 40,000 30 Palmer High School Swim 31 Dive Team Scoreboard (HD 32 7-11) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -21- Matanuska-Susitna Borough - 300,000 300,000 3 Permanent Emergency 4 Operations Center Planning 5 (HD 7-11) 6 Matanuska-Susitna Borough - 2,500,000 2,500,000 7 Port MacKenzie Cathodic 8 Protection (HD 7-11) 9 Matanuska-Susitna Borough - 25,000,000 25,000,000 10 Rail Extension to Port 11 MacKenzie (HD 7-11) 12 Matanuska-Susitna Borough - 2,500,000 2,500,000 13 River Management (HD 7-11) 14 Matanuska-Susitna Borough - 750,000 750,000 15 School District Alaska 16 Middle College School (HD 17 7-11) 18 Matanuska-Susitna Borough - 500,000 500,000 19 School District Cyber 20 Centers (HD 7-11) 21 Matanuska-Susitna Borough - 500,000 500,000 22 School District Preschool 23 Program (HD 7-11) 24 Matanuska-Susitna Borough - 750,000 750,000 25 School District STEM 26 Initiative (HD 7-11) 27 Matanuska-Susitna Borough - 140,000 140,000 28 Self-Contained Breathing 29 Apparatus Upgrade (HD 30 7-11) 31 Matanuska-Susitna Borough - 75,000 75,000 32 Shushana Drive 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -22- Improvements (HD 7-11) 3 Matanuska-Susitna Borough - 125,000 125,000 4 Sitze Road Drainage 5 Improvements (HD 7-11) 6 Matanuska-Susitna Borough - 2,500,000 2,500,000 7 Substandard Roads and 8 Bridges (HD 7-11) 9 Matanuska-Susitna Borough - 30,000 30,000 10 Sutton Elementary School 11 Carpet Replacement (HD 6) 12 Matanuska-Susitna Borough - 100,000 100,000 13 Talkeetna Planning Phase 14 Water and Sewer 15 Improvements (HD 7-11) 16 Matanuska-Susitna Borough - 350,000 350,000 17 Warm Storage Fire Station 18 in the Crystal Lakes Area 19 (HD 7-11) 20 This appropriation is contingent on the Warm Storage Fire Station providing a $150,000 21 match from sources other than the state. 22 Matanuska-Susitna Borough - 388,000 388,000 23 Warm Storage Fire Station 24 on Four Mile Road (HD 25 7-11) 26 This appropriation is contingent on the Warm Storage Fire Station providing a $150,000 27 match from sources other than the state. 28 Matanuska-Susitna Borough - 2,700,000 2,700,000 29 West Lakes Fire Service 30 Area Station 7-3 (HD 7-11) 31 Matanuska-Susitna Borough - 65,000 65,000 32 Willow Community Center 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -23- Area Improvements (HD 3 7-11) 4 Matanuska-Susitna Borough - 758,000 758,000 5 Willow Elementary School 6 Roof Replacement (HD 7-11) 7 Matanuska-Susitna Borough - 100,000 100,000 8 Willow Fire Service Area 9 Fire Station Addition 10 Construction (HD 7-11) 11 Matanuska-Susitna Borough - 470,000 470,000 12 Willow Fire Service Area 13 Tanker (HD 7-11) 14 Napaskiak - Replacement 200,000 200,000 15 Generators (HD 36) 16 Nenana - Totchaket Resource 3,000,000 3,000,000 17 Development Corridor 18 Construction (HD 38) 19 Newhalen - Purchase Backhoe/ 60,000 60,000 20 Loader (HD 36) 21 Nome - Location and 300,000 300,000 22 Distribution of Affordable 23 Energy Sources to Nome and 24 Other Rural Alaskan 25 Communities (HD 39) 26 Nome - Port of Nome 500,000 500,000 27 Improvements (HD 39) 28 North Pole - 100 Foot 980,000 980,000 29 Aerial Platform (HD 1-5) 30 North Pole - Ambulance 125,000 125,000 31 (HD 1-5) 32 North Pole - International 80,000 80,000 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -24- Federation of Sleddog 3 Sports World Championships 4 Hosting Costs (HD 1-5) 5 North Pole - North Pole 150,000 150,000 6 Archival System (HD 1-5) 7 North Pole - Police 75,000 75,000 8 Station Heating and Cooling 9 System (HD 1-5) 10 North Slope Borough - 1,700,000 1,700,000 11 Critical Infrastructure 12 Protection (HD 40) 13 Northwest Arctic Borough - 100,000 100,000 14 Kiana Fuel Dispenser 15 Upgrade (HD 40) 16 Northwest Arctic Borough - 2,500,000 2,500,000 17 Kivalina Evacuation and 18 Access Road (HD 40) 19 Northwest Arctic Borough - 350,000 350,000 20 Kobuk Heavy Equipment (HD 21 40) 22 Northwest Arctic Borough - 4,000,000 4,000,000 23 Kotzebue High School 24 Residential Program and 25 Northwest Magnet School 26 (HD 40) 27 Northwest Arctic Borough - 200,000 200,000 28 Noorvik Dumpster and 29 Fencing (HD 40) 30 Northwest Arctic Borough - 350,000 350,000 31 Shungnak Heavy Equipment 32 (HD 40) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -25- Old Harbor - Airport 4,470,000 4,470,000 3 Improvements (HD 35) 4 Ouzinkie - Mahoona Lake 1,800,000 1,800,000 5 Dam Repair and Replacement 6 (HD 35) 7 Ouzinkie - Ouzinkie Dock 2,500,000 2,500,000 8 Completion (HD 35) 9 Palmer - Aerial 1,800,000 1,800,000 10 Firefighting Apparatus and 11 Equipment (HD 7-11) 12 Palmer - Bogard Waterline 3,500,000 3,500,000 13 Extension (HD 7-11) 14 Palmer - Steel Water Main 1,000,000 1,000,000 15 Replacement (HD 7-11) 16 Pelican - Fuel Dock and 80,000 80,000 17 Float Repair (HD 34) 18 Petersburg - Police Station 2,500,000 2,500,000 19 and Jail Facility (HD 20 31-32) 21 Port Lions - City Dock and 3,500,000 3,500,000 22 Ferry Terminal Replacement 23 (HD 35) 24 Saxman - Mahoney Lake 200,000 200,000 25 Hydroelectric Project Phase 26 III Pre-Construction (HD 27 33) 28 Selawik - Road, Landfill, 340,000 340,000 29 Community Maintenance and 30 Material Handling (HD 40) 31 Seward - Lowell Canyon 575,000 575,000 32 Water Tank Refurbishment 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 18(FIN) am H, Sec. 1 -26- (HD 28-30) 3 Seward - Seward Marine 10,000,000 10,000,000 4 Industrial Center/ 5 Homeport Coastal Villages 6 Region Fund's Fleet to 7 Alaska Project (HD 28-30) 8 Shaktoolik - Heavy 360,500 360,500 9 Equipment (HD 39) 10 Skagway - Port of Skagway 1,500,000 1,500,000 11 Gateway Project (HD 31-32) 12 Soldotna - Water Reservoir 2,500,000 2,500,000 13 Reconstruction, 14 Infrastructure 15 Improvements, and 16 Equipment (HD 28-30) 17 Tenakee Springs - Indian 312,000 312,000 18 River Hydroelectric Project 19 (HD 31-32) 20 Thorne Bay - Manholes and 200,000 200,000 21 Sewer Lines Repairs (HD 22 33) 23 Unalaska - Heavy Equipment 1,000,000 1,000,000 24 (HD 37) 25 Valdez - Senior Center 150,000 150,000 26 Facility and Grounds 27 Upgrade (HD 6) 28 Valdez - Small Boat Harbor 1,000,000 1,000,000 29 Expansion and Upland 30 Development (HD 6) 31 Wales - Honey Bucket Haul 75,000 75,000 32 Vehicle and Equipment 33 19 River Hydroelectric Project 20 (HD 31-32) 18 Tenakee Springs - Indian 312,000 312,000