Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appropriation - SLA 14, Ch 18, Sec 1, Pg. 4-6, Lns 8-33, 1-33,1-5
1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 119(FIN) am H, Sec. 1 -4- 36) 3 Kake New Tank Farm (HD 34) 3,550,000 4 Alaska Energy Authority - Round VII 22,843,900 22,843,900 5 Renewable Energy Project Grants (AS 6 42.45.045) 7 Atka Dispatchable Heat (HD 115,000 8 37) 9 Packers Creek Hydroelectric 2,352,700 10 Project Phase II (HD 37) 11 Venetie Clinic Heat 198,500 12 Recovery (HD 39) 13 Galena Community Wood Heat 3,096,900 14 Project (HD 39) 15 Nunam Iqua Heat Recovery 450,000 16 Project (HD 38) 17 Sitka Centennial Hall Air 232,600 18 Source Heat Pump (HD 34) 19 Stebbins St. Michael Wind 342,000 20 Energy Final Design and 21 Permitting (HD 39) 22 Tuntutuliak Heat Recovery 455,600 23 (HD 36) 24 Emmonak Heat Recovery 689,300 25 System (HD 38) 26 Chisana Mountain Wind 119,000 27 Feasibility Project (HD 39) 28 Yerrick Creek Hydroelectric 75,000 29 Project (HD 39) 30 Mountain Village Wind 123,500 31 Feasibility and Conceptual 32 Design (HD 38) 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 119(FIN) am H, Sec. 1 -5- Kake Community Energy (HD 175,000 3 34) 4 Ketchikan Gateway Borough 620,000 5 Biomass Heating Project (HD 6 33) 7 Stetson Creek Diversion 3,453,900 8 Cooper Lake Dam Facilities 9 Project (HD 28-30) 10 Allison Creek Hydroelectric 5,914,500 11 Project Consultation (HD 6) 12 Gunnuk Creek Hydroelectric 80,000 13 Feasibility Study (HD 31- 14 34) 15 Brevig Mission Water System 731,400 16 Heat Recovery (HD 39) 17 Seldovia House Ground 318,300 18 Source Heat Pump Project 19 (HD 30) 20 Haines Borough Municipal 1,237,400 21 Buildings Biomass Project 22 (HD 34) 23 St. Mary's Heat Recovery 735,200 24 System (HD 38) 25 Biomass Heat for Minto 274,800 26 Community Buildings (HD 38) 27 Yakutat Biomass District 103,000 28 Heating Loop (HD 35) 29 Kongiganak Wind Heat 311,500 30 Electrical Thermal Storage 31 (HD 36) 32 Igiugig Wind Resource 80,000 33 1 Appropriation General Other 2 Allocations Items Funds Funds HCS CSSB 119(FIN) am H, Sec. 1 -6- Feasibility/Conceptual 3 Design (HD 36) 4 Chevak Water and Vacuum 558,800 5 Plant Heat Recovery (HD 38) 6 Alaska Energy Authority - Rural Power 5,120,000 4,000,000 1,120,000 7 Systems Upgrades 8 Nunam Iqua Rural Power 1,560,000 9 System Upgrade (HD 38) 10 Kake Rural Power System 3,560,000 11 Upgrade (HD 34) 12 Grants to Municipalities (AS 13 37.05.315) 14 Aleknagik - Public Safety/Heavy 150,000 150,000 15 Equipment Building, Design and 16 Engineering (HD 36) 17 Aleutians East Borough - Akutan Harbor 300,000 300,000 18 (HD 37) 19 Anchorage - 100th Avenue Extension 4,500,000 4,500,000 20 Phase II Minnesota Drive to C St (HD 21 21) 22 Anchorage - 10th Avenue Bike Boulevard 100,000 100,000 23 P Street to Medfra Street (HD 18) 24 Anchorage - 112th Avenue and Mael 50,000 50,000 25 Street Intersection Safety 26 Improvements (HD 23) 27 Anchorage - 64th Avenue Upgrade/ 2,400,000 2,400,000 28 Reconstruction - Laurel Street to Norm 29 Drive (HD 24) 30 Anchorage - Bolin Street Area Storm 800,000 800,000 31 Drain (HD 13) 32 Anchorage - Boniface Parkway 140,000 140,000 33