HomeMy WebLinkAboutAEA - Summary Project Region_Jan 2009Alaska Renewable Energy Fund
Round 1 Request for LBA Approval
January 23, 2009
Energy Region ID Project Name Applicant
Applicant
Type Project Type Project Cost Grant Request Match Offered
Aleutians 58 Chuniisax Creek Hydroelectric
Construction City of Atka Utility Hydro 2,440,000 996,000 1,344,000 996,000 996,000
89 Nikolski Wind Integration
Construction
Umnak Power / Nikolski
IRA Council Government Wind 451,030 409,430 41,600 409,430 409,430
90 St. George Wind Farm
Construction
City of St. George - St.
George Municipal Electric
Utility
Government Wind 3,000,000 1,500,000 1,500,000 1,500,000 1,500,000
11 Aleutians East Borough
Renewable Energy
Reconnaissance
Aleutians East Borough Government Other 40,000 25,000 15,000 25,000 25,000
95 Makushin Geothermal Feasibility
Study
Kiiguusi Suuluta Land
Company, LLC IPP Geothermal 250,000,000 3,225,500 - -
TOTAL 255,931,030 6,155,930 2,900,600 - 2,930,430 2,930,430
Bering Straits 52 Nome/Newton Peak Wind Farm
Construction
City of Nome d/b/a Nome
Joint Utility System
(NJUS)
Utility Wind 15,534,309 13,951,326 1,582,983 4,000,000 4,000,000
50 Unalakleet Wind Farm
Construction
Unalakleet Valley Electric
Cooperative, Inc. (UVEC)Utility Wind 8,996,832 8,774,080 222,752 4,000,000 4,000,000
47 Nome Banner Peak Wind Farm
Transmission Construction
City of Nome d/b/a Nome
Joint Utilities System Utility Transmission 890,000 801,000 89,000 801,000 801,000
106 Nome/ Banner Peak Wind Farm
Construction Banner Wind, LLC IPP Wind 5,157,000 4,126,000 1,031,000 -
TOTAL 30,578,141 27,652,406 2,925,735 - 8,801,000 8,801,000
Bristol Bay 64 Lake Pen Borough Wind
Feasibility Study
Lake and Peninsula
Borough Government Wind 8,000,000 184,000 40,000 184,000 184,000
62 Chignik Lake Area Wind-Hydro
Final Design
Lake and Peninsula
Borough Government Wind 8,150,000 375,000 96,000 375,000 375,000
63 Lake Pen Borough Wood
Heating Final Design
Lake and Peninsula
Borough Government Biomass 1,265,000 77,000 18,000 77,000 77,000
40 Indian Creek Hydro Feasibility
Study City Of Chignik Government Hydro 207,500 207,500 - 207,500 207,500
6 Lake Elva Hydropower
Construction
Nushagak Electric &
Telephone Cooperative,
Inc
Utility Hydro 22,000,000 10,000,000 12,000,000 4,006,500 4,006,500
14 Chignik Lagoon Hydroelectric
Final Design
Chignik Lagoon Power
Utility (CLPU)Utility Hydro 1,900,000 150,000 150,000 150,000
18 Pike's Ridge Geothermal Final
Design
Naknek Electric
Association Utility Geothermal 10,020,000 5,000,000 5,000,000 - -
7 Naknek/King Salmon Fish Waste
Feasibility Study
Naknek Electric
Association Utility Biofuels 100,000 80,000 20,000 - -
55 Snake Mountain Wind Farm
Construction (Withdrawn)
Bristol Bay Area Health
Corporation Government Wind 13,100,000 10,100,000 2,800,000 - -
TOTAL 64,742,500 26,173,500 19,974,000 - 5,000,000 5,000,000
Request for
LB&A
Approval
Jan 09
Total
Requested
and
Approved
Project Approved
by
LB&A
2008
Cost and Request
Page 1 of 6
Alaska Renewable Energy Fund
Round 1 Request for LBA Approval
January 23, 2009
Energy Region ID Project Name Applicant
Applicant
Type Project Type Project Cost Grant Request Match Offered
Request for
LB&A
Approval
Jan 09
Total
Requested
and
Approved
Project Approved
by
LB&A
2008
Cost and Request
21 Humpback Creek Hydroelectric
Construction
Cordova Electric
Cooperative
Utility Hydro 11,600,000 5,500,000 6,100,000 4,000,000 4,000,000
22 Cordova Heat Recovery
Construction
Cordova Electric
Cooperative Utility Heat Recovery 5,260,000 1,780,000 3,480,000 1,780,000 1,780,000
26 Cordova Wood Processing Plant
Construction Native Village of Eyak Government Biomass 628,825 364,225 264,600 147,720 147,720
27 Allison Lake Hydro Feasibility
Study
Copper Valley Electric
Association, Inc (CVEA) Utility Hydro 45,058,000 2,288,000 572,000 2,288,000 2,288,000
15 Chistochina Central Wood
Heating Construction Cheesh'na Tribal Council Government Biomass 839,000 827,000 12,000 500,000 500,000
46 Kenny Lake Wood Heating
Construction
Copper River School
District Government Biomass 1,200,000 1,200,000 120,000 120,000
2 Gulkana Central Wood Heating
Construction Gulkana Village Council Government Biomass 898,000 898,000 - 500,000 500,000
TOTAL 65,483,825 12,857,225 10,428,600 - 9,335,720 9,335,720
Kodiak 103 Pillar Mountain Wind Farm
Construction
Kodiak Electric
Associaiton, Inc.Utility Wind 23,319,539 9,650,000 2,000,000 1,000,000 3,000,000 4,000,000
73 Old Harbor Hydroelectric Final
Design
Alaska Village Electric
Cooperative Utility Hydro 4,100,000 225,000 25,000 225,000 225,000
TOTAL 27,419,539 9,875,000 2,025,000 1,000,000 3,225,000 4,225,000
122 Bethel Wind Power Project
Times 4 City of Bethel Government Wind 3,197,986 2,598,320 599,666 2,598,320 2,598,320
110 Kongiganak Wind Farm
Construction
Puvurnaq Power
Company Utility Wind 3,200,000 1,700,000 1,500,000 1,700,000 1,700,000
107 Kwigillingok Wind Farm
Construction
Native Village of
Kwigillingok Utility Wind 3,200,000 1,600,000 1,600,000 1,600,000 1,600,000
67 Bethel Wind Farm Construction
(BNC land)Village Wind Power, LLC IPP Wind 8,710,000 6,960,000 1,750,000 - -
70 Quinhagak Wind Farm
Construction
Alaska Village Electric
Cooperative
Utility Wind 4,313,603 3,882,243 431,360 3,882,243 3,882,243
72 Mekoryuk Wind Farm
Construction
Alaska Village Electric
Cooperative Utility Wind 3,506,406 3,155,765 350,641 3,155,765 3,155,765
91 Napaimute Solar PV
Construction
Native Village of
Napaimute Government Solar 123,494 109,471 14,023 - -
71 Toksook Bay Wind Farm
Expansion Construction
Alaska Village Electric
Cooperative Utility Wind 1,153,056 1,037,750 115,306 1,037,750 1,037,750
35 Hooper Bay Wind Farm
Construction City of Hooper Bay Government Wind 2,220,141 2,220,141 - 80,000 80,000
113 Napaskiak Wind Farm Feasibility
Study
Napaskiak Utility (electric) -
City of Napaskiak Utility Wind - -
96 Crooked Creek Renewable
Energy Reconnaissance Study
Crooked Creek Traditional
Council Government Other 178,000 137,543 58,000 - -
TOTAL 29,802,686 23,401,233 6,418,996 - 14,054,078 14,054,078
Copper River/
Chugach
Lower Yukon/
Kuskokwim
Page 2 of 6
Alaska Renewable Energy Fund
Round 1 Request for LBA Approval
January 23, 2009
Energy Region ID Project Name Applicant
Applicant
Type Project Type Project Cost Grant Request Match Offered
Request for
LB&A
Approval
Jan 09
Total
Requested
and
Approved
Project Approved
by
LB&A
2008
Cost and Request
59 Kobuk River Valley Woody
Biomass Feasibility Study
Northwest Inupiat Housing
Authority Government Biomass 7,500,000 249,500 248,980 249,500 249,500
75 Ambler Solar PV Construction Alaska Village Electric
Cooperative Utility Solar 605,000 550,000 55,000 550,000 550,000
76 Noatak Solar PV Construction Alaska Village Electric
Cooperative Utility Solar 605,000 550,000 55,000 -
77 Shungnak Solar PV Construction Alaska Village Electric
Cooperative Utility Solar 605,000 550,000 55,000 -
85 Kotzebue Wind Farm Expansion
Construction
Kotzebue Electric
Association Utility Wind 14,807,535 12,075,535 2,800,000 4,000,000 4,000,000
56 Buckland/Deering/Noorvik Wind
Farm Construction Northwest Arctic Borough Government Wind 10,921,428 10,758,928 162,500 10,758,928 10,758,928
74 Upper Kobuk Region
Hydroelectric Feasibility
Alaska Village Electric
Cooperative Utility Hydro 1,500,000 1,025,000 50,625 1,025,000 1,025,000
83 Kotzebue Wind Farm Red-Ox
Flow Battery Storage
Construction
Kotzebue Electric
Association Utility Wind 3,930,399 3,144,399 786,000 - -
121 Ambler Solar and Wind Power
Construction City of Ambler Government Other 150,000 150,000 - -
TOTAL 40,624,362 29,053,362 4,213,105 - 16,583,428 16,583,428
Railbelt 68 Anchorage Landfill Gas
Electricity Construction
Municipality of Anchorage,
Solid Waste Services
Dept
Government Biofuels 7,400,000 3,700,000 3,700,000 2,000,000 2,000,000
57 South Fork Hydroelectric
Construction South Fork Hydro, LLC IPP Hydro 3,087,000 1,000,000 2,087,000 1,000,000 1,000,000
94 Nikolaevsk Wind Farm Final
Design
Alaska Wind Energy, LLC,
d/b/a Wind Energy Alaska
(WEA)
IPP Wind 21,923,000 4,334,600 17,588,400 180,600 180,600
109 Eva Creek Wind Farm
Construction
Golden Valley Electric
Association Utility Wind 93,341,555 79,340,322 14,001,233 2,000,000 2,000,000
53 North Pole Biomass
Electricity/Heat Construction Chena Power Utility, LLC Utility Biofuels 4,007,900 2,000,000 2,007,900 1,000,000 1,000,000 2,000,000
93 Anchorage Landfill Gas
Electricity Final Design
Alaska Wind Energy, LLC,
d/b/a Wind Energy Alaska
(WEA)
IPP Biofuels 8,257,850 2,100,000 6,157,850 -
87 Fishhook Hydroelectric
Construction
Fishhook Renewable
Energy, LLC
IPP Hydro 4,555,922 2,142,961 2,412,961 453,071 1,546,929 2,000,000
34 Grant Lake/Falls Creek Hydro
Feasibility Study Kenai Hydro, LLC IPP Hydro 26,924,120 816,000 204,000 816,000 816,000
105 North Pole Heat Recovery
Construction
Golden Valley Electric
Association Utility Heat Recovery 1,050,000 840,000 210,000 840,000 840,000
66 Coal Mine Road Wind Farm
Final Design Alaska Wind Power, LLC IPP Wind 96,000,000 105,000 26,250 105,000 105,000
102 Delta Junction Wind Farm
Construction
Alaska Environmental
Power LLC IPP Wind 8,363,886 6,269,750 2,094,136 801,500 1,198,500 2,000,000
98 Nikiski Wind Farm Construction Kenai Winds, LLC IPP Wind 46,800,000 11,700,000 35,100,000 80,000 80,000
78 Girdwood Gas CHP/Hydro/Wind
Solar Construction Alaska Green Energy, LLC IPP Other 12,231,750 5,231,750 7,000,000 47,625 47,625
48 Whittier Creek Hydroelectric
Reconnaissance City of Whittier Government Hydro 3,000,000 85,000 115,000 85,000 85,000
86 Fourth of July Creek
Hydroelectric Reconnaissance Independence Power, LLC IPP Hydro 15,675,000 7,837,500 7,837,500 20,000 20,000
Northwest
Arctic
Page 3 of 6
Alaska Renewable Energy Fund
Round 1 Request for LBA Approval
January 23, 2009
Energy Region ID Project Name Applicant
Applicant
Type Project Type Project Cost Grant Request Match Offered
Request for
LB&A
Approval
Jan 09
Total
Requested
and
Approved
Project Approved
by
LB&A
2008
Cost and Request
Railbelt 97 Nenana Hydrokinetic
Construction
University of Alaska
Fairbanks, Office of
Sponsored Programs
Government Ocean/River 1,937,072 1,854,026 83,046 450,000 450,000
[cont.]112 Delta Junction Wood Chip
Heating Feasibility Study
Delta/Greely School
District Government Biomass 2,868,000 2,868,000 - 2,704,684 2,704,684
108 McKinley Village Solar Thermal
Construction
Golden Valley Electric
Association Utility Solar 190,000 190,000 3,600 -
8 Anchorage Geothermal District
Heating Feasibility Study
Iceland America Energy,
Inc.IPP Geothermal 1,070,000,000 4,047,230 4,295,580 -
3 Anchorage Waste Gasification
Feasibility Study
Alaska Recycling Energy,
LLC IPP Biofuels 200,000,000 1,100,000 100,000 -
39 Delta Junction Barley/Wood
Pellet Central Heating
Construction
State of AK, Dept. of
Natural Resources,
Division of Forestry
Government Biomass 831,203 831,203 - -
5 Fairbanks Waste Gasification
Feasibility Study
Alaska Recycling Energy,
LLC IPP Biofuels 100,000,000 775,000 - -
4 Palmer Waste Gasification
Feasibility Study
Alaska Recycling Energy,
LLC IPP Biofuels 60,000,000 650,000 - -
16 Mt. Redoubt/Mt. Spur
Geothermal Construction Cook Inlet Power IPP Geothermal 98,150,000 950,000 97,200,000 -
17 Jack River Hydroelectric
Feasibility Study Native Village of Cantwell Government Hydro 200,000 194,540 5,460 -
43 Palmer Gas CHP Construction Alpine Energy, LLC IPP Gas 15,000,000 7,500,000 7,500,000 -
44 Whittier Gas CHP Construction Alpine Energy, LLC IPP Gas 15,000,000 7,500,000 7,500,000 -
45 Anchorage Wood Processing
and Heating Construction EarthRun Energy IPP Biomass 300,000 300,000 -
51 Mt. Alice Harbor Renewable
Energy Construction
Mt. Alice Development,
Inc.Government Other 140,229,650 14,673,250 -
79 Palmer Coal Bed Methane CHP
Construction Alaska Green Energy, LLC IPP Other 20,824,011 19,401,411 1,422,600 -
92 Delia Creek Hydro Construction HPML, LLC IPP Hydro 600,000 50,000 - -
--Kenai Hydro Recon Assessment Homer Electric
Associtation Utility Hydro 200,000 - 200,000
TOTAL 2,078,747,919 190,387,543 218,652,516 2,454,571 14,074,338 16,528,909
Page 4 of 6
Alaska Renewable Energy Fund
Round 1 Request for LBA Approval
January 23, 2009
Energy Region ID Project Name Applicant
Applicant
Type Project Type Project Cost Grant Request Match Offered
Request for
LB&A
Approval
Jan 09
Total
Requested
and
Approved
Project Approved
by
LB&A
2008
Cost and Request
Southeast 23 Coffman Cove-Naukati Intertie
Construction
Alaska Power &
Telephone Company
Utility Transmission 6,155,019 3,752,181 2,402,838 3,752,181 3,752,181
29 Kake-Petersburg Intertie Final
Design
Kwaan Electric
Transmission Intertie
Cooperative, Inc
Utility Transmission 40,000,000 2,990,000 2,500,000 2,990,000 2,990,000
10 Falls Creek Hydroelectric
Construction
Gustavus Electric
Company Utility Hydro 10,153,000 750,000 - 750,000 750,000
104 Reynolds Creek Hydroelectric
Construction Haida Power, Inc.Utility Hydro 17,145,000 10,500,000 6,645,000 1,000,000 1,000,000 2,000,000
111 Juneau Ground Source Heat
Pump Construction (Aquatic
Center)
City & Borough of Juneau Government Geothermal 1,950,000 1,450,000 500,000 1,450,000 1,450,000
37 Whitman Lake Hydro
Construction
Ketchikan Public Utilities-
Electic Division Utility Hydro 17,750,000 1,300,000 320,000 1,300,000 1,300,000
33 Haines Central Wood Heating
System Construction (Low
Income Housing Project)
Chilkoot Indian
Association Government Biomass 441,229 288,222 28,446 288,222 288,222
60 Yakutat Biomass Gasification
Construction Yakutat Power Utility Biofuels 3,633,600 3,393,600 240,000 249,600 249,600
38 Ruth Lake Hydro
Reconnaissance
City of Petersburg d/b/a
Petersburg Municipal &
Light
Utility Hydro 109,975,000 160,000 45,000 160,000 160,000
42 Burro Creek Hydro Feasibility
Study
Burro Creek Holdings,
LLC IPP Hydro 60,000 48,000 12,000 48,000 48,000
28 Hoonah - Hawk Inlet Intertie
Construction
Kwaan Electric
Transmission Intertie
Cooperative, Inc
Utility Transmission 37,459,970 36,709,970 750,000 - -
20 Metlakatla-Ketchikan Intertie
Construction
Metlakatla Indian
Community Government Transmission 7,652,000 7,152,000 500,000 820,000 820,000
41 Haines Central Wood Heating
Feasibility Study (Community
Buildings)
Haines Borough Government Biomass 2,090,500 120,500 20,000 120,500 120,500
65 Indian River Hydroelectric
Construction City of Tenakee Springs Utility Hydro 2,500,000 2,400,000 100,000 - -
9 Wrangell Hydro Based Electric
Boilers Construction
City and Borough of
Wrangell Government Other 3,260,000 3,260,000 123,000 2,000,000 2,000,000
19 Gustavus/Angoon/Wrangell/Nikis
ki Tidal Feasibility Study
Alaska Tidal Energy
Company IPP Ocean/River 1,940,000 515,000 - -
1 Takatz Lake Hydroelectric
Feasibility City & Borough of Sitka Government Hydro 225,000,000 2,000,000 -
101 Ketchikan Biomass Gasification
Construction
Diesel Brewing Company,
LLC dba Diesel Brewing of
Ketchikan
IPP Biofuels 25,625,000 20,500,000 5,125,000 - -
12 Juneau Waste Gasification
Reconnaissance Study
Alaska Recycling Energy,
LLC IPP Biofuels 95,000 - -
13 Ketchikan Waste Gasification
Reconnaissance Study
Alaska Recycling Energy,
LLC IPP Biofuels 105,620 - -
25 Haines Ground Source Heat
Pump Construction
Haines Assisted Living,
Inc IPP Geothermal 2,379,007 1,432,906 946,101 - -
--Juneau Ground Source Heat
Pump Construction (Airport)City & Borough of Juneau Government Geothermal 1,076,000 1,026,000 513,000 513,000 - 513,000
TOTAL 514,305,325 101,373,999 21,285,385 1,513,000 14,928,503 16,441,503
Page 5 of 6
Alaska Renewable Energy Fund
Round 1 Request for LBA Approval
January 23, 2009
Energy Region ID Project Name Applicant
Applicant
Type Project Type Project Cost Grant Request Match Offered
Request for
LB&A
Approval
Jan 09
Total
Requested
and
Approved
Project Approved
by
LB&A
2008
Cost and Request
61 McGrath Heat Recovery
Construction
McGrath Light & Power,
Co.Utility Heat Recovery 991,815 824,815 167,000 712,415 712,415
54 Galena Wood Heating
Construction
Interior Regional Housing
Authority (IRHA)Government Biomass 382,779 382,779 4,659,760 382,779 382,779
84 Ruby Hydrokinetic Construction Yukon River Inter-Tribal
Watershed Council IPP Hydro 461,950 446,950 10,555 446,950 446,950
49 Tok Wood Heating Construction Alaska Gateway School
District Government Biomass 3,805,349 3,245,349 560,000 3,245,349 3,245,349
24 Yerrick Creek Hydroelectric
Construction
Alaska Power &
Telephone Company Utility Hydro 14,500,000 11,600,000 2,900,000 - -
30 McGrath Central Wood Heating
Construction McGrath Power and Light Utility Biomass 4,005,000 3,052,000 953,000 322,000 322,000
31 Fort Yukon Central Wood
Heating Construction
Gwitchyaa Zhee Utility
Company Utility Biomass 4,285,161 2,945,991 1,200,000 210,000 210,000
--Manley Hot Springs Geothermal
Construction TDX Power Utility Geothermal 1,880,000 1,880,000 1,665,000 215,000 - 215,000
TOTAL 30,312,054 24,377,884 12,115,315 215,000 5,319,493 5,534,493
Statewide 88 Statewide Hydrokinetic
Feasibility Study
Thomas Ravens, Ph.D.
and Myree McDonald,
Ph.D.
Government Ocean/River 565,439 565,439 - 565,439 565,439
36 Statewide Heat Recovery
Demonstration Project Precision Power, LLC IPP Heat Recovery 7,000,000 300,000 60,000 - -
82 Juneau Based Statewide
Hydro/Ammonia Electricity
Construction
Alaska Electric Light &
Power Utility Other 800,000 800,000 - -
32 Statewide Biomass
Reconnaissance Study
University of Alaska,
Fairbanks Government Biofuels 286,149 286,149 - - -
81 Statewide Heat Recovery/Electric
Demonstration Construction Ormat Nevada Inc.IPP Heat Recovery 28,000,000 495,000 - - -
TOTAL 36,651,588 2,446,588 60,000 - 565,439 565,439
TOTAL 3,174,598,969 453,754,671 300,999,252 5,182,571 94,817,429 100,000,000
Yukon-
Koyukuk/
Upper Tanana
Page 6 of 6