HomeMy WebLinkAboutREF Round 1 Recommendations - Feb2008Alaska Renewable Energy Fund
Ranking and Proposed Grant Allocation Round 1
Revised Feb 20, 2009
Page 1 of 6
Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered
Approved by LB&A 2008
Request for LB&A Approval Feb 09 Total Requested and Approved
Aleutians 58 Chuniisax Creek Hydroelectric
Construction City of Atka Utility Hydro 2,440,000 996,000 1,344,000 996,000 996,000
89 Nikolski Wind Integration Construction Umnak Power / Nikolski IRA Council Government Wind 451,030 409,430 41,600 409,430 409,430
90 St. George Wind Farm Construction City of St. George - St. George Municipal Electric Utility
Government Wind 3,000,000 1,500,000 1,500,000 1,500,000 1,500,000
11 Aleutians East Borough Renewable Energy Reconnaissance Aleutians East Borough Government Other 40,000 25,000 15,000 25,000 25,000
95 Makushin Geothermal Feasibility
Study
Kiiguusi Suuluta Land
Company, LLC IPP Geothermal 250,000,000 3,225,500 - -
TOTAL 255,931,030 6,155,930 2,900,600 - 2,930,430 2,930,430
Bering Straits 52 Nome/Newton Peak Wind Farm Construction City of Nome d/b/a Nome Joint Utility System (NJUS)Utility Wind 15,534,309 13,951,326 1,582,983 4,000,000 4,000,000
50 Unalakleet Wind Farm Construction Unalakleet Valley Electric
Cooperative, Inc. (UVEC)Utility Wind 8,996,832 8,774,080 222,752 4,000,000 4,000,000
47 Nome Banner Peak Wind Farm
Transmission Construction
City of Nome d/b/a Nome
Joint Utilities System Utility Transmission 890,000 801,000 89,000 801,000 801,000
106 Nome/ Banner Peak Wind Farm Construction Banner Wind, LLC IPP Wind 5,157,000 4,126,000 1,031,000 -
TOTAL 30,578,141 27,652,406 2,925,735 - 8,801,000 8,801,000
Bristol Bay 64 Lake Pen Borough Wind Feasibility
Study Lake and Peninsula Borough Government Wind 8,000,000 184,000 40,000 184,000 184,000
62 Chignik Lake Area Wind-Hydro Final Design Lake and Peninsula Borough Government Wind 8,150,000 375,000 96,000 375,000 375,000
63 Lake Pen Borough Wood Heating
Final Design Lake and Peninsula Borough Government Biomass 1,265,000 77,000 18,000 77,000 77,000
40 Indian Creek Hydro Feasibility Study City Of Chignik Government Hydro 207,500 207,500 - 207,500 207,500
6 Lake Elva Hydropower Construction Nushagak Electric &
Telephone Cooperative, Inc Utility Hydro 22,000,000 10,000,000 12,000,000 4,006,500 4,006,500
14 Chignik Lagoon Hydroelectric Final
Design
Chignik Lagoon Power Utility
(CLPU)Utility Hydro 1,900,000 150,000 150,000 150,000
18 Pike's Ridge Geothermal Final Design Naknek Electric Association Utility Geothermal 10,020,000 5,000,000 5,000,000 - -
7 Naknek/King Salmon Fish Waste
Feasibility Study Naknek Electric Association Utility Biofuels 100,000 80,000 20,000 - -
55 Snake Mountain Wind Farm Construction (Withdrawn)Bristol Bay Area Health Corporation Government Wind 13,100,000 10,100,000 2,800,000 - -
TOTAL 64,742,500 26,173,500 19,974,000 - 5,000,000 5,000,000
21 Humpback Creek Hydroelectric
Construction
Cordova Electric
Cooperative
Utility Hydro 11,600,000 5,500,000 6,100,000 4,000,000 4,000,000
22 Cordova Heat Recovery Construction Cordova Electric Cooperative Utility Heat Recovery 5,260,000 1,780,000 3,480,000 1,780,000 1,780,000
26 Cordova Wood Processing Plant
Construction Native Village of Eyak Government Biomass 628,825 364,225 264,600 147,720 147,720
Cost and RequestProject Fund Allocation
Copper River/
Chugach
Alaska Renewable Energy Fund
Ranking and Proposed Grant Allocation Round 1
Revised Feb 20, 2009
Page 2 of 6
Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered
Approved by LB&A 2008
Request for LB&A Approval Feb 09 Total Requested and Approved
Cost and RequestProject Fund Allocation
27 Allison Lake Hydro Feasibility Study Copper Valley Electric
Association, Inc (CVEA) Utility Hydro 45,058,000 2,288,000 572,000 2,288,000 2,288,000
15 Chistochina Central Wood Heating Construction Cheesh'na Tribal Council Government Biomass 839,000 827,000 12,000 500,000 500,000
46 Kenny Lake Wood Heating
Construction Copper River School District Government Biomass 1,200,000 1,200,000 120,000 120,000
2 Gulkana Central Wood Heating Construction Gulkana Village Council Government Biomass 898,000 898,000 - 500,000 500,000
TOTAL 65,483,825 12,857,225 10,428,600 - 9,335,720 9,335,720
Kodiak 103 Pillar Mountain Wind Farm
Construction
Kodiak Electric Associaiton,
Inc.Utility Wind 23,319,539 9,650,000 2,000,000 1,000,000 3,000,000 4,000,000
73 Old Harbor Hydroelectric Final Design Alaska Village Electric Cooperative Utility Hydro 4,100,000 225,000 25,000 225,000 225,000
TOTAL 27,419,539 9,875,000 2,025,000 1,000,000 3,225,000 4,225,000
122 Bethel Wind Power Project Times 4 City of Bethel Government Wind 3,197,986 2,598,320 599,666 2,598,320 2,598,320
110 Kongiganak Wind Farm Construction Puvurnaq Power Company Utility Wind 3,200,000 1,700,000 1,500,000 1,700,000 1,700,000
107 Kwigillingok Wind Farm
Construction Puvurnaq Power Company Utility Wind 3,200,000 1,600,000 1,600,000 1,600,000 1,600,000
67 Bethel Wind Farm Construction (BNC land)Village Wind Power, LLC IPP Wind 8,710,000 6,960,000 1,750,000 - -
70 Quinhagak Wind Farm Construction Alaska Village Electric
Cooperative
Utility Wind 4,313,603 3,882,243 431,360 3,882,243 3,882,243
72 Mekoryuk Wind Farm Construction Alaska Village Electric Cooperative Utility Wind 3,506,406 3,155,765 350,641 3,155,765 3,155,765
91 Napaimute Solar PV Construction Native Village of Napaimute Government Solar 123,494 109,471 14,023 - -
71 Toksook Bay Wind Farm Expansion Construction Alaska Village Electric Cooperative Utility Wind 1,153,056 1,037,750 115,306 1,037,750 1,037,750
35 Hooper Bay Wind Farm
Construction City of Hooper Bay Government Wind 2,220,141 2,220,141 - 80,000 80,000
113 Napaskiak Wind Farm Feasibility
Study
Napaskiak Utility (electric) -
City of Napaskiak Utility Wind - -
96 Crooked Creek Renewable Energy Reconnaissance Study Crooked Creek Traditional Council Government Other 178,000 137,543 58,000 - -
TOTAL 29,802,686 23,401,233 6,418,996 - 14,054,078 14,054,078
Lower Yukon/
Kuskokwim
Alaska Renewable Energy Fund
Ranking and Proposed Grant Allocation Round 1
Revised Feb 20, 2009
Page 3 of 6
Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered
Approved by LB&A 2008
Request for LB&A Approval Feb 09 Total Requested and Approved
Cost and RequestProject Fund Allocation
59 Kobuk River Valley Woody Biomass
Feasibility Study
Northwest Inupiat Housing
Authority Government Biomass 7,500,000 249,500 248,980 249,500 249,500
75 Ambler Solar PV Construction Alaska Village Electric Cooperative Utility Solar 605,000 550,000 55,000 550,000 550,000
76 Noatak Solar PV Construction Alaska Village Electric
Cooperative Utility Solar 605,000 550,000 55,000 -
77 Shungnak Solar PV Construction Alaska Village Electric Cooperative Utility Solar 605,000 550,000 55,000 -
85 Kotzebue Wind Farm Expansion
Construction
Kotzebue Electric
Association Utility Wind 14,807,535 12,075,535 2,800,000 4,000,000 4,000,000
56 Buckland/Deering/Noorvik Wind Farm Construction Northwest Arctic Borough Government Wind 10,921,428 10,758,928 162,500 10,758,928 10,758,928
74 Upper Kobuk Region Hydroelectric
Feasibility
Alaska Village Electric
Cooperative Utility Hydro 1,500,000 1,025,000 50,625 1,025,000 1,025,000
83 Kotzebue Wind Farm Red-Ox Flow
Battery Storage Construction
Kotzebue Electric
Association Utility Wind 3,930,399 3,144,399 786,000 - -
121 Ambler Solar and Wind Power Construction City of Ambler Government Other 150,000 150,000 - -
TOTAL 40,624,362 29,053,362 4,213,105 - 16,583,428 16,583,428
Railbelt 68 Anchorage Landfill Gas Electricity
Construction
Municipality of Anchorage,
Solid Waste Services Dept Government Biofuels 7,400,000 3,700,000 3,700,000 2,000,000 2,000,000
57 South Fork Hydroelectric Construction South Fork Hydro, LLC IPP Hydro 3,087,000 1,000,000 2,087,000 1,000,000 1,000,000
94 Nikolaevsk Wind Farm Final Design Alaska Wind Energy, LLC, d/b/a Wind Energy Alaska (WEA)IPP Wind 21,923,000 4,334,600 17,588,400 180,600 180,600
109 Eva Creek Wind Farm Construction Golden Valley Electric Association Utility Wind 93,341,555 79,340,322 14,001,233 2,000,000 2,000,000
53 North Pole Biomass Electricity/Heat
Construction Chena Power Utility, LLC Utility Biofuels 4,007,900 2,000,000 2,007,900 1,000,000 1,000,000 2,000,000
93 Anchorage Landfill Gas Electricity
Final Design
Alaska Wind Energy, LLC,
d/b/a Wind Energy Alaska (WEA)
IPP Biofuels 8,257,850 2,100,000 6,157,850 -
87 Fishhook Hydroelectric Construction Fishhook Renewable Energy, LLC IPP Hydro 4,555,922 2,142,961 2,412,961 453,071 1,546,929 2,000,000
34 Grant Lake/Falls Creek Hydro
Feasibility Study Kenai Hydro, LLC IPP Hydro 26,924,120 816,000 204,000 816,000 816,000
105 North Pole Heat Recovery Construction Golden Valley Electric Association Utility Heat Recovery 1,050,000 840,000 210,000 840,000 840,000
66 Coal Mine Road Wind Farm Final
Design Alaska Wind Power, LLC IPP Wind 96,000,000 105,000 26,250 105,000 105,000
102 Delta Junction Wind Farm Construction Alaska Environmental Power LLC IPP Wind 8,363,886 6,269,750 2,094,136 801,500 1,198,500 2,000,000
98 Nikiski Wind Farm Construction Kenai Winds, LLC IPP Wind 46,800,000 11,700,000 35,100,000 80,000 80,000
78 Girdwood Gas CHP/Hydro/Wind Solar Construction Alaska Green Energy, LLC IPP Other 12,231,750 5,231,750 7,000,000 47,625 47,625
48 Whittier Creek Hydroelectric
Reconnaissance City of Whittier Government Hydro 3,000,000 85,000 115,000 85,000 85,000
86 Fourth of July Creek Hydroelectric
Reconnaissance Independence Power, LLC IPP Hydro 15,675,000 7,837,500 7,837,500 20,000 20,000
Northwest Arctic
Alaska Renewable Energy Fund
Ranking and Proposed Grant Allocation Round 1
Revised Feb 20, 2009
Page 4 of 6
Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered
Approved by LB&A 2008
Request for LB&A Approval Feb 09 Total Requested and Approved
Cost and RequestProject Fund Allocation
97 Nenana Hydrokinetic Construction University of Alaska Fairbanks, Office of Sponsored Programs
Government Ocean/River 1,937,072 1,854,026 83,046 450,000 450,000
112 Delta Junction Wood Chip Heating Feasibility Study Delta/Greely School District Government Biomass 2,868,000 2,868,000 - 2,000,000 2,000,000
108 McKinley Village Solar Thermal
Construction
Golden Valley Electric
Association Utility Solar 190,000 190,000 3,600 190,000 190,000
8 Anchorage Geothermal District Heating Feasibility Study Iceland America Energy, Inc.IPP Geothermal 1,070,000,000 4,047,230 4,295,580 -
3 Anchorage Waste Gasification
Feasibility Study
Alaska Recycling Energy,
LLC IPP Biofuels 200,000,000 1,100,000 100,000 -
39 Delta Junction Barley/Wood Pellet Central Heating Construction
State of AK, Dept. of Natural
Resources, Division of Forestry
Government Biomass 831,203 831,203 - -
5 Fairbanks Waste Gasification
Feasibility Study
Alaska Recycling Energy,
LLC IPP Biofuels 100,000,000 775,000 - -
4 Palmer Waste Gasification
Feasibility Study
Alaska Recycling Energy,
LLC IPP Biofuels 60,000,000 650,000 - -
16 Mt. Redoubt/Mt. Spur Geothermal Construction Cook Inlet Power IPP Geothermal 98,150,000 950,000 97,200,000 -
17 Jack River Hydroelectric Feasibility
Study Native Village of Cantwell Government Hydro 200,000 194,540 5,460 -
43 Palmer Gas CHP Construction Alpine Energy, LLC IPP Gas 15,000,000 7,500,000 7,500,000 -
44 Whittier Gas CHP Construction Alpine Energy, LLC IPP Gas 15,000,000 7,500,000 7,500,000 -
45 Anchorage Wood Processing and Heating Construction EarthRun Energy IPP Biomass 300,000 300,000 -
51 Mt. Alice Harbor Renewable Energy
Construction Mt. Alice Development, Inc.Government Other 140,229,650 14,673,250 -
79 Palmer Coal Bed Methane CHP
Construction Alaska Green Energy, LLC IPP Other 20,824,011 19,401,411 1,422,600 -
92 Delia Creek Hydro Construction HPML, LLC IPP Hydro 600,000 50,000 - -
--Kenai Hydro Recon Assessment Homer Electric Associtation Utility Hydro 200,000 - 200,000
TOTAL 2,078,747,919 190,387,543 218,652,516 2,454,571 13,559,654 16,014,225
Alaska Renewable Energy Fund
Ranking and Proposed Grant Allocation Round 1
Revised Feb 20, 2009
Page 5 of 6
Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered
Approved by LB&A 2008
Request for LB&A Approval Feb 09 Total Requested and Approved
Cost and RequestProject Fund Allocation
Southeast 23 Coffman Cove-Naukati Intertie
Construction
Alaska Power & Telephone
Company
Utility Transmission 6,155,019 3,752,181 2,402,838 3,752,181 3,752,181
29 Kake-Petersburg Intertie Final Design
Kwaan Electric Transmission
Intertie Cooperative, Inc
(KWETICO)
Utility Transmission 40,000,000 2,990,000 2,500,000 2,990,000 2,990,000
10 Falls Creek Hydroelectric Construction Gustavus Electric Company Utility Hydro 10,153,000 750,000 - 750,000 750,000
104 Reynolds Creek Hydroelectric Construction Haida Power, Inc.Utility Hydro 17,145,000 10,500,000 6,645,000 1,000,000 1,000,000 2,000,000
111 Juneau Ground Source Heat Pump
Construction (Aquatic Center)City & Borough of Juneau Government Geothermal 1,950,000 1,450,000 500,000 1,450,000 1,450,000
37 Whitman Lake Hydro Construction Ketchikan Public Utilities- Electic Division Utility Hydro 17,750,000 1,300,000 320,000 1,300,000 1,300,000
33 Haines Central Wood Heating System Construction (Low Income Housing Project)Chilkoot Indian Association Government Biomass 441,229 288,222 28,446 288,222 288,222
60 Yakutat Biomass Gasification Construction Yakutat Power Utility Biofuels 3,633,600 3,393,600 240,000 249,600 249,600
38 Ruth Lake Hydro Reconnaissance City of Petersburg d/b/a
Petersburg Municipal & Light Utility Hydro 109,975,000 160,000 45,000 160,000 160,000
42 Burro Creek Hydro Feasibility Study Burro Creek Holdings, LLC IPP Hydro 60,000 48,000 12,000 48,000 48,000
28 Hoonah - Hawk Inlet Intertie
Construction
Kwaan Electric Transmission
Intertie Cooperative, Inc
(KWETICO)
Utility Transmission 37,459,970 36,709,970 750,000 - -
20 Metlakatla-Ketchikan Intertie
Construction Metlakatla Indian Community Government Transmission 7,652,000 7,152,000 500,000 820,000 820,000
41 Haines Central Wood Heating
Feasibility Study (Community
Buildings)
Haines Borough Government Biomass 2,090,500 120,500 20,000 120,500 120,500
65 Indian River Hydroelectric
Construction City of Tenakee Springs Utility Hydro 2,500,000 2,400,000 100,000 - -
9 Wrangell Hydro Based Electric Boilers Construction City and Borough of Wrangell Government Other 3,260,000 3,260,000 123,000 2,000,000 2,000,000
19 Gustavus/Angoon/Wrangell/Nikiski
Tidal Feasibility Study
Alaska Tidal Energy
Company IPP Ocean/River 1,940,000 515,000 - -
1 Takatz Lake Hydroelectric Feasibility City & Borough of Sitka Government Hydro 225,000,000 2,000,000 514,684 514,684
101 Ketchikan Biomass Gasification
Construction
Diesel Brewing Company, LLC dba Diesel Brewing of
Ketchikan
IPP Biofuels 25,625,000 20,500,000 5,125,000 - -
12 Juneau Waste Gasification Reconnaissance Study Alaska Recycling Energy, LLC IPP Biofuels 95,000 - -
13 Ketchikan Waste Gasification
Reconnaissance Study
Alaska Recycling Energy,
LLC IPP Biofuels 105,620 - -
25 Haines Ground Source Heat Pump
Construction Haines Assisted Living, Inc IPP Geothermal 2,379,007 1,432,906 946,101 - -
--Juneau Ground Source Heat Pump Construction (Airport)City & Borough of Juneau Government Geothermal 1,076,000 1,026,000 513,000 513,000 - 513,000
TOTAL 514,305,325 101,373,999 21,285,385 1,513,000 15,443,187 16,956,187
61 McGrath Heat Recovery Construction McGrath Light & Power, Co.Utility Heat Recovery 991,815 824,815 167,000 712,415 712,415
54 Galena Wood Heating Construction Interior Regional Housing
Authority (IRHA)Government Biomass 382,779 382,779 4,659,760 382,779 382,779
Yukon-Koyukuk/
Upper Tanana
Alaska Renewable Energy Fund
Ranking and Proposed Grant Allocation Round 1
Revised Feb 20, 2009
Page 6 of 6
Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered
Approved by LB&A 2008
Request for LB&A Approval Feb 09 Total Requested and Approved
Cost and RequestProject Fund Allocation
84 Ruby Hydrokinetic Construction Yukon River Inter-Tribal
Watershed Council IPP Hydro 461,950 446,950 10,555 446,950 446,950
49 Tok Wood Heating Construction Alaska Gateway School District Government Biomass 3,805,349 3,245,349 560,000 3,245,349 3,245,349
24 Yerrick Creek Hydroelectric
Construction
Alaska Power & Telephone
Company Utility Hydro 14,500,000 11,600,000 2,900,000 - -
30 McGrath Central Wood Heating Construction McGrath Power and Light Utility Biomass 4,005,000 3,052,000 953,000 322,000 322,000
31 Fort Yukon Central Wood Heating
Construction
Gwitchyaa Zhee Utility
Company Utility Biomass 4,285,161 2,945,991 1,200,000 210,000 210,000
--Manley Hot Springs Geothermal Construction TDX Power Utility Geothermal 1,880,000 1,880,000 1,665,000 215,000 - 215,000
TOTAL 30,312,054 24,377,884 12,115,315 215,000 5,319,493 5,534,493
Statewide 88 Statewide Hydrokinetic Feasibility
Study
Thomas Ravens, Ph.D. and
Myree McDonald, Ph.D.Government Ocean/River 565,439 565,439 - 565,439 565,439
36 Statewide Heat Recovery Demonstration Project Precision Power, LLC IPP Heat Recovery 7,000,000 300,000 60,000 - -
82 Juneau Based Statewide Hydro/Ammonia Electricity Construction
Alaska Electric Light &
Power Utility Other 800,000 800,000 - -
32 Statewide Biomass Reconnaissance Study University of Alaska, Fairbanks Government Biofuels 286,149 286,149 - - -
81 Statewide Heat Recovery/Electric
Demonstration Construction Ormat Nevada Inc.IPP Heat Recovery 28,000,000 495,000 - - -
TOTAL 36,651,588 2,446,588 60,000 - 565,439 565,439
TOTAL 3,174,598,969 453,754,671 300,999,252 5,182,571 94,817,429 100,000,000