Loading...
HomeMy WebLinkAboutREF Round 1 Recommendations - Feb2008Alaska Renewable Energy Fund Ranking and Proposed Grant Allocation Round 1 Revised Feb 20, 2009 Page 1 of 6 Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered Approved by LB&A 2008 Request for LB&A Approval Feb 09 Total Requested and Approved Aleutians 58 Chuniisax Creek Hydroelectric Construction City of Atka Utility Hydro 2,440,000 996,000 1,344,000 996,000 996,000 89 Nikolski Wind Integration Construction Umnak Power / Nikolski IRA Council Government Wind 451,030 409,430 41,600 409,430 409,430 90 St. George Wind Farm Construction City of St. George - St. George Municipal Electric Utility Government Wind 3,000,000 1,500,000 1,500,000 1,500,000 1,500,000 11 Aleutians East Borough Renewable Energy Reconnaissance Aleutians East Borough Government Other 40,000 25,000 15,000 25,000 25,000 95 Makushin Geothermal Feasibility Study Kiiguusi Suuluta Land Company, LLC IPP Geothermal 250,000,000 3,225,500 - - TOTAL 255,931,030 6,155,930 2,900,600 - 2,930,430 2,930,430 Bering Straits 52 Nome/Newton Peak Wind Farm Construction City of Nome d/b/a Nome Joint Utility System (NJUS)Utility Wind 15,534,309 13,951,326 1,582,983 4,000,000 4,000,000 50 Unalakleet Wind Farm Construction Unalakleet Valley Electric Cooperative, Inc. (UVEC)Utility Wind 8,996,832 8,774,080 222,752 4,000,000 4,000,000 47 Nome Banner Peak Wind Farm Transmission Construction City of Nome d/b/a Nome Joint Utilities System Utility Transmission 890,000 801,000 89,000 801,000 801,000 106 Nome/ Banner Peak Wind Farm Construction Banner Wind, LLC IPP Wind 5,157,000 4,126,000 1,031,000 - TOTAL 30,578,141 27,652,406 2,925,735 - 8,801,000 8,801,000 Bristol Bay 64 Lake Pen Borough Wind Feasibility Study Lake and Peninsula Borough Government Wind 8,000,000 184,000 40,000 184,000 184,000 62 Chignik Lake Area Wind-Hydro Final Design Lake and Peninsula Borough Government Wind 8,150,000 375,000 96,000 375,000 375,000 63 Lake Pen Borough Wood Heating Final Design Lake and Peninsula Borough Government Biomass 1,265,000 77,000 18,000 77,000 77,000 40 Indian Creek Hydro Feasibility Study City Of Chignik Government Hydro 207,500 207,500 - 207,500 207,500 6 Lake Elva Hydropower Construction Nushagak Electric & Telephone Cooperative, Inc Utility Hydro 22,000,000 10,000,000 12,000,000 4,006,500 4,006,500 14 Chignik Lagoon Hydroelectric Final Design Chignik Lagoon Power Utility (CLPU)Utility Hydro 1,900,000 150,000 150,000 150,000 18 Pike's Ridge Geothermal Final Design Naknek Electric Association Utility Geothermal 10,020,000 5,000,000 5,000,000 - - 7 Naknek/King Salmon Fish Waste Feasibility Study Naknek Electric Association Utility Biofuels 100,000 80,000 20,000 - - 55 Snake Mountain Wind Farm Construction (Withdrawn)Bristol Bay Area Health Corporation Government Wind 13,100,000 10,100,000 2,800,000 - - TOTAL 64,742,500 26,173,500 19,974,000 - 5,000,000 5,000,000 21 Humpback Creek Hydroelectric Construction Cordova Electric Cooperative Utility Hydro 11,600,000 5,500,000 6,100,000 4,000,000 4,000,000 22 Cordova Heat Recovery Construction Cordova Electric Cooperative Utility Heat Recovery 5,260,000 1,780,000 3,480,000 1,780,000 1,780,000 26 Cordova Wood Processing Plant Construction Native Village of Eyak Government Biomass 628,825 364,225 264,600 147,720 147,720 Cost and RequestProject Fund Allocation Copper River/ Chugach Alaska Renewable Energy Fund Ranking and Proposed Grant Allocation Round 1 Revised Feb 20, 2009 Page 2 of 6 Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered Approved by LB&A 2008 Request for LB&A Approval Feb 09 Total Requested and Approved Cost and RequestProject Fund Allocation 27 Allison Lake Hydro Feasibility Study Copper Valley Electric Association, Inc (CVEA) Utility Hydro 45,058,000 2,288,000 572,000 2,288,000 2,288,000 15 Chistochina Central Wood Heating Construction Cheesh'na Tribal Council Government Biomass 839,000 827,000 12,000 500,000 500,000 46 Kenny Lake Wood Heating Construction Copper River School District Government Biomass 1,200,000 1,200,000 120,000 120,000 2 Gulkana Central Wood Heating Construction Gulkana Village Council Government Biomass 898,000 898,000 - 500,000 500,000 TOTAL 65,483,825 12,857,225 10,428,600 - 9,335,720 9,335,720 Kodiak 103 Pillar Mountain Wind Farm Construction Kodiak Electric Associaiton, Inc.Utility Wind 23,319,539 9,650,000 2,000,000 1,000,000 3,000,000 4,000,000 73 Old Harbor Hydroelectric Final Design Alaska Village Electric Cooperative Utility Hydro 4,100,000 225,000 25,000 225,000 225,000 TOTAL 27,419,539 9,875,000 2,025,000 1,000,000 3,225,000 4,225,000 122 Bethel Wind Power Project Times 4 City of Bethel Government Wind 3,197,986 2,598,320 599,666 2,598,320 2,598,320 110 Kongiganak Wind Farm Construction Puvurnaq Power Company Utility Wind 3,200,000 1,700,000 1,500,000 1,700,000 1,700,000 107 Kwigillingok Wind Farm Construction Puvurnaq Power Company Utility Wind 3,200,000 1,600,000 1,600,000 1,600,000 1,600,000 67 Bethel Wind Farm Construction (BNC land)Village Wind Power, LLC IPP Wind 8,710,000 6,960,000 1,750,000 - - 70 Quinhagak Wind Farm Construction Alaska Village Electric Cooperative Utility Wind 4,313,603 3,882,243 431,360 3,882,243 3,882,243 72 Mekoryuk Wind Farm Construction Alaska Village Electric Cooperative Utility Wind 3,506,406 3,155,765 350,641 3,155,765 3,155,765 91 Napaimute Solar PV Construction Native Village of Napaimute Government Solar 123,494 109,471 14,023 - - 71 Toksook Bay Wind Farm Expansion Construction Alaska Village Electric Cooperative Utility Wind 1,153,056 1,037,750 115,306 1,037,750 1,037,750 35 Hooper Bay Wind Farm Construction City of Hooper Bay Government Wind 2,220,141 2,220,141 - 80,000 80,000 113 Napaskiak Wind Farm Feasibility Study Napaskiak Utility (electric) - City of Napaskiak Utility Wind - - 96 Crooked Creek Renewable Energy Reconnaissance Study Crooked Creek Traditional Council Government Other 178,000 137,543 58,000 - - TOTAL 29,802,686 23,401,233 6,418,996 - 14,054,078 14,054,078 Lower Yukon/ Kuskokwim Alaska Renewable Energy Fund Ranking and Proposed Grant Allocation Round 1 Revised Feb 20, 2009 Page 3 of 6 Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered Approved by LB&A 2008 Request for LB&A Approval Feb 09 Total Requested and Approved Cost and RequestProject Fund Allocation 59 Kobuk River Valley Woody Biomass Feasibility Study Northwest Inupiat Housing Authority Government Biomass 7,500,000 249,500 248,980 249,500 249,500 75 Ambler Solar PV Construction Alaska Village Electric Cooperative Utility Solar 605,000 550,000 55,000 550,000 550,000 76 Noatak Solar PV Construction Alaska Village Electric Cooperative Utility Solar 605,000 550,000 55,000 - 77 Shungnak Solar PV Construction Alaska Village Electric Cooperative Utility Solar 605,000 550,000 55,000 - 85 Kotzebue Wind Farm Expansion Construction Kotzebue Electric Association Utility Wind 14,807,535 12,075,535 2,800,000 4,000,000 4,000,000 56 Buckland/Deering/Noorvik Wind Farm Construction Northwest Arctic Borough Government Wind 10,921,428 10,758,928 162,500 10,758,928 10,758,928 74 Upper Kobuk Region Hydroelectric Feasibility Alaska Village Electric Cooperative Utility Hydro 1,500,000 1,025,000 50,625 1,025,000 1,025,000 83 Kotzebue Wind Farm Red-Ox Flow Battery Storage Construction Kotzebue Electric Association Utility Wind 3,930,399 3,144,399 786,000 - - 121 Ambler Solar and Wind Power Construction City of Ambler Government Other 150,000 150,000 - - TOTAL 40,624,362 29,053,362 4,213,105 - 16,583,428 16,583,428 Railbelt 68 Anchorage Landfill Gas Electricity Construction Municipality of Anchorage, Solid Waste Services Dept Government Biofuels 7,400,000 3,700,000 3,700,000 2,000,000 2,000,000 57 South Fork Hydroelectric Construction South Fork Hydro, LLC IPP Hydro 3,087,000 1,000,000 2,087,000 1,000,000 1,000,000 94 Nikolaevsk Wind Farm Final Design Alaska Wind Energy, LLC, d/b/a Wind Energy Alaska (WEA)IPP Wind 21,923,000 4,334,600 17,588,400 180,600 180,600 109 Eva Creek Wind Farm Construction Golden Valley Electric Association Utility Wind 93,341,555 79,340,322 14,001,233 2,000,000 2,000,000 53 North Pole Biomass Electricity/Heat Construction Chena Power Utility, LLC Utility Biofuels 4,007,900 2,000,000 2,007,900 1,000,000 1,000,000 2,000,000 93 Anchorage Landfill Gas Electricity Final Design Alaska Wind Energy, LLC, d/b/a Wind Energy Alaska (WEA) IPP Biofuels 8,257,850 2,100,000 6,157,850 - 87 Fishhook Hydroelectric Construction Fishhook Renewable Energy, LLC IPP Hydro 4,555,922 2,142,961 2,412,961 453,071 1,546,929 2,000,000 34 Grant Lake/Falls Creek Hydro Feasibility Study Kenai Hydro, LLC IPP Hydro 26,924,120 816,000 204,000 816,000 816,000 105 North Pole Heat Recovery Construction Golden Valley Electric Association Utility Heat Recovery 1,050,000 840,000 210,000 840,000 840,000 66 Coal Mine Road Wind Farm Final Design Alaska Wind Power, LLC IPP Wind 96,000,000 105,000 26,250 105,000 105,000 102 Delta Junction Wind Farm Construction Alaska Environmental Power LLC IPP Wind 8,363,886 6,269,750 2,094,136 801,500 1,198,500 2,000,000 98 Nikiski Wind Farm Construction Kenai Winds, LLC IPP Wind 46,800,000 11,700,000 35,100,000 80,000 80,000 78 Girdwood Gas CHP/Hydro/Wind Solar Construction Alaska Green Energy, LLC IPP Other 12,231,750 5,231,750 7,000,000 47,625 47,625 48 Whittier Creek Hydroelectric Reconnaissance City of Whittier Government Hydro 3,000,000 85,000 115,000 85,000 85,000 86 Fourth of July Creek Hydroelectric Reconnaissance Independence Power, LLC IPP Hydro 15,675,000 7,837,500 7,837,500 20,000 20,000 Northwest Arctic Alaska Renewable Energy Fund Ranking and Proposed Grant Allocation Round 1 Revised Feb 20, 2009 Page 4 of 6 Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered Approved by LB&A 2008 Request for LB&A Approval Feb 09 Total Requested and Approved Cost and RequestProject Fund Allocation 97 Nenana Hydrokinetic Construction University of Alaska Fairbanks, Office of Sponsored Programs Government Ocean/River 1,937,072 1,854,026 83,046 450,000 450,000 112 Delta Junction Wood Chip Heating Feasibility Study Delta/Greely School District Government Biomass 2,868,000 2,868,000 - 2,000,000 2,000,000 108 McKinley Village Solar Thermal Construction Golden Valley Electric Association Utility Solar 190,000 190,000 3,600 190,000 190,000 8 Anchorage Geothermal District Heating Feasibility Study Iceland America Energy, Inc.IPP Geothermal 1,070,000,000 4,047,230 4,295,580 - 3 Anchorage Waste Gasification Feasibility Study Alaska Recycling Energy, LLC IPP Biofuels 200,000,000 1,100,000 100,000 - 39 Delta Junction Barley/Wood Pellet Central Heating Construction State of AK, Dept. of Natural Resources, Division of Forestry Government Biomass 831,203 831,203 - - 5 Fairbanks Waste Gasification Feasibility Study Alaska Recycling Energy, LLC IPP Biofuels 100,000,000 775,000 - - 4 Palmer Waste Gasification Feasibility Study Alaska Recycling Energy, LLC IPP Biofuels 60,000,000 650,000 - - 16 Mt. Redoubt/Mt. Spur Geothermal Construction Cook Inlet Power IPP Geothermal 98,150,000 950,000 97,200,000 - 17 Jack River Hydroelectric Feasibility Study Native Village of Cantwell Government Hydro 200,000 194,540 5,460 - 43 Palmer Gas CHP Construction Alpine Energy, LLC IPP Gas 15,000,000 7,500,000 7,500,000 - 44 Whittier Gas CHP Construction Alpine Energy, LLC IPP Gas 15,000,000 7,500,000 7,500,000 - 45 Anchorage Wood Processing and Heating Construction EarthRun Energy IPP Biomass 300,000 300,000 - 51 Mt. Alice Harbor Renewable Energy Construction Mt. Alice Development, Inc.Government Other 140,229,650 14,673,250 - 79 Palmer Coal Bed Methane CHP Construction Alaska Green Energy, LLC IPP Other 20,824,011 19,401,411 1,422,600 - 92 Delia Creek Hydro Construction HPML, LLC IPP Hydro 600,000 50,000 - - --Kenai Hydro Recon Assessment Homer Electric Associtation Utility Hydro 200,000 - 200,000 TOTAL 2,078,747,919 190,387,543 218,652,516 2,454,571 13,559,654 16,014,225 Alaska Renewable Energy Fund Ranking and Proposed Grant Allocation Round 1 Revised Feb 20, 2009 Page 5 of 6 Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered Approved by LB&A 2008 Request for LB&A Approval Feb 09 Total Requested and Approved Cost and RequestProject Fund Allocation Southeast 23 Coffman Cove-Naukati Intertie Construction Alaska Power & Telephone Company Utility Transmission 6,155,019 3,752,181 2,402,838 3,752,181 3,752,181 29 Kake-Petersburg Intertie Final Design Kwaan Electric Transmission Intertie Cooperative, Inc (KWETICO) Utility Transmission 40,000,000 2,990,000 2,500,000 2,990,000 2,990,000 10 Falls Creek Hydroelectric Construction Gustavus Electric Company Utility Hydro 10,153,000 750,000 - 750,000 750,000 104 Reynolds Creek Hydroelectric Construction Haida Power, Inc.Utility Hydro 17,145,000 10,500,000 6,645,000 1,000,000 1,000,000 2,000,000 111 Juneau Ground Source Heat Pump Construction (Aquatic Center)City & Borough of Juneau Government Geothermal 1,950,000 1,450,000 500,000 1,450,000 1,450,000 37 Whitman Lake Hydro Construction Ketchikan Public Utilities- Electic Division Utility Hydro 17,750,000 1,300,000 320,000 1,300,000 1,300,000 33 Haines Central Wood Heating System Construction (Low Income Housing Project)Chilkoot Indian Association Government Biomass 441,229 288,222 28,446 288,222 288,222 60 Yakutat Biomass Gasification Construction Yakutat Power Utility Biofuels 3,633,600 3,393,600 240,000 249,600 249,600 38 Ruth Lake Hydro Reconnaissance City of Petersburg d/b/a Petersburg Municipal & Light Utility Hydro 109,975,000 160,000 45,000 160,000 160,000 42 Burro Creek Hydro Feasibility Study Burro Creek Holdings, LLC IPP Hydro 60,000 48,000 12,000 48,000 48,000 28 Hoonah - Hawk Inlet Intertie Construction Kwaan Electric Transmission Intertie Cooperative, Inc (KWETICO) Utility Transmission 37,459,970 36,709,970 750,000 - - 20 Metlakatla-Ketchikan Intertie Construction Metlakatla Indian Community Government Transmission 7,652,000 7,152,000 500,000 820,000 820,000 41 Haines Central Wood Heating Feasibility Study (Community Buildings) Haines Borough Government Biomass 2,090,500 120,500 20,000 120,500 120,500 65 Indian River Hydroelectric Construction City of Tenakee Springs Utility Hydro 2,500,000 2,400,000 100,000 - - 9 Wrangell Hydro Based Electric Boilers Construction City and Borough of Wrangell Government Other 3,260,000 3,260,000 123,000 2,000,000 2,000,000 19 Gustavus/Angoon/Wrangell/Nikiski Tidal Feasibility Study Alaska Tidal Energy Company IPP Ocean/River 1,940,000 515,000 - - 1 Takatz Lake Hydroelectric Feasibility City & Borough of Sitka Government Hydro 225,000,000 2,000,000 514,684 514,684 101 Ketchikan Biomass Gasification Construction Diesel Brewing Company, LLC dba Diesel Brewing of Ketchikan IPP Biofuels 25,625,000 20,500,000 5,125,000 - - 12 Juneau Waste Gasification Reconnaissance Study Alaska Recycling Energy, LLC IPP Biofuels 95,000 - - 13 Ketchikan Waste Gasification Reconnaissance Study Alaska Recycling Energy, LLC IPP Biofuels 105,620 - - 25 Haines Ground Source Heat Pump Construction Haines Assisted Living, Inc IPP Geothermal 2,379,007 1,432,906 946,101 - - --Juneau Ground Source Heat Pump Construction (Airport)City & Borough of Juneau Government Geothermal 1,076,000 1,026,000 513,000 513,000 - 513,000 TOTAL 514,305,325 101,373,999 21,285,385 1,513,000 15,443,187 16,956,187 61 McGrath Heat Recovery Construction McGrath Light & Power, Co.Utility Heat Recovery 991,815 824,815 167,000 712,415 712,415 54 Galena Wood Heating Construction Interior Regional Housing Authority (IRHA)Government Biomass 382,779 382,779 4,659,760 382,779 382,779 Yukon-Koyukuk/ Upper Tanana Alaska Renewable Energy Fund Ranking and Proposed Grant Allocation Round 1 Revised Feb 20, 2009 Page 6 of 6 Energy Region ID Project Name Applicant Applicant Type Project Type Project Cost Grant Request Match Offered Approved by LB&A 2008 Request for LB&A Approval Feb 09 Total Requested and Approved Cost and RequestProject Fund Allocation 84 Ruby Hydrokinetic Construction Yukon River Inter-Tribal Watershed Council IPP Hydro 461,950 446,950 10,555 446,950 446,950 49 Tok Wood Heating Construction Alaska Gateway School District Government Biomass 3,805,349 3,245,349 560,000 3,245,349 3,245,349 24 Yerrick Creek Hydroelectric Construction Alaska Power & Telephone Company Utility Hydro 14,500,000 11,600,000 2,900,000 - - 30 McGrath Central Wood Heating Construction McGrath Power and Light Utility Biomass 4,005,000 3,052,000 953,000 322,000 322,000 31 Fort Yukon Central Wood Heating Construction Gwitchyaa Zhee Utility Company Utility Biomass 4,285,161 2,945,991 1,200,000 210,000 210,000 --Manley Hot Springs Geothermal Construction TDX Power Utility Geothermal 1,880,000 1,880,000 1,665,000 215,000 - 215,000 TOTAL 30,312,054 24,377,884 12,115,315 215,000 5,319,493 5,534,493 Statewide 88 Statewide Hydrokinetic Feasibility Study Thomas Ravens, Ph.D. and Myree McDonald, Ph.D.Government Ocean/River 565,439 565,439 - 565,439 565,439 36 Statewide Heat Recovery Demonstration Project Precision Power, LLC IPP Heat Recovery 7,000,000 300,000 60,000 - - 82 Juneau Based Statewide Hydro/Ammonia Electricity Construction Alaska Electric Light & Power Utility Other 800,000 800,000 - - 32 Statewide Biomass Reconnaissance Study University of Alaska, Fairbanks Government Biofuels 286,149 286,149 - - - 81 Statewide Heat Recovery/Electric Demonstration Construction Ormat Nevada Inc.IPP Heat Recovery 28,000,000 495,000 - - - TOTAL 36,651,588 2,446,588 60,000 - 565,439 565,439 TOTAL 3,174,598,969 453,754,671 300,999,252 5,182,571 94,817,429 100,000,000