Loading...
HomeMy WebLinkAboutREF Rd 16 PMP Template (2) 813 West Northern Lights Boulevard Anchorage, Alaska 99503 T 907.771.3000 Toll Free 888.300.8534 F 907.771.3044 REDUCING THE COST OF ENERGY IN ALASKA WWW.AKENERGYAUTHORITY.ORG Alaska Energy Authority – Project Management Plan Template Project No: [******] Grant No: [******] Application No: [15***] Project Manager: [Name] Project: [Project Title] Grant: Renewable Energy Fund Round 15 (FY2024) Date: [Date] EXECUTIVE SUMMARY: The project’s objective is to convert the energy from the pressure head and flow volume at three sites in a City of Homer water pipeline to electricity that will have a capacity of 19kW and generate 98,000 kWh annually. This will be used to reduce operating costs for the City of Homer’s Department of Public Works water distribution infrastructure. The proposed project will create a flow bypass around the existing pressure control valve at each site to flow through an energy recovery system. This system shall utilize an integrated solution, a pressure recovery valve that will generate a new source of renewal energy, reduce Homer’s carbon footprint, save water and extend the life of its infrastructure. Renewable Energy Fund (REF) is funding Phase 3 of 4, (Phase 3 – Final Design and Permitting) for this project. PROJECT REQUIREMENTS: a. Planned Outcome i. Obtain Mechanical and Electrical Engineering Final Design including a Notice of FERC exemption (regulatory/permitting) submitted by Grantee. b. Assumptions and constraints i. Assumptions a. AEA will issue a pass-through grant to the City of Homer. b. The City of Homer, Department of Public Works will perform the solicitation of contractual services necessary to produce the Final Design and Permitting. c. AEA staff will perform a final review of the design documents. ii. Constraints a. Grant application, schedule and budget were prepared in November 2021 with the Final Design and permitting being contracted out. Cost and schedule proposed by contractors to the City of Homer back in November 2021 may be different during contract execution. Current Consumer Price Index (CPI) is continues an upward trend which could affect the project cost and schedule. c. Organizational documents i. Renewable Energy Fund Grant Application #14006 ii. Project Management Plan iii. Running budget d. Non-Organizational documents i. Grant Documentation ii. Final Design Documents iii. Permitting SCOPE: This project will be a pass-through grant with a series of deliverables that need to be approved prior to moving to the next phase of design. SCHEDULE/SCOPE MANAGEMENT PLAN: Milestone Task Start End Deliverable 1 Final Design Nov 22 Mar 23 Mechanical Engineering Design Nov 22 Feb 23 Submit copies of mechanical design drawings to AEA Electrical Engineering Design Nov 22 Mar 23 Submit copies of electrical design drawings to AEA. 2 Regulatory/Permitting Nov 22 Mar 23 FERC Exemption Nov 22 Mar 23 Submit a copy of the Notice of FERC exemption to AEA. 3 Project close-out Mar 23 May 23 Final Report Final Inspection Mar 23 Apr 23 Trip Report Grant close-out Mar 23 May 23 BOUNDARIES (ITEMS SPECFICIALLY EXCLUDED FROM SCOPE, IF ANY): None identified. BUDGET: • Type of Project: Bulk Fuel ___ RPSU ___ REF ___ OTHER ___ • Project Code: Existing _______ New _______ • Grant Type: Managed ___ Pass-thru ___ ESTIMATD TOTAL BUDGET: $_________ FUNDING SOURCE: Fund Source Description Term Date of Fund Source Federal: State: $79,500 REF Rd 14 June 30, 2023 Other: $10,000 Grantee cash match TOTAL: $89,500 BUDGET MANAGMENT PLAN: This project was awarded as part of a grant application process in November 2021. At that time this budget was established: Milestone or Task REF Grant Funds Grantee Match Source of Match Total 1. Mechanical Design $40,000 $5,000 Cash $45,000 2. Electrical Design $30,500 $5,000 Cash $35,500 3. Regulatory $4,000 $0 $4,000 4. Close out $5,000 $0 $5,000 TOTAL $79,500 $10,000 $89,500 ACCOUNTING BUDGET ENTRIES (completed by accounting for posting): Amount Fund GL Acct Appropriation Contract Stage Award Dept. Finance Type CHANGE MANAGEMENT PLAN: Contract changes will be conducted by the grantee in accordance with their standing procedures. The Project Manager must be informed and conferred with in advance of any changes prior to them being implemented. STAFFING REQUIREMENT (Org Chart): CONSULT THE RACI MATRIX BELOW ALONG WITH THE PROPOSED TEAM STRUCTURE ABOVE A. FINANCE RESPONSIBILITIES: I. RECTIFY EXISTING GRANT FUNDS II. ISSUE REIMBURSEMENTS WITHIN THE GRANT BUDGET AS REIMBURSEMENT REQUESTS ARE COMPLETED B. GRANTS RESPONSIBILITIES: I. DEVELOP AND EXECUTE THE GRANT II. TRACK FINANCIAL REPORTS/REIMBURSEMENT REQUESTS III. AMEND THE GRANT UPON REQUEST OF THE PROJECT MANAGER RACI Matrix: • R = Responsible o Person who carries out the task. Responsible to get the job done. • A = Accountable o Responsible persons are accountable to them. • C = Consulted o Not directly involved in task but consulted i.e. stakeholder or SME. • I = Informed o Receive output from task, have to approve, or need to be informed. o Curtis Thayer Executive Director Conner Erickson Program Manager Rebecca Garrett Rural Programs Mgr. Khae Pasao Project Manager Janette KeiserCity of Homer Karin St. Clair Grants Manager AEA Finance Finance Audrey Alstrom AEEE Director Approval Required ROLE Executive Director AEEE Director Program Manager Project Manager Grants Finance City Management TASK Project Management Plan I I A R C C C Scope Development C A I I R Schedule Development I A I I R Budget Development I A I C R Communications A I I R Commission/Inspection A R I Grant Reporting A R I R Procurement A R Close-out I I I R A C I COMMUNICATION MANAGEMENT PLAN: The RACI matrix above will guide the internal AEA communications for this project. The City of Homer, Department of Public Works will provide quarterly reports to the AEA project manager who will act as the primary point of contact for the agency. Design progression will be reviewed and documented. Project close-out will be closely monitored and may include an onsite inspection. PROCUREMENT MANAGEMENT PLAN: This project is planned as a pass-through grant to the City of Homer, Department of Public Works who will enter into a contractual agreement with their solicited vendor to perform the design activities. APPROVAL: The undersigned acknowledge they have reviewed the project charter and authorize and fund the Project. Changes to this project charter will be coordinated with and approved by the undersigned or their designated representatives. The following approvals signify acceptance of the proposed Project Charter and authorize the Project Manager to proceed. Project Manager Date Grants Manager Date AEA Assistant Controller Date REF Program Manager Date Executive Director Date