Loading...
HomeMy WebLinkAboutREFund Construction Status July 2010Renewable Energy Fund Construction Projects Type Biomass Geothermal Heat Recovery Hydro Ocean/River Solar Wind Round 1 1 1 1 1 1 1 1 2 3 3 1 1 1 3 1 1 1 2 2 2 3 3 1 1, 3 1 1 1 1 1 3 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1, 3 1 1 1 1 2 2 2 2 2 3 3 ID 53 33 2 26 49 112 15 68 2 445 476 -- 111 -- 453 105 22 61 235 307 271 519 448 10 21, 407 9 87 23 58 104 469 438 84 97 108 75 103 50 122 102 70 71 72 107 110 89 85518 47 52 90 56 222 273 317 302 303 486 503 Chena Power, Biomass/ORC Haines/Chilkoot, District Heat Gulkana Village Council, Boiler Native Village of Eyak, Wood Tok, Gateway School, Boiler Delta/Greeley School Dist. Wood Chistochina Central Wood Heat Anchorage Muni Landfill Gas Thorne Bay School, Wood Heat Ft Yukon District Wood Heating Tanana Biomass Juneau Ground Source Heat Pump, Airport Juneau Ground Source Heat Pump, Aquatic Ctr Manley Hot Springs Geothermal, TDX Alaska Sealife Center Seawater Heat Pump North Pole GVEA HR Expansion Cordova Electric Heat to Power McGrath Light & Power HE Expansion Kotzebue HR and Ammonia Power Cycle City of Ambler Heat Recovery Unalaska Heat Recovery Atka Hydro Dispatch Excess Power St Paul Heat Recovery Falls Creek Hydro Cordova Humpback Creek Hydro Wrangell Excess Hydro to Heat Fishhook Creek Hydro North Prince of Wales Hydro Intertie Atka, Chuniisax Creek Hydro Reynolds Creek Hydro, Haida/AP&T Akutan Hyddro Repair & Upgrade Yerrick Creek Hydro Ruby Hydrokinetic, YRI-CWC Nenana Hydrokinetic McKinley Village Solar Thermal Ambler Solar PV Kodiak Pillar Mountain Wind Unalakleet Wind Bethel Wind Project Times 4 Delta Junction Wind, AEP 2MW Quinhagak Wind, AVEC 300 KW Toksook Bay Wind, AVEC 100 KW Mekoryuk Wind Turbine/Controls, AVEC Kwigillingok Power Company 450KW Kongiganak Wind, Puvurnaq Power Co. Nikolski IRA Wind, Umnak Power Kotzebue Electric Turbines/Battery Nome Banner Creek Wind Transmission Nome, Newton Peak Wind Farm St. George Wind Farm NW Arctic Borough Wind Farm Nikiski, Kenai Winds Project Tuntutuliak High Penetration wind/diesel Sand Point Wind Emmonak Wind and Transmission Shaktoolik Wind Pilot Point Wind Power and Heat St Paul Wind Diesel Pre-construction PM PC DP RB BT RB RB RB DP DP AF DP NMc NMc NMc NMc LL DP KN DP LL DP LL JJ DO DO LL DO RG LL DO AA AA NMc NMc RG LL JJ JJ LL JJ JJ JJ JJ RS RS JJ JJ JJ RS JJ JJ RS RS JJ RS RS JJ JJ (Final Design,Contracts, Procurement) 2010 J COMPLETED IN 2009 COMPLETED IN 2009 COMPLETED IN 2009 COMPLETED IN 2009 COMPLETED IN 2009 F M A M J Construction J Now A ? ? S O N D 2011 J F ? M Equipment Installation A Schedule not yet determined Schedule not yet determined Schedule not yet determined Schedule not yet determined Schedule not yet determined Schedule not yet determined Schedule not yet determined M J ? J A S O Commissioning N D Project Completion 2012 J F M A M J J A S O N D Notes Assume completed 2012 Project no-go based on study Assume completed 2011 Go/no-go following design Power sales agreement not in place