HomeMy WebLinkAboutHoffman report 2bRENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Fivemile Creek Feasibility/Concept ual Design Chitna Electric Inc.HYDRO 303,000 303,000 COPPER- CHU 12/18/09 ACTIVE Grant agreement executed. Putting together RFP for solicitation of design team.RE Round 2 0 Cordova Wood Processing Plant- Purchase and setup Native Village of Eyak BIOMASS 147,720 147,720 COPPER- CHU 06/01/09 ACTIVE Processor purchased / grantee needs to request funds RE Round 1 0 Falls Creek Hydroelectric Construction Gustavus Electric Company HYDRO 750,000 750,000 SOUTHEAST 12/14/09 CLOSED Complete and operating RE Round 1 750,000 Statewide Hydrokinetic Feasibility Study University of Alaska-Anch OCEAN/RV 565,439 565,439 STATEWIDE 09/09/09 ACTIVE Some sites completed in 2009, some left to do in 2010 RE Round 1 171,119 Haines Central Wood Heating Construction Chilkoot Indian Association BIOMASS 316,689 288,222 28,467 SOUTHEAST 12/23/09 ACTIVE Ground was found to be unstable, grantee having to reengineer certain aspects of project.RE Round 1 5,677 Galena Wood Heating Construction Interior Regional Housing BIOMASS 765,558 382,779 382,779 YUK 06/01/09 DRAFT-EXT Grantee decided they couldn't complete the project with the budget approved.RE Round 1 0 Thorne Bay Wood Boiler Southeast Island School Dist BIOMASS 220,179 178,179 42,000 SOUTHEAST 12/01/09 DRAFT-EXT Grantee needs to provide additional information. RE Round 2 0 Falls Creek Low- Impact Hydro Assess PreConstr Homer Electric Assn, Inc.HYDRO 125,000 50,000 50,000 25,000 RAILBELT 12/03/09 ACTIVE Final Reconnaissance Report issued on 4-2-09. Biological field studies conducted in Summer 2009. Round 0 & RE Round 1 50,000 Grant Lk/Crk Low- Impact Hydro Assess Pre-Const Homer Electric Association HYDRO 125,000 50,000 50,000 25,000 RAILBELT 12/08/09 ACTIVE Final Reconnaissance Report issued on 4-2-09. Biological field studies conducted in Summer 2009. Round 0 & RE Round 1 50,000 Prepared by Alaska Energy Authority 1 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Crescent Lk/Crk Low-Impact Hydro Assess Pre-Constr Homer Electric Association HYDRO 100,000 50,000 30,000 20,000 RAILBELT 12/03/09 ACTIVE Grant scope is complete. Final Reconnaissance Report issued on 4-2- 09. Grant scope is complete. HEA is not pursuing further scoping for this site. Round 0 & RE Round 1 23,273 Ptarmigan Lk/Crk Low-Impact Hydro Assess Pre-Const Homer Electric Association HYDRO 125,000 50,000 50,000 25,000 RAILBELT 12/02/09 ACTIVE Grant scope is complete. Final Reconnaissance Report issued on 4-2- 09. Grant scope is complete. HEA is not pursuing further scoping for this site. Round 0 & RE Round 1 4,684 Chuniisax Creek Hydroelectric Construction City of Atka/Utility HYDRO 2,914,891 996,000 1,344,000 574,891 ALEUTIANS 11/20/09 DRAFT-INT Grantee has hired CM firm anticipating construction commencement in Spring 2010. Final dam design under review at State dam safety office.RE Round 1 0 Chignik Lagoon Hydroelectric Final Design Chignik Lagoon Power Utility HYDRO 150,000 150,000 BRISTOL 07/29/09 ACTIVE Grantee has hired engineering firm. Topo field work has been conducted. Grantee anticipates final design and permits by late summer 2010.RE Round 1 0 Indian Creek Hydro Feasibility Study City of Chignik HYDRO 207,500 207,500 BRISTOL 08/22/09 ACTIVE Grantee has hired engineering firm. Have had initial meeting with city and seafood co. to discuss future hydro ownership and operation issues. Field data collection planned for 2010.RE Round 1 0 Humpback Creek Hydroelectric Construction Cordova Electric Cooperative HYDRO 7,400,238 4,000,000 430,238 2,970,000 COPPER- CHU 12/21/09 ACTIVE Grantee has awarded construction contract. Contractor has mobilized to site and has begun construction. Anticipated completion by 10/2010.RE Round 1 1,054,305 Allison Lake Hydro Feasibility Study Copper Valley Electric Assoc HYDRO 2,860,000 2,288,000 572,000 COPPER- CHU 10/01/09 ACTIVE Consultant has prepared draft application for license for discussion of future license conditions with resource agencies and FERC and study plan definition.RE Round 1 236,622 Prepared by Alaska Energy Authority 2 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Whittier Creek Hydroelectric Reconnaissance City of Whittier HYDRO 200,000 85,000 15,000 RAILBELT 10/21/09 DRAFT-INT Have clarified tasks and milestones for grant with City and Corps of Engineers. Preparation of initial recon study of Whittier Creek hydro expected to begin in Spring 2010.RE Round 1 0 Burro Creek Hydro Feasibility Study Burro Creek Holdings, LLC HYDRO 60,000 48,000 12,000 SOUTHEAST 12/18/09 DRAFT-INT Grantee provided milestones and dates have been incorporated into the draft document which is undergoing internal AEA review.RE Round 1 0 Cosmos Hills Hydroelectric Feasibility Study Alaska Village Electric Coop HYDRO 1,075,625 1,025,000 50,625 NW ARCTIC 11/24/09 ACTIVE Grant recently awarded. Planning for summer 2010 field work is underway.RE Round 1 0 Ruth Lake Hydro Reconnaissance City of Petersburg d.b.a HYDRO 205,000 160,000 45,000 SOUTHEAST 12/03/09 ACTIVE Grant funds provided engineering to support City's application to FERC for Preliminary Permit (PP). Competing applications for PP were received by FERC. Final FERC decision was to award PP to City of Angoon. Grant is complete.RE Round 1 157,972 Takatz Lake Hydroelectric Feasibility City and Borough of Sitka HYDRO 514,684 514,684 SOUTHEAST 12/08/09 ACTIVE Completed agreement with USGS for stream gauging and installed gauge. Prepared for upcoming scoping meetings with resource agencies. Completed Preliminary Application Document.RE Round 1 47,318 Lake Elva Hydropower Feasibility, Permitting & Fin Nushagak Electric and HYDRO 4,006,500 4,006,500 BRISTOL 12/03/09 ACTIVE Grantee recently signed grant agreement. Preparing for spring 2010 field work - scope detailing and seeking site control.RE Round 1 0 Fourth of July Creek Hydroelectric Reconnaissance Independenc e Power, LLC HYDRO 40,000 20,000 20,000 RAILBELT 10/14/09 ACTIVE Grantee submitted reconnaissance study and initial feasibility assessment in November 2009. Document is under review at AEA.RE Round 1 0 Prepared by Alaska Energy Authority 3 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals California Creek Hydroelectric Feasibility Alaska Green Energy, LLC HYDRO 52,450 47,625 4,825 RAILBELT 12/01/09 DRAFT-INT Grant award document has been prepared and is under final internal review at AEA.RE Round 1 0 Old Harbor Hydroelectric Final Design Alaska Village Electric Coop HYDRO 250,000 225,000 25,000 KODIAK 10/07/09 ACTIVE Grantee has conducted initial meeting at Old Harbor. AVEC has hired engineering consultant. Feasibility study is under preparation.RE Round 1 0 South Fork Hydroelectric Construction South Fork Hydro, LLC HYDRO 3,087,000 1,000,000 2,087,000 RAILBELT 12/14/09 DRAFT-INT Grant award document has been prepared. Grantee has concerns with some of the grant provisions. A meeting has been scheduled in the near future to discuss these differences.RE Round 1 0 Fishhook Hydroelectric Construction Fishhook Renewable Energy, LLC HYDRO 4,412,961 2,000,000 2,412,961 RAILBELT 08/27/09 DRAFT-EXT AEA awaiting grantee to establish a cost based power purchase agreement and RCA certification. Grantee has requested a 1 year extension. Construction grant is on hold pending completion of preconstruction activities, including permitting and final design. RE Round 0 and Round 1 0 Whitman Lake Hydro Construction (reconnaissance) Ketchikan Public Util- Elec HYDRO 1,620,000 1,300,000 320,000 SOUTHEAST 11/05/09 ACTIVE Grantee is finalizing final design at this time.RE Round 1 0 Kiseralik/Chikuminu k Hydro Assoc of Village Cncl Presidents HYDRO 400,000 250,000 150,000 LYUK-KUSK 12/07/09 DRAFT-EXT Awaiting revised budget, timeline and scope.RE Round 2 0 Barrow Atqasuk Transmission Feasibility Study North Slope Borough TRANS 275,000 175,000 100,000 BARROW 12/01/09 DRAFT-INT Grant agreement needs to be completed. RE Round 2 0 Prepared by Alaska Energy Authority 4 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Neck Lake Feasibility Study & Conceptual Design Alaska Power & Telephone Co HYDRO 108,000 108,000 SOUTHEAST 11/05/09 ACTIVE Grantee has begun work late this fall after receipt of grant award. Additional work will be accomplished next summer to complete conceptual design, environmental surveys and a feasibility report REF Round 2 0 Terror Lake Capacity - Feasibility/Concept ual Design Kodiak Electric Association HYDRO 1,000,000 500,000 500,000 KODIAK 12/08/09 OPEN Grantee's consultant has completed the first task of grant, which is a pre- feasibility analysis engineering and regulatory assessment for Terror Lake. Additional grant-funded tasks will be conducted over the next 2 years culminating in a FERC license amendment application.RE Round 2 0 Carlson Creek Hydroelectric Alaska Power Company HYDRO 50,000 40,000 10,000 COPPER- CHU 10/05/09 DRAFT-INT Grantee is awaiting grant award document. It has proceeded with a site reconnaissance in Sept. 2009. Stream gauges will be installed in 2010 and a recon study completed in 2011.RE Round 2 0 Loud Creek Hydro Feasibility Analysis/Conce Design City of Akutan HYDRO 237,772 237,772 ALEUTIANS 11/23/09 DRAFT-INT Grant award document has been mailed to grantee for signature in 1/10. Grantee began field data collection in 10/09. RE Round 2 0 Town Creek Hydro System - Design for Repairs/Upgrade City of Akutan HYDRO 162,000 162,000 ALEUTIANS 11/20/09 DRAFT-INT Grant award document has been mailed to grantee for signature in 1/10. Grantee began field data collection in 10/09. RE Round 2 0 Delta Area Wind Turbines- Construction Alaska Environment al Power WIND 2,801,500 2,000,000 801,500 RAILBELT 12/08/09 ACTIVE Turbines are installed and commissioned. Interconnection with GVEA grid is nearly complete. RE Round 0 and Round 1 1,802,458 Pillar Mountain Wind Project - Construction Kodiak Electric Association WIND 5,000,000 4,000,000 1,000,000 KODIAK 12/08/09 ACTIVE Project is complete. RE Round 0 and Round 1 4,000,000 Prepared by Alaska Energy Authority 5 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Nikolski Wind Integration Construction Umnak Power/Nikols ki IRA WIND 450,930 409,430 41,500 ALEUTIANS 12/15/09 DRAFT-INT Grant is nearly in place. Current schedule shows project completion in spring of 2010. RE Round 1 0 Buckland, Deering, Noorvik Wind Farm Construction Northwest Arctic Borough WIND 10,921,428 10,758,928 162,500 NW ARCTIC 09/16/09 DRAFT-INT Grant agreement is in internal review. Grantee has completed the required tasks of getting MOUs signed between the three utilities and the NWAB.RE Round 1 0 Lake Pen Borough Wind Feasibility Study Lake and Peninsula Borough WIND 224,000 184,000 40,000 BRISTOL 12/14/09 ACTIVE Grant signed in December, no progress report yet. Schedule has load assessment being completed.Re Round 1 0 Quinhagak Wind Farm Construction Alaska Village Electric Coop WIND 4,838,603 3,882,243 956,360 LYUK-KUSK 08/31/09 ACTIVE Grant is in place. Grantee is preparing a budget adjustment request for Geotechnical work.RE Round 1 850,500 Toksook Wind Farm Construction Alaska Village Electric Coop WIND 1,253,056 1,037,750 215,306 LYUK-KUSK 05/27/09 ACTIVE Grant has been extended to October 2010. Turbine procurement and site control have been completed.RE Round 1 271,823 Mekoryuk Wind Farm Construction Alaska Village Electric Coop WIND 4,031,406 3,155,765 875,641 LYUK-KUSK 12/15/09 ACTIVE Completed pad and civil work and erected both towers. Beginning work on control module.RE Round 1 1,541,689 St. George Wind Farm Construction City of St. George -WIND 3,000,000 1,500,000 500,000 1,000,000 ALEUTIANS 08/27/09 DRAFT-EXT Grantee is working to obtain matching funds and finalize land use agreements.RE Round 1 0 Unalakleet Wind Farm Construction Unalakleet Valley Electric Co WIND 4,164,340 4,000,000 164,340 BERING 12/15/09 ACTIVE Turbines are up and operating with approximately 162,000kWh produced as of late December. Work to complete integration is ongoing and will not be completed until the separately funded Power House upgrade has been completed. (Scheduled for fall 2010) RE Round 1 3,788,533 Prepared by Alaska Energy Authority 6 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Chignik Lake Area Wind-Hydro Final Design Lake and Peninsula Borough WIND 471,000 375,000 96,000 BRISTOL 12/08/09 ACTIVE Contractors have completed the initial site visit and have installed the Met. Tower. RE Round 1 0 Kwigillingok Wind Farm Construction Kwigillingok Utility Company WIND 3,200,000 1,600,000 1,600,000 LYUK-KUSK 07/10/09 DRAFT-EXT Grant agreement being negotiated/prepared. RE Round 1 0 Eva Creek Wind Farm Feasibility Golden Valley Electric Assoc WIND 2,300,000 2,000,000 300,000 RAILBELT 09/02/09 DRAFT-EXT Adding additional met towers. Avian study underway. Meeting on 9/21 with Greg Wyman. Follow-up email on Oct. 5 asking for updates. Another follow- up sent Nov. 5. Another follow-up sent Dec. 30 RE Round 1 0 Nikolaevsk Wind Farm Final Design Alaska Wind Energy WIND 903,000 180,600 722,400 RAILBELT 12/21/09 CANCELLE D Meeting with CIRI rep for WEA scheduled for Wed 12/16. Grantee is placing project on hold - may release RE funds.RE Round 1 0 Kotzebue Wind Farm Expansion Construction Kotzebue Electric Association WIND 4,427,495 4,000,000 427,495 NW ARCTIC 08/27/09 DRAFT-EXT KEA has proposed a revised scope of work, budget and timeline. These are under review by PM.RE Round 1 0 Bethel Wind Power Project Times Four City of Bethel WIND 3,197,986 2,598,320 599,666 LYUK-KUSK 08/27/09 DRAFT-EXT Conference call is scheduled with grantee for January 5th, 2010 to discuss PPA and IPP status.RE Round 1 0 Coal Mine Road Wind Farm Final Design Alaska Wind Power, LLC WIND 131,250 105,000 26,250 RAILBELT 08/27/09 DRAFT-INT December meetings with grantee have nearly finalized scope, budget, and milestones. Met. Tower, integration study and avian studies have been or are nearly complete. RE Round 1 0 Nome/Newton Peak Wind Farm Construction City of Nome WIND 4,400,000 4,000,000 400,000 BERING 08/27/09 DRAFT-EXT Waiting to resolve Banner Wind Intertie due to limited resources at NJUS. Meeting will be held week of Jan. 4.RE Round 1 0 Prepared by Alaska Energy Authority 7 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Sand Point Wind Aleutian Wind Energy WIND 1,077,706 639,806 437,900 ALEUTIANS 12/01/09 DRAFT-INT Grant agreement will be completed after other grant agreements with same grantee are completed.RE Round 2 0 Metlakatla- Ketchikan Intertie Design and Permitting Metlakatla Indian Community TRANS 980,833 820,000 160,833 SOUTHEAST 10/29/09 ACTIVE Grant is in place. No requests for reimbursement have been filed. RE Round 1 0 Angoon Heat Recovery Inside Passage Electric Company HEAT 617,934 545,934 72,000 SOUTHEAST 12/07/09 COMPLETE D Project completed using other funds.RE Round 2 0 Kake-Petersburg Intertie Final Design Kwaan Electric Transmiss TRANS 5,490,000 2,990,000 2,500,000 SOUTHEAST 08/28/09 DRAFT-EXT Grantee needs to provide additional information for grant agreement.RE Round 1 0 Reynolds Creek Hydroelectric Construction Haida Power, Inc.HYDRO 8,645,000 2,000,000 6,645,000 SOUTHEAST 08/27/09 DRAFT-EXT Master agreement between Alaska Power & Telephone, Haida Corporation, the entity being established to operate the facility and the various grants for this project needs to be completed. RE Round 0 and Round 1 0 Tok Wind Construction Village Wind Power, LLC WIND 130,000 130,000 YUK 12/01/09 DRAFT-EXT December meetings with grantee have nearly finalized scope, budget, and milestones. Met. Tower study is ongoing.RE Round 2 0 Kobuk River Valley Woody Biomass Feasibility Northwest Inupiat Housing Auth BIOMASS 498,480 249,500 248,980 NW ARCTIC 12/23/09 ACTIVE As of November 30, 2009: Aerial survey performed, report pending. RE Round 1 0 Prepared by Alaska Energy Authority 8 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Haines Central Wood Heating Feasibility Study Haines Borough BIOMASS 140,500 120,500 20,000 SOUTHEAST 12/22/09 ACTIVE As of December 14, 2009: Received 4th Quarter Report. On October 13, Paul Weisner, CE2, presented an overview of the wood source report to the public in an evening’s meeting called especially for this purpose. Received annotated Draft Engineering Wood Heating Report RE Round 1 0 North Pole Heat Recovery Construction Golden Valley Electric Assoc HEAT 1,050,000 840,000 210,000 RAILBELT 12/22/09 ACTIVE As of December 15, 2009: Construction substantially complete. Glycol lines and heaters in place. System in operation. Installation of Variable Speed Pumps scheduled for early 2010.RE Round 1 734,254 North Pole Biomass Electricity/Heat Construction Chena Power Utility, LLC BIOFUEL 0 NORTH POLE 08/06/09 COMBINED In progress RE Round 0 and Round 1 0 McGrath Central Wood Heating Proj Dev Ph III McGrath Light & Power Company BIOMASS 505,000 322,000 183,000 YUK 07/09/09 ACTIVE As of December 10, 2009: ML&P is finalizing the Scope of Services and contract with Alaska Energy and Engineering (Steve Stassel) as well as Efour engineering (Greg Koontz). RE Round 1 0 Fort Yukon Central Wood Heating Design Gwitchyaa Zhee Corporation BIOMASS 350,656 210,000 140,656 YUK 12/15/09 ACTIVE As of December 10, 2009: 35% Design Report submitted. Site visit and coordination meetings with community entities and design engineers accomplished. Site Control and Permitting issues being investigated.RE Round 1 0 Lake Peninsula Borough Wood Heating Final Design Lake and Peninsula Borough BIOMASS 95,000 77,000 18,000 BRISTOL 07/22/09 ACTIVE As of November 5, 2009: Lake and Peninsula Borough issued and RFP on this project and did not receive an acceptable response. They will re- issue the RFP. RE Round 1 0 Prepared by Alaska Energy Authority 9 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Cordova Heat Recovery Construction Cordova Electric Cooperative HEAT 5,260,000 1,780,000 3,480,000 COPPER- CHU 12/15/09 ACTIVE As of November 30, 2009: Heat recovery equipment and piping completed to new generator. The conceptual design, project budget and schedule, necessary permits, design documents for the Organic Rankin Cycle Generator completed or executed. RFP for ORC Generator being prepared.RE Round 1 0 Ambler Solar PV Construction Alaska Village Electric Coop SOLAR 605,000 550,000 55,000 NW ARCTIC 12/23/09 DRAFT-INT Grant agreement needs to be completed. RE Round 1 0 Wrangell Hydro Based Electric Boilers Construction City and Borough of Wrangell OTHER 2,082,000 2,000,000 82,000 SOUTHEAST 12/22/09 ACTIVE As of December 15, 2009: 65% Engineering Design package submitted. Wrangell Heat Pump Feasibility Report submitted.RE Round 1 43,674 Yakutat Biomass Feasibility Yakutat Power BIOMASS 267,252 249,600 17,652 SOUTHEAST 12/14/09 ACTIVE As of November 20, 2009: Contract in place for Feasibility Study Report. Local multi-species biomass data collection completed, correlation with USFS data underway and Resource Report pending. RFP for engineering evaluation of biomass energy system for Yakutat being prepared.RE Round 1 8,431 Hooper Bay Wind Farm Feasibility City of Hooper Bay WIND 80,000 80,000 LYUK-KUSK 11/23/09 DRAFT-INT Grant agreement needs to be completed. RE Round 1 0 Unalaska Heat Recovery Construction City of Unalaska HEAT 1,919,807 1,300,000 619,807 ALEUTIANS 12/14/09 ACTIVE First Progress Report not due until January 5, 2010.RE Round 2 0 Adak Diesel Hybrid TDX Adak Generating, LLC OTHER 92,305 85,835 6,470 ALEUTIANS 12/09/09 DRAFT-INT Grant agreement needs to be completed. RE Round 2 0 Prepared by Alaska Energy Authority 10 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Chalkyitsik Biomass Central Heating Conceptual Des Chalkyitsik Village Council BIOMASS 42,500 32,500 10,000 YUK 12/21/09 ACTIVE First Progress Report not due until February 5, 2010.RE Round 2 0 Venetie District Heating Conceptual Design Venetie Village Council BIOMASS 42,500 32,500 10,000 YUK 10/22/09 OPEN In progress RE Round 2 0 Ambler Heat Recovery Construction City of Ambler HEAT 500,000 435,000 65,000 NW ARCTIC 11/04/09 ACTIVE As of December 22, 2009: the City of Ambler is in negotiations with AVEC for a heat sales agreement. Design of the heat recovery system to the new water plant is underway.RE Round 2 0 Kotzebue Electric Heat Recovery Construction Kotzebue Electric Association HEAT 1,215,627 915,627 300,000 NW ARCTIC 11/04/09 ACTIVE First Monthly Report due January 5, 2010. RE Round 2 0 McGrath Biomass Feasibility McGrath Traditional Council BIOMASS 43,940 34,740 9,200 YUK 11/04/09 ACTIVE First Monthly Report due February 5, 2010.RE Round 2 0 Point Lay Heat Recovery Construction North Slope Borough HEAT 4,257,116 395,912 3,861,204 BARROW 12/15/09 DRAFT-INT Grant agreement needs to be completed. RE Round 2 0 Wainwright Heat Recovery North Slope Borough HEAT 350,000 300,000 50,000 BARROW 12/08/09 ACTIVE First Monthly Report due February 5, 2010.RE Round 2 0 Biomass Hydronic Heating Yukon- Koyukuk School District BIOMASS 19,050 16,550 2,500 YUK 11/05/09 ACTIVE First Monthly Report due January 5, 2010.RE Round 2 0 Juneau Airport Ground Source Heat Pump City and Borough of Juneau GEOTHERM 1,026,000 513,000 513,000 SOUTHEAST 12/08/09 ACTIVE Construction nearing completion RE Round 0 389,778 Prepared by Alaska Energy Authority 11 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Juneau Ground Source Heat Pump Constr City & Borough of Juneau GEOTHERM 1,950,000 1,450,000 500,000 SOUTHEAST 07/30/09 ACTIVE Construction started RE Round 1 139,911 Ruby Hydrokinetic Yukon River Inter-Tribal OCEAN/RV 461,950 446,950 15,000 YUK 07/30/09 ACTIVE In progress RE Round 1 56,498 Manley Hot Springs Geothermal Plant TDX Power, Inc.GEOTHERM 1,645,000 215,000 725,000 705,000 YUK 09/09/09 ACTIVE In progress RE Round 0 0 Nenana Hydrokinetic Construction University of Alaska-Fbks OCEAN/RV 450,000 450,000 RAILBELT 12/21/09 ACTIVE In progress RE Round 1 53,168 Kvichak River Igiugig Village Council OCEAN/RV 812,375 718,175 94,200 BRISTOL 12/01/09 DRAFT-INT Grant agreement needs to be prepared RE Round 2 0 Hot Springs Bay Valley Geothermal Reconnaissance City of Akutan GEOTHERM 2,595,000 2,595,000 ALEUTIANS 12/22/09 ACTIVE In progress RE Round 2 0 Biomass-fired Organic Rankine Cycle System Chena Power, LLC BIOFUEL 4,612,900 2,000,000 2,612,900 RAILBELT 08/22/09 ACTIVE In progress RE Round 0 and Round 1 600,000 Anchorage Landfill Gas Electricity Construction Municipality of Anchorage BIOFUEL 5,700,000 2,000,000 3,700,000 RAILBELT 08/27/09 DRAFT-EXT Grantee needs to provide additional information for grant agreement.RE Round 1 0 North Prince of Wales Island Intertie Project Ak Power & Telephone Co TRANS 6,155,019 3,752,181 2,402,838 SOUTHEAST 12/08/09 ACTIVE In progress RE Round 1 791,262 McKinley Village Solar Thermal Construction Golden Valley Electric Assoc SOLAR 193,600 190,000 3,600 RAILBELT 06/23/09 ACTIVE Substantially complete RE Round 1 0 Prepared by Alaska Energy Authority 12 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Aleutians East Borough Feasibility Study Aleutians East Borough OTHER 40,000 25,000 15,000 ALEUTIANS 08/22/09 ACTIVE In progress RE Round 1 0 Kongiganak High Penetration Wind- Diesel Smart Grid Puvurnaq Power Company WIND 2,892,850 1,700,000 1,192,850 LYUK-KUSK 12/23/09 OPEN Grant agreement being negotiated/prepared.RE Round 1 0 Nikiski Wind Farm Construction Kenai Winds, LLC WIND 21,000,000 2,080,000 18,920,000 RAILBELT 12/14/09 COMBINED Grant agreement being negotiated/prepared. RE ROUND 1 and ROUND 2 0 Nome Banner Peak Wind Farm Transmission Construction Nome Joint Utility Systems TRANS 890,000 801,000 89,000 BERING 12/18/09 DRAFT-INT This project has been completed, grant agreement being negotiated/prepared.RE Round 1 0 Tuntutuliak High Penetration Wind Diesel Tuntutuliak Comm. Svcs Assoc WIND 3,360,000 1,760,000 1,600,000 LYUK-KUSK 12/01/09 DRAFT-INT Grant agreement being negotiated/prepared.RE Round 2 0 Tatitlek High Penetration Wind Tatitlek IRA Council WIND 146,240 138,210 COPPER- CHU 12/01/09 DRAFT-INT Grant agreement being negotiated/prepared.RE Round 2 0 Shaktoolik Wind Alaska Village Electric Coop WIND 2,727,960 2,465,664 262,296 BERING 12/01/09 DRAFT-INT Minor changes to draft will be needed after Teller grant is submitted for AEA review. RE Round 2 0 Teller Wind Analysis Alaska Village Electric Coop WIND 123,800 117,610 6,190 BERING 12/18/09 DRAFT-INT Grant agreement being negotiated/prepared.RE Round 2 0 Emmonak/Alakanu k Wind & Trans Alaska Village Electric Coop WIND 9,062,818 8,000,000 1,062,818 LYUK-KUSK 12/01/09 DRAFT-INT Grantee requests that this be a lower priority behind Teller and Shaktoolik projects. Grantee considering alternate turbine manufacturers to reduce costs. RE Round 2 0 Prepared by Alaska Energy Authority 13 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Kenai Winds Kenai Winds, LLC WIND 0 RAILBELT 09/03/09 COMBINED Grant agreement being negotiated/prepared.RE Round 2 0 Delta Junction Wood Chip Heating Delta/Greely School District BIOMASS 2,000,000 2,000,000 RAILBELT 12/16/09 ACTIVE The Design Engineer has been selected and a kick-off meeting was held in Delta on 12/16/09 to look at the site and the school building. The project is about $900k underfunded due to the project being capped at $2mil because Delta is connected to the GVEA grid. DGSD is in the process of identifying potential funding sources for the shortfall, but will proceed with the site plan development. The wood boiler manufacturer needs to be selected early in the design process in order to do the building layout for the fuel storage, delivery system and boiler layout. DGSD will not proceed with that procurement until the funding has been obtained, so the project may be delayed and miss the 2010 construction season.RE Round 1 0 Chistochina Central Wood Heating Constr Cheesh'na Tribal Council BIOMASS 512,000 500,000 12,000 COPPER- CHU 12/01/09 ACTIVE The design has started and it is anticipated that the project will be constructed in 2010.RE Round 1 0 Gulkana Central Wood Heating Construction Gulkana Village Council BIOMASS 500,000 500,000 COPPER- CHU 12/11/09 ACTIVE The project is under construction and should be completed in the Spring of 2010. The building is erected, the underground heat lines are installed, the wood boilers are on site, and work is progressing on the interior of the new building.RE Round 1 0 Prepared by Alaska Energy Authority 14 1/6/2010 RENEWABLE ENERGY FUND - GRANT and PROJECT STATUS Status Key Rounds 1 and 2 DRAFT-EXT Waiting for information from grantee DRAFT-INT Grant draft distributed for internal review OPEN, ACTIVE, AMD #Project in progress, grant in place COMBINED Grant combined with earlier grant CLOSED Grant project complete & grant closed Project Name Applicant Project Type Total Project Cost Approved RE Grant Approved Other AEA Grant Approved Match Other Funding Sources Region Status Date Status Code- Header Comment RE Fund Grant Round RE Fund Actuals Tok Wood Heating Construction Alaska Gateway School District BIOMASS 3,260,349 3,245,349 15,000 YUK 08/08/09 ACTIVE The project is 100% designed and currently being reviewed by the AGSD and AEA. The wood chip boiler has been ordered, and construction is set to start in May of 2010.RE Round 1 99,320 Kenny Lake Wood Boiler Assessment Copper River School District BIOMASS 170,000 120,000 40,000 10,000 COPPER- CHU 10/21/09 ACTIVE The design has started and the funding for construction has been applied for with the REF round III applications. Construction will be scheduled contingent upon funding availability. RE Round 0 & Round 1 0 Grant Lk/Falls Ck Hydro Feasibility Study Kenai Hydro, LLC HYDRO 26,924,120 816,000 204,000 RAILBELT 12/28/09 DRAFT-INT Grant award document in draft. Grantee has conducted some field studies in summer 2009 and has held an initial public scoping meeting in Seward in 11/09. Further work continues.RE Round 1 0 McGrath Heat Recovery Construction McGrath Light & Power Company HEAT 991,815 712,415 167,000 YUK 12/28/09 DRAFT-INT Grant award document in draft. Grantee got some of piping completed before ground froze.RE Round 1 0 124,613,014 17,722,269 Prepared by Alaska Energy Authority 15 1/6/2010