HomeMy WebLinkAboutREFund Status Nov 2010Renewable Energy Fund Construction Schedule (11/09/2010)
Renewable Energy Fund Construction Projects Now
2010 2011 2012
Type Round ID
Navision
Grant#
Total Project
Cost
Total REF
Grant PM J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D Notes
Biomass /
BioFuel 1 53 2195358 Chena Power, Biomass/ORC 4,612,900$ 2,000,000$ PC
1 33 2195373 Haines/Chilkoot, District Heat 225,120$ 188,620$ DP
1 2 2195381 Gulkana Village Council, Boiler 500,000$ 500,000$ RB
1 26 2195399 Native Village of Eyak, Wood 137,760$ 137,760$ BT closed
1 49 2195417 Tok, Gateway School, Boiler 3,260,349$ 3,245,349$ RB
1 112 2195395 Delta/Greeley School Dist. Wood 2,868,000$ 2,000,000$ RB
1 15 2195380 Chistochina Central Wood Heat 512,000$ 500,000$ RB
1 68 2195430 Anchorage Muni Landfill Gas 7,395,200$ 2,000,000$ DP
2 211 2195469 Thorne Bay School, Wood Heat 220,179$ 178,179$ DP
3 476 7030022 Tanana Biomass 492,652$ 412,642$ RB
3 445 n/a Ft Yukon District Wood Heating 3,606,255$ 2,318,255$ AF Schedule not yet determined Grant not in place
Geothermal
1 --2195359 Juneau Ground Source Heat Pump, Airport 1,026,000$ 513,000$ NMc closed
1 111 2195393 Juneau Ground Source Heat Pump, Aquatic Ctr 1,950,000$ 1,450,000$ NMc
1 --2195421 Manley Hot Springs Geothermal, TDX 1,645,000$ 215,000$ NMc
3 453 7030017 Alaska Sealife Center Seawater Heat Pump 286,580$ 286,580$ NMc
Heat Recovery
1 105 2195391 North Pole GVEA HR Expansion 1,050,000$ 840,000$ DP
1 22 2195407 Cordova Electric Heat to Power 3,770,000$ 1,780,000$ DP
1 61 2195416 McGrath Light & Power HE Expansion 954,225$ 712,415$ KN
1 9 2195423 Wrangell Excess Hydro to Heat 2,082,000$ 2,000,000$ DP
2 235 2195454 Kotzebue HR and Ammonia Power Cycle 1,215,627$ 915,627$ DP
2 307 2195453 City of Ambler Heat Recovery 500,000$ 435,000$ DP
2 271 2195449 Unalaska Heat Recovery 1,919,807$ 1,300,000$ DP
3 519 7030001 Atka Hydro Dispatch Excess Power 350,000$ 80,000$ AA
3 448 n/a St Paul Heat Recovery 615,591$ 98,149$ JJ Schedule not yet determined Grant not in place
Hydro
1 10 2195387 Falls Creek Hydro / Gustavus 10,178,000$ 750,000$ DL COMPLETED IN 2009 closed
1, 3 21, 407
2195386,
7030009 Cordova Humpback Creek Hydro 17,031,000$ 8,000,000$ DO
1 87 2195435 Fishhook Creek Hydro 4,412,961$ 2,000,000$ DO ?Draft extension, Assume completed 2012
1 23 2195360 North Prince of Wales Hydro Intertie 6,155,019$ 3,752,181$ RG
1 58 2195376 Atka, Chuniisax Creek Hydro 2,914,891$ 996,000$ AA
1 104 2195440 Reynolds Creek Hydro, Haida/AP&T 17,000,000$ 2,000,000$ JS Draft Interim
3 469 n/a Akutan Hydro Repair & Upgrade 1,491,000$ 1,391,000$ AA Grant not in place
3 438 n/a Yerrick Creek Hydro / Tok (AP&T)14,500,000$ 4,000,000$ AA Schedule not yet determined Grant not in place
Ocean/River
1 84 2195402 Ruby Hydrokinetic, YRI-CWC 461,950$ 446,950$ NMc
1 265 2195466 Kvichak River RISEC, Iguigig 683,175$ 718,175$ AF
Solar
1 108 2195394 McKinley Village Solar Thermal 193,600$ 190,000$ RG COMPLETED IN 2009 Closed
1 75 2195412 Ambler Solar PV 605,000$ 550,000$ DP Project no-go based on study Pending close
Wind
1 103 2195371 Kodiak Pillar Mountain Wind 23,319,539$ 4,000,000$ JJ COMPLETED IN 2009 Closed
1 50 2195401 Unalakleet Wind 4,164,340$ 4,000,000$ JJ COMPLETED IN 2009
1 122 2195432 Bethel Wind Project Times 4 3,197,986$ 2,598,320$ JJ ?Grant not in place waiting for grantee on sched.
1 102 2195370 Delta Junction Wind, AEP 2MW 2,350,000$ 2,000,000$ JJ
1 70 2195383 Quinhagak Wind, AVEC 300 KW 4,838,603$ 3,882,243$ JJ Control Mod. Damaged in shipping causing delay
1 71 2195385 Toksook Bay Wind, AVEC 100 KW 1,253,056$ 1,037,750$ JJ
1 72 2195384 Mekoryuk Wind Turbine/Controls, AVEC 4,031,406$ 3,155,765$ JJ Control Mod. Damaged in shipping causing delay
1 107 2195410 Kwigillingok Power Company 450KW 3,200,000$ 1,600,000$ RS
1 110 2195411 Kongiganak Wind, Puvurnaq Power Co.2,892,850$ 1,700,000$ RS
1 89 2195375 Nikolski IRA Wind, Umnak Power 450,930$ 409,430$ JJ
1, 3 85,518 2195427 Kotzebue Electric Turbines/Battery/Diesel 10,755,497$ 8,000,000$ JJ R1 - Kotzebue Wind Farm Exp Const.
1 47 2195444 Banner Peak Wind Transmission (Nome)890,000$ 801,000$ RS COMPLETED IN 2009 Closed
1 52 2195438 Nome, Newton Peak Wind Farm 4,444,444$ 4,000,000$ RS ?Go/no-go following design
1 90 2195398 St. George Wind Farm 3,000,000$ 1,500,000$ JJ Draft extension
1 56 2195377 NW Arctic Borough Wind Farm Buckland, Deering, Noorvik)10,921,428$ 10,758,928$ JJ Deering and Buckland may be completed in 2011
1, 2 98, 222 2195433 Nikiski, Kenai Winds Project 21,000,000$ 2,080,000$ RS ?Power sales agreement not in place
2 273 2195457 Tuntutuliak High Penetration wind/diesel 3,360,000$ 1,760,000$ RS
2 317 2195446 Sand Point Wind 1,077,706$ 639,806$ JJ
2 302 2195468 Emmonak & Alakanuk Wind and Transmission 8,888,889$ 8,000,000$ RS
2 303 2195463 Shaktoolik Wind 2,727,960$ 2,465,664$ RS
3 486 n/a Pilot Point Wind Power and Heat 1,571,240$ 1,421,240$ RS Schedule not yet determined Grant not in place
3 503 n/a St Paul Wind Diesel 2,100,000$ 1,900,000$ JJ Schedule not yet determined Grant not in place
Pre-construction Construction/Equipment Installation Commissiong/Project Completion
(Final Design,Contracts, Procurement)
S:\AEEE Shared Files\Renewable Energy Fund\REFund Status Nov 2010 v2.xlsx 11/9/20108:40 AM
Revised 11/09/2010 EFB
Renewable Energy Fund Reconnaisance, Feasibility, and Final Design Projects11/9/2010Type Round ID Total Project Cost Total REF Grant PMBiomass /1 30 McGrath Wood Heat 370,000$ 322,000$ DPBioFuel2314McGrath Biomass Study 43,940$ 34,740$ DP131Fort Yukon District Wood Heat Design 350,656$ 210,000$ AF146Kenny Lake School Wood Heat Design 170,000$ 120,000$ RB159Kobuk River Valley Biomass Study 531,712$ 249,500$ DP141Haines Borough Wood Heat Study 140,500$ 120,500$ DP163Lake & Peninsula Wood Heat Design 95,000$ 77,000$ DP160Yakutat Biomass Study 267,252$ 249,600$ DP2292Chalkyitsik Biomass Study 42,500$ 32,500$ DP2293Venetie Biomass Study 42,500$ 32,500$ DP2260Yukon-Koyukuk School District Biomass Study 19,050$ 16,550$ DP
Geothermal
2 246 Hot Springs Valley Geothermal Recon (Akutan)2,595,000$ 2,595,000$ NMc
3 470 Hot Springs Valley Geothermal Recon (Akutan)2,870,000$ 173,792$ NMc
3 466 Pilgrim Hot Springs Study 6,356,222$ 613,174$ NMc
3 477 Mount Spurr Geothermal Study /Ormat Nevada 4,152,805$ 1,993,158$ NMc
Heat Recovery
2 244 Point Lay Heat Recovery (North Slope Borough)395,912$ 395,912$ DP
2 243 Wainwright Heat Recovery 350,000$ 300,000$ DP
Hydro
1, 3 6, 435 Lake Elva / Nushagak Area Hydro 700,000$ 700,000$ DO
3 436 Port Alsworth Hydro Study 150,000$ 150,000$ DO
3 455 Chenega Bay Hydro/Design & Permitting 950,500$ 252,000$ AA
2 215 Terror Lake Hydro Unit 3 Study 1,000,000$ 500,000$ DO
3 401 Terror Lake Hydro Unit 3 Study 248,160$ 248,160$ DO
3 462 Hoonah-IPEC Hydro Design 850,000$ 850,000$ DO
1 999 Falls Creek Hydro Recon / Kenai Peninsula 125,000$ 50,000$ DO
1 999 Grant Lake Hydro Recon / Kenai Peninsula 125,000$ 50,000$ DO
1 999 Crescent LakeHydro Recon / Kenai Peninsula 66,591$ 23,273$ DO
1 999 Ptarmigan Lake Hydro Recon / Kenai Peninsula 68,355$ 4,684$ DO
1 14 Chignik Lagoon Hydro Final Design 150,000$ 150,000$ AA
1 40 Indian Creek Hydro Feasibility (Chignik)207,500$ 207,500$ AA
1 27 Allison Lake Hydro Feasibility (CVEA)2,860,000$ 2,288,000$ DO
1 48 Whittier Creek Hydro Feasibility 200,000$ 85,000$ DO
1 42 Burro Creek Hydro Feasibility (Skagway)60,000$ 48,000$ DO
1 74 Cosmos Hills Hydro Feasibility (Upper Kobuk)1,075,625$ 1,025,000$ AA
1 38 Ruth Lake Hydro Reconnaissance 202,529$ 157,972$ DO
1 1 Takatz Lake Hydro Feasibility 1,383,902$ 1,152,134$ DO
1 86 Fourth of July Creek Hydro Feasibility 40,000$ 20,000$ DO
1 78 California Creek Hydro Feasibility 52,450$ 47,625$ AA
1 34 Grant Lake Hydro Study / Kenai Peninsula 1,020,000$ 816,000$ DO
1 73 Old Harbor Hydro Design 250,000$ 225,000$ AA
1 37 Whitman Lake Recon (Ketchikan)1,620,000$ 1,300,000$ DO
2 210 Kiseralik / Chikuminuk Hydro Study (Bethel)400,000$ 250,000$ AA
2 223 Neck Lake Hydro Study 108,000$ 108,000$ AA
3 440 Neck Lake Hydro Design 90,000$ 90,000$ AA
2 236 Five Mile Creek Hydro Study (Chitina)303,000$ 303,000$ AF
2 226 Carlson Creek Hydro Study (Slana)50,000$ 40,000$ AA
2 248 Loud Creek Hydro Study (Akutan)237,772$ 237,772$ AA
2 249 Town Creek Hydro Design (Akutan)162,000$ 162,000$ AA
Ocean/River
1 88 Statewide Hydrokinetic Study 565,439$ 565,439$ NMc
1 97 Nenana Hydrokinetic 450,000$ 450,000$ NMc
Other
2 315 Adak Diesel Hybrid 92,305$ 85,835$ DP
1 11 Aleutians East Borough Renewable Energy Study 40,000$ 25,000$ RG
Transmission
1 29 Kake-Petersburg Inertie Design 5,490,000$ 2,990,000$ JS
1 20 Metlakatla-Ketchikan Intertie Design 980,833$ 820,000$ JS
2 245 Barrow-Atqasuk Transmission Study 225,000$ 175,000$ DP
Wind
1 109 Eva Creek Wind Study (GVEA)2,300,000$ 2,000,000$ RS
1 64 Lake & Peninsula Borough Wind Study 224,000$ 184,000$ JJ
1 62 Chignik Lake Wind & Hydro Design 471,000$ 375,000$ JJ
1 66 Delta Junction Wind Study (AWP) 500,000$ 105,000$ JJ
1 35 Hooper Bay Wind Study 80,000$ 80,000$ JJ
2 316 Tatitlek Wind-Hydro Study 146,240$ 138,210$ RS
2 297 Teller Wind Study 123,800$ 117,610$ RS
1 287 Tok Wind Resource Study 130,000$ 130,000$ JJ
3 515 New Stuyahok Wind Study 142,500$ 142,500$ RS
3 413 Point Hope Wind Study 132,000$ 132,000$ RS
3 414 Wainwright Wind Study 132,000$ 132,000$ RS
3 412 Point Lay Wind Study 132,000$ 132,000$ RS
3 512 Kivalina Wind Study 183,350$ 183,350$ RS
S:\AEEE Shared Files\Renewable Energy Fund\REFund Status Nov 2010 v2.xlsxREFund Status Nov 2010 v2.xlsxPreconstruction 11/9/20108:45 AM