HomeMy WebLinkAboutR4 Prliminary Ranking SummariesAlaska Renewable Energy Fund Ranking and Funding Allocation Round 4 Preliminary - 1/5/2011 Project ID Project Name Applicant Applicant Type Project Type Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (25) 2. Match (20) 3. Tech & Econ Feas (20) 4. Readi- ness (10) 5. Benefit (15) 6. Local Supt (5) 7. Sustain- ability (5) Total (100) State- wide Rank (74)Project Cost Grant Requested Match Offered Type Funding Cumulative Reconn/ Feasibility Permitting /Final Design Construct Southeast 687 Hoonah Heat Recovery Project Inside Passage Electric Cooperative, Inc.Utility Heat Recovery 89.33 3.55 4.82 13.19 17.00 17.87 8.00 12.50 4.00 4.00 76.55 1 1,005,000 475,000 530,000 Full 475,000 475,000 475,000 Bering Straits 654 Pilgrim Hot Springs Geothermal Resource Assessment University of Alaska Fairbanks INE/ACEP Governmt Entity Geothermal 86.67 1.91 1.87 11.50 18.00 17.33 5.67 13.75 5.00 3.83 75.08 2 3,330,467 1,330,467 2,000,000 Full 1,330,467 1,805,467 1,330,467 Northwest Arctic 668 Upper Kobuk River Biomass Northwest Inupiat Housing Authority Governmt Entity Biomass 74.67 3.01 4.23 24.97 9.00 14.93 4.00 12.75 5.00 3.00 73.65 3 2,200,000 250,000 20,000 Full 250,000 2,055,467 250,000 Southeast 636 Thorne Bay School Wood Fired Boiler Project Southeast Island School District Governmt Entity Biomass 76.00 1.34 2.26 18.56 13.00 15.20 8.00 9.38 4.00 3.50 71.64 4 580,179 300,000 60,000 Full 300,000 2,355,467 300,000 Aleutians 680 Cold Bay Wind Energy Project G&K Electric Utility IPP Wind 82.33 1.89 1.00 20.13 8.00 16.47 4.00 12.38 4.00 4.00 68.97 5 2,937,068 158,625 10,000 Partial 99,075 2,454,542 99,075 Kodiak 653 Terror Lake Unit 3 Hydroelectric Project Kodiak Electric Association, Inc.Utility Hydro 86.33 2.21 6.56 4.78 20.00 17.27 4.00 12.75 5.00 5.00 68.80 6 15,907,950 7,000,000 7,459,790 Partial 3,751,840 6,206,382 3,751,840 Southeast 670-1 Thayer Lake Hydropower Development Generation - Transmission Kootznoowoo, Inc.IPP Hydro 75.00 1.77 1.65 13.19 13.00 15.00 6.00 12.13 5.00 4.33 68.65 7 30,402,216 8,000,000 1,956,000 Partial 1,060,500 7,266,882 1,060,500 Yukon-Koyukuk/Upper Tanana 665 Upper Tanana Biomass CHP Project Alaska Power & Telephone Company Utility Biomass 81.33 3.10 4.50 16.59 11.00 16.27 3.67 13.50 5.00 2.33 68.36 8 18,000,000 380,000 45,000 Full 380,000 7,646,882 380,000 Lower Yukon-Kuskokwim 604 Bethel Renewable Energy Project TDX Power, Inc.IPP Wind 77.00 2.26 3.25 16.78 14.00 15.40 3.67 11.75 2.00 4.67 68.26 9 4,660,750 3,961,638 699,113 Partial 213,690 7,860,572 213,690 Railbelt 675 Battle Creek Diversion Project Chugach Electric Association, Inc.Utility Hydro 90.33 1.94 1.94 6.19 18.00 18.07 6.00 11.88 3.00 5.00 68.13 10 34,530,000 500,000 500,000 Full 500,000 8,360,572 500,000 Kodiak 644 Old Harbor Hydroelectric Alaska Village Electric Cooperative, Inc.Utility Hydro 79.67 1.52 1.47 19.50 8.00 15.93 4.00 10.50 4.00 4.83 66.77 11 4,100,000 237,500 12,500 Full 237,500 8,598,072 237,500 Copper River/Chugach 618 CVEA Silver Lake Feasibility Copper Valley Electric Association, Inc.Utility Hydro 81.67 3.53 2.86 10.34 16.00 16.33 6.00 11.88 3.00 2.50 66.05 12 89,560,000 637,500 212,500 Full 637,500 9,235,572 637,500 Bristol Bay 686 Port Heiden Wind Turbine Project Lake & Peninsula Borough Local Governmt Wind 61.67 1.41 3.94 17.81 14.00 12.33 6.00 8.25 3.00 2.33 63.73 13 2,123,536 1,700,000 448,536 Partial 250,000 9,485,572 250,000 Railbelt 616 GVEA Eva Creek Wind Turbine Purchase Golden Valley Electric Association Utility Wind 78.83 1.25 1.60 5.25 20.00 15.77 8.00 8.00 2.00 4.67 63.68 14 93,300,000 1,463,200 36,329,400 Full 1,463,200 10,948,772 1,463,200 Southeast 672 Snettisham Transmission Line Avalanche Mitigation Alaska Electric Light & Power Company Utility Transmission 89.67 2.56 3.14 3.47 14.00 17.93 6.00 12.00 5.00 4.67 63.07 15 4,019,600 3,215,680 803,920 Partial 2,000,000 12,948,772 268,000 1,732,000 Southeast 688 Pelican Hydroelectric Upgrade Project City of Pelican Local Governmt Hydro 66.67 1.42 3.50 13.56 13.00 13.33 8.00 9.38 3.00 2.33 62.60 16 5,520,836 1,896,836 3,624,000 Full 1,896,836 14,845,608 1,896,836 Southeast 695 Indian River Hydroelectric Project City of Tenakee Springs Electric Department Utility Local Governmt Hydro 80.67 1.84 2.01 9.22 11.00 16.13 6.00 12.00 2.00 5.00 61.35 17 2,711,000 203,000 26,000 Full 203,000 15,048,608 203,000 Yukon-Koyukuk/Upper Tanana 658 Organic Rankine Cycle Field Testing University of Alaska Fairbanks ACEP Governmt Entity Heat Recovery 77.17 2.21 2.00 17.59 2.00 15.43 5.67 12.88 4.00 3.67 61.24 18 472,787 472,787 Full 472,787 15,521,395 472,787 Bristol Bay 681 Lake & Peninsula Wood Boilers Lake & Peninsula Borough Local Governmt Biomass 34.00 0.90 0.80 22.66 16.00 6.80 6.00 2.25 5.00 2.33 61.04 19 493,200 369,900 123,300 Full 369,900 15,891,295 369,900 Copper River/Chugach 682 Fivemile Creek Hydroelectric Project Chitina Electric, Inc.Utility Hydro 78.67 1.37 1.18 16.56 9.00 15.73 6.00 7.50 2.00 4.17 60.96 20 4,405,000 3,602,000 803,000 Partial 277,000 16,168,295 277,000 Railbelt 652 Mount Spurr Geothermal Project Ormat Nevada, Inc.IPP Geothermal 75.17 1.08 0.67 4.72 19.00 15.03 6.00 6.38 5.00 4.17 60.29 21 300,000,000 1,999,972 3,882,298 Full 1,999,972 18,168,267 1,999,972 Lower Yukon-Kuskokwim 685 Napaskiak Wind, Power and Heat Recovery City of Napaskiak Electric Utility Local Governmt Wind 72.83 1.48 1.71 18.75 8.00 14.57 4.00 8.25 3.00 3.33 59.90 22 1,075,000 171,275 9,550 Partial 61,225 18,229,492 61,225 Lower Yukon-Kuskokwim 645 St. Mary’s/Pitka’s Point Wind Construction Alaska Village Electric Cooperative Utility Wind 64.50 0.95 1.07 18.56 12.00 12.90 4.00 2.00 5.00 4.33 58.80 23 4,500,000 4,000,000 500,000 Partial 275,554 18,505,046 60,000 215,554 Yukon-Koyukuk/Upper Tanana 608 Renewable Energy Feasibility Study Louden Tribal Council Local Governmt Biomass 74.67 2.97 3.27 17.59 0.00 14.93 4.33 14.25 4.00 3.50 58.61 24 11,000,000 100,000 49,300 Full 100,000 18,605,046 100,000 Railbelt 615 CEA Transmission Line to Renewable Energy Resources Chugach Electric Association, Inc.Utility Transmission 88.33 10.21 10.74 4.72 9.00 17.67 4.00 14.13 5.00 4.00 58.51 25 61,780,000 1,700,000 80,000 Partial 600,000 19,205,046 600,000 Yukon-Koyukuk/Upper Tanana 637 Feasibility Assessments for Wood Heating in Interior AK Communities Interior Regional Housing Authority Governmt Entity Biomass 81.00 1.12 1.12 21.66 0.00 16.20 4.00 7.50 5.00 3.67 58.02 26 154,477 Full 154,477 19,359,523 154,477 Lower Yukon-Kuskokwim 607 Lime Village Photovoltaic System Retrofit Lime Village Traditional Council Governmt Entity Solar 46.33 0.82 1.82 25.00 7.00 9.27 8.00 1.38 4.00 3.33 57.98 27 72,000 69,000 3,000 Partial 25,000 19,384,523 25,000 Southeast 605 Biomass Fuel Dryer Project City of Craig, Alaska Local Governmt Biomass 66.00 1.04 4.33 6.16 18.00 13.20 9.00 3.38 4.00 4.17 57.90 28 600,000 350,000 250,000 Full 350,000 19,734,523 350,000 Railbelt 693 Fourth of July Creek Hydroelectric Project Independence Power, LLC IPP Hydro 75.33 2.14 2.25 3.94 15.00 15.07 6.00 11.75 3.00 2.67 57.42 29 16,700,000 136,500 61,500 Full 136,500 19,871,023 136,500 Northwest Arctic 667 Kotzebue Paper & Wood Waste to Energy City of Kotzebue Local Governmt Other 67.83 1.49 1.49 14.50 10.00 13.57 0.00 10.13 5.00 3.67 56.86 30 2,500,000 85,000 9,250 Full 85,000 19,956,023 85,000 Lower Yukon-Kuskokwim 673 Atmautluak Wind Renewable Energy Village of Atmautluak Utility Governmt Entity Wind 57.50 1.00 1.40 24.19 7.00 11.50 5.00 3.75 2.00 3.33 56.77 31 1,700,000 225,000 25,000 Partial 100,000 20,056,023 100,000 Bering Straits 648 Stebbins Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 64.17 0.89 0.97 19.03 8.00 12.83 4.67 2.63 5.00 4.50 56.66 32 4,000,000 137,750 7,250 Full 137,750 20,193,773 137,750 Southeast 692 Elfin Cove Hydroelectric Project Community of Elfin Cove Utility Commission Utility Hydro 52.17 1.16 1.47 16.34 11.00 10.43 6.00 4.88 5.00 3.00 56.65 33 3,100,000 347,000 48,000 Full 347,000 20,540,773 347,000 Southeast 620 Whitman Lake Project City of Ketchikan dba Ketchikan Public Utilities Utility Local Governmt Hydro 68.50 3.30 3.00 20.00 13.70 7.67 2.25 5.00 5.00 56.62 34 19,150,000 2,000,000 14,500,000 Partial 700,000 21,240,773 700,000 Lower Yukon - Kuskokwim 639 Eek Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 57.00 0.79 0.93 21.94 8.00 11.40 5.00 0.75 5.00 4.17 56.25 35 750,000 142,500 7,500 Full 142,500 21,383,273 142,500 Lower Yukon-Kuskokwim 664 Kwethluk Wind Feasibility Organized Village of Kwethluk Governmt Entity Wind 62.67 1.11 1.15 16.25 11.00 12.53 4.00 4.88 4.00 3.50 56.16 36 1,466,813 145,000 16,000 Full 145,000 21,528,273 145,000 Southeast 705 Japonski Island Boathouse Heat Pump City and Borough of Sitka Local Governmt Geothermal 73.00 1.52 2.88 13.00 14.60 4.00 10.00 5.00 5.00 54.48 37 165,000 125,000 40,000 Full 125,000 21,653,273 25,000 100,000 Lower Yukon-Kuskokwim 643 Marshall Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 60.00 0.74 0.85 19.53 8.00 12.00 4.00 1.13 5.00 4.50 54.16 38 2,000,000 111,150 5,850 Full 111,150 21,764,423 111,150 Aleutians 679 Nelson Lagoon Wind Energy Project Nelson Lagoon Electrical Cooperative Utility Wind 55.33 0.89 0.96 23.13 8.00 11.07 4.00 0.38 4.00 3.33 53.90 39 1,815,480 158,625 10,000 Partial 99,075 21,863,498 99,075 North Slope 609 Atqasuk Transmission Line North Slope Borough Local Governmt Other 73.33 2.33 3.57 4.69 11.00 14.67 5.00 12.00 3.00 3.17 53.52 40 14,000,000 210,000 21,000 Full 210,000 22,073,498 210,000 Yukon-Koyukuk/Upper Tanana 641 Kaltag Solar Construction Alaska Village Electric Cooperative, Inc.Utility Solar 60.33 0.67 0.56 19.69 10.00 12.07 2.00 0.75 4.00 4.67 53.17 41 100,000 90,000 10,000 Full 90,000 22,163,498 90,000 Lower Yukon-Kuskokwim 646 Scammon Bay Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 63.83 0.91 0.99 19.41 8.00 12.77 2.00 2.25 4.00 4.50 52.92 42 2,000,000 142,500 7,500 Full 142,500 22,305,998 142,500 Railbelt 674 Stetson Creek Diversion/Cooper Lake Dam Facilities Chugach Electric Association, Inc.Utility Hydro 57.17 0.29 0.29 4.72 20.00 11.43 6.00 1.13 4.00 5.00 52.28 43 23,900,000 2,000,000 21,900,000 Partial 576,080 22,882,078 30,000 546,080 Railbelt 635 Grant Lake Hydroelectric Facility Kenai Hydro LLC IPP Hydro 62.83 1.40 1.32 5.50 14.00 12.57 6.00 7.13 2.00 5.00 52.19 44 27,160,000 1,500,000 375,000 Partial 1,184,000 24,066,078 1,184,000 Northwest Arctic 647 Selawik Hybrid Wind Diesel System Turbine Upgrade Alaska Village Electric Cooperative, Inc.Utility Wind 49.00 0.52 0.87 20.47 10.00 9.80 3.33 0.50 3.00 4.33 51.44 45 2,500,000 85,000 8,500 Full 85,000 24,151,078 85,000 Southeast 629 Reynolds Creek Hydroelectric Project Transmission Line Alaska Power Company Utility Transmission 46.83 1.09 0.84 10.03 14.00 9.37 6.00 5.00 2.00 5.00 51.40 46 3,000,000 2,000,000 400,000 Full 2,000,000 26,151,078 2,000,000 Railbelt 657 AVTEC Hydro Training Facility Alaska Vocational Technical Center Governmt Entity Hydro 90.33 2.15 1.56 3.94 2.00 18.07 6.00 13.38 3.00 4.50 50.88 47 720,388 703,800 16,588 Partial 67,500 26,218,578 67,500 Bering Straits 642 Koyuk Wind Phase II Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 57.33 0.67 0.73 19.72 8.00 11.47 2.00 1.13 4.00 4.50 50.81 48 2,000,000 142,500 7,500 Full 142,500 26,361,078 142,500 Lower Yukon-Kuskokwim 650 Chefornak Wind Feasibilitly City of Chefornak Local Governmt Wind 50.00 0.53 0.62 20.31 9.00 10.00 2.00 0.38 5.00 4.00 50.69 49 4,198,905 250,000 15,000 Partial 136,750 26,497,828 136,750 Bering Straits 640 Elim Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 59.33 0.76 0.82 18.69 8.00 11.87 2.00 1.13 4.00 4.50 50.18 50 2,000,000 142,500 7,500 Full 142,500 26,640,328 142,500 Aleutians 621 Akutan Geothermal Development Project City of Akutan Local Governmt Geothermal 59.50 1.59 2.03 10.09 12.00 11.90 5.67 2.75 4.00 3.33 49.74 51 45,000,000 2,695,000 355,000 Full 2,695,000 29,335,328 2,695,000 Lower Yukon-Kuskokwim 669 Akiachak Wind Feasibility & Conceptual Design Akiachak Native Community/Akiachak Ltd.Utility Governmt Entity Wind 55.33 0.83 0.83 19.69 8.00 11.07 4.00 0.38 2.00 4.00 49.13 52 4,250,000 110,000 15,000 Full 110,000 29,445,328 110,000 Bristol Bay 684 New Koliganek Wind & Heat Recovery Feasibility Study New Koliganek Village Council Governmt Entity Wind 53.17 0.94 0.96 15.63 8.00 10.63 6.00 1.50 3.00 3.17 47.93 53 662,050 105,050 7,000 Full 105,050 29,550,378 105,050 Railbelt 660 Cook Inlet TidGen Project ORPC Alaska, LLC IPP Other 37.83 0.01 -0.18 4.72 20.00 7.57 6.00 1.50 5.00 2.00 46.79 54 8,459,989 2,000,000 6,050,538 Full 2,000,000 31,550,378 2,000,000 Southeast 627 Connelly Lake Hydroelectric Project Alaska Power Company Utility Hydro 50.67 0.81 2.11 6.63 14.00 10.13 6.00 1.38 5.00 3.50 46.63 55 33,300,000 1,040,000 260,000 Partial 468,000 32,018,378 468,000 Aleutians 678 False Pass Wind Energy Project City of False Pass Electric Utility Utility Local Governmt Wind 52.67 0.75 0.60 16.25 8.00 10.53 4.00 0.63 4.00 2.50 45.91 56 1,594,320 128,625 10,000 Partial 69,075 32,087,453 69,075 Copper River/Chugach 622 Cordova Community Biomass Feasibility Study Native Village of Eyak Local Governmt Biomass 56.67 0.00 10.34 7.00 11.33 4.00 2.63 5.00 4.17 44.47 57 1,800,000 245,065 3,000 Partial 75,000 32,162,453 75,000 Railbelt 690 Hunter Creek Hydroelectric Project Eklutna, Inc.IPP Hydro 58.17 1.47 2.05 5.28 13.00 11.63 0.00 8.25 2.00 2.17 42.33 58 25,000,000 84,000 16,000 Full 84,000 32,246,453 84,000 Railbelt 689 Port Graham Biomass Waste Heat Demo Project Port Graham Village Council Local Governmt Biomass 42.50 0.30 0.38 6.28 14.00 8.50 4.00 1.38 4.00 3.83 41.99 59 845,805 697,475 148,330 Partial 75,000 32,321,453 75,000 Copper River/Chugach 649 Kenny Lake School Wood Fired Boiler Copper River School District Local Governmt Biomass 69.50 0.91 1.20 6.19 2.00 13.90 10.00 3.38 0.00 4.17 39.63 60 565,485 565,485 Full 565,485 32,886,938 565,485 Southeast 630 Schubee Lake Hydroelectric Project Alaska Power Company Utility Hydro 51.33 0.25 1.64 6.63 13.00 10.27 2.00 0.38 4.00 3.00 39.27 61 40,200,000 160,000 40,000 Partial 80,000 32,966,938 80,000 North Slope 613 Wainwright Wind Turbine Design North Slope Borough Utility Local Governmt Wind 53.33 0.78 0.88 4.69 11.00 10.67 4.00 0.38 4.00 4.00 38.73 62 4,433,000 400,000 40,000 Partial 298,000 33,264,938 298,000 Railbelt 676 Eska Creek Hydroelectric Project Bering Pacific Engineering IPP Hydro 52.67 1.34 1.03 5.28 12.00 10.53 0.00 6.75 2.00 1.83 38.40 63 5,800,000 37,000 7,400 Full 37,000 33,301,938 37,000 North Slope 610 Kaktovik Wind Diesel North Slope Borough Utility Local Governmt Wind 57.00 0.67 0.78 4.69 10.00 11.40 4.00 0.75 3.00 4.50 38.34 64 4,565,200 132,000 13,200 Full 132,000 33,433,938 132,000 North Slope 611 Point Hope Wind Turbine Design North Slope Borough Utility Local Governmt Wind 54.67 0.75 0.84 4.69 11.00 10.93 4.00 0.38 2.00 4.00 37.00 65 4,433,000 400,000 40,000 Partial 298,000 33,731,938 298,000 North Slope 612 Point Lay Wind Generation Design North Slope Borough Utility Local Governmt Wind 53.33 0.60 0.83 4.69 11.00 10.67 4.00 0.38 2.00 4.00 36.73 66 4,433,000 400,000 40,000 Partial 298,000 34,029,938 298,000 Southeast 656 Metlakatla-Ketchikan Intertie Metlakatla Indian Community Governmt Entity Transmission 41.67 0.13 3.60 2.88 14.00 8.33 4.00 0.38 2.00 3.83 35.42 67 12,725,200 9,405,200 3,320,000 Partial 1,180,000 35,209,938 750,000 430,000 Southeast 625 Excursion Inlet Hydro Project Phases I and II Haines Borough Governmt Entity Hydro 37.67 0.05 1.38 6.63 7.00 7.53 1.67 1.00 5.00 2.83 31.66 68 15,500,000 317,130 10,000 Partial 93,593 35,303,531 93,593 Railbelt 606 Jack River Hydro Project Native Village of Cantwell Local Governmt Hydro 36.00 5.25 8.00 7.20 2.00 0.63 5.00 2.50 30.58 69 200,000 190,000 10,000 Partial 30,000 35,333,531 30,000 Southeast 624 Wrangell Electric Vehicle Feasibility Study City & Borough of Wrangell Local Governmt Other 47.00 0.39 0.27 4.13 10.00 9.40 0.67 1.00 2.00 3.33 30.53 70 125,000 112,500 12,500 Partial 25,000 35,358,531 25,000 Southeast 707 Sitka Renewable Energy Feasibility for Centennial Hall & Library City & Borough of Sitka Local Governmt Geothermal 51.67 0.76 2.88 12.00 10.33 0.00 0.75 0.00 4.00 29.96 71 39,000 30,000 9,000 Full 30,000 35,388,531 30,000 Southeast 706 Sitka Renewable Energy Feasibility for Wastewater Treatment Plant City & Borough of Sitka Local Governmt Geothermal 50.33 0.80 0.00 2.88 12.00 10.07 0.00 0.75 0.00 4.00 29.69 72 26,000 20,000 6,000 Full 20,000 35,408,531 20,000 Southeast 632 Reconnaissance Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative Utility Geothermal 34.00 0.32 0.56 12.00 0.00 6.80 1.00 1.50 4.00 2.50 27.80 73 27,000,000 2,579,200 0 Partial 599,200 36,007,731 599,200 Southeast 655 Triangle Lake Hydroelectric Project Metlakatla Indian Community Governmt Entity Hydro 49.33 0.13 3.60 2.88 0.00 9.87 6.00 0.38 2.00 4.50 25.62 74 18,530,700 500,000 Full 500,000 36,507,731 500,000 SubTotal 1,093,700,924 77,932,412 108,349,113 36,507,731 9,887,364 8,396,134 18,224,233 Energy Region Development PhaseBene/Cost Stage 3 Review Scores (max)Cost and Request Recommendation R4 RankedAll $36.5M Page 1 of 2 Alaska Renewable Energy Fund Ranking and Funding Allocation Round 4 Preliminary - 1/5/2011 Project ID Project Name Applicant Applicant Type Project Type Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (25) 2. Match (20) 3. Tech & Econ Feas (20) 4. Readi- ness (10) 5. Benefit (15) 6. Local Supt (5) 7. Sustain- ability (5) Total (100) State- wide Rank (74)Project Cost Grant Requested Match Offered Type Funding Cumulative Reconn/ Feasibility Permitting /Final Design ConstructEnergy Region Development PhaseBene/Cost Stage 3 Review Scores (max)Cost and Request Recommendation Yukon-Koyukuk/Upper Tanana 631 Yerrick Creek Hydroelectric Project Alaska Power Company Utility Hydro 14,500,000 4,000,000 8,725,000 Not Pass S1 Railbelt 666 Kenai Winds Expansion Kenai Winds LLC IPP Wind 10,200,000 2,000,000 8,000,000 Not Pass S1 Railbelt 694 Southern Railbelt Small Hydro Reconn. Study Polarconsult Alaska, Inc.IPP Hydro 175,000,000 1,375,000 80,000 Not Pass S1 Lower Yukon-Kuskokwim 699 Akiak Integrated Renewable Energy Projects City of Akiak Local Governmt Other 142,000 142,000 Not Pass S1 Lower Yukon-Kuskokwim 600 AVCP Housing Wind Turbine Project AVCP Regional Housing Authority Governmt Entity Wind 0.61 0.57 3,795,000 3,045,000 750,000 Not Recom Copper River/Chugach 601 Waste Energy Powered Absorption Refrigeration Unit Valdez Fisheries Development Assn., Inc.IPP Other 36,016,000 1,021,287 350,000 Not Recom Aleutians 602 Adak Renewable Diesel Project TDX Adak Generating, LLC Utility Wind 4,000,000 250,050 0 Not Recom Southeast 603 Takatz Lake Hydroelectric Feasibility Analysis City & Borough of Sitka Utility Local Governmt Hydro 226,000,000 2,000,000 0 Not Recom Northwest Arctic 614 NWAB School Alternate Energy Solar Awareness Project Northwest Arctic Borough Local Governmt Solar 0.54 0.44 149,709 137,209 12,500 Not Recom Yukon-Koyukuk/Upper Tanana 617 Tok School Biomass Heating Project Alaska Gateway School District Local Governmt Biomass 0.47 0.69 4,560,000 754,651 560,000 Not Recom Southeast 619 Port St. Nick Fish Enhancement Hydropower City of Coffman Cove Local Governmt Hydro 198,000 158,400 39,600 Not Recom Railbelt 623 Susitna Valley High School Wood Heat Matanuska Susitna Borough Local Governmt Biomass 0.75 0.79 755,500 750,000 5,500 Not Recom Copper River/Chugach 626 Carlson Creek Hydroelectric Project Alaska Power Company Utility Hydro 6,300,000 540,000 60,000 Not Recom Bristol Bay 633 Nushagak Community Wind Power Project Nushagak Electric & Telephone Cooperative (NETC)Utility Wind 0.80 0.99 3,554,889 3,199,400 355,488 Not Recom Railbelt 634 Nikiski Combined Cycle Conversion (NCCC)Alaska Electric & Energy Cooperative Utility Heat Recovery 1.37 1.79 85,000,000 2,000,000 500,000 Not Recom Yukon-Koyukuk/Upper Tanana 638 Yukon River Debris Mitigation Project Alaska Power & Telephone Company Utility Other 1,190,876 1,190,876 Not Recom Bristol Bay 651 Southwest Alaska Regional Geothermal Energy Project Naknek Electric Association, Inc.Utility Geothermal 0.99 1.66 160,830,500 4,000,000 5,624,000 Not Recom Railbelt 659 Kachemak Bay Tidal Power City of Homer Local Governmt Other 6,452,000 620,811 706,424 Not Recom Railbelt 661 Turnagain Arm Tidal Electrical Generation Project Turnagain Tidal Energy Corporation IPP Other 0.87 4.30 2,500,000,000 2,000,000 Not Recom Copper River/Chugach 662 Gulkana Village Pellet Fuels Project Gulkana Village Council Governmt Entity Biomass 1,054,000 955,000 99,000 Not Recom Railbelt 663 Ionia Renewable Energy Training Center Alaska Mental Health Trust Authority Governmt Entity Biomass 0.53 0.43 274,623 241,623 33,000 Not Recom Lower Yukon-Kuskokwim 677 Akiak Hydro Study City of Akiak Local Governmt Ocean/River 350,000 Not Recom Railbelt 683 Cook Inlet Tidal Hydrokinetic Power Generation Baker Hughes, Inc.IPP Other 0.03 0.19 3,600,000 400,000 1,960,000 Not Recom Railbelt 691 Glacier Fork Hydroelectric Project Glacier Fork Hydro, LLC Utility Hydro 1.07 1.09 370,000,000 210,000 40,000 Not Recom Railbelt 696 Merrill Field Landfill Gas Heating/Energy Project Municipality of Anchorage Local Governmt Other 0.22 0.27 2,200,000 2,000,000 200,000 Not Recom Lower Yukon-Kuskokwim 697 Napakiak Wind Design & Construction Planning Napakiak Ircinraq Power Company Utility Wind 1.39 2.62 302,395 282,395 20,000 Not Recom Lower Yukon-Kuskokwim 698 Kongiganak Flywheel Energy Storage Puvurnaq Power Company Utility Other 0.55 1.14 1,561,368 1,395,231 166,137 Not Recom Lower Yukon-Kuskokwim 700 High Penetration Wind Diesel Power and Heat Kipnuk Light Plant Utility Wind 1.24 1.12 4,624,041 3,424,041 1,200,000 Not Recom Railbelt 701 Palmer Ice Arena Geothermal & Heat Recovery Improvements City of Palmer Local Governmt Geothermal 1,344,695 1,094,695 250,000 Not Recom Bristol Bay 702 Packers Creek Hydroelectric Project Chignik Lagoon Power Utility Utility Hydro 2,500,000 2,440,000 60,000 Not Recom Lower Yukon-Kuskokwim 703 Tuntutuliak Wind Energy Storage Tuntutuliak Community Services Assn., Inc.Utility Other 1.02 1.42 708,162 3,200,000 Not Recom Lower Yukon-Kuskokwim 704 Kwigillingok Wind Energy Storage Kwig Power Company Utility Other 1.07 1.42 708,162 3,200,000 Not Recom Southeast 628 Neck Lake Hydroelectric Project Alaska Power Company Utility Hydro 2,440,000 1,844,000 596,000 Not Recom-W SubTotal 3,628,545,596 45,237,993 36,792,649 GRAND TOTAL 4,722,246,520 123,170,405 145,141,762 36,507,731 0 9,887,364 8,396,134 18,224,233 R4 RankedAll $36.5M Page 2 of 2 Alaska Renewable Energy Fund Ranking and Funding Allocation Round 4 Preliminary - 1/5/2011 Project ID Project Name Applicant Applicant Type Project Type Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (25) 2. Match (20) 3. Tech & Econ Feas (20) 4. Readi- ness (10) 5. Benefit (15) 6. Local Supt (5) 7. Sustain- ability (5)Total (100) State- wide Rank (74)Project Cost Grant Requested Match Offered Type Funding Reconn/ Feasibility Permitting /Final Design Construct 680 Cold Bay Wind Energy Project G&K Electric Utility IPP Wind 82.33 1.89 1.00 20.13 8.00 16.47 4.00 12.38 4.00 4.00 68.97 5 2,937,068 158,625 10,000 Partial 99,075 99,075 679 Nelson Lagoon Wind Energy Project Nelson Lagoon Electrical Cooperative Utility Wind 55.33 0.89 0.96 23.13 8.00 11.07 4.00 0.38 4.00 3.33 53.90 39 1,815,480 158,625 10,000 Partial 99,075 99,075 621 Akutan Geothermal Development Project City of Akutan Local Governmt Geothermal 59.50 1.59 2.03 10.09 12.00 11.90 5.67 2.75 4.00 3.33 49.74 51 45,000,000 2,695,000 355,000 Full 2,695,000 2,695,000 678 False Pass Wind Energy Project City of False Pass Electric Utility Utility Local Governmt Wind 52.67 0.75 0.60 16.25 8.00 10.53 4.00 0.63 4.00 2.50 45.91 56 1,594,320 128,625 10,000 Partial 69,075 69,075 602 Adak Renewable Diesel Project TDX Adak Generating, LLC Utility Wind 4,000,000 250,050 0 Not Recom Aleutians Total 55,346,868 3,390,925 385,000 2,962,225 267,225 2,695,000 654 Pilgrim Hot Springs Geothermal Resource Assessment University of Alaska Fairbanks INE/ACEP Governmt Entity Geothermal 86.67 1.91 1.87 11.50 18.00 17.33 5.67 13.75 5.00 3.83 75.08 2 3,330,467 1,330,467 2,000,000 Full 1,330,467 1,330,467 648 Stebbins Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 64.17 0.89 0.97 19.03 8.00 12.83 4.67 2.63 5.00 4.50 56.66 32 4,000,000 137,750 7,250 Full 137,750 137,750 642 Koyuk Wind Phase II Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 57.33 0.67 0.73 19.72 8.00 11.47 2.00 1.13 4.00 4.50 50.81 48 2,000,000 142,500 7,500 Full 142,500 142,500 640 Elim Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 59.33 0.76 0.82 18.69 8.00 11.87 2.00 1.13 4.00 4.50 50.18 50 2,000,000 142,500 7,500 Full 142,500 142,500 Bering Straits Total 11,330,467 1,753,217 2,022,250 1,753,217 1,753,217 686 Port Heiden Wind Turbine Project Lake & Peninsula Borough Local Governmt Wind 61.67 1.41 3.94 17.81 14.00 12.33 6.00 8.25 3.00 2.33 63.73 13 2,123,536 1,700,000 448,536 Partial 250,000 250,000 681 Lake & Peninsula Wood Boilers Lake & Peninsula Borough Local Governmt Biomass 34.00 0.90 0.80 22.66 16.00 6.80 6.00 2.25 5.00 2.33 61.04 19 493,200 369,900 123,300 Full 369,900 369,900 684 New Koliganek Wind & Heat Recovery Feasibility Study New Koliganek Village Council Governmt Entity Wind 53.17 0.94 0.96 15.63 8.00 10.63 6.00 1.50 3.00 3.17 47.93 53 662,050 105,050 7,000 Full 105,050 105,050 633 Nushagak Community Wind Power Project Nushagak Electric & Telephone Cooperative (NETC)Utility Wind 0.80 0.99 3,554,889 3,199,400 355,488 Not Recom 651 Southwest Alaska Regional Geothermal Energy Project Naknek Electric Association, Inc.Utility Geothermal 0.99 1.66 160,830,500 4,000,000 5,624,000 Not Recom 702 Packers Creek Hydroelectric Project Chignik Lagoon Power Utility Utility Hydro 2,500,000 2,440,000 60,000 Not Recom Bristol Bay Total 170,164,175 11,814,350 6,618,324 724,950 105,050 250,000 369,900 618 CVEA Silver Lake Feasibility Copper Valley Electric Association, Inc.Utility Hydro 81.67 3.53 2.86 10.34 16.00 16.33 6.00 11.88 3.00 2.50 66.05 12 89,560,000 637,500 212,500 Full 637,500 637,500 682 Fivemile Creek Hydroelectric Project Chitina Electric, Inc.Utility Hydro 78.67 1.37 1.18 16.56 9.00 15.73 6.00 7.50 2.00 4.17 60.96 20 4,405,000 3,602,000 803,000 Partial 277,000 277,000 622 Cordova Community Biomass Feasibility Study Native Village of Eyak Local Governmt Biomass 56.67 0.00 10.34 7.00 11.33 4.00 2.63 5.00 4.17 44.47 57 1,800,000 245,065 3,000 Partial 75,000 75,000 649 Kenny Lake School Wood Fired Boiler Copper River School District Local Governmt Biomass 69.50 0.91 1.20 6.19 2.00 13.90 10.00 3.38 0.00 4.17 39.63 60 565,485 565,485 Full 565,485 565,485 601 Waste Energy Powered Absorption Refrigeration Unit Valdez Fisheries Development Assn., Inc.IPP Other 36,016,000 1,021,287 350,000 Not Recom 626 Carlson Creek Hydroelectric Project Alaska Power Company Utility Hydro 6,300,000 540,000 60,000 Not Recom 662 Gulkana Village Pellet Fuels Project Gulkana Village Council Governmt Entity Biomass 1,054,000 955,000 99,000 Not Recom Copper River/Chugach Total 139,700,485 7,566,337 1,527,500 1,554,985 712,500 277,000 565,485 653 Terror Lake Unit 3 Hydroelectric Project Kodiak Electric Association, Inc.Utility Hydro 86.33 2.21 6.56 4.78 20.00 17.27 4.00 12.75 5.00 5.00 68.80 6 15,907,950 7,000,000 7,459,790 Partial 3,751,840 3,751,840 644 Old Harbor Hydroelectric Alaska Village Electric Cooperative, Inc.Utility Hydro 79.67 1.52 1.47 19.50 8.00 15.93 4.00 10.50 4.00 4.83 66.77 11 4,100,000 237,500 12,500 Full 237,500 237,500 Kodiak Total 20,007,950 7,237,500 7,472,290 3,989,340 237,500 3,751,840 604 Bethel Renewable Energy Project TDX Power, Inc.IPP Wind 77.00 2.26 3.25 16.78 14.00 15.40 3.67 11.75 2.00 4.67 68.26 9 4,660,750 3,961,638 699,113 Partial 213,690 213,690 685 Napaskiak Wind, Power and Heat Recovery City of Napaskiak Electric Utility Local Governmt Wind 72.83 1.48 1.71 18.75 8.00 14.57 4.00 8.25 3.00 3.33 59.90 22 1,075,000 171,275 9,550 Partial 61,225 61,225 645 St. Mary’s/Pitka’s Point Wind Construction Alaska Village Electric Cooperative Utility Wind 64.50 0.95 1.07 18.56 12.00 12.90 4.00 2.00 5.00 4.33 58.80 23 4,500,000 4,000,000 500,000 Partial 275,554 60,000 215,554 607 Lime Village Photovoltaic System Retrofit Lime Village Traditional Council Governmt Entity Solar 46.33 0.82 1.82 25.00 7.00 9.27 8.00 1.38 4.00 3.33 57.98 27 72,000 69,000 3,000 Partial 25,000 25,000 673 Atmautluak Wind Renewable Energy Village of Atmautluak Utility Governmt Entity Wind 57.50 1.00 1.40 24.19 7.00 11.50 5.00 3.75 2.00 3.33 56.77 31 1,700,000 225,000 25,000 Partial 100,000 100,000 639 Eek Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 57.00 0.79 0.93 21.94 8.00 11.40 5.00 0.75 5.00 4.17 56.25 35 750,000 142,500 7,500 Full 142,500 142,500 664 Kwethluk Wind Feasibility Organized Village of Kwethluk Governmt Entity Wind 62.67 1.11 1.15 16.25 11.00 12.53 4.00 4.88 4.00 3.50 56.16 36 1,466,813 145,000 16,000 Full 145,000 145,000 643 Marshall Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 60.00 0.74 0.85 19.53 8.00 12.00 4.00 1.13 5.00 4.50 54.16 38 2,000,000 111,150 5,850 Full 111,150 111,150 646 Scammon Bay Wind Feasibility Alaska Village Electric Cooperative, Inc.Utility Wind 63.83 0.91 0.99 19.41 8.00 12.77 2.00 2.25 4.00 4.50 52.92 42 2,000,000 142,500 7,500 Full 142,500 142,500 650 Chefornak Wind Feasibilitly City of Chefornak Local Governmt Wind 50.00 0.53 0.62 20.31 9.00 10.00 2.00 0.38 5.00 4.00 50.69 49 4,198,905 250,000 15,000 Partial 136,750 136,750 669 Akiachak Wind Feasibility & Conceptual Design Akiachak Native Community/Akiachak Ltd.Utility Governmt Entity Wind 55.33 0.83 0.83 19.69 8.00 11.07 4.00 0.38 2.00 4.00 49.13 52 4,250,000 110,000 15,000 Full 110,000 110,000 600 AVCP Housing Wind Turbine Project AVCP Regional Housing Authority Governmt Entity Wind 0.61 0.57 3,795,000 3,045,000 750,000 Not Recom 677 Akiak Hydro Study City of Akiak Local Governmt Ocean/River 350,000 Not Recom 697 Napakiak Wind Design & Construction Planning Napakiak Ircinraq Power Company Utility Wind 1.39 2.62 302,395 282,395 20,000 Not Recom 698 Kongiganak Flywheel Energy Storage Puvurnaq Power Company Utility Other 0.55 1.14 1,561,368 1,395,231 166,137 Not Recom 699 Akiak Integrated Renewable Energy Projects City of Akiak Local Governmt Other 142,000 142,000 Not Pass S1 700 High Penetration Wind Diesel Power and Heat Kipnuk Light Plant Utility Wind 1.24 1.12 4,624,041 3,424,041 1,200,000 Not Recom 703 Tuntutuliak Wind Energy Storage Tuntutuliak Community Services Assn., Inc.Utility Other 1.02 1.42 708,162 3,200,000 Not Recom 704 Kwigillingok Wind Energy Storage Kwig Power Company Utility Other 1.07 1.42 708,162 3,200,000 Not Recom Lower Yukon-Kuskokwim Total 37,098,272 19,383,054 9,839,650 1,463,369 1,222,815 240,554 609 Atqasuk Transmission Line North Slope Borough Local Governmt Other 73.33 2.33 3.57 4.69 11.00 14.67 5.00 12.00 3.00 3.17 53.52 40 14,000,000 210,000 21,000 Full 210,000 210,000 613 Wainwright Wind Turbine Design North Slope Borough Utility Local Governmt Wind 53.33 0.78 0.88 4.69 11.00 10.67 4.00 0.38 4.00 4.00 38.73 62 4,433,000 400,000 40,000 Partial 298,000 298,000 610 Kaktovik Wind Diesel North Slope Borough Utility Local Governmt Wind 57.00 0.67 0.78 4.69 10.00 11.40 4.00 0.75 3.00 4.50 38.34 64 4,565,200 132,000 13,200 Full 132,000 132,000 611 Point Hope Wind Turbine Design North Slope Borough Utility Local Governmt Wind 54.67 0.75 0.84 4.69 11.00 10.93 4.00 0.38 2.00 4.00 37.00 65 4,433,000 400,000 40,000 Partial 298,000 298,000 612 Point Lay Wind Generation Design North Slope Borough Utility Local Governmt Wind 53.33 0.60 0.83 4.69 11.00 10.67 4.00 0.38 2.00 4.00 36.73 66 4,433,000 400,000 40,000 Partial 298,000 298,000 North Slope Total 31,864,200 1,542,000 154,200 1,236,000 132,000 1,104,000 668 Upper Kobuk River Biomass Northwest Inupiat Housing Authority Governmt Entity Biomass 74.67 3.01 4.23 24.97 9.00 14.93 4.00 12.75 5.00 3.00 73.65 3 2,200,000 250,000 20,000 Full 250,000 250,000 667 Kotzebue Paper & Wood Waste to Energy City of Kotzebue Local Governmt Other 67.83 1.49 1.49 14.50 10.00 13.57 0.00 10.13 5.00 3.67 56.86 30 2,500,000 85,000 9,250 Full 85,000 85,000 647 Selawik Hybrid Wind Diesel System Turbine Upgrade Alaska Village Electric Cooperative, Inc.Utility Wind 49.00 0.52 0.87 20.47 10.00 9.80 3.33 0.50 3.00 4.33 51.44 45 2,500,000 85,000 8,500 Full 85,000 85,000 614 NWAB School Alternate Energy Solar Awareness Project Northwest Arctic Borough Local Governmt Solar 0.54 0.44 149,709 137,209 12,500 Not Recom Northwest Arctic Total 7,349,709 557,209 50,250 420,000 170,000 250,000 Development Phase Aleutians Bering Straits Stage 3 Review Scores (max)Cost and Request Recommendation Northwest Arctic North Slope Lower Yukon-Kuskokwim Kodiak Energy Region Bene/Cost Copper River/Chugach Bristol Bay R4 RankedReg $36.5M Page 1 of 2 Alaska Renewable Energy Fund Ranking and Funding Allocation Round 4 Preliminary - 1/5/2011 Project ID Project Name Applicant Applicant Type Project Type Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (25) 2. Match (20) 3. Tech & Econ Feas (20) 4. Readi- ness (10) 5. Benefit (15) 6. Local Supt (5) 7. Sustain- ability (5)Total (100) State- wide Rank (74)Project Cost Grant Requested Match Offered Type Funding Reconn/ Feasibility Permitting /Final Design Construct Development Phase Aleutians Stage 3 Review Scores (max)Cost and Request Recommendation Energy Region Bene/Cost 675 Battle Creek Diversion Project Chugach Electric Association, Inc.Utility Hydro 90.33 1.94 1.94 6.19 18.00 18.07 6.00 11.88 3.00 5.00 68.13 10 34,530,000 500,000 500,000 Full 500,000 500,000 616 GVEA Eva Creek Wind Turbine Purchase Golden Valley Electric Association Utility Wind 78.83 1.25 1.60 5.25 20.00 15.77 8.00 8.00 2.00 4.67 63.68 14 93,300,000 1,463,200 36,329,400 Full 1,463,200 1,463,200 652 Mount Spurr Geothermal Project Ormat Nevada, Inc.IPP Geothermal 75.17 1.08 0.67 4.72 19.00 15.03 6.00 6.38 5.00 4.17 60.29 21 300,000,000 1,999,972 3,882,298 Full 1,999,972 1,999,972 615 CEA Transmission Line to Renewable Energy Resources Chugach Electric Association, Inc.Utility Transmission 88.33 10.21 10.74 4.72 9.00 17.67 4.00 14.13 5.00 4.00 58.51 25 61,780,000 1,700,000 80,000 Partial 600,000 600,000 693 Fourth of July Creek Hydroelectric Project Independence Power, LLC IPP Hydro 75.33 2.14 2.25 3.94 15.00 15.07 6.00 11.75 3.00 2.67 57.42 29 16,700,000 136,500 61,500 Full 136,500 136,500 674 Stetson Creek Diversion/Cooper Lake Dam Facilities Chugach Electric Association, Inc.Utility Hydro 57.17 0.29 0.29 4.72 20.00 11.43 6.00 1.13 4.00 5.00 52.28 43 23,900,000 2,000,000 21,900,000 Partial 576,080 30,000 546,080 635 Grant Lake Hydroelectric Facility Kenai Hydro LLC IPP Hydro 62.83 1.40 1.32 5.50 14.00 12.57 6.00 7.13 2.00 5.00 52.19 44 27,160,000 1,500,000 375,000 Partial 1,184,000 1,184,000 657 AVTEC Hydro Training Facility Alaska Vocational Technical Center Governmt Entity Hydro 90.33 2.15 1.56 3.94 2.00 18.07 6.00 13.38 3.00 4.50 50.88 47 720,388 703,800 16,588 Partial 67,500 67,500 660 Cook Inlet TidGen Project ORPC Alaska, LLC IPP Other 37.83 0.01 -0.18 4.72 20.00 7.57 6.00 1.50 5.00 2.00 46.79 54 8,459,989 2,000,000 6,050,538 Full 2,000,000 2,000,000 690 Hunter Creek Hydroelectric Project Eklutna, Inc.IPP Hydro 58.17 1.47 2.05 5.28 13.00 11.63 0.00 8.25 2.00 2.17 42.33 58 25,000,000 84,000 16,000 Full 84,000 84,000 689 Port Graham Biomass Waste Heat Demo Project Port Graham Village Council Local Governmt Biomass 42.50 0.30 0.38 6.28 14.00 8.50 4.00 1.38 4.00 3.83 41.99 59 845,805 697,475 148,330 Partial 75,000 75,000 676 Eska Creek Hydroelectric Project Bering Pacific Engineering IPP Hydro 52.67 1.34 1.03 5.28 12.00 10.53 0.00 6.75 2.00 1.83 38.40 63 5,800,000 37,000 7,400 Full 37,000 37,000 606 Jack River Hydro Project Native Village of Cantwell Local Governmt Hydro 36.00 5.25 8.00 7.20 2.00 0.63 5.00 2.50 30.58 69 200,000 190,000 10,000 Partial 30,000 30,000 623 Susitna Valley High School Wood Heat Matanuska Susitna Borough Local Governmt Biomass 0.75 0.79 755,500 750,000 5,500 Not Recom 634 Nikiski Combined Cycle Conversion (NCCC)Alaska Electric & Energy Cooperative Utility Heat Recovery 1.37 1.79 85,000,000 2,000,000 500,000 Not Recom 659 Kachemak Bay Tidal Power City of Homer Local Governmt Other 6,452,000 620,811 706,424 Not Recom 661 Turnagain Arm Tidal Electrical Generation Project Turnagain Tidal Energy Corporation IPP Other 0.87 4.30 2,500,000,000 2,000,000 Not Recom 663 Ionia Renewable Energy Training Center Alaska Mental Health Trust Authority Governmt Entity Biomass 0.53 0.43 274,623 241,623 33,000 Not Recom 666 Kenai Winds Expansion Kenai Winds LLC IPP Wind 10,200,000 2,000,000 8,000,000 Not Pass S1 683 Cook Inlet Tidal Hydrokinetic Power Generation Baker Hughes, Inc.IPP Other 0.03 0.19 3,600,000 400,000 1,960,000 Not Recom 691 Glacier Fork Hydroelectric Project Glacier Fork Hydro, LLC Utility Hydro 1.07 1.09 370,000,000 210,000 40,000 Not Recom 694 Southern Railbelt Small Hydro Reconn. Study Polarconsult Alaska, Inc.IPP Hydro 175,000,000 1,375,000 80,000 Not Pass S1 696 Merrill Field Landfill Gas Heating/Energy Project Municipality of Anchorage Local Governmt Other 0.22 0.27 2,200,000 2,000,000 200,000 Not Recom 701 Palmer Ice Arena Geothermal & Heat Recovery Improvements City of Palmer Local Governmt Geothermal 1,344,695 1,094,695 250,000 Not Recom Railbelt Total 3,753,223,000 25,704,076 81,151,978 8,753,252 2,601,500 688,580 5,463,172 687 Hoonah Heat Recovery Project Inside Passage Electric Cooperative, Inc.Utility Heat Recovery 89.33 3.55 4.82 13.19 17.00 17.87 8.00 12.50 4.00 4.00 76.55 1 1,005,000 475,000 530,000 Full 475,000 475,000 636 Thorne Bay School Wood Fired Boiler Project Southeast Island School District Governmt Entity Biomass 76.00 1.34 2.26 18.56 13.00 15.20 8.00 9.38 4.00 3.50 71.64 4 580,179 300,000 60,000 Full 300,000 300,000 670-1 Thayer Lake Hydropower Development Generation - Transmission Kootznoowoo, Inc.IPP Hydro 75.00 1.77 1.65 13.19 13.00 15.00 6.00 12.13 5.00 4.33 68.65 7 30,402,216 8,000,000 1,956,000 Partial 1,060,500 1,060,500 672 Snettisham Transmission Line Avalanche Mitigation Alaska Electric Light & Power Company Utility Transmission 89.67 2.56 3.14 3.47 14.00 17.93 6.00 12.00 5.00 4.67 63.07 15 4,019,600 3,215,680 803,920 Partial 2,000,000 268,000 1,732,000 688 Pelican Hydroelectric Upgrade Project City of Pelican Local Governmt Hydro 66.67 1.42 3.50 13.56 13.00 13.33 8.00 9.38 3.00 2.33 62.60 16 5,520,836 1,896,836 3,624,000 Full 1,896,836 1,896,836 695 Indian River Hydroelectric Project City of Tenakee Springs Electric Department Utility Local Governmt Hydro 80.67 1.84 2.01 9.22 11.00 16.13 6.00 12.00 2.00 5.00 61.35 17 2,711,000 203,000 26,000 Full 203,000 203,000 605 Biomass Fuel Dryer Project City of Craig, Alaska Local Governmt Biomass 66.00 1.04 4.33 6.16 18.00 13.20 9.00 3.38 4.00 4.17 57.90 28 600,000 350,000 250,000 Full 350,000 350,000 692 Elfin Cove Hydroelectric Project Community of Elfin Cove Utility Commission Utility Hydro 52.17 1.16 1.47 16.34 11.00 10.43 6.00 4.88 5.00 3.00 56.65 33 3,100,000 347,000 48,000 Full 347,000 347,000 620 Whitman Lake Project City of Ketchikan dba Ketchikan Public Utilities Utility Local Governmt Hydro 68.50 3.30 3.00 20.00 13.70 7.67 2.25 5.00 5.00 56.62 34 19,150,000 2,000,000 14,500,000 Partial 700,000 700,000 705 Japonski Island Boathouse Heat Pump City and Borough of Sitka Local Governmt Geothermal 73.00 1.52 2.88 13.00 14.60 4.00 10.00 5.00 5.00 54.48 37 165,000 125,000 40,000 Full 125,000 25,000 100,000 629 Reynolds Creek Hydroelectric Project Transmission Line Alaska Power Company Utility Transmission 46.83 1.09 0.84 10.03 14.00 9.37 6.00 5.00 2.00 5.00 51.40 46 3,000,000 2,000,000 400,000 Full 2,000,000 2,000,000 627 Connelly Lake Hydroelectric Project Alaska Power Company Utility Hydro 50.67 0.81 2.11 6.63 14.00 10.13 6.00 1.38 5.00 3.50 46.63 55 33,300,000 1,040,000 260,000 Partial 468,000 468,000 630 Schubee Lake Hydroelectric Project Alaska Power Company Utility Hydro 51.33 0.25 1.64 6.63 13.00 10.27 2.00 0.38 4.00 3.00 39.27 61 40,200,000 160,000 40,000 Partial 80,000 80,000 656 Metlakatla-Ketchikan Intertie Metlakatla Indian Community Governmt Entity Transmission 41.67 0.13 3.60 2.88 14.00 8.33 4.00 0.38 2.00 3.83 35.42 67 12,725,200 9,405,200 3,320,000 Partial 1,180,000 750,000 430,000 625 Excursion Inlet Hydro Project Phases I and II Haines Borough Governmt Entity Hydro 37.67 0.05 1.38 6.63 7.00 7.53 1.67 1.00 5.00 2.83 31.66 68 15,500,000 317,130 10,000 Partial 93,593 93,593 624 Wrangell Electric Vehicle Feasibility Study City & Borough of Wrangell Local Governmt Other 47.00 0.39 0.27 4.13 10.00 9.40 0.67 1.00 2.00 3.33 30.53 70 125,000 112,500 12,500 Partial 25,000 25,000 707 Sitka Renewable Energy Feasibility for Centennial Hall & Library City & Borough of Sitka Local Governmt Geothermal 51.67 0.76 2.88 12.00 10.33 0.00 0.75 0.00 4.00 29.96 71 39,000 30,000 9,000 Full 30,000 30,000 706 Sitka Renewable Energy Feasibility for Wastewater Treatment Plant City & Borough of Sitka Local Governmt Geothermal 50.33 0.80 0.00 2.88 12.00 10.07 0.00 0.75 0.00 4.00 29.69 72 26,000 20,000 6,000 Full 20,000 20,000 632 Reconnaissance Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative Utility Geothermal 34.00 0.32 0.56 12.00 0.00 6.80 1.00 1.50 4.00 2.50 27.80 73 27,000,000 2,579,200 0 Partial 599,200 599,200 655 Triangle Lake Hydroelectric Project Metlakatla Indian Community Governmt Entity Hydro 49.33 0.13 3.60 2.88 0.00 9.87 6.00 0.38 2.00 4.50 25.62 74 18,530,700 500,000 Full 500,000 500,000 603 Takatz Lake Hydroelectric Feasibility Analysis City & Borough of Sitka Utility Local Governmt Hydro 226,000,000 2,000,000 0 Not Recom 619 Port St. Nick Fish Enhancement Hydropower City of Coffman Cove Local Governmt Hydro 198,000 158,400 39,600 Not Recom 628 Neck Lake Hydroelectric Project Alaska Power Company Utility Hydro 2,440,000 1,844,000 596,000 Not Recom-W Southeast Total 446,337,731 37,078,946 26,531,020 12,453,129 1,815,793 2,653,500 7,983,836 665 Upper Tanana Biomass CHP Project Alaska Power & Telephone Company Utility Biomass 81.33 3.10 4.50 16.59 11.00 16.27 3.67 13.50 5.00 2.33 68.36 8 18,000,000 380,000 45,000 Full 380,000 380,000 658 Organic Rankine Cycle Field Testing University of Alaska Fairbanks ACEP Governmt Entity Heat Recovery 77.17 2.21 2.00 17.59 2.00 15.43 5.67 12.88 4.00 3.67 61.24 18 472,787 472,787 Full 472,787 472,787 608 Renewable Energy Feasibility Study Louden Tribal Council Local Governmt Biomass 74.67 2.97 3.27 17.59 0.00 14.93 4.33 14.25 4.00 3.50 58.61 24 11,000,000 100,000 49,300 Full 100,000 100,000 637 Feasibility Assessments for Wood Heating in Interior AK Communities Interior Regional Housing Authority Governmt Entity Biomass 81.00 1.12 1.12 21.66 0.00 16.20 4.00 7.50 5.00 3.67 58.02 26 154,477 Full 154,477 154,477 641 Kaltag Solar Construction Alaska Village Electric Cooperative, Inc.Utility Solar 60.33 0.67 0.56 19.69 10.00 12.07 2.00 0.75 4.00 4.67 53.17 41 100,000 90,000 10,000 Full 90,000 90,000 617 Tok School Biomass Heating Project Alaska Gateway School District Local Governmt Biomass 0.47 0.69 4,560,000 754,651 560,000 Not Recom 631 Yerrick Creek Hydroelectric Project Alaska Power Company Utility Hydro 14,500,000 4,000,000 8,725,000 Not Pass S1 638 Yukon River Debris Mitigation Project Alaska Power & Telephone Company Utility Other 1,190,876 1,190,876 Not Recom Yukon-Koyukuk/Upper Tanana Total 49,823,663 7,142,791 9,389,300 1,197,264 1,107,264 90,000 Grand Total 4,722,246,520 123,170,405 145,141,762 36,507,731 9,887,364 8,396,134 18,224,233 Yukon-Koyukuk/Upper Tanana Southeast Railbelt R4 RankedReg $36.5M Page 2 of 2 Alaska Renewable Energy Fund Regional Summary Round 4 Ranking $36.5 million Allocation Preliminary 1/04/2011 Rounds 1-3 Rounds 1-3 Grant Funding % of Total Funding Aleutians 11,593,784 6% Bering Straits 11,997,448 9% Bristol Bay 7,431,915 4% Copper River/Chugach 14,057,970 7% Kodiak 4,973,160 3% Lower Yukon-Kuskokwim 24,064,078 17% North Slope 1,266,912 1% Northwest Arctic 22,117,405 13% Railbelt 19,193,454 17% Southeast 20,211,588 17% Yukon-Koyukuk/Upper Tanana 12,128,901 5% Statewide 565,439 0% TOTAL 149,602,054 100% Round 4 Even Split Energy Region Grant Funding % Total Average cost power ($/kWh) Allocation cost of power basis Additional funding needed to reach 50%% total Allocation per capita basis Allocation per region basis Aleutians 2,962,225 8%0.51 4,505,837 (709,306) 1%479,090 3,318,885 Bering Straits 1,753,217 5%0.51 4,456,992 475,279 1%534,711 3,318,885 Bristol Bay 724,950 2%0.49 4,274,680 1,412,390 1%365,077 3,318,885 Copper River/Chugach 1,554,985 4%0.25 2,227,543 (441,213) 1%365,077 3,318,885 Kodiak 3,989,340 11%0.17 1,530,723 (3,223,978) 1%365,077 3,318,885 Lower Yukon-Kuskokwim 1,463,369 4%0.61 5,335,412 1,204,337 4%1,362,969 3,318,885 North Slope 1,236,000 3%0.14 1,220,045 (625,978) 1%434,074 3,318,885 Northwest Arctic 420,000 1%0.59 5,195,452 2,177,726 1%383,932 3,318,885 Railbelt 8,753,252 24%0.16 1,414,032 (8,046,236) 75%27,380,798 3,318,885 Southeast 12,453,129 34%0.15 1,359,666 (11,773,296) 11%4,015,850 3,318,885 Yukon-Koyukuk/Upper Tanana 1,197,264 3%0.57 4,987,349 1,296,411 1%543,962 3,318,885 Statewide - 0%0.20 - TOTAL 36,507,731 100%0.20 36,507,731 100%36,507,731 36,507,731 Cumulative Rounds 1-4 Even Split Energy Region Total Rounds 1-3 Funding % of Total Funding Average cost power ($/kWh) Allocation cost of power basis Additional funding needed to reach 50%% total Allocation per capita basis Allocation per region basis Aleutians 14,556,009 8%0.51 20,967,940 (4,072,039) 1%2,442,312 16,919,071 Bering Straits 13,750,665 7%0.51 20,740,637 (3,380,347) 1%2,725,861 16,919,071 Bristol Bay 8,156,865 4%0.49 19,892,248 1,789,259 1%1,861,098 16,919,071 Copper River/Chugach 15,612,955 8%0.25 10,365,887 (10,430,012) 1%1,861,098 16,919,071 Kodiak 8,962,500 5%0.17 7,123,229 (5,400,886) 1%1,861,098 16,919,071 Lower Yukon-Kuskokwim 25,527,447 14%0.61 24,828,373 (13,113,261) 4%6,948,168 16,919,071 North Slope 2,502,912 1%0.14 5,677,485 335,831 1%2,212,829 16,919,071 Northwest Arctic 22,537,405 12%0.59 24,177,065 (10,448,872) 1%1,957,213 16,919,071 Railbelt 27,946,706 15%0.16 6,580,206 (24,656,603) 75%139,582,339 16,919,071 Southeast 32,664,717 18%0.15 6,327,214 (29,501,110) 11%20,472,076 16,919,071 Yukon-Koyukuk/Upper Tanana 13,326,165 7%0.57 23,208,660 (1,721,835) 1%2,773,019 16,919,071 Statewide 565,439 0%0.20 8,110,421 TOTAL 186,109,785 100%0.20 186,109,785 100%186,109,785 186,109,785 (Highlighted in blue indicates additional allocations needed to reach the 50% goal of regional spread) Recommendation Cost of Power Population Recommendation Cost of Power Population Alaska Renewable Energy Fund Regional Summary Round 4 Ranking $25 million Allocation Preliminary 1/04/11 Rounds 1-3 Rounds 1-3 Grant Funding % of Total Funding Aleutians 11,593,784 6% Bering Straits 11,997,448 9% Bristol Bay 7,431,915 4% Copper River/Chugach 14,057,970 7% Kodiak 4,973,160 3% Lower Yukon-Kuskokwim 24,064,078 17% North Slope 1,266,912 1% Northwest Arctic 22,117,405 13% Railbelt 19,193,454 17% Southeast 20,211,588 17% Yukon-Koyukuk/Upper Tanana 12,128,901 5% Statewide 565,439 0% TOTAL 149,602,054 100% Round 4 Even Split Energy Region Grant Funding % Total Average cost power ($/kWh) Allocation cost of power basis Additional funding needed to reach 50%% total Allocation per capita basis Allocation per region basis Aleutians 198,150 1%0.51 3,085,536 1,344,618 1%328,074 2,272,727 Bering Straits 1,468,217 6%0.51 3,052,087 57,827 1%366,163 2,272,727 Bristol Bay 619,900 2%0.49 2,927,243 843,721 1%250,000 2,272,727 Copper River/Chugach 914,500 4%0.25 1,525,392 (151,804) 1%250,000 2,272,727 Kodiak 3,989,340 16%0.17 1,048,218 (3,465,231) 1%250,000 2,272,727 Lower Yukon-Kuskokwim 1,216,619 5%0.61 3,653,618 610,190 4%933,343 2,272,727 North Slope 210,000 1%0.14 835,470 207,735 1%297,248 2,272,727 Northwest Arctic 420,000 2%0.59 3,557,775 1,358,887 1%262,911 2,272,727 Railbelt 6,459,752 26%0.16 968,310 (5,975,597) 76%18,939,765 2,272,727 Southeast 8,306,258 33%0.15 931,081 (7,840,718) 11%2,750,000 2,272,727 Yukon-Koyukuk/Upper Tanana 1,197,264 5%0.57 3,415,269 510,371 1%372,498 2,272,727 Statewide - 0%0.20 - TOTAL 25,000,000 100%0.20 25,000,000 100%25,000,000 25,000,000 Cumulative Rounds 1-4 Even Split Energy Region Total Rounds 1-4 Funding % of Total Funding Average cost power ($/kWh) Allocation cost of power basis Additional funding needed to reach 50%% total Allocation per capita basis Allocation per region basis Aleutians 11,791,934 7%0.51 20,567,744 (1,508,062) 1%2,291,296 15,872,914 Bering Straits 13,465,665 8%0.51 20,344,779 (3,293,275) 1%2,557,313 15,872,914 Bristol Bay 8,051,815 5%0.49 19,512,583 1,704,476 1%1,746,021 15,872,914 Copper River/Chugach 14,972,470 9%0.25 10,168,043 (9,888,449) 1%1,746,021 15,872,914 Kodiak 8,962,500 5%0.17 6,987,274 (5,468,863) 1%1,746,021 15,872,914 Lower Yukon-Kuskokwim 25,280,697 14%0.61 24,354,496 (13,103,449) 4%6,518,541 15,872,914 North Slope 1,476,912 1%0.14 5,569,124 1,307,650 1%2,076,003 15,872,914 Northwest Arctic 22,537,405 13%0.59 23,715,620 (10,679,595) 1%1,836,193 15,872,914 Railbelt 25,653,206 15%0.16 6,454,616 (22,425,898) 76%132,276,875 15,872,914 Southeast 28,517,846 16%0.15 6,206,452 (25,414,620) 11%19,206,226 15,872,914 Yukon-Koyukuk/Upper Tanana 13,326,165 8%0.57 22,765,697 (1,943,316) 1%2,601,555 15,872,914 Statewide 565,439 0%0.20 7,955,624 TOTAL 174,602,054 100%0.20 174,602,054 100%174,602,054 174,602,054 (Highlighted in blue indicates additional allocations needed to reach the 50% goal of regional spread) Recommendation Cost of Power Population Recommendation Cost of Power Population