App #Project_Name Applicant_Name Grant_Fund_Request Resource
600 AVCP Regional Housing Authority AVCP Regional Housing Authority 3,045,000$ Wind
601 Waste Energy Powered Absorption Refrigeration Unit Valdez Fisheries Development Assn., Inc.1,021,287$ Other
602 Adak Renewable Diesel Project TDX Adak Generating, LLC 250,050$ Wind
603 Takatz Lake Hydroelectric Feasibility Analysis City & Borough of Sitka 2,000,000$ Hydro
604 Bethel Renewable Energy Project TDX Power, Inc.3,961,638$ Wind
605 Biomass Fuel Dryer Project City of Craig, Alaska 350,000$ Biomass
606 Jack River Hydro Project Native Village of Cantwell 190,000$ Hydro
607 Lime Village Photovoltaic System Retrofit Lime Village Traditional Council 69,000$ Solar
608 Renewable Energy Feasibility Study Louden Tribal Council 100,000$ Biomass
609 Atqasuk Transmission Line North Slope Borough 210,000$ Other
610 Kaktovik Wind Diesel North Slope Borough 132,000$ Wind
611 Point Hope Wind Turbine Design North Slope Borough 400,000$ Wind
612 Point Lay Wind Generation Design North Slope Borough 400,000$ Wind
613 Wainwright Wind Turbine Design North Slope Borough 400,000$ Wind
614 NWAB School Alternate Energy Solar Awareness Project Northwest Arctic Borough 137,209$ Solar
615 CEA Transmission Line to Renewable Energy Resources Chugach Electric Association, Inc.1,700,000$ Transmission
616 GVEA Eva Creek Wind Turbine Purchase Golden Valley Electric Association 1,463,200$ Wind
617 Tok School Biomass Heating Project Alaska Gateway School District 754,651$ Biomass
618 CVEA Silver Lake Feasibility Copper Valley Electric Association, Inc.637,500$ Hydro
619 Port St. Nick Fish Enhancement Hydropower City of Coffman Cove 158,400$ Hydro
620 Whitman Lake Project City of Ketchikan dba Ketchikan Public Utilities 2,000,000$ Hydro
621 Akutan Geothermal Development Project City of Akutan 2,695,000$ Geothermal
622 Cordova Community Biomass Feasibility Study Native Village of Eyak 245,065$ Biomass
623 Susitna Valley High School Wood Heat Matanuska Susitna Borough 750,000$ Biomass
624 Wrangell Electric Vehicle Feasibility Study City & Borough of Wrangell 112,500$ Other
625 Excursion Inlet Hydro Project Phases I and II Haines Borough 317,130$ Hydro
626 Carlson Creek Hydroelectric Project Alaska Power Company 540,000$ Hydro
627 Connelly Lake Hydroelectric Project Alaska Power Company 1,040,000$ Hydro
628 Neck Lake Hydroelectric Project Alaska Power Company 1,844,000$ Hydro
629 Reynolds Creek Hydroelectric Project Transmission Line Alaska Power Company 2,000,000$ Transmission
630 Schubee Lake Hydroelectric Project Alaska Power Company 160,000$ Hydro
631 Yerrick Creek Hydroelectric Project Alaska Power Company 4,000,000$ Hydro
632 Reconnaissance Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative 2,579,200$ Geothermal
633 Nushagak Community Wind Power Project Nushagak Electric & Telephone Cooperative (NETC)3,199,400$ Wind
634 Nikiski Combined Cycle Conversion (NCCC)Alaska Electric & Energy Cooperative 2,000,000$ Heat Recovery
635 Grant Lake Hydroelectric Facility Kenai Hydro LLC 1,500,000$ Hydro
636 Thorne Bay School Wood Fired Boiler Project Southeast Island School District 300,000$ Biomass
637 Feasibility Assessments for Wood Heating in Interior AK Communities Interior Regional Housing Authority 154,477$ Biomass
638 Yukon River Debris Mitigation Project Alaska Power & Telephone Company 1,190,876$ Other
639 Eek Wind Feasibility Alaska Village Electric Cooperative, Inc.142,500$ Wind
January 03, 2011 1
Alaska Energy Authority Renewable Energy Fund Round IV - Applications
App #Project_Name Applicant_Name Grant_Fund_Request Resource
640 Elim Wind Feasibilityi Alaska Village Electric Cooperative, Inc.142,500$ Wind
641 Kaltag Solar Construction Alaska Village Electric Cooperative, Inc.90,000$ Solar
642 Koyuk Wind Phase II Feasibility Alaska Village Electric Cooperative, Inc.142,500$ Wind
643 Marshall Wind Feasibility Alaska Village Electric Cooperative, Inc.111,150$ Wind
644 Old Harbor Hydroelectric Alaska Village Electric Cooperative, Inc.237,500$ Hydro
645 St. Mary’s/Pitka’s Point Wind Construction Alaska Village Electric Cooperative 4,000,000$ Wind
646 Scammon Bay Wind Feasibility Alaska Village Electric Cooperative, Inc.142,500$ Wind
647 Selawik Hybrid Wind Diesel System Turbine Upgrade Alaska Village Electric Cooperative, Inc.85,000$ Wind
648 Stebbins Wind Feasibility Alaska Village Electric Cooperative, Inc.137,750$ Wind
649 Kenny Lake School Wood Fired Boiler Copper River School District 565,485$ Biomass
650 Chefornak Wind Feasibilitly City of Chefornak 250,000$ Wind
651 Southwest Alaska Regional Geothermal Energy Project Naknek Electric Association, Inc.4,000,000$ Geothermal
652 Mount Spurr Geothermal Project Ormat Nevada, Inc.1,999,972$ Geothermal
653 Terror Lake Unit 3 Hydroelectric Project Kodiak Electric Association, Inc.7,000,000$ Hydro
654 Pilgrim Hot Springs Geothermal Resource Assessment University of Alaska Fairbanks INE/ACEP 1,330,467$ Geothermal
655 Triangle Lake Hydroelectric Project Metlakatla Indian Community 500,000$ Hydro
656 Metlakatla-Ketchikan Intertie Metlakatla Indian Community 9,405,200$ Transmission
657 AVTEC Hydro Training Facility Alaska Vocational Technical Center 703,800$ Hydro
658 Organic Rankine Cycle Field Testing University of Alaska Fairbanks ACEP 472,787$ Heat Recovery
659 Kachemak Bay Tidal Power City of Homer 620,811$ Other
660 Cook Inlet TidGen Project ORPC Alaska, LLC 2,000,000$ Other
661 Turnagain Arm Tidal Electrical Generation Project Turnagain Tidal Energy Corporation 2,000,000$ Other
662 Gulkana Village Pellet Fuels Project Gulkana Village Council 955,000$ Biomass
663 Ionia Renewable Energy Training Center Alaska Mental Health Trust Authority 241,623$ Biomass
664 Kwethluk Wind Feasibility Organized Village of Kwethluk 145,000$ Wind
665 Upper Tanana Biomass CHP Project Alaska Power & Telephone Company 380,000$ Biomass
666 Kenai Winds Expansion Kenai Winds LLC 2,000,000$ Wind
667 Kotzebue Paper & Wood Waste to Energy City of Kotzebue 85,000$ Other
668 Upper Kobuk River Biomass Northwest Inupiat Housing Authority 250,000$ Biomass
669 Akiachak Wind Feasibility & Conceptual Design Akiachak Native Community/Akiachak Ltd.110,000$ Wind
670 Thayer Lake Hydropower Development Generation Kootznoowoo, Inc.4,000,000$ Hydro
671 Thayer Lake Hydropower Development, Transmission Kootznoowoo, Inc.4,000,000$ Hydro
672 Snettisham Transmission Line Avalanche Mitigation Alaska Electric Light & Power Company 3,215,680$ Transmission
673 Atmautluak Wind Renewable Energy Village of Atmautluak 225,000$ Wind
674 Stetson Creek Diversion/Cooper Lake Dam Facilities Chugach Electric Association, Inc.2,000,000$ Hydro
675 Battle Creek Diversion Project Chugach Electric Association, Inc.500,000$ Hydro
676 Eska Creek Hydroelectric Project Bering Pacific Engineering 37,000$ Hydro
677 Akiak Hydro Study City of Akiak 350,000$ Ocean/River
678 False Pass Wind Energy Project City of False Pass Electric Utility 128,625$ Wind
679 Nelson Lagoon Wind Energy Project Nelson Lagoon Electrical Cooperative 158,625$ Wind
January 03, 2011 2
Alaska Energy Authority Renewable Energy Fund Round IV - Applications
App #Project_Name Applicant_Name Grant_Fund_Request Resource
680 Cold Bay Wind Energy Project G&K Electric Utility 158,625$ Wind
681 Lake & Peninsula Wood Boilers Lake & Peninsula Borough 369,900$ Biomass
682 Fivemile Creek Hydroelectric Project Chitina Electric, Inc.3,602,000$ Hydro
683 Cook Inlet Tidal Hydrokinetic Power Generation Baker Hughes, Inc.400,000$ Other
684 New Koliganek Wind & Heat Recovery Feasibility Study New Koliganek Village Council 105,050$ Wind
685 Napaskiak Wind, Power and Heat Recovery City of Napaskiak Electric Utility 171,275$ Wind
686 Port Heiden Wind Turbine Project Lake & Peninsula Borough 1,700,000$ Wind
687 Hoonah Heat Recovery Project Inside Passage Electric Cooperative, Inc.475,000$ Heat Recovery
688 Pelican Hydroelectric Upgrade Project City of Pelican 1,896,836$ Hydro
689 Port Graham Biomass Waste Heat Demo Project Port Graham Village Council 697,475$ Biomass
690 Hunter Creek Hydroelectric Project Eklutna, Inc.84,000$ Hydro
691 Glacier Fork Hydroelectric Project Glacier Fork Hydro, LLC 210,000$ Hydro
692 Elfin Cove Hydroelectric Project Community of Elfin Cove Utility Commission 347,000$ Hydro
693 Fourth of July Creek Hydroelectric Project Independence Power, LLC 136,500$ Hydro
694 Southern Railbelt Small Hydro Reconn. Study Polarconsult Alaska, Inc.1,375,000$ Hydro
695 Indian River Hydroelectric Project City of Tenakee Springs Electric Department 203,000$ Hydro
696 Merrill Field Landfill Gas Heating/Energy Project Municipality of Anchorage 2,000,000$ Other
697 Napakiak Wind Design & Construction Planning Napakiak Ircinraq Power Company 282,395$ Wind
698 Kongiganak Flywheel Energy Storage Puvurnaq Power Company 1,395,231$ Other
699 Akiak Integrated Renewable Energy Projects City of Akiak 142,000$ Other
700 High Penetration Wind Diesel Power and Heat Kipnuk Light Plant 3,424,041$ Wind
701 Palmer Ice Arena Geothermal & Heat Recovery Improvements City of Palmer 1,094,695$ Geothermal
702 Packers Creek Hydroelectric Project Chignik Lagoon Power Utility 2,440,000$ Hydro
703 Tuntutuliak Wind Energy Storage Tuntutuliak Community Services Assn., Inc.708,162$ Other
704 Kwigillingok Wind Energy Storage Kwig Power Company 708,162$ Other
705 Japonski Island Boathouse Heat Pump City and Borough of Sitka 125,000$ Geothermal
706 Sitka Renewable Energy Feasibility for Wastewater Treatment Plant City and Borough of Sitka 20,000$ Geothermal
707 Sitka Renewable Energy Feasibility for Centennial Hall & Library City and Borough of Sitka 30,000$ Geothermal
123,170,405$