Loading...
HomeMy WebLinkAboutRoundIVList Alaska Energy Authority Renewable Energy Fund Round IV - Applications App #Project_Name Applicant_Name Grant_Fund_Request Resource 600 AVCP Regional Housing Authority AVCP Regional Housing Authority 3,045,000$ Wind 601 Waste Energy Powered Absorption Refrigeration Unit Valdez Fisheries Development Assn., Inc.1,021,287$ Other 602 Adak Renewable Diesel Project TDX Adak Generating, LLC 250,050$ Wind 603 Takatz Lake Hydroelectric Feasibility Analysis City & Borough of Sitka 2,000,000$ Hydro 604 Bethel Renewable Energy Project TDX Power, Inc.3,961,638$ Wind 605 Biomass Fuel Dryer Project City of Craig, Alaska 350,000$ Biomass 606 Jack River Hydro Project Native Village of Cantwell 190,000$ Hydro 607 Lime Village Photovoltaic System Retrofit Lime Village Traditional Council 69,000$ Solar 608 Renewable Energy Feasibility Study Louden Tribal Council 100,000$ Biomass 609 Atqasuk Transmission Line North Slope Borough 210,000$ Other 610 Kaktovik Wind Diesel North Slope Borough 132,000$ Wind 611 Point Hope Wind Turbine Design North Slope Borough 400,000$ Wind 612 Point Lay Wind Generation Design North Slope Borough 400,000$ Wind 613 Wainwright Wind Turbine Design North Slope Borough 400,000$ Wind 614 NWAB School Alternate Energy Solar Awareness Project Northwest Arctic Borough 137,209$ Solar 615 CEA Transmission Line to Renewable Energy Resources Chugach Electric Association, Inc.1,700,000$ Transmission 616 GVEA Eva Creek Wind Turbine Purchase Golden Valley Electric Association 1,463,200$ Wind 617 Tok School Biomass Heating Project Alaska Gateway School District 754,651$ Biomass 618 CVEA Silver Lake Feasibility Copper Valley Electric Association, Inc.637,500$ Hydro 619 Port St. Nick Fish Enhancement Hydropower City of Coffman Cove 158,400$ Hydro 620 Whitman Lake Project City of Ketchikan dba Ketchikan Public Utilities 2,000,000$ Hydro 621 Akutan Geothermal Development Project City of Akutan 2,695,000$ Geothermal 622 Cordova Community Biomass Feasibility Study Native Village of Eyak 245,065$ Biomass 623 Susitna Valley High School Wood Heat Matanuska Susitna Borough 750,000$ Biomass 624 Wrangell Electric Vehicle Feasibility Study City & Borough of Wrangell 112,500$ Other 625 Excursion Inlet Hydro Project Phases I and II Haines Borough 317,130$ Hydro 626 Carlson Creek Hydroelectric Project Alaska Power Company 540,000$ Hydro 627 Connelly Lake Hydroelectric Project Alaska Power Company 1,040,000$ Hydro 628 Neck Lake Hydroelectric Project Alaska Power Company 1,844,000$ Hydro 629 Reynolds Creek Hydroelectric Project Transmission Line Alaska Power Company 2,000,000$ Transmission 630 Schubee Lake Hydroelectric Project Alaska Power Company 160,000$ Hydro 631 Yerrick Creek Hydroelectric Project Alaska Power Company 4,000,000$ Hydro 632 Reconnaissance Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative 2,579,200$ Geothermal 633 Nushagak Community Wind Power Project Nushagak Electric & Telephone Cooperative (NETC)3,199,400$ Wind 634 Nikiski Combined Cycle Conversion (NCCC)Alaska Electric & Energy Cooperative 2,000,000$ Heat Recovery 635 Grant Lake Hydroelectric Facility Kenai Hydro LLC 1,500,000$ Hydro 636 Thorne Bay School Wood Fired Boiler Project Southeast Island School District 300,000$ Biomass 637 Feasibility Assessments for Wood Heating in Interior AK Communities Interior Regional Housing Authority 154,477$ Biomass 638 Yukon River Debris Mitigation Project Alaska Power & Telephone Company 1,190,876$ Other 639 Eek Wind Feasibility Alaska Village Electric Cooperative, Inc.142,500$ Wind January 03, 2011 1 Alaska Energy Authority Renewable Energy Fund Round IV - Applications App #Project_Name Applicant_Name Grant_Fund_Request Resource 640 Elim Wind Feasibilityi Alaska Village Electric Cooperative, Inc.142,500$ Wind 641 Kaltag Solar Construction Alaska Village Electric Cooperative, Inc.90,000$ Solar 642 Koyuk Wind Phase II Feasibility Alaska Village Electric Cooperative, Inc.142,500$ Wind 643 Marshall Wind Feasibility Alaska Village Electric Cooperative, Inc.111,150$ Wind 644 Old Harbor Hydroelectric Alaska Village Electric Cooperative, Inc.237,500$ Hydro 645 St. Mary’s/Pitka’s Point Wind Construction Alaska Village Electric Cooperative 4,000,000$ Wind 646 Scammon Bay Wind Feasibility Alaska Village Electric Cooperative, Inc.142,500$ Wind 647 Selawik Hybrid Wind Diesel System Turbine Upgrade Alaska Village Electric Cooperative, Inc.85,000$ Wind 648 Stebbins Wind Feasibility Alaska Village Electric Cooperative, Inc.137,750$ Wind 649 Kenny Lake School Wood Fired Boiler Copper River School District 565,485$ Biomass 650 Chefornak Wind Feasibilitly City of Chefornak 250,000$ Wind 651 Southwest Alaska Regional Geothermal Energy Project Naknek Electric Association, Inc.4,000,000$ Geothermal 652 Mount Spurr Geothermal Project Ormat Nevada, Inc.1,999,972$ Geothermal 653 Terror Lake Unit 3 Hydroelectric Project Kodiak Electric Association, Inc.7,000,000$ Hydro 654 Pilgrim Hot Springs Geothermal Resource Assessment University of Alaska Fairbanks INE/ACEP 1,330,467$ Geothermal 655 Triangle Lake Hydroelectric Project Metlakatla Indian Community 500,000$ Hydro 656 Metlakatla-Ketchikan Intertie Metlakatla Indian Community 9,405,200$ Transmission 657 AVTEC Hydro Training Facility Alaska Vocational Technical Center 703,800$ Hydro 658 Organic Rankine Cycle Field Testing University of Alaska Fairbanks ACEP 472,787$ Heat Recovery 659 Kachemak Bay Tidal Power City of Homer 620,811$ Other 660 Cook Inlet TidGen Project ORPC Alaska, LLC 2,000,000$ Other 661 Turnagain Arm Tidal Electrical Generation Project Turnagain Tidal Energy Corporation 2,000,000$ Other 662 Gulkana Village Pellet Fuels Project Gulkana Village Council 955,000$ Biomass 663 Ionia Renewable Energy Training Center Alaska Mental Health Trust Authority 241,623$ Biomass 664 Kwethluk Wind Feasibility Organized Village of Kwethluk 145,000$ Wind 665 Upper Tanana Biomass CHP Project Alaska Power & Telephone Company 380,000$ Biomass 666 Kenai Winds Expansion Kenai Winds LLC 2,000,000$ Wind 667 Kotzebue Paper & Wood Waste to Energy City of Kotzebue 85,000$ Other 668 Upper Kobuk River Biomass Northwest Inupiat Housing Authority 250,000$ Biomass 669 Akiachak Wind Feasibility & Conceptual Design Akiachak Native Community/Akiachak Ltd.110,000$ Wind 670 Thayer Lake Hydropower Development Generation Kootznoowoo, Inc.4,000,000$ Hydro 671 Thayer Lake Hydropower Development, Transmission Kootznoowoo, Inc.4,000,000$ Hydro 672 Snettisham Transmission Line Avalanche Mitigation Alaska Electric Light & Power Company 3,215,680$ Transmission 673 Atmautluak Wind Renewable Energy Village of Atmautluak 225,000$ Wind 674 Stetson Creek Diversion/Cooper Lake Dam Facilities Chugach Electric Association, Inc.2,000,000$ Hydro 675 Battle Creek Diversion Project Chugach Electric Association, Inc.500,000$ Hydro 676 Eska Creek Hydroelectric Project Bering Pacific Engineering 37,000$ Hydro 677 Akiak Hydro Study City of Akiak 350,000$ Ocean/River 678 False Pass Wind Energy Project City of False Pass Electric Utility 128,625$ Wind 679 Nelson Lagoon Wind Energy Project Nelson Lagoon Electrical Cooperative 158,625$ Wind January 03, 2011 2 Alaska Energy Authority Renewable Energy Fund Round IV - Applications App #Project_Name Applicant_Name Grant_Fund_Request Resource 680 Cold Bay Wind Energy Project G&K Electric Utility 158,625$ Wind 681 Lake & Peninsula Wood Boilers Lake & Peninsula Borough 369,900$ Biomass 682 Fivemile Creek Hydroelectric Project Chitina Electric, Inc.3,602,000$ Hydro 683 Cook Inlet Tidal Hydrokinetic Power Generation Baker Hughes, Inc.400,000$ Other 684 New Koliganek Wind & Heat Recovery Feasibility Study New Koliganek Village Council 105,050$ Wind 685 Napaskiak Wind, Power and Heat Recovery City of Napaskiak Electric Utility 171,275$ Wind 686 Port Heiden Wind Turbine Project Lake & Peninsula Borough 1,700,000$ Wind 687 Hoonah Heat Recovery Project Inside Passage Electric Cooperative, Inc.475,000$ Heat Recovery 688 Pelican Hydroelectric Upgrade Project City of Pelican 1,896,836$ Hydro 689 Port Graham Biomass Waste Heat Demo Project Port Graham Village Council 697,475$ Biomass 690 Hunter Creek Hydroelectric Project Eklutna, Inc.84,000$ Hydro 691 Glacier Fork Hydroelectric Project Glacier Fork Hydro, LLC 210,000$ Hydro 692 Elfin Cove Hydroelectric Project Community of Elfin Cove Utility Commission 347,000$ Hydro 693 Fourth of July Creek Hydroelectric Project Independence Power, LLC 136,500$ Hydro 694 Southern Railbelt Small Hydro Reconn. Study Polarconsult Alaska, Inc.1,375,000$ Hydro 695 Indian River Hydroelectric Project City of Tenakee Springs Electric Department 203,000$ Hydro 696 Merrill Field Landfill Gas Heating/Energy Project Municipality of Anchorage 2,000,000$ Other 697 Napakiak Wind Design & Construction Planning Napakiak Ircinraq Power Company 282,395$ Wind 698 Kongiganak Flywheel Energy Storage Puvurnaq Power Company 1,395,231$ Other 699 Akiak Integrated Renewable Energy Projects City of Akiak 142,000$ Other 700 High Penetration Wind Diesel Power and Heat Kipnuk Light Plant 3,424,041$ Wind 701 Palmer Ice Arena Geothermal & Heat Recovery Improvements City of Palmer 1,094,695$ Geothermal 702 Packers Creek Hydroelectric Project Chignik Lagoon Power Utility 2,440,000$ Hydro 703 Tuntutuliak Wind Energy Storage Tuntutuliak Community Services Assn., Inc.708,162$ Other 704 Kwigillingok Wind Energy Storage Kwig Power Company 708,162$ Other 705 Japonski Island Boathouse Heat Pump City and Borough of Sitka 125,000$ Geothermal 706 Sitka Renewable Energy Feasibility for Wastewater Treatment Plant City and Borough of Sitka 20,000$ Geothermal 707 Sitka Renewable Energy Feasibility for Centennial Hall & Library City and Borough of Sitka 30,000$ Geothermal 123,170,405$ January 03, 2011 3