Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
REF Round 4 Total rank vs stage 2 score
ID 681 632 606 625 660 656 689 607 629 624 647 655 650 706 627 630 707 692 678 676 684 613 612 611 679 669 623 622 639 610 674 642 673 690 640 621 643 641 686 664 635 646 648 645 605 688 667 620 649 685 705 609 668 608 670-1 652 693 636 604 658 682 616 644 695 637 665 680 653 654 615 687 672 675 657 Project Name Lake & Peninsula Wood Boilers Reconnaissance Study of Tenakee Inlet Geothermal Resource Jack River Hydro Project Excursion Inlet Hydro Project Phases I and II Cook Inlet TidGen Project Metlakatla-Ketchikan Intertie Port Graham Biomass Waste Heat Demo Project Lime Village Photovoltaic System Retrofit Reynolds Creek Hydroelectric Project Transmission Line * Wrangell Electric Vehicle Feasibility Study Selawik Hybrid Wind Diesel System Turbine Upgrade Triangle Lake Hydroelectric Project Chefornak Wind Feasibilitly Sitka Renewable Energy Feasibility for Wastewater Treatment Plant Connelly Lake Hydroelectric Project Schubee Lake Hydroelectric Project Sitka Renewable Energy Feasibility for Centennial Hall & Library Elfin Cove Hydroelectric Project False Pass Wind Energy Project Eska Creek Hydroelectric Project New Koliganek Wind & Heat Recovery Feasibility Study Wainwright Wind Turbine Design Point Lay Wind Generation Design Point Hope Wind Turbine Design Nelson Lagoon Wind Energy Project Akiachak Wind Feasibility & Conceptual Design Susitna Valley High School Wood Heat Cordova Community Biomass Feasibility Study Eek Wind Feasibility Kaktovik Wind Diesel Stetson Creek Diversion/Cooper Lake Dam Facilities Koyuk Wind Phase II Feasibility Atmautluak Wind Renewable Energy Hunter Creek Hydroelectric Project Elim Wind Feasibility Akutan Geothermal Development Project Marshall Wind Feasibility Kaltag Solar Construction Port Heiden Wind Turbine Project Kwethluk Wind Feasibility Grant Lake Hydroelectric Facility Scammon Bay Wind Feasibility Stebbins Wind Feasibility St. Mary’s/Pitka’s Point Wind Construction Biomass Fuel Dryer Project Pelican Hydroelectric Upgrade Project Kotzebue Paper & Wood Waste to Energy Whitman Lake Project Kenny Lake School Wood Fired Boiler Napaskiak Wind, Power and Heat Recovery Japonski Island Boathouse Heat Pump Atqasuk Transmission Line Upper Kobuk River Biomass Renewable Energy Feasibility Study Thayer Lake Hydropower Development Generation - Transmission Mount Spurr Geothermal Project Fourth of July Creek Hydroelectric Project Thorne Bay School Wood Fired Boiler Project Bethel Renewable Energy Project Organic Rankine Cycle Field Testing Fivemile Creek Hydroelectric Project GVEA Eva Creek Wind Turbine Purchase Old Harbor Hydroelectric Indian River Hydroelectric Project Feasibility Assessments for Wood Heating in Interior AK Communities Upper Tanana Biomass CHP Project Cold Bay Wind Energy Project Terror Lake Unit 3 Hydroelectric Project Pilgrim Hot Springs Geothermal Resource Assessment CEA Transmission Line to Renewable Energy Resources Hoonah Heat Recovery Project Snettisham Transmission Line Avalanche Mitigation Battle Creek Diversion Project AVTEC Hydro Training Facility Project Type Biomass Geothermal Hydro Hydro Other Transmission Biomass Solar Transmission Other Wind Hydro Wind Geothermal Hydro Hydro Geothermal Hydro Wind Hydro Wind Wind Wind Wind Wind Wind Biomass Biomass Wind Wind Hydro Wind Wind Hydro Wind Geothermal Wind Solar Wind Wind Hydro Wind Wind Wind Biomass Hydro Other Hydro Biomass Wind Geothermal Other Biomass Biomass Hydro Geothermal Hydro Biomass Wind Heat Recovery Hydro Wind Hydro Hydro Biomass Biomass Wind Hydro Geothermal Transmission Heat Recovery Transmission Hydro Hydro AEA B/C 0.9 0.32 0.05 0.01 0.13 0.3 0.82 1.09 0.39 0.52 0.13 0.53 0.8 0.81 0.25 0.76 1.16 0.75 1.34 0.94 0.78 0.6 0.75 0.89 0.83 0.75 0 0.79 0.67 0.29 0.67 1 1.47 0.76 1.59 0.74 0.67 1.41 1.11 1.4 0.91 0.89 0.95 1.04 1.42 1.49 0.91 1.48 1.52 2.33 3.01 2.97 1.77 1.08 2.14 1.34 2.26 2.21 1.37 1.25 1.52 1.84 1.12 3.1 1.89 2.21 1.91 10.21 3.55 2.56 1.94 2.15 Total (100) 61.0395833333333 27.8 30.575 31.6583333333333 46.7854166666667 35.4166666666667 41.9895833333333 57.975 51.3979166666667 30.525 51.4354166666667 25.6166666666667 50.6875 29.6916666666667 46.6333333333333 39.2666666666667 29.9583333333333 56.6520833333333 45.9083333333333 38.3979166666667 47.925 38.7291666666667 36.7291666666667 36.9958333333333 53.9 49.1291666666667 40.63 44.46875 56.2541666666667 38.3375 52.2770833333333 50.8104166666667 56.7708333333333 42.33125 50.1791666666667 49.74375 54.15625 53.1708333333333 63.7291666666667 56.1583333333333 52.1916666666667 52.9229166666667 56.65625 58.7958333333333 57.8979166666667 62.6041666666667 56.8583333333333 56.6166666666667 39.6291666666667 59.9 54.475 53.5208333333333 73.6520833333333 58.6104166666667 68.6458333333333 60.29375 57.4208333333333 71.6375 68.2645833333333 61.2354166666667 60.9625 63.6833333333333 66.7666666666667 61.3520833333333 58.0229166666667 68.3604166666667 68.9666666666667 68.7979166666667 75.0833333333333 58.5104166666667 76.5541666666667 63.06875 68.1291666666667 50.8791666666667 State- wide Rank (74) 19 74 70 69 54 68 59 27 46 71 45 75 49 73 55 62 72 33 56 64 53 63 67 66 39 52 60 57 35 65 43 48 31 58 50 51 38 41 13 36 44 42 32 23 28 16 30 34 61 22 37 40 3 24 7 21 29 4 9 18 20 14 11 17 26 8 5 6 2 25 1 15 10 47 Total Stage 2 Score 34 34 36 37.6666666666667 37.8333333333333 41.6666666666667 42.5 46.3333333333333 46.8333333333333 47 49 49.3333333333333 50 50.3333333333333 50.6666666666667 51.3333333333333 51.6666666666667 52.1666666666667 52.6666666666667 52.6666666666667 53.1666666666667 53.3333333333333 53.3333333333333 54.6666666666667 55.3333333333333 55.3333333333333 56.33 56.6666666666667 57 57 57.1666666666667 57.3333333333333 57.5 58.1666666666667 59.3333333333333 59.5 60 60.3333333333333 61.6666666666667 62.6666666666667 62.8333333333333 63.8333333333333 64.1666666666667 64.5 66 66.6666666666667 67.8333333333333 68.5 69.5 72.8333333333333 73 73.3333333333333 74.6666666666667 74.6666666666667 75 75.1666666666667 75.3333333333333 76 77 77.1666666666667 78.6666666666667 78.8333333333333 79.6666666666667 80.6666666666667 81 81.3333333333333 82.3333333333333 86.3333333333333 86.6666666666667 88.3333333333333 89.3333333333333 89.6666666666667 90.3333333333333 90.3333333333333