DRAFTREF6StatewideSummary11x17_010213
DRAFT Alaska Renewable Energy Fund Statewide Ranking and Funding Allocation - Round 6 DRAFT January 2, 2013 Count Energy Region ID Project Name Applicant Energy Source Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Post Stage 3 Project Cost Grant Requested Match Offered Type Funding Cumulative Reconn/ Feasibility Permitting /Final Design Construct Phase Recommended for Funding (Top Rank up to $25 million total) 1 Southeast 978 Indian River Hydroelectric Project Construction City of Tenakee Springs DBA Tenakee Springs Electric DepartmentHydro 80.50 1.57 1.70 30.16 9.00 16.10 3.00 11.00 5.00 5.00 79.26 1 $3,674,000 $2,988,000 $332,000 Full SP $2,988,000 $2,988,000 $2,988,000 Construction 2 Bristol Bay 966 High-penetration Wind Energy Project- Kokhanok Kokhanok Electric Wind 74.00 5.68 9.77 35.00 5.25 14.80 4.83 12.25 2.00 3.50 77.63 2 $190,000 $185,000 $5,000 Full $185,000 $3,173,000 $185,000 Construction 3 Bristol Bay 912 Egegik Wind Feasibility Study Lake and Peninsula Borough Wind 72.67 1.42 1.26 35.00 7.50 14.53 2.00 8.50 5.00 4.50 77.03 3 $90,000 $80,000 $10,000 Partial $60,000 $3,233,000 $60,000 Recon 4 Bristol Bay 908 Tazimina Hydroelectric Project Capacity Increase INN Electric Cooperative, Inc.Hydro 91.67 10.97 13.07 26.01 9.75 18.33 4.33 12.38 0.00 4.17 74.97 4 $2,600,000 $160,000 $30,000 Full $160,000 $3,393,000 $160,000 Feasibility 5 Southeast 922 Gartina Falls Hydroelectric Project Inside Passage Electric Cooperative Hydro 78.33 2.26 1.61 27.09 5.25 15.67 3.00 12.13 5.00 4.83 72.97 5 $8,009,000 $6,694,000 $15,000 Full SP $6,694,000 $10,087,000 $6,694,000 Construction 6 Copper River/Chugach 982 Community Facilities Woody Biomass Space Heating Project Mentasta Traditional Council Biomass 82.00 1.76 2.08 29.38 8.25 16.40 3.00 12.63 0.00 3.00 72.65 6 $510,000 $460,000 $50,000 Full SP $460,000 $10,547,000 $88,000 $372,000 DesignConstruction 7 Bristol Bay 944 New Stuyahok Heat Recovery Southwest Region School District Heat Recovery 89.67 4.54 4.54 27.24 5.25 17.93 4.33 12.88 0.00 4.83 72.47 7 $548,000 $486,000 $62,000 Full SP $486,000 $11,033,000 $37,000 $449,000 DesignConstruction 8 Aleutians 967 Cold Bay Waste Heat Recovery Project G&K Electric Utility Heat Recovery 82.33 1.58 1.58 31.34 5.25 16.47 2.00 10.50 2.00 4.50 72.05 8 $114,765 $109,765 $5,000 Partial $30,000 $11,063,000 $30,000 Feasibility 9 Yukon-Koyukok/Upper Tanana 915 Eagle Solar Array Project Alaska Power Company (APC)Solar 83.33 1.82 1.52 25.85 9.75 16.67 4.00 11.25 0.00 4.50 72.01 9 $165,750 $132,600 $33,150 Full $132,600 $11,195,600 $132,600 Construction 10 Bering Straits 939 Stebbins Heat Recovery Project Alaska Village Electric Cooperative, Inc.Heat Recovery 87.33 3.38 4.28 24.35 6.00 17.47 3.17 12.75 4.00 2.83 70.57 10 $1,341,063 $1,319,088 $21,975 Full SP $1,319,088 $12,514,688 $120,179 $1,198,909 Design Construction 11 Yukon-Koyukok/Upper Tanana 927 Galena Community Wood Heat Project City of Galena Biomass 81.50 3.41 4.71 24.50 6.00 16.30 3.00 12.63 5.00 2.83 70.26 11 $2,870,635 $2,787,719 $82,916 Partial $317,788 $12,832,476 $317,788 DesignConstruction 12 Bristol Bay 976 Knutson Creek Hydroelectric Project Design and Permitting Pedro Bay Village Council Hydro 47.83 2.04 2.14 35.00 5.25 9.57 2.50 11.88 4.00 2.00 70.19 12 $3,400,000 $290,000 $2,500 Full SP $290,000 $13,122,476 $290,000 Design 13 Northwest Arctic 941 Heat Recovery for the Water Treatment Plant City of Noorvik Heat Recovery 78.83 1.65 2.25 27.00 6.00 15.77 3.00 10.88 2.00 4.67 69.31 13 $985,808 $985,805 $29,580 Full SP $985,805 $14,108,281 $74,592 $911,213 Design Construction 14 Lower Yukon-Kuskokwim 937 Heat Recovery for the Water Treatment Plant and Washeteria Native Village of Kwinhagak Heat Recovery 84.00 1.96 2.48 23.65 6.00 16.80 3.00 12.75 2.00 4.33 68.53 14 $668,350 $668,350 $20,050 Full SP $668,350 $14,776,631 $56,015 $612,335 Design Construction 15 Bristol Bay 911 Levelock Wind Reconnaissance Study Lake and Peninsula Borough Wind 67.00 1.17 n/a 30.63 6.00 13.40 4.67 4.50 5.00 4.00 68.19 15 $10,000 $10,000 $1,000 Full $10,000 $14,786,631 $10,000 Recon 16 Bering Straits 934 Savoonga Heat Recovery System - Power Plant to Water Plant City of Savoonga Heat Recovery 81.50 1.62 2.21 21.48 5.25 16.30 3.50 11.63 5.00 4.33 67.49 16 $425,701 $425,701 $11,752 Full SP $425,701 $15,212,332 $425,701 Construction 17 Lower Yukon-Kuskokwim 940 Heat Recovery for the Water Treatment Plant & Community Store City of Marshall Heat Recovery 82.67 3.64 4.61 22.27 5.25 16.53 2.67 12.75 5.00 3.00 67.47 17 $183,200 $183,200 $6,000 Full SP $183,200 $15,395,532 $29,600 $153,600 Design Construction 18 Lower Yukon-Kuskokwim 935 Atmautluak Washeteria Heat Recovery Project Atmautluak Traditional Council Heat Recovery 73.67 1.10 1.49 30.63 5.25 14.73 4.00 6.00 2.00 4.00 66.61 18 $360,500 $350,000 $10,500 Full SP $350,000 $15,745,532 $350,000 Construction 19 Aleutians 929 Waterfall Creek Hydroelectric Project City of King Cove Hydro 80.00 2.16 2.11 11.60 12.75 16.00 3.00 12.00 5.00 5.00 65.35 19 $4,300,000 $2,600,000 $1,300,000 Full SP $2,600,000 $18,345,532 $2,600,000 Construction 20 Southeast 917 Blue Lake Hydroelectric Expansion Project City & Borough of Sitka (CBS)Hydro 92.50 2.02 2.02 4.14 14.25 18.50 5.00 13.00 5.00 5.00 64.89 20 $145,000,000 $4,000,000 $4,000,000 Full SP $4,000,000 $22,345,532 $4,000,000 Construction 21 Copper River/Chugach 930 Allison Creek Project *Copper Valley Electric Association, Inc. Hydro 79.33 4.10 4.10 12.44 15.00 15.87 3.50 12.38 0.00 4.83 64.02 21 $38,804,000 $6,114,000 Full SP $6,114,000 $28,459,532 $6,114,000 Construction Subtotal Count = 21 $28,459,532 $260,000 $1,013,174 $27,186,358 Recommended for Funding (Second Rank up to $50 million total) 22 Railbelt 913 Stetson Creek Diversion/Cooper Lake Dam Facilities Project Chugach Electric Association, Inc.Hydro 94.00 5.23 0.58 6.23 15.00 18.80 5.00 13.00 0.00 5.00 63.03 22 $23,808,913 $3,453,920 $17,343,267 Full $3,453,920 $31,913,452 $3,453,920 Construction 23 Yukon-Koyukok/Upper Tanana 933 Biomass Feasibility Studies in Public Facilities, Interior Region Interior Regional Housing Authority Biomass 76.50 1.43 1.05 28.96 0.00 15.30 2.00 9.63 5.00 1.50 62.39 23 168959 $168,959 Full $168,959 $32,082,411 $168,959 Feasibility 24 Lower Yukon-Kuskokwim 942 Heat Recovery for the Water Treatment Plant/Washeteria Building Native Village of Tuntutuliak Heat Recovery 71.50 1.22 1.57 28.44 5.25 14.30 3.00 7.13 2.00 2.17 62.28 24 $438,585 $425,811 $12,774 Full SP $425,811 $32,508,222 $41,884 $383,927 Design Construction 25 Bering Straits 948 Wales Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 62.00 1.04 1.33 28.10 6.00 12.40 3.33 3.75 5.00 3.50 62.09 25 $1,020,000 $190,000 $10,000 Partial $75,000 $32,583,222 $75,000 Feasibility 26 Lower Yukon-Kuskokwim 936 Heat Recovery for the Water System City of Chuathbaluk Heat Recovery 59.67 0.71 0.92 35.00 5.25 11.93 3.00 1.00 2.00 2.67 60.85 26 $199,863 $199,863 $5,996 Full SP $199,863 $32,783,085 $21,218 $178,645 Design Construction 27 Lower Yukon-Kuskokwim 945 St. Mary’s / Pitka’s Point Wind Energy Project Alaska Village Electric Cooperative, Inc.Wind 61.67 1.19 1.15 21.88 9.00 12.33 3.50 4.50 5.00 3.67 59.88 27 $6,153,991 $5,538,592 $615,399 Full SP $5,538,592 $38,321,677 $5,538,592 Construction 28 Southeast 916 Hydaburg Schools Wood Fired Boiler Project Hydaburg City Schools Biomass 90.00 2.85 3.93 10.34 9.00 18.00 3.00 13.00 2.00 4.00 59.34 28 $463,216 $20,000 $5,200 Full $20,000 $38,341,677 $20,000 Design 29 Southeast 906 Coffman Cove Hydropower Line Extension City of Coffman Cove Transmission 77.00 3.52 34.74 19.88 0.00 15.40 3.00 11.63 5.00 4.00 58.91 29 $175,000 $175,000 $36,000 Full SP $175,000 $38,516,677 $25,000 $150,000 DesignConstruction 30 Railbelt 924 Seward Schools Biomass Heating System Kenai Peninsula Borough School District Biomass 89.00 5.54 6.01 8.41 6.00 17.80 3.00 12.88 5.00 4.83 57.92 30 $1,415,234 $1,367,464 $47,770 Full SP $1,367,464 $39,884,141 $100,000 $1,267,464 Design Construction 31 Kodiak 928 Bathymetric survey and marine geological study City of Ouzinkie Transmission 62.50 1.04 1.04 18.12 9.75 12.50 3.00 4.88 5.00 4.67 57.91 31 $6,129,000 $356,400 $25,000 Full SP $356,400 $40,240,541 $356,400 Design 32 Railbelt 931 Nenana Collaborative Biomass Heating System Project Nenana City School District Biomass 84.17 2.02 2.79 9.81 6.00 16.83 3.00 13.13 5.00 4.00 57.77 32 $3,006,607 $466,890 $19,200 Full $466,890 $40,707,431 $466,890 Design 33 Northwest Arctic 952 Cosmos Hills Wind Resource and Intertie Assessment Alaska Village Electric Cooperative, Inc.Wind 40.00 0.64 0.65 32.38 6.00 8.00 2.00 0.38 5.00 3.67 57.42 33 $233,000 $221,350 $11,650 Partial $40,000 $40,747,431 $40,000 Recon Feasibility 34 Yukon-Koyukok/Upper Tanana 981 Tanana Solar Domestic Hot Water Heating Project City of Tanana Solar 57.33 0.53 0.92 31.23 6.00 11.47 2.17 0.38 2.00 4.00 57.24 34 $81,700 $81,700 $50,000 Full SP $81,700 $40,829,131 $81,700 Construction 35 Lower Yukon-Kuskokwim 949 Kotlik Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 59.17 1.10 0.99 25.78 6.00 11.83 1.50 3.38 5.00 3.67 57.15 35 $3,060,000 $142,500 $7,500 Full $142,500 $40,971,631 $142,500 Feasibility 36 Railbelt 943 OIT Inc Waste Heat Turbine Project OIT Inc.Heat Recovery 75.33 2.15 2.15 9.81 14.25 15.07 1.83 12.50 0.00 2.83 56.29 36 $3,258,447 $1,629,223 $1,629,223 Partial SP $225,000 $41,196,631 $225,000 DesignConstruction 37 Northwest Arctic 953 Hotham Peak Wind Resource and lntertie Assessment Alaska Village Electric Cooperative, Inc.Wind 46.83 0.56 0.63 27.13 6.00 9.37 3.50 1.13 5.00 4.00 56.12 37 $23,000,000 $207,100 $10,900 Full $207,100 $41,403,731 $207,100 Feasibility 38 Southeast 983 Wood Heat Feasibility Study and Conceptual Design Organized Village of Kake Biomass 60.50 0.60 0.60 27.01 5.25 12.10 2.33 1.38 5.00 3.00 56.07 38 $30,700 $5,000 Full $30,700 $41,434,431 $30,700 Feasibility 39 Southeast 965 Haines Borough Pellet Heating Project Haines Borough Biomass 85.33 1.77 2.17 9.52 6.75 17.07 3.50 12.75 2.00 3.83 55.42 39 $517,000 $472,000 $45,000 Full $472,000 $41,906,431 $472,000 Design Construction 40 Lower Yukon-Kuskokwim 955 St. Mary’s / Pilot Station Wind Energy Intertie Construction Alaska Village Electric Cooperative, Inc.Wind 52.17 0.92 0.86 22.75 9.00 10.43 2.67 1.13 5.00 3.50 54.48 40 $6,202,000 $5,581,800 $620,200 Full SP $5,581,800 $47,488,231 $5,581,800 Construction 41 Lower Yukon-Kuskokwim 921 AVCP RHA Wood Biomass Heating System**AVCP Regional Housing Authority Biomass 61.00 0.67 0.65 22.24 7.50 12.20 2.00 1.75 5.00 3.33 54.02 41 $3,399,387 $3,149,387 $250,000 Full SP $3,149,387 $50,637,618 $144,006 $3,005,381 Design Construction Subtotal Count = 20 $924,259 $2,885,572 $46,827,787 Ben / Cost Stage 3 Review Scores (max)Cost Request Recommendation Development Phase * If the FY14 appropriations budget is limited to $25M, funding amount for #930 will be reduced by $3,459,532 ** If the FY14 appropriations budget is limited to $50M, funding amount for #921 will be reduced by $637,618.1 DRAFT Alaska Renewable Energy Fund Statewide Ranking and Funding Allocation - Round 6 DRAFT January 2, 2013 Count Energy Region ID Project Name Applicant Energy Source Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Post Stage 3 Project Cost Grant Requested Match Offered Type Funding Cumulative Reconn/ Feasibility Permitting /Final Design Construct Phase Ben / Cost Stage 3 Review Scores (max)Cost Request Recommendation Development Phase Recommended for Funding (Third Rank exceed FY14 recommended appropriation) 42 Northwest Arctic 903 Northwest Arctic Borough Solar PV Northwest Arctic Borough Solar 74.17 1.21 1.21 18.25 0.00 14.83 5.00 5.88 5.00 5.00 53.96 42 $75,000 $75,000 Full $75,000 $50,712,618 $75,000 Design Construction 43 Lower Yukon-Kuskokwim 956 Goodnews Bay Wind Energy Feasibility and Conceptual Design Alaska Village Electric Cooperative, Inc.Wind 55.67 0.88 1.05 25.46 6.00 11.13 2.00 0.00 5.00 3.83 53.42 43 $1,530,000 $142,500 $7,500 Full $142,500 $50,855,118 $142,500 Feasibility 44 Southeast 914 Connelly Lake Hydroelectric Project Alaska Power & Telephone Company Hydro 60.50 4.47 0.11 9.52 10.50 12.10 2.00 11.38 5.00 1.83 52.33 44 $46,475,000 $1,752,000 $438,000 Partial $180,000 $51,035,118 $180,000 Feasibility 45 Bristol Bay 962 Manokotak Wind & Heat Feasibility Study Manokotak Power Company Wind 48.00 0.99 0.66 24.06 5.25 9.60 4.00 1.38 4.00 3.83 52.12 45 $1,020,000 $193,000 $7,000 Partial $143,000 $51,178,118 $143,000 Feasibility 46 Bering Straits 957 Shishmaref Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 54.33 0.87 1.30 25.79 6.00 10.87 1.50 0.00 5.00 2.67 51.83 46 $2,040,000 $142,500 $7,500 Full $142,500 $51,320,618 $142,500 Feasibility 47 Lower Yukon-Kuskokwim 954 St. Mary’s / Mountain Village Wind Energy Intertie Final Design Alaska Village Electric Cooperative, Inc.Wind 45.00 0.78 0.69 24.94 6.75 9.00 2.50 0.00 5.00 3.50 51.69 47 $7,449,000 $332,500 $17,500 Full SP $332,500 $51,653,118 $332,500 Design 48 Southeast 904 Dimond Park Library Geothermal HVAC System City & Borough of Juneau Geothermal 76.17 1.68 0.60 5.29 10.50 15.23 2.50 11.13 2.00 4.50 51.15 48 $875,000 $700,000 $175,000 Partial SP $300,000 $51,953,118 $300,000 Design Construction 49 Railbelt 975 Juniper Creek Hydroelectric Project Feasibility Study Ram Valley LLC Hydro 60.00 1.48 1.55 6.23 11.25 12.00 4.83 8.13 4.00 3.00 49.43 49 $4,300,000 $127,900 $44,800 Partial SP $30,000 $51,983,118 $30,000 Recon 50 Southeast 909 Mahoney Lake Hydroelectric Project: Phase Ill City of Saxman Hydro 49.33 3.08 8.67 4.46 14.25 9.87 1.50 11.75 5.00 1.17 48.00 50 $51,100,000 $1,000,000 $100,000 Partial $500,000 $52,483,118 $500,000 Feasibility 51 Railbelt 959 Ticasuk Brown School Pellet Boiler Project-Phase 2 Fairbanks North Star Borough (FNSB)Biomass 87.17 1.80 1.80 9.81 0.00 17.43 3.17 13.00 0.00 4.50 47.91 51 $350,000 $350,000 Partial $250,000 $52,733,118 $250,000 Construction 52 Yukon-Koyukok/Upper Tanana 926 AGSD District Heat Loop Project Alaska Gateway School District Heat Recovery 42.00 0.72 1.05 21.25 6.00 8.40 2.00 1.00 5.00 4.17 47.82 52 $2,848,939 $2,753,364 $95,575 Full SP $2,753,364 $55,486,482 $349,621 $2,403,743 Design Construction 53 Southeast 907 Petersburg Community Heating System Retrofit Feasibility Study City of Petersburg Biomass 63.83 1.59 n/a 4.46 9.00 12.77 1.17 9.75 5.00 4.50 46.65 53 $51,360 $41,360 $10,000 Full $41,360 $55,527,842 $41,360 Recon Feasibility 54 Railbelt 902 Jack River Hydroelectric Project Feasibility Study Native Village of Cantwell Hydro 58.00 2.43 2.43 9.81 3.00 11.60 2.00 11.75 5.00 1.67 44.82 54 $10,000,000 $213,750 $11,250 Full SP $213,750 $55,741,592 $213,750 Feasibility 55 Southeast 918 West Creek Hydroelectric Project Municipality of Skagway Borough Hydro 42.00 1.45 1.53 9.52 11.25 8.40 1.17 8.25 5.00 1.00 44.59 55 $140,000,000 $236,000 $84,000 Full $236,000 $55,977,592 $236,000 Feasibility 56 Kodiak 901 Karluk Tribal Council – Wind Energy System Karluk Tribal Council Wind 28.17 0.43 0.48 26.25 0.00 5.63 4.00 0.38 5.00 2.67 43.93 56 $1,300,000 $81,000 $300 Partial $70,000 $56,047,592 $70,000 Feasibility Design 57 Kodiak 923 Afognak Biomass Feasibility Study Native Village of Afognak Biomass 57.00 3.47 3.22 8.32 0.00 11.40 0.83 11.88 5.00 3.00 40.43 57 $1,633,974 $170,974 Full SP $170,974 $56,218,566 $170,974 Recon Feasibility 58 Railbelt 977 Carlo Creek Hydroelectric Project Reconnaissance Study Native Village of Cantwell Hydro 39.50 0.94 4.59 9.81 6.00 7.90 2.00 1.25 5.00 3.33 35.29 58 $7,500,000 $66,500 $3,500 Partial $30,000 $56,248,566 $30,000 Recon 59 Railbelt 979 Waste-to-Energy Feasibility Study Chugach Electric Association, Inc.Biofuels 45.67 1.48 1.48 6.23 6.75 9.13 0.00 8.88 0.00 3.50 34.48 59 $550,000 $150,000 Partial $40,000 $56,288,566 $40,000 Feasibility Subtotal Count = 18 $2,864,343 $3,942,693 $49,481,530 Not Recommended for Funding 60 Southeast 905 HydroPower Surplus to Stored Hydrogen Feasibility Study The Southeast Alaska Power Agency Other 0.15 n/a $244,385 $244,385 $5,000 Not Recommended Feasibility 61 Bristol Bay 910 Igiugig Wind Turbine Design Lake and Peninsula Borough Wind 0.52 1.21 $250,000 $205,000 $45,000 Not Recommended Design 62 Southeast 919 Metlakatla-Ketchikan Intertie Metlakatla Indian Community (MIC)Transmission 1.94 1.94 $14,510,599 $9,570,434 Not Recommended DesignConstruction 63 Yukon-Koyukok/Upper Tanana 925 Upper Tanana Biomass CHP Project Alaska Power & Telephone Company Biomass 1.76 1.76 $18,000,000 $1,990,000 $60,000 Not Recommended Design 64 Yukon-Koyukok/Upper Tanana 932 Design and Construction of Biomass Systems in Interior Villages Interior Regional Housing Authority Biomass 1.90 1.47 $1,314,380 $1,314,380 $108,313 Not Recommended Design Construction 65 Southeast 938 Feasibility Study & Conceptual Design -Tenakee Inlet Geothermal Inside Passage Electric Cooperative Geothermal 0.38 1.06 $27,000,000 $3,485,000 Not Recommended Feasibility 66 Northwest Arctic 946 Shungnak Solar Energy Construction Project Alaska Village Electric Cooperative, Inc.Solar 0.66 0.63 $650,000 $585,000 $65,000 Not Recommended Construction 67 Lower Yukon-Kuskokwim 947 Marshall Wind Energy Design and Permitting Project Alaska Village Electric Cooperative, Inc.Wind 0.79 0.85 $2,509,850 $332,500 $17,500 Not Recommended Design 68 Lower Yukon-Kuskokwim 950 Russian Mission Wind Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 0.52 0.89 $1,530,000 $142,500 $7,500 Not Recommended Feasibility 69 Bering Straits 951 St. Michael/Stebbins Wind Energy Final Design and Permitting Alaska Village Electric Cooperative, Inc.Wind 1.64 1.76 $5,000,000 $332,500 $17,500 Not Recommended Design 70 Railbelt 960 TidGen™ Array Project ORPC Alaska 2, LLC Other -0.01 0.01 $8,696,494 $2,000,000 $6,696,494 Not Recommended Construction 71 Aleutians 961 Atka Wind Power Project City of Atka Wind n/a n/a $140,000 $50,000 Not Recommended Recon Feasibility 72 Aleutians 963 Mount Makushin Geothermal Project The Aleut Corporation Geothermal 0.49 3.13 $311,304,000 $32,464,000 $540,000 Not Recommended ReconFeasibilitDesignConstruction 73 Aleutians 968 False Pass Wind Energy Project City of False Pass Electric Utility Wind 0.64 0.30 $190,195 $185,195 $5,000 Not Recommended Design 74 Aleutians 969 Nelson Lagoon Wind Energy Project Nelson Lagoon Electric Cooperative Wind 0.93 0.56 $218,195 $5,000 Not Recommended Design 75 Lower Yukon-Kuskokwim 970 Kipnuk Wind Diesel Power Generation and Heating Kipnuk Light Plant Wind 0.81 1.49 $4,067,778 $2,567,778 $1,500,000 Not Recommended Design Construction 76 Copper River/Chugach 971 Eastern Copper Basin Geothermal Assessment Copper Valley Development Association Geothermal 0.68 0.00 $0 $695,950 Not Recommended Recon 77 Lower Yukon-Kuskokwim 972 Akiak Wind Resource Assessment Akiak Native Community/ Akiak IRA Council Wind 0.58 1.24 $2,000,000 $181,000 Not Recommended Feasibility 78 Bering Straits 973 Elim Geothermal Resource Assessment I Feasibility City of Elim Geothermal 0.28 0.39 $10,000,000 $527,908 Not Recommended Recon 79 Bristol Bay 980 Bristol Bay Borough School District Energy Project Bristol Bay Borough School District Solar 1.45 1.06 $460,000 $45,000 $10,000 Not Recommended Design Construction 80 Northwest Arctic 984 Noatak Wind Resource Assessment Noatak IRA Wind 0.98 1.53 $2,000,000 $181,000 Not Recommended Feasibility Design 81 Southeast 920 Walker Lake Hydro Feasibility Project Tlingit-Haida Regional Electric Authority Hydro 29.50 0.01 0.01 $690,000 $640,000 $50,000 Not Pass Stage 2 Design Feasibility Recon 82 Southeast 964 Excursion Inlet Hydro Project- Phase II Haines Borough Hydro 29.83 1.09 1.86 $15,900,000 $213,536 $10,000 Not Pass Stage 2 Feasibility 83 Southeast 974 Neck Lake Hydro Project Alaska Power Company (APC)Hydro 28.83 0.74 0.88 $2,777,885 $297,600 $74,400 Not Pass Stage 2 Feasibility Design 84 Southeast 958 Wrangell Power Plant Upgrade City & Borough of Wrangell Hydro Transmission $117,136 $117,136 Not Pass Stage 1 FeasibilityDesignConstruction 85 Lower Yukon-Kuskokwim 985 Electrical Power Lines -Western Alaska Nuvista Light & Electric Cooperative, Inc.Transmission Wind $82,000 $82,000 Not Pass Stage 1 Recon Subtotal Count = 26 GRAND TOTAL Count = 85 $1,004,824,649 $122,594,232 $37,197,134 * If the FY14 appropriations budget is limited to $25M, funding amount for #930 will be reduced by $3,459,532 ** If the FY14 appropriations budget is limited to $50M, funding amount for #921 will be reduced by $637,618.2