Loading...
HomeMy WebLinkAboutPostStage4REF6Statewide11x17_010813DRAFT Alaska Renewable Energy Fund Statewide Ranking and Funding Allocation - Round 6 Post Stage 4 Regional Spread DRAFT January 8, 2013 Post Stage 3 Rank Energy Region ID Project Name Applicant Energy Source Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Post Stage 4 Project Cost Grant Requested Match Offered Type Funding Cumulative Reconn/ Feasibility Permitting /Final Design Construct Phase 1 Southeast 978 Indian River Hydroelectric Project Construction City of Tenakee Springs DBA Tenakee Springs Electric DepartmentHydro 80.50 1.57 1.70 30.16 9.00 16.10 3.00 11.00 5.00 5.00 79.26 $3,674,000 $2,988,000 $332,000 Full SP $2,988,000 $2,988,000 $2,988,000 Construction 2 Bristol Bay 966 High-penetration Wind Energy Project- Kokhanok Kokhanok Electric Wind 74.00 5.68 9.77 35.00 5.25 14.80 4.83 12.25 2.00 3.50 77.63 $190,000 $185,000 $5,000 Full $185,000 $3,173,000 $185,000 Construction 3 Bristol Bay 912 Egegik Wind Feasibility Study Lake and Peninsula Borough Wind 72.67 1.42 1.26 35.00 7.50 14.53 2.00 8.50 5.00 4.50 77.03 $90,000 $80,000 $10,000 Partial $60,000 $3,233,000 $60,000 Recon 4 Bristol Bay 908 Tazimina Hydroelectric Project Capacity Increase INN Electric Cooperative, Inc.Hydro 91.67 10.97 13.07 26.01 9.75 18.33 4.33 12.38 0.00 4.17 74.97 $2,600,000 $160,000 $30,000 Full $160,000 $3,393,000 $160,000 Feasibility 5 Southeast 922 Gartina Falls Hydroelectric Project Inside Passage Electric Cooperative Hydro 78.33 2.26 1.61 27.09 5.25 15.67 3.00 12.13 5.00 4.83 72.97 $8,009,000 $6,694,000 $15,000 Full SP $6,694,000 $10,087,000 $6,694,000 Construction 6 Copper River/Chugach 982 Community Facilities Woody Biomass Space Heating Project Mentasta Traditional Council Biomass 82.00 1.76 2.08 29.38 8.25 16.40 3.00 12.63 0.00 3.00 72.65 $510,000 $460,000 $50,000 Full SP $460,000 $10,547,000 $88,000 $372,000 Construction Design 7 Bristol Bay 944 New Stuyahok Heat Recovery Southwest Region School District Heat Recovery 89.67 4.54 4.54 27.24 5.25 17.93 4.33 12.88 0.00 4.83 72.47 $548,000 $486,000 $62,000 Full SP $486,000 $11,033,000 $37,000 $449,000 Construction Design 8 Aleutians 967 Cold Bay Waste Heat Recovery Project G&K Electric Utility Heat Recovery 82.33 1.58 1.58 31.34 5.25 16.47 2.00 10.50 2.00 4.50 72.05 $114,765 $109,765 $5,000 Partial $30,000 $11,063,000 $30,000 Feasibility 9 Bering Straits 939 Stebbins Heat Recovery Project Alaska Village Electric Cooperative, Inc.Heat Recovery 87.33 3.38 4.28 24.35 6.00 17.47 3.17 12.75 4.00 2.83 70.57 $1,341,063 $1,319,088 $21,975 Full SP $1,319,088 $12,382,088 $120,179 $1,198,909 Design Construction 10 Yukon-Koyukok/Upper Tanana 927 Galena Community Wood Heat Project City of Galena Biomass 81.50 3.41 4.71 24.50 6.00 16.30 3.00 12.63 5.00 2.83 70.26 $2,870,635 $2,787,719 $82,916 Partial $317,788 $12,699,876 $317,788 Construction Design 11 Bristol Bay 976 Knutson Creek Hydroelectric Project Design and Permitting Pedro Bay Village Council Hydro 47.83 2.04 2.14 35.00 5.25 9.57 2.50 11.88 4.00 2.00 70.19 $3,400,000 $290,000 $2,500 Full SP $290,000 $12,989,876 $290,000 Design 12 Northwest Arctic 941 Heat Recovery for the Water Treatment Plant City of Noorvik Heat Recovery 78.83 1.65 2.25 27.00 6.00 15.77 3.00 10.88 2.00 4.67 69.31 $985,808 $985,805 $29,580 Full SP $985,805 $13,975,681 $74,592 $911,213 Design Construction 13 Lower Yukon-Kuskokwim 937 Heat Recovery for the Water Treatment Plant and Washeteria Native Village of Kwinhagak Heat Recovery 84.00 1.96 2.48 23.65 6.00 16.80 3.00 12.75 2.00 4.33 68.53 $668,350 $668,350 $20,050 Full SP $668,350 $14,644,031 $56,015 $612,335 Design Construction 14 Bristol Bay 911 Levelock Wind Reconnaissance Study Lake and Peninsula Borough Wind 67.00 1.17 30.63 6.00 13.40 4.67 4.50 5.00 4.00 68.19 $10,000 $10,000 $1,000 Full $10,000 $14,654,031 $10,000 Recon 15 Yukon-Koyukok/Upper Tanana 915 Eagle Solar Array Project Alaska Power Company (APC)Solar 68.17 1.23 1.52 25.85 9.75 13.63 4.00 5.63 0.00 4.33 63.19 $165,750 $132,600 $33,150 Full SP $132,600 $14,786,631 $132,600 Construction 16 Bering Straits 934 Savoonga Heat Recovery System - Power Plant to Water Plant City of Savoonga Heat Recovery 81.50 1.62 2.21 21.48 5.25 16.30 3.50 11.63 5.00 4.33 67.49 $425,701 $425,701 $11,752 Full SP $425,701 $15,212,332 $425,701 Construction 17 Lower Yukon-Kuskokwim 940 Heat Recovery for the Water Treatment Plant and Community Store City of Marshall Heat Recovery 82.67 3.64 4.61 22.27 5.25 16.53 2.67 12.75 5.00 3.00 67.47 $183,200 $183,200 $6,000 Full SP $183,200 $15,395,532 $29,600 $153,600 Design Construction 18 Lower Yukon-Kuskokwim 935 Atmautluak Washeteria Heat Recovery Project Atmautluak Traditional Council Heat Recovery 73.67 1.10 1.49 30.63 5.25 14.73 4.00 6.00 2.00 4.00 66.61 $360,500 $350,000 $10,500 Full SP $350,000 $15,745,532 $350,000 Construction 19 Aleutians 929 Waterfall Creek Hydroelectric Project City of King Cove Hydro 80.00 2.16 2.11 11.60 12.75 16.00 3.00 12.00 5.00 5.00 65.35 $4,300,000 $2,600,000 $1,300,000 Full SP $2,600,000 $18,345,532 $2,600,000 Construction 20 Southeast 917 Blue Lake Hydroelectric Expansion Project City & Borough of Sitka (CBS)Hydro 92.50 2.02 2.02 4.14 14.25 18.50 5.00 13.00 5.00 5.00 64.89 $145,000,000 $4,000,000 $4,000,000 Full SP $4,000,000 $22,345,532 $4,000,000 Construction 21 Copper River/Chugach 930 Allison Creek Project Copper Valley Electric Association, Inc. (CVEA)Hydro 79.33 4.10 4.10 12.44 15.00 15.87 3.50 12.38 0.00 4.83 64.02 $38,804,000 $6,114,000 Full SP $6,114,000 $28,459,532 $6,114,000 Construction 22 Railbelt 913 Stetson Creek Diversion/Cooper Lake Dam Facilities Project Chugach Electric Association, Inc.Hydro 94.00 5.23 0.58 6.23 15.00 18.80 5.00 13.00 0.00 5.00 63.03 $23,808,913 $3,453,920 $17,343,267 Full $3,453,920 $31,913,452 $3,453,920 Construction 23 Yukon-Koyukok/Upper Tanana 933 Biomass Feasibility Studies in Public Facilities, Interior Region Interior Regional Housing Authority Biomass 76.50 1.43 1.05 28.96 0.00 15.30 2.00 9.63 5.00 1.50 62.39 $168,959 $168,959 Full $168,959 $32,082,411 $168,959 Feasibility 24 Lower Yukon-Kuskokwim 942 Heat Recovery for the Water Treatment Plant/Washeteria Building Native Village of Tuntutuliak Heat Recovery 71.50 1.22 1.57 28.44 5.25 14.30 3.00 7.13 2.00 2.17 62.28 $438,585 $425,811 $12,774 Full SP $425,811 $32,508,222 $41,884 $383,927 Design Construction 25 Bering Straits 948 Wales Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 62.00 1.04 1.33 28.10 6.00 12.40 3.33 3.75 5.00 3.50 62.09 $1,020,000 $190,000 $10,000 Partial $75,000 $32,583,222 $75,000 Feasibility 26 Lower Yukon-Kuskokwim 936 Heat Recovery for the Water System City of Chuathbaluk Heat Recovery 59.67 0.71 0.92 35.00 5.25 11.93 3.00 1.00 2.00 2.67 60.85 $199,863 $199,863 $5,996 Full SP $199,863 $32,783,085 $21,218 $178,645 Design Construction 27 Lower Yukon-Kuskokwim 945 St. Mary’s / Pitka’s Point Wind Energy Project Alaska Village Electric Cooperative, Inc.Wind 61.67 1.19 1.15 21.88 9.00 12.33 3.50 4.50 5.00 3.67 59.88 $6,153,991 $5,538,592 $615,399 Full SP $5,538,592 $38,321,677 $5,538,592 Construction 28 Southeast 916 Hydaburg Schools Wood Fired Boiler Project Hydaburg City Schools Biomass 90.00 2.85 3.93 10.34 9.00 18.00 3.00 13.00 2.00 4.00 59.34 $463,216 $20,000 $5,200 Full $20,000 $38,341,677 $20,000 Design 29 Southeast 906 Coffman Cove Hydropower Line Extension City of Coffman Cove Transmission 77.00 3.52 34.74 19.88 0.00 15.40 3.00 11.63 5.00 4.00 58.91 $175,000 $175,000 $36,000 Full SP $175,000 $38,516,677 $25,000 $150,000 Construction Design 30 Railbelt 924 Seward Schools Biomass Heating System Kenai Peninsula Borough School District (KPBSD)Biomass 89.00 5.54 6.01 8.41 6.00 17.80 3.00 12.88 5.00 4.83 57.92 $1,415,234 $1,367,464 $47,770 Full SP $1,367,464 $39,884,141 $100,000 $1,267,464 Design Construction 31 Kodiak 928 Bathymetric survey and marine geological study to refine submarine cable route for Kodiak-Ouzinkie Electrical Inter-tie projectCity of Ouzinkie Transmission 62.50 1.04 1.04 18.12 9.75 12.50 3.00 4.88 5.00 4.67 57.91 $6,129,000 $356,400 $25,000 Full SP $356,400 $40,240,541 $356,400 Design 32 Railbelt 931 Nenana Collaborative Biomass Heating System Project Nenana City School District Biomass 84.17 2.02 2.79 9.81 6.00 16.83 3.00 13.13 5.00 4.00 57.77 $3,006,607 $466,890 $19,200 Full $466,890 $40,707,431 $466,890 Design 33 Northwest Arctic 952 Cosmos Hills Wind Resource and Intertie Assessment Alaska Village Electric Cooperative, Inc.Wind 40.00 0.64 0.65 32.38 6.00 8.00 2.00 0.38 5.00 3.67 57.42 $233,000 $221,350 $11,650 Partial $40,000 $40,747,431 $40,000 Feasibility Recon 34 Yukon-Koyukok/Upper Tanana 981 Tanana Solar Domestic Hot Water Heating Project City of Tanana Solar 57.33 0.53 0.92 31.23 6.00 11.47 2.17 0.38 2.00 4.00 57.24 $81,700 $81,700 $50,000 Full SP $81,700 $40,829,131 $81,700 Construction 35 Lower Yukon-Kuskokwim 949 Kotlik Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 59.17 1.10 0.99 25.78 6.00 11.83 1.50 3.38 5.00 3.67 57.15 $3,060,000 $142,500 $7,500 Full $142,500 $40,971,631 $142,500 Feasibility 36 Yukon-Koyukok/Upper Tanana 925 Upper Tanana Biomass CHP Project Alaska Power & Telephone Company Biomass 65.50 1.12 1.49 21.25 6.00 13.10 2.50 7.63 3.00 2.83 56.31 $18,000,000 $1,990,000 $60,000 Partial $400,000 $41,371,631 $1,990,000 Design 37 Railbelt 943 OIT Inc Waste Heat Turbine Project OIT Inc.Heat Recovery 75.33 2.15 2.15 9.81 14.25 15.07 1.83 12.50 0.00 2.83 56.29 $3,258,447 $1,629,223 $1,629,223 Partial SP $225,000 $41,596,631 $225,000 Construction Design 38 Northwest Arctic 953 Hotham Peak Wind Resource and lntertie Assessment Alaska Village Electric Cooperative, Inc.Wind 46.83 0.56 0.63 27.13 6.00 9.37 3.50 1.13 5.00 4.00 56.12 $23,000,000 $207,100 $10,900 Full $207,100 $41,803,731 $207,100 Feasibility 39 Southeast 983 Wood Heat Feasibility Study and Conceptual Design for the Organized Village of KakeOrganized Village of Kake Biomass 60.50 0.60 0.60 27.01 5.25 12.10 2.33 1.38 5.00 3.00 56.07 $30,700 $5,000 Full $30,700 $41,834,431 $30,700 Feasibility 40 Southeast 965 Haines Borough Pellet Heating Project Haines Borough Biomass 85.33 1.77 2.17 9.52 6.75 17.07 3.50 12.75 2.00 3.83 55.42 $517,000 $472,000 $45,000 Full $472,000 $42,306,431 $472,000 Design Construction 41 Lower Yukon-Kuskokwim 955 St. Mary’s / Pilot Station Wind Energy Intertie Construction Project Alaska Village Electric Cooperative, Inc.Wind 52.17 0.92 0.86 22.75 9.00 10.43 2.67 1.13 5.00 3.50 54.48 $6,202,000 $5,581,800 $620,200 Full SP $5,581,800 $47,888,231 $5,581,800 Construction 46 Bristol Bay 962 Manokotak Wind & Heat Feasibility Study Manokotak Power Company Wind 48.00 0.99 0.66 24.06 5.25 9.60 4.00 1.38 4.00 3.83 52.12 $1,020,000 $193,000 $7,000 Partial $143,000 $48,031,231 $143,000 Feasibility 53 Yukon-Koyukok/Upper Tanana 926 AGSD District Heat Loop Project Alaska Gateway School District Heat Recovery 42.00 0.72 1.05 21.25 6.00 8.40 2.00 1.00 5.00 4.17 47.82 $2,848,939 $2,753,364 $95,575 Full SP $2,753,364 $50,784,595 $349,621 $2,403,743 Design Construction Ben / Cost Stage 3 Review Scores (max)Cost Request Recommendation Development Phase * If the FY14 appropriations budget is limited to $25M, funding amount for #930 would be reduced by 3,459,532 ** If the FY14 appropriations budget is limited to $50M, funding amount for #926 would be reduced by $784,595 1 DRAFT Alaska Renewable Energy Fund Statewide Ranking and Funding Allocation - Round 6 Post Stage 4 Regional Spread DRAFT January 8, 2013 Post Stage 3 Rank Energy Region ID Project Name Applicant Energy Source Total Stage 2 Score AEA B/C Appl B/C 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Post Stage 4 Project Cost Grant Requested Match Offered Type Funding Cumulative Reconn/ Feasibility Permitting /Final Design Construct Phase Ben / Cost Stage 3 Review Scores (max)Cost Request Recommendation Development Phase 42 Lower Yukon-Kuskokwim 921 AVCP RHA Wood Biomass Heating System AVCP Regional Housing Authority Biomass 61.00 0.67 0.65 22.24 7.50 12.20 2.00 1.75 5.00 3.33 54.02 $3,399,387 $3,149,387 $250,000 Full SP $3,149,387 $53,933,982 $144,006 $3,005,381 Design Construction 43 Northwest Arctic 903 Northwest Arctic Borough Solar PV Northwest Arctic Borough Solar 74.17 1.21 1.21 18.25 0.00 14.83 5.00 5.88 5.00 5.00 53.96 $75,000 $75,000 Full $75,000 $54,008,982 $75,000 Design Construction 44 Lower Yukon-Kuskokwim 956 Goodnews Bay Wind Energy Feasibility and Conceptual Design ProjectAlaska Village Electric Cooperative, Inc.Wind 55.67 0.88 1.05 25.46 6.00 11.13 2.00 0.00 5.00 3.83 53.42 $1,530,000 $142,500 $7,500 Full $142,500 $54,151,482 $142,500 Feasibility 45 Southeast 914 Connelly Lake Hydroelectric Project Alaska Power & Telephone Company Hydro 60.50 4.47 0.11 9.52 10.50 12.10 2.00 11.38 5.00 1.83 52.33 $46,475,000 $1,752,000 $438,000 Partial $180,000 $54,331,482 $180,000 Feasibility 47 Bering Straits 957 Shishmaref Wind Energy Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 54.33 0.87 1.30 25.79 6.00 10.87 1.50 0.00 5.00 2.67 51.83 $2,040,000 $142,500 $7,500 Full $142,500 $54,473,982 $142,500 Feasibility 48 Lower Yukon-Kuskokwim 954 St. Mary’s / Mountain Village Wind Energy Intertie Final Design Alaska Village Electric Cooperative, Inc.Wind 45.00 0.78 0.69 24.94 6.75 9.00 2.50 0.00 5.00 3.50 51.69 $7,449,000 $332,500 $17,500 Full SP $332,500 $54,806,482 $332,500 Design 49 Southeast 904 Dimond Park Library Geothermal HVAC System City & Borough of Juneau Geothermal 76.17 1.68 0.60 5.29 10.50 15.23 2.50 11.13 2.00 4.50 51.15 $875,000 $700,000 $175,000 Partial SP $300,000 $55,106,482 $300,000 Design Construction 50 Railbelt 975 Juniper Creek Hydroelectric Project Feasibility Study Ram Valley LLC Hydro 60.00 1.48 1.55 6.23 11.25 12.00 4.83 8.13 4.00 3.00 49.43 $4,300,000 $127,900 $44,800 Partial SP $30,000 $55,136,482 $30,000 Recon 51 Southeast 909 Mahoney Lake Hydroelectric Project: Phase Ill City of Saxman Hydro 49.33 3.08 8.67 4.46 14.25 9.87 1.50 11.75 5.00 1.17 48.00 $51,100,000 $1,000,000 $100,000 Partial $500,000 $55,636,482 $500,000 Feasibility 52 Railbelt 959 Ticasuk Brown School Pellet Boiler Project-Phase 2 Fairbanks North Star Borough (FNSB)Biomass 87.17 1.80 1.80 9.81 0.00 17.43 3.17 13.00 0.00 4.50 47.91 $350,000 $350,000 Partial $250,000 $55,886,482 $250,000 Construction 54 Southeast 907 Petersburg Community Heating System Retrofit Feasibility Study City of Petersburg Biomass 63.83 1.59 4.46 9.00 12.77 1.17 9.75 5.00 4.50 46.65 $51,360 $41,360 $10,000 Full $41,360 $55,927,842 $41,360 Feasibility Recon 55 Lower Yukon-Kuskokwim 947 Marshall Wind Energy Design and Permitting Project Alaska Village Electric Cooperative, Inc.Wind 42.67 0.79 0.85 22.27 6.75 8.53 2.50 0.00 4.00 2.50 46.55 $2,509,850 $332,500 $17,500 Full SP $332,500 $56,260,342 $332,500 Design 56 Railbelt 902 Jack River Hydroelectric Project Feasibility Study Native Village of Cantwell Hydro 58.00 2.43 2.43 9.81 3.00 11.60 2.00 11.75 5.00 1.67 44.82 $10,000,000 $213,750 $11,250 Full SP $213,750 $56,474,092 $213,750 Feasibility 57 Southeast 918 West Creek Hydroelectric Project Municipality of Skagway Borough Hydro 42.00 1.45 1.53 9.52 11.25 8.40 1.17 8.25 5.00 1.00 44.59 $140,000,000 $236,000 $84,000 Full $236,000 $56,710,092 $236,000 Feasibility 58 Kodiak 901 Karluk Tribal Council – Wind Energy System Karluk Tribal Council Wind 28.17 0.43 0.48 26.25 0.00 5.63 4.00 0.38 5.00 2.67 43.93 $1,300,000 $81,000 $300 Partial $70,000 $56,780,092 $70,000 Feasibility Design 59 Kodiak 923 Afognak Biomass Feasibility Study Native Village of Afognak Biomass 57.00 3.47 3.22 8.32 0.00 11.40 0.83 11.88 5.00 3.00 40.43 $1,633,974 $170,974 Full SP $170,974 $56,951,066 $170,974 Recon Feasibility 60 Railbelt 977 Carlo Creek Hydroelectric Project Reconnaissance Study Native Village of Cantwell Hydro 39.50 0.94 4.59 9.81 6.00 7.90 2.00 1.25 5.00 3.33 35.29 $7,500,000 $66,500 $3,500 Partial $30,000 $56,981,066 $30,000 Recon 61 Railbelt 979 Waste-to-Energy Feasibility Study Chugach Electric Association, Inc.Biofuels 45.67 1.48 1.48 6.23 6.75 9.13 0.00 8.88 0.00 3.50 34.48 $550,000 $150,000 Partial $40,000 $57,021,066 $40,000 Feasibility 62 Northwest Arctic 946 Shungnak Solar Energy Construction Project Alaska Village Electric Cooperative, Inc.Solar 0.66 0.63 $650,000 $585,000 $65,000 Not Recommended Construction 63 Aleutians 961 Atka Wind Power Project City of Atka Wind $140,000 $50,000 Not Recommended Feasibility Recon 64 Bristol Bay 910 Igiugig Wind Turbine Design Lake and Peninsula Borough Wind 0.52 1.21 $250,000 $205,000 $45,000 Not Recommended Design 65 Aleutians 969 Nelson Lagoon Wind Energy Project Nelson Lagoon Electric Cooperative Wind 0.93 0.56 $218,195 $5,000 Not Recommended Design 66 Southeast 938 Feasibility Study and Conceptual Design of Tenakee Inlet Geothermal ResourceInside Passage Electric Cooperative Geothermal 0.38 1.06 $27,000,000 $3,485,000 Not Recommended Feasibility 67 Lower Yukon-Kuskokwim 970 Kipnuk Wind Diesel Power Generation and Heating Kipnuk Light Plant Wind 0.81 1.49 $4,067,778 $2,567,778 $1,500,000 Not Recommended Design Construction 68 Yukon-Koyukok/Upper Tanana 932 Design and Construction of Biomass Systems in Interior Villages Interior Regional Housing Authority Biomass 1.90 1.47 $1,314,380 $1,314,380 $108,313 Not Recommended Design Construction 69 Bering Straits 951 St. Michael/Stebbins Wind Energy Final Design and Permitting ProjectAlaska Village Electric Cooperative, Inc.Wind 1.64 1.76 $5,000,000 $332,500 $17,500 Not Recommended Design 70 Lower Yukon-Kuskokwim 950 Russian Mission Wind Feasibility and Conceptual Design Project Alaska Village Electric Cooperative, Inc.Wind 0.52 0.89 $1,530,000 $142,500 $7,500 Not Recommended Feasibility 71 Northwest Arctic 984 Noatak Wind Resource Assessment Noatak IRA Wind 0.98 1.53 $2,000,000 $181,000 Not Recommended Feasibility Design 72 Bering Straits 973 Elim Geothermal Resource Assessment I Feasibility City of Elim Geothermal 0.28 0.39 $10,000,000 $527,908 Not Recommended Recon 73 Aleutians 968 False Pass Wind Energy Project City of False Pass Electric Utility Wind 0.64 0.30 $190,195 $185,195 $5,000 Not Recommended Design 74 Railbelt 960 TidGen™ Array Project ORPC Alaska 2, LLC Other -0.01 0.01 $8,696,494 $2,000,000 $6,696,494 Not Recommended Construction 75 Lower Yukon-Kuskokwim 972 Akiak Wind Resource Assessment Akiak Native Community/ Akiak IRA Council Wind 0.58 1.24 $2,000,000 $181,000 Not Recommended Feasibility 76 Bristol Bay 980 Bristol Bay Borough School District Energy Project Bristol Bay Borough School District Solar 1.45 1.06 $460,000 $45,000 $10,000 Not Recommended Design Construction 77 Aleutians 963 Mount Makushin Geothermal Project The Aleut Corporation Geothermal 0.49 3.13 $311,304,000 $32,464,000 $540,000 Not Recommended Construction Design Feasibility Recon 78 Copper River/Chugach 971 Eastern Copper Basin Geothermal Assessment Copper Valley Development Association Geothermal 0.68 0.00 $0 $695,950 Not Recommended Recon 79 Southeast 905 HydroPower Surplus to Stored Hydrogen Feasibility Study The Southeast Alaska Power Agency Other 0.15 $244,385 $244,385 $5,000 Not Recommended Feasibility 80 Southeast 919 Metlakatla-Ketchikan Intertie Metlakatla Indian Community (MIC)Transmission 1.94 1.94 $14,510,599 $9,570,434 Not Recommended Construction Design 81 Southeast 974 Neck Lake Hydro Project Alaska Power Company (APC)Hydro 28.83 0.74 0.88 $2,777,885 $297,600 $74,400 Not Pass Stage 2 Feasibility Design 82 Southeast 920 Walker Lake Hydro Feasibility Project Tlingit-Haida Regional Electric Authority Hydro 29.50 0.01 0.01 $690,000 $640,000 $50,000 Not Pass Stage 2 Design Feasibility Recon 83 Southeast 964 Excursion Inlet Hydro Project- Phase II Haines Borough Hydro 29.83 1.09 1.86 $15,900,000 $213,536 $10,000 Not Pass Stage 2 Feasibility 84 Southeast 958 Wrangell Power Plant Upgrade City & Borough of Wrangell Hydro Transmission $117,136 $117,136 Not Pass Stage 1 Design Feasibility Construction 85 Lower Yukon-Kuskokwim 985 Electrical Power Lines -Western Alaska Nuvista Light & Electric Cooperative, Inc.Transmission Wind $82,000 $82,000 Not Pass Stage 1 Recon $1,004,824,649 $122,594,232 $37,197,134 $57,021,066 $2,864,343 $6,265,193 $49,481,530 * If the FY14 appropriations budget is limited to $25M, funding amount for #930 would be reduced by 3,459,532 ** If the FY14 appropriations budget is limited to $50M, funding amount for #926 would be reduced by $784,595 2