HomeMy WebLinkAboutEvaluation Process ReviewEvaluation Process Review:
1. Offer assistance to all potential applicants in advance of deadline, track assistance provided
2. Received, date stamped
3. Entry into database
4. Stage 1 Review: eligibility of applicant, proposal, completeness
5. Assignment to AEA project managers, DNR, Economists
6. Stage 2 begins: 6-week comprehensive review
7. Stage 2 scoring: Technical and economic evaluation
8. Stage 3 scoring: uses Stage 2 score, combined with ranking criteria (cost of energy)
9. Stage 4 scoring: statewide spread:
10. At any rejection point, reconsideration point, ED decides
11. REFAC review and recommendations, (review of scoring criteria, published after review)
12. Recommendations to Legislature by 10th day of session.
Rounds 1-6 updates:
Map and charts of R6
R 1-6 by the numbers
Summary: saving 11-12M gal of diesel this year!!
Preparing to send out R6 grants in July. Expecting fairly quick turn-around, 23 grants.
RFA
Start with what was approved and incorporated at last meeting (see matrix)
P10 Hi/Lo cost areas:
• To modernize and keep current communities that are high/low
• Need to further define
• For Heat projects: Nat Gas: Y/N
• For electric projects: below $.20 vs at or above $.20c
• Applicants provide current price at time of application
• Impact:
• Max Grant increases $4-$8M
o GVEA goes from $4M to $8
• Max Grant decreases from $8-$4M
o Kodiak Electric
o Homer Electric
o City of Seward
o North Slope Borough
o Barroe Utilities
o Hyder (BC Electric)
o Metlakatla
• Variability between years: Only 2 changes in last 3 years:
o Pelican Utility between 2008-2009
o Golden Valley Electric from 2008-2010