HomeMy WebLinkAboutREFAC Nome Presentation 2013 11 08 (JCraft)Banner Peak Wind Farm Nome, Alaska AOC Entegrity 15-50 Wind Turbine •Built by Bering Straits Native Corporation •1.17 megawatts of installed nameplate capacity •200,000 gallons of diesel displaced •Valued at nearly $600,000 Nome Power Plants •Installed two EWT 900*52 wind turbines in July 2013 •Total nameplate capacity increased to 2.84 MW •EWT turbines expected to produce 5,400 MWh/year (~20-25% of Nome’s demand)