HomeMy WebLinkAboutREFAC Nome Presentation 2013 11 08 (JCraft)Banner Peak Wind Farm
Nome, Alaska
AOC Entegrity 15-50 Wind Turbine
•Built by Bering Straits Native Corporation
•1.17 megawatts of installed nameplate capacity
•200,000 gallons of diesel displaced
•Valued at nearly $600,000
Nome Power Plants
•Installed two EWT 900*52
wind turbines in July 2013
•Total nameplate capacity
increased to 2.84 MW
•EWT turbines expected to
produce 5,400 MWh/year