HomeMy WebLinkAboutREF7 Recommendations Draft 12.31.13Count
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
H
H
S
H
H
H
S
H
H
S
S
S
H
H
S
S
S
H
H
H
H
H
H
H
S
H
H
H
H
S
S
H
H
S
H
S
S
H
S
H
H
H
H
S
S
H
S
S
S
S
S
H
H
S
S
H
S
S
H
H
H
S
S
Not Recommended Projects:
S
S
S
S
S
S
S
S
S
H
H
S
S
S
S
S
S
S
S
H
S
S
S
Energy Region
Aleutians
Yukon-Koyukok/Upper Tanana
Bristol Bay
Yukon-Koyukok/Upper Tanana
Lower Yukon-Kuskokwim
Southeast
Bering Straits
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Lower Yukon-Kuskokwim
Southeast
Southeast
Railbelt
Copper River/Chugach
Southeast
Bering Straits
Railbelt
Southeast
Sub Totals, Top Ranking $20 Million (prior to stage 4 regional spreading)
Lower Yukon-Kuskokwim
Yukon-Koyukok/Upper Tanana
Southeast
Lower Yukon-Kuskokwim
Bristol Bay
Lower Yukon-Kuskokwim
Southeast
Yukon-Koyukok/Upper Tanana
Southeast
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Northwest Arctic
Aleutians
Yukon-Koyukok/Upper Tanana
Kodiak
Southeast
Southeast
Railbelt
Southeast
Lower Yukon-Kuskokwim
Southeast
Lower Yukon-Kuskokwim
Aleutians
Aleutians
Copper River/Chugach
Southeast
Kodiak
Lower Yukon-Kuskokwim
North Slope
Railbelt
Southeast
Southeast
Bristol Bay
Aleutians
Railbelt
Railbelt
Copper River/Chugach
Yukon-Koyukok/Upper Tanana
Railbelt
Railbelt
Bristol Bay
North Slope
Sub Totals, All Recommended Projects
Southeast
Railbelt
Southeast
Railbelt
Aleutians
Northwest Arctic
Kodiak
Northwest Arctic
Southeast
Bristol Bay
Lower Yukon-Kuskokwim
Southeast
Southeast
Southeast
Bristol Bay
Bristol Bay
Northwest Arctic
Bristol Bay
Copper River/Chugach
Northwest Arctic
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Sub Totals, Not Recommended Projects
Grand Total, All Applications
Notes
This document represents AEA's draft recommendations for consideration by the REFAC committee. This is a draft document only and is subject to change prior to AEA's final recommendations.
This view combines the heat and "standard application 'projects, for perspective. Please see the sepate heat and standard lists.
If REF 7 funding is limited to $20M exactly, #1021, Haines Borough Municipal Building Biomass would be partially funded.
H = Heat application, applications that deliver heat only, not electricity
S = Standard spplication, applications that deliver electricity, energy storage, transmission or a combination of electricity and heat.
B/C = Benefit/Cost Ratio over the life of the project.
AEA B/C ratio uses AEA's best assumptions in the standard REF economic model
SP = Special Provisions
The Applicant B/C ratio uses the applicants assumptions in the standard REF economic model.
Total Stage 2 Score column is the technical and economic evaluation score and is on a scale of 0 to 100. A minimum score of 40 is required to pass stage 2.
Match offered is applicant's offered cash and in-kind match, including supporting energy efficiency work and wood harvest value where applicable.
Some not recommended projects' B/C ratios may be incomplete due to incomplete information provided or other reasons.
ID
1026
1044
1036
1047
1052
1011
1068
1085
1061
1027
1077
1067
1087
1037
1082
1015
1025
1040
1031
1021**
1043
1032
1053
1073
1072
1041
1017
1045
1016
1057
1069
1071
1038
1083
1060
1065
1023
1013
1084
1010
1042
1033
1074
1062
1070
1014
1022
1030
1066
1049
1028
1007
1012
1079
1080
1009
1081
1075
1051
1078
1055
1018
1048
1019
1002
1024
1029
1056
1059
1004
1001
1003
1006
1008
1020
1034
1035
1046
1050
1058
1063
1064
1076
1039
1054
1086
Project Name
Atka Dispatchable Heat
Venetie Clinic Heat Recovery
Packers Creek Hydroelectric Project Phase II
Galena Community Wood Heat Project
Nunam Iqua Heat Recovery Project
Sitka Centennial Hall Air Source Heat Pump
Stebbins St Michael Wind Energy Final Design and Permitting
Tuntutuliak Heat Recovery
Emmonak Heat Recovery System
Chisana Mountain Wind Feasibility Project
Yerrick Creek Hydroelectric Project
Mountain Village Wind Feasibility and Conceptual Design
Kake Community Energy
Ketchikan Gateway Borough Biomass Heating Project
Stetson Creek Diversion Cooper Lake Dam Facilities Project
Allison Creek Hydroelectric Project Construction
Gunnuk Creek Hydroelectric Feasibility Study
Brevig Mission Water System Heat Recovery
Seldovia House Ground Source Heat Pump Project
Haines Borough Municipal Buildings Biomass Project
St Marys Heat Recovery System
Biomass Heat for Minto Community Buildings
Yakutat Biomass District Heating Loop
Kongiganak Wind Heat Electrical Thermal Storage
Igiugig Wind Resource Feasibility and Conceptual Design
Chevak Water and Vacuum Plant Heat Recovery
Southeast Island School District Wood Boilers
Grayling Heat Recovery System
Hydaburg Schools Wood Fired Boiler Project
Mertarvik Renewable Energy Feasibility and Conceptual Design
St Marys Pitkas Point Wind Energy Construction Project
Kwigillingok Wind Heat Electrical Thermal Storage
Kotzebue Paper and Wood Waste to Energy Project
Waterfall Creek Hydroelectric Project
Holy Cross Water System Heat Recovery
Old Harbor Hydroelectric Project Final Design and Permitting
Swan Lake Reservoir Expansion Project
Sitka Kettleson Library Air Source Heat Pump
Juniper Creek Hydroelectric Reconnaissance Study
Craig High School Wood Heat Conversion
Eek Water System Heat Recovery
Sitka Sea Water Source Heat Pump Project
Tuntutuliak Wind Heat Electrical Thermal Storage
False Pass Hydrokinetic Feasibility Study
Sand Point Energy Storage Project
Wood Chip Boiler for The Native Village of Tazlina
SEAPA Wind Resource Assessment Phase I and II
Flywheels ESS for Kodiak Pier Electric Crane
Marshall Wind Energy Final Design and Permitting Project
Atqasuk Transmission Line Design and Permitting Project
Carlo Creek Hydroelectric Project Reconnaissance Study
Mendenhall Valley Library Geothermal HVAC System
Sitka Wastewater Treatment Plant Effluent Heat Pump
Koliganek Wind Diesel and Heat Recovery
False Pass Wind Energy Project
Nenana Collaborative Biomass Heating System Project
Waste to Energy Reconnaissance Study
Cascade Creek Hydroelectric Project Feasibility Study
AGSD Extension of Heating Loop
Chickaloon Solar Thermal and Biomass Project
Alaska SeaLife Center Heat Recovery Project
Chignik Hydroelectric Project Design and Permitting
Kaktovik Wind Diesel Design and Permitting
Survey Creek Hydroelectric Project
Poncelet Kinetics RHK100 Prototype Demonstration
Walker Lake Hydro Project Feasibility
Jack River Hydroelectric Project Feasibility Study
Adak Wind Data Collection Analysis and Preliminary Design
Cosmos Hills Hydroelectric Design and Permitting
Karluk Tribal Council Wind Energy System
Northwest Arctic Borough Solar PV Project
Mahoney Lake Hydroelectric Phase III and IV
NEA Stack Heat to Power Project
Chuathbaluk Water System Heat Recovery
Excursion Inlet Hydro Project Feasibility and Conceptual Design
Metlakatla to Ketchikan Intertie
Feasibility Study of Tenakee Inlet Geothermal Resource
Port Alsworth Hydropower PreConstruction Phase
Bristol Bay Borough School District Solar PV Project
Noatak Utility Size Photovoltaic Array Construction Project
Iliamna Solar Ground Mounted Energy System
Chenega Bay Hydroelectric Construction
NWAB School District Solar Thermal Systems
Four Villages lntertie Design
Multiple Alternative Energy Sources for Napakiak
Chefornak High Penetration Wind Diesel System
Applicant
City of Atka
Village of Venetie
Chignik Lagoon Village Council
City of Galena
City of Nunam Iqua
City and Borough of Sitka
Alaska Village Electric Cooperative, Inc.
Native Village of Tuntutuliak
City of Emmonak
Alaska Power Company
Native Village of Tanacross
Alaska Village Electric Cooperative, Inc.
Organized Village of Kake
Ketchikan Gateway Borough
Chugach Electric Association, Inc.
Copper Valley Electric Association, Inc.
Inside Passage Electric Cooperative
City of Brevig Mission
Cook Inlet Housing Authority
Haines Borough
City of St. Mary's
Village of Minto
City and Borough of Yakutat
Puvurnaq Power Company
Igiugig Village Council
City of Chevak
Southeast Island School District
City of Grayling
Hydaburg City School District
Ungusraq Power Company UPC / Newtok Traditional Council
Alaska Village Electric Cooperative, Inc.
Kwig Power Company
City of Kotzebue
City of King Cove
City of Holy Cross
Alaska Village Electric Cooperative, Inc.
The Southeast Alaska Power Agency
City and Borough of Sitka
Ram Valley, LLC
Craig City School District
City of Eek
City and Borough of Sitka
TCSA Electrical Services
City of False Pass
TDX Sand Point Generating, LLC
Native Village of Tazlina
The Southeast Alaska Power Agency
Kodiak Electric Association, Inc.
Alaska Village Electric Cooperative, Inc.
North Slope Borough
Native Village of Cantwell
City & Borough of Juneau
City and Borough of Sitka
New Koliganek Village Council
City of False Pass Electric Utility
Nenana School District
Chugach Electric Association, Inc.
Blue Hole Properties, LLC (BHP)
Alaska Gateway School District
Chickaloon Native Village
City of Seward
City of Chignik
North Slope Borough
Edna Bay Community
Whitestone Power and Communications
Tlingit-Haida Regional Electrical Authority
Native Village Of Cantwell
City of Adak, Alaska
Alaska Village Electric Cooperative
Karluk Tribal Council
Northwest Arctic Borough
City of Saxman
Naknek Electric Association, Inc.
City of Chuathbaluk
Haines Borough
Metlakatla Indian Community
Inside Passage Electric Cooperative
Port Alsworth Improvement Corporation
Bristol Bay Borough School District
Northwest Arctic Borough
Iliamna Village Council
Native Village of Chenega
Northwest Arctic Borough School District
Nuvista Light and Electric Cooperative
Napakiak lrcinraq Power Company
Naterqak Light Plant, City of Chefornak
Applicant Type
Local Government
Government Entity
Government Entity
Local Government
Local Government
Local Government
Utility
Government Entity
Government Entity
Utility
Government Entity
Utility
Government Entity
Local Government
Utility
Utility
Utility
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Local Government
Utility
Government Entity
Government Entity
Government Entity
Government Entity
Government Entity
IPP
Utility
Utility
Local Government
Local Government
Government Entity
Utility
Government Entity
Local Government
IPP
Government Entity
Government Entity
Utility
Local Government
Utility
Government Entity
Government Entity
Utility
Utility
Local Government
Government Entity
Local Government
Local Government
Government Entity
Local Government
Government Entity
Utility
IPP
Government Entity
Government Entity
Local Government
Local Government
Local Government
Local Government
IPP
Utility
Government Entity
Local Government
Utility
Government Entity
Local Government
Local Government
Utility
Government Entity
Local Government
Government Entity
Utility
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Government Entity
Government Entity
Utility
Local Government
Energy Source
Hydro to Heat
Heat Recovery
Hydro
Biomass
Heat Recovery
Heat Pumps
Wind
Heat Recovery
Heat Recovery
Wind
Hydro
Wind
Biomass
Biomass
Hydro
Hydro
Hydro
Heat Recovery
Heat Pumps
Biomass
Heat Recovery
Biomass
Biomass
Wind to Heat
Wind
Heat Recovery
Biomass
Heat Recovery
Biomass
Wind
Wind
Wind to Heat
Biomass
Hydro
Heat Recovery
Hydro
Hydro
Heat Pumps
Hydro
Biomass
Heat Recovery
Heat Pumps
Wind to Heat
Hydrokinetic
Storage of Renewable
Biomass
Wind
Storage of Renewable
Wind
Transmission
Hydro
Heat Pumps
Heat Pumps
Wind
Wind
Biomass
Biomass
Hydro
Heat Recovery
Biomass
Heat Recovery
Hydro
Wind
Hydro
Hydrokinetic
Hydro
Hydro
Wind
Hydro
Wind
Solar PV
Hydro
Heat Recovery
Heat Recovery
Hydro
Transmission
Geothermal
Hydro
Solar PV
Solar PV
Solar PV
Hydro
Solar Thermal
Transmission
Wind
Wind
Total Stage 2 Score
82.8333333333333
85.1666666666667
86.3333333333333
88
87.6666666666667
80.5
83.3333333333333
81.3333333333333
87.6666666666667
85
58.3333333333333
79.1666666666667
73.8333333333333
84.3333333333333
94.3333333333333
89.3333333333333
73
83
58.1666666666667
88.5
85.1666666666667
69.3333333333333
67.6666666666667
74.1666666666667
47
85.3333333333333
76.6666666666667
80.1666666666667
77.8333333333333
53
65
64.17
62.8333333333333
71.1666666666667
57.6666666666667
56.3333333333333
81.1666666666667
61.1666666666667
73.1666666666667
66.3333333333333
70.1666666666667
54.8333333333333
46.6666666666667
42.83
47.5
64.5
90.3333333333333
66.8333333333333
52.1666666666667
74.1666666666667
61
49.3333333333333
57.6666666666667
52.33
46.3333333333333
54.6666666666667
61.5
45.8333333333333
59.8333333333333
43.6666666666667
57.6666666666667
52.1666666666667
65.8333333333333
39.3333333333333
39.1666666666667
37
35.3333333333333
35.3333333333333
27.5
21.1666666666667
Ben / Cost
AEA B/C
3.18
1.68
1.66
4.31
2.2
1.69
1.8
1.54
2.56
2.55
4.23
1.7
1.62
2.15
7.11
3.96
4.28
1.51
1.12
1.72
1.61
1.02
1.45
1.7
0.86
1.83
1.47
1.47
1.91
1.14
1.19
1.52
1.12
1.37
0.55
1.11
4.07
0.91
2.45
1.12
1.01
0.5
1
0.22
1.08
1.19
1.84
0.51
0.98
3.3
1.9
0.86
0.73
1.05
0.67
0.66
1.31
1.3
0.97
0.74
1.13
1.02
1.03
1.48
0.16
1.05
0.79
0.47
0.71
0.76
0.68
1.79
1.39
0.97
0.09
1.77
0.44
1.52
0.96
1.24
0.01
1.14
1.48
Appl B/C
6.9
2.45
3.85
3.96
2.33
3.58
2.74
2.32
4.02
9.84
1.23
1.18
0.24
0.89
3.68
0
2.01
0.94
1.79
2.21
1.37
2.31
2.55
1.4
2.44
2.32
2.02
2.45
1.47
1.73
1.16
1.87
0.74
1.79
4.07
1.87
3.49
1.54
1.35
0.52
0.96
0.22
1.01
1.84
1.02
1.6
3.55
1.88
0.74
1.06
1.6
0.61
1.11
1.34
3.46
1.45
0.79
4.41
1.6
1.37
1.37
0.16
1.21
0.27
1.05
1.83
0.83
6.91
6.44
0.98
3.93
1.28
1.24
1.28
1.22
0.4
1.02
3.14
Cost of Energy ($/kWh)
0.7017
0.9
0.6917
0.5633
0.53
0.0947
0.5583
0.65
0.551
0.4904
0.4904
0.544
0.6204
0.102
0.1549
0.2844
0.6204
0.5358
0.1973
0.2202
0.4936
0.5894
0.5031
0.5584
0.803
0.4844
0.4082
0.5551
0.2402
0.8
0.4936
0.5975
0.4176
0.2801
0.5333
0.5762
0.1022
0.0947
0.1511
0.2855
0.6036
0.0947
0.65
0.5132
0.5841
0.2844
0.1022
0.1903
0.504
0.15
0.2242
0.121
0.0947
0.505
0.5132
0.2242
0.1549
0.2844
0.4904
0.1511
0.105
0.4756
0.15
N/A
0.2242
0.6219
0.2242
0.8116
0.743
0.6
0.4176
0.1022
0.5046
0.8495
N/A
0.0967
0.6539
0.6827
0.5046
0.74
0.594
0.435
0.6337
Fuel Price $/gal
7.65
8.5
6.02
4.38
3.59
6.8
5.77
5.85
3.59
5.29
5.19
4.09
4.6
5
5.05
6.21
4.3
3.8
5
4.2
5.95
6.07
7.15
3.59
3.8
3.89
3.59
6.8
4.17
4.12
3.59
4.06
3.79
3.71
Stage 3 Review Scores (max)
1. Cost of Energy (35)
33.47
35
30.26
26.34
19.16
15.71
24.42
29.75
25.24
21.46
21.46
23.8
25.59
15.71
6.78
12.44
27.14
23.14
22.71
17.89
20.13
21.88
22.09
27.17
35
18.81
16.63
21.88
18.38
35
21.6
26.03
26.56
12.26
31.28
25.21
4.47
15.71
6.61
16.63
17.02
15.71
29.75
22.45
22.55
18.24
4.47
8.32
22.05
6.56
9.81
18.03
15.71
22.09
22.45
17.76
6.78
12.44
16.58
16.23
4.59
20.81
6.56
2. Match (15)
11
6
11
6
13
15
7
6
6
11
15
7
7
11
15
15
7
6
15
9
6
15
11
6
13
6
11
6
7
7
9
6
7
15
6
7
15
15
15
11
6
15
6
13
9
6
7
15
7
9
9
11
9
6
9
7
15
11
6
11
9
0
9
3.
Tech & Econ Feas
(20)
16.57
17.03
17.27
17.6
17.53
16.1
16.67
16.27
17.53
17
11.67
15.83
14.7666666666667
16.87
18.87
17.87
14.6
16.6
11.63
17.7
17.0333333333333
13.8666666666667
13.5333333333333
14.8333333333333
9.4
17.0666666666667
15.3333333333333
16.0333333333333
15.5666666666667
10.6
13
12.8333333333333
12.5666666666667
14.2333333333333
11.5333333333333
11.2666666666667
16.2333333333333
12.2333333333333
14.6333333333333
13.2666666666667
14.0333333333333
10.9666666666667
9.33333333333333
8.57
9.5
12.9
18.0666666666667
13.3666666666667
10.4333333333333
14.8333333333333
12.2
9.86666666666667
11.5333333333333
10.47
9.26666666666667
10.9333333333333
12.3
9.16666666666667
11.9666666666667
8.73333333333333
11.5333333333333
10.4333333333333
13.1666666666667
4.
Readi- ness (5)
5
8
5
3.84
3
5
3
3.84
4
2.5
3
2.5
2
3.67
5
4
2
5
4.5
3.84
3.84
3
2
2.84
2.5
3
3
3.84
3
2
5
2.84
2
2.84
4
2
3
5
2
3
5
4
2.84
2.5
3
3
2
3.5
2.5
2.5
1.5
4
5
3.84
2.5
3
0
3
4
3
4.5
3.5
3
5. Benefit (15)
12
11.25
11
14.125
12.5
10.75
11.625
10.125
12.5
12.5
11.25
11.625
12
13
12.875
12.125
11.625
10.25
5.25
12.625
11.25
5.375
8.875
12.375
0
12.5
9.75
9
13.5
4.5
4.5
10
6
7.625
1.25
5.375
11.25
1.75
11.25
6.375
4.5
0.5
2.125
0.75
4.125
6.25
13.125
3.25
1.5
12.375
11.625
0.625
0.75
4.13
0.375
1
8.25
6.375
3.375
0.75
4.875
4.875
4
6.
Local Supt
(5)
3
4
5
5
5
5
5
3
3
2
5
5
4
5
5
2
2
4
5
2
5
5
5
0
3
5
5
4
3
2
5
2
5
5
5
5
5
5
4
2
5
5
2
5
2
4
5
5
5
2
5
4
5
2
4
5
2
5
2
2
5
0
2
7. Sustan-ability
(5)
4
3.33333333333333
3.83333333333333
4.5
3.5
4.83333333333333
4.5
3
2.66666666666667
4.16666666666667
3.16666666666667
4.5
4
3.5
5
5
3.83333333333333
3.16666666666667
3.83333333333333
4.5
4.16666666666667
3.16666666666667
4.16666666666667
3
3.16666666666667
2.83333333333333
4
3.5
3.5
1.66666666666667
4.33333333333333
2.5
3
5
2.83333333333333
4.5
5
4.83333333333333
3.83333333333333
3.5
3.83333333333333
4.16666666666667
2.5
2.5
4
3
3.66666666666667
4
3.83333333333333
5
3
4.5
4.83333333333333
3.16666666666667
1.66666666666667
4
4
1.33333333333333
4
4.16666666666667
5
4
4.5
Total (100)
85.04
84.6133333333333
83.3633333333333
77.405
73.69
72.3933333333333
72.215
71.985
70.9366666666667
70.6266666666667
70.5466666666667
70.255
69.3566666666667
68.75
68.525
68.435
68.1983333333333
68.1566666666667
67.9233333333333
67.555
67.42
67.2883333333333
66.665
66.2183333333333
66.0666666666667
65.21
64.7133333333333
64.2533333333333
63.9466666666667
62.7666666666667
62.4333333333333
62.2033333333333
62.1266666666667
61.9583333333333
61.8966666666667
60.3516666666667
59.9533333333333
59.5266666666667
57.3266666666667
55.7716666666667
55.3866666666667
55.3433333333333
54.5483333333333
54.77
54.175
53.39
53.3283333333333
52.4366666666667
52.3166666666667
52.2683333333333
52.135
52.0216666666667
51.8266666666667
51.6966666666667
49.2583333333333
48.6933333333333
48.33
48.315
47.9216666666667
45.88
44.4983333333333
43.6183333333333
42.2266666666667
State- wide Rank
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
Project Cost
Project Cost
135254
204428
5389149
3144200
603000
232620
3946050
469311
689251
148800
19000000
4833000
1423292
1957261
21772523
49000000
300000
753313
362805
1374892
115739149
757299
403550
335456
320456
110000
558814
1058775
332590
627900
8000000
4782528
302737
2692700
5500000
497773
8155000
13391869
230200
2350000
585450
297408
388838
259817
5000000
1397403
278150
170583
3800000
3214875
17342837
8340000
825000
962984
2566000
52050
3244225
TBD
2250000
629000
152867
250000
BLANK
4565200
222719483
3562772
1940558
825000
31500000
72400000
38660000
1300000
77000
51000000
1940379
232430
14500000
14510599
49000000
7224213
235000
447800
2000000
1650000
467252
1250000
2284000
4358784
301365787
524085270
Grant Requested
114965
198474
2352653
3096898
450000
232620
342000
455642
689251
119000
6000000
123500
208073
1412889
3453920
5914491
275000
731372
318289
1237403
27726440
735242
274750
286166
311456
80000
558814
940950
322903
583900
375000
4274575
293737
2495189
800000
497773
1092500
4000000
230200
35750
492850
288745
373838
250817
428646
1256403
267150
158771
1900000
353400
2017818
54000
660000
849984
306000
47050
367965
150000
170000
625000
127065
225000
1375000
440000
59100847
62272
1560558
700000
213750
160000
2922000
81000
76000
4000000
1843379
225660
213536
9281615
3378500
159000
230000
447800
800000
1400000
456252
1250000
141000
4308784
33911106
93011953
Match Offered
20289
11908
3036496
47302
153000
1021393
18000
13669
20677
29800
11500000
6500
20000
353222
13591226
5914491
25000
21941
411835
137448
36354197
22057
278800
49290
9000
30000
16765
177825
19374
44000
25000
507953
9000
95000
1900000
14933
57500
8813869
192891
35750
82550
8663
825000
9000
137820
141000
11000
11812
1900000
18600
201782
6000
165000
113000
10000
5000
25800
100000
30000
4000
25802
25000
0
44000
52554033
3500
120000
125000
11250
0
150000
300
1000
4000000
97000
6770
10000
0
0
10000
5000
0
120000
0
11000
0
20000
50000
4740820
57294853
Type
Construction
DesignConstruction
Construction
Construction
Construction
DesignConstruction
Design
Design Construction
DesignConstruction
Feasibility
Construction
Feasibility
Design
Construction
Construction
Construction
ReconFeasibility
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
Construction
Feasibility
DesignConstruction
Construction
DesignConstruction
DesignConstruction
ReconFeasibility
Construction
Construction
DesignConstruction
Construction
DesignConstruction
Design
DesignConstruction
DesignConstruction
Recon
DesignConstruction
DesignConstruction
DesignConstruction
Construction
Feasibility
DesignConstruction
DesignConstruction
ReconFeasibility
Construction
Design
Design
Recon
DesignConstruction
DesignConstruction
Design
Feasibility
Design
Recon
Feasibility
DesignConstruction
DesignConstruction
Construction
Design
Design
Recon
Construction
ReconFeasibility
Feasibility
Feasibility
Design
FeasibilityDesign
Construction
DesignConstruction
FeasibilityDesign
Construction
DesignConstruction
Feasibility
DesignConstruction
Feasibility
ReconFeasibility
DesignConstruction
Construction
ReconFeasibility
DesignConstruction
Construction
Feasibility
DesignConstruction
DesignConstruction
Recommendation
AEA Recomnd
Full
Full
Full
Full SP
Full
Full
Full
Full
Full SP
Full
Partial
Full
Partial
Partial SP
Full
Full
Partial SP
Full
Full
Full SP
SubTotal
Full
Full SP
Partial SP
Full SP
Full SP
Full SP
Full SP
Full
Partial SP
Partial SP
Full SP
Full SP
Partial SP
Full SP
Full
Partial
Partial SP
Full
Full
Partial SP
Full
Partial SP
Full SP
Full SP
Partial SP
Partial SP
Full
Partial SP
Full SP
Full SP
Partial
Full
Full
Full SP
Full SP
Full
Partial
Full
Full
Partial SP
Full
Partial SP
Full
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Did Not Pass Stage 1
Did Not Pass Stage 1
Did Not Pass Stage 1
Early
X
X
X
X
X
X
X
X
X
X
Recommend Funding
114965
198474
2352653
3096898
450000
232620
342000
455642
689251
119000
75000
123500
175000
620000
3453920
5914491
80000
731372
318289
1237403
20780478
735242
274750
103000
311456
80000
558814
940950
322903
125000
75000
4274575
293737
270000
800000
497773
400000
560488
230200
35750
125000
288745
56841
250817
428646
200000
125000
158771
1470548
353400
2017818
35000
660000
849984
306000
47050
367965
50000
170000
625000
97000
225000
500000
440000
41518701
41518701
Cumulative Funding
114965
313439
2666092
5762990
6212990
6445610
6787610
7243252
7932503
8051503
8126503
8250003
8425003
9045003
12498923
18413414
18493414
19224786
19543075
20780478
**
21515720
21790470
21893470
22204926
22284926
22843740
23784690
24107593
24232593
24307593
28582168
28875905
29145905
29945905
30443678
30843678
31404166
31634366
31670116
31795116
32083861
32140702
32391519
32820165
33020165
33145165
33303936
34774484
35127884
37145702
37180702
37840702
38690686
38996686
39043736
39411701
39461701
39631701
40256701
40353701
40578701
41078701
41518701
TOTAL
Count
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
Not Recommended Projects:
H
H
H
Energy Region
Aleutians
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Lower Yukon-Kuskokwim
Southeast
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Southeast
Southeast
Bering Straits
Railbelt
Southeast
Sub Totals, Top Ranking $20 Million (prior to stage 4 regional spreading)
Lower Yukon-Kuskokwim
Yukon-Koyukok/Upper Tanana
Southeast
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Southeast
Yukon-Koyukok/Upper Tanana
Southeast
Lower Yukon-Kuskokwim
Northwest Arctic
Yukon-Koyukok/Upper Tanana
Southeast
Southeast
Lower Yukon-Kuskokwim
Southeast
Lower Yukon-Kuskokwim
Copper River/Chugach
Southeast
Southeast
Railbelt
Yukon-Koyukok/Upper Tanana
Railbelt
Railbelt
Sub Totals, All Recommended Projects
Bristol Bay
Lower Yukon-Kuskokwim
Northwest Arctic
Sub Totals, Not Recommended Projects
Grand Total, All Applications
Notes
This document represents AEA's draft recommendations for consideration by the REFAC committee. This is a draft document only and is subject to change prior to AEA's final recommendations.
H = Heat application, applications that deliver heat only, not electricity
S = Standard spplication, applications that deliver electricity, energy storage, transmission or a combination of electricity and heat.
B/C = Benefit/Cost Ratio over the life of the project.
AEA B/C ratio uses AEA's best assumptions in the standard REF economic model
SP = Special Provisions
The Applicant B/C ratio uses the applicants assumptions in the standard REF economic model.
Total Stage 2 Score column is the technical and economic evaluation score and is on a scale of 0 to 100. A minimum score of 40 is required to pass stage 2.
Match offered is applicant's offered cash and in-kind match, including supporting energy efficiency work and wood harvest value where applicable.
Some not recommended projects' B/C ratios may be incomplete due to incomplete information provided or other reasons.
ID
1026
1044
1047
1052
1011
1085
1061
1087
1037
1040
1031
1021**
1043
1032
1053
1073
1041
1017
1045
1016
1071
1038
1060
1013
1010
1042
1033
1074
1014
1007
1012
1009
1051
1078
1055
1006
1008
1076
Project Name
Atka Dispatchable Heat
Venetie Clinic Heat Recovery
Galena Community Wood Heat Project
Nunam Iqua Heat Recovery Project
Sitka Centennial Hall Air Source Heat Pump
Tuntutuliak Heat Recovery
Emmonak Heat Recovery System
Kake Community Energy
Ketchikan Gateway Borough Biomass Heating Project
Brevig Mission Water System Heat Recovery
Seldovia House Ground Source Heat Pump Project
Haines Borough Municipal Buildings Biomass Project
St Marys Heat Recovery System
Biomass Heat for Minto Community Buildings
Yakutat Biomass District Heating Loop
Kongiganak Wind Heat Electrical Thermal Storage
Chevak Water and Vacuum Plant Heat Recovery
Southeast Island School District Wood Boilers
Grayling Heat Recovery System
Hydaburg Schools Wood Fired Boiler Project
Kwigillingok Wind Heat Electrical Thermal Storage
Kotzebue Paper and Wood Waste to Energy Project
Holy Cross Water System Heat Recovery
Sitka Kettleson Library Air Source Heat Pump
Craig High School Wood Heat Conversion
Eek Water System Heat Recovery
Sitka Sea Water Source Heat Pump Project
Tuntutuliak Wind Heat Electrical Thermal Storage
Wood Chip Boiler for The Native Village of Tazlina
Mendenhall Valley Library Geothermal HVAC System
Sitka Wastewater Treatment Plant Effluent Heat Pump
Nenana Collaborative Biomass Heating System Project
AGSD Extension of Heating Loop
Chickaloon Solar Thermal and Biomass Project
Alaska SeaLife Center Heat Recovery Project
NEA Stack Heat to Power Project
Chuathbaluk Water System Heat Recovery
NWAB School District Solar Thermal Systems
Applicant
City of Atka
Village of Venetie
City of Galena
City of Nunam Iqua
City and Borough of Sitka
Native Village of Tuntutuliak
City of Emmonak
Organized Village of Kake
Ketchikan Gateway Borough
City of Brevig Mission
Cook Inlet Housing Authority
Haines Borough
City of St. Mary's
Village of Minto
City and Borough of Yakutat
Puvurnaq Power Company
City of Chevak
Southeast Island School District
City of Grayling
Hydaburg City School District
Kwig Power Company
City of Kotzebue
City of Holy Cross
City and Borough of Sitka
Craig City School District
City of Eek
City and Borough of Sitka
TCSA Electrical Services
Native Village of Tazlina
City & Borough of Juneau
City and Borough of Sitka
Nenana School District
Alaska Gateway School District
Chickaloon Native Village
City of Seward
Naknek Electric Association, Inc.
City of Chuathbaluk
Northwest Arctic Borough School District
Applicant Type
Local Government
Government Entity
Local Government
Local Government
Local Government
Government Entity
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Local Government
Utility
Government Entity
Government Entity
Government Entity
Government Entity
Utility
Local Government
Government Entity
Local Government
Government Entity
Government Entity
Utility
Government Entity
Local Government
Local Government
Government Entity
Government Entity
Government Entity
Local Government
Utility
Government Entity
Government Entity
Energy Source
Hydro to Heat
Heat Recovery
Biomass
Heat Recovery
Heat Pumps
Heat Recovery
Heat Recovery
Biomass
Biomass
Heat Recovery
Heat Pumps
Biomass
Heat Recovery
Biomass
Biomass
Wind to Heat
Heat Recovery
Biomass
Heat Recovery
Biomass
Wind to Heat
Biomass
Heat Recovery
Heat Pumps
Biomass
Heat Recovery
Heat Pumps
Wind to Heat
Biomass
Heat Pumps
Heat Pumps
Biomass
Heat Recovery
Biomass
Heat Recovery
Heat Recovery
Heat Recovery
Solar Thermal
Total Stage 2 Score
82.8333333333333
85.1666666666667
88
87.6666666666667
80.5
81.3333333333333
87.6666666666667
73.8333333333333
84.3333333333333
83
58.1666666666667
88.5
85.1666666666667
69.3333333333333
67.6666666666667
74.1666666666667
85.3333333333333
76.6666666666667
80.1666666666667
77.8333333333333
64.17
62.8333333333333
57.6666666666667
61.1666666666667
66.3333333333333
70.1666666666667
54.8333333333333
46.6666666666667
64.5
49.3333333333333
57.6666666666667
54.6666666666667
59.8333333333333
43.6666666666667
57.6666666666667
Ben / Cost
AEA B/C
3.18
1.68
4.31
2.2
1.69
1.54
2.56
1.62
2.15
1.51
1.12
1.72
1.61
1.02
1.45
1.7
1.83
1.47
1.47
1.91
1.52
1.12
0.55
0.91
1.12
1.01
0.5
1
1.19
0.86
0.73
0.66
0.97
0.74
1.13
1.39
0.97
1.48
Appl B/C
6.9
2.45
3.96
2.33
3.58
2.32
4.02
1.18
0.24
2.01
0.94
1.79
2.21
1.37
2.31
2.55
2.44
2.32
2.02
2.45
1.73
1.16
0.74
1.87
1.54
1.35
0.52
0.96
1.84
0.74
1.06
1.11
1.45
0.79
4.41
6.44
0.98
3.14
Cost of Energy ($/kWh)
0.7017
0.9
0.5633
0.53
0.0947
0.65
0.551
0.6204
0.102
0.5358
0.1973
0.2202
0.4936
0.5894
0.5031
0.5584
0.4844
0.4082
0.5551
0.2402
0.5975
0.4176
0.5333
0.0947
0.2855
0.6036
0.0947
0.65
0.2844
0.121
0.0947
0.2242
0.4904
0.1511
0.105
0.5046
0.8495
0.6337
Fuel Price $/gal
7.65
8.5
6.02
4.38
3.59
6.8
5.77
5.85
3.59
5.29
5.19
4.09
4.6
5
5.05
6.21
4.3
3.8
5
4.2
5.95
6.07
7.15
3.59
3.8
3.89
3.59
6.8
4.17
4.12
3.59
4.06
3.79
3.71
Stage 3 Review Scores (max)
1. Cost of Energy (35)
33.47
35
26.34
19.16
15.71
29.75
25.24
25.59
15.71
23.14
22.71
17.89
20.13
21.88
22.09
27.17
18.81
16.63
21.88
18.38
26.03
26.56
31.28
15.71
16.63
17.02
15.71
29.75
18.24
18.03
15.71
17.76
16.58
16.23
4.59
2. Match (15)
11
6
6
13
15
6
6
7
11
6
15
9
6
15
11
6
6
11
6
7
6
7
6
15
11
6
15
6
6
11
9
7
6
11
9
3.
Tech & Econ Feas
(20)
16.57
17.03
17.6
17.53
16.1
16.27
17.53
14.7666666666667
16.87
16.6
11.63
17.7
17.0333333333333
13.8666666666667
13.5333333333333
14.8333333333333
17.0666666666667
15.3333333333333
16.0333333333333
15.5666666666667
12.8333333333333
12.5666666666667
11.5333333333333
12.2333333333333
13.2666666666667
14.0333333333333
10.9666666666667
9.33333333333333
12.9
9.86666666666667
11.5333333333333
10.9333333333333
11.9666666666667
8.73333333333333
11.5333333333333
4.
Readi- ness (5)
5
8
3.84
3
5
3.84
4
2
3.67
5
4.5
3.84
3.84
3
2
2.84
3
3
3.84
3
2.84
2
4
5
3
5
4
2.84
3
4
5
3
4
3
4.5
5. Benefit (15)
12
11.25
14.125
12.5
10.75
10.125
12.5
12
13
10.25
5.25
12.625
11.25
5.375
8.875
12.375
12.5
9.75
9
13.5
10
6
1.25
1.75
6.375
4.5
0.5
2.125
6.25
0.625
0.75
1
3.375
0.75
4.875
6.
Local Supt
(5)
3
4
5
5
5
3
3
4
5
4
5
2
5
5
5
0
5
5
4
3
2
5
5
5
2
5
5
2
4
4
5
5
2
2
5
7. Sustan-ability
(5)
4
3.33333333333333
4.5
3.5
4.83333333333333
3
2.66666666666667
4
3.5
3.16666666666667
3.83333333333333
4.5
4.16666666666667
3.16666666666667
4.16666666666667
3
2.83333333333333
4
3.5
3.5
2.5
3
2.83333333333333
4.83333333333333
3.5
3.83333333333333
4.16666666666667
2.5
3
4.5
4.83333333333333
4
4
4.16666666666667
5
Total (100)
85.04
84.6133333333333
77.405
73.69
72.3933333333333
71.985
70.9366666666667
69.3566666666667
68.75
68.1566666666667
67.9233333333333
67.555
67.42
67.2883333333333
66.665
66.2183333333333
65.21
64.7133333333333
64.2533333333333
63.9466666666667
62.2033333333333
62.1266666666667
61.8966666666667
59.5266666666667
55.7716666666667
55.3866666666667
55.3433333333333
54.5483333333333
53.39
52.0216666666667
51.8266666666667
48.6933333333333
47.9216666666667
45.88
44.4983333333333
State- wide Rank
1
2
4
5
6
8
9
13
14
18
19
20
21
22
23
24
26
27
28
29
32
33
35
38
40
41
42
43
46
52
53
56
59
60
61
Project Cost
Project Cost
135254
204428
3144200
603000
232620
469311
689251
1423292
1957261
753313
362805
1374892
11349627
757299
403550
335456
320456
558814
1058775
332590
627900
302737
2692700
497773
230200
585450
297408
388838
259817
278150
825000
962984
3244225
629000
152867
250000
27341616
1940379
232430
467252
2640061
29981677
Grant Requested
114965
198474
3096898
450000
232620
455642
689251
208073
1412889
731372
318289
1237403
9145876
735242
274750
286166
311456
558814
940950
322903
583900
293737
2495189
497773
230200
492850
288745
373838
250817
267150
660000
849984
367965
625000
127065
225000
21205370
1843379
225660
456252
2525291
23730661
Match Offered
20289
11908
47302
153000
1021393
13669
20677
20000
353222
21941
411835
137448
2232684
22057
278800
49290
9000
16765
177825
19374
44000
9000
95000
14933
192891
82550
8663
825000
9000
11000
165000
113000
25800
4000
25802
25000
4456434
97000
6770
11000
114770
4571204
Type
Construction
DesignConstruction
Construction
Construction
DesignConstruction
Design Construction
DesignConstruction
Design
Construction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
DesignConstruction
Design
DesignConstruction
DesignConstruction
Construction
FeasibilityDesign
Construction
DesignConstruction
Construction
Recommendation
AEA Recomnd
Full
Full
Full SP
Full
Full
Full
Full SP
Partial
Partial SP
Full
Full
Full SP
SubTotal
Full
Full SP
Partial SP
Full SP
Full SP
Full SP
Full
Partial SP
Full SP
Partial SP
Full
Full
Partial SP
Full
Partial SP
Full SP
Partial SP
Full
Full
Full
Full
Partial SP
Full
Not Recommended
Not Recommended
Not Recommended
Early
X
X
X
X
X
X
X
X
Recommend Funding
114965
198474
3096898
450000
232620
455642
689251
175000
620000
731372
318289
1237403
8319914
735242
274750
103000
311456
558814
940950
322903
125000
293737
270000
497773
230200
125000
288745
56841
250817
125000
660000
849984
367965
625000
97000
225000
16655091
16655091
Cumulative Funding
114965
313439
3410337
3860337
4092957
4548599
5237850
5412850
6032850
6764222
7082511
8319914
**
9055156
9329906
9432906
9744362
10303176
11244126
11567029
11692029
11985766
12255766
12753539
12983739
13108739
13397484
13454325
13705142
13830142
14490142
15340126
15708091
16333091
16430091
16655091
TOTAL
Count
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Not Recommended Projects:
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Energy Region
Bristol Bay
Bering Straits
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Lower Yukon-Kuskokwim
Railbelt
Copper River/Chugach
Southeast
Sub Totals, Top Ranking $20 Million (prior to stage 4 regional spreading)
Bristol Bay
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Aleutians
Kodiak
Southeast
Railbelt
Aleutians
Aleutians
Southeast
Kodiak
Lower Yukon-Kuskokwim
North Slope
Railbelt
Bristol Bay
Aleutians
Railbelt
Copper River/Chugach
Bristol Bay
North Slope
Sub Totals, All Recommended Projects
Southeast
Railbelt
Southeast
Railbelt
Aleutians
Northwest Arctic
Kodiak
Northwest Arctic
Southeast
Southeast
Southeast
Southeast
Bristol Bay
Bristol Bay
Northwest Arctic
Bristol Bay
Copper River/Chugach
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Sub Totals, Not Recommended Projects
Grand Total, All Applications
Notes
This document represents AEA's draft recommendations for consideration by the REFAC committee. This is a draft document only and is subject to change prior to AEA's final recommendations.
H = Heat application, applications that deliver heat only, not electricity
S = Standard spplication, applications that deliver electricity, energy storage, transmission or a combination of electricity and heat.
B/C = Benefit/Cost Ratio over the life of the project.
AEA B/C ratio uses AEA's best assumptions in the standard REF economic model
SP = Special Provisions
The Applicant B/C ratio uses the applicants assumptions in the standard REF economic model.
Total Stage 2 Score column is the technical and economic evaluation score and is on a scale of 0 to 100. A minimum score of 40 is required to pass stage 2.
Match offered is applicant's offered cash and in-kind match, including supporting energy efficiency work and wood harvest value where applicable.
Some not recommended projects' B/C ratios may be incomplete due to incomplete information provided or other reasons.
ID
1036
1068
1027
1077
1067
1082
1015
1025
1072
1057
1069
1083
1065
1023
1084
1062
1070
1022
1030
1066
1049
1028
1079
1080
1081
1075
1018
1048
1019
1002
1024
1029
1056
1059
1004
1001
1003
1020
1034
1035
1046
1050
1058
1063
1064
1039
1054
1086
Project Name
Packers Creek Hydroelectric Project Phase II
Stebbins St Michael Wind Energy Final Design and Permitting
Chisana Mountain Wind Feasibility Project
Yerrick Creek Hydroelectric Project
Mountain Village Wind Feasibility and Conceptual Design
Stetson Creek Diversion Cooper Lake Dam Facilities Project
Allison Creek Hydroelectric Project Construction
Gunnuk Creek Hydroelectric Feasibility Study
Igiugig Wind Resource Feasibility and Conceptual Design
Mertarvik Renewable Energy Feasibility and Conceptual Design
St Marys Pitkas Point Wind Energy Construction Project
Waterfall Creek Hydroelectric Project
Old Harbor Hydroelectric Project Final Design and Permitting
Swan Lake Reservoir Expansion Project
Juniper Creek Hydroelectric Reconnaissance Study
False Pass Hydrokinetic Feasibility Study
Sand Point Energy Storage Project
SEAPA Wind Resource Assessment Phase I and II
Flywheels ESS for Kodiak Pier Electric Crane
Marshall Wind Energy Final Design and Permitting Project
Atqasuk Transmission Line Design and Permitting Project
Carlo Creek Hydroelectric Project Reconnaissance Study
Koliganek Wind Diesel and Heat Recovery
False Pass Wind Energy Project
Waste to Energy Reconnaissance Study
Cascade Creek Hydroelectric Project Feasibility Study
Chignik Hydroelectric Project Design and Permitting
Kaktovik Wind Diesel Design and Permitting
Survey Creek Hydroelectric Project
Poncelet Kinetics RHK100 Prototype Demonstration
Walker Lake Hydro Project Feasibility
Jack River Hydroelectric Project Feasibility Study
Adak Wind Data Collection Analysis and Preliminary Design
Cosmos Hills Hydroelectric Design and Permitting
Karluk Tribal Council Wind Energy System
Northwest Arctic Borough Solar PV Project
Mahoney Lake Hydroelectric Phase III and IV
Excursion Inlet Hydro Project Feasibility and Conceptual Design
Metlakatla to Ketchikan Intertie
Feasibility Study of Tenakee Inlet Geothermal Resource
Port Alsworth Hydropower PreConstruction Phase
Bristol Bay Borough School District Solar PV Project
Noatak Utility Size Photovoltaic Array Construction Project
Iliamna Solar Ground Mounted Energy System
Chenega Bay Hydroelectric Construction
Four Villages lntertie Design
Multiple Alternative Energy Sources for Napakiak
Chefornak High Penetration Wind Diesel System
Applicant
Chignik Lagoon Village Council
Alaska Village Electric Cooperative, Inc.
Alaska Power Company
Native Village of Tanacross
Alaska Village Electric Cooperative, Inc.
Chugach Electric Association, Inc.
Copper Valley Electric Association, Inc.
Inside Passage Electric Cooperative
Igiugig Village Council
Ungusraq Power Company UPC / Newtok Traditional Council
Alaska Village Electric Cooperative, Inc.
City of King Cove
Alaska Village Electric Cooperative, Inc.
The Southeast Alaska Power Agency
Ram Valley, LLC
City of False Pass
TDX Sand Point Generating, LLC
The Southeast Alaska Power Agency
Kodiak Electric Association, Inc.
Alaska Village Electric Cooperative, Inc.
North Slope Borough
Native Village of Cantwell
New Koliganek Village Council
City of False Pass Electric Utility
Chugach Electric Association, Inc.
Blue Hole Properties, LLC (BHP)
City of Chignik
North Slope Borough
Edna Bay Community
Whitestone Power and Communications
Tlingit-Haida Regional Electrical Authority
Native Village Of Cantwell
City of Adak, Alaska
Alaska Village Electric Cooperative
Karluk Tribal Council
Northwest Arctic Borough
City of Saxman
Haines Borough
Metlakatla Indian Community
Inside Passage Electric Cooperative
Port Alsworth Improvement Corporation
Bristol Bay Borough School District
Northwest Arctic Borough
Iliamna Village Council
Native Village of Chenega
Nuvista Light and Electric Cooperative
Napakiak lrcinraq Power Company
Naterqak Light Plant, City of Chefornak
Applicant Type
Government Entity
Utility
Utility
Government Entity
Utility
Utility
Utility
Utility
Government Entity
IPP
Utility
Local Government
Utility
Government Entity
IPP
Local Government
Utility
Government Entity
Utility
Utility
Local Government
Government Entity
Government Entity
Local Government
Utility
IPP
Local Government
Local Government
Local Government
IPP
Utility
Government Entity
Local Government
Utility
Government Entity
Local Government
Local Government
Local Government
Government Entity
Utility
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Government Entity
Utility
Local Government
Energy Source
Hydro
Wind
Wind
Hydro
Wind
Hydro
Hydro
Hydro
Wind
Wind
Wind
Hydro
Hydro
Hydro
Hydro
Hydrokinetic
Storage of Renewable
Wind
Storage of Renewable
Wind
Transmission
Hydro
Wind
Wind
Biomass
Hydro
Hydro
Wind
Hydro
Hydrokinetic
Hydro
Hydro
Wind
Hydro
Wind
Solar PV
Hydro
Hydro
Transmission
Geothermal
Hydro
Solar PV
Solar PV
Solar PV
Hydro
Transmission
Wind
Wind
Total Stage 2 Score
86.3333333333333
83.3333333333333
85
58.3333333333333
79.1666666666667
94.3333333333333
89.3333333333333
73
47
53
65
71.1666666666667
56.3333333333333
81.1666666666667
73.1666666666667
42.83
47.5
90.3333333333333
66.8333333333333
52.1666666666667
74.1666666666667
61
52.33
46.3333333333333
61.5
45.8333333333333
52.1666666666667
65.8333333333333
39.3333333333333
39.1666666666667
37
35.3333333333333
35.3333333333333
27.5
21.1666666666667
Ben / Cost
AEA B/C
1.66
1.8
2.55
4.23
1.7
7.11
3.96
4.28
0.86
1.14
1.19
1.37
1.11
4.07
2.45
0.22
1.08
1.84
0.51
0.98
3.3
1.9
1.05
0.67
1.31
1.3
1.02
1.03
1.48
0.16
1.05
0.79
0.47
0.71
0.76
0.68
1.79
0.09
1.77
0.44
1.52
0.96
1.24
0.01
1.14
Appl B/C
3.85
2.74
9.84
1.23
0.89
3.68
0
1.4
1.47
1.87
1.79
4.07
3.49
0.22
1.01
1.02
1.6
3.55
1.88
1.6
0.61
1.34
3.46
1.6
1.37
1.37
0.16
1.21
0.27
1.05
1.83
0.83
6.91
3.93
1.28
1.24
1.28
1.22
0.4
1.02
Cost of Energy ($/kWh)
0.6917
0.5583
0.4904
0.4904
0.544
0.1549
0.2844
0.6204
0.803
0.8
0.4936
0.2801
0.5762
0.1022
0.1511
0.5132
0.5841
0.1022
0.1903
0.504
0.15
0.2242
0.505
0.5132
0.1549
0.2844
0.4756
0.15
N/A
0.2242
0.6219
0.2242
0.8116
0.743
0.6
0.4176
0.1022
N/A
0.0967
0.6539
0.6827
0.5046
0.74
0.594
0.435
Fuel Price $/gal
Stage 3 Review Scores (max)
1. Cost of Energy (35)
30.26
24.42
21.46
21.46
23.8
6.78
12.44
27.14
35
35
21.6
12.26
25.21
4.47
6.61
22.45
22.55
4.47
8.32
22.05
6.56
9.81
22.09
22.45
6.78
12.44
20.81
6.56
2. Match (15)
11
7
11
15
7
15
15
7
13
7
9
15
7
15
15
13
9
7
15
7
9
9
6
9
15
11
0
9
3.
Tech & Econ Feas
(20)
17.27
16.67
17
11.67
15.83
18.87
17.87
14.6
9.4
10.6
13
14.2333333333333
11.2666666666667
16.2333333333333
14.6333333333333
8.57
9.5
18.0666666666667
13.3666666666667
10.4333333333333
14.8333333333333
12.2
10.47
9.26666666666667
12.3
9.16666666666667
10.4333333333333
13.1666666666667
4.
Readi- ness (5)
5
3
2.5
3
2.5
5
4
2
2.5
2
5
2.84
2
3
2
2.5
3
2
3.5
2.5
2.5
1.5
3.84
2.5
0
3
3.5
3
5. Benefit (15)
11
11.625
12.5
11.25
11.625
12.875
12.125
11.625
0
4.5
4.5
7.625
5.375
11.25
11.25
0.75
4.125
13.125
3.25
1.5
12.375
11.625
4.13
0.375
8.25
6.375
4.875
4
6.
Local Supt
(5)
5
5
2
5
5
5
2
2
3
2
5
5
5
5
4
5
2
5
5
5
2
5
2
4
2
5
0
2
7. Sustan-ability
(5)
3.83333333333333
4.5
4.16666666666667
3.16666666666667
4.5
5
5
3.83333333333333
3.16666666666667
1.66666666666667
4.33333333333333
5
4.5
5
3.83333333333333
2.5
4
3.66666666666667
4
3.83333333333333
5
3
3.16666666666667
1.66666666666667
4
1.33333333333333
4
4.5
Total (100)
83.3633333333333
72.215
70.6266666666667
70.5466666666667
70.255
68.525
68.435
68.1983333333333
66.0666666666667
62.7666666666667
62.4333333333333
61.9583333333333
60.3516666666667
59.9533333333333
57.3266666666667
54.77
54.175
53.3283333333333
52.4366666666667
52.3166666666667
52.2683333333333
52.135
51.6966666666667
49.2583333333333
48.33
48.315
43.6183333333333
42.2266666666667
State- wide Rank
3
7
10
11
12
15
16
17
25
30
31
34
36
37
39
44
45
47
48
49
50
51
54
55
57
58
62
63
Project Cost
Project Cost
5389149
3946050
148800
19000000
4833000
21772523
49000000
300000
104389522
110000
8000000
4782528
5500000
8155000
13391869
2350000
5000000
1397403
170583
3800000
3214875
17342837
8340000
2566000
52050
TBD
2250000
BLANK
4565200
195377867
3562772
1940558
825000
31500000
72400000
38660000
1300000
77000
51000000
14500000
14510599
49000000
7224213
235000
447800
2000000
1650000
1250000
2284000
4358784
298725726
494103593
Grant Requested
2352653
342000
119000
6000000
123500
3453920
5914491
275000
18580564
80000
375000
4274575
800000
1092500
4000000
35750
428646
1256403
158771
1900000
353400
2017818
54000
306000
47050
150000
170000
1375000
440000
37895477
62272
1560558
700000
213750
160000
2922000
81000
76000
4000000
213536
9281615
3378500
159000
230000
447800
800000
1400000
1250000
141000
4308784
31385815
69281292
Match Offered
3036496
18000
29800
11500000
6500
13591226
5914491
25000
34121513
30000
25000
507953
1900000
57500
8813869
35750
137820
141000
11812
1900000
18600
201782
6000
10000
5000
100000
30000
0
44000
48097599
3500
120000
125000
11250
0
150000
300
1000
4000000
10000
0
0
10000
5000
0
120000
0
0
20000
50000
4626050
52723649
Type
Construction
Design
Feasibility
Construction
Feasibility
Construction
Construction
ReconFeasibility
Feasibility
ReconFeasibility
Construction
Construction
Design
DesignConstruction
Recon
Feasibility
DesignConstruction
ReconFeasibility
Construction
Design
Design
Recon
Design
Feasibility
Recon
Feasibility
Design
Design
Recon
Construction
ReconFeasibility
Feasibility
Feasibility
Design
FeasibilityDesign
Construction
DesignConstruction
Feasibility
DesignConstruction
Feasibility
ReconFeasibility
DesignConstruction
Construction
ReconFeasibility
DesignConstruction
Feasibility
DesignConstruction
DesignConstruction
Recommendation
AEA Recomnd
Full
Full
Full
Partial
Full
Full
Full
Partial SP
SubTotal
Full SP
Partial SP
Full SP
Full SP
Partial
Partial SP
Full
Full SP
Partial SP
Full
Partial SP
Full SP
Full SP
Partial
Full SP
Full SP
Partial
Full
Partial SP
Full
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Did Not Pass Stage 1
Did Not Pass Stage 1
Did Not Pass Stage 1
Early
X
X
Recommend Funding
2352653
342000
119000
75000
123500
3453920
5914491
80000
12460564
80000
75000
4274575
800000
400000
560488
35750
428646
200000
158771
1470548
353400
2017818
35000
306000
47050
50000
170000
500000
440000
24863610
24863610
Cumulative Funding
2352653
2694653
2813653
2888653
3012153
6466073
12380564
12460564
**
12540564
12615564
16890139
17690139
18090139
18650627
18686377
19115023
19315023
19473794
20944342
21297742
23315560
23350560
23656560
23703610
23753610
23923610
24423610
24863610
TOTAL
Count
1
2
3
4
5
6
1
2
1
2
3
4
5
6
7
8
1
2
3
4
1
2
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1
2
1
2
3
4
5
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
1
2
3
4
5
6
7
8
86
H
S
S
S
S
S
S
H
S
S
S
S
H
S
S
S
S
H
S
S
S
S
S
H
H
H
S
H
H
S
H
S
H
H
H
S
H
S
S
S
S
S
H
S
S
H
S
S
H
S
S
H
H
H
S
S
S
H
H
H
H
S
H
H
H
H
S
H
H
H
H
S
S
S
S
S
S
S
H
H
S
S
H
H
H
H
Energy Region
Aleutians
Aleutians
Aleutians
Aleutians
Aleutians
Aleutians
Aleutians Total
Bering Straits
Bering Straits
Bering Straits Total
Bristol Bay
Bristol Bay
Bristol Bay
Bristol Bay
Bristol Bay
Bristol Bay
Bristol Bay
Bristol Bay
Bristol Bay Total
Copper River/Chugach
Copper River/Chugach
Copper River/Chugach
Copper River/Chugach
Copper River/Chugach Total
Kodiak
Kodiak
Kodiak
Kodiak Total
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim Total
North Slope
North Slope
North Slope Total
Northwest Arctic
Northwest Arctic
Northwest Arctic
Northwest Arctic
Northwest Arctic
Northwest Arctic Total
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt
Railbelt Total
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast
Southeast Total
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana Total
Grand Total
ID
1026
1083
1070
1080
1056
1062
1068
1040
1036
1072
1079
1018
1006
1046
1050
1063
1015
1014
1075
1064
1065
1030
1004
1052
1085
1061
1067
1043
1041
1069
1071
1057
1073
1042
1074
1066
1008
1039
1054
1086
1049
1048
1038
1001
1058
1076
1059
1082
1031
1084
1028
1009
1055
1078
1081
1002
1029
1011
1037
1021**
1087
1025
1053
1017
1016
1013
1023
1033
1010
1012
1007
1022
1003
1020
1034
1035
1019
1024
1044
1047
1077
1027
1032
1045
1060
1051
Project Name
Atka Dispatchable Heat
Waterfall Creek Hydroelectric Project
Sand Point Energy Storage Project
False Pass Wind Energy Project
Adak Wind Data Collection Analysis and Preliminary Design
False Pass Hydrokinetic Feasibility Study
Stebbins St Michael Wind Energy Final Design and Permitting
Brevig Mission Water System Heat Recovery
Packers Creek Hydroelectric Project Phase II
Igiugig Wind Resource Feasibility and Conceptual Design
Koliganek Wind Diesel and Heat Recovery
Chignik Hydroelectric Project Design and Permitting
NEA Stack Heat to Power Project
Port Alsworth Hydropower PreConstruction Phase
Bristol Bay Borough School District Solar PV Project
Iliamna Solar Ground Mounted Energy System
Allison Creek Hydroelectric Project Construction
Wood Chip Boiler for The Native Village of Tazlina
Cascade Creek Hydroelectric Project Feasibility Study
Chenega Bay Hydroelectric Construction
Old Harbor Hydroelectric Project Final Design and Permitting
Flywheels ESS for Kodiak Pier Electric Crane
Karluk Tribal Council Wind Energy System
Nunam Iqua Heat Recovery Project
Tuntutuliak Heat Recovery
Emmonak Heat Recovery System
Mountain Village Wind Feasibility and Conceptual Design
St Marys Heat Recovery System
Chevak Water and Vacuum Plant Heat Recovery
St Marys Pitkas Point Wind Energy Construction Project
Kwigillingok Wind Heat Electrical Thermal Storage
Mertarvik Renewable Energy Feasibility and Conceptual Design
Kongiganak Wind Heat Electrical Thermal Storage
Eek Water System Heat Recovery
Tuntutuliak Wind Heat Electrical Thermal Storage
Marshall Wind Energy Final Design and Permitting Project
Chuathbaluk Water System Heat Recovery
Four Villages lntertie Design
Multiple Alternative Energy Sources for Napakiak
Chefornak High Penetration Wind Diesel System
Atqasuk Transmission Line Design and Permitting Project
Kaktovik Wind Diesel Design and Permitting
Kotzebue Paper and Wood Waste to Energy Project
Northwest Arctic Borough Solar PV Project
Noatak Utility Size Photovoltaic Array Construction Project
NWAB School District Solar Thermal Systems
Cosmos Hills Hydroelectric Design and Permitting
Stetson Creek Diversion Cooper Lake Dam Facilities Project
Seldovia House Ground Source Heat Pump Project
Juniper Creek Hydroelectric Reconnaissance Study
Carlo Creek Hydroelectric Project Reconnaissance Study
Nenana Collaborative Biomass Heating System Project
Alaska SeaLife Center Heat Recovery Project
Chickaloon Solar Thermal and Biomass Project
Waste to Energy Reconnaissance Study
Poncelet Kinetics RHK100 Prototype Demonstration
Jack River Hydroelectric Project Feasibility Study
Sitka Centennial Hall Air Source Heat Pump
Ketchikan Gateway Borough Biomass Heating Project
Haines Borough Municipal Buildings Biomass Project
Kake Community Energy
Gunnuk Creek Hydroelectric Feasibility Study
Yakutat Biomass District Heating Loop
Southeast Island School District Wood Boilers
Hydaburg Schools Wood Fired Boiler Project
Sitka Kettleson Library Air Source Heat Pump
Swan Lake Reservoir Expansion Project
Sitka Sea Water Source Heat Pump Project
Craig High School Wood Heat Conversion
Sitka Wastewater Treatment Plant Effluent Heat Pump
Mendenhall Valley Library Geothermal HVAC System
SEAPA Wind Resource Assessment Phase I and II
Mahoney Lake Hydroelectric Phase III and IV
Excursion Inlet Hydro Project Feasibility and Conceptual Design
Metlakatla to Ketchikan Intertie
Feasibility Study of Tenakee Inlet Geothermal Resource
Survey Creek Hydroelectric Project
Walker Lake Hydro Project Feasibility
Venetie Clinic Heat Recovery
Galena Community Wood Heat Project
Yerrick Creek Hydroelectric Project
Chisana Mountain Wind Feasibility Project
Biomass Heat for Minto Community Buildings
Grayling Heat Recovery System
Holy Cross Water System Heat Recovery
AGSD Extension of Heating Loop
Applicant
City of Atka
City of King Cove
TDX Sand Point Generating, LLC
City of False Pass Electric Utility
City of Adak, Alaska
City of False Pass
Alaska Village Electric Cooperative, Inc.
City of Brevig Mission
Chignik Lagoon Village Council
Igiugig Village Council
New Koliganek Village Council
City of Chignik
Naknek Electric Association, Inc.
Port Alsworth Improvement Corporation
Bristol Bay Borough School District
Iliamna Village Council
Copper Valley Electric Association, Inc.
Native Village of Tazlina
Blue Hole Properties, LLC (BHP)
Native Village of Chenega
Alaska Village Electric Cooperative, Inc.
Kodiak Electric Association, Inc.
Karluk Tribal Council
City of Nunam Iqua
Native Village of Tuntutuliak
City of Emmonak
Alaska Village Electric Cooperative, Inc.
City of St. Mary's
City of Chevak
Alaska Village Electric Cooperative, Inc.
Kwig Power Company
Ungusraq Power Company (UPC) / Newtok Traditional Council
Puvurnaq Power Company
City of Eek
TCSA Electrical Services
Alaska Village Electric Cooperative, Inc.
City of Chuathbaluk
Nuvista Light and Electric Cooperative
Napakiak lrcinraq Power Company
Naterqak Light Plant, City of Chefornak
North Slope Borough
North Slope Borough
City of Kotzebue
Northwest Arctic Borough
Northwest Arctic Borough
Northwest Arctic Borough School District
Alaska Village Electric Cooperative
Chugach Electric Association, Inc.
Cook Inlet Housing Authority
Ram Valley, LLC
Native Village of Cantwell
Nenana School District
City of Seward
Chickaloon Native Village
Chugach Electric Association, Inc.
Whitestone Power and Communications
Native Village Of Cantwell
City and Borough of Sitka
Ketchikan Gateway Borough
Haines Borough
Organized Village of Kake
Inside Passage Electric Cooperative
City and Borough of Yakutat
Southeast Island School District
Hydaburg City School District
City and Borough of Sitka
The Southeast Alaska Power Agency
City and Borough of Sitka
Craig City School District
City and Borough of Sitka
City & Borough of Juneau
The Southeast Alaska Power Agency
City of Saxman
Haines Borough
Metlakatla Indian Community
Inside Passage Electric Cooperative
Edna Bay Community
Tlingit-Haida Regional Electrical Authority
Village of Venetie
City of Galena
Native Village of Tanacross
Alaska Power Company
Village of Minto
City of Grayling
City of Holy Cross
Alaska Gateway School District
Applicant Type
Local Government
Local Government
Utility
Local Government
Local Government
Local Government
Utility
Government Entity
Government Entity
Government Entity
Government Entity
Local Government
Utility
Government Entity
Government Entity
Government Entity
Utility
Government Entity
IPP
Government Entity
Utility
Utility
Government Entity
Local Government
Government Entity
Government Entity
Utility
Government Entity
Government Entity
Utility
Utility
IPP
Utility
Government Entity
Utility
Utility
Government Entity
Government Entity
Utility
Local Government
Local Government
Local Government
Local Government
Local Government
Local Government
Government Entity
Utility
Utility
Government Entity
IPP
Government Entity
Government Entity
Local Government
Government Entity
Utility
IPP
Government Entity
Local Government
Local Government
Local Government
Government Entity
Utility
Local Government
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Local Government
Local Government
Government Entity
Local Government
Local Government
Government Entity
Utility
Local Government
Utility
Government Entity
Local Government
Government Entity
Utility
Government Entity
Government Entity
Government Entity
Government Entity
Energy Source
Hydro to Heat
Hydro
Storage of Renewable
Wind
Wind
Hydrokinetic
Wind
Heat Recovery
Hydro
Wind
Wind
Hydro
Heat Recovery
Hydro
Solar PV
Solar PV
Hydro
Biomass
Hydro
Hydro
Hydro
Storage of Renewable
Wind
Heat Recovery
Heat Recovery
Heat Recovery
Wind
Heat Recovery
Heat Recovery
Wind
Wind to Heat
Wind
Wind to Heat
Heat Recovery
Wind to Heat
Wind
Heat Recovery
Transmission
Wind
Wind
Transmission
Wind
Biomass
Solar PV
Solar PV
Solar Thermal
Hydro
Hydro
Heat Pumps
Hydro
Hydro
Biomass
Heat Recovery
Biomass
Biomass
Hydrokinetic
Hydro
Heat Pumps
Biomass
Biomass
Biomass
Hydro
Biomass
Biomass
Biomass
Heat Pumps
Hydro
Heat Pumps
Biomass
Heat Pumps
Heat Pumps
Wind
Hydro
Hydro
Transmission
Geothermal
Hydro
Hydro
Heat Recovery
Biomass
Hydro
Wind
Biomass
Heat Recovery
Heat Recovery
Heat Recovery
Total Stage 2 Score
82.8333333333333
71.1666666666667
47.5
46.3333333333333
35.3333333333333
33.6666666666667
83.3333333333333
83
86.3333333333333
47
44.8333333333333
52.1666666666667
46.5
89.3333333333333
64.5
45.8333333333333
56.3333333333333
66.8333333333333
21.1666666666667
87.6666666666667
81.3333333333333
87.6666666666667
79.1666666666667
85.1666666666667
85.3333333333333
65
59.1666666666667
53
74.1666666666667
70.1666666666667
46.6666666666667
52.1666666666667
74.1666666666667
65.8333333333333
62.8333333333333
21
27.5
94.3333333333333
58.1666666666667
73.1666666666667
61
54.6666666666667
57.6666666666667
43.6666666666667
61.5
39.1666666666667
35.3333333333333
80.5
84.3333333333333
88.5
73.8333333333333
73
67.6666666666667
76.6666666666667
77.8333333333333
61.1666666666667
81.1666666666667
54.8333333333333
66.3333333333333
57.6666666666667
49.3333333333333
90.3333333333333
0
39.3333333333333
37
85.1666666666667
88
58.3333333333333
85
69.3333333333333
80.1666666666667
57.6666666666667
59.8333333333333
Ben / Cost
AEA B/C
3.18
1.37
1.08
0.67
0.47
0.08
1.8
1.51
1.66
0.86
0.89
1.02
1.52
0.96
0.01
3.96
1.19
1.3
1.14
1.11
0.51
0.76
2.2
1.54
2.56
1.7
1.66
1.83
1.19
1.37
1.14
1.7
1.01
1
0.98
0.97
3.3
1.03
1.12
0.68
1.24
1.48
0.71
7.11
1.12
2.45
1.9
0.66
1.13
1.31
0.16
0.79
1.69
2.46
1.72
1.62
4.44
1.45
1.47
1.83
0.91
4.07
0.5
1.12
0.73
0.86
1.84
0.09
1.77
0.44
1.48
1.05
1.68
4.31
4.23
2.93
1.02
1.47
0.55
0.97
Appl B/C
6.9
2.18
1.01
0.61
0.27
0.22
2.74
2.01
3.85
1.4
1.6
1.6
1.28
0.4
3.68
1.84
3.46
1.02
1.79
1.02
1.83
2.33
2.32
4.02
1.23
2.21
2.44
1.47
1.73
2.55
1.35
0.96
1.6
0.98
3.55
1.37
1.16
0.83
1.22
3.14
0.75
0.89
0.94
3.49
1.88
1.11
4.41
0.79
1.34
0.16
1.21
3.58
0.24
1.79
1.18
0
2.31
2.32
2.33
1.88
4.07
0.52
1.54
1.03
0.74
3.93
1.28
1.24
1.37
2.45
3.96
9.84
1.37
2.02
0.74
1.45
Cost of Energy ($/kWh)
0.7017
0.2801
0.5841
0.5132
0.8116
0.5132
0.5583
0.5358
0.6917
0.803
0.505
0.4756
0.5046
0.6827
0.5046
0.594
0.2844
0.2844
0.2844
0.435
0.5762
0.1903
0.6
0.53
0.65
0.551
0.544
0.4936
0.4844
0.4936
0.5975
0.8
0.5584
0.6036
0.65
0.504
0.8495
0.15
0.15
0.4176
0.4176
0.74
0.6337
0.743
0.1549
0.1973
0.1511
0.2242
0.2242
0.105
0.1511
0.1549
0.2242
0.2242
0.0947
0.102
0.2202
0.6204
0.6204
0.5031
0.4082
0.2402
0.0947
0.1022
0.0947
0.2855
0.0947
0.121
0.1022
0.1022
0.0967
0.6539
0.6219
0.9
0.5633
0.4904
0.4904
0.5894
0.5551
0.5333
0.4904
Fuel Price $/gal
7.65
5.29
4.17
4.38
6.8
5.77
4.6
4.3
5.95
6.21
3.89
6.8
6.07
5.19
4.06
3.71
3.59
3.59
4.09
5.85
5.05
3.8
4.2
3.59
3.59
3.8
3.59
4.12
8.5
6.02
5
5
7.15
3.79
Stage 3 Review Scores (max)
1. Cost of Energy (35)
33.47
12.26
22.55
22.45
24.42
23.14
30.26
35
22.09
20.81
12.44
18.24
12.44
25.21
8.32
19.16
29.75
25.24
23.8
20.13
18.81
21.6
26.03
35
27.17
17.02
29.75
22.05
6.56
6.56
26.56
6.78
22.71
6.61
9.81
17.76
4.59
16.23
6.78
15.71
15.71
17.89
25.59
27.14
22.09
16.63
18.38
15.71
4.47
15.71
16.63
15.71
18.03
4.47
35
26.34
21.46
21.46
21.88
21.88
31.28
16.58
2. Match (15)
11
15
9
9
7
6
11
13
6
0
15
6
11
7
15
13
6
6
7
6
6
9
6
7
0
6
6
7
9
9
7
15
15
15
9
7
9
11
15
15
11
9
7
7
11
11
7
15
15
15
11
9
11
7
6
6
15
11
15
6
6
6
3. Tech & Econ Feas (20)
16.57
14.2333333333333
9.5
9.26666666666667
16.67
16.6
17.27
9.4
8.96666666666667
10.4333333333333
17.87
12.9
9.16666666666667
11.2666666666667
13.3666666666667
17.53
16.27
17.53
15.83
17.0333333333333
17.0666666666667
13
11.8333333333333
10.6
14.8333333333333
14.0333333333333
9.33333333333333
10.4333333333333
14.8333333333333
13.1666666666667
12.5666666666667
18.87
11.63
14.6333333333333
12.2
10.9333333333333
11.5333333333333
8.73333333333333
12.3
16.1
16.87
17.7
14.7666666666667
14.6
13.5333333333333
15.3333333333333
15.5666666666667
12.2333333333333
16.2333333333333
10.9666666666667
13.2666666666667
11.5333333333333
9.86666666666667
18.0666666666667
17.03
17.6
11.67
17
13.8666666666667
16.0333333333333
11.5333333333333
11.9666666666667
4. Readi- ness (5)
10
5.66666666666667
6
5
6
10
10
5
7.66666666666667
7
8
6
6
4
7
6
7.66666666666667
8
5
7.66666666666667
6
10
5.66666666666667
4
5.66666666666667
10
5.66666666666667
5
5
6
4
10
9
4
3
6
9
6
0
10
7.33333333333333
7.66666666666667
4
4
4
6
6
10
6
8
6
10
8
4
8
7.66666666666667
6
5
6
7.66666666666667
8
8
5. Benefit (15)
12
7.625
4.125
0.375
11.625
10.25
11
0
0.75
4.875
12.125
6.25
6.375
5.375
3.25
12.5
10.125
12.5
11.625
11.25
12.5
4.5
7.75
4.5
12.375
4.5
2.125
1.5
12.375
4
6
12.875
5.25
11.25
11.625
1
4.875
0.75
8.25
10.75
13
12.625
12
11.625
8.875
9.75
13.5
1.75
11.25
0.5
6.375
0.75
0.625
13.125
11.25
14.125
11.25
12.5
5.375
9
1.25
3.375
6. Local Supt (5)
3
5
2
4
5
4
5
3
2
0
2
4
5
5
5
5
3
3
5
5
5
5
2
2
0
5
2
5
2
2
5
5
5
4
5
5
5
2
2
5
5
2
4
2
5
5
3
5
5
5
2
5
4
5
4
5
5
2
5
4
5
2
7. Sustan-ability (5)
4
5
4
1.66666666666667
4.5
3.16666666666667
3.83333333333333
3.16666666666667
3.16666666666667
4
5
3
1.33333333333333
4.5
4
3.5
3
2.66666666666667
4.5
4.16666666666667
2.83333333333333
4.33333333333333
2.5
1.66666666666667
3
3.83333333333333
2.5
3.83333333333333
5
4.5
3
5
3.83333333333333
3.83333333333333
3
4
5
4.16666666666667
4
4.83333333333333
3.5
4.5
4
3.83333333333333
4.16666666666667
4
3.5
4.83333333333333
5
4.16666666666667
3.5
4.83333333333333
4.5
3.66666666666667
3.33333333333333
4.5
3.16666666666667
4.16666666666667
3.16666666666667
3.5
2.83333333333333
4
Total (100)
90.0366666666667
64.785
57.175
51.7583333333333
75.2116666666667
73.1566666666667
88.36
68.5666666666667
50.64
47.1183333333333
72.4316666666667
56.39
51.315
62.3516666666667
55.9366666666667
76.6933333333333
75.8083333333333
74.94
72.7583333333333
71.2466666666667
68.21
67.4333333333333
61.78
64.7666666666667
63.045
60.3866666666667
57.375
54.8166666666667
54.7683333333333
45.2266666666667
64.1266666666667
73.5216666666667
72.4266666666667
59.3266666666667
53.635
51.6933333333333
48.9983333333333
48.88
48.33
77.3933333333333
72.41
71.3816666666667
71.3566666666667
70.1983333333333
68.665
67.7133333333333
66.9466666666667
64.5266666666667
62.9533333333333
59.3433333333333
58.7716666666667
56.8266666666667
56.0216666666667
55.3283333333333
84.6166666666667
81.2316666666667
73.5433333333333
73.1266666666667
70.2883333333333
68.08
65.8966666666667
51.9216666666667
State- wide Rank
1
32
45
56
8
12
2
24
50
63
15
47
58
38
49
6
7
9
14
20
25
28
31
33
36
39
43
52
53
64
35
11
16
41
54
57
60
61
62
5
17
18
19
22
23
27
29
34
37
40
42
46
48
51
3
4
10
13
21
26
30
55
Project Cost
Project Cost
135254
5500000
1397403
52050
72400000
5000000
84484707
3946050
753313
5389149
110000
2566000
BLANK
1940379
7224213
235000
2000000
19464741
49000000
278150
2250000
1650000
53178150
8155000
3800000
1300000
13255000
603000
469311
689251
4833000
757299
558814
4782528
302737
8000000
320456
297408
259817
3214875
232430
1250000
2284000
4358784
33213710
17342837
4565200
2692700
77000
447800
467252
38660000
42344752
21772523
362805
2350000
8340000
3244225
250000
152867
TBD
1940558
31500000
69912978
232620
1957261
1374892
1423292
300000
335456
1058775
627900
230200
13391869
388838
585450
962984
825000
170583
51000000
14500000
14510599
49000000
3562772
825000
157263491
204428
3144200
19000000
148800
403550
332590
497773
629000
24360341
524085270
Grant Requested
114965
800000
1256403
47050
160000
428646
2807064
342000
731372
2352653
80000
306000
1375000
1843379
159000
230000
800000
7146032
5914491
267150
170000
1400000
7751641
1092500
1900000
81000
3073500
450000
455642
689251
123500
735242
558814
4274575
293737
375000
311456
288745
250817
353400
225660
1250000
141000
4308784
15085623
2017818
440000
2495189
76000
447800
456252
2922000
6397241
3453920
318289
35750
54000
367965
225000
127065
150000
1560558
213750
6506297
232620
1412889
1237403
208073
275000
286166
940950
583900
230200
4000000
373838
492850
849984
660000
158771
4000000
213536
9281615
3378500
62272
700000
29578567
198474
3096898
6000000
119000
274750
322903
497773
625000
11134798
93011953
Match Offered
20289
1900000
141000
0
2061289
18000
905000
20000
97000
1022000
5914491
14000
5928491
57500
1900000
1957500
6500
0
474953
9000
9000
9000
18600
0
20000
50000
597053
201782
44000
0
75000
75000
13591226
12000
25802
100000
0
13729028
1021393
296936
86448
25000
25000
40000
4000
8813869
113000
165000
8356
4000000
10000
500
0
14609502
5954
11500000
14000
9687
4000
11533641
51777286
Type
Construction
Construction
DesignConstruction
Feasibility
Feasibility
Feasibility
Design
DesignConstruction
Construction
Feasibility
Design
Design
FeasibilityDesign
Construction
ReconFeasibility
DesignConstruction
ReconFeasibility
Construction
DesignConstruction
Feasibility
DesignConstruction
Design
Construction
FeasibilityDesign
Construction
Design Construction
DesignConstruction
Feasibility
DesignConstruction
DesignConstruction
Construction
Construction
ReconFeasibility
Construction
DesignConstruction
Construction
Design
DesignConstruction
Feasibility
DesignConstruction
DesignConstruction
Design
Design
DesignConstruction
Construction
Construction
Construction
Design
Construction
DesignConstruction
Recon
Recon
Design
Construction
DesignConstruction
Recon
Construction
Feasibility
DesignConstruction
Construction
DesignConstruction
Design
ReconFeasibility
DesignConstruction
Construction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
ReconFeasibility
DesignConstruction
Feasibility
DesignConstruction
Feasibility
Recon
ReconFeasibility
DesignConstruction
Construction
Construction
Feasibility
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
0
Recommendation
AEA Recomnd
Full
Full SP
Partial SP
Full SP
Did Not Pass Stage 2
Did Not Pass Stage 2
Full
Full
Full
Full SP
Full SP
Partial SP
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Full
Partial SP
Full
Not Recommended
Partial
Partial SP
Did Not Pass Stage 2
Full
Full
Full SP
Full
Full
Full SP
Full SP
Full SP
Partial SP
Full SP
Full
Full SP
Full SP
Not Recommended
Did Not Pass Stage 1
Did Not Pass Stage 1
Did Not Pass Stage 1
Full SP
Full
Partial SP
Not Recommended
Not Recommended
Not Recommended
Did Not Pass Stage 2
Full
Full
Full
Partial
Full
Full
Partial SP
Partial
Did Not Pass Stage 2
Did Not Pass Stage 2
Full
Partial SP
Full SP
Partial
Partial SP
Partial SP
Full SP
Partial SP
Full
Partial SP
Partial SP
Partial SP
Full
Full
Full
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Did Not Pass Stage 2
Did Not Pass Stage 2
Full
Full SP
Partial
Full
Full SP
Full
Full
Full
0
Recommend Funding
114965
800000
200000
47050
1162015
342000
731372
1073372
2352653
80000
306000
500000
3238653
5914491
125000
170000
6209491
400000
1470548
1870548
450000
455642
689251
123500
735242
558814
4274575
293737
75000
311456
288745
250817
353400
8860179
2017818
440000
2457818
270000
270000
3453920
318289
35750
35000
367965
225000
97000
50000
4582924
232620
620000
1237403
175000
80000
103000
940950
125000
230200
560488
56841
125000
849984
660000
158771
6155257
198474
3096898
75000
119000
274750
322903
497773
625000
5209798
41090055
Cumulative Funding
114965
914965
1114965
1162015
342000
1073372
2352653
2432653
2738653
3238653
5914491
6039491
6209491
400000
1870548
450000
905642
1594893
1718393
2453635
3012449
7287024
7580761
7655761
7967217
8255962
8506779
8860179
2017818
2457818
270000
3453920
3772209
3807959
3842959
4210924
4435924
4532924
4582924
232620
852620
2090023
2265023
2345023
2448023
3388973
3513973
3744173
4304661
4361502
4486502
5336486
5996486
6155257
198474
3295372
3370372
3489372
3764122
4087025
4584798
5209798
TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
Count
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
Energy Region
Bristol Bay
Bering Straits
Yukon-Koyukok/Upper Tanana
Railbelt
Yukon-Koyukok/Upper Tanana
Lower Yukon-Kuskokwim
Copper River/Chugach
Southeast
Bristol Bay
Lower Yukon-Kuskokwim
Aleutians
Lower Yukon-Kuskokwim
Southeast
Kodiak
Railbelt
Aleutians
Kodiak
Bristol Bay
Southeast
Lower Yukon-Kuskokwim
North Slope
Railbelt
Aleutians
Copper River/Chugach
Railbelt
Bristol Bay
North Slope
Northwest Arctic
Southeast
Southeast
Southeast
Southeast
Bristol Bay
Bristol Bay
Northwest Arctic
Bristol Bay
Copper River/Chugach
Railbelt
Kodiak
Southeast
Southeast
Railbelt
Aleutians
Northwest Arctic
Aleutians
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
ID
1036
1068
1077
1082
1027
1067
1015
1025
1072
1069
1083
1057
1023
1065
1084
1070
1030
1079
1022
1066
1049
1028
1080
1075
1081
1018
1048
1001
1003
1020
1034
1035
1046
1050
1058
1063
1064
1002
1004
1019
1024
1029
1056
1059
1062
1039
1054
1086
Project Name
Packers Creek Hydroelectric Project Phase II
Stebbins St Michael Wind Energy Final Design and Permitting
Yerrick Creek Hydroelectric Project
Stetson Creek Diversion Cooper Lake Dam Facilities Project
Chisana Mountain Wind Feasibility Project
Mountain Village Wind Feasibility and Conceptual Design
Allison Creek Hydroelectric Project Construction
Gunnuk Creek Hydroelectric Feasibility Study
Igiugig Wind Resource Feasibility and Conceptual Design
St Marys Pitkas Point Wind Energy Construction Project
Waterfall Creek Hydroelectric Project
Mertarvik Renewable Energy Feasibility and Conceptual Design
Swan Lake Reservoir Expansion Project
Old Harbor Hydroelectric Project Final Design and Permitting
Juniper Creek Hydroelectric Reconnaissance Study
Sand Point Energy Storage Project
Flywheels ESS for Kodiak Pier Electric Crane
Koliganek Wind Diesel and Heat Recovery
SEAPA Wind Resource Assessment Phase I and II
Marshall Wind Energy Final Design and Permitting Project
Atqasuk Transmission Line Design and Permitting Project
Carlo Creek Hydroelectric Project Reconnaissance Study
False Pass Wind Energy Project
Cascade Creek Hydroelectric Project Feasibility Study
Waste to Energy Reconnaissance Study
Chignik Hydroelectric Project Design and Permitting
Kaktovik Wind Diesel Design and Permitting
Northwest Arctic Borough Solar PV Project
Mahoney Lake Hydroelectric Phase III and IV
Excursion Inlet Hydro Project Feasibility and Conceptual Design
Metlakatla to Ketchikan Intertie
Feasibility Study of Tenakee Inlet Geothermal Resource
Port Alsworth Hydropower PreConstruction Phase
Bristol Bay Borough School District Solar PV Project
Noatak Utility Size Photovoltaic Array Construction Project
Iliamna Solar Ground Mounted Energy System
Chenega Bay Hydroelectric Construction
Poncelet Kinetics RHK100 Prototype Demonstration
Karluk Tribal Council Wind Energy System
Survey Creek Hydroelectric Project
Walker Lake Hydro Project Feasibility
Jack River Hydroelectric Project Feasibility Study
Adak Wind Data Collection Analysis and Preliminary Design
Cosmos Hills Hydroelectric Design and Permitting
False Pass Hydrokinetic Feasibility Study
Four Villages lntertie Design
Multiple Alternative Energy Sources for Napakiak
Chefornak High Penetration Wind Diesel System
Applicant
Chignik Lagoon Village Council
Alaska Village Electric Cooperative, Inc.
Native Village of Tanacross
Chugach Electric Association, Inc.
Alaska Power Company
Alaska Village Electric Cooperative, Inc.
Copper Valley Electric Association, Inc.
Inside Passage Electric Cooperative
Igiugig Village Council
Alaska Village Electric Cooperative, Inc.
City of King Cove
Ungusraq Power Company (UPC) / Newtok Traditional Council
The Southeast Alaska Power Agency
Alaska Village Electric Cooperative, Inc.
Ram Valley, LLC
TDX Sand Point Generating, LLC
Kodiak Electric Association, Inc.
New Koliganek Village Council
The Southeast Alaska Power Agency
Alaska Village Electric Cooperative, Inc.
North Slope Borough
Native Village of Cantwell
City of False Pass Electric Utility
Blue Hole Properties, LLC (BHP)
Chugach Electric Association, Inc.
City of Chignik
North Slope Borough
Northwest Arctic Borough
City of Saxman
Haines Borough
Metlakatla Indian Community
Inside Passage Electric Cooperative
Port Alsworth Improvement Corporation
Bristol Bay Borough School District
Northwest Arctic Borough
Iliamna Village Council
Native Village of Chenega
Whitestone Power and Communications
Karluk Tribal Council
Edna Bay Community
Tlingit-Haida Regional Electrical Authority
Native Village Of Cantwell
City of Adak, Alaska
Alaska Village Electric Cooperative
City of False Pass
Nuvista Light and Electric Cooperative
Napakiak lrcinraq Power Company
Naterqak Light Plant, City of Chefornak
Applicant Type
Government Entity
Utility
Government Entity
Utility
Utility
Utility
Utility
Utility
Government Entity
Utility
Local Government
IPP
Government Entity
Utility
IPP
Utility
Utility
Government Entity
Government Entity
Utility
Local Government
Government Entity
Local Government
IPP
Utility
Local Government
Local Government
Local Government
Local Government
Local Government
Government Entity
Utility
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
IPP
Government Entity
Local Government
Utility
Government Entity
Local Government
Utility
Local Government
Government Entity
Utility
Local Government
Energy Source
Hydro
Wind
Hydro
Hydro
Wind
Wind
Hydro
Hydro
Wind
Wind
Hydro
Wind
Hydro
Hydro
Hydro
Storage of Renewable
Storage of Renewable
Wind
Wind
Wind
Transmission
Hydro
Wind
Hydro
Biomass
Hydro
Wind
Solar PV
Hydro
Hydro
Transmission
Geothermal
Hydro
Solar PV
Solar PV
Solar PV
Hydro
Hydrokinetic
Wind
Hydro
Hydro
Hydro
Wind
Hydro
Hydrokinetic
Transmission
Wind
Wind
Total Stage 2 Score
86.3333333333333
83.3333333333333
58.3333333333333
94.3333333333333
85
79.1666666666667
89.3333333333333
73
47
65
71.1666666666667
53
81.1666666666667
56.3333333333333
73.1666666666667
47.5
66.8333333333333
44.8333333333333
90.3333333333333
52.1666666666667
74.1666666666667
61
46.3333333333333
45.8333333333333
61.5
52.1666666666667
65.8333333333333
21
0
46.5
39.1666666666667
21.1666666666667
39.3333333333333
37
35.3333333333333
35.3333333333333
27.5
33.6666666666667
Ben / Cost
AEA B/C
1.66
1.8
4.23
7.11
2.93
1.7
3.96
4.44
0.86
1.19
1.37
1.14
4.07
1.11
2.45
1.08
0.51
0.89
1.84
0.98
3.3
1.9
0.67
1.3
1.31
1.02
1.03
0.68
0.09
1.77
0.44
1.52
0.96
1.24
0.01
1.14
0.16
0.76
1.48
1.05
0.79
0.47
0.71
0.08
Appl B/C
3.85
2.74
9.84
0.89
1.23
3.68
0
1.4
1.47
2.18
4.07
1.79
3.49
1.01
1.02
1.6
1.6
3.55
1.88
0.61
3.46
1.34
1.6
1.37
0.83
3.93
1.28
1.24
1.28
1.22
0.4
1.02
0.16
1.83
1.37
1.21
0.27
0.75
0.22
Cost of Energy ($/kWh)
0.6917
0.5583
0.4904
0.1549
0.4904
0.544
0.2844
0.6204
0.803
0.4936
0.2801
0.8
0.1022
0.5762
0.1511
0.5841
0.1903
0.505
0.1022
0.504
0.15
0.2242
0.5132
0.2844
0.1549
0.4756
0.15
0.4176
0.1022
0.0967
0.6539
0.6827
0.5046
0.74
0.594
0.435
0.2242
0.6
0.6219
0.2242
0.8116
0.743
0.5132
Fuel Price $/gal
Stage 3 Review Scores (max)
1. Cost of Energy (35)
30.26
24.42
21.46
6.78
21.46
23.8
12.44
27.14
35
21.6
12.26
35
4.47
25.21
6.61
22.55
8.32
22.09
4.47
22.05
6.56
9.81
22.45
12.44
6.78
20.81
6.56
2. Match (15)
11
7
15
15
11
7
15
7
13
9
15
7
15
7
15
9
15
6
7
7
9
9
9
11
15
0
9
3. Tech & Econ Feas (20)
17.27
16.67
11.67
18.87
17
15.83
17.87
14.6
9.4
13
14.2333333333333
10.6
16.2333333333333
11.2666666666667
14.6333333333333
9.5
13.3666666666667
8.96666666666667
18.0666666666667
10.4333333333333
14.8333333333333
12.2
9.26666666666667
9.16666666666667
12.3
10.4333333333333
13.1666666666667
4. Readi- ness (5)
10
6
6
10
5
5
8
4
5
10
5.66666666666667
4
6
4
4
6
7
7.66666666666667
4
5
5
3
5
6
0
7
6
5. Benefit (15)
11
11.625
11.25
12.875
12.5
11.625
12.125
11.625
0
4.5
7.625
4.5
11.25
5.375
11.25
4.125
3.25
0.75
13.125
1.5
12.375
11.625
0.375
6.375
8.25
4.875
4
6. Local Supt (5)
5
5
5
5
2
5
2
2
3
5
5
2
5
5
4
2
5
2
5
5
2
5
4
5
2
0
2
7. Sustan-ability (5)
3.83333333333333
4.5
3.16666666666667
5
4.16666666666667
4.5
5
3.83333333333333
3.16666666666667
4.33333333333333
5
1.66666666666667
5
4.5
3.83333333333333
4
4
3.16666666666667
3.66666666666667
3.83333333333333
5
3
1.66666666666667
1.33333333333333
4
4
4.5
Total (100)
88.36
75.2116666666667
73.5433333333333
73.5216666666667
73.1266666666667
72.7583333333333
72.4316666666667
70.1983333333333
68.5666666666667
67.4333333333333
64.785
64.7666666666667
62.9533333333333
62.3516666666667
59.3266666666667
57.175
55.9366666666667
50.64
55.3283333333333
54.8166666666667
54.7683333333333
53.635
51.7583333333333
51.315
48.33
47.1183333333333
45.2266666666667
State- wide Rank
2
8
10
11
13
14
15
22
24
28
32
33
37
38
41
45
49
50
51
52
53
54
56
58
62
63
64
Project Cost
Project Cost
5389149
3946050
19000000
21772523
148800
4833000
49000000
104089522
300000
110000
4782528
5500000
8000000
13391869
8155000
2350000
1397403
3800000
2566000
170583
3214875
17342837
8340000
52050
2250000
TBD
BLANK
4565200
190377867
77000
51000000
14500000
14510599
49000000
7224213
235000
447800
2000000
1650000
1940558
1300000
3562772
825000
31500000
72400000
38660000
5000000
1250000
2284000
4358784
303725726
494103593
Grant Requested
2352653
342000
6000000
3453920
119000
123500
5914491
18305564
275000
80000
4274575
5500000
375000
4000000
1150000
35735
1256403
1900000
306000
158771
353400
2219600
54000
47050
170000
150000
1375000
484000
42470098
77000
8000000
223536
9281615
3378500
169000
235000
447800
920000
1650000
1680558
81300
65772
825000
225000
160000
3072000
566466
1250000
161000
4358784
36828331
79298429
Match Offered
905000
18000
11500000
13591226
14000
6500
5914491
31949217
25000
20000
474953
1900000
0
8813869
57500
12000
141000
1900000
0
8356
18600
201782
0
0
14000
100000
0
44000
45680277
4000000
10000
0
0
0
0
0
0
0
500
0
0
0
75000
0
0
20000
50000
4155500
49835777
Type
Construction
Design
Construction
Construction
Feasibility
Feasibility
Construction
ReconFeasibility
Feasibility
Construction
Construction
ReconFeasibility
DesignConstruction
Design
Recon
DesignConstruction
Construction
Design
ReconFeasibility
Design
Design
Recon
Feasibility
Feasibility
Recon
Design
Design
Construction
DesignConstruction
Feasibility
DesignConstruction
Feasibility
DesignConstruction
Construction
ReconFeasibility
DesignConstruction
Construction
FeasibilityDesign
Recon
ReconFeasibility
Feasibility
Feasibility
Design
Feasibility
Feasibility
DesignConstruction
DesignConstruction
Recommendation
AEA Recomnd
Full
Full
Partial
Full
Full
Full
Full
Partial SP
Full SP
Full SP
Full SP
Partial
Partial SP
Partial SP
Full
Full SP
Partial SP
Full SP
Full
Full SP
Full SP
Partial
Full SP
Full
Partial
Partial SP
Full
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Not Recommended
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 2
Did Not Pass Stage 1
Did Not Pass Stage 1
Did Not Pass Stage 1
Recommend Funding
2352653
342000
75000
3453920
119000
123500
5914491
12380564
80000
80000
4274575
800000
75000
560488
400000
35750
200000
1470548
306000
158771
353400
2017818
35000
47050
170000
50000
500000
440000
24434964
24434964
Cumulative Funding
2352653
2694653
2769653
6223573
6342573
6466073
12380564
SubTotal
12460564
12540564
16815139
17615139
17690139
18250627
18650627
18686377
18886377
20356925
20662925
20821696
21175096
23192914
23227914
23274964
23444964
23494964
23994964
24434964
SubTotal
TOTAL
4274575
Count
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
H
Energy Region
Aleutians
Yukon-Koyukok/Upper Tanana
Yukon-Koyukok/Upper Tanana
Southeast
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Bering Straits
Railbelt
Southeast
Southeast
Southeast
Lower Yukon-Kuskokwim
Yukon-Koyukok/Upper Tanana
Southeast
Lower Yukon-Kuskokwim
Yukon-Koyukok/Upper Tanana
Southeast
Southeast
Yukon-Koyukok/Upper Tanana
Lower Yukon-Kuskokwim
Southeast
Northwest Arctic
Lower Yukon-Kuskokwim
Lower Yukon-Kuskokwim
Southeast
Southeast
Lower Yukon-Kuskokwim
Southeast
Copper River/Chugach
Southeast
Yukon-Koyukok/Upper Tanana
Railbelt
Railbelt
Railbelt
Bristol Bay
Lower Yukon-Kuskokwim
Northwest Arctic
ID
1026
1044
1047
1011
1052
1085
1061
1040
1031
1037
1021**
1087
1043
1032
1053
1041
1045
1017
1016
1060
1071
1013
1038
1073
1042
1033
1010
1074
1012
1014
1007
1051
1009
1055
1078
1006
1008
1076
Project Name
Atka Dispatchable Heat
Venetie Clinic Heat Recovery
Galena Community Wood Heat Project
Sitka Centennial Hall Air Source Heat Pump
Nunam Iqua Heat Recovery Project
Tuntutuliak Heat Recovery
Emmonak Heat Recovery System
Brevig Mission Water System Heat Recovery
Seldovia House Ground Source Heat Pump Project
Ketchikan Gateway Borough Biomass Heating Project
Haines Borough Municipal Buildings Biomass Project
Kake Community Energy
St Marys Heat Recovery System
Biomass Heat for Minto Community Buildings
Yakutat Biomass District Heating Loop
Chevak Water and Vacuum Plant Heat Recovery
Grayling Heat Recovery System
Southeast Island School District Wood Boilers
Hydaburg Schools Wood Fired Boiler Project
Holy Cross Water System Heat Recovery
Kwigillingok Wind Heat Electrical Thermal Storage
Sitka Kettleson Library Air Source Heat Pump
Kotzebue Paper and Wood Waste to Energy Project
Kongiganak Wind Heat Electrical Thermal Storage
Eek Water System Heat Recovery
Sitka Sea Water Source Heat Pump Project
Craig High School Wood Heat Conversion
Tuntutuliak Wind Heat Electrical Thermal Storage
Sitka Wastewater Treatment Plant Effluent Heat Pump
Wood Chip Boiler for The Native Village of Tazlina
Mendenhall Valley Library Geothermal HVAC System
AGSD Extension of Heating Loop
Nenana Collaborative Biomass Heating System Project
Alaska SeaLife Center Heat Recovery Project
Chickaloon Solar Thermal and Biomass Project
NEA Stack Heat to Power Project
Chuathbaluk Water System Heat Recovery
NWAB School District Solar Thermal Systems
Applicant
City of Atka
Village of Venetie
City of Galena
City and Borough of Sitka
City of Nunam Iqua
Native Village of Tuntutuliak
City of Emmonak
City of Brevig Mission
Cook Inlet Housing Authority
Ketchikan Gateway Borough
Haines Borough
Organized Village of Kake
City of St. Mary's
Village of Minto
City and Borough of Yakutat
City of Chevak
City of Grayling
Southeast Island School District
Hydaburg City School District
City of Holy Cross
Kwig Power Company
City and Borough of Sitka
City of Kotzebue
Puvurnaq Power Company
City of Eek
City and Borough of Sitka
Craig City School District
TCSA Electrical Services
City and Borough of Sitka
Native Village of Tazlina
City & Borough of Juneau
Alaska Gateway School District
Nenana School District
City of Seward
Chickaloon Native Village
Naknek Electric Association, Inc.
City of Chuathbaluk
Northwest Arctic Borough School District
Applicant Type
Local Government
Government Entity
Local Government
Local Government
Local Government
Government Entity
Government Entity
Government Entity
Government Entity
Local Government
Local Government
Government Entity
Government Entity
Government Entity
Local Government
Government Entity
Government Entity
Government Entity
Government Entity
Government Entity
Utility
Local Government
Local Government
Utility
Government Entity
Local Government
Government Entity
Utility
Local Government
Government Entity
Local Government
Government Entity
Government Entity
Local Government
Government Entity
Utility
Government Entity
Government Entity
Energy Source
Hydro to Heat
Heat Recovery
Biomass
Heat Pumps
Heat Recovery
Heat Recovery
Heat Recovery
Heat Recovery
Heat Pumps
Biomass
Biomass
Biomass
Heat Recovery
Biomass
Biomass
Heat Recovery
Heat Recovery
Biomass
Biomass
Heat Recovery
Wind to Heat
Heat Pumps
Biomass
Wind to Heat
Heat Recovery
Heat Pumps
Biomass
Wind to Heat
Heat Pumps
Biomass
Heat Pumps
Heat Recovery
Biomass
Heat Recovery
Biomass
Heat Recovery
Heat Recovery
Solar Thermal
Total Stage 2 Score
82.8333333333333
85.1666666666667
88
80.5
87.6666666666667
81.3333333333333
87.6666666666667
83
58.1666666666667
84.3333333333333
88.5
73.8333333333333
85.1666666666667
69.3333333333333
67.6666666666667
85.3333333333333
80.1666666666667
76.6666666666667
77.8333333333333
57.6666666666667
59.1666666666667
61.1666666666667
62.8333333333333
74.1666666666667
70.1666666666667
54.8333333333333
66.3333333333333
46.6666666666667
57.6666666666667
64.5
49.3333333333333
59.8333333333333
54.6666666666667
57.6666666666667
43.6666666666667
Ben / Cost
AEA B/C
3.18
1.68
4.31
1.69
2.2
1.54
2.56
1.51
1.12
2.46
1.72
1.62
1.66
1.02
1.45
1.83
1.47
1.47
1.83
0.55
1.37
0.91
1.12
1.7
1.01
0.5
1.12
1
0.73
1.19
0.86
0.97
0.66
1.13
0.97
1.48
Appl B/C
6.9
2.45
3.96
3.58
2.33
2.32
4.02
2.01
0.94
0.24
1.79
1.18
2.21
1.37
2.31
2.44
2.02
2.32
2.33
0.74
1.73
1.88
1.16
2.55
1.35
0.52
1.54
0.96
1.03
1.84
0.74
1.45
1.11
4.41
0.79
0.98
3.14
Cost of Energy ($/kWh)
0.7017
0.9
0.5633
0.0947
0.53
0.65
0.551
0.5358
0.1973
0.102
0.2202
0.6204
0.4936
0.5894
0.5031
0.4844
0.5551
0.4082
0.2402
0.5333
0.5975
0.0947
0.4176
0.5584
0.6036
0.0947
0.2855
0.65
0.0947
0.2844
0.121
0.4904
0.2242
0.105
0.1511
0.5046
0.8495
0.6337
Fuel Price $/gal
7.65
8.5
6.02
3.59
4.38
6.8
5.77
5.29
5.19
3.59
4.09
5.85
4.6
5
5.05
4.3
5
3.8
4.2
7.15
5.95
3.59
6.07
6.21
3.89
3.59
3.8
6.8
3.59
4.17
4.12
3.79
4.06
3.71
Stage 3 Review Scores (max)
1. Cost of Energy (35)
33.47
35
26.34
15.71
19.16
29.75
25.24
23.14
22.71
15.71
17.89
25.59
20.13
21.88
22.09
18.81
21.88
16.63
18.38
31.28
26.03
15.71
26.56
27.17
17.02
15.71
16.63
29.75
15.71
18.24
18.03
16.58
17.76
4.59
16.23
2. Match (15)
11
6
6
15
13
6
6
6
15
11
9
7
6
15
11
6
6
11
7
6
6
15
7
0
6
15
11
6
9
6
11
6
7
9
11
3. Tech & Econ Feas (20)
16.57
17.03
17.6
16.1
17.53
16.27
17.53
16.6
11.63
16.87
17.7
14.7666666666667
17.0333333333333
13.8666666666667
13.5333333333333
17.0666666666667
16.0333333333333
15.3333333333333
15.5666666666667
11.5333333333333
11.8333333333333
12.2333333333333
12.5666666666667
14.8333333333333
14.0333333333333
10.9666666666667
13.2666666666667
9.33333333333333
11.5333333333333
12.9
9.86666666666667
11.9666666666667
10.9333333333333
11.5333333333333
8.73333333333333
4. Readi- ness (5)
10
8
7.66666666666667
10
6
7.66666666666667
8
10
9
7.33333333333333
7.66666666666667
4
7.66666666666667
6
4
6
7.66666666666667
6
6
8
5.66666666666667
10
4
5.66666666666667
10
8
6
5.66666666666667
10
6
8
8
6
9
6
5. Benefit (15)
12
11.25
14.125
10.75
12.5
10.125
12.5
10.25
5.25
13
12.625
12
11.25
5.375
8.875
12.5
9
9.75
13.5
1.25
7.75
1.75
6
12.375
4.5
0.5
6.375
2.125
0.75
6.25
0.625
3.375
1
4.875
0.75
6. Local Supt (5)
3
4
5
5
5
3
3
4
5
5
2
4
5
5
5
5
4
5
3
5
2
5
5
0
5
5
2
2
5
4
4
2
5
5
2
7. Sustan-ability (5)
4
3.33333333333333
4.5
4.83333333333333
3.5
3
2.66666666666667
3.16666666666667
3.83333333333333
3.5
4.5
4
4.16666666666667
3.16666666666667
4.16666666666667
2.83333333333333
3.5
4
3.5
2.83333333333333
2.5
4.83333333333333
3
3
3.83333333333333
4.16666666666667
3.5
2.5
4.83333333333333
3
4.5
4
4
5
4.16666666666667
Total (100)
90.0366666666667
84.6166666666667
81.2316666666667
77.3933333333333
76.6933333333333
75.8083333333333
74.94
73.1566666666667
72.4266666666667
72.41
71.3816666666667
71.3566666666667
71.2466666666667
70.2883333333333
68.665
68.21
68.08
67.7133333333333
66.9466666666667
65.8966666666667
61.78
64.5266666666667
64.1266666666667
63.045
60.3866666666667
59.3433333333333
58.7716666666667
57.375
56.8266666666667
56.39
56.0216666666667
51.9216666666667
51.6933333333333
48.9983333333333
48.88
State- wide Rank
1
3
4
5
6
7
9
12
16
17
18
19
20
21
23
25
26
27
29
30
31
34
35
36
39
40
42
43
46
47
48
55
57
60
61
Project Cost
Project Cost
135254
204428
3144200
232620
603000
469311
689251
753313
362805
1957261
1374892
9926335
1423292
757299
403550
335456
558814
332590
1058775
627900
497773
302737
230200
2692700
320456
297408
388838
585450
259817
962984
278150
825000
629000
3244225
250000
152867
27341616
1940379
232430
467252
2640061
29981677
Grant Requested
114965
198474
3096898
232620
450000
455642
689251
731372
318289
1412889
1237403
8937803
208073
735242
274750
286166
558814
322903
940950
583900
497773
293737
230200
2495189
311456
288745
373838
492850
250817
849984
267150
660000
625000
367965
225000
127065
21205370
1843379
225660
456252
2525291
23730661
Match Offered
20289
5954
1021393
296936
86448
1431020
25000
0
9687
40000
4000
9000
9000
9000
113000
165000
4000
25802
1844509
97000
0
97000
1941509
Project Phase
Construction
DesignConstruction
Construction
DesignConstruction
Construction
Design Construction
DesignConstruction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
Design
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
DesignConstruction
Construction
DesignConstruction
DesignConstruction
DesignConstruction
DesignConstruction
Design
Construction
DesignConstruction
FeasibilityDesign
Construction
DesignConstruction
Construction
Recommendation
AEA Recomnd
Full
Full
Full SP
Full
Full
Full
Full SP
Full
Full
Partial SP
Partial
Partial
Partial
Full SP
Partial SP
Full
Full
Full
Partial SP
Full
Full SP
Full
Partial SP
Full SP
Full SP
Partial SP
Partial SP
Full SP
Partial SP
Full
Full
Full
Full
Full
Partial SP
Not Recommended
Not Recommended
Not Recommended
Recommend Funding
114965
198474
3096898
232620
450000
455642
689251
731372
318289
620000
1237403
8144914
175000
735242
274750
103000
558814
322903
940950
125000
497773
293737
230200
270000
311456
288745
56841
125000
250817
849984
125000
660000
625000
367965
225000
97000
16655091
16655091
Cumulative Funding
114965
313439
3410337
3642957
4092957
4548599
5237850
5969222
6287511
6907511
8144914
SubTotal
8319914
9055156
9329906
9432906
9991720
10314623
11255573
11380573
11878346
12172083
12402283
12672283
12983739
13272484
13329325
13454325
13705142
14555126
14680126
15340126
15965126
16333091
16558091
16655091
SubTotal
TOTAL
Rounds 1-6
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
Round 7
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast ***
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
Cumulative Rounds 1-7
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
** In the Southeast Energy Region, # 1021 Haines Borough Municipal Buildings Heat Application recommended funding would be reduced by
~58% to $711,925 to meet the governor's budget of $20million for REF 7 funding
Total Rounds 1-4 Funding
17376231.85
20355815
11214341.6
15715630.73
16486918.68
27511331.25
2185341.67
23203362
26401441.68
52382472.27
11329179.11
565439
224727504.84
Recommendation
Grant Funding
114965
1073372
2352653
5914491
0
1718393
0
0
3772209
1564545
3489372
0
20000000
Recommendation
Total Rounds 1-7 Funding
17491196.85
21429187
13566994.6
21630121.73
16486918.68
29229724.25
2185341.67
23203362
30173650.68
53947017.27
14818551.11
565439
244727504.84
% of Total Funding
7.81646997833799E-02
7.38400616231296E-02
4.38017662601444E-02
8.04170940121372E-02
4.81279670690326E-02
0.137080516437654
1.34404537029497E-02
0.121024210394583
0.154099204614528
0.175407132395567
7.15605277853829E-02
3.03636592151149E-03
1
% Total
0.00574825
0.0536686
0.11763265
0.29572455
0
0.08591965
0
0
0.18861045
0.07822725
0.1744686
0
1
% of Total Funding
7.14721333077602E-02
8.75634596691947E-02
5.54371467517308E-02
8.83845146222592E-02
6.73684745438767E-02
0.119437838705993
8.92969374827219E-03
9.48130534619314E-02
0.123294889553698
0.220437082890499
6.05512286806021E-02
2.31048406418264E-03
1
Cost of Power
Avg cost power ($/kWh)
0.46
0.47
0.53
0.34
0.21
0.56
0.16
0.539091761553918
0.16
0.15
0.6
0.2
Cost of Power
Avg cost power ($/kWh)
0.46
0.47
0.53
0.34
0.21
0.56
0.16
0.539091761553918
0.16
0.15
0.6
0.2
Allocation cost of power basis
2201435.26989203
2249292.55836794
2536436.28922342
1627147.80818106
1005003.05799419
2680008.15465116
765716.615614618
2579946.99476743
765716.615614618
717859.327138705
2871437.30855482
20000000
Allocation cost of power basis
25707306.0708034
26266160.5506034
29619287.4294039
19001052.3132025
11735944.0758015
31295850.8688041
8941671.67680117
30127384.596772
8941671.67680117
8382817.19700109
33531268.7880044
11177089.5960015
244727504.84
Additional funding needed to reach 50%
985752.634946014
51274.2791839703
-1084434.85538829
-5100917.09590947
502501.528997093
-378388.922674418
382858.307807309
1289973.49738372
-3389350.69219269
-1205615.33643065
-2053653.34572259
0
Additional funding needed to reach 50%
-4637543.81459832
-8296106.72469829
1242649.11470193
-12129595.5733988
-10618946.6420992
-13581798.815598
2285494.16840058
-8139669.701614
-25702814.8415994
-49755608.6714995
1947083.28400218
Population
% Total
1.31229613896685E-02
0.014646522520138
0.01
0.01
0.01
3.73337034640035E-02
1.18899097967886E-02
1.05164452607404E-02
0.75
0.11
0.014899911394591
1
Population
% Total
1.31229613896685E-02
0.014646522520138
0.01
0.01
0.01
3.73337034640035E-02
1.18899097967886E-02
1.05164452607404E-02
0.75
0.11
0.014899911394591
1
Allocation per capita basis
262459.22779337
292930.450402759
200000
200000
200000
746674.069280069
237798.195935772
210328.905214808
15000000
2200000
297998.227891821
20000000
Allocation per capita basis
3211549.59700523
3584406.91093623
2447275.0484
2447275.0484
2447275.0484
9136584.09518203
2909787.95734074
2573663.40844744
183545628.63
26920025.5324
3646418.13793535
244727504.84
Even Split
Allocation per region basis
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
1818181.81818182
20000000
Even Split
Allocation per region basis
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
22247954.9854545
244727504.84
Rounds 1-6
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
Round 7
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
Cumulative Rounds 1-7
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
Total Rounds 1-6 Funding
17376231.85
20355815
11214341.6
15715630.73
16486918.68
27511331.25
2185341.67
23203362
26401441.68
52382472.27
11329179.11
565439
224727504.84
Recommendation
Grant Funding
1162015
1073372
3238653
6209491
1870548
8860179
2457818
270000
4582924
6155257
5209798
0
41090055
Recommendation
Total Rounds 1-7 Funding
18538246.85
21429187
14452994.6
21925121.73
18357466.68
36371510.25
4643159.67
23473362
30984365.68
58537729.27
16538977.11
565439
265817559.84
% of Total Funding
7.81646997833799E-02
7.38400616231296E-02
4.38017662601444E-02
8.04170940121372E-02
4.81279670690326E-02
0.137080516437654
1.34404537029497E-02
0.121024210394583
0.154099204614528
0.175407132395567
7.15605277853829E-02
3.03636592151149E-03
1
% Total
2.82797139113102E-02
2.61224279208193E-02
7.88184148208125E-02
0.151119072486031
4.55231320571365E-02
0.215628307141473
5.98153981541276E-02
6.57093303963696E-03
0.111533654554612
0.149799191069469
0.126789754844573
0
1
% of Total Funding
6.97404899102922E-02
0.080616145197099
5.43718579340639E-02
0.0824818410913
6.90603987601484E-02
0.136828847093069
1.74674678106096E-02
8.83062880199826E-02
0.116562523930511
0.220217691055605
6.22192797193499E-02
2.12716947796958E-03
1
Cost of Power
Avg cost power ($/kWh)
0.46
0.47
0.53
0.34
0.21
0.56
0.16
0.539091761553918
0.16
0.15
0.6
0.2
Cost of Power
Avg cost power ($/kWh)
0.46
0.47
0.53
0.34
0.21
0.56
0.16
0.539091761553918
0.16
0.15
0.6
0.2
Allocation cost of power basis
4522854.81594016
4621177.74672147
5211115.33140932
3342979.64656447
2064781.54640747
5506084.12375324
1573166.89250093
5300508.19560392
1573166.89250093
1474843.96171962
5899375.84687847
41090055
Allocation cost of power basis
27922702.7393942
28529718.0163375
32171809.6779976
20638519.4160739
12747320.8158104
33992855.5088277
9712244.43109362
32723693.4937531
9712244.43109362
9105229.15415027
36420916.6166011
12140305.538867
265817559.84
Additional funding needed to reach 50%
1099412.40797008
1237216.87336073
-633095.334295341
-4538001.17671777
-838157.226796267
-6107136.93812338
-1671234.55374954
2380254.09780196
-3796340.55374954
-5417835.01914019
-2260110.07656076
0
Additional funding needed to reach 50%
-4576895.48030292
-7164327.99183124
1632910.23899881
-11605862.021963
-11983806.2720948
-19375082.4955862
212962.54554681
-7111515.25312346
-26128243.4644532
-53985114.6929249
1671481.19830054
Population
% Total
1.31229613896685E-02
0.014646522520138
0.01
0.01
0.01
3.73337034640035E-02
1.18899097967886E-02
1.05164452607404E-02
0.75
0.11
0.014899911394591
1
Population
% Total
1.31229613896685E-02
0.014646522520138
0.01
0.01
0.01
3.73337034640035E-02
1.18899097967886E-02
1.05164452607404E-02
0.75
0.11
0.014899911394591
1
Allocation per capita basis
539223.205264356
601826.415911207
410900.55
410900.55
410900.55
1534043.92868959
488557.047495082
432121.314168312
30817541.25
4519906.05
612238.178698872
41090055
Allocation per capita basis
3488313.57447622
3893302.87644468
2658175.5984
2658175.5984
2658175.5984
9923953.95459155
3160546.80890005
2795455.81740094
199363169.88
29239931.5824
3960658.0887424
265817559.84
Even Split
Allocation per region basis
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
3735459.54545455
41090055
Even Split
Allocation per region basis
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
24165232.7127273
265817559.84
Energy Region
Aleutians
Bering Straits
Bristol Bay
Copper River/Chugach
Kodiak
Lower Yukon-Kuskokwim
North Slope
Northwest Arctic
Railbelt
Southeast
Yukon-Koyukuk/Upper Tanana
Statewide
TOTAL
Total Rounds 1-6 Funding
17376231.85
20355815
11214341.6
15715630.73
16486918.68
27511331.25
2185341.67
23203362
26401441.68
52382472.27
11329179.11
565439
224727504.84
% of Total Funding
7.81646997833799E-02
7.38400616231296E-02
4.38017662601444E-02
8.04170940121372E-02
4.81279670690326E-02
0.137080516437654
1.34404537029497E-02
0.121024210394583
0.154099204614528
0.175407132395567
7.15605277853829E-02
3.03636592151149E-03
1
Total Population for known residential COE $/kWh
8876
9294
7311
9005
13555
24393
9003
7465
538430
70188
6630
704150
% total
1.26052687637577E-02
1.31988922814741E-02
1.03827309522119E-02
1.27884683661152E-02
1.92501597670951E-02
3.46417666690336E-02
1.27856280622027E-02
1.06014343534758E-02
0.764652417808706
9.96776255059291E-02
9.41560746999929E-03
1
Avg cost power ($/kWh)
0.46
0.47
0.53
0.34
0.21
0.56
0.16
0.539091761553918
0.16
0.15
0.6
0.2
Allocation cost of power basis
24736152.7635
25273895.2149
28500349.9231
18283243.3469
11292591.479
30113577.2773
8603879.2221
28989252.5377
8603879.2221
8066136.7707
32264547.0828
224727504.84
Additional funding needed to reach 50%
-5008155.46825982
-7718867.39256981
3035833.36157021
-6574009.05653986
-10840622.9405099
-12454542.6113598
2116597.94104006
-8708735.73116146
-22099502.0689599
-48349403.8846499
4803094.43140024
Allocation per capita basis
2832750.5971
2966154.1291
2333285.2203
2873920.5866
4326040.3722
7784957.7868
2873282.2922
2382433.89
171838429.924
22400304.0683
2115945.9733
224727504.84
Allocation region basis
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
20429773.1673
224727504.84