HomeMy WebLinkAbout7a REFAC REF7_Rankings_01062014 11x17Renewable Energy Fund Round 7 - Standard Applications Recommended Applications and Funding Prior to Stage 4 Regional Spread Count Energy Region ID Project Name Applicant Applicant Type Energy Source Total Stage 2 Score AEA B/C Appl B/C Cost of Energy ($/kWh) 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Project Cost Grant Requested Match Offered Phase AEA Recomnd EarlyRecommend Funding Cumulative Funding 1 S Bristol Bay 1036 Packers Creek Hydroelectric Project Phase II Chignik Lagoon Village Council Government Entity Hydro 86.33 1.66 3.85 $0.69 30.26 11.00 17.27 5.00 11.00 5.00 3.83 83.36 2 $5,389,149 $2,352,653 $3,036,496 Construction FULL $2,352,653 $2,352,653 2 S Bering Straits 1068 Stebbins St Michael Wind Energy Final Design and Permitting Alaska Village Electric Cooperative, Inc.Utility Wind 83.33 1.80 2.74 $0.56 24.42 7.00 16.67 3.00 11.63 5.00 4.50 72.21 7 $3,946,050 $342,000 $18,000 Design FULL $342,000 $2,694,653 3 S Yukon-Koyukok/Upper Tanana1027 Chisana Mountain Wind Feasibility Project Alaska Power Company Utility Wind 85.00 2.55 $0.49 21.46 11.00 17.00 2.50 12.50 2.00 4.17 70.63 10 $148,800 $119,000 $29,800 Feasibility FULL $119,000 $2,813,653 4 S Yukon-Koyukok/Upper Tanana1077 Yerrick Creek Hydroelectric Project Native Village of Tanacross Government Entity Hydro 58.33 4.23 9.84 $0.49 21.46 15.00 11.67 3.00 11.25 5.00 3.17 70.54 11 $19,000,000 $6,000,000 $11,500,000 Construction PARTIAL $75,000 $2,888,653 5 S Lower Yukon-Kuskokwim 1067 Mountain Village Wind Feasibility and Conceptual Design Alaska Village Electric Cooperative, Inc.Utility Wind 79.17 1.70 1.23 $0.54 23.80 7.00 15.83 2.50 11.63 5.00 4.50 70.26 12 $4,833,000 $123,500 $6,500 Feasibility FULL $123,500 $3,012,153 6 S Railbelt 1082 Stetson Creek Diversion Cooper Lake Dam Facilities Project Chugach Electric Association, Inc.Utility Hydro 94.33 7.11 0.89 $0.15 6.78 15.00 18.87 5.00 12.88 5.00 5.00 68.52 15 $21,772,523 $3,453,920 $13,591,226 Construction FULL $3,453,920 $6,466,073 7 S Copper River/Chugach 1015 Allison Creek Hydroelectric Project Construction Copper Valley Electric Association, Inc.Utility Hydro 89.33 3.96 3.68 $0.28 12.44 15.00 17.87 4.00 12.13 2.00 5.00 68.43 16 $49,000,000 $5,914,491 $5,914,491 Construction FULL $5,914,491 $12,380,564 8 S Southeast 1025 Gunnuk Creek Hydroelectric Feasibility Study Inside Passage Electric Cooperative Utility Hydro 73.00 4.28 0.00 $0.62 27.14 7.00 14.60 2.00 11.63 2.00 3.83 68.20 17 $300,000 $275,000 $25,000 ReconFeasibility PARTIAL SP $80,000 $12,460,564 SubTotal - Top Ranking $20 million prior to stage 4 regional spreading $104,389,522 $18,580,564 $34,121,513 $12,460,564 SubTotal 9 S Bristol Bay 1072 Igiugig Wind Resource Feasibility and Conceptual Design Igiugig Village Council Government Entity Wind 47.00 0.86 1.40 $0.80 35.00 13.00 9.40 2.50 0.00 3.00 3.17 66.07 25 $110,000 $80,000 $30,000 Feasibility FULL SP $80,000 $12,540,564 10 S Lower Yukon-Kuskokwim 1057 Mertarvik Renewable Energy Feasibility and Conceptual DesignUngusraq Power Company (UPC) / Newtok Traditional CouncilIPP Wind 53.00 1.14 $0.80 35.00 7.00 10.60 2.00 4.50 2.00 1.67 62.77 30 $8,000,000 $375,000 $25,000 ReconFeasibility PARTIAL $75,000 $12,615,564 11 S Lower Yukon-Kuskokwim 1069 St Marys Pitkas Point Wind Energy Construction Project Alaska Village Electric Cooperative, Inc.Utility Wind 65.00 1.19 1.47 $0.49 21.60 9.00 13.00 5.00 4.50 5.00 4.33 62.43 31 $4,782,528 $4,274,575 $507,953 Construction FULL SP $4,274,575 $16,890,139 12 S Aleutians 1083 Waterfall Creek Hydroelectric Project City of King Cove Local Government Hydro 71.17 1.37 1.87 $0.28 12.26 15.00 14.23 2.83 7.63 5.00 5.00 61.95 34 $5,500,000 $800,000 $1,900,000 Construction FULL SP $800,000 $17,690,139 13 S Kodiak 1065 Old Harbor Hydroelectric Project Final Design and Permitting Alaska Village Electric Cooperative, Inc.Utility Hydro 56.33 1.11 1.79 $0.58 25.21 7.00 11.27 2.00 5.38 5.00 4.50 60.35 36 $8,155,000 $1,092,500 $57,500 Design PARTIAL $400,000 $18,090,139 14 S Southeast 1023 Swan Lake Reservoir Expansion Project The Southeast Alaska Power Agency Government Entity Hydro 81.17 4.07 4.07 $0.10 4.47 15.00 16.23 3.00 11.25 5.00 5.00 59.95 37 $13,391,869 $4,000,000 $8,813,869 DesignConstructionPARTIAL SP $560,488 $18,650,627 15 S Railbelt 1084 Juniper Creek Hydroelectric Reconnaissance Study Ram Valley, LLC IPP Hydro 73.17 2.45 3.49 $0.15 6.61 15.00 14.63 2.00 11.25 4.00 3.83 57.33 39 $2,350,000 $35,750 $35,750 Recon FULL $35,750 $18,686,377 16 S Aleutians 1062 False Pass Hydrokinetic Feasibility Study City of False Pass Local Government Hydrokinetic 42.83 0.22 0.22 $0.51 22.45 13.00 8.57 2.50 0.75 5.00 2.50 54.77 43 $5,000,000 $428,646 $137,820 Feasibility FULL $428,646 $19,115,023 17 S Aleutians 1070 Sand Point Energy Storage Project TDX Sand Point Generating, LLC Utility Storage of Renewable47.50 1.08 1.01 $0.58 22.55 9.00 9.50 3.00 4.125 2.00 4.00 54.18 45 $1,397,403 $1,256,403 $141,000 DesignConstructionPARTIAL SP Y $200,000 $19,315,023 18 S Southeast 1022 SEAPA Wind Resource Assessment Phase I and II The Southeast Alaska Power Agency Government Entity Wind 90.33 1.84 $0.10 4.47 7.00 18.07 2.00 13.13 5.00 3.67 53.33 47 $170,583 $158,771 $11,812 ReconFeasibility FULL $158,771 $19,473,794 19 S Kodiak 1030 Flywheels ESS for Kodiak Pier Electric Crane Kodiak Electric Association, Inc.Utility Storage of Renewable66.83 0.51 1.02 $0.19 8.32 15.00 13.37 3.50 3.25 5.00 4.00 52.44 48 $3,800,000 $1,900,000 $1,900,000 Construction PARTIAL SP $1,470,548 $20,944,342 20 S Lower Yukon-Kuskokwim 1066 Marshall Wind Energy Final Design and Permitting Project Alaska Village Electric Cooperative, Inc.Utility Wind 52.17 0.98 1.60 $0.50 22.05 7.00 10.43 2.50 1.50 5.00 3.83 52.32 49 $3,214,875 $353,400 $18,600 Design FULL SP $353,400 $21,297,742 21 S North Slope 1049 Atqasuk Transmission Line Design and Permitting Project North Slope Borough Local Government Transmission 74.17 3.30 3.55 $0.15 6.56 9.00 14.83 2.50 12.38 2.00 5.00 52.27 50 $17,342,837 $2,017,818 $201,782 Design FULL SP $2,017,818 $23,315,560 22 S Railbelt 1028 Carlo Creek Hydroelectric Project Reconnaissance Study Native Village of Cantwell Government Entity Hydro 61.00 1.90 1.88 $0.22 9.81 9.00 12.20 1.50 11.63 5.00 3.00 52.14 51 $8,340,000 $54,000 $6,000 Recon PARTIAL $35,000 $23,350,560 23 S Bristol Bay 1079 Koliganek Wind Diesel and Heat Recovery New Koliganek Village Council Government Entity Wind 52.33 1.05 1.60 $0.51 22.09 6.00 10.47 3.83 4.13 2.00 3.17 51.68 54 $2,566,000 $306,000 $10,000 Design FULL SP Y $306,000 $23,656,560 24 S Aleutians 1080 False Pass Wind Energy Project City of False Pass Electric Utility Local Government Wind 46.33 0.67 0.61 $0.51 22.45 9.00 9.27 2.50 0.38 4.00 1.67 49.26 55 $52,050 $47,050 $5,000 Feasibility FULL SP $47,050 $23,703,610 25 S Railbelt 1081 Waste to Energy Reconnaissance Study Chugach Electric Association, Inc.Utility Biomass 61.50 1.31 1.34 $0.15 6.78 15.00 12.30 0.00 8.25 2.00 4.00 48.33 57 TBD $150,000 $100,000 Recon PARTIAL $50,000 $23,753,610 26 S Copper River/Chugach 1075 Cascade Creek Hydroelectric Project Feasibility Study Blue Hole Properties, LLC (BHP)IPP Hydro 45.83 1.30 3.46 $0.28 12.44 11.00 9.17 3.00 6.38 5.00 1.33 48.32 58 $2,250,000 $170,000 $30,000 Feasibility FULL $170,000 $23,923,610 27 S Northwest Arctic 1001 Northwest Arctic Borough Solar PV Project Northwest Arctic Borough Local Government Solar PV 46.00 0.68 0.83 $0.42 18.27 6.00 9.20 4.50 0.38 3.00 4.50 45.85 61 $77,000 $76,000 $1,000 Construction FULL SP $75,000 $23,998,610 28 S Bristol Bay 1018 Chignik Hydroelectric Project Design and Permitting City of Chignik Local Government Hydro 52.17 1.02 1.60 $0.48 20.81 0.00 10.43 3.50 4.88 0.00 4.00 43.62 63 BLANK $1,375,000 $0 Design PARTIAL SP $500,000 $24,498,610 29 S North Slope 1048 Kaktovik Wind Diesel Design and Permitting North Slope Borough Local Government Wind 65.83 1.03 1.37 $0.15 6.56 9.00 13.17 3.00 4.00 2.00 4.50 42.23 64 $4,565,200 $440,000 $44,000 Design FULL $440,000 $24,938,610 SubTotal - All Recommended Projects $195,454,867 $37,971,477 $48,098,599 $24,938,610 SubTotal Not Recommended Projects: 30 S Southeast 1019 Survey Creek Hydroelectric Project Edna Bay Community Local Government Hydro 39.33 1.48 1.37 N/A $3,562,772 $62,272 $3,500 Recon Did Not Pass Stage 2 31 S Railbelt 1002 Poncelet Kinetics RHK100 Prototype Demonstration Whitestone Power and Communications IPP Hydrokinetic 39.17 0.16 0.16 $0.22 $1,940,558 $1,560,558 $120,000 Construction Did Not Pass Stage 2 32 S Southeast 1024 Walker Lake Hydro Project Feasibility Tlingit-Haida Regional Electrical Authority Utility Hydro 39.00 1.05 $0.62 $825,000 $700,000 $125,000 ReconFeasibility Did Not Pass Stage 2 33 S Railbelt 1029 Jack River Hydroelectric Project Feasibility Study Native Village Of Cantwell Government Entity Hydro 35.33 0.79 1.21 $0.22 $31,500,000 $213,750 $11,250 Feasibility Did Not Pass Stage 2 34 S Aleutians 1056 Adak Wind Data Collection Analysis and Preliminary Design City of Adak, Alaska Local Government Wind 35.33 0.47 0.27 $0.81 $72,400,000 $160,000 $0 Feasibility Did Not Pass Stage 2 35 S Northwest Arctic 1059 Cosmos Hills Hydroelectric Design and Permitting Alaska Village Electric Cooperative Utility Hydro 27.50 0.71 1.05 $0.74 $38,660,000 $2,922,000 $150,000 Design Did Not Pass Stage 2 36 S Kodiak 1004 Karluk Tribal Council Wind Energy System Karluk Tribal Council Government Entity Wind 21.17 0.76 1.83 $0.60 $1,300,000 $81,000 $300 FeasibilityDesign Did Not Pass Stage 2 37 S Southeast 1003 Mahoney Lake Hydroelectric Phase III and IV City of Saxman Local Government Hydro 1.79 6.91 $0.10 $51,000,000 $4,000,000 $4,000,000 DesignConstructionNot Recommended 38 S Southeast 1020 Excursion Inlet Hydro Project Feasibility and Conceptual DesignHaines Borough Local Government Hydro 0.09 3.93 N/A $14,500,000 $213,536 $10,000 Feasibility Not Recommended 39 S Southeast 1034 Metlakatla to Ketchikan Intertie Metlakatla Indian Community Government Entity Transmission 1.77 1.28 $0.10 $14,510,599 $9,281,615 $0 DesignConstructionNot Recommended 40 S Southeast 1035 Feasibility Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative Utility Geothermal 0.44 1.24 $0.65 $49,000,000 $3,378,500 $0 Feasibility Not Recommended 41 S Bristol Bay 1046 Port Alsworth Hydropower PreConstruction Phase Port Alsworth Improvement Corporation Government Entity Hydro 1.52 $0.68 $7,224,213 $159,000 $10,000 ReconFeasibility Not Recommended 42 S Bristol Bay 1050 Bristol Bay Borough School District Solar PV Project Bristol Bay Borough School District Government Entity Solar PV 0.96 1.28 $0.50 $235,000 $230,000 $5,000 DesignConstructionNot Recommended 43 S Northwest Arctic 1058 Noatak Utility Size Photovoltaic Array Construction Project Northwest Arctic Borough Local Government Solar PV 1.24 1.22 $0.74 $447,800 $447,800 $0 Construction Not Recommended 44 S Bristol Bay 1063 Iliamna Solar Ground Mounted Energy System Iliamna Village Council Government Entity Solar PV 0.01 0.40 $0.59 $2,000,000 $800,000 $120,000 ReconFeasibility Not Recommended 45 S Copper River/Chugach 1064 Chenega Bay Hydroelectric Construction Native Village of Chenega Government Entity Hydro 1.14 1.02 $0.44 $1,650,000 $1,400,000 $0 DesignConstructionNot Recommended 46 S Lower Yukon-Kuskokwim 1039 Four Villages lntertie Design Nuvista Light and Electric Cooperative Government Entity Transmission $1,250,000 $1,250,000 $0 Feasibility Did Not Pass Stage 1 47 S Lower Yukon-Kuskokwim 1054 Multiple Alternative Energy Sources for Napakiak Napakiak lrcinraq Power Company Utility Wind $2,284,000 $141,000 $20,000 DesignConstructionDid Not Pass Stage 1 48 S Lower Yukon-Kuskokwim 1086 Chefornak High Penetration Wind Diesel System Naterqak Light Plant, City of Chefornak Local Government Wind $4,358,784 $4,308,784 $50,000 DesignConstructionDid Not Pass Stage 1 Sub Total - Not Recommended Projects $298,648,726 $31,309,815 $4,625,050 Grand Total - All Applications $494,103,593 $69,281,292 $52,723,649 $24,938,610 GrandTotal Ben / Cost Stage 3 Review Scores (max)Project Cost Recommendation DRAFT 1/6/2014 for REFAC Review DRAFT Page 1 Renewable Energy Fund Round 7 - Heat Applications Recommended Applications and Funding Prior to Stage 4 Regional Spread Count Energy Region ID Project Name Applicant Applicant Type Energy Source Total Stage 2 Score AEA B/C Appl B/C Cost of Energy ($/kWh ) Fuel Price $/gal 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Project Cost Grant Requested Match Offered Phase AEA Recomnd EarlyRecommend Funding Cumulative Funding 1 H Aleutians 1026 Atka Dispatchable Heat City of Atka Local Government Hydro to Heat 82.83 3.18 6.90 $0.70 $7.65 33.47 11.00 16.57 5.00 12.00 3.00 4.00 85.04 1 $135,254 $114,965 $20,289 Construction FULL $114,965 $114,965 2 H Yukon-Koyukok/Upper Tanana1044 Venetie Clinic Heat Recovery Village of Venetie Government Entity Heat Recovery 85.17 1.68 2.45 $0.90 $8.50 35.00 6.00 17.03 4.00 11.25 4.00 3.33 80.62 3 $204,428 $198,474 $11,908 DesignConstructionFULL $198,474 $313,439 3 H Yukon-Koyukok/Upper Tanana1047 Galena Community Wood Heat Project City of Galena Local Government Biomass 88.00 4.31 3.96 $0.56 $6.02 26.34 6.00 17.60 3.83 14.13 5.00 4.50 77.40 4 $3,144,200 $3,096,898 $47,302 Construction FULL SP $3,096,898 $3,410,337 4 H Lower Yukon-Kuskokwim 1052 Nunam Iqua Heat Recovery Project City of Nunam Iqua Local Government Heat Recovery 87.67 2.20 2.33 $0.53 $4.38 19.16 13.00 17.53 3.00 12.50 5.00 3.50 73.69 5 $603,000 $450,000 $153,000 Construction FULL $450,000 $3,860,337 5 H Southeast 1011 Sitka Centennial Hall Air Source Heat Pump City and Borough of Sitka Local Government Heat Pumps 80.50 1.69 3.58 $0.09 $3.59 15.71 15.00 16.10 5.00 10.75 5.00 4.83 72.39 6 $232,620 $232,620 $1,021,393 DesignConstructionFULL $232,620 $4,092,957 6 H Lower Yukon-Kuskokwim 1085 Tuntutuliak Heat Recovery Native Village of Tuntutuliak Government Entity Heat Recovery 81.33 1.54 2.32 $0.65 $6.80 29.75 6.00 16.27 3.83 10.13 3.00 3.00 71.98 8 $469,311 $455,642 $13,669 DesignConstructionFULL $455,642 $4,548,599 7 H Lower Yukon-Kuskokwim 1061 Emmonak Heat Recovery System City of Emmonak Government Entity Heat Recovery 87.67 2.56 4.02 $0.55 $5.77 25.24 6.00 17.53 4.00 12.50 3.00 2.67 70.94 9 $689,251 $689,251 $20,677 DesignConstructionFULL SP $689,251 $5,237,850 8 H Southeast 1087 Kake Community Energy Organized Village of Kake Government Entity Biomass 73.83 1.62 1.18 $0.62 $5.85 25.59 7.00 14.77 2.00 12.00 4.00 4.00 69.36 13 $1,423,292 $208,073 $20,000 Design PARTIAL Y $175,000 $5,412,850 9 H Southeast 1037 Ketchikan Gateway Borough Biomass Heating Project Ketchikan Gateway Borough Local Government Biomass 84.33 2.15 0.24 $0.10 $3.59 15.71 11.00 16.87 3.67 13.00 5.00 3.50 68.74 14 $1,957,261 $1,412,889 $353,222 Construction PARTIAL SP $620,000 $6,032,850 10 H Bering Straits 1040 Brevig Mission Water System Heat Recovery City of Brevig Mission Government Entity Heat Recovery 83.00 1.51 2.01 $0.54 $5.29 23.14 6.00 16.60 5.00 10.25 4.00 3.17 68.16 18 $753,313 $731,372 $21,941 DesignConstructionFULL $731,372 $6,764,222 11 H Railbelt 1031 Seldovia House Ground Source Heat Pump Project Cook Inlet Housing Authority Government Entity Heat Pumps 58.17 1.12 0.94 $0.20 $5.19 22.71 15.00 11.63 4.50 5.25 5.00 3.83 67.93 19 $362,805 $318,289 $411,835 DesignConstructionFULL $318,289 $7,082,511 12 H Southeast 1021**Haines Borough Municipal Buildings Biomass Project Haines Borough Local Government Biomass 88.50 1.72 1.79 $0.22 $4.09 17.89 9.00 17.70 3.83 12.63 2.00 4.50 67.55 20 $1,374,892 $1,237,403 $137,448 DesignConstructionFULL SP $1,237,403 $8,319,914 SubTotal - Top Ranking $20 million prior to stage 4 regional spreading $11,349,627 $9,145,876 $2,232,684 $8,319,914 SubTotal 13 H Lower Yukon-Kuskokwim 1043 St Marys Heat Recovery System City of St. Mary's Government Entity Heat Recovery 85.17 1.61 2.21 $0.49 $4.60 20.13 6.00 17.03 3.83 11.25 5.00 4.17 67.41 21 $757,299 $735,242 $22,057 DesignConstructionFULL $735,242 $9,055,156 14 H Yukon-Koyukok/Upper Tanana1032 Biomass Heat for Minto Community Buildings Village of Minto Government Entity Biomass 69.33 1.02 1.37 $0.59 $5.00 21.88 15.00 13.87 3.00 5.38 5.00 3.17 67.29 22 $403,550 $274,750 $278,800 DesignConstructionFULL SP $274,750 $9,329,906 15 H Southeast 1053 Yakutat Biomass District Heating Loop City and Borough of Yakutat Local Government Biomass 67.67 1.45 2.31 $0.50 $5.05 22.09 11.00 13.53 2.00 8.88 5.00 4.17 66.67 23 $335,456 $286,166 $49,290 DesignConstructionPARTIAL SP Y $103,000 $9,432,906 16 H Lower Yukon-Kuskokwim 1073 Kongiganak Wind Heat Electrical Thermal Storage Puvurnaq Power Company Utility Wind to Heat 74.17 1.70 2.55 $0.56 $6.21 27.17 6.00 14.83 2.83 12.38 0.00 3.00 66.21 24 $320,456 $311,456 $9,000 Construction FULL SP $311,456 $9,744,362 17 H Lower Yukon-Kuskokwim 1041 Chevak Water and Vacuum Plant Heat Recovery City of Chevak Government Entity Heat Recovery 85.33 1.83 2.44 $0.48 $4.30 18.81 6.00 17.07 3.00 12.50 5.00 2.83 65.21 26 $558,814 $558,814 $16,765 DesignConstructionFULL SP $558,814 $10,303,176 18 H Southeast 1017 Southeast Island School District Wood Boilers Southeast Island School District Government Entity Biomass 76.67 1.47 2.32 $0.41 $3.80 16.63 11.00 15.33 3.00 9.75 5.00 4.00 64.71 27 $1,058,775 $940,950 $177,825 Construction FULL SP $940,950 $11,244,126 19 H Yukon-Koyukok/Upper Tanana1045 Grayling Heat Recovery System City of Grayling Government Entity Heat Recovery 80.17 1.47 2.02 $0.56 $5.00 21.88 6.00 16.03 3.83 9.00 4.00 3.50 64.25 28 $332,590 $322,903 $19,374 DesignConstructionFULL $322,903 $11,567,029 20 H Southeast 1016 Hydaburg Schools Wood Fired Boiler Project Hydaburg City School District Government Entity Biomass 77.83 1.91 2.45 $0.24 $4.20 18.38 7.00 15.57 3.00 13.50 3.00 3.50 63.95 29 $627,900 $583,900 $44,000 DesignConstructionPARTIAL SP Y $125,000 $11,692,029 21 H Lower Yukon-Kuskokwim 1071 Kwigillingok Wind Heat Electrical Thermal Storage Kwig Power Company Utility Wind to Heat 64.17 1.53 1.73 $0.60 $5.95 26.03 6.00 12.83 2.83 10.00 2.00 2.50 62.20 32 $302,737 $293,737 $9,000 Construction FULL SP $293,737 $11,985,766 22 H Northwest Arctic 1038 Kotzebue Paper and Wood Waste to Energy Project City of Kotzebue Local Government Biomass 62.83 1.12 1.16 $0.42 $6.07 26.56 7.00 12.57 2.00 6.00 5.00 3.00 62.13 33 $2,692,700 $2,495,189 $95,000 DesignConstructionPARTIAL SP Y $270,000 $12,255,766 23 H Yukon-Koyukok/Upper Tanana1060 Holy Cross Water System Heat Recovery City of Holy Cross Government Entity Heat Recovery 57.67 0.55 0.74 $0.53 $7.15 31.28 6.00 11.53 4.00 1.25 5.00 2.83 61.90 35 $497,773 $497,773 $14,933 DesignConstructionFULL $497,773 $12,753,539 24 H Southeast 1013 Sitka Kettleson Library Air Source Heat Pump City and Borough of Sitka Local Government Heat Pumps 61.17 0.91 1.87 $0.09 $3.59 15.71 15.00 12.23 5.00 1.75 5.00 4.83 59.53 38 $230,200 $230,200 $192,891 DesignConstructionFULL $230,200 $12,983,739 25 H Southeast 1010 Craig High School Wood Heat Conversion Craig City School District Government Entity Biomass 66.33 1.12 1.54 $0.29 $3.80 16.63 11.00 13.27 3.00 6.38 2.00 3.50 55.77 40 $585,450 $492,850 $82,550 DesignConstructionPARTIAL SP Y $125,000 $13,108,739 26 H Lower Yukon-Kuskokwim 1042 Eek Water System Heat Recovery City of Eek Government Entity Heat Recovery 70.17 1.01 1.35 $0.60 $3.89 17.02 6.00 14.03 5.00 4.50 5.00 3.83 55.39 41 $297,408 $288,745 $8,663 DesignConstructionFULL $288,745 $13,397,484 27 H Southeast 1033 Sitka Sea Water Source Heat Pump Project City and Borough of Sitka Heat Pumps 54.83 0.50 0.52 $0.09 $3.59 15.71 15.00 10.97 4.00 0.50 5.00 4.17 55.34 42 $388,838 $373,838 $825,000 DesignConstructionPARTIAL SP Y $56,841 $13,454,325 28 H Lower Yukon-Kuskokwim 1074 Tuntutuliak Wind Heat Electrical Thermal Storage TCSA Electrical Services Utility Wind to Heat 46.67 1.00 0.96 $0.65 $6.80 29.75 6.00 9.33 2.83 2.13 2.00 2.50 54.54 44 $259,817 $250,817 $9,000 Construction FULL SP $250,817 $13,705,142 29 H Copper River/Chugach 1014 Wood Chip Boiler for The Native Village of Tazlina Native Village of Tazlina Government Entity Biomass 64.50 1.19 1.84 $0.28 $4.17 18.24 6.00 12.90 3.00 6.25 4.00 3.00 53.39 46 $278,150 $267,150 $11,000 DesignConstructionPARTIAL SP Y $125,000 $13,830,142 30 H Southeast 1007 Mendenhall Valley Library Geothermal HVAC System City & Borough of Juneau Local Government Heat Pumps 49.33 0.86 0.74 $0.12 $4.12 18.03 11.00 9.87 4.00 0.63 4.00 4.50 52.02 52 $825,000 $660,000 $165,000 DesignConstructionFULL $660,000 $14,490,142 31 H Southeast 1012 Sitka Wastewater Treatment Plant Effluent Heat Pump City and Borough of Sitka Local Government Heat Pumps 57.67 0.73 1.06 $0.09 $3.59 15.71 9.00 11.53 5.00 0.75 5.00 4.83 51.83 53 $962,984 $849,984 $113,000 DesignConstructionFULL $849,984 $15,340,126 32 H Railbelt 1009 Nenana Collaborative Biomass Heating System Project Nenana School District Government Entity Biomass 54.67 0.66 1.11 $0.22 $4.06 17.76 7.00 10.93 3.00 1.00 5.00 4.00 48.69 56 $3,244,225 $367,965 $25,800 Design FULL Y $367,965 $15,708,091 33 H Yukon-Koyukok/Upper Tanana1051 AGSD Extension of Heating Loop Alaska Gateway School District Government Entity Heat Recovery 59.83 0.97 1.45 $0.49 $3.79 16.58 6.00 11.97 4.00 3.38 2.00 4.00 47.92 59 $629,000 $625,000 $4,000 DesignConstructionFULL $625,000 $16,333,091 34 H Railbelt 1078 Chickaloon Solar Thermal and Biomass Project Chickaloon Native Village Government Entity Biomass 43.67 0.74 0.79 $0.15 $3.71 16.23 11.00 8.73 3.00 0.75 2.00 4.17 45.88 60 $152,867 $127,065 $25,802 DesignConstructionPARTIAL SP $97,000 $16,430,091 35 H Railbelt 1055 Alaska SeaLife Center Heat Recovery Project City of Seward Local Government Heat Recovery 57.67 1.13 4.41 $0.11 4.59 9.00 11.53 4.50 4.88 5.00 5.00 44.50 62 $250,000 $225,000 $25,000 Construction FULL $225,000 $16,655,091 SubTotal - All Recommended Projects $27,341,616 $21,205,370 $4,456,434 $16,655,091 SubTotal Not Recommended Projects: 36 H Bristol Bay 1006 NEA Stack Heat to Power Project Naknek Electric Association, Inc.Utility Heat Recovery 1.39 6.44 $0.50 $1,940,379 $1,843,379 $97,000 FeasDesignConstructionNot Recommended 37 H Lower Yukon-Kuskokwim 1008 Chuathbaluk Water System Heat Recovery City of Chuathbaluk Government Entity Heat Recovery 0.97 0.98 $0.85 $232,430 $225,660 $6,770 DesignConstructionNot Recommended 38 H Northwest Arctic 1076 NWAB School District Solar Thermal Systems Northwest Arctic Borough School District Government Entity Solar Thermal 1.48 3.14 $0.63 $467,252 $456,252 $11,000 Construction Not Recommended Sub Total - Not Recommended Projects $2,640,061 $2,525,291 $114,770 Grand Total - All Applications $29,981,677 $23,730,661 $4,571,204 $16,655,091 GrandTotal Notes This document represents AEA's draft recommendations for consideration by the REFAC committee. This is a draft document only and is subject to change prior to AEA's final recommendations. This view combines the heat and "standard application 'projects, for perspective. Please see the sepate heat and standard lists. If REF 7 funding is limited to $20M exactly, #1021, Haines Borough Municipal Building Biomass would be partially funded. H = Heat application, applications that deliver heat only, not electricity S = Standard spplication, applications that deliver electricity, energy storage, transmission or a combination of electricity and heat. B/C = Benefit/Cost Ratio over the life of the project. AEA B/C ratio uses AEA's best assumptions in the standard REF economic model SP = Special Provisions The Applicant B/C ratio uses the applicants assumptions in the standard REF economic model. Total Stage 2 Score column is the technical and economic evaluation score and is on a scale of 0 to 100. A minimum score of 40 is required to pass stage 2. Match offered is applicant's offered cash and in-kind match, including supporting energy efficiency work and wood harvest value where applicable. Some not recommended projects' B/C ratios may be incomplete due to incomplete information provided or other reasons. Ben / Cost Stage 3 Review Scores (max)Project Cost Recommendation DRAFT 1/6/2014 for REFAC Review DRAFT Page 2 Renewable Energy Fund Round 7 - Heat and Standard Combined Statewide Ranking Recommended Applications and Funding Prior to Stage 4 Regional Spread Count Energy Region ID Project Name Applicant Applicant Type Energy Source Total Stage 2 Score AEA B/C Appl B/C Cost of Energy $/kWh Fuel Price $/gal 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Project Cost Grant Requested Match Offered Phase AEA Recomnd EarlyRecommend Funding Cumulative Funding 1 H Aleutians 1026 Atka Dispatchable Heat City of Atka Local Government Hydro to Heat 82.83 3.18 6.90 $0.70 $7.65 33.47 11.00 16.57 5.00 12.00 3.00 4.00 85.04 1 $135,254 $114,965 $20,289 Construction FULL $114,965 $114,965 2 S Bristol Bay 1036 Packers Creek Hydroelectric Project Phase II Chignik Lagoon Village Council Government Entity Hydro 86.33 1.66 3.85 $0.69 30.26 11.00 17.27 5.00 11.00 5.00 3.83 83.36 2 $5,389,149 $2,352,653 $3,036,496 Construction FULL $2,352,653 $2,666,092 3 H Yukon-Koyukok/Upper Tanana1044 Venetie Clinic Heat Recovery Village of Venetie Government Entity Heat Recovery 85.17 1.68 2.45 $0.90 $8.50 35.00 6.00 17.03 4.00 11.25 4.00 3.33 80.62 3 $204,428 $198,474 $11,908 DesignConstructionFULL $198,474 $313,439 4 H Yukon-Koyukok/Upper Tanana1047 Galena Community Wood Heat Project City of Galena Local Government Biomass 88.00 4.31 3.96 $0.56 $6.02 26.34 6.00 17.60 3.83 14.13 5.00 4.50 77.40 4 $3,144,200 $3,096,898 $47,302 Construction FULL SP $3,096,898 $5,762,990 5 H Lower Yukon-Kuskokwim 1052 Nunam Iqua Heat Recovery Project City of Nunam Iqua Local Government Heat Recovery 87.67 2.20 2.33 $0.53 $4.38 19.16 13.00 17.53 3.00 12.50 5.00 3.50 73.69 5 $603,000 $450,000 $153,000 Construction FULL $450,000 $6,212,990 6 H Southeast 1011 Sitka Centennial Hall Air Source Heat Pump City and Borough of Sitka Local Government Heat Pumps 80.50 1.69 3.58 $0.09 $3.59 15.71 15.00 16.10 5.00 10.75 5.00 4.83 72.39 6 $232,620 $232,620 $1,021,393 DesignConstructionFULL $232,620 $6,445,610 7 S Bering Straits 1068 Stebbins St Michael Wind Energy Final Design and Permitting Alaska Village Electric Cooperative, Inc.Utility Wind 83.33 1.80 2.74 $0.56 24.42 7.00 16.67 3.00 11.63 5.00 4.50 72.21 7 $3,946,050 $342,000 $18,000 Design FULL $342,000 $6,787,610 8 H Lower Yukon-Kuskokwim 1085 Tuntutuliak Heat Recovery Native Village of Tuntutuliak Government Entity Heat Recovery 81.33 1.54 2.32 $0.65 $6.80 29.75 6.00 16.27 3.83 10.13 3.00 3.00 71.98 8 $469,311 $455,642 $13,669 DesignConstructionFULL $455,642 $7,243,252 9 H Lower Yukon-Kuskokwim 1061 Emmonak Heat Recovery System City of Emmonak Government Entity Heat Recovery 87.67 2.56 4.02 $0.55 $5.77 25.24 6.00 17.53 4.00 12.50 3.00 2.67 70.94 9 $689,251 $689,251 $20,677 DesignConstructionFULL SP $689,251 $7,932,503 10 S Yukon-Koyukok/Upper Tanana1027 Chisana Mountain Wind Feasibility Project Alaska Power Company Utility Wind 85.00 2.55 $0.49 21.46 11.00 17.00 2.50 12.50 2.00 4.17 70.63 10 $148,800 $119,000 $29,800 Feasibility FULL $119,000 $8,051,503 11 S Yukon-Koyukok/Upper Tanana1077 Yerrick Creek Hydroelectric Project Native Village of Tanacross Government Entity Hydro 58.33 4.23 9.84 $0.49 21.46 15.00 11.67 3.00 11.25 5.00 3.17 70.54 11 $19,000,000 $6,000,000 $11,500,000 Construction PARTIAL $75,000 $8,126,503 12 S Lower Yukon-Kuskokwim 1067 Mountain Village Wind Feasibility and Conceptual Design Alaska Village Electric Cooperative, Inc.Utility Wind 79.17 1.70 1.23 $0.54 23.80 7.00 15.83 2.50 11.63 5.00 4.50 70.26 12 $4,833,000 $123,500 $6,500 Feasibility FULL $123,500 $8,250,003 13 H Southeast 1087 Kake Community Energy Organized Village of Kake Government Entity Biomass 73.83 1.62 1.18 $0.62 $5.85 25.59 7.00 14.77 2.00 12.00 4.00 4.00 69.36 13 $1,423,292 $208,073 $20,000 Design PARTIAL Y $175,000 $8,425,003 14 H Southeast 1037 Ketchikan Gateway Borough Biomass Heating Project Ketchikan Gateway Borough Local Government Biomass 84.33 2.15 0.24 $0.10 $3.59 15.71 11.00 16.87 3.67 13.00 5.00 3.50 68.74 14 $1,957,261 $1,412,889 $353,222 Construction PARTIAL SP $620,000 $9,045,003 15 S Railbelt 1082 Stetson Creek Diversion Cooper Lake Dam Facilities Project Chugach Electric Association, Inc.Utility Hydro 94.33 7.11 0.89 $0.15 6.78 15.00 18.87 5.00 12.88 5.00 5.00 68.52 15 $21,772,523 $3,453,920 $13,591,226 Construction FULL $3,453,920 $12,498,923 16 S Copper River/Chugach 1015 Allison Creek Hydroelectric Project Construction Copper Valley Electric Association, Inc.Utility Hydro 89.33 3.96 3.68 $0.28 12.44 15.00 17.87 4.00 12.13 2.00 5.00 68.43 16 $49,000,000 $5,914,491 $5,914,491 Construction FULL $5,914,491 $18,413,414 17 S Southeast 1025 Gunnuk Creek Hydroelectric Feasibility Study Inside Passage Electric Cooperative Utility Hydro 73.00 4.28 0.00 $0.62 27.14 7.00 14.60 2.00 11.63 2.00 3.83 68.20 17 $300,000 $275,000 $25,000 ReconFeasibility PARTIAL SP $80,000 $18,493,414 18 H Bering Straits 1040 Brevig Mission Water System Heat Recovery City of Brevig Mission Government Entity Heat Recovery 83.00 1.51 2.01 $0.54 $5.29 23.14 6.00 16.60 5.00 10.25 4.00 3.17 68.16 18 $753,313 $731,372 $21,941 DesignConstructionFULL $731,372 $19,224,786 19 H Railbelt 1031 Seldovia House Ground Source Heat Pump Project Cook Inlet Housing Authority Government Entity Heat Pumps 58.17 1.12 0.94 $0.20 $5.19 22.71 15.00 11.63 4.50 5.25 5.00 3.83 67.93 19 $362,805 $318,289 $411,835 DesignConstructionFULL $318,289 $19,543,075 20 H Southeast 1021**Haines Borough Municipal Buildings Biomass Project Haines Borough Local Government Biomass 88.50 1.72 1.79 $0.22 $4.09 17.89 9.00 17.70 3.83 12.63 2.00 4.50 67.55 20 $1,374,892 $1,237,403 $137,448 DesignConstructionFULL SP $1,237,403 $20,780,478 SubTotal - Top Ranking $20 million prior to stage 4 regional spreading $115,739,149 $27,726,440 $36,354,197 $20,780,478 SubTotal 21 H Lower Yukon-Kuskokwim 1043 St Marys Heat Recovery System City of St. Mary's Government Entity Heat Recovery 85.17 1.61 2.21 $0.49 $4.60 20.13 6.00 17.03 3.83 11.25 5.00 4.17 67.41 21 $757,299 $735,242 $22,057 DesignConstructionFULL $735,242 $21,515,720 22 H Yukon-Koyukok/Upper Tanana1032 Biomass Heat for Minto Community Buildings Village of Minto Government Entity Biomass 69.33 1.02 1.37 $0.59 $5.00 21.88 15.00 13.87 3.00 5.38 5.00 3.17 67.29 22 $403,550 $274,750 $278,800 DesignConstructionFULL SP $274,750 $21,790,470 23 H Southeast 1053 Yakutat Biomass District Heating Loop City and Borough of Yakutat Local Government Biomass 67.67 1.45 2.31 $0.50 $5.05 22.09 11.00 13.53 2.00 8.88 5.00 4.17 66.67 23 $335,456 $286,166 $49,290 DesignConstructionPARTIAL SP Y $103,000 $21,893,470 24 H Lower Yukon-Kuskokwim 1073 Kongiganak Wind Heat Electrical Thermal Storage Puvurnaq Power Company Utility Wind to Heat 74.17 1.70 2.55 $0.56 $6.21 27.17 6.00 14.83 2.83 12.38 0.00 3.00 66.21 24 $320,456 $311,456 $9,000 Construction FULL SP $311,456 $22,204,926 25 S Bristol Bay 1072 Igiugig Wind Resource Feasibility and Conceptual Design Igiugig Village Council Government Entity Wind 47.00 0.86 1.40 $0.80 35.00 13.00 9.40 2.50 0.00 3.00 3.17 66.07 25 $110,000 $80,000 $30,000 Feasibility FULL SP $80,000 $22,284,926 26 H Lower Yukon-Kuskokwim 1041 Chevak Water and Vacuum Plant Heat Recovery City of Chevak Government Entity Heat Recovery 85.33 1.83 2.44 $0.48 $4.30 18.81 6.00 17.07 3.00 12.50 5.00 2.83 65.21 26 $558,814 $558,814 $16,765 DesignConstructionFULL SP $558,814 $22,843,740 27 H Southeast 1017 Southeast Island School District Wood Boilers Southeast Island School District Government Entity Biomass 76.67 1.47 2.32 $0.41 $3.80 16.63 11.00 15.33 3.00 9.75 5.00 4.00 64.71 27 $1,058,775 $940,950 $177,825 Construction FULL SP $940,950 $23,784,690 28 H Yukon-Koyukok/Upper Tanana1045 Grayling Heat Recovery System City of Grayling Government Entity Heat Recovery 80.17 1.47 2.02 $0.56 $5.00 21.88 6.00 16.03 3.83 9.00 4.00 3.50 64.25 28 $332,590 $322,903 $19,374 DesignConstructionFULL $322,903 $24,107,593 29 H Southeast 1016 Hydaburg Schools Wood Fired Boiler Project Hydaburg City School District Government Entity Biomass 77.83 1.91 2.45 $0.24 $4.20 18.38 7.00 15.57 3.00 13.50 3.00 3.50 63.95 29 $627,900 $583,900 $44,000 DesignConstructionPARTIAL SP Y $125,000 $24,232,593 30 S Lower Yukon-Kuskokwim 1057 Mertarvik Renewable Energy Feasibility and Conceptual DesignUngusraq Power Company (UPC) / Newtok Traditional CouncilIPP Wind 53.00 1.14 $0.80 35.00 7.00 10.60 2.00 4.50 2.00 1.67 62.77 30 $8,000,000 $375,000 $25,000 ReconFeasibility PARTIAL $75,000 $24,307,593 31 S Lower Yukon-Kuskokwim 1069 St Marys Pitkas Point Wind Energy Construction Project Alaska Village Electric Cooperative, Inc.Utility Wind 65.00 1.19 1.47 $0.49 21.60 9.00 13.00 5.00 4.50 5.00 4.33 62.43 31 $4,782,528 $4,274,575 $507,953 Construction FULL SP $4,274,575 $28,582,168 32 H Lower Yukon-Kuskokwim 1071 Kwigillingok Wind Heat Electrical Thermal Storage Kwig Power Company Utility Wind to Heat 64.17 1.53 1.73 $0.60 $5.95 26.03 6.00 12.83 2.83 10.00 2.00 2.50 62.20 32 $302,737 $293,737 $9,000 Construction FULL SP $293,737 $28,875,905 33 H Northwest Arctic 1038 Kotzebue Paper and Wood Waste to Energy Project City of Kotzebue Local Government Biomass 62.83 1.12 1.16 $0.42 $6.07 26.56 7.00 12.57 2.00 6.00 5.00 3.00 62.13 33 $2,692,700 $2,495,189 $95,000 DesignConstructionPARTIAL SP Y $270,000 $29,145,905 34 S Aleutians 1083 Waterfall Creek Hydroelectric Project City of King Cove Local Government Hydro 71.17 1.37 1.87 $0.28 12.26 15.00 14.23 2.83 7.63 5.00 5.00 61.95 34 $5,500,000 $800,000 $1,900,000 Construction FULL SP $800,000 $29,945,905 35 H Yukon-Koyukok/Upper Tanana1060 Holy Cross Water System Heat Recovery City of Holy Cross Government Entity Heat Recovery 57.67 0.55 0.74 $0.53 $7.15 31.28 6.00 11.53 4.00 1.25 5.00 2.83 61.90 35 $497,773 $497,773 $14,933 DesignConstructionFULL $497,773 $30,443,678 36 S Kodiak 1065 Old Harbor Hydroelectric Project Final Design and Permitting Alaska Village Electric Cooperative, Inc.Utility Hydro 56.33 1.11 1.79 $0.58 25.21 7.00 11.27 2.00 5.38 5.00 4.50 60.35 36 $8,155,000 $1,092,500 $57,500 Design PARTIAL $400,000 $30,843,678 37 S Southeast 1023 Swan Lake Reservoir Expansion Project The Southeast Alaska Power Agency Government Entity Hydro 81.17 4.07 4.07 $0.10 4.47 15.00 16.23 3.00 11.25 5.00 5.00 59.95 37 $13,391,869 $4,000,000 $8,813,869 DesignConstructionPARTIAL SP $560,488 $31,404,166 38 H Southeast 1013 Sitka Kettleson Library Air Source Heat Pump City and Borough of Sitka Local Government Heat Pumps 61.17 0.91 1.87 $0.09 $3.59 15.71 15.00 12.23 5.00 1.75 5.00 4.83 59.53 38 $230,200 $230,200 $192,891 DesignConstructionFULL $230,200 $31,634,366 39 S Railbelt 1084 Juniper Creek Hydroelectric Reconnaissance Study Ram Valley, LLC IPP Hydro 73.17 2.45 3.49 $0.15 6.61 15.00 14.63 2.00 11.25 4.00 3.83 57.33 39 $2,350,000 $35,750 $35,750 Recon FULL $35,750 $31,670,116 40 H Southeast 1010 Craig High School Wood Heat Conversion Craig City School District Government Entity Biomass 66.33 1.12 1.54 $0.29 $3.80 16.63 11.00 13.27 3.00 6.38 2.00 3.50 55.77 40 $585,450 $492,850 $82,550 DesignConstructionPARTIAL SP Y $125,000 $31,795,116 41 H Lower Yukon-Kuskokwim 1042 Eek Water System Heat Recovery City of Eek Government Entity Heat Recovery 70.17 1.01 1.35 $0.60 $3.89 17.02 6.00 14.03 5.00 4.50 5.00 3.83 55.39 41 $297,408 $288,745 $8,663 DesignConstructionFULL $288,745 $32,083,861 42 H Southeast 1033 Sitka Sea Water Source Heat Pump Project City and Borough of Sitka Heat Pumps 54.83 0.50 0.52 $0.09 $3.59 15.71 15.00 10.97 4.00 0.50 5.00 4.17 55.34 42 $388,838 $373,838 $825,000 DesignConstructionPARTIAL SP Y $56,841 $32,140,702 43 S Aleutians 1062 False Pass Hydrokinetic Feasibility Study City of False Pass Local Government Hydrokinetic 42.83 0.22 0.22 $0.51 22.45 13.00 8.57 2.50 0.75 5.00 2.50 54.77 43 $5,000,000 $428,646 $137,820 Feasibility FULL $428,646 $32,569,348 44 H Lower Yukon-Kuskokwim 1074 Tuntutuliak Wind Heat Electrical Thermal Storage TCSA Electrical Services Utility Wind to Heat 46.67 1.00 0.96 $0.65 $6.80 29.75 6.00 9.33 2.83 2.13 2.00 2.50 54.54 44 $259,817 $250,817 $9,000 Construction FULL SP $250,817 $32,820,165 45 S Aleutians 1070 Sand Point Energy Storage Project TDX Sand Point Generating, LLC Utility Storage of Renewable47.50 1.08 1.01 $0.58 22.55 9.00 9.50 3.00 4.125 2.00 4.00 54.18 45 $1,397,403 $1,256,403 $141,000 DesignConstructionPARTIAL SP Y $200,000 $33,020,165 46 H Copper River/Chugach 1014 Wood Chip Boiler for The Native Village of Tazlina Native Village of Tazlina Government Entity Biomass 64.50 1.19 1.84 $0.28 $4.17 18.24 6.00 12.90 3.00 6.25 4.00 3.00 53.39 46 $278,150 $267,150 $11,000 DesignConstructionPARTIAL SP Y $125,000 $33,145,165 47 S Southeast 1022 SEAPA Wind Resource Assessment Phase I and II The Southeast Alaska Power Agency Government Entity Wind 90.33 1.84 $0.10 4.47 7.00 18.07 2.00 13.13 5.00 3.67 53.33 47 $170,583 $158,771 $11,812 ReconFeasibility FULL $158,771 $33,303,936 48 S Kodiak 1030 Flywheels ESS for Kodiak Pier Electric Crane Kodiak Electric Association, Inc.Utility Storage of Renewable66.83 0.51 1.02 $0.19 8.32 15.00 13.37 3.50 3.25 5.00 4.00 52.44 48 $3,800,000 $1,900,000 $1,900,000 Construction PARTIAL SP $1,470,548 $34,774,484 49 S Lower Yukon-Kuskokwim 1066 Marshall Wind Energy Final Design and Permitting Project Alaska Village Electric Cooperative, Inc.Utility Wind 52.17 0.98 1.60 $0.50 22.05 7.00 10.43 2.50 1.50 5.00 3.83 52.32 49 $3,214,875 $353,400 $18,600 Design FULL SP $353,400 $35,127,884 50 S North Slope 1049 Atqasuk Transmission Line Design and Permitting Project North Slope Borough Local Government Transmission 74.17 3.30 3.55 $0.15 6.56 9.00 14.83 2.50 12.38 2.00 5.00 52.27 50 $17,342,837 $2,017,818 $201,782 Design FULL SP $2,017,818 $37,145,702 51 S Railbelt 1028 Carlo Creek Hydroelectric Project Reconnaissance Study Native Village of Cantwell Government Entity Hydro 61.00 1.90 1.88 $0.22 9.81 9.00 12.20 1.50 11.63 5.00 3.00 52.14 51 $8,340,000 $54,000 $6,000 Recon PARTIAL $35,000 $37,180,702 52 H Southeast 1007 Mendenhall Valley Library Geothermal HVAC System City & Borough of Juneau Local Government Heat Pumps 49.33 0.86 0.74 $0.12 $4.12 18.03 11.00 9.87 4.00 0.63 4.00 4.50 52.02 52 $825,000 $660,000 $165,000 DesignConstructionFULL $660,000 $37,840,702 53 H Southeast 1012 Sitka Wastewater Treatment Plant Effluent Heat Pump City and Borough of Sitka Local Government Heat Pumps 57.67 0.73 1.06 $0.09 $3.59 15.71 9.00 11.53 5.00 0.75 5.00 4.83 51.83 53 $962,984 $849,984 $113,000 DesignConstructionFULL $849,984 $38,690,686 54 S Bristol Bay 1079 Koliganek Wind Diesel and Heat Recovery New Koliganek Village Council Government Entity Wind 52.33 1.05 1.60 $0.51 22.09 6.00 10.47 3.83 4.13 2.00 3.17 51.68 54 $2,566,000 $306,000 $10,000 Design FULL SP Y $306,000 $38,996,686 55 S Aleutians 1080 False Pass Wind Energy Project City of False Pass Electric Utility Local Government Wind 46.33 0.67 0.61 $0.51 22.45 9.00 9.27 2.50 0.38 4.00 1.67 49.26 55 $52,050 $47,050 $5,000 Feasibility FULL SP $47,050 $39,043,736 56 H Railbelt 1009 Nenana Collaborative Biomass Heating System Project Nenana School District Government Entity Biomass 54.67 0.66 1.11 $0.22 $4.06 17.76 7.00 10.93 3.00 1.00 5.00 4.00 48.69 56 $3,244,225 $367,965 $25,800 Design FULL Y $367,965 $39,411,701 57 S Railbelt 1081 Waste to Energy Reconnaissance Study Chugach Electric Association, Inc.Utility Biomass 61.50 1.31 1.34 $0.15 6.78 15.00 12.30 0.00 8.25 2.00 4.00 48.33 57 TBD $150,000 $100,000 Recon PARTIAL $50,000 $39,461,701 58 S Copper River/Chugach 1075 Cascade Creek Hydroelectric Project Feasibility Study Blue Hole Properties, LLC (BHP)IPP Hydro 45.83 1.30 3.46 $0.28 12.44 11.00 9.17 3.00 6.38 5.00 1.33 48.32 58 $2,250,000 $170,000 $30,000 Feasibility FULL $170,000 $39,631,701 59 H Yukon-Koyukok/Upper Tanana1051 AGSD Extension of Heating Loop Alaska Gateway School District Government Entity Heat Recovery 59.83 0.97 1.45 $0.49 $3.79 16.58 6.00 11.97 4.00 3.38 2.00 4.00 47.92 59 $629,000 $625,000 $4,000 DesignConstructionFULL $625,000 $40,256,701 60 H Railbelt 1078 Chickaloon Solar Thermal and Biomass Project Chickaloon Native Village Government Entity Biomass 43.67 0.74 0.79 $0.15 $3.71 16.23 11.00 8.73 3.00 0.75 2.00 4.17 45.88 60 $152,867 $127,065 $25,802 DesignConstructionPARTIAL SP $97,000 $40,353,701 61 S Northwest Arctic 1001 Northwest Arctic Borough Solar PV Project Northwest Arctic Borough Local Government Solar PV 46.00 0.68 0.83 $0.42 18.27 6.00 9.20 4.50 0.38 3.00 4.50 45.85 61 $77,000 $76,000 $1,000 Construction FULL SP $75,000 $40,428,701 62 H Railbelt 1055 Alaska SeaLife Center Heat Recovery Project City of Seward Local Government Heat Recovery 57.67 1.13 4.41 $0.11 4.59 9.00 11.53 4.50 4.88 5.00 5.00 44.50 62 $250,000 $225,000 $25,000 Construction FULL $225,000 $40,653,701 63 S Bristol Bay 1018 Chignik Hydroelectric Project Design and Permitting City of Chignik Local Government Hydro 52.17 1.02 1.60 $0.48 20.81 0.00 10.43 3.50 4.88 0.00 4.00 43.62 63 BLANK $1,375,000 $0 Design PARTIAL SP $500,000 $41,153,701 64 S North Slope 1048 Kaktovik Wind Diesel Design and Permitting North Slope Borough Local Government Wind 65.83 1.03 1.37 $0.15 6.56 9.00 13.17 3.00 4.00 2.00 4.50 42.23 64 $4,565,200 $440,000 $44,000 Design FULL $440,000 $41,593,701 SubTotal - All Recommended Projects $222,796,483 $59,176,847 $52,555,033 $41,593,701 SubTotal Ben / Cost Stage 3 Review Scores (max)Project Cost Recommendation DRAFT 1/6/2014 for REFAC Review DRAFT Page 3 Renewable Energy Fund Round 7 - Heat and Standard Combined Statewide Ranking Recommended Applications and Funding Prior to Stage 4 Regional Spread Count Energy Region ID Project Name Applicant Applicant Type Energy Source Total Stage 2 Score AEA B/C Appl B/C Cost of Energy $/kWh Fuel Price $/gal 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Project Cost Grant Requested Match Offered Phase AEA Recomnd EarlyRecommend Funding Cumulative Funding Ben / Cost Stage 3 Review Scores (max)Project Cost Recommendation Not Recommended Projects: 65 S Southeast 1019 Survey Creek Hydroelectric Project Edna Bay Community Local Government Hydro 39.33 1.48 1.37 N/A $3,562,772 $62,272 $3,500 Recon Did Not Pass Stage 2 66 S Railbelt 1002 Poncelet Kinetics RHK100 Prototype Demonstration Whitestone Power and Communications IPP Hydrokinetic 39.17 0.16 0.16 $0.22 $1,940,558 $1,560,558 $120,000 Construction Did Not Pass Stage 2 67 S Southeast 1024 Walker Lake Hydro Project Feasibility Tlingit-Haida Regional Electrical Authority Utility Hydro 39.00 1.05 $0.62 $825,000 $700,000 $125,000 ReconFeasibility Did Not Pass Stage 2 68 S Railbelt 1029 Jack River Hydroelectric Project Feasibility Study Native Village Of Cantwell Government Entity Hydro 35.33 0.79 1.21 $0.22 $31,500,000 $213,750 $11,250 Feasibility Did Not Pass Stage 2 69 S Aleutians 1056 Adak Wind Data Collection Analysis and Preliminary Design City of Adak, Alaska Local Government Wind 35.33 0.47 0.27 $0.81 $72,400,000 $160,000 $0 Feasibility Did Not Pass Stage 2 70 S Northwest Arctic 1059 Cosmos Hills Hydroelectric Design and Permitting Alaska Village Electric Cooperative Utility Hydro 27.50 0.71 1.05 $0.74 $38,660,000 $2,922,000 $150,000 Design Did Not Pass Stage 2 71 S Kodiak 1004 Karluk Tribal Council Wind Energy System Karluk Tribal Council Government Entity Wind 21.17 0.76 1.83 $0.60 $1,300,000 $81,000 $300 FeasibilityDesign Did Not Pass Stage 2 72 S Southeast 1003 Mahoney Lake Hydroelectric Phase III and IV City of Saxman Local Government Hydro 1.79 6.91 $0.10 $51,000,000 $4,000,000 $4,000,000 DesignConstructionNot Recommended 73 H Bristol Bay 1006 NEA Stack Heat to Power Project Naknek Electric Association, Inc.Utility Heat Recovery 1.39 6.44 $0.50 $1,940,379 $1,843,379 $97,000 FeasDesignConstructionNot Recommended 74 H Lower Yukon-Kuskokwim 1008 Chuathbaluk Water System Heat Recovery City of Chuathbaluk Government Entity Heat Recovery 0.97 0.98 $0.85 $232,430 $225,660 $6,770 DesignConstructionNot Recommended 75 S Southeast 1020 Excursion Inlet Hydro Project Feasibility and Conceptual DesignHaines Borough Local Government Hydro 0.09 3.93 N/A $14,500,000 $213,536 $10,000 Feasibility Not Recommended 76 S Southeast 1034 Metlakatla to Ketchikan Intertie Metlakatla Indian Community Government Entity Transmission 1.77 1.28 $0.10 $14,510,599 $9,281,615 $0 DesignConstructionNot Recommended 77 S Southeast 1035 Feasibility Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative Utility Geothermal 0.44 1.24 $0.65 $49,000,000 $3,378,500 $0 Feasibility Not Recommended 78 S Bristol Bay 1046 Port Alsworth Hydropower PreConstruction Phase Port Alsworth Improvement Corporation Government Entity Hydro 1.52 $0.68 $7,224,213 $159,000 $10,000 ReconFeasibility Not Recommended 79 S Bristol Bay 1050 Bristol Bay Borough School District Solar PV Project Bristol Bay Borough School District Government Entity Solar PV 0.96 1.28 $0.50 $235,000 $230,000 $5,000 DesignConstructionNot Recommended 80 S Northwest Arctic 1058 Noatak Utility Size Photovoltaic Array Construction Project Northwest Arctic Borough Local Government Solar PV 1.24 1.22 $0.74 $447,800 $447,800 $0 Construction Not Recommended 81 S Bristol Bay 1063 Iliamna Solar Ground Mounted Energy System Iliamna Village Council Government Entity Solar PV 0.01 0.40 $0.59 $2,000,000 $800,000 $120,000 ReconFeasibility Not Recommended 82 S Copper River/Chugach 1064 Chenega Bay Hydroelectric Construction Native Village of Chenega Government Entity Hydro 1.14 1.02 $0.44 $1,650,000 $1,400,000 $0 DesignConstructionNot Recommended 83 H Northwest Arctic 1076 NWAB School District Solar Thermal Systems Northwest Arctic Borough School District Government Entity Solar Thermal 1.48 3.14 $0.63 $467,252 $456,252 $11,000 Construction Not Recommended 84 S Lower Yukon-Kuskokwim 1039 Four Villages lntertie Design Nuvista Light and Electric Cooperative Government Entity Transmission $1,250,000 $1,250,000 $0 Feasibility Did Not Pass Stage 1 85 S Lower Yukon-Kuskokwim 1054 Multiple Alternative Energy Sources for Napakiak Napakiak lrcinraq Power Company Utility Wind $2,284,000 $141,000 $20,000 DesignConstructionDid Not Pass Stage 1 86 S Lower Yukon-Kuskokwim 1086 Chefornak High Penetration Wind Diesel System Naterqak Light Plant, City of Chefornak Local Government Wind $4,358,784 $4,308,784 $50,000 DesignConstructionDid Not Pass Stage 1 Sub Total - Not Recommended Projects $301,288,787 $33,835,106 $4,739,820 SubTotal Grand Total - All Applications $524,085,270 $93,011,953 $57,294,853 $41,593,701 GrandTotal Notes This document represents AEA's draft recommendations for consideration by the REFAC committee. This is a draft document only and is subject to change prior to AEA's final recommendations. This view combines the heat and "standard application 'projects, for perspective. Please see the sepate heat and standard lists. If REF 7 funding is limited to $20M exactly, #1021, Haines Borough Municipal Building Biomass would be partially funded. H = Heat application, applications that deliver heat only, not electricity S = Standard spplication, applications that deliver electricity, energy storage, transmission or a combination of electricity and heat. B/C = Benefit/Cost Ratio over the life of the project. AEA B/C ratio uses AEA's best assumptions in the standard REF economic model SP = Special Provisions The Applicant B/C ratio uses the applicants assumptions in the standard REF economic model. Total Stage 2 Score column is the technical and economic evaluation score and is on a scale of 0 to 100. A minimum score of 40 is required to pass stage 2. Match offered is applicant's offered cash and in-kind match, including supporting energy efficiency work and wood harvest value where applicable. Some not recommended projects' B/C ratios may be incomplete due to incomplete information provided or other reasons. DRAFT 1/6/2014 for REFAC Review DRAFT Page 4 Renewable Energy Fund Round 7 - Heat and Standard Combined by Energy Region Recommended Applications and Funding Prior to Stage 4 Regional Spread Count Energy Region ID Project Name Applicant Applicant Type Energy Source Total Stage 2 Score AEA B/C Appl B/C Cost of Energy ($/kWh ) Fuel Price $/gal 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Project Cost Grant Requested Match Offered Phase AEA Recomnd EarlyRecommend Funding Cumulative Funding 1 H Aleutians 1026 Atka Dispatchable Heat City of Atka Local Government Hydro to Heat 82.83 3.18 6.90 $0.70 $7.65 33.47 11.00 16.57 5.00 12.00 3.00 4.00 85.04 1 $135,254 $114,965 $20,289 Construction FULL $114,965 $114,965 2 S Aleutians 1083 Waterfall Creek Hydroelectric Project City of King Cove Local Government Hydro 71.17 1.37 1.87 $0.28 12.26 15.00 14.23 2.83 7.63 5.00 5.00 61.95 34 $5,500,000 $800,000 $1,900,000 Construction FULL SP $800,000 $914,965 3 S Aleutians 1062 False Pass Hydrokinetic Feasibility Study City of False Pass Local Government Hydrokinetic 42.83 0.22 0.22 $0.51 22.45 13.00 8.57 2.50 0.75 5.00 2.50 54.77 43 $5,000,000 $428,646 $137,820 Feasibility FULL $428,646 $1,343,611 4 S Aleutians 1070 Sand Point Energy Storage Project TDX Sand Point Generating, LLC Utility Storage of Renewable47.50 1.08 1.01 $0.58 22.55 9.00 9.50 3.00 4.125 2.00 4.00 54.18 45 $1,397,403 $1,256,403 $141,000 DesignConstructionPARTIAL SP Y $200,000 $1,543,611 5 S Aleutians 1080 False Pass Wind Energy Project City of False Pass Electric Utility Local Government Wind 46.33 0.67 0.61 $0.51 22.45 9.00 9.27 2.50 0.38 4.00 1.67 49.26 55 $52,050 $47,050 $5,000 Feasibility FULL SP $47,050 $1,590,661 6 S Aleutians 1056 Adak Wind Data Collection Analysis and Preliminary Design City of Adak, Alaska Local Government Wind 35.33 0.47 0.27 $0.81 $72,400,000 $160,000 $0 Feasibility Did Not Pass Stage 2 6 Aleutians Total $84,484,707 $2,807,064 $2,204,109 $1,590,661 1 S Bering Straits 1068 Stebbins St Michael Wind Energy Final Design and Permitting Alaska Village Electric Cooperative, Inc.Utility Wind 83.33 1.80 2.74 $0.56 24.42 7.00 16.67 3.00 11.63 5.00 4.50 72.21 7 $3,946,050 $342,000 $18,000 Design FULL $342,000 $342,000 2 H Bering Straits 1040 Brevig Mission Water System Heat Recovery City of Brevig Mission Government Entity Heat Recovery 83.00 1.51 2.01 $0.54 $5.29 23.14 6.00 16.60 5.00 10.25 4.00 3.17 68.16 18 $753,313 $731,372 $21,941 DesignConstructionFULL $731,372 $1,073,372 2 Bering Straits Total $4,699,363 $1,073,372 $39,941 $1,073,372 1 S Bristol Bay 1036 Packers Creek Hydroelectric Project Phase II Chignik Lagoon Village Council Government Entity Hydro 86.33 1.66 3.85 $0.69 30.26 11.00 17.27 5.00 11.00 5.00 3.83 83.36 2 $5,389,149 $2,352,653 $3,036,496 Construction FULL $2,352,653 $2,352,653 2 S Bristol Bay 1072 Igiugig Wind Resource Feasibility and Conceptual Design Igiugig Village Council Government Entity Wind 47.00 0.86 1.40 $0.80 35.00 13.00 9.40 2.50 0.00 3.00 3.17 66.07 25 $110,000 $80,000 $30,000 Feasibility FULL SP $80,000 $2,432,653 3 S Bristol Bay 1079 Koliganek Wind Diesel and Heat Recovery New Koliganek Village Council Government Entity Wind 52.33 1.05 1.60 $0.51 22.09 6.00 10.47 3.83 4.13 2.00 3.17 51.68 54 $2,566,000 $306,000 $10,000 Design FULL SP Y $306,000 $2,738,653 4 S Bristol Bay 1018 Chignik Hydroelectric Project Design and Permitting City of Chignik Local Government Hydro 52.17 1.02 1.60 $0.48 20.81 0.00 10.43 3.50 4.88 0.00 4.00 43.62 63 BLANK $1,375,000 $0 Design PARTIAL SP $500,000 $3,238,653 5 H Bristol Bay 1006 NEA Stack Heat to Power Project Naknek Electric Association, Inc.Utility Heat Recovery 1.39 6.44 $0.50 $1,940,379 $1,843,379 $97,000 FeasibilityDesign Construction Not Recommended 6 S Bristol Bay 1046 Port Alsworth Hydropower PreConstruction Phase Port Alsworth Improvement Corporation Government Entity Hydro 1.52 $0.68 $7,224,213 $159,000 $10,000 ReconFeasibility Not Recommended 7 S Bristol Bay 1050 Bristol Bay Borough School District Solar PV Project Bristol Bay Borough School District Government Entity Solar PV 0.96 1.28 $0.50 $235,000 $230,000 $5,000 DesignConstructionNot Recommended 8 S Bristol Bay 1063 Iliamna Solar Ground Mounted Energy System Iliamna Village Council Government Entity Solar PV 0.01 0.40 $0.59 $2,000,000 $800,000 $120,000 ReconFeasibility Not Recommended 8 Bristol Bay Total $19,464,741 $7,146,032 $3,308,496 $3,238,653 1 S Copper River/Chugach 1015 Allison Creek Hydroelectric Project Construction Copper Valley Electric Association, Inc.Utility Hydro 89.33 3.96 3.68 $0.28 12.44 15.00 17.87 4.00 12.13 2.00 5.00 68.43 16 $49,000,000 $5,914,491 $5,914,491 Construction FULL $5,914,491 $5,914,491 2 H Copper River/Chugach 1014 Wood Chip Boiler for The Native Village of Tazlina Native Village of Tazlina Government Entity Biomass 64.50 1.19 1.84 $0.28 $4.17 18.24 6.00 12.90 3.00 6.25 4.00 3.00 53.39 46 $278,150 $267,150 $11,000 DesignConstructionPARTIAL SP Y $125,000 $6,039,491 3 S Copper River/Chugach 1075 Cascade Creek Hydroelectric Project Feasibility Study Blue Hole Properties, LLC (BHP)IPP Hydro 45.83 1.30 3.46 $0.28 12.44 11.00 9.17 3.00 6.38 5.00 1.33 48.32 58 $2,250,000 $170,000 $30,000 Feasibility FULL $170,000 $6,209,491 4 S Copper River/Chugach 1064 Chenega Bay Hydroelectric Construction Native Village of Chenega Government Entity Hydro 1.14 1.02 $0.44 $1,650,000 $1,400,000 $0 DesignConstructionNot Recommended 4 Copper River/Chugach Total $53,178,150 $7,751,641 $5,955,491 $6,209,491 1 S Kodiak 1065 Old Harbor Hydroelectric Project Final Design and Permitting Alaska Village Electric Cooperative, Inc.Utility Hydro 56.33 1.11 1.79 $0.58 25.21 7.00 11.27 2.00 5.38 5.00 4.50 60.35 36 $8,155,000 $1,092,500 $57,500 Design PARTIAL $400,000 $400,000 2 S Kodiak 1030 Flywheels ESS for Kodiak Pier Electric Crane Kodiak Electric Association, Inc.Utility Storage of Renewable66.83 0.51 1.02 $0.19 8.32 15.00 13.37 3.50 3.25 5.00 4.00 52.44 48 $3,800,000 $1,900,000 $1,900,000 Construction PARTIAL SP $1,470,548 $1,870,548 3 S Kodiak 1004 Karluk Tribal Council Wind Energy System Karluk Tribal Council Government Entity Wind 21.17 0.76 1.83 $0.60 $1,300,000 $81,000 $300 FeasibilityDesign Did Not Pass Stage 2 3 Kodiak Total $13,255,000 $3,073,500 $1,957,800 $1,870,548 1 H Lower Yukon-Kuskokwim 1052 Nunam Iqua Heat Recovery Project City of Nunam Iqua Local Government Heat Recovery 87.67 2.20 2.33 $0.53 $4.38 19.16 13.00 17.53 3.00 12.50 5.00 3.50 73.69 5 $603,000 $450,000 $153,000 Construction FULL $450,000 $450,000 2 H Lower Yukon-Kuskokwim 1085 Tuntutuliak Heat Recovery Native Village of Tuntutuliak Government Entity Heat Recovery 81.33 1.54 2.32 $0.65 $6.80 29.75 6.00 16.27 3.83 10.13 3.00 3.00 71.98 8 $469,311 $455,642 $13,669 DesignConstructionFULL $455,642 $905,642 3 H Lower Yukon-Kuskokwim 1061 Emmonak Heat Recovery System City of Emmonak Government Entity Heat Recovery 87.67 2.56 4.02 $0.55 $5.77 25.24 6.00 17.53 4.00 12.50 3.00 2.67 70.94 9 $689,251 $689,251 $20,677 Construction Design FULL SP $689,251 $1,594,893 4 S Lower Yukon-Kuskokwim 1067 Mountain Village Wind Feasibility and Conceptual Design Alaska Village Electric Cooperative, Inc.Utility Wind 79.17 1.70 1.23 $0.54 23.80 7.00 15.83 2.50 11.63 5.00 4.50 70.26 12 $4,833,000 $123,500 $6,500 Feasibility FULL $123,500 $1,718,393 5 H Lower Yukon-Kuskokwim 1043 St Marys Heat Recovery System City of St. Mary's Government Entity Heat Recovery 85.17 1.61 2.21 $0.49 $4.60 20.13 6.00 17.03 3.83 11.25 5.00 4.17 67.41 21 $757,299 $735,242 $22,057 DesignConstructionFULL $735,242 $2,453,635 6 H Lower Yukon-Kuskokwim 1073 Kongiganak Wind Heat Electrical Thermal Storage Puvurnaq Power Company Utility Wind to Heat 74.17 1.70 2.55 $0.56 $6.21 27.17 6.00 14.83 2.83 12.38 0.00 3.00 66.21 24 $320,456 $311,456 $9,000 Construction FULL SP $311,456 $2,765,091 7 H Lower Yukon-Kuskokwim 1041 Chevak Water and Vacuum Plant Heat Recovery City of Chevak Government Entity Heat Recovery 85.33 1.83 2.44 $0.48 $4.30 18.81 6.00 17.07 3.00 12.50 5.00 2.83 65.21 26 $558,814 $558,814 $16,765 DesignConstructionFULL SP $558,814 $3,323,905 8 S Lower Yukon-Kuskokwim 1057 Mertarvik Renewable Energy Feasibility and Conceptual DesignUngusraq Power Company (UPC) / Newtok Traditional CouncilIPP Wind 53.00 1.14 $0.80 35.00 7.00 10.60 2.00 4.50 2.00 1.67 62.77 30 $8,000,000 $375,000 $25,000 ReconFeasibility PARTIAL $75,000 $3,398,905 9 S Lower Yukon-Kuskokwim 1069 St Marys Pitkas Point Wind Energy Construction Project Alaska Village Electric Cooperative, Inc.Utility Wind 65.00 1.19 1.47 $0.49 21.60 9.00 13.00 5.00 4.50 5.00 4.33 62.43 31 $4,782,528 $4,274,575 $507,953 Construction FULL SP $4,274,575 $7,673,480 10 H Lower Yukon-Kuskokwim 1071 Kwigillingok Wind Heat Electrical Thermal Storage Kwig Power Company Utility Wind to Heat 64.17 1.53 1.73 $0.60 $5.95 26.03 6.00 12.83 2.83 10.00 2.00 2.50 62.20 32 $302,737 $293,737 $9,000 Construction FULL SP $293,737 $7,967,217 11 H Lower Yukon-Kuskokwim 1042 Eek Water System Heat Recovery City of Eek Government Entity Heat Recovery 70.17 1.01 1.35 $0.60 $3.89 17.02 6.00 14.03 5.00 4.50 5.00 3.83 55.39 41 $297,408 $288,745 $8,663 DesignConstructionFULL $288,745 $8,255,962 12 H Lower Yukon-Kuskokwim 1074 Tuntutuliak Wind Heat Electrical Thermal Storage TCSA Electrical Services Utility Wind to Heat 46.67 1.00 0.96 $0.65 $6.80 29.75 6.00 9.33 2.83 2.13 2.00 2.50 54.54 44 $259,817 $250,817 $9,000 Construction FULL SP $250,817 $8,506,779 13 S Lower Yukon-Kuskokwim 1066 Marshall Wind Energy Final Design and Permitting Project Alaska Village Electric Cooperative, Inc.Utility Wind 52.17 0.98 1.60 $0.50 22.05 7.00 10.43 2.50 1.50 5.00 3.83 52.32 49 $3,214,875 $353,400 $18,600 Design FULL SP $353,400 $8,860,179 14 H Lower Yukon-Kuskokwim 1008 Chuathbaluk Water System Heat Recovery City of Chuathbaluk Government Entity Heat Recovery 0.97 0.98 $0.85 $232,430 $225,660 $6,770 DesignConstructionNot Recommended 15 S Lower Yukon-Kuskokwim 1039 Four Villages lntertie Design Nuvista Light and Electric Cooperative Government Entity Transmission $1,250,000 $1,250,000 $0 Feasibility Did Not Pass Stage 1 16 S Lower Yukon-Kuskokwim 1054 Multiple Alternative Energy Sources for Napakiak Napakiak lrcinraq Power Company Utility Wind $2,284,000 $141,000 $20,000 DesignConstructionDid Not Pass Stage 1 17 S Lower Yukon-Kuskokwim 1086 Chefornak High Penetration Wind Diesel System Naterqak Light Plant, City of Chefornak Local Government Wind $4,358,784 $4,308,784 $50,000 DesignConstructionDid Not Pass Stage 1 17 Lower Yukon-Kuskokwim Total $33,213,710 $15,085,623 $896,654 $8,860,179 1 S North Slope 1049 Atqasuk Transmission Line Design and Permitting Project North Slope Borough Local Government Transmission 74.17 3.30 3.55 $0.15 6.56 9.00 14.83 2.50 12.38 2.00 5.00 52.27 50 $17,342,837 $2,017,818 $201,782 Design FULL SP $2,017,818 $2,017,818 2 S North Slope 1048 Kaktovik Wind Diesel Design and Permitting North Slope Borough Local Government Wind 65.83 1.03 1.37 $0.15 6.56 9.00 13.17 3.00 4.00 2.00 4.50 42.23 64 $4,565,200 $440,000 $44,000 Design FULL $440,000 $2,457,818 2 North Slope Total $21,908,037 $2,457,818 $245,782 $2,457,818 1 H Northwest Arctic 1038 Kotzebue Paper and Wood Waste to Energy Project City of Kotzebue Local Government Biomass 62.83 1.12 1.16 $0.42 $6.07 26.56 7.00 12.57 2.00 6.00 5.00 3.00 62.13 33 $2,692,700 $2,495,189 $95,000 DesignConstructionPARTIAL SP Y $270,000 $270,000 2 S Northwest Arctic 1001 Northwest Arctic Borough Solar PV Project Northwest Arctic Borough Local Government Solar PV 46.00 0.68 0.83 $0.42 18.27 6.00 9.20 4.50 0.38 3.00 4.50 45.85 61 $77,000 $76,000 $1,000 Construction FULL SP $75,000 $345,000 3 S Northwest Arctic 1059 Cosmos Hills Hydroelectric Design and Permitting Alaska Village Electric Cooperative Utility Hydro 27.50 0.71 1.05 $0.74 $38,660,000 $2,922,000 $150,000 Design Did Not Pass Stage 2 4 S Northwest Arctic 1058 Noatak Utility Size Photovoltaic Array Construction Project Northwest Arctic Borough Local Government Solar PV 1.24 1.22 $0.74 $447,800 $447,800 $0 Construction Not Recommended 5 H Northwest Arctic 1076 NWAB School District Solar Thermal Systems Northwest Arctic Borough School District Government Entity Solar Thermal 1.48 3.14 $0.63 $467,252 $456,252 $11,000 Construction Not Recommended 5 Northwest Arctic Total $42,344,752 $6,397,241 $257,000 $345,000 Ben / Cost Stage 3 Review Scores (max)Project Cost Recommendation DRAFT 1/6/2014 for REFAC Review DRAFT Page 5 Renewable Energy Fund Round 7 - Heat and Standard Combined by Energy Region Recommended Applications and Funding Prior to Stage 4 Regional Spread Count Energy Region ID Project Name Applicant Applicant Type Energy Source Total Stage 2 Score AEA B/C Appl B/C Cost of Energy ($/kWh ) Fuel Price $/gal 1. Cost of Energy (35) 2. Match (15) 3. Tech & Econ Feas (20) 4. Readi- ness (5) 5. Benefit (15) 6. Local Supt (5) 7. Sustan- ability (5) Total (100) State- wide Rank Project Cost Grant Requested Match Offered Phase AEA Recomnd EarlyRecommend Funding Cumulative Funding Ben / Cost Stage 3 Review Scores (max)Project Cost Recommendation 1 S Railbelt 1082 Stetson Creek Diversion Cooper Lake Dam Facilities Project Chugach Electric Association, Inc.Utility Hydro 94.33 7.11 0.89 $0.15 6.78 15.00 18.87 5.00 12.88 5.00 5.00 68.52 15 $21,772,523 $3,453,920 $13,591,226 Construction FULL $3,453,920 $3,453,920 2 H Railbelt 1031 Seldovia House Ground Source Heat Pump Project Cook Inlet Housing Authority Government Entity Heat Pumps 58.17 1.12 0.94 $0.20 $5.19 22.71 15.00 11.63 4.50 5.25 5.00 3.83 67.93 19 $362,805 $318,289 $411,835 DesignConstructionFULL $318,289 $3,772,209 3 S Railbelt 1084 Juniper Creek Hydroelectric Reconnaissance Study Ram Valley, LLC IPP Hydro 73.17 2.45 3.49 $0.15 6.61 15.00 14.63 2.00 11.25 4.00 3.83 57.33 39 $2,350,000 $35,750 $35,750 Recon FULL $35,750 $3,807,959 4 S Railbelt 1028 Carlo Creek Hydroelectric Project Reconnaissance Study Native Village of Cantwell Government Entity Hydro 61.00 1.90 1.88 $0.22 9.81 9.00 12.20 1.50 11.63 5.00 3.00 52.14 51 $8,340,000 $54,000 $6,000 Recon PARTIAL $35,000 $3,842,959 5 H Railbelt 1009 Nenana Collaborative Biomass Heating System Project Nenana School District Government Entity Biomass 54.67 0.66 1.11 $0.22 $4.06 17.76 7.00 10.93 3.00 1.00 5.00 4.00 48.69 56 $3,244,225 $367,965 $25,800 Design FULL Y $367,965 $4,210,924 6 S Railbelt 1081 Waste to Energy Reconnaissance Study Chugach Electric Association, Inc.Utility Biomass 61.50 1.31 1.34 $0.15 6.78 15.00 12.30 0.00 8.25 2.00 4.00 48.33 57 TBD $150,000 $100,000 Recon PARTIAL $50,000 $4,260,924 7 H Railbelt 1078 Chickaloon Solar Thermal and Biomass Project Chickaloon Native Village Government Entity Biomass 43.67 0.74 0.79 $0.15 $3.71 16.23 11.00 8.73 3.00 0.75 2.00 4.17 45.88 60 $152,867 $127,065 $25,802 DesignConstructionPARTIAL SP $97,000 $4,357,924 8 H Railbelt 1055 Alaska SeaLife Center Heat Recovery Project City of Seward Local Government Heat Recovery 57.67 1.13 4.41 $0.11 4.59 9.00 11.53 4.50 4.88 5.00 5.00 44.50 62 $250,000 $225,000 $25,000 Construction FULL $225,000 $4,582,924 9 S Railbelt 1002 Poncelet Kinetics RHK100 Prototype Demonstration Whitestone Power and Communications IPP Hydrokinetic 39.17 0.16 0.16 $0.22 $1,940,558 $1,560,558 $120,000 Construction Did Not Pass Stage 2 10 S Railbelt 1029 Jack River Hydroelectric Project Feasibility Study Native Village Of Cantwell Government Entity Hydro 35.33 0.79 1.21 $0.22 $31,500,000 $213,750 $11,250 Feasibility Did Not Pass Stage 2 10 Railbelt Total $69,912,978 $6,506,297 $14,352,663 $4,582,924 1 H Southeast 1011 Sitka Centennial Hall Air Source Heat Pump City and Borough of Sitka Local Government Heat Pumps 80.50 1.69 3.58 $0.09 $3.59 15.71 15.00 16.10 5.00 10.75 5.00 4.83 72.39 6 $232,620 $232,620 $1,021,393 DesignConstructionFULL $232,620 $232,620 2 H Southeast 1087 Kake Community Energy Organized Village of Kake Government Entity Biomass 73.83 1.62 1.18 $0.62 $5.85 25.59 7.00 14.77 2.00 12.00 4.00 4.00 69.36 13 $1,423,292 $208,073 $20,000 Design PARTIAL Y $175,000 $407,620 3 H Southeast 1037 Ketchikan Gateway Borough Biomass Heating Project Ketchikan Gateway Borough Local Government Biomass 84.33 2.15 0.24 $0.10 $3.59 15.71 11.00 16.87 3.67 13.00 5.00 3.50 68.74 14 $1,957,261 $1,412,889 $353,222 Construction PARTIAL SP $620,000 $1,027,620 4 S Southeast 1025 Gunnuk Creek Hydroelectric Feasibility Study Inside Passage Electric Cooperative Utility Hydro 73.00 4.28 0.00 $0.62 27.14 7.00 14.60 2.00 11.63 2.00 3.83 68.20 17 $300,000 $275,000 $25,000 ReconFeasibility PARTIAL SP $80,000 $1,107,620 5 H Southeast 1021**Haines Borough Municipal Buildings Biomass Project Haines Borough Local Government Biomass 88.50 1.72 1.79 $0.22 $4.09 17.89 9.00 17.70 3.83 12.63 2.00 4.50 67.55 20 $1,374,892 $1,237,403 $137,448 DesignConstructi on FULL SP $1,237,403 $2,345,023 6 H Southeast 1053 Yakutat Biomass District Heating Loop City and Borough of Yakutat Local Government Biomass 67.67 1.45 2.31 $0.50 $5.05 22.09 11.00 13.53 2.00 8.88 5.00 4.17 66.67 23 $335,456 $286,166 $49,290 DesignConstructionPARTIAL SP Y $103,000 $2,448,023 7 H Southeast 1017 Southeast Island School District Wood Boilers Southeast Island School District Government Entity Biomass 76.67 1.47 2.32 $0.41 $3.80 16.63 11.00 15.33 3.00 9.75 5.00 4.00 64.71 27 $1,058,775 $940,950 $177,825 Construction FULL SP $940,950 $3,388,973 8 H Southeast 1016 Hydaburg Schools Wood Fired Boiler Project Hydaburg City School District Government Entity Biomass 77.83 1.91 2.45 $0.24 $4.20 18.38 7.00 15.57 3.00 13.50 3.00 3.50 63.95 29 $627,900 $583,900 $44,000 DesignConstructionPARTIAL SP Y $125,000 $3,513,973 9 S Southeast 1023 Swan Lake Reservoir Expansion Project The Southeast Alaska Power Agency Government Entity Hydro 81.17 4.07 4.07 $0.10 4.47 15.00 16.23 3.00 11.25 5.00 5.00 59.95 37 $13,391,869 $4,000,000 $8,813,869 DesignConstructionPARTIAL SP $560,488 $4,074,461 10 H Southeast 1013 Sitka Kettleson Library Air Source Heat Pump City and Borough of Sitka Local Government Heat Pumps 61.17 0.91 1.87 $0.09 $3.59 15.71 15.00 12.23 5.00 1.75 5.00 4.83 59.53 38 $230,200 $230,200 $192,891 DesignConstructionFULL $230,200 $4,304,661 11 H Southeast 1010 Craig High School Wood Heat Conversion Craig City School District Government Entity Biomass 66.33 1.12 1.54 $0.29 $3.80 16.63 11.00 13.27 3.00 6.38 2.00 3.50 55.77 40 $585,450 $492,850 $82,550 DesignConstructionPARTIAL SP Y $125,000 $4,429,661 12 H Southeast 1033 Sitka Sea Water Source Heat Pump Project City and Borough of Sitka Heat Pumps 54.83 0.50 0.52 $0.09 $3.59 15.71 15.00 10.97 4.00 0.50 5.00 4.17 55.34 42 $388,838 $373,838 $825,000 DesignConstructionPARTIAL SP Y $56,841 $4,486,502 13 S Southeast 1022 SEAPA Wind Resource Assessment Phase I and II The Southeast Alaska Power Agency Government Entity Wind 90.33 1.84 $0.10 4.47 7.00 18.07 2.00 13.13 5.00 3.67 53.33 47 $170,583 $158,771 $11,812 ReconFeasibility FULL $158,771 $4,645,273 14 H Southeast 1007 Mendenhall Valley Library Geothermal HVAC System City & Borough of Juneau Local Government Heat Pumps 49.33 0.86 0.74 $0.12 $4.12 18.03 11.00 9.87 4.00 0.63 4.00 4.50 52.02 52 $825,000 $660,000 $165,000 DesignConstructionFULL $660,000 $5,305,273 15 H Southeast 1012 Sitka Wastewater Treatment Plant Effluent Heat Pump City and Borough of Sitka Local Government Heat Pumps 57.67 0.73 1.06 $0.09 $3.59 15.71 9.00 11.53 5.00 0.75 5.00 4.83 51.83 53 $962,984 $849,984 $113,000 DesignConstructionFULL $849,984 $6,155,257 16 S Southeast 1019 Survey Creek Hydroelectric Project Edna Bay Community Local Government Hydro 39.33 1.48 1.37 N/A $3,562,772 $62,272 $3,500 Recon Did Not Pass Stage 2 17 S Southeast 1024 Walker Lake Hydro Project Feasibility Tlingit-Haida Regional Electrical Authority Utility Hydro 39.00 1.05 $0.62 $825,000 $700,000 $125,000 ReconFeasibility Did Not Pass Stage 2 18 S Southeast 1003 Mahoney Lake Hydroelectric Phase III and IV City of Saxman Local Government Hydro 1.79 6.91 $0.10 $51,000,000 $4,000,000 $4,000,000 DesignConstructionNot Recommended 19 S Southeast 1020 Excursion Inlet Hydro Project Feasibility and Conceptual DesignHaines Borough Local Government Hydro 0.09 3.93 N/A $14,500,000 $213,536 $10,000 Feasibility Not Recommended 20 S Southeast 1034 Metlakatla to Ketchikan Intertie Metlakatla Indian Community Government Entity Transmission 1.77 1.28 $0.10 $14,510,599 $9,281,615 $0 DesignConstructionNot Recommended 21 S Southeast 1035 Feasibility Study of Tenakee Inlet Geothermal Resource Inside Passage Electric Cooperative Utility Geothermal 0.44 1.24 $0.65 $49,000,000 $3,378,500 $0 Feasibility Not Recommended 21 Southeast Total $157,263,491 $29,578,567 $16,170,800 $6,155,257 1 H Yukon-Koyukok/Upper Tanana1044 Venetie Clinic Heat Recovery Village of Venetie Government Entity Heat Recovery 85.17 1.68 2.45 $0.90 $8.50 35.00 6.00 17.03 4.00 11.25 4.00 3.33 80.62 3 $204,428 $198,474 $11,908 DesignConstructionFULL $198,474 $198,474 2 H Yukon-Koyukok/Upper Tanana1047 Galena Community Wood Heat Project City of Galena Local Government Biomass 88.00 4.31 3.96 $0.56 $6.02 26.34 6.00 17.60 3.83 14.13 5.00 4.50 77.40 4 $3,144,200 $3,096,898 $47,302 Construction FULL SP $3,096,898 $3,295,372 3 S Yukon-Koyukok/Upper Tanana1027 Chisana Mountain Wind Feasibility Project Alaska Power Company Utility Wind 85.00 2.55 $0.49 21.46 11.00 17.00 2.50 12.50 2.00 4.17 70.63 10 $148,800 $119,000 $29,800 Feasibility FULL $119,000 $3,414,372 4 S Yukon-Koyukok/Upper Tanana1077 Yerrick Creek Hydroelectric Project Native Village of Tanacross Government Entity Hydro 58.33 4.23 9.84 $0.49 21.46 15.00 11.67 3.00 11.25 5.00 3.17 70.54 11 $19,000,000 $6,000,000 $11,500,000 Construction PARTIAL $75,000 $3,489,372 5 H Yukon-Koyukok/Upper Tanana1032 Biomass Heat for Minto Community Buildings Village of Minto Government Entity Biomass 69.33 1.02 1.37 $0.59 $5.00 21.88 15.00 13.87 3.00 5.38 5.00 3.17 67.29 22 $403,550 $274,750 $278,800 DesignConstructionFULL SP $274,750 $3,764,122 6 H Yukon-Koyukok/Upper Tanana1045 Grayling Heat Recovery System City of Grayling Government Entity Heat Recovery 80.17 1.47 2.02 $0.56 $5.00 21.88 6.00 16.03 3.83 9.00 4.00 3.50 64.25 28 $332,590 $322,903 $19,374 DesignConstructionFULL $322,903 $4,087,025 7 H Yukon-Koyukok/Upper Tanana1060 Holy Cross Water System Heat Recovery City of Holy Cross Government Entity Heat Recovery 57.67 0.55 0.74 $0.53 $7.15 31.28 6.00 11.53 4.00 1.25 5.00 2.83 61.90 35 $497,773 $497,773 $14,933 DesignConstructionFULL $497,773 $4,584,798 8 H Yukon-Koyukok/Upper Tanana1051 AGSD Extension of Heating Loop Alaska Gateway School District Government Entity Heat Recovery 59.83 0.97 1.45 $0.49 $3.79 16.58 6.00 11.97 4.00 3.38 2.00 4.00 47.92 59 $629,000 $625,000 $4,000 DesignConstructionFULL $625,000 $5,209,798 8 Yukon-Koyukok/Upper Tanana Total $24,360,341 $11,134,798 $11,906,117 $5,209,798 86 Grand Total $524,085,270 $93,011,953 $57,294,853 $41,593,701 Notes This document represents AEA's draft recommendations for consideration by the REFAC committee. This is a draft document only and is subject to change prior to AEA's final recommendations. This view combines the heat and "standard application 'projects, for perspective. Please see the sepate heat and standard lists. If REF 7 funding is limited to $20M exactly, #1021, Haines Borough Municipal Building Biomass would be partially funded. H = Heat application, applications that deliver heat only, not electricity S = Standard spplication, applications that deliver electricity, energy storage, transmission or a combination of electricity and heat. B/C = Benefit/Cost Ratio over the life of the project. AEA B/C ratio uses AEA's best assumptions in the standard REF economic model SP = Special Provisions The Applicant B/C ratio uses the applicants assumptions in the standard REF economic model. Total Stage 2 Score column is the technical and economic evaluation score and is on a scale of 0 to 100. A minimum score of 40 is required to pass stage 2. Match offered is applicant's offered cash and in-kind match, including supporting energy efficiency work and wood harvest value where applicable. Some not recommended projects' B/C ratios may be incomplete due to incomplete information provided or other reasons. DRAFT 1/6/2014 for REFAC Review DRAFT Page 6