HomeMy WebLinkAboutPartial Funding RationaleRationale for partial funding recommendations
Renewable Energy Fund Round IX
Project # Project name Reason for partial funding recommendation
1245 Adak Hydro Application requested funding for feasibility, design and construction. Recommended
for partial funding to complete the feasibility study.
1238 Koyuk Water
Heat
Recovery
Application was for funding final design and construction. Project economics are
marginal so AEA recommends limiting funding to final design to improve project
economics and better assess value.
1233 Grayling
Water Heat
Recovery
Application was for funding final design and construction. AEA recommends funding
only the design phase to allow for improved construction cost estimates prior to
funding the construction phase. Requested design costs of $75,760 (17.5% of total
project cost) is higher than expected based on the complexity of the project. Partial
funding of $50,000 recommended for final design phase only.
1221 Old Harbor
Hydro
Total design budget appears excessive. Recommend funding full design and partial
geotech funding with the recommendation that GPR and/or seismic surveys be done
prior to investing in costly helicopter supported drilling.
1214 Eek Water
Heat
Recovery
Application was for final design and construction. AEA recommends funding only the
design phase to allow for improved construction cost estimates prior to funding the
construction phase. Requested design costs of $68,262 (21% of total project cost) is
higher than expected based on the complexity of the project. Partial funding of
$50,000 recommended for final design phase only.
1215 Huslia Water
and Clinic
Biomass
Application was for funding final design and construction. The economics of this
project are challenging. Recommend partial funding of $53,116 to complete the
design phase only and work to improve the economics of the project.
1235 Scammon
Bay Hydro
Application requested funding for stream gauging and preliminary design. AEA
recommends the project for partial funding to complete stream gauging to better
understand the hydroelectric resource potential of Hillside Creek.
1201 Unalaska
Inline Micro
Turbines
Application was for funding feasibility, final design and construction. AEA
recommends partially funding the feasibility and final design phases of this project to
better understand operation of power recovery turbine and PRV under varying flow
conditions and events such as load rejection.
1217 Klawock
School
Biomass
Application requested funding for final design and construction. While the economics
of this project are good, the engineering will be challenging due to the site
constraints. Recommend partial funding of $111,986 for the development of final
design and a business/operating plan.
1210 Chugach
Community
Solar
Chugach Electric's application for a 500kW solar garden project is recommended for
funding at 50% of the requested level. The applicant requested a $100,000 grant to
match $100,000 in a cash contribution from Chugach Electric. However, AEA has
estimated that the applicant should be able to complete the proposed feasibility
study, conceptual design and cost estimate for $100,000.
1209 Ketchikan
Schools
Central
Heating
Application requested feasibility and design funding. The economics of this project
are challenging but there are opportunities in the feasibility phase to identify an
economically viable option. Recommend partial funding of $40,000 for a feasibility
study.