Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S3 Recommendations Graphs
1 $29.09 $6.97 Round IX Recommendations by Application Type Millions of $'s Standard Heat 26 13 Round IX Recommendations by Application Type # of projects Standard Heat 2 $21.44 $4.57 $3.40 $2.02 $1.89 $1.69 $0.75 $0.27 $0.05 Round IX Recommendation by Project Technology Millions of $'s Hydro Wind Heat Recovery Transmission Biomass Heat Pumps Storage of Renewable Other Solar PV 17 5 5 1 5 3 1 1 1 Round IX Recommendation by Project Technology # of projects Hydro Wind Heat Recovery Transmission Biomass Heat Pumps Storage of Renewable Other Solar PV 3 $7.58 $5.89 $4.78$4.63 $4.03 $2.46 $1.94 $1.94 $1.03 $0.91 $0.89 Round IX Recommendations by Region Millions of $'s Southeast Lower Yukon-Kuskokwim Railbelt Copper River/ Chugach Yukon-Koyukuk/Upper Tanana North Slope Kodiak Aleutians Bristol Bay Northwest Arctic Bering Straits 9 4 3 232 3 6 1 3 3 Round IX Recommendations by Region # of projects Southeast Lower Yukon-Kuskokwim Railbelt Copper River/ Chugach Yukon-Koyukuk/Upper Tanana North Slope Kodiak Aleutians Bristol Bay Northwest Arctic Bering Straits 4 Recon, Feasibility Feasibility Feasibility, Design Design Design, Construction Construction Funding $265,200 $1,423,600 $539,200 $10,287,852 $7,010,434 $16,535,489 Count 1 8 2 13 8 7 $0 $2 $4 $6 $8 $10 $12 $14 $16 $18 MillionsRound IX Recommendations by Phases 5 6 7