Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2Recommended Rank List REF R9 for REFAC Final
Renewable Energy Fund Round IX - Heat and Standard Combined Recommended Applications and Funding After Stage 4 Regional Spreading CountEnergy Region ID Project Name Applicant Energy Source B/C Ratio Household Energy Cost Tech/ Econ Score State- wide Rank Project Cost Through Construction Applicant Grant Requested Applicant Match Offered Recommended Phase(s) AEA Recomnd Recommend Funding Cumulative Funding 1 Copper River/Chugach 1226 Fivemile Creek Hydroelectric Project Chitina Electric Inc. (CEI)Hydro 1.71 $12,269 75.67 1 $6,589,090 $3,400,000 $2,600,000 Constr Full $3,400,000 $3,400,000 2 Aleutians 1237 Sand Point High Penetration Wind System Sand Point Generating, TDX Wind 2.19 $10,793 83.33 2 $1,067,309 $649,030 $423,275 Design, Constr Full $649,030 $4,049,030 3 Bering Straits 1234 Wales Water System Heat Recovery City of Wales HeatRecovery 1.44 $17,269 72.50 3 $653,277 $650,047 $6,566 Design, ConstrFull $650,047 $4,699,077 4 Aleutians 1245 Adak Hydro Power Generator TDX Adak Generating, TDX Hydro 1.75 $14,961 59.50 4 $1,750,000 $294,102 $126,044 Feas Partial $19,600 $4,718,677 5 Bering Straits 1238 Koyuk Water System Heat Recovery City of Koyuk Heat Recovery 1.06 $18,742 61.50 8 $695,269 $688,386 $6,884 Design Partial $90,922 $4,809,599 6 Bering Straits 1223 Shishmaref Wind Feasibility & Conceptual Design Alaska Village Electric Coop Wind 0.93 $15,812 52.50 18 $2,529,400 $152,000 $8,000 Feas Full SP $152,000 $4,961,599 7 Y-K/Upper Tanana 1233 Grayling Water System Heat Recovery City of Grayling Heat Recovery 0.98 $12,652 54.50 21 $431,982 $427,705 $4,277 Design Partial $38,401 $5,000,000 Y-K/Upper Tanana 1233 Grayling Water System Heat Recovery City of Grayling Heat Recovery 0.98 $12,652 54.50 21 $431,982 $427,705 $4,277 Design Partial $11,599 $5,011,599 8 Railbelt 1242 Heat Pump System for City of Seward City of Seward HeatPump 1.97 $9,005 83.17 5 $955,458 $725,000 $125,000 Design, Constr Full $725,000 $5,736,599 9 Southeast 1244 IPEC Gunnuk Creek Hydro Rehab in Kake Inside Passage Electric Coop Hydro 2.23 $10,561 73.00 6 $5,715,000 $3,920,000 $1,545,000 Constr Full SP $3,920,000 $9,656,599 10 Lower Yukon-Kuskokwim 1224 Mountain Village-St. Mary's Wind Intertie Alaska Village Electric Coop Wind, Trans 1.00 $12,362 66.00 7 $6,196,000 $3,196,000 $3,000,000 Design, Constr Full SP $3,196,000 $12,852,599 11 Southeast 1250 Elfin Cove Hydroelectric Permitting Elfin Cove Utility Commission Hydro 1.22 $12,008 67.33 9 $3,705,000 $88,000 $22,000 Design Full $88,000 $12,940,599 12 Northwest Arctic 1216 Shungnak Wind-Diesel Conceptual Design Native Village of Shungnak Wind 1.04 $17,752 50.00 10 $5,598,500 $135,000 $39,000 Feas Full SP $135,000 $13,075,599 13 Lower Yukon-Kuskokwim 1222 Bethel Power Plant Heat Recovery Module Alaska Village Electric Coop Heat Recovery 2.16 $10,766 71.67 11 $8,233,369 $2,555,489 $283,943 Constr Full SP $2,555,489 $15,631,088 14 Bristol Bay 1247 Chignik Hydroelectric Dam Project City of Chignik Hydro 1.86 $8,746 73.67 12 $7,783,428 $1,025,175 $60,251 Design Full $1,025,175 $16,656,263 15 Kodiak 1221 Old Harbor Hydro Geotech & Final Design Alaska Village Electric Coop Hydro 1.38 $12,095 68.50 13 $9,317,500 $1,092,500 $57,500 Design Partial $792,500 $17,448,763 16 Kodiak 1202 Upper Hidden Basin Geotech Investigation Kodiak Electric Association Hydro, Storage 4.24 $7,047 79.00 14 $79,247,000 $750,000 $750,000 Feas Full $750,000 $18,198,763 17 Southeast 1249 Indian River Hydroelectric Project - Construction Tenakee Springs Electric Hydro 0.94 $11,498 56.33 15 $5,473,280 $809,000 $1,115,280 Constr Full $809,000 $19,007,763 18 Northwest Arctic 1212 Cosmos Hills Hydro Design & Permitting NANA Regional Corporation Hydro 1.08 $15,410 40.50 16 $50,797,871 $341,335 $37,200 Design Full $341,335 $19,349,098 19 Lower Yukon-Kuskokwim 1214 Eek Water System Heat Recovery City of Eek Heat Recovery 1.01 $12,572 59.50 17 $311,394 $308,311 $3,083 Design Partial $50,000 $19,299,098 20 Southeast 1211 Sitka Wastewater Plant Effluent Heat Pump City and Borough of Sitka Heat Pump 1.13 $6,991 72.50 19 $826,067 $667,000 $113,000 Design, Constr Full $667,000 $19,966,098 21 Y-K/Upper Tanana 1207 Yerrick Creek Hydro Construction Upper Tanana Energy Hydro 1.23 $7,963 57.17 20 $20,744,264 $4,000,000 $15,000,000 Constr Full SP $3,925,000 $23,891,098 22 Southeast 1205 Neck Lake Hydropower Project: Phases II-III Alaska Power Company Hydro 1.21 $9,630 63.17 22 $3,016,475 $395,200 $98,800 Feas, Design Full $395,200 $24,286,298 23 Lower Yukon-Kuskokwim 1235 Scammon Bay Hydroelectric Project City of Scammon Bay Hydro 1.25 $12,698 49.67 23 $4,283,056 $305,000 $3,050 Feas Partial $90,000 $24,376,298 24 Y-K/Upper Tanana 1215 Huslia Water & Clinic Biomass Boiler City of Huslia Biomass 0.72 $13,795 44.67 24 $496,526 $491,610 $4,916 Design Partial $53,116 $24,429,414 25 Aleutians 1219 False Pass Hydro Feasibility & Conceptual Design City of False Pass Hydro 1.87 $8,145 73.67 25 $4,380,000 $187,000 $33,000 Feas Full $187,000 $24,616,414 26 Aleutians 1246 St. Paul Island 80% Renewable Energy Feasibility TDX Power, Inc.Other, Wind 1.66 $8,560 48.83 26 $5,731,500 $265,200 $66,300 Recon, Feas Full $265,200 $24,881,614 27 Northwest Arctic 1213 Ambler Washeteria and City Office Biomass Heating City of Ambler Biomass 1.06 $11,345 49.17 27 $484,691 $429,892 $54,799 Design, Constr Full SP $429,892 $25,311,506 28 North Slope 1232 Atqasuk Transmission Line Design and Permitting North Slope Borough Trans, Other 2.02 $3,417 78.00 28 $32,840,509 $2,017,818 $201,782 Design Full $2,017,818 $27,329,324 29 Southeast 1218 Saxman Low-Rent Multifamily Air Source Heat Pump Tlingit-Haida RHA Heat Pump 0.93 $6,194 60.83 29 $438,341 $296,038 $213,193 Design, Constr Full $296,038 $27,625,362 30 Aleutians 1201 Unalaska Water Treatment Inline Micro Turbines City of Unalaska Hydro 1.24 $7,677 58.00 30 $1,340,000 $1,100,000 $240,000 Feas, Design Partial $144,000 $27,769,362 31 Southeast 1208 Ketchikan High School Biomass Boiler Ketchikan Gateway Borough Biomass 1.33 $6,194 82.67 31 $1,365,890 $1,251,000 $0 Constr Full $1,251,000 $29,020,362 32 Southeast 1217 Klawock School Biomass Fuel Boiler Project Klawock City School District Biomass 1.38 $7,488 59.67 32 $858,556 $833,556 $25,000 Design Partial $111,986 $29,132,348 33 Copper River/Chugach 1248 Crater Lake Power and Water Project Cordova Electric Cooperative Hydro, Storage 0.91 $11,122 45.17 33 $17,306,696 $1,227,000 $420,680 Design Full SP $1,227,000 $30,359,348 34 Railbelt 1210 Chugach Electric Solar Project Chugach Electric Association Solar 0.36 $3,751 59.67 34 $1,814,049 $100,000 $100,000 Feas Partial $50,000 $30,409,348 35 Railbelt 1225 Grant Lake Hydroelectric Project Kenai Hydro LLC Hydro 1.10 $6,643 56.67 35 $58,936,366 $4,000,000 $875,528 Design Full $4,000,000 $34,409,348 36 Kodiak 1239 Ouzinkie Hydroelectric Power Project City of Ouzinkie Hydro 0.73 $7,460 40.67 36 $4,603,385 $397,427 $4,014 Design, Constr Full SP $397,427 $34,806,775 37 Aleutians 1220 Waterfall Creek Hydro Construction City of King Cove Hydro 0.72 $6,054 41.83 37 $6,874,498 $675,000 $5,525,000 Constr Full $675,000 $35,481,775 38 North Slope 1231 Kaktovik Wind Diesel Design North Slope Borough Wind 0.79 $6,293 58.17 38 $7,606,795 $440,000 $44,000 Design Full $440,000 $35,921,775 39 Southeast 1209 Ketchikan Schools Recreation Heating Plant Ketchikan Gateway Borough Biomass 0.00 $6,194 62.00 39 $2,600,000 $220,000 $0 Feas Partial $40,000 $35,961,775 Sub Totals, All Recommended Projects $374,029,773 $40,933,526 $33,240,642 $36,061,775 Recommended Projects Project Cost Recommendation Draft 1/13/16 - for REFAC meeting - Not final recommendations