Loading...
HomeMy WebLinkAbout2Recommended Rank List REF R9 for REFAC FinalRenewable Energy Fund Round IX - Heat and Standard Combined Recommended Applications and Funding After Stage 4 Regional Spreading CountEnergy Region ID Project Name Applicant Energy Source B/C Ratio Household Energy Cost Tech/ Econ Score State- wide Rank Project Cost Through Construction Applicant Grant Requested Applicant Match Offered Recommended Phase(s) AEA Recomnd Recommend Funding Cumulative Funding 1 Copper River/Chugach 1226 Fivemile Creek Hydroelectric Project Chitina Electric Inc. (CEI)Hydro 1.71 $12,269 75.67 1 $6,589,090 $3,400,000 $2,600,000 Constr Full $3,400,000 $3,400,000 2 Aleutians 1237 Sand Point High Penetration Wind System Sand Point Generating, TDX Wind 2.19 $10,793 83.33 2 $1,067,309 $649,030 $423,275 Design, Constr Full $649,030 $4,049,030 3 Bering Straits 1234 Wales Water System Heat Recovery City of Wales HeatRecovery 1.44 $17,269 72.50 3 $653,277 $650,047 $6,566 Design, ConstrFull $650,047 $4,699,077 4 Aleutians 1245 Adak Hydro Power Generator TDX Adak Generating, TDX Hydro 1.75 $14,961 59.50 4 $1,750,000 $294,102 $126,044 Feas Partial $19,600 $4,718,677 5 Bering Straits 1238 Koyuk Water System Heat Recovery City of Koyuk Heat Recovery 1.06 $18,742 61.50 8 $695,269 $688,386 $6,884 Design Partial $90,922 $4,809,599 6 Bering Straits 1223 Shishmaref Wind Feasibility & Conceptual Design Alaska Village Electric Coop Wind 0.93 $15,812 52.50 18 $2,529,400 $152,000 $8,000 Feas Full SP $152,000 $4,961,599 7 Y-K/Upper Tanana 1233 Grayling Water System Heat Recovery City of Grayling Heat Recovery 0.98 $12,652 54.50 21 $431,982 $427,705 $4,277 Design Partial $38,401 $5,000,000 Y-K/Upper Tanana 1233 Grayling Water System Heat Recovery City of Grayling Heat Recovery 0.98 $12,652 54.50 21 $431,982 $427,705 $4,277 Design Partial $11,599 $5,011,599 8 Railbelt 1242 Heat Pump System for City of Seward City of Seward HeatPump 1.97 $9,005 83.17 5 $955,458 $725,000 $125,000 Design, Constr Full $725,000 $5,736,599 9 Southeast 1244 IPEC Gunnuk Creek Hydro Rehab in Kake Inside Passage Electric Coop Hydro 2.23 $10,561 73.00 6 $5,715,000 $3,920,000 $1,545,000 Constr Full SP $3,920,000 $9,656,599 10 Lower Yukon-Kuskokwim 1224 Mountain Village-St. Mary's Wind Intertie Alaska Village Electric Coop Wind, Trans 1.00 $12,362 66.00 7 $6,196,000 $3,196,000 $3,000,000 Design, Constr Full SP $3,196,000 $12,852,599 11 Southeast 1250 Elfin Cove Hydroelectric Permitting Elfin Cove Utility Commission Hydro 1.22 $12,008 67.33 9 $3,705,000 $88,000 $22,000 Design Full $88,000 $12,940,599 12 Northwest Arctic 1216 Shungnak Wind-Diesel Conceptual Design Native Village of Shungnak Wind 1.04 $17,752 50.00 10 $5,598,500 $135,000 $39,000 Feas Full SP $135,000 $13,075,599 13 Lower Yukon-Kuskokwim 1222 Bethel Power Plant Heat Recovery Module Alaska Village Electric Coop Heat Recovery 2.16 $10,766 71.67 11 $8,233,369 $2,555,489 $283,943 Constr Full SP $2,555,489 $15,631,088 14 Bristol Bay 1247 Chignik Hydroelectric Dam Project City of Chignik Hydro 1.86 $8,746 73.67 12 $7,783,428 $1,025,175 $60,251 Design Full $1,025,175 $16,656,263 15 Kodiak 1221 Old Harbor Hydro Geotech & Final Design Alaska Village Electric Coop Hydro 1.38 $12,095 68.50 13 $9,317,500 $1,092,500 $57,500 Design Partial $792,500 $17,448,763 16 Kodiak 1202 Upper Hidden Basin Geotech Investigation Kodiak Electric Association Hydro, Storage 4.24 $7,047 79.00 14 $79,247,000 $750,000 $750,000 Feas Full $750,000 $18,198,763 17 Southeast 1249 Indian River Hydroelectric Project - Construction Tenakee Springs Electric Hydro 0.94 $11,498 56.33 15 $5,473,280 $809,000 $1,115,280 Constr Full $809,000 $19,007,763 18 Northwest Arctic 1212 Cosmos Hills Hydro Design & Permitting NANA Regional Corporation Hydro 1.08 $15,410 40.50 16 $50,797,871 $341,335 $37,200 Design Full $341,335 $19,349,098 19 Lower Yukon-Kuskokwim 1214 Eek Water System Heat Recovery City of Eek Heat Recovery 1.01 $12,572 59.50 17 $311,394 $308,311 $3,083 Design Partial $50,000 $19,299,098 20 Southeast 1211 Sitka Wastewater Plant Effluent Heat Pump City and Borough of Sitka Heat Pump 1.13 $6,991 72.50 19 $826,067 $667,000 $113,000 Design, Constr Full $667,000 $19,966,098 21 Y-K/Upper Tanana 1207 Yerrick Creek Hydro Construction Upper Tanana Energy Hydro 1.23 $7,963 57.17 20 $20,744,264 $4,000,000 $15,000,000 Constr Full SP $3,925,000 $23,891,098 22 Southeast 1205 Neck Lake Hydropower Project: Phases II-III Alaska Power Company Hydro 1.21 $9,630 63.17 22 $3,016,475 $395,200 $98,800 Feas, Design Full $395,200 $24,286,298 23 Lower Yukon-Kuskokwim 1235 Scammon Bay Hydroelectric Project City of Scammon Bay Hydro 1.25 $12,698 49.67 23 $4,283,056 $305,000 $3,050 Feas Partial $90,000 $24,376,298 24 Y-K/Upper Tanana 1215 Huslia Water & Clinic Biomass Boiler City of Huslia Biomass 0.72 $13,795 44.67 24 $496,526 $491,610 $4,916 Design Partial $53,116 $24,429,414 25 Aleutians 1219 False Pass Hydro Feasibility & Conceptual Design City of False Pass Hydro 1.87 $8,145 73.67 25 $4,380,000 $187,000 $33,000 Feas Full $187,000 $24,616,414 26 Aleutians 1246 St. Paul Island 80% Renewable Energy Feasibility TDX Power, Inc.Other, Wind 1.66 $8,560 48.83 26 $5,731,500 $265,200 $66,300 Recon, Feas Full $265,200 $24,881,614 27 Northwest Arctic 1213 Ambler Washeteria and City Office Biomass Heating City of Ambler Biomass 1.06 $11,345 49.17 27 $484,691 $429,892 $54,799 Design, Constr Full SP $429,892 $25,311,506 28 North Slope 1232 Atqasuk Transmission Line Design and Permitting North Slope Borough Trans, Other 2.02 $3,417 78.00 28 $32,840,509 $2,017,818 $201,782 Design Full $2,017,818 $27,329,324 29 Southeast 1218 Saxman Low-Rent Multifamily Air Source Heat Pump Tlingit-Haida RHA Heat Pump 0.93 $6,194 60.83 29 $438,341 $296,038 $213,193 Design, Constr Full $296,038 $27,625,362 30 Aleutians 1201 Unalaska Water Treatment Inline Micro Turbines City of Unalaska Hydro 1.24 $7,677 58.00 30 $1,340,000 $1,100,000 $240,000 Feas, Design Partial $144,000 $27,769,362 31 Southeast 1208 Ketchikan High School Biomass Boiler Ketchikan Gateway Borough Biomass 1.33 $6,194 82.67 31 $1,365,890 $1,251,000 $0 Constr Full $1,251,000 $29,020,362 32 Southeast 1217 Klawock School Biomass Fuel Boiler Project Klawock City School District Biomass 1.38 $7,488 59.67 32 $858,556 $833,556 $25,000 Design Partial $111,986 $29,132,348 33 Copper River/Chugach 1248 Crater Lake Power and Water Project Cordova Electric Cooperative Hydro, Storage 0.91 $11,122 45.17 33 $17,306,696 $1,227,000 $420,680 Design Full SP $1,227,000 $30,359,348 34 Railbelt 1210 Chugach Electric Solar Project Chugach Electric Association Solar 0.36 $3,751 59.67 34 $1,814,049 $100,000 $100,000 Feas Partial $50,000 $30,409,348 35 Railbelt 1225 Grant Lake Hydroelectric Project Kenai Hydro LLC Hydro 1.10 $6,643 56.67 35 $58,936,366 $4,000,000 $875,528 Design Full $4,000,000 $34,409,348 36 Kodiak 1239 Ouzinkie Hydroelectric Power Project City of Ouzinkie Hydro 0.73 $7,460 40.67 36 $4,603,385 $397,427 $4,014 Design, Constr Full SP $397,427 $34,806,775 37 Aleutians 1220 Waterfall Creek Hydro Construction City of King Cove Hydro 0.72 $6,054 41.83 37 $6,874,498 $675,000 $5,525,000 Constr Full $675,000 $35,481,775 38 North Slope 1231 Kaktovik Wind Diesel Design North Slope Borough Wind 0.79 $6,293 58.17 38 $7,606,795 $440,000 $44,000 Design Full $440,000 $35,921,775 39 Southeast 1209 Ketchikan Schools Recreation Heating Plant Ketchikan Gateway Borough Biomass 0.00 $6,194 62.00 39 $2,600,000 $220,000 $0 Feas Partial $40,000 $35,961,775 Sub Totals, All Recommended Projects $374,029,773 $40,933,526 $33,240,642 $36,061,775 Recommended Projects Project Cost Recommendation Draft 1/13/16 - for REFAC meeting - Not final recommendations