Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
recomended not in gov budget
Energy Region Project NameApplicantEnergy SourceB/C RatioImpacted Pop.Household Energy CostTech/ Econ ScoreState- wide RankProject Cost Through ConstructionApplicant Grant RequestedApplicant Match OfferedRecommended Phase(s)AEA Recomnd Recommended FundingSoutheast Elfin Cove Hydroelectric Permitting Elfin Cove Utility Commission Hydro 1.22 16 $12,008 67.33 9 $3,705,000 $88,000 $22,000 Design Full $88,000Northwest Arctic Shungnak Wind-Diesel Conceptual Design Native Village of Shungnak Wind 1.04 460 $17,752 50.00 10 $5,598,500 $135,000 $39,000 Feas Full SP $135,000Lower Yukon-Kuskokwim Bethel Power Plant Heat Recovery Module Alaska Village Electric Coop Heat Recovery 2.16 6,241 $10,766 71.67 11 $8,233,369 $2,555,489 $283,943 Constr Full SP $2,555,489Kodiak Old Harbor Hydro Geotech & Final Design Alaska Village Electric Coop Hydro 1.38 213 $12,095 68.50 13 $9,317,500 $1,092,500 $57,500Design Partial $792,500Southeast Indian River Hydroelectric Project - Construction Tenakee Springs Electric Hydro 0.94* 128 $11,498 56.33 15 $5,473,280 $809,000 $1,115,280 Constr Full $809,000Northwest Arctic Cosmos Hills Hydro Design & Permitting NANA Regional Corporation Hydro 1.08 734 $15,410 40.50 16 $50,797,871 $341,335 $37,200 Design Full $341,335Southeast Sitka Wastewater Plant Effluent Heat Pump City and Borough of Sitka Heat Pump 1.13 9,061 $6,991 72.50 19 $826,067 $667,000 $113,000 Design, Constr Full $667,000Y-K/Upper Tanana Yerrick Creek Hydro Construction Upper Tanana Energy Hydro 1.23 1,539 $7,963 57.17 20 $20,744,264 $4,000,000 $15,000,000Constr Full SP $3,925,000Lower Yukon-Kuskokwim Scammon Bay Hydroelectric Project City of Scammon Bay Hydro 1.25 528 $12,698 49.67 23 $4,283,056 $305,000 $3,050 Feas Partial $90,000Y-K/Upper Tanana Huslia Water & Clinic Biomass Boiler City of Huslia Biomass 0.72* 338 $13,795 44.67 24 $496,526 $491,610 $4,916 Design Partial$53,116Aleutians False Pass Hydro Feasibility & Conceptual Design City of False Pass Hydro 1.87 34 $8,145 73.67 25 $4,380,000 $187,000 $33,000 Feas Full $187,000Aleutians St. Paul Island 80% Renewable Energy Feasibility TDX Power, Inc. Other, Wind 1.66 436 $8,560 48.83 26 $5,731,500 $265,200 $66,300 Recon, Feas Full $265,200Northwest Arctic Ambler Washeteria and City Office Biomass Heating City of Ambler Biomass 1.06 274 $11,345 49.17 27 $484,691 $429,892 $54,799 Design, Constr Full SP $429,892North Slope Atqasuk Transmission Line Design and Permitting North Slope Borough Trans, Other 2.02 4,698 $3,417 78.00 28 $32,840,509 $2,017,818 $201,782 Design Full $2,017,818Southeast Saxman Low-Rent Multifamily Air Source Heat Pump Tlingit-Haida RHA Heat Pump 0.93* 8,314 $6,194 60.83 29 $438,341 $296,038 $213,193 Design, Constr Full $296,038Aleutians Unalaska Water Treatment Inline Micro Turbines City of Unalaska Hydro 1.24 4,689 $7,677 58.00 30 $1,340,000 $1,100,000 $240,000Feas, Design Partial $144,000Southeast Ketchikan High School Biomass Boiler Ketchikan Gateway Borough Biomass 1.33 8,314 $6,194 82.67 31 $1,365,890 $1,251,000 $0 Constr Full $1,251,000Southeast Klawock School Biomass Fuel Boiler Project Klawock City School District Biomass 1.38 802 $7,488 59.67 32 $858,556 $833,556 $25,000 Design Partial $111,986Copper River/Chugach Crater Lake Power and Water Project Cordova Electric Cooperative Hydro, Storage 0.91* 2,286 $11,122 45.17 33 $17,306,696 $1,227,000 $420,680 Design Full SP $1,227,000Railbelt Grant Lake Hydroelectric Project Kenai Hydro LLC Hydro 1.10 49,918 $6,643 56.67 35 $58,936,366 $4,000,000 $875,528 Design Full $4,000,000Kodiak Ouzinkie Hydroelectric Power Project City of Ouzinkie Hydro0.73* 171 $7,460 40.67 36 $4,603,385 $397,427 $4,014 Design, Constr Full SP $397,427North Slope Kaktovik Wind Diesel Design North Slope Borough Wind 0.79* 251 $6,293 58.17 38 $7,606,795 $440,000 $44,000 Design Full $440,000Southeast Ketchikan Schools Recreation Heating Plant Ketchikan Gateway Borough BiomassN/A†8,314 $6,194 62.00 39 $2,600,000 $220,000 $0 Feas Partial $40,000Sub Totals, All Recommended Projects$247,968,162 $23,149,865 $18,854,185 $20,263,801Project Cost Recommendation